Gipe Associates, Inc. CONSULTING ENGINEERS 849 Fairmount Avenue 8719 Brooks Drive Dulaney Center I, Suite 102 Post Office Box 1147 Baltimore, Maryland 21286 Easton, Maryland 21601 TEL 410.832.2420 TEL 410.822.8688 FAX 410.832.2418 FAX 410.822.6306 October 25, 2011 To: All Plan Holders RE: HAVRE DE GRACE HIGH SCHOOL - HVAC SYSTEM REPLACEMENT PHASE II Gentlemen: Please find the enclosed Addendum No. 2 dated October 25, 2011. Addendum No. 2 consists of the following: Pre-Bid Meeting Notes Drawing Clarifications Questions Section 00300 - Form of Proposal, revision to Add Alternate 5 & 6. Excluding this cover letter, Addendum No. 2 consists of twenty-four (24) pages. Advise Gipe Associates – Baltimore Office at once if any attachments are missing. JWA/tmf Cc: Harry Miller – HCPS Pat Walling – HCPS Karen Burlingame – G&P Jocko Nickolaus – CEI File/Field

Upload: phungnhu

Post on 14-Nov-2018

215 views

Category:

Documents


0 download

TRANSCRIPT

Gipe Associates, Inc.CONSULTING ENGINEERS

849 Fairmount Avenue 8719 Brooks Drive Dulaney Center I, Suite 102 Post Office Box 1147 Baltimore, Maryland 21286 Easton, Maryland 21601 TEL 410.832.2420 TEL 410.822.8688 FAX 410.832.2418 FAX 410.822.6306

October 25, 2011

To: All Plan Holders RE: HAVRE DE GRACE HIGH SCHOOL - HVAC SYSTEM REPLACEMENT PHASE II Gentlemen: Please find the enclosed Addendum No. 2 dated October 25, 2011. Addendum No. 2 consists of the following:

• Pre-Bid Meeting Notes • Drawing Clarifications • Questions • Section 00300 - Form of Proposal, revision to Add Alternate 5 & 6.

Excluding this cover letter, Addendum No. 2 consists of twenty-four (24) pages. Advise Gipe Associates – Baltimore Office at once if any attachments are missing. JWA/tmf Cc: Harry Miller – HCPS Pat Walling – HCPS Karen Burlingame – G&P Jocko Nickolaus – CEI File/Field

HAVRE DE GRACE HIGH SCHOOL - HVAC SYSTEM REPLACEMENT PHASE II

Page 1 of 6

HAVRE DE GRACE – ADDENDUM No. 2 Gipe Associates, Inc. October 25, 2011 Dulaney Center I, Suite 102 849 Fairmount Avenue Baltimore, MD 2 1286 W.O.#10144

HAVRE DE GRACE HIGH SCHOOL ADDENDUM No. 2

This Addendum is hereby made part of the Contract Documents for the above-referenced project. Its provisions supplement and/or supersede those of the previously issued drawings and specifications where contrary thereto.

PRE-BID MEETING NOTES (October 20, 2011):

Pre-Bid Attendees:

Name Representing Tel Email

Alban, Jeffrey Gipe Associates 410-832-2420 [email protected]

Bannon, Jack G.E. Tignall 410-666-3000 [email protected]

Barilla, Andrew HCPS

Brown, Mark Delcard Associates 302-221-4822 [email protected]

Flanagan, David Phillip Way 410-526-0966 [email protected]

Giro, Brian Dynastics. Inc. 410-247-6750 [email protected]

Huber, Jeff Coastal Crane 410-365-5219 [email protected]

Jenkins, Tom Greater Chesapeake 410-665-4136 [email protected]

Lippa, Jerry JMLippa Electric 443-829-4209 [email protected]

Maranto, Vince Maranto Electric 410-914-5564 [email protected]

Marsh, Gary Ample Sheet Metal 410-760-6401 [email protected]

McGirk, John Merit Mechanical 302-366-8601 [email protected]

Munsanto, Rolan M&E Sales, Inc. 410-766-3831 [email protected]

HAVRE DE GRACE HIGH SCHOOL - HVAC SYSTEM REPLACEMENT PHASE II

Page 2 of 6

Raver, Dan TMI Contractors 410-668-1364 [email protected]

Rosseau, Paul C.E.R., Inc. 410-247-9096 [email protected]

SPECIFICATION CLARIFICATONS: Item 1: Section 00100 – Instructions to Bidders

Calls for the MBE Attachments to be submitted “30 minutes after submitting the Bid Proposal”. However, Page 00300-4 of the Form of Proposal states that they must be submitted “At time of bid opening or the bid will be rejected as non-responsive”. Which is correct?

CLARIFY: HCPS will receive all bids at 2:00pm, local time. There will be an additional

thirty (30) minutes available to submit MBE forms A & B. at 2:30 pm, local time, at which time the bids will be open and read aloud.

DRAWING CLARIFICATIONS: Item 1: Drawing M-2.6, New Work

There is no connect to existing symbol for the HS/R piping at boiler room 412. It was established during the walk thru on Thursday that the existing valved connections are 6”. The pipe sizes for the new piping to be installed are not indicated until the connect to existing 2” to the west and the only main sizing to the east and north is 2” at the north side of the gym. Are we installing 2” in both directions from the connect to existing at boiler room 412 to service all equipment as indicated?

CLARIFY: Refer to sketch SK-M-1 for additional information on pipe sizing at existing Boiler Room 412. Item 2: Drawing M-2.6 New Work

There is no main pipe sizing at match line “A”, Multi-purpose room 418 for HS/R and only 3” for CHS/R. Will the main pipe size for the CHS/R be 3” to FCU-2 then reduce accordingly to service FCU-1?

CLARIFY: The pipe size for HS/R leading into Multipurpose Room 418 shall be 2". Refer to

sketch SK-M-3 for additional pipe sizes and temperature sensor locations.

HAVRE DE GRACE HIGH SCHOOL - HVAC SYSTEM REPLACEMENT PHASE II

Page 3 of 6

Item 3: Drawing M-2.6 New Work

The drawings indicate “remove gas piping in its entirety” does that include the existing PRV’s and all associated apparatus? Or do we connect to existing downstream of that equipment? No new gas pipe sizing indicated on drawings.

CLARIFY: The gas piping including existing PRV's, etc. that is associated with the existing

boilers is to be removed in its entirety. Provide gas piping, PRV's and associated apparatus to Boilers and existing/relocated Domestic Hot Water Heater. Gas piping sizes for new boilers and relocated water heater is provided on drawing M-7.2.

Item 4: Drawing M-2.6

Shows Pre-Heat Pumps P-13 and #14 to AHU-5. Pump schedule does not include these numbered pumps. Please advise.

CLARIFY: On drawing M-2.6, the designation for 'PREHEAT COIL CIRCULATING PUMPS P-13 & P-14' shall be revised to reflect 'PREHEAT COIL CIRCULATING PUMPS P-34 & P-35'.

Item 5: Drawing M-2.6

Please verify pipe size to HS and HR and CHS and CHR to AHU-12 and 13 and to FCU #1 and #2, also for mains outside Room 412.

CLARIFY: Refer to sketch SK-M-1 for additional information on pipe sizing at existing Boiler Room 412. Refer to sketch SK-M-3 for pipe sizing in Multipurpose 418.

Item 6: Drawing M-2.6

There is no piping shown on Drawing M-2.6 up to AHU#7.

CLARIFY: Refer to sketch SK-M-2 for pipe sizing up to AHU-7. Item 7: Drawing M-3.1

Mechanical Room 124 shows Boiler #1 and #2. Drawing M-7.1 shows detail for Boiler #4 and #5. Drawing M-9.2 also shows Boiler #4 and #5. Please verify if Boiler #1 and #2 are numbered correctly.

CLARIFY: On drawing M-3.1, the designation for 'BOILER 1' & 'BOILER 2' shall be revised to reflect 'BOILER 4' & 'BOILER 5' respectively.

HAVRE DE GRACE HIGH SCHOOL - HVAC SYSTEM REPLACEMENT PHASE II

Page 4 of 6

Item 8: Drawing M-3.1

Shows Secondary Heating Pumps #3 and #4. Drawing M-7.1 shows Secondary Heating Pumps #24 and #25. Pump schedule on M-9.2 shows Secondary Heating Pumps as P-24 and #25. Please verify if P-3 and 4 are numbered correctly.

CLARIFY: On drawing M-3.1, the designation for 'SECONDARY HEATING WATER PUMP No. 3'

& 'SECONDARY HEATING WATER PUMP No. 4' shall be revised to reflect 'SECONDARY HEATING WATER PUMP No. 24' & 'SECONDARY HEATING WATER PUMP No. 25' respectively.

Item 9 : Drawing M-9.2, Pump Schedule

The pump schedule does not reflect pumps P-1, 2, 11, 12, 13, or 14. The secondary heating pumps indicate on M-7.1 piping schematic are labeled P-24, 25 however, on drawings M-2.6 they are labeled 3 and 4. The pump schedule on drawing M-9.2 only provides for pumps numbered P-22 thru P-45.

CLARIFY: On drawing M-3.1, the designation for 'P-1' & 'P-2' shall be revised to reflect 'P-22' & 'P-23' respectively. Additionally, the designation for 'SECONDARY HEATING WATER PUMP No. 3' & 'SECONDARY HEATING WATER PUMP No. 4' shall be revised to reflect 'SECONDARY HEATING WATER PUMP No. 24' & 'SECONDARY HEATING WATER PUMP No. 25' respectively.

On drawing M-3.1, the designation 'PREHEAT COIL CIRCULATING PUMPS P-11 & P-12' shall be revised to reflect 'PREHEAT COIL CIRCULATING PUMPS P-32 & P-33'. On drawing M-2.6, the designation 'PREHEAT COIL CIRCULATING PUMPS P-13 & P-14' shall be revised to reflect 'PREHEAT COIL CIRCULATING PUMPS P-34 & P-35'. Item 10: Drawing M-9.2, Pump Schedule

Pump schedule on M-9.2 Note 1, calls for VSD’s to pumps #3 and #4 which are not on the schedule. Please advise.

CLARIFY: On drawing M-9.2 Note #1 for the Pump Schedule shall be revised to reflect 'PROVIDE VARIABLE SPEED DRIVES AND INVERTER DUTY RATED MOTORS FOR PUMPS P-24 & P-25'.

Item 11: Drawing E-2.6 - Lower Level Gymnasium Floor Plan Electrical New Work ADD: FCU-17 to Weight Room 422. Refer to Sketch SK-E-1 for additional information. REVISE Location of FCU-10. Refer to Sketch SK-E-1 for additional information.

HAVRE DE GRACE HIGH SCHOOL - HVAC SYSTEM REPLACEMENT PHASE II

Page 5 of 6

Item 12: Drawing E-5.1 -Panelboard Schedules REVISE: Description to circuit BR-26 to read as follows: FCU-1 TO FCU-10, FCU-17. Item 13: Drawing M-7.1 - Heating Water System & Hydronic Details REVISE: Revision to detail #6. Refer to sketch SK-M-4. Item 14: Drawing M-7.1 - Heating Water System & Hydronic Details REVISE: Revision to detail #7. Refer to sketch SK-M-5. Item 15: Drawing M-7.1 - Heating Water System & Hydronic Details REVISE: Revision to detail #8. Refer to sketch SK-M-6. Item 16: Drawing M-7.1 - Heating Water System & Hydronic Details REVISE: Revision to detail #9. Refer to sketch SK-M-7. Item 17: Drawing M-7.2 - Hydronic Details REVISE: Revision to detail 11. Refer to sketch SK-M-8. Item 18: Drawing M-7.2 - Hydronic Details REVISE: Revision to detail 12. Refer to sketch SK-M-9. Item 19: Drawing M-7.2 - Hydronic Details ADD: Detail 51, 52 ,53. Refer to sketch SK-M-10, 11 & 12. Item 20: Drawing M-9.1 -Schedules REVISE: Refer to sketch SK-M-13.

HAVRE DE GRACE HIGH SCHOOL - HVAC SYSTEM REPLACEMENT PHASE II

Page 6 of 6

QUESTIONS: Item 1: There are no Condensate piping shown to FCU-1,3,4,5. CLARIFY: Refer to sketch SK-M-2 for condensate piping from FCU-1, FCU-3, FCU-4 & FCU-5. Item 2: There is no piping shown to FCU-10. CLARIFY: Refer to sketch SK-M-2 for piping to FCU-10.

Item 3: Drawings E-1.6 shows the demo of the lighting trough out the gym and related area

rooms. General note #1 refer to E-0.2 in Alternate #2. If the demo is in the base bid and Alternate #2 is not accepted, what is to be done to the lighting in these areas? These rooms are all listed on the table for Alternate #2.

CLARIFY: Refer to Drawing Note 3 and rooms noted with Drawing Note 3. Existing lighting to

remain if alternate is not accepted.

Addendum No.2#10144.doc

HARFORD COUNTY PUBLIC SCHOOLS HAVRE DE GRACE HIGH SCHOOL HVAC SYSTEM REPLACEMENT – PHASE II

FORM OF PROPOSAL 00300 - 1

SECTION 00300 - FORM OF PROPOSAL Proposal of: (firm name) Re: Havre de Grace High School HVAC System Replacement – Phase II Location: 700 Congress Avenue, Havre de Grace, MD 21078 Date: To: Board of Education of Harford County Harford County Public Schools 102 South Hickory Avenue Bel Air, Maryland 21014 Gentlemen Having examined the Instruction to Bidders, the Drawings and the Specification, including Addenda Nos. , , , , and , thereto, and other proposed Contract Documents prepared by Gipe Associates, Inc. and having examined the site and other conditions affecting the construction, the undersigned hereby proposes to furnish all labor, materials, equipment and services to perform all work required for the Havre de Grace High School HVAC System Replacement – Phase II in strict accordance with the Contract Documents for the sums listed in the following bid items: It is understood that if no figure is listed for an Alternate, that the Alternate may be accepted and there shall be no change in the Base Bid amount indicated below: 1. BASE BID:

The Lump Sum Base Bid: Installation of Central Heating Plant, Air Handling System and related work including piping, pumps, ceilings, ductwork, masonry, steel, roofing, electrical, controls, etc.

Dollars ($ ) 2. ADD ALTERNATE 1: Replace the existing Gymnasium windows in their entirety. Add , Dollars ($ ) 3. ADD ALTERNATE 2: Provide lighting upgrades to gymnasium and auditorium building. Add , Dollars ($ )

HARFORD COUNTY PUBLIC SCHOOLS HAVRE DE GRACE HIGH SCHOOL HVAC SYSTEM REPLACEMENT – PHASE II

FORM OF PROPOSAL 00300 - 2

4. ADD ALTERNATE 3: Cleaning all existing supply and return air distribution systems for handling units A/C-1, A/C-2, A/C-

3A, A/C-3B, and A/C-5. Add , Dollars ($ ) 5. ADD ALTERNATE 4: Provide packaged rooftop unit, associated air distribution system, ATC controls, electrical

connections and supplemental structural support for Room 161 – Environmental Science. Add , Dollars ($ ) 6. ADD ALTERNATE 5: Provide packaged rooftop unit, associated air distribution system, ATC controls, electrical

connections and supplemental structural support for Room 159 – Technology. Add , Dollars ($ ) 7. ADD ALTERNATE 6: Provide packaged rooftop unit, associated air distribution system, ATC controls, electrical

connections and supplemental structural support for Room 153 – Technology. Add , Dollars ($ ) 8. ADD ALTERNATE 7: Convert all variable air volume terminal control units from pneumatic to DDC control. Add , Dollars ($ ) PERFORMANCE BOND The undersigned intends that the surety company, noted here, shall furnish the performance bond: SUBSTITUTIONS REQUESTS: Indicate proposed substitutions below and attach copies of “Substitution Request Form” referenced in Section 01600A. Proposed Substitution Price Change $ $

HARFORD COUNTY PUBLIC SCHOOLS HAVRE DE GRACE HIGH SCHOOL HVAC SYSTEM REPLACEMENT – PHASE II

FORM OF PROPOSAL 00300 - 3

$ EXECUTION: The undersigned affirms that the Base Bid stated above represents the entire cost of the Project in accordance with the Bid Documents and that no claim shall be made on account of any increase in wage, scale, material prices, taxes, insurance, cost indexes, or any other rate affecting the construction industry and/or this project. The undersigned agrees, upon receipt of written notice of the acceptance of this bid within (60) calendar days after the date of opening of bids to execute the standard form of contract in accordance with the bid as accepted, and to give performance and payment bond with good and sufficient surety or sureties, for the faithful performance of the contract and for the protection of all persons supplying labor and materials in the prosecution of the work, within ten (10) calendar days after the prescribed forms are presented for signature. Signature of: X_________________________________________________________________ Bidder if the bidder is an individual __________________________________________________________________ Name and Title (printed) Registered Maryland Contractor No. _____________________________________

OR X_________________________________________________________________

Partner if the bidder is a partnership __________________________________________________________________ Name and Title (printed) Registered Maryland Contractor No. _____________________________________

OR

X_____________________________________________________________________ Officer if bidder is a corporation ______________________________________________________________________ Name and Title (printed) Registered Maryland Contractor No. _____________________________________

ALL Subscribed and sworn before me this ______ day of ____________, 2011.

HARFORD COUNTY PUBLIC SCHOOLS HAVRE DE GRACE HIGH SCHOOL HVAC SYSTEM REPLACEMENT – PHASE II

FORM OF PROPOSAL 00300 - 4

X__________________________________________ Notary Public My Commission expires:________________________ NOTE: The following items shall be completed and submitted as attachments to the Bid at the time of the

Bid opening:

*□1. Section 00430 Bid Bond

*□2. Section 00660 Minority Business Enterprise Utilization Affidavit – Attachment A

*□3. Section 00660 Minority Business Enterprise Schedule of Participation – Attachment B

□4. Section 00640 Affidavit of Qualification to Bid

□5. Section 00650 Bidder’s Relevant Experience Forms & Certification *NOTE: Items 1, 2, and 3 must be submitted in proper form and content at the time of bid opening or the bid will be rejected as non-responsive.