HISTORIC BARTON SCHOOLHOUSE ADAPTIVE USE/RESTORATION
1175 IOWA STREET REDLANDS CA 92373 05-14- 2015
WELCOME
BEGAN LIFE AS A SCHOOL HOUSE
Years: 1903 or 1912
CLASS PHOTO
Year: 1909
HOW IT LOOKED
MOVING DAY!!
Fall, 2009
BARTON SCHOOL HAS FOUND A NEW HOME!
LOOKING MUCH BETTER, BUT……..
STUDENTS LEARN BY WORKING
BARTON SCHOOLHOUSE : EXTERIOR
BARTON SCHOOLHOUSE : EXTERIOR
BARTON SCHOOLHOUSE : INTERIOR
BARTON SCHOOLHOUSE
BARTON SCHOOLHOUSE
BARTON SCHOOLHOUSE
BARTON SCHOOLHOUSE
BARTON SCHOOLHOUSE TODAY
BARTON SCHOOLHOUSE TODAY
BARTON SCHOOLHOUSE TODAY
BARTON SCHOOLHOUSE TODAY
Architectural Site PlanMASTER ARCHITECTURAL SITE PLAN
Architectural Site PlanPARTAL ARCHITECTURAL SITE PLAN
ARCHITECTURAL FLOOR PLAN
ARCHITECTURAL FLOOR PLANFLOOR AREA : EXISTING AND ADDITION
23
44
26
EXISTING HISTORICBARTON SCHOOLHOUSE2,704 SF
1,758 SF1,606 SF
TOTAL ADDITION = 3,364 SF
SERVICE WINGADDITION
ENTRY LOBBY
GALLERY
ARCHITECTURAL FLOOR PLANSEMINAR CONFIGURATION
23 29
44
26
ARCHITECTURAL FLOOR PLANSEMINAR / THEATRE CONFIGURATION
52
151
ARCHITECTURAL FLOOR PLANASSEMBLY CONFIGURATION
350
ARCHITECTURAL FLOOR PLANSEMINAR ASSEMBLY CONFIGURATION
134
ARCHITECTURAL FLOOR PLANBANQUET HALL CONFIGURATION
134
EXTERIOR ELEVATION NORTH ELEVATION
EXTERIOR ELEVATION WEST ELEVATION
EXTERIOR ELEVATION SOUTH ELEVATION
EXTERIOR ELEVATION EAST ELEVATION
EXTERIOR PERSPECTIVE VIEWS
EXTERIOR PERSPECTIVE VIEWS
EXTERIOR PERSPECTIVE VIEWS
EXTERIOR PERSPECTIVE VIEWS
EXTERIOR PERSPECTIVE VIEWSSEMINAR CONFIGURATION
EXTERIOR PERSPECTIVE VIEWSSEMINAR W/THEATRE CONFIGURATION
EXTERIOR PERSPECTIVE VIEWSASSEMBLY CONFIGURATION
EXTERIOR PERSPECTIVE VIEWSSEMINAR ASSEMBLY CONFIGURATION
EXTERIOR PERSPECTIVE VIEWSBANQUET HALL CONFIGURATION
INTERIOR PERSPECTIVE VIEWSEMINAR CONFIGURATION 1
INTERIOR PERSPECTIVE VIEWSEMINAR CONFIGURATION 2
INTERIOR PERSPECTIVE VIEWASSEMBLY CONFIGURATION 1
INTERIOR PERSPECTIVE VIEWASSEMBLY CONFIGURATION 2
THEATRE CONFIGURATION
INTERIOR PERSPECTIVE VIEW
THEATRE CONFIGURATION 2
INTERIOR PERSPECTIVE VIEW
INTERIOR PERSPECTIVE VIEWSSEMINAR CONFIGURATION
INTERIOR PERSPECTIVE VIEWSBANQUET HALL CONFIGURATION
BARTON SCHOOLHOUSE PRESERVATION/ ADAPTIVE USE PROJECTCOST ESTIMATE SUMMARY
SPACE/ COMPONENT AREA/ QUANTITY SF COST SUBTOTAL NOTE
BSH SEMINAR ROOM/ ASSEMBLY 2,704 $ 115.00 $ 310,960.00 INCLUDES RETROFIT
RESTROOMS 485 $ 200.00 $ 97,000.00
KITCHEN 840 $ 275.00 $ 231,000.00 INCLUDES EQUIPMENT
CONF. ROOM/ STORAGE/ HALL 433 $ 150.00 $ 64,950.00
ENTRY LOBBY 756 $ 180.00 $ 136,080.00
GALLERY/ LOUNGE 850 $ 160.00 $ 136,000.00
MAIN LANDING, STAIR, ADA RAMP 400 $ 100.00 $ 40,000.00
EAST LANDING, STAIR, ADA RAMP 560 $ 100.00 $ 56,000.00
GRADE LEVEL COVERED PATIO 1,128 $ 45.00 $ 50,760.00
UTILITY RUN/ CONNECTIONS $ 90,000.00
BUILDING COST TOTAL $ 1,212,750.00
A&E FEE $ 65,000.00
TOTAL PROJECT COST $ 1,277,750.00
PROJECT PHASING DESCRIPTION COST SUBTOTAL NOTEPHASE 1 COMPLETE BSH EXTERIOR $ 100,000.00 $ 100,000.00 PHASE 2 INSTALL UTILITIES $ 90,000.00 $ 190,000.00 PHASE 3 ADDITION SHELL $ 196,475.00 $ 386,475.00 PHASE 4 FINISH RESTROOMS $ 48,000.00 $ 434,475.00 PHASE 5 FINISH BSH INTERIOR $ 210,960.00 $ 645,435.00 CERT OF OCCUPANCYPHASE 6 ENTRIES/ LOBBY/ LOUNGE/ RAMPS $ 368,080.00 $ 1,013,515.00 PHASE 7 KITCHEN/ COMPLETE ADDITION $ 148,475.00 $ 1,161,990.00 PHASE 8 GRADE LEVEL COVERED DINING $ 50,760.00 $ 1,212,750.00
BARTON SCHOOLHOUSE PRESERVATION/ ADAPTIVE USE PROJECTCOST ESTIMATE SUMMARY
BARTON SCHOOLHOUSE
HISTORIC BARTON SCHOOLHOUSE ADAPTIVE USE/RESTORATION