ici project 2.docx
DESCRIPTION
TRANSCRIPT
YEAR 2013
COMPANY PROFILE
2
TABLE OF CONTENTS 1-17................................COMPANY PROFILE 1.0
..............................................The Organisation 1.1 .........................................................Strategy 1.2 ...........................................Organisation Chart 1.3 ........................................Financial Information 1.4 .........................................................Contacts 1.5 ..........................................................Projects 1.6 .............................History: Company Relocation 1.7 ................................Equipments & Applications 1.8 .................S & H Consultant company in pictures 1.9
18.................................................ENVELOPE 2.0 19..............................................LETTERHEAD 3.0 20................................NAME LETTER / CARD 4.0
21-22..........................BUILDING & PROCESS 5.0
.................................Role of Quantity Surveyor 5.1
.....................Before construction / Preliminaries 5.2
.........................................During Construction 5.3 .........................Post Constrction / Final Account 5.4
23-32...........................SAMPLE DOCUMENTS 6.0
..............................................Bill of Quantities 6.1
3
1.1THE ORGANISATION
COMPANY DETAILS:
Office Location: Level 3, Jalan Bengkurong, No. 777, 47500,
Muara, Bengkurong,
Brunei Darrussalam.
Telephone: +673 2696146
E-mail: s&[email protected]
Website: www.s&h.com.bru
S & H CONSULTANT was founded by HJ MUHD SYAFIQ BIN HJ ABD ZARIFUL, the current director since 2009. This company has experienced in many projects types including commercial, private residential, multi-storey residential, and industrial.
EXPERIENCE Types of Facilities Undertaken:
• Banks • Laboratories • Residential Buildings • Commercial Buildings • Educational & Institutional Buildings • Religious Buildings • Healthcare Buildings • Offices • Civic Amenities • Defence Installations • Sport Facilities • Service Apertments • Hotel
4
PRINCIPAL QUANTITY SURVEYOR PERSONAL DETAILS: NAME: ADDRESS: TELEPHONE: MOBILE: E-MAIL: DATE OF BIRTH: NATIONALITY: Bruneian I/C No.: 01-096614 Academic Qualifications: 2002 Bachelor of Science (Hons) (in Quantity Surveying) (Taylor’s University, Malaysia) 2006 Master of Quantity Surveyor (Harvard University, England)
Hj Muhd Syafiq Bin Hj Abd Zariful No.5 Spg 10-34 Kg Bengkurong Jln Bengkurong, Brunei Muara Brunei Darrusslam +673 2656996 +673 9769606 [email protected] 14 June1981
5
Professional Association
Professional Member of the Royal Institution of Chartered Surveyors (RICS), UK since 2009
Corporate Member of Pertubuhan Ukur, Jurutera & Arkitek, (PUJA) Brunei since 2010
Registered Member of the Board of Quantity Surveyors (BQSM), Malaysia since 2012
6
1.2 STRATEGY MISSION STATEMENT We are committed to excellence in the full range of counsulting services provided and will execute it with the emphasis on professional integrity. In this process it is expected from all the members of this practice to be dedicated to a high quality of service executed in a friendly and fair manner. We do believe in equal opportunities for all our employees and a fair distribution of wealth. We do not only accept our social responsibilities but fully endorse the affirmative development programme in the country. this will be achieved by the provision of recruitment, promotion and growth opportunities to anyone able to satisfy the professional, technical, administrative and managerial positions within the practice, irrespective of race, colour, language, sex, class, political, religion or other opinion. AIM Ensuring Client’s satisfaction and peace of mind by providing the highest standards and quality of service through total professionalism, commitment and cooperation
PHILOSOPHY
S & H CONSULTANT’s underlying commitment is to provide outstanding professional services through Integrity, Quality and Competence
VALUES
Integrity, Sincerity, Recognition of community values and professionalism
7
BACKGROUND
• Sole Proprietorship
• Independent firm
• Brunei-based
• Chartered Quantity Surveying practice
• Set up in 2009 by local Bruneian Muhd Syafiq Bin Hj Abd
Zariful
SERVICES
• Cost Management • Tender Documentation
• Dispute Resolution
• Building Valuation
• Contractual Assistance
• Expert Witness in Construction Cost Issues
• Quantity Surveying Consultancy
• Construction Cost Consultancy
• Project Management
• Facilities Management
8
1.3 ORGANISATION CHART
BOARD OF DIRECTORS/ SHARE HOLDERS
EXCUTIVE DIRECTOR
EXCUTIVE (ADMINISTRATION )
EXCUTIVE (ACCOUNT )
SENIOR QUANTITY SURVEYOR
QUANTITY SURVEYOR
ASSOCIATE DIRECTOR
QUANTITY SURVEYOR QUANTITY SURVEYOR
QUANTITY SURVEYOR
QUANTITY SURVEYOR
QUANTITY SURVEYOR
QUANTITY SURVEYOR ASST. QUANTITY SURVEYOR
MANAGING DIRECTOR
ASST. QUANTITY SURVEYOR
ASST. QUANTITY SURVEYOR
ASST. QUANTITY SURVEYOR
ASST. QUANTITY SURVEYOR
ASST. QUANTITY SURVEYOR
SENIOR QUANTITY SURVEYOR
SENIOR QUANTITY SURVEYOR
SENIOR QUANTITY SURVEYOR SENIOR PROJECT MANAGER
SEPECIAL PROJECT DIVISION
PROFESSIONAL & SUB-‐PROFESSIONAL
ADMINISTRATION & FINANCE
CONSULTANCY DIVISION
9
1.4 FINANCIAL INFORMATION Registered Company number: 061496-S
Authorized Capital: B$400,000
Paid up Capital B$146,000
Registered Bank HSBC
Signing Principal Haji Muhammad Syafiq bin Hj Abdul Zariful
1.5 CONTACTS The Company Telephone: +673 2696146
E-mail: s&[email protected]
Website: www.s&h.com.bru
The Director Telephone: +673 2656996
Mobile: +673 9769606
E-mail: [email protected]
10
1.6 PROJECTS SELECTED COMPLETED PROJECTS Project Name: Building Type: Project Cost: Project Name: Building Type: Project Cost: Project Name: Building Type: Project Cost: Project Name: Building Type: Project Cost: Project Name: Building Type: Project Cost:
UBD Sports House Commercial B$ 1,000,000 Happy District Commercial B$ 300,000 Bengkurong Residential Residential B$ 30,000,000 Mulaut Mosque Religious B$ 1,000,000 BX-treme Park Commercial B$ 3,000,000
Bengkurong Residential B$ 30M
Mulaut Mosque B$ 1M
11
CURRENT PROJECTS Project Name: Building Type: Project Cost: Project Name: Building Type: Project Cost: Project Name: Building Type: Project Cost: Project Name: Building Type: Project Cost: Project Name: Building Type: Project Cost:
Rimba Religious School Educational B$ 3,500,000 BM District Office Building Commercial B$ 8,000,000 Sixth Form Centre at Sengkurong Educational B$ 32,000,000 National Housing at Tanah Jambu Residential B$ 53,000,000 UBD Sports Complex Commercial B$ 6,400,000
Sixth Form Centre at Sengkurong B$ 32M
BM District Office Building B$ 8M
12
1.7 HISTORY: COMPANY RELOCATION
The picture shows the company’s old building in Tutong
The shows the new building in Muara
The new building is currently located in Muara, at Kg BengkurongPreviously at the old building there were only a few staff but now the business is getting bigger and the staff has increased.The reason S & H CONSULTANT relocate to a new building is that there is not much space or rooms for members in the old building, the solution to that is to extend the building but another problem is that there is not much space for further extension because of the other buildings around it so the only way is to relocate the company to a new building. S & H CONSULTANT relocate its company in Kg Bengkurong which gives them some profit because all of the members current houses are closer to the new building which saves transportation costs and they can arrive puntually for work every working days.
13
1.8HARDWARES AND SOFTWARES USAGE
CURRENT HARDWARES -LCD Monitor
Technical Specifications:
Type-Wide-Aspect Active Matrix TFT (Thin Film Transistor)
Size-19” to 23”
Resolution-Full HD
Reason: The Company needs a Widescreen Thin-Film Transistor (TFT) LCD monitor because LCD monitor uses less power and less heat which saves electricity so that means the company don’t have to worry about the payment of using electricity.
-CPU
Technical Specifications:
Operating system- Windows 7
Processor- Mobile
Memory- 4GB RAM
Storage capacity- 500GB
Reason: This company must have CPU (Central Processing Unit) for the workers to do the forms and documents. It is to carry out a computer program.
14
-Laser Printer
Technical Specifications:
Type: HP CP3525x printer
Size-small
Print Resolution-High Quality, up to 4800 x 1200 dpi
Memory-500 MB
Reason:- Because of the way that laser printers use their toner, they are able to print far more copies than inkjet printers do. This means that over time you save more money on printing when you use a laser printer.
-Network Adapter
Network Card: It is one of the most important pieces of hardware as it allows a computer to communicate with other computers over a network. It serves as a networking medium and provides the computers with a MAC address system. A network card is also known as a network adapter, a LAN card and better known as a NIC.
Reason: - allows a computer to communicate with other computers over a network. The company needs it to communicate with other computers over a network.
15
CURRENT SOFTWARES Operating System
-Windows 7
Microsoft 7 is use in the Company because the system compatibility is in the desired and acceptable range to the new program because the windows 7 has better and upgraded parts already installed in the computers. This is also because the new program works well with window 7 and it is more friendly and easy to learn.
Reason: The windows 7 has more advanced option for the new system to work on and more tools that useful in the work.
Applications
-Word Processor
It is needed for the company to make documents
Product name: Word 2010 Operating system: Windows 7 -Spreadsheet The office clerk uses this to create tables such as creating a Gantt chart. It is also used for calculation which is easier than calculating manually. Product name: Excel 2010 Operating system: Windows 7
16
-Database
Product name: Microsoft Access 2010
Operating system: Windows 7
It contains all the database characteristics needed. This software is used to create database such as creating forms and reports.
Benefits of using a database
It gives you true command of your data, enabling you to retrieve it, sort it, analyze it, summarize it, and report results in moments. It can combine data from various files, so that you never have to enter information twice. It can even make data entry more efficient and accurate.
-Anti-virus software
anti-virus software is used to prevent, detect, and remove malware
Name: Kapersky Anti-Virus 2011
Size:146MB
Type: Anti-Virus
Reason:The company needs anti-virus software to prevent virus infection. If the computer infected with virus the data might be lost, computer becomes slow, and memory becomes smaller and it can affect the company’s work.
17
1.9 S & H Consultant company in pictures
18
2.0 ENVELOPE
Teleph
one n
o. +6
73
2
69
61
46
Email: s&
h@
gm
ail.com
No
.47
7 | K
g B
eng
kuro
ng
| S
pg
.10
- 34
|
Bru
nei D
arussalam
19
3.0 LETTERHEAD
Telephone no. +673 2696146
Email: s&[email protected]
No.477 | Kg Bengkurong | Spg.10 - 34 | Brunei Darussalam
20
4.0 NAMELETTER
Front card view
Back card view
Muhd Syafiq Bin Hj Abd Zariful | 0314702 | FNBE 0413 | ICI | Group B 21
5.0 BUILDING & PROCESS (Procedures)
5.1 ROLE OF QUANTITY SURVEYOR
The term quantity surveyor derives from the role taken in quantifying the numerous resources that it takes to build a given project, such as labour, supervision, plant and materials.
A Quantity Surveyor is a construction industry professional who specialises in estimating the value of construction works and can also be referred to as a “Cost Engineer” or “Cost Planner”. Quantity Surveyors are involved at different stages of the construction process, typically prior to construction, during construction and following completion of the works.
Quantity Surveyors work with accountants, architects, builders, clients, developers, engineers, financiers, government, insurance underwriters, solicitors and subcontractors. The Quantity Surveyor’s detailed knowledge of construction costs allows them to perform the following tasks independently of whether they are working for the Client or the Contractor.
Muhd Syafiq Bin Hj Abd Zariful | 0314702 | FNBE 0413 | ICI | Group B 22
5.2 Before construction / Preliminaries:
• Meeting with Client & Consultants
• Estimating project preliminary cost
• Preparation of Bill of Quantities
• Preparation of Tender documents
• Preparation of Contract documents
• preparation of Feasibility Studies
• Assigning work to sub-contractor 5.3 During construction:
• Feasibility Studies
• Calculating the contractor's progress claims
• Preparing finantial statements
• Site visits for assessment and verification
• Monthly meetings to discuss payments
• Make final payments to contractors
• Determine the final cost of the project 5.4 Post construction / Final Account:
• Accurate calculation of the final project payment
• Assessment of work completed by the contractor
• Architects issues final certificate for final payment to
main contractor
Muhd Syafiq Bin Hj Abd Zariful | 0314702 | FNBE 0413 | ICI | Group B 23
6.0 SAMPLE DOCUMENTS 6.1 BILL OF QUANTITIES
Bill No. 1: General Items
Item no.
Description Unit Quantity Rate Amount
101 Performance Bond/Guarantee
sum item -
102 Insurance of the Works sum item -
103 Insurance of Contractor's Equipment
sum item -
104 Third-Party Insurance sum item -
105 Allow for maintenance of Works for 12 months after completion
month 12
106 -etc.-
112 Provide and equip Engineer's offices
nr 2
113 Maintain Engineer's offices for 24 months, including services
month 24
114 -etc.-
121 Provide diversion road sum item -
122 Provide for traffic control and maintenance of diversion road
month 24 -
123 -etc.-
132 Provide for cleaning up the Site on completion
-etc.-
sum item -
Muhd Syafiq Bin Hj Abd Zariful | 0314702 | FNBE 0413 | ICI | Group B 24
Total for Bill No. 1 (carried forward to Summary, p. )
Bill of Quantities
Bill No. 2: Earthworks
Item no.
Description Unit Quantity Rate Amount
201 Excavate topsoil to maximum depth 25 cm and stockpile for reuse, maximum haul distance 1 km
m3 95,000
202 Excavate topsoil to maximum depth 25-50 cm, and dispose
m3 15,000
203 -etc.-
206 Excavate fill material from cuttings or approved borrow pits, haul up to 1 km, deposit, shape, and compact to fill
m3 258,000
207 Excavate rock in cuttings and dispose, any depth
m3 25,000
Muhd Syafiq Bin Hj Abd Zariful | 0314702 | FNBE 0413 | ICI | Group B 25
208 -etc.-
Total for Bill No. 2 (carried forward to Summary, p. )
Muhd Syafiq Bin Hj Abd Zariful | 0314702 | FNBE 0413 | ICI | Group B 26
Bill of Quantities
Bill No. 3: Culverts and Bridges
Item no.
Description Unit Quantity Rate Amount
301 Excavate in all materials other than rock from ground level to underside of foundations, maximum depth 5 m, and dispose
m3 18,500
302 Excavate in all materials other than rock, depth 5 m to 7.5 m
m3 2,500
303 Provisional Item As Item 302, depth 7.5 m to 10 m
m3 500
304 -etc.-
311 Concrete class B in abutments
m3 18,500
312 -etc.-
318 Mild steel reinforcement in abutments and piers up to 20 mm diameter
t 370
319 -etc.-
Total for Bill No. 3 (carried forward to Summary, p. )
Muhd Syafiq Bin Hj Abd Zariful | 0314702 | FNBE 0413 | ICI | Group B 27
Bill of Quantities
Schedule of Daywork Rates: 1. Labor
Item no.
Description Unit Nominal quantity
Rate Extended amount
D100 Ganger hour 500
D101 Laborer hour 5,000
D102 Bricklayer hour 500
D103 Mason hour 500
D104 Carpenter hour 500
D105 Steelwork Erector hour 500
D106 -etc.- hour
D113 Driver for vehicle up to 10 tons
hour 1,000
D114 Operator for excavator, dragline, shovel, or crane
hour 500
D115 Operator for tractor with dozer blade or ripper
hour 500
D116 -etc.- hour
Muhd Syafiq Bin Hj Abd Zariful | 0314702 | FNBE 0413 | ICI | Group B 28
Subtotal
D122 Allow percent% of Subtotal for Contractor's overhead, profit, etc., in accordance with paragraph 3 (b) above.
Total for Daywork: Labor (carried forward to Daywork Summary, p. )
a. To be entered by the bidder.
Bill of Quantities
Schedule of Daywork Rates: 2. Materials
Item no.
Description Unit Nominal quantity
Rate Extended amount
D201 Cement, ordinary Portland, or equivalent in bags
t 200
D202 Mild steel reinforcing bar up to 16 mm diameter to BS 4449 or equivalent
t 100
D203 Fine aggregate for concrete as specified in Clause
m3 1,000
D204 -etc.-
D222 Gelignite (Nobel Special Gelatine 60%, or equivalent) including caps, fuse, wire, and requisite accessories
t 10
Muhd Syafiq Bin Hj Abd Zariful | 0314702 | FNBE 0413 | ICI | Group B 29
Subtotal
D122 Allow percenta of Subtotal for Contractors overhead, profit, etc., in accordance with paragraph 3 (b) above.
Total for Daywork: Materials (carried forward to Daywork Summary, p. )
a. To be entered by the bidder.
Bill of Quantities
Schedule of Daywork Rates: 3. Contractor¬タル s Equipment
Item no.
Description Nominal quantity (hours)
Basic hourly rental rate
Extended amount
D301 Excavator, face shovel, or dragline:
.1 Up to and including 1 m3 500
.2 Over 1 m3 to 2 m3 400
.3 Over 2 m3 100
D302 Tractor, including bull or angle dozer:
Muhd Syafiq Bin Hj Abd Zariful | 0314702 | FNBE 0413 | ICI | Group B 30
.1 Up to and including 150 kW 500
.2 Over 150 kW to 200 kW 400
.3 Over 200 kW to 250 kW 200
D303 Tractor with ripper:
.1 Up to and including 200 kW 400
.2 Over 200 kW to 250 kW 200
D304 -etc-.
Total for Daywork: Contractor¬タル s Equipment (carried forward to Daywork Summary, p. )
Muhd Syafiq Bin Hj Abd Zariful | 0314702 | FNBE 0413 | ICI | Group B 31
Bill of Quantities
Daywork Summary
Amounta
( ) %
Foreign
1. Total for Daywork: Labor
2. Total for Daywork: Materials
3. Total for Daywork: Contractor's Equipment
Total for Daywork (Provisional Sum) (carried forward to Bid Summary, p. )
a. The Employer should insert local currency unit.
Bill of Quantities
Summary of Specified Provisional Sums
Bill no.
Item no.
Description Amount
1
2 2.8 Supply and install equipment in pumping station
1,250,000
3
4 4.32 Provide for ventilation system in subway tunnel
3,500,000
Muhd Syafiq Bin Hj Abd Zariful | 0314702 | FNBE 0413 | ICI | Group B 32
Total for Specified Provisional Sums
(carried forward to Grand Summary (B), p. )
4,750,000
Bill of Quantities
Grand Summary
Contract Name:
Contract No.:
General Summary Page Amount
Bill No. 1: Preliminary Items
Bill No. 2: Earthworks
Bill No. 3: Drainage Structures
Total for Daywork (Provisional Sum)
Subtotal of Bills (A)
Specified Provisional Sums included in subtotal of bills
(B) 4,750,000b
Total of Bills Less Specified Provisional Sums (A - B)
(C)
Add Provisional Suma for Contingency Allowance (D) [sum]b
Bid Price (A + D) (Carried forward to Form of Bid) (E)
a. All Provisional Sums are to be expended in whole or in part at the direction and discretion of the Engineer in accordance with Sub-Clause 52.4 and Clause 58 of Part I of the Conditions of Contract.
b. To be entered by the Employer.
Muhd Syafiq Bin Hj Abd Zariful | 0314702 | FNBE 0413 | ICI | Group B 33