Health and Safety Executive
North & West Yorks
WWT
David Stewart
HM Principal Inspector, Construction Group, Leeds
![Page 2: Health and Safety Executive North & West Yorks WWT David Stewart HM Principal Inspector, Construction Group, Leeds](https://reader031.vdocuments.site/reader031/viewer/2022032805/56649ef95503460f94c0b211/html5/thumbnails/2.jpg)
Topics
Control of Asbestos Regulations 2012
RIDDOR
Fee for Intervention
Refurb’ Campaign – Feb/March 2012
Work plan 2012/13
![Page 3: Health and Safety Executive North & West Yorks WWT David Stewart HM Principal Inspector, Construction Group, Leeds](https://reader031.vdocuments.site/reader031/viewer/2022032805/56649ef95503460f94c0b211/html5/thumbnails/3.jpg)
Control of Asbestos Regulations 2012
• EU Directive on exposure to asbestos (Directive 2009/148/EC)
• 6th April 2012– What has stayed the same– What has changed
• Notification
• April 2015 – health surveillance
• Enforcement expectation
![Page 4: Health and Safety Executive North & West Yorks WWT David Stewart HM Principal Inspector, Construction Group, Leeds](https://reader031.vdocuments.site/reader031/viewer/2022032805/56649ef95503460f94c0b211/html5/thumbnails/4.jpg)
RIDDOR
• 6th April
• The trigger point has increased from over three days to over seven days incapacitation (not counting the day on which the accident happened).
• The deadline by which the over-seven-day injury must be reported has also increased to 15 days from the day of the day of the accident.
![Page 5: Health and Safety Executive North & West Yorks WWT David Stewart HM Principal Inspector, Construction Group, Leeds](https://reader031.vdocuments.site/reader031/viewer/2022032805/56649ef95503460f94c0b211/html5/thumbnails/5.jpg)
Fee For Intervention
• Material breach –when, in the opinion of the HSE Inspector, there has been a contravention of health and safety law that requires them to notify the duty holder, in writing, of that opinion.
• £124 per hour *
• October 2012 ?
![Page 6: Health and Safety Executive North & West Yorks WWT David Stewart HM Principal Inspector, Construction Group, Leeds](https://reader031.vdocuments.site/reader031/viewer/2022032805/56649ef95503460f94c0b211/html5/thumbnails/6.jpg)
Refurbishment campaign
Inspection initiative 20th Feb to 16th March
-Refurb’ & small sites
No of sites visited – 132 (3237)
No of Contractors seen – 175 (4080)
No of notices issued – 27 (581)
FFI dry run
Issues
-WAH, Fire Safety, Good Order, asbestos survey
![Page 7: Health and Safety Executive North & West Yorks WWT David Stewart HM Principal Inspector, Construction Group, Leeds](https://reader031.vdocuments.site/reader031/viewer/2022032805/56649ef95503460f94c0b211/html5/thumbnails/7.jpg)
![Page 8: Health and Safety Executive North & West Yorks WWT David Stewart HM Principal Inspector, Construction Group, Leeds](https://reader031.vdocuments.site/reader031/viewer/2022032805/56649ef95503460f94c0b211/html5/thumbnails/8.jpg)
![Page 9: Health and Safety Executive North & West Yorks WWT David Stewart HM Principal Inspector, Construction Group, Leeds](https://reader031.vdocuments.site/reader031/viewer/2022032805/56649ef95503460f94c0b211/html5/thumbnails/9.jpg)
![Page 10: Health and Safety Executive North & West Yorks WWT David Stewart HM Principal Inspector, Construction Group, Leeds](https://reader031.vdocuments.site/reader031/viewer/2022032805/56649ef95503460f94c0b211/html5/thumbnails/10.jpg)
![Page 11: Health and Safety Executive North & West Yorks WWT David Stewart HM Principal Inspector, Construction Group, Leeds](https://reader031.vdocuments.site/reader031/viewer/2022032805/56649ef95503460f94c0b211/html5/thumbnails/11.jpg)
![Page 12: Health and Safety Executive North & West Yorks WWT David Stewart HM Principal Inspector, Construction Group, Leeds](https://reader031.vdocuments.site/reader031/viewer/2022032805/56649ef95503460f94c0b211/html5/thumbnails/12.jpg)
![Page 13: Health and Safety Executive North & West Yorks WWT David Stewart HM Principal Inspector, Construction Group, Leeds](https://reader031.vdocuments.site/reader031/viewer/2022032805/56649ef95503460f94c0b211/html5/thumbnails/13.jpg)
![Page 14: Health and Safety Executive North & West Yorks WWT David Stewart HM Principal Inspector, Construction Group, Leeds](https://reader031.vdocuments.site/reader031/viewer/2022032805/56649ef95503460f94c0b211/html5/thumbnails/14.jpg)
![Page 15: Health and Safety Executive North & West Yorks WWT David Stewart HM Principal Inspector, Construction Group, Leeds](https://reader031.vdocuments.site/reader031/viewer/2022032805/56649ef95503460f94c0b211/html5/thumbnails/15.jpg)
![Page 16: Health and Safety Executive North & West Yorks WWT David Stewart HM Principal Inspector, Construction Group, Leeds](https://reader031.vdocuments.site/reader031/viewer/2022032805/56649ef95503460f94c0b211/html5/thumbnails/16.jpg)
![Page 17: Health and Safety Executive North & West Yorks WWT David Stewart HM Principal Inspector, Construction Group, Leeds](https://reader031.vdocuments.site/reader031/viewer/2022032805/56649ef95503460f94c0b211/html5/thumbnails/17.jpg)
![Page 18: Health and Safety Executive North & West Yorks WWT David Stewart HM Principal Inspector, Construction Group, Leeds](https://reader031.vdocuments.site/reader031/viewer/2022032805/56649ef95503460f94c0b211/html5/thumbnails/18.jpg)
![Page 19: Health and Safety Executive North & West Yorks WWT David Stewart HM Principal Inspector, Construction Group, Leeds](https://reader031.vdocuments.site/reader031/viewer/2022032805/56649ef95503460f94c0b211/html5/thumbnails/19.jpg)
![Page 20: Health and Safety Executive North & West Yorks WWT David Stewart HM Principal Inspector, Construction Group, Leeds](https://reader031.vdocuments.site/reader031/viewer/2022032805/56649ef95503460f94c0b211/html5/thumbnails/20.jpg)
Work plan 2012/13
• Priority Areas– Asbestos– Small sites– Refurbishment– Major Projects – Timber Frame buildings– Temporary Demountable Structures