1Executive SummaryI-405 Bus Rapid Transit Project
BackgroundThis Executive Summary (Summary) augments the full I-405 Bus Rapid Transit Phase 1 Report.
PUBLIC INVOLVEMENT PUBLIC INVOLVEMENT
Final route design
Final station designs and public art
Obtain land use and construction permits
PLANNING DESIGN2018–2020 2020–2023
START OFSERVICE
20242016Project refinement (2018)
PUBLIC INVOLVEMENT
Groundbreaking
Construction updatesand mitigation
CONSTRUCTION*Begins 2023
Construction of roadway improvements, parking and stations
Preliminary engineering (2020)
Conceptual Engineering & Environmental Review (2019)
The Summary provides an overview of
the first phase of project development
for the I-405 Bus Rapid Transit (BRT)
project. Sound Transit began planning
for the I-405 BRT project as part of
Sound Transit 3 (ST3). During 2018,
Sound Transit considered and evaluated
community input and technical analyses
to refine the ST3 representative project
and develop a Proposed Refined Project.
The Sound Transit Board’s (the Board)
System Expansion Committee will
consider advancing the Proposed Refined
Project into the next phase of project
development, Conceptual Engineering and
Environmental Review.
BRT
Below is the Project Schedule, leading to the Start of Service in 2024:
*Construction for most of the BRT projects is expected to begin by 2023 and be completed by 2024. Construction of some elements may begin before 2023, and others may occur after service starts in 2024.
2Executive SummaryI-405 Bus Rapid Transit Project
Sound Transit plans, builds and operates regional transit systems and services to improve mobility in urban areas of King, Pierce and Snohomish counties. A bus rapid transit system is being planned as part of Sound Transit’s ST3 system expansion program. BRT will provide fast, reliable bus service every 10 minutes in peak hours and 15 minutes off-peak along I-405, SR 518, SR 522 and NE 145th Street, connecting to light rail service in Bellevue, Tukwila, Shoreline and Lynnwood.
Kingsgate/Totem Lake
South Everett
Downtown Everett
NE 85th
Brickyard
Canyon Park
Woodinville
Bonney LakeSouth Hill
LakewoodTowne Center
NE 44th
South Renton
IssaquahHighlands
SouthSammamish
NorthSammamish
Burien
WestwoodVillage
Kirkland
EvergreenPoint
LakeForest
Park
KenmoreBothell
Edmonds
Mukilteo
Tukwila
Puyallup
Sumner
Kent
Auburn
Tillicum
DuPont
South Tacoma
Lakewood
& King StreetInternational District/Chinatown
SeaTac/Airport
Angle Lake
University ofWashington
Capitol Hill
MountBaker
Columbia City
Rainier Beach
Othello
Tukwila/International
Blvd
BeaconHill
Westlake
Pioneer SquareUniversity Street
Stadium
SODO
Convention CenterTheater District
Union StationS 25th
Roosevelt
Shoreline North/185th
Shoreline South/145th
NE 130th
Northgate
U District
BellevueDowntown
Midtown
MountlakeTerrace
SE Redmond
Downtown Redmond
Spring District/120th
Overlake Village
S Graham St
S Boeing Access Rd
Lakemont
Redmond Technology
S 4thOld City Hall
S 272nd
Kent/DesMoines
Federal Way
SouthFederal Way
Stadium District
6th AveHilltop District
St Jos
eph
Tacoma General
TacomaDome
EastTacoma
Sprag
ue
Ainswort
h
Steve
nsUnio
n
Ballard
Interbay
Smith CoveSeattle CenterSouth Lake Union
TacomaCommunity
College
Mariner
SW EverettIndustrial Center
SR 99/Airport Rd
West Alderwood
LynnwoodCity Center
MercerIsland
JudkinsPark
AlaskaJunction
Avalon
Delridg
e
Denny
East Main
Wilburton
SouthBellevue
Bel-Red/130th
Eastgate
Richards Rd
SR 526/Evergreen
SouthKirkland
Ash Way
FifePearl
Issaquah
EverettEverett
BellevueSeattle
Tacoma
2021
2031
2036
2024
2024
2024
2024
2024
2023
2035
2036
2031
2023
2022
2041
2030
2031
2041
2039
2022
2036
2024
2024
2030
2022
2024
2024
2023
Link Light RailFuture service:
Everett–Seattle–West SeattleRedmond–Seattle–MarinerBallard–Seattle–TacomaIssaquah–Bellevue–South KirklandTacoma Dome–TacomaCommunity College
In service:Univ. of Washington–Angle LakeTacoma Dome–Theater District
Sounder Commuter RailFuture service:
DuPont–Lakewood
In service:North Line (Everett–Seattle)South Line (Lakewood–Seattle)
BusFuture service:
Bus Rapid Transit (BRT)
In service:ST Express bus(service re-evaluated annually)
New station or bus facilityAdded parkingStation improvementsMajor transfer hubExisting station or bus facilityExisting parkingProvisional light rail station
A map of Sound Transit’s planned System Expansion.
Project history
3Executive SummaryI-405 Bus Rapid Transit Project
BRT will be part of Sound Transit’s high-capacity transit service and is being designed for fast and
reliable service, including frequent arrivals and departures. BRT will include features such as:
Unique brand identity for buses and stations
Transit speed and reliability
Off-board fare payment Real-time rider informationFrequent, all-day service
Unique station design
Entry and exit through multiple doors, level with
the station platform
Transit priority improvements, including business access and transit lanes, bus queue jumps,
and transit signal priority
Dedicated fleet of BRT buses
These features will help riders avoid traffic congestion and enjoy more frequent and reliable service.
4Executive SummaryI-405 Bus Rapid Transit Project
The ST3 Plan included two BRT
projects, I-405 BRT and SR 522/NE
145th BRT. Both ST3 BRT projects
were based on high-level project
scopes, cost estimates and ridership
forecasts. ST3 also established transit
mode, general corridor, number of
stations and representative station
locations for both BRT projects.
I-405 BRT will have two lines
connecting communities along I-5, I-405 and SR 518 from Lynnwood to Bellevue and Bellevue to Burien with 11 BRT stations, a new transit center in South Renton, and a new bus base. Connections to Link light rail will be available at Lynnwood, Bellevue and Tukwila. Connections to the SR 522/145th BRT will be available in Bothell.
SR 522/NE 145th BRT will connect
communities from Shoreline to Woodinville via NE 145th Street, SR 522 and the transit center at UW Bothell/Cascadia College. The route has nine BRT stations and an expanded transit center at UW Bothell/Cascadia College. It will connect to Link light rail at the Shoreline South/145th Station and to I-405 BRT in Bothell.
Map of the SR 522/ NE 145th and I-405 BRT representative projects.
��������������
2024
2024
2024
2024
522
520
518
167
527
104
Totem Lake/Kingsgate
NE 85th
Brickyard
Woodinville
Canyon Park
NE 44th
South RentonTransit Center
BurienTransitCenter
LakeForest
Park
KenmoreBothell
TukwilaInternationalBlvd
ShorelineSouth/145th
BellevueDowntown
LynnwoodCity Center
UW Bothell/Cascadia College
BellevueTransit Center
Project subject to change.
Bus Rapid TransitBRT in service 2024Less frequent serviceStationMajor transfer hubNew parkingExisting parking
Link Light RailIn service 2024Current service
Bus RapidTransit (BRT)
Bus Base
5Executive SummaryI-405 Bus Rapid Transit Project
I-405 BRT is a bus system that will run predominantly in managed lanes, such as high-occupancy vehicle (HOV) lanes,
express toll lanes, and bus-on-shoulder lanes to improve transit speed and reliability. The project includes new direct-
access ramps with freeway BRT stations, upgraded freeway ramp BRT stations, improvements to local roadways for transit,
improvements to bicycle and pedestrian networks for access to BRT stations, and new or expanded park-and-ride lots.
LakeWashington
2024
2024
522
520
518
167
527
522
South RentonTransit Center
BurienTransitCenter
Totem Lake/Kingsgate
NE 85th
Brickyard
Canyon Park
NE 44th
UW Bothell/Cascadia College
TukwilaInternationalBlvd
BellevueDowntown
LynnwoodCity Center
BellevueTransit Center
Seattle
I-405 BRT
Project subject to change.
Bus Rapid TransitBRT in service 2024StationMajor transfer hubNew parkingExisting parking
Link Light RailIn service 2024Current service
Sound Transit is partnering with the
Washington State Department of
Transportation (WSDOT) to deliver the
I-405 BRT project. I-405 BRT builds
upon collaborative efforts between
Sound Transit, WSDOT, and other
local and regional partners, including:
• I-405 Master Plan (2002)
• I-405 Corridor Program
• I-405 Renton to Bellevue
Widening and Express Toll
Lanes Project
• NE 85th Street Interchange
Improvements Project
• Sound Transit Regional Transit
Long-Range Plan (2014)
I-405 BRT
6Executive SummaryI-405 Bus Rapid Transit Project
Part of creating a new line of service is developing a new brand to
accompany it. Sound Transit calls our region’s commuter rail system
Sounder and light rail Link. Sound Transit is excited to welcome bus
rapid transit to the family and announce its name – Stride.
Sound Transit interviewed stakeholders inside and outside the
organization to help develop a BRT brand. Common themes heard
included a desire for the name to be memorable, short, easy to
pronounce, and integrate well with the overall Sound Transit brand.
The Stride name will be integrated with the design of the BRT
system, including vehicles, stations, signage and marketing materials.
The BRT system will have a unique design that helps riders identify
buses and stations. The Stride brand will:
• Differentiate BRT as premium transit service
• Help riders navigate the system by making BRT easily identifiable
and distinguishing it from other services
• Allow Sound Transit to more effectively reach existing and
new customers
• Create a sense of place at our transit facilities
• Generate excitement for public transportation and endure
for generations
Station design and branding
BRT station features• All-door entry and exit
• Off-board fare payment
• Level boarding at the platforms
• Lighting and directional signage
• Real-time rider information
• Sheltered and comfortable stations
• Unique brand identity
• Artwork
BRT station design Sound Transit will continue to
develop the BRT station design
during the next few years. The
rendering, left, shows the general
station design concept. While
stations will have a consistent
look and feel throughout the
Sound Transit BRT system,
station design at each station
location will vary based on
ridership and site conditions.
7Executive SummaryI-405 Bus Rapid Transit Project
WE
AR
E H
ER
E!
Share Proposed Refined Project
Sound Transit shared the Proposed Refined Project with our stakeholders. The project team will request the Sound Transit Board of Directors’ approval to advance the project into Conceptual Engineering and more detailed evaluation (including environmental review) in 2019.
4
Evaluate refinements
Sound Transit evaluated the project refinements using the objectives, evaluation criteria and technical analysis. Based on this evaluation, Sound Transit developed a Proposed Refined Project.
3
Develop refinements to the representative project
Sound Transit developed refinements based on technical analysis and stakeholder input. Technical analysis included collecting information on existing conditions along the I-405 corridor, identifying potential non-motorized access barriers, and conducting operations analysis through coordination with WSDOT, cities, transit agencies and other local and regional partners.
2
Start with the ST3 representative project
The representative project identified the high-capacity transit mode (BRT), the 11 BRT station locations and the parking facilities that would be developed as part of the project.
1
Project Objectives• Improve speed, frequency and
reliability in the corridor
• Increase regional mobility
• Deliver the project on-time and
within budget
• Develop stations to support
safe and convenient access for
multiple modes
• Encourage equitable transit-
oriented development
• Promote a healthy and
sustainable environment
Evaluation Criteria• BRT travel time
• Service reliability
• Non-motorized access
• Transit access
• Vehicular access
During this Planning Phase 1 in 2018, the BRT Team used the following
process to develop project refinements, review and evaluate those
refinements, and share the refinements throughout the corridor:
Project refinement process
8Executive SummaryI-405 Bus Rapid Transit Project
I-405 BRT will build upon WSDOT’s I-405 Master Plan with corridor improvements facilitating faster bus travel.
WSDOT is currently improving I-405 as part of the I-405 Corridor Program. WSDOT projects include the I-405
Renton to Bellevue Widening and Express Toll Lanes Project with construction expected to begin in 2019 and
design efforts under way in the north corridor between SR 522 and SR 527 (I-405 - SR 522 to SR 527 Capacity
Improvements Project). These projects are designed to improve speeds and trip reliability for all travelers and support
the future I-405 Bus Rapid Transit line.
Sound Transit also works closely with King County Metro, Community Transit and other local and regional
transportation agencies to determine routes, ensure fast and seamless transfers, and provide integrated transit
services that best serve the needs of the community.
Sound Transit will continue to coordinate with our transit partners to integrate I-405 BRT with local and regional
transit service.
Agency coordination
9E
xecu
tive
Sum
mar
yI-
405
Bu
s R
ap
id T
ran
sit
Pro
jec
t
The
sche
dule
bel
ow s
how
s th
e st
akeh
olde
r inv
olve
men
t tim
elin
e an
d ac
tiviti
es fo
r 201
8 in
to e
arly
201
9. T
he P
roje
ct e
ngag
ed a
n In
tera
genc
y G
roup
,
Ele
cted
Lea
ders
hip
Gro
up, s
take
hold
ers,
and
the
publ
ic to
ens
ure
dive
rse
voic
es c
ontr
ibut
ed to
the
first
pha
se o
f pro
ject
dev
elop
men
t.
2019
2018
MA
RA
PR
MA
YJU
NJU
LA
UG
SE
PO
CT
NO
VD
EC
Q1
On
go
ing
up
dat
es
Sou
nd T
rans
it pl
ans,
bui
lds,
and
ope
rate
s re
gion
al tr
ansi
t sys
tem
s an
d se
rvic
es to
impr
ove
mob
ility
for C
entr
al P
uget
Sou
nd. 4
01 S
. Jac
kson
St.
l Sea
ttle,
WA
981
04-
2826
l 1-
800
-201
-49
00 /
TTY
Rel
ay: 7
11 l
brt@
soun
dtra
nsit.
org
l sou
ndtr
ansi
t.org
Com
mun
ity
Upd
ates
&
Sta
keho
lder
P
roce
ss
Pro
ject
M
ilest
ones
Co
rrid
or-
wid
e E
ven
t: P
roje
ct
Lau
nch
Ear
ly S
take
ho
lder
In
terv
iew
sS
tati
on
Are
a O
utr
each
Sou
nd
Tran
sit
Boa
rd
Cor
ridor
E
xecu
tive
Adv
isor
y G
roup
Bo
ard
A
ctio
n
Inte
rage
ncy
Gro
up
Ele
cted
Le
ader
ship
G
roup
Kic
koff
M
eeti
ng
On
go
ing
co
ord
inati
on
wit
h I
-405
/SR
167
Co
rrid
or
Exe
cuti
ve A
dvi
sory
Gro
up
Ref
ined
Pro
ject
Ong
oing
O
utre
ach
Act
iviti
esB
riefi
ng
s, f
air
s an
d f
est
ivals
, so
cial m
ed
ia u
pd
ate
s, w
eb
site
up
date
s, e
-new
slett
ers
, co
mm
un
ity
eve
nts
On
go
ing
co
ord
inati
on
wit
h p
rop
ert
y o
wn
ers
City
Cou
ncil
Coo
rdin
atio
nC
oo
rdin
ati
on
wit
h C
ity
Co
un
cils
Rig
ht o
f Way
C
oord
inat
ion
Iden
tify
Ran
ge o
f Pro
ject
Ref
inem
ents
Id
entif
y &
Eva
luat
e R
ange
of P
roje
ct R
efin
emen
ts
Pro
pose
and
Rec
omm
end
Pro
ject
I-40
5 B
us
Ra
pid
Tra
nsi
tC
omm
unity
Eng
agem
ent
Gui
de
Sta
keho
lder
invo
lvem
ent
10Executive SummaryI-405 Bus Rapid Transit Project
Elected Leadership Group
The I-405 BRT Elected Leadership Group (ELG) is
made of up of elected officials who represent the cities
along the project corridor, the Sound Transit Board and
WSDOT. The ELG met four times during Phase 1 and
includes representatives from the following agencies and
jurisdictions:
• City of Bellevue
• City of Bothell
• City of Burien
• City of Kirkland
• City of Lynnwood
• City of Renton
• City of Tukwila
• Washington State Department of Transportation
• Sound Transit Board of Directors
Executive Advisory Group
The I-405/SR 167 Corridor Executive Advisory Group
(EAG), made up of state and local elected officials,
and representatives from federal and regional transit
agencies, has been advising WSDOT on I-405 corridor
improvements since 1999. Sound Transit regularly
updated the EAG about the I-405 BRT project in 2018.
Interagency Group
The I-405 BRT Interagency Group is made up of city and
partner transit agency staff to provide technical expertise
and input on the project refinements. The IAG met eight
times during Phase 1 and includes representatives from the
following agencies and jurisdictions:
• City of Bellevue
• City of Bothell
• City of Burien
• City of Kirkland
• City of Lynnwood
• City of Renton
• City of SeaTac
• City of Tukwila
• Community Transit
• King County Metro
• Port of Seattle
• Washington State Department of Transportation
The publicSound Transit engages the public to gather input on
corridor-wide and local issues to ensure the priorities of
local communities are being heard and considered along
the corridor. During Phase 1, the project team conducted
the following outreach activities:
• 2 in-person open houses
• 2 online open houses
• 13 community briefings
• 6 fairs and festivals
• 2 project mailings
11Executive SummaryI-405 Bus Rapid Transit Project
Stay engagedSound Transit will continue to provide opportunities to participate throughout the development of the I-405 BRT project.
Join us at one of our public events to provide your feedback and comment on current plans
Find us at your local fairs and festivals
Request a briefing or meeting with us; we are happy to meet with you or your community group in person
CALL the project line at 206-398-5470 to speak with an Outreach Specialist
Learn about the project SOUNDTRANSIT.ORG/ I405BRT
Respond to online SURVEYS
Subscribe to EMAIL UPDATES
Follow on SOCIAL MEDIA
EMAIL with questions, concerns or comments [email protected]
PUBLIC EVENTS
FAIRS AND FESTIVALS
BRIEFINGS
COMMUNITY WORKSHOPS
Come back to the next public event to learn about how the community’s input has helped shape the project. Provide your feedback and comment on current plans
CONTACT US GO ONLINE GET INVOLVED
12Executive SummaryI-405 Bus Rapid Transit Project
Sound Transit has developed a Proposed Refined Project based on the analyses and the feedback obtained to date. The
map identifies the Project Elements that make up the Proposed Refined Project. BRT station concepts and proposed
roadway improvements will continue to be refined during Conceptual Engineering and Environmental Review following
additional technical analysis and ongoing stakeholder involvement.
Proposed Refined Project
North end refinements
Snohomish County
King County
LakeWashington
PugetSound
5
405
90
5
5
513
523
524
181
202
515
518
527
599
520
99
519
167
509
525
522
9Lynnwood City Center
Canyon Park
UW Bothell/Cascadia College
Brickyard
Totem Lake/Kingsgate
NE 85th Street
BellevueTransitCenter
NE 44th Street
South RentonTransit CenterTukwila
International Boulevard
BurienTransitCenter
21Miles
0
BRT in Existing Express Toll LanesBRT in Future Express Toll LanesBRT in General Purpose LanesExisting Bus On ShoulderProposed Bus On Shoulder (Project Refinement)
Project Elements Station Improvement
Corridor Improvement
I-405 BRTProposed Refined Project
NB: Northbound SB: Southbound EB: Eastbound WB: Westbound TSP: Transit Signal Priority BRT: Bus Rapid Transit ETL: Express Toll Lane
BRT station at existing Lynnwood Transit Center with connections to light rail
NB BAT lane on 44th Avenue W between 196th Street SW and 200th Street SW
Queue bypass at 196th Street SW on-ramp to NB I-5
BRT station at NE 195th Street ramps
TSP at NB and SB ramps
BRT station at existing flyer stops
TSP/queue bypass at NB and SB ramps
SB bus on shoulder between Damson Road and Canyon Park
BRT station at existing NE 160th Street flyer stops
TSP/queue jumps at NB and SB ramps
BRT in-line station
New 600-stall parking garage at Kingsgate Park-and-Ride
TSP at NE 128th Street and ETL ramps
BRT station at existing Bellevue Transit Center with connections to light rail
New BRT in-line station
Revised in-line station and interchange by WSDOT
New 200-stall park-and-ride
WB lane reconfiguration and approach widening to extend merge area
EB bus-only lane on NE 148th Street and SR 518 between First Avenue and SR 509 on-ramp
WB bus-only lane from First Avenue to Burien Transit Center
BRT station at existing Burien Transit Center
Transit-only WB entrance to Burien Transit Center
BRT station on SR 518 with pedestrian bridge to LRT station
BRT station at new South Renton Transit Center
New 700-stall parking garage
Arterial transit speed and reliability improvements
New BRT in-line station
Revised in-line station and interchange by WSDOT with local transit speed and reliability improvements
Spot transit speed and reliability improvements and improved ped/bike connections along NE 85th Street
Snohomish County
King County
LakeWashington
PugetSound
5
405
90
5
5
513
523
524
181
202
515
518
527
599
520
99
519
167
509
525
522
9Lynnwood City Center
Canyon Park
UW Bothell/Cascadia College
Brickyard
Totem Lake/Kingsgate
NE 85th Street
BellevueTransitCenter
NE 44th Street
South RentonTransit CenterTukwila
International Boulevard
BurienTransitCenter
21Miles
0
BRT in Existing Express Toll LanesBRT in Future Express Toll LanesBRT in General Purpose LanesExisting Bus On ShoulderProposed Bus On Shoulder (Project Refinement)
Project Elements Station Improvement
Corridor Improvement
I-405 BRTProposed Refined Project
NB: Northbound SB: Southbound EB: Eastbound WB: Westbound TSP: Transit Signal Priority BRT: Bus Rapid Transit ETL: Express Toll Lane
BRT station at existing Lynnwood Transit Center with connections to light rail
NB BAT lane on 44th Avenue W between 196th Street SW and 200th Street SW
Queue bypass at 196th Street SW on-ramp to NB I-5
BRT station at NE 195th Street ramps
TSP at NB and SB ramps
BRT station at existing flyer stops
TSP/queue bypass at NB and SB ramps
SB bus on shoulder between Damson Road and Canyon Park
BRT station at existing NE 160th Street flyer stops
TSP/queue jumps at NB and SB ramps
BRT in-line station
New 600-stall parking garage at Kingsgate Park-and-Ride
TSP at NE 128th Street and ETL ramps
BRT station at existing Bellevue Transit Center with connections to light rail
New BRT in-line station
Revised in-line station and interchange by WSDOT
New 200-stall park-and-ride
WB lane reconfiguration and approach widening to extend merge area
EB bus-only lane on NE 148th Street and SR 518 between First Avenue and SR 509 on-ramp
WB bus-only lane from First Avenue to Burien Transit Center
BRT station at existing Burien Transit Center
Transit-only WB entrance to Burien Transit Center
BRT station on SR 518 with pedestrian bridge to LRT station
BRT station at new South Renton Transit Center
New 700-stall parking garage
Arterial transit speed and reliability improvements
New BRT in-line station
Revised in-line station and interchange by WSDOT with local transit speed and reliability improvements
Spot transit speed and reliability improvements and improved ped/bike connections along NE 85th Street
NB: Northbound SB: Southbound EB: Eastbound WB: Westbound TSP: Transit Signal Priority BRT: Bus Rapid Transit ETL: Express Toll Lane
13Executive SummaryI-405 Bus Rapid Transit Project
South end refinements
Snohomish County
King County
LakeWashington
PugetSound
5
405
90
5
5
513
523
524
181
202
515
518
527
599
520
99
519
167
509
525
522
9Lynnwood City Center
Canyon Park
UW Bothell/Cascadia College
Brickyard
Totem Lake/Kingsgate
NE 85th Street
BellevueTransitCenter
NE 44th Street
South RentonTransit CenterTukwila
International Boulevard
BurienTransitCenter
21Miles
0
BRT in Existing Express Toll LanesBRT in Future Express Toll LanesBRT in General Purpose LanesExisting Bus On ShoulderProposed Bus On Shoulder (Project Refinement)
Project Elements Station Improvement
Corridor Improvement
I-405 BRTProposed Refined Project
NB: Northbound SB: Southbound EB: Eastbound WB: Westbound TSP: Transit Signal Priority BRT: Bus Rapid Transit ETL: Express Toll Lane
BRT station at existing Lynnwood Transit Center with connections to light rail
NB BAT lane on 44th Avenue W between 196th Street SW and 200th Street SW
Queue bypass at 196th Street SW on-ramp to NB I-5
BRT station at NE 195th Street ramps
TSP at NB and SB ramps
BRT station at existing flyer stops
TSP/queue bypass at NB and SB ramps
SB bus on shoulder between Damson Road and Canyon Park
BRT station at existing NE 160th Street flyer stops
TSP/queue jumps at NB and SB ramps
BRT in-line station
New 600-stall parking garage at Kingsgate Park-and-Ride
TSP at NE 128th Street and ETL ramps
BRT station at existing Bellevue Transit Center with connections to light rail
New BRT in-line station
Revised in-line station and interchange by WSDOT
New 200-stall park-and-ride
WB lane reconfiguration and approach widening to extend merge area
EB bus-only lane on NE 148th Street and SR 518 between First Avenue and SR 509 on-ramp
WB bus-only lane from First Avenue to Burien Transit Center
BRT station at existing Burien Transit Center
Transit-only WB entrance to Burien Transit Center
BRT station on SR 518 with pedestrian bridge to LRT station
BRT station at new South Renton Transit Center
New 700-stall parking garage
Arterial transit speed and reliability improvements
New BRT in-line station
Revised in-line station and interchange by WSDOT with local transit speed and reliability improvements
Spot transit speed and reliability improvements and improved ped/bike connections along NE 85th Street
14Executive SummaryI-405 Bus Rapid Transit Project
StationsThe information below describes each of the 11 BRT stations. Agencies and jurisdictions partnering to refine these
stations are listed in the parentheses.
Lynnwood City Center (City of Lynnwood)
• BRT station at existing Lynnwood Transit Center
adjacent to the future Link light rail station which is
also planned to begin service in 2024
• I-405 BRT riders will be able to connect to
local and express buses, Swift (Community Transit
BRT), and Link light rail at the future Lynnwood City
Center Station
• Transit speed and reliability improvements between the
Lynnwood Transit Center and I-405
Canyon Park (City of Bothell)
• Located at the existing northbound and southbound
bus stops on the SR 527 bus-only ramps near the
existing Canyon Park Park-and-Ride
• I-405 BRT riders will be able to connect to Swift and
other local bus routes
• Ramp modifications and transit speed and reliability
improvements
• Sound Transit is working with its partners to coordinate
with WSDOT’s I-405 – SR 522 to SR 527 Capacity
Improvement Project
UW Bothell/Cascadia College (City of Bothell, UW Bothell, WSDOT)
• Sound Transit is working with its partners to determine
the location of the UW Bothell/Cascadia College
station, the I-405 BRT connection to SR 522/NE
145th BRT, and coordination with WSDOT’s I-405 –
SR 522 to SR 527 Capacity Improvements Project
Brickyard (City of Bothell)
• Located on the northbound and southbound ramps
• Serves the existing Brickyard Park-and-Ride located
on the west side of I-405 south of Juanita Woodinville
Way/NE 160th Street
• Transit speed and reliability improvements
• Sound Transit is working with its partners to coordinate
with WSDOT’s I-405 – SR 522 to SR 527 Capacity
Improvement Project
Totem Lake/Kingsgate (City of Kirkland)
• BRT station at the existing Totem Lake freeway station
• 600-stall parking garage (for a net gain of 400 stalls)
at the adjacent Kingsgate Park-and-Ride
NE 85th Street (City of Kirkland, WSDOT)
• Project partnership with WSDOT
• New three-tiered interchange with inline BRT station
and I-405 express toll lanes (ETL) access
• Local bus connections at same level as BRT stations
serving downtown Kirkland and Redmond
• Sound Transit is working with partners to address
connections along the NE 85th Street corridor
Bellevue Transit Center (City of Bellevue)
• BRT station at the existing Bellevue Transit Center
• I-405 BRT riders will be able to connect to local and
express buses, RapidRide, and Link light rail at the
future Bellevue Downtown Station
• East Link Extension service anticipated to begin
in 2023
15Executive SummaryI-405 Bus Rapid Transit Project
NE 44th Street (City of Renton, WSDOT)
• Project partnership with WSDOT
• WSDOT I-405 Renton to Bellevue Widening and
Express Toll Lanes Project
• I-405/NE 44th Street interchange improvements
with new direct access ramps
• NE 44th Street BRT station (inline freeway station)
• Local bus connections on NE 44th Street
• 200-stall park-and-ride
South Renton Transit Center (City of Renton)
• New transit center at Rainier Ave S/SW Grady Way
• 700-stall parking garage
• BRT station
• Integrating transit services with the existing South
Renton Park-and-Ride which will provide connections
to local buses and RapidRide
• Evaluating transit speed and reliability improvements
to/from South Renton Transit Center
Tukwila International Boulevard (City of Tukwila, City of SeaTac, Port of Seattle)
• Tukwila International Boulevard BRT station on SR 518
(new freeway station)
• Connects to light rail station with new
pedestrian bridge
• Provides connections to local bus service and
Link light rail at the existing Tukwila International
Boulevard Station
• Coordinating with SR 518 Feasibility Study (WSDOT/
Port of Seattle)
Burien Transit Center (City of Burien)
• BRT station at existing Burien Transit Center
• Connections to local buses and RapidRide
• Evaluating transit speed and reliability improvements
to/from Burien Transit Center
Speed and reliability improvementsTransit priority improvements help buses move through traffic
more efficiently and can include bus lanes and transit priority
signals. Sound Transit will continue to coordinate with our
partners to evaluate opportunities to improve travel times
along the route during Phase 2.
To maintain travel times, I-405 BRT will operate as two
service lines. The north line will run from Lynnwood to
Bellevue. The south line will run from Bellevue to Burien.
Riders traveling between the north and south lines will
transfer in Bellevue.
16Executive SummaryI-405 Bus Rapid Transit Project
I-405 BRT performanceThe Proposed Refined Project has higher ridership projections (year 2042) compared to the ST3 Representative Project.
The changes in ridership reflect the anticipated growth in the region as well as the refined station concepts and resulting
faster travel times.
ST3 Representative Project Proposed Refined Project% change
Low High Low High
North corridor boardings 8,600 11,600 9,600 13,000 +12%
South corridor boardings 7,800 10,600 9,600 12,800 +22%
Total boardings 16,400 22,200 19,200 25,800 +17%
AM peak hour travel times to Bellevue
*Preliminary travel time estimates for planning purposes, subject to change. Existing travel times are average times. Year 2025 estimates assume new express toll lanes are open between Renton to Bellevue. Updated information will be provided prior to beginning service.
57MIN
North Line – Lynnwood to Bellevue
ST Express (existing)
ST3 representative project*
I-405 BRT proposed refined project*
50-55MIN
46-51MIN
55 MIN
South Line – Burien to Bellevue
ST Express (existing)
ST3 representative project*
I-405 BRT proposed refined project*
45-49 MIN
38-42 MIN
Next stepsSound Transit will continue its work on all Proposed Refined Project elements with communities and stakeholders along
the corridor, transit partners, the IAG and the ELG in Phase 2 - Conceptual Engineering and Environmental Review during
2019 and into early 2020. The following next steps will also be part of the Phase 2 process:
• Fieldwork and technical studies
• Stakeholder involvement
• Partner agreements
• BRT vehicle fleet analysis
• Conceptual design for a new bus
base, Bus Base North
• Station design development
The “low” forecasts assume less development, while the “high” forecast assumes more development as well as a per-mile fee for vehicles, which leads to more transit use. All projections are for 2042.