II Meeting of the Monitoring Committee of
OP “Transport and Transport infrastructure” 2014-2020
3 June 2015Pravets
* Innovations in management and services Development of systems for railway traffic management (GSM-R)Development of information systems for automobile traffic managementImprovement of quality of aeronautical data and information in the area of civil aviationDevelopment of navigation information systems, upgrading the existing systems and the systems under construction, supply of multipurpose vessels; (ISТS by sea)
1. Plovdiv – Bourgas – Phase ІІ (ing. Railway Plovdiv and Railway Bourgas)
2. Elin Pelin – Septemvri3. Struma MW, Lot3 “Blagoevgrad - Sandanski”4. Hemus MW - from Yablanitsa to Veliko
Turnovo“5. Tunnel under Mount Shipka
PRIORITY PROJECTS 2014-2020 RAILWAY AND ROAD INFRASTRUCTURE
1.
2.
4.
5.
PRIORITY PROJECTS 2014 – 2020 г.(1)
Railway InfrastructureProject: Rehabilitation and modernization of the railway line Plovdiv - Burgas Phase 2,incl. Plovdiv and Burgas railway junctions (for speed of 130 km), with a length of 100 kmIndicative budget: 320 million euroProject: Modernization of Stara Zagora, Nova Zagora, Yambol and Karnobat railway stations Project: Modernization of the railway line Elin Pelin - Ihtiman - Septemvri(for speed of 160 km), with total length of 78 kmIndicative budget: 740 million euroRailway projects are complemented with investments under CEF (Sofia - Elin Pelin; part of the railway junction Sofia; Sofia – Dragoman; Vidin - Medkovets)
Intermodality for passengers and freight and sustainable urban transportProject: Construction of Line 3 of the Sofia metro: Stage I (section 2) "Botevgradsko Road (Vladimir
Vazov blvd.) - Center – “Ovcha Kupel “ (str. Zhitnitsa)"Indicative budget: 434 million euroProject: Extension of Line 2 of the Sofia Mmetro: Metro station “James Boucher” (MS II-11) to
“Hladilnika” district, Metro station Vitosha (MS II-12)Indicative budget: 21.6 million euro
Intermodal terminals - Ruse, Vidin
II Meeting of OP “Transport and transport infrastructure” 2014-2020 Monitoring Committee
PRIORITY PROJECTS 2014 – 2020 г.(2)
Road infrastructure
Project: Construction of the "Struma" MW, Lot 3Construction of motorway section with an apprx. length of 62 km(Lot 3.1 from Blagoevgrad to Krupnik; Lot 3.2 from Krupnik to Kresna; Lot 3.3
from Kresna to Sandanski)Indicative value: 750 million euro
Project: Construction of the "Hemus" MW• Stage 1 – from "Hemus" MW (Yablanica) to road II-35 (Pleven-Lovech) - 60 km;• Stage 2 - from road II-35 to road E85 (Ruse – Veliko Tarnovo) - 85 kmIndicative value (Stage 1 and Stage 2): 445 million euro
Project: Construction of a tunnel under the "Shipka“ Peak(Phase 2 of the project “Gabrovo bypass“)
II Meeting of OP “Transport and transport infrastructure” 2014-2020 Monitoring Committee
Started projects OP TTI 2014 - 2020
Struma MW Lot 3- Lot 3.1 Blagoevgrad - Krupnik (13 km)- Lot 3.3 Kresna - Sandanski (24 km) Indicative total budget: 185 million euro
Hemus MW- Stage 1 - from "Hemus" (Yablanica) to road II-35 (Pleven-Lovech) (60 km)Indicative total budget: 217 million Euro
Extension of the Metro in Sofia- Construction of Line 3 of the metro in Sofia: Stage I (section 2) "Botevgradsko
shosse” (Vladimir Vazov blvd.) - Center city area – Ovcha Kupel (str. Zhitnitsa)“ - 255 million Euro
- Extension of Line 2 of the Sofia Mmetro: Metro station “James Boucher” (MS II-11) to “Hladilnika” district, Metro station Vitosha (MS II-12) - 22 million euro
In the pipeline is the tender documentation for the rehabilitation of the sections Skutare (Plovdiv) -Orizovo and Straldzha - Tserkovski , project Plovdiv - Burgas, Phase2
II Meeting of OP “Transport and transport infrastructure” 2014-2020 Monitoring Committee
Implementation of preliminary conditions for the Transport Plan
• Development of Integrated Transport Strategy (ITS)• ITS is a basis for planning transport projects earmarked for funding from: ERDF
and CF; The Connecting Europe; State budget; other international financing institutions, public-private partnerships, private finance initiatives, etc.
• In developing the ITS will be used: Road Strategy developed by the World Bank Draft Strategy for development of railway transport in Bulgaria
• Create an Unit to support the work of the Consultant - specialists in modeling and modal transport
• NSI will assist MTITC in collecting the necessary information.
II Meeting of OP “Transport and transport infrastructure” 2014-2020 Monitoring Committee
Actions in Comprehensive Transport Plan
Reports Scope SigningSeptember 1
SigningOctober 1
Inception Report Technical Assistance, Data Collection studies; Draft National Transport Model
28.09.2015 28.10.2015
Report №1 Data Collection Undertake. Report on the scope of the model
14.12.2015 14.01.2016
Report № 2 Results of the analysis 25.03.2016 22.04.2016
Report № 3 Objectives and measures 06.06.2016 06.07.2016
Report № 4 Administrative capacity assessment 11.07.2016 11.08.2016
Report № 5 Comprehensive Transport Plan; Manual for use of the model
29.08.2016 29.09.2016
Report № 6 Draft Final Report of the Integrated Transport Strategy until 2030
29.08.2016 29.09.2016
Report №7 Strategic Environmental Assessment 17.10.2016 17.11.2016
Final Final report 24.10.2016 24.11.2016
Approval of the final report 21.11.2016 22.12.2016