general presentation of bouygues e&s group

26
FRANCE-TANZANIA BUSINESS FORUM Presentation of T&D – Solar PV Activities 6 th April 2017

Upload: others

Post on 31-Dec-2021

3 views

Category:

Documents


0 download

TRANSCRIPT

FRANCE-TANZANIA BUSINESS FORUM

Presentation of T&D – Solar PV Activities

6th April 2017

General Presentation of BOUYGUES E&S Group

3

BOUYGUES Energies & Services in short

€2.2bn turnover

* Figures 2016

Key figures for 2016

Employees

127,000____

Turnover

€31.77 billion

Strong Financial Structure

Financial Structure

Employees

50,000____

Turnover

€11.80 billion

100%

Employees

12,600____

Turnover

€2.20 billion

100%

3 major fields of expertise

Energy and digital networks

Electrical, climatic and mechanical

engineering

FacilityManagement

March 2013Corporate presentation

49%of turnover

2016

26%of turnover

2016

25%Of turnover

2016

Both a global and a local player

200branches in

France 14 %of turnover in the UK

Corporate presentation

Presence in

30countries

30%of turnover

internationally

8%of turnover in Africa

PRESENCE IN AFRICA

• Cameroon• Congo• Cote d’Ivoire•Djibouti• Ethiopia•Gabon•Mauritania•Mozambique• Rwanda• South Africa• Tanzania

PRESENCE IN ASIA &

PACIFIC

• Thailand• Philippines• Australia• Japan

OPERATIONS

BUSINESS DEVELOPMENT

ENGINEERING

SUPPORT

T&D’s Organization

RTE, SNCF, RATP ---------- France

FINGRID ---------------------Finland

EDM ----------------- Mozambique

SNE ------------------------- Congo B.

EEPCO ---------------------- Ethiopia

CIE -------------------- Cote d’Ivoire

ENI Congo --------------- Congo B.

DESIGN - ENGINEERING

TENDERING

R&D - INNOVATION

IT SOLUTIONS

H.R

Q . H . S . E

LEGAL & FINANCE

A structured organization

dedicated to its clients

ORGANIZATION CLIENTS

Worldwide player in energies and services

March 2013Corporate presentation

OPERATE

An integrated approach underlying our commitment to results

Integrated solutions ENERGIES + SERVICES

to accompany our Public and Private Clients sustainably over the long term

DESIGN BUILD MAINTAIN

10

FOCUS ON T&D ACTIVITIES

BOUYGUES E&S offers a Global Approach

FROM POWER GENERATION TO END-USER

A Team of Experts and Professionals

11From generation to end-user

•Grid Studies

•Electrical & Mechanical design

•OPGW

•EPCMS

•Underground Cables

•Special Foundations

•Solar Farms

•Drone

•Civil Works

•Mechanical & Electrical Works

•Telecoms and SCADA

•Rural Electrification

•Urban Networks

•Street Lighting & City Box

DistributionSub

Stations

OHLSpecialized Activities

12

TYPICAL REFERENCES &

ONGOING PROJECTS

14

OHL

FRANCE

BOUYGUES E&S builds for RTE 2x400kV lines

in Normandy (West of France).

Those new power lines are connected to the future Nuclear Power Station of Flamanville(completed in 2013).

OHL

FINLAND

BOUYGUES E&S builds of a second 400kV line, parallel to an existing 400kV line in operation that is also modified.

Located in a wooded area with many lakes and difficult access, this line will strengthen the Finnish grid and the interconnection with Russia.

• 2 ½ year project

• 96 km long

• Guyed towers

INTEGRATED PROJECT

SUBSTATION & OHL

CONGO B.

BOUYGUES E&S built and renovated extra high voltage power lines and transformer substations to transport electricity between Pointe Noire and Brazzaville

• 35 months • 20 worksites spread over 500 km • 8,400 km² of brush to clear• 2 site accommodation

compounds• 8 substations (construction

or renovation)• 10 stretches of extra high

voltage power lines, a total of 755 km

• 379 pylons

INTEGRATED PROJECT

SUBSTATION, OHL & SCADA

SYSTEM

GABON

Extension over 63 kilometers of a high voltage line north of the town of Oyem, and electrification of all villages to the borders with Cameroonand Equatorial Guinea in the north, and of the town of Minvoul in the east

• 110 villages in rural areas

• 30,000 inhabitants

SUBSTATION

COTE D’IVOIRE(Ivory Coast)

BOUYGUES E&S designed and built the Tongon gold

mine’s power supply

• extra high voltage substation at Korhogo

• 90 kV line from Korhogo to Tongon

• 90/33/11 kV substation atTongon

POWERGENERATION

THAILAND (2015)Construction of a Solar Project

(3 x 10 MWp)

PHILIPPINES (2016)Construction of a Solar Project

(132MWp – 108MVA)Largest in South-East Asia

Complete EPC solution

• Excavations• Panel foundations and structures• Installation of panels• Earthing and AC/DC cabling• Installation of electrical equipment• Connection of panels / inverters / PDL• Video surveillance and lighting

24

OHL

MOZAMBIQUE

BOUYGUES E&S has built for a Coal Mine

(VALE) a 2x220kV line in Mozambique (Tete Province).

The line includes a crossing of the Zambezi

River in one span of 1,600 meters long

(amongst top 25 in the world)

completed in December 2015.

26

INTEGRATED PROJECTSUBSTATION, OHL &

DISTRIBUTION

MOZAMBIQUE

• design and build the power distributionnetwork in the country’s northern provinces(2007- 2010)

• 120 km of LV distribution network• A power network of 940 km• Electricity supplied to 22,000 homes (4,200

new connections)• Supply and installation of 3 substations (total

of 35 MVA)• 23 km of HV line on steel lattice support• Construction and refurbishment of 47

distribution substations (50 to 500 Kva)

RWANDA-UGANDA

INTERCONNECTION

Rwanda section

220 kV DC Transmission linefrom Shango S/S to Mirama

≈ 98 km

(completed in December2015)

28

NATIONAL DISPATCHING &

“PALMERAIE” SUBSTATION

DJIBOUTI

Global Turnkey Project

Construction of the National Dispatching and he 63/20 kV

substation installed in two buildings

Key figures

1 dispatching building of 750 m²

Construction of 63 kV building (7bays)

Construction of 20 kV building

40 MVA 63/20 kV transformer

30

BOUYGUES E&Son going projects

KENYA – TANZANIA INTERCONNECTION

HIGH VOLTAGE TRANSMISSION LINE

Lot T2

Arusha - Babati400 kV – 150 km

Main features

• EPC contract (turnkey) : • 395 steel towers• 10,000 tons of steel• 20,000 cum of concrete• 2,000 km of cables

Interconnection KENYA - TANZANIA : 400 kV Double Circuit

Lot T1

Lot K1

Lot T3

Lot T2

32

Mauritania :National Dispatching Centre in consortium with SIEMENS

Tanzania :Kenya – Tanzania interconnection (lot T2) : 150 km 400 kV DC

Cameroon :Nachtigal HPP : connection to the national grid (50 km 225 kV DC)Douala HV Network Strengthening : 225 & 90 kV OHTL and substations (ECA funding)

Cote d’Ivoire :CLSG : Cote d’Ivoire – Liberia interconnection (225 kV) 200 km

Australia :200 MW Solar PV

On-going projects

44

“Australia” Bouygues E&S’s head office

• Certified “High Quality Energy Standard*”

• 11th building awarded “low carbon footprint*”

certification

• Consumption target of35 kWhpe/m²/year

• Biomass heating and absorption chiller

• Electricity production by solar panels

• Infrastructure network Ecoflex’IT® and

monitoring by Hypervision®

*French certification standard

THANK YOU

FOR YOUR ATTENTION

Christophe BARTHOLOME