PROJECT BRIEF

For the construction of

Taman Mewah

SS16 Persiaran Kemajuan, 47500 Subang Jaya, Selangor

Prepared by:

FNBE 0115 Students

Tutor: Ms Ann See Peng

Group Members:

Lew Quo Ming ( 0322884 )

Lim Win Kee ( 0322790 )

Liew Cherng Qing ( 0322613 )

Koo Jian Xiang ( 0322975 )

�1

Page 2: Ici project brief

CONTENT

�2

Index Title Page

Cover 1

Content 2

1 Introduction to Project 3

1.1 Project Description 3

1.2 Site Analysis 3

1.3 Project Concept 7

1.4 Project Background 8

1.5 Project Summary 8

1.6 Visuals 10

1.6.1 Bubble Diagram of Proposed Site 10

1.6.2 Master Plan of Proposed Site 10

1.7 Project Objectives 11

1.8 Project Benefits 11

1.9 Success Criteria 11

2 Project Specifications 12

2.1 Schedules 12

2.1.1 Schedule of Preliminary Stage 12

2.1.2 Schedule of Construction Stage 13

2.2 Constraints 14

2.2.1 Time 14

2.2.2 Financial 14

2.2.3 Resources 14

2.3 Assumptions 16

3 Project Organisation 17

3.1 Overview 17

3.2 Project Management Team 17

3.3 Team Objective 17

3.4 Tasks 17

4 Stakeholders 22

Page 3: Ici project brief

1. INTRODUCTION TO PROJECT

1.1 PROJECT DESCRIPTION

This is the final project for this module.

For this project, we are assigned to

locate a piece of land to construct

something which is beneficial to the

society. Therefore, the name of our

project is “ Taman Mewah”. It involves

the construction of a recreational area with parks for the residences around the area, running

pathway & tracks for joggers, gazebo and pergolas. The project is on the open area of a 50m x

70m ( 3500m2 ) site just located in front of the Subang Jaya LRT Station and above Subang

Parade. The site is currently not in use and it is a missed opportunity to develop a beautiful

location.

The agreement of the project brief is estimated to be signed on 15 June 2015. The whole

construction process is approximately 4 months.

1.2 SITE ANALYSIS

Photos of the site:

�3

Location Plan

Page 4: Ici project brief

This site has been a large vacant space since 200* without any construction or renovation. Hence,

most areas of the site is covered with grass and soil. A site analysis shows that the site is ideal for

the construction plan due to the following reasons:

1. Large enough to occupy large amount of residences.

2. Easily accessible. Residences can take LRT or buses to reach the location.

3. Has good ventilation due to large open space.

4. Has a lot of un utilised space available for new development.

5. Able to provide a healthy and beautiful scenery for the residences around.

6. The topography of the land is flat and smooth.

7. The land is firm with soil but it is muddy sometimes when rain occurs.

8. The microclimate of the sun rises at the east side of the land and sets at the west side of

the land.

9. There is no other recreational area such as open parks nearby the area.

Major buildings around the site:

�4

AEON BIG SUBANG PARADE

SAUJANA RESIDENCY E-Tiara Apartment

Page 5: Ici project brief

Other findings:

1. Residence nearby always access to AEON BIG, Subang Parade or Subang Avenue for

shopping and spending leisure time.

2. There are a few residency around the suggested site such as Saujana Residency, Subang

Avenue, E-Tiara & Casa Tiara Condominium.

3. Large carpark in front of Subang Parade.

4. Low frequency of traffic jam will occur on the roads at the location of the site.

Transportation:

1. Transportation around the other site that can be used is Subang Jaya KTM which is located right

behind AEON BIG and Subang Parade.

2. There is also a bus stop in front of AEON BIG .

�5

Page 6: Ici project brief

Proposed by:

Koo Jian Xiang 0322975

FNBE JAN15 Intake

Introduction to the Construction Industry

[ QSB30105 ]

Tutor: Ms. Jaqurliyn Ann See Peng

�6

Page 7: Ici project brief

1.3 PROJECT CONCEPT

The project team explored a variety of possible ideas and concepts that could be incorporated in

this construction project after conducting the site analysis. The finished project will be function as a

recreational park and rest area.

The following concepts are combined in this project:

Parks with jogging pathway

A park is an area of open space provided for recreational use. It can be in its natural or semi-

natural state, or planted, and it is set aside for human enjoyment or for the protection of wildlife or

natural habitats. It may consist of rocks, soil, water, flora and fauna and grass areas, but may also

contain buildings and other artifacts such as play grounds and gazebos.

Gazebo

Gazebos are freestanding elements that can be found in park. It is roofed, and open on all sides.

They provide shade, shelter, ornamental features in a landscape, and it is also a place to rest.

Some gazebos in public parks are large enough to serve as bandstands or rain shelters.

�7

Page 8: Ici project brief

Pergola

A pergola is a garden feature forming a shaded walkway, passageway, or sitting area of vertical

posts or pillars that usually support cross-beams and a sturdy open lattice, often upon which

woody vines are trained. As a type of gazebo, it may also be an extension of a building or serve as

protection for an open terrace or a link between pavilions.

1.4 PROJECT BACKGROUND

This project is taken place in a vacant land in Seksyen 16 Petaling Jaya ( PJS16 ),

Selangor . This area is a residential & commercial area and the number of residents around

here are very compact. Most of the land are used to build apartment, condominiums and

commercial blocks. Hence, this land is proposed for development in order to enhance the

quality of the life of residents nearby . From the site analysis, I am able to conclude that this

residential and commercial area are still lacking of a place for them to gather , relax and

work out. Hence, this project is proposed.

1.5 Project Summary

1. Parks elements such as gazebo and pergola will be built to provide shades and covers

for the residents or pedestrian around, and also as a resting spot too.

2. A few toilets with changing room will be built too to accommodate the residents when in

need.

�8

Page 9: Ici project brief

3. A small water feature will be built in the middle section of the suggested area, in order

to provide enjoyment and some relaxing scenery for the residents.

4. A service centre will be built and function both as reception counter and a convenient

store for the residents around.

5. Garden lamps and benches will be added along the jogging pathway.

�9

Page 10: Ici project brief

1.6 VISUALS

1.6.1 Bubble Diagram of Proposed Site

1.6.2 Master Plan of Proposed Site

�10

SITE

PLANTATION

JOGGINGPATHWAY PERGOLA

WATER FEATURE

GAZEBO

SHRUBS

FLOWERS

WOODEN BENCH

STONES

WATER FOUNTAIN

TAIWANGRASS

TILESSHRUBSSH

STONE BENCH

GARDENTABLE

WOODENBENCH

Page 11: Ici project brief

1.7 PROJECT OBJECTIVES

• Provide a conducive environment and green space for the residents to relax and work

out.

• Improve the standard of living of the residents nearby the area.

• Transform most softscape in the site to hardscape.

• Create more interactive spaces and awareness about self- sustainable living.

1.8 PROJECT BENEFITS

• Residents and pedestrain can maintain their mental health by relieving stress in that

area.

• The aesthetic value of the site is enhanced.

• The space of the site is fully utilised to the commercial.

1.9 SUCCESS CRITERIA

• The gazebo, pergola, water feature are built within the estimated time.

• The land is grassified and paved within the estimated time.

• The area of the land will be cover with new taiwan grass.

• The decorations and facilities are builded within the estimated time and controlled cost.

• The whole project should be done within the estimated time and budget.

• The water feature is well maintained.

• Taman Mewah is fully occupied by residents and recognised by people around Subang

Jaya because of it’s well known design of the park layouts due to its comfortable

ambience and relaxing environment.

�11

Page 12: Ici project brief

2. PROJECT SPECIFICATIONS

2.1 SCHEDULES

2.1.1 Schedule of Preliminary Stage

No. Tasks June 2015 July 2015

1 Site Analysisccccccccas

2 Meeting and Negotiation with Subang Jaya Local Authorities ( MPSJ ) ————————

3 Preparation of Outline Proposal zzzczxczc

4 Produce Order of Cost and Estimate zzzczxczc

5 Approval of Design by Subang Jaya Local Authorities ( MPSJ ) asdasdasdasdasdd

6 Deposit of Application for Approval of Building Plans to MPSJ fsdfsdfsdfssdfsf

7 Deposit of Forms to Board of Architects and Engineers Malaysia cccccccccccc

8 Obtain Landscape Approval asdasdasdasdasa

9 Obtain Building Plan Approval asdasdasdasdasa

10 Tender Documentation and Tender Action asdsdasdasd

11 Contractors Bid for Project asdasdasdas

12 Selection of Contractor asdasdasdasda

13 Hiring of Working Team jasdasdasdas

�12

Page 13: Ici project brief

2.1.2 Schedule of Construction Stage

No. Tasks August 2015 September 2015

1 Clearance of destroyed rocks and stones in that area

asasdda

2 Demolition of certain large rocks asdasddd

3 Soil digs evenly to form a flat land asdasdasdd

4 Soil digging for water drainage system asdasdasdas

5 Construction of water pipes for water drainage system asdasdasdasd

6 Supply and Installation of Granular Base asasdasddddd

7 Construction of reinforced concreate walls of Gazebo asdasdasd

8 Drilling Cavities asdasddddsss

9 Filling Cavities with Loam Soil asdasdasdddd

10 Installation of Underground Electrical Supply casasdasddddddd

11 Planting Taiwan Grass on soil asdasdadsdsddsdsdd

12 Installation of Tile, Concrete, Smooth Granite and Flooring

asdasdasdasdasdas

13 Installation of Verticle Metal Wires asdasdasdasdasdd

14 Installation of Water Pumping and Circulation System for the water feature

aassdsdsdsddd

15 Installation of Piping asdddasdad

16 Construction of concrete jogging pathways asdasdads

17 Installation of Outdoor Lightings asdasdad

18 Installation of Pergolas asdasddd

19 Flower and shrubs plantation sssssssasddddd

�13

Page 14: Ici project brief

2.2 CONSTRAINTS

2.2.1 TIME

2.2.2 Financial

2.2.3 Resources

Tasks Milestone

Approval from local authority obtained 20th June 2015

Project planning and design completed 15th July 2015

Execution 1st August 2015

Completion 31st September 2015

Constraint Details

Minimum wages Workers have minimum wage of RM900.00

Funding from local authorities RM 180,000.00

Human Resources

Working Hours All workers can only work for maximum 8 hours, any extra overtime is decided on worker’s own will

Requirements Only workers with minimum working experience of 2 years and able to speak fluently in English or Malay or Chinese are hired

Equipment

Usage time of electric power tool, chain or circular saw, gas or air compressor, hammer, pliers and any other impacting or grinding equipment

Monday to Friday: Before 7am and after 8pm

Weekends and public holidays: Before 9am and after 8pm

Placing of materials Materials shall be placed only within the site and not exceeding 5m from site

Electrical equipment Plugs of equipment are switched off when not in use to prevent wastage.

�14

Page 15: Ici project brief

Materials

Transportation of materials to site Vehicles carrying construction materials to site can only stop beside the site not far from 5 meters away. The materials are then carried by workers to the construction site.

Placing of construction materials All materials are carried to a specific 5m x 5m site nearby the construction site.

Placing of waste materials All waste materials are to be placed at a specific 10m x 10m area in the site compound. Waste materials must be cleared from the area before completion.

�15

Page 16: Ici project brief

2.3 ASSUMPTIONS

Assumption Confidence Impact Priority

Approvals from the local authorities are obtained

High High High

Project sponsor will fund construction

High High High

Sufficient skilled human resources will be provided

Medium Medium Low

Project milestones are reached in time

Medium Medium Low

Materials selected and bought are suitable and correct

Medium High Medium

Suppier will supply material and equipment

High High High

Materials and equipment can be delivered on schedule

Medium High Medium

All accidents are prevented during construction

Medium Medium High

Worker is availabe when required

High Medium Low

All foreign workers during construction are fluent in English, Malay & Chinese

High Medium Low

Final cost of construction does not exceed given budget

Medium Low Medium

�16

Page 17: Ici project brief

3. Project Organisation

3.1 OVERVIEW

3.2 TEAM OBJECTIVE

To completely understand the needs of residents in PJS 16 and fully utilise the land to plan,

design, and build Taman Mewah.

3.3 TASKS

ARCHITECT

• Translate site requirements, compact form concepts, compartmentalised concepts

and low profile concepts of Taman Mewah to reality.

• Coordinate with certain environmental and engineering service such as electrical

wiring and water supply to construct Taman Mewah.

• Conduct site analysis before proceeding to the design stage.

• Consider the requirements of local authorities , which includes construction methods,

timing, construction strategy, cost, selection of materials and aesthetic value.

• Provide a design plan that is functional and has high aesthetic value that satisfies the

needs of client.

Project Requestor Subang Jaya Local Authorities ( MPSJ )

Project Sponsor Subang Jaya Local Authorities ( MPSJ )

Project Owner Subang Jaya Local Authorities ( MPSJ )

Project Manager Ar. Koo Jian Xiang

Team Members Lead Architect- Ar. Koo Jian XiangLandscape Architect- Ar. Liew Cherng QingQuantity Surveyor- Sr. Lew Quo MingCivil and Structural Engineer- Mdm. Lim Win KeeMechanical and Electrical Engineer- Mr. Justin LeeContractor- Mr. Soo Yon LiPlumbing Sub ContractorSupplier

�17

Page 18: Ici project brief

• Submit drawing to authorities for approval.

• Award tenders and contract administration to contractors.

• Mediating between client and contractor.

• Prepare an outline proposal of Taman Mewah.

• Prepare a project timeline for the whole construction process of Taman Mewah.

• Supervise progress of construction of Taman Mewah to ensure that site work will

meet specifications of construction documents when the construction have

completed.

• Submit modification of the design of Taman Mewah during construction to contractor.

• Recommend alternative solutions to resolve any variations to original budgets.

• Conduct an assessment of Taman Mewah to Subang Jaya Local Authorities.

• Make recommendations for maintenance for Taman Mewah.

• Ensure the Park is completed before deadline.

• Continuously follow up the progress of the construction.

• Meeting with client for feedbacks and suggestion.

LANDSCAPE ARCHITECT

• Oversee the design of Taman Mewah, including urban regeneration schemes and

reviving the natural characteristics of the given site.

• Establish general landscape requirements with clients to implement Taman Mewah.

• Conduct preliminary assessment and site analysis of the site for Taman Mewah.

(contours, soil, ecology, buildings,climate,topography)

• Present proposals to clients, dealing with enquiries and negotiating any amendments

to the final design of Taman Mewah.�18

Page 19: Ici project brief

• Decide the most suitable design for the park to be proposed.

• Carrying out environmental impact assessments of the implementation of Taman

Mewah. Select materials and plants to be implemented in Taman Mewah.

• Accurately prepare and present detailed plans and drawings, including applications,

construction details and specifications for Taman Mewah.

• Choose the suitable hardscape and softscape for Taman Mewah.

• Familiar with what the residents needs and include it into Taman Mewah.

• Monitor and check the work on site.

• Ensure that the plants and soil are put into place accordingly at site.

• Contact and coordinate manufacturers and suppliers in the process of building of th

water feature in Taman Mewah.

• Authorising payment once construction work of Taman Mewah has been completed.

• Coordinate and give advises for all the authorities.

QUANTITY SURVEYOR

• Undertake site visits with Architect, Landscape Architect and Clients.

• Estimate the define project budget of Taman Mewah with the draft design by the

architects.

• Analyse the effect of design changes on the project budget of Taman Mewah.

• Produce order of cost and estimate and procurement strategy of Taman Mewah.

• Negotiate with Design Consultants about the material used regarding the cost of

construction of Taman Mewah.

• Prepare Bill of Quantities to assist in the tender process.

• Provision of cost control services during construction of Taman Mewah.�19

Page 20: Ici project brief

• Assessment of contractor’s progress and variation while constructing Taman Mewah.

• Negotiation and settlement of accounts while building Taman Mewah.

• Carry out monthly forecasting and cost reporting to client while building Taman

Mewah.

• Carry out monthly negotiation and agreement of payments for Taman Mewah.

• Prepare tax depreciation reports of Taman Mewah for client.

• Prepare detailed cost analysis and Statement of Final Account.

• Prepare and consult all the necessary agreement and and official letter that is

needed in building Taman Mewah to the client.

• Controlling the budget and cost of this project.

CIVIL AND STRUCTURAL ENGINEER

• Design structures to ensure square , medic centre , mini square and decking

withstand stresses and pressure.

• To ensure that the soil is firm and compact.

• To ensure that the base of the water feature is firm.

• Choose appropriate materials to meet design specifications of Taman Mewah.

• Analysis configurations of the basic structural components of the water feature.

• Conduct stress analysis and calculate pressure, stress and strains that each

component of structures in Taman Mewah will experience due to human or

environmental factors.

• Ensure the fire safety of Taman Mewah with a safety plan provided when there is a

fire.

�20

Page 21: Ici project brief

• Consult the architect in building the elements in the park so that the land will not be

overloaded.

• Monitor the construction process for any miscalculation.

MECHANICAL AND ELECTRICAL ENGINEER

• Collaborate with the design consultants in coming out with a plan for electrical works.

• Serve as a specialist in electrical works ( electrical wiring ).

• Make sure the ventilation of the medic centre is fresh and give a comfortable

environment to users.

• Make sure the electrical wiring, and plugs are safely installed.

• Make sure the lightings and sound system can be function well.

CONTRACTOR

• Tender for the job of constructing Taman Mewah during preliminary stages.

• Perform and complete works of Taman Mewah within an agreed time and budget

when assigned.

• Cooperate with other parties to build Taman Mewah.

• Carry out high quality of construction of Taman Mewah by hiring a professional

workforce controlled by an experienced management team.

• Provide sufficient and relevant information to workers while building Taman Mewah.

• Ensure Taman Mewah is accurately built as per drawings.

• Consult and give orders to workers during construction stage.

• Consult other authorities in building process.

• Cooperate with consultants and owners to achieve the common goal of LIGNO Park

being completed on time.�21

Page 22: Ici project brief

• Monitoring the supplier and make sure the supplies are arrived on time.

• Prevent any wastage of materials or energy during construction.

• Ensure the safety of workers during construction of Taman Mewah.

PLUMBING SUB CONTRACTOR

• Serve as a specialist in plumbing works (piping, water tanks).

• Install pipes in the park.

• Install water filters in the water feature.

• Cooperate with the Civil and Structural Engineer while constructing the water feature.

• Ensure all pipping system are well functioned.

SUPPLIER

• Supply materials to the construction site of Taman Mewah.

• Ensure the materials and equipment are safely transported and are of good quality.

• Ensure the materials and equipment reach the site on time as planned.

• Supply the material as design required.

• Supply healthy shrubs, flower plantation and in good conditions .

• Ensure that the supply of materials will not stop until the end of construction.

• Inform the client and consultation authorities for and changes .

4. STAKEHOLDERS

The following are the stakeholders in the project . They are the one who always visit and

use the facilities in Taman Mewah.

�22

Page 23: Ici project brief

RESIDENTS

Residents living in PJS16 or nearby PJS16 can have a place to relax or jogging . They can

also do various kind of activities such as playing kites or reading . Meanwhile Taman

Mewah also provide a place for the residents to gather and built relationships between each

other. For adults , they can use the outdoor gym equipment and do gym just in front of their

home. They can also watch over their child while doing gym if they leave them in the

playground. For the childrens, they can have fun and play on the playground. Moreover, for

those who has pets, they can also bring their pets together and spend some quality time

with their pets in the garden. Various activities can be carried out in the park which indeed

will make the residents to come more closer and the whole residential area will become

more lively.

VISITORS OF TAMAN MEWAH

Taman Mewah create easy excess for the visitor outside this residential area by preparing a

few parking lots so that they can drive to the park. With this functionality, they can enjoy the

beautiful scenery in the park and spend quality time with their love ones. They can also

relax and enjoy here. Moreover, they can participate in the various activities organised in

the park .

LOCAL AUTHORITY

The aesthetic value of the whole residential area will be raised by Taman Mewah. The

residents will satisfied with their living conditions and area which makes their reputation

higher. More residents will move into this area into the vacant house which increase their

income. The popularity of their product will become higher.

�23

Page 24: Ici project brief

OTHER AUTHORITIES

They can organise various activities in this park as a way to promote their products .

Exhibitions can also be carried out in the park . An awareness or new product can be

spread in the neighbourhood more easily.

PUBLIC SELLER

They can come to the park during night and sell their product in the open market . They can

also sell selective item during an event or festival celebrate in the park . Other option , they

can also rent the vending can and sell food and drinks to the public daily .