edsa road engineering works - · pdf fileroad engineering works on edsa department of public...

12
Road Engineering Works on EDSA Department of Public Works and Highways 24 September 2015

Upload: vanlien

Post on 11-Feb-2018

219 views

Category:

Documents


3 download

TRANSCRIPT

Page 1: EDSA Road Engineering Works -   · PDF fileRoad Engineering Works on EDSA Department of Public Works and Highways 24 September 2015

Road Engineering Works on EDSA

Department of Public Works and Highways

24 September 2015

Page 2: EDSA Road Engineering Works -   · PDF fileRoad Engineering Works on EDSA Department of Public Works and Highways 24 September 2015

Typical Yellow Bus Lanes

90 meters 90 meters

Page 3: EDSA Road Engineering Works -   · PDF fileRoad Engineering Works on EDSA Department of Public Works and Highways 24 September 2015

Lane Usage

YELLOW BUS LANES • Public and Private Buses • PUJs

CAR LANES • All cars • Taxis • UV Express

May enter yellow bus lanes only at transition sections and when entering/exiting

establishments

Buses may use interchanges but should stay in the yellow lane.

Page 4: EDSA Road Engineering Works -   · PDF fileRoad Engineering Works on EDSA Department of Public Works and Highways 24 September 2015

Typical Bus Stop

Collapsible bollards at 2-meter spacing

Page 5: EDSA Road Engineering Works -   · PDF fileRoad Engineering Works on EDSA Department of Public Works and Highways 24 September 2015

EDSA Guadalupe Bus Stop

Page 6: EDSA Road Engineering Works -   · PDF fileRoad Engineering Works on EDSA Department of Public Works and Highways 24 September 2015

Yellow Box

Page 7: EDSA Road Engineering Works -   · PDF fileRoad Engineering Works on EDSA Department of Public Works and Highways 24 September 2015

EDSA-Kamuning

EDSA-P. Tuazon

Page 8: EDSA Road Engineering Works -   · PDF fileRoad Engineering Works on EDSA Department of Public Works and Highways 24 September 2015

Signalization of EDSA Intersections

• Congressional Avenue – Roosevelt Avenue

• Quezon Avenue

• Roxas Boulevard

Page 9: EDSA Road Engineering Works -   · PDF fileRoad Engineering Works on EDSA Department of Public Works and Highways 24 September 2015

Bonifacio Global City to Ortigas Center Link Road Project

(Sta. Monica Street-Lawton Avenue Bridge Project)

Page 10: EDSA Road Engineering Works -   · PDF fileRoad Engineering Works on EDSA Department of Public Works and Highways 24 September 2015

Legend:

- Phase II-B (Sta. Monica St. to Meralco Avenue)

- Phase II-A (Lawton to Global City)

Pasig City

Makati City

- Phase 1 (Sta. Monica St.-Lawton)

Location Plan

Page 11: EDSA Road Engineering Works -   · PDF fileRoad Engineering Works on EDSA Department of Public Works and Highways 24 September 2015

Perspective View

Page 12: EDSA Road Engineering Works -   · PDF fileRoad Engineering Works on EDSA Department of Public Works and Highways 24 September 2015

Thank you! End of Presentation.