geosynthetics in forestry application

73
Geosynthetics in Geosynthetics in Forestry Application Forestry Application By By Donald Lindsay, CEG, PE Donald Lindsay, CEG, PE Engineering Geologist/Civil Engineer Engineering Geologist/Civil Engineer California Geological Survey California Geological Survey

Upload: others

Post on 24-Dec-2021

7 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Geosynthetics in Forestry Application

Geosynthetics in Geosynthetics in Forestry ApplicationForestry Application

ByBy

Donald Lindsay, CEG, PEDonald Lindsay, CEG, PEEngineering Geologist/Civil EngineerEngineering Geologist/Civil Engineer

California Geological SurveyCalifornia Geological Survey

Page 2: Geosynthetics in Forestry Application

Presentation OutlinePresentation Outline

Background information on Geosynthetics.

Look at examples of geosynthetics in Forestry Applications.

Review currently accepted design standards.

Where applicable, identify simplified design procedures to promote the use of geosynthetics.

Page 3: Geosynthetics in Forestry Application

PRACTITIONERSRPFsLTOs

REVIEW TEAM AGENCIESCDFDFG

RWQCBCGS

GEOSYNTHETICSKNOWLEDGE

DESIGN STANDARDS

GOALGOAL

Page 4: Geosynthetics in Forestry Application

ASTM, 1994

Geosynthetics DefinedGeosynthetics Defined

““Planar, polymeric material used with soil, Planar, polymeric material used with soil, rock, earth, or other geotechnicalrock, earth, or other geotechnical--related related material as an integral part of an material as an integral part of an engineered project, structure, or system.engineered project, structure, or system.””

Page 5: Geosynthetics in Forestry Application

Common Geosynthetics in Forest Common Geosynthetics in Forest ApplicationsApplications

Geotextiles Geogrids

Geocomposites Geocells

Page 6: Geosynthetics in Forestry Application

Common Geosynthetic functions in Common Geosynthetic functions in Forest ApplicationsForest Applications

►►SeparationSeparation►►FiltrationFiltration►►InIn--plane Drainageplane Drainage►►ReinforcementReinforcement►►Protection/CushionProtection/Cushion►►Fluid BarrierFluid Barrier

Page 7: Geosynthetics in Forestry Application

SeparationSeparation

Rock Fill

Geotextile

CMP

Road surface

Tensar

Page 8: Geosynthetics in Forestry Application

FiltrationFiltration

Geocomposites

Wrapped aggregate drains

Filter fabric

Page 9: Geosynthetics in Forestry Application

InIn--Plane DrainagePlane Drainage

Nonwoven

Geocomposite

Page 10: Geosynthetics in Forestry Application

ReinforcementReinforcement

►►Geosynthetics increase soil shear resistance Geosynthetics increase soil shear resistance by increasing by increasing tensionaltensional and and passive resistant passive resistant forcesforces..

Page 11: Geosynthetics in Forestry Application

Mechanics of ReinforcementMechanics of Reinforcement

HIGHHIGHLOW LOW ExtensibilityExtensibility of of geosyntheticgeosynthetic

LOW to NALOW to NAHIGHHIGHConfinementConfinement(Dilation)(Dilation)

GEOTEXTILEGEOTEXTILE

LOWLOW

GEOGRIDGEOGRID

HIGHHIGHFrictionFriction between between geosynthetic and geosynthetic and soilsoil

W

F

S

Tmax

Tmax

Page 12: Geosynthetics in Forestry Application

Confinement:

Dr. Jie Han, PE

Page 13: Geosynthetics in Forestry Application

GEOSYNTHETICS

Geogrids

Geocells

Geotextiles

Geocomposites

FUNCTIONS

Separation

Filtration

In-Plane Drainage

Reinforcement

FOREST APPLICATIONS

Page 14: Geosynthetics in Forestry Application

Forest ApplicationsForest Applications

►►Erosion Control SystemsErosion Control Systems

►►Soft Subgrade Reinforcement and Soft Subgrade Reinforcement and

SeparationSeparation

►►Subsurface DrainageSubsurface Drainage

►►Reinforced SlopesReinforced Slopes

Page 15: Geosynthetics in Forestry Application

Erosion Control SystemsErosion Control Systems►► Used instead of graded Used instead of graded

granular materials in hard granular materials in hard armor structures such as:armor structures such as:

Beneath rock slope Beneath rock slope protection along stream protection along stream channels and bridge channels and bridge abutments abutments (separation, filtration)(separation, filtration)

Beneath armor stone on cut Beneath armor stone on cut and fill slopesand fill slopes (separation, (separation, filtration)filtration)

Fabric

Without fabric With fabric

hh/2

Page 16: Geosynthetics in Forestry Application

Erosion Control SystemsErosion Control Systems

►► Used as scour protection in Used as scour protection in lowlow--water stream water stream

crossingscrossings (separation, reinforcement)(separation, reinforcement)

GeocellClarkin K. et. al., 2006 (USFS)

Page 17: Geosynthetics in Forestry Application

Erosion Control SystemsErosion Control Systems

►► Used to temporarily control Used to temporarily control and minimize erosion and and minimize erosion and sediment transport until sediment transport until vegetation can be vegetation can be established. Examples established. Examples include:include:

Erosion control blankets and Erosion control blankets and mats.mats.

Ed Rose, USFS

Page 18: Geosynthetics in Forestry Application

Erosion Control SystemsErosion Control Systems

Advantages:Advantages:►►Reduce the use of costly granular aggregate Reduce the use of costly granular aggregate

material.material.►►Expedite construction.Expedite construction.►►Provide protection while promoting Provide protection while promoting

vegetation growth.vegetation growth.

Page 19: Geosynthetics in Forestry Application

Erosion Control SystemsErosion Control Systems

DisadvantagesDisadvantages::►►Additional time to place and workaround.Additional time to place and workaround.►►Use of improper geosynthetic for the given Use of improper geosynthetic for the given

function and site conditions (oversight).function and site conditions (oversight).►►Improper installation (oversight).Improper installation (oversight).

Page 20: Geosynthetics in Forestry Application

Forest ApplicationsForest Applications

►►Erosion Control SystemsErosion Control Systems

►►Soft Subgrade Reinforcement and Soft Subgrade Reinforcement and

SeparationSeparation

►►Subsurface DrainageSubsurface Drainage

►►Reinforced SlopesReinforced Slopes

Page 21: Geosynthetics in Forestry Application

Soft Subgrade Reinforcement and Soft Subgrade Reinforcement and SeparationSeparation

►► The cost to rock roads The cost to rock roads can be substantially can be substantially lowered when the road lowered when the road has a soft, yielding has a soft, yielding subgrade.subgrade.

►► Achieved by providing Achieved by providing three functions: three functions:

Reinforcement Reinforcement SeparationSeparationFiltration Filtration (less common)(less common)

Geosynthetic Materials Association

Page 22: Geosynthetics in Forestry Application

Soft Subgrade Soft Subgrade ReinforcementReinforcement

FHWA HI-95-038

Page 23: Geosynthetics in Forestry Application

Tensar

Soft Subgrade ReinforcementSoft Subgrade Reinforcement

Page 24: Geosynthetics in Forestry Application

Soft Subgrade SeparationSoft Subgrade Separation

Tensar

FHWA HI-95-038

Page 25: Geosynthetics in Forestry Application

FHWA HI-95-038

Soft Subgrade Reinforcement and SeparationSoft Subgrade Reinforcement and Separation

Aggregate lost to weak subgrades

Log truck makes ruts

Log truck stuck

Pickup truck makes ruts

Pickup truck stuck

(Relative substrate strength)

Page 26: Geosynthetics in Forestry Application

Soft Subgrade Reinforcement and Soft Subgrade Reinforcement and SeparationSeparation

Advantages:Advantages:►► Reduces stresses in subgrade Reduces stresses in subgrade ( reinforcement).( reinforcement).

►► Prevents contamination of surface rock Prevents contamination of surface rock (separation, (separation, filtration).filtration).

►► Reduces excavation of unsuitable subgrade Reduces excavation of unsuitable subgrade materials materials (separation, reinforcement).(separation, reinforcement).

►► Reduces the thickness of aggregate required to Reduces the thickness of aggregate required to stabilize the subgrade stabilize the subgrade (separation, reinforcement).(separation, reinforcement).

►► Aids in compaction of surface rock Aids in compaction of surface rock (separation, reinforcement, (separation, reinforcement, drainage).drainage).

►► Reduces maintenance and extends the life of the Reduces maintenance and extends the life of the road surface road surface (filtration, separation, drainage, reinforcement).(filtration, separation, drainage, reinforcement).

Page 27: Geosynthetics in Forestry Application

Soft Subgrade Reinforcement and Soft Subgrade Reinforcement and SeparationSeparation

Disadvantages:Disadvantages:►► Price of geosynthetics? (about $3/ft. road).Price of geosynthetics? (about $3/ft. road).►► Use of improper geosynthetic for the given function and Use of improper geosynthetic for the given function and

site conditions (specifications and/or oversight).site conditions (specifications and/or oversight).

Page 28: Geosynthetics in Forestry Application

Forest ApplicationsForest Applications

►►Erosion Control SystemsErosion Control Systems

►►Soft Subgrade Reinforcement and Soft Subgrade Reinforcement and

SeparationSeparation

►►Subsurface DrainageSubsurface Drainage

►►Reinforced SlopesReinforced Slopes

Page 29: Geosynthetics in Forestry Application

Subsurface DrainageSubsurface Drainage

►►Geosynthetics can be used as a replacement Geosynthetics can be used as a replacement for, or in conjunction with, conventional for, or in conjunction with, conventional graded granular filters.graded granular filters.

►►Examples:Examples:GeocompositeGeocomposite drainsdrainsWrapped aggregate drains (burrito drains, Wrapped aggregate drains (burrito drains, wrapped wrapped underdrainsunderdrains))

Page 30: Geosynthetics in Forestry Application

Ed Rose, USFS

Geocomposite Drain

Page 31: Geosynthetics in Forestry Application

Ed Rose, USFS

Geocomposite Drain

Page 32: Geosynthetics in Forestry Application

Ed Rose, USFS

Wrapped Aggregate Drain

Page 33: Geosynthetics in Forestry Application

Precautions to prevent damage from construction:

Page 34: Geosynthetics in Forestry Application

Need to choose appropriate fabric for the soil conditions.

Filter bridge forms

Poorly-graded soils can cause clogging.

Too large an AOS can cause soil piping.

Too small an AOS can cause clogging.

No Filter bridgeNo Filter bridge

AOS < D85

AOS > 3D15

AOS > 3D15AOS < D85

AOS = apparent opening size

Precautions to prevent clogging:

Page 35: Geosynthetics in Forestry Application

Subsurface DrainageSubsurface Drainage

Advantages:Advantages:►►Prevents fines from contaminating the drain Prevents fines from contaminating the drain

rock while allowing water to pass rock while allowing water to pass (filtration).(filtration).

►►Allows for the use of lessAllows for the use of less--costly drainage costly drainage aggregate aggregate (separation, filtration).(separation, filtration).

►►Expedites constructionExpedites construction..

Page 36: Geosynthetics in Forestry Application

Subsurface DrainageSubsurface Drainage

Disadvantages:Disadvantages:►►Use of improper geosynthetic for the Use of improper geosynthetic for the

given function and site conditions given function and site conditions (specifications and oversight).(specifications and oversight).

►►Poor installation.Poor installation.

Page 37: Geosynthetics in Forestry Application

1.1. Evaluate the critical nature of the application.Evaluate the critical nature of the application.2.2. Obtain soil samples and perform necessary tests Obtain soil samples and perform necessary tests

(gradation, hydrometer, (gradation, hydrometer, AtterbergAtterberg limits).limits).3.3. Determine the dimensions of the drain system.Determine the dimensions of the drain system.4.4. Determine geotextile hydraulic Determine geotextile hydraulic requirmentsrequirments

(retention, flow, clogging).(retention, flow, clogging).5.5. Determine geotextile survivability requirements.Determine geotextile survivability requirements.6.6. Prepare Specifications.Prepare Specifications.7.7. Monitor Installation.Monitor Installation.

Adapted from FHWA HI-95-038

Accepted Design ProcedureAccepted Design Procedure

Page 38: Geosynthetics in Forestry Application
Page 39: Geosynthetics in Forestry Application
Page 40: Geosynthetics in Forestry Application

High permeability High permeability but Percent open but Percent open

area (POS) is more area (POS) is more prone to clogging.prone to clogging.

High porosity +High porosity +High permeabilityHigh permeability= High flow for = High flow for

longer.longer.

WOVENWOVENNONWOVENNONWOVEN

Geofabric

Page 41: Geosynthetics in Forestry Application

Forest ApplicationsForest Applications

►►Erosion Control SystemsErosion Control Systems

►►Soft Subgrade Reinforcement and Soft Subgrade Reinforcement and

SeparationSeparation

►►Subsurface DrainageSubsurface Drainage

►►Reinforced SlopesReinforced Slopes……..Finally the good stuff!..Finally the good stuff!

Page 42: Geosynthetics in Forestry Application

Reinforced SlopesReinforced Slopes

►►GeosyntheticGeosynthetic--reinforced slopes allow the reinforced slopes allow the ability to construct slopes steeper than ability to construct slopes steeper than those constructed using more traditional those constructed using more traditional means. means.

►►Two common types of reinforcement:Two common types of reinforcement:GeogridGeogridGeotextileGeotextile

Page 43: Geosynthetics in Forestry Application

Ed Rose, USFS

Page 44: Geosynthetics in Forestry Application

Ed Rose, USFS

Page 45: Geosynthetics in Forestry Application

Ed Rose, USFS

Page 46: Geosynthetics in Forestry Application

Ed Rose, USFS

Page 47: Geosynthetics in Forestry Application

Ed Rose, USFS

Page 48: Geosynthetics in Forestry Application

Ed Rose, USFS

Page 49: Geosynthetics in Forestry Application

Ed Rose, USFS

Page 50: Geosynthetics in Forestry Application

Ed Rose, USFS

Page 51: Geosynthetics in Forestry Application

Ed Rose, USFS

Page 52: Geosynthetics in Forestry Application

Ed Rose, USFS

Page 53: Geosynthetics in Forestry Application

Ed Rose, USFS

Page 54: Geosynthetics in Forestry Application

Ed Rose, USFS

Page 55: Geosynthetics in Forestry Application

Ed Rose, USFS

Page 56: Geosynthetics in Forestry Application

Ed Rose, USFS

Page 57: Geosynthetics in Forestry Application

Ed Rose, USFS

Page 58: Geosynthetics in Forestry Application

Ed Rose, USFS

Page 59: Geosynthetics in Forestry Application

Ed Rose, USFS

Page 60: Geosynthetics in Forestry Application

Ed Rose, USFS

Page 61: Geosynthetics in Forestry Application

Reinforced SlopesReinforced SlopesAdvantages:Advantages:►► Allows for the use of onAllows for the use of on--site, native material site, native material

rather then importing select material rather then importing select material (reinforcement).(reinforcement).

►► Can eliminate the need for buttress elements such Can eliminate the need for buttress elements such as ripas rip--rap, krap, k--rails, etc. rails, etc. (reinforcement).(reinforcement).

►► Reduces the area and volume of fills Reduces the area and volume of fills (reinforcement).(reinforcement).

►► Aids in compaction during construction Aids in compaction during construction (separation, (separation, reinforcement, drainage).reinforcement, drainage).

►► Can stabilize large landslides by unloading the Can stabilize large landslides by unloading the head, reinforcing the toe, and providing internal head, reinforcing the toe, and providing internal drainage drainage (separation, reinforcement, drainage).(separation, reinforcement, drainage).

Page 62: Geosynthetics in Forestry Application

Reinforced SlopesReinforced Slopes

Disadvantages:Disadvantages:►►Consultant fees for design.Consultant fees for design.►►Use of improper geosynthetic for the given Use of improper geosynthetic for the given

function and site conditions.function and site conditions.►►Requires more complex construction Requires more complex construction

techniques (keying, benching) and more techniques (keying, benching) and more stringent construction specifications stringent construction specifications (moisture conditioning, compaction).(moisture conditioning, compaction).

Page 63: Geosynthetics in Forestry Application

Accepted Design ProcedureAccepted Design Procedure1.1. Address cause of original failure.Address cause of original failure.2.2. Establish the geometric, loading, and performance Establish the geometric, loading, and performance

requirements for design.requirements for design.3.3. Determine the subsurface Determine the subsurface stratigraphystratigraphy and the and the

engineering properties of the natural soils.engineering properties of the natural soils.4.4. Determine the engineering properties of the available fill Determine the engineering properties of the available fill

soils.soils.5.5. Establish design parameters for the reinforcement Establish design parameters for the reinforcement

(design reinforcement strength, durability criteria, soil(design reinforcement strength, durability criteria, soil--reinforcement interaction).reinforcement interaction).

6.6. Determine the factor of safety of the unreinforced slope. Determine the factor of safety of the unreinforced slope. 7.7. Design reinforcement to provide stable slope.Design reinforcement to provide stable slope.8.8. Check external stability.Check external stability.9.9. Evaluate requirements for subsurface and surface water Evaluate requirements for subsurface and surface water

control. control. FHWA HI-95-038

Page 64: Geosynthetics in Forestry Application
Page 65: Geosynthetics in Forestry Application
Page 66: Geosynthetics in Forestry Application

FHWA HI-00-043

Page 67: Geosynthetics in Forestry Application

Challenges of Simplified DesignChallenges of Simplified Design

►►Assessment of onAssessment of on--site materials.site materials.►►Assessment of Global Stability.Assessment of Global Stability.►►Accountability that the work was performed Accountability that the work was performed

as designed. Needs oversight by designer as designed. Needs oversight by designer or designee.or designee.

►►Evaluating the appropriateness of the Evaluating the appropriateness of the proposed repairs. proposed repairs.

Page 68: Geosynthetics in Forestry Application

Developing Soil StrengthsDeveloping Soil Strengths

Page 69: Geosynthetics in Forestry Application

TRA#1TRA#1 USCSUSCS►►Sand = Sand = SWSW--SPSP►►Sandy loam = Sandy loam = SCSC--SMSM►►Loam = Loam = SCSC--SMSM►►Silt loam = Silt loam = MLML►►Clay loam = Clay loam = CLCL--MLML►►Clay = Clay = CLCL--CHCH

Forestry Technical Rule Addendum No. 1

Page 70: Geosynthetics in Forestry Application

FHWA HI-00-043

Global StabilityGlobal StabilityIssuesIssues

Page 71: Geosynthetics in Forestry Application

SummarySummary

►► Erosion Control SystemsErosion Control Systems

Training.Training.

Easy access to available information.Easy access to available information.

►► Soft Subgrade Reinforcement and SeparationSoft Subgrade Reinforcement and Separation

Training.Training.

Easy access to available information.Easy access to available information.

Page 72: Geosynthetics in Forestry Application

SummarySummary

►► Subsurface DrainageSubsurface Drainage

Training.Training.

Easy access to available information.Easy access to available information.

Simplified design guidelinesSimplified design guidelines..

►► Reinforced SlopesReinforced Slopes

Training.Training.

Easy access to available information.Easy access to available information.

Simplified design guidelinesSimplified design guidelines..

Page 73: Geosynthetics in Forestry Application