  • 8/12/2019 Hw3 Hotel Alberi-1

    1/23

    P O L I T E C N I C O D I M I L A N O

    BUILDING PATHOLOGY AND DIAGNOST

    case study: HOTEL ALBERI

    via lungo lario Isonzo LECCO

    STUDENTS:

    Janaina Gerde Muniz

    Gerardo Diosdado Espinosa

    Marco DellOro

  • 8/12/2019 Hw3 Hotel Alberi-1

    2/23

    CONTENTS

    1. LOCATION ............................................................................................................................................ 3

    2. THE BUILDING AND ITS CONSTRUCTION TECHNIQUES AND MATERIALS ............................................. 4

    3. FAILURE PATTERN IDENTIFICATION ................................................................................................... 10

    3.1. Exterior Degradation pattern ........................................................................................................... 10

    3.2. Interior Degradation pattern ........................................................................................................... 16

    4. MAPPING ........................................................................................................................................... 22

  • 8/12/2019 Hw3 Hotel Alberi-1

    3/23

    1. LOCATION Our case study is a Hotel situated on the lakeside of Lecco. Despite of being a new building, only ten

    years old,

    it

    presents

    many

    and

    different

    interesting

    defects.

  • 8/12/2019 Hw3 Hotel Alberi-1

    4/23

    The Hotel Alberi has been built attached at two other buildings and for this reason it has only two faades exposed: west and east faade. Its proximity to the lake also let the building exposed to humidity, therefore increasing the chances for early degradation of building components.

    The building surrou nding

    2. THE BUILDING AND ITS CONSTRUCTION TECHNIQUES AND MATERIALS The Hotel is composed by five floors over the ground level. In the ground floor we can find the hall of the hotel and a small dining room. Upstairs there are four floors where are located the rooms of the

    guests. The last floor, the 5 th , is used by the owner's family. There is also a basement floor, used like garages and services facilities.

    The buildings site

  • 8/12/2019 Hw3 Hotel Alberi-1

    5/23

    Ground Floor Plan

    First Floor Plan

  • 8/12/2019 Hw3 Hotel Alberi-1

    6/23

    Second, Third and Fourth Floors Plan (Type floor)

    Fifth Floor Plan

  • 8/12/2019 Hw3 Hotel Alberi-1

    7/23

    Basement Floor Plan

    The Hotel has been built with a typical reinforced concrete structure. According to the owners of the

    building, the vertical enclosure on the external side of the EAST faade are made by hole bricks and a

    rendering layer, while inside the finishing is with gypsum board and wallpaper.

    Concrete Structu re Dry wall system

  • 8/12/2019 Hw3 Hotel Alberi-1

    8/23

    East Faade

    At the basement, the perimetral walls are in concrete with an insulation layer inside, and a water proof layer outside, made with asphalt and felt membranes.

    On the WEST faade, which looks at the landscape of the lake, the enclosure is given by a ventilated wall, made by a layer of ceramic bricks, a layer of insulation, a layer of still air, and the finishing is made

    with stone tiles, hanged at the reinforced concrete structure with metallic joints.

  • 8/12/2019 Hw3 Hotel Alberi-1

    9/23

    West Faade

    Some example of materials used in the building process of the Hotel Alberi, according to information from the owner:

    - The horizontal structures are made with reinforced concrete combined with holed bricks, in

    order to have a resistant but light structure.

    - The vertical structures are made with reinforced concrete pillar

    - The ceilings and the inside layer of the walls are made with gypsum boards, applied on a light

    metallic structure. - The floors of the rooms are finished with parquet, glued at the layer below

  • 8/12/2019 Hw3 Hotel Alberi-1

    10/23

    3. FAILURE PATTERN IDENTIFICATION

    3.1. Exterior Degradation pattern

    EAST FAADE Degradation pattern Degradation pattern

  • 8/12/2019 Hw3 Hotel Alberi-1

    11/23

    EAST FAADE

    Degradation pattern

  • 8/12/2019 Hw3 Hotel Alberi-1

    12/23

    EAST FAADE

    Degradation pattern Description

    Chromatic alteration: Under the left bottom window there is a line presenting

    chromatic alteration.

    The painted central column

    presents diffuse over all its

    surface bleaching of the paint.

    Crack missing structural joints: The center decorative column presents cracking on different places, which apparently will

    eventually become loss of mass.

    At the lower part of the faade are shown 3 horizontal cracks, on the whole width of the building,

    and apparently situated on the

    wall slab connections.

    Also in the connection between the slab and the porch columns there are deeper cracks,

    presenting already exfoliation on

    the paint and loss of mass on the left column.

  • 8/12/2019 Hw3 Hotel Alberi-1

    13/23

    Degradation pattern Description

    Cracks and delamination of the painting: In correspondence with cracks and haircrack we

    can see delamination of the paint, loss of mass

    and, in the last picture, some blistering.

  • 8/12/2019 Hw3 Hotel Alberi-1

    14/23

    WEST FAADE

    Degradation pattern Degradation pattern

  • 8/12/2019 Hw3 Hotel Alberi-1

    15/23

    WEST FAADE

    Degradation pattern Synthetic description

    Crack and chromatic alteration: As we saw on the east faade, alson this side we can see that thcentral column presents some colobleaching, diffuse along the entirsurface, in some point we caobserve an exfoliation of the painAlso on the main central column arvisible some small but diffuse cracks

    Cracks missing joints:

    In the first picture we can see column at the main faade

    presenting

    a

    vertical

    cracking

    in

    its height, and its located basically

    the joints between finishing.

    In the second picture of the maifaade it can be noticed again vertical crack between the differenfinishing types. The crack continuesto the second level, presenting alsloss of mass and chromaticalteration on the left side.

  • 8/12/2019 Hw3 Hotel Alberi-1

    16/23

  • 8/12/2019 Hw3 Hotel Alberi-1

    17/23

    BASEMENT FLOOR

    Degradation pattern Description

    Loss of mass with pulverization:

    We can see a detachment of the painting and rendering leading to a pulverization of the wall. Probably caused by the humidity in the basement

    floor.

    Crack missing structural joints:

    As seen in the picture, the cracks are only in the joints of the structural parts. These cracks were probably caused by the movement of the site while some construction works were done nearby.

    Crack of the painting, pulverization and stain: By the pattern of the cracks, the stains and the

    pulverization in this wall, we can say that they

    were probably caused by water capillarity.

  • 8/12/2019 Hw3 Hotel Alberi-1

    18/23

    FIRST TO FOURTH FLOOR

  • 8/12/2019 Hw3 Hotel Alberi-1

    19/23

    FIRST TO FOURTH FLOOR

    Degradation pattern Synthetic description

    Crack and Delamination of the painting: In this case, the loss of mass appears in the shape of a crack in the painting, leading also to a delamination process.

    Blistering: Case of blistering in the painting of the

    gypsum ceiling, probably caused by water

    capillarity.

    Staining:

    The ceiling surface became darker, due to iron

    oxides and water etc.

  • 8/12/2019 Hw3 Hotel Alberi-1

    20/23

    Degradation pattern Synthetic description

    Cracks missing structural joints:

    As seen

    in

    these

    pictures,

    the

    cracks

    are

    only

    in

    the joints of the structural parts. These cracks are also reflected in the exterior of the building and were probably caused by the movement of

    the site while some construction works were done nearby.

    Cracking blistering of the wallpaper:

    The crack in the wall here causes a blistering at

    the wallpaper. This crack is also reflected in the outside and it was probably caused by the

    movement of the site while some construction works were done nearby.

  • 8/12/2019 Hw3 Hotel Alberi-1

    21/23

    Degradation pattern Synthetic description

    Cracking:

    Here the cracks appear in the openings of the walls, from the top to the bottom direction. These cracks were probably caused by the movement of the site while some construction

    works were done nearby.

  • 8/12/2019 Hw3 Hotel Alberi-1

    22/23

    4. MAPPING WEST FAADE

  • 8/12/2019 Hw3 Hotel Alberi-1