i-405 · final route design final station designs and public art obtain land use and construction...

18
I-405 Bus Rapid Transit Project Phase 1 Project Refinements Executive Summary Spring 2019

Upload: others

Post on 05-Jun-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: I-405 · Final route design Final station designs and public art Obtain land use and construction permits ... the first phase of project development for the I-405 Bus Rapid Transit

I-405 Bus Rapid Transit Project

Phase 1 Project Refinements Executive SummarySpring 2019

Page 2: I-405 · Final route design Final station designs and public art Obtain land use and construction permits ... the first phase of project development for the I-405 Bus Rapid Transit

Contents

1 Background

2 Project history

6 Station design and branding

7 Project refinement process

8 Agency coordination

9 Stakeholder involvement

12 Proposed refined project

15 Next steps

Page 3: I-405 · Final route design Final station designs and public art Obtain land use and construction permits ... the first phase of project development for the I-405 Bus Rapid Transit

1Executive SummaryI-405 Bus Rapid Transit Project

BackgroundThis Executive Summary (Summary) augments the full I-405 Bus Rapid Transit Phase 1 Report.

PUBLIC INVOLVEMENT PUBLIC INVOLVEMENT

Final route design

Final station designs and public art

Obtain land use and construction permits

PLANNING DESIGN2018–2020 2020–2023

START OFSERVICE

20242016Project refinement (2018)

PUBLIC INVOLVEMENT

Groundbreaking

Construction updatesand mitigation

CONSTRUCTION*Begins 2023

Construction of roadway improvements, parking and stations

Preliminary engineering (2020)

Conceptual Engineering & Environmental Review (2019)

The Summary provides an overview of

the first phase of project development

for the I-405 Bus Rapid Transit (BRT)

project. Sound Transit began planning

for the I-405 BRT project as part of

Sound Transit 3 (ST3). During 2018,

Sound Transit considered and evaluated

community input and technical analyses

to refine the ST3 representative project

and develop a Proposed Refined Project.

The Sound Transit Board’s (the Board)

System Expansion Committee will

consider advancing the Proposed Refined

Project into the next phase of project

development, Conceptual Engineering and

Environmental Review.

BRT

Below is the Project Schedule, leading to the Start of Service in 2024:

*Construction for most of the BRT projects is expected to begin by 2023 and be completed by 2024. Construction of some elements may begin before 2023, and others may occur after service starts in 2024.

Page 4: I-405 · Final route design Final station designs and public art Obtain land use and construction permits ... the first phase of project development for the I-405 Bus Rapid Transit

2Executive SummaryI-405 Bus Rapid Transit Project

Sound Transit plans, builds and operates regional transit systems and services to improve mobility in urban areas of King, Pierce and Snohomish counties. A bus rapid transit system is being planned as part of Sound Transit’s ST3 system expansion program. BRT will provide fast, reliable bus service every 10 minutes in peak hours and 15 minutes off-peak along I-405, SR 518, SR 522 and NE 145th Street, connecting to light rail service in Bellevue, Tukwila, Shoreline and Lynnwood.

Kingsgate/Totem Lake

South Everett

Downtown Everett

NE 85th

Brickyard

Canyon Park

Woodinville

Bonney LakeSouth Hill

LakewoodTowne Center

NE 44th

South Renton

IssaquahHighlands

SouthSammamish

NorthSammamish

Burien

WestwoodVillage

Kirkland

EvergreenPoint

LakeForest

Park

KenmoreBothell

Edmonds

Mukilteo

Tukwila

Puyallup

Sumner

Kent

Auburn

Tillicum

DuPont

South Tacoma

Lakewood

& King StreetInternational District/Chinatown

SeaTac/Airport

Angle Lake

University ofWashington

Capitol Hill

MountBaker

Columbia City

Rainier Beach

Othello

Tukwila/International

Blvd

BeaconHill

Westlake

Pioneer SquareUniversity Street

Stadium

SODO

Convention CenterTheater District

Union StationS 25th

Roosevelt

Shoreline North/185th

Shoreline South/145th

NE 130th

Northgate

U District

BellevueDowntown

Midtown

MountlakeTerrace

SE Redmond

Downtown Redmond

Spring District/120th

Overlake Village

S Graham St

S Boeing Access Rd

Lakemont

Redmond Technology

S 4thOld City Hall

S 272nd

Kent/DesMoines

Federal Way

SouthFederal Way

Stadium District

6th AveHilltop District

St Jos

eph

Tacoma General

TacomaDome

EastTacoma

Sprag

ue

Ainswort

h

Steve

nsUnio

n

Ballard

Interbay

Smith CoveSeattle CenterSouth Lake Union

TacomaCommunity

College

Mariner

SW EverettIndustrial Center

SR 99/Airport Rd

West Alderwood

LynnwoodCity Center

MercerIsland

JudkinsPark

AlaskaJunction

Avalon

Delridg

e

Denny

East Main

Wilburton

SouthBellevue

Bel-Red/130th

Eastgate

Richards Rd

SR 526/Evergreen

SouthKirkland

Ash Way

FifePearl

Issaquah

EverettEverett

BellevueSeattle

Tacoma

2021

2031

2036

2024

2024

2024

2024

2024

2023

2035

2036

2031

2023

2022

2041

2030

2031

2041

2039

2022

2036

2024

2024

2030

2022

2024

2024

2023

Link Light RailFuture service:

Everett–Seattle–West SeattleRedmond–Seattle–MarinerBallard–Seattle–TacomaIssaquah–Bellevue–South KirklandTacoma Dome–TacomaCommunity College

In service:Univ. of Washington–Angle LakeTacoma Dome–Theater District

Sounder Commuter RailFuture service:

DuPont–Lakewood

In service:North Line (Everett–Seattle)South Line (Lakewood–Seattle)

BusFuture service:

Bus Rapid Transit (BRT)

In service:ST Express bus(service re-evaluated annually)

New station or bus facilityAdded parkingStation improvementsMajor transfer hubExisting station or bus facilityExisting parkingProvisional light rail station

A map of Sound Transit’s planned System Expansion.

Project history

Page 5: I-405 · Final route design Final station designs and public art Obtain land use and construction permits ... the first phase of project development for the I-405 Bus Rapid Transit

3Executive SummaryI-405 Bus Rapid Transit Project

BRT will be part of Sound Transit’s high-capacity transit service and is being designed for fast and

reliable service, including frequent arrivals and departures. BRT will include features such as:

Unique brand identity for buses and stations

Transit speed and reliability

Off-board fare payment Real-time rider informationFrequent, all-day service

Unique station design

Entry and exit through multiple doors, level with

the station platform

Transit priority improvements, including business access and transit lanes, bus queue jumps,

and transit signal priority

Dedicated fleet of BRT buses

These features will help riders avoid traffic congestion and enjoy more frequent and reliable service.

Page 6: I-405 · Final route design Final station designs and public art Obtain land use and construction permits ... the first phase of project development for the I-405 Bus Rapid Transit

4Executive SummaryI-405 Bus Rapid Transit Project

The ST3 Plan included two BRT

projects, I-405 BRT and SR 522/NE

145th BRT. Both ST3 BRT projects

were based on high-level project

scopes, cost estimates and ridership

forecasts. ST3 also established transit

mode, general corridor, number of

stations and representative station

locations for both BRT projects.

I-405 BRT will have two lines

connecting communities along I-5, I-405 and SR 518 from Lynnwood to Bellevue and Bellevue to Burien with 11 BRT stations, a new transit center in South Renton, and a new bus base. Connections to Link light rail will be available at Lynnwood, Bellevue and Tukwila. Connections to the SR 522/145th BRT will be available in Bothell.

SR 522/NE 145th BRT will connect

communities from Shoreline to Woodinville via NE 145th Street, SR 522 and the transit center at UW Bothell/Cascadia College. The route has nine BRT stations and an expanded transit center at UW Bothell/Cascadia College. It will connect to Link light rail at the Shoreline South/145th Station and to I-405 BRT in Bothell.

Map of the SR 522/ NE 145th and I-405 BRT representative projects.

��������������

2024

2024

2024

2024

522

520

518

167

527

104

Totem Lake/Kingsgate

NE 85th

Brickyard

Woodinville

Canyon Park

NE 44th

South RentonTransit Center

BurienTransitCenter

LakeForest

Park

KenmoreBothell

TukwilaInternationalBlvd

ShorelineSouth/145th

BellevueDowntown

LynnwoodCity Center

UW Bothell/Cascadia College

BellevueTransit Center

Project subject to change.

Bus Rapid TransitBRT in service 2024Less frequent serviceStationMajor transfer hubNew parkingExisting parking

Link Light RailIn service 2024Current service

Bus RapidTransit (BRT)

Bus Base

Page 7: I-405 · Final route design Final station designs and public art Obtain land use and construction permits ... the first phase of project development for the I-405 Bus Rapid Transit

5Executive SummaryI-405 Bus Rapid Transit Project

I-405 BRT is a bus system that will run predominantly in managed lanes, such as high-occupancy vehicle (HOV) lanes,

express toll lanes, and bus-on-shoulder lanes to improve transit speed and reliability. The project includes new direct-

access ramps with freeway BRT stations, upgraded freeway ramp BRT stations, improvements to local roadways for transit,

improvements to bicycle and pedestrian networks for access to BRT stations, and new or expanded park-and-ride lots.

LakeWashington

2024

2024

522

520

518

167

527

522

South RentonTransit Center

BurienTransitCenter

Totem Lake/Kingsgate

NE 85th

Brickyard

Canyon Park

NE 44th

UW Bothell/Cascadia College

TukwilaInternationalBlvd

BellevueDowntown

LynnwoodCity Center

BellevueTransit Center

Seattle

I-405 BRT

Project subject to change.

Bus Rapid TransitBRT in service 2024StationMajor transfer hubNew parkingExisting parking

Link Light RailIn service 2024Current service

Sound Transit is partnering with the

Washington State Department of

Transportation (WSDOT) to deliver the

I-405 BRT project. I-405 BRT builds

upon collaborative efforts between

Sound Transit, WSDOT, and other

local and regional partners, including:

• I-405 Master Plan (2002)

• I-405 Corridor Program

• I-405 Renton to Bellevue

Widening and Express Toll

Lanes Project

• NE 85th Street Interchange

Improvements Project

• Sound Transit Regional Transit

Long-Range Plan (2014)

I-405 BRT

Page 8: I-405 · Final route design Final station designs and public art Obtain land use and construction permits ... the first phase of project development for the I-405 Bus Rapid Transit

6Executive SummaryI-405 Bus Rapid Transit Project

Part of creating a new line of service is developing a new brand to

accompany it. Sound Transit calls our region’s commuter rail system

Sounder and light rail Link. Sound Transit is excited to welcome bus

rapid transit to the family and announce its name – Stride.

Sound Transit interviewed stakeholders inside and outside the

organization to help develop a BRT brand. Common themes heard

included a desire for the name to be memorable, short, easy to

pronounce, and integrate well with the overall Sound Transit brand.

The Stride name will be integrated with the design of the BRT

system, including vehicles, stations, signage and marketing materials.

The BRT system will have a unique design that helps riders identify

buses and stations. The Stride brand will:

• Differentiate BRT as premium transit service

• Help riders navigate the system by making BRT easily identifiable

and distinguishing it from other services

• Allow Sound Transit to more effectively reach existing and

new customers

• Create a sense of place at our transit facilities

• Generate excitement for public transportation and endure

for generations

Station design and branding

BRT station features• All-door entry and exit

• Off-board fare payment

• Level boarding at the platforms

• Lighting and directional signage

• Real-time rider information

• Sheltered and comfortable stations

• Unique brand identity

• Artwork

BRT station design Sound Transit will continue to

develop the BRT station design

during the next few years. The

rendering, left, shows the general

station design concept. While

stations will have a consistent

look and feel throughout the

Sound Transit BRT system,

station design at each station

location will vary based on

ridership and site conditions.

Page 9: I-405 · Final route design Final station designs and public art Obtain land use and construction permits ... the first phase of project development for the I-405 Bus Rapid Transit

7Executive SummaryI-405 Bus Rapid Transit Project

WE

AR

E H

ER

E!

Share Proposed Refined Project

Sound Transit shared the Proposed Refined Project with our stakeholders. The project team will request the Sound Transit Board of Directors’ approval to advance the project into Conceptual Engineering and more detailed evaluation (including environmental review) in 2019.

4

Evaluate refinements

Sound Transit evaluated the project refinements using the objectives, evaluation criteria and technical analysis. Based on this evaluation, Sound Transit developed a Proposed Refined Project.

3

Develop refinements to the representative project

Sound Transit developed refinements based on technical analysis and stakeholder input. Technical analysis included collecting information on existing conditions along the I-405 corridor, identifying potential non-motorized access barriers, and conducting operations analysis through coordination with WSDOT, cities, transit agencies and other local and regional partners.

2

Start with the ST3 representative project

The representative project identified the high-capacity transit mode (BRT), the 11 BRT station locations and the parking facilities that would be developed as part of the project.

1

Project Objectives• Improve speed, frequency and

reliability in the corridor

• Increase regional mobility

• Deliver the project on-time and

within budget

• Develop stations to support

safe and convenient access for

multiple modes

• Encourage equitable transit-

oriented development

• Promote a healthy and

sustainable environment

Evaluation Criteria• BRT travel time

• Service reliability

• Non-motorized access

• Transit access

• Vehicular access

During this Planning Phase 1 in 2018, the BRT Team used the following

process to develop project refinements, review and evaluate those

refinements, and share the refinements throughout the corridor:

Project refinement process

Page 10: I-405 · Final route design Final station designs and public art Obtain land use and construction permits ... the first phase of project development for the I-405 Bus Rapid Transit

8Executive SummaryI-405 Bus Rapid Transit Project

I-405 BRT will build upon WSDOT’s I-405 Master Plan with corridor improvements facilitating faster bus travel.

WSDOT is currently improving I-405 as part of the I-405 Corridor Program. WSDOT projects include the I-405

Renton to Bellevue Widening and Express Toll Lanes Project with construction expected to begin in 2019 and

design efforts under way in the north corridor between SR 522 and SR 527 (I-405 - SR 522 to SR 527 Capacity

Improvements Project). These projects are designed to improve speeds and trip reliability for all travelers and support

the future I-405 Bus Rapid Transit line.

Sound Transit also works closely with King County Metro, Community Transit and other local and regional

transportation agencies to determine routes, ensure fast and seamless transfers, and provide integrated transit

services that best serve the needs of the community.

Sound Transit will continue to coordinate with our transit partners to integrate I-405 BRT with local and regional

transit service.

Agency coordination

Page 11: I-405 · Final route design Final station designs and public art Obtain land use and construction permits ... the first phase of project development for the I-405 Bus Rapid Transit

9E

xecu

tive

Sum

mar

yI-

405

Bu

s R

ap

id T

ran

sit

Pro

jec

t

The

sche

dule

bel

ow s

how

s th

e st

akeh

olde

r inv

olve

men

t tim

elin

e an

d ac

tiviti

es fo

r 201

8 in

to e

arly

201

9. T

he P

roje

ct e

ngag

ed a

n In

tera

genc

y G

roup

,

Ele

cted

Lea

ders

hip

Gro

up, s

take

hold

ers,

and

the

publ

ic to

ens

ure

dive

rse

voic

es c

ontr

ibut

ed to

the

first

pha

se o

f pro

ject

dev

elop

men

t.

2019

2018

MA

RA

PR

MA

YJU

NJU

LA

UG

SE

PO

CT

NO

VD

EC

Q1

On

go

ing

up

dat

es

Sou

nd T

rans

it pl

ans,

bui

lds,

and

ope

rate

s re

gion

al tr

ansi

t sys

tem

s an

d se

rvic

es to

impr

ove

mob

ility

for C

entr

al P

uget

Sou

nd. 4

01 S

. Jac

kson

St.

l Sea

ttle,

WA

981

04-

2826

l 1-

800

-201

-49

00 /

TTY

Rel

ay: 7

11 l

brt@

soun

dtra

nsit.

org

l sou

ndtr

ansi

t.org

Com

mun

ity

Upd

ates

&

Sta

keho

lder

P

roce

ss

Pro

ject

M

ilest

ones

Co

rrid

or-

wid

e E

ven

t: P

roje

ct

Lau

nch

Ear

ly S

take

ho

lder

In

terv

iew

sS

tati

on

Are

a O

utr

each

Sou

nd

Tran

sit

Boa

rd

Cor

ridor

E

xecu

tive

Adv

isor

y G

roup

Bo

ard

A

ctio

n

Inte

rage

ncy

Gro

up

Ele

cted

Le

ader

ship

G

roup

Kic

koff

M

eeti

ng

On

go

ing

co

ord

inati

on

wit

h I

-405

/SR

167

Co

rrid

or

Exe

cuti

ve A

dvi

sory

Gro

up

Ref

ined

Pro

ject

Ong

oing

O

utre

ach

Act

iviti

esB

riefi

ng

s, f

air

s an

d f

est

ivals

, so

cial m

ed

ia u

pd

ate

s, w

eb

site

up

date

s, e

-new

slett

ers

, co

mm

un

ity

eve

nts

On

go

ing

co

ord

inati

on

wit

h p

rop

ert

y o

wn

ers

City

Cou

ncil

Coo

rdin

atio

nC

oo

rdin

ati

on

wit

h C

ity

Co

un

cils

Rig

ht o

f Way

C

oord

inat

ion

Iden

tify

Ran

ge o

f Pro

ject

Ref

inem

ents

Id

entif

y &

Eva

luat

e R

ange

of P

roje

ct R

efin

emen

ts

Pro

pose

and

Rec

omm

end

Pro

ject

I-40

5 B

us

Ra

pid

Tra

nsi

tC

omm

unity

Eng

agem

ent

Gui

de

Sta

keho

lder

invo

lvem

ent

Page 12: I-405 · Final route design Final station designs and public art Obtain land use and construction permits ... the first phase of project development for the I-405 Bus Rapid Transit

10Executive SummaryI-405 Bus Rapid Transit Project

Elected Leadership Group

The I-405 BRT Elected Leadership Group (ELG) is

made of up of elected officials who represent the cities

along the project corridor, the Sound Transit Board and

WSDOT. The ELG met four times during Phase 1 and

includes representatives from the following agencies and

jurisdictions:

• City of Bellevue

• City of Bothell

• City of Burien

• City of Kirkland

• City of Lynnwood

• City of Renton

• City of Tukwila

• Washington State Department of Transportation

• Sound Transit Board of Directors

Executive Advisory Group

The I-405/SR 167 Corridor Executive Advisory Group

(EAG), made up of state and local elected officials,

and representatives from federal and regional transit

agencies, has been advising WSDOT on I-405 corridor

improvements since 1999. Sound Transit regularly

updated the EAG about the I-405 BRT project in 2018.

Interagency Group

The I-405 BRT Interagency Group is made up of city and

partner transit agency staff to provide technical expertise

and input on the project refinements. The IAG met eight

times during Phase 1 and includes representatives from the

following agencies and jurisdictions:

• City of Bellevue

• City of Bothell

• City of Burien

• City of Kirkland

• City of Lynnwood

• City of Renton

• City of SeaTac

• City of Tukwila

• Community Transit

• King County Metro

• Port of Seattle

• Washington State Department of Transportation

The publicSound Transit engages the public to gather input on

corridor-wide and local issues to ensure the priorities of

local communities are being heard and considered along

the corridor. During Phase 1, the project team conducted

the following outreach activities:

• 2 in-person open houses

• 2 online open houses

• 13 community briefings

• 6 fairs and festivals

• 2 project mailings

Page 13: I-405 · Final route design Final station designs and public art Obtain land use and construction permits ... the first phase of project development for the I-405 Bus Rapid Transit

11Executive SummaryI-405 Bus Rapid Transit Project

Stay engagedSound Transit will continue to provide opportunities to participate throughout the development of the I-405 BRT project.

Join us at one of our public events to provide your feedback and comment on current plans

Find us at your local fairs and festivals

Request a briefing or meeting with us; we are happy to meet with you or your community group in person

CALL the project line at 206-398-5470 to speak with an Outreach Specialist

Learn about the project SOUNDTRANSIT.ORG/ I405BRT

Respond to online SURVEYS

Subscribe to EMAIL UPDATES

Follow on SOCIAL MEDIA

EMAIL with questions, concerns or comments [email protected]

PUBLIC EVENTS

FAIRS AND FESTIVALS

BRIEFINGS

COMMUNITY WORKSHOPS

Come back to the next public event to learn about how the community’s input has helped shape the project. Provide your feedback and comment on current plans

CONTACT US GO ONLINE GET INVOLVED

Page 14: I-405 · Final route design Final station designs and public art Obtain land use and construction permits ... the first phase of project development for the I-405 Bus Rapid Transit

12Executive SummaryI-405 Bus Rapid Transit Project

Sound Transit has developed a Proposed Refined Project based on the analyses and the feedback obtained to date. The

map identifies the Project Elements that make up the Proposed Refined Project. BRT station concepts and proposed

roadway improvements will continue to be refined during Conceptual Engineering and Environmental Review following

additional technical analysis and ongoing stakeholder involvement.

Proposed Refined Project

North end refinements

Snohomish County

King County

LakeWashington

PugetSound

5

405

90

5

5

513

523

524

181

202

515

518

527

599

520

99

519

167

509

525

522

9Lynnwood City Center

Canyon Park

UW Bothell/Cascadia College

Brickyard

Totem Lake/Kingsgate

NE 85th Street

BellevueTransitCenter

NE 44th Street

South RentonTransit CenterTukwila

International Boulevard

BurienTransitCenter

21Miles

0

BRT in Existing Express Toll LanesBRT in Future Express Toll LanesBRT in General Purpose LanesExisting Bus On ShoulderProposed Bus On Shoulder (Project Refinement)

Project Elements Station Improvement

Corridor Improvement

I-405 BRTProposed Refined Project

NB: Northbound SB: Southbound EB: Eastbound WB: Westbound TSP: Transit Signal Priority BRT: Bus Rapid Transit ETL: Express Toll Lane

BRT station at existing Lynnwood Transit Center with connections to light rail

NB BAT lane on 44th Avenue W between 196th Street SW and 200th Street SW

Queue bypass at 196th Street SW on-ramp to NB I-5

BRT station at NE 195th Street ramps

TSP at NB and SB ramps

BRT station at existing flyer stops

TSP/queue bypass at NB and SB ramps

SB bus on shoulder between Damson Road and Canyon Park

BRT station at existing NE 160th Street flyer stops

TSP/queue jumps at NB and SB ramps

BRT in-line station

New 600-stall parking garage at Kingsgate Park-and-Ride

TSP at NE 128th Street and ETL ramps

BRT station at existing Bellevue Transit Center with connections to light rail

New BRT in-line station

Revised in-line station and interchange by WSDOT

New 200-stall park-and-ride

WB lane reconfiguration and approach widening to extend merge area

EB bus-only lane on NE 148th Street and SR 518 between First Avenue and SR 509 on-ramp

WB bus-only lane from First Avenue to Burien Transit Center

BRT station at existing Burien Transit Center

Transit-only WB entrance to Burien Transit Center

BRT station on SR 518 with pedestrian bridge to LRT station

BRT station at new South Renton Transit Center

New 700-stall parking garage

Arterial transit speed and reliability improvements

New BRT in-line station

Revised in-line station and interchange by WSDOT with local transit speed and reliability improvements

Spot transit speed and reliability improvements and improved ped/bike connections along NE 85th Street

Snohomish County

King County

LakeWashington

PugetSound

5

405

90

5

5

513

523

524

181

202

515

518

527

599

520

99

519

167

509

525

522

9Lynnwood City Center

Canyon Park

UW Bothell/Cascadia College

Brickyard

Totem Lake/Kingsgate

NE 85th Street

BellevueTransitCenter

NE 44th Street

South RentonTransit CenterTukwila

International Boulevard

BurienTransitCenter

21Miles

0

BRT in Existing Express Toll LanesBRT in Future Express Toll LanesBRT in General Purpose LanesExisting Bus On ShoulderProposed Bus On Shoulder (Project Refinement)

Project Elements Station Improvement

Corridor Improvement

I-405 BRTProposed Refined Project

NB: Northbound SB: Southbound EB: Eastbound WB: Westbound TSP: Transit Signal Priority BRT: Bus Rapid Transit ETL: Express Toll Lane

BRT station at existing Lynnwood Transit Center with connections to light rail

NB BAT lane on 44th Avenue W between 196th Street SW and 200th Street SW

Queue bypass at 196th Street SW on-ramp to NB I-5

BRT station at NE 195th Street ramps

TSP at NB and SB ramps

BRT station at existing flyer stops

TSP/queue bypass at NB and SB ramps

SB bus on shoulder between Damson Road and Canyon Park

BRT station at existing NE 160th Street flyer stops

TSP/queue jumps at NB and SB ramps

BRT in-line station

New 600-stall parking garage at Kingsgate Park-and-Ride

TSP at NE 128th Street and ETL ramps

BRT station at existing Bellevue Transit Center with connections to light rail

New BRT in-line station

Revised in-line station and interchange by WSDOT

New 200-stall park-and-ride

WB lane reconfiguration and approach widening to extend merge area

EB bus-only lane on NE 148th Street and SR 518 between First Avenue and SR 509 on-ramp

WB bus-only lane from First Avenue to Burien Transit Center

BRT station at existing Burien Transit Center

Transit-only WB entrance to Burien Transit Center

BRT station on SR 518 with pedestrian bridge to LRT station

BRT station at new South Renton Transit Center

New 700-stall parking garage

Arterial transit speed and reliability improvements

New BRT in-line station

Revised in-line station and interchange by WSDOT with local transit speed and reliability improvements

Spot transit speed and reliability improvements and improved ped/bike connections along NE 85th Street

NB: Northbound SB: Southbound EB: Eastbound WB: Westbound TSP: Transit Signal Priority BRT: Bus Rapid Transit ETL: Express Toll Lane

Page 15: I-405 · Final route design Final station designs and public art Obtain land use and construction permits ... the first phase of project development for the I-405 Bus Rapid Transit

13Executive SummaryI-405 Bus Rapid Transit Project

South end refinements

Snohomish County

King County

LakeWashington

PugetSound

5

405

90

5

5

513

523

524

181

202

515

518

527

599

520

99

519

167

509

525

522

9Lynnwood City Center

Canyon Park

UW Bothell/Cascadia College

Brickyard

Totem Lake/Kingsgate

NE 85th Street

BellevueTransitCenter

NE 44th Street

South RentonTransit CenterTukwila

International Boulevard

BurienTransitCenter

21Miles

0

BRT in Existing Express Toll LanesBRT in Future Express Toll LanesBRT in General Purpose LanesExisting Bus On ShoulderProposed Bus On Shoulder (Project Refinement)

Project Elements Station Improvement

Corridor Improvement

I-405 BRTProposed Refined Project

NB: Northbound SB: Southbound EB: Eastbound WB: Westbound TSP: Transit Signal Priority BRT: Bus Rapid Transit ETL: Express Toll Lane

BRT station at existing Lynnwood Transit Center with connections to light rail

NB BAT lane on 44th Avenue W between 196th Street SW and 200th Street SW

Queue bypass at 196th Street SW on-ramp to NB I-5

BRT station at NE 195th Street ramps

TSP at NB and SB ramps

BRT station at existing flyer stops

TSP/queue bypass at NB and SB ramps

SB bus on shoulder between Damson Road and Canyon Park

BRT station at existing NE 160th Street flyer stops

TSP/queue jumps at NB and SB ramps

BRT in-line station

New 600-stall parking garage at Kingsgate Park-and-Ride

TSP at NE 128th Street and ETL ramps

BRT station at existing Bellevue Transit Center with connections to light rail

New BRT in-line station

Revised in-line station and interchange by WSDOT

New 200-stall park-and-ride

WB lane reconfiguration and approach widening to extend merge area

EB bus-only lane on NE 148th Street and SR 518 between First Avenue and SR 509 on-ramp

WB bus-only lane from First Avenue to Burien Transit Center

BRT station at existing Burien Transit Center

Transit-only WB entrance to Burien Transit Center

BRT station on SR 518 with pedestrian bridge to LRT station

BRT station at new South Renton Transit Center

New 700-stall parking garage

Arterial transit speed and reliability improvements

New BRT in-line station

Revised in-line station and interchange by WSDOT with local transit speed and reliability improvements

Spot transit speed and reliability improvements and improved ped/bike connections along NE 85th Street

Page 16: I-405 · Final route design Final station designs and public art Obtain land use and construction permits ... the first phase of project development for the I-405 Bus Rapid Transit

14Executive SummaryI-405 Bus Rapid Transit Project

StationsThe information below describes each of the 11 BRT stations. Agencies and jurisdictions partnering to refine these

stations are listed in the parentheses.

Lynnwood City Center (City of Lynnwood)

• BRT station at existing Lynnwood Transit Center

adjacent to the future Link light rail station which is

also planned to begin service in 2024

• I-405 BRT riders will be able to connect to

local and express buses, Swift (Community Transit

BRT), and Link light rail at the future Lynnwood City

Center Station

• Transit speed and reliability improvements between the

Lynnwood Transit Center and I-405

Canyon Park (City of Bothell)

• Located at the existing northbound and southbound

bus stops on the SR 527 bus-only ramps near the

existing Canyon Park Park-and-Ride

• I-405 BRT riders will be able to connect to Swift and

other local bus routes

• Ramp modifications and transit speed and reliability

improvements

• Sound Transit is working with its partners to coordinate

with WSDOT’s I-405 – SR 522 to SR 527 Capacity

Improvement Project

UW Bothell/Cascadia College (City of Bothell, UW Bothell, WSDOT)

• Sound Transit is working with its partners to determine

the location of the UW Bothell/Cascadia College

station, the I-405 BRT connection to SR 522/NE

145th BRT, and coordination with WSDOT’s I-405 –

SR 522 to SR 527 Capacity Improvements Project

Brickyard (City of Bothell)

• Located on the northbound and southbound ramps

• Serves the existing Brickyard Park-and-Ride located

on the west side of I-405 south of Juanita Woodinville

Way/NE 160th Street

• Transit speed and reliability improvements

• Sound Transit is working with its partners to coordinate

with WSDOT’s I-405 – SR 522 to SR 527 Capacity

Improvement Project

Totem Lake/Kingsgate (City of Kirkland)

• BRT station at the existing Totem Lake freeway station

• 600-stall parking garage (for a net gain of 400 stalls)

at the adjacent Kingsgate Park-and-Ride

NE 85th Street (City of Kirkland, WSDOT)

• Project partnership with WSDOT

• New three-tiered interchange with inline BRT station

and I-405 express toll lanes (ETL) access

• Local bus connections at same level as BRT stations

serving downtown Kirkland and Redmond

• Sound Transit is working with partners to address

connections along the NE 85th Street corridor

Bellevue Transit Center (City of Bellevue)

• BRT station at the existing Bellevue Transit Center

• I-405 BRT riders will be able to connect to local and

express buses, RapidRide, and Link light rail at the

future Bellevue Downtown Station

• East Link Extension service anticipated to begin

in 2023

Page 17: I-405 · Final route design Final station designs and public art Obtain land use and construction permits ... the first phase of project development for the I-405 Bus Rapid Transit

15Executive SummaryI-405 Bus Rapid Transit Project

NE 44th Street (City of Renton, WSDOT)

• Project partnership with WSDOT

• WSDOT I-405 Renton to Bellevue Widening and

Express Toll Lanes Project

• I-405/NE 44th Street interchange improvements

with new direct access ramps

• NE 44th Street BRT station (inline freeway station)

• Local bus connections on NE 44th Street

• 200-stall park-and-ride

South Renton Transit Center (City of Renton)

• New transit center at Rainier Ave S/SW Grady Way

• 700-stall parking garage

• BRT station

• Integrating transit services with the existing South

Renton Park-and-Ride which will provide connections

to local buses and RapidRide

• Evaluating transit speed and reliability improvements

to/from South Renton Transit Center

Tukwila International Boulevard (City of Tukwila, City of SeaTac, Port of Seattle)

• Tukwila International Boulevard BRT station on SR 518

(new freeway station)

• Connects to light rail station with new

pedestrian bridge

• Provides connections to local bus service and

Link light rail at the existing Tukwila International

Boulevard Station

• Coordinating with SR 518 Feasibility Study (WSDOT/

Port of Seattle)

Burien Transit Center (City of Burien)

• BRT station at existing Burien Transit Center

• Connections to local buses and RapidRide

• Evaluating transit speed and reliability improvements

to/from Burien Transit Center

Speed and reliability improvementsTransit priority improvements help buses move through traffic

more efficiently and can include bus lanes and transit priority

signals. Sound Transit will continue to coordinate with our

partners to evaluate opportunities to improve travel times

along the route during Phase 2.

To maintain travel times, I-405 BRT will operate as two

service lines. The north line will run from Lynnwood to

Bellevue. The south line will run from Bellevue to Burien.

Riders traveling between the north and south lines will

transfer in Bellevue.

Page 18: I-405 · Final route design Final station designs and public art Obtain land use and construction permits ... the first phase of project development for the I-405 Bus Rapid Transit

16Executive SummaryI-405 Bus Rapid Transit Project

I-405 BRT performanceThe Proposed Refined Project has higher ridership projections (year 2042) compared to the ST3 Representative Project.

The changes in ridership reflect the anticipated growth in the region as well as the refined station concepts and resulting

faster travel times.

ST3 Representative Project Proposed Refined Project% change

Low High Low High

North corridor boardings 8,600 11,600 9,600 13,000 +12%

South corridor boardings 7,800 10,600 9,600 12,800 +22%

Total boardings 16,400 22,200 19,200 25,800 +17%

AM peak hour travel times to Bellevue

*Preliminary travel time estimates for planning purposes, subject to change. Existing travel times are average times. Year 2025 estimates assume new express toll lanes are open between Renton to Bellevue. Updated information will be provided prior to beginning service.

57MIN

North Line – Lynnwood to Bellevue

ST Express (existing)

ST3 representative project*

I-405 BRT proposed refined project*

50-55MIN

46-51MIN

55 MIN

South Line – Burien to Bellevue

ST Express (existing)

ST3 representative project*

I-405 BRT proposed refined project*

45-49 MIN

38-42 MIN

Next stepsSound Transit will continue its work on all Proposed Refined Project elements with communities and stakeholders along

the corridor, transit partners, the IAG and the ELG in Phase 2 - Conceptual Engineering and Environmental Review during

2019 and into early 2020. The following next steps will also be part of the Phase 2 process:

• Fieldwork and technical studies

• Stakeholder involvement

• Partner agreements

• BRT vehicle fleet analysis

• Conceptual design for a new bus

base, Bus Base North