highways works programme 2020-2021
TRANSCRIPT
Highways works programme 2020-2021 Street Name Area/Parish Works Type Duration Planned
Start
Planned
Finish
Traffic
Management
Removal of vegetation on
cycleway links
Footway and
Cycleways
Vegetation
Removal
Various TBC -
2020/2021
TBC -
2020/2021
Off Highway
Work
Various Location upgrades of
PROW surfacing
PROW Network PROW Footway
surfacing
Various TBC -
2020/2021
TBC -
2020/2021
Off Highway
Work
CHAPEL LANE Addlethorpe Surface Dressing
1 days 18/05/2020 18/05/2020 Short duration road closure
A1104, Market Place, crossing Alford Replace anti-skid/red with new surfacing
TBC TBC in 2021
TBC in 2021
TBC
Various locations through village
Alford Street Lighting Improvements
30 days 06/07/2020 14/08/2020 Give & Take
RED BARN LN / MOORES LN / ELM LN
Algarkirk Surface Dressing
1 days 17/05/2020 17/05/2020 Short duration road closure
PITCHER ROW LN Algarkirk Surface
Dressing
1 days 17/05/2020 17/05/2020 Short duration
road closure YARBURGH ROAD Alvingham Surface
Dressing
1 days 21/05/2020 21/05/2020 Short duration
road closure
SUTTERTON DRO. Amber Hill Surface Dressing
1 days 15/06/2020 15/06/2020 Short duration road closure
SUTTERTON DRO. Amber Hill Surface Dressing
1 days 23/06/2020 23/06/2020 Short duration road closure
Camp to B1191 junction Ashby Carriageway structural patching
TBC TBC in 2021
TBC in 2021
TBC
MAIN STREET Ashby De La Launde Surface Dressing
1 days 02/06/2020 02/06/2020 Short duration road closure
THURLBY ROAD Aubourn Carriageway
Resurfacing
5 days 08/10/2020 14/10/2020 Road Closure
Highways works programme 2020-2021 Street Name Area/Parish Works Type Duration Planned
Start
Planned
Finish
Traffic
Management
ROYAL OAK LANE Aubourn Minor Drainage
Repairs
20 days 07/09/2020 02/10/2020 Road Closure
B1190 HORNCASTLE ROAD Bardney Carriageway
Resurfacing
6 days 28/09/2020 05/10/2020 Road Closure
A607 - GRANTHAM ROAD Barkston Surface Dressing
1 days 10/06/2020 10/06/2020 Convoy
CHAPEL NOOK LANE Bassingham Surface Dressing
1 days 26/05/2020 26/05/2020 Short duration road closure
THURLBY ROAD Bassingham Surface Dressing
1 days 11/07/2020 11/07/2020 Short duration road closure
MAIN STREET Belton Surface Dressing
1 days 21/05/2020 21/05/2020 Short duration road closure
BILLINGBOROUGH DROVE Billingborough Surface Dressing
1 days 03/06/2020 03/06/2020 Short duration road closure
Links to village Centre Billinghay New Cycleway TBC 2021 - TBC 2021 - TBC Footway Closure
HIGH STREET Billinghay Surface
Dressing
1 days 06/07/2020 06/07/2020 Stop & Go
MILL LN Billinghay Surface
Dressing
1 days 06/07/2020 06/07/2020 Stop & Go
FIELD ROAD (PART) Billinghay Surface Dressing
1 days 06/07/2020 06/07/2020 Short duration road closure
MEADOW WAY Billinghay Surface Dressing
1 days 06/07/2020 06/07/2020 Short duration road closure
LOUTH RD Binbrook Footway Works 5 days 20/04/2020 24/04/2020 Road Closure
ATTERBY CARR LANE-SOUTH RAMPER
Bishop Norton Carriageway Reconstruction
5 days 15/09/2020 21/09/2020 Road Closure
Atterby Carr Lane Bishop Norton Carriageway
Reconstruction
TBC TBC in
2021
TBC in
2021
TBC
Highways works programme 2020-2021 Street Name Area/Parish Works Type Duration Planned
Start
Planned
Finish
Traffic
Management
C003, LONG WOOD CULVERT
(BR NO 05/59/61)
Blankney Structures
Improvements
16 days 06/07/2020 27/07/2020 Road Closure
B1188 - LINCOLN ROAD Blankney Surface
Dressing
1 days 09/06/2020 09/06/2020 Convoy
STATION ROAD Blyton Surface Dressing
1 days 30/05/2020 30/05/2020 Short duration road closure
RED CAP LANE - TBC Boston Carriageway Patching
5 days 16/11/2020 20/11/2020 Road Closure
PENN STREET Boston Carriageway Resurfacing
5 days 03/08/2020 07/08/2020 Road Closure - NIGHTS
WIDE BARGATE Boston Carriageway Resurfacing
4 days 10/08/2020 13/08/2020 Road Closure - NIGHTS
A1138 Dock Road Boston Carriageway Resurfacing
8 weeks 28/09/2020 20/11/2020 Road Closure - NIGHTS
ARUNDLE CRESCENT Boston Footway Works 31 days 22/07/2020 02/09/2020 Road Closure
AMBERLEY CRESCENT Boston Footway Works 31 days 22/07/2020 02/09/2020 Road Closure
Various locations BOSTON Street Lighting Improvements
20 days 15/02/2021 12/03/2021
C849, TOWN BRIDGE (BR NO 34/24/70)
Boston Structures Improvements
65 days 08/06/2020 06/09/2020 Lane Closure
RAWSON'S BRIDGE Boston Structures Improvements
10 days 22/06/2020 03/07/2020 Road Closure
RICHARDSONS BRIDGE,
COWBRIDGE
Boston Structures
Improvements
5 days 17/08/2020 21/08/2020 Road Closure
A16, SOUTH FORTY FOOT
DRAIN BRIDGE (34/22/59)
Boston Structures
Improvements
TBC TBC TBC 2-way Signals
HORNCASTLE RD Boston Surface Dressing
1 days 18/06/2020 18/06/2020 Stop & Go
Highways works programme 2020-2021 Street Name Area/Parish Works Type Duration Planned
Start
Planned
Finish
Traffic
Management
RED LION ST Boston Surface
Dressing
1 days 24/07/2020 24/07/2020 Short duration
road closure WELLAND RD/ SOUTH
PARADE
Boston Surface
Dressing
1 days 24/07/2020 24/07/2020 Stop & Go
CHURCH RD Boston Surface Dressing
1 days 24/07/2020 24/07/2020 Stop & Go
FRESHNEY WAY Boston Surface Dressing
1 days 25/07/2020 25/07/2020 Short duration road closure
GLEN DRI Boston Surface Dressing
1 days 25/07/2020 25/07/2020 Short duration road closure
CHESTER WAY Boston Surface Dressing
1 days 25/07/2020 25/07/2020 Short duration road closure
MEDLAM RD Boston Surface Dressing
1 days 25/07/2020 25/07/2020 Short duration road closure
FENSIDE RD Boston Surface Dressing
1 days 25/07/2020 25/07/2020 Short duration road closure
GPR SURVEY -
HORNCASTLE RD O/S NEW PROPERTIES
Boston Traffic Signals
Improvements
2 days 06/07/2020 07/07/2020 Mobile Works
SLEAFORD ROAD/BROTHERTOFT ROAD
Boston Traffic Signals Improvements
25 days 27/07/2020 28/08/2020 Road Closure
A151 Bourne Carriageway Resurfacing
3 weeks 27/07/2020 14/08/2020 Road Closure
HARRINGTON STREET Bourne Footway Micro-asphalt surfacing
9 days 20/05/2020 01/06/2020 Give and Take
RECREATION ROAD Bourne Footway Micro-
asphalt surfacing
9 days 20/05/2020 01/06/2020 Give and
Take
Highways works programme 2020-2021 Street Name Area/Parish Works Type Duration Planned
Start
Planned
Finish
Traffic
Management
MANNING ROAD EAST Bourne Footway Micro-
asphalt surfacing
8 days 21/05/2020 01/06/2020 Give and
Take
STANTON CLOSE Bourne Footway Micro-asphalt surfacing
5 days 26/05/2020 01/06/2020 Give and Take
NORTH ROAD(EAST SIDE) Bourne Footway Micro-asphalt
surfacing
6 days 26/05/2020 02/06/2020 Give and Take
CHERRY HOLT ROAD Bourne Footway Micro-
asphalt surfacing
8 days 26/05/2020 04/06/2020 Give and
Take
WEST ROAD(SOUTH SIDE) Bourne Footway Micro-asphalt surfacing
6 days 29/05/2020 05/06/2020 Give and Take
STEPHENSON WAY Bourne Footway Micro-asphalt
surfacing
10 days 08/06/2020 19/06/2020 Give and Take
CHERITON WAY Bourne Footway Micro-asphalt surfacing
10 days 08/06/2020 19/06/2020 Give and Take
THE SPINDLES Bourne Footway Micro-asphalt surfacing
10 days 08/06/2020 19/06/2020 Give and Take
LINDEN RISE Bourne Footway Micro-
asphalt surfacing
10 days 09/06/2020 22/06/2020 Give and
Take
Highways works programme 2020-2021 Street Name Area/Parish Works Type Duration Planned
Start
Planned
Finish
Traffic
Management
BRYONY GARDENS Bourne Footway Micro-
asphalt surfacing
10 days 10/06/2020 23/06/2020 Give and
Take
THE BRAMBLES Bourne Footway Micro-asphalt surfacing
10 days 10/06/2020 23/06/2020 Give and Take
BRIAR WALK Bourne Footway Micro-asphalt
surfacing
10 days 10/06/2020 23/06/2020 Give and Take
NORTHFIELDS Bourne Footway Micro-
asphalt surfacing
10 days 10/06/2020 23/06/2020 Give and
Take
RANGOON WAY Bourne Footway Micro-asphalt surfacing
10 days 11/06/2020 24/06/2020 Give and Take
WINGATE WAY Bourne Footway Micro-asphalt
surfacing
10 days 12/06/2020 25/06/2020 Give and Take
MOUNTBATTEN WAY Bourne Footway Micro-asphalt surfacing
10 days 15/06/2020 26/06/2020 Give and Take
ARAKAM WAY Bourne Footway Micro-asphalt surfacing
10 days 15/06/2020 26/06/2020 Give and Take
MANDALAY DRIVE Bourne Footway Micro-
asphalt surfacing
10 days 15/06/2020 26/06/2020 Give and
Take
Highways works programme 2020-2021 Street Name Area/Parish Works Type Duration Planned
Start
Planned
Finish
Traffic
Management
ARNHEM WAY Bourne Footway Micro-
asphalt surfacing
10 days 15/06/2020 26/06/2020 Give and
Take
PEGASUS GROVE Bourne Footway Micro-asphalt surfacing
10 days 15/06/2020 26/06/2020 Give and Take
BARKSTON CLOSE Bourne Footway Micro-asphalt
surfacing
10 days 15/06/2020 26/06/2020 Give and Take
LONSDALE GROVE Bourne Footway Micro-
asphalt surfacing
10 days 15/06/2020 26/06/2020 Give and
Take
OOSTERBEEK CLOSE Bourne Footway Micro-asphalt surfacing
10 days 15/06/2020 26/06/2020 Give and Take
ANCASTER ROAD Bourne Footway Micro-asphalt
surfacing
10 days 15/06/2020 26/06/2020 Give and Take
BLACKTHORN WAY Bourne Footway Micro-asphalt surfacing
10 days 15/06/2020 26/06/2020 Give and Take
MILL DROVE Bourne Footway Micro-asphalt surfacing
10 days 17/06/2020 30/06/2020 Give and Take
BALDWIN GROVE Bourne Footway Micro-
asphalt surfacing
10 days 18/06/2020 01/07/2020 Give and
Take
Highways works programme 2020-2021 Street Name Area/Parish Works Type Duration Planned
Start
Planned
Finish
Traffic
Management
SOUTHFIELDS
(INC.LINKPATH)
Bourne Footway Micro-
asphalt surfacing
10 days 19/06/2020 02/07/2020 Give and
Take
WESTWOOD DRIVE Bourne Footway Micro-asphalt surfacing
10 days 22/06/2020 03/07/2020 Give and Take
HARVEY CLOSE Bourne Footway Micro-asphalt
surfacing
10 days 22/06/2020 03/07/2020 Give and Take
OSTLER DRIVE Bourne Footway Micro-
asphalt surfacing
10 days 22/06/2020 03/07/2020 Give and
Take
CECIL CLOSE Bourne Footway Micro-asphalt surfacing
10 days 22/06/2020 03/07/2020 Give and Take
CHURCHILL AVENUE Bourne Footway Micro-asphalt
surfacing
14 days 22/06/2020 09/07/2020 Give and Take
MANOR LANE Bourne Footway Micro-asphalt surfacing
14 days 22/06/2020 09/07/2020 Give and Take
BERKELEY DRIVE Bourne Surface Dressing
1 days 26/06/2020 26/06/2020 Short duration road closure
STRETHAM WAY Bourne Surface Dressing
1 days 26/06/2020 26/06/2020 Short duration road closure
LARCH CLOSE Bourne Surface Dressing
1 days 26/06/2020 26/06/2020 Short duration road closure
WILLOW DRIVE Bourne Surface
Dressing
1 days 26/06/2020 26/06/2020 Short duration
road closure
Highways works programme 2020-2021 Street Name Area/Parish Works Type Duration Planned
Start
Planned
Finish
Traffic
Management
ELDER CLOSE Bourne Surface
Dressing
1 days 26/06/2020 26/06/2020 Short duration
road closure HOLLY DRIVE Bourne Surface
Dressing
1 days 26/06/2020 26/06/2020 Short duration
road closure
LAVENDER WAY Bourne Surface Dressing
1 days 26/06/2020 26/06/2020 Short duration road closure
LILAC CLOSE Bourne Surface Dressing
1 days 26/06/2020 26/06/2020 Short duration road closure
CEDAR DRIVE Bourne Surface Dressing
1 days 26/06/2020 26/06/2020 Short duration road closure
ROWAN WAY Bourne Surface Dressing
1 days 26/06/2020 26/06/2020 Short duration road closure
SHARPES CLOSE Bourne Surface Dressing
1 days 26/06/2020 26/06/2020 Short duration road closure
OAK CRESCENT Bourne Surface Dressing
1 days 26/06/2020 26/06/2020 Short duration road closure
ASH GROVE Bourne Surface
Dressing
1 days 27/06/2020 27/06/2020 Short duration
road closure SAXON WAY Bourne Surface
Dressing
1 days 27/06/2020 27/06/2020 Short duration
road closure
EDWIN GARDENS Bourne Surface Dressing
1 days 27/06/2020 27/06/2020 Short duration road closure
KINGSLEY AVENUE Bourne Surface Dressing
1 days 27/06/2020 27/06/2020 Short duration road closure
FOREST AVENUE Bourne Surface Dressing
1 days 27/06/2020 27/06/2020 Short duration road closure
WESTBOURNE PARK Bourne Surface Dressing
1 days 28/06/2020 28/06/2020 Short duration road closure
Highways works programme 2020-2021 Street Name Area/Parish Works Type Duration Planned
Start
Planned
Finish
Traffic
Management
PINEWOOD CLOSE Bourne Surface
Dressing
1 days 28/06/2020 28/06/2020 Short duration
road closure CHESTNUT WAY Bourne Surface
Dressing
1 days 28/06/2020 28/06/2020 Short duration
road closure
FIR AVENUE Bourne Surface Dressing
1 days 28/06/2020 28/06/2020 Short duration road closure
BEECH AVENUE Bourne Surface Dressing
1 days 28/06/2020 28/06/2020 Short duration road closure
WATLING CLOSE Bourne Surface Dressing
1 days 28/06/2020 28/06/2020 Short duration road closure
STONE CLOSE Bourne Surface Dressing
1 days 28/06/2020 28/06/2020 Short duration road closure
AKEMAN CLOSE Bourne Surface Dressing
1 days 28/06/2020 28/06/2020 Short duration road closure
DERE CLOSE Bourne Surface Dressing
1 days 29/06/2020 29/06/2020 Short duration road closure
ERMINE CLOSE Bourne Surface
Dressing
1 days 29/06/2020 29/06/2020 Short duration
road closure ST GILBERTS ROAD Bourne Surface
Dressing
1 days 29/06/2020 29/06/2020 Short duration
road closure
EXETER COURT Bourne Surface Dressing
1 days 29/06/2020 29/06/2020 Short duration road closure
EXETER CLOSE Bourne Surface Dressing
1 days 29/06/2020 29/06/2020 Short duration road closure
MAPLE GARDENS Bourne Surface Dressing
1 days 29/06/2020 29/06/2020 Short duration road closure
BALDWIN GROVE Bourne Surface Dressing
1 days 29/06/2020 29/06/2020 Short duration road closure
Highways works programme 2020-2021 Street Name Area/Parish Works Type Duration Planned
Start
Planned
Finish
Traffic
Management
ARNHEM WAY Bourne Surface
Dressing
1 days 29/06/2020 29/06/2020 Short duration
road closure OOSTERBEEK CLOSE Bourne Surface
Dressing
1 days 29/06/2020 29/06/2020 Short duration
road closure
BARKSTON CLOSE Bourne Surface Dressing
1 days 29/06/2020 29/06/2020 Short duration road closure
PEGASUS GROVE Bourne Surface Dressing
1 days 29/06/2020 29/06/2020 Short duration road closure
RANGOON WAY Bourne Surface Dressing
1 days 29/06/2020 29/06/2020 Short duration road closure
WINGATE WAY Bourne Surface Dressing
1 days 30/06/2020 30/06/2020 Short duration road closure
MOUNTBATTEN WAY Bourne Surface Dressing
1 days 30/06/2020 30/06/2020 Short duration road closure
ARAKAN WAY Bourne Surface Dressing
1 days 30/06/2020 30/06/2020 Short duration road closure
MANDALAY DRIVE Bourne Surface
Dressing
1 days 30/06/2020 30/06/2020 Short duration
road closure SOUTHFIELDS Bourne Surface
Dressing
1 days 30/06/2020 30/06/2020 Short duration
road closure
AUSTERBY CLOSE Bourne Surface Dressing
1 days 30/06/2020 30/06/2020 Short duration road closure
GROVENSOR AVENUE Bourne Surface Dressing
1 days 30/06/2020 30/06/2020 Short duration road closure
ESSEX WAY Bourne Surface Dressing
1 days 30/06/2020 30/06/2020 Short duration road closure
SYCAMORE GROVE Bracebridge Heath Footway Micro-asphalt surfacing
5 days 11/05/2020 15/05/2020 Give & Take
Highways works programme 2020-2021 Street Name Area/Parish Works Type Duration Planned
Start
Planned
Finish
Traffic
Management
KING DRIVE Bracebridge Heath Footway Micro-
asphalt surfacing
4 days 12/05/2020 15/05/2020 Give & Take
CARDYKE WAY Bracebridge Heath Footway Micro-asphalt surfacing
4 days 12/05/2020 15/05/2020 Give & Take
MAREHAM CLOSE Bracebridge Heath Footway Micro-asphalt
surfacing
3 days 13/05/2020 15/05/2020 Give & Take
FOSSE COURT Bracebridge Heath Footway Micro-
asphalt surfacing
3 days 13/05/2020 15/05/2020 Give & Take
PEDDARS COURT Bracebridge Heath Footway Micro-asphalt surfacing
9 days 14/05/2020 26/05/2020 Give & Take
AKEMAN DRIVE Bracebridge Heath Footway Micro-asphalt
surfacing
9 days 14/05/2020 26/05/2020 Give & Take
SALTERS CLOSE Bracebridge Heath Footway Micro-asphalt surfacing
8 days 15/05/2020 26/05/2020 Give & Take
ICKNIELD CLOSE Bracebridge Heath Footway Micro-asphalt surfacing
8 days 15/05/2020 26/05/2020 Give & Take
SEWSTERN CLOSE Bracebridge Heath Footway Micro-
asphalt surfacing
8 days 15/05/2020 26/05/2020 Give & Take
Highways works programme 2020-2021 Street Name Area/Parish Works Type Duration Planned
Start
Planned
Finish
Traffic
Management
STANE DRIVE Bracebridge Heath Footway Micro-
asphalt surfacing
8 days 15/05/2020 26/05/2020 Give & Take
APPIAN WAY Bracebridge Heath Footway Micro-asphalt surfacing
8 days 15/05/2020 26/05/2020 Give & Take
ERMINE COURT Bracebridge Heath Footway Micro-asphalt
surfacing
8 days 15/05/2020 26/05/2020 Give & Take
HADRIANS ROAD Bracebridge Heath Footway Micro-
asphalt surfacing
8 days 15/05/2020 26/05/2020 Give & Take
WATLING CLOSE Bracebridge Heath Footway Micro-asphalt surfacing
8 days 15/05/2020 26/05/2020 Give & Take
OAKDENE AVENUE Bracebridge Heath Footway Micro-asphalt
surfacing
8 days 15/05/2020 26/05/2020 Give & Take
MAPLE CLOSE Bracebridge Heath Footway Micro-asphalt surfacing
8 days 15/05/2020 26/05/2020 Give & Take
CAISTOR DRIVE Bracebridge Heath Footway Micro-asphalt surfacing
8 days 15/05/2020 26/05/2020 Give and Take
NORFOLK CRESCENT Bracebridge Heath Footway Micro-
asphalt surfacing
8 days 15/05/2020 26/05/2020 Give and
Take
Highways works programme 2020-2021 Street Name Area/Parish Works Type Duration Planned
Start
Planned
Finish
Traffic
Management
LICHFIELD ROAD Bracebridge Heath Footway Micro-
asphalt surfacing
10 days 18/05/2020 29/05/2020 Give and
Take
CARLISLE WAY Bracebridge Heath Footway Micro-asphalt surfacing
10 days 18/05/2020 29/05/2020 Give and Take
WINCHESTER CLOSE Bracebridge Heath Footway Micro-asphalt
surfacing
10 days 18/05/2020 29/05/2020 Give and Take
CANTERBURY ROAD Bracebridge Heath Footway Micro-
asphalt surfacing
10 days 18/05/2020 29/05/2020 Give and
Take
NORWICH DRIVE Bracebridge Heath Footway Micro-asphalt surfacing
9 days 26/05/2020 05/06/2020 Give and Take
SALISBURY DRIVE Bracebridge Heath Footway Micro-asphalt
surfacing
9 days 26/05/2020 05/06/2020 Give and Take
CHICHESTER ROAD Bracebridge Heath Footway Micro-asphalt surfacing
9 days 26/05/2020 05/06/2020 Give and Take
DURHAM CLOSE Bracebridge Heath Footway Micro-asphalt surfacing
9 days 26/05/2020 05/06/2020 Give and Take
YORK WAY Bracebridge Heath Footway Micro-
asphalt surfacing
9 days 26/05/2020 05/06/2020 Give and
Take
Highways works programme 2020-2021 Street Name Area/Parish Works Type Duration Planned
Start
Planned
Finish
Traffic
Management
WORCESTER CLOSE Bracebridge Heath Footway Micro-
asphalt surfacing
9 days 26/05/2020 05/06/2020 Give and
Take
ROCHESTER CLOSE Bracebridge Heath Footway Micro-asphalt surfacing
9 days 26/05/2020 05/06/2020 Give and Take
RIPON CLOSE Bracebridge Heath Footway Micro-asphalt
surfacing
9 days 26/05/2020 05/06/2020 Give and Take
WELLS DRIVE Bracebridge Heath Footway Micro-
asphalt surfacing
9 days 26/05/2020 05/06/2020 Give and
Take
GLOUCESTER CLOSE Bracebridge Heath Footway Micro-asphalt surfacing
9 days 26/05/2020 05/06/2020 Give and Take
BATH ROAD Bracebridge Heath Footway Micro-asphalt
surfacing
10 days TBC TBC Give and Take
SOUTHWELL COURT Bracebridge Heath Footway Micro-asphalt surfacing
10 days TBC TBC Give and Take
WESTMINSTER DRIVE Bracebridge Heath Footway Micro-asphalt surfacing
10 days TBC TBC Give and Take
SYCAMORE GROVE Bracebridge Heath Surface
Dressing
1 days 12/07/2020 12/07/2020 Short duration
road closure ELY CLOSE Bracebridge Heath Surface
Dressing
1 days 26/07/2020 26/07/2020 Short duration
road closure
Highways works programme 2020-2021 Street Name Area/Parish Works Type Duration Planned
Start
Planned
Finish
Traffic
Management
LICHFIELD ROAD (PART) Bracebridge Heath Surface
Dressing
1 days 26/07/2020 26/07/2020 Short duration
road closure SALISBURY DRIVE Bracebridge Heath Surface
Dressing
1 days 26/07/2020 26/07/2020 Short duration
road closure
YORK WAY Bracebridge Heath Surface Dressing
1 days 26/07/2020 26/07/2020 Short duration road closure
WORCESTER CLOSE Bracebridge Heath Surface Dressing
1 days 26/07/2020 26/07/2020 Short duration road closure
NORFOLK CRESCENT Bracebridge Heath Surface Dressing
1 days 26/07/2020 26/07/2020 Short duration road closure
MAIN ROAD Brampton Surface Dressing
1 days 29/05/2020 29/05/2020 Short duration road closure
Magnolia Close Branston Carriageway resurfacing
5 Days TBC in 2021
TBC in 2021
Road Closure
SWINHOPE ROAD Brookenby Surface Dressing
1 days 12/05/2020 12/05/2020 Short duration road closure
KENT RD Brookenby Surface
Dressing
1 days 11/06/2020 11/06/2020 Short duration
road closure DALE VIEW RD Brookenby Surface
Dressing
1 days 11/06/2020 11/06/2020 Short duration
road closure
JAVELIN RD Brookenby Surface Dressing
1 days 11/06/2020 11/06/2020 Short duration road closure
CANBERRA RD Brookenby Surface Dressing
1 days 11/06/2020 11/06/2020 Short duration road closure
LINCOLN RD Brookenby Surface Dressing
1 days 11/06/2020 11/06/2020 Short duration road closure
WINDSMOOR RD Brookenby Surface Dressing
1 days 11/06/2020 11/06/2020 Short duration road closure
Highways works programme 2020-2021 Street Name Area/Parish Works Type Duration Planned
Start
Planned
Finish
Traffic
Management
EDINBURGH RD Brookenby Surface
Dressing
1 days 11/06/2020 11/06/2020 Short duration
road closure SAINT DAVIDS RD Brookenby Surface
Dressing
1 days 11/06/2020 11/06/2020 Short duration
road closure
DRIGH RD Brookenby Surface Dressing
1 days 11/06/2020 11/06/2020 Short duration road closure
MERLIN RD Brookenby Surface Dressing
1 days 11/06/2020 11/06/2020 Short duration road closure
HUNTER RD Brookenby Surface Dressing
1 days 11/06/2020 11/06/2020 Short duration road closure
CUMBERLAND TERRACE Brookenby Surface Dressing
1 days 11/06/2020 11/06/2020 Short duration road closure
SAILSBURY AVE Brookenby Surface Dressing
1 days 11/06/2020 11/06/2020 Short duration road closure
CHICHESTER RD Brookenby Surface Dressing
1 days 11/06/2020 11/06/2020 Short duration road closure
SUSSEX CLOSE Brookenby Surface
Dressing
1 days 11/06/2020 11/06/2020 Short duration
road closure YORK RD Brookenby Surface
Dressing
1 days 11/06/2020 11/06/2020 Short duration
road closure
C502 BARDNEY ROAD Bucknall Carriageway Resurfacing
7 days 14/09/2020 22/09/2020 Road Closure
BURGH ON BAIN O/S VILLAGE STORE
Burgh On Bain Minor Drainge Repairs
5 days 28/09/2020 02/10/2020 2-way Signals
A46 Caistor Carriageway Resurfacing
3 weeks 25/05/2020 12/06/2020 Road Closure - NIGHTS
C248 NORTH KELSEY ROAD Caistor Carriageway Resurfacing
6 days 26/10/2020 02/11/2020 Road Closure
Highways works programme 2020-2021 Street Name Area/Parish Works Type Duration Planned
Start
Planned
Finish
Traffic
Management
Various locations through Town Caistor Street Lighting
Improvements
35 days 15/07/2020 01/09/2020
BLACKTHORNE LANE Cammeringham Carriageway
Reconstruction
5 days 09/09/2020 15/09/2020 Road Closure
A158 Main road to Gunby Candlesby Carriageway Resurfacing
TBC TBC in 2021
TBC in 2021
TBC
A1028 BLUESTONE HEATH ROAD (AVOID POSTPONING, SUNDAY WORKING)
Candlesby Surface Dressing
1 days 17/05/2020 17/05/2020 Convoy
GRANGE LANE / HALL DRIVE Canwick Surface Dressing
1 days 13/07/2020 13/07/2020 Short duration road closure
A6121 Carlby Carriageway Resurfacing
TBC TBC in 2021
TBC in 2021
TBC
CHURCH STREET Carlby Surface
Dressing
1 days 25/06/2020 25/06/2020 Short duration
road closure THE AVENUE Carlby Surface
Dressing
1 days 25/06/2020 25/06/2020 Short duration
road closure
TEMPLEMEN DRIVE/FENTON DRIVE
Carlby Surface Dressing
1 days 25/06/2020 25/06/2020 Short duration road closure
HIGH STREET/HOLYWELL ROAD
Carlby Surface Dressing
1 days 25/06/2020 25/06/2020 Short duration road closure
A6121 - BOURNE ROAD Carlby Surface Dressing
1 days 25/06/2020 25/06/2020 Convoy
NAVENBY LANE Carlton Le Moorland Carriageway Patching
4 days 01/09/2020 04/09/2020 Road Closure
BROUGHTON ROAD C1 JUNCTION
Carlton Le Moorland Carriageway Resurfacing
2 days 13/07/2020 14/07/2020 Road Closure
BROUGHTON ROAD Carlton Le Moorland Surface Dressing
1 days 06/07/2020 06/07/2020 Short duration road closure
Highways works programme 2020-2021 Street Name Area/Parish Works Type Duration Planned
Start
Planned
Finish
Traffic
Management
A607 Carlton Scroop Carriageway
Resurfacing
6 weeks 14/09/2020 23/10/2020 Road Closure
NEWARK ROAD Carlton Scroop Minor Drainge
Repairs
10 days 30/11/2020 11/12/2020 TBC
HOUGH LANE (LOOP) Carlton Scroop Surface Dressing
1 days 14/07/2020 14/07/2020 Short duration road closure
COLD HARBOUR LANE Carrington Surface Dressing
1 days 20/05/2020 20/05/2020 Short duration road closure
NEWHAM DRAIN Carrington Surface Dressing
1 days 20/05/2020 20/05/2020 Short duration road closure
NORTHLANDS ROAD Carrington Surface Dressing
1 days 20/05/2020 20/05/2020 Short duration road closure
Regal Gardens Castle Bytham Carriageway resurfacing
5 Days TBC in 2021
TBC in 2021
Road Closure
SUNNINGDALE DRIVE Chapel St Leonards Footway Works 25 days 05/10/2020 06/11/2020 Road Closure
SUNNINGDALE CLOSE Chapel St Leonards Footway Works 25 days 09/11/2020 11/12/2020 Road Closure
MAIN STREET Claypole Minor Drainge Repairs
10 days 07/12/2020 18/12/2020 Road Closure
MAIN STREET Claypole Surface Dressing
1 days 10/06/2020 10/06/2020 Stop & Go
A153 - TUMBY ROAD/HIGH STREET
Coningsby Surface Dressing
1 days 19/05/2020 19/05/2020 Stop & Go
C719 DECOY FM TO
CROWLAND - TBC
Crowland Carriageway
Patching
20 days 23/11/2020 18/12/2020 Road Closure
HALL MEADOW ROAD Deeping St James Carriageway
Patching
5 days 19/10/2020 23/10/2020 Road Closure
FROGNALL Deeping St James Carriageway Patching
3 days 26/10/2020 28/10/2020 Road Closure
Highways works programme 2020-2021 Street Name Area/Parish Works Type Duration Planned
Start
Planned
Finish
Traffic
Management
C418 CHURCH ST Denton Carriageway
Resurfacing
1 days 22/07/2020 22/07/2020 Road Closure
THE HURN Digby Surface
Dressing
1 days 10/07/2020 10/07/2020 Short duration
road closure
CHESTNUT CLOSE Digby Surface Dressing
1 days 10/07/2020 10/07/2020 Short duration road closure
CHURCH STREET/BECK STREET/STATION ROAD
Digby to Walcott Surface Dressing
1 days 03/06/2020 03/06/2020 Short duration road closure
CHURCH STREET/BECK STREET/STATION ROAD/DIGBY ROAD
Digby to Walcott Surface Dressing
1 days 03/06/2020 03/06/2020 Short duration road closure
A152 School Lane Donington Replace anti-skid/red with
new surfacing
TBC TBC in 2021
TBC in 2021
TBC
CHURCH ST Donington Surface Dressing
1 days 24/06/2020 24/06/2020 Stop & Go
DODDINGTON RD Dry Doddington Carriageway Patching
7 days 07/09/2020 15/09/2020 Road Closure
WESTBOROUGH ROAD Dry Doddington Surface Dressing
1 days 11/06/2020 11/06/2020 Short duration road closure
DODDINGTON LANE Dry Doddington Surface Dressing
1 days 11/06/2020 11/06/2020 Convoy
Chapel Lane Dunston Carriageway structural
patching
TBC TBC in 2021
TBC in 2021
TBC
Front Street/ Middle Street Dunston Carriageway
structural patching
TBC TBC in
2021
TBC in
2021
TBC
Highways works programme 2020-2021 Street Name Area/Parish Works Type Duration Planned
Start
Planned
Finish
Traffic
Management
MEADOW ROAD Dunston Surface
Dressing
1 days 10/07/2020 10/07/2020 Short duration
road closure SPRING COURT Dunston Surface
Dressing
1 days 10/07/2020 10/07/2020 Short duration
road closure
FEN LANE Dunston Surface Dressing
1 days 10/07/2020 10/07/2020 Short duration road closure
B1188 - SLEAFORD ROAD Dunston to Nocton Surface Dressing
1 days 31/05/2020 31/05/2020 Convoy
SWINDERBY ROAD Eagle Surface Dressing
1 days 11/07/2020 11/07/2020 Short duration road closure
MAIN ROAD East Torrington Surface Dressing
1 days 11/05/2020 11/05/2020 Short duration road closure
TORRINGTON LANE East Torrington Surface Dressing
1 days 01/06/2020 01/06/2020 Road Closure
A158 LINCOLN ROAD Edlington Carriageway Resurfacing
10 days 11/05/2020 22/05/2020 Road Closure
SHEARMANS
WATH/DOCKINGS LANE
Edlington Surface
Dressing
1 days 17/05/2020 17/05/2020 Short duration
road closure EVEDON EAST LANE Ewerby Carriageway
Reconstruction
2 days 24/08/2020 25/08/2020 Road Closure
SPRIDLINGTON ROAD Faldingworth Surface Dressing
1 days 27/05/2020 27/05/2020 Short duration road closure
JUBILEE AVENUE Faldingworth Surface Dressing
1 days 27/05/2020 27/05/2020 Short duration road closure
Farthorpe Road Farthorpe Carriageway structural patching
TBC TBC in 2021
TBC in 2021
TBC
Highways works programme 2020-2021 Street Name Area/Parish Works Type Duration Planned
Start
Planned
Finish
Traffic
Management
KETTLETHORPE ROAD Fenton Footway Micro-
asphalt surfacing
10 days 20/04/2020 01/05/2020 Give and
Take
ADDISON PLACE Fenton Footway Micro-asphalt surfacing
10 days 20/04/2020 01/05/2020 Give and Take
MALKILN ROAD Fenton Footway Micro-asphalt
surfacing
10 days 20/04/2020 01/05/2020 Stop & Go
A156 LINCOLN ROAD Fenton Footway Micro-
asphalt surfacing
10 days 20/04/2020 01/05/2020 2-way Signals
WILLINGHAM ROAD Fillingham Surface Dressing
1 days 30/05/2020 30/05/2020 Road Closure
FERRY ROAD Fiskerton Carriageway Patching
15 days 16/11/2020 04/12/2020 Road Closure
Ferryside Gardens Fiskerton Carriageway resurfacing
5 Days TBC in 2021
TBC in 2021
Road Closure
Mill Bank Fleet Carriageway structural
patching
TBC TBC in 2021
TBC in 2021
TBC
Strongs Bank Fleet Carriageway structural patching
TBC TBC in 2021
TBC in 2021
TBC
Torrington Lane Fleet Carriageway structural patching
TBC TBC in 2021
TBC in 2021
TBC
WINSLOW GATE (STH) Fleet Surface
Dressing
1 days 18/05/2020 18/05/2020 Short duration
road closure
Highways works programme 2020-2021 Street Name Area/Parish Works Type Duration Planned
Start
Planned
Finish
Traffic
Management
PUTTOCK LANE Fosdyke Carriageway
Patching
4 days 28/09/2020 01/10/2020 Road Closure
A16 - MAIN ROAD Fotherby Surface
Dressing
1 days 12/05/2020 12/05/2020 Stop & Go
BARTON STREET/FOTHERBY COMMON
Fotherby Surface Dressing
1 days 12/05/2020 12/05/2020 Short duration road closure
HARRIS' BRIDGE Frampton Structures Improvements
10 days 13/07/2020 24/07/2020 2-way Signals
SPITTAL HILL RD / BRAND END RD
Freiston / Butterwick Surface Dressing
1 days 16/06/2020 16/06/2020 Short duration road closure
SHORT FERRY Friskerton Traffic Signals Improvements
20 days 15/06/2020 10/07/2020 2-way Signals
GREENFIELD LANE Friskney Surface Dressing
1 days 14/05/2020 14/05/2020 Short duration road closure
EAUDYKE ROAD Friskney Surface Dressing
1 days 18/05/2020 18/05/2020 Short duration road closure
B1183 BOSTON ROAD Frithville Carriageway
Patching
10 days 02/11/2020 13/11/2020 Road Closure
B1183 WESTVILLE ROAD Frithville Carriageway
Resurfacing
7 days 17/08/2020 25/08/2020 Road Closure
U/C, SCHOOL CULVERT (BR NO 35/10/56)
Frithville Structures Improvements
12 days 14/05/2020 29/05/2020 3-way Signals
BELCHFORD ROAD Fulletby Surface Dressing
1 days 16/05/2020 16/05/2020 Short duration road closure
B1399 FULNETBY BANK SLIP Fulnetby Structures Improvements
15 days 27/07/2020 14/08/2020 Road Closure
THORESBY ROAD/FULSTOW TOP
Fulstow Surface Dressing
1 days 13/05/2020 13/05/2020 Short duration road closure
Highways works programme 2020-2021 Street Name Area/Parish Works Type Duration Planned
Start
Planned
Finish
Traffic
Management
OCCUPATION LANE Fulstow Surface
Dressing
1 days 13/05/2020 13/05/2020 Short duration
road closure MAIN STREET Fulstow Surface
Dressing
1 days 10/06/2020 10/06/2020 Short duration
road closure
CORRINGHAM RD/ THORNEDYKE WAY, GAINSBOROUGH
Gainsborough Junction Improvement
50 days 14/09/2020 20/11/2020 TBC
TRINITY STREET/ TESCO'S + N503 PED
Gainsborough Traffic Signals Improvements
30 days 07/09/2020 16/10/2020 TBC
MAIN STREET Gayton Le Marsh Carriageway Reconstruction
3 days 28/08/2020 02/09/2020 Road Closure
WEST DROVE SOUTH Gedney Hill Carriageway Reconstruction
6 days 05/08/2020 12/08/2020 Road Closure
C427 GELSTION ROAD WELL
HILL FM
Gelston Carriageway
Patching
3 days 24/08/2020 26/08/2020 Road Closure
LOVEDON HOUSE LANE Gelston Surface
Dressing
1 days 26/05/2020 26/05/2020 Short duration
road closure
B1397 BOSTON RD Gosberton Footway Works 50 days 07/09/2020 13/11/2020 2-way Signals
WESTHORPE RD Gosberton Surface Dressing
1 days 16/06/2020 16/06/2020 Short duration road closure
COLD HURN LN Gosberton Surface Dressing
1 days 24/06/2020 24/06/2020 Short duration road closure
CHEAL RD Gosberton Cheal Surface Dressing
1 days 24/06/2020 24/06/2020 Short duration road closure
WINDMILL LN / SILTSIDE Gosberton Risegate Surface
Dressing
1 days 18/05/2020 18/05/2020 Short duration
road closure BEACH LN Gosberton Risegate Surface
Dressing
1 days 06/07/2020 06/07/2020 Short duration
road closure
Highways works programme 2020-2021 Street Name Area/Parish Works Type Duration Planned
Start
Planned
Finish
Traffic
Management
HFP. HALL'S FOOTBRIDGE
(BR NO 27/59/72)
Goulceby Structures
Improvements
30 days 07/12/2020 15/01/2021 Road Closure
CHAPEL LANE Grainthorpe Surface
Dressing
1 days 11/06/2020 11/06/2020 Short duration
road closure
WHYALLLA CLOSE Grainthorpe Surface Dressing
1 days 11/06/2020 11/06/2020 Short duration road closure
JACKLIN CLOSE Grainthorpe Surface Dressing
1 days 11/06/2020 11/06/2020 Short duration road closure
STAPES GARTH Grainthorpe Surface Dressing
1 days 11/06/2020 11/06/2020 Short duration road closure
Pasture Close Grantham Carriageway resurfacing
5 Days TBC in 2021
TBC in 2021
Road Closure
HUNTINGTOWER ROAD Grantham Carriageway Resurfacing
10 days 29/03/2021 09/04/2021 Road Closure
ST CATHERINES RD Grantham Footway Works 18 days 19/08/2020 11/09/2020 Road Closure
ST CATHERINES RD Grantham Investigation Works
2 days 02/07/2020 03/07/2020 TBC
Church Lane Grayingham Carriageway structural patching
TBC TBC in 2021
TBC in 2021
TBC
GREAT HALE DROVE Great Hale Fen Surface Dressing
1 days 21/05/2020 21/05/2020 Short duration road closure
A18 HIGH STREET Great Limber Carriageway Resurfacing
5 days 26/05/2020 30/05/2020 Road Closure
Various locations GREAT LIMBER Street Lighting
Improvements
25 days 09/02/2021 15/03/2021
U/C. EASTFIELD LANE
CULVERT (BR NO 46/54/31)
Great Steeping Structures
Improvements
5 days 15/05/2020 21/05/2020 Road Closure
Highways works programme 2020-2021 Street Name Area/Parish Works Type Duration Planned
Start
Planned
Finish
Traffic
Management
GREAT STEEPING Great Steeping Structures
Improvements
TBC TBC TBC TBC
WEST ROAD, MAIN STREET Haconby Surface
Dressing
1 days 10/06/2020 10/06/2020 Short duration
road closure
CHURCH ST Haconby Surface Dressing
1 days 14/07/2020 14/07/2020 Short duration road closure
HALL LANE/HACONBY LANE Haconby to Morton Surface Dressing
1 days 10/06/2020 10/06/2020 Short duration road closure
A157 SCHOOL LANE/LOUTH RD
Hainton Minor Drainge Repairs
10 days 14/09/2020 25/09/2020 3-way Signals
SCHOOL LANE Hainton Surface Dressing
1 days 15/05/2020 15/05/2020 Short duration road closure
A157 LOUTH RD Hainton Surface Dressing
1 days 16/05/2020 16/05/2020 Convoy
A631 Harpswell Carriageway Resurfacing
3 weeks 01/03/2021 19/03/2021 Road Closure
BANKS LANE Heckington Carriageway
Resurfacing
2 days 06/10/2020 07/10/2020 Road Closure
Fen Road Heighington Carriageway
structural patching
TBC TBC in
2021
TBC in
2021
TBC
BELLS MEADOW Heighington Footway Micro-asphalt surfacing
9 days 26/05/2020 05/06/2020 Give & Take
BACK LANE Heighington Footway Micro-asphalt
surfacing
9 days 26/05/2020 05/06/2020 Give & Take
Highways works programme 2020-2021 Street Name Area/Parish Works Type Duration Planned
Start
Planned
Finish
Traffic
Management
CLARKE AVENUE Heighington Footway Micro-
asphalt surfacing
9 days 26/05/2020 05/06/2020 Give & Take
ST AUBINS CRESCENT Heighington Footway Micro-asphalt surfacing
9 days 26/05/2020 05/06/2020 Give & Take
EDWARD BARKER ROAD Heighington Footway Micro-asphalt
surfacing
9 days 26/05/2020 05/06/2020 Give & Take
MARTIN CLOSE Heighington Footway Micro-
asphalt surfacing
9 days 26/05/2020 05/06/2020 Give & Take
GARRATT CLOSE Heighington Footway Micro-asphalt surfacing
9 days 26/05/2020 05/06/2020 Give & Take
LINTIN CLOSE Heighington Footway Micro-asphalt
surfacing
9 days 26/05/2020 05/06/2020 Give & Take
CHAPEL LANE Heighington Footway Micro-asphalt surfacing
9 days 26/05/2020 05/06/2020 Give & Take
STATION ROAD Heighington Footway Micro-asphalt surfacing
10 days 01/06/2020 12/06/2020 Give & Take
CURTIS DRIVE Heighington Footway Micro-
asphalt surfacing
10 days 01/06/2020 12/06/2020 Give & Take
Highways works programme 2020-2021 Street Name Area/Parish Works Type Duration Planned
Start
Planned
Finish
Traffic
Management
KENYON CLOSE Heighington Footway Micro-
asphalt surfacing
10 days 01/06/2020 12/06/2020 Give & Take
STEVENSONS CLOSE Heighington Footway Micro-asphalt surfacing
10 days 01/06/2020 12/06/2020 Give & Take
CURTIS DRIVE Heighington Surface Dressing
1 days 13/07/2020 13/07/2020 Short duration road closure
KENYON CLOSE Heighington Surface Dressing
1 days 13/07/2020 13/07/2020 Short duration road closure
STEPHENSON CLOSE Heighington Surface
Dressing
1 days 13/07/2020 13/07/2020 Short duration
road closure B1398 MIDDLE STREET Hemswell Carriageway
Patching
10 days 10/08/2020 21/08/2020 Road Closure
B1168 NEW RIVER GATE Holbeach Carriageway Patching
5 days 12/10/2020 16/10/2020 Road Closure
FROSTLY GATE - TBC Holbeach Carriageway Patching
5 days 02/11/2020 06/11/2020 Road Closure
BATTLEFIELDS LN STH Holbeach Surface Dressing
1 days 25/06/2020 25/06/2020 Short duration road closure
STAR LANE Holbeach Bank Surface Dressing
1 days 18/05/2020 18/05/2020 Short duration road closure
CAMPLING PL Holbeach Bank Surface Dressing
1 days 25/06/2020 25/06/2020 Short duration road closure
DOG DROVE NORTH Holbeach Drove Carriageway Reconstruction
3 days 14/08/2020 18/08/2020 Road Closure
FROGS ABBEY GATE Holbeach Drove Carriageway
Reconstruction
5 days 17/08/2020 21/08/2020 Road Closure
Highways works programme 2020-2021 Street Name Area/Parish Works Type Duration Planned
Start
Planned
Finish
Traffic
Management
NEW ROAD Holbeach St Marks Surface
Dressing
1 days 18/05/2020 18/05/2020 Short duration
road closure LAPWATER LN Holbeach St Marks Surface
Dressing
1 days 25/06/2020 25/06/2020 Short duration
road closure
B1192, LANGRICK RD Hollend Fen with Brothertoft
Surface Dressing
1 days 15/06/2020 15/06/2020 Road Closure
B1202 - WRAGBY ROAD Holton Cum Beckering
Surface Dressing
1 days 26/05/2020 26/05/2020 Stop & Go
LOUTH ROAD Holton Le Clay Surface Dressing
1 days 11/05/2020 11/05/2020 Stop & Go
A52 Horbling Carriageway Resurfacing
4 weeks Spring 2021
TBC Road Closure
CROSS DROVE Horbling Surface Dressing
1 days 03/06/2020 03/06/2020 Short duration road closure
HORBLING FEN DROVE Horbling Surface Dressing
1 days 03/06/2020 03/06/2020 Short duration road closure
JUBILEE WAY Horncastle Improvement
Scheme
10 days 07/09/2020 18/09/2020 2-way Signals
A158 Jubiliee Way Horncastle Replace anti-
skid/red with new surfacing
TBC TBC in
2021
TBC in
2021
TBC
A158 - LINCOLN ROAD (AVOID POSTPONING, SUNDAY WORKING)
Horncastle Surface Dressing
1 days 17/05/2020 17/05/2020 Stop & Go
SAXON WAY Horncastle Surface Dressing
1 days 17/07/2020 17/07/2020 Short duration road closure
ISLIP COURT Horncastle Surface
Dressing
1 days 17/07/2020 17/07/2020 Short duration
road closure
Highways works programme 2020-2021 Street Name Area/Parish Works Type Duration Planned
Start
Planned
Finish
Traffic
Management
BANOVALLUM GARDENS Horncastle Surface
Dressing
1 days 17/07/2020 17/07/2020 Short duration
road closure BANOVALLUM GARDENS Horncastle Surface
Dressing
1 days 17/07/2020 17/07/2020 Short duration
road closure
BANOVALLUM GARDENS Horncastle Surface Dressing
1 days 17/07/2020 17/07/2020 Short duration road closure
LODDINGTON COURT Horncastle Surface Dressing
1 days 17/07/2020 17/07/2020 Short duration road closure
LODDINGTON COURT Horncastle Surface Dressing
1 days 17/07/2020 17/07/2020 Short duration road closure
BONNTABLE ROAD Horncastle Surface Dressing
1 days 17/07/2020 17/07/2020 Short duration road closure
MADELY CLOSE Horncastle Surface Dressing
1 days 17/07/2020 17/07/2020 Short duration road closure
JESSOP CLOSE Horncastle Surface Dressing
1 days 17/07/2020 17/07/2020 Short duration road closure
THOMAS GIBSON DRIVE Horncastle Surface
Dressing
1 days 17/07/2020 17/07/2020 Short duration
road closure WESELY WAY Horncastle Surface
Dressing
1 days 17/07/2020 17/07/2020 Short duration
road closure
CARLISLE GARDENS Horncastle Surface Dressing
1 days 17/07/2020 17/07/2020 Short duration road closure
A158 Main Road Horncastle/Wragby White Lining works
TBC 2020/2021 2020/2021 2 Way Lights
A52 Huttoft Carriageway Resurfacing
7 weeks 06/04/2020 22/05/2020 Road Closure
LINCOLN RD/HIGH STREET/ CHURCHILL
Ingham Surface Dressing
1 days 01/06/2020 01/06/2020 Road Closure
Highways works programme 2020-2021 Street Name Area/Parish Works Type Duration Planned
Start
Planned
Finish
Traffic
Management
A52 - CHAPEL ROAD (AVOID
POSTPONING)
Ingoldmells Surface
Dressing
1 days 18/05/2020 18/05/2020 Convoy
PINFOLD LANE Irby in the Marsh Surface
Dressing
1 days 14/05/2020 14/05/2020 Short duration
road closure
PADLEYS LANE Keal Cotes Carriageway Reconstruction
2 days 26/08/2020 27/08/2020 Road Closure
A57 DRINSEY KNOOK, FERRY LANE
Kettlethorpe Carriageway Resurfacing
2 days 01/06/2020 02/06/2020 Road Closure
UPTON ROAD Kexby Carriageway Resurfacing
2 days 26/08/2020 27/08/2020 Road Closure
B1202 BARDNEY ROAD Kingthorpe Carriageway Resurfacing
10 days 08/06/2020 19/06/2020 Road Closure
B1191 Main Road Kirkby Green Carriageway Reconstruction
TBC TBC in 2021
TBC in 2021
TBC
WASH ROAD Kirton Improvement Scheme
10 days 26/10/2020 06/11/2020 TBC
C791, GRAVES PARK
CULVERT (BR NO 33/08/94C)
Kirton Structures
Improvements
30 days 21/09/2020 30/10/2020 Road Closure
B1192 Main Road Langrick Bridge New Footway TBC 2021 - TBC 2021 - TBC Footway Closure
A15, DEEPING RD/BOURNE RD
Langtoft Surface Dressing
1 days 10/06/2020 10/06/2020 Convoy
Hoop Lane Langton By Wragby Carriageway structural patching
TBC TBC in 2021
TBC in 2021
TBC
A158 Main Road Langworth Carriageway
Resurfacing
TBC TBC in
2021
TBC in
2021
TBC
Highways works programme 2020-2021 Street Name Area/Parish Works Type Duration Planned
Start
Planned
Finish
Traffic
Management
A158 Wragby Road crossing Langworth Replace anti-
skid/red with new surfacing
TBC TBC in
2021
TBC in
2021
TBC
A158 - LINCOLN ROAD Langworth to Reepham
Surface Dressing
1 days 26/05/2020 26/05/2020 Convoy
BLYTON ROAD Laughton Minor Drainge Repairs
6 days TBC TBC TBC
A607 - GRANTHAM ROAD Leadenham Surface Dressing
1 days 08/06/2020 08/06/2020 Convoy
LEASINGHAM, LINK FOOTWAY
Leasingham Footway Works 15 days 17/08/2020 04/09/2020 TBC
ROXHOLM ROAD Leasingham/Roxholm
Surface Dressing
1 days 02/06/2020 02/06/2020 Short duration road closure
C418 FOLKINGHAM ROAD Lenton Carriageway
Resurfacing
10 days 31/08/2020 11/09/2020 Road Closure
FOLKINGHAM ROAD Lenton Surface
Dressing
1 days 20/05/2020 20/05/2020 Short duration
road closure
Beaufort close Lincoln Carriageway resurfacing
5 Days TBC in 2021
TBC in 2021
Road Closure
Campus Way Lincoln Carriageway Resurfacing
2 weeks 08/07/2020 17/07/2020 Road Closure - NIGHTS
TOWER CRESCENT Lincoln Carriageway Resurfacing
5 days 19/10/2020 23/10/2020 Road Closure
160 WRAGBY RD Lincoln Footway Works 10 days 06/04/2020 17/04/2020 2 & 3 way Signals
BRISTOL DRIVE Lincoln Footway Works 60 days 04/01/2021 26/03/2021 Road Closure
HILLSIDE AVENUE Lincoln Footway Works 75 days 04/01/2021 16/04/2021 Road Closure
HILLSIDE APPROACH Lincoln Footway Works 75 days 04/01/2021 16/04/2021 Road Closure
Highways works programme 2020-2021 Street Name Area/Parish Works Type Duration Planned
Start
Planned
Finish
Traffic
Management
B1182 Cabourne Ave Lincoln Replace anti-
skid/red with new surfacing
TBC TBC in
2021
TBC in
2021
TBC
BRANT ROAD Lincoln Street Lighting Improvements
25 days 28/09/2020 30/10/2020
HFP, ST. MARK'S FOOTBRIDGE (BR NO 97/70/17B)
Lincoln Structures Improvements
10 days 07/09/2020 18/09/2020 Footway Closure
A15, PELHAM BRIDGE (BR NO 97/70/88)
Lincoln Structures Improvements
85 days 18/01/2021 14/05/2021 Lane Closure
MARIGOLD CLOSE Lincoln Surface
Dressing
1 days 29/05/2020 29/05/2020 Short duration
road closure LUPIN ROAD Lincoln Surface
Dressing
1 days 29/05/2020 29/05/2020 Short duration
road closure
WOODRUSH ROAD Lincoln Surface Dressing
1 days 29/05/2020 29/05/2020 Short duration road closure
PENNYCRESS ROAD Lincoln Surface Dressing
1 days 29/05/2020 29/05/2020 Short duration road closure
ASTER CLOSE Lincoln Surface Dressing
1 days 29/05/2020 29/05/2020 Short duration road closure
THISTLE CLOSE Lincoln Surface Dressing
1 days 29/05/2020 29/05/2020 Short duration road closure
AZALEA ROAD Lincoln Surface Dressing
1 days 29/05/2020 29/05/2020 Short duration road closure
BLACKTHORN CLOSE Lincoln Surface Dressing
1 days 29/05/2020 29/05/2020 Short duration road closure
BELLFLOWER CLOSE Lincoln Surface
Dressing
1 days 29/05/2020 29/05/2020 Short duration
road closure
Highways works programme 2020-2021 Street Name Area/Parish Works Type Duration Planned
Start
Planned
Finish
Traffic
Management
CHATSWORTH CLOSE Lincoln Surface
Dressing
1 days 29/05/2020 29/05/2020 Short duration
road closure ARABIS CLOSE Lincoln Surface
Dressing
1 days 29/05/2020 29/05/2020 Short duration
road closure
WINDEREMERE ROAD Lincoln Surface Dressing
1 days 29/05/2020 29/05/2020 Short duration road closure
MARLBOROUGH CLOSE Lincoln Surface Dressing
1 days 29/05/2020 29/05/2020 Short duration road closure
HURSTWOOD CLOSE Lincoln Surface Dressing
1 days 29/05/2020 29/05/2020 Short duration road closure
WESTHOLM CLOSE Lincoln Surface Dressing
1 days 29/05/2020 29/05/2020 Short duration road closure
LARKSPUR ROAD Lincoln Surface Dressing
1 days 30/05/2020 30/05/2020 Short duration road closure
SWAYNE CLOSE Lincoln Surface Dressing
1 days 30/05/2020 30/05/2020 Short duration road closure
THURLOW COURT Lincoln Surface
Dressing
1 days 30/05/2020 30/05/2020 Short duration
road closure LILFORD ROAD Lincoln Surface
Dressing
1 days 30/05/2020 30/05/2020 Short duration
road closure
LILFORD CLOSE Lincoln Surface Dressing
1 days 30/05/2020 30/05/2020 Short duration road closure
HALE CLOSE Lincoln Surface Dressing
1 days 30/05/2020 30/05/2020 Short duration road closure
FAWSLEY CLOSE Lincoln Surface Dressing
1 days 30/05/2020 30/05/2020 Short duration road closure
HOLDENBY ROAD Lincoln Surface Dressing
1 days 30/05/2020 30/05/2020 Short duration road closure
Highways works programme 2020-2021 Street Name Area/Parish Works Type Duration Planned
Start
Planned
Finish
Traffic
Management
HOLDENBY CLOSE Lincoln Surface
Dressing
1 days 30/05/2020 30/05/2020 Short duration
road closure ATWATER GROVE Lincoln Surface
Dressing
1 days 30/05/2020 30/05/2020 Short duration
road closure
ATWATER CLOSE Lincoln Surface Dressing
1 days 30/05/2020 30/05/2020 Short duration road closure
ATWATER COURT Lincoln Surface Dressing
1 days 30/05/2020 30/05/2020 Short duration road closure
NEVILLE CLOSE Lincoln Surface Dressing
1 days 31/05/2020 31/05/2020 Short duration road closure
BULLINGHAM ROAD Lincoln Surface Dressing
1 days 31/05/2020 31/05/2020 Short duration road closure
WINNIFFE GARDENS Lincoln Surface Dressing
1 days 31/05/2020 31/05/2020 Short duration road closure
MONTAIGNE CRESCENT Lincoln Surface Dressing
1 days 31/05/2020 31/05/2020 Short duration road closure
MONTAIGNE CLOSE Lincoln Surface
Dressing
1 days 31/05/2020 31/05/2020 Short duration
road closure MONTAIGNE GARDEN Lincoln Surface
Dressing
1 days 31/05/2020 31/05/2020 Short duration
road closure
LANEY CLOSE Lincoln Surface Dressing
1 days 31/05/2020 31/05/2020 Short duration road closure
GLYNWELL GROVE Lincoln Surface Dressing
1 days 31/05/2020 31/05/2020 Short duration road closure
REMIGIUS GROVE Lincoln Surface Dressing
1 days 31/05/2020 31/05/2020 Short duration road closure
WALTHAM ROAD Lincoln Surface Dressing
1 days 03/06/2020 03/06/2020 Short duration road closure
Highways works programme 2020-2021 Street Name Area/Parish Works Type Duration Planned
Start
Planned
Finish
Traffic
Management
WALTHAM CLOSE Lincoln Surface
Dressing
1 days 03/06/2020 03/06/2020 Short duration
road closure AYNSLEY ROAD (INCL.
AYNSLEY CLO)
Lincoln Surface
Dressing
1 days 03/06/2020 03/06/2020 Short duration
road closure
KIRMINGTON CLOSE Lincoln Surface Dressing
1 days 03/06/2020 03/06/2020 Short duration road closure
GRAVELEY CLOSE Lincoln Surface Dressing
1 days 03/06/2020 03/06/2020 Short duration road closure
WITCHFORD ROAD Lincoln Surface Dressing
1 days 03/06/2020 03/06/2020 Short duration road closure
WITCHFORD CLOSE Lincoln Surface Dressing
1 days 03/06/2020 03/06/2020 Short duration road closure
CHEDBURGH CLOSE Lincoln Surface Dressing
1 days 03/06/2020 03/06/2020 Short duration road closure
ELVINGTON ROAD Lincoln Surface Dressing
1 days 03/06/2020 03/06/2020 Short duration road closure
LANGER CLOSE Lincoln Surface
Dressing
1 days 03/06/2020 03/06/2020 Short duration
road closure LISSETT CLOSE Lincoln Surface
Dressing
1 days 03/06/2020 03/06/2020 Short duration
road closure
ELVINGTON CLOSE Lincoln Surface Dressing
1 days 03/06/2020 03/06/2020 Short duration road closure
WYTON CLOSE Lincoln Surface Dressing
1 days 03/06/2020 03/06/2020 Short duration road closure
SNAITH CLOSE Lincoln Surface Dressing
1 days 03/06/2020 03/06/2020 Short duration road closure
ABINGDON AVENUE Lincoln Surface Dressing
1 days 11/06/2020 11/06/2020 Short duration road closure
Highways works programme 2020-2021 Street Name Area/Parish Works Type Duration Planned
Start
Planned
Finish
Traffic
Management
WOODVALE AVENUE Lincoln Surface
Dressing
1 days 11/06/2020 11/06/2020 Short duration
road closure WOODVALE CLOSE Lincoln Surface
Dressing
1 days 11/06/2020 11/06/2020 Short duration
road closure
ALCONBURY CLOSE Lincoln Surface Dressing
1 days 11/06/2020 11/06/2020 Short duration road closure
SHAWBURY CLOSE Lincoln Surface Dressing
1 days 11/06/2020 11/06/2020 Short duration road closure
ABINGDON CLOSE Lincoln Surface Dressing
1 days 11/06/2020 11/06/2020 Short duration road closure
BENSON CLOSE Lincoln Surface Dressing
1 days 11/06/2020 11/06/2020 Short duration road closure
LOCKING CLOSE Lincoln Surface Dressing
1 days 11/06/2020 11/06/2020 Short duration road closure
SYWELL CLOSE Lincoln Surface Dressing
1 days 11/06/2020 11/06/2020 Short duration road closure
KINLOSS CLOSE Lincoln Surface
Dressing
1 days 11/06/2020 11/06/2020 Short duration
road closure BOSCOMBE CLOSE Lincoln Surface
Dressing
1 days 11/06/2020 11/06/2020 Short duration
road closure
KELSTERN ROAD Lincoln Surface Dressing
1 days 11/06/2020 11/06/2020 Short duration road closure
KELSTERN CLOSE Lincoln Surface Dressing
1 days 11/06/2020 11/06/2020 Short duration road closure
BRIGG CLOSE Lincoln Surface Dressing
1 days 11/06/2020 11/06/2020 Short duration road closure
BRIGG GROVE Lincoln Surface Dressing
1 days 11/06/2020 11/06/2020 Short duration road closure
Highways works programme 2020-2021 Street Name Area/Parish Works Type Duration Planned
Start
Planned
Finish
Traffic
Management
HARLAXTON CLOSE Lincoln Surface
Dressing
1 days 11/06/2020 11/06/2020 Short duration
road closure HARLAXTON DRIVE Lincoln Surface
Dressing
1 days 11/06/2020 11/06/2020 Short duration
road closure
BLYTON ROAD Lincoln Surface Dressing
1 days 11/06/2020 11/06/2020 Short duration road closure
BLYTON CLOSE Lincoln Surface Dressing
1 days 11/06/2020 11/06/2020 Short duration road closure
BLYTON GROVE Lincoln Surface Dressing
1 days 11/06/2020 11/06/2020 Short duration road closure
BENSON CRESCENT Lincoln Surface Dressing
1 days 15/07/2020 15/07/2020 Short duration road closure
MELBOURNE ROAD Lincoln Surface Dressing
1 days 15/07/2020 15/07/2020 Short duration road closure
RIDGEWELL CLOSE Lincoln Surface Dressing
1 days 15/07/2020 15/07/2020 Short duration road closure
MELBOURNE CLOSE Lincoln Surface
Dressing
1 days 15/07/2020 15/07/2020 Short duration
road closure CAISTOR ROAD Lincoln Surface
Dressing
1 days 15/07/2020 15/07/2020 Short duration
road closure
FALDINGWORTH CLOSE Lincoln Surface Dressing
1 days 15/07/2020 15/07/2020 Short duration road closure
CAISTOR CLOSE Lincoln Surface Dressing
1 days 15/07/2020 15/07/2020 Short duration road closure
HIBALDSTOW ROAD Lincoln Surface Dressing
1 days 15/07/2020 15/07/2020 Short duration road closure
HIBALDSTOW CLOSE Lincoln Surface Dressing
1 days 15/07/2020 15/07/2020 Short duration road closure
Highways works programme 2020-2021 Street Name Area/Parish Works Type Duration Planned
Start
Planned
Finish
Traffic
Management
DIGBY CLOSE Lincoln Surface
Dressing
1 days 15/07/2020 15/07/2020 Short duration
road closure BINBROOK CLOSE Lincoln Surface
Dressing
1 days 15/07/2020 15/07/2020 Short duration
road closure
ALMOND AVENUE Lincoln Surface Dressing
1 days 15/07/2020 15/07/2020 Short duration road closure
ALMOND CRESCENT Lincoln Surface Dressing
1 days 15/07/2020 15/07/2020 Short duration road closure
HARTSHOLME DRIVE Lincoln Surface Dressing
1 days 15/07/2020 15/07/2020 Short duration road closure
WESTWOOD DRIVE Lincoln Surface Dressing
1 days 15/07/2020 15/07/2020 Short duration road closure
SIXFIELD CLOSE Lincoln Surface Dressing
1 days 15/07/2020 15/07/2020 Short duration road closure
EARLS DRIVE Lincoln Surface Dressing
1 days 15/07/2020 15/07/2020 Short duration road closure
GRESLEY DRIVE Lincoln Surface
Dressing
1 days 15/07/2020 15/07/2020 Short duration
road closure PEPPERCORN CLOSE Lincoln Surface
Dressing
1 days 15/07/2020 15/07/2020 Short duration
road closure
Various locations LINCOLN SOUTH Street Lighting Improvements
50 days 26/10/2020 15/01/2021
MILL LANE/LISSINGLY LANE Linwood Surface Dressing
1 days 22/05/2020 22/05/2020 Road Closure
FEN ROAD Little Hale Fen Surface Dressing
1 days 06/07/2020 06/07/2020 Short duration road closure
BENINGTON LANE Long Benington Surface Dressing
1 days 06/07/2020 06/07/2020 Short duration road closure
Highways works programme 2020-2021 Street Name Area/Parish Works Type Duration Planned
Start
Planned
Finish
Traffic
Management
Main Road off A1 Long Bennington New Cycleway TBC 2021 - TBC 2021 - TBC Footway
Closure B1520 LONDON RD Louth Surface
Dressing
1 days 21/05/2020 21/05/2020 Stop & Go
MONKS DYKE ROAD Louth Surface Dressing
1 days 12/06/2020 12/06/2020 Short duration road closure
SOMERSBY WAY Louth Surface Dressing
1 days 12/06/2020 12/06/2020 Short duration road closure
BUCKINGHAM ROAD Louth Surface Dressing
1 days 12/06/2020 12/06/2020 Short duration road closure
CHATSWORTH DRIVE Louth Surface Dressing
1 days 12/06/2020 12/06/2020 STOP/GO WITH EXTRA TM
OPERATIVES
LONGLEET DRIVE Louth Surface Dressing
1 days 12/06/2020 12/06/2020 Short duration road closure
MERIDIAN VIEW Louth Surface Dressing
1 days 17/07/2020 17/07/2020 Short duration road closure
ST JAMES VIEW Louth Surface Dressing
1 days 17/07/2020 17/07/2020 Short duration road closure
SUDBURY PLACE Louth Surface Dressing
1 days 17/07/2020 17/07/2020 Short duration road closure
VANESSA ROAD Louth Surface
Dressing
1 days 17/07/2020 17/07/2020 Short duration
road closure HUNTER PLACE Louth Surface
Dressing
1 days 17/07/2020 17/07/2020 Short duration
road closure
ARUNDEL DRIVE Louth Surface Dressing
1 days 17/07/2020 17/07/2020 Stop & Go
Highways works programme 2020-2021 Street Name Area/Parish Works Type Duration Planned
Start
Planned
Finish
Traffic
Management
WOOD LANE Louth Minor Drainge
Repairs
5 days 15/02/2021 19/02/2021 Road Closure
A18 - PEAR TREE
LANE/LINCOLNGATE
Ludbourgh Surface
Dressing
1 days 11/05/2020 11/05/2020 Stop & Go
LIVESEY ROAD Ludbourgh Surface Dressing
1 days 12/05/2020 12/05/2020 Stop & Go
CHAPEL LANE Ludbourgh Surface Dressing
1 days 10/06/2020 10/06/2020 Short duration road closure
STATION ROAD Ludbourgh Surface Dressing
1 days 10/06/2020 10/06/2020 Short duration road closure
LUDBOURGH PARK Ludbourgh Surface Dressing
1 days 10/06/2020 10/06/2020 Short duration road closure
POKES HOLE Ludford Surface Dressing
1 days 13/05/2020 13/05/2020 Short duration road closure
B1195 HUNDLEBY TO LUSBY Lusby with Winceby Surface Dressing
1 days 14/05/2020 14/05/2020 Stop & Go
HIGH STREET Mablethorpe Footway Works TBC TBC TBC TBC
Various locations MABLETHORPE Street Lighting Improvements
26 days 04/01/2021 08/02/2021
MAREHAM LE FEN FEN LANE Mareham Le Fen Minor Drainge Repairs
10 days 13/07/2020 24/07/2020 2-way Signals
A155 Main Road Mareham le Fen Replace anti-skid/red with new surfacing
TBC TBC in 2021
TBC in 2021
TBC
A155 - MAREHAM LE FEN Mareham Le Fen Surface
Dressing
1 days 15/05/2020 15/05/2020 CONVOY &
STOP/GO FEN LANE Mareham Le Fen Surface
Dressing
1 days 15/05/2020 15/05/2020 Short duration
road closure
Highways works programme 2020-2021 Street Name Area/Parish Works Type Duration Planned
Start
Planned
Finish
Traffic
Management
HORNCASTLE ROAD Mareham Le Fen Surface
Dressing
1 days 15/05/2020 15/05/2020 Road Closure
BEGGARS LANE Mareham Le Fen Surface
Dressing
1 days 20/07/2020 20/07/2020 Short duration
road closure
MOORSIDE/FIELDSIDE Mareham Le Fen Surface Dressing
1 days 20/07/2020 20/07/2020 Short duration road closure
CHURCH RISE Mareham Le Fen Surface Dressing
1 days 20/07/2020 20/07/2020 Short duration road closure
CHURCH LANE Mareham Le Fen Surface Dressing
1 days 20/07/2020 20/07/2020 Short duration road closure
RECTORY LANE Mareham Le Fen Surface Dressing
1 days 20/07/2020 20/07/2020 Short duration road closure
FIELD SIDE Mareham Le Fen Surface Dressing
1 days 20/07/2020 20/07/2020 Short duration road closure
LAMMINS LANE Mareham Le Fen Surface Dressing
1 days 20/07/2020 20/07/2020 Short duration road closure
SCHOOL LANE Mareham Le Fen Surface
Dressing
1 days 20/07/2020 20/07/2020 Short duration
road closure HAZELNUT CLOSE Mareham Le Fen Surface
Dressing
1 days 20/07/2020 20/07/2020 Short duration
road closure
ORMSBY HOUSE DRIVE Mareham Le Fen Surface Dressing
1 days 20/07/2020 20/07/2020 Short duration road closure
BIRKWOOD LANE Mareham Le Fen/ Tumby
Surface Dressing
1 days 15/05/2020 15/05/2020 Short duration road closure
C469 TOWNGATE EAST Market Deeping Carriageway Patching
3 days 16/09/2020 18/09/2020 Road Closure
BLENHEIM WAY/WHITLEY WAY
Market Deeping Carriageway Resurfacing
4 days 27/07/2020 30/07/2020 Road Closure - NIGHTS
Highways works programme 2020-2021 Street Name Area/Parish Works Type Duration Planned
Start
Planned
Finish
Traffic
Management
Various locations MARKET DEEPING Street Lighting
Improvements
15 days 30/11/2020 18/12/2020
A631 Market Rasen Carriageway
Resurfacing
TBC TBC TBC Road Closure
A46 Gallamore Lane crossing Market Rasen Replace anti-skid/red with new surfacing
TBC TBC in 2021
TBC in 2021
TBC
HALLGARTH Marshchapel Surface Dressing
1 days 11/06/2020 11/06/2020 Short duration road closure
MILL LANE Marshchapel Surface Dressing
1 days 11/06/2020 11/06/2020 Short duration road closure
MILL CLOSE Marshchapel Surface Dressing
1 days 11/06/2020 11/06/2020 Short duration road closure
PLUM TREE DRIVE Marshchapel Surface
Dressing
1 days 11/06/2020 11/06/2020 Short duration
road closure B1191 South Drove Martin Carriageway
Resurfacing
9 weeks 27/07/2020 25/09/2020 Road Closure
JUBILEE CLOSE Martin Footway Micro-asphalt surfacing
10 days 14/05/2020 27/05/2020 Give & Take
TIMBERLAND ROAD Martin Footway Micro-asphalt surfacing
10 days 08/06/2020 19/06/2020 Give & Take
POUND ROAD Martin Footway Micro-
asphalt surfacing
10 days 08/06/2020 19/06/2020 Give & Take
MILL LANE Martin Footway Micro-asphalt surfacing
10 days 08/06/2020 19/06/2020 Give & Take
Highways works programme 2020-2021 Street Name Area/Parish Works Type Duration Planned
Start
Planned
Finish
Traffic
Management
WYATT CLOSE Martin Footway Micro-
asphalt surfacing
10 days 08/06/2020 19/06/2020 Give & Take
B1191 HIGH STREET Martin Footway Micro-asphalt surfacing
10 days 08/06/2020 19/06/2020 Give & Take
C389, RED HOUSE BRIDGE (BR NO 16/41/42)
Martin Structures Improvements
10 days 06/04/2020 17/04/2020 Road Closure
Churchill Drive Martin Dales Carriageway resurfacing
5 Days TBC in 2021
TBC in 2021
Road Closure
Alfred Ave Metheringham Carriageway
resurfacing
5 Days TBC in
2021
TBC in
2021
Road Closure
Londesborough Road Metheringham Carriageway
resurfacing
5 Days TBC in
2021
TBC in
2021
Road Closure
Westfield Close Metheringham Carriageway resurfacing
5 Days TBC in 2021
TBC in 2021
Road Closure
CALVARY COURT Metheringham Footway Micro-asphalt surfacing
10 days 08/06/2020 19/06/2020 Give and Take
SADDLERS CLOSE Metheringham Footway Micro-asphalt
surfacing
10 days 08/06/2020 19/06/2020 Give and Take
PADDOCK LANE Metheringham Footway Micro-
asphalt surfacing
10 days 08/06/2020 19/06/2020 Give and
Take
CHESTNUT CLOSE Metheringham Footway Micro-asphalt surfacing
10 days 08/06/2020 19/06/2020 Give and Take
Highways works programme 2020-2021 Street Name Area/Parish Works Type Duration Planned
Start
Planned
Finish
Traffic
Management
THE CHASE Metheringham Footway Micro-
asphalt surfacing
10 days 08/06/2020 19/06/2020 Give and
Take
BLACKSMITHS COURT Metheringham Footway Micro-asphalt surfacing
10 days 08/06/2020 19/06/2020 Give and Take
HUNTERS DRIVE Metheringham Footway Micro-asphalt
surfacing
10 days 08/06/2020 19/06/2020 Give and Take
ROSSINGTON CLOSE Metheringham Footway Micro-
asphalt surfacing
10 days 08/06/2020 19/06/2020 Give and
Take
SHIREGATE Metheringham Footway Micro-asphalt surfacing
10 days 08/06/2020 19/06/2020 Give and Take
BARLEY CLOSE Metheringham Footway Micro-asphalt
surfacing
10 days 08/06/2020 19/06/2020 Give and Take
HARVEST CLOSE Metheringham Footway Micro-asphalt surfacing
10 days 08/06/2020 19/06/2020 Give & Take
GRANARY CLOSE Metheringham Footway Micro-asphalt surfacing
10 days 08/06/2020 19/06/2020 Give & Take
MILLFIELD ROAD Metheringham Footway Micro-
asphalt surfacing
10 days 08/06/2020 19/06/2020 Give & Take
B1189 - MOOR LANE Metheringham Surface Dressing
1 days 17/06/2020 17/06/2020 Convoy
Highways works programme 2020-2021 Street Name Area/Parish Works Type Duration Planned
Start
Planned
Finish
Traffic
Management
B1189 - STATION ROAD Metheringham Surface
Dressing
1 days 10/07/2020 10/07/2020 Stop & Go
THE CHASE Metheringham Surface
Dressing
1 days 13/07/2020 13/07/2020 Short duration
road closure
SADDLERS CLOSE Metheringham Surface Dressing
1 days 13/07/2020 13/07/2020 Short duration road closure
HUNTERS DRIVE Metheringham Surface Dressing
1 days 13/07/2020 13/07/2020 Short duration road closure
CHESTNUT CLOSE Metheringham Surface Dressing
1 days 14/07/2020 14/07/2020 Short duration road closure
ROSSINGTON CLOSE Metheringham Surface Dressing
1 days 14/07/2020 14/07/2020 Short duration road closure
BLACKSMITH COURT Metheringham Surface Dressing
1 days 14/07/2020 14/07/2020 Short duration road closure
CAVALRY COURT Metheringham Surface Dressing
1 days 14/07/2020 14/07/2020 Short duration road closure
SHIREGATE Metheringham Surface
Dressing
1 days 14/07/2020 14/07/2020 Short duration
road closure PADDOCK LANE Metheringham Surface
Dressing
1 days 14/07/2020 14/07/2020 Short duration
road closure
Fodderdyke bank extension Midville Carriageway Reconstruction
TBC TBC in 2021
TBC in 2021
TBC
FODDERDYKE BANK Midville Carriageway Resurfacing
12 days 20/08/2020 07/09/2020 Road Closure
BELLWATER BANK Midville Surface Dressing
1 days 18/05/2020 18/05/2020 Short duration road closure
B1434, RIVERHEAD CULVERT (BR NO 09/79/30)
Moortown Structures Improvements
20 days 20/04/2020 15/05/2020 Road Closure
Highways works programme 2020-2021 Street Name Area/Parish Works Type Duration Planned
Start
Planned
Finish
Traffic
Management
SCOTTEN DIKE DRO/NORTH
FEN
Morton Surface
Dressing
1 days 20/06/2020 20/06/2020 Short duration
road closure SOUTH FEN Morton Surface
Dressing
1 days 20/06/2020 20/06/2020 Short duration
road closure
EAUGATE RD Moulton Chapel Surface Dressing
1 days 06/07/2020 06/07/2020 Short duration road closure
WASHDYKE LANE Mumby Surface Dressing
1 days 21/07/2020 21/07/2020 Short duration road closure
CUMBERWORTH LANE Mumby Surface Dressing
1 days 22/07/2020 22/07/2020 Short duration road closure
COOTS LANE Mumby Surface Dressing
1 days 22/07/2020 22/07/2020 Short duration road closure
MUMBY MEADOWS Mumby Surface Dressing
1 days 22/07/2020 22/07/2020 Short duration road closure
OFF A52 - LOOP Mumby Surface Dressing
1 days 22/07/2020 22/07/2020 Short duration road closure
HEATH LANE Navenby Carriageway
Resurfacing
8 days 22/06/2020 01/07/2020 Road Closure
LOWFIELDS ROAD Navenby Carriageway
Resurfacing
7 days 02/07/2020 10/07/2020 Road Closure
HIGH STREET Nettleham Carriageway Resurfacing
5 days 10/08/2020 14/08/2020 Road Closure
FIELD CLOSE Nettleham Footway Works 7 days 14/04/2020 22/04/2020 Road Closure
PARKSIDE Nettleham Footway Works 50 days 04/05/2020 10/07/2020 Road Closure
THE DENE Nettleham Footway Works 40 days 19/05/2020 13/07/2020 Road Closure
HIGHFIELDS Nettleham Footway Works 45 days 06/07/2020 04/09/2020 Road Closure
WASHDYKE LANE Nettleham Surface Dressing
1 days 28/05/2020 28/05/2020 Stop & Go
Highways works programme 2020-2021 Street Name Area/Parish Works Type Duration Planned
Start
Planned
Finish
Traffic
Management
KINGSWAY Nettleham Surface
Dressing
1 days 28/05/2020 28/05/2020 Short duration
road closure DALDERBY CRESCENT Nettleham Surface
Dressing
1 days 28/05/2020 28/05/2020 Short duration
road closure
MANOR COURT Nettleham Surface Dressing
1 days 28/05/2020 28/05/2020 Short duration road closure
SUTTON CLOSE Nettleham Surface Dressing
1 days 28/05/2020 28/05/2020 Short duration road closure
GREETWELL LANE Nettleham Surface Dressing
1 days 04/06/2020 04/06/2020 Road Closure
Danby Hills Nettleham New Cycleway TBC 2021 - TBC 2021 - TBC Footway Closure
BECKSIDE Nettleham & Nettleton
Footway Micro-asphalt
surfacing
9 days 27/04/2020 07/05/2020 Give and Take
CHURCH LANE Nettleham &
Nettleton
Footway Micro-
asphalt surfacing
9 days 27/04/2020 07/05/2020 Give and
Take
B1205, RIVERMEADE RETAINING WALL (STR NO 09/89/07)
Nettleton Beck Structures Improvements
17 days 24/08/2020 15/09/2020 Road Closure
C18 CHAPEL LANE, H3E0091 New Bolingbroke Carriageway Patching
5 days 08/06/2020 12/06/2020 Road Closure
A158 -NEWBALL Newball to Langworth Surface
Dressing
1 days 26/05/2020 26/05/2020 Convoy
A57 / A1133 Newton and Girton Carriageway
Resurfacing
12 weeks Spring
2021
TBC Road Closure
A1133 - LAUGHERTON ROAD Newton on Trent to Laughterton
Surface Dressing
1 days 30/05/2020 30/05/2020 Stop & Go
Highways works programme 2020-2021 Street Name Area/Parish Works Type Duration Planned
Start
Planned
Finish
Traffic
Management
THE GREEN Nocton Footway Micro-
asphalt surfacing
10 days 01/05/2020 14/05/2020 Give & Take
WELLHEAD LANE Nocton Footway Micro-asphalt surfacing
10 days 01/05/2020 14/05/2020 Give & Take
B1202 MAIN STREET Nocton Footway Micro-asphalt
surfacing
10 days 01/05/2020 14/05/2020 Give & Take
B1202 POTTERHANWORTH
RD
Nocton Footway Micro-
asphalt surfacing
11 days 04/05/2020 18/05/2020 Stop & Go
BLOXHOLME LANE Nocton / Dunston Surface Dressing
1 days 01/06/2020 01/06/2020 Short duration road closure
B1188 - SLEAFORD ROAD Nocton to Potterhanworth
Surface Dressing
1 days 31/05/2020 31/05/2020 Convoy
CARLTON LANE North Carlton Carriageway Resurfacing
5 days 15/07/2020 21/07/2020 Road Closure
SCHOOL LANE North Cockerington Surface Dressing
1 days 21/05/2020 21/05/2020 Short duration road closure
LOCK ROAD North Cockerington Surface
Dressing
1 days 21/05/2020 21/05/2020 Short duration
road closure TETNEY LOCK RD North cotes Surface
Dressing
1 days 11/05/2020 11/05/2020 Short duration
road closure
C6 - BINBROOK ROAD North Elkington Surface Dressing
1 days 12/05/2020 12/05/2020 Short duration road closure
NORTH ELKINGTON LANE North Elkington to Fotherby
Surface Dressing
1 days 12/05/2020 12/05/2020 Short duration road closure
Highways works programme 2020-2021 Street Name Area/Parish Works Type Duration Planned
Start
Planned
Finish
Traffic
Management
Westfield Avenue North Greetwell Carriageway
resurfacing
5 Days TBC in
2021
TBC in
2021
Road Closure
Westfield Drive North Greetwell Carriageway
resurfacing
5 Days TBC in
2021
TBC in
2021
Road Closure
MILLMOOR WAY North Hykeham Footway Micro-asphalt surfacing
10 days 20/04/2020 01/05/2020 Give and Take
SEDGEMOOR CLOSE North Hykeham Footway Micro-asphalt surfacing
10 days 20/04/2020 01/05/2020 Give and Take
HAWKSMOOR CLOSE North Hykeham Footway Micro-
asphalt surfacing
10 days 20/04/2020 01/05/2020 Give and
Take
EXMOOR CLOSE North Hykeham Footway Micro-asphalt surfacing
10 days 20/04/2020 01/05/2020 Give and Take
HEBDON MOOR WAY North Hykeham Footway Micro-asphalt
surfacing
9 days 27/04/2020 07/05/2020 Give and Take
LADDSMILL CLOSE North Hykeham Footway Micro-
asphalt surfacing
9 days 27/04/2020 07/05/2020 Give and
Take
SPENNYMOOR CLOSE North Hykeham Footway Micro-asphalt surfacing
9 days 27/04/2020 07/05/2020 Give and Take
ALFORD MILL CLOSE North Hykeham Footway Micro-asphalt
surfacing
9 days 27/04/2020 07/05/2020 Give and Take
Highways works programme 2020-2021 Street Name Area/Parish Works Type Duration Planned
Start
Planned
Finish
Traffic
Management
KEXBY MILL CLOSE North Hykeham Footway Micro-
asphalt surfacing
9 days 27/04/2020 07/05/2020 Give and
Take
RIGSMOOR CLOSE North Hykeham Footway Micro-asphalt surfacing
9 days 27/04/2020 07/05/2020 Give and Take
GRASSMOOR CLOSE North Hykeham Footway Micro-asphalt
surfacing
10 days 04/05/2020 15/05/2020 Give and Take
MILLBROOK CLOSE North Hykeham Footway Micro-
asphalt surfacing
10 days 04/05/2020 15/05/2020 Give and
Take
PATELY MOOR CLOSE North Hykeham Footway Micro-asphalt surfacing
10 days 04/05/2020 15/05/2020 Give and Take
MALVERN CLOSE North Hykeham Footway Micro-asphalt
surfacing
10 days 04/05/2020 15/05/2020 Give and Take
U/C, ARDEN MOOR CULVERT (BR NO 96/45/19)
North Hykeham Structures Improvements
5 days 17/08/2020 21/08/2020 2-way Signals
B1434 North Kelsey Carriageway Resurfacing
3 weeks 16/03/2020 06/04/2020 Road Closure - NIGHTS
TOM LANE North Rauceby Footway Micro-asphalt surfacing
6 days 02/06/2020 09/06/2020 Stop & Go
MAIN STREET North Rauceby Footway Micro-asphalt
surfacing
10 days 22/06/2020 03/07/2020 Give and Take
Highways works programme 2020-2021 Street Name Area/Parish Works Type Duration Planned
Start
Planned
Finish
Traffic
Management
CHURCH LANE North Rauceby Footway Micro-
asphalt surfacing
10 days 22/06/2020 03/07/2020 Give and
Take
U/C, FORD FOOTBRIDGE (BR NO 92/22/80)
North Witham Structures Improvements
16 days 27/07/2020 17/08/2020 Road Closure
A52 Main Road Old Leake Replace anti-skid/red with new surfacing
TBC TBC in 2021
TBC in 2021
TBC
STATION RD Old Leake Surface Dressing
1 days 23/07/2020 23/07/2020 Stop & Go
GREEN LN Old Leake Surface
Dressing
1 days 23/07/2020 23/07/2020 Short duration
road closure FORTY FOOT LN /
SANDYFORD LN
Old Leake
(Commonside)
Surface
Dressing
1 days 15/05/2020 15/05/2020 Short duration
road closure
WASHDYKE LN Old Leake (Commonside)
Surface Dressing
1 days 15/05/2020 15/05/2020 Short duration road closure
FOLD HILL RD Old Leake (Commonside)
Surface Dressing
1 days 16/05/2020 16/05/2020 Short duration road closure
RISEWOOD LANE Old Somerby Surface Dressing
1 days 20/05/2020 20/05/2020 Short duration road closure
A15 - LONDON ROAD (LAYBY)
Osbournby Surface Dressing
1 days 12/07/2020 12/07/2020 Short duration road closure
MAIN STREET/LOW RD Osgodby Surface Dressing
1 days 27/05/2020 27/05/2020 Short duration road closure
MILL LANE Osgodby Surface Dressing
1 days 28/05/2020 28/05/2020 Short duration road closure
SAND LANE Osgodby Surface
Dressing
1 days 28/05/2020 28/05/2020 Short duration
road closure
Highways works programme 2020-2021 Street Name Area/Parish Works Type Duration Planned
Start
Planned
Finish
Traffic
Management
A158 Partney By pass Partney Replace anti-
skid/red with new surfacing
TBC TBC in
2021
TBC in
2021
TBC
PILHAM LANE Pilham Surface Dressing
1 days 30/05/2020 30/05/2020 Short duration road closure
B1180 PINCHBECK, GLENSIDE SOUTH
Pinchbeck Carriageway Patching
5 days 23/06/2020 29/06/2020 Road Closure
CROSS LN Pinchbeck Surface Dressing
1 days 16/06/2020 16/06/2020 Short duration road closure
COWARDS LN / OLD FEN LN PT / HERRING LN
Pinchbeck Surface Dressing
1 days 06/07/2020 06/07/2020 Short duration road closure
B1202 NOCTON ROAD Potterhanworth Footway Micro-asphalt
surfacing
9 days 27/04/2020 07/05/2020 Give and Take
B1202 MAIN ROAD Potterhanworth Footway Micro-asphalt surfacing
9 days 27/04/2020 07/05/2020 Give and Take
B1202 MOOR LANE Potterhanworth Footway Micro-asphalt surfacing
10 days 01/06/2020 12/06/2020 Give and Take
FOSTERS GARDENS Potterhanworth Footway Micro-
asphalt surfacing
10 days 27/07/2020 07/08/2020 Give and
Take
STATION ROAD Potterhanworth Footway Micro-asphalt surfacing
10 days 27/07/2020 07/08/2020 Give and Take
CROSS STREET Potterhanworth Footway Micro-asphalt
surfacing
10 days 27/07/2020 07/08/2020 Give and Take
Highways works programme 2020-2021 Street Name Area/Parish Works Type Duration Planned
Start
Planned
Finish
Traffic
Management
MIDDLE STREET Potterhanworth Footway Micro-
asphalt surfacing
10 days 27/07/2020 07/08/2020 Give and
Take
RECTORY CLOSE Potterhanworth Footway Micro-asphalt surfacing
10 days 27/07/2020 07/08/2020 Give and Take
WOODLANDS CLOSE Potterhanworth Footway Micro-asphalt
surfacing
10 days 27/07/2020 07/08/2020 Give and Take
THE PARK Potterhanworth Footway Micro-
asphalt surfacing
10 days 27/07/2020 07/08/2020 Give and
Take
B1178 - STATION ROAD Potterhanworth Surface Dressing
1 days 31/05/2020 31/05/2020 Stop & Go
FOSTERS GARDENS Potterhanworth Surface Dressing
1 days 12/07/2020 12/07/2020 Short duration road closure
B1202 - MOOR ROAD Potterhanworth / Potterhanworth
Booths
Surface Dressing
1 days 31/05/2020 31/05/2020 Convoy
GOULCEBY RD Ranby Surface
Dressing
1 days 14/05/2020 14/05/2020 Short duration
road closure
Elmtree Road Ruskington Carriageway resurfacing
5 Days TBC in 2021
TBC in 2021
Road Closure
B1188 - SLEAFORD ROAD Ruskington Surface Dressing
1 days 30/05/2020 30/05/2020 Short duration road closure
MEADOWBROOK Ruskington Surface Dressing
1 days 08/07/2020 08/07/2020 Short duration road closure
BROOK WAY Ruskington Surface Dressing
1 days 08/07/2020 08/07/2020 Short duration road closure
Highways works programme 2020-2021 Street Name Area/Parish Works Type Duration Planned
Start
Planned
Finish
Traffic
Management
FIELD CLOSE Ruskington Surface
Dressing
1 days 08/07/2020 08/07/2020 Short duration
road closure WESTBECK Ruskington Surface
Dressing
1 days 08/07/2020 08/07/2020 Short duration
road closure
HOLLOWBROOK CLOSE Ruskington Surface Dressing
1 days 08/07/2020 08/07/2020 Short duration road closure
BECK CLOSE Ruskington Surface Dressing
1 days 08/07/2020 08/07/2020 Short duration road closure
WINCHELSEA ROAD Ruskington Surface Dressing
1 days 08/07/2020 08/07/2020 Short duration road closure
SYCAMORE ROAD Ruskington Surface Dressing
1 days 08/07/2020 08/07/2020 Short duration road closure
ASHTREE CLOSE Ruskington Surface Dressing
1 days 09/07/2020 09/07/2020 Short duration road closure
WILLOW CLOSE Ruskington Surface Dressing
1 days 09/07/2020 09/07/2020 Short duration road closure
LIME CLOSE Ruskington Surface
Dressing
1 days 09/07/2020 09/07/2020 Short duration
road closure BLACKTHORN CLOSE Ruskington Surface
Dressing
1 days 09/07/2020 09/07/2020 Short duration
road closure
BEECHTREE CLOSE Ruskington Surface Dressing
1 days 09/07/2020 09/07/2020 Short duration road closure
CEDAR CLOSE Ruskington Surface Dressing
1 days 09/07/2020 09/07/2020 Short duration road closure
LARCH CLOSE Ruskington Surface Dressing
1 days 09/07/2020 09/07/2020 Short duration road closure
HURN CLOSE Ruskington Surface Dressing
1 days 09/07/2020 09/07/2020 Short duration road closure
Highways works programme 2020-2021 Street Name Area/Parish Works Type Duration Planned
Start
Planned
Finish
Traffic
Management
GRANGE ROAD Ruskington Surface
Dressing
1 days 09/07/2020 09/07/2020 Short duration
road closure GRANGE CLOSE Ruskington Surface
Dressing
1 days 09/07/2020 09/07/2020 Short duration
road closure
B1200 MAIN RAOD Saltfleet St Peter Carriageway Resurfacing
7 days 03/11/2020 11/11/2020 Road Closure
Three Bridges Lane Saltfleetby Carriageway Reconstruction
TBC TBC in 2021
TBC in 2021
TBC
A158 Main Road Sausthorpe Carriageway Resurfacing
TBC TBC in 2021
TBC in 2021
TBC
THE SIDINGS Saxilby Footway Micro-asphalt surfacing
10 days 20/04/2020 01/05/2020 Give and Take
MANOR ROAD Saxilby Footway Micro-
asphalt surfacing
10 days 20/04/2020 01/05/2020 Give and
Take
ROSEHILL CLOSE Saxilby Footway Micro-asphalt surfacing
10 days 20/04/2020 01/05/2020 Give and Take
ORCHARD LANE Saxilby Footway Micro-asphalt
surfacing
10 days 20/04/2020 01/05/2020 Give and Take
OTTER AVENUE Saxilby Footway Micro-
asphalt surfacing
14 days 20/04/2020 07/05/2020 Give and
Take
MEADOW RISE Saxilby Footway Micro-asphalt surfacing
9 days 27/04/2020 07/05/2020 Give and Take
Highways works programme 2020-2021 Street Name Area/Parish Works Type Duration Planned
Start
Planned
Finish
Traffic
Management
FOSDYKE GARDENS Saxilby Footway Micro-
asphalt surfacing
9 days 27/04/2020 07/05/2020 Give and
Take
ELM CLOSE Saxilby Footway Micro-asphalt surfacing
9 days 27/04/2020 07/05/2020 Give and Take
WILLOW CLOSE Saxilby Footway Micro-asphalt
surfacing
9 days 27/04/2020 07/05/2020 Give and Take
HIGHFIELD ROAD Saxilby Footway Micro-
asphalt surfacing
10 days 04/05/2020 15/05/2020 Give and
Take
SYKES LANE Saxilby Footway Micro-asphalt surfacing
10 days 04/05/2020 15/05/2020 Give and Take
OAKFIELD Saxilby Footway Micro-asphalt
surfacing
10 days 11/05/2020 22/05/2020 Give and Take
TORKSEY AVENUE Saxilby Footway Micro-asphalt surfacing
4 days 12/05/2020 15/05/2020 Give and Take
HARDWICK CLOSE Saxilby Footway Micro-asphalt surfacing
10 days 12/05/2020 25/05/2020 Give and Take
BLANKNEY CLOSE Saxilby Footway Micro-
asphalt surfacing
8 days 13/05/2020 22/05/2020 Give and
Take
Highways works programme 2020-2021 Street Name Area/Parish Works Type Duration Planned
Start
Planned
Finish
Traffic
Management
NORTHFIELDS RISE Saxilby Footway Micro-
asphalt surfacing
10 days 13/05/2020 26/05/2020 Give and
Take
BROAD HOLME ROAD Saxilby Footway Micro-asphalt surfacing
11 days 13/05/2020 27/05/2020 Give and Take
ST BOTOLPHS Saxilby Footway Micro-asphalt
surfacing
7 days 14/05/2020 22/05/2020 Give and Take
QUEENSWAY Saxilby Footway Micro-
asphalt surfacing
7 days 14/05/2020 22/05/2020 Give and
Take
THONOCK DRIVE Saxilby Footway Micro-asphalt surfacing
7 days 14/05/2020 22/05/2020 Give and Take
WOODHALL CRESCENT Saxilby Footway Micro-asphalt
surfacing
7 days 14/05/2020 22/05/2020 Give and Take
ST GEORGES MEWS Saxilby Footway Micro-asphalt surfacing
7 days 14/05/2020 22/05/2020 Give and Take
ST ANDREWS DRIVE Saxilby Footway Micro-asphalt surfacing
9 days 14/05/2020 26/05/2020 Give and Take
WARWICK CLOSE Saxilby Footway Micro-
asphalt surfacing
9 days 14/05/2020 26/05/2020 Give and
Take
Highways works programme 2020-2021 Street Name Area/Parish Works Type Duration Planned
Start
Planned
Finish
Traffic
Management
CHURCH ROAD Saxilby Footway Micro-
asphalt surfacing
10 days 14/05/2020 27/05/2020 Give and
Take
WESTCROFT DRIVE Saxilby Footway Micro-asphalt surfacing
9 days 14/05/2020 26/05/2020 Give and Take
KENILWORTH CLOSE Saxilby Footway Micro-asphalt
surfacing
10 days 18/05/2020 29/05/2020 Give and Take
LINGFIELD CLOSE Saxilby Footway Micro-
asphalt surfacing
10 days 18/05/2020 29/05/2020 Give and
Take
EASTCROFT Saxilby Footway Micro-asphalt surfacing
10 days 18/05/2020 29/05/2020 Give and Take
ST BOTOLPHS(CHURCH PATH)
Saxilby Footway Micro-asphalt
surfacing
10 days 18/05/2020 29/05/2020 Give and Take
WOODCROFT ROAD Saxilby Footway Micro-asphalt surfacing
8 days 19/05/2020 28/05/2020 Give and Take
NORTHCROFT Saxilby Footway Micro-asphalt surfacing
9 days 19/05/2020 29/05/2020 Give and Take
SALISBURY CLOSE Saxilby Footway Micro-
asphalt surfacing
9 days 19/05/2020 29/05/2020 Give and
Take
Highways works programme 2020-2021 Street Name Area/Parish Works Type Duration Planned
Start
Planned
Finish
Traffic
Management
A57, SAXILBY RAILWAY
BRIDGE (BR NO 87/95/60)
Saxilby Structures
Improvements
28 days 26/10/2020 02/12/2020 3-way Signals
A57, FOSSDYKE CANAL BRIDGE (BR NO 97/61/93)
Saxilby Structures Improvements
10 days 07/12/2020 18/12/2020 3-way Signals
Farriers Court Scopwick Carriageway resurfacing
5 Days TBC in 2021
TBC in 2021
Road Closure
Vicarage Lane Scopwick Carriageway resurfacing
5 Days TBC in 2021
TBC in 2021
Road Closure
BROOKSIDE Scopwick Minor Drainge
Repairs
5 days TBC TBC TBC
A159 Scotter Carriageway
Resurfacing
10 weeks 28/09/2020 04/12/2020 Road Closure
GORSE DROVE/CLAY LANE Scredington Surface Dressing
1 days 06/07/2020 06/07/2020 Short duration road closure
Sleaford Road Silk Willougby New Cycleway TBC 2021 - TBC 2021 - TBC Footway Closure
LUDFORD ROAD Sixhills Surface Dressing
1 days 16/05/2020 16/05/2020 Road Closure
SCARBOROUGH AVE Skegenss Carriageway Resurfacing
8 days 12/11/2020 23/11/2020 Road Closure
A52 Roman Bank (East) Skegness Carriageway Resurfacing
2 weeks Spring 2021
TBC Road Closure
Skegness Road Skegness Footway Micro-asphalt
surfacing
TBC TBC in 2021
TBC in 2021
2 Way Lights
Town Centre Skegness Footway works TBC 2020/2021 2020/2021 Footway Closure
Highways works programme 2020-2021 Street Name Area/Parish Works Type Duration Planned
Start
Planned
Finish
Traffic
Management
Town Centre Skegness Guardrail
replacement
TBC 2020/2021 2020/2021 Off Highway
Work Scarborough Avenue Skegness Joint Treatment TBC 2020/2021 2020/2021 2 Way Lights
DAVID DRIVE Skegness Surface Dressing
1 days 22/07/2020 22/07/2020 Short duration road closure
HUCKLES WAY Skegness Surface Dressing
1 days 22/07/2020 22/07/2020 Short duration road closure
TAGGS DRIVE Skegness Surface Dressing
1 days 22/07/2020 22/07/2020 Short duration road closure
ST VALENTINES WAY Skegness Surface Dressing
1 days 22/07/2020 22/07/2020 Short duration road closure
SCOTTS CLOSE Skegness Surface
Dressing
1 days 22/07/2020 22/07/2020 Short duration
road closure LINCOLN ROAD Skegness Traffic Signals
Improvements
14 days 26/05/2020 12/06/2020 2-way Signals
LUMLEY ROAD (GYRATORY) Skegness Traffic Signals Improvements
25 days 04/01/2021 05/02/2021 TBC
GRAND PARADE (SCARBOROUGH AVE)
Skegness Traffic Signals Improvements
25 days 25/01/2021 26/02/2021 TBC
SAXILBY ROAD Skellingthorpe Carriageway Resurfacing
5 days 07/09/2020 11/09/2020 Road Closure - NIGHTS
DALBY ROAD Skendlby Surface Dressing
1 days 14/05/2020 14/05/2020 Short duration road closure
U/C, SADDLEBACK CULVERT (1)
(BR NO 49/22/91A)
Skidbrooke Structures Improvements
21 days 16/09/2020 14/10/2020 Road Closure
Oak Road Sleaford Carriageway
resurfacing
5 Days TBC in
2021
TBC in
2021
Road Closure
Highways works programme 2020-2021 Street Name Area/Parish Works Type Duration Planned
Start
Planned
Finish
Traffic
Management
SOUTHFIELDS Sleaford Surface
Dressing
1 days 01/07/2020 01/07/2020 Short duration
road closure OAK ROAD / HAWTHORN
DRIVE
Sleaford Surface
Dressing
1 days 02/07/2020 02/07/2020 Short duration
road closure
CHESTNUT CLOSE Sleaford Surface Dressing
1 days 02/07/2020 02/07/2020 Short duration road closure
PINE CLOSE Sleaford Surface Dressing
1 days 02/07/2020 02/07/2020 Short duration road closure
JUNIPER WAY Sleaford Surface Dressing
1 days 02/07/2020 02/07/2020 Short duration road closure
ALDER ROAD Sleaford Surface Dressing
1 days 02/07/2020 02/07/2020 Short duration road closure
ASPEN DRIVE Sleaford Surface Dressing
1 days 02/07/2020 02/07/2020 Short duration road closure
LAVENDER CLOSE Sleaford Surface Dressing
1 days 02/07/2020 02/07/2020 Short duration road closure
CYPRESS CLOSE Sleaford Surface
Dressing
1 days 02/07/2020 02/07/2020 Short duration
road closure MULBERRY CLOSE Sleaford Surface
Dressing
1 days 02/07/2020 02/07/2020 Short duration
road closure
ACACIA CLOSE Sleaford Surface Dressing
1 days 02/07/2020 02/07/2020 Short duration road closure
REDWOOD AVENUE Sleaford Surface Dressing
1 days 03/07/2020 03/07/2020 Short duration road closure
MAGNOLIA ROAD Sleaford Surface Dressing
1 days 03/07/2020 03/07/2020 Short duration road closure
LIMETREE CLOSE Sleaford Surface Dressing
1 days 03/07/2020 03/07/2020 Short duration road closure
Highways works programme 2020-2021 Street Name Area/Parish Works Type Duration Planned
Start
Planned
Finish
Traffic
Management
ROWAN CLOSE Sleaford Surface
Dressing
1 days 03/07/2020 03/07/2020 Short duration
road closure PEAR TREE CLOSE Sleaford Surface
Dressing
1 days 03/07/2020 03/07/2020 Short duration
road closure
LARCH WAY Sleaford Surface Dressing
1 days 03/07/2020 03/07/2020 Short duration road closure
HOLLY CLOSE Sleaford Surface Dressing
1 days 03/07/2020 03/07/2020 Short duration road closure
ROSEWOOD DRIVE Sleaford Surface Dressing
1 days 06/07/2020 06/07/2020 Short duration road closure
BRIDLE CLOSE Sleaford Surface Dressing
1 days 06/07/2020 06/07/2020 Short duration road closure
SNITTERBY CARR LANE Snitterby Carriageway Reconstruction
6 days 18/09/2020 25/09/2020 Road Closure
PF FOOTWAY South Hykeham Footway Works 50 days 05/10/2020 11/12/2020 TBC
THE DROVE South Hykeham Surface Dressing
1 days 11/07/2020 11/07/2020 Short duration road closure
FOX COVERT (PART) South Hykeham Surface Dressing
1 days 11/07/2020 11/07/2020 Short duration road closure
LAKEVIEW CLOSE / POST MILL CLOSE (PART)
South Hykeham Surface Dressing
1 days 11/07/2020 11/07/2020 Short duration road closure
PENROSE CLOSE South Hykeham Surface Dressing
1 days 11/07/2020 11/07/2020 Short duration road closure
Thornton lane South Kelsey Carriageway Reconstruction
TBC TBC in 2021
TBC in 2021
TBC
HPF, VILLAGE FOOTBRIDGE (BR NO 14/79/46)
South Kyme Structures Improvements
10 days 24/08/2020 04/09/2020 Footway Closure
COW DROVE South Kyme Surface
Dressing
1 days 22/05/2020 22/05/2020 Short duration
road closure
Highways works programme 2020-2021 Street Name Area/Parish Works Type Duration Planned
Start
Planned
Finish
Traffic
Management
Brinkhall Road South Ormsby Carriageway
structural patching
TBC TBC in
2021
TBC in
2021
TBC
MAIN STREET South Rauceby Footway Micro-asphalt surfacing
7 days 04/06/2020 12/06/2020 Give & Take
TOM LANE South Rauceby Footway Micro-asphalt
surfacing
7 days 05/06/2020 15/06/2020 Stop & Go
SOUTHGATE SPINNEYS South Rauceby Footway Micro-
asphalt surfacing
10 days 22/06/2020 03/07/2020 Give and
Take
PINFOLD LANE South Rauceby Footway Micro-asphalt surfacing
10 days 22/06/2020 03/07/2020 Give and Take
CLIFFE VIEW South Rauceby Footway Micro-asphalt
surfacing
10 days 22/06/2020 03/07/2020 Give and Take
BEECH RISE South Rauceby Footway Micro-asphalt surfacing
10 days 22/06/2020 03/07/2020 Give and Take
CHAPEL CLOSE South Rauceby Footway Micro-asphalt surfacing
10 days 22/06/2020 03/07/2020 Give and Take
HOLYROOD WALK Spalding Carriageway
Patching
4 days 05/10/2020 08/10/2020 Road Closure
WOOLRAM WYGATE Spalding Carriageway
Resurfacing
4 days 21/04/2020 24/04/2020 Road Closure
Highways works programme 2020-2021 Street Name Area/Parish Works Type Duration Planned
Start
Planned
Finish
Traffic
Management
B1356 PARK ROAD Spalding Carriageway
Resurfacing
4 days 01/09/2020 04/09/2020 Road Closure
MALVERN AVE/DRIVE Spalding Footway Works 30 days 09/11/2020 18/12/2020 Road Closure
TOLLGATE Spalding Footway Works TBC TBC TBC 4-way Signals
CLAY LAKE BANK Spalding Surface Dressing
1 days 06/07/2020 06/07/2020 Short duration road closure
PENNYGATE Spalding Surface
Dressing
1 days 16/07/2020 16/07/2020 Stop & Go
HORSESHOE BRIDGE Spalding Traffic Signals
Improvements
25 days 09/11/2020 11/12/2020 Road Closure
WILLOUGHBY DRIVE Spilsby Surface Dressing
1 days 21/07/2020 21/07/2020 Short duration road closure
ASHBY MEADOWS Spilsby Surface Dressing
1 days 21/07/2020 21/07/2020 Short duration road closure
FALDINGWORTH ROAD Spridlington Surface Dressing
1 days 11/05/2020 11/05/2020 Short duration road closure
Cycle Route 63 Stamford New Cycleway TBC 2021 - TBC 2021 - TBC Footway Closure
Various locations through Town STAMFORD Street Lighting Improvements
40 days 05/10/2020 27/11/2020
HIGH ST Stapleford Carriageway Patching
2 days 27/08/2020 28/08/2020 Road Closure
C53, BROUGHTON CLAYS
BRIDGE (BR NO 85/87/51B)
Stapleford Structures
Improvements
5 days 20/04/2020 24/04/2020 Road Closure
A16 - MAIN ROAD Stickney Surface Dressing
1 days 19/05/2020 19/05/2020 Convoy
C604, DICKINSON'S BRIDGE (BR NO 16/86/98)
Stixwould Structures Improvements
35 days 18/05/2020 03/07/2020 Road Closure
Highways works programme 2020-2021 Street Name Area/Parish Works Type Duration Planned
Start
Planned
Finish
Traffic
Management
STAGGLETHORPE LANE Stragglethorpe Surface
Dressing
1 days 11/07/2020 11/07/2020 Short duration
road closure MAIN STREET -
PROGRAMME WITH W87.1
Stubton Surface
Dressing
1 days 10/06/2020 10/06/2020 Stop & Go
A1500 - TILLBRIDGE LANE Sturton by Stow Surface Dressing
1 days 26/05/2020 26/05/2020 Stop & Go
A1500 - TILLBRIDGE LANE Sturton by Stow Surface Dressing
1 days 26/05/2020 26/05/2020 Stop & Go
B1241 - HIGH STREET Sturton by Stow Surface Dressing
1 days 29/05/2020 29/05/2020 Stop & Go
Ellison Close Sudbrooke Carriageway resurfacing
5 Days TBC in 2021
TBC in 2021
Road Closure
COURTFIELD CLOSE Sudbrooke Footway Works 25 days 27/04/2020 29/05/2020 No Through Road &
Priority Boards
A158 Wragby Road Sudrooke Replace anti-skid/red with new surfacing
TBC TBC in 2021
TBC in 2021
TBC
WIGTOFT RD Sutterton Surface Dressing
1 days 15/06/2020 15/06/2020 Stop & Go
Old A17 Bridge road Sutton Bridge Replace anti-skid/red with
new surfacing
TBC TBC in 2021
TBC in 2021
TBC
Marine Ave West (Part) Sutton on Sea Carriageway resurfacing
5 Days TBC in 2021
TBC in 2021
Road Closure
Morrison Close Sutton on Sea Carriageway resurfacing
5 Days TBC in 2021
TBC in 2021
Road Closure
Highways works programme 2020-2021 Street Name Area/Parish Works Type Duration Planned
Start
Planned
Finish
Traffic
Management
William Green Close Sutton on Sea Carriageway
resurfacing
5 Days TBC in
2021
TBC in
2021
Road Closure
William Tow Close Sutton on Sea Carriageway
resurfacing
5 Days TBC in
2021
TBC in
2021
Road Closure
CRABTREE LANE Sutton On Sea Carriageway Resurfacing
10 days 24/11/2020 07/12/2020 Road Closure
Various locations through village
Sutton on Sea Street Lighting Improvements
23 days 29/06/2020 29/07/2020 Give & Take
LUTTON GATE Sutton St Edmonds Carriageway Reconstruction
10 days 20/07/2020 31/07/2020 Road Closure
INLEY DROVE Sutton St James Carriageway Reconstruction
4 days 11/08/2020 14/08/2020 Road Closure
B1165 FISHERGATE / CHAPEL GATE / DRAW DYKE
Sutton St James Surface Dressing
1 days 27/06/2020 27/06/2020 Stop & Go
PARSONS DROVE Swaton Surface Dressing
1 days 06/07/2020 06/07/2020 Short duration road closure
HIGH STREET Swayfield Footway Micro-
asphalt surfacing
6 days 02/06/2020 09/06/2020 Give and
Take
OVERGATE ROAD Swayfield Footway Micro-asphalt surfacing
10 days 17/06/2020 30/06/2020 Give and Take
CORBY ROAD Swayfield Footway Micro-asphalt
surfacing
10 days 17/06/2020 30/06/2020 Give and Take
THE CRESCENT Swayfield Footway Micro-
asphalt surfacing
10 days 17/06/2020 30/06/2020 Give and
Take
Highways works programme 2020-2021 Street Name Area/Parish Works Type Duration Planned
Start
Planned
Finish
Traffic
Management
CASTLE BYTHAM LANE Swayfield Footway Micro-
asphalt surfacing
10 days 17/06/2020 30/06/2020 Give and
Take
C164 NEWARK ROAD - TBC Swinderby Carriageway Patching
5 days 09/11/2020 13/11/2020 Road Closure
STATION ROAD Swinderby Surface Dressing
1 days 07/07/2020 07/07/2020 Short duration road closure
HIGH STREET Swinderby Surface Dressing
1 days 07/07/2020 07/07/2020 Short duration road closure
COW LANE Swinderby Surface Dressing
1 days 07/07/2020 07/07/2020 Short duration road closure
MOOR LANE Swinderby Surface Dressing
1 days 07/07/2020 07/07/2020 Short duration road closure
VILLA LANE Swineshead Carriageway
Resurfacing
2 days 23/09/2020 24/09/2020 Road Closure
- NIGHTS Station Road Swineshead Carriageway
structural patching
TBC TBC in
2021
TBC in
2021
TBC
WESTFIELD DRIVE Swineshead Surface Dressing
1 days 25/07/2020 25/07/2020 Short duration road closure
B1203 BINBROOK RD/HATCLIFFE RD
Swinhope Surface Dressing
1 days 27/05/2020 27/05/2020 Convoy
MAIN STREET (LOOP) Syston Surface Dressing
1 days 01/07/2020 01/07/2020 Short duration road closure
CHURCH LANE Syston Surface Dressing
1 days 01/07/2020 01/07/2020 Short duration road closure
THE DRIFT Syston Surface
Dressing
1 days 01/07/2020 01/07/2020 Short duration
road closure
Highways works programme 2020-2021 Street Name Area/Parish Works Type Duration Planned
Start
Planned
Finish
Traffic
Management
RIVER LANE Syston Surface
Dressing
1 days 01/07/2020 01/07/2020 Short duration
road closure Cromwell Place Tattershall Carriageway
resurfacing
5 Days TBC in
2021
TBC in
2021
Road Closure
U/C, OLD TATTERSHALL BRIDGE (BR NO 15/96/62)
Tattershall Bridge Structures Improvements
25 days 02/11/2020 04/12/2020 None
A153 SLEAFORD RD Tattershall to Kirkstead Bridge
Surface Dressing
1 days 19/05/2020 19/05/2020 Convoy
B1203 - RASEN ROAD Tealby Surface Dressing
1 days 28/05/2020 28/05/2020 Convoy
SOUTH OMSBY TO TETFORD Tetford Carriageway Patching
5 days 30/06/2020 06/07/2020 Road Closure
ORMSBY ROAD Tetford Carriageway
Patching
10 days 07/07/2020 20/07/2020 Road Closure
HARRINGTON ROAD Tetford Carriageway
Patching
4 days 20/07/2020 23/07/2020 Road Closure
South Road Tetford Carriageway structural patching
TBC TBC in 2021
TBC in 2021
TBC
A1031 Tetney Carriageway Resurfacing
6 weeks 21/09/2020 30/10/2020 Road closure
CHURCH LANE/HOOP END Tetney Surface Dressing
1 days 11/05/2020 11/05/2020 Road Closure
B1190 - THIMBLEY Thimbleby Surface Dressing
1 days 20/05/2020 20/05/2020 Stop & Go
ORFORD ROAD Thoresway Surface
Dressing
1 days 22/05/2020 22/05/2020 Convoy
Highways works programme 2020-2021 Street Name Area/Parish Works Type Duration Planned
Start
Planned
Finish
Traffic
Management
LINCOLN LANE Thorpe Le Fallows Carriageway
Reconstruction
3 days 03/09/2020 07/09/2020 Road Closure
THORPE LANE Thorpe Le Fallows Carriageway
Reconstruction
4 days 07/09/2020 10/09/2020 Road Closure
LYMN BANK Thorpe St Peter Surface Dressing
1 days 09/06/2020 09/06/2020 Short duration road closure
B1195, MILL HILL BRIDGE (BR NO 46/71/59)
Thorpe St. Peter Structures Improvements
25 days 21/09/2020 23/10/2020 Road Closure
U/C, THORPE BRIDGE (BR NO 98/00/46)
Thorpe-le-fallows Structures Improvements
4 days 14/04/2020 17/04/2020 Road Closure
THORNTON ROAD - TBC Thorton Le Moor / South Kelsey
Carriageway Patching
10 days 14/01/2021 27/01/2021 Road Closure
A15 THURLBY NEAR BOURNE
THURLBY NEAR BOURNE
Street Lighting Improvements
30 days 04/01/2021 12/02/2021
BAYFIELDS ROAD Timberland Footway Micro-asphalt
surfacing
10 days 08/06/2020 19/06/2020 Give & Take
CHURCH LANE Timberland Footway Micro-asphalt surfacing
10 days 08/06/2020 19/06/2020 Give & Take
WEST STREET Timberland Footway Micro-asphalt surfacing
10 days 08/06/2020 19/06/2020 Give & Take
MARTIN ROAD Timberland Footway Micro-
asphalt surfacing
10 days 08/06/2020 19/06/2020 Give & Take
FOSTER CLOSE Timberland Footway Micro-asphalt surfacing
10 days 08/06/2020 19/06/2020 Give & Take
Highways works programme 2020-2021 Street Name Area/Parish Works Type Duration Planned
Start
Planned
Finish
Traffic
Management
AUCKLAND CRESCENT Timberland Footway Micro-
asphalt surfacing
10 days 08/06/2020 19/06/2020 Give & Take
FEN ROAD Timberland Footway Micro-asphalt surfacing
10 days 08/06/2020 19/06/2020 Give & Take
MAIN STREET Timberland Footway Micro-asphalt
surfacing
10 days 08/06/2020 19/06/2020 Give & Take
STATION ROAD Timberland Footway Micro-
asphalt surfacing
10 days 08/06/2020 19/06/2020 Give & Take
B1189 - SLEAFORD ROAD Timberland/Thorpe Tilney
Surface Dressing
1 days 01/06/2020 01/06/2020 Convoy
A6121 MAIN ROAD Toft Minor Drainge Repairs
20 days 28/09/2020 23/10/2020 2-way Signals
TOFT LANE Toft newton Surface Dressing
1 days 28/05/2020 28/05/2020 Short duration road closure
SAND LANE Torksey Footway Micro-asphalt
surfacing
9 days 27/04/2020 07/05/2020 Give and Take
STATION ROAD Torksey Footway Micro-asphalt surfacing
9 days 27/04/2020 07/05/2020 Give and Take
A156 MAIN ROAD Torksey Footway Micro-asphalt surfacing
9 days 27/04/2020 07/05/2020 2-way Signals
LEA ROAD Torksey Footway Works TBC TBC TBC 2-way Signals
Highways works programme 2020-2021 Street Name Area/Parish Works Type Duration Planned
Start
Planned
Finish
Traffic
Management
A156 TORKSEY DUAL
CARRIAGWAY
Torksey Surface
Dressing
1 days 26/05/2020 26/05/2020 LANE
CLOSURE CHURCH STREET, TORSKEY Torskey Surface
Dressing
1 days 29/05/2020 29/05/2020 Short duration
road closure
COUNTER DRAIN DRO Tounge End Surface Dressing
1 days 16/07/2020 16/07/2020 Short duration road closure
CHAPEL LANE Toynton St Peter Carriageway Reconstruction
2 days 26/08/2020 27/08/2020 Road Closure
CHURCH LANE Toynton St Peter Carriageway Reconstruction
1 days 27/08/2020 27/08/2020 Road Closure
Various sites across the County Traffic Signals Removal of pedestrian barriers
Various TBC - 2020/2021
TBC - 2020/2021
Footway Closure
Willows Close Tydd st Mary Carriageway
resurfacing
5 Days TBC in
2021
TBC in
2021
Road Closure
CHURCH LANE Ulceby Surface
Dressing
1 days 23/07/2020 23/07/2020 Short duration
road closure
A1104 - ALFORD ROAD Ulceby Cross Surface Dressing
1 days 14/05/2020 14/05/2020 Stop & Go
Various locations through village
Waddington Street Lighting Improvements
38 days 03/08/2020 23/09/2020
A607 - GRANTHAM ROAD Waddington Surface Dressing
1 days 08/06/2020 08/06/2020 Convoy
MELBOURNE WAY Waddington Surface Dressing
1 days 11/07/2020 11/07/2020 Short duration road closure
ADELAIDE CLOSE Waddington Surface Dressing
1 days 11/07/2020 11/07/2020 Short duration road closure
HOBART CLOSE Waddington Surface Dressing
1 days 11/07/2020 11/07/2020 Short duration road closure
Highways works programme 2020-2021 Street Name Area/Parish Works Type Duration Planned
Start
Planned
Finish
Traffic
Management
CAIRNS WAY Waddington Surface
Dressing
1 days 11/07/2020 11/07/2020 Short duration
road closure A607 Cliff Road villgae Links Waddington to
Welbourn
New Cycleway TBC 2021 - TBC 2021 - TBC Footway
Closure
C661 CROFT BANK Wainfleet Carriageway Patching
5 days 03/08/2020 07/08/2020 Road Closure
STATION RD Wainfleet Footway Works 15 days 30/11/2020 18/12/2020 Road Closure
WINCHESTER ROAD Wainfleet Footway Works 9 days 14/12/2020 24/12/2020 Road Closure
HALLGATE Wainfleet Surface
Dressing
1 days 14/05/2020 14/05/2020 Short duration
road closure
CROWS LANE Wainfleet Surface Dressing
1 days 09/06/2020 09/06/2020 Short duration road closure
COLLISON GATE Wainfleet Surface Dressing
1 days 09/06/2020 09/06/2020 Short duration road closure
BREWSTER LANE Wainfleet Surface Dressing
1 days 09/06/2020 09/06/2020 Short duration road closure
ABRAHAMS LANE Wainfleet Surface Dressing
1 days 09/06/2020 09/06/2020 Short duration road closure
LADY LANE Wainfleet All Saints Carriageway Reconstruction
2 days 27/08/2020 28/08/2020 Road Closure
ST MICHAELS LANE Wainfleet St Mary Surface Dressing
1 days 23/07/2020 23/07/2020 Short duration road closure
ST EDMUND CLOSE Wainfleet St Mary Surface
Dressing
1 days 23/07/2020 23/07/2020 Short duration
road closure QUEENS ESTATE Wainfleet St Mary Surface
Dressing
1 days 23/07/2020 23/07/2020 Short duration
road closure
LONG DROVE Walcot Surface Dressing
1 days 02/06/2020 02/06/2020 Short duration road closure
Highways works programme 2020-2021 Street Name Area/Parish Works Type Duration Planned
Start
Planned
Finish
Traffic
Management
Drake Avenue Washingborough Carriageway
resurfacing
5 Days TBC in
2021
TBC in
2021
Road Closure
Grosvenor Mews Washingborough Carriageway
resurfacing
5 Days TBC in
2021
TBC in
2021
Road Closure
SCHOOL LANE Washingborough Footway Micro-asphalt surfacing
10 days 14/05/2020 27/05/2020 Give & Take
HIGH MEADOWS Washingborough Footway Micro-asphalt surfacing
10 days 14/05/2020 27/05/2020 Give & Take
TURNBERRY CLOSE Washingborough Footway Micro-
asphalt surfacing
10 days 01/06/2020 12/06/2020 Give & Take
LINDRICK CLOSE Washingborough Footway Micro-asphalt surfacing
10 days 01/06/2020 12/06/2020 Give & Take
LYTHAM CLOSE Washingborough Footway Micro-asphalt
surfacing
10 days 03/06/2020 16/06/2020 Give & Take
NORWICH CLOSE Washingborough Footway Micro-
asphalt surfacing
10 days 03/06/2020 16/06/2020 Give & Take
WELLS CLOSE Washingborough Footway Micro-asphalt surfacing
10 days 03/06/2020 16/06/2020 Give & Take
READING CLOSE Washingborough Footway Micro-asphalt
surfacing
10 days 03/06/2020 16/06/2020 Give & Take
Highways works programme 2020-2021 Street Name Area/Parish Works Type Duration Planned
Start
Planned
Finish
Traffic
Management
MALVERN AVENUE Washingborough Footway Micro-
asphalt surfacing
10 days 03/06/2020 16/06/2020 Give & Take
BECKETT CLOSE Washingborough Footway Micro-asphalt surfacing
10 days 03/06/2020 16/06/2020 Give & Take
REPTON CLOSE Washingborough Footway Micro-asphalt
surfacing
10 days 03/06/2020 16/06/2020 Give & Take
PARK CRESCENT Washingborough Footway Micro-
asphalt surfacing
10 days 03/06/2020 16/06/2020 Give & Take
JULIA ROAD Washingborough Footway Micro-asphalt surfacing
10 days 03/06/2020 16/06/2020 Give & Take
TROON CLOSE Washingborough Footway Micro-asphalt
surfacing
10 days 03/06/2020 16/06/2020 Give & Take
ROWAN COURT Washingborough Footway Micro-asphalt surfacing
10 days 03/06/2020 16/06/2020 Give & Take
WENTWORTH CLOSE Washingborough Footway Micro-asphalt surfacing
10 days 03/06/2020 16/06/2020 Give & Take
BIRKDALE CLOSE Washingborough Footway Micro-
asphalt surfacing
10 days 03/06/2020 16/06/2020 Give & Take
Highways works programme 2020-2021 Street Name Area/Parish Works Type Duration Planned
Start
Planned
Finish
Traffic
Management
SUNNINGDALE GROVE Washingborough Footway Micro-
asphalt surfacing
10 days 03/06/2020 16/06/2020 Give & Take
GLENEAGLES GROVE Washingborough Footway Micro-asphalt surfacing
10 days 03/06/2020 16/06/2020 Give & Take
MANOR ROAD Washingborough Footway Micro-asphalt
surfacing
10 days 08/06/2020 19/06/2020 Give & Take
NELSON DRIVE Washingborough Footway Micro-
asphalt surfacing
10 days 08/06/2020 19/06/2020 Give & Take
LEE AVENUE Washingborough Footway Micro-asphalt surfacing
10 days 08/06/2020 19/06/2020 Give & Take
GERRARD MEWS Washingborough Footway Micro-asphalt
surfacing
10 days 08/06/2020 19/06/2020 Give & Take
JERMYN MEWS Washingborough Footway Micro-asphalt surfacing
10 days 08/06/2020 19/06/2020 Give & Take
BURTON MEWS Washingborough Footway Micro-asphalt surfacing
10 days 08/06/2020 19/06/2020 Give & Take
THE GREEN Welbourn Minor Drainge
Repairs
45 days 01/10/2020 15/11/2020 Road Closure
HIGH ST/ CROSBY LANE Welbourn Minor Drainge
Repairs
45 days 01/10/2020 15/11/2020 Road Closure
Highways works programme 2020-2021 Street Name Area/Parish Works Type Duration Planned
Start
Planned
Finish
Traffic
Management
HIGH ST (JOINERS ARMS) Welbourn Minor Drainge
Repairs
45 days 01/10/2020 15/11/2020 Road Closure
MAIN ROAD Welbourn Minor Drainge
Repairs
45 days 01/10/2020 15/11/2020 Road Closure
CASTLE HILL & MOAT LANE Welbourn Minor Drainge Repairs
45 days 01/10/2020 15/11/2020 Road Closure
A607 MAIN ROAD Welbourn Minor Drainge Repairs
45 days 01/10/2020 15/11/2020 2-way Signals
HIGH ST (O/S SCHOOL) Welbourn Minor Drainge Repairs
5 days 01/10/2020 15/11/2020 Road Closure
High Barn Lane Well Carriageway structural patching
TBC TBC in 2021
TBC in 2021
TBC
C307 POTTERGATE ROAD Wellingore Carriageway
Patching
6 days 15/06/2020 22/06/2020 Road Closure
A607 Cliff Road Wellingore Carriageway
structural patching
TBC TBC in
2021
TBC in
2021
TBC
EASTFIELD LANE Welton Surface Dressing
1 days 28/05/2020 28/05/2020 Short duration road closure
B1196 - HANBY LANE Welton Le Marsh Surface Dressing
1 days 14/05/2020 14/05/2020 Stop & Go
C6 - DARK LANE Welton Le Wold Surface Dressing
1 days 13/05/2020 13/05/2020 Short duration road closure
C553 - BUNKERS HILL Welton Le Wold Surface Dressing
1 days 13/05/2020 13/05/2020 Short duration road closure
A153 - LOUTH ROAD West Ashby Surface
Dressing
1 days 17/05/2020 17/05/2020 Convoy
Highways works programme 2020-2021 Street Name Area/Parish Works Type Duration Planned
Start
Planned
Finish
Traffic
Management
WEST DROVE NORTH West Drove Carriageway
Reconstruction
5 days 03/08/2020 07/08/2020 Road Closure
A155 - WEST KEAL West Keal Surface
Dressing
1 days 19/05/2020 19/05/2020 Convoy
HALL LANE West Keal Surface Dressing
1 days 21/07/2020 21/07/2020 Short duration road closure
NORTH GATE West Pinchbeck Surface Dressing
1 days 09/06/2020 09/06/2020 Short duration road closure
GLENSIDE NORTH West Pinchbeck Surface Dressing
1 days 16/06/2020 16/06/2020 Short duration road closure
MARKET RASEN RD/TORRINGTON RD
West Torrington Surface Dressing
1 days 15/05/2020 15/05/2020 Road Closure
WESTLABY LANE Westaby Surface Dressing
1 days 29/05/2020 29/05/2020 Road Closure
C427 EASE LANE Westborough Carriageway Patching
4 days 21/09/2020 24/09/2020 Road Closure
A151 weston roundabout Weston Replace anti-
skid/red with new surfacing
TBC TBC in
2021
TBC in
2021
TBC
PARSONS LANE Whaplode Carriageway Reconstruction
3 days 13/07/2020 15/07/2020 Road Closure
COMMON ROAD Whaplode Carriageway Reconstruction
5 days 15/07/2020 21/07/2020 Road Closure
COOPERS CLOSE Whaplode Carriageway Resurfacing
1 days 15/10/2020 15/10/2020 Road Closure
EAST GATE / CRANESGATE NORTH
Whaplode Surface Dressing
1 days 25/06/2020 25/06/2020 Short duration road closure
BARS LANE Whaplode Drove Carriageway Reconstruction
2 days 13/08/2020 14/08/2020 Road Closure
Highways works programme 2020-2021 Street Name Area/Parish Works Type Duration Planned
Start
Planned
Finish
Traffic
Management
WHISBY ROAD Whisby Surface
Dressing
1 days 05/06/2020 05/06/2020 Stop & Go
MOOR LANE Whisby Surface
Dressing
1 days 05/06/2020 05/06/2020 Short duration
road closure
STATION ROAD/SHORTWOOD LANE
Wickenby to Friesthorpe
Surface Dressing
1 days 19/06/2020 19/06/2020 Short duration road closure
LINGHALL LANE Wildmore Surface Dressing
1 days 19/05/2020 19/05/2020 Short duration road closure
MILL LANE Wildmore Surface Dressing
1 days 20/05/2020 20/05/2020 Short duration road closure
TAVERN WAY Willoughby Surface Dressing
1 days 21/07/2020 21/07/2020 Short duration road closure
JOHN SMITHS CLOSE Willoughby Surface Dressing
1 days 21/07/2020 21/07/2020 Short duration road closure
A153 SLEAFORD ROAD / BACK LANE/ TOWN END
Wilsford Surface Dressing
1 days 11/06/2020 11/06/2020 Convoy
CAMP ROAD Witham St Hughs Surface
Dressing
1 days 16/06/2020 16/06/2020 Convoy
WARREN ROAD Witham St Hughs Surface
Dressing
1 days 11/07/2020 11/07/2020 Short duration
road closure
HORNCASTLE ROAD Wood Enderby Surface Dressing
1 days 15/05/2020 15/05/2020 Short duration road closure
Tor O Moor Gardens Woodhall Spa Carriageway resurfacing
5 Days TBC in 2021
TBC in 2021
Road Closure
A158 Crossroads Wragby Guardrail replacement
TBC 2020/2021 2020/2021 TBC
A158 Main Road Wragby to Lincoln Ironwork replacement
TBC 2020/2021 2020/2021 2 Way Lights
Highways works programme 2020-2021 Street Name Area/Parish Works Type Duration Planned
Start
Planned
Finish
Traffic
Management
A52 Main Road Wrangle Carriageway
Resurfacing
TBC TBC in
2021
TBC in
2021
TBC
DOUBLE BANK Wrangle Surface
Dressing
1 days 16/05/2020 16/05/2020 Short duration
road closure
HALL END RD / HALL LN Wrangle Surface Dressing
1 days 16/05/2020 16/05/2020 Short duration road closure
COMMON DRO (AKA PINDERS DRO)
Wrangle Surface Dressing
1 days 24/07/2020 24/07/2020 Short duration road closure
JUDE GATE / MILL LN Wrangle Surface Dressing
1 days 24/07/2020 24/07/2020 Short duration road closure
Various locations through village
Wyberton Street Lighting Improvements
30 days 24/08/2020 02/10/2020
SALTERS LANE Wyham Surface Dressing
1 days 12/05/2020 12/05/2020 Short duration road closure