2/29/2012 1 Glacken Slope Restoration h Next Phases Fresh Pond Reservation, Cambridge, MA Public Presentation 29 February 2012 Agenda Introductions P j tO i ProjectOverview Previous Phases Restoration Approach Schedule and Next Steps Schedule and Next Steps Questions and Comments

Upload: others

Post on 30-Jun-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: GlackenSlope PublicMeeting022912 db edits/media/Files/water... · • In asi eInvasive Species Remo alRemoval • Gully Stabilization • Slope Breaks • Soil Amendments • Restoration

2/29/2012

1

Glacken Slope Restoration

hNext PhasesFresh Pond Reservation, Cambridge, MA

Public Presentation

29 February 2012y

Agenda

• Introductions

P j t O i• Project Overview 

• Previous Phases

• Restoration Approach

• Schedule and Next Steps• Schedule and Next Steps

• Questions and Comments

Page 2: GlackenSlope PublicMeeting022912 db edits/media/Files/water... · • In asi eInvasive Species Remo alRemoval • Gully Stabilization • Slope Breaks • Soil Amendments • Restoration

2/29/2012

2

Project Overview

Phased Restoration Approach

• Slope stabilization and gully repair

• Community‐based restoration plantings

• Improved Drainage ‐ Perimeter Rd

d l h• Integrated Upper Slope with Glacken Field re‐design

Page 3: GlackenSlope PublicMeeting022912 db edits/media/Files/water... · • In asi eInvasive Species Remo alRemoval • Gully Stabilization • Slope Breaks • Soil Amendments • Restoration

2/29/2012

3

Previous Phases

Phase 1 ‐ Stormwater Infiltration(C l t d S 2010)(Completed Summer 2010)

Phases 2 and 3 – Slope Stabilization and Restoration Plantings( l d )(Completed Summer 2011)

Phase 1 – Golf Course Clubhouse

• Level Spreader

• Bioretention Swale

• Rain Garden

• Porous Paving Terrace

Page 4: GlackenSlope PublicMeeting022912 db edits/media/Files/water... · • In asi eInvasive Species Remo alRemoval • Gully Stabilization • Slope Breaks • Soil Amendments • Restoration

2/29/2012

4

Page 5: GlackenSlope PublicMeeting022912 db edits/media/Files/water... · • In asi eInvasive Species Remo alRemoval • Gully Stabilization • Slope Breaks • Soil Amendments • Restoration

2/29/2012

5

Phases 2 and 3 –Upper and Lower Slope

• In asi e Species Remo al• Invasive Species Removal

• Gully Stabilization

• Slope Breaks

• Soil Amendments

• Restoration Plantings

Page 6: GlackenSlope PublicMeeting022912 db edits/media/Files/water... · • In asi eInvasive Species Remo alRemoval • Gully Stabilization • Slope Breaks • Soil Amendments • Restoration

2/29/2012

6

Page 7: GlackenSlope PublicMeeting022912 db edits/media/Files/water... · • In asi eInvasive Species Remo alRemoval • Gully Stabilization • Slope Breaks • Soil Amendments • Restoration

2/29/2012

7

Page 8: GlackenSlope PublicMeeting022912 db edits/media/Files/water... · • In asi eInvasive Species Remo alRemoval • Gully Stabilization • Slope Breaks • Soil Amendments • Restoration

2/29/2012

8

Phased Restoration Approach

Phased Approach

Page 9: GlackenSlope PublicMeeting022912 db edits/media/Files/water... · • In asi eInvasive Species Remo alRemoval • Gully Stabilization • Slope Breaks • Soil Amendments • Restoration

2/29/2012

9

Lower Slope Stabilization

• Gully Restoration

• Slope Stabilization

• Restoration Plantings

Existing Site Conditions

Erosion and Compaction

Page 10: GlackenSlope PublicMeeting022912 db edits/media/Files/water... · • In asi eInvasive Species Remo alRemoval • Gully Stabilization • Slope Breaks • Soil Amendments • Restoration

2/29/2012

10

Canopy dominated by Black Locust (35%) and Red Oak (22%) 

Invasive species removed include Norway Maple, y p ,Buckthorn, Oriental Bittersweet

Page 11: GlackenSlope PublicMeeting022912 db edits/media/Files/water... · • In asi eInvasive Species Remo alRemoval • Gully Stabilization • Slope Breaks • Soil Amendments • Restoration

2/29/2012

11

Restoration Planting Approach

• Diversify native plant community

• Increase wildlife h bit t lhabitat value

• Enhance topsoil layer

Perimeter Road Improvements

• Porous Pavement

• Refurbish Perimeter Fence

• Re‐set Curb

Page 12: GlackenSlope PublicMeeting022912 db edits/media/Files/water... · • In asi eInvasive Species Remo alRemoval • Gully Stabilization • Slope Breaks • Soil Amendments • Restoration

2/29/2012

12

Pooling, Muddy Conditions

Page 13: GlackenSlope PublicMeeting022912 db edits/media/Files/water... · • In asi eInvasive Species Remo alRemoval • Gully Stabilization • Slope Breaks • Soil Amendments • Restoration

2/29/2012

13

High Infiltration 

RatesRates

Porous Paving – Winter Conditions

Page 14: GlackenSlope PublicMeeting022912 db edits/media/Files/water... · • In asi eInvasive Species Remo alRemoval • Gully Stabilization • Slope Breaks • Soil Amendments • Restoration

2/29/2012

14

Porous Paving – Winter Conditions

Upper Slope/Glacken Fields Interface

Page 15: GlackenSlope PublicMeeting022912 db edits/media/Files/water... · • In asi eInvasive Species Remo alRemoval • Gully Stabilization • Slope Breaks • Soil Amendments • Restoration

2/29/2012

15

Next Steps

• Spring 2012 Bid process for Phase 4 (Lower Slope) Only( p ) y

• Spring/Summer 2012 Phase 4 Slope Stabilization, Gully Repair and Planting

• Summer 2013 Phase 5

Perimeter Road Improvements

• Spring/Summer 2014 (TBD) DesignPhase 6 (Upper Slope) Restoration

Questions or Comments?