himalayan balsam method statement (condition...
TRANSCRIPT
Pine Lake, Stenson Himalayan Balsam Method Statement
TEP.5257.002 June 2015
Prepared by:
TEP
Genesis Centre
Birchwood Science Park
Warrington
WA3 7BH
Tel: 01925 844004
Fax: 01925 844002
E-mail: [email protected]
For:
Foundation Matters Pine Lake
Barrow on Trent Derby
DE73 7GB
Written: Checked: Approved:
AMB DCS DCS
HIMALAYAN BALSAM METHOD STATEMENT FOR
PINE LAKE, STENSON
(Report Ref: TEP. 5257.002) June 2015 Version 2.0
PINE LAKE, STENSON HIMALAYAN BALSAM METHOD STATEMENT
1.0 INTRODUCTION ........................................................................................... 1
2.0 METHOD STATEMENT ................................................................................. 2
APPENDICES Appendix 1: Phase 1 Habitat Map Appendix 2: Landscape Buffer Zones (TEP Ref: D4519.006)
5257.002 1 June 2015 Version 2.0
1.0 INTRODUCTION
1.1 TEP was commissioned by Foundation Matters to prepare a Himalayan Balsam Method
Statement to comply with Condition 6 of planning permission (application ref:
9/2014/0955) for the extension to an existing children’s camp, creation of a recreation
lake and recreational facilities at Pine Lake, Stenson.
1.2 Condition 6 states:
“No development, including site clearance, shall take place until a detailed method statement for the management during the construction phase of the Himalayan balsam located on the site has been submitted to and approved in writing by the Local Planning Authority. The method statement shall include measures that will be used to prevent the spread of Himalayan balsam, Water fern and New Zealand pygmyweed during any operations for the duration of construction (e.g. mowing, strimming or soil movement). It shall also contain measures to ensure that any soils brought on to or removed from the site are free of the seeds/root/stem of any invasive plant listed under the Wildlife and Countryside Act 1981 (as amended). Development shall proceed in accordance with the approved method statement at all times.”
1.3 Water fern and New Zealand pygmyweed were not identified during site surveys and no
records of these species were returned during the desktop survey (TEP report ref.
4519.003 Pine Lake, Stenson, Ecological Assessment). Reference to these species in
Condition 6 appears to be in error; this method statement therefore only addresses
measures to avoid the spread of Himalayan balasam Impatiens glandulifera.
1.4 The locations of Himalayan balsam are shown on the Phase 1 Habitat Map (TEP Ref:
G4519.001) at Appendix 1. Himalayan balsam is present along the banks of Twyford
Brook, along a ditch surrounding an amenity grassland field in the east of the site and
within an area mapped as swamp habitat in the south east of the site.
1.5 Himalayan balsam is a non-native invasive plant and is listed on Schedule 9 of the
Wildlife and Countryside Act 1981. Under provisions made within the Wildlife and
Countryside Act 1981, it is an offence to spread Himalayan balsam. Liability may also
extend in situations where a landowner has knowingly permitted the spread of
Himalayan balsam onto neighbouring land.
1.6 Any waste containing Himalayan balsam is classed as Controlled Waste under the
Environmental Protection (Duty of Care) Regulations 1991, which requires all producers,
carriers and disposers of waste to follow a code of practice and keep records.
1.7 Failure to manage and dispose of invasive species in accordance with the above
legislation can lead to prosecution.
5257.002 2 June 2015 Version 2.0
2.0 METHOD STATEMENT
2.1 All staff working on site will be made aware that Himalayan balsam is present on site; an
explanation of the content of this Method Statement will be included in the Site Induction.
This Method Statement will be on display in the Site Office for the duration of the works.
2.2 Fencing will be erected at 10m distance from the bank tops of Twyford Brook and
ditches. This is to prevent accidental encroachment onto and disturbance of the brook
banks, ditch banks and swamp and to prevent the spreading of Himalayan balsam to
other parts of the site. The area within the fencing is referred to as the Exclusion Zone
and is shown on the Landscape Buffer Zones plan (TEP Ref: D4519.006) at Appendix 2.
2.3 Where works require access to the Exclusion Zone, these works will be overseen by an
Ecological Clerk of Works.
2.4 Vehicles working within the Exclusion Zone will be cleaned within the Exclusion Zone
before being used in other parts of the site or before leaving the site. This is to prevent
contaminating other parts of the site or off-site areas.
2.5 Any material from within Exclusion Zone that is not reused within the Exclusion Zone will
be taken off-site and disposed of at a facility licensed to accept Controlled Waste. The
Ecological Clerk of Works will supervise the loading of Controlled Waste onto carrier
vehicles and will ensure that these loads are sealed before leaving the site. The
Ecological Clerk of Works will obtain signed receipts from carriers from all loads of
Controlled Waste that leave the site and will give these receipts to the Site Manager.
2.6 During construction, areas outside of the Exclusion Zone but within the site will be
monitored for Himalayan balsam by a suitably qualified person. Monitoring inspections
will be undertaken each month between April and September. If any Himalayan balsam
plants are identified outside of the Exclusion Zone, management measures will be
implemented to keep the species under control.
2.7 Management measures implemented outside of the Exclusion Zone will aim to prevent
Himalayan balsam plants from flowering and hence prevent the plants from setting seed.
Identified plants will either be cut with a scythe below the lowest node or sprayed with a
glyphosate-based herbicide. Plants will be cut or sprayed once every four weeks within
the monitoring period of April to September inclusive.
5257.002 3 June 2015 Version 2.0
APPENDIX 1
5257.002 4 June 2015 Version 2.0
M MG G
M MG G
M M
M M
G G
G G
M M M M
M M M M
G G G G
G G G G
A A A A A
A A A A A
A A A A A
A A A A A
A A A A A
A A A A A
A A A A A
A A A A A
A A A A A
A A A A A
A A A A A
A
A
A
A
A A
! ! ! ! ! ! !
! ! ! ! ! ! !
! ! ! ! ! ! !
! ! ! ! ! ! !
! ! ! ! ! ! !
! ! ! ! ! ! !
! ! ! ! ! ! !
! ! ! ! ! ! !
! ! ! ! ! ! !
! ! ! ! ! ! !
! ! ! ! ! ! !
! ! ! ! ! ! !
A A A A A A A A
A A A A A A A A
A A A A A A A A
A A A A A A A A
A A A A A A A A
A A A A A A A A
A A A A A A A A
A A A A A A A A
M M M M
M M M M
M M M M
G G G G
G G G G
G G G G
! ! ! ! ! !
! ! ! ! ! !
! ! ! ! ! !
! ! ! ! ! !
D D D D D D D D DD D D D D D D D DD D D D D D D D DD D D D D D D D DD D D D D D D D DD D D D D D D D D
S S S S S S S S S S S S S
S S S S S S S S S S S S S
S S S S S S S S S S S S S
S S S S S S S S S S S S S
S S S S S S S S S S S S S
S S S S S S S S S S S S S
S S S S S S S S S S S S S
S S S S S S S S S S S S S
S S S S S S S S S S S S S
S S S S S S S S S S S S S
S S S S S S S S S S S S S
I I I I I I I I I I I I I
I I I I I I I I I I I I I
I I I I I I I I I I I I I
I I I I I I I I I I I I I
I I I I I I I I I I I I I
I I I I I I I I I I I I I
I I I I I I I I I I I I I
I I I I I I I I I I I I I
I I I I I I I I I I I I I
I I I I I I I I I I I I I
I I I I I I I I I I I I I
S S S S S S S S S
S S S S S S S S S
S S S S S S S S S
S S S S S S S S S
S S S S S S S S S
S S S S S S S S S
S S S S S S S S S
S S S S S S S S S
S S S S S S S S S
I I I I I I I I I
I I I I I I I I I
I I I I I I I I I
I I I I I I I I I
I I I I I I I I I
I I I I I I I I I
I I I I I I I I I
I I I I I I I I I
I I I I I I I I I
! ! ! ! ! ! ! ! ! ! ! !
! ! ! ! ! ! ! ! ! ! ! !
! ! ! ! ! ! ! ! ! ! ! !
! ! ! ! ! ! ! ! ! ! ! !
! ! ! ! ! ! ! ! ! ! ! !
! ! ! ! ! ! ! ! ! ! ! !
! ! ! ! ! ! ! ! ! ! ! !
! ! ! ! ! ! ! ! ! ! ! !
! ! ! ! ! ! ! ! ! ! ! !
! ! ! ! ! ! ! ! ! ! ! !
S S S S S
S S S S S
S S S S S
S S S S S
S S S S S
S S S S S
I I I I I
I I I I I
I I I I I
I I I I I
I I I I I
I I I I I
S S S S
S S S S
I I I I
I I I I
S S S S S S
S S S S S S
S S S S S S
S S S S S S
S S S S S S
S S S S S S
I I I I I I
I I I I I I
I I I I I I
I I I I I I
I I I I I I
I I I I I I
S S S S S S S S S S S
S S S S S S S S S S S
S S S S S S S S S S S
S S S S S S S S S S S
S S S S S S S S S S S
S S S S S S S S S S S
S S S S S S S S S S S
S S S S S S S S S S S
S S S S S S S S S S S
S S S S S S S S S S S
S S S S S S S S S S S
S S S S S S S S S S S
I I I I I I I I I I I
I I I I I I I I I I I
I I I I I I I I I I I
I I I I I I I I I I I
I I I I I I I I I I I
I I I I I I I I I I I
I I I I I I I I I I I
I I I I I I I I I I I
I I I I I I I I I I I
I I I I I I I I I I I
I I I I I I I I I I I
I I I I I I I I I I I
! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !
! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !
! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !
! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !
! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !
! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !
! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !
! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !
! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !
! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !
! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !
! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !
! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !
! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !
! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !
! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !
! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !
! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !
! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !
! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !
! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !
! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !
! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !
! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !
! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !
! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !
! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !
! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !
! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !
! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !
! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !
! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !
! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !
! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !
! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !
! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !
! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !
! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !
! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !
! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !
! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !
M M M M M M M M M M M M M
M M M M M M M M M M M M M
M M M M M M M M M M M M M
M M M M M M M M M M M M M
M M M M M M M M M M M M M
M M M M M M M M M M M M M
M M M M M M M M M M M M M
M M M M M M M M M M M M M
G G G G G G G G G G G G G
G G G G G G G G G G G G G
G G G G G G G G G G G G G
G G G G G G G G G G G G G
G G G G G G G G G G G G G
G G G G G G G G G G G G G
G G G G G G G G G G G G G
G G G G G G G G G G G G G
A
A
A
A A
A A
A A
A
A
A A
A A
A A A A A A A A
A A A A A A A A
A A A A A A A AA A
A A
A A
A A A
A A A
A A A
A A A
A A A
VI VI VI VI VI VI VI VI VI VI VI VI VI VI VI VI VI VI VI VIVI VI VI VI VI VI VI VI VI VI VI VIVI VIVI VIVI VIVIVIVIVIVIVIVIVIVI
VIVIVIVIVIVIVIVIVIVIVIVIVIVIVIVIVIVIVIVIVIVI
VI VI VI VI VI VI VI VI VI VI VI VI VI VI VI VI VI VI VI VI VI VI VI VI VI VI VI VI VI VI VI VI VI VI VI VI VI VI VI VI VI VI VI VI VI VI VI VI VI VI VI VI VI VI VI VI VI VI VI VI VI VI VI VI VI VI VI VI VI VI VI VI VI VI VI VI VI VI VI VI VI
VI VI VI VI VI VI VI VI VI
VI VI VI VI
??
??
?
?
!!!
!!!
!!!!
!!!
! ! !
!
!!!!!!!!
!!!!!!!!!
!!
!!
!! ! !!
!
!!
!
!
!
!! !
!
!
!
!
!!
!
!
!
!
!
!
!!
!! ! !
!
!
!!
!!
!!!!
!!
!!
!!
!!
!!
!!
!!
!!
!!!!
!!!!
!!!!
!!
!!!!!!!!!!!!!!!!
!!
!!
!!
!!
EEEEEEEEEE EEEEE
EEEEE EE
EEEEEEEEEEE EE E E EE EEE E
EEE EEEE
EEEEEEEEEEEEE
EEEEEEEEEEEEEEEEEEEEEEEEE
EEEE
E
EE
EE
EEEE
EEE
EEE
EEE
EEE
EEE
EEE
EEE
EE
EE
EEE
EEEEEE E E E E E
EEEE E
EE
!(HB!(HB
!(HB !(HB
!(HB
!(HB
!(HB
!(HB
H
H
H
H
H
H
H
H
H
H
H
H
H
H
P1
P2
P3
P4
D1 D2
TN9
TN8
TN7
TN6
TN5
TN4
TN3
TN2
TN1
TN14
TN13
TN12
TN11
TN10
IH VG ??
16/07/2014
G4519.001
Phase 1 Habitat Map
Key
Rev Description Dwn Appvd Date
Pine Lake, Stenson
Drawn: Checked: Approved:
Date:Scale:
Map No.
Title:
Project:
@ A31:2,500
Genesis CentreBirchwood Science Park Warrington WA3 7BHTel 01925 844004Fax 01925 844002email [email protected]
Survey boundaryH Target notes (TN1 - TN14)!(HB Himalayan balsamE Scattered scrub! Scattered broad-leaved trees!! Broad-leaved tree with bat potential
Marginal vegetation? Running water
VI VI VI Native species-rich hedge and treesDry ditchSemi-natural broad-leaved woodlandPlantation broad-leaved woodland
D D D D D DD D D D D DD D D D D DD D D D D DScattered scrub
SISemi-improved neutral grassland
MG
Modified neutral grasslandTall ruderalSwampStanding waterRunning water
A A
A A Amenity grassland
! ! ! ! ! !
! ! ! ! ! !
! ! ! ! ! !
! ! ! ! ! !
Bare groundBuildingsHardstanding
0 100 200 300 40050Metres
Fizam
s Lan
e
SIMG
A
Contains Ordnance Survey data © Crown copyright and database right 2011
5257.002 5 June 2015 Version 2.0
APPENDIX 2
10m Buffer Zone from existing
watercourses and waterbodies
5m Buffer Zone from existing trees
and hedgerows
10m Buffer Zone from Himalayan
Balsam
Key
HB
HB
HB
HB
HB
HB
0m 10m 20m 50m 100m
Title
LG
Drawn
Scale
see scale bar @ A3
Drwg No
D4519.006
Landscape Buffer Zones
MW
Checked
MW
18/06/15
Approved
Date
Pine Lake, Stenson
Project
Genesis Centre
Birchwood Science Park Warrington
WA3 7BH
Tel 01925 844004
Fax 01925 844002
e-mail [email protected]
Description
Reproduced by permission of Ordnance Survey on behalf of Her Majesty's
Stationery Office.
© Crown Copyright and database right 2014. All rights reserved.
Rev Drawn Approved Date
Scale Bar