    February 15, 2016

    Mary Anne Clausen, Chair

    Board of Supervisors

    Eldred Township

    P.O. Box 600

    490 Kunkletown Road

    Kunkletown, PA 18058

    Dear Mary Anne:

    RE: Special Exception Review

    Deer Park - Chestnut Springs Project

    Hanover Project ELD15-21

    We are in receipt

    of

    the following materials related to the above-referenced Project:

    • A Site Plan consisting

    of

    fifteen

     15

    sheets, prepared by Miller Bros. Construction,

    Inc., dated December 10, 2015.

    • One

     1

    copy

    of

    the Deer Park - Chestnut Springs Project Volume 1 of 3

    Application, Environmental Impact Statement, and Erosion and Sediment

    Control/Stonnwater Management Plans.

    • One  1 copy of the  eer Park - Chestnut Springs Project Volume 2 of 3

    Hydrogeological Report, prepared by EarthRes Group, Inc., dated December 2015.

    One

     1

    copy

    of

    the Deer Park - Chestnut Springs Project Volume 3

    of

    3 Traffic

    Impact Study, prepared by Pennoni Associates, Inc., dated December 2015.

    This site is

    located

    in

    Eldred Township, Monroe County, south east

    of

    the intersection of

    Chestnut Ridge Road SR 3001 and Kunkletown Road

     SR

    3004 . The Applicant proposes to

    access the site via an unnamed Township Road to Chestnut Ridge Road.

    We have reviewed this Special Exception Use Application with respect to the applicable

    Township Ordinances and general engineering practice and have the follo\.ving comments to offer:

    StTBDIVISIO - A_

    TD

    L N EVELOPME T ORDINA_ TCE:

    A Land Development

    will

    be required for this project   zoning approval

     

    received. A

    Subdivision and Land Development re\-iew

    \. ill

    be perfonned upon receipt

    of

    the Land

    Development application. Please note that the written application and narrative contain a

    description of features to address many ordinance requirements which

    will

    need to be shown on

    these land development Plans.

    252 Brodhead Road Suite

    1

    Bethlehem PA 18017· 8944 610.691.5644· Fax 610.6 91.6 968 www.hanovereng.com

  • 8/17/2019 Hanover Engineering Feb 15 Civil Engineer Report - Nestle Project in Eldred Township

    2/5

    Mary Anne Clausen

    Eldred Township

    ZO I  G ORDINA CE:

    2

    February 15 2016

    1.

    Section 303 Water extraction/bottling is considered light manufacturing for the

    purposes of the Zoning Ordinance.

    2. Section 404.1 Light Manufacturing in the Commercial District

    is

    permitted by

    Special Exception.

    3.

    Section 502.1.A

    The

    total number and type

    of

    uses must be identified on the

    property. Two  2 or

    more

    principal buildings or uses located on a parcel in single

    ownership shall conform to all the requirements of this Ordinance which would

    normally apply to each building or use if each were

    on

    a separate district lot

    including but not limited to setbacks parking lot coverage and sewage disposal

    requirement

    Each use should identify these features

    as

    if it was on its own separate

    lot. This may include street frontage requirements such

    as

    Section 502.2 and

    SALDO Section 606.3c.

    4. Section 503.2 The height

    of

    all proposed fences shall

    be

    identified

    on

    the Plan to

    verify compliance with this section.

    5. Section 504.6.A Parking tabulations should be provided for each use in accordance

    with

    comment

    three

     3

    above.

    6. Section 504.7 Off street loading areas are required to be developed to street

    construction standards. Section 607.10

    of

    the SALDO requires thicker paving

    requirements than are proposed.

    7. Section 504.7.H Fire Lanes should be identified on the Plan.

    The

    fire company

    should

    be

    consulted

    to

    verify compliance with their accessibility requirements.

    8. Section S04.8.C A Highway Occupancy Permit

     vill

    be required.

    9.

    Section 504.8.D Turning radius templates shall be provided to assure adequate

    circulation for the expected vehicles at

      ll

    intersections and access points.

    10. Section S04.9.B Parking spaces shall be located a minimum

    of

    10 feet from a

    building wall.

    11.

    Section 504.15 Parking lots are required to be landscaped per Sections 701.1 and 2.

    12.

    Section 701.1 This section requires landscape buffers along any property with

    existing residential use and any other boundary decided by the Township.

    13. Section 701.1.B The residential buffer should

    be

    defined and dimensioned.

    14.

    Section 701.1.C The Plan must cl rify that the landscape buffer

    will

    provide a dense

    screen within three  3 years per this section.

  • 8/17/2019 Hanover Engineering Feb 15 Civil Engineer Report - Nestle Project in Eldred Township

    3/5

    Mary Anne Clausen

    Eldred Township 3

    Febmary 15, 2016

    15. Section 701.8.C.3.d -

    The

    building elevations review or Sheet A-2.1 show wall pack

    lighting mounted on the proposed building.   is not clear if these

    fL tures

    are

    accounted for

    on

    the Lighting Plan Sheet LL-1.

    16. Section 701.11 -

    The

    application narrative states Consistent with state law  Act 124

    of 2009) and

    NW

    A policy, tanker trucks

    w ll

    not be allowed to idle their engines

    when

    not

    engaged in vehicle movements . Are anyon-site measures/signage

    proposed to prohibit idling of trucks?

    17. Section 701.12 - A hydro-geologic study is required which clearly establishes tlliit the

    proposed use will not cause a reduction

     n

    the quantity or the quality of ground water

    supplies available to other properties located within 1000 feet

    of

    any portion

    of

    this

    property. It is our understanding that the submitted study

    is

    under review by

    another Township consultant.

    18. Section 701.13 - Stormwater review comments are provided under the Stormwater

    Management Ordinance section

    of

    t s letter and may be revisited during any future

    land development plan review.

    19. Section 701.15 - 0   D parking spaces have been shown.

    20. Section 701.20 -   nadequate and reliable water source shall

    be

    provided for

    firefighting purposes. The Plan must identify the fire-fighting provisions proposed

      the satisfaction of the Fire Department and Township.

    21. Section 701.21 - The Applicant shall provide evidence that they have obtained all

    required permits and authorizations.

    22. Section 703.4 - An Environmental Impact Statement has been prepared. The

    consultants must be previously approved by the Zoning Hearing Board.

    23. Section 704.2 - 704.4 - Buffers for

    all

    on-site features shall be identified and

    dimensioned.

    24. Section 707.7 -

    The

    Township may wish to evaluate the future land use prohibitions

    and special exceptions which may be introduced upon neighboring properties as a

    result of the proposed.water supply wells. AI.so

    e

    se : age system for the existing  

    house should be identified and evaluated for lsolatlOn distance for wellhead

    protection.

    25. Section 708 -

    The

    following comments relate to the Traffic Impact Study TIS):

    26. Section 708.C - The Intersection Sight Distance ISD) for all intersections reviewed

    shall be revised in accordance with the AASTHO Green Book to account for the

    posted speed limit not reduced truck speed), minor street approach grade, etc.

  • 8/17/2019 Hanover Engineering Feb 15 Civil Engineer Report - Nestle Project in Eldred Township

    4/5

    Mary Anne Clausen

    Eldred Township

      February 15, 2016

    27.

    Section

    7 8 C -

    The Applicant shall provide a Table summarizing the sight distances

    for all intersections analyzed.

    28.

    Section

    7 8 C -

    The Truck Route Study contained   Appendix I refers to

    structurally deficient

     SD

    and functionally obsolete FO) bridges; however, only

    those with posted weight restrictions are called out.

    The

    Tables should be revised to

    identify these bridges.

    29. Section 708.3.B - The Trip Generation appears to be based on the average daily

    ,vater withdrawal volumes and capacity

    of

    the trucks. The study should also report

    the maximum number of trucks that can be served during hours

    of

    operation as d ily

    water withdrawal can be higher than the monthly average daily withdraw.

    30. Section 708.3.B - The narrative references to HCS 2010 Sheet 11 should be

    removed as Synchro 8 was used.

    31. Section 708.3.B - The TIS shall include the volume capacity analysis of the

    intersection

    of

    Silver Spring Blvd, SR 3003 and Kunkletown Road, SR 3004 as

    requested by the Township following the Scoping Meeting with PennDOT.

    32. Section 708.3.B - T he TIS should include the Saturday peak h ou r for peak hour s

    analyzed.

    33.

    Section 1208.4 - The Planning Commission should review the standards and criteria

    for special exceptions in this section.

    STORMWATER rvfANAGEMENT ORDIN NCE

    A Stormwater Management review

    will

    be performed

    upon

    receipt

    of

    the Land

    Development application. We noted that the following items were not addressed

     

    the stormwater

    analysis provided:

    1. The Plan identifies minimum stone envelopes around the infiltration trench, with

    actual dimensions to be determined by the Designer. The Plan should clarify what

    stone is proposed above and below the infiltration trench.

    2. The Plan identifies an elevation of 523.5 near the bottom of the infiltration trench.

    The Plan should clarify whether this

    is

    the bottom of the stone trench or the bottom

    of

    the SC-740 - Stormwater Facility.

    3.

    The Plan must clarify what filter fabric will be provided around the infiltration

    trench.

    4.

    The

    Designer must confirm that the widest orifice 4 ) will fit in the outlet control

    structure, which

    is

    proposed to be a Type 1 Inlet Box.

    S.

    The Plan must show the infiltration test pit locations and limiting zones

    on

    a sheet

    that shows the proposed infiltration system.

  • 8/17/2019 Hanover Engineering Feb 15 Civil Engineer Report - Nestle Project in Eldred Township

    5/5

    Mary Anne Clausen

    Eldred Township 5

    February 15, 2016

    6 The

    erosion control details and construction sequence must provide for assuring that

    no water enters the infiltration trench until the tributary area is completely stabilized

    and the upstream storm sewer has been cleaned.

    7.

    The

    Plan must make provisions to prevent conveyance

    in

    the trench outside

    of

    and

    along the discharge pipe downstream of Inlet S-20 that might drain the infiltration

    trench.

    8 Means of access must be provided at  ll bends  n the storm sewer.

      The Plan must clearly identify whether pavement

    will

    be graded to direct water to the

    proposed inlets.

    GENERAL COMMENTS:

     

    The

    Applicant shall verify that they have rights to cross any properties necessary to access

    the public streets. The Applicant shall address any improvements required by PennDOT for

    the access to Chestnut Ridge Drive (SR3001). Stone Arch Bridge Road (T-361) and its right

    of-way

    must

    be labeled

    on

    the Plan, and the Applicant must provide  ll frontage and

    connection in1provements the Township would require.

    Please note that the review

    of

    the application

    is

    ongoing and is, therefore subject to further

    comment.

      you have any questions or comments regarding this information, please contact this office.

    Respectfully,

    trnk:jam/jle

    s:\PrOI \MunlCq,.I\E1dr.dT P\ E d 15-21-K  leW Extr terion \Docs\20160215_,

    G ASSOCIATES, INC.

    cc: Attorney Paul Cohen

    Eric Andreus