geni engineering conference report oct. 9-10, 2007 minneapolis slides available at masaki hirabaru...
TRANSCRIPT
GENI Engineering Conference Report
Oct. 9-10, 2007 @ Minneapolis
slides available at
http://www.geni.net/geni-engineering-conference/
Masaki Hirabaru and Kiyohide NakauchiNICT
Copyright © 2007 National Institute of Information and Communications Technology. All Rights Reserved.
Participants 150-200 about people
2
New Faces (NSF) Program Director
Guru Parulkar-> Allison Mankin -> Suzi Iacono (Senior Science Advisor)
Division Director: Taieb Znati
Chip ElliottProject Director
Henry YehProject Manager Craig Partridge
Outreach Director
Heidi Picher DempseyOperations &
Integration Director
Kristin RauschenbachSubstrate Architect
Aaron Falk(Community Nominee)Engineering Architect
GPO Leadership
3
WGs
Former WGs★GENI Planning Group Research Coordinat
ion Facility Architecture Backbone Network Distributed Service
s Wireless Subnets
New WGs★GENI Project Office (Chip Elliott) End-user Opt-in (Henning Schulzrinne) Experiment Workflow and Services (Jay L
epreau, Jeff Chase) Narrow Waist (Larry Peterson, John Wrocl
awski) Operations, Management, Integration, &
Security (Heidi Picher Dempsey) Substrate (Joe Evans, Kristin
Rauschenbach)
WGs are sort of kick-off to review former WGs, to define charters, and to confirm scopes if overlapped
Testbed/Operation people involved as well as research people
wireless, optical get marged
O&M
AggregateControl
Measure-ments
Components
Aggregate A
O&MMeasure-
ments
Components
Aggregate B
Researcherwith Tools
Clearinghouse
List ofOrganizations
List ofAggregates
O&M Policy
Measurement Plane
Control Plane
Data Plane
Federation
Trust
Interface
Internet
Opt-inUser (??)
AggregateControl
GENI Block Diagram
ResearchOrganization
End-User Opt-In WGHenning Schulzrinne
Substrate WGJoe EvansKristin Rauschenbach
Narrow Waist WGLarry Peterson, John Wroclawski
Experimenter Workflow & Services WGJay Lepreau, Jeff Chase
Operations, Management, Integration, & Security WGHeidi Picher Dempsey
Current Timelinefor GENI Planning and Construction
Planning Phase Construction Phase Operations Phase
3-4 years 5 years TBD years
June 2007
12 months
PDR FDR
18-30 months
CDR
9 monthsEarly 2008
GENI Engineering ConferencesSolicitations issued for new prototypes & trials
Original plan:
Early 2006 Early 2007 Early 2008
Construction will be delayed 2009 to 2011 or beyond
6
Focusing on PrototypingSubcontract Timelines (estimated, subject to change)
Dec. 17, 2007 Solicitation issues on geni.net
Feb. 15, 2008 Proposals due, 5 PM your local time
May 15, 2008 Winners notified
Types of SubcontractsType of Work Duration Suggested
Total ValueEst. # Contracts
Analyses, papers, participation in working groups
3 to 24 months Up to$30 K
25
Prototypes (*) 12 to 24 months Up to$750 K
15
Integration Trials 24 months Up to$950 K
4
GPO solicitation 2006: $12.5Mx4yrs for GPO, additional $10Mx4 for subcontractssecured : subcontracts $7.5M x 3years ($23M)
7
NICT: Nakao, Nakauchi, HirabaruNII: (1)KDDI: (1)NEC: Iwata and (2)WIDE: (1)NTT: (2)NTT Docomo: (1)
Korea: NIA (1) and UM Ph.D Strudent (1)
Japanese Participents:
Future Meeting: 2nd GENI Engineering Conference: Feb. 2008
Side-Meeting:10/10 GENI International Lunch MeetingLed by Ellen (GSC co-chair)NICT 3, NEC 3, KDDI 1, Hitachi 2 people joinedConsensus: Will keep going on as a form of BOF.