Geotechnical Considerations in the Context of CCS
by
Dr Britta Bienen
The LRET Research CollegiumSouthampton, 11 July – 2 September 2011
![Page 2: Geotechnical Considerations in the Context of CCS Dr ... · Geotechnical Considerations in the Context of CCS by Dr Britta Bienen The LRET Research Collegium Southampton, 11 July](https://reader031.vdocuments.site/reader031/viewer/2022040521/5e7ae2b68bdb0d5d5346ed7c/html5/thumbnails/2.jpg)
Geotechnical considerations in the context of carbon storage in ocean spaces
Centre for Offshore Foundation Systems, University of Western AustraliaBritta Bienen
![Page 3: Geotechnical Considerations in the Context of CCS Dr ... · Geotechnical Considerations in the Context of CCS by Dr Britta Bienen The LRET Research Collegium Southampton, 11 July](https://reader031.vdocuments.site/reader031/viewer/2022040521/5e7ae2b68bdb0d5d5346ed7c/html5/thumbnails/3.jpg)
Themes
• Examples of carbon sequestration in ocean spaces
–Sleipner West–Gorgon
• Geotechnical considerations in the context of geo-sequestration of CO2 in the offshore environment
• “Ship design”: Mobile jack-up drilling rigs
• Offshore wind energy installations
![Page 4: Geotechnical Considerations in the Context of CCS Dr ... · Geotechnical Considerations in the Context of CCS by Dr Britta Bienen The LRET Research Collegium Southampton, 11 July](https://reader031.vdocuments.site/reader031/viewer/2022040521/5e7ae2b68bdb0d5d5346ed7c/html5/thumbnails/4.jpg)
Geo-sequestration
Geological storage (aka geo-sequestration)• Injection of carbon dioxide, generally in supercritical
form, directly into underground geological formations• Suggested as storage sites :
Oil fields, gas fields, saline formations, unmineable coalseams, and saline-filled basalt formations
• Various trapping mechanisms prevent the CO2 from escaping to the surface
– physical (e.g., highly impermeable caprock)– geochemical
![Page 5: Geotechnical Considerations in the Context of CCS Dr ... · Geotechnical Considerations in the Context of CCS by Dr Britta Bienen The LRET Research Collegium Southampton, 11 July](https://reader031.vdocuments.site/reader031/viewer/2022040521/5e7ae2b68bdb0d5d5346ed7c/html5/thumbnails/5.jpg)
Other forms of CO2 ocean storage
• Dissolution: depths of 1000 – 3000 m, upward-plume, CO2 dissolves in seawater
• Lake deposits: depths > 3000 m, downward-plume, expected delay dissolution of CO2, possibly for millennia
• Bicarbonate(s): chemical reaction to combine CO2 with carbonate mineral (such as limestone)
![Page 6: Geotechnical Considerations in the Context of CCS Dr ... · Geotechnical Considerations in the Context of CCS by Dr Britta Bienen The LRET Research Collegium Southampton, 11 July](https://reader031.vdocuments.site/reader031/viewer/2022040521/5e7ae2b68bdb0d5d5346ed7c/html5/thumbnails/6.jpg)
Other forms of CO2 ocean storage
IPCC (2005)
![Page 7: Geotechnical Considerations in the Context of CCS Dr ... · Geotechnical Considerations in the Context of CCS by Dr Britta Bienen The LRET Research Collegium Southampton, 11 July](https://reader031.vdocuments.site/reader031/viewer/2022040521/5e7ae2b68bdb0d5d5346ed7c/html5/thumbnails/7.jpg)
Sleipner West, Norway
• Operator: Statoil, Norway• International energy company
presented in more than 30 countries around the world
Source of information: Statoil, http://www.statoil.com
• Sleipner gas field (after steed Sleipnir, Norse mythology)• Sleipner West (proven in 1974), Sleipner East (1981)• Central North Sea• about 250 kilometres west of Stavanger
![Page 8: Geotechnical Considerations in the Context of CCS Dr ... · Geotechnical Considerations in the Context of CCS by Dr Britta Bienen The LRET Research Collegium Southampton, 11 July](https://reader031.vdocuments.site/reader031/viewer/2022040521/5e7ae2b68bdb0d5d5346ed7c/html5/thumbnails/8.jpg)
Sleipner West
Licensees:Statoil (49.5%),Esso Norge (32.2%),Norsk Hydro (8.9%),TotalFinaElf Exploration Norge (9.4%)
• Natural gas and light oil condensates from sandstone structures about 2,500 metres below sea level.
• Carbon capture and storage facility at Sleipner West• World’s first offshore CCS plant• In operation since 1996=> Oldest plant that stores CO2 on an industrial scale
![Page 9: Geotechnical Considerations in the Context of CCS Dr ... · Geotechnical Considerations in the Context of CCS by Dr Britta Bienen The LRET Research Collegium Southampton, 11 July](https://reader031.vdocuments.site/reader031/viewer/2022040521/5e7ae2b68bdb0d5d5346ed7c/html5/thumbnails/9.jpg)
Sleipner West
![Page 10: Geotechnical Considerations in the Context of CCS Dr ... · Geotechnical Considerations in the Context of CCS by Dr Britta Bienen The LRET Research Collegium Southampton, 11 July](https://reader031.vdocuments.site/reader031/viewer/2022040521/5e7ae2b68bdb0d5d5346ed7c/html5/thumbnails/10.jpg)
Sleipner West
![Page 11: Geotechnical Considerations in the Context of CCS Dr ... · Geotechnical Considerations in the Context of CCS by Dr Britta Bienen The LRET Research Collegium Southampton, 11 July](https://reader031.vdocuments.site/reader031/viewer/2022040521/5e7ae2b68bdb0d5d5346ed7c/html5/thumbnails/11.jpg)
Sleipner West
IPCC (2005)
![Page 12: Geotechnical Considerations in the Context of CCS Dr ... · Geotechnical Considerations in the Context of CCS by Dr Britta Bienen The LRET Research Collegium Southampton, 11 July](https://reader031.vdocuments.site/reader031/viewer/2022040521/5e7ae2b68bdb0d5d5346ed7c/html5/thumbnails/12.jpg)
Sleipner West
Eiken et al. (2011)
![Page 13: Geotechnical Considerations in the Context of CCS Dr ... · Geotechnical Considerations in the Context of CCS by Dr Britta Bienen The LRET Research Collegium Southampton, 11 July](https://reader031.vdocuments.site/reader031/viewer/2022040521/5e7ae2b68bdb0d5d5346ed7c/html5/thumbnails/13.jpg)
Statoil, further projects
• In Salah (Algerian Sahara)• Snøhvit (Barents Sea)
Source of information: Statoil, http://www.statoil.com
![Page 14: Geotechnical Considerations in the Context of CCS Dr ... · Geotechnical Considerations in the Context of CCS by Dr Britta Bienen The LRET Research Collegium Southampton, 11 July](https://reader031.vdocuments.site/reader031/viewer/2022040521/5e7ae2b68bdb0d5d5346ed7c/html5/thumbnails/14.jpg)
Gorgon, Australia
![Page 15: Geotechnical Considerations in the Context of CCS Dr ... · Geotechnical Considerations in the Context of CCS by Dr Britta Bienen The LRET Research Collegium Southampton, 11 July](https://reader031.vdocuments.site/reader031/viewer/2022040521/5e7ae2b68bdb0d5d5346ed7c/html5/thumbnails/15.jpg)
Gorgon
Source of information: Chevron, http://www.chevronaustralia.com
![Page 16: Geotechnical Considerations in the Context of CCS Dr ... · Geotechnical Considerations in the Context of CCS by Dr Britta Bienen The LRET Research Collegium Southampton, 11 July](https://reader031.vdocuments.site/reader031/viewer/2022040521/5e7ae2b68bdb0d5d5346ed7c/html5/thumbnails/16.jpg)
Gorgon
• Led by Chevron• Greater Gorgon Area gas fields• ~ 130 km off the north-west coast of Western Australia
• One of the world's largest natural gas projects • The largest single resource natural gas project in
Australia's history• 15 million tonne per annum (MTPA) Liquefied Natural
Gas (LNG) plant on Barrow Island• domestic gas plant, capacity of 300 terajoules per day
![Page 17: Geotechnical Considerations in the Context of CCS Dr ... · Geotechnical Considerations in the Context of CCS by Dr Britta Bienen The LRET Research Collegium Southampton, 11 July](https://reader031.vdocuments.site/reader031/viewer/2022040521/5e7ae2b68bdb0d5d5346ed7c/html5/thumbnails/17.jpg)
Gorgon
• Important pillar of the Australian economy for > 40 years• Projected AU$64 billion boost to Australia’s Gross
Domestic Product in first 30 years• Direct and indirect employment of around 10,000 people
at peak construction
• ~ 40 trillion cubic feet LNG sufficient power for a city of 1 million people for 800 years
![Page 18: Geotechnical Considerations in the Context of CCS Dr ... · Geotechnical Considerations in the Context of CCS by Dr Britta Bienen The LRET Research Collegium Southampton, 11 July](https://reader031.vdocuments.site/reader031/viewer/2022040521/5e7ae2b68bdb0d5d5346ed7c/html5/thumbnails/18.jpg)
Gorgon
• Largest proposed carbon dioxide sequestration operation in the world
• Designed to capture 3.5 Mt of CO2 per annum• CO2 injection location: central eastern coast of Barrow
Island near the gas processing plant• Site selection, aims: maximise distance from major
geological faults and limit ground disturbance• Injection wells: directionally drilled from surface locations• Minimise the area of land required for the well sites,
surface facilities, pipelines and access roads• Monitoring wells: sample points within injection area
![Page 19: Geotechnical Considerations in the Context of CCS Dr ... · Geotechnical Considerations in the Context of CCS by Dr Britta Bienen The LRET Research Collegium Southampton, 11 July](https://reader031.vdocuments.site/reader031/viewer/2022040521/5e7ae2b68bdb0d5d5346ed7c/html5/thumbnails/19.jpg)
Gorgon
![Page 20: Geotechnical Considerations in the Context of CCS Dr ... · Geotechnical Considerations in the Context of CCS by Dr Britta Bienen The LRET Research Collegium Southampton, 11 July](https://reader031.vdocuments.site/reader031/viewer/2022040521/5e7ae2b68bdb0d5d5346ed7c/html5/thumbnails/20.jpg)
Gorgon
Monitoring Seismic surveys Well pressure data
Update reservoir models
Predict behaviour of injected CO2
![Page 21: Geotechnical Considerations in the Context of CCS Dr ... · Geotechnical Considerations in the Context of CCS by Dr Britta Bienen The LRET Research Collegium Southampton, 11 July](https://reader031.vdocuments.site/reader031/viewer/2022040521/5e7ae2b68bdb0d5d5346ed7c/html5/thumbnails/21.jpg)
Themes
• Examples of carbon sequestration in ocean spaces
–Sleipner West–Gorgon
• Geotechnical considerations in the context of geo-sequestration of CO2 in the offshore environment
• “Ship design”: Mobile jack-up drilling rigs
• Offshore wind energy installation
![Page 22: Geotechnical Considerations in the Context of CCS Dr ... · Geotechnical Considerations in the Context of CCS by Dr Britta Bienen The LRET Research Collegium Southampton, 11 July](https://reader031.vdocuments.site/reader031/viewer/2022040521/5e7ae2b68bdb0d5d5346ed7c/html5/thumbnails/22.jpg)
Geotechnical considerations
IPCC (2005)
![Page 23: Geotechnical Considerations in the Context of CCS Dr ... · Geotechnical Considerations in the Context of CCS by Dr Britta Bienen The LRET Research Collegium Southampton, 11 July](https://reader031.vdocuments.site/reader031/viewer/2022040521/5e7ae2b68bdb0d5d5346ed7c/html5/thumbnails/23.jpg)
Geotechnical considerations
• Geohazards (tectonic activity)
• Soil permeability
• Subsea installations
• Pipeline-soil interaction
• Movements of the seabed due to carbon sequestration Potential impact on soil-structure interaction
of existing or proposed infrastructure
![Page 24: Geotechnical Considerations in the Context of CCS Dr ... · Geotechnical Considerations in the Context of CCS by Dr Britta Bienen The LRET Research Collegium Southampton, 11 July](https://reader031.vdocuments.site/reader031/viewer/2022040521/5e7ae2b68bdb0d5d5346ed7c/html5/thumbnails/24.jpg)
General considerations
• Major concern: effectiveness as climate change mitigation option due to leakage of stored CO2
• IPCC estimate: risks comparable to those associated with current hydrocarbon activity for well-selected, designed and managed geological storage sites
• CO2 could be trapped for millions of years• Well selected storage sites likely to retain over 99% of
injected CO2 over 1000 years• Greater risk: Leakage through the injection pipe
![Page 25: Geotechnical Considerations in the Context of CCS Dr ... · Geotechnical Considerations in the Context of CCS by Dr Britta Bienen The LRET Research Collegium Southampton, 11 July](https://reader031.vdocuments.site/reader031/viewer/2022040521/5e7ae2b68bdb0d5d5346ed7c/html5/thumbnails/25.jpg)
Themes
• Examples of carbon sequestration in ocean spaces
–Sleipner West–Gorgon
• Geotechnical considerations in the context of geo-sequestration of CO2 in the offshore environment
• “Ship design”: Mobile jack-up drilling rigs
• Offshore wind energy installation
![Page 26: Geotechnical Considerations in the Context of CCS Dr ... · Geotechnical Considerations in the Context of CCS by Dr Britta Bienen The LRET Research Collegium Southampton, 11 July](https://reader031.vdocuments.site/reader031/viewer/2022040521/5e7ae2b68bdb0d5d5346ed7c/html5/thumbnails/26.jpg)
“Design”, context of jack-ups
Site
? Site-specific assessment
![Page 27: Geotechnical Considerations in the Context of CCS Dr ... · Geotechnical Considerations in the Context of CCS by Dr Britta Bienen The LRET Research Collegium Southampton, 11 July](https://reader031.vdocuments.site/reader031/viewer/2022040521/5e7ae2b68bdb0d5d5346ed7c/html5/thumbnails/27.jpg)
Why?
• Self-elevating
• MOBILE
i.e.re-useable
• Time spent on location
~ 2 weeks to 3 months
Goldeneye, North Sea (artist’s impression)
![Page 28: Geotechnical Considerations in the Context of CCS Dr ... · Geotechnical Considerations in the Context of CCS by Dr Britta Bienen The LRET Research Collegium Southampton, 11 July](https://reader031.vdocuments.site/reader031/viewer/2022040521/5e7ae2b68bdb0d5d5346ed7c/html5/thumbnails/28.jpg)
Spudcan footings
Seabed
What’s beneath the water?
~ 100 m
~ 20 m diameter
![Page 29: Geotechnical Considerations in the Context of CCS Dr ... · Geotechnical Considerations in the Context of CCS by Dr Britta Bienen The LRET Research Collegium Southampton, 11 July](https://reader031.vdocuments.site/reader031/viewer/2022040521/5e7ae2b68bdb0d5d5346ed7c/html5/thumbnails/29.jpg)
Risks associated with jack-ups
• In transit– Ship impact, towline failure, flooding, capsize (legs 500 ft
above the water line)• During installation
– High leg impact loads at touchdown, contact with other structures (pipeline, WHP), punch-through, …
• During operation– Punch-through (not necessarily in the clear after
installation!), leg sliding, excessive platform movement, ship impact, wave impact on hull, loss of foundation stability due to scour, rack/pinion failure
Jack-ups tend to be used to their operational and design limits
![Page 30: Geotechnical Considerations in the Context of CCS Dr ... · Geotechnical Considerations in the Context of CCS by Dr Britta Bienen The LRET Research Collegium Southampton, 11 July](https://reader031.vdocuments.site/reader031/viewer/2022040521/5e7ae2b68bdb0d5d5346ed7c/html5/thumbnails/30.jpg)
Considerations, examples
• “Simple” installation
• Punch-through
• Rack Phase difference (RPD)
• Removal from site
Modified after Dean (2010)
![Page 31: Geotechnical Considerations in the Context of CCS Dr ... · Geotechnical Considerations in the Context of CCS by Dr Britta Bienen The LRET Research Collegium Southampton, 11 July](https://reader031.vdocuments.site/reader031/viewer/2022040521/5e7ae2b68bdb0d5d5346ed7c/html5/thumbnails/31.jpg)
Installation on a sandy site
Bearing capacity problem, but…
•Context of offshore jack-up platforms
•Footing penetration
•SI?
??(density, stresses, compressibility)
BC???
![Page 32: Geotechnical Considerations in the Context of CCS Dr ... · Geotechnical Considerations in the Context of CCS by Dr Britta Bienen The LRET Research Collegium Southampton, 11 July](https://reader031.vdocuments.site/reader031/viewer/2022040521/5e7ae2b68bdb0d5d5346ed7c/html5/thumbnails/32.jpg)
Guidelines
• SNAME (2008)• ISO19905-1
• InSafeJIP: guideline available for download (free)http://insafe.woking.rpsplc.co.uk/download.asp
Primarily aimed at site-specific assessment during operation
Focus on SI workscope and procedures, jack-up installation
Use realistic , account for mobilisation in BC
![Page 33: Geotechnical Considerations in the Context of CCS Dr ... · Geotechnical Considerations in the Context of CCS by Dr Britta Bienen The LRET Research Collegium Southampton, 11 July](https://reader031.vdocuments.site/reader031/viewer/2022040521/5e7ae2b68bdb0d5d5346ed7c/html5/thumbnails/33.jpg)
Spudcan
![Page 34: Geotechnical Considerations in the Context of CCS Dr ... · Geotechnical Considerations in the Context of CCS by Dr Britta Bienen The LRET Research Collegium Southampton, 11 July](https://reader031.vdocuments.site/reader031/viewer/2022040521/5e7ae2b68bdb0d5d5346ed7c/html5/thumbnails/34.jpg)
Modified after Dean (2010)
Motivation
• Accurate, not conservative prediction required
• Prediction of vertical load-penetration curve
• Footing penetration, not placement
• Large diameter foundations
• Conical foundation profile
• SI data
Ultimate aim: direct correlation with piezocone
![Page 35: Geotechnical Considerations in the Context of CCS Dr ... · Geotechnical Considerations in the Context of CCS by Dr Britta Bienen The LRET Research Collegium Southampton, 11 July](https://reader031.vdocuments.site/reader031/viewer/2022040521/5e7ae2b68bdb0d5d5346ed7c/html5/thumbnails/35.jpg)
Bearing capacity
• Soil characteristics
• Dense sand -> little penetration
• Soft clay -> larger penetration
(of the order of 20-30 m)
-> soil backflow?
Where is the uncertainty?...
![Page 36: Geotechnical Considerations in the Context of CCS Dr ... · Geotechnical Considerations in the Context of CCS by Dr Britta Bienen The LRET Research Collegium Southampton, 11 July](https://reader031.vdocuments.site/reader031/viewer/2022040521/5e7ae2b68bdb0d5d5346ed7c/html5/thumbnails/36.jpg)
“Simple” installation
Where is the uncertainty?
Real life scenario:
• Neither single sand nor single clay
• Carbonate soils
• Silts
• …
![Page 37: Geotechnical Considerations in the Context of CCS Dr ... · Geotechnical Considerations in the Context of CCS by Dr Britta Bienen The LRET Research Collegium Southampton, 11 July](https://reader031.vdocuments.site/reader031/viewer/2022040521/5e7ae2b68bdb0d5d5346ed7c/html5/thumbnails/37.jpg)
Jack-up foundation failure
punch through 31%
uneven seabed/scour/footprint
15%
sliding of mat foundation 10%
unexpected penetration 8%
others 8%
punch through /additional penetration during storm
8%
seafloor instability /mudslide/ seabed
slide/volcanic activ ities 6%
punch through during preloading/jacking up
14%
Dier et al. (2004)
![Page 38: Geotechnical Considerations in the Context of CCS Dr ... · Geotechnical Considerations in the Context of CCS by Dr Britta Bienen The LRET Research Collegium Southampton, 11 July](https://reader031.vdocuments.site/reader031/viewer/2022040521/5e7ae2b68bdb0d5d5346ed7c/html5/thumbnails/38.jpg)
Considerations, examples
• “Simple” installation
• Punch-through
• Rack Phase difference (RPD)
• Removal from site
Modified after Dean (2010)
![Page 39: Geotechnical Considerations in the Context of CCS Dr ... · Geotechnical Considerations in the Context of CCS by Dr Britta Bienen The LRET Research Collegium Southampton, 11 July](https://reader031.vdocuments.site/reader031/viewer/2022040521/5e7ae2b68bdb0d5d5346ed7c/html5/thumbnails/39.jpg)
Punch-through failure
AD19, September 2002,
Saudi Arabia
![Page 40: Geotechnical Considerations in the Context of CCS Dr ... · Geotechnical Considerations in the Context of CCS by Dr Britta Bienen The LRET Research Collegium Southampton, 11 July](https://reader031.vdocuments.site/reader031/viewer/2022040521/5e7ae2b68bdb0d5d5346ed7c/html5/thumbnails/40.jpg)
Punch-through
Maersk Victory, November 1996, South Australia
![Page 41: Geotechnical Considerations in the Context of CCS Dr ... · Geotechnical Considerations in the Context of CCS by Dr Britta Bienen The LRET Research Collegium Southampton, 11 July](https://reader031.vdocuments.site/reader031/viewer/2022040521/5e7ae2b68bdb0d5d5346ed7c/html5/thumbnails/41.jpg)
Punch-through
(Lee 2009)
0
5
10
15
20
0 500 1000 1500q (kPa)D
epth
(m)
D2F30a
Measured
Trapped sand thickness = 0.6Hs
D = 6mHs = 6.7m
Trapped sand thickness = 0.9Hs
Sand-clay interface
Predicted
![Page 42: Geotechnical Considerations in the Context of CCS Dr ... · Geotechnical Considerations in the Context of CCS by Dr Britta Bienen The LRET Research Collegium Southampton, 11 July](https://reader031.vdocuments.site/reader031/viewer/2022040521/5e7ae2b68bdb0d5d5346ed7c/html5/thumbnails/42.jpg)
Punch-through
• Uncontrolled
• Structural problems
– Leg bending,• Damage to leg-hull connection,
– Failure of leg element(s),– Lost time, lost revenue, repairs,– Excessive penetration -> legs not long enough– …– Collapse of rig
![Page 43: Geotechnical Considerations in the Context of CCS Dr ... · Geotechnical Considerations in the Context of CCS by Dr Britta Bienen The LRET Research Collegium Southampton, 11 July](https://reader031.vdocuments.site/reader031/viewer/2022040521/5e7ae2b68bdb0d5d5346ed7c/html5/thumbnails/43.jpg)
Punch-throughAdded risk: Increasing bearing pressure
Jack-up Development - Spudcan Installation Bearing Pressures
100
200
300
400
500
600
700
1955
1960
1965
1970
1975
1980
1985
1990
1995
2000
2005
2010
Jack-up Design Class - 1st Build Date
Spud
can
Bea
ring
Pres
sure
/ kP
a
Osborne et al. (2006)
![Page 44: Geotechnical Considerations in the Context of CCS Dr ... · Geotechnical Considerations in the Context of CCS by Dr Britta Bienen The LRET Research Collegium Southampton, 11 July](https://reader031.vdocuments.site/reader031/viewer/2022040521/5e7ae2b68bdb0d5d5346ed7c/html5/thumbnails/44.jpg)
Clay over clay, Sunda Shelf Castleberry & Prebaharan (1985)
![Page 45: Geotechnical Considerations in the Context of CCS Dr ... · Geotechnical Considerations in the Context of CCS by Dr Britta Bienen The LRET Research Collegium Southampton, 11 July](https://reader031.vdocuments.site/reader031/viewer/2022040521/5e7ae2b68bdb0d5d5346ed7c/html5/thumbnails/45.jpg)
Punch-through: Clay over clay Comparison of finite element results with SNAME (2008)
Hossain & Randolph (2010)
![Page 46: Geotechnical Considerations in the Context of CCS Dr ... · Geotechnical Considerations in the Context of CCS by Dr Britta Bienen The LRET Research Collegium Southampton, 11 July](https://reader031.vdocuments.site/reader031/viewer/2022040521/5e7ae2b68bdb0d5d5346ed7c/html5/thumbnails/46.jpg)
Punch-through: Sand over clay
SNAME (2008):
Two recommended methods
• Punching shear method
• Projected area method
“although this method can provide reasonable quantitative estimates on leg penetration, it may not be based on a physically correct model”
Input: best estimate of soil strength parameters
-> Bearing resistance at every prescribed embedment using either one of the two methods with a safety factor of unity
-> Assess punch-through potential based on predicted bearing resistance-depth profile and target preload
![Page 47: Geotechnical Considerations in the Context of CCS Dr ... · Geotechnical Considerations in the Context of CCS by Dr Britta Bienen The LRET Research Collegium Southampton, 11 July](https://reader031.vdocuments.site/reader031/viewer/2022040521/5e7ae2b68bdb0d5d5346ed7c/html5/thumbnails/47.jpg)
Punch-through, sand over clay
Existing methods (incl. those in SNAME 2008)
are based on
• wished in place footing and
• one failure mechanism
- is that correct?
![Page 48: Geotechnical Considerations in the Context of CCS Dr ... · Geotechnical Considerations in the Context of CCS by Dr Britta Bienen The LRET Research Collegium Southampton, 11 July](https://reader031.vdocuments.site/reader031/viewer/2022040521/5e7ae2b68bdb0d5d5346ed7c/html5/thumbnails/48.jpg)
Punch-through, sand over clay
![Page 49: Geotechnical Considerations in the Context of CCS Dr ... · Geotechnical Considerations in the Context of CCS by Dr Britta Bienen The LRET Research Collegium Southampton, 11 July](https://reader031.vdocuments.site/reader031/viewer/2022040521/5e7ae2b68bdb0d5d5346ed7c/html5/thumbnails/49.jpg)
Punch-throughSand over clay (Teh et al. 2008)
![Page 50: Geotechnical Considerations in the Context of CCS Dr ... · Geotechnical Considerations in the Context of CCS by Dr Britta Bienen The LRET Research Collegium Southampton, 11 July](https://reader031.vdocuments.site/reader031/viewer/2022040521/5e7ae2b68bdb0d5d5346ed7c/html5/thumbnails/50.jpg)
Punch-through, sand over clayComparison of failure mechanisms (Teh et al. 2010)
![Page 51: Geotechnical Considerations in the Context of CCS Dr ... · Geotechnical Considerations in the Context of CCS by Dr Britta Bienen The LRET Research Collegium Southampton, 11 July](https://reader031.vdocuments.site/reader031/viewer/2022040521/5e7ae2b68bdb0d5d5346ed7c/html5/thumbnails/51.jpg)
Punch-through
(Lee 2009)
0
5
10
15
20
0 500 1000 1500q (kPa)D
epth
(m)
D2F30a
Measured
Trapped sand thickness = 0.6Hs
D = 6mHs = 6.7m
Trapped sand thickness = 0.9Hs
Sand-clay interface
Predicted
![Page 52: Geotechnical Considerations in the Context of CCS Dr ... · Geotechnical Considerations in the Context of CCS by Dr Britta Bienen The LRET Research Collegium Southampton, 11 July](https://reader031.vdocuments.site/reader031/viewer/2022040521/5e7ae2b68bdb0d5d5346ed7c/html5/thumbnails/52.jpg)
Recent developmentsPunch-through sand over clayTeh, K.L., Cassidy, M.J., Leung, C.F., Chow, Y.K., Randolph, M.F., Quah, C.K. (2008). Revealing
the bearing failure mechanisms of a penetrating spudcan through sand overlaying clay. Géotechnique. Vol. 58, No. 10, pp. 793-804.
Lee, K.K., Randolph, M.F., Cassidy, M.J. (2009). New simplified conceptual model for spudcan foundations on sand overlying clay soils. Proc. 41st Offshore Technology Conference, Houston, OTC-20012.
Teh, K.L., Leung, C.F., Chow, Y.K., Cassidy, M.J. (2010). Centrifuge model study of spudcan penetration in sand overlying clay. Géotechnique, Vol. 60, No. 11, pp. 825-842.
Punch-through clay over clayHossain, M.S. and Randolph, M.F. (2010). Deep-penetrating spudcan foundations on layered
clays: centrifuge tests. Géotechnique, Vol. 60, No. 3, pp. 157-170.
Hossain, M.S. and Randolph, M.F. (2010). Deep-penetrating spudcan foundations on layered clays: numerical analysis. Géotechnique, Vol. 60, No. 3, pp. 171-184.
![Page 53: Geotechnical Considerations in the Context of CCS Dr ... · Geotechnical Considerations in the Context of CCS by Dr Britta Bienen The LRET Research Collegium Southampton, 11 July](https://reader031.vdocuments.site/reader031/viewer/2022040521/5e7ae2b68bdb0d5d5346ed7c/html5/thumbnails/53.jpg)
Considerations, examples
• “Simple” installation
• Punch-through
• Rack Phase difference (RPD)
• Removal from site
Modified after Dean (2010)
![Page 54: Geotechnical Considerations in the Context of CCS Dr ... · Geotechnical Considerations in the Context of CCS by Dr Britta Bienen The LRET Research Collegium Southampton, 11 July](https://reader031.vdocuments.site/reader031/viewer/2022040521/5e7ae2b68bdb0d5d5346ed7c/html5/thumbnails/54.jpg)
Rack phase difference (RPD)
• What is RPD?
– “Measurable difference in the vertical position of the chords relative to each other within an individual leg”Nowak & Lawson (2005)
– Alerts to potential problems!
![Page 55: Geotechnical Considerations in the Context of CCS Dr ... · Geotechnical Considerations in the Context of CCS by Dr Britta Bienen The LRET Research Collegium Southampton, 11 July](https://reader031.vdocuments.site/reader031/viewer/2022040521/5e7ae2b68bdb0d5d5346ed7c/html5/thumbnails/55.jpg)
Why is it important?
RPD results in large loads
being transferred to the leg’s
diagonal braces, which might
buckle as a consequence.
Rack phase difference (RPD)
Sharples (2008)
GSF High Island II
after Hurricane Rita
![Page 56: Geotechnical Considerations in the Context of CCS Dr ... · Geotechnical Considerations in the Context of CCS by Dr Britta Bienen The LRET Research Collegium Southampton, 11 July](https://reader031.vdocuments.site/reader031/viewer/2022040521/5e7ae2b68bdb0d5d5346ed7c/html5/thumbnails/56.jpg)
Rack phase difference (RPD)
GSF High Island III
after Hurricane Rita Sharples (2008)
![Page 57: Geotechnical Considerations in the Context of CCS Dr ... · Geotechnical Considerations in the Context of CCS by Dr Britta Bienen The LRET Research Collegium Southampton, 11 July](https://reader031.vdocuments.site/reader031/viewer/2022040521/5e7ae2b68bdb0d5d5346ed7c/html5/thumbnails/57.jpg)
Rack Phase difference
… a measure of how “unhappy” the rig is
Typical situations where RPD occurs:– Existing footprints– Sloping or uneven seabed (hard spots)– Scour (leading to uneven seabed)– Rapid penetration / punch-through
Nowak & Lawson (2005)
![Page 58: Geotechnical Considerations in the Context of CCS Dr ... · Geotechnical Considerations in the Context of CCS by Dr Britta Bienen The LRET Research Collegium Southampton, 11 July](https://reader031.vdocuments.site/reader031/viewer/2022040521/5e7ae2b68bdb0d5d5346ed7c/html5/thumbnails/58.jpg)
Existing footprints
Nowak et al. (2008)
![Page 59: Geotechnical Considerations in the Context of CCS Dr ... · Geotechnical Considerations in the Context of CCS by Dr Britta Bienen The LRET Research Collegium Southampton, 11 July](https://reader031.vdocuments.site/reader031/viewer/2022040521/5e7ae2b68bdb0d5d5346ed7c/html5/thumbnails/59.jpg)
Soil characteristics at existing footprints
original spudcanlocation
reinstalled location
remolded soil
less soildisturbance
new sea-bedsurface
original spudcanlocation
reinstalled location
remolded soil
less soildisturbance
new sea-bedsurface
![Page 60: Geotechnical Considerations in the Context of CCS Dr ... · Geotechnical Considerations in the Context of CCS by Dr Britta Bienen The LRET Research Collegium Southampton, 11 July](https://reader031.vdocuments.site/reader031/viewer/2022040521/5e7ae2b68bdb0d5d5346ed7c/html5/thumbnails/60.jpg)
Soil characteristics at existing footprints Change in sand over clay soil profile (Teh 2006)
![Page 61: Geotechnical Considerations in the Context of CCS Dr ... · Geotechnical Considerations in the Context of CCS by Dr Britta Bienen The LRET Research Collegium Southampton, 11 July](https://reader031.vdocuments.site/reader031/viewer/2022040521/5e7ae2b68bdb0d5d5346ed7c/html5/thumbnails/61.jpg)
Considerations, examples
• “Simple” installation
• Punch-through
• Rack Phase difference (RPD)
• Removal from site
Modified after Dean (2010)
![Page 62: Geotechnical Considerations in the Context of CCS Dr ... · Geotechnical Considerations in the Context of CCS by Dr Britta Bienen The LRET Research Collegium Southampton, 11 July](https://reader031.vdocuments.site/reader031/viewer/2022040521/5e7ae2b68bdb0d5d5346ed7c/html5/thumbnails/62.jpg)
Spudcan extraction with jetting
Purwana et al. (2008)
![Page 63: Geotechnical Considerations in the Context of CCS Dr ... · Geotechnical Considerations in the Context of CCS by Dr Britta Bienen The LRET Research Collegium Southampton, 11 July](https://reader031.vdocuments.site/reader031/viewer/2022040521/5e7ae2b68bdb0d5d5346ed7c/html5/thumbnails/63.jpg)
Spudcan extraction with jetting
Experiments carried out in the UWA geotechnical centrifuge
Gaudin et al. (2011)
![Page 64: Geotechnical Considerations in the Context of CCS Dr ... · Geotechnical Considerations in the Context of CCS by Dr Britta Bienen The LRET Research Collegium Southampton, 11 July](https://reader031.vdocuments.site/reader031/viewer/2022040521/5e7ae2b68bdb0d5d5346ed7c/html5/thumbnails/64.jpg)
Centrifuge experiments
• Numerous field experiments offshore not feasible
• True scale model
• Similitude to prototype
• Carefully controlled conditions
• Enhanced g level
![Page 65: Geotechnical Considerations in the Context of CCS Dr ... · Geotechnical Considerations in the Context of CCS by Dr Britta Bienen The LRET Research Collegium Southampton, 11 July](https://reader031.vdocuments.site/reader031/viewer/2022040521/5e7ae2b68bdb0d5d5346ed7c/html5/thumbnails/65.jpg)
Centrifuge experiments
2D actuator
Syringe pump
Strongbox
![Page 66: Geotechnical Considerations in the Context of CCS Dr ... · Geotechnical Considerations in the Context of CCS by Dr Britta Bienen The LRET Research Collegium Southampton, 11 July](https://reader031.vdocuments.site/reader031/viewer/2022040521/5e7ae2b68bdb0d5d5346ed7c/html5/thumbnails/66.jpg)
Centrifuge model
![Page 67: Geotechnical Considerations in the Context of CCS Dr ... · Geotechnical Considerations in the Context of CCS by Dr Britta Bienen The LRET Research Collegium Southampton, 11 July](https://reader031.vdocuments.site/reader031/viewer/2022040521/5e7ae2b68bdb0d5d5346ed7c/html5/thumbnails/67.jpg)
Spudcan extraction with jetting Experiments carried out in the UWA geotechnical centrifuge
0
10
20
30
40
50
60
70
80
90
100
-1500 -500 500 1500Net load (N)
Dep
th (m
m)
No jetting
Most jetting
Some jetiing
More jetting
![Page 68: Geotechnical Considerations in the Context of CCS Dr ... · Geotechnical Considerations in the Context of CCS by Dr Britta Bienen The LRET Research Collegium Southampton, 11 July](https://reader031.vdocuments.site/reader031/viewer/2022040521/5e7ae2b68bdb0d5d5346ed7c/html5/thumbnails/68.jpg)
Conceptual framework
0.0
0.1
0.2
0.3
0.4
0.5
0.6
0.7
0.8
0.9
1.0
0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1.0
Filling ratio, f (-)
Extra
ctio
n re
sist
ance
ratio
, Qdi
rect
/Qul
t (-)
Idea: - estimate available and required uplift force
- enter diagram => ‘filling ratio’
- calculate required jetting flow rate from required filling ratio and theoretical cavity
Bienen et al. (2009)
![Page 69: Geotechnical Considerations in the Context of CCS Dr ... · Geotechnical Considerations in the Context of CCS by Dr Britta Bienen The LRET Research Collegium Southampton, 11 July](https://reader031.vdocuments.site/reader031/viewer/2022040521/5e7ae2b68bdb0d5d5346ed7c/html5/thumbnails/69.jpg)
Themes
• Examples of carbon sequestration in ocean spaces
–Sleipner West–Gorgon
• Geotechnical considerations in the context of geo-sequestration of CO2 in the offshore environment
• “Ship design”: Mobile jack-up drilling rigs
• Offshore wind energy installation
![Page 70: Geotechnical Considerations in the Context of CCS Dr ... · Geotechnical Considerations in the Context of CCS by Dr Britta Bienen The LRET Research Collegium Southampton, 11 July](https://reader031.vdocuments.site/reader031/viewer/2022040521/5e7ae2b68bdb0d5d5346ed7c/html5/thumbnails/70.jpg)
Offshore wind energy
Offshore wind turbine under construction
• Foundation concepts
“exported” fromonshore experience
• Differences in scale
• Differences in logistics
![Page 71: Geotechnical Considerations in the Context of CCS Dr ... · Geotechnical Considerations in the Context of CCS by Dr Britta Bienen The LRET Research Collegium Southampton, 11 July](https://reader031.vdocuments.site/reader031/viewer/2022040521/5e7ae2b68bdb0d5d5346ed7c/html5/thumbnails/71.jpg)
Offshore wind energy
Alpha Ventus
• Differences in loading
? Applicability of methods?
Development of appropriate design methods
Development of novel foundation concepts
![Page 72: Geotechnical Considerations in the Context of CCS Dr ... · Geotechnical Considerations in the Context of CCS by Dr Britta Bienen The LRET Research Collegium Southampton, 11 July](https://reader031.vdocuments.site/reader031/viewer/2022040521/5e7ae2b68bdb0d5d5346ed7c/html5/thumbnails/72.jpg)
Thank you
-