Guide for Relevant Authorities

Development Assessment

Issue Development Approval

Version 2.3 18 January 2022

This Guide includes Software Version 3.30.01 features and functionality.

Page 2: Guide - Issue development approval

OFFICIAL Guide for Relevant Authorities Development Assessment Page 2 of 26

Issue Development Approval

Table of Contents Introduction ............................................................................................................................ 3

1. Locate and Open Development Application for Approval ................................................. 4

2. Check Stamped Plans for Consistency ............................................................................ 6

3. Indicate inconsistent consents ......................................................................................... 7

4. Review resolution of inconsistencies ............................................................................... 8

5. Check Compliance Fees and Invoice .............................................................................. 9

Invoice applicant for compliance and assessment fees ............................................. 11

6. Confirm Building Works Require Notifications................................................................ 13

Include designated building product notifications ...................................................... 14

7. Confirm Building Insurance............................................................................................ 16

8. Record Building Statistics .............................................................................................. 17

Dwelling Statistics ..................................................................................................... 17

Building Code of Australia (BCA) Classifications Statistics ........................................ 18

Building Component Statistics................................................................................... 18

Supplementary Information ....................................................................................... 19

9. Upload Stamped Plans .................................................................................................. 20

Upload stamped plans .............................................................................................. 21

10. Issue Development Approval ......................................................................................... 22

Page 3: Guide - Issue development approval

OFFICIAL Guide for Relevant Authorities Development Assessment Page 3 of 26

Issue Development Approval

Introduction A decision to grant Development Approval can be made after reviewing and approving required consents.

Before recording the development approval decision, check and update the following information:

• Check Conditions and Notes and update as required• Check consents are consistent• Check Compliance Fees collected and invoice when missing• Check Required Notifications and add notifications when missing• Update Building Statistics• Upload Stamped Plans

On issuing Development Approval all parties involved in the assessment of the Development Application are notified by email (or by post).

• Applicant• Relevant Authority• Referral Bodies

The email received contains links that will direct the recipient to view the Development Application or download the Decision Notification Form (DNF) from the applications Documents store.

If the recipient was a representor, they can view the application and the DNF from the Public Register located on the SA Planning Portal.

Page 4: Guide - Issue development approval

OFFICIAL Guide for Relevant Authorities Development Assessment Page 4 of 26

Issue Development Approval

1. Locate and Open Development Application for Approval

When the decision is granted on the last consent an email notification is received.

Method 1: Go direct to Development Approval without assignment

1. Searching for the application ID number provided in the email.

2. Remove the Assigned to me only flag to show or locate in the For Your Action table.

3. Click on the application record (not the ID) to show the status details.

4. Click on Development Approval to open.

Method 2: View the application and assign Development Approval to an assessor

1. Click on the ID number to open the development application.

Page 5: Guide - Issue development approval

OFFICIAL Guide for Relevant Authorities Development Assessment Page 5 of 26

Issue Development Approval

2. In the Allocated Assessor field type the name of the staff member and select from listof matches.

3. Click on Save User Allocation to complete the assignment.

On allocating the development approval to team member to assess the assigned team member is notified by email of the allocation and then return to the Assessment dashboard.

Commence Granting Development Approval

1. Click on Grant Development Approval to proceed.

Page 6: Guide - Issue development approval

OFFICIAL Guide for Relevant Authorities Development Assessment Page 6 of 26

Issue Development Approval

2. Check Stamped Plans for Consistency

If there are inconsistencies then complete Perform Consistency Check.

1. Click on Documents tab to view.

2. Click on ‘Planning’ and ‘Building Consent’ filters within the Where was the documentuploaded?

3. Click on ‘Decision Documents’ filter to show the stamped plans within Additionaldocument filters.

4. Click on the file name to download.

5. Click on the stamped plan(s) to view in a new tab.

Refer to the PlanSA Support Library – Request, Upload and Generated Documents - for instructions on ‘how to download and open multiple documents at once’.

6. Review the stamped plans/s on screen or print as required.

Page 7: Guide - Issue development approval

OFFICIAL Guide for Relevant Authorities Development Assessment Page 7 of 26

Issue Development Approval

3. Indicate inconsistent consents

On determining inconsistency of the granted consents, the relevant authority that granted the last consent e.g. Building Consent receives an email advising the development application has been marked inconsistent and details of what will need to be resolved before the development approval can proceed.

Refer to the PlanSA support library – Issue development approval page - for instructions on how to resolve a consent inconsistency.

1. Click the Summary tab and then Grant Development Approval.

2. Complete the inconsistent fields as follows.

• Click No• Provide a reason for inconsistency.• Click on Submit to complete the action.

Page 8: Guide - Issue development approval

OFFICIAL Guide for Relevant Authorities Development Assessment Page 8 of 26

Issue Development Approval

4. Review resolution of inconsistencies

On resolving of the inconsistencies by the relevant authority who issued the prior consent (e.g. building rules approval) an email notification is received advising the inconsistencies have been resolved.

1. Search for the development application.

2. Removed the ‘Assigned to me only’ flag to show within the For Your Action table.

3. Click on the application record (not ID) to view the status details.

4. Click on Development Approval.

5. Click on Inconsistencies tab to view the resolution.

6. Click on View action to review the details of the resolution.

7. After reviewing the resolution details review ‘any’ supporting documentation uploaded from

the Documents tab.

Page 9: Guide - Issue development approval

OFFICIAL Guide for Relevant Authorities Development Assessment Page 9 of 26

Issue Development Approval

5. Check Compliance Fees and Invoice Checking what fees have already been paid is perform to ensure all the required fees have been invoiced and paid by the applicant prior to granting the development approval.

Consents granted by a private certifier

When a private certifier is the Relevant Authority for planning and/or building consent the assessments fees are invoiced from their systems (i.e. not in the DAP system). The fees available to a private certifier during verification and assessment are:

Planning Verification Planning Assessment

1. Electronic Lodgement Fee None

Building Verification Building Assessment

1. Electronic Lodgement Fee 2. Home Builder Development

Approval Fee 3. Compliance fees

1. Referral to Commission

(concurrence) 2. Referral to Commission (Opinion)

Compliance and assessment fees not yet invoiced

Send a fee advice for payment when it is determined that compliance fees and/or assessment fees have not yet been invoiced. The applications contact will receive an email notification advising a payment is required or the ‘fee advice’ is sent by post, as per their preferred method of communication.

Can additional fees be invoiced once development approval has been granted?

No. Once development approval has been granted, invoicing the application for additional fees cannot be performed.

Page 10: Guide - Issue development approval

OFFICIAL Guide for Relevant Authorities Development Assessment Page 10 of 26

Issue Development Approval

1. Click on Fees tab to view the invoiced and paid fees.

Check the fee invoices already paid

2. Click on the Fee Advice to show more details and check the required assessment and compliance fees have been invoiced.

3. Click on the Fee Advice record to show less details.

4. Repeat step 2 until all fee advices have been checked.

Page 11: Guide - Issue development approval

OFFICIAL Guide for Relevant Authorities Development Assessment Page 11 of 26

Issue Development Approval

Invoice applicant for compliance and assessment fees

5. Click on Determine Additional Fees.

6. Click on Compliance fee category to select the applicable fee(s).

When the Certificate of Occupancy or Home Builder Development Approval fees have not been charged, then select the Building Consent category to add these fee/s to the invoice.

7. Click on Submit to invoice the applicant.

Page 12: Guide - Issue development approval

OFFICIAL Guide for Relevant Authorities Development Assessment Page 12 of 26

Issue Development Approval

Returns to the Fees screen showing an ‘Assessment Fee Advice – awaiting payment’ record.

The applications ‘invoice contact’ receives an email notification with the fee advice attached advising payment is required or as indicated print and send the fee advice. Refer to the PlanSA support library - Fee invoicing and payments page - for instructions on making a fee payment and recording over the counter payments.

Page 13: Guide - Issue development approval

OFFICIAL Guide for Relevant Authorities Development Assessment Page 13 of 26

Issue Development Approval

6. Confirm Building Works Require Notifications

When editing the building notifications the building notifications added by an accredited professional during the building consent assessment cannot be edited e.g. the name of the building stage or when notification required (commencement or completion) and the delete option is not available.

1. Click on Required Notifications tab.

2. Click on Edit to check the required notifications have been added.

3. As required, modify the response to question Are building notifications required for this building work? from No to Yes, or Yes to No.

Page 14: Guide - Issue development approval

OFFICIAL Guide for Relevant Authorities Development Assessment Page 14 of 26

Issue Development Approval

4. Click on Add Notification to add a building notification activity.

5. Complete the notification fields as follows. • Enter the name of the building stage.

• Choose when the notification required on ‘commencement’ or ‘completion’.

• Number of business days’ notice defaults to 1 within metropolitan Adelaide and 2 outside metropolitan Adelaide.

Include designated building product notifications

The building stage/s notifications pre-defined for designated building products are available from the Removed default notifications.

6. Click on include against the required notification for designated building product.

The included ‘designed building product’ building stage/s show.

Page 15: Guide - Issue development approval

OFFICIAL Guide for Relevant Authorities Development Assessment Page 15 of 26

Issue Development Approval

7. Click on Submit to complete and return to the Required Notifications screen.

8. On return to the Required Notifications screen repeat steps 2 to 8 until each building work has a notification indicated.

Page 16: Guide - Issue development approval

OFFICIAL Guide for Relevant Authorities Development Assessment Page 16 of 26

Issue Development Approval

7. Confirm Building Insurance

When an applicant has answered ‘yes’ to entering into a domestic building works and the building works is $12,000 and over, then the Building Indemnity Insurance details and copy of the insurance certificate is required.

1. Click on Insurance tab.

2. Check the information supplied and edit as required referring to How to update the

building indemnity insurance details and upload the insurance certificate instructions.

Page 17: Guide - Issue development approval

OFFICIAL Guide for Relevant Authorities Development Assessment Page 17 of 26

Issue Development Approval

8. Record Building Statistics

The capturing of building information for Australian Bureau of Statistics (ABS) reporting only applies if the development approval or staged development approval has a granted building consent, or stage building consent.

1. Click on the Statistics tab.

2. Click on Update Building Statistics to complete.

Dwelling Statistics

3. Complete the Dwellings fields.

Page 18: Guide - Issue development approval

OFFICIAL Guide for Relevant Authorities Development Assessment Page 18 of 26

Issue Development Approval

Building Code of Australia (BCA) Classifications Statistics

4. Complete the BCA Classifications fields making selections from the field drop-downs.

Building Component Statistics

Completion of the Building Component fields is required to record whether building consent applies to one or more of the following categories (single or multiple selections allowed).

5. Click on the applicable building category, i.e. Residential, Commercial, industrial or other non-residential.

On selection of a category a list of ‘building types’ displays according to the category selected.

Page 19: Guide - Issue development approval

OFFICIAL Guide for Relevant Authorities Development Assessment Page 19 of 26

Issue Development Approval

6. Click on the applicable building type/s.

Supplementary Information

7. Complete the Supplementary Information fields making selections from the field drop-downs.

8. Click on Add another building to provide ‘Supplementary Information’ for more than

one building / building work.

9. Click on Submit to complete the action.

Page 20: Guide - Issue development approval

OFFICIAL Guide for Relevant Authorities Development Assessment Page 20 of 26

Issue Development Approval

9. Upload Stamped Plans

Download the stamped plans and open in your marking up tool or PDF reader to stamp, and then upload into the Development Approval Documents prior to granting approval.

1. Click on Documents tab to view.

2. Click on ‘Planning’ and ‘Building Consent’ filters within the Where was the document

uploaded?

3. Click on ‘Decision Documents’ filter to show the stamped plans within Additional document filters.

4. Click on the file name to download.

5. Click on the stamped plan(s) to view in a new tab.

Refer to the PlanSA Support Library – Request, Upload and Generated Documents - for instructions on ‘how to download and open multiple documents at once’.

Page 21: Guide - Issue development approval

OFFICIAL Guide for Relevant Authorities Development Assessment Page 21 of 26

Issue Development Approval

Upload stamped plans

1. Return to the Documents screen and click on Upload Documents.

2. Click on Upload to locate the stamped plans.

3. Drag-and-drop the file into the Drop files here field.

4. Categorise the uploaded plans as follows: • Document Category = Plans

• Document Type = Stamped Plans – Dev Approval

5. Click on Save Changes to complete the upload.

Page 22: Guide - Issue development approval

OFFICIAL Guide for Relevant Authorities Development Assessment Page 22 of 26

Issue Development Approval

10. Issue Development Approval

On granting Development Approval, the following documentation is generated and distributed to all relevant parties.

• Decision Notification Form (DNF) • Email delivered to relevant parties advising the approval • Email delivered to the applicant, and contacts advising approval

When an ‘on-screen message” advises a ‘post’ method of communications, go to the Documents store to print the Decision Notification Form (DNF) and provide to the applicable contacts.

1. Click on Summary tab and the Grant Development Approval.

Check Urban Tree Canopy Response

The Urban Tree Canopy questions are only shown for applications with a ‘New Housing’ element and 'Urban Tree Canopy’ overlay.

2. Contact the applicant (if required) to answer question This application is for New housing in the Urban Tree Canopy Overlay. When “To be confirmed prior to Development Approval” chosen on granting the Planning Consent then the following options are available:

• Applicant has opted to pay into the Urban Tree Canopy Off-set scheme

• Applicant has opted to plant new trees or retain existing trees

3. Choose a Soil Type H1-D, H2-D or E-D (if know – not mandatory).

Page 23: Guide - Issue development approval

OFFICIAL Guide for Relevant Authorities Development Assessment Page 23 of 26

Issue Development Approval

4. Click on Yes to confirm all development approvals are consistent.

5. Leave the Substantial Commencement Date default of 12 months from today’s date.

6. Leave the Substantial Completion Date default of 24 months from today’s date.

7. Click on Preview DNF to check the details before granting the approval.

Review the Decision Notification Form (DNF) and then return to the application to make updates or continue with the decision.

Page 24: Guide - Issue development approval

OFFICIAL Guide for Relevant Authorities Development Assessment Page 24 of 26

Issue Development Approval

8. Click on Generate Development Approval within the Consistency Check screen.

The Summary page is shown with the development approvals status.