ga106 – roll -up door reset augusta, ga...ga106 - roll-up door reset may 22, 2015 augusta, ga...

186
U.S. Army Corps of Engineers Charleston District Charleston, South Carolina May 22, 2015 Specifications GA106 ROLL-UP DOOR RESET Augusta, GA

Upload: others

Post on 11-Mar-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: GA106 – ROLL -UP DOOR RESET Augusta, GA...GA106 - Roll-Up Door Reset May 22, 2015 Augusta, GA SECTION 01 33 00.00 13 SUBMITTAL REGISTER COVER PAGE 07/13 PART 1 GENERAL 1.1 SUBMITTAL

U.S. Army Corps of Engineers – Charleston District

Charleston, South Carolina

May 22, 2015

Specifications

GA106 – ROLL-UP DOOR RESET

Augusta, GA

dlinder
2015-0522 Alexander
dlinder
2015-0522 Avila
dlinder
2015-0522 Hoke
Page 2: GA106 – ROLL -UP DOOR RESET Augusta, GA...GA106 - Roll-Up Door Reset May 22, 2015 Augusta, GA SECTION 01 33 00.00 13 SUBMITTAL REGISTER COVER PAGE 07/13 PART 1 GENERAL 1.1 SUBMITTAL

GA106 - Roll-Up Door Reset May 22, 2015Augusta, GA

PROJECT TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

01 33 00.00 13 SUBMITTAL REGISTER COVER PAGE01 42 00 SOURCES FOR REFERENCE PUBLICATIONS

DIVISION 02 - EXISTING CONDITIONS

02 41 00 DEMOLITION AND DECONSTRUCTION02 81 00 TRANSPORTATION AND DISPOSAL OF HAZARDOUS MATERIALS02 83 13.00 20 LEAD IN CONSTRUCTION02 84 00 ENVIRONMENTAL EVALUATION REPORT02 84 16 HANDLING OF LIGHTING BALLASTS AND LAMPS CONTAINING PCBs

AND MERCURY

DIVISION 05 - METALS

05 05 23.16 STRUCTURAL WELDING05 12 00 STRUCTURAL STEEL05 50 13 MISCELLANEOUS METAL FABRICATIONS

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

07 21 16 MINERAL FIBER BLANKET INSULATION

DIVISION 08 - OPENINGS

08 33 23 OVERHEAD COILING DOORS

DIVISION 09 - FINISHES

09 90 00 PAINTS AND COATINGS

DIVISION 13 - SPECIAL CONSTRUCTION

13 48 00 SEISMIC PROTECTION FOR MISCELLANEOUS EQUIPMENT

DIVISION 26 - ELECTRICAL

26 00 00.00 20 BASIC ELECTRICAL MATERIALS AND METHODS26 05 48.00 10 SEISMIC PROTECTION FOR ELECTRICAL EQUIPMENT26 20 00 INTERIOR DISTRIBUTION SYSTEM26 24 16.00 40 PANELBOARDS

-- End of Project Table of Contents --

PROJECT TABLE OF CONTENTS Page 1

Page 3: GA106 – ROLL -UP DOOR RESET Augusta, GA...GA106 - Roll-Up Door Reset May 22, 2015 Augusta, GA SECTION 01 33 00.00 13 SUBMITTAL REGISTER COVER PAGE 07/13 PART 1 GENERAL 1.1 SUBMITTAL

GA106 - Roll-Up Door Reset May 22, 2015Augusta, GA

SECTION 01 33 00.00 13

SUBMITTAL REGISTER COVER PAGE07/13

PART 1 GENERAL

1.1 SUBMITTAL REGISTER FOR DIVISIONS 2 - 48

This document serves as a cover page for the Submittal Register for Divisions 2 through 48 Specification Sections. Information related to preparing, using and maintaining the Submittal Register shall be in accordance with Section 01 33 00 SUBMITTAL PROCEDURES.

PART 2 PRODUCTS

Not Used.

PART 3 EXECUTION

Not Used.

-- End of Section --

SECTION 01 33 00.00 13 Page 1

Page 4: GA106 – ROLL -UP DOOR RESET Augusta, GA...GA106 - Roll-Up Door Reset May 22, 2015 Augusta, GA SECTION 01 33 00.00 13 SUBMITTAL REGISTER COVER PAGE 07/13 PART 1 GENERAL 1.1 SUBMITTAL

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 10 PAGES

W912HP-11-D-0012

81st Lifecycle Resets at Various Locations-GA106 Roll-Up Dr Reset

02 41 00 SD-01 Preconstruction Submittals

1.9 GExisting Conditions

SD-07 Certificates

1.2.1 GDemolition Plan

1.6 GNotification

SD-11 Closeout Submittals

Receipts

02 81 00 SD-03 Product Data

3.1 GOnsite Hazardous Waste

Management

3.4Notices of Non-Compliance and

Notices of Violation

2.2Packaging

SD-06 Test Reports

3.6 GRecordkeeping

3.7Spill Response

3.6 GException Report

SD-07 Certificates

1.4.3Certification

1.4.2Security Plans

1.4.1 GTransportation and Disposal

Coordinator

1.4.2 GTraining

USEPA Offsite Policy

3.4.5Certificates of Disposal

SUBMITTAL REGISTERCONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:SCHEDULE DATES

CONTRACTORACTION

APPROVING AUTHORITY

ACTIVITY NO

TRANSMITTAL NO

SPEC SECT

DESCRIPTION

ITEM SUBMITTED

PARAGRAPH

#

CLASSIFICATION

GOVT OR A/E REVWR SUBMIT

APPROVALNEEDED

BY

MATERIALNEEDED

BY

ACTION CODE

DATEOF

ACTION

DATE FWDTO APPRAUTH/

DATE RCDFROMCONTR

DATE FWDTO OTHERREVIEWER

DATE RCDFROM OTHREVIEWER

ACTION CODE

DATEOF

ACTION

MAILEDTO

CONTR/

DATE RCDFRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

Page 5: GA106 – ROLL -UP DOOR RESET Augusta, GA...GA106 - Roll-Up Door Reset May 22, 2015 Augusta, GA SECTION 01 33 00.00 13 SUBMITTAL REGISTER COVER PAGE 07/13 PART 1 GENERAL 1.1 SUBMITTAL

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 10 PAGES

W912HP-11-D-0012

81st Lifecycle Resets at Various Locations-GA106 Roll-Up Dr Reset

02 81 00 3.4.3 GShipping Documents and

Packagings Certification

GWaste Minimization

02 83 13.00 20 SD-01 Preconstruction Submittals

1.5.2.2 GLead Compliance Plan (LCP)

1.5.1.1 GCompetent Person

1.5.1.2 GTraining Certification

1.5.2.8 GLead waste management plan

3.5.2.1 Gwritten evidence

1.5.2.4 GMedical Examinations

SD-06 Test Reports

1.5.2.3 GSampling results

SD-07 Certificates

GTesting laboratory qualifications

3.4.1.1Clearance Certification

3.5.1.1Clearance Certification

SD-11 Closeout Submittals

Gturn-in documents or weight

tickets

02 84 16 SD-07 Certificates

1.8.1Qualifications of CIH

1.8.1Training Certification

1.8.2PCB and Lamp Removal Work

Plan

1.8.3PCB and Lamp Disposal Plan

SD-11 Closeout Submittals

SUBMITTAL REGISTERCONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:SCHEDULE DATES

CONTRACTORACTION

APPROVING AUTHORITY

ACTIVITY NO

TRANSMITTAL NO

SPEC SECT

DESCRIPTION

ITEM SUBMITTED

PARAGRAPH

#

CLASSIFICATION

GOVT OR A/E REVWR SUBMIT

APPROVALNEEDED

BY

MATERIALNEEDED

BY

ACTION CODE

DATEOF

ACTION

DATE FWDTO APPRAUTH/

DATE RCDFROMCONTR

DATE FWDTO OTHERREVIEWER

DATE RCDFROM OTHREVIEWER

ACTION CODE

DATEOF

ACTION

MAILEDTO

CONTR/

DATE RCDFRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

Page 6: GA106 – ROLL -UP DOOR RESET Augusta, GA...GA106 - Roll-Up Door Reset May 22, 2015 Augusta, GA SECTION 01 33 00.00 13 SUBMITTAL REGISTER COVER PAGE 07/13 PART 1 GENERAL 1.1 SUBMITTAL

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 10 PAGES

W912HP-11-D-0012

81st Lifecycle Resets at Various Locations-GA106 Roll-Up Dr Reset

02 84 16 3.5.2Transporter certification

Certification of Decontamination

3.5.2.1Certificate of Disposal and/or

recycling

3.5.3.2DD Form 1348-1

05 05 23.16 SD-01 Preconstruction Submittals

3.2Welding Quality Assurance Plan

SD-03 Product Data

1.3 GWelding Procedure Qualifications

1.3.5Welder, Welding Operator, and

Tacker Qualification

1.3.6Inspector Qualification

1.3.2Previous Qualifications

1.3.3Pre-qualified Procedures

2.2Welding Electrodes and Rods

SD-06 Test Reports

3.3Nondestructive Testing

SD-07 Certificates

1.3.1Certified Welding Procedure

Specifications (WPS)

1.3.1Certified Brazing Procedure

Specifications (BPS)

1.3.1Certified Procedure Qualification

Records (PQR)

1.3.1Certified Welder Performance

Qualifications (WPQ)

SUBMITTAL REGISTERCONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:SCHEDULE DATES

CONTRACTORACTION

APPROVING AUTHORITY

ACTIVITY NO

TRANSMITTAL NO

SPEC SECT

DESCRIPTION

ITEM SUBMITTED

PARAGRAPH

#

CLASSIFICATION

GOVT OR A/E REVWR SUBMIT

APPROVALNEEDED

BY

MATERIALNEEDED

BY

ACTION CODE

DATEOF

ACTION

DATE FWDTO APPRAUTH/

DATE RCDFROMCONTR

DATE FWDTO OTHERREVIEWER

DATE RCDFROM OTHREVIEWER

ACTION CODE

DATEOF

ACTION

MAILEDTO

CONTR/

DATE RCDFRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

Page 7: GA106 – ROLL -UP DOOR RESET Augusta, GA...GA106 - Roll-Up Door Reset May 22, 2015 Augusta, GA SECTION 01 33 00.00 13 SUBMITTAL REGISTER COVER PAGE 07/13 PART 1 GENERAL 1.1 SUBMITTAL

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 10 PAGES

W912HP-11-D-0012

81st Lifecycle Resets at Various Locations-GA106 Roll-Up Dr Reset

05 05 23.16 1.3.1Certified Brazer Performance

Qualifications (BPQ)

05 12 00 SD-02 Shop Drawings

1.5.2 GFabrication drawings

SD-03 Product Data

2.6.2Shop primer

2.4.1Welding electrodes and rods

2.4.2Non-Shrink Grout

SD-06 Test Reports

2.6.2Class B coating

2.3Bolts, nuts, and washers

SD-07 Certificates

2.2Steel

2.3Bolts, nuts, and washers

2.5Galvanizing

1.3AISC Fabrication Plant Quality

Certification

1.5.3.1Welding procedures and

qualifications

2.4.1Welding electrodes and rods

05 50 13 SD-02 Shop Drawings

2.4 Gstructural steel door frames

2.3 Gangles and plates

SD-03 Product Data

2.4Structural steel door frames

07 21 16 SD-03 Product Data

SUBMITTAL REGISTERCONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:SCHEDULE DATES

CONTRACTORACTION

APPROVING AUTHORITY

ACTIVITY NO

TRANSMITTAL NO

SPEC SECT

DESCRIPTION

ITEM SUBMITTED

PARAGRAPH

#

CLASSIFICATION

GOVT OR A/E REVWR SUBMIT

APPROVALNEEDED

BY

MATERIALNEEDED

BY

ACTION CODE

DATEOF

ACTION

DATE FWDTO APPRAUTH/

DATE RCDFROMCONTR

DATE FWDTO OTHERREVIEWER

DATE RCDFROM OTHREVIEWER

ACTION CODE

DATEOF

ACTION

MAILEDTO

CONTR/

DATE RCDFRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

Page 8: GA106 – ROLL -UP DOOR RESET Augusta, GA...GA106 - Roll-Up Door Reset May 22, 2015 Augusta, GA SECTION 01 33 00.00 13 SUBMITTAL REGISTER COVER PAGE 07/13 PART 1 GENERAL 1.1 SUBMITTAL

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 10 PAGES

W912HP-11-D-0012

81st Lifecycle Resets at Various Locations-GA106 Roll-Up Dr Reset

07 21 16 2.1Blanket insulation

Sill sealer insulation

Vapor retarder

Pressure sensitive tape

2.3Accessories

Certification

SD-08 Manufacturer’s Instructions

3.3.1Insulation

08 33 23 SD-02 Shop Drawings

2.3 GOverhead Coiling Doors

1.4 GCounterbalancing Mechanism

2.5 GCounterbalancing Mechanism

1.4 GBack-up Manual Door Operator

2.6 GBack-up Manual Door Operator

1.4 GElectric Door Operators

2.7 GElectric Door Operators

2.3.3 GBottom Bars

1.3 GGuides

2.5.1 GMounting Brackets

2.3.9 GOverhead Drum

1.4 GHood

1.4 GPainting

1.3 GInstallation Drawings

SD-03 Product Data

2.3 GOverhead Coiling Doors

2.4 GHardware

SUBMITTAL REGISTERCONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:SCHEDULE DATES

CONTRACTORACTION

APPROVING AUTHORITY

ACTIVITY NO

TRANSMITTAL NO

SPEC SECT

DESCRIPTION

ITEM SUBMITTED

PARAGRAPH

#

CLASSIFICATION

GOVT OR A/E REVWR SUBMIT

APPROVALNEEDED

BY

MATERIALNEEDED

BY

ACTION CODE

DATEOF

ACTION

DATE FWDTO APPRAUTH/

DATE RCDFROMCONTR

DATE FWDTO OTHERREVIEWER

DATE RCDFROM OTHREVIEWER

ACTION CODE

DATEOF

ACTION

MAILEDTO

CONTR/

DATE RCDFRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

Page 9: GA106 – ROLL -UP DOOR RESET Augusta, GA...GA106 - Roll-Up Door Reset May 22, 2015 Augusta, GA SECTION 01 33 00.00 13 SUBMITTAL REGISTER COVER PAGE 07/13 PART 1 GENERAL 1.1 SUBMITTAL

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 10 PAGES

W912HP-11-D-0012

81st Lifecycle Resets at Various Locations-GA106 Roll-Up Dr Reset

08 33 23 1.4 GCounterbalancing Mechanism

2.5 GCounterbalancing Mechanism

1.4 GBack-Up Manual Door Operator

2.6 GBack-Up Manual Door Operator

1.4 GElectric Door Operators

2.7 GElectric Door Operators

SD-04 Samples

GSelection Samples

GVerification Samples

SD-05 Design Data

2.3 GOverhead Coiling Doors

2.4 GHardware

1.4 GCounterbalancing Mechanism

2.5 GCounterbalancing Mechanism

1.4 GBack-Up Manual Door Operator

2.6 GBack-Up Manual Door Operator

1.4 GElectric Door Operators

2.7 GElectric Door Operators

SD-10 Operation and Maintenance

Data

3.3 GOperation and Maintenance

Manuals

1.4 GMaterials

1.4 GDevices

1.4 GProcedures

1.4 GManufacture's Brochures

SUBMITTAL REGISTERCONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:SCHEDULE DATES

CONTRACTORACTION

APPROVING AUTHORITY

ACTIVITY NO

TRANSMITTAL NO

SPEC SECT

DESCRIPTION

ITEM SUBMITTED

PARAGRAPH

#

CLASSIFICATION

GOVT OR A/E REVWR SUBMIT

APPROVALNEEDED

BY

MATERIALNEEDED

BY

ACTION CODE

DATEOF

ACTION

DATE FWDTO APPRAUTH/

DATE RCDFROMCONTR

DATE FWDTO OTHERREVIEWER

DATE RCDFROM OTHREVIEWER

ACTION CODE

DATEOF

ACTION

MAILEDTO

CONTR/

DATE RCDFRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

Page 10: GA106 – ROLL -UP DOOR RESET Augusta, GA...GA106 - Roll-Up Door Reset May 22, 2015 Augusta, GA SECTION 01 33 00.00 13 SUBMITTAL REGISTER COVER PAGE 07/13 PART 1 GENERAL 1.1 SUBMITTAL

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 10 PAGES

W912HP-11-D-0012

81st Lifecycle Resets at Various Locations-GA106 Roll-Up Dr Reset

08 33 23 1.4 GParts Lists

09 90 00 SD-02 Shop Drawings

3.11Piping identification

3.11stencil

SD-03 Product Data

Certification

2.1 GCoating

2.1Manufacturer's Technical Data

Sheets

3.2.5Sealant

SD-04 Samples

1.9 GColor

SD-07 Certificates

1.3Applicator's qualifications

1.4.1.2 GQualification Testing

SD-08 Manufacturer’s Instructions

3.3.1Application instructions

3.7.2Mixing

1.7.2Manufacturer's Material Safety

Data Sheets

SD-10 Operation and Maintenance

Data

2.1 GCoatings:

13 48 00 SD-02 Shop Drawings

3.1 GBracing

SUBMITTAL REGISTERCONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:SCHEDULE DATES

CONTRACTORACTION

APPROVING AUTHORITY

ACTIVITY NO

TRANSMITTAL NO

SPEC SECT

DESCRIPTION

ITEM SUBMITTED

PARAGRAPH

#

CLASSIFICATION

GOVT OR A/E REVWR SUBMIT

APPROVALNEEDED

BY

MATERIALNEEDED

BY

ACTION CODE

DATEOF

ACTION

DATE FWDTO APPRAUTH/

DATE RCDFROMCONTR

DATE FWDTO OTHERREVIEWER

DATE RCDFROM OTHREVIEWER

ACTION CODE

DATEOF

ACTION

MAILEDTO

CONTR/

DATE RCDFRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

Page 11: GA106 – ROLL -UP DOOR RESET Augusta, GA...GA106 - Roll-Up Door Reset May 22, 2015 Augusta, GA SECTION 01 33 00.00 13 SUBMITTAL REGISTER COVER PAGE 07/13 PART 1 GENERAL 1.1 SUBMITTAL

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 10 PAGES

W912HP-11-D-0012

81st Lifecycle Resets at Various Locations-GA106 Roll-Up Dr Reset

13 48 00 3.4 GResilient Vibration Isolation

Devices

2.1 GEquipment Requirements

SD-03 Product Data

3.1 GBracing

2.1 GEquipment Requirements

SD-06 Test Reports

3.3 GAnchor Bolts

26 05 48.00 10 SD-02 Shop Drawings

1.3 GEquipment Requirements

SD-03 Product Data

1.3 GEquipment Requirements

1.2.4 GContractor Designed Bracing

26 20 00 SD-02 Shop Drawings

2.12 GTransformers

3.1.8.1 GMarking strips

SD-03 Product Data

2.11 GReceptacles

GCircuit breakers

2.9 GSwitches

2.12 GTransformers

2.14 GMotor controllers

GCombination motor controllers

2.15 GManual motor starters

2.22 GSurge protective devices

SD-06 Test Reports

SUBMITTAL REGISTERCONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:SCHEDULE DATES

CONTRACTORACTION

APPROVING AUTHORITY

ACTIVITY NO

TRANSMITTAL NO

SPEC SECT

DESCRIPTION

ITEM SUBMITTED

PARAGRAPH

#

CLASSIFICATION

GOVT OR A/E REVWR SUBMIT

APPROVALNEEDED

BY

MATERIALNEEDED

BY

ACTION CODE

DATEOF

ACTION

DATE FWDTO APPRAUTH/

DATE RCDFROMCONTR

DATE FWDTO OTHERREVIEWER

DATE RCDFROM OTHREVIEWER

ACTION CODE

DATEOF

ACTION

MAILEDTO

CONTR/

DATE RCDFRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

Page 12: GA106 – ROLL -UP DOOR RESET Augusta, GA...GA106 - Roll-Up Door Reset May 22, 2015 Augusta, GA SECTION 01 33 00.00 13 SUBMITTAL REGISTER COVER PAGE 07/13 PART 1 GENERAL 1.1 SUBMITTAL

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 10 PAGES

W912HP-11-D-0012

81st Lifecycle Resets at Various Locations-GA106 Roll-Up Dr Reset

26 20 00 3.5.2 G600-volt wiring test

3.5.5 GGrounding system test

3.5.3 GTransformer tests

3.5.4 GGround-fault receptacle test

SD-07 Certificates

2.10 GFuses

SD-09 Manufacturer’s Field

Reports

2.24.1Transformer factory tests

SD-10 Operation and Maintenance

Data

1.5.1 GElectrical Systems

26 24 16.00 40 SD-02 Shop Drawings

1.2Detail Drawings

1.2Outline Drawings

SD-03 Product Data

2.1 GPanelboards

2.3 GDirectory Card and Holder

SD-04 Samples

2.1Keys

SD-06 Test Reports

GContinuity Tests

3.2 GInsulation Tests

SD-07 Certificates

1.2Statements

SD-08 Manufacturer’s Instructions

SUBMITTAL REGISTERCONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:SCHEDULE DATES

CONTRACTORACTION

APPROVING AUTHORITY

ACTIVITY NO

TRANSMITTAL NO

SPEC SECT

DESCRIPTION

ITEM SUBMITTED

PARAGRAPH

#

CLASSIFICATION

GOVT OR A/E REVWR SUBMIT

APPROVALNEEDED

BY

MATERIALNEEDED

BY

ACTION CODE

DATEOF

ACTION

DATE FWDTO APPRAUTH/

DATE RCDFROMCONTR

DATE FWDTO OTHERREVIEWER

DATE RCDFROM OTHREVIEWER

ACTION CODE

DATEOF

ACTION

MAILEDTO

CONTR/

DATE RCDFRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

Page 13: GA106 – ROLL -UP DOOR RESET Augusta, GA...GA106 - Roll-Up Door Reset May 22, 2015 Augusta, GA SECTION 01 33 00.00 13 SUBMITTAL REGISTER COVER PAGE 07/13 PART 1 GENERAL 1.1 SUBMITTAL

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 10 PAGES

W912HP-11-D-0012

81st Lifecycle Resets at Various Locations-GA106 Roll-Up Dr Reset

26 24 16.00 40 2.1Panelboards

SUBMITTAL REGISTERCONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:SCHEDULE DATES

CONTRACTORACTION

APPROVING AUTHORITY

ACTIVITY NO

TRANSMITTAL NO

SPEC SECT

DESCRIPTION

ITEM SUBMITTED

PARAGRAPH

#

CLASSIFICATION

GOVT OR A/E REVWR SUBMIT

APPROVALNEEDED

BY

MATERIALNEEDED

BY

ACTION CODE

DATEOF

ACTION

DATE FWDTO APPRAUTH/

DATE RCDFROMCONTR

DATE FWDTO OTHERREVIEWER

DATE RCDFROM OTHREVIEWER

ACTION CODE

DATEOF

ACTION

MAILEDTO

CONTR/

DATE RCDFRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

Page 14: GA106 – ROLL -UP DOOR RESET Augusta, GA...GA106 - Roll-Up Door Reset May 22, 2015 Augusta, GA SECTION 01 33 00.00 13 SUBMITTAL REGISTER COVER PAGE 07/13 PART 1 GENERAL 1.1 SUBMITTAL

GA106 - Roll-Up Door Reset May 22, 2015Augusta, GA

SECTION 01 42 00

SOURCES FOR REFERENCE PUBLICATIONS11/14

PART 1 GENERAL

1.1 REFERENCES

Various publications are referenced in other sections of the specifications to establish requirements for the work. These references are identified in each section by document number, date and title. The document number used in the citation is the number assigned by the standards producing organization (e.g. ASTM B564 Standard Specification for Nickel Alloy Forgings). However, when the standards producing organization has not assigned a number to a document, an identifying number has been assigned for reference purposes.

1.2 ORDERING INFORMATION

The addresses of the standards publishing organizations whose documents are referenced in other sections of these specifications are listed below, and if the source of the publications is different from the address of the sponsoring organization, that information is also provided. Documents listed in the specifications with numbers which were not assigned by the standards producing organization should be ordered from the source by title rather than by number.

AMERICAN CONFERENCE OF GOVERNMENTAL INDUSTRIAL HYGIENISTS (ACGIH)1330 Kemper Meadow DriveCincinnati, OH 45240Ph: 513-742-2020 or 513-742-6163Fax: 513-742-3355E-mail: [email protected]: http://www.acgih.org

AMERICAN INDUSTRIAL HYGIENE ASSOCIATION (AIHA)3141 Fairview Park Dr, Suite 777Falls Church, VA 22042Tel: 703-849-8888Fax: 703-207-3561E-mail: [email protected] http://www.aiha.org

AMERICAN INSTITUTE OF STEEL CONSTRUCTION (AISC)One East Wacker Drive, Suite 700Chicago, IL 60601-1802Ph: 312-670-2400Fax: 312-670-5403Bookstore: 800-644-2400E-mail: [email protected]: http://www.aisc.org

AMERICAN SOCIETY FOR NONDESTRUCTIVE TESTING (ASNT)P.O. Box 285181711 Arlingate LaneColumbus, OH 43228-0518

SECTION 01 42 00 Page 1

Page 15: GA106 – ROLL -UP DOOR RESET Augusta, GA...GA106 - Roll-Up Door Reset May 22, 2015 Augusta, GA SECTION 01 33 00.00 13 SUBMITTAL REGISTER COVER PAGE 07/13 PART 1 GENERAL 1.1 SUBMITTAL

GA106 - Roll-Up Door Reset May 22, 2015Augusta, GA

Ph: 800-222-2768; 614-274-6003Fax: 614-274-6899E-mail: [email protected]: http://www.asnt.org

AMERICAN SOCIETY OF CIVIL ENGINEERS (ASCE)1801 Alexander Bell DriveReston, VA 20191Ph: 703-295-6300; 800-548-2723E-mail: [email protected]: http://www.asce.org

AMERICAN SOCIETY OF HEATING, REFRIGERATING AND AIR-CONDITIONING ENGINEERS (ASHRAE)1791 Tullie Circle, NEAtlanta, GA 30329Ph: 800-527-4723 or 404-636-8400Fax: 404-321-5478E-mail: [email protected]: http://www.ashrae.org

AMERICAN SOCIETY OF SAFETY ENGINEERS (ASSE/SAFE)1800 East Oakton StreetDes Plaines, IL 60018Ph: 847-699-2929Internet: http://www.asse.org

AMERICAN WELDING SOCIETY (AWS)13301 NW 47 AveMiami, FL 33054

Ph: 888-WELDING, 305-824-1177, 305-826-6192Fax: 305-826-6195E-mail: [email protected]: http://www.aws.org

ASME INTERNATIONAL (ASME)Two Park Avenue, M/S 10ENew York, NY 10016-5990Ph: 800-843-2763Fax: 973-882-1717E-mail: [email protected]: http://www.asme.org

ASTM INTERNATIONAL (ASTM)100 Barr Harbor Drive, P.O. Box C700West Conshohocken, PA 19428-2959Ph: 877-909-2786Internet: http://www.astm.org

INSTITUTE OF ELECTRICAL AND ELECTRONICS ENGINEERS (IEEE)445 and 501 Hoes LanePiscataway, NJ 08854-4141Ph: 732-981-0060 or 800-701-4333Fax: 732-562-9667E-mail: [email protected]: http://www.ieee.org

SECTION 01 42 00 Page 2

Page 16: GA106 – ROLL -UP DOOR RESET Augusta, GA...GA106 - Roll-Up Door Reset May 22, 2015 Augusta, GA SECTION 01 33 00.00 13 SUBMITTAL REGISTER COVER PAGE 07/13 PART 1 GENERAL 1.1 SUBMITTAL

GA106 - Roll-Up Door Reset May 22, 2015Augusta, GA

INTERNATIONAL ELECTRICAL TESTING ASSOCIATION (NETA)3050 Old Centre Ave. Suite 102Portage, MI 49024Ph: 269-488-6382Internet: http://www.netaworld.org

MASTER PAINTERS INSTITUTE (MPI)2800 Ingleton AvenueBurnaby, BC CANADA V5C 6G7Ph: 1-888-674-8937Fax: 1-888-211-8708E-mail: [email protected] or [email protected]: http://www.mpi.net/

NATIONAL ELECTRICAL MANUFACTURERS ASSOCIATION (NEMA)1300 North 17th Street, Suite 900Arlington, VA 22209Ph: 703-841-3200Internet: http://www.nema.org/

NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)1 Batterymarch ParkQuincy, MA 02169-7471Ph: 617-770-3000Fax: 617-770-0700Internet: http://www.nfpa.org

SOCIETY FOR PROTECTIVE COATINGS (SSPC)40 24th Street, 6th FloorPittsburgh, PA 15222Ph: 412-281-2331Fax: 412-281-9992E-mail: [email protected]: http://www.sspc.org

TELECOMMUNICATIONS INDUSTRY ASSOCIATION (TIA)1320 N. Courthouse Rd., Suite 200Arlington, VA 22201Ph: 703-907-7700Fax: 703-907-7727Internet: http://www.tiaonline.org

U.S. ARMY CORPS OF ENGINEERS (USACE)CRD-C DOCUMENTS available on Internet: http://www.wbdg.org/ccb/browse_cat.php?c=68Order Other Documents from:USACE Publications DepotAttn: CEHEC-IM-PD2803 52nd AvenueHyattsville, MD 20781-1102Ph: 301-394-0081Fax: 301-394-0084E-mail: [email protected]: http://www.publications.usace.army.mil/ or http://www.hnc.usace.army.mil/Missions/Engineering/TECHINFO.aspx

SECTION 01 42 00 Page 3

Page 17: GA106 – ROLL -UP DOOR RESET Augusta, GA...GA106 - Roll-Up Door Reset May 22, 2015 Augusta, GA SECTION 01 33 00.00 13 SUBMITTAL REGISTER COVER PAGE 07/13 PART 1 GENERAL 1.1 SUBMITTAL

GA106 - Roll-Up Door Reset May 22, 2015Augusta, GA

U.S. DEFENSE LOGISTICS AGENCY (DLA)

Fort Belvoir, VA

Internet: http://www.dla.mil

U.S. DEPARTMENT OF DEFENSE (DOD)Order DOD Documents from:Room 3A750-The Pentagon1400 Defense PentagonWashington, DC 20301-1400Ph: 703-571-3343FAX: 215-697-1462E-mail: [email protected]: http://www.ntis.govObtain Military Specifications, Standards and Related Publications from:Acquisition Streamlining and Standardization Information System (ASSIST)Department of Defense Single Stock Point (DODSSP)Document Automation and Production Service (DAPS)Building 4/D700 Robbins AvenuePhiladelphia, PA 19111-5094Ph: 215-697-6396 - for account/password issuesInternet: http://assist.daps.dla.mil/online/start/ ; account registration requiredObtain Unified Facilities Criteria (UFC) from:Whole Building Design Guide (WBDG)National Institute of Building Sciences (NIBS)1090 Vermont Avenue NW, Suite 700Washington, CD 20005Ph: 202-289-7800Fax: 202-289-1092Internet: http://www.wbdg.org/references/docs_refs.php

U.S. GENERAL SERVICES ADMINISTRATION (GSA)General Services Administration1275 First St. NEWashington, DC 20417Ph: 202-501-1231Internet: http://www.gsaelibrary.gsa.gov/ElibMain/home.doObtain documents from:Acquisition Streamlining and Standardization Information System (ASSIST)Internet: https://assist.dla.mil/online/start/ ; account registration required

U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)8601 Adelphi Road College Park, MD 20740-6001Ph: 866-272-6272Fax: 301-837-0483Internet: http://www.archives.govOrder documents from:Superintendent of DocumentsU.S.Government Printing Office (GPO)710 North Capitol Street, NWWashington, DC 20401

SECTION 01 42 00 Page 4

Page 18: GA106 – ROLL -UP DOOR RESET Augusta, GA...GA106 - Roll-Up Door Reset May 22, 2015 Augusta, GA SECTION 01 33 00.00 13 SUBMITTAL REGISTER COVER PAGE 07/13 PART 1 GENERAL 1.1 SUBMITTAL

GA106 - Roll-Up Door Reset May 22, 2015Augusta, GA

Ph: 202-512-1800Fax: 202-512-2104E-mail: [email protected]: http://www.gpoaccess.gov

UNDERWRITERS LABORATORIES (UL)2600 N.W. Lake RoadCamas, WA 98607-8542Ph: 877-854-3577E-mail: [email protected]: http://www.ul.com/UL Directories available through IHS at http://www.ihs.com

PART 2 PRODUCTS

Not used

PART 3 EXECUTION

Not used

-- End of Section --

SECTION 01 42 00 Page 5

Page 19: GA106 – ROLL -UP DOOR RESET Augusta, GA...GA106 - Roll-Up Door Reset May 22, 2015 Augusta, GA SECTION 01 33 00.00 13 SUBMITTAL REGISTER COVER PAGE 07/13 PART 1 GENERAL 1.1 SUBMITTAL

GA106 - Roll-Up Door Reset May 22, 2015Augusta, GA

SECTION 02 41 00

DEMOLITION AND DECONSTRUCTION05/10

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

AMERICAN SOCIETY OF SAFETY ENGINEERS (ASSE/SAFE)

ASSE/SAFE A10.6 (2006) Safety Requirements for Demolition Operations

U.S. ARMY CORPS OF ENGINEERS (USACE)

EM 385-1-1 (2008; Errata 2011 Safety and Health Requirements Manual

U.S. DEFENSE LOGISTICS AGENCY (DLA)

DLA 4145.25 (June 2000) Storage and Handling of Liquefied and Gaseous Compressed Gases and Their Full and Empty Cylinders

U.S. DEPARTMENT OF DEFENSE (DOD)

DOD 4000.25-1-M (2006) MILSTRIP - Military Standard Requisitioning and Issue Procedures

MIL-STD-129 (2014; Rev R; Change 4 2007) Military Marking for Shipment and Storage

U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)

40 CFR 61 National Emission Standards for Hazardous Air Pollutants

49 CFR 173.301 Shipment of Compressed Gases in Cylinders and Spherical Pressure Vessels

1.2 PROJECT DESCRIPTION

1.2.1 Demolition/Deconstruction Plan

Prepare a Demolition Plan and submit proposed salvage, demolition, deconstruction, and removal procedures for approval before work is started. Include in the plan procedures for careful removal and disposition of materials specified to be salvaged, coordination with other work in progress, a disconnection schedule of utility services, a detailed description of methods and equipment to be used for each operation and of the sequence of operations. Coordinate with Waste Management Plan. Provide procedures for safe conduct of the work in accordance with

SECTION 02 41 00 Page 1

Page 20: GA106 – ROLL -UP DOOR RESET Augusta, GA...GA106 - Roll-Up Door Reset May 22, 2015 Augusta, GA SECTION 01 33 00.00 13 SUBMITTAL REGISTER COVER PAGE 07/13 PART 1 GENERAL 1.1 SUBMITTAL

GA106 - Roll-Up Door Reset May 22, 2015Augusta, GA

EM 385-1-1 . Plan shall be approved by Contracting Officer prior to work beginning.

1.2.2 General Requirements

Do not begin demolition until authorization is received from the Contracting Officer. Remove rubbish and debris from the project site; do not allow accumulations inside or outside the buildings. The work includes demolition, deconstruction, salvage of identified items and materials, and removal of resulting rubbish and debris. Remove rubbish and debris from Government property daily, unless otherwise directed. Store materials that cannot be removed daily in areas specified by the Contracting Officer. In the interest of occupational safety and health, perform the work in accordance with EM 385-1-1 , Section 23, Demolition, and other applicable Sections.

1.3 ITEMS TO REMAIN IN PLACE

Take necessary precautions to avoid damage to existing items to remain in place, to be reused, or to remain the property of the Government. Repair or replace damaged items as approved by the Contracting Officer. Coordinate the work of this section with all other work indicated. Construct and maintain shoring, bracing, and supports as required. Ensure that structural elements are not overloaded. Increase structural supports or add new supports as may be required as a result of any cutting, removal, deconstruction, or demolition work performed under this contract. Provide new supports and reinforcement for existing construction weakened by demolition, deconstruction, or removal work. Repairs, reinforcement, or structural replacement require approval by the Contracting Officer prior to performing such work.

1.3.1 Existing Construction Limits and Protection

Do not disturb existing construction beyond the extent indicated or necessary for installation of new construction. Provide temporary shoring and bracing for support of building components to prevent settlement or other movement. Provide protective measures to control accumulation and migration of dust and dirt in all work areas. Remove snow, dust, dirt, and debris from work areas daily.

1.3.2 Weather Protection

For portions of the building to remain, protect building interior and materials and equipment from the weather at all times.

1.3.3 Trees

Protect trees within the project site which might be damaged during demolition or deconstruction, and which are indicated to be left in place. Replace any tree designated to remain that is damaged during the work under this contract with like-kind or as approved by the Contracting Officer.

1.3.4 Utility Service

Maintain existing utilities indicated to stay in service and protect against damage during demolition and deconstruction operations.

SECTION 02 41 00 Page 2

Page 21: GA106 – ROLL -UP DOOR RESET Augusta, GA...GA106 - Roll-Up Door Reset May 22, 2015 Augusta, GA SECTION 01 33 00.00 13 SUBMITTAL REGISTER COVER PAGE 07/13 PART 1 GENERAL 1.1 SUBMITTAL

GA106 - Roll-Up Door Reset May 22, 2015Augusta, GA

1.3.5 Facilities

Protect electrical and mechanical services and utilities. Where removal of existing utilities and pavement is specified or indicated, provide approved barricades, temporary covering of exposed areas, and temporary services or connections for electrical and mechanical utilities. Floors, roofs, walls, columns, pilasters, and other structural components that are designed and constructed to stand without lateral support or shoring, and are determined to be in stable condition, must remain standing without additional bracing, shoring, or lateral support until demolished or deconstructed, unless directed otherwise by the Contracting Officer. Ensure that no elements determined to be unstable are left unsupported and place and secure bracing, shoring, or lateral supports as may be required as a result of any cutting, removal, deconstruction, or demolition work performed under this contract.

1.4 BURNING

The use of burning at the project site for the disposal of refuse and debris will not be permitted

1.5 SUBMITTALS

Government approval is required for submittals with a "G" designation; submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:

SD-01 Preconstruction Submittals

Existing Conditions; G

SD-07 Certificates

Demolition Plan; GNotification; G

SD-11 Closeout Submittals

Receipts

1.6 QUALITY ASSURANCE

Submit timely notification of demolition, deconstruction and renovation projects to Federal, State, regional, and local authorities in accordance with 40 CFR 61 , Subpart M. Notify the Regional Office of the United States Environmental Protection Agency (USEPA) and State's environmental protection agency and the Contracting Officer in writing 10 working days prior to the commencement of work in accordance with 40 CFR 61 , Subpart M. Comply with federal, state, and local hauling and disposal regulations. In addition to the requirements of the "Contract Clauses," conform to the safety requirements contained in ASSE/SAFE A10.6 . Comply with the Environmental Protection Agency requirements specified. Use of explosives will not be permitted.

1.6.1 Dust and Debris Control

Prevent the spread of dust and debris to occupied portions of the building

SECTION 02 41 00 Page 3

Page 22: GA106 – ROLL -UP DOOR RESET Augusta, GA...GA106 - Roll-Up Door Reset May 22, 2015 Augusta, GA SECTION 01 33 00.00 13 SUBMITTAL REGISTER COVER PAGE 07/13 PART 1 GENERAL 1.1 SUBMITTAL

GA106 - Roll-Up Door Reset May 22, 2015Augusta, GA

and avoid the creation of a nuisance or hazard in the surrounding area. Do not use water if it results in hazardous or objectionable conditions such as, but not limited to, ice, flooding, or pollution. Vacuum and dust the work area daily .

1.7 PROTECTION

1.7.1 Traffic Control Signs

a. Where pedestrian and driver safety is endangered in the area of removal work, use traffic barricades with flashing lights. Anchor barricades in a manner to prevent displacement by wind. Notify the Contracting Officer prior to beginning such work.

1.7.2 Protection of Personnel

Before, during and after the demolition and deconstruction work continuously evaluate the condition of the work being demolished and deconstructed and take immediate action to protect all personnel working in and around the project site. No area, section, or component of floors, walls, columns, pilasters, or other structural element will be allowed to be left standing without sufficient bracing, shoring, or lateral support to prevent collapse or failure while workmen remove debris or perform other work in the immediate area.

1.8 RELOCATIONS

Perform the removal and reinstallation of relocated items as indicated with workmen skilled in the trades involved. Repair or replace items to be relocated which are damaged by the Contractor with new undamaged items as approved by the Contracting Officer.

1.9 EXISTING CONDITIONS

Before beginning any demolition or deconstruction work, survey the site and examine the drawings and specifications to determine the extent of the work. Record existing conditions in the presence of the Contracting Officer showing the condition of structures and other facilities adjacent to areas of alteration or removal. Photographs sized 4 inch will be acceptable as a record of existing conditions. Include in the record the elevation of the top of foundation walls, finish floor elevations, possible conflicting electrical conduits, plumbing lines, alarms systems, the location and extent of existing cracks and other damage and description of surface conditions that exist prior to before starting work. It is the Contractor's responsibility to verify and document all required outages which will be required during the course of work, and to note these outages on the record document. Submit survey results.

PART 2 PRODUCTS

Not Applicable

PART 3 EXECUTION

3.1 EXISTING FACILITIES TO BE REMOVED

Inspect and evaluate portions of existing structures onsite for reuse. Existing construction scheduled to be removed for reuse shall be disassembled. Dismantled and removed materials are to be separated, set

SECTION 02 41 00 Page 4

Page 23: GA106 – ROLL -UP DOOR RESET Augusta, GA...GA106 - Roll-Up Door Reset May 22, 2015 Augusta, GA SECTION 01 33 00.00 13 SUBMITTAL REGISTER COVER PAGE 07/13 PART 1 GENERAL 1.1 SUBMITTAL

GA106 - Roll-Up Door Reset May 22, 2015Augusta, GA

aside, and prepared as specified, and stored or delivered to a collection point for reuse, remanufacture, recycling, or other disposal, as specified. Materials shall be designated for reuse onsite whenever possible.

3.1.1 Utilities and Related Equipment

3.1.1.1 General Requirements

Do not interrupt existing utilities serving occupied or used facilities, except when authorized in writing by the Contracting Officer. Do not interrupt existing utilities serving facilities occupied and used by the Government except when approved in writing and then only after temporary utility services have been approved and provided. Do not begin demolition or deconstruction work until all utility disconnections have been made. Shut off and cap utilities for future use, as indicated.

3.1.1.2 Disconnecting Existing Utilities

Remove existing utilities , as indicated and terminate in a manner conforming to the nationally recognized code covering the specific utility and approved by the Contracting Officer. When utility lines are encountered but are not indicated on the drawings, notify the Contracting Officer prior to further work in that area. Remove meters and related equipment and deliver to a location on the station in accordance with instructions of the Contracting Officer.

3.1.2 Masonry

Sawcut and remove masonry so as to prevent damage to surfaces to remain, to removed materials being salvaged and to facilitate the installation of new work. Where new masonry adjoins existing, the new work shall abut or tie into the existing construction as indicated and specified for the new work. Provide square, straight edges and corners where existing masonry adjoins new work and other locations.

3.1.3 Concrete

Saw concrete along straight lines to a depth of a minimum 2 inch. Make each cut in walls perpendicular to the face and in alignment with the cut in the opposite face. Break out the remainder of the concrete provided that the broken area is concealed in the finished work, and the remaining concrete is sound. At locations where the broken face cannot be concealed, grind smooth or saw cut entirely through the concrete.

3.1.4 Miscellaneous Metal

Scrap metal shall become the Contractor's property. Recycle scrap metal as part of demolition and deconstruction operations. Provide separate containers to collect scrap metal and transport to a scrap metal collection or recycling facility, in accordance with the Waste Management Plan.

3.1.5 Patching

Where removals leave holes and damaged surfaces exposed in the finished work, patch and repair these holes and damaged surfaces to match adjacent finished surfaces, using on-site materials when available. Where new work is to be applied to existing surfaces, perform removals and patching in a

SECTION 02 41 00 Page 5

Page 24: GA106 – ROLL -UP DOOR RESET Augusta, GA...GA106 - Roll-Up Door Reset May 22, 2015 Augusta, GA SECTION 01 33 00.00 13 SUBMITTAL REGISTER COVER PAGE 07/13 PART 1 GENERAL 1.1 SUBMITTAL

GA106 - Roll-Up Door Reset May 22, 2015Augusta, GA

manner to produce surfaces suitable for receiving new work. Finished surfaces of patched area shall be flush with the adjacent existing surface and shall match the existing adjacent surface as closely as possible as to texture and finish. Patching shall be as specified and indicated, and shall include:

a. Concrete and Masonry: Completely fill holes and depressions, caused by previous physical damage or left as a result of removals in existing masonry walls to remain, with an approved masonry patching material, applied in accordance with the manufacturer's printed instructions.

3.1.6 Electrical Equipment and Fixtures

Salvage motors, motor controllers, and operating and control equipment that are attached to the driven equipment. Salvage wiring systems and components. Box loose items and tag for identification. Disconnect primary, secondary, control, communication, and signal circuits at the point of attachment to their distribution system.

3.1.6.1 Fixtures

Remove and salvage electrical fixtures. Salvage unprotected glassware from the fixture and salvage separately. Salvage incandescent, mercury-vapor, and fluorescent lamps and fluorescent ballasts manufactured prior to 1978, boxed and tagged for identification, and protected from breakage.

3.1.6.2 Electrical Devices

Remove and salvage switches, switchgear, transformers, conductors including wire and nonmetallic sheathed and flexible armored cable, regulators, meters, instruments, plates, circuit breakers, panelboards, outlet boxes, and similar items. Box and tag these items for identification according to type and size.

3.1.6.3 Wiring Ducts or Troughs

Remove and salvage wiring ducts or troughs. Dismantle plug-in ducts and wiring troughs into unit lengths. Remove plug-in or disconnecting devices from the busway and store separately.

3.1.6.4 Conduit and Miscellaneous Items

Salvage conduit except where embedded in concrete or masonry. Consider corroded, bent, or damaged conduit as scrap metal. Sort straight and undamaged lengths of conduit according to size and type. Classify supports, knobs, tubes, cleats, and straps as debris to be removed and disposed.

3.1.7 Items With Unique/Regulated Disposal Requirements

Remove and dispose of items with unique or regulated disposal requirements in the manner dictated by law or in the most environmentally responsible manner.

SECTION 02 41 00 Page 6

Page 25: GA106 – ROLL -UP DOOR RESET Augusta, GA...GA106 - Roll-Up Door Reset May 22, 2015 Augusta, GA SECTION 01 33 00.00 13 SUBMITTAL REGISTER COVER PAGE 07/13 PART 1 GENERAL 1.1 SUBMITTAL

GA106 - Roll-Up Door Reset May 22, 2015Augusta, GA

3.2 DISPOSITION OF MATERIAL

3.2.1 Title to Materials

Except for salvaged items specified in related Sections, and for materials or equipment scheduled for salvage, all materials and equipment removed and not reused or salvaged, shall become the property of the Contractor and shall be removed from Government property. Title to materials resulting from demolition and deconstruction, and materials and equipment to be removed, is vested in the Contractor upon approval by the Contracting Officer of the Contractor's demolition, deconstruction, and removal procedures, and authorization by the Contracting Officer to begin demolition and deconstruction. The Government will not be responsible for the condition or loss of, or damage to, such property after contract award. Showing for sale or selling materials and equipment on site is prohibited.

3.2.2 Reuse of Materials and Equipment

Remove and store materials and equipment listed on the drawings to be reused or relocated to prevent damage, and reinstall as the work progresses.

3.2.3 Salvaged Materials and Equipment

Remove materials and equipment that are listed on the drawings to be removed by the Contractor and that are to remain the property of the Government, and deliver to a storage site , as directed within the work site.

a. Salvage items and material to the maximum extent possible.

b. Store all materials salvaged for the Contractor as approved by the Contracting Officer and remove from Government property before completion of the contract. On site sales of salvaged material is prohibited.

c. Remove salvaged items to remain the property of the Government in a manner to prevent damage, and packed or crated to protect the items from damage while in storage or during shipment. Items damaged during removal or storage must be repaired or replaced to match existing items. Properly identify the contents of containers.

3.2.4 Transportation Guidance

Ship all ODS containers in accordance with MIL-STD-129 , DLA 4145.25 (also referenced one of the following: Army Regulation 700-68, Naval Supply Instruction 4440.128C, Marine Corps Order 10330.2C, and Air Force Regulation 67-12), 49 CFR 173.301 , and DOD 4000.25-1-M .

3.2.5 Unsalvageable and Non-Recyclable Material

Dispose of unsalvageable and non-recyclable combustible material in the sanitary fill area located off the site.

3.3 CLEANUP

Remove debris and rubbish from basement and similar excavations. Remove and transport the debris in a manner that prevents spillage on streets or

SECTION 02 41 00 Page 7

Page 26: GA106 – ROLL -UP DOOR RESET Augusta, GA...GA106 - Roll-Up Door Reset May 22, 2015 Augusta, GA SECTION 01 33 00.00 13 SUBMITTAL REGISTER COVER PAGE 07/13 PART 1 GENERAL 1.1 SUBMITTAL

GA106 - Roll-Up Door Reset May 22, 2015Augusta, GA

adjacent areas. Apply local regulations regarding hauling and disposal.

3.4 DISPOSAL OF REMOVED MATERIALS

3.4.1 Regulation of Removed Materials

Dispose of debris, rubbish, scrap, and other nonsalvageable materials resulting from removal operations with all applicable federal, state and local regulations as contractually specified in the Waste Management Plan. Storage of removed materials on the project site is prohibited.

3.4.2 Burning on Government Property

Burning of materials removed from demolished and deconstructed structures will not be permitted on Government property.

3.4.3 Removal from Government Property

Transport waste materials removed from demolished and deconstructed structures, except waste soil, from Government property for legal disposal. Dispose of waste soil as directed.

3.5 REUSE OF SALVAGED ITEMS

Recondition salvaged materials and equipment designated for reuse before installation. Replace items damaged during removal and salvage operations or restore them as necessary to usable condition.

-- End of Section --

SECTION 02 41 00 Page 8

Page 27: GA106 – ROLL -UP DOOR RESET Augusta, GA...GA106 - Roll-Up Door Reset May 22, 2015 Augusta, GA SECTION 01 33 00.00 13 SUBMITTAL REGISTER COVER PAGE 07/13 PART 1 GENERAL 1.1 SUBMITTAL

GA106 - Roll-Up Door Reset May 22, 2015Augusta, GA

SECTION 02 81 00

TRANSPORTATION AND DISPOSAL OF HAZARDOUS MATERIALS02/10

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)

40 CFR 261 Identification and Listing of Hazardous Waste

40 CFR 262 Standards Applicable to Generators of Hazardous Waste

40 CFR 264 Standards for Owners and Operators of Hazardous Waste Treatment, Storage, and Disposal Facilities

40 CFR 300 National Oil and Hazardous Substances Pollution Contingency Plan

40 CFR 302 Designation, Reportable Quantities, and Notification

40 CFR 61 National Emission Standards for Hazardous Air Pollutants

49 CFR 107 Hazardous Materials Program Procedures

49 CFR 172 Hazardous Materials Table, Special Provisions, Hazardous Materials Communications, Emergency Response Information, and Training Requirements

49 CFR 173 Shippers - General Requirements for Shipments and Packagings

49 CFR 178 Specifications for Packagings

STATE OF Georgia (GA) REGULATIONS

OCGA 391-3-4 Georgia Department of Natural Resources, GA Environmental Protection Division (EPD), Solid Waste Management, Asbestos Containing Waste. Chapter 391-3-4-.04(8).

OCGA 391-3-14 Georgia Department of Natural Resources Rules of Asbestos Removal and Encapsulation, Chapter 391-3-14.

SECTION 02 81 00 Page 1

Page 28: GA106 – ROLL -UP DOOR RESET Augusta, GA...GA106 - Roll-Up Door Reset May 22, 2015 Augusta, GA SECTION 01 33 00.00 13 SUBMITTAL REGISTER COVER PAGE 07/13 PART 1 GENERAL 1.1 SUBMITTAL

GA106 - Roll-Up Door Reset May 22, 2015Augusta, GA

OCGA 391-3-24 Georgia Department of Natural Resources Rules for Lead-Based Paint Hazard Management, 391-3-24.

1.2 DEFINITIONS

1.2.1 Hazardous Material

A substance or material that has been determined by the Secretary of Transportation to be capable of posing an unreasonable risk to health, safety, and property when transported in commerce, and has been so designated pursuant to the Hazardous Materials Transportation Act, 49 U.S.C. Appendix Section 1801 et seq. The term includes materials designated as hazardous materials under the provisions of 49 CFR 172 , Sections .101 and .102 and materials that meet the defining criteria for hazard classes and divisions in 49 CFR 173 . USEPA designated hazardous wastes are also hazardous materials. The hazardous materials covered under this specification are lead based paint (LBP) and asbestos containing material(ACM). Per Georgia EPD ( OCGA 391-3-24 ), LBP at a concentration exceeding 0.5% by weight is considered a hazardous material for disposal purposes.

1.2.2 Hazardous Waste

A waste that meets criteria established in the Resource Conservation and Recovery Act (RCRA) or specified by the USEPA in 40 CFR 261 or has been designated as hazardous by a RCRA authorized state program. Hazardous wastes covered under this specification include LBP at a concentration exceeding 0.5% by weight, as well as universal wastes.

1.3 SUBMITTALS

Government approval is required for submittals with a "G" designation; submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:

SD-03 Product Data

Onsite Hazardous Waste Management; GNotices of Non-Compliance and Notices of ViolationPackaging Notifications

SD-06 Test Reports

Recordkeeping; GSpill ResponseException Report; G

SD-07 Certificates

CertificationSecurity PlansTransportation and Disposal Coordinator; GTraining; GUSEPA Offsite PolicyCertificates of DisposalShipping Documents and Packagings Certification; G

SECTION 02 81 00 Page 2

Page 29: GA106 – ROLL -UP DOOR RESET Augusta, GA...GA106 - Roll-Up Door Reset May 22, 2015 Augusta, GA SECTION 01 33 00.00 13 SUBMITTAL REGISTER COVER PAGE 07/13 PART 1 GENERAL 1.1 SUBMITTAL

GA106 - Roll-Up Door Reset May 22, 2015Augusta, GA

Waste Minimization; G

1.4 QUALITY ASSURANCE

1.4.1 Transportation and Disposal Coordinator

Designate, by position and title, one person to act as the Transportation and Disposal Coordinator (TDC) for this contract. The TDC shall serve as the single point of contact for all environmental regulatory matters and shall have overall responsibility for total environmental compliance at the site including, but not limited to, accurate identification and classification of hazardous waste and hazardous materials; determination of proper shipping names; identification of marking, labeling, packaging and placarding requirements; completion of waste profiles, hazardous waste manifests, asbestos waste shipment records, PCB manifests, bill of ladings, exception and discrepancy reports; and all other environmental documentation. The TDC shall have, at a minimum, one year of specialized experience in the management and transportation of hazardous LBP, ACM, PCB, and mercury waste and have been Department of Transportation certified under 49 CFR 172 , Subpart H.

1.4.2 Training

The Contractor's hazardous materials employees shall be trained, tested, and certified to safely and effectively carry out their assigned duties in accordance with Section 01 35 29.13 HEALTH, SAFETY, AND EMERGENCY RESPONSE PROCEDURES FOR CONTAMINATED SITES. The Contractor's employees transporting hazardous materials or preparing hazardous materials for transportation, including samples, shall be trained, tested, and certified in accordance with 49 CFR 172 , Subpart H, including security awareness and any applicable security plans. Contractor employees making determinations that shipments do not constitute DOT regulated hazardous materials shall also be trained, tested, and certified in accordance with 49 CFR 172 , Subpart H.

1.4.3 Certification

The Contractor and/or subcontractors transporting hazardous materials shall possess a current certificate of registration issued by the Research and Special Programs Administration (RSPA), DOT, when required by 49 CFR 107 , Subpart G. Submit copies of the certificates or written statements certifying exemption from these requirements.

1.4.4 Laws and Regulations Requirements

Work shall meet or exceed the minimum requirements established by Federal, state, and local laws and regulations which are applicable. These requirements are amended frequently and compliance with amendments is required as they become effective. In the event that compliance exceeds the scope of work or conflicts with specific requirements of the contract, notify the Contracting Officer immediately.

PART 2 PRODUCTS

2.1 MATERIALS

Provide all the materials required for the packaging, labeling, marking, placarding and transportation of hazardous wastes and hazardous materials in conformance with Department of Transportation standards and EP

SECTION 02 81 00 Page 3

Page 30: GA106 – ROLL -UP DOOR RESET Augusta, GA...GA106 - Roll-Up Door Reset May 22, 2015 Augusta, GA SECTION 01 33 00.00 13 SUBMITTAL REGISTER COVER PAGE 07/13 PART 1 GENERAL 1.1 SUBMITTAL

GA106 - Roll-Up Door Reset May 22, 2015Augusta, GA

415-1-266. Details in this specification shall not be construed as establishing the limits of the Contractor's responsibility.

2.2 Packagings

Provide bulk and non-bulk containers for packaging hazardous materials/wastes consistent with the authorizations referenced in the Hazardous Materials Table in 49 CFR 172 , Section .101, Column 8. Bulk and non-bulk packaging shall meet the corresponding specifications in 49 CFR 173 referenced in the Hazardous Materials Table, 49 CFR 172 , Section .101. Each packaging shall conform to the general packaging requirements of Subpart B of 49 CFR 173 , to the requirements of 49 CFR 178 at the specified packing group performance level, to the requirements of special provisions of column 7 of the Hazardous Materials Table in 49 CFR 172 , Section .101, and shall be compatible with the material to be packaged as required by 40 CFR 262 . Also provide other packaging related materials such as materials used to cushion or fill voids in overpacked containers, etc. Sorbent materials shall not be capable of reacting dangerously with, being decomposed by, or being ignited by the hazardous materials being packaged. Additionally, sorbents used to treat free liquids to be disposed of in landfills shall be non-biodegradable as specified in 40 CFR 264 , Section .314.

2.3 Markings

Provide markings for each hazardous material/waste package, freight container, and transport vehicle consistent with the requirements of 49 CFR 172 , Subpart D and 40 CFR 262 , Section .32 (for hazardous waste, and 40 CFR 61 , Section .149(d) for asbestos). Markings shall be capable of withstanding, without deterioration or substantial color change, a 180 day exposure to conditions reasonably expected to be encountered during container storage and transportation.

2.4 Labeling

Provide primary and subsidiary labels for hazardous materials/wastes consistent with the requirements in the Hazardous Materials Table in 49 CFR 172 , Section .101, Column 6 and GA OCGA 391-3-4 . Labels shall meet design specifications required by 49 CFR 172 , Subpart E including size, shape, color, printing, and symbol requirements. Labels shall be durable and weather resistant and capable of withstanding, without deterioration or substantial color change, a 180 day exposure to conditions reasonably expected to be encountered during container storage and transportation.

2.5 Placards

For each offsite shipment of hazardous material/waste, provide primary and subsidiary placards consistent with the requirements of 49 CFR 172 , Subpart F. Placards shall be provided for each side and each end of bulk packaging, freight containers, transport vehicles, and rail cars requiring such placarding. Placards may be plastic, metal, or other material capable of withstanding, without deterioration, a 30 day exposure to open weather conditions and shall meet design requirements specified in 49 CFR 172 , Subpart F.

SECTION 02 81 00 Page 4

Page 31: GA106 – ROLL -UP DOOR RESET Augusta, GA...GA106 - Roll-Up Door Reset May 22, 2015 Augusta, GA SECTION 01 33 00.00 13 SUBMITTAL REGISTER COVER PAGE 07/13 PART 1 GENERAL 1.1 SUBMITTAL

GA106 - Roll-Up Door Reset May 22, 2015Augusta, GA

PART 3 EXECUTION

3.1 ONSITE HAZARDOUS WASTE MANAGEMENT

These paragraphs apply to Government owned waste only. Contractors are prohibited by 10 U.S.C. 2692 from storing Contractor owned waste onsite for any length of time. The Contractor is responsible for ensuring compliance with all Federal, State, and local hazardous waste laws and regulations and shall verify those requirements when preparing reports, waste shipment records, hazardous waste manifests, or other documents. When accumulating hazardous waste onsite, comply with generator requirements in 40 CFR 262 and any applicable state or local law or regulations. Onsite accumulation times shall be restricted to applicable time frames referenced in 40 CFR 262 , Section .34, GA 391-3-11, and any other applicable state or local law or regulation. Accumulation start dates shall commence when waste is first generated (i.e. containerized or otherwise collected for discard). Only use containers in good condition and compatible with the waste to be stored. Ensure containers are closed except when adding or removing waste, and immediately mark all hazardous waste LBP containers with the words "hazardous waste" and all asbestos waste containers with the words CAUTION! CONTAINS ASBESTOS - AVOID OPENING OR BREAKING CONTAINER. BREATHING ASBESTOS IS HAZARDOUS TO YOUR HEALTH. (GA OCGA 391-3-14 ) and other information required by 40 CFR 262 , Section .32 and any applicable state or local law or regulation as soon as the waste is containerized. Asbestos waste must be maintained in a secured, locked location where access is controlled (GA OCGA 391-3-24 ). Inspect all hazardous waste areas weekly and provide written documentation of the inspection. Include date and time of inspection, name of individual conducting the inspection, problems noted, and corrective actions taken on the inspection logs.

3.2 Hazardous Waste Classification

Identify, in consultation with the CO the waste code applicable to the hazardous LBP waste stream based on requirements in 40 CFR 261 or any applicable state or local law or regulation. Waste profiles, analyses, and classification information shall be submitted to the CO for review and approval.

3.3 Management Plan

Prepare a plan detailing the manner in which hazardous wastes will be managed and describing the types and volumes of hazardous wastes anticipated to be managed as well as the management practices to be utilized. The plan shall identify the method to be used to ensure accurate piece counts and/or weights of shipments; shall propose facilities to be utilized for treatment, storage, and/or disposal; shall identify areas onsite where hazardous wastes are to be handled; and shall identify whether transfer facilities are to be utilized; and if so, how the wastes will be tracked to ultimate disposal. Submit the plan prior to start of work.

3.4 OFFSITE HAZARDOUS WASTE MANAGEMENT

Regulated asbestos waste must be handled by properly licensed asbestos abatement personnel and disposed at a landfill permitted to accept regulated asbestos waste (GA OCGA 391-3-14 ). A list of approved landfills may be obtained from the GA EPD.

SECTION 02 81 00 Page 5

Page 32: GA106 – ROLL -UP DOOR RESET Augusta, GA...GA106 - Roll-Up Door Reset May 22, 2015 Augusta, GA SECTION 01 33 00.00 13 SUBMITTAL REGISTER COVER PAGE 07/13 PART 1 GENERAL 1.1 SUBMITTAL

GA106 - Roll-Up Door Reset May 22, 2015Augusta, GA

Wastes with LBP less than 5 mg/l may be disposed in a permitted municipal solid waste landfill or a permitted C&D landfill. Wastes with LBP greater than or equal to 5 mg/l is classified as a Conditionally Exempt Small Quantity Generator (CESQG) waste and disposal in a MSW or C& D Landfill is permissible depending upon the waste form (GA OCGA 391-3-4 ).

Waste disposal shall meet the requirements of GA Chapter 319-3-14 for asbestos waste and GA Chapter OCGA 391-3-4 for lead waste.

Submit Notices of Non-Compliance and Notices of Violation by a Federal, state, or local regulatory agency issued to the Contractor in relation to any work performed under this contract. Immediately provide copies of such notices to the Contracting Officer. Also furnish all relevant documents regarding the incident and any information requested by the Contracting Officer, and coordinate its response to the notice with the Contracting Officer or the designated representative prior to submission to the notifying authority. Also furnish a copy to the Contracting Officer of all documents submitted to the regulatory authority, including the final reply to the notice, and all other materials, until the matter is resolved.

3.4.1 Treatment, Storage, and/or Disposal Facility and Transporter

Provide the Contracting Officer with USEPA ID numbers, names, locations, and telephone numbers of TSD facilities and transporters. This information shall be contained in the Hazardous Waste Management Plan and shall be approved by the Contracting Officer prior to waste disposal.

3.4.2 Status of the Facility

Facilities receiving hazardous LBP waste shall be permitted as a Subtitle C hazardous waste landfill. Facilities receiving asbestos waste shall be permitted by GA EPD to accept asbestos waste materials.

3.4.3 Shipping Documents and Packagings Certification

Prior to shipment of any hazardous material offsite and a minimum of 14 days prior to anticipated pickup, the Contractor's TDC shall provide for review written certification to the Contracting Officer that hazardous materials have been properly packaged, labeled, and marked in accordance with DOT, USEPA, and state requirements. An asbestos waste shipment record is required to be submitted to GA EPD prior to shipment.

3.4.4 Transportation

Use manifests for transporting hazardous wastes as required by applicable federal, state, or local law or regulation. An asbestos waste shipment record is required to be submitted to GA EPD prior to shipment. Transportation shall comply with all requirements in the Department of Transportation referenced regulations in the 49 CFR series and GA OCGA 391-3-4 -.04(8). Prepare waste manifests for each shipment of hazardous waste shipped offsite. Submit manifests to the CO for review and approval.

3.4.5 Treatment and Disposal of Hazardous Wastes

The hazardous LBP waste shall be transported to a Subtitle C hazardous waste 90 days of the accumulation start date on each container. Ship hazardous wastes only to facilities which are properly permitted to accept

SECTION 02 81 00 Page 6

Page 33: GA106 – ROLL -UP DOOR RESET Augusta, GA...GA106 - Roll-Up Door Reset May 22, 2015 Augusta, GA SECTION 01 33 00.00 13 SUBMITTAL REGISTER COVER PAGE 07/13 PART 1 GENERAL 1.1 SUBMITTAL

GA106 - Roll-Up Door Reset May 22, 2015Augusta, GA

the hazardous waste or operating under interim status. Propose TSD facilities via submission of the Hazardous Waste Management Plan, subject to the approval of the CO.

Asbestos waste may only be kept onsite until a sufficient quantity has accumulated for a full shipment; otherwise, asbestos waste should not be allowed to accumulate or become dry (GA OCGA 391-3-4 -.04(8)).

Submit Certificates of Disposal documenting the ultimate disposal, destruction or placement of asbestos and lead painted materials within 180 days of initial shipment. Receipt of these certificates will be required for final payment.

3.5 SPECIAL REQUIREMENTS FOR ASBESTOS WASTES

If work involves asbestos containing wastes, manage these wastes in accordance with specification Sections 02 82 14.00 10 and 02 82 16.00 20.

3.6 RECORDKEEPING

The Contractor is responsible for maintaining adequate records to support information provided to the CO regarding exception reports, annual reports, and biennial reports; maintaining asbestos waste shipment records for a minimum of 3 years from the date of shipment or any longer period required by any applicable law or regulation or any other provision of this contract; and maintaining bill of ladings for a minimum of 375 days from the date of shipment or any longer period required by any applicable law or regulation or any other provision of this contract. Submit information necessary to file state annual or USEPA biennial reports for all hazardous waste transported, treated, stored, or disposed of under this contract. Do not forward these data directly to the regulatory agency but to the Contracting Officer at the specified time. The submittal shall contain all the information necessary for filing of the formal reports in the form and format required by the governing Federal or state regulatory agency. A cover letter shall accompany the data to include the contract number, Contractor name, and project location. In the events that a manifest copy documenting receipt of hazardous waste at the treatment storage and disposal facility is not received within 35 days of shipment initiation, prepare and submit an exception report to the CO within 37 days of shipment initiation.

3.7 SPILL RESPONSE

In the event of a spill or release of a hazardous substance (as designated in 40 CFR 302 ), or pollutant or contaminant, or oil (as governed by the Oil Pollution Act (OPA), 33 U.S.C. 2701 et seq.), notify the CO immediately. Any direction from the CO concerning a spill or release shall not be considered a change under the contract. If the spill exceeds a reporting threshold, follow the pre-established procedures for immediate reporting to the Contracting Officer. Comply with all applicable requirements of Federal, State, or local laws or regulations regarding any spill incident.

3.8 EMERGENCY CONTACTS

The Contractor is responsible for complying with the emergency contact provisions in 49 CFR 172 , Section .604. Whenever the Contractor ships hazardous materials, provide a 24 hr emergency response contact and phone number of a person knowledgeable about the hazardous materials being

SECTION 02 81 00 Page 7

Page 34: GA106 – ROLL -UP DOOR RESET Augusta, GA...GA106 - Roll-Up Door Reset May 22, 2015 Augusta, GA SECTION 01 33 00.00 13 SUBMITTAL REGISTER COVER PAGE 07/13 PART 1 GENERAL 1.1 SUBMITTAL

GA106 - Roll-Up Door Reset May 22, 2015Augusta, GA

shipped and who has comprehensive emergency response and incident mitigation information for that material, or has immediate access to a person who possesses such knowledge and information. The phone shall be monitored on a 24 hour basis at all times when the hazardous materials are in transportation, including during storage incidental to transportation. Ensure that information regarding this emergency contact and phone number are placed on all hazardous material shipping documents. Designate an emergency coordinator and post the following information at areas in which hazardous wastes are managed:

a. The name of the emergency coordinator.

b. Phone number through which the emergency coordinator can be contacted on a 24 hour basis.

c. The telephone number of the local fire department.

d. The location of fire extinguishers and spill control materials.

SECTION 02 81 00 Page 8

Page 35: GA106 – ROLL -UP DOOR RESET Augusta, GA...GA106 - Roll-Up Door Reset May 22, 2015 Augusta, GA SECTION 01 33 00.00 13 SUBMITTAL REGISTER COVER PAGE 07/13 PART 1 GENERAL 1.1 SUBMITTAL

GA106 - Roll-Up Door Reset May 22, 2015Augusta, GA

Attachment ASAMPLE OFF-SITE POLICY CERTIFICATION MEMO

Project/Contract #:

Waste Stream:

Primary TSD Facility, EPA ID # and Location:

Alter. TSD Facility, EPA ID # and Location:

EPA Region Contact

I (617) 918-1752

II (212) 637-4130

III (214) 814-5267

IV (404) 562-8591

V (312) 353-8207

VI (214) 665-2282

VII (913) 551-7154

VIII (303) 312-6419

IX (415) 972-3304

X (206) 553-2859

EPA representative contacted:

EPA representative phone number:

Date contacted:

Comment:

The above EPA representative was contacted on __________. As of that datethe above sites were considered acceptable in accordance with the Off-SitePolicy in 40 CFR 300 .440.

Date: Signature:

Phone number:

-- End of Section --

SECTION 02 81 00 Page 9

Page 36: GA106 – ROLL -UP DOOR RESET Augusta, GA...GA106 - Roll-Up Door Reset May 22, 2015 Augusta, GA SECTION 01 33 00.00 13 SUBMITTAL REGISTER COVER PAGE 07/13 PART 1 GENERAL 1.1 SUBMITTAL

GA106 - Roll-Up Door Reset May 22, 2015Augusta, GA

SECTION 02 83 13.00 20

LEAD IN CONSTRUCTION08/11

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

AMERICAN INDUSTRIAL HYGIENE ASSOCIATION (AIHA)

AIHA Z88.6 (2006) Respiratory Protection - Respirator Use-Physical Qualifications for Personnel

STATE OF GEORGIA REGULATION

OCGA 391-3-24 Georgia Department of Natural Resources Rules for Lead-Based Paint Hazard Management, Chapter 391-3-24.

U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)

29 CFR 1926.103 Respiratory Protection

29 CFR 1926.21 Safety Training and Education

29 CFR 1926.33 Access to Employee Exposure and Medical Records

29 CFR 1926.55 Gases, Vapors, Fumes, Dusts, and Mists

29 CFR 1926.59 Hazard Communication

29 CFR 1926.62 Lead

29 CFR 1926.65 Hazardous Waste Operations and Emergency Response

40 CFR 260 Hazardous Waste Management System: General

40 CFR 261 Identification and Listing of Hazardous Waste

40 CFR 262 Standards Applicable to Generators of Hazardous Waste

40 CFR 263 Standards Applicable to Transporters of Hazardous Waste

40 CFR 264 Standards for Owners and Operators of Hazardous Waste Treatment, Storage, and Disposal Facilities

40 CFR 265 Interim Status Standards for Owners and

SECTION 02 83 13.00 20 Page 1

Page 37: GA106 – ROLL -UP DOOR RESET Augusta, GA...GA106 - Roll-Up Door Reset May 22, 2015 Augusta, GA SECTION 01 33 00.00 13 SUBMITTAL REGISTER COVER PAGE 07/13 PART 1 GENERAL 1.1 SUBMITTAL

GA106 - Roll-Up Door Reset May 22, 2015Augusta, GA

Operators of Hazardous Waste Treatment, Storage, and Disposal Facilities

40 CFR 268 Land Disposal Restrictions

49 CFR 172 Hazardous Materials Table, Special Provisions, Hazardous Materials Communications, Emergency Response Information, and Training Requirements

49 CFR 178 Specifications for Packagings

1.2 DEFINITIONS

1.2.1 Action Level

Employee exposure, without regard to use of respirators, to an airborne concentration of lead of 30 micrograms per cubic meter of air averaged over an 8 hour period.

1.2.2 Area Sampling

Sampling of lead concentrations within the lead control area and inside the physical boundaries which is representative of the airborne lead concentrations but is not collected in the breathing zone of personnel (approximately 5 to 6 feet above the floor).

1.2.3 Competent Person (CP)

As used in this section, refers to a person employed by the Contractor who is trained in the recognition and control of lead hazards in accordance with current federal, State, and local regulations and has the authority to take prompt corrective actions to control the lead hazard. A Certified Industrial Hygienist (CIH) certified by the American Board of Industrial Hygiene or a Certified Safety Professional (CSP) certified by the Board of Certified Safety Professionals is the best choice.

1.2.4 Contaminated Room

Refers to a room for removal of contaminated personal protective equipment (PPE).

1.2.5 Decontamination Shower Facility

That facility that encompasses a clean clothing storage room, and a contaminated clothing storage and disposal rooms, with a shower facility in between.

1.2.6 High Efficiency Particulate Arrestor (HEPA) Filter Equipment

HEPA filtered vacuuming equipment with a UL 586 filter system capable of collecting and retaining lead-contaminated particulate. A high efficiency particulate filter demonstrates at least 99.97 percent efficiency against 0.3 micron or larger size particles.

1.2.7 Lead

Metallic lead, inorganic lead compounds, and organic lead soaps. Excludes other forms of organic lead compounds.

SECTION 02 83 13.00 20 Page 2

Page 38: GA106 – ROLL -UP DOOR RESET Augusta, GA...GA106 - Roll-Up Door Reset May 22, 2015 Augusta, GA SECTION 01 33 00.00 13 SUBMITTAL REGISTER COVER PAGE 07/13 PART 1 GENERAL 1.1 SUBMITTAL

GA106 - Roll-Up Door Reset May 22, 2015Augusta, GA

1.2.8 Lead Control Area

A system to prevent the spread of lead dust, paint chips or debris to adjacent areas that may include temporary containment, floor or ground cover protection, physical boundaries, and warning signs to prevent unauthorized entry of personnel. HEPA filtered local exhaust equipment may be used as engineering controls to further reduce personnel exposures or building/outdoor environmental contamination.

1.2.9 Lead Permissible Exposure Limit (PEL)

Fifty micrograms per cubic meter of air as an 8 hour time weighted average as determined by 29 CFR 1926.62 . If an employee is exposed for more than eight hours in a work day, the PEL shall be determined by the following formula:

PEL (micrograms/cubic meter of air) = 400/No. hrs worked per day

1.2.10 Material Containing Lead/Paint with Lead (MCL/PWL)

Any material, including paint, which contains lead as determined by the testing laboratory using a valid test method. The requirements of this section does not apply if no detectable levels of lead are found using a quantitative method for analyzing paint or MCL using laboratory instruments with specified limits of detection (usually 0.01 percent). An X-Ray Fluorescence (XRF) instrument is not considered a valid test method.

1.2.11 Personal Sampling

Sampling of airborne lead concentrations within the breathing zone of an employee to determine the 8 hour time weighted average concentration in accordance with 29 CFR 1926.62 . Samples shall be representative of the employees' work tasks. Breathing zone shall be considered an area within a hemisphere, forward of the shoulders, with a radius of 6 to 9 inches and centered at the nose or mouth of an employee.

1.2.12 Physical Boundary

Area physically roped or partitioned off around lead control area to limit unauthorized entry of personnel.

1.3 DESCRIPTION

1.3.1 Description of Work

Lead bulk samples of paint/materials anticipated to be disturbed during construction activities were collected and lead was found to be present. Lead was found to be present in two samples collected from the building at a concentration exceeding the laboratory detection limit. Sample results are summarized in the attached table, and referenced in the attached laboratory analytical report.

Bulk samples of painted or unpainted surfaces have not been analyzed for Toxicity Characteristic Leaching Potential (TCLP) analysis to evaluate whether the wastes generated during demolition are classified as non-hazardous solid or hazardous waste, as defined under the Resource Conservation and Recovery Act (RCRA). The Contractor shall comply with 29 CFR 1926.62 - the "Lead in Construction Standard" for persons likely to

SECTION 02 83 13.00 20 Page 3

Page 39: GA106 – ROLL -UP DOOR RESET Augusta, GA...GA106 - Roll-Up Door Reset May 22, 2015 Augusta, GA SECTION 01 33 00.00 13 SUBMITTAL REGISTER COVER PAGE 07/13 PART 1 GENERAL 1.1 SUBMITTAL

GA106 - Roll-Up Door Reset May 22, 2015Augusta, GA

come in contact with airborne lead during construction/renovation activities. 29 CFR 1926.62 addresses any concentration of lead in paint. Should additional unforeseen MCL/PWL be encountered during the course of construction/demolition activities, the Contractor shall stop work immediately and notify the Contracting Officer (CO).

1.3.2 Coordination with Other Work

The contractor shall coordinate with work being performed in adjacent areas. Coordination procedures shall be explained in the Plan and shall describe how the Contractor will prevent lead exposure to other contractors and/or Government personnel performing work unrelated to lead activities.

1.4 SUBMITTALS

Government approval is required for submittals with a "G" designation; submittals not having a "G" designation are for Contractor Quality Control approval. The following shall be submitted in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:

SD-01 Preconstruction Submittals

Lead Compliance Plan (LCP) including CP approval(signature, date, and certification number); G

Competent Person qualifications; G

Training Certification of workers and supervisors; G

Lead waste management plan; G

written evidence that TSD is approved for lead disposal; G

Certification of Medical Examinations; G

SD-06 Test Reports

Sampling results; G

SD-07 Certificates

Testing laboratory qualifications; G

Clearance Certification

SD-11 Closeout Submittals

Waste turn-in documents or weight tickets for non-hazardous wastes that are disposed of at sanitary or construction and demolition landfills; G

1.5 QUALITY ASSURANCE

1.5.1 Qualifications

1.5.1.1 Competent Person (CP)

Submit name, address, and telephone number of the CP selected to perform

SECTION 02 83 13.00 20 Page 4

Page 40: GA106 – ROLL -UP DOOR RESET Augusta, GA...GA106 - Roll-Up Door Reset May 22, 2015 Augusta, GA SECTION 01 33 00.00 13 SUBMITTAL REGISTER COVER PAGE 07/13 PART 1 GENERAL 1.1 SUBMITTAL

GA106 - Roll-Up Door Reset May 22, 2015Augusta, GA

responsibilities specified in paragraph entitled "Competent Person (CP)Responsibilities." Provide documented construction project-related experience with implementation of OSHA's Lead in Construction standard (29 CFR 1926.62 ) which shows ability to assess occupational and environmental exposure to lead, experience with the use of respirators, personal protective equipment and other exposure reduction methods to protect employee health.

1.5.1.2 Training Certification

Submit a certificate for each worker and supervisor, signed and dated by the training provider, stating that the employee has received the required lead training specified in 29 CFR 1926.62 (l).

1.5.1.3 Testing Laboratory

Submit the name, address, and telephone number of the testing laboratory selected to perform the air and wipe analysis, testing, and reporting of airborne concentrations of lead. Use a laboratory participating in the EPANational Lead Laboratory Accreditation Program (NLLAP) by being accredited by either the American Association for Laboratory Accreditation (A2LA) or the American Industrial Hygiene Association (AIHA) and that is successfully participating in the Environmental Lead Proficiency Analytical Testing (ELPAT) program to perform sample analysis. Laboratories selected to perform blood lead analysis shall be OSHA approved.

1.5.2 Requirements

1.5.2.1 Competent Person (CP) Responsibilities

a. Verify training meets all federal, State, and local requirements.

b. Review and approve LCP for conformance to the applicable referenced standards.

c. Continuously inspect PWL or MCL work for conformance with the approved plan.

d. Perform (or oversee performance of) air sampling. Recommend upgrades or downgrades (whichever is appropriate based on exposure) on the use of PPE (respirators included) and engineering controls.

e. Ensure work is performed in strict accordance with specifications at all times.

f. Control work to prevent hazardous exposure to human beings and to the environment at all times.

g. Supervise final cleaning of the lead control area, take clearance wipe samples if necessary; review clearance sample results and make recommendations for further cleaning.

h. Certify the conditions of the work as called for elsewhere in this specification.

1.5.2.2 Lead Compliance Plan (LCP)

Submit a detailed job-specific plan of the work procedures to be used in

SECTION 02 83 13.00 20 Page 5

Page 41: GA106 – ROLL -UP DOOR RESET Augusta, GA...GA106 - Roll-Up Door Reset May 22, 2015 Augusta, GA SECTION 01 33 00.00 13 SUBMITTAL REGISTER COVER PAGE 07/13 PART 1 GENERAL 1.1 SUBMITTAL

GA106 - Roll-Up Door Reset May 22, 2015Augusta, GA

the disturbance of PWL or MCL. The plan shall include a sketch showing the location, size, and details of lead control areas, critical barriers, physical boundaries, location and details of decontamination facilities, viewing ports, and mechanical ventilation system. Include a description of equipment and materials, work practices, controls and job responsibilities for each activity from which lead is emitted. Include in the plan, eating, drinking, smoking, hygiene facilities and sanitary procedures, interface of trades, sequencing of lead related work, collected waste water and dust containing lead and debris, air sampling, respirators, personal protective equipment, and a detailed description of the method of containment of the operation to ensure that lead is not released outside of the lead control area. Include site preparation, cleanup and clearance procedures. Include occupational and environmental sampling, training and strategy, sampling and analysis strategy and methodology, frequency of sampling, duration of sampling, and qualifications of sampling personnel in the air sampling portion of the plan. Include a description of arrangements made among contractors on multicontractor worksites to inform affected employees and to clarify responsibilities to control exposures.

1.5.2.3 Occupational and Environmental Assessment Data Report

If initial monitoring is necessary, submit occupational and environmental sampling results to the Contracting Officer within three working days of collection, signed by the testing laboratory employee performing the analysis, the employee that performed the sampling, and the CP.

In order to reduce the full implementation of 29 CFR 1926.62 , the Contractor shall provide documentation. Submit a report that supports the determination to reduce full implementation of the requirements of 29 CFR 1926.62 and supporting the LCP.

a. The initial monitoring shall represent each job classification, or if working conditions are similar to previous jobs by the same employer, provide previously collected exposure data that can be used to estimate worker exposures per 29 CFR 1926.62 . The data shall represent the worker's regular daily exposure to lead for stated work.

b. Submit worker exposure data gathered during the task based trigger operations of 29 CFR 1926.62 with a complete process description. This includes manual demolition, manual scraping, manual sanding, heat gun, power tool cleaning, rivet busting, cleanup of dry expendable abrasives, abrasive blast enclosure removal, abrasive blasting, welding, cutting and torch burning where lead containing coatings are present.

c. The initial assessment shall determine the requirement for further monitoring and the need to fully implement the control and protective requirements including the LCP per 29 CFR 1926.62 .

1.5.2.4 Medical Examinations

Initial medical surveillance as required by 29 CFR 1926.62 shall be made available to all employees exposed to lead at any time (1 day) above the action level. Full medical surveillance shall be made available to all employees on an annual basis who are or may be exposed to lead in excess of the action level for more than 30 days a year or as required by 29 CFR1926.62 . Adequate records shall show that employees meet the medical surveillance requirements of 29 CFR 1926.33 , 29 CFR 1926.62 and 29 CFR1926.103 . Provide medical surveillance to all personnel exposed to lead as

SECTION 02 83 13.00 20 Page 6

Page 42: GA106 – ROLL -UP DOOR RESET Augusta, GA...GA106 - Roll-Up Door Reset May 22, 2015 Augusta, GA SECTION 01 33 00.00 13 SUBMITTAL REGISTER COVER PAGE 07/13 PART 1 GENERAL 1.1 SUBMITTAL

GA106 - Roll-Up Door Reset May 22, 2015Augusta, GA

indicated in 29 CFR 1926.62 . Maintain complete and accurate medical records of employees for the duration of employment plus 30 years.

1.5.2.5 Training

Train each employee performing work that disturbs lead, who performs MCL/PWL disposal, and air sampling operations prior to the time of initial job assignment and annually thereafter, in accordance with 29 CFR 1926.21 , 29 CFR 1926.62 , and State and local regulations where appropriate.

1.5.2.6 Respiratory Protection Program

a. Provide each employee required to wear a respirator a respirator fit test at the time of initial fitting and at least annually thereafter as required by 29 CFR 1926.62 .

b. Establish and implement a respiratory protection program as required by AIHA Z88.6 , 29 CFR 1926.103 , 29 CFR 1926.62 , and 29 CFR 1926.55 .

1.5.2.7 Hazard Communication Program

Establish and implement a Hazard Communication Program as required by 29CFR 1926.59 .

1.5.2.8 Lead Waste Management

The Lead Waste Management Plan shall comply with applicable requirements of federal, State, and local hazardous waste regulations, and address:

a. Identification and classification of wastes associated with the work.

b. Estimated quantities of wastes to be generated and disposed of.

c. Names and qualifications of each contractor that will be transporting, storing, treating, and disposing of the wastes. Include the facility location and operator and a 24-hour point of contact. Furnish two copies of USEPA, State, and local hazardous waste permit applications, permits, manifests, and USEPA Identification numbers if applicable.

d. Names and qualifications (experience and training) of personnel who will be working on-site with hazardous wastes.

e. List of waste handling equipment to be used in performing the work, to include cleaning, volume reduction, and transport equipment.

f. Spill prevention, containment, and cleanup contingency measures including a health and safety plan to be implemented in accordance with 29 CFR 1926.65 .

g. Work plan and schedule for waste containment, removal and disposal. Proper containment of the waste includes using acceptable waste containers (e.g., 55-gallon drums) as well as proper marking/labeling of the containers. Wastes shall be cleaned up and containerized daily.

h. Include any process that may alter or treat waste rendering a hazardous waste non hazardous.

i. Unit cost for hazardous waste disposal according to this plan.

SECTION 02 83 13.00 20 Page 7

Page 43: GA106 – ROLL -UP DOOR RESET Augusta, GA...GA106 - Roll-Up Door Reset May 22, 2015 Augusta, GA SECTION 01 33 00.00 13 SUBMITTAL REGISTER COVER PAGE 07/13 PART 1 GENERAL 1.1 SUBMITTAL

GA106 - Roll-Up Door Reset May 22, 2015Augusta, GA

1.5.2.9 Environmental, Safety and Health Compliance

In addition to the detailed requirements of this specification, comply with laws, ordinances, rules, and regulations of federal, State, and local authorities regarding lead. Comply with the applicable requirements of the current issue of 29 CFR 1926.62 and GA OCGA 391-3-24 . Submit matters regarding interpretation of standards to the Contracting Officer for resolution before starting work. Where specification requirements and the referenced documents vary, the most stringent requirement shall apply.

1.5.2.10 Pre-Construction Conference

Along with the CP, meet with the CO to discuss in detail the Lead Waste Management Plan and the LCP, including procedures and precautions for the work.

1.6 EQUIPMENT

1.6.1 Respirators

Furnish appropriate respirators approved by the National Institute forOccupational Safety and Health (NIOSH), Department of Health and HumanServices, for use in atmospheres containing lead dust, fume and mist.Respirators shall comply with the requirements of 29 CFR 1926.62 .

1.6.2 Special Protective Clothing

Furnish personnel who will be exposed to lead-contaminated dust with proper disposable or uncontaminated, reusable protective whole body clothing, head covering, gloves, eye, and foot coverings as required by 29 CFR 1926.62 . Furnish proper disposable plastic or rubber gloves to protect hands. Reduce the level of protection only after obtaining approval from the CP.

1.6.3 Rental Equipment Notification

If rental equipment is to be used during PWL or MCL handling and disposal, notify the rental agency in writing concerning the intended use of the equipment.

1.6.4 Vacuum Filters

UL 586 labeled HEPA filters.

1.6.5 Equipment for Government Personnel

Furnish the CO with two complete sets of PPE daily, as required herein, for entry into and inspection of the lead removal work within the lead controlled area. PPE shall include disposable whole body covering, including appropriate foot, head, eye, and hand protection. PPE shall remain the property of the Contractor. The Government will providerespiratory protection for the CO.

1.7 PROJECT/SITE CONDITIONS

1.7.1 Protection of Existing Work to Remain

Perform work without damage or contamination of adjacent areas. Where existing work is damaged or contaminated, restore work to its original

SECTION 02 83 13.00 20 Page 8

Page 44: GA106 – ROLL -UP DOOR RESET Augusta, GA...GA106 - Roll-Up Door Reset May 22, 2015 Augusta, GA SECTION 01 33 00.00 13 SUBMITTAL REGISTER COVER PAGE 07/13 PART 1 GENERAL 1.1 SUBMITTAL

GA106 - Roll-Up Door Reset May 22, 2015Augusta, GA

condition or better as determined by the CO.

PART 2 PRODUCTS

Not used.

PART 3 EXECUTION

3.1 PREPARATION

3.1.1 Protection

3.1.1.1 Notification

a. Notify the CO 20 days prior to the start of any lead work.

3.1.1.2 Lead Control Area

a. Physical Boundary - Provide physical boundaries around the lead control area by roping off the area designated in the work plan or providing curtains, portable partitions or other enclosures to ensure that lead will not escape outside of the lead control area.

b. Warning Signs - Provide warning signs at approaches to lead control areas. Locate signs at such a distance that personnel may read the sign and take the necessary precautions before entering the area. Signs shall comply with the requirements of 29 CFR 1926.62 .

3.1.1.3 Furnishings

Furniture and equipment will remain in the building. Protect and cover furnishings or remove furnishings from the work area and store in a location approved by the CO.

3.1.1.4 Heating, Ventilating and Air Conditioning (HVAC) Systems

Shut down, lock out, and isolate HVAC systems that supply, exhaust, or pass through the lead control areas. Seal intake and exhaust vents in the lead control area with 6 mil plastic sheet and tape. Seal seams in HVAC components that pass through the lead control area. Provide temporary HVAC system for areas in which HVAC has been shut down outside the lead control area.

3.1.1.5 Decontamination Shower Facility

Provide clean and contaminated change rooms and shower facilities in accordance with this specification and 29 CFR 1926.62 .

3.1.1.6 Eye Wash Station

Where eyes may be exposed to injurious corrosive materials, suitable facilities for quick drenching or flushing of the eyes shall be provided within the work area.

3.1.1.7 Mechanical Ventilation System

a. To the extent feasible, use local exhaust ventilation or other collection systems, approved by the CP. Local exhaust ventilation systems shall be evaluated and maintained in accordance with

SECTION 02 83 13.00 20 Page 9

Page 45: GA106 – ROLL -UP DOOR RESET Augusta, GA...GA106 - Roll-Up Door Reset May 22, 2015 Augusta, GA SECTION 01 33 00.00 13 SUBMITTAL REGISTER COVER PAGE 07/13 PART 1 GENERAL 1.1 SUBMITTAL

GA106 - Roll-Up Door Reset May 22, 2015Augusta, GA

29 CFR 1926.62 .

b. Vent local exhaust outside the building and away from building ventilation intakes or ensure system is connected to HEPA filters.

c. Use locally exhausted, power actuated tools or manual hand tools.

3.1.1.8 Personnel Protection

Personnel shall wear and use protective clothing and equipment as specified herein. Eating, smoking, or drinking or application of cosmetics is not permitted in the lead control area. No one will be permitted in the lead control area unless they have been appropriately trained and provided with protective equipment.

3.2 ERECTION

3.2.1 Lead Control Area Requirements

Full containment - Contain removal operations by the use of a negative pressure enclosure system with decontamination facilities and with HEPA filtered exhaust if required by the CP. For containment areas larger than 1,000 square feet install a minimum of two 18 inch square viewing ports. Locate ports to provide a view of the required work from the exterior of the enclosed contaminated area. Glaze ports with laminated safety glass.

3.3 APPLICATION

3.3.1 Lead Work

Perform lead work in accordance with approved LCP. Use procedures and equipment required to limit occupational exposure and environmental contamination with lead when the work is performed in accordance with 29 CFR 1926.62 , and as specified herein. Dispose of all PWL or MCL and associated waste in compliance with federal, State, and local requirements.

3.3.2 Paint with Lead or Material Containing Lead Removal

Manual or power sanding or grinding of lead surfaces or materials is not permitted unless tools are equipped with HEPA attachments or wet methods. The dry sanding or grinding of surfaces that contain lead is prohibited. Provide methodology for removing lead in the LCP. Select lead removal processes to minimize contamination of work areas outside the control area with lead-contaminated dust or other lead-contaminated debris or waste and to ensure that unprotected personnel are not exposed to hazardous concentrations of lead. Describe this removal process in the LCP.

3.3.2.1 Paint with Lead or Material Containing Lead - Indoor Removal

Perform manual mechanical removal and thermal cutting in the lead control areas using enclosures, barriers or containments. Collect residue and debris for disposal in accordance with federal, State, and local requirements.

3.3.3 Personnel Exiting Procedures

Whenever personnel exit the lead-controlled area, they shall perform the following procedures and shall not leave the work place wearing any clothing or equipment worn in the control area:

SECTION 02 83 13.00 20 Page 10

Page 46: GA106 – ROLL -UP DOOR RESET Augusta, GA...GA106 - Roll-Up Door Reset May 22, 2015 Augusta, GA SECTION 01 33 00.00 13 SUBMITTAL REGISTER COVER PAGE 07/13 PART 1 GENERAL 1.1 SUBMITTAL

GA106 - Roll-Up Door Reset May 22, 2015Augusta, GA

a. Vacuum all clothing before entering the contaminated change room.

b. Remove protective clothing in the contaminated change room, and place them in an approved impermeable disposal bag.

c. Wash hands and face at the site, don appropriate disposable or uncontaminated reusable clothing, move to an appropriate shower facility, shower.

d. Change to clean clothes prior to leaving the clean clothes storage area.

3.4 FIELD QUALITY CONTROL

3.4.1 Tests

3.4.1.1 Air and Wipe Sampling

Conduct sampling for lead in accordance with 29 CFR 1926.62 and as specified herein. Air and wipe sampling shall be directed or performed by the CP.

a. The CP shall be on the job site directing the air and wipe sampling and inspecting the PWL or MCL removal work to ensure that the requirements of the contract have been satisfied during the entire PWL or MCL operation.

b. Collect personal air samples on employees who are anticipated to have the greatest risk of exposure as determined by the CP. In addition, collect air samples on at least twenty-five percent of the work crew or a minimum of two employees, whichever is greater, during each work shift.

c. Submit results of air samples, signed by the CP, within 72 hours after the air samples are taken.

d. Conduct area air sampling daily, on each shift in which LBP removal operations are performed, in areas immediately adjacent to the lead control area. Sufficient area monitoring shall be conducted to ensure unprotected personnel are not exposed at or above 30 micrograms per cubic meter of air. If 30 micrograms per cubic meter of air is reached or exceeded, stop work, correct the conditions(s) causing the increased levels. Notify the CO immediately. Determine if condition(s) require any further change in work methods. Removal work shall resume only after the CP and the CO give approval.

e. Surface Wipe Samples - Collect surface wipe samples on floors at a location no greater than 10 feet outside the lead control area at a frequency of once per day while lead removal work is conducted in occupied buildings. Surface wipe results shall meet criteria in paragraph "Clearance Certification."

3.5 CLEANING AND DISPOSAL

3.5.1 Cleanup

Maintain surfaces of the lead control area free of accumulations of dust and debris. Restrict the spread of dust and debris; keep waste from being distributed over the work area. Do not dry sweep or use pressurized air to

SECTION 02 83 13.00 20 Page 11

Page 47: GA106 – ROLL -UP DOOR RESET Augusta, GA...GA106 - Roll-Up Door Reset May 22, 2015 Augusta, GA SECTION 01 33 00.00 13 SUBMITTAL REGISTER COVER PAGE 07/13 PART 1 GENERAL 1.1 SUBMITTAL

GA106 - Roll-Up Door Reset May 22, 2015Augusta, GA

clean up the area. At the end of each shift and when the lead operation has been completed, clean the controlled area of visible contamination by vacuuming with a HEPA filtered vacuum cleaner, wet mopping the area and wet wiping the area as indicated by the LCP. Reclean areas showing dust or debris. After visible dust and debris is removed, wet wipe and HEPA vacuum all surfaces in the controlled area. If adjacent areas become contaminated at any time during the work, clean, visually inspect, and then wipe sample all contaminated areas. The CP shall then certify in writing that the area has been cleaned of lead contamination before clearance testing.

3.5.1.1 Clearance Certification

The CP shall certify in writing that air samples collected outside the lead control area during paint removal operations are less than 30 micrograms per cubic meter of air; the respiratory protection used for the employees was adequate; the work procedures were performed in accordance with 29 CFR 1926.62 ; and that there were no visible accumulations of material and dust containing lead left in the work site. Do not remove the lead control area or roped off boundary and warning signs prior to the CO s acknowledgement of receipt of the CP certification.

Certify surface wipe samples are not significantly greater than the initial surface loading determined prior to work.

3.5.2 Disposal

a. All material, whether hazardous or non-hazardous shall be disposed in accordance with all laws and provisions and all Federal, State or local regulations. Ensure all waste is properly characterized. The result of each waste characterization (TCLP for RCRA materials) will dictate disposal requirements.

b. Contractor is responsible for segregation of waste. Collect lead-contaminated waste, scrap, debris, bags, containers, equipment, and lead-contaminated clothing that may produce airborne concentrations of lead particles. Label the containers in accordance with 29 CFR 1926.62 and 40 CFR 261 .

c. Dispose of lead-contaminated material classified as hazardous waste at a USEPA or approved hazardous waste treatment, storage, or disposal facility off Government property.

d. Store waste materials in U.S. Department of Transportation ( 49 CFR 178 ) approved 55 gallon drums. Properly label each drum to identify the type of waste ( 49 CFR 172 ) and the date the drum was filled. For hazardous waste, the collection drum requires marking/labeling in accordance with 40 CFR 262 during the accumulation/collection timeframe. The CO or an authorized representative will assign an area for interim storage of waste-containing drums. Do not store hazardous waste drums in interim storage longer than 90 calendar days from the date affixed to each drum.

e. Handle, store, transport, and dispose lead or lead-contaminated waste in accordance with 40 CFR 260 , 40 CFR 261 , 40 CFR 262 , 40 CFR 263 , 40 CFR 264 , 40 CFR 265 , and GA OCGA 391-3-24 . Comply with land disposal restriction notification requirements as required by 40 CFR 268 .

SECTION 02 83 13.00 20 Page 12

Page 48: GA106 – ROLL -UP DOOR RESET Augusta, GA...GA106 - Roll-Up Door Reset May 22, 2015 Augusta, GA SECTION 01 33 00.00 13 SUBMITTAL REGISTER COVER PAGE 07/13 PART 1 GENERAL 1.1 SUBMITTAL

GA106 - Roll-Up Door Reset May 22, 2015Augusta, GA

3.5.2.1 Disposal Documentation

Submit written evidence to demonstrate the hazardous waste treatment, storage, or disposal facility (TSD) is approved for lead disposal by the EPA, State or local regulatory agencies. Submit one copy of the completed hazardous waste manifest, signed and dated by the initial transporter in accordance with 40 CFR 262 . Contractor shall provide a certificate that the waste was accepted by the disposal facility.

3.5.2.2 Payment for Hazardous Waste

Payment for disposal of hazardous and non-hazardous waste will not be made until a signed copy of the manifest from the treatment or disposal facility certifying the amount of lead-containing materials or non-hazardous waste delivered is returned and a copy is furnished to the Government.

-- End of Section --

SECTION 02 83 13.00 20 Page 13

Page 49: GA106 – ROLL -UP DOOR RESET Augusta, GA...GA106 - Roll-Up Door Reset May 22, 2015 Augusta, GA SECTION 01 33 00.00 13 SUBMITTAL REGISTER COVER PAGE 07/13 PART 1 GENERAL 1.1 SUBMITTAL

GA106 - Roll-Up Door Reset May 22, 2015Augusta, GA

SECTION 02 84 00

ENVIRONMENTAL EVALUATION REPORT03/15

PART 1 GENERAL

1.1 DEFINITIONS

1.1.1 ACM

Asbestos containing material.

1.1.2 Asbestos

The term asbestos includes chrysotile, amosite, crocidolite, tremolite asbestos, anthophyllite asbestos, and actinolite asbestos and any of these minerals that has been chemically treated or altered. Materials are considered to contain asbestos if the asbestos content of the material is determined to be greater than one percent.

1.1.3 Asbestos Fibers

Those fibers having an aspect ratio of at least 3:1 and longer than 5 micrometers as determined by National Institute for Occupational Safety and Health (NIOSH) Method 7400.

1.1.4 Friable Asbestos Material

Greater than one percent ACM that can be crumbled, pulverized, or reduced to powder by hand pressure when dry.

1.1.5 LBP

Refers to lead based paint.

1.1.6 Nonfriable Asbestos Material

Material that contains asbestos in which the fibers have been immobilized by a bonding agent, coating, binder, or other material so that the asbestos is well bound and will not normally release asbestos fibers during any appropriate use, handling, storage or transportation. It is understood that asbestos fibers may be released under other conditions such as demolition, removal, or mishap.

1.1.7 PLM

Refers to Polarized Light Microscopy.

1.1.8 TEM

Refers to Transmission Electron Microscopy.

1.2 REPORT

A limited pre-renovation survey was conducted by licensed asbestos inspectors experienced in the identification of asbestos and lead paint based on the provided scope of work for planned resets and repairs of the

SECTION 02 84 00 Page 1

Page 50: GA106 – ROLL -UP DOOR RESET Augusta, GA...GA106 - Roll-Up Door Reset May 22, 2015 Augusta, GA SECTION 01 33 00.00 13 SUBMITTAL REGISTER COVER PAGE 07/13 PART 1 GENERAL 1.1 SUBMITTAL

GA106 - Roll-Up Door Reset May 22, 2015Augusta, GA

facility. The purpose of this survey was to identify and quantify ACM, and LBP within and on the exterior of the structures in the areas of planned resets or repairs. A visual inspection was also conducted to identify and quantify building materials potentially containing polychlorinated biphenyls (PCBs) and mercury. The survey included a visual inspection, sample collection, and subsequent laboratory analysis of samples of materials suspected to contain asbestos or lead. No suspect ACMs were found to be located within the areas of the identified renovations; therefore, no samples were collected. Samples of paint potentially containing lead were collected at this facility. Brown paint on the roll-up door and on the roll-up door frame was identified as containing lead paint at concentrations that exceed laboratory detection limits, but do not exceed the USEPA definition of lead as a hazardous waste of 0.5% or greater by weight ( 40 CFR 261 and 40 CFR 275 ). Therefore, the materials are not considered hazardous waste. It is recommended that applicable state and federal regulations concerning lead, including those governing worker protection, are followed during renovation activities.

Tables listing the results of the sampling, and laboratory data (including chains-of-custody) are attached to this section. Sample locations are shown on Plan Sheets ENV-01 and ENV-03.

PART 2 PRODUCTS

Not Used.

PART 3 EXECUTION

Not Used.

-- End of Section --

SECTION 02 84 00 Page 2

Page 51: GA106 – ROLL -UP DOOR RESET Augusta, GA...GA106 - Roll-Up Door Reset May 22, 2015 Augusta, GA SECTION 01 33 00.00 13 SUBMITTAL REGISTER COVER PAGE 07/13 PART 1 GENERAL 1.1 SUBMITTAL

U.S.ArmyCorpsofEngineers– CharlestonDistrictCharleston,SouthCarolina

March 9, 2015

GA106 – ROLL‐UP DOOR RESETAugusta, GA

LIMITED PRE‐RENOVATION SURVEY REPORT

Page 52: GA106 – ROLL -UP DOOR RESET Augusta, GA...GA106 - Roll-Up Door Reset May 22, 2015 Augusta, GA SECTION 01 33 00.00 13 SUBMITTAL REGISTER COVER PAGE 07/13 PART 1 GENERAL 1.1 SUBMITTAL

 

300 Drayton Street, 3rd Floor, Savannah, Georgia 31401 | p 912‐644‐5653 | f 912‐644‐5639 | www.obg.com 

  I:\COE‐Charleston.14254\52442.Lifecycle Rests 81st\GA106\GA106 Roll‐Up Door\GA106 Roll‐Up Door Survey Report\GA106 Roll‐Up Door Reset Survey Report_Inspector Final.doc 360° Engineering and Project Delivery Solutions 

March9,2015

LeeC.ShokesProjectManagerUSACE69AHagoodAvenueCharleston,SC29403

RE:LimitedPre‐RenovationSurveyReport,GA106Roll‐UpDoorReset‐Augusta,GA

FILE:52442DearMr.Shokes,

Alimitedpre‐renovationasbestosandlead‐basedpaint(LBP)survey,aswellasaninvestigationofpotentialpolychlorinatedbiphenyls(PCBs),andmercuryinbuildingmaterials,wasconductedinportionsofthe81stUSARCBuilding,FACID00002,locatedat3311WrightsboroRoad,Augusta,GA,inwhichrenovationworkinsupportoftheRoll‐UpDoorResetprojectmayoccur.ThesurveywasconductedonDecember11,2014.Thepurposeofthissurveywastoidentifyandquantifyasbestos‐containingmaterials(ACM)andLBPthatmaybeimpactedbytheproposedrenovations.Thesurveyincludedavisualinspection,samplecollection,andsubsequentlaboratoryanalysisofsamplesofmaterialssuspectedtocontainasbestosorlead.NosuspectACMsthatwouldbeimpactedbytheproposedRoll‐UpDoorResetprojectwereidentified;therefore,nosamplesofsuspectACMwerecollected.Samplesofpaintedsurfaceswerecollectedatthisfacility.AvisualinspectionwasalsoconductedtoidentifyandquantifybuildingmaterialspotentiallycontainingPCBsandmercury,includinglightballasts,mercury‐containinglamps,andswitches/controlsLBPwasfound.LightfixturesandbulbspotentiallycontainingPCBsandmercurywereobservedwithinthebuilding.

Thebuildingisamulti‐wythe,approximately8,047ft2concretemasonryunit(CMU)structurewithbrickveneerconstructedin1980.Thesinglestoryhighbaystructurefeaturesanexistingelevatedmezzaninelevelcurrentlyun‐used,butintendedtoprovideadditionalstoragecapacity.

Thefollowingsectionsdescribethesamplingactivitiesconducted,andresultsofthesurvey.

FIELD ACTIVITIES AND RESULTS 

ThescopeofthefieldservicesincludedidentifyingsuspectbuildingmaterialsforthepotentialpresenceofasbestosandLBP,collectingsamples,andconductingavisualinspectionofbuildingmaterialspotentiallycontainingPCBsandmercury.ThefieldserviceswereperformedbyJosephChait[UnitedStatesEnvironmentalProtectionAgency(USEPA)trainedinaccordancewithAsbestosHazardEmergencyResponseAct(AHERA),expiresApril2013andpresentedinAttachment1]ofO'Brien&GereEngineers,Inc.(O'Brien&Gere),underthedirectionofMaureenT.Hoke,PE,inaccordancewithOccupationalSafetyandHealthAdministration(OSHA)andUSEPAregulations.Thefollowingparagraphsdiscusstheactivitiesconductedforeachspecificmaterialandtheresultsoftheinvestigation.

ASBESTOS 

The asbestos survey consisted of a visual inspection of accessible interior areas of the building thatmay beimpacted by the proposed renovation project to identify homogeneous areas of suspect ACM. Based on thevisual inspection, no suspect ACMs were identified within the scope of the proposed renovation. Significantdestructivemethodswerenotusedaspartofthevisualinspection.

Page 53: GA106 – ROLL -UP DOOR RESET Augusta, GA...GA106 - Roll-Up Door Reset May 22, 2015 Augusta, GA SECTION 01 33 00.00 13 SUBMITTAL REGISTER COVER PAGE 07/13 PART 1 GENERAL 1.1 SUBMITTAL

Mr. Lee C. Shokes USACE March 9, 2015 Page 2 

300 Drayton Street, 3rd Floor, Savannah, Georgia 31401 | p 912‐644‐5653 | f 912‐644‐5639 | www.obg.com 

  I:\COE‐Charleston.14254\52442.Lifecycle Rests 81st\GA106\GA106 Roll‐Up Door\GA106 Roll‐Up Door Survey Report\GA106 Roll‐Up Door Reset Survey Report_Inspector Final.doc 

© 2015 O’Brien & Gere. All Rights Reserved.

360° Engineering and Project Delivery Solutions 

SuspectACMsthatpotentiallymaybeburiedbehindwalls,abovehardceilings,andbelowtheexistingflooringand roofmaterialsmaynothavebeenobservedor sampled.These suspectmaterials areassumed to containasbestos.Ifthesematerialswillbeimpactedaspartoftheproposedrenovationactivities,destructivesamplingwillneed tobeperformedand samples submitted for laboratoryanalysis to confirmordeny thepresenceofACMinthesematerials.

LEAD BASED PAINT 

AlimitedscreenforLBPwasconductedatthesite.Twopaintchipsampleswerecollectedfromthefollowingbuildingmaterials:

Brownpaintontheroll‐updoorframe

Brownpaintontheroll‐updoor

ThelocationsofthesamplescollectedareshownonFigureH101.Thesampleswereplacedinsealedcontainers,andsentunderchain‐of‐custodytoEMSLAnalytical,Inc.,inCinnaminson,NewJersey,(NVLAP#101048‐0)foranalysisofLBPusingUSEPAmethodSW8467000B.Copiesofthechain‐of‐custodyformsandthelaboratoryanalyticalreportarepresentedinAttachment2.

Thelaboratoryanalyticaldataindicatesthatleadwasdetectedatconcentrationsabovelaboratorydetectionlimitinthetwosamplesanalyzed;however,thedetectedconcentrationsofleaddidnotexceedtheUSEPAdefinitionofleadasahazardouswasteof0.5%orgreaterbyweight(40CFRParts261and275).

AtablesummarizingthelaboratoryanalyticaldatafortheleadsamplingisincludedintheTablesectionofthisreport.

PCBS AND MERCURY                                 

Thefluorescentlightfixturesatthesitewerevisuallyinspectedduringthefieldactivities.Theballastsappearedtobeoriginaltothebuilding,andareassumedtocontainPCBs.

Basedonavisualinspection,fluorescentlightbulbslocatedatthesiteappeartocontainmercury.

CONCLUSIONS AND RECOMMENDATIONS 

Basedonthefindingsdiscussedabove,thefollowingconclusionsandrecommendationsareprovided:

ASBESTOS 

Basedontheresultsoftheassessmentconductedanddiscussedabove,suspectACMswerenotidentifiedintheareasexpectedtobeimpactedbytheplannedRoll‐UpDoorResetproject.Asstatedabove,buildingmaterialsmaybeencounteredduringrenovationthatwerenotobservedorsampledusingdestructivemethodsduringthefieldsurveythatshouldbeassumedtocontainasbestos.Ifthesematerialsaredisturbedasapartofrenovationactivities,theyshouldbeaddressedinaccordancewithasbestosregulations,orsampledusingdestructivemethodstoidentifywhethertheyareindeedACM,priortodisturbing.O’Brien&GererecommendsthatasbestosremovalbeperformedbyaqualifiedasbestosabatementcontractorutilizingUSEPAcertifiedworkersandsupervisors,andinaccordancewithfederal,state,andlocalregulations.

LEAD BASED PAINT 

Leadwasdetectedabovethelaboratorydetectionlimitintwopaintchipsamplescollectedfromthesite.Thedetectedconcentrationsdidnotexceed0.5%orgreaterbyweight,andare,therefore,notconsideredhazardouswaste.However,itisrecommendedthatapplicablestateandfederalregulationsconcerninglead,includingthosegoverningworkerprotection,arefollowedduringrenovationactivities.ThesiteisnotsubjecttotheGeorgiaLeadRenovation,Repair,andPainting(RRP)rulesbecauseitisnotconsideredachild‐occupiedfacilityortargethousing.LBPbuildingmaterialsatthesitearesubjecttoGeorgia’ssolidwasteruleswhichrequire

Page 54: GA106 – ROLL -UP DOOR RESET Augusta, GA...GA106 - Roll-Up Door Reset May 22, 2015 Augusta, GA SECTION 01 33 00.00 13 SUBMITTAL REGISTER COVER PAGE 07/13 PART 1 GENERAL 1.1 SUBMITTAL

Mr. Lee C. Shokes USACE March 9, 2015 Page 3 

300 Drayton Street, 3rd Floor, Savannah, Georgia 31401 | p 912‐644‐5653 | f 912‐644‐5639 | www.obg.com 

  I:\COE‐Charleston.14254\52442.Lifecycle Rests 81st\GA106\GA106 Roll‐Up Door\GA106 Roll‐Up Door Survey Report\GA106 Roll‐Up Door Reset Survey Report_Inspector Final.doc 

© 2015 O’Brien & Gere. All Rights Reserved.

360° Engineering and Project Delivery Solutions 

debrisfrompaintedmaterialstonotbeleftinsoilandthewastetobedisposedofinapermittedmunicipalsolidwaste(MSW)orpermittedconstructionanddemolition(C&D)landfill.

PCBS AND MERCURY                                 

FluorescentlightballastsareregulatedundertheToxicSubstanceControlAct(TSCA)andshouldbedisposedusingacertifiedrecyclerorataTSCAapprovedPCBdisposalfacility.

BuildingmaterialscontainingmercuryareconsidereduniversalwasteandshouldbehandledinaccordancewithGeorgia’sruleforSolidWasteManagement(391‐3‐4),whichreferencesUSEPAStandardsforSolidWasteManagement[40CodeofFederalRegulations(CFR)Part273].Accordingto40CFRPart273,asmallquantityhandler(lessthan5,000kgofuniversalwasteonsiteatanyonetime)ofmercurycontainingequipmentandlampsmustmanagetheequipmentinawaythatpreventsreleasesofanyuniversalwasteorcomponentofauniversalwastetotheenvironment.Asmallquantityhandlerofuniversalwasteisprohibitedfromsendingortakinguniversalwastetoaplaceotherthananotheruniversalwastehandler,adestinationfacility,oraforeigndestination.Itisrecommendedthatsuspectmercurycontainingequipment(fluorescentbulbs,thermostats,andelectricalpanels)bedisposedusingarecyclercertifiedtohandlethewaste.40CFRPart273shouldbefollowedwhenhandlinguniversalwasteatthesite.

O’Brien&GereappreciatestheopportunitytobeofservicetotheUSArmyCorpsofEngineers.Shouldtherebeanyquestionsorcommentsregardingthecontentofthisreport,pleasefeelfreetocontactmeat912‐644‐5653.

Verytrulyyours,O’BRIEN&GEREENGINEERS,INC.MaureenT.Hoke,PEVicePresident

IcertifythatIamanAHERAtrainedAsbestosBuildingInspectorasrequiredbythestateofGeorgia,andthatIconductedthelimitedasbestosinspectiondocumentedherein.

Inspector’sSignature

JosephChait

Name

TABLE

SummaryofLeadBasedPaintSamplesandAnalyticalResults

FIGURES

H101‐AsbestosandLead‐BasedPaintSampleLocations

Page 55: GA106 – ROLL -UP DOOR RESET Augusta, GA...GA106 - Roll-Up Door Reset May 22, 2015 Augusta, GA SECTION 01 33 00.00 13 SUBMITTAL REGISTER COVER PAGE 07/13 PART 1 GENERAL 1.1 SUBMITTAL

Mr. Lee C. Shokes USACE March 9, 2015 Page 4 

300 Drayton Street, 3rd Floor, Savannah, Georgia 31401 | p 912‐644‐5653 | f 912‐644‐5639 | www.obg.com 

  I:\COE‐Charleston.14254\52442.Lifecycle Rests 81st\GA106\GA106 Roll‐Up Door\GA106 Roll‐Up Door Survey Report\GA106 Roll‐Up Door Reset Survey Report_Inspector Final.doc 

© 2015 O’Brien & Gere. All Rights Reserved.

360° Engineering and Project Delivery Solutions 

ATTACHMENTS

1‐AsbestosInspectorCertification2‐LaboratoryAnalyticalReports

Page 56: GA106 – ROLL -UP DOOR RESET Augusta, GA...GA106 - Roll-Up Door Reset May 22, 2015 Augusta, GA SECTION 01 33 00.00 13 SUBMITTAL REGISTER COVER PAGE 07/13 PART 1 GENERAL 1.1 SUBMITTAL

 

Tables

Page 57: GA106 – ROLL -UP DOOR RESET Augusta, GA...GA106 - Roll-Up Door Reset May 22, 2015 Augusta, GA SECTION 01 33 00.00 13 SUBMITTAL REGISTER COVER PAGE 07/13 PART 1 GENERAL 1.1 SUBMITTAL

Sample 

NumberSample Date Sample Location Sample Description

Lead 

Concentration 

(Percent by 

Weight)

LP‐2 12/11/14 Roll‐up Door Brown Frame Paint 0.041 %

LP‐3 12/11/14 Roll‐up Door Brown Roll‐Up Door Paint 0.062 %

bold ‐ greater than the USEPA's definition of lead of 0.5% or greater by weight (40 CFR 745)

Summary of Lead Based Paint Samples and Analytical Results

GA106 ‐ Roll‐Up Door Reset

Page 58: GA106 – ROLL -UP DOOR RESET Augusta, GA...GA106 - Roll-Up Door Reset May 22, 2015 Augusta, GA SECTION 01 33 00.00 13 SUBMITTAL REGISTER COVER PAGE 07/13 PART 1 GENERAL 1.1 SUBMITTAL

 

   

Figures

Page 59: GA106 – ROLL -UP DOOR RESET Augusta, GA...GA106 - Roll-Up Door Reset May 22, 2015 Augusta, GA SECTION 01 33 00.00 13 SUBMITTAL REGISTER COVER PAGE 07/13 PART 1 GENERAL 1.1 SUBMITTAL

 

   

Attachment1

AsbestosInspectorCertification

Page 60: GA106 – ROLL -UP DOOR RESET Augusta, GA...GA106 - Roll-Up Door Reset May 22, 2015 Augusta, GA SECTION 01 33 00.00 13 SUBMITTAL REGISTER COVER PAGE 07/13 PART 1 GENERAL 1.1 SUBMITTAL
Page 61: GA106 – ROLL -UP DOOR RESET Augusta, GA...GA106 - Roll-Up Door Reset May 22, 2015 Augusta, GA SECTION 01 33 00.00 13 SUBMITTAL REGISTER COVER PAGE 07/13 PART 1 GENERAL 1.1 SUBMITTAL

 

 

   

Attachment2

LaboratoryAnalyticalReport

Page 62: GA106 – ROLL -UP DOOR RESET Augusta, GA...GA106 - Roll-Up Door Reset May 22, 2015 Augusta, GA SECTION 01 33 00.00 13 SUBMITTAL REGISTER COVER PAGE 07/13 PART 1 GENERAL 1.1 SUBMITTAL

EMSL Analytical, Inc.200 Route 130 North, Cinnaminson, NJ 08077Phone/Fax: (800) 220-3675 / (856) 786-5974http://www.EMSL.com [email protected]

041436679CustomerID: OBGR34ACustomerPO:ProjectID:

EMSL Order:

Attn: Joseph ChaitO'Brien & Gere2170 Ashley Phosphate RoadSuite 504North Charleston, SC 29406

Received: 12/15/14 9:10 AM

81st USARC

Fax:Phone: (843) 553-6670

Project:

12/16/2014Analysis Date:12/11/2014Collected:

Sample Description Appearance % Type

AsbestosNon-Asbestos

% Fibrous % Non-Fibrous

Test Report: Asbestos Analysis of Bulk Materials via EPA 600/R-93/116 Method using Polarized Light Microscopy

M1-A-Cove Base

041436679-0001

AMSA Office - Black Cove Base

Black None Detected

HA: M1

Non-FibrousHomogeneous

Non-fibrous (other)100%

M1-A-Mastic

041436679-0001A

AMSA Office - Mastic

Tan None Detected

HA: M1

Non-FibrousHomogeneous

Non-fibrous (other)100%

M1-B-Cove Base

041436679-0002

Admin Office - Black Cove Base

Black None Detected

HA: M1

Non-FibrousHomogeneous

Non-fibrous (other)100%

M1-B-Mastic

041436679-0002A

Admin Office - Mastic

Tan None Detected

HA: M1

Non-FibrousHomogeneous

Non-fibrous (other)100%

D-A-Tar

041436679-0003

Roof Gutter Drain - Black Tar

Black None Detected

HA: D

FibrousHomogeneous

Cellulose10% Non-fibrous (other)90%

D-A-Shingle

041436679-0003A

Roof Gutter Drain - Shingle

Black None Detected

HA: D

FibrousHomogeneous

Synthetic20% Non-fibrous (other)80%

D-A-Silver Paint

041436679-0003B

Roof Gutter Drain - Silver Paint

Silver None Detected

HA: D

Non-FibrousHomogeneous

Non-fibrous (other)100%

1Test Report PLM-7.28.9 Printed: 12/16/2014 1:36:44 PM

Stephen Siegel, CIH, Laboratory Manageror other approved signatory

Analyst(s)

EMSL maintains liability limited to cost of analysis. This report relates only to the samples reported and may not be reproduced, except in full, without written approval by EMSL. EMSL bears no responsibility for sample collection activities or analytical method limitations. Interpretation and use of test results are the responsibility of the client. This report must not be used by the client to claim product certification, approval, or endorsement by NVLAP, NIST or any agency of the federal government. Non-friable organically bound materials present a problem matrix and therefore EMSL recommends gravimetric reduction prior to analysis. Samples received in good condition unless otherwise noted. Estimated accuracy, precision and uncertainty data available upon request. Unless requested by the client, building materials manufactured with multiple layers (i.e. linoleum, wallboard, etc.) are reported as a single sample. Reporting limit is 1%Samples analyzed by EMSL Analytical, Inc. Cinnaminson, NJ NVLAP Lab Code 101048-0, AIHA-LAP, LLC-IHLAP Lab 100194, NYS ELAP 10872, NJ DEP 03036, PA ID# 68-00367

Initial report from 12/16/2014 13:36:44

Jillian Yurick (35)Thomas Schwab (17)

Page 63: GA106 – ROLL -UP DOOR RESET Augusta, GA...GA106 - Roll-Up Door Reset May 22, 2015 Augusta, GA SECTION 01 33 00.00 13 SUBMITTAL REGISTER COVER PAGE 07/13 PART 1 GENERAL 1.1 SUBMITTAL

EMSL Analytical, Inc.200 Route 130 North, Cinnaminson, NJ 08077Phone/Fax: (800) 220-3675 / (856) 786-5974http://www.EMSL.com [email protected]

041436679CustomerID: OBGR34ACustomerPO:ProjectID:

EMSL Order:

Attn: Joseph ChaitO'Brien & Gere2170 Ashley Phosphate RoadSuite 504North Charleston, SC 29406

Received: 12/15/14 9:10 AM

81st USARC

Fax:Phone: (843) 553-6670

Project:

12/16/2014Analysis Date:12/11/2014Collected:

Sample Description Appearance % Type

AsbestosNon-Asbestos

% Fibrous % Non-Fibrous

Test Report: Asbestos Analysis of Bulk Materials via EPA 600/R-93/116 Method using Polarized Light Microscopy

D-B-Tar

041436679-0004

Roof Gutter Drain - Black Tar

Black None Detected

HA: D

FibrousHomogeneous

Cellulose10% Non-fibrous (other)90%

D-B-Shingle

041436679-0004A

Roof Gutter Drain - Shingle

Black None Detected

HA: D

FibrousHomogeneous

Synthetic20% Non-fibrous (other)80%

D-B-Silver Paint

041436679-0004B

Roof Gutter Drain - Silver Paint

Silver None Detected

HA: D

Non-FibrousHomogeneous

Non-fibrous (other)100%

D-C-Tar

041436679-0005

Roof Gutter Drain - Black Tar

Black None Detected

HA: D

FibrousHomogeneous

Cellulose10% Non-fibrous (other)90%

D-C-Shingle

041436679-0005A

Roof Gutter Drain - Shingle

Black None Detected

HA: D

FibrousHomogeneous

Synthetic20% Non-fibrous (other)80%

D-C-Silver Paint

041436679-0005B

Roof Gutter Drain - Silver Paint

Silver None Detected

HA: D

Non-FibrousHomogeneous

Non-fibrous (other)100%

V-A-Flashing

041436679-0006

Roof Vent - Flashing

Black None Detected

HA: V

FibrousHomogeneous

Synthetic20% Non-fibrous (other)80%

2Test Report PLM-7.28.9 Printed: 12/16/2014 1:36:44 PM

Stephen Siegel, CIH, Laboratory Manageror other approved signatory

Analyst(s)

EMSL maintains liability limited to cost of analysis. This report relates only to the samples reported and may not be reproduced, except in full, without written approval by EMSL. EMSL bears no responsibility for sample collection activities or analytical method limitations. Interpretation and use of test results are the responsibility of the client. This report must not be used by the client to claim product certification, approval, or endorsement by NVLAP, NIST or any agency of the federal government. Non-friable organically bound materials present a problem matrix and therefore EMSL recommends gravimetric reduction prior to analysis. Samples received in good condition unless otherwise noted. Estimated accuracy, precision and uncertainty data available upon request. Unless requested by the client, building materials manufactured with multiple layers (i.e. linoleum, wallboard, etc.) are reported as a single sample. Reporting limit is 1%Samples analyzed by EMSL Analytical, Inc. Cinnaminson, NJ NVLAP Lab Code 101048-0, AIHA-LAP, LLC-IHLAP Lab 100194, NYS ELAP 10872, NJ DEP 03036, PA ID# 68-00367

Initial report from 12/16/2014 13:36:44

Jillian Yurick (35)Thomas Schwab (17)

Page 64: GA106 – ROLL -UP DOOR RESET Augusta, GA...GA106 - Roll-Up Door Reset May 22, 2015 Augusta, GA SECTION 01 33 00.00 13 SUBMITTAL REGISTER COVER PAGE 07/13 PART 1 GENERAL 1.1 SUBMITTAL

EMSL Analytical, Inc.200 Route 130 North, Cinnaminson, NJ 08077Phone/Fax: (800) 220-3675 / (856) 786-5974http://www.EMSL.com [email protected]

041436679CustomerID: OBGR34ACustomerPO:ProjectID:

EMSL Order:

Attn: Joseph ChaitO'Brien & Gere2170 Ashley Phosphate RoadSuite 504North Charleston, SC 29406

Received: 12/15/14 9:10 AM

81st USARC

Fax:Phone: (843) 553-6670

Project:

12/16/2014Analysis Date:12/11/2014Collected:

Sample Description Appearance % Type

AsbestosNon-Asbestos

% Fibrous % Non-Fibrous

Test Report: Asbestos Analysis of Bulk Materials via EPA 600/R-93/116 Method using Polarized Light Microscopy

V-A-Tar

041436679-0006A

Roof Vent - Tar Black None Detected

HA: V

Non-FibrousHomogeneous

Non-fibrous (other)100%

V-A-Silver Paint

041436679-0006B

Roof Vent - Silver Paint

Silver None Detected

HA: V

Non-FibrousHomogeneous

Non-fibrous (other)100%

V-B-Flashing

041436679-0007

Roof Vent - Flashing

Black None Detected

HA: V

FibrousHomogeneous

Synthetic35% Non-fibrous (other)65%

V-B-Tar

041436679-0007A

Roof Vent - Tar Black None Detected

HA: V

Non-FibrousHomogeneous

Cellulose5% Non-fibrous (other)95%

V-B-Silver Paint

041436679-0007B

Roof Vent - Silver Paint

Silver None Detected

HA: V

Non-FibrousHomogeneous

Non-fibrous (other)100%

V-B-Shingle

041436679-0007C

Roof Vent - Shingle

Black None Detected

HA: V

FibrousHomogeneous

Synthetic20% Non-fibrous (other)80%

V-C-Flashing

041436679-0008

Roof Vent - Flashing

Black None Detected

HA: V

FibrousHomogeneous

Cellulose15% Non-fibrous (other)85%

3Test Report PLM-7.28.9 Printed: 12/16/2014 1:36:44 PM

Stephen Siegel, CIH, Laboratory Manageror other approved signatory

Analyst(s)

EMSL maintains liability limited to cost of analysis. This report relates only to the samples reported and may not be reproduced, except in full, without written approval by EMSL. EMSL bears no responsibility for sample collection activities or analytical method limitations. Interpretation and use of test results are the responsibility of the client. This report must not be used by the client to claim product certification, approval, or endorsement by NVLAP, NIST or any agency of the federal government. Non-friable organically bound materials present a problem matrix and therefore EMSL recommends gravimetric reduction prior to analysis. Samples received in good condition unless otherwise noted. Estimated accuracy, precision and uncertainty data available upon request. Unless requested by the client, building materials manufactured with multiple layers (i.e. linoleum, wallboard, etc.) are reported as a single sample. Reporting limit is 1%Samples analyzed by EMSL Analytical, Inc. Cinnaminson, NJ NVLAP Lab Code 101048-0, AIHA-LAP, LLC-IHLAP Lab 100194, NYS ELAP 10872, NJ DEP 03036, PA ID# 68-00367

Initial report from 12/16/2014 13:36:44

Jillian Yurick (35)Thomas Schwab (17)

Page 65: GA106 – ROLL -UP DOOR RESET Augusta, GA...GA106 - Roll-Up Door Reset May 22, 2015 Augusta, GA SECTION 01 33 00.00 13 SUBMITTAL REGISTER COVER PAGE 07/13 PART 1 GENERAL 1.1 SUBMITTAL

EMSL Analytical, Inc.200 Route 130 North, Cinnaminson, NJ 08077Phone/Fax: (800) 220-3675 / (856) 786-5974http://www.EMSL.com [email protected]

041436679CustomerID: OBGR34ACustomerPO:ProjectID:

EMSL Order:

Attn: Joseph ChaitO'Brien & Gere2170 Ashley Phosphate RoadSuite 504North Charleston, SC 29406

Received: 12/15/14 9:10 AM

81st USARC

Fax:Phone: (843) 553-6670

Project:

12/16/2014Analysis Date:12/11/2014Collected:

Sample Description Appearance % Type

AsbestosNon-Asbestos

% Fibrous % Non-Fibrous

Test Report: Asbestos Analysis of Bulk Materials via EPA 600/R-93/116 Method using Polarized Light Microscopy

V-C-Tar

041436679-0008A

Roof Vent - Tar Black None Detected

HA: V

Non-FibrousHomogeneous

Non-fibrous (other)100%

V-C-Silver Paint

041436679-0008B

Roof Vent - Silver Paint

Silver None Detected

HA: V

Non-FibrousHomogeneous

Non-fibrous (other)100%

V-C-Shingle

041436679-0008C

Roof Vent - Shingle

Black None Detected

HA: V

FibrousHomogeneous

Synthetic20% Non-fibrous (other)80%

R-A-Silver Paint

041436679-0009

Roofing Material - Silver Paint

Silver None Detected

HA: R

Non-FibrousHomogeneous

Non-fibrous (other)100%

R-A-Flashing

041436679-0009A

Roofing Material - Roof Mastic Flashing

Black None Detected

HA: R

FibrousHomogeneous

Synthetic35% Non-fibrous (other)65%

R-A-Tar

041436679-0009B

Roofing Material - Tar

Black None Detected

HA: R

Non-FibrousHomogeneous

Non-fibrous (other)100%

R-A-Insulation

041436679-0009C

Roofing Material - Insulation

Brown None Detected

HA: R

FibrousHomogeneous

Cellulose90% Non-fibrous (other)10%

4Test Report PLM-7.28.9 Printed: 12/16/2014 1:36:44 PM

Stephen Siegel, CIH, Laboratory Manageror other approved signatory

Analyst(s)

EMSL maintains liability limited to cost of analysis. This report relates only to the samples reported and may not be reproduced, except in full, without written approval by EMSL. EMSL bears no responsibility for sample collection activities or analytical method limitations. Interpretation and use of test results are the responsibility of the client. This report must not be used by the client to claim product certification, approval, or endorsement by NVLAP, NIST or any agency of the federal government. Non-friable organically bound materials present a problem matrix and therefore EMSL recommends gravimetric reduction prior to analysis. Samples received in good condition unless otherwise noted. Estimated accuracy, precision and uncertainty data available upon request. Unless requested by the client, building materials manufactured with multiple layers (i.e. linoleum, wallboard, etc.) are reported as a single sample. Reporting limit is 1%Samples analyzed by EMSL Analytical, Inc. Cinnaminson, NJ NVLAP Lab Code 101048-0, AIHA-LAP, LLC-IHLAP Lab 100194, NYS ELAP 10872, NJ DEP 03036, PA ID# 68-00367

Initial report from 12/16/2014 13:36:44

Jillian Yurick (35)Thomas Schwab (17)

Page 66: GA106 – ROLL -UP DOOR RESET Augusta, GA...GA106 - Roll-Up Door Reset May 22, 2015 Augusta, GA SECTION 01 33 00.00 13 SUBMITTAL REGISTER COVER PAGE 07/13 PART 1 GENERAL 1.1 SUBMITTAL

EMSL Analytical, Inc.200 Route 130 North, Cinnaminson, NJ 08077Phone/Fax: (800) 220-3675 / (856) 786-5974http://www.EMSL.com [email protected]

041436679CustomerID: OBGR34ACustomerPO:ProjectID:

EMSL Order:

Attn: Joseph ChaitO'Brien & Gere2170 Ashley Phosphate RoadSuite 504North Charleston, SC 29406

Received: 12/15/14 9:10 AM

81st USARC

Fax:Phone: (843) 553-6670

Project:

12/16/2014Analysis Date:12/11/2014Collected:

Sample Description Appearance % Type

AsbestosNon-Asbestos

% Fibrous % Non-Fibrous

Test Report: Asbestos Analysis of Bulk Materials via EPA 600/R-93/116 Method using Polarized Light Microscopy

R-B-Silver Paint

041436679-0010

Roofing Material - Silver Paint

Silver None Detected

HA: R

Non-FibrousHomogeneous

Non-fibrous (other)100%

R-B-Flashing

041436679-0010A

Roofing Material - Roof Mastic Flashing

Black None Detected

HA: R

FibrousHomogeneous

Synthetic30% Non-fibrous (other)70%

R-B-Tar

041436679-0010B

Roofing Material - Tar

Black None Detected

HA: R

Non-FibrousHomogeneous

Non-fibrous (other)100%

R-B-Insulation

041436679-0010C

Roofing Material - Insulation

Brown None Detected

HA: R

FibrousHomogeneous

Cellulose90% Non-fibrous (other)10%

R-C-Silver Paint

041436679-0011

Roof - Silver Paint Silver None Detected

HA: R

Non-FibrousHomogeneous

Non-fibrous (other)100%

R-C-Flashing

041436679-0011A

Roof - Flashing Black None Detected

HA: R

FibrousHomogeneous

Synthetic30% Non-fibrous (other)70%

R-C-Tar

041436679-0011B

Roof - Tar Black None Detected

HA: R

Non-FibrousHomogeneous

Non-fibrous (other)100%

5Test Report PLM-7.28.9 Printed: 12/16/2014 1:36:44 PM

Stephen Siegel, CIH, Laboratory Manageror other approved signatory

Analyst(s)

EMSL maintains liability limited to cost of analysis. This report relates only to the samples reported and may not be reproduced, except in full, without written approval by EMSL. EMSL bears no responsibility for sample collection activities or analytical method limitations. Interpretation and use of test results are the responsibility of the client. This report must not be used by the client to claim product certification, approval, or endorsement by NVLAP, NIST or any agency of the federal government. Non-friable organically bound materials present a problem matrix and therefore EMSL recommends gravimetric reduction prior to analysis. Samples received in good condition unless otherwise noted. Estimated accuracy, precision and uncertainty data available upon request. Unless requested by the client, building materials manufactured with multiple layers (i.e. linoleum, wallboard, etc.) are reported as a single sample. Reporting limit is 1%Samples analyzed by EMSL Analytical, Inc. Cinnaminson, NJ NVLAP Lab Code 101048-0, AIHA-LAP, LLC-IHLAP Lab 100194, NYS ELAP 10872, NJ DEP 03036, PA ID# 68-00367

Initial report from 12/16/2014 13:36:44

Jillian Yurick (35)Thomas Schwab (17)

Page 67: GA106 – ROLL -UP DOOR RESET Augusta, GA...GA106 - Roll-Up Door Reset May 22, 2015 Augusta, GA SECTION 01 33 00.00 13 SUBMITTAL REGISTER COVER PAGE 07/13 PART 1 GENERAL 1.1 SUBMITTAL

EMSL Analytical, Inc.200 Route 130 North, Cinnaminson, NJ 08077Phone/Fax: (800) 220-3675 / (856) 786-5974http://www.EMSL.com [email protected]

041436679CustomerID: OBGR34ACustomerPO:ProjectID:

EMSL Order:

Attn: Joseph ChaitO'Brien & Gere2170 Ashley Phosphate RoadSuite 504North Charleston, SC 29406

Received: 12/15/14 9:10 AM

81st USARC

Fax:Phone: (843) 553-6670

Project:

12/16/2014Analysis Date:12/11/2014Collected:

Sample Description Appearance % Type

AsbestosNon-Asbestos

% Fibrous % Non-Fibrous

Test Report: Asbestos Analysis of Bulk Materials via EPA 600/R-93/116 Method using Polarized Light Microscopy

R-C-Insulation

041436679-0011C

Roof - Insulation Brown None Detected

HA: R

FibrousHomogeneous

Cellulose90% Non-fibrous (other)10%

R-D-Silver Paint

041436679-0012

Roof - Silver Paint Silver None Detected

HA: R

Non-FibrousHomogeneous

Non-fibrous (other)100%

R-D-Flashing

041436679-0012A

Roof - Flashing Black None Detected

HA: R

FibrousHomogeneous

Synthetic25% Non-fibrous (other)75%

R-D-Tar

041436679-0012B

Roof - Tar Black None Detected

HA: R

Non-FibrousHomogeneous

Non-fibrous (other)100%

R-D-Insulation

041436679-0012C

Roof - Insulation Brown None Detected

HA: R

FibrousHomogeneous

Cellulose90% Non-fibrous (other)10%

R-E-Silver Paint

041436679-0013

Roof - Silver Paint Silver None Detected

HA: R

Non-FibrousHomogeneous

Non-fibrous (other)100%

R-E-Flashing

041436679-0013A

Roof - Flashing Black None Detected

HA: R

FibrousHomogeneous

Synthetic30% Non-fibrous (other)70%

6Test Report PLM-7.28.9 Printed: 12/16/2014 1:36:44 PM

Stephen Siegel, CIH, Laboratory Manageror other approved signatory

Analyst(s)

EMSL maintains liability limited to cost of analysis. This report relates only to the samples reported and may not be reproduced, except in full, without written approval by EMSL. EMSL bears no responsibility for sample collection activities or analytical method limitations. Interpretation and use of test results are the responsibility of the client. This report must not be used by the client to claim product certification, approval, or endorsement by NVLAP, NIST or any agency of the federal government. Non-friable organically bound materials present a problem matrix and therefore EMSL recommends gravimetric reduction prior to analysis. Samples received in good condition unless otherwise noted. Estimated accuracy, precision and uncertainty data available upon request. Unless requested by the client, building materials manufactured with multiple layers (i.e. linoleum, wallboard, etc.) are reported as a single sample. Reporting limit is 1%Samples analyzed by EMSL Analytical, Inc. Cinnaminson, NJ NVLAP Lab Code 101048-0, AIHA-LAP, LLC-IHLAP Lab 100194, NYS ELAP 10872, NJ DEP 03036, PA ID# 68-00367

Initial report from 12/16/2014 13:36:44

Jillian Yurick (35)Thomas Schwab (17)

Page 68: GA106 – ROLL -UP DOOR RESET Augusta, GA...GA106 - Roll-Up Door Reset May 22, 2015 Augusta, GA SECTION 01 33 00.00 13 SUBMITTAL REGISTER COVER PAGE 07/13 PART 1 GENERAL 1.1 SUBMITTAL

EMSL Analytical, Inc.200 Route 130 North, Cinnaminson, NJ 08077Phone/Fax: (800) 220-3675 / (856) 786-5974http://www.EMSL.com [email protected]

041436679CustomerID: OBGR34ACustomerPO:ProjectID:

EMSL Order:

Attn: Joseph ChaitO'Brien & Gere2170 Ashley Phosphate RoadSuite 504North Charleston, SC 29406

Received: 12/15/14 9:10 AM

81st USARC

Fax:Phone: (843) 553-6670

Project:

12/16/2014Analysis Date:12/11/2014Collected:

Sample Description Appearance % Type

AsbestosNon-Asbestos

% Fibrous % Non-Fibrous

Test Report: Asbestos Analysis of Bulk Materials via EPA 600/R-93/116 Method using Polarized Light Microscopy

R-E-Tar

041436679-0013B

Roof - Tar Black None Detected

HA: R

Non-FibrousHomogeneous

Non-fibrous (other)100%

R-E-Insulation

041436679-0013C

Roof - Insulation Brown None Detected

HA: R

FibrousHomogeneous

Cellulose90% Non-fibrous (other)10%

R-F-Silver Paint

041436679-0014

Roof - Silver Paint Silver None Detected

HA: R

Non-FibrousHomogeneous

Non-fibrous (other)100%

R-F-Flashing

041436679-0014A

Roof - Flashing Black None Detected

HA: R

FibrousHomogeneous

Cellulose10%Synthetic20%

Non-fibrous (other)70%

R-F-Tar

041436679-0014B

Roof - Tar Black None Detected

HA: R

Non-FibrousHomogeneous

Non-fibrous (other)100%

R-F-Insulation

041436679-0014C

Roof - Insulation Brown None Detected

HA: R

FibrousHomogeneous

Cellulose75% Non-fibrous (other)25%

R-G-Silver Paint

041436679-0015

Roof - Silver Paint Silver None Detected

HA: R

Non-FibrousHomogeneous

Non-fibrous (other)100%

7Test Report PLM-7.28.9 Printed: 12/16/2014 1:36:44 PM

Stephen Siegel, CIH, Laboratory Manageror other approved signatory

Analyst(s)

EMSL maintains liability limited to cost of analysis. This report relates only to the samples reported and may not be reproduced, except in full, without written approval by EMSL. EMSL bears no responsibility for sample collection activities or analytical method limitations. Interpretation and use of test results are the responsibility of the client. This report must not be used by the client to claim product certification, approval, or endorsement by NVLAP, NIST or any agency of the federal government. Non-friable organically bound materials present a problem matrix and therefore EMSL recommends gravimetric reduction prior to analysis. Samples received in good condition unless otherwise noted. Estimated accuracy, precision and uncertainty data available upon request. Unless requested by the client, building materials manufactured with multiple layers (i.e. linoleum, wallboard, etc.) are reported as a single sample. Reporting limit is 1%Samples analyzed by EMSL Analytical, Inc. Cinnaminson, NJ NVLAP Lab Code 101048-0, AIHA-LAP, LLC-IHLAP Lab 100194, NYS ELAP 10872, NJ DEP 03036, PA ID# 68-00367

Initial report from 12/16/2014 13:36:44

Jillian Yurick (35)Thomas Schwab (17)

Page 69: GA106 – ROLL -UP DOOR RESET Augusta, GA...GA106 - Roll-Up Door Reset May 22, 2015 Augusta, GA SECTION 01 33 00.00 13 SUBMITTAL REGISTER COVER PAGE 07/13 PART 1 GENERAL 1.1 SUBMITTAL

EMSL Analytical, Inc.200 Route 130 North, Cinnaminson, NJ 08077Phone/Fax: (800) 220-3675 / (856) 786-5974http://www.EMSL.com [email protected]

041436679CustomerID: OBGR34ACustomerPO:ProjectID:

EMSL Order:

Attn: Joseph ChaitO'Brien & Gere2170 Ashley Phosphate RoadSuite 504North Charleston, SC 29406

Received: 12/15/14 9:10 AM

81st USARC

Fax:Phone: (843) 553-6670

Project:

12/16/2014Analysis Date:12/11/2014Collected:

Sample Description Appearance % Type

AsbestosNon-Asbestos

% Fibrous % Non-Fibrous

Test Report: Asbestos Analysis of Bulk Materials via EPA 600/R-93/116 Method using Polarized Light Microscopy

R-G-Flashing

041436679-0015A

Roof - Flashing Black None Detected

HA: R

FibrousHomogeneous

Synthetic20%Cellulose5%

Non-fibrous (other)75%

R-G-Tar

041436679-0015B

Roof - Tar Black None Detected

HA: R

Non-FibrousHomogeneous

Non-fibrous (other)100%

R-G-Insulation

041436679-0015C

Roof - Insulation Brown None Detected

HA: R

FibrousHomogeneous

Cellulose95% Non-fibrous (other)5%

8THIS IS THE LAST PAGE OF THE REPORT.Test Report PLM-7.28.9 Printed: 12/16/2014 1:36:44 PM

Stephen Siegel, CIH, Laboratory Manageror other approved signatory

Analyst(s)

EMSL maintains liability limited to cost of analysis. This report relates only to the samples reported and may not be reproduced, except in full, without written approval by EMSL. EMSL bears no responsibility for sample collection activities or analytical method limitations. Interpretation and use of test results are the responsibility of the client. This report must not be used by the client to claim product certification, approval, or endorsement by NVLAP, NIST or any agency of the federal government. Non-friable organically bound materials present a problem matrix and therefore EMSL recommends gravimetric reduction prior to analysis. Samples received in good condition unless otherwise noted. Estimated accuracy, precision and uncertainty data available upon request. Unless requested by the client, building materials manufactured with multiple layers (i.e. linoleum, wallboard, etc.) are reported as a single sample. Reporting limit is 1%Samples analyzed by EMSL Analytical, Inc. Cinnaminson, NJ NVLAP Lab Code 101048-0, AIHA-LAP, LLC-IHLAP Lab 100194, NYS ELAP 10872, NJ DEP 03036, PA ID# 68-00367

Initial report from 12/16/2014 13:36:44

Jillian Yurick (35)Thomas Schwab (17)

Page 70: GA106 – ROLL -UP DOOR RESET Augusta, GA...GA106 - Roll-Up Door Reset May 22, 2015 Augusta, GA SECTION 01 33 00.00 13 SUBMITTAL REGISTER COVER PAGE 07/13 PART 1 GENERAL 1.1 SUBMITTAL

Client Sample Description ConcentrationLab ID AnalyzedLead

Collected

EMSL Analytical, Inc.200 Route 130 North, Cinnaminson, NJ 08077Phone/Fax: (856) 303-2500 / (856) 786-5974http://www.EMSL.com [email protected]

Attn: O'Brien & Gere2170 Ashley Phosphate RoadSuite 504North Charleston, SC 29406

Received: 12/15/14 9:58 AM

81st USARC

Fax:Phone: (843) 553-6670

Project:

12/11/2014Collected:

Test Report: Lead in Paint Chips by Flame AAS (SW 846 3050B/7000B)*

201417811CustomerID: OBGR34ACustomerPO:ProjectID:

EMSL Order:

Site: AMSA Office201417811-0001LP-1 <0.010 % wt12/15/201412/11/2014

Site: Rollup Door East201417811-0002LP-2 0.041 % wt12/15/201412/11/2014

Site: Rollup Door West201417811-0003LP-3 0.062 % wt12/15/201412/11/2014

Site: Drain Pipe201417811-0004LP-4 3.0 % wt12/15/201412/11/2014

Page 1 of 1

Julie Smith - Laboratory DirectorNJ-NELAP Accredited:03036or other approved signatory

Test Report ChmSnglePrm/nQC-7.32.3 Printed: 12/16/2014 11:34:02 AM

*Analysis following Lead in Paint by EMSL SOP/Determination of Environmental Lead by FLAA. Reporting limit is 0.010 % wt based on the minimum sample weight per our SOP. Unless noted, results in this report are not blank corrected. This report relates only to the samples reported above and may not be reproduced, except in full, without written approval by EMSL. EMSL bears no responsibility for sample collection activities. Samples received in good condition unless otherwise noted. "<" (less than) result signifies that the analyte was not detected at or above the reporting limit. Measurement of uncertainty is available upon request. The QC data associated with the sample results included in this report meet the recovery and precision requirements established by the AIHA-LAP, unless specifically indicated otherwise.Samples analyzed by EMSL Analytical, Inc. Cinnaminson, NJ NELAP Certifications: NJ 03036, NY 10872, PA 68-00367, AIHA-LAP, LLC ELLAP 100194, A2LA 2845.01

Initial report from 12/16/2014 11:34:02

Page 71: GA106 – ROLL -UP DOOR RESET Augusta, GA...GA106 - Roll-Up Door Reset May 22, 2015 Augusta, GA SECTION 01 33 00.00 13 SUBMITTAL REGISTER COVER PAGE 07/13 PART 1 GENERAL 1.1 SUBMITTAL

OrderID: 041436679

Page 1 Of 2

Page 72: GA106 – ROLL -UP DOOR RESET Augusta, GA...GA106 - Roll-Up Door Reset May 22, 2015 Augusta, GA SECTION 01 33 00.00 13 SUBMITTAL REGISTER COVER PAGE 07/13 PART 1 GENERAL 1.1 SUBMITTAL

OrderID: 041436679

Page 2 Of 2

Page 73: GA106 – ROLL -UP DOOR RESET Augusta, GA...GA106 - Roll-Up Door Reset May 22, 2015 Augusta, GA SECTION 01 33 00.00 13 SUBMITTAL REGISTER COVER PAGE 07/13 PART 1 GENERAL 1.1 SUBMITTAL

OrderID: 201417811

Page 1 Of 1

Page 74: GA106 – ROLL -UP DOOR RESET Augusta, GA...GA106 - Roll-Up Door Reset May 22, 2015 Augusta, GA SECTION 01 33 00.00 13 SUBMITTAL REGISTER COVER PAGE 07/13 PART 1 GENERAL 1.1 SUBMITTAL

GA106 - Roll-Up Door Reset May 22, 2015Augusta, GA

SECTION 02 84 16

HANDLING OF LIGHTING BALLASTS AND LAMPS CONTAINING PCBs AND MERCURY04/06

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)

29 CFR 1910.1000 Air Contaminants

40 CFR 260 Hazardous Waste Management System: General

40 CFR 261 Identification and Listing of Hazardous Waste

40 CFR 262 Standards Applicable to Generators of Hazardous Waste

40 CFR 263 Standards Applicable to Transporters of Hazardous Waste

40 CFR 264 Standards for Owners and Operators of Hazardous Waste Treatment, Storage, and Disposal Facilities

40 CFR 265 Interim Status Standards for Owners and Operators of Hazardous Waste Treatment, Storage, and Disposal Facilities

40 CFR 268 Land Disposal Restrictions

40 CFR 270 United States Environmental Protection Agency (USEPA) Administered Permit Programs: The Hazardous Waste Permit Program

40 CFR 273 Standards For Universal Waste Management

40 CFR 761 Polychlorinated Biphenyls (PCBs) Manufacturing, Processing, Distribution in Commerce, and Use Prohibitions

49 CFR 178 Specifications for Packagings

STATE OF Georgia (GA) REGULATIONS

OCGA 391-3-4 Georgia Department of Natural Resources Rules for Solid Waste Management, 391-3-4.

SECTION 02 84 16 Page 1

Page 75: GA106 – ROLL -UP DOOR RESET Augusta, GA...GA106 - Roll-Up Door Reset May 22, 2015 Augusta, GA SECTION 01 33 00.00 13 SUBMITTAL REGISTER COVER PAGE 07/13 PART 1 GENERAL 1.1 SUBMITTAL

GA106 - Roll-Up Door Reset May 22, 2015Augusta, GA

1.2 REQUIREMENTS

Removal and disposal of PCB containing lighting ballasts and associatedmercury-containing lamps. Contractor may encounter leaking PCB ballasts.

1.3 DEFINITIONS

1.3.1 Certified Industrial Hygienist (CIH)

An industrial hygienist hired by the contractor shall be certified by the American Board of Industrial Hygiene.

1.3.2 Leak

Leak or leaking means any instance in which a PCB article, PCB container, or PCB equipment has any PCBs on any portion of its external surface.

1.3.3 Lamps

Lamp, also referred to as "universal waste lamp", is defined as the bulb or tube portion of an electric lighting device. A lamp is specifically designed to produce radiant energy, most often in the ultraviolet, visible, and infra-red regions of the electromagnetic spectrum. Examples of common universal waste electric lamps include, but are not limited to, fluorescent, high intensity discharge, neon, mercury vapor, high pressure sodium, and metal halide lamps.

1.3.4 Polychlorinated Biphenyls (PCBs)

PCBs as used in this specification shall mean the same as PCBs, PCB containing lighting ballast, and PCB container, as defined in 40 CFR 761 , Section 3, Definitions.

1.3.5 Spill

Spill means both intentional and unintentional spills, leaks, and other uncontrolled discharges when the release results in any quantity of PCBs running off or about to run off the external surface of the equipment or other PCB source, as well as the contamination resulting from those releases.

1.3.6 Universal Waste

Universal Waste means any of the following hazardous wastes that are managed under the universal waste requirements 40 CFR 273 :

(1) Batteries as described in Sec. 273.2 of this chapter; (2) Pesticides as described in Sec. 273.3 of this chapter; (3) Thermostats as described in Sec. 273.4 of this chapter; and (4) Lamps as described in Sec. 273.5 of this chapter.

1.4 QUALITY ASSURANCE

1.4.1 Regulatory Requirements

Perform PCB related work in accordance with 40 CFR 761 . Perform storage and transport of mercury-containing lamps in accordance with 40 CFR 261 , 40 CFR 264 , 40 CFR 265 , and 40 CFR 273 .

SECTION 02 84 16 Page 2

Page 76: GA106 – ROLL -UP DOOR RESET Augusta, GA...GA106 - Roll-Up Door Reset May 22, 2015 Augusta, GA SECTION 01 33 00.00 13 SUBMITTAL REGISTER COVER PAGE 07/13 PART 1 GENERAL 1.1 SUBMITTAL

GA106 - Roll-Up Door Reset May 22, 2015Augusta, GA

1.4.2 Training

CIH shall instruct and certify the training of all persons involved in the removal of PCB containing lighting ballasts and mercury-containing lamps. The instruction shall include: The dangers of PCB and mercury exposure, decontamination, safe work practices, and applicable OSHA and USEPA regulations. The CIH shall review and approve the PCB and Mercury-Containing Lamp Removal Work Plans.

1.4.3 Regulation Documents

Maintain at all times one copy each at the office and one copy each in view at the job site of OCGA 391-3-4 , 29 CFR 1910.1000 , 40 CFR 260 , 40 CFR 261 , 40 CFR 262 , 40 CFR 263 , 40 CFR 265 , 40 CFR 268 , 40 CFR 270 , 40 CFR 273 and of the Contractor removal work plan and disposal plan for PCB and for associated mercury-containing lamps.

1.5 SUBMITTALS

The following shall be submitted in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:

SD-07 Certificates

Qualifications of CIH

Training Certification

PCB and Lamp Removal Work Plan

PCB and Lamp Disposal Plan

SD-11 Closeout Submittals

Transporter certification of notification to EPA of their PCB waste activities and USEPA ID numbers

Certification of Decontamination

Certificate of Disposal and/or recycling. Submit to the Government before application for payment within 30 days of the date that the disposal of the PCB and mercury-containing lamp waste identified on the manifest was completed.

DD Form 1348-1

1.6 ENVIRONMENTAL REQUIREMENTS

Use special clothing:

a. Disposable gloves (polyethylene)

b. Eye protection

c. Personal protective equipment (PPE) as required by CIH

1.7 SCHEDULING

Notify the Contracting Officer 20 days prior to the start of PCB and

SECTION 02 84 16 Page 3

Page 77: GA106 – ROLL -UP DOOR RESET Augusta, GA...GA106 - Roll-Up Door Reset May 22, 2015 Augusta, GA SECTION 01 33 00.00 13 SUBMITTAL REGISTER COVER PAGE 07/13 PART 1 GENERAL 1.1 SUBMITTAL

GA106 - Roll-Up Door Reset May 22, 2015Augusta, GA

mercury-containing lamp removal work.

1.8 QUALITY ASSURANCE

1.8.1 Qualifications of CIH

Submit the name, address, and telephone number of the Industrial Hygienist selected to perform the duties in paragraph entitled "Certified Industrial Hygienist." Submit training certification that the Industrial Hygienist is certified, including certification number and date of certification or re certification.

1.8.2 PCB and Lamp Removal Work Plan

Submit a job-specific plan within 20 calendar days after award of contract of the work procedures to be used in the removal, packaging, and storage of PCB-containing lighting ballasts and associated mercury-containing lamps. Include in the plan: Requirements for PPE, spill cleanup procedures and equipment, eating, smoking and restroom procedures. The plan shall be approved and signed by the CIH. Obtain approval of the plan by the Contracting Officer prior to the start of PCB and/or lamp removal work.

1.8.3 PCB and Lamp Disposal Plan

Submit a PCB and lamp Disposal Plan within 45 calendar days after award of contract. The PCB and Lamp Disposal Plan shall comply with applicable requirements of federal, state, and local PCB and Universal waste regulations and address:

a. Estimated quantities of wastes to be generated, disposed, and recycled.

b. Names and qualifications of each Contractor that will be transporting, storing, treating, and disposing of the wastes. Include the facility location. Furnish two copies of USEPA and state PCB and mercury-containing lamp waste permit applications and USEPA identification numbers, as required.

c. Names and qualifications (experience and training) of personnel who will be working on-site with PCB and mercury-containing lamp wastes.

d. Spill prevention, containment, and cleanup contingency measures to be implemented.

e. Work plan and schedule for PCB and mercury-containing lamp waste removal, containment, storage, transportation, disposal and or recycling. Wastes shall be cleaned up and containerize daily.

PART 2 PRODUCTS

Not used.

PART 3 EXECUTION

3.1 WORK PROCEDURE

Furnish labor, materials, services, and equipment necessary for the removal of PCB containing lighting ballasts, associated mercury-containing fluorescent lamps, and high intensity discharge (HID) lamps in accordance

SECTION 02 84 16 Page 4

Page 78: GA106 – ROLL -UP DOOR RESET Augusta, GA...GA106 - Roll-Up Door Reset May 22, 2015 Augusta, GA SECTION 01 33 00.00 13 SUBMITTAL REGISTER COVER PAGE 07/13 PART 1 GENERAL 1.1 SUBMITTAL

GA106 - Roll-Up Door Reset May 22, 2015Augusta, GA

with local, state, or federal regulations. Do not expose PCBs to open flames or other high temperature sources since toxic decomposition by-products may be produced. Do not break mercury containing fluorescent lamps or HID lamps.

3.1.1 Work Operations

Ensure that work operations or processes involving PCB or PCB-contaminated materials are conducted in accordance with 40 CFR 761 , 40 CFR 262 , 40 CFR 263 , and the applicable requirements of this section, including but not limited to:

a. Obtaining suitable PCB and mercury-containing lamp storage sites.

b. Notifying Contracting Officer prior to commencing the operation.

c. Reporting leaks and spills to the Contracting Officer.

d. Cleaning up spills.

e. Inspecting PCB and PCB-contaminated items and waste containers for leaks and forwarding copies of inspection reports to the Contracting Officer.

f. Maintaining inspection, inventory and spill records.

3.2 PCB SPILL CLEANUP REQUIREMENTS

3.2.1 PCB Spills

Immediately report to the Contracting Officer any PCB spills.

3.2.2 PCB Spill Control Area

Rope off an area around the edges of a PCB leak or spill and post a "PCB Spill Authorized Personnel Only" caution sign. Immediately transfer leaking items to a drip pan or other container.

3.2.3 PCB Spill Cleanup

40 CFR 761 , subpart G. Initiate cleanup of spills as soon as possible, but no later than 24 hours of its discovery. Mop up the liquid with rags or other conventional absorbent. The spent absorbent shall be properly contained and disposed of as solid PCB waste.

3.2.4 Records and Certification

Document the cleanup with records of decontamination in accordance with 40 CFR 761 , Section 125, Requirements for PCB Spill Cleanup. Provide test results of cleanup and certification of decontamination.

3.3 REMOVAL

3.3.1 Ballasts

As ballasts are removed from the lighting fixture, inspect label on ballast. Ballasts without a "No PCB" label shall be assumed to contain PCBs and containerized and disposed of as required under paragraphs STORAGE FOR DISPOSAL and DISPOSAL. If there are less than 1600 "No PCB"

SECTION 02 84 16 Page 5

Page 79: GA106 – ROLL -UP DOOR RESET Augusta, GA...GA106 - Roll-Up Door Reset May 22, 2015 Augusta, GA SECTION 01 33 00.00 13 SUBMITTAL REGISTER COVER PAGE 07/13 PART 1 GENERAL 1.1 SUBMITTAL

GA106 - Roll-Up Door Reset May 22, 2015Augusta, GA

labeled lighting ballasts, dispose them as normal demolition debris. If there are more than 1600 "No PCB" labeled ballasts, establish whether the "No PCB" labeled ballasts contain diethylhexyl phthalate (DEHP) either by test or by checking with the ballast manufacturer indicated on the label. Submit testing results and/or written confirmation from the manufacturer to the Contracting Officer. If the ballasts do not contain DEHP, dispose them as normal construction debris. If they do contain DEHP, dispose them as hazardous material in accordance with Federal, State, and local regulations. As a basis of bid assume ballasts with "No PCB" labels do not contain DEHP and may disposed as normal construction debris. If 1600 or more DEHP ballasts are disposed in a 24 hour period, notify the National Response Team at 800-424-8802.

3.3.2 Lighting Lamps

Remove lighting tubes/lamps from the lighting fixture and carefully place (unbroken) into appropriate containers (original transport boxes or equivalent). In the event of a lighting tube/lamp breaking, sweep and place waste in double plastic taped bags and dispose as universal waste as specified herein.

3.4 STORAGE FOR DISPOSAL

3.4.1 Storage Containers for PCBs

49 CFR 178 . Store PCB in containers approved by DOT for PCB.

3.4.2 Storage Containers for lamps

Store mercury containing lamps in appropriate DOT containers. The boxes shall be stored and labeled for transport in accordance with 40 CFR 273 .

3.4.3 Labeling of Waste Containers

Label with the following:

a. Date the item was placed in storage and the name of the cognizant activity/building.

b. "Caution Contains PCB," conforming to 40 CFR 761 , CFR Subpart C. Affix labels to PCB waste containers.

c. Label mercury-containing lamp waste in accordance with 40 CFR 273 . Affix labels to all lighting waste containers.

3.5 DISPOSAL

Dispose off Government property in accordance with USEPA, DOT, and local regulations at a permitted site.

3.5.1 Identification Number

Federal regulations 40 CFR 761 , and 40 CFR 263 require that generators, transporters, commercial storers, and disposers of PCB waste posses USEPA identification numbers. The contractor shall verify that the activity has a USEPA generator identification number for use on the Uniform Hazardous Waste manifest. If not, the contractor shall advise the activity that it must file and obtain an I.D. number with USEPA prior to commencement of removal work. For mercury containing lamp removal, Federal regulations

SECTION 02 84 16 Page 6

Page 80: GA106 – ROLL -UP DOOR RESET Augusta, GA...GA106 - Roll-Up Door Reset May 22, 2015 Augusta, GA SECTION 01 33 00.00 13 SUBMITTAL REGISTER COVER PAGE 07/13 PART 1 GENERAL 1.1 SUBMITTAL

GA106 - Roll-Up Door Reset May 22, 2015Augusta, GA

40 CFR 273 require that large quantity handlers of Universal waste (LQHUW) must provide notification of universal waste management to the appropriate USEPA Region (or state director in authorized states), obtain an USEPA identification number, and retain for three years records of off-site shipments of universal waste. The contractor shall verify that the activity has a USEPA generator identification number for use on the Universal Waste manifest. If not, the contractor shall advise the activity that it must file and obtain an I.D. number with USEPA prior to commencement of removal work.

3.5.2 Transporter Certification

Comply with disposal and transportation requirements outlined in 40 CFR 761 and 40 CFR 263 . Before transporting the PCB waste, sign and date the manifest acknowledging acceptance of the PCB waste from the Government. Return a signed copy to the Government before leaving the job site. Ensure that the manifest accompanies the PCB waste at all times. Submit transporter certification of notification to USEPA of their PCB waste activities (EPA Form 7710-53).

3.5.2.1 Certificate of Disposal and/or Recycling

40 CFR 761 . Certificate for the PCBs and PCB items disposed shall include:

a. The identity of the disposal and or recycling facility, by name, address, and USEPA identification number.

b. The identity of the PCB waste affected by the Certificate of Disposal including reference to the manifest number for the shipment.

c. A statement certifying the fact of disposal and or recycling of the identified PCB waste, including the date(s) of disposal, and identifying the disposal process used.

d. A certification as defined in 40 CFR 761 .

3.5.3 Disposal by the Government

Comply with disposal and transportation requirements outlined in 40 CFR 76 and 40 CFR 263 . Load and haul PCBs to the storage site operated by the Defense Reutilization and Marketing Officer (DRMO). If the primary site is filled to capacity, contact the Contracting Officer. The transport distance to any storage site will not exceed the distance between the project site and the DRMO storage site.

3.5.3.1 Delivery

Contact DRMO at least 5 working days in advance to make arrangements for delivery of PCB to the storage site. pick up of PCB waste by the Government.

3.5.3.2 DD Form 1348-1

Prepare DD Form 1348-1 Turn-in Document (TID), which will accompany the PCB to the storage site. Ensure that a responsible person from the activity that owns the PCB signs the DD Form 1348-1.

-- End of Section --

SECTION 02 84 16 Page 7

Page 81: GA106 – ROLL -UP DOOR RESET Augusta, GA...GA106 - Roll-Up Door Reset May 22, 2015 Augusta, GA SECTION 01 33 00.00 13 SUBMITTAL REGISTER COVER PAGE 07/13 PART 1 GENERAL 1.1 SUBMITTAL

GA106 - Roll-Up Door Reset May 22, 2015Augusta, GA

SECTION 05 05 23.16

STRUCTURAL WELDING05/14

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

AMERICAN INSTITUTE OF STEEL CONSTRUCTION (AISC)

AISC 360 (2010) Specification for Structural Steel Buildings

AMERICAN SOCIETY FOR NONDESTRUCTIVE TESTING (ASNT)

ANSI/ASNT CP-189 (2011) ASNT Standard for Qualification and Certification of Nondestructive Testing Personnel (ANSI/ASNT CP-105-2006)

AMERICAN WELDING SOCIETY (AWS)

AWS A2.4 (2012) Standard Symbols for Welding, Brazing and Nondestructive Examination

AWS D1.1/D1.1M (2010; Errata 2011) Structural Welding Code - Steel

AWS D1.3/D1.3M (2008; Errata 2008) Structural Welding Code - Sheet Steel

AWS D1.4/D1.4M (2011) Structural Welding Code - Reinforcing Steel

AWS D1.8/D1.8M (2009) Structural Welding Code—Seismic Supplement

AWS D14.4/D14.4M (2012) Specification for Welded Joints for Machinery and Equipment

AWS Z49.1 (2012) Safety in Welding and Cutting and Allied Processes

ASTM INTERNATIONAL (ASTM)

ASTM E165/E165M (2012) Standard Practice for Liquid Penetrant Examination for General Industry

ASTM E709 (2014) Standard Guide for Magnetic Particle Examination

SECTION 05 05 23.16 Page 1

Page 82: GA106 – ROLL -UP DOOR RESET Augusta, GA...GA106 - Roll-Up Door Reset May 22, 2015 Augusta, GA SECTION 01 33 00.00 13 SUBMITTAL REGISTER COVER PAGE 07/13 PART 1 GENERAL 1.1 SUBMITTAL

GA106 - Roll-Up Door Reset May 22, 2015Augusta, GA

1.2 SUBMITTALS

Government approval is required for submittals with a "G" designation; submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:

SD-01 Preconstruction Submittals

Welding Quality Assurance Plan

SD-03 Product Data

Welding Procedure Qualifications; GWelder, Welding Operator, and Tacker QualificationInspector QualificationPrevious QualificationsPre-qualified ProceduresWelding Electrodes and Rods

SD-06 Test Reports

Nondestructive Testing

SD-07 Certificates

Certified Welding Procedure Specifications (WPS)Certified Brazing Procedure Specifications (BPS)Certified Procedure Qualification Records (PQR)Certified Welder Performance Qualifications (WPQ)Certified Brazer Performance Qualifications (BPQ)

1.3 QUALITY ASSURANCE

Except for pre-qualified (in accordance with AWS D1.1/D1.1M ) and previously qualified procedures, each Contractor performing welding must record in detail and qualify the welding procedure specification for any welding procedure followed in the fabrication of weldments. Conform welding procedure qualifications to AWS D1.1/D1.1M and to the specifications in this section. Submit for approval copies of the welding procedure specification and the results of the procedure qualification test records for each type of welding which requires procedure qualification and the welder, welding operator, or tacker qualification test records.. Approval of any procedure, however, does not relieve the Contractor of the sole responsibility for producing a finished structure meeting all the specified requirements. Submit this information on the forms in Annex M of AWS D1.1/D1.1M . Individually identify and clearly reference on the detail drawings and erection drawings all welding procedure specifications, or suitably key them to the contract drawings. In case of conflict between this specification and AWS D1.1/D1.1M , this specification governs.

1.3.1 General Requirements

Fabricate work in an AISC Certified Fabrication Plant, Category Std. Work must be erected by an AISC Certified Erector, Category ASCE.

a. For Structural Projects, provide documentation of the following:

SECTION 05 05 23.16 Page 2

Page 83: GA106 – ROLL -UP DOOR RESET Augusta, GA...GA106 - Roll-Up Door Reset May 22, 2015 Augusta, GA SECTION 01 33 00.00 13 SUBMITTAL REGISTER COVER PAGE 07/13 PART 1 GENERAL 1.1 SUBMITTAL

GA106 - Roll-Up Door Reset May 22, 2015Augusta, GA

(1) Component Thickness 1/8 inch and greater: Qualification documents (WPS, PQR, and WPQ) in accordance with AWS D1.1/D1.1M .

(2) Component Thickness Less than 1/8 inch: Qualification documents (WPS, PQR, and WPQ) in accordance with AWS D1.3/D1.3M .

(3) Reinforcing Steel: Qualification documents (WPS, PWR, and WPQ) in accordance with AWS D1.4/D1.4M .

b. For other applications, provide documentation of the following:

(1) Submit two copies of the Certified Welding Procedure Specifications (WPS), Certified Brazing Procedure Specifications (BPS) and Certified Procedure Qualification Records (PQR) to the Contracting Officer for review.

(2) Submit two copies of the Certified Welder Performance Qualifications (WPQ)and Certified Brazer Performance Qualifications (BPQ) to the Contracting Officer for review within fifteen calendar days prior to any employee welding on the project material.

(3) Machinery: Qualification documents (WPS, PQR, and WPQ) in accordance with AWS D14.4/D14.4M .

1.3.2 Previous Qualifications

Welding procedures previously qualified by test may be accepted for this contract without re-qualification, upon receipt of the test results, if the following conditions are met:

a. Testing was performed by an approved testing laboratory, technical consultant, or the Contractor's approved quality control organization.

b. The qualified welding procedure conforms to the requirements of this specification and is applicable to welding conditions encountered under this contract.

c. The welder, welding operator, and tacker qualification tests conform to the requirements of this specification and are applicable to welding conditions encountered under this contract.

1.3.3 Pre-qualified Procedures

Welding procedures which are considered pre-qualified as specified in AWS D1.1/D1.1M will be accepted without further qualification. Submit for approval a listing or an annotated drawing to indicate the joints not pre-qualified. Procedure qualification is mandatory for these joints.

1.3.4 Retests

If welding procedure fails to meet the requirements of AWS D1.1/D1.1M , revise and re-qualify the procedure specification, or at the Contractor's option, welding procedure may be retested in accordance with AWS D1.1/D1.1M . If the welding procedure is qualified through retesting, submit all test results, including those of test welds that failed to meet the requirements, with the welding procedure.

SECTION 05 05 23.16 Page 3

Page 84: GA106 – ROLL -UP DOOR RESET Augusta, GA...GA106 - Roll-Up Door Reset May 22, 2015 Augusta, GA SECTION 01 33 00.00 13 SUBMITTAL REGISTER COVER PAGE 07/13 PART 1 GENERAL 1.1 SUBMITTAL

GA106 - Roll-Up Door Reset May 22, 2015Augusta, GA

1.3.5 Welder, Welding Operator, and Tacker Qualification

Each welder, welding operator, and tacker assigned to work on this contract must be qualified in accordance with the applicable requirements of AWS D1.1/D1.1M , AWS D1.8/D1.8M and as specified in this section. Welders, welding operators, and tackers who make acceptable procedure qualification test welds will be considered qualified for the welding procedure used.

1.3.5.1 Previous Personnel Qualifications

At the discretion of the Contracting Officer, welders, welding operators, and tackers qualified by test within the previous 6 months may be accepted for this contract without re-qualification if all the following conditions are met:

a. Copies of the welding procedure specifications, the procedure qualification test records, and the welder, welding operator, and tacker qualification test records are submitted and approved in accordance with the specified requirements for detail drawings.

b. Testing was performed by an approved testing laboratory, technical consultant, or the Contractor's approved quality control organization.

c. The previously qualified welding procedure conforms to the requirements of this specification and is applicable to welding conditions encountered under this contract.

d. The welder, welding operator, and tacker qualification tests conform to the requirements of this specification and are applicable to welding conditions encountered under this contract.

1.3.5.2 Certificates

Before assigning any welder, welding operator, or tacker to work under this contract, submit the names of the welders, welding operators, and tackers to be employed, and certification that each individual is qualified as specified. State in the certification the type of welding and positions for which the welder, welding operator, or tacker is qualified, the code and procedure under which the individual is qualified, the date qualified, and the name of the firm and person certifying the qualification tests. Keep the certification current, on file, and furnish 3 copies.

1.3.5.3 Renewal of Qualification

Re-qualification of a welder or welding operator is required under any of the following conditions:

a. It has been more than 6 months since the welder or welding operator has used the specific welding process for which he is qualified.

b. There is specific reason to question the welder or welding operator's ability to make welds that meet the requirements of these specifications.

c. The welder or welding operator was qualified by an employer other than those firms performing work under this contract, and a qualification test has not been taken within the past 12 months. Submit as evidence

SECTION 05 05 23.16 Page 4

Page 85: GA106 – ROLL -UP DOOR RESET Augusta, GA...GA106 - Roll-Up Door Reset May 22, 2015 Augusta, GA SECTION 01 33 00.00 13 SUBMITTAL REGISTER COVER PAGE 07/13 PART 1 GENERAL 1.1 SUBMITTAL

GA106 - Roll-Up Door Reset May 22, 2015Augusta, GA

of conformance all records showing periods of employment, name of employer where welder, or welding operator, was last employed, and the process for which qualified.

d. A tacker who passes the qualification test is considered eligible to perform tack welding indefinitely in the positions and with the processes for which he/she is qualified, unless there is some specific reason to question the tacker's ability. In such a case, the tacker is required to pass the prescribed tack welding test.

1.3.6 Inspector Qualification

Submit inspector qualifications that are in accordance with AWS D1.1/D1.1M . Qualify all nondestructive testing personnel in accordance with the requirements of ANSI/ASNT CP-189 for Levels I or II in the applicable nondestructive testing method. The inspector may be supported by assistant welding inspectors who are not qualified to AWS D1.1/D1.1M , and assistant inspectors may perform specific inspection functions under the supervision of the qualified inspector, as allowed by AWS D1.1/D1.1M .

1.3.7 Symbols and Safety

Use symbols in accordance with AWS A2.4 , unless otherwise indicated. Follow safe welding practices and safety precautions during welding in conformance with AWS Z49.1 .

PART 2 PRODUCTS

2.1 SYSTEM DESCRIPTION

Conform the design of welded connections to AISC 360 , unless otherwise indicated or specified. Material with welds will not be accepted unless the welding is specified or indicated on the drawings or otherwise approved. Perform welding as specified in this section, except where additional requirements are shown on the drawings or are specified in other sections. Do not commence welding until welding procedures, inspectors, nondestructive testing personnel, welders, welding operators, and tackers have been qualified and the submittals approved by the Contracting Officer. Perform all testing at or near the work site. Maintain records of the test results obtained in welding procedure, welder, welding operator, and tacker performance qualifications.

2.1.1 Pre-erection Conference

Hold a pre-erection conference prior to the start of the field welding, to bring all affected parties together and to gain a naturally clear understanding of the project and the Welding Procedure Specifications (WPS) (submitted for all welding, including welding done using pre-qualified procedures). Mandatory attendance is required by all Contractor's welding production and inspection personnel and appropriate Government personnel. Include as items for discussion: responsibilities of various parties; welding procedures and processes to be followed; welding sequence (both within a joint and joint sequence within the building); inspection requirements and procedures, both visual and nondestructive testing; welding schedule; and other items deemed necessary by the attendees.

SECTION 05 05 23.16 Page 5

Page 86: GA106 – ROLL -UP DOOR RESET Augusta, GA...GA106 - Roll-Up Door Reset May 22, 2015 Augusta, GA SECTION 01 33 00.00 13 SUBMITTAL REGISTER COVER PAGE 07/13 PART 1 GENERAL 1.1 SUBMITTAL

GA106 - Roll-Up Door Reset May 22, 2015Augusta, GA

2.2 WELDING EQUIPMENT AND MATERIALS

Provide all welding equipment, welding electrodes and rods, welding wire, and fluxes capable of producing satisfactory welds when used by a qualified welder or welding operator performing qualified welding procedures. Provide welding equipment and materials that comply with the applicable requirements of AWS D1.1/D1.1M . Submit product data on welding electrodes and rods.

PART 3 EXECUTION

3.1 WELDING OPERATIONS

3.1.1 Requirements

Conform workmanship and techniques for welded construction to the requirements of AWS D1.1/D1.1M and AISC 360 . When AWS D1.1/D1.1M and the AISC 360 specification conflict, the requirements of AWS D1.1/D1.1M govern.

3.1.2 Identification

Identify all welds in one of the following ways:

a. Submit written records to indicate the location of welds made by each welder, welding operator, or tacker.

b. Identify all work performed by each welder, welding operator, or tacker with an assigned number, letter, or symbol to identify welds made by that individual. The Contracting Officer may require welders, welding operators, and tackers to apply their symbol next to the weld by means of rubber stamp, felt-tipped marker with waterproof ink, or other methods that do not cause an indentation in the metal. Place the identification mark for seam welds adjacent to the weld at 3 foot intervals. Identification with die stamps or electric etchers is not allowed.

3.2 QUALITY CONTROL

Perform testing using an approved inspection or testing laboratory or technical consultant; or if approved, the Contractor's inspection and testing personnel may be used instead of the commercial inspection or testing laboratory or technical consultant. Perform visual inspections to determine conformance with paragraph STANDARDS OF ACCEPTANCE. Conform procedures and techniques for inspection with applicable requirements of AWS D1.1/D1.1M , ASTM E165/E165M , and ASTM E709. Submit a Welding Quality Assurance Plan and records of tests and inspections.

3.3 STANDARDS OF ACCEPTANCE

Conform dimensional tolerances for welded construction, details of welds, and quality of welds with the applicable requirements of AWS D1.1/D1.1M and the contract drawings. Perform nondestructive testing by visual inspection methods. The minimum extent of nondestructive testing must be random 15 percent of welds or joints, as indicated on the drawings. Submit all records of nondestructive testing.

3.3.1 Nondestructive Testing

The welding is subject to inspection and tests in the mill, shop, and

SECTION 05 05 23.16 Page 6

Page 87: GA106 – ROLL -UP DOOR RESET Augusta, GA...GA106 - Roll-Up Door Reset May 22, 2015 Augusta, GA SECTION 01 33 00.00 13 SUBMITTAL REGISTER COVER PAGE 07/13 PART 1 GENERAL 1.1 SUBMITTAL

GA106 - Roll-Up Door Reset May 22, 2015Augusta, GA

field. Inspection and tests in the mill or shop do not relieve the Contractor of the responsibility to furnish weldments of satisfactory quality. When materials or workmanship do not conform to the specification requirements, the Government reserves the right to reject material or workmanship or both at any time before final acceptance of the structure containing the weldment. Any indication of a defect is regarded as a defect, unless re-evaluation by nondestructive methods or by surface conditioning shows that no unacceptable defect is present. Submit all records of nondestructive testing in accordance with paragraph STANDARDS OF ACCEPTANCE.

3.3.2 Destructive Tests

Make all repairs when metallographic specimens are removed from any part of a structure. Employ only qualified welders or welding operators, and use the proper joints and welding procedures, including peening or heat treatment if required, to develop the full strength of the members and joints cut and to relieve residual stress.

3.4 GOVERNMENT INSPECTION AND TESTING

In addition to the inspection and tests performed by the Contractor for quality control, the Government will perform inspection and testing for acceptance to the extent determined by the Contracting Officer. The costs of such inspection and testing will be borne by the Contractor if unsatisfactory welds are discovered, or by the Government if the welds are satisfactory. The work may be performed by the Government's own forces or under a separate contract for inspection and testing. The Government reserves the right to perform supplemental nondestructive and destructive tests to determine compliance with paragraph STANDARDS OF ACCEPTANCE.

3.5 CORRECTIONS AND REPAIRS

If inspection or testing indicates defects in the weld joints, repair defective welds using a qualified welder or welding operator as applicable. Conduct corrections in accordance with the requirements of AWS D1.1/D1.1M and the specifications. Repair all defects in accordance with the approved procedures. Repair defects discovered between passes before additional weld material is deposited. Wherever a defect is removed and repair by welding is not required, blend the affected area into the surrounding surface to eliminate sharp notches, crevices, or corners. After a defect is thought to have been removed, and before re-welding, examine the area by suitable methods to ensure that the defect has been eliminated. Repaired welds must meet the inspection requirements for the original welds.

-- End of Section --

SECTION 05 05 23.16 Page 7

Page 88: GA106 – ROLL -UP DOOR RESET Augusta, GA...GA106 - Roll-Up Door Reset May 22, 2015 Augusta, GA SECTION 01 33 00.00 13 SUBMITTAL REGISTER COVER PAGE 07/13 PART 1 GENERAL 1.1 SUBMITTAL

GA106 - Roll-Up Door Reset May 22, 2015Augusta, GA

SECTION 05 12 00

STRUCTURAL STEEL05/14

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

AMERICAN INSTITUTE OF STEEL CONSTRUCTION (AISC)

AISC 201 (2006) AISC Certification Program for Structural Steel Fabricators

AISC 303 (2010) Code of Standard Practice for Steel Buildings and Bridges

AISC 325 (2011) Steel Construction Manual

AISC 326 (2009) Detailing for Steel Construction

AISC 341 (2010) Seismic Provisions for Structural Steel Buildings

AISC 360 (2010) Specification for Structural Steel Buildings

AMERICAN WELDING SOCIETY (AWS)

AWS A2.4 (2012) Standard Symbols for Welding, Brazing and Nondestructive Examination

AWS D1.1/D1.1M (2010; Errata 2011) Structural Welding Code - Steel

ASME INTERNATIONAL (ASME)

ASME B46.1 (2009) Surface Texture, Surface Roughness, Waviness and Lay

ASTM INTERNATIONAL (ASTM)

ASTM A123/A123M (2013) Standard Specification for Zinc (Hot-Dip Galvanized) Coatings on Iron and Steel Products

ASTM A307 (2012) Standard Specification for Carbon Steel Bolts and Studs, 60 000 PSI Tensile Strength

ASTM A325 (2010; E 2013) Standard Specification for Structural Bolts, Steel, Heat Treated, 120/105 ksi Minimum Tensile Strength

SECTION 05 12 00 Page 1

Page 89: GA106 – ROLL -UP DOOR RESET Augusta, GA...GA106 - Roll-Up Door Reset May 22, 2015 Augusta, GA SECTION 01 33 00.00 13 SUBMITTAL REGISTER COVER PAGE 07/13 PART 1 GENERAL 1.1 SUBMITTAL

GA106 - Roll-Up Door Reset May 22, 2015Augusta, GA

ASTM A36/A36M (2012) Standard Specification for Carbon Structural Steel

ASTM A490 (2012) Standard Specification for Structural Bolts, Alloy Steel, Heat Treated, 150 ksi Minimum Tensile Strength

ASTM A500/A500M (2013) Standard Specification for Cold-Formed Welded and Seamless Carbon Steel Structural Tubing in Rounds and Shapes

ASTM A53/A53M (2012) Standard Specification for Pipe, Steel, Black and Hot-Dipped, Zinc-Coated, Welded and Seamless

ASTM A563 (2007a; R2014) Standard Specification for Carbon and Alloy Steel Nuts

ASTM A563M (2007; R 2013) Standard Specification for Carbon and Alloy Steel Nuts (Metric)

ASTM A6/A6M (2014) Standard Specification for General Requirements for Rolled Structural Steel Bars, Plates, Shapes, and Sheet Piling

ASTM A780/A780M (2009) Standard Practice for Repair of Damaged and Uncoated Areas of Hot-Dip Galvanized Coatings

ASTM A992/A992M (2011) Standard Specification for Structural Steel Shapes

ASTM C1107/C1107M (2014) Standard Specification for Packaged Dry, Hydraulic-Cement Grout (Nonshrink)

ASTM C827/C827M (2010) Change in Height at Early Ages of Cylindrical Specimens from Cementitious Mixtures

ASTM F2329 (2013) Zinc Coating, Hot-Dip, Requirements for Application to Carbon and Alloy Steel Bolts, Screws, Washers, Nuts, and Special Threaded Fasteners

ASTM F436 (2011) Hardened Steel Washers

ASTM F844 (2007a; R 2013) Washers, Steel, Plain (Flat), Unhardened for General Use

SOCIETY FOR PROTECTIVE COATINGS (SSPC)

SSPC PA 1 (2000; E 2004) Shop, Field, and Maintenance Painting of Steel

SSPC Paint 20 (2002; E 2004) Zinc-Rich Primers (Type I, Inorganic, and Type II, Organic)

SSPC Paint 29 (2002; E 2004) Zinc Dust Sacrificial

SECTION 05 12 00 Page 2

Page 90: GA106 – ROLL -UP DOOR RESET Augusta, GA...GA106 - Roll-Up Door Reset May 22, 2015 Augusta, GA SECTION 01 33 00.00 13 SUBMITTAL REGISTER COVER PAGE 07/13 PART 1 GENERAL 1.1 SUBMITTAL

GA106 - Roll-Up Door Reset May 22, 2015Augusta, GA

Primer, Performance-Based

SSPC SP 3 (1982; E 2004) Power Tool Cleaning

SSPC SP 6/NACE No.3 (2007) Commercial Blast Cleaning

U.S. DEPARTMENT OF DEFENSE (DOD)

UFC 3-301-01 (2013) Structural Engineering

UFC 3-310-04 (2013) Seismic Design for Buildings

1.2 SUBMITTALS

Government approval is required for submittals with a "G" designation; submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:

SD-02 Shop Drawings

Fabrication drawings including description of connections; G

SD-03 Product Data

Shop primer

Welding electrodes and rods

Non-Shrink Grout

SD-06 Test Reports

Class B coating

Bolts, nuts, and washers

SD-07 Certificates

Steel

Bolts, nuts, and washers

Galvanizing

AISC Fabrication Plant Quality Certification

Welding procedures and qualifications

Welding electrodes and rods

1.3 AISC QUALITY CERTIFICATION

Work must be fabricated in an AISC Certified Fabrication Plant, Category Std. Submit AISC fabrication plant quality certification.

Work must be erected by an AISC Certified Erector, Category ASCE.

SECTION 05 12 00 Page 3

Page 91: GA106 – ROLL -UP DOOR RESET Augusta, GA...GA106 - Roll-Up Door Reset May 22, 2015 Augusta, GA SECTION 01 33 00.00 13 SUBMITTAL REGISTER COVER PAGE 07/13 PART 1 GENERAL 1.1 SUBMITTAL

GA106 - Roll-Up Door Reset May 22, 2015Augusta, GA

1.4 SEISMIC PROVISIONS

The structural steel system must be provided in accordance with AISC 341 , Chapter J as amended by UFC 3-310-04 .

1.5 QUALITY ASSURANCE

1.5.1 Preconstruction Submittals

1.5.1.1 Erection Drawings

Submit for record purposes. Indicate the sequence of erection, temporary shoring and bracing. The erection drawings must conform to AISC 303 . Erection drawings must be reviewed, stamped and sealed by a registered professional engineer.

1.5.2 Fabrication Drawing Requirements

Submit fabrication drawings for approval prior to fabrication. Prepare in accordance with AISC 326 and AISC 325 . Fabrication drawings must not be reproductions of contract drawings. Include complete information for the fabrication and erection of the structure's components, including the location, type, and size of bolts, welds, member sizes and lengths, connection details, blocks, copes, and cuts. Use AWS A2.4 standard welding symbols. Shoring and temporary bracing must be designed and sealed by a registered professional engineer and submitted for record purposes, with calculations, as part of the drawings. Any deviations from the details shown on the contract drawings must be clearly highlighted on the fabrication drawings. Explain the reasons for any deviations from the contract drawings.

1.5.3 Certifications

1.5.3.1 Welding Procedures and Qualifications

Prior to welding, submit certification for each welder stating the type of welding and positions qualified for, the code and procedure qualified under, date qualified, and the firm and individual certifying the qualification tests. If the qualification date of the welding operator is more than one-year old, the welding operator's qualification certificate must be accompanied by a current certificate by the welder attesting to the fact that he has been engaged in welding since the date of certification, with no break in welding service greater than 6 months.

Conform to all requirements specified in AWS D1.1/D1.1M .

PART 2 PRODUCTS

2.1 SYSTEM DESCRIPTION

Provide the structural steel system, including shop primer and galvanizing, complete and ready for use. Structural steel systems including design, materials, installation, workmanship, fabrication, assembly, erection, inspection, quality control, and testing must be provided in accordance with AISC 360 , AISC 341 , UFC 3-301-01 and UFC 3-310-04 except as modified in this contract.

SECTION 05 12 00 Page 4

Page 92: GA106 – ROLL -UP DOOR RESET Augusta, GA...GA106 - Roll-Up Door Reset May 22, 2015 Augusta, GA SECTION 01 33 00.00 13 SUBMITTAL REGISTER COVER PAGE 07/13 PART 1 GENERAL 1.1 SUBMITTAL

GA106 - Roll-Up Door Reset May 22, 2015Augusta, GA

2.2 STEEL

2.2.1 Structural Steel

Wide flange and WT shapes, ASTM A992/A992M . Angles, Channels and Plates, ASTM A36/A36M.

2.2.2 Structural Steel Tubing

ASTM A500/A500M , Grade C.

2.2.3 Steel Pipe

ASTM A53/A53M, Type E or S, Grade B, weight class STD (Standard).

2.3 BOLTS, NUTS, AND WASHERS

Submit the certified manufacturer's mill reports which clearly show the applicable ASTM mechanical and chemical requirements together with the actual test results for the supplied fasteners.

2.3.1 Common Grade Bolts

2.3.1.1 Bolts

ASTM A307, Grade A. The bolt heads and the nuts of the supplied fasteners must be marked with the manufacturer's identification mark, the strength grade and type specified by ASTM specifications.

2.3.1.2 Nuts

ASTM A563M, Grade A, heavy hex style.

2.3.1.3 Washers

ASTM F844.

2.3.2 High-Strength Bolts

2.3.2.1 Bolts

ASTM A325, Type 1 ASTM A490, Type 1 or 2.

2.3.2.2 Nuts

ASTM A563, Grade and Style as specified in the applicable ASTM bolt standard.

2.3.2.3 Washers

ASTM F436, plain carbon steel.

2.4 STRUCTURAL STEEL ACCESSORIES

2.4.1 Welding Electrodes and Rods

AWS D1.1/D1.1M .

SECTION 05 12 00 Page 5

Page 93: GA106 – ROLL -UP DOOR RESET Augusta, GA...GA106 - Roll-Up Door Reset May 22, 2015 Augusta, GA SECTION 01 33 00.00 13 SUBMITTAL REGISTER COVER PAGE 07/13 PART 1 GENERAL 1.1 SUBMITTAL

GA106 - Roll-Up Door Reset May 22, 2015Augusta, GA

2.4.2 Non-Shrink Grout

ASTM C1107/C1107M , with no ASTM C827/C827M shrinkage. Grout must be nonmetallic.

2.5 GALVANIZING

ASTM F2329 for threaded parts or ASTM A123/A123M for structural steel members, as applicable, unless specified otherwise galvanize after fabrication where practicable.

2.6 FABRICATION

Fabrication must be in accordance with the applicable provisions of AISC 325 . Fabrication and assembly must be done in the shop to the greatest extent possible. Punch, subpunch and ream, or drill bolt holes perpendicular to the surface of the member.

Compression joints depending on contact bearing must have a surface roughness not in excess of 500 micro inch as determined by ASME B46.1 , and ends must be square within the tolerances for milled ends specified in ASTM A6/A6M.

Shop splices of members between field splices will be permitted only where indicated on the Contract Drawings. Splices not indicated require the approval of the Contracting Officer.

2.6.1 Markings

Prior to erection, members must be identified by a painted erection mark. Connecting parts assembled in the shop for reaming holes in field connections must be match marked with scratch and notch marks. Do not locate erection markings on areas to be welded. Do not locate match markings in areas that will decrease member strength or cause stress concentrations.

2.6.2 Shop Primer

SSPC Paint 20 or SSPC Paint 29 , (zinc rich primer). Shop prime structural steel, except as modified herein, in accordance with SSPC PA 1 . Do not prime steel surfaces embedded in concrete, galvanized surfaces, surfaces designed as part of a composite steel concrete section, or surfaces within 0.5 inch of the toe of the welds prior to welding (except surfaces on which metal decking is to be welded). If flash rusting occurs, re-clean the surface prior to application of primer. Apply primer in accordance with endorsement "P1" of AISC 201 to a minimum dry film thickness of 2.0 mil.

Slip critical surfaces must be primed with a Class B coating in accordance with AISC 325 . Submit test report for Class B coating.

Prior to assembly, prime surfaces which will be concealed or inaccessible after assembly. Do not apply primer in foggy or rainy weather; when the ambient temperature is below 45 degrees F or over 95 degrees F; or when the primer may be exposed to temperatures below 40 degrees F within 48 hours after application, unless approved otherwise by the Contracting Officer. Repair damaged primed surfaces with an additional coat of primer.

SECTION 05 12 00 Page 6

Page 94: GA106 – ROLL -UP DOOR RESET Augusta, GA...GA106 - Roll-Up Door Reset May 22, 2015 Augusta, GA SECTION 01 33 00.00 13 SUBMITTAL REGISTER COVER PAGE 07/13 PART 1 GENERAL 1.1 SUBMITTAL

GA106 - Roll-Up Door Reset May 22, 2015Augusta, GA

2.6.2.1 Cleaning

SSPC SP 6/NACE No.3 , except steel exposed in spaces above ceilings, attic spaces, furred spaces, and chases that will be hidden to view in finished construction may be cleaned to SSPC SP 3 when recommended by the shop primer manufacturer. Maintain steel surfaces free from rust, dirt, oil, grease, and other contaminants through final assembly.

2.6.3 Surface Finishes

ASME B46.1 maximum surface roughness of 125 for pin, pinholes, and sliding bearings, unless indicated otherwise.

2.7 DRAINAGE HOLES

Adequate drainage holes must be drilled to eliminate water traps. Hole diameter must be 1/2 inch and location must be indicated on the detail drawings. Hole size and location must not affect the structural integrity.

PART 3 EXECUTION

3.1 ERECTION

a. Erection of structural steel, except as indicated in item b. below, must be in accordance with the applicable provisions of AISC 325 .

After final positioning of steel members, provide full bearing under base plates and bearing plates using nonshrink grout. Place nonshrink grout in accordance with the manufacturer's instructions.

3.1.1 STORAGE

Material must be stored out of contact with the ground in such manner and location as will minimize deterioration.

3.2 CONNECTIONS

Except as modified in this section, connections not fully detailed must be designed in accordance with AISC 360 . Build connections into existing work. Do not tighten anchor bolts set in concrete with impact torque wrenches. Holes must not be cut or enlarged by burning. Bolts, nuts, and washers must be clean of dirt and rust, and lubricated immediately prior to installation.

3.2.1 High-Strength Bolts

Provide direct tension indicator washers in all ASTM A325 and ASTM A490 bolted connections. Bolts must be installed in connection holes and initially brought to a snug tight fit. After the initial tightening procedure, bolts must then be fully tensioned, progressing from the most rigid part of a connection to the free edges.

3.3 GAS CUTTING

Use of gas-cutting torch in the field for correcting fabrication errors will not be permitted on any major member in the structural framing. Use of a gas cutting torch will be permitted on minor members not under stress only after approval has been obtained from the Contracting Officer.

SECTION 05 12 00 Page 7

Page 95: GA106 – ROLL -UP DOOR RESET Augusta, GA...GA106 - Roll-Up Door Reset May 22, 2015 Augusta, GA SECTION 01 33 00.00 13 SUBMITTAL REGISTER COVER PAGE 07/13 PART 1 GENERAL 1.1 SUBMITTAL

GA106 - Roll-Up Door Reset May 22, 2015Augusta, GA

3.4 WELDING

Welding must be in accordance with AWS D1.1/D1.1M . Grind exposed welds smooth as indicated. Provide AWS D1.1/D1.1M qualified welders, welding operators, and tackers.

Develop and submit the Welding Procedure Specifications (WPS) for all welding, including welding done using prequalified procedures. Prequalified procedures may be submitted for information only; however, procedures that are not prequalified must be submitted for approval.

3.5 SHOP PRIMER REPAIR

Repair shop primer in accordance with the paint manufacturer's recommendation for surfaces damaged by handling, transporting, cutting, welding, or bolting.

3.5.1 Field Priming

Steel exposed to the weather, or located in building areas without HVAC for control of relative humidity must be field primed. After erection, the field bolt heads and nuts, field welds, and any abrasions in the shop coat must be cleaned and primed with paint of the same quality as that used for the shop coat.

3.6 GALVANIZING REPAIR

Repair damage to galvanized coatings using ASTM A780/A780M zinc rich paint for galvanizing damaged by handling, transporting, cutting, welding, or bolting. Do not heat surfaces to which repair paint has been applied.

3.7 FIELD QUALITY CONTROL

Perform field tests, and provide labor, equipment, and incidentals required for testing. The Contracting Officer must be notified in writing of defective welds, bolts, nuts, and washers within 7 working days of the date of the inspection.

3.7.1 Welds

3.7.1.1 Visual Inspection

AWS D1.1/D1.1M . Furnish the services of AWS-certified welding inspectors for fabrication and erection inspection and testing and verification inspections.

Inspect proper preparation, size, gaging location, and acceptability of welds; identification marking; operation and current characteristics of welding sets in use.

3.7.2 High-Strength Bolts

3.7.2.1 Inspection

Inspection procedures must be in accordance with AISC 360 . Confirm and report to the Contracting Officer that the materials meet the project specification and that they are properly stored. Confirm that the faying surfaces have been properly prepared before the connections are assembled. Observe the specified job site testing and calibration, and

SECTION 05 12 00 Page 8

Page 96: GA106 – ROLL -UP DOOR RESET Augusta, GA...GA106 - Roll-Up Door Reset May 22, 2015 Augusta, GA SECTION 01 33 00.00 13 SUBMITTAL REGISTER COVER PAGE 07/13 PART 1 GENERAL 1.1 SUBMITTAL

GA106 - Roll-Up Door Reset May 22, 2015Augusta, GA

confirm that the procedure to be used provides the required tension. Monitor the work to ensure the testing procedures are routinely followed on joints that are specified to be fully tensioned.

3.7.2.2 Testing

The Government has the option to perform nondestructive tests on 5 percent of the installed bolts to verify compliance with pre-load bolt tension requirements. Provide the required access for the Government to perform the tests. The nondestructive testing will be done in-place using an ultrasonic measuring device or any other device capable of determining in-place pre-load bolt tension. The test locations must be selected by the Contracting Officer. If more than 10 percent of the bolts tested contain defects identified by testing, then all bolts used from the batch from which the tested bolts were taken, must be tested at the Contractor's expense. Retest new bolts after installation at the Contractor's expense.

-- End of Section --

SECTION 05 12 00 Page 9

Page 97: GA106 – ROLL -UP DOOR RESET Augusta, GA...GA106 - Roll-Up Door Reset May 22, 2015 Augusta, GA SECTION 01 33 00.00 13 SUBMITTAL REGISTER COVER PAGE 07/13 PART 1 GENERAL 1.1 SUBMITTAL

GA106 - Roll-Up Door Reset May 22, 2015Augusta, GA

SECTION 05 50 13

MISCELLANEOUS METAL FABRICATIONS05/10

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

AMERICAN INSTITUTE OF STEEL CONSTRUCTION (AISC)

AISC 303 (2010) Code of Standard Practice for Steel Buildings and Bridges

AMERICAN SOCIETY OF SAFETY ENGINEERS (ASSE/SAFE)

ASSE/SAFE A10.3 (2013) Operations - Safety Requirements for Powder Actuated Fastening Systems

AMERICAN WELDING SOCIETY (AWS)

AWS D1.1/D1.1M (2010; Errata 2011) Structural Welding Code - Steel

ASME INTERNATIONAL (ASME)

ASME B18.2.1 (2012; Errata 2013) Square and Hex Bolts and Screws (Inch Series)

ASME B18.2.2 (2010) Nuts for General Applications: Machine Screw Nuts, Hex, Square, Hex Flange, and Coupling Nuts (Inch Series)

ASME B18.21.1 (2009) Washers: Helical Spring-Lock, Tooth Lock, and Plain Washers (Inch Series)

ASME B18.6.2 (1998; R 2010) Slotted Head Cap Screws, Square Head Set Screws, and Slotted Headless Set Screws: Inch Series

ASME B18.6.3 (2013) Machine Screws, Tapping Screws, and Machine Drive Screws (Inch Series)

ASTM INTERNATIONAL (ASTM)

ASTM A123/A123M (2013) Standard Specification for Zinc (Hot-Dip Galvanized) Coatings on Iron and Steel Products

ASTM A153/A153M (2009) Standard Specification for Zinc Coating (Hot-Dip) on Iron and Steel Hardware

SECTION 05 50 13 Page 1

Page 98: GA106 – ROLL -UP DOOR RESET Augusta, GA...GA106 - Roll-Up Door Reset May 22, 2015 Augusta, GA SECTION 01 33 00.00 13 SUBMITTAL REGISTER COVER PAGE 07/13 PART 1 GENERAL 1.1 SUBMITTAL

GA106 - Roll-Up Door Reset May 22, 2015Augusta, GA

ASTM A307 (2012) Standard Specification for Carbon Steel Bolts and Studs, 60 000 PSI Tensile Strength

ASTM A36/A36M (2012) Standard Specification for Carbon Structural Steel

ASTM A47/A47M (1999; R 2014) Standard Specification for Ferritic Malleable Iron Castings

ASTM A500/A500M (2013) Standard Specification for Cold-Formed Welded and Seamless Carbon Steel Structural Tubing in Rounds and Shapes

ASTM A53/A53M (2012) Standard Specification for Pipe, Steel, Black and Hot-Dipped, Zinc-Coated, Welded and Seamless

ASTM A653/A653M (2013) Standard Specification for Steel Sheet, Zinc-Coated (Galvanized) or Zinc-Iron Alloy-Coated (Galvannealed) by the Hot-Dip Process

ASTM A780/A780M (2009) Standard Practice for Repair of Damaged and Uncoated Areas of Hot-Dip Galvanized Coatings

ASTM A924/A924M (2013) Standard Specification for General Requirements for Steel Sheet, Metallic-Coated by the Hot-Dip Process

ASTM B108/B108M (2012; E 2012) Standard Specification for Aluminum-Alloy Permanent Mold Castings

ASTM B209 (2010) Standard Specification for Aluminum and Aluminum-Alloy Sheet and Plate

ASTM B221 (2013) Standard Specification for Aluminum and Aluminum-Alloy Extruded Bars, Rods, Wire, Profiles, and Tubes

ASTM B26/B26M (2012) Standard Specification for Aluminum-Alloy Sand Castings

ASTM C1513 (2013) Standard Specification for Steel Tapping Screws for Cold-Formed Steel Framing Connections

ASTM D1187/D1187M (1997; E 2011; R 2011) Asphalt-Base Emulsions for Use as Protective Coatings for Metal

ASTM E488/E488M (2010) Standard Test Methods for Strength of Anchors in Concrete and Masonry Elements

MASTER PAINTERS INSTITUTE (MPI)

MPI 79 (Oct 2009) Alkyd Anti-Corrosive Metal

SECTION 05 50 13 Page 2

Page 99: GA106 – ROLL -UP DOOR RESET Augusta, GA...GA106 - Roll-Up Door Reset May 22, 2015 Augusta, GA SECTION 01 33 00.00 13 SUBMITTAL REGISTER COVER PAGE 07/13 PART 1 GENERAL 1.1 SUBMITTAL

GA106 - Roll-Up Door Reset May 22, 2015Augusta, GA

Primer

SOCIETY FOR PROTECTIVE COATINGS (SSPC)

SSPC SP 3 (1982; E 2004) Power Tool Cleaning

SSPC SP 6/NACE No.3 (2007) Commercial Blast Cleaning

1.2 SUBMITTALS

Government approval is required for submittals with a "G" designation; submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:

SD-02 Shop Drawings

Fabrication drawings of structural steel door frames; G

Embedded angles and plates, installation drawings; G

Submit fabrication drawings showing layout(s), connections to structural system, and anchoring details as specified in AISC 303 .

Submit templates, erection and installation drawings indicating thickness, type, grade, class of metal, and dimensions. Show construction details, reinforcement, anchorage, and installation with relation to the building construction.

SD-03 Product Data

Structural steel door frames

1.3 QUALIFICATION OF WELDERS

Qualify welders in accordance with AWS D1.1/D1.1M . Use procedures, materials, and equipment of the type required for the work.

1.4 DELIVERY, STORAGE, AND PROTECTION

Protect from corrosion, deformation, and other types of damage. Store items in an enclosed area free from contact with soil and weather. Remove and replace damaged items with new items.

PART 2 PRODUCTS

2.1 MATERIALS

2.1.1 Structural Carbon Steel

ASTM A36/A36M.

2.1.2 Structural Tubing

ASTM A500/A500M .

SECTION 05 50 13 Page 3

Page 100: GA106 – ROLL -UP DOOR RESET Augusta, GA...GA106 - Roll-Up Door Reset May 22, 2015 Augusta, GA SECTION 01 33 00.00 13 SUBMITTAL REGISTER COVER PAGE 07/13 PART 1 GENERAL 1.1 SUBMITTAL

GA106 - Roll-Up Door Reset May 22, 2015Augusta, GA

2.1.3 Steel Pipe

ASTM A53/A53M, Type E or S, Grade B.

2.1.4 Fittings for Steel Pipe

Standard malleable iron fittings ASTM A47/A47M.

2.1.5 Anchor Bolts

ASTM A307. Where exposed, shall be of the same material, color, and finish as the metal to which applied.

2.1.5.1 Expansion Anchors, Sleeve Anchors and Adhesive Anchors

Provide expansion anchors, sleeve anchors andadhesive anchors as dictated by the design drawings. Minimum concrete and masonry embedment shall be as required by design values listed and shall be as tested according to ASTM E488/E488M .

2.1.5.2 Lag Screws and Bolts

ASME B18.2.1 , type and grade best suited for the purpose.

2.1.5.3 Toggle Bolts

ASME B18.2.1 .

2.1.5.4 Bolts, Nuts, Studs and Rivets

ASME B18.2.2 or ASTM A307.

2.1.5.5 Powder Actuated Fasteners

Follow safety provisions of ASSE/SAFE A10.3 .

2.1.5.6 Screws

ASME B18.2.1 , ASME B18.6.2 , ASME B18.6.3 and ASTM C1513.

2.1.5.7 Washers

Provide plain washers to conform to ASME B18.21.1 . Provide beveled washers for American Standard beams and channels, square or rectangular, tapered in thickness, and smooth. Provide lock washers to conform to ASME B18.21.1 .

2.1.6 Aluminum Alloy Products

Conform to ASTM B209 for sheet plate, ASTM B221 for extrusions and ASTM B26/B26M or ASTM B108/B108M for castings, as applicable. Provide aluminum extrusions at least 1/8 inch thick and aluminum plate or sheet at least 0.050 inch thick.

2.2 FABRICATION FINISHES

2.2.1 Galvanizing

Hot-dip galvanize items specified to be zinc-coated, after fabrication

SECTION 05 50 13 Page 4

Page 101: GA106 – ROLL -UP DOOR RESET Augusta, GA...GA106 - Roll-Up Door Reset May 22, 2015 Augusta, GA SECTION 01 33 00.00 13 SUBMITTAL REGISTER COVER PAGE 07/13 PART 1 GENERAL 1.1 SUBMITTAL

GA106 - Roll-Up Door Reset May 22, 2015Augusta, GA

where practicable. Galvanizing: ASTM A123/A123M , ASTM A153/A153M , ASTM A653/A653M or ASTM A924/A924M , G90, as applicable.

2.2.2 Galvanize

Anchor bolts, grating fasteners, washers, and parts or devices necessary for proper installation, unless indicated otherwise.

2.2.3 Repair of Zinc-Coated Surfaces

Repair damaged surfaces with galvanizing repair method and paint conforming to ASTM A780/A780M or by application of stick or thick paste material specifically designed for repair of galvanizing, as approved by Contracting Officer. Clean areas to be repaired and remove slag from welds. Heat surfaces to which stick or paste material is applied, with a torch to a temperature sufficient to melt the metallics in stick or paste; spread molten material uniformly over surfaces to be coated and wipe off excess material.

2.2.4 Shop Cleaning and Painting

2.2.4.1 Surface Preparation

Blast clean surfaces in accordance with SSPC SP 6/NACE No.3 . Surfaces that will be exposed in spaces above ceiling or in attic spaces, crawl spaces, furred spaces, and chases may be cleaned in accordance with SSPC SP 3 in lieu of being blast cleaned. Wash cleaned surfaces which become contaminated with rust, dirt, oil, grease, or other contaminants with solvents until thoroughly clean. Steel to be embedded in concrete shall be free of dirt and grease. Do not paint or galvanize bearing surfaces, including contact surfaces within slip critical joints, but coat with rust preventative applied in the shop.

2.2.4.2 Pretreatment, Priming and Painting

Apply pretreatment, primer, and paint in accordance with manufacturer's printed instructions. On surfaces concealed in the finished construction or not accessible for finish painting, apply an additional prime coat to a minimum dry film thickness of 1.0 mil. Tint additional prime coat with a small amount of tinting pigment.

2.3 MISCELLANEOUS PLATES AND SHAPES

Provide for items that do not form a part of the structural steel framework, such as lintels, sill angles, miscellaneous mountings and frames. Provide lintels fabricated from structural steel shapes over openings in masonry walls and partitions as indicated and as required to support wall loads over openings. Provide with connections and fasteners or welds. Construct to have at least 8 inches bearing on masonry at each end.

Provide angles and plates, ASTM A36/A36M, for embedment as indicated. Galvanize embedded items exposed to the elements according to ASTM A123/A123M .

2.4 STRUCTURAL STEEL DOOR FRAMES

a. Provide frames as indicated. If not otherwise shown, construct frames of structural shapes, or shape and plate composite, to form a full

SECTION 05 50 13 Page 5

Page 102: GA106 – ROLL -UP DOOR RESET Augusta, GA...GA106 - Roll-Up Door Reset May 22, 2015 Augusta, GA SECTION 01 33 00.00 13 SUBMITTAL REGISTER COVER PAGE 07/13 PART 1 GENERAL 1.1 SUBMITTAL

GA106 - Roll-Up Door Reset May 22, 2015Augusta, GA

depth channel shape with at least 1 1/2 inchoutstanding legs.

b. Where track, guides, hoods, hangers, operators, and other such accessories are required, provide support as indicated.

c. Provide jamb anchors near top, bottom, and at not more than 24 inch intervals. Provide the bottom of each jamb member with a clip angle welded in place with two 1/2 inchdiameter floor bolts for adjustment.

2.5 DOWNSPOUT BOOTS

Provide cast iron downspout boots with receiving bells sized to fit downspouts.

PART 3 EXECUTION

3.1 GENERAL INSTALLATION REQUIREMENTS

Install items at locations indicated, according to manufacturer's instructions. Verify all measurements and take all field measurements necessary before fabrication. Exposed fastenings shall be compatible materials, shall generally match in color and finish, and harmonize with the material to which fastenings are applied. Include materials and parts necessary to complete each item, even though such work is not definitely shown or specified. Poor matching of holes for fasteners shall be cause for rejection. Conceal fastenings where practicable. Thickness of metal and details of assembly and supports shall provide strength and stiffness. Form joints exposed to the weather shall be formed to exclude water. Items listed below require additional procedures.

3.2 WORKMANSHIP

Provide miscellaneous metalwork that is well formed to shape and size, with sharp lines and angles and true curves. Drilling and punching shall produce clean true lines and surfaces. Provide continuous welding along the entire area of contact except where tack welding is permitted. Do not tack weld exposed connections of work in place and ground smooth. Provide a smooth finish on exposed surfaces of work in place and unless otherwise approved, flush exposed riveting. Mill joints where tight fits are required. Corner joints shall be coped or mitered, well formed, and in true alignment. Accurately set work to established lines and elevations and securely fastened in place. Install in accordance with manufacturer's installation instructions and approved drawings, cuts, and details.

3.3 ANCHORAGE, FASTENINGS, AND CONNECTIONS

Provide anchorage where necessary for fastening miscellaneous metal items securely in place. Include for anchorage not otherwise specified or indicated slotted inserts, expansion shields, and powder-driven fasteners, when approved for concrete; toggle bolts and through bolts for masonry; machine and carriage bolts for steel; through bolts, lag bolts, and screws for wood. Do not use wood plugs in any material. Provide non-ferrous attachments for non-ferrous metal. Make exposed fastenings of compatible materials, generally matching in color and finish, to which fastenings are applied. Conceal fastenings where practicable.

3.4 BUILT-IN WORK

Form for anchorage metal work built-in with concrete or masonry, or

SECTION 05 50 13 Page 6

Page 103: GA106 – ROLL -UP DOOR RESET Augusta, GA...GA106 - Roll-Up Door Reset May 22, 2015 Augusta, GA SECTION 01 33 00.00 13 SUBMITTAL REGISTER COVER PAGE 07/13 PART 1 GENERAL 1.1 SUBMITTAL

GA106 - Roll-Up Door Reset May 22, 2015Augusta, GA

provide with suitable anchoring devices as indicated or as required. Furnish metal work in ample time for securing in place as the work progresses.

3.5 WELDING

Perform welding, welding inspection, and corrective welding, in accordance with AWS D1.1/D1.1M . Use continuous welds on all exposed connections. Grind visible welds smooth in the finished installation.

3.6 FINISHES

3.6.1 Dissimilar Materials

Where dissimilar metals are in contact, protect surfaces with a coat conforming to MPI 79 to prevent galvanic or corrosive action. Where aluminum is in contact with concrete, plaster, mortar, masonry, wood, or absorptive materials subject to wetting, protect with ASTM D1187/D1187M , asphalt-base emulsion.

3.6.2 Field Preparation

Remove rust preventive coating just prior to field erection, using a remover approved by the rust preventive manufacturer. Surfaces, when assembled, shall be free of rust, grease, dirt and other foreign matter.

3.6.3 Environmental Conditions

Do not clean or paint surface when damp or exposed to foggy or rainy weather, when metallic surface temperature is less than 5 degrees F above the dew point of the surrounding air, or when surface temperature is below 45 degrees F or over 95 degrees F, unless approved by the Contracting Officer.

3.7 INSTALLATION OF DOWNSPOUT BOOTS

Secure downspouts to building through integral lips with appropriate fasteners.

3.8 STRUCTURAL STEEL DOOR FRAMES

Secure door frames to the floor slab by means of angle clips and expansion bolts. Weld continuous door stops to the frame or tap screwed with countersunk screws at no more than 18 inchcenters, assuring in either case full contact with the frame. Make any necessary reinforcements and drill and tap the frames as required for hardware.

-- End of Section --

SECTION 05 50 13 Page 7

Page 104: GA106 – ROLL -UP DOOR RESET Augusta, GA...GA106 - Roll-Up Door Reset May 22, 2015 Augusta, GA SECTION 01 33 00.00 13 SUBMITTAL REGISTER COVER PAGE 07/13 PART 1 GENERAL 1.1 SUBMITTAL

GA106 - Roll-Up Door Reset May 22, 2015Augusta, GA

SECTION 07 21 16

MINERAL FIBER BLANKET INSULATION11/11

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

ASTM INTERNATIONAL (ASTM)

ASTM C665 (2012) Mineral-Fiber Blanket Thermal Insulation for Light Frame Construction and Manufactured Housing

ASTM C930 (2012) Potential Health and Safety Concerns Associated with Thermal Insulation Materials and Accessories

ASTM E136 (2012) Behavior of Materials in a Vertical Tube Furnace at 750 Degrees C

ASTM E84 (2014) Standard Test Method for Surface Burning Characteristics of Building Materials

NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)

NFPA 211 (2013) Standard for Chimneys, Fireplaces, Vents, and Solid Fuel-Burning Appliances

NFPA 31 (2011) Standard for the Installation of Oil-Burning Equipment

NFPA 54 (2015) National Fuel Gas Code

NFPA 70 (2014; AMD 1 2013; Errata 1 2013; AMD 2 2013; Errata 2 2013; AMD 3 2014; Errata 3 2014) National Electrical Code

U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)

29 CFR 1910.134 Respiratory Protection

1.2 SUBMITTALS

Government approval is required for submittals with a "G" designation; submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:

SD-03 Product Data

SECTION 07 21 16 Page 1

Page 105: GA106 – ROLL -UP DOOR RESET Augusta, GA...GA106 - Roll-Up Door Reset May 22, 2015 Augusta, GA SECTION 01 33 00.00 13 SUBMITTAL REGISTER COVER PAGE 07/13 PART 1 GENERAL 1.1 SUBMITTAL

GA106 - Roll-Up Door Reset May 22, 2015Augusta, GA

Blanket insulation

Sill sealer insulation

Vapor retarder

Pressure sensitive tape

Accessories

Certification

SD-08 Manufacturer's Instructions

Insulation

1.3 DELIVERY, STORAGE, AND HANDLING

1.3.1 Delivery

Deliver materials to site in original sealed wrapping bearing manufacturer's name and brand designation, specification number, type, grade, R-value, and class. Store and handle to protect from damage. Do not allow insulation materials to become wet, soiled, crushed, or covered with ice or snow. Comply with manufacturer's recommendations for handling, storing, and protecting of materials before and during installation.

1.3.2 Storage

Inspect materials delivered to the site for damage; unload and store out of weather in manufacturer's original packaging. Store only in dry locations, not subject to open flames or sparks, and easily accessible for inspection and handling.

1.4 SAFETY PRECAUTIONS

1.4.1 Respirators

Provide installers with dust/mist respirators, training in their use, and protective clothing, all approved by National Institute for Occupational Safety and Health (NIOSH)/Mine Safety and Health Administration (MSHA) in accordance with 29 CFR 1910.134 .

1.4.2 Smoking

Do not smoke during installation of blanket thermal insulation.

1.4.3 Other Safety Concerns

Consider other safety concerns and measures as outlined in ASTM C930.

PART 2 PRODUCTS

2.1 BLANKET INSULATION

ASTM C665, Type I, blankets without membrane coverings ; Class A, membrane-faced surface with a flame spread of 25 or less , except a flame spread rating of 25 or less and a smoke developed rating of 150 or less

SECTION 07 21 16 Page 2

Page 106: GA106 – ROLL -UP DOOR RESET Augusta, GA...GA106 - Roll-Up Door Reset May 22, 2015 Augusta, GA SECTION 01 33 00.00 13 SUBMITTAL REGISTER COVER PAGE 07/13 PART 1 GENERAL 1.1 SUBMITTAL

GA106 - Roll-Up Door Reset May 22, 2015Augusta, GA

when tested in accordance with ASTM E84.

2.1.1 Thermal Resistance Value (R-VALUE)

As indicated

2.1.2 Recycled Materials

Provide Thermal Insulation containing recycled materials to the extent practicable, provided the material meets all other requirements of this section. The minimum required recycled materials content by weight are:

Rock Wool: 75 percent slagFiberglass: 20 to 25 percent glass cullet

2.1.3 Prohibited Materials

Do not provide asbestos-containing materials.

2.2 BLOCKING

Wood, metal, unfaced mineral fiber blankets in accordance with ASTM C665, Type I, or other approved materials. Use only non-combustible materials meeting the requirements of ASTM E136 for blocking around chimneys and heat producing devices.

2.3 ACCESSORIES

2.3.1 Mechanical Fasteners

Corrosion resistant fasteners as recommended by the insulation manufacturer.

2.3.2 Wire Mesh

Corrosion resistant and as recommended by the insulation manufacturer.

PART 3 EXECUTION

3.1 EXISTING CONDITIONS

Before installing insulation, ensure that areas that will be in contact with the insulation are dry and free of projections which could cause voids, compressed insulation, or punctured vapor retarders. If moisture or other conditions are found that do not allow the workmanlike installation of the insulation, do not proceed but notify Contracting Officer of such conditions.

3.2 PREPARATION

3.2.1 Blocking Around Heat Producing Devices

Install non-combustible blocking around heat producing devices to provide the following clearances:

a. Recessed lighting fixtures, including wiring compartments, ballasts, and other heat producing devices, unless these are certified by the manufacturer for installation surrounded by insulation: 3 inches from outside face of fixtures and devices or as required by NFPA 70 and, if

SECTION 07 21 16 Page 3

Page 107: GA106 – ROLL -UP DOOR RESET Augusta, GA...GA106 - Roll-Up Door Reset May 22, 2015 Augusta, GA SECTION 01 33 00.00 13 SUBMITTAL REGISTER COVER PAGE 07/13 PART 1 GENERAL 1.1 SUBMITTAL

GA106 - Roll-Up Door Reset May 22, 2015Augusta, GA

insulation is to be placed above fixture or device, 24 inches above fixture.

b. Vents and vent connectors used for venting the products of combustion, flues, and chimneys other than masonry chimneys: Minimum clearances as required by NFPA 211 .

d. Gas Fired Appliances: Clearances as required in NFPA 54 .

e. Oil Fired Appliances: Clearances as required in NFPA 31 .

Blocking around flues and chimneys is not required when insulation blanket, including any attached vapor retarder, passed ASTM E136, in addition to meeting all other requirements stipulated in Part 2. Blocking is also not required if the chimneys are certified by the manufacturer for use in contact with insulating materials.

3.3 INSTALLATION

3.3.1 Insulation

Install and handle insulation in accordance with manufacturer's instructions. Keep material dry and free of extraneous materials. Ensure personal protective clothing and respiratory equipment is used as required. Observe safe work practices.

3.3.1.1 Electrical wiring

Do not install insulation in a manner that would sandwich electrical wiring between two layers of insulation.

3.3.1.2 Continuity of Insulation

Install blanket insulation to butt tightly against adjoining blankets and to studs, rafters, joists, sill plates, headers and any obstructions. Provide continuity and integrity of insulation at corners, wall to ceiling joints, roof, and floor. Avoid creating thermal bridges.

3.3.1.3 Installation at Bridging and Cross Bracing

Insulate at bridging and cross bracing by splitting blanket vertically at center and packing one half into each opening. Butt insulation at bridging and cross bracing; fill in bridged area with loose or scrap insulation.

3.3.1.4 Cold Climate Requirement

Place insulation to the outside of pipes.

3.3.1.5 Insulation without Affixed Vapor Retarder

Provide snug friction fit to hold insulation in place. Stuff pieces of insulation into cracks between trusses, joists, studs and other framing, such as at attic access doors, door and window heads, jambs, and sills, band joists, and headers.

3.3.1.6 Sizing of Blankets

Provide only full width blankets when insulating between trusses, joists,

SECTION 07 21 16 Page 4

Page 108: GA106 – ROLL -UP DOOR RESET Augusta, GA...GA106 - Roll-Up Door Reset May 22, 2015 Augusta, GA SECTION 01 33 00.00 13 SUBMITTAL REGISTER COVER PAGE 07/13 PART 1 GENERAL 1.1 SUBMITTAL

GA106 - Roll-Up Door Reset May 22, 2015Augusta, GA

or studs. Size width of blankets for a snug fit where trusses, joists or studs are irregularly spaced.

-- End of Section --

SECTION 07 21 16 Page 5

Page 109: GA106 – ROLL -UP DOOR RESET Augusta, GA...GA106 - Roll-Up Door Reset May 22, 2015 Augusta, GA SECTION 01 33 00.00 13 SUBMITTAL REGISTER COVER PAGE 07/13 PART 1 GENERAL 1.1 SUBMITTAL

GA106 - Roll-Up Door Reset May 22, 2015Augusta, GA

SECTION 08 33 23

OVERHEAD COILING DOORS07/07

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

AMERICAN SOCIETY OF CIVIL ENGINEERS (ASCE)

ASCE 7 (2010; Errata 2011; Supp 1 2013) Minimum Design Loads for Buildings and Other Structures

AMERICAN SOCIETY OF HEATING, REFRIGERATING AND AIR-CONDITIONING ENGINEERS (ASHRAE)

ASHRAE FUN IP (2013) Fundamentals Handbook, I-P Edition

ASME INTERNATIONAL (ASME)

ASME B29.400 (2001; R 2013) Combination, "H" Type Mill Chains, and Sprockets

ASTM INTERNATIONAL (ASTM)

ASTM A153/A153M (2009) Standard Specification for Zinc Coating (Hot-Dip) on Iron and Steel Hardware

ASTM A27/A27M (2013) Standard Specification for Steel Castings, Carbon, for General Application

ASTM A307 (2012) Standard Specification for Carbon Steel Bolts and Studs, 60 000 PSI Tensile Strength

ASTM A36/A36M (2012) Standard Specification for Carbon Structural Steel

ASTM A48/A48M (2003; R 2012) Standard Specification for Gray Iron Castings

ASTM A53/A53M (2012) Standard Specification for Pipe, Steel, Black and Hot-Dipped, Zinc-Coated, Welded and Seamless

ASTM A653/A653M (2013) Standard Specification for Steel Sheet, Zinc-Coated (Galvanized) or Zinc-Iron Alloy-Coated (Galvannealed) by the Hot-Dip Process

ASTM A666 (2010) Standard Specification for Annealed

SECTION 08 33 23 Page 1

Page 110: GA106 – ROLL -UP DOOR RESET Augusta, GA...GA106 - Roll-Up Door Reset May 22, 2015 Augusta, GA SECTION 01 33 00.00 13 SUBMITTAL REGISTER COVER PAGE 07/13 PART 1 GENERAL 1.1 SUBMITTAL

GA106 - Roll-Up Door Reset May 22, 2015Augusta, GA

or Cold-Worked Austenitic Stainless Steel Sheet, Strip, Plate and Flat Bar

ASTM A780/A780M (2009) Standard Practice for Repair of Damaged and Uncoated Areas of Hot-Dip Galvanized Coatings

ASTM A924/A924M (2013) Standard Specification for General Requirements for Steel Sheet, Metallic-Coated by the Hot-Dip Process

ASTM B221 (2013) Standard Specification for Aluminum and Aluminum-Alloy Extruded Bars, Rods, Wire, Profiles, and Tubes

ASTM D2000 (2012) Standard Classification System for Rubber Products in Automotive Applications

ASTM E330 (2002; R 2010) Structural Performance of Exterior Windows, Doors, Skylights and Curtain Walls by Uniform Static Air Pressure Difference

ASTM E84 (2014) Standard Test Method for Surface Burning Characteristics of Building Materials

NATIONAL ELECTRICAL MANUFACTURERS ASSOCIATION (NEMA)

NEMA ICS 2 (2000; R 2005; Errata 2008) Standard for Controllers, Contactors, and Overload Relays Rated 600 V

NEMA ICS 6 (1993; R 2011) Enclosures

NEMA MG 1 (2011; Errata 2012) Motors and Generators

NEMA ST 1 (1988; R 1994; R 1997) Specialty Transformers (Except General Purpose Type)

NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)

NFPA 70 (2014; AMD 1 2013; Errata 1 2013; AMD 2 2013; Errata 2 2013; AMD 3 2014; Errata 3 2014) National Electrical Code

UNDERWRITERS LABORATORIES (UL)

UL 325 (2013) Door, Drapery, Gate, Louver, and Window Operators and Systems

1.2 SUBMITTALS

Government approval is required for submittals with a "G" designation; submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:

SECTION 08 33 23 Page 2

Page 111: GA106 – ROLL -UP DOOR RESET Augusta, GA...GA106 - Roll-Up Door Reset May 22, 2015 Augusta, GA SECTION 01 33 00.00 13 SUBMITTAL REGISTER COVER PAGE 07/13 PART 1 GENERAL 1.1 SUBMITTAL

GA106 - Roll-Up Door Reset May 22, 2015Augusta, GA

SD-02 Shop Drawings

Overhead Coiling Doors; G

Include detailed plans, elevations, details of framing members, anchoring methods, required clearances, hardware, and accessories. Include relationship with adjacent construction.

Counterbalancing Mechanism; G

Back-up Manual Door Operator; G

Electric Door Operators; G

Bottom Bars; G

Guides; G

Mounting Brackets; G

Overhead Drum; G

Hood; G

Painting; G

Installation Drawings; G

SD-03 Product Data

Overhead Coiling Doors; G

Submit manufacturer's data sheets on each product to be used, including preparation instructions and recommendations, storage and handling requirements and recommendations, details of construction and fabrication and installation instructions.

Hardware; G

Counterbalancing Mechanism; G

Back-Up Manual Door Operator; G

Electric Door Operators; G

SD-04 Samples

Selection Samples; G

For each finish product specified, furnish two complete sets of color chips representing manufacturer's full range of available colors and patterns.

Verification Samples; G

For each finish product specified, two samples, minimum size 6 inches long, representing actual product, color, and patterns.

SD-05 Design Data

SECTION 08 33 23 Page 3

Page 112: GA106 – ROLL -UP DOOR RESET Augusta, GA...GA106 - Roll-Up Door Reset May 22, 2015 Augusta, GA SECTION 01 33 00.00 13 SUBMITTAL REGISTER COVER PAGE 07/13 PART 1 GENERAL 1.1 SUBMITTAL

GA106 - Roll-Up Door Reset May 22, 2015Augusta, GA

Overhead Coiling Doors; G

Provide calculations confirming all doors meet performance criteria for structural components and cladding calculations for windloads provided on the drawings.

Hardware; G

Counterbalancing Mechanism; G

Back-Up Manual Door Operator; G

Electric Door Operators; G

SD-10 Operation and Maintenance Data

Operation and Maintenance Manuals; G

Submit lubrication requirements and frequency, and periodic adjustments required.

Materials; G

Devices; G

Procedures; G

Manufacture's Brochures; G

Parts Lists; G

1.3 OVERHEAD COILING DOOR DETAIL SHOP DRAWINGS

Provide installation drawings for overhead coiling door assemblies which show: elevations of each door type, shape and thickness of materials, finishes, details of joints and connections, details of guides and fittings, rough opening dimensions, location and description of hardware, anchorage locations, and counterbalancing mechanism and door operator details. Show locations of replaceable fusible links on wiring diagrams for power, signal and controls. Include a schedule showing the location of each door with the drawings.

1.4 WARRANTY, OPERATION AND MAINTENANCE DATA

Submit Operation and Maintenance Manuals for Overhead Coiling Door Assemblies, including the following items:

Materials

Devices

Back-Up Manual Door Operator

Electric Door Operators

Hood

Counterbalancing Mechanism

SECTION 08 33 23 Page 4

Page 113: GA106 – ROLL -UP DOOR RESET Augusta, GA...GA106 - Roll-Up Door Reset May 22, 2015 Augusta, GA SECTION 01 33 00.00 13 SUBMITTAL REGISTER COVER PAGE 07/13 PART 1 GENERAL 1.1 SUBMITTAL

GA106 - Roll-Up Door Reset May 22, 2015Augusta, GA

Painting

Procedures

Manufacture's Brochures

Parts Lists

Furnish a written guarantee that the helical spring and counterbalance mechanism are free from defects in material and workmanship for not less than two years after completion and acceptance of the project.

Warrant that upon notification by the Government, any defects in material, workmanship, and door operation are immediately correct within the same time period covered by the guarantee, at no cost to the Government.

1.5 DELIVERY AND STORAGE

Deliver doors to the jobsite wrapped in a protective covering with the brands and names clearly marked thereon. Store doors in an adequately ventilated dry location that is free from dirt and dust, water, or other contaminants. Store in a manner that permits easy access for inspection and handling.

1.6 QUALITY ASSURANCE

1.6.1 Manufacturer Qualifications

Company specializing in performing Work of this section with a minimum of five years experience in the fabrication and installation of security closures.

1.6.2 Installer Qualifications

Installer Qualifications: Company specializing in performing Work of this section with minimum three years and approved by manufacturer.

PART 2 PRODUCTS

2.1 DESCRIPTION

Doors to be coiling type, with interlocking slats, complete with anchoring and door hardware, guides, hood, and operating mechanisms, and designed for use on openings as indicated. Use grease-sealed or self-lubricating bearings for rotating members.

2.2 PERFORMANCE REQUIREMENTS

2.2.1 Wind Loading

Design and fabricate door assembly to withstand the wind loading pressure of at least 20 pounds per square foot with a maximum deflection of 1/120 of the opening width and shall meet the maximum windload values as listed on the drawings. Provide test data showing compliance with ASTM E330. Sound engineering principles may be used to interpolate or extrapolate test results to door sizes not specifically tested. Ensure complete assembly meets or exceeds the requirements of ASCE 7. Door wall thicknesses listed may be modificed to meet performance criteria.

SECTION 08 33 23 Page 5

Page 114: GA106 – ROLL -UP DOOR RESET Augusta, GA...GA106 - Roll-Up Door Reset May 22, 2015 Augusta, GA SECTION 01 33 00.00 13 SUBMITTAL REGISTER COVER PAGE 07/13 PART 1 GENERAL 1.1 SUBMITTAL

GA106 - Roll-Up Door Reset May 22, 2015Augusta, GA

2.2.2 Single Source Responsibility

Provide doors, tracks, motors, and accessories from one manufacturer for each type of door. Provide secondary components from source acceptable to manufacturer of primary components.

2.2.3 Operational Cycle Life

Design all portions of the door, hardware and operating mechanism that are subject to movement, wear, or stress fatigue to operate through a minimum number of 10 cycles per day. One complete cycle of door operation is defined as when the door is in the closed position, moves to the fully open position, and returns to the closed position.

2.3 OVERHEAD COILING DOORS

2.3.1 Curtain Materials and Construction

Provide curtain slats fabricated from Grade A steel sheets conforming to ASTM A653/A653M , with the additional requirement of a minimum yield point of 33,000 psi. Provide sheets, galvanized in accordance with ASTM A653/A653M and ASTM A924/A924M .

Provide slats filled with manufacturer's standard thermal insulation complying with maximum flame-spread and smoke-developed indexes of 75 and 450, respectively, according to ASTM E84. Enclose insulation completely within slat faces on interior surface of slats.

2.3.2 Insulated Curtains

Form Curtains from manufacturer's standard shapes of interlocking slats. Supply slat system with a minimum R-value of 7.7 when calculated in accordance with ASHRAE FUN IP . Slats to consist of a urethane core not less than 11/16 inch thick, completely enclosed within metal facings. Ensure the exterior face of slats are the same gauge as specified for curtains. Select an interior face not lighter than 0.0219 inches. The insulated slat assembly requires a flame spread rating of not more than 25 and a smoke development factor of not more than 50 when tested in accordance with ASTM E84.

2.3.3 Curtain Bottom Bar

Install curtain bottom bars as pairs of angles from the manufacturer's standard steel extrusions not less than 2.0 by 2.0 inches by 0.188 inch. Ensure steel extrusions conform to ASTM A36/A36M. Stainless steel extrusions conforming to ASTM A666, Type 304. Aluminum extrusions conforming to ASTM B221. Galvanize angles and fasteners in accordance with ASTM A653/A653M and ASTM A924/A924M . Coat welds and abrasions with paint conforming to ASTM A780/A780M .

2.3.4 Insulated Vision Panels

Provide complete manufacturer's standard insulated vision panels assembly consisting of clear acrylic glazing panels as required for the type door, as indicated on drawings. Vision panel Size shall be 10 inches by 1 inch. Set panels in a neoprene channel with a galvanized-steel frame not less than 0.0359-inch uncoated thickness.

SECTION 08 33 23 Page 6

Page 115: GA106 – ROLL -UP DOOR RESET Augusta, GA...GA106 - Roll-Up Door Reset May 22, 2015 Augusta, GA SECTION 01 33 00.00 13 SUBMITTAL REGISTER COVER PAGE 07/13 PART 1 GENERAL 1.1 SUBMITTAL

GA106 - Roll-Up Door Reset May 22, 2015Augusta, GA

2.3.5 Locks

Provide end and/or wind locks of Grade B cast steel conforming to ASTM A27/A27M, galvanized in accordance with ASTM A653/A653M , ASTM A153/A153M and ASTM A924/A924M . Secure locks at every other curtain slat.

2.3.6 Weather Stripping

Ensure weather-stripping at the door-head and jamb is 1/8-inch thick sheet of natural or neoprene rubber with air baffles. Secure weather stripping to the insides of hoods with galvanized-steel fasteners through continuous galvanized-steel pressure bars at least 5/8-inch wide and 1/8-inch thick.

Ensure threshold weather-stripping is 1/8-inch thick sheet natural or neoprene rubber secured to the bottom bars.

Provide weather-stripping of natural or neoprene rubber conforming to ASTM D2000.

2.3.7 Locking Devices

Provide chain lock keeper which suitable for a standard padlock.

2.3.8 Safety Interlock

Equip power-operated doors with safety interlock switch to disengage power supply when door is locked.

2.3.9 Overhead Drum

Fabricate drums from nominal 0.028-inch thick, hot-dip galvanized steel sheet with G90 (Z275) zinc coating, complying with ASTM A653/A653M .

2.3.10 Slats

No. 5F, 18 gauge, Grade 40 steel, ASTM A653/A653M galvanized steel zinc coating. Back slat shall be minimum 24 gauge steel with galvanized steel zinc coating. Slat gauge indicated is miniumum and may be increased to meet performance criteria.

2.4 HARDWARE

Ensure all hardware conforms to ASTM A153/A153M , ASTM A307, and ASTM A27/A27M.

2.4.1 Guides

Fabricate curtain jamb guides from the manufacturer's standard angles or channels of same material and finish as curtain slats unless otherwise indicated. Provide guides with sufficient depth and strength to retain curtain, and to withstand loading. Ensure curtain operates smoothly. Slot bolt holes for track adjustment.

Ensure guides are roll-formed steel channel bolted to angle or structural grade, three angle assembly of steel to form a slot of sufficient depth to retain curtains in guides to achieve 20 psf windload standard. Guides may be provided with integral windlock bars and removable bottom bar stops.

SECTION 08 33 23 Page 7

Page 116: GA106 – ROLL -UP DOOR RESET Augusta, GA...GA106 - Roll-Up Door Reset May 22, 2015 Augusta, GA SECTION 01 33 00.00 13 SUBMITTAL REGISTER COVER PAGE 07/13 PART 1 GENERAL 1.1 SUBMITTAL

GA106 - Roll-Up Door Reset May 22, 2015Augusta, GA

2.4.2 Equipment Supports

Fabricate door-operating equipment supports from the manufacturer's standard steel shapes and plates conforming to ASTM A36/A36M, galvanized in accordance with ASTM A653/A653M and ASTM A924/A924M . Size the shapes and plates in accordance with the industry standards for the size, weight, and type of door installation.

2.4.3 Hood

Provide a hood with a minimum 24-gauge galvanized sheet metal, flanged at top for attachment to header and flanged at bottom to provide longitudinal stiffness. Provide hood with internal baffle weatherseal. The hood encloses the curtain coil and counterbalance mechanism.

2.5 COUNTERBALANCING MECHANISM

Counterbalance doors by means of manufacturer's standard mechanism with an adjustable-tension, steel helical torsion spring mounted, around a steel shaft and contained in a spring barrel connected to top of curtain with barrel rings. Use grease-sealed or self-lubricating bearings for rotating members.

2.5.1 Brackets

Provide the manufacturer's standard mounting brackets with one located at each end of the counterbalance barrel conforming to ASTM A48/A48M. Provide brackets of either cast iron or cold-rolled steel.

Brackets will be of 3/16 inch minimum thick steel plates, with permanently sealed ball bearings. Designed to enclose ends of coil and provide support of counterbalance pipe at each end.

2.5.2 Counterbalance Barrels

Fabricate spring barrel of manufacturer's standard hot-formed, structural-quality, welded or seamless carbon-steel pipe, conforming to ASTM A53/A53M. Ensure the barrel is of sufficient diameter and wall thickness to support rolled-up curtain without distortion of slats. Limit barrel deflection to not more than 0.03 inch per foot of span under full load.

Curtain to be coiled on a pipe of sufficient size to carry door load with deflection not to exceed 0.033 inches per foot of door span and to be correctly balanced by helical springs, oil tempered torsion type. Use cast iron barrel plugs to anchor springs to tension shaft and pipe.

2.5.2.1 Barrel

Provide steel pipe capable of supporting curtain load with maximum deflection of 0.03 inches per foot of width.

2.5.2.2 Spring Balance

Provide an oil-tempered, heat-treated steel helical torsion spring assembly designed for proper balance of door. Ensure that effort to operate manually operated units does not exceed 25 lbs. Provide wheel for applying and adjusting spring torque.

SECTION 08 33 23 Page 8

Page 117: GA106 – ROLL -UP DOOR RESET Augusta, GA...GA106 - Roll-Up Door Reset May 22, 2015 Augusta, GA SECTION 01 33 00.00 13 SUBMITTAL REGISTER COVER PAGE 07/13 PART 1 GENERAL 1.1 SUBMITTAL

GA106 - Roll-Up Door Reset May 22, 2015Augusta, GA

2.5.3 Spring Balance

Install one or more oil-tempered, heat-treated steel helical torsion springs within the barrel, capable of producing sufficient torque to assure easy operation of the door curtain. Provide and size springs to counterbalance weight of curtain, with uniform adjustment accessible from outside barrel. Secure ends of springs to barrel and shaft with cast-steel barrel plugs.

2.5.4 Torsion Rod for Counter Balance

Fabricate rod from the manufacturer's standard cold-rolled steel, sized to hold fixed spring ends and carry torsional load.

2.5.5 Counterbalance Shaft Assembly

2.5.5.1 Barrel

Provide steel pipe capable of supporting the curtain load with maximum deflection of 0.03 inches per foot of width.

2.5.5.2 Spring Balance

Provide an oil-tempered, heat-treated steel helical torsion spring assembly designed for proper balance of door. Ensure that maximum effort to operate does not exceed 25 pounds. Provide wheel for applying and adjusting spring torque.

2.6 BACK-UP MANUAL DOOR OPERATOR

2.6.1 Manual Chain-Hoist Door Operators

Provide door operators which consist of an endless steel hand chain, chain-pocket wheel, guard, and a geared reduction unit of at least a 3 to 1 ratio with a maximum lifting force of 25 lbf. Required pull for operation cannot exceed 35 pounds.

Provide chain hoists with a self-locking mechanism allowing the curtain to be stopped at any point in its upward or downward travel and to remain in that position until moved to the fully open or closed position. Provide hand chains of cadmium-plated alloy steel conforming to ASME B29.400 . Ensure yield point of the chain is at least three times the required hand-chain pull.

Provide chain sprocket wheels of cast iron conforming to ASTM A48/A48M.

2.7 ELECTRIC DOOR OPERATORS

Provide electrical wiring and door operating controls conforming to the applicable requirements of NFPA 70 .

Electric door-operator assemblies needs to be the sizes and capacities recommended and provided by the door manufacturer for specified doors. Furnish complete assemblies with electric motors and factory-prewired motor controls, starter, gear reduction units, solenoid-operated brakes, clutch, remote-control stations, manual or automatic control devices, and accessories as required for proper operation of the doors.

SECTION 08 33 23 Page 9

Page 118: GA106 – ROLL -UP DOOR RESET Augusta, GA...GA106 - Roll-Up Door Reset May 22, 2015 Augusta, GA SECTION 01 33 00.00 13 SUBMITTAL REGISTER COVER PAGE 07/13 PART 1 GENERAL 1.1 SUBMITTAL

GA106 - Roll-Up Door Reset May 22, 2015Augusta, GA

Design the operators so that motors may be removed without disturbing the limit-switch adjustment and affecting the emergency auxiliary operators.

Provide a manual operator of chain-gear mechanisms with a release clutch to permit manual operation of doors in case of power failure. Arrange the emergency manual operator so that it may be put into and out of operation from floor level, and its use does not affect the adjustment of the limit switches. Provide an electrical or mechanical device that automatically disconnects the motor from the operating mechanism when the emergency manual operating mechanism is engaged.

2.7.1 Door-Operator Types

Provide an operator mounted to the inside front wall on the left or right side of door and connected to door drive shaft with drive chain and sprockets. Side room is required for this type of mounting. Wall mounted operator can also be mounted above or below shaft; if above shaft, headroom is required.

2.7.2 Electric Motors

Provide motors which are the high-starting-torque, reversible, constant-duty electrical type with overload protection of sufficient torque and minimum 3/4 horsepower to move the door in either direction from any position. Ensure they produce a door-travel speed of not less than 8 nor more than 12 inches per second without exceeding the horsepower rating.

Provide motors which conform to NEMA MG 1 and NEMA ICS 6 , Type 4 designation, temperature rating, service factor, enclosure type, and efficiency to the requirements specified.

2.7.3 Motor Bearings

Select bearings with bronze-sleeve or heavy-duty ball or roller antifriction type with full provisions for the type of thrust imposed by the specific duty load.

Equip motors coupled to worm-gear reduction units with either ball or roller bearings.

Equip bearings in motors 1/2 horsepower or larger with lubrication service fittings. Fit lubrication fittings with color-coded plastic or metal dust caps.

In any motor, bearings that are lubricated at the factory for extended duty periods do not need to be lubricated for a given number of operating hours. Display this information on an appropriate tag or label on the motor with instructions for lubrication cycle maintenance.

2.7.4 Motor Starters, Controls, and Enclosures

Provide each door motor with: a factory-wired, unfused, disconnect switch; a reversing, across-the-line magnetic starter with thermal overload protection; 120-volt operating coils with a control transformer limit switch; and a safety interlock assembled in a NEMA ICS 6 type enclosure as specified herein. Ensure control equipment conforms to NEMA ICS 2 .

SECTION 08 33 23 Page 10

Page 119: GA106 – ROLL -UP DOOR RESET Augusta, GA...GA106 - Roll-Up Door Reset May 22, 2015 Augusta, GA SECTION 01 33 00.00 13 SUBMITTAL REGISTER COVER PAGE 07/13 PART 1 GENERAL 1.1 SUBMITTAL

GA106 - Roll-Up Door Reset May 22, 2015Augusta, GA

Provide adjustable switches, electrically interlocked with the motor controls and set to stop the door automatically at the fully open and fully closed position.

2.7.5 Control Enclosures

Provide control enclosures that conform to NEMA ICS 6 for oil-tight and dust-tight NEMA Type 13.

2.7.6 Transformer

Provide starters with 230/460 to 115 volt control transformers with one secondary fuse when required to reduce the voltage on control circuits to 120 volts or less. Provide a transformer conforming to NEMA ST 1 .

2.7.7 Safety-Edge Device

Provide each door with an electric safety device extending the full width of the door and located within a U-section neoprene or rubber astragal, mounted on the bottom rail of the bottom door section. Device needs to immediately stop and reverse the door upon contact with an obstruction in the door opening during downward travel and cause the door to return to full-open position. A safety device is not a substitute for a limit switch.

Connect safety device to the control circuit through a retracting safety cord and reel.

2.7.8 Photoelectric Sensor

Provide manufacturer's standard system designed to detect an obstruction in door opening without contact between door and obstruction. System shall comply with UL 325 .

2.7.9 Remote-Control Stations

Provide interior remote control stations which are full-guarded, momentary-contact three-button, heavy-duty, surface-mounted NEMA ICS 6 type enclosures as specified. Mark buttons "OPEN," "CLOSE," and "STOP." Ensure the "CLOSE" button requires a constant pressure to maintain the closing motion of the door. When the door is in motion and the "STOP" button is pressed, ensure the door stops instantly and remains in the stopped position. From the stopped position, the door may then be operated in either direction.

2.7.10 Speed-Reduction Units

Provide speed-reduction units consisting of hardened-steel worm and bronze worm gear assemblies running in oil or grease and inside a sealed casing, coupled to the motor through a flexible coupling. Drive shafts need to rotate on ball- or roller-bearing assemblies that are integral with the unit.

Provide minimum ratings of speed reduction units in accordance with AGMA provisions for class of service.

Ground worm gears to provide accurate thread form; machine teeth for all other types of gearing. Surface harden all gears.

SECTION 08 33 23 Page 11

Page 120: GA106 – ROLL -UP DOOR RESET Augusta, GA...GA106 - Roll-Up Door Reset May 22, 2015 Augusta, GA SECTION 01 33 00.00 13 SUBMITTAL REGISTER COVER PAGE 07/13 PART 1 GENERAL 1.1 SUBMITTAL

GA106 - Roll-Up Door Reset May 22, 2015Augusta, GA

Provide antifriction type bearings equipped with oil seals.

2.7.11 Chain Drives

Provide roller chains that are a power-transmission series steel roller type conforming to ASME B29.400 , with a minimum safety factor of 10 times the design load.

Heat-treat or otherwise harden roller-chain side bars, rollers, pins, and bushings.

Provide high-carbon steel chain sprockets with machine-cut hardened teeth, finished bore and keyseat, and hollow-head setscrews.

2.7.12 Brakes

Provide 360-degree shoe brakes or shoe and drum brakes. Ensure the brakes are solenoid-operated and electrically interlocked to the control circuit to set automatically when power is interrupted.

2.7.13 Clutches

Ensure clutches are either the 4-inch diameter, multiple face, externally adjustable friction type or adjustable centrifugal type.

2.7.14 Weather/Smoke Seal Sensing Edge

Provide automatic stop control by an automatic sensing switch within neoprene astragal extending the full width of door bottom bar.

Provide an electric sensing edge device. Ensure the door immediately stops downward travel when contact occurs before door fully closes. Provide a self-monitoring wireless sensing edge connection to the motor operator; eliminating the need for a physical traveling electric cord connection between bottom bar sensing edge device and motor operator. Supervised system alters normal door operation; preventing damage, injury or death due to an inoperable sensing edge system.

2.8 SURFACE FINISHING

Comply with NAAMM's "Metal Finishes Manual for Architectural and Metal Products" for recommendations for applying and designating finishes. Noticeable variations in the same metal component are not acceptable. Variations in appearance of adjoining components are acceptable if they are within the range of approved samples and are assembled or installed to minimize contrast.

2.8.1 Galvanized Steel

Slats and hood galvanized in accordance with ASTM A653/A653M and receive rust-inhibitive, roll coating process, including 0.2 mils thick baked-on prime paint, and an industrial textured powder coat top coat. Coating shall be applied to entire door system including slats, guides, bottom bar and head plate. New door color shall match color of existing doors.

2.8.2 Non-Galvanized Steel

Non-galvanized exposed ferrous surfaces shall receive one coat of rust-inhibitive primer.

SECTION 08 33 23 Page 12

Page 121: GA106 – ROLL -UP DOOR RESET Augusta, GA...GA106 - Roll-Up Door Reset May 22, 2015 Augusta, GA SECTION 01 33 00.00 13 SUBMITTAL REGISTER COVER PAGE 07/13 PART 1 GENERAL 1.1 SUBMITTAL

GA106 - Roll-Up Door Reset May 22, 2015Augusta, GA

PART 3 EXECUTION

3.1 GENERAL

Install overhead coiling door assembly, anchors and inserts for guides, brackets, motors, switches, hardware, and other accessories in accordance with approved detail drawings and manufacturer's written instructions. Upon completion of installation, ensure doors are free from all distortion.

Install overhead coiling doors, motors, hoods, and operators at the mounting locations as indicated for each door in the contract documents and as required by the manufacturer.

Install overhead coiling doors, switches, and controls along accessible routes in compliance with regulatory requirements for accessibility and as required by the manufacturer.

3.2 ACCEPTANCE PROVISIONS

After installation, adjust hardware and moving parts. Lubricate bearings and sliding parts as recommended by manufacturer to provide smooth operating functions for ease movement, free of warping, twisting, or distortion of the door assembly.

Adjust seals to provide weather-tight fit around entire perimeter.

Engage a factory-authorized service representative to perform startup service and checks according to manufacturer's written instructions.

Test the door opening and closing operation when activated by controls or alarm-connected fire-release system. Adjust controls and safeties. Replace damaged and malfunctioning controls and equipment. Reset door-closing mechanism after successful test.

Test and make final adjustment of new doors at no additional cost to the Government.

3.2.1 Maintenance and Adjustment

Not more than 90 calendar days after completion and acceptance of the project, examine, lubricate, test, and re-adjust doors as required for proper operation.

3.3 OPERATION AND MAINTENANCE

Submit 6 copies of the Operation and Maintenance Manuals 30 calendar days prior to testing the Overhead Coiling Door Assemblies. Update and resubmit data for final approval no later than 30 calendar days prior to contract completion.

Provide operation and maintenance manuals which are consistent with manufacturer's standard brochures, schematics, printed instructions, general operating procedures, and safety precautions. Provide test data that is legible and of good quality.

-- End of Section --

SECTION 08 33 23 Page 13

Page 122: GA106 – ROLL -UP DOOR RESET Augusta, GA...GA106 - Roll-Up Door Reset May 22, 2015 Augusta, GA SECTION 01 33 00.00 13 SUBMITTAL REGISTER COVER PAGE 07/13 PART 1 GENERAL 1.1 SUBMITTAL

GA106 - Roll-Up Door Reset May 22, 2015Augusta, GA

SECTION 09 90 00

PAINTS AND COATINGS05/11

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

AMERICAN CONFERENCE OF GOVERNMENTAL INDUSTRIAL HYGIENISTS (ACGIH)

ACGIH 0100 (2001; Supplements 2002-2008) Documentation of the Threshold Limit Values and Biological Exposure Indices

ASME INTERNATIONAL (ASME)

ASME A13.1 (2007; R 2013) Scheme for the Identification of Piping Systems

ASTM INTERNATIONAL (ASTM)

ASTM C920 (2014A) Standard Specification for Elastomeric Joint Sealants

ASTM D235 (2002; R 2012) Mineral Spirits (Petroleum Spirits) (Hydrocarbon Dry Cleaning Solvent)

ASTM D4214 (2007) Standard Test Method for Evaluating the Degree of Chalking of Exterior Paint Films

ASTM D4263 (1983; R 2012) Indicating Moisture in Concrete by the Plastic Sheet Method

ASTM D4444 (2013) Use and Calibration of Hand-Held Moisture Meters

ASTM D523 (2014) Standard Test Method for Specular Gloss

ASTM D6386 (2010) Standard Practice for Preparation of Zinc (Hot-Dip Galvanized) Coated Iron and Steel Product and Hardware Surfaces for Painting

ASTM F1869 (2011) Measuring Moisture Vapor Emission Rate of Concrete Subfloor Using Anhydrous Calcium Chloride

MASTER PAINTERS INSTITUTE (MPI)

MPI 101 (Oct 2009) Epoxy Anti-Corrosive Metal Primer

SECTION 09 90 00 Page 1

Page 123: GA106 – ROLL -UP DOOR RESET Augusta, GA...GA106 - Roll-Up Door Reset May 22, 2015 Augusta, GA SECTION 01 33 00.00 13 SUBMITTAL REGISTER COVER PAGE 07/13 PART 1 GENERAL 1.1 SUBMITTAL

GA106 - Roll-Up Door Reset May 22, 2015Augusta, GA

MPI 107 (Oct 2009) Rust Inhibitive Primer (Water-Based)

MPI 108 (Oct 2009) High Build Epoxy Coating, Low Gloss

MPI 116 (Oct 2009) Epoxy Block Filler

MPI 138 (Oct 2009) Interior High Performance Latex, MPI Gloss Level 2

MPI 141 (Oct 2009) Interior High Performance Latex MPI Gloss Level 5

MPI 153 (Oct 2009) Interior W.B. Light Industrial Coating, Semi-Gloss, MPI Gloss Level 5

MPI 163 (Oct 2009) Exterior W.B. Light Industrial Coating, Semi-Gloss, MPI Gloss Level 5

MPI 23 (Oct 2009) Surface Tolerant Metal Primer

MPI 39 (Oct 2009) Interior Latex-Based Wood Primer

MPI 4 (Oct 2009) Interior/Exterior Latex Block Filler

MPI 46 (Oct 2009) Interior Enamel Undercoat

MPI 47 (Oct 2009) Interior Alkyd, Semi-Gloss, MPI Gloss Level 5

MPI 50 (Oct 2009) Interior Latex Primer Sealer

MPI 77 (Oct 2009) Epoxy Gloss

MPI 79 (Oct 2009) Alkyd Anti-Corrosive Metal Primer

MPI 8 (Oct 2009) Exterior Alkyd, Flat, MPI Gloss Level I

MPI 94 (Oct 2009) Exterior Alkyd, Semi-Gloss, MPI Gloss Level 5

MPI 95 (Oct 2009) Quick Drying Primer for Aluminum

THE SOCIETY FOR PROTECTIVE COATINGS (SSPC)

SSPC PA 1 (2000; E 2004) Shop, Field, and Maintenance Painting of Steel

SSPC PA Guide 3 (1982; E 1995) A Guide to Safety in Paint Application

SSPC QP 1 (1998; E 2004) Standard Procedure for Evaluating Painting Contractors (Field Application to Complex Industrial

SECTION 09 90 00 Page 2

Page 124: GA106 – ROLL -UP DOOR RESET Augusta, GA...GA106 - Roll-Up Door Reset May 22, 2015 Augusta, GA SECTION 01 33 00.00 13 SUBMITTAL REGISTER COVER PAGE 07/13 PART 1 GENERAL 1.1 SUBMITTAL

GA106 - Roll-Up Door Reset May 22, 2015Augusta, GA

Structures)

SSPC SP 1 (1982; E 2004) Solvent Cleaning

SSPC SP 10/NACE No. 2 (2007) Near-White Blast Cleaning

SSPC SP 12/NACE No.5 (2002) Surface Preparation and Cleaning of Metals by Waterjetting Prior to Recoating

SSPC SP 2 (1982; E 2000; E 2004) Hand Tool Cleaning

SSPC SP 3 (1982; E 2004) Power Tool Cleaning

SSPC SP 6/NACE No.3 (2007) Commercial Blast Cleaning

U.S. ARMY CORPS OF ENGINEERS (USACE)

EM 385-1-1 (2008; Errata 2011) Safety and Health Requirements Manual

U.S. GENERAL SERVICES ADMINISTRATION (GSA)

FED-STD-313 (2014; Rev E) Material Safety Data, Transportation Data and Disposal Data for Hazardous Materials Furnished to Government Activities

U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)

29 CFR 1910.1000 Air Contaminants

1.2 SUBMITTALS

Government approval is required for submittals with a "G" designation; submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. The following shall be submitted in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:

The current MPI, "Approved Product List" which lists paint by brand, label, product name and product code as of the date of contract award, will be used to determine compliance with the submittal requirements of this specification. The Contractor may choose to use a subsequent MPI "Approved Product List", however, only one list may be used for the entire contract and each coating system is to be from a single manufacturer. All coats on a particular substrate must be from a single manufacturer. No variation from the MPI Approved Products List is acceptable.

Samples of specified materials may be taken and tested for compliance with specification requirements.

SD-02 Shop Drawings

Piping identification

Submit color stencil codes

SD-03 Product Data

SECTION 09 90 00 Page 3

Page 125: GA106 – ROLL -UP DOOR RESET Augusta, GA...GA106 - Roll-Up Door Reset May 22, 2015 Augusta, GA SECTION 01 33 00.00 13 SUBMITTAL REGISTER COVER PAGE 07/13 PART 1 GENERAL 1.1 SUBMITTAL

GA106 - Roll-Up Door Reset May 22, 2015Augusta, GA

Certification

Coating; G

Manufacturer's Technical Data Sheets

Indicate VOC content.

Sealant

SD-04 Samples

Color; G

Submit manufacturer's samples of paint colors. Cross reference color samples to color scheme as indicated.

SD-07 Certificates

Applicator's qualifications

Qualification Testing laboratory for coatings; G

SD-08 Manufacturer's Instructions

Application instructions

Mixing

Detailed mixing instructions, minimum and maximum application temperature and humidity, potlife, and curing and drying times between coats.

Manufacturer's Material Safety Data Sheets

Submit manufacturer's Material Safety Data Sheets for coatings, solvents, and other potentially hazardous materials, as defined in FED-STD-313 .

SD-10 Operation and Maintenance Data

Coatings:; G

Preprinted cleaning and maintenance instructions for all coating systems shall be provided.

1.3 APPLICATOR'S QUALIFICATIONS

1.3.1 SSPC QP 1 Certification

All contractors and subcontractors that perform surface preparation or coating application shall be certified by the Society for Protective Coatings (formerly Steel Structures Painting Council) (SSPC) to the requirements of SSPC QP 1 prior to contract award, and shall remain certified while accomplishing any surface preparation or coating application. The painting contractors and painting subcontractors must remain so certified for the duration of the project. If a contractor's or subcontractor's certification expires, the firm will not be allowed to perform any work until the certification is reissued. Requests for

SECTION 09 90 00 Page 4

Page 126: GA106 – ROLL -UP DOOR RESET Augusta, GA...GA106 - Roll-Up Door Reset May 22, 2015 Augusta, GA SECTION 01 33 00.00 13 SUBMITTAL REGISTER COVER PAGE 07/13 PART 1 GENERAL 1.1 SUBMITTAL

GA106 - Roll-Up Door Reset May 22, 2015Augusta, GA

extension of time for any delay to the completion of the project due to an inactive certification will not be considered and liquidated damages will apply. Notify the Contracting Officer of any change in contractor certification status.

1.4 QUALITY ASSURANCE

1.4.1 Field Samples and Tests

The Contracting Officer may choose up to two coatings that have been delivered to the site to be tested at no cost to the Government. Take samples of each chosen product as specified in the paragraph "Sampling Procedures." Test each chosen product as specified in the paragraph "Testing Procedure." Products which do not conform, shall be removed from the job site and replaced with new products that conform to the referenced specification. Testing of replacement products that failed initial testing shall be at no cost to the Government.

1.4.1.1 Sampling Procedure

The Contracting Officer will select paint at random from the products that have been delivered to the job site for sample testing. The Contractor shall provide one quart samples of the selected paint materials. The samples shall be taken in the presence of the Contracting Officer, and labeled, identifying each sample. Provide labels in accordance with the paragraph "Packaging, Labeling, and Storage" of this specification.

1.4.1.2 Testing Procedure

Provide Batch Quality Conformance Testing for specified products, as defined by and performed by MPI. As an alternative to Batch Quality Conformance Testing, the Contractor may provide Qualification Testing for specified products above to the appropriate MPI product specification, using the third-party laboratory approved under the paragraph "Qualification Testing" laboratory for coatings. The qualification testing lab report shall include the backup data and summary of the test results. The summary shall list all of the reference specification requirements and the result of each test. The summary shall clearly indicate whether the tested paint meets each test requirement. Note that Qualification Testing may take 4 to 6 weeks to perform, due to the extent of testing required.

Submit name, address, telephone number, FAX number, and e-mail address of the independent third party laboratory selected to perform testing of coating samples for compliance with specification requirements. Submit documentation that laboratory is regularly engaged in testing of paint samples for conformance with specifications, and that employees performing testing are qualified. If the Contractor chooses MPI to perform the Batch Quality Conformance testing, the above submittal information is not required, only a letter is required from the Contractor stating that MPI will perform the testing.

1.5 REGULATORY REQUIREMENTS

1.5.1 Environmental Protection

In addition to requirements specified elsewhere for environmental protection, provide coating materials that conform to the restrictions of the local Air Pollution Control District and regional jurisdiction.

SECTION 09 90 00 Page 5

Page 127: GA106 – ROLL -UP DOOR RESET Augusta, GA...GA106 - Roll-Up Door Reset May 22, 2015 Augusta, GA SECTION 01 33 00.00 13 SUBMITTAL REGISTER COVER PAGE 07/13 PART 1 GENERAL 1.1 SUBMITTAL

GA106 - Roll-Up Door Reset May 22, 2015Augusta, GA

Notify Contracting Officer of any paint specified herein which fails to conform.

1.5.2 Lead Content

Do not use coatings having a lead content over 0.06 percent by weight of nonvolatile content.

1.5.3 Chromate Content

Do not use coatings containing zinc-chromate or strontium-chromate.

1.5.4 Asbestos Content

Materials shall not contain asbestos.

1.5.5 Mercury Content

Materials shall not contain mercury or mercury compounds.

1.5.6 Silica

Abrasive blast media shall not contain free crystalline silica.

1.5.7 Human Carcinogens

Materials shall not contain ACGIH 0100 confirmed human carcinogens (A1) or suspected human carcinogens (A2).

1.6 PACKAGING, LABELING, AND STORAGE

Paints shall be in sealed containers that legibly show the contract specification number, designation name, formula or specification number, batch number, color, quantity, date of manufacture, manufacturer's formulation number, manufacturer's directions including any warnings and special precautions, and name and address of manufacturer. Pigmented paints shall be furnished in containers not larger than 5 gallons. Paints and thinners shall be stored in accordance with the manufacturer's written directions, and as a minimum, stored off the ground, under cover, with sufficient ventilation to prevent the buildup of flammable vapors, and at temperatures between 40 to 95 degrees F. Do not store paint, polyurethane, varnish, or wood stain products with materials that have a high capacity to adsorb VOC emissions. Do not store paint, polyurethane, varnish, or wood stain products in occupied spaces.

1.7 SAFETY AND HEALTH

Apply coating materials using safety methods and equipment in accordance with the following:

Work shall comply with applicable Federal, State, and local laws and regulations, and with the ACCIDENT PREVENTION PLAN, including the Activity Hazard Analysis as specified in Section 01 35 26 GOVERNMENT SAFETY REQUIREMENTS and in Appendix A of EM 385-1-1 . The Activity Hazard Analysis shall include analyses of the potential impact of painting operations on painting personnel and on others involved in and adjacent to the work zone.

SECTION 09 90 00 Page 6

Page 128: GA106 – ROLL -UP DOOR RESET Augusta, GA...GA106 - Roll-Up Door Reset May 22, 2015 Augusta, GA SECTION 01 33 00.00 13 SUBMITTAL REGISTER COVER PAGE 07/13 PART 1 GENERAL 1.1 SUBMITTAL

GA106 - Roll-Up Door Reset May 22, 2015Augusta, GA

1.7.1 Safety Methods Used During Coating Application

Comply with the requirements of SSPC PA Guide 3 .

1.7.2 Toxic Materials

To protect personnel from overexposure to toxic materials, conform to the most stringent guidance of:

a. The applicable manufacturer's Material Safety Data Sheets (MSDS) or local regulation.

b. 29 CFR 1910.1000 .

c. ACGIH 0100 , threshold limit values.

1.8 ENVIRONMENTAL CONDITIONS

Comply, at minimum, with manufacturer recommendations for space ventilation during and after installation.

1.8.1 Coatings

Do not apply coating when air or substrate conditions are:

a. Less than 5 degrees F above dew point;

b. Below 50 degrees F or over 95 degrees F, unless specifically pre-approved by the Contracting Officer and the product manufacturer. Under no circumstances shall application conditions exceed manufacturer recommendations.

1.8.2 Post-Application

Vacate space for as long as possible after application. Wait a minimum of 48 hours before occupying freshly painted rooms. Maintain one of the following ventilation conditions during the curing period, or for 72 hours after application:

a. Supply 100 percent outside air 24 hours a day.

b. Supply airflow at a rate of 6 air changes per hour, when outside temperatures are between 55 degrees F and 85 degrees F and humidity is between 30 percent and 60 percent.

c. Supply airflow at a rate of 1.5 air changes per hour, when outside air conditions are not within the range stipulated above.

1.9 COLOR SELECTION

Colors of finish coats shall be as indicated or specified. Where not indicated or specified, colors shall be selected by the Contracting Officer. Manufacturers' names and color identification are used for the purpose of color identification only. Named products are acceptable for use only if they conform to specified requirements. Products of other manufacturers are acceptable if the colors approximate colors indicated and the product conforms to specified requirements.

Tint each coat progressively darker to enable confirmation of the number

SECTION 09 90 00 Page 7

Page 129: GA106 – ROLL -UP DOOR RESET Augusta, GA...GA106 - Roll-Up Door Reset May 22, 2015 Augusta, GA SECTION 01 33 00.00 13 SUBMITTAL REGISTER COVER PAGE 07/13 PART 1 GENERAL 1.1 SUBMITTAL

GA106 - Roll-Up Door Reset May 22, 2015Augusta, GA

of coats.

Color, texture, and pattern of wall coating systems shall be in accordance with the Finish Schedule on the drawings.

1.10 LOCATION AND SURFACE TYPE TO BE PAINTED

1.10.1 Painting Included

Where a space or surface is indicated to be painted, include the following unless indicated otherwise.

a. Surfaces behind portable objects and surface mounted articles readily detachable by removal of fasteners, such as screws and bolts.

b. New factory finished surfaces that require identification or color coding and factory finished surfaces that are damaged during performance of the work.

c. Existing coated surfaces that are damaged during performance of the work.

1.10.1.1 Exterior Painting

Includes new surfaces and existing coated surfaces of the building and appurtenances. Also included are existing coated surfaces made bare by cleaning operations.

1.10.1.2 Interior Painting

Includes new surfaces, existing uncoated surfaces, and existing coated surfaces of the buildings and appurtenances as indicated and existing coated surfaces made bare by cleaning operations. Where a space or surface is indicated to be painted, include the following items, unless indicated otherwise.

a. Exposed columns, girders, beams, joists, and metal deck; and

b. Other contiguous surfaces.

1.10.2 Painting Excluded

Do not paint the following unless indicated otherwise.

a. Surfaces concealed and made inaccessible by panelboards, fixed ductwork, machinery, and equipment fixed in place.

b. Surfaces in concealed spaces. Concealed spaces are defined as enclosed spaces above suspended ceilings, furred spaces, attic spaces, crawl spaces, elevator shafts and chases.

c. Steel to be embedded in concrete.

d. Copper, stainless steel, aluminum, brass, and lead except existing coated surfaces.

e. Hardware, fittings, and other factory finished items.

SECTION 09 90 00 Page 8

Page 130: GA106 – ROLL -UP DOOR RESET Augusta, GA...GA106 - Roll-Up Door Reset May 22, 2015 Augusta, GA SECTION 01 33 00.00 13 SUBMITTAL REGISTER COVER PAGE 07/13 PART 1 GENERAL 1.1 SUBMITTAL

GA106 - Roll-Up Door Reset May 22, 2015Augusta, GA

1.10.3 Mechanical and Electrical Painting

Includes field coating of interior new and existing surfaces.

a. Where a space or surface is indicated to be painted, include the following items unless indicated otherwise.

(1) Exposed piping, conduit, and ductwork;

(2) Supports, hangers, air grilles, and registers;

(3) Miscellaneous metalwork and insulation coverings.

b. Do not paint the following, unless indicated otherwise:

(1) New zinc-coated, aluminum, and copper surfaces under insulation

(2) New aluminum jacket on piping

(3) New interior ferrous piping under insulation.

1.10.4 Definitions and Abbreviations

1.10.4.1 Qualification Testing

Qualification testing is the performance of all test requirements listed in the product specification. This testing is accomplished by MPI to qualify each product for the MPI Approved Product List, and may also be accomplished by Contractor's third party testing lab if an alternative to Batch Quality Conformance Testing by MPI is desired.

1.10.4.2 Batch Quality Conformance Testing

Batch quality conformance testing determines that the product provided is the same as the product qualified to the appropriate product specification. This testing shall only be accomplished by MPI testing lab.

1.10.4.3 Coating

A film or thin layer applied to a base material called a substrate. A coating may be a metal, alloy, paint, or solid/liquid suspensions on various substrates (metals, plastics, wood, paper, leather, cloth, etc.). They may be applied by electrolysis, vapor deposition, vacuum, or mechanical means such as brushing, spraying, calendaring, and roller coating. A coating may be applied for aesthetic or protective purposes or both. The term "coating" as used herein includes emulsions, enamels, stains, varnishes, sealers, epoxies, and other coatings, whether used as primer, intermediate, or finish coat. The terms paint and coating are used interchangeably.

1.10.4.4 DFT or dft

Dry film thickness, the film thickness of the fully cured, dry paint or coating.

1.10.4.5 DSD

Degree of Surface Degradation, the MPI system of defining degree of surface degradation. Five (5) levels are generically defined under the

SECTION 09 90 00 Page 9

Page 131: GA106 – ROLL -UP DOOR RESET Augusta, GA...GA106 - Roll-Up Door Reset May 22, 2015 Augusta, GA SECTION 01 33 00.00 13 SUBMITTAL REGISTER COVER PAGE 07/13 PART 1 GENERAL 1.1 SUBMITTAL

GA106 - Roll-Up Door Reset May 22, 2015Augusta, GA

Assessment sections in the MPI Maintenance Repainting Manual.

1.10.4.6 EPP

Environmentally Preferred Products, a standard for determining environmental preferability in support of Executive Order 13101.

1.10.4.7 EXT

MPI short term designation for an exterior coating system.

1.10.4.8 INT

MPI short term designation for an interior coating system.

1.10.4.9 micron / microns

The metric measurement for 0.001 mm or one/one-thousandth of a millimeter.

1.10.4.10 mil / mils

The English measurement for 0.001 in or one/one-thousandth of an inch, equal to 25.4 microns or 0.0254 mm.

1.10.4.11 mm

The metric measurement for millimeter, 0.001 meter or one/one-thousandth of a meter.

1.10.4.12 MPI Gloss Levels

MPI system of defining gloss. Seven (7) gloss levels (G1 to G7) are generically defined under the Evaluation sections of the MPI Manuals. Traditionally, Flat refers to G1/G2, Eggshell refers to G3, Semigloss refers to G5, and Gloss refers to G6.

Gloss levels are defined by MPI as follows:

Gloss Description Units UnitsLevel at 60 degrees at 85 degrees

G1 Matte or Flat 0 to 5 10 maxG2 Velvet 0 to 10 10 to 35G3 Eggshell 10 to 25 10 to 35G4 Satin 20 to 35 35 minG5 Semi-Gloss 35 to 70 G6 Gloss 70 to 85G7 High Gloss

Gloss is tested in accordance with ASTM D523. Historically, the Government has used Flat (G1 / G2), Eggshell (G3), Semi-Gloss (G5), and Gloss (G6).

1.10.4.13 MPI System Number

The MPI coating system number in each Division found in either the MPI Architectural Painting Specification Manual or the Maintenance Repainting Manual and defined as an interior system (INT/RIN). The Division number follows the CSI Master Format.

SECTION 09 90 00 Page 10

Page 132: GA106 – ROLL -UP DOOR RESET Augusta, GA...GA106 - Roll-Up Door Reset May 22, 2015 Augusta, GA SECTION 01 33 00.00 13 SUBMITTAL REGISTER COVER PAGE 07/13 PART 1 GENERAL 1.1 SUBMITTAL

GA106 - Roll-Up Door Reset May 22, 2015Augusta, GA

1.10.4.14 Paint

See Coating definition.

1.10.4.15 RIN

MPI short term designation for an interior coating system used in repainting projects or over existing coating systems.

PART 2 PRODUCTS

2.1 MATERIALS

Conform to the coating specifications and standards referenced in PART 3. Submit manufacturer's technical data sheets for specified coatings and solvents. Comply with applicable regulations regarding toxic and hazardous materials.

PART 3 EXECUTION

3.1 PROTECTION OF AREAS AND SPACES NOT TO BE PAINTED

Prior to surface preparation and coating applications, remove, mask, or otherwise protect, hardware, hardware accessories, machined surfaces, radiator covers, plates, lighting fixtures, public and private property, and other such items not to be coated that are in contact with surfaces to be coated. Following completion of painting, workmen skilled in the trades involved shall reinstall removed items. Restore surfaces contaminated by coating materials, to original condition and repair damaged items.

3.2 RESEALING OF EXISTING EXTERIOR JOINTS

3.2.1 Surface Condition

Surfaces shall be clean, dry to the touch, and free from frost and moisture; remove grease, oil, wax, lacquer, paint, defective backstop, or other foreign matter that would prevent or impair adhesion. Where adequate grooves have not been provided, clean out to a depth of 1/2 inch and grind to a minimum width of 1/4 inch without damage to adjoining work. Grinding shall not be required on metal surfaces.

3.2.2 Backstops

In joints more than 1/2 inch deep, install glass fiber roving or neoprene, butyl, polyurethane, or polyethylene foams free of oil or other staining elements as recommended by sealant manufacturer. Backstop material shall be compatible with sealant. Do not use oakum and other types of absorptive materials as backstops.

3.2.3 Primer and Bond Breaker

Install the type recommended by the sealant manufacturer.

3.2.4 Ambient Temperature

Between 38 degrees F and 95 degrees F when applying sealant.

SECTION 09 90 00 Page 11

Page 133: GA106 – ROLL -UP DOOR RESET Augusta, GA...GA106 - Roll-Up Door Reset May 22, 2015 Augusta, GA SECTION 01 33 00.00 13 SUBMITTAL REGISTER COVER PAGE 07/13 PART 1 GENERAL 1.1 SUBMITTAL

GA106 - Roll-Up Door Reset May 22, 2015Augusta, GA

3.2.5 Exterior Sealant

For joints in vertical surfaces, provide ASTM C920, Type S or M, Grade NS, Class 25, Use NT. For joints in horizontal surfaces, provide ASTM C920, Type S or M, Grade P, Class 25, Use T. Color(s) shall be selected by the Contracting Officer. Apply the sealant in accordance with the manufacturer's printed instructions. Force sealant into joints with sufficient pressure to fill the joints solidly. Sealant shall be uniformly smooth and free of wrinkles.

3.2.6 Cleaning

Immediately remove fresh sealant from adjacent areas using a solvent recommended by the sealant manufacturer. Upon completion of sealant application, remove remaining smears and stains and leave the work in a clean condition. Allow sealant time to cure, in accordance with manufacturer's recommendations, prior to coating.

3.3 SURFACE PREPARATION

Remove dirt, splinters, loose particles, grease, oil, disintegrated coatings, and other foreign matter and substances deleterious to coating performance as specified for each substrate before application of paint or surface treatments. Oil and grease shall be removed prior to mechanical cleaning. Cleaning shall be programmed so that dust and other contaminants will not fall on wet, newly painted surfaces. Exposed ferrous metals such as nail heads on or in contact with surfaces to be painted with water-thinned paints, shall be spot-primed with a suitable corrosion-inhibitive primer capable of preventing flash rusting and compatible with the coating specified for the adjacent areas.

3.3.1 Additional Requirements for Preparation of Surfaces With Existing Coatings

Before application of coatings, perform the following on surfaces covered by soundly-adhered coatings, defined as those which cannot be removed with a putty knife:

a. Test existing finishes for lead before sanding, scraping, or removing. If lead is present, refer to paragraph Toxic Materials.

b. Wipe previously painted surfaces to receive solvent-based coatings, except stucco and similarly rough surfaces clean with a clean, dry cloth saturated with mineral spirits, ASTM D235. Allow surface to dry. Wiping shall immediately precede the application of the first coat of any coating, unless specified otherwise.

c. Sand existing glossy surfaces to be painted to reduce gloss. Brush, and wipe clean with a damp cloth to remove dust.

d. The requirements specified are minimum. Comply also with the application instructions of the paint manufacturer.

e. Previously painted surfaces specified to be repainted or damaged during construction shall be thoroughly cleaned of all grease, dirt, dust or other foreign matter.

f. Blistering, cracking, flaking and peeling or other deteriorated coatings shall be removed.

SECTION 09 90 00 Page 12

Page 134: GA106 – ROLL -UP DOOR RESET Augusta, GA...GA106 - Roll-Up Door Reset May 22, 2015 Augusta, GA SECTION 01 33 00.00 13 SUBMITTAL REGISTER COVER PAGE 07/13 PART 1 GENERAL 1.1 SUBMITTAL

GA106 - Roll-Up Door Reset May 22, 2015Augusta, GA

g. Chalk shall be removed so that when tested in accordance with ASTM D4214, the chalk resistance rating is no less than 8.

h. Slick surfaces shall be roughened. Damaged areas such as, but not limited to, nail holes, cracks, chips, and spalls shall be repaired with suitable material to match adjacent undamaged areas.

i. Edges of chipped paint shall be feather edged and sanded smooth.

j. Rusty metal surfaces shall be cleaned as per SSPC requirements. Solvent, mechanical, or chemical cleaning methods shall be used to provide surfaces suitable for painting.

k. New, proposed coatings shall be compatible with existing coatings.

3.3.2 Existing Coated Surfaces with Minor Defects

Sand, spackle, and treat minor defects to render them smooth. Minor defects are defined as scratches, nicks, cracks, gouges, spalls, alligatoring, chalking, and irregularities due to partial peeling of previous coatings.

3.3.3 Removal of Existing Coatings

Remove existing coatings from the following surfaces:

a. Surfaces containing large areas of minor defects;

b. Surfaces containing more than 20 percent peeling area; and

c. Surfaces designated by the Contracting Officer, such as surfaces where rust shows through existing coatings.

3.3.4 Substrate Repair

a. Repair substrate surface damaged during coating removal;

b. Sand edges of adjacent soundly-adhered existing coatings so they are tapered as smooth as practical to areas involved with coating removal; and

c. Clean and prime the substrate as specified.

3.4 PREPARATION OF METAL SURFACES

3.4.1 Existing and New Ferrous Surfaces

a. Ferrous Surfaces including Shop-coated Surfaces and Small Areas That Contain Rust, Mill Scale and Other Foreign Substances: Solvent clean or detergent wash in accordance with SSPC SP 1 to remove oil and grease. Shop-coated ferrous surfaces shall be protected from corrosion by treating and touching up corroded areas immediately upon detection.

3.4.2 Galvanized Surfaces

a. New or Existing Galvanized Surfaces With Only Dirt and Zinc Oxidation Products: Clean with solvent, or non-alkaline detergent solution in

SECTION 09 90 00 Page 13

Page 135: GA106 – ROLL -UP DOOR RESET Augusta, GA...GA106 - Roll-Up Door Reset May 22, 2015 Augusta, GA SECTION 01 33 00.00 13 SUBMITTAL REGISTER COVER PAGE 07/13 PART 1 GENERAL 1.1 SUBMITTAL

GA106 - Roll-Up Door Reset May 22, 2015Augusta, GA

accordance with SSPC SP 1 . If the galvanized metal has been passivated or stabilized, the coating shall be completely removed by brush-off abrasive blast. New galvanized steel to be coated shall not be "passivated" or "stabilized" If the absence of hexavalent stain inhibitors is not documented, test as described in ASTM D6386, Appendix X2, and remove by one of the methods described therein.

c. Galvanized With Severe Deteriorated Coating or Severe Rusting: Water jet to SSPC SP 12/NACE No.5 WJ3 degree of cleanliness.

3.4.3 Non-Ferrous Metallic Surfaces

Aluminum and aluminum-alloy, lead, copper, and other nonferrous metal surfaces.

Surface Cleaning: Solvent clean in accordance with SSPC SP 1 and wash with mild non-alkaline detergent to remove dirt and water soluble contaminants.

3.5 PREPARATION OF CONCRETE AND CEMENTITIOUS SURFACE

3.5.1 Concrete and Masonry

a. Curing: Concrete, stucco and masonry surfaces shall be allowed to cure at least 30 days before painting, except concrete slab on grade, which shall be allowed to cure 90 days before painting.

b. Surface Cleaning: Remove the following deleterious substances.

(1) Dirt, Chalking, Grease, and Oil: Wash new and existing uncoated surfaces with a solution composed of 1/2 cup trisodium phosphate, 1/4 cuphousehold detergent, and 4 quarts of warm water. Then rinse thoroughly with fresh water. Wash existing coated surfaces with a suitable detergent and rinse thoroughly. For large areas, water blasting may be used.

(2) Fungus and Mold: Wash new , existing coated, and existing uncoated surfaces with a solution composed of 1/2 cup trisodium phosphate, 1/4 cup household detergent, 1 quart 5 percent sodium hypochlorite solution and 3 quarts of warm water. Rinse thoroughly with fresh water.

(3) Paint and Loose Particles: Remove by wire brushing.

(4) Efflorescence: Remove by scraping or wire brushing followed by washing with a 5 to 10 percent by weight aqueous solution of hydrochloric (muriatic) acid. Do not allow acid to remain on the surface for more than five minutes before rinsing with fresh water. Do not acid clean more than 4 square feet of surface, per workman, at one time.

c. Cosmetic Repair of Minor Defects: Repair or fill mortar joints and minor defects, including but not limited to spalls, in accordance with manufacturer's recommendations and prior to coating application.

d. Allowable Moisture Content: Latex coatings may be applied to damp surfaces, but not to surfaces with droplets of water. Do not apply epoxies to damp vertical surfaces as determined by ASTM D4263 or horizontal surfaces that exceed 3 lbs of moisture per 1000 square feet

SECTION 09 90 00 Page 14

Page 136: GA106 – ROLL -UP DOOR RESET Augusta, GA...GA106 - Roll-Up Door Reset May 22, 2015 Augusta, GA SECTION 01 33 00.00 13 SUBMITTAL REGISTER COVER PAGE 07/13 PART 1 GENERAL 1.1 SUBMITTAL

GA106 - Roll-Up Door Reset May 22, 2015Augusta, GA

in 24 hours as determined by ASTM F1869. In all cases follow manufacturers recommendations. Allow surfaces to cure a minimum of 30 days before painting.

3.5.2 Gypsum Board, Plaster, and Stucco

a. Surface Cleaning: Plaster and stucco shall be clean and free from loose matter; gypsum board shall be dry. Remove loose dirt and dust by brushing with a soft brush, rubbing with a dry cloth, or vacuum-cleaning prior to application of the first coat material. A damp cloth or sponge may be used if paint will be water-based.

b. Repair of Minor Defects: Prior to painting, repair joints, cracks, holes, surface irregularities, and other minor defects with patching plaster or spackling compound and sand smooth.

c. Allowable Moisture Content: Latex coatings may be applied to damp surfaces, but not surfaces with droplets of water. Do not apply epoxies to damp surfaces as determined by ASTM D4263. New plaster to be coated shall have a maximum moisture content of 8 percent, when measured in accordance with ASTM D4444, Method A, unless otherwise authorized. In addition to moisture content requirements, allow new plaster to age a minimum of 30 days before preparation for painting.

3.6 PREPARATION OF WOOD AND PLYWOOD SURFACES

3.6.1 New , Existing Uncoated, and Existing Coated Plywood and Wood Surfaces, Except Floors:

a. Wood surfaces shall be cleaned of foreign matter.

Surface Cleaning: Surfaces shall be free from dust and other deleterious substances and in a condition approved by the Contracting Officer prior to receiving paint or other finish. Do not use water to clean uncoated wood. Scrape to remove loose coatings. Lightly sand to roughen the entire area of previously enamel-coated wood surfaces.

b. Removal of Fungus and Mold: Wash existing coated surfaces with a solution composed of 3 ounces (2/3 cup) trisodium phosphate, 1 ounce (1/3 cup) household detergent, 1 quart 5 percent sodium hypochlorite solution and 3 quarts of warm water. Rinse thoroughly with fresh water.

c. Moisture content of the wood shall not exceed 12 percent as measured by a moisture meter in accordance with ASTM D4444, Method A, unless otherwise authorized.

d. Wood surfaces adjacent to surfaces to receive water-thinned paints shall be primed and/or touched up before applying water-thinned paints.

e. Cracks and Nailheads: Set and putty stop nailheads and putty cracks

after the prime coat has dried.

f. Cosmetic Repair of Minor Defects:

(1) Knots and Resinous Wood: Prior to application of coating, cover knots and stains with two or more coats of 3-pound-cut shellac varnish, plasticized with 5 ounces of castor oil per gallon. Scrape away existing coatings from knotty areas, and sand before

SECTION 09 90 00 Page 15

Page 137: GA106 – ROLL -UP DOOR RESET Augusta, GA...GA106 - Roll-Up Door Reset May 22, 2015 Augusta, GA SECTION 01 33 00.00 13 SUBMITTAL REGISTER COVER PAGE 07/13 PART 1 GENERAL 1.1 SUBMITTAL

GA106 - Roll-Up Door Reset May 22, 2015Augusta, GA

treating. Prime before applying any putty over shellacked area.

(2) Open Joints and Other Openings: Fill with whiting putty, linseed oil putty. Sand smooth after putty has dried.

(3) Checking: Where checking of the wood is present, sand the surface, wipe and apply a coat of pigmented orange shellac. Allow to dry before paint is applied.

3.7 APPLICATION

3.7.1 Coating Application

Painting practices shall comply with applicable federal, state and local laws enacted to insure compliance with Federal Clean Air Standards. Apply coating materials in accordance with SSPC PA 1 . SSPC PA 1 methods are applicable to all substrates, except as modified herein.

At the time of application, paint shall show no signs of deterioration. Uniform suspension of pigments shall be maintained during application.

Unless otherwise specified or recommended by the paint manufacturer, paint may be applied by brush, roller, or spray. Use trigger operated spray nozzles for water hoses. Rollers for applying paints and enamels shall be of a type designed for the coating to be applied and the surface to be coated. Wear protective clothing and respirators when applying oil-based paints or using spray equipment with any paints.

Paints, except water-thinned types, shall be applied only to surfaces that are completely free of moisture as determined by sight or touch.

Thoroughly work coating materials into joints, crevices, and open spaces. Special attention shall be given to insure that all edges, corners, crevices, welds, and rivets receive a film thickness equal to that of adjacent painted surfaces.

Each coat of paint shall be applied so dry film shall be of uniform thickness and free from runs, drops, ridges, waves, pinholes or other voids, laps, brush marks, and variations in color, texture, and finish. Hiding shall be complete.

Touch up damaged coatings before applying subsequent coats. Interior areas shall be broom clean and dust free before and during the application of coating material.

a. Drying Time: Allow time between coats, as recommended by the coating manufacturer, to permit thorough drying, but not to present topcoat adhesion problems. Provide each coat in specified condition to receive next coat.

b. Primers, and Intermediate Coats: Do not allow primers or intermediate coats to dry more than 30 days, or longer than recommended by manufacturer, before applying subsequent coats. Follow manufacturer's recommendations for surface preparation if primers or intermediate coats are allowed to dry longer than recommended by manufacturers of subsequent coatings. Each coat shall cover surface of preceding coat or surface completely, and there shall be a visually perceptible difference in shades of successive coats.

SECTION 09 90 00 Page 16

Page 138: GA106 – ROLL -UP DOOR RESET Augusta, GA...GA106 - Roll-Up Door Reset May 22, 2015 Augusta, GA SECTION 01 33 00.00 13 SUBMITTAL REGISTER COVER PAGE 07/13 PART 1 GENERAL 1.1 SUBMITTAL

GA106 - Roll-Up Door Reset May 22, 2015Augusta, GA

c. Finished Surfaces: Provide finished surfaces free from runs, drops, ridges, waves, laps, brush marks, and variations in colors.

d. Thermosetting Paints: Topcoats over thermosetting paints (epoxies and urethanes) should be applied within the overcoating window recommended by the manufacturer.

3.7.2 Mixing and Thinning of Paints

Reduce paints to proper consistency by adding fresh paint, except when thinning is mandatory to suit surface, temperature, weather conditions, application methods, or for the type of paint being used. Obtain written permission from the Contracting Officer to use thinners. The written permission shall include quantities and types of thinners to use.

When thinning is allowed, paints shall be thinned immediately prior to application with not more than 1 pint of suitable thinner per gallon. The use of thinner shall not relieve the Contractor from obtaining complete hiding, full film thickness, or required gloss. Thinning shall not cause the paint to exceed limits on volatile organic compounds. Paints of different manufacturers shall not be mixed.

3.7.3 Two-Component Systems

Two-component systems shall be mixed in accordance with manufacturer's instructions. Any thinning of the first coat to ensure proper penetration and sealing shall be as recommended by the manufacturer for each type of substrate.

3.7.4 Coating Systems

a. Systems by Substrates: Apply coatings that conform to the respective specifications listed in the following Tables:

Table

Division 5. Exterior Metal, Ferrous and Non-Ferrous Paint Table Division 3. Interior Concrete Paint Table Division 4. Interior Concrete Masonry Units Paint Table Division 5. Interior Metal, Ferrous and Non-Ferrous Paint Table Division 6. Interior Wood Paint Table Division 9: Interior Plaster, Gypsum Board, Textured Surfaces Paint Table

b. Minimum Dry Film Thickness (DFT): Apply paints, primers, varnishes, enamels, undercoats, and other coatings to a minimum dry film thickness of 1.5 mil each coat unless specified otherwise in the Tables. Coating thickness where specified, refers to the minimum dry film thickness.

c. Coatings for Surfaces Not Specified Otherwise: Coat surfaces which have not been specified, the same as surfaces having similar conditions of exposure.

d. Existing Surfaces Damaged During Performance of the Work, Including New Patches In Existing Surfaces: Coat surfaces with the following:

(1) One coat of primer.

SECTION 09 90 00 Page 17

Page 139: GA106 – ROLL -UP DOOR RESET Augusta, GA...GA106 - Roll-Up Door Reset May 22, 2015 Augusta, GA SECTION 01 33 00.00 13 SUBMITTAL REGISTER COVER PAGE 07/13 PART 1 GENERAL 1.1 SUBMITTAL

GA106 - Roll-Up Door Reset May 22, 2015Augusta, GA

(2) One coat of undercoat or intermediate coat.

(3) One topcoat to match adjacent surfaces.

e. Existing Coated Surfaces To Be Painted: Apply coatings conforming to the respective specifications listed in the Tables herein, except that pretreatments, sealers and fillers need not be provided on surfaces where existing coatings are soundly adhered and in good condition. Do not omit undercoats or primers.

3.8 COATING SYSTEMS FOR METAL

Apply coatings of Tables in Division 5 for Exterior and Interior.

a. Apply specified ferrous metal primer on the same day that surface is cleaned, to surfaces that meet all specified surface preparation requirements at time of application.

b. Inaccessible Surfaces: Prior to erection, use one coat of specified primer on metal surfaces that will be inaccessible after erection.

c. Shop-primed Surfaces: Touch up exposed substrates and damaged coatings to protect from rusting prior to applying field primer.

d. Surface Previously Coated with Epoxy or Urethane: Apply MPI 101, 1.5 mils DFT immediately prior to application of epoxy or urethane coatings.

e. Pipes and Tubing: The semitransparent film applied to some pipes and tubing at the mill is not to be considered a shop coat, but shall be overcoated with the specified ferrous-metal primer prior to application of finish coats.

f. Exposed Nails, Screws, Fasteners, and Miscellaneous Ferrous Surfaces. On surfaces to be coated with water thinned coatings, spot prime exposed nails and other ferrous metal with latex primer MPI 107 .

3.9 COATING SYSTEMS FOR CONCRETE AND CEMENTITIOUS SUBSTRATES

Apply coatings of Tables in Division 3, 4 and 9 for Exterior and Interior.

3.10 COATING SYSTEMS FOR WOOD AND PLYWOOD

a. Apply coatings of Tables in Division 6 for Exterior and Interior.

b. Prior to erection, apply two coats of specified primer to treat and prime wood and plywood surfaces which will be inaccessible after erection.

3.11 PIPING IDENTIFICATION

Piping Identification, Including Surfaces In Concealed Spaces: Provide in accordance with ASME A13.1 . Place stenciling in clearly visible locations. On piping not covered by ASME A13.1 , stencil approved names or code letters, in letters a minimum of 1/2 inch high for piping and a minimum of 2 inches high elsewhere. Stencil arrow-shaped markings on piping to indicate direction of flow using black stencil paint.

SECTION 09 90 00 Page 18

Page 140: GA106 – ROLL -UP DOOR RESET Augusta, GA...GA106 - Roll-Up Door Reset May 22, 2015 Augusta, GA SECTION 01 33 00.00 13 SUBMITTAL REGISTER COVER PAGE 07/13 PART 1 GENERAL 1.1 SUBMITTAL

GA106 - Roll-Up Door Reset May 22, 2015Augusta, GA

3.12 INSPECTION AND ACCEPTANCE

In addition to meeting previously specified requirements, demonstrate mobility of moving components, including swinging and sliding doors, cabinets, and windows with operable sash, for inspection by the Contracting Officer. Perform this demonstration after appropriate curing and drying times of coatings have elapsed and prior to invoicing for final payment.

3.13 WASTE MANAGEMENT

As specified in the Waste Management Plan and as follows. Do not use kerosene or any such organic solvents to clean up water based paints. Properly dispose of paints or solvents in designated containers. Close and seal partially used containers of paint to maintain quality as necessary for reuse. Store in protected, well-ventilated, fire-safe area at moderate temperature. Place materials defined as hazardous or toxic waste in designated containers. Coordinate with manufacturer for take-back program. Set aside scrap to be returned to manufacturer for recycling into new product. When such a service is not available, local recyclers shall be sought after to reclaim the materials. Set aside extra paint for future color matches or reuse by the Government. Where local options exist for leftover paint recycling, collect all waste paint by type and provide for delivery to recycling or collection facility for reuse by local organizations.

3.14 PAINT TABLES

All DFT's are minimum values.

3.14.1 EXTERIOR PAINT TABLES

DIVISION 5: EXTERIOR METAL, FERROUS AND NON-FERROUS PAINT TABLE

STEEL / FERROUS SURFACES

A. New Steel that has been hand or power tool cleaned to SSPC SP 2 or SSPC SP 3

1. Alkyd New; MPI EXT 5.1Q-G5 (Semigloss) Existing; MPI REX 5.1D-G5 Primer: Intermediate: Topcoat: MPI 23 MPI 94 MPI 94 System DFT: 5.25 mils

B. New Steel that has been blast-cleaned to SSPC SP 6/NACE No.3 :

1. Alkyd New; MPI EXT 5.1D-G5 (Semigloss) / Existing; MPI REX 5.1D-G5 Primer: Intermediate: Topcoat: MPI 79 MPI 94 MPI 94 System DFT: 5.25 mils

C. Existing steel that has been spot-blasted to SSPC SP 6/NACE No.3 :

1. Surface previously coated with alkyd or latex:

Waterborne Light Industrial Coating MPI REX 5.1C-G5 (Semigloss)

SECTION 09 90 00 Page 19

Page 141: GA106 – ROLL -UP DOOR RESET Augusta, GA...GA106 - Roll-Up Door Reset May 22, 2015 Augusta, GA SECTION 01 33 00.00 13 SUBMITTAL REGISTER COVER PAGE 07/13 PART 1 GENERAL 1.1 SUBMITTAL

GA106 - Roll-Up Door Reset May 22, 2015Augusta, GA

STEEL / FERROUS SURFACES Spot Primer: Intermediate: Topcoat: MPI 79 MPI 163 MPI 163 System DFT: 5 mils

2. Surface previously coated with epoxy:

Waterborne Light Industrial a. MPI REX 5.1L-G5 (Semigloss) Spot Primer: Intermediate: Topcoat: MPI 101 MPI 163 MPI 163 System DFT: 5 mils

D. New and existing steel blast cleaned to SSPC SP 10/NACE No. 2 :

1. Waterborne Light Industrial MPI EXT 5.1R-G5 (Semigloss) Primer: Intermediate: Topcoat: MPI 101 MPI 108 MPI 163 System DFT: 8.5 mils

EXTERIOR GALVANIZED SURFACES

E. Galvanized surfaces with severely deteriorated coating or rusting:

1. Waterborne Light Industrial Coating MPI REX 5.3L-G5(Semigloss) Primer: Intermediate: Topcoat: MPI 101 MPI 108 MPI 163 System DFT: 8.5 mils EXTERIOR SURFACES, OTHER METALS (NON-FERROUS)

F. Aluminum, aluminum alloy and other miscellaneous non-ferrous metal items not otherwise specified except hot metal surfaces, roof surfaces, and new prefinished equipment. Match surrounding finish:

1. Alkyd MPI EXT 5.4F-G1 (Flat) Primer: Intermediate: Topcoat: MPI 95 MPI 8 MPI 8 System DFT: 5 mils

3.14.2 INTERIOR PAINT TABLES

DIVISION 3: INTERIOR CONCRETE PAINT TABLE

A. New and uncoated existing and Existing, previously painted Concrete, vertical surfaces, not specified otherwise:

1. New; MPI INT 3.1C-G5 (Semigloss) / Existing; MPI RIN 3.1J-G5 (Semigloss) Primer: Intermediate: Topcoat: MPI 50 MPI 141 MPI 141 System DFT: 4 mils DIVISION 4: INTERIOR CONCRETE MASONRY UNITS PAINT TABLE

A. New and uncoated Existing Concrete masonry:

SECTION 09 90 00 Page 20

Page 142: GA106 – ROLL -UP DOOR RESET Augusta, GA...GA106 - Roll-Up Door Reset May 22, 2015 Augusta, GA SECTION 01 33 00.00 13 SUBMITTAL REGISTER COVER PAGE 07/13 PART 1 GENERAL 1.1 SUBMITTAL

GA106 - Roll-Up Door Reset May 22, 2015Augusta, GA

DIVISION 4: INTERIOR CONCRETE MASONRY UNITS PAINT TABLE 1. MPI INT 4.2D-G5 (Semigloss) Filler Primer: Intermediate: Topcoat: MPI 4 N/A MPI 141 MPI 141 System DFT: 11 mils

Fill all holes in masonry surface B. Existing, previously painted Concrete masonry:

1. MPI RIN 4.2K-G5 (Semigloss) Spot Primer: Intermediate: Topcoat: MPI 50 MPI 141 MPI 141 System DFT: 4.5 mils C. New and uncoated Existing Concrete masonry units in toiletsand other high humidity areas unless otherwise specified:

1. MPI INT 4.2K-G5(Semigloss) Filler: Primer: Intermediate: Topcoat: MPI 4 N/A MPI 153 MPI 153 System DFT: 11 mils

Fill all holes in masonry surface

2. Epoxy MPI INT 4.2G-G6 (Gloss) Filler: Primer: Intermediate: Topcoat: MPI 116 N/A MPI 77 MPI 77 System DFT: 10 mils

Fill all holes in masonry surface

D. Existing, previously painted, concrete masonry units in toilets and other high humidity areas unless otherwise specified:

1. MPI RIN 4.2G-G5(Semigloss) Spot Primer: Intermediate: Topcoat: MPI 153 MPI 153 MPI 153 System DFT: 4.5 mils 2. Epoxy MPI RIN 4.2D-G6 (Gloss) Spot Primer: Intermediate: Topcoat: MPI 77 MPI 77 MPI 77 System DFT: 5 mils

DIVISION 5: INTERIOR METAL, FERROUS AND NON-FERROUS PAINT TABLE

INTERIOR STEEL / FERROUS SURFACES

A. Metal and miscellaneous metal items not otherwise specified except floors, hot metal surfaces, and new prefinished equipment:

1. MPI INT 5.1R-G5 (Semigloss) Primer: Intermediate: Topcoat: MPI 79 MPI 141 MPI 141 System DFT: 5 mils

SECTION 09 90 00 Page 21

Page 143: GA106 – ROLL -UP DOOR RESET Augusta, GA...GA106 - Roll-Up Door Reset May 22, 2015 Augusta, GA SECTION 01 33 00.00 13 SUBMITTAL REGISTER COVER PAGE 07/13 PART 1 GENERAL 1.1 SUBMITTAL

GA106 - Roll-Up Door Reset May 22, 2015Augusta, GA

INTERIOR STEEL / FERROUS SURFACES 2. Alkyd MPI INT 5.1E-G5 (Semigloss) Primer: Intermediate: Topcoat: MPI 79 MPI 47 MPI 47 System DFT: 5.25 mils DIVISION 6: INTERIOR WOOD PAINT TABLE

A. New and Existing, uncoated Wood and plywood not otherwise specified:

1. High Performance Architectural Latex MPI INT 6.4S-G5 (Semigloss) Primer: Intermediate: Topcoat: MPI 39 MPI 141 MPI 141 System DFT: 4.5 mils

B. Existing, previously painted Wood and plywood not otherwise specified:

1. High Performance Architectural Latex MPI RIN 6.4B-G5 (Semigloss) Primer: Intermediate: Topcoat: MPI 46 MPI 141 MPI 141 System DFT: 4.5 mils DIVISION 9: INTERIOR PLASTER, GYPSUM BOARD, TEXTURED SURFACES PAINT TABLE

A. New and Existing, previously painted Plaster and Wallboard not otherwise specified:

1. High Performance Architectural Latex - High Traffic Areas New; MPI INT 9.2B-G2 (Flat) / Existing; MPI RIN 9.2B-G2 (Flat) Primer: Intermediate: Topcoat: MPI 50 MPI 138 MPI 138 System DFT: 4 mils B. New and Existing, previously painted Plaster and Wallboard in toilets and other high humidity areas not otherwise specified.:

1. Waterborne Light Industrial Coating New; MPI INT 9.2L-G5(Semigloss) / Existing; MPI RIN 9.2L-G5 (Semigloss) Primer: Intermediate: Topcoat: MPI 50 MPI 153 MPI 153 System DFT: 4 mils

-- End of Section --

SECTION 09 90 00 Page 22

Page 144: GA106 – ROLL -UP DOOR RESET Augusta, GA...GA106 - Roll-Up Door Reset May 22, 2015 Augusta, GA SECTION 01 33 00.00 13 SUBMITTAL REGISTER COVER PAGE 07/13 PART 1 GENERAL 1.1 SUBMITTAL

GA106 - Roll-Up Door Reset May 22, 2015Augusta, GA

SECTION 13 48 00

SEISMIC PROTECTION FOR MISCELLANEOUS EQUIPMENT08/08

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

ASME INTERNATIONAL (ASME)

ASME B18.2.1 (2012; Errata 20132010) Square and Hex Bolts and Screws (Inch Series)

ASME B18.2.2 (2010) Standard for Square and Hex Nuts

ASTM INTERNATIONAL (ASTM)

ASTM A153/A153M (2009) Standard Specification for Zinc Coating (Hot-Dip) on Iron and Steel Hardware

ASTM A307 (2012) Standard Specification for Carbon Steel Bolts and Studs, 60 000 PSI Tensile Strength

ASTM A36/A36M (2012) Standard Specification for Carbon Structural Steel

ASTM A500/A500M (2013) Standard Specification for Cold-Formed Welded and Seamless Carbon Steel Structural Tubing in Rounds and Shapes

ASTM A53/A53M (2012) Standard Specification for Pipe, Steel, Black and Hot-Dipped, Zinc-Coated, Welded and Seamless

ASTM A563 (2007a; R2014) Standard Specification for Carbon and Alloy Steel Nuts

ASTM A572/A572M (2013a) Standard Specification for High-Strength Low-Alloy Columbium-Vanadium Structural Steel

ASTM A603 (1998; R 2014) Standard Specification for Zinc-Coated Steel Structural Wire Rope

ASTM A653/A653M (2013) Standard Specification for Steel Sheet, Zinc-Coated (Galvanized) or Zinc-Iron Alloy-Coated (Galvannealed) by the Hot-Dip Process

SECTION 13 48 00 Page 1

Page 145: GA106 – ROLL -UP DOOR RESET Augusta, GA...GA106 - Roll-Up Door Reset May 22, 2015 Augusta, GA SECTION 01 33 00.00 13 SUBMITTAL REGISTER COVER PAGE 07/13 PART 1 GENERAL 1.1 SUBMITTAL

GA106 - Roll-Up Door Reset May 22, 2015Augusta, GA

ASTM E488/E488M (2010) Standard Test Methods for Strength of Anchors in Concrete and Masonry Elements

U.S. DEPARTMENT OF DEFENSE (DOD)

UFC 3-310-04 (2013) Seismic Design for Buildings

1.2 SYSTEM DESCRIPTION

1.2.1 General Requirements

Apply the requirements for seismic protection measures, described in this section, to the electrical equipment and systems outlined in Section 26 05 48.00 10 SEISMIC PROTECTION FOR ELECTRICAL EQUIPMENT, and the miscellaneous equipment in accordance with UFC 3-310-04 and additional data furnished by the Contracting Officer. Provide seismic protection measures in addition to any other requirements called for in other sections of these specifications. The design for seismic protection shall be based on a Seismic Use Group building occupancy and on site response coefficients as indicated on the dawings. Accomplish resistance to lateral forces induced by earthquakes without consideration of friction resulting from gravity loads. The basic force formulas, for Ground Motions A and B in UFC 3-310-04 , use the design spectral response acceleration parameters for the performance objective of the building, not for equipment in the building; therefore, corresponding adjustments to the formulas are required.

1.3 SUBMITTALS

Government approval is required for submittals with a "G" designation; submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:

SD-02 Shop Drawings

Bracing; G Resilient Vibration Isolation Devices; G Equipment Requirements; G

SD-03 Product Data

Bracing; G Equipment Requirements; G

SD-06 Test Reports

Anchor Bolts; G

PART 2 PRODUCTS

2.1 EQUIPMENT REQUIREMENTS

Submit detail drawings along with claculations, catalog cuts, templates, and erection and installation details, as appropriate, for the items listed below. Indicate thickness, type, grade, class of metal, and dimensions; and show construction details, reinforcement, anchorage, and installation with relation to the building construction. For equipment

SECTION 13 48 00 Page 2

Page 146: GA106 – ROLL -UP DOOR RESET Augusta, GA...GA106 - Roll-Up Door Reset May 22, 2015 Augusta, GA SECTION 01 33 00.00 13 SUBMITTAL REGISTER COVER PAGE 07/13 PART 1 GENERAL 1.1 SUBMITTAL

GA106 - Roll-Up Door Reset May 22, 2015Augusta, GA

and systems in buildings that have a performance objective higher than life-safety, the drawings shall be stamped by the registered engineer who stamps the calculations. Calculations shall be stamped, by a registered engineer, and verify the capability of structural members to which bracing is attached for carrying the load from the brace.

2.1.1 Rigidly Mounted Equipment

All items of equipment to be furnished under this contract shall be constructed and assembled to withstand the seismic forces specified in UFC 3-310-04 . For any rigid equipment which is rigidly attached on both sides of a building expansion joint, provide flexible joints for piping, electrical conduit, etc., that are capable of accommodating displacements equal to the full width of the joint in both orthogonal directions.

2.1.2 Nonrigid or Flexibly-Mounted Equipment

All items of equipment to be furnished under this contract shall be constructed and assembled to resist a horizontal lateral force of 2-1/2 times the operating weight of the equipment at the vertical center of gravity of the equipment.

2.2 BOLTS AND NUTS

Squarehead and hexhead bolts, and heavy hexagon nuts, ASME B18.2.1 , ASME B18.2.2 , or ASTM A307 for bolts and ASTM A563 for nuts . Provide bolts and nuts galvanized in accordance with ASTM A153/A153M when used underground and/or exposed to weather.

2.3 SWAY BRACING

Material used for members listed in this section and on the drawings, shall be structural steel conforming with the following:

a. Plates, rods, and rolled shapes, ASTM A36/A36M . If the Contractor does the design, both ASTM A36/A36Mand ASTM A572/A572M , grade 503 will be allowed.

b. Wire rope, ASTM A603.

c. Tubes, ASTM A500/A500M , Grade B .

d. Pipes, ASTM A53/A53M, Type E or S, Grade B.

e. Light gauge angles, less than 1/4 inch thickness, ASTM A653/A653M .

PART 3 EXECUTION

3.1 BRACING

Provide bracing conforming to the arrangements shown. Secure trapeze-type hanger with not less than two 1/2 inch bolts.

3.2 BUILDING DRIFT

Sway braces for a piping run shall not be attached to two dissimilar structural elements of a building that may respond differentially during an earthquake unless a flexible joint is provided.

SECTION 13 48 00 Page 3

Page 147: GA106 – ROLL -UP DOOR RESET Augusta, GA...GA106 - Roll-Up Door Reset May 22, 2015 Augusta, GA SECTION 01 33 00.00 13 SUBMITTAL REGISTER COVER PAGE 07/13 PART 1 GENERAL 1.1 SUBMITTAL

GA106 - Roll-Up Door Reset May 22, 2015Augusta, GA

3.3 ANCHOR BOLTS

Submit copies of test results to verify the adequacy of the specific anchor and application, as specified.

3.3.1 Cast-In-Place

Use cast-in-place anchor bolts, conforming to ASTM A307, for floor or pad mounted equipment, except as specified below. Provide one nut on each bolt. Anchor bolts shall have an embedded straight length equal to at least 12 times nominal diameter of the bolt. Anchor bolts that exceed the normal depth of equipment foundation piers or pads shall either extend into concrete floor or the foundation or be increased in depth to accommodate bolt lengths.

3.3.2 Expansion or Chemically Bonded Anchors

Do not use expansion or chemically bonded anchors: 1)Unless test data in accordance with ASTM E488/E488M has been provided to verify the adequacy of the specific anchor and application. 2)To resist pull-out in overhead and wall installations if the adhesive is manufactured with temperature sensitive epoxies and the location is accessible to a building fire. Install expansion and chemically bonded anchors in accordance with the manufacturer's recommendations. Adjust the allowable forces for the spacing between anchor bolts and the distance between the anchor bolt and the nearest edge, as specified by the manufacturer.

3.3.2.1 General Testing

Test in place expansion and chemically bonded anchors not more than 24 hours after installation of the anchor, conducted by an independent testing agency; testing shall be performed on random anchor bolts as described below.

3.3.2.2 Torque Wrench Testing

Perform torque wrench testing on not less than 50 percent of the total installed expansion anchors and at least one anchor for every piece of equipment containing more than two anchors. The test torque shall equal the minimum required installation torque as required by the bolt manufacturer. Calibrate torque wrenches at the beginning of each day the torque tests are performed. Recalibrate torque wrenches for each bolt diameter whenever tests are run on bolts of various diameters. Apply torque between 20 and 100 percent of wrench capacity. Reach the test torque within one half turn of the nut, except for 3/8 inch sleeve anchors which shall reach their torque by one quarter turn of the nut. If any anchor fails the test, test similar anchors not previously tested until 20 consecutive anchors pass. Failed anchors shall be retightened and retested to the specified torque; if the anchor still fails the test it shall be replaced.

3.3.2.3 Pullout Testing

Test expansion and chemically bonded anchors by applying a pullout load using a hydraulic ram attached to the anchor bolt. At least 5 percent of the anchors, but not less than 3 per day shall be tested. Apply the load to the anchor without removing the nut; when that is not possible, the nut shall be removed and a threaded coupler shall be installed of the same tightness as the original nut. Check the test setup to verify that the

SECTION 13 48 00 Page 4

Page 148: GA106 – ROLL -UP DOOR RESET Augusta, GA...GA106 - Roll-Up Door Reset May 22, 2015 Augusta, GA SECTION 01 33 00.00 13 SUBMITTAL REGISTER COVER PAGE 07/13 PART 1 GENERAL 1.1 SUBMITTAL

GA106 - Roll-Up Door Reset May 22, 2015Augusta, GA

anchor is not restrained from withdrawing by the baseplate, the test fixture, or any other fixtures. The support for the testing apparatus shall be at least 1.5 times the embedment length away from the bolt being tested. Load each tested anchor to 1 times the design tension value for the anchor. The anchor shall have no observable movement at the test load. If any anchor fails the test, similar anchors not previously tested shall be tested until 20 consecutive anchors pass. Failed anchors shall be retightened and retested to the specified load; if the anchor still fails the test it shall be replaced.

3.4 RESILIENT VIBRATION ISOLATION DEVICES

Where the need for these devices is determined, based on the magnitude of the design seismic forces, selection of anchor bolts for vibration isolation devices and/or snubbers for equipment base and foundations shall follow the same procedure as in paragraph ANCHOR BOLTS, except that an equipment weight equal to five times the actual equipment weight shall be used.

3.4.1 Resilient and Spring-Type Vibration Devices

Select vibration isolation devices so that the maximum movement of equipment from the static deflection point is 1/2 inch.

3.4.2 Multidirectional Seismic Snubbers

Install multidirectional seismic snubbers employing elastomeric pads on floor- or slab-mounted equipment. These snubbers shall provide 1/4 inch free vertical and horizontal movement from the static deflection point. Snubber medium shall consist of multiple pads of cotton duct and neoprene or other suitable materials arranged around a flanged steel trunnion so both horizontal and vertical forces are resisted by the snubber medium.

3.5 SWAY BRACES FOR PIPING

Provide transverse sway bracing for steel and copper pipe at intervals not to exceed those shown on the drawings. Provide bracing consisting of at least one vertical angle 2 by 2 inch by 16 gauge and one diagonal angle of the same size.

3.5.1 Anchor Rods, Angles, and Bars

Anchor rods, angles, and bars shall be bolted to either pipe clamps or pipe flanges at one end and cast-in-place concrete or masonry insert or clip angles bolted to the steel structure on the other end. Rods shall be solid metal or pipe as specified below. Anchor rods, angles, and bars shall not exceed lengths given in the tabulation below.

SECTION 13 48 00 Page 5

Page 149: GA106 – ROLL -UP DOOR RESET Augusta, GA...GA106 - Roll-Up Door Reset May 22, 2015 Augusta, GA SECTION 01 33 00.00 13 SUBMITTAL REGISTER COVER PAGE 07/13 PART 1 GENERAL 1.1 SUBMITTAL

GA106 - Roll-Up Door Reset May 22, 2015Augusta, GA

3.5.2 Maximum Length for Anchor Braces

Type Size (in) Maximum Length* (ft-in)

Angles 1-1/2 x 1-1/2 x 1/4 4-10

2 x 2 x 1/4 6-6

2-1/2 x 1-1/2 x 1/4 8-0

3 x 2-1/2 x 1/4 8-10

3 x 3 x 1/4 9-10

Rods 3/4 3-1

7/8 3-8

Flat Bars 1-1/2 x 1/4 1-2

2 x 1/4 1-2

2 x 3/8 1-9

Pipes (40s) 1 7-0

1-1/4 9-0

1-1/2 10-4

2 13-1

3.5.3 Bolts

Bolts used for attachment of anchors to pipe and structure shall be not less than 1/2 inch diameter.

3.6 EQUIPMENT SWAY BRACING

3.6.1 Suspended Equipment and Light Fixtures

Provide equipment sway bracing for items supported from overhead floor or roof structural systems, including light fixtures. Braces shall consist of angles, rods, wire rope, bars, or pipes arranged as shown and secured at both ends with not less than 1/2 inch bolts. Provide sufficient braces for equipment to resist a horizontal force as specified in UFC 3-310-04 without exceeding safe working stress of bracing components. Provide, for approval, specific force calculations in accordance with UFC 3-310-04 for the equipment in the project. Submit details of equipment bracing for acceptance. In lieu of bracing with vertical supports, these items may be supported with hangers inclined at 45 degrees directed up and radially away from equipment and oriented symmetrically in 90-degree intervals on the horizontal plane, bisecting the angles of each corner of the equipment, provided that supporting members are properly sized to support operating weight of equipment when hangers are inclined at a 45-degree

SECTION 13 48 00 Page 6

Page 150: GA106 – ROLL -UP DOOR RESET Augusta, GA...GA106 - Roll-Up Door Reset May 22, 2015 Augusta, GA SECTION 01 33 00.00 13 SUBMITTAL REGISTER COVER PAGE 07/13 PART 1 GENERAL 1.1 SUBMITTAL

GA106 - Roll-Up Door Reset May 22, 2015Augusta, GA

angle.

3.6.2 Floor or Pad Mounted Equipment

3.6.2.1 Shear Resistance

Bolt to the floor, floor mounted equipment. Requirements for the number and installation of bolts to resist shear forces shall be in accordance with paragraph ANCHOR BOLTS.

3.6.2.2 Overturning Resistance

Use the ratio of the overturning moment from seismic forces to the resisting moment due to gravity loads to determine if overturning forces need to be considered in the sizing of anchor bolts. Provide calculations to verify the adequacy of the anchor bolts for combined shear and overturning.

3.7 SPECIAL INSPECTION AND TESTING FOR SEISMIC-RESISTING SYSTEMS

Perform special inspections and testing for seismic-resisting systems and components in accordance with Section 01 45 35 SPECIAL INSPECTIONS.

-- End of Section --

SECTION 13 48 00 Page 7

Page 151: GA106 – ROLL -UP DOOR RESET Augusta, GA...GA106 - Roll-Up Door Reset May 22, 2015 Augusta, GA SECTION 01 33 00.00 13 SUBMITTAL REGISTER COVER PAGE 07/13 PART 1 GENERAL 1.1 SUBMITTAL

GA106 - Roll-Up Door Reset May 22, 2015Augusta, GA

SECTION 26 00 00.00 20

BASIC ELECTRICAL MATERIALS AND METHODS07/06

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by the basic designation only.

ASTM INTERNATIONAL (ASTM)

ASTM D709 (2013) Laminated Thermosetting Materials

INSTITUTE OF ELECTRICAL AND ELECTRONICS ENGINEERS (IEEE)

IEEE 100 (2000; Archived) The Authoritative Dictionary of IEEE Standards Terms

IEEE C2 (2012; Errata 2012; INT 1-4 2012; INT 5-7 2013) National Electrical Safety Code

NATIONAL ELECTRICAL MANUFACTURERS ASSOCIATION (NEMA)

NEMA 250 (2008) Enclosures for Electrical Equipment (1000 Volts Maximum)

NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)

NFPA 70 (2014; AMD 1 2013; Errata 1 2013; AMD 2 2013; Errata 2 2013; AMD 3 2014; Errata 3 2014) National Electrical Code

1.2 RELATED REQUIREMENTS

This section applies to all sections of Division 26, of this project specification unless specified otherwise in the individual sections. This section has been incorporated into, and thus, does not apply to, and is not referenced in the following sections.

1.3 DEFINITIONS

a. Unless otherwise specified or indicated, electrical and electronics terms used in these specifications, and on the drawings, shall be as defined in IEEE 100 .

b. The technical sections referred to herein are those specification sections that describe products, installation procedures, and equipment operations and that refer to this section for detailed description of submittal types.

c. The technical paragraphs referred to herein are those paragraphs in PART 2 - PRODUCTS and PART 3 - EXECUTION of the technical sections that describe products, systems, installation procedures, equipment, and test methods.

SECTION 26 00 00.00 20 Page 1

Page 152: GA106 – ROLL -UP DOOR RESET Augusta, GA...GA106 - Roll-Up Door Reset May 22, 2015 Augusta, GA SECTION 01 33 00.00 13 SUBMITTAL REGISTER COVER PAGE 07/13 PART 1 GENERAL 1.1 SUBMITTAL

GA106 - Roll-Up Door Reset May 22, 2015Augusta, GA

1.4 ELECTRICAL CHARACTERISTICS

Electrical characteristics for this project shall be 60 Hz, and 208/120 volts secondary, three phase, four wire and 408/277 volts, three phase, four wire.

1.5 ADDITIONAL SUBMITTALS INFORMATION

Submittals required in other sections that refer to this section must conform to the following additional requirements as applicable.

1.5.1 Shop Drawings (SD-02)

Include wiring diagrams and installation details of equipment indicating proposed location, layout and arrangement, control panels, accessories, piping, ductwork, and other items that must be shown to ensure a coordinated installation. Wiring diagrams shall identify circuit terminals and indicate the internal wiring for each item of equipment and the interconnection between each item of equipment. Drawings shall indicate adequate clearance for operation, maintenance, and replacement of operating equipment devices.

1.5.2 Product Data (SD-03)

Submittal shall include performance and characteristic curves.

1.6 QUALITY ASSURANCE

1.6.1 Regulatory Requirements

In each of the publications referred to herein, consider the advisory provisions to be mandatory, as though the word, "shall" had been substituted for "should" wherever it appears. Interpret references in these publications to the "authority having jurisdiction," or words of similar meaning, to mean the Contracting Officer. Equipment, materials, installation, and workmanship shall be in accordance with the mandatory and advisory provisions of NFPA 70 unless more stringent requirements are specified or indicated.

1.6.2 Standard Products

Provide materials and equipment that are products of manufacturers regularly engaged in the production of such products which are of equal material, design and workmanship. Products shall have been in satisfactory commercial or industrial use for 2 years prior to bid opening. The 2-year period shall include applications of equipment and materials under similar circumstances and of similar size. The product shall have been on sale on the commercial market through advertisements, manufacturers' catalogs, or brochures during the 2-year period. Where two or more items of the same class of equipment are required, these items shall be products of a single manufacturer; however, the component parts of the item need not be the products of the same manufacturer unless stated in the technical section.

1.6.2.1 Alternative Qualifications

Products having less than a 2-year field service record will be acceptable if a certified record of satisfactory field operation for not less than

SECTION 26 00 00.00 20 Page 2

Page 153: GA106 – ROLL -UP DOOR RESET Augusta, GA...GA106 - Roll-Up Door Reset May 22, 2015 Augusta, GA SECTION 01 33 00.00 13 SUBMITTAL REGISTER COVER PAGE 07/13 PART 1 GENERAL 1.1 SUBMITTAL

GA106 - Roll-Up Door Reset May 22, 2015Augusta, GA

6000 hours, exclusive of the manufacturers' factory or laboratory tests, is furnished.

1.6.2.2 Material and Equipment Manufacturing Date

Products manufactured more than 3 years prior to date of delivery to site shall not be used, unless specified otherwise.

1.7 WARRANTY

The equipment items shall be supported by service organizations which are reasonably convenient to the equipment installation in order to render satisfactory service to the equipment on a regular and emergency basis during the warranty period of the contract.

1.8 POSTED OPERATING INSTRUCTIONS

Provide for each system and principal item of equipment as specified in the technical sections for use by operation and maintenance personnel. The operating instructions shall include the following:

a. Wiring diagrams, control diagrams, and control sequence for each principal system and item of equipment.

b. Start up, proper adjustment, operating, lubrication, and shutdown procedures.

c. Safety precautions.

d. The procedure in the event of equipment failure.

e. Other items of instruction as recommended by the manufacturer of each system or item of equipment.

Print or engrave operating instructions and frame under glass or in approved laminated plastic. Post instructions where directed. For operating instructions exposed to the weather, provide weather-resistant materials or weatherproof enclosures. Operating instructions shall not fade when exposed to sunlight and shall be secured to prevent easy removal or peeling.

1.9 MANUFACTURER'S NAMEPLATE

Each item of equipment shall have a nameplate bearing the manufacturer's name, address, model number, and serial number securely affixed in a conspicuous place; the nameplate of the distributing agent will not be acceptable.

1.10 FIELD FABRICATED NAMEPLATES

ASTM D709. Provide laminated plastic nameplates for each equipment enclosure, relay, switch, and device. Each nameplate inscription shall identify the function and, when applicable, the position. Nameplates shall be melamine plastic, 0.125 inch thick, white with black center core. Surface shall be matte finish. Corners shall be square. Accurately align lettering and engrave into the core. Minimum size of nameplates shall be one by 2.5 inches. Lettering shall be a minimum of 0.25 inch high normal block style.

SECTION 26 00 00.00 20 Page 3

Page 154: GA106 – ROLL -UP DOOR RESET Augusta, GA...GA106 - Roll-Up Door Reset May 22, 2015 Augusta, GA SECTION 01 33 00.00 13 SUBMITTAL REGISTER COVER PAGE 07/13 PART 1 GENERAL 1.1 SUBMITTAL

GA106 - Roll-Up Door Reset May 22, 2015Augusta, GA

1.11 ELECTRICAL REQUIREMENTS

Electrical installations shall conform to IEEE C2 , NFPA 70 , and requirements specified herein. All electrical equipment shall be UL Listed.

1.12 INSTRUCTION TO GOVERNMENT PERSONNEL

Where specified in the technical sections, furnish the services of competent instructors to give full instruction to designated Government personnel in the adjustment, operation, and maintenance of the specified systems and equipment, including pertinent safety requirements as required. Instructors shall be thoroughly familiar with all parts of the installation and shall be trained in operating theory as well as practical operation and maintenance work. Instruction shall be given during the first regular work week after the equipment or system has been accepted and turned over to the Government for regular operation. The number of man-days (8 hours per day) of instruction furnished shall be as specified in the individual section. When more than 4 man-days of instruction are specified, use approximately half of the time for classroom instruction. Use other time for instruction with equipment or system. When significant changes or modifications in the equipment or system are made under the terms of the contract, provide additional instructions to acquaint the operating personnel with the changes or modifications.

PART 2 PRODUCTS

2.1 FACTORY APPLIED FINISH

Electrical equipment shall have factory-applied painting systems which shall, as a minimum, meet the requirements of NEMA 250 corrosion-resistance test and the additional requirements specified in the technical sections.

PART 3 EXECUTION

3.1 FIELD APPLIED PAINTING

Paint electrical equipment as recommended by manufacturer.

3.2 FIELD FABRICATED NAMEPLATE MOUNTING

Provide number, location, and letter designation of nameplates as indicated. Fasten nameplates to the device with a minimum of two sheet-metal screws or two rivets.

-- End of Section --

SECTION 26 00 00.00 20 Page 4

Page 155: GA106 – ROLL -UP DOOR RESET Augusta, GA...GA106 - Roll-Up Door Reset May 22, 2015 Augusta, GA SECTION 01 33 00.00 13 SUBMITTAL REGISTER COVER PAGE 07/13 PART 1 GENERAL 1.1 SUBMITTAL

GA106 - Roll-Up Door Reset May 22, 2015Augusta, GA

SECTION 26 05 48.00 10

SEISMIC PROTECTION FOR ELECTRICAL EQUIPMENT10/07

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

AMERICAN INSTITUTE OF STEEL CONSTRUCTION (AISC)

AISC 325 (2011) Steel Construction Manual

U.S. DEPARTMENT OF DEFENSE (DOD)

UFC 3-310-04 (2013) Seismic Design for Buildings

1.2 SYSTEM DESCRIPTION

1.2.1 General Requirements

The requirements for seismic protection measures described in this section shall be applied to the electrical equipment and systems listed in drawings.

1.2.2 Electrical Equipment

Electrical equipment shall include the following items to the extent required on the drawings or in other sections of these specifications:

Control Panels PanelboardsLight Fixtures Disconnect SwitchesMotor Control Centers TransformersSwitchboards

1.2.3 Electrical Systems

The following electrical systems shall be installed as required on the drawings and other sections of these specifications and shall be seismically protected in accordance with this specification:

Conduits greater than 2 inchesDisconnect SwitchesVariable Frequency Drives

1.2.4 Contractor Designed Bracing

Submit copies of the Design Calculations with the Drawings. Calculations shall be approved, certified, stamped and signed by a Registered Professional Engineer. Calculations shall verify the capability of structural members to which bracing is attached for carrying the load from the brace. Design the bracing in accordance with UFC 3-310-04 and additional data furnished by the Contracting Officer. Resistance to lateral forces induced by earthquakes shall be accomplished without

SECTION 26 05 48.00 10 Page 1

Page 156: GA106 – ROLL -UP DOOR RESET Augusta, GA...GA106 - Roll-Up Door Reset May 22, 2015 Augusta, GA SECTION 01 33 00.00 13 SUBMITTAL REGISTER COVER PAGE 07/13 PART 1 GENERAL 1.1 SUBMITTAL

GA106 - Roll-Up Door Reset May 22, 2015Augusta, GA

consideration of friction resulting from gravity loads. UFC 3-310-04 uses parameters for the building, not for the equipment in the building; therefore, corresponding adjustments to the formulas shall be required. Loadings determined using UFC 3-310-04 are based on strength design; therefore, AISC 325 shall be used for the design.

1.2.5 Conduits Requiring No Special Seismic Restraints

Seismic restraints may be omitted from electrical conduit less than 2-1/2 inches trade size. All other interior conduit, shall be seismically protected as specified.

1.3 EQUIPMENT REQUIREMENTS

Submit detail drawings along with catalog cuts, templates, and erection and installation details, as appropriate, for the items listed. Submittals shall be complete in detail, indicating thickness, type, grade, class of metal, and dimensions; and shall show construction details, reinforcement, anchorage, and installation with relation to the building construction. Submit copies of the design calculations with the detail drawings. Calculations shall be stamped by a registered engineer and shall verify the capability of structural members to which bracing is attached for carrying the load from the brace.

1.3.1 Rigidly Mounted Equipment

All electical equipment to be furnished under this contract shall be constructed and assembled to withstand the seismic forces specified in UFC 3-310-04 . Each item of rigid electrical equipment shall be entirely located and rigidly attached on one side only of a building expansion joint. Piping, electrical conduit, etc., which cross the expansion joint shall be provided with flexible joints that are capable of accommodating displacements equal to the full width of the joint in both orthogonal directions.

1.4 SUBMITTALS

Government approval is required for submittals with a "G" designation; submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:

SD-02 Shop Drawings

Equipment Requirements; G

SD-03 Product Data

Equipment Requirements; GContractor Designed Bracing; G

PART 2 PRODUCTS

Not Used. PART 3 EXECUTION

Not Used. -- End of Section --

SECTION 26 05 48.00 10 Page 2

Page 157: GA106 – ROLL -UP DOOR RESET Augusta, GA...GA106 - Roll-Up Door Reset May 22, 2015 Augusta, GA SECTION 01 33 00.00 13 SUBMITTAL REGISTER COVER PAGE 07/13 PART 1 GENERAL 1.1 SUBMITTAL

GA106 - Roll-Up Door Reset May 22, 2015Augusta, GA

SECTION 26 20 00

INTERIOR DISTRIBUTION SYSTEM02/14

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by the basic designation only.

ASTM INTERNATIONAL (ASTM)

ASTM B1 (2013) Standard Specification for Hard-Drawn Copper Wire

ASTM B8 (2011) Standard Specification for Concentric-Lay-Stranded Copper Conductors, Hard, Medium-Hard, or Soft

ASTM D709 (2013) Laminated Thermosetting Materials

INSTITUTE OF ELECTRICAL AND ELECTRONICS ENGINEERS (IEEE)

IEEE 100 (2000; Archived) The Authoritative Dictionary of IEEE Standards Terms

IEEE 81 (2012) Guide for Measuring Earth Resistivity, Ground Impedance, and Earth Surface Potentials of a Ground System

IEEE C2 (2012; Errata 2012; INT 1-4 2012; INT 5-7 2013) National Electrical Safety Code

INTERNATIONAL ELECTRICAL TESTING ASSOCIATION (NETA)

NETA ATS (2013) Standard for Acceptance Testing Specifications for Electrical Power Equipment and Systems

NATIONAL ELECTRICAL MANUFACTURERS ASSOCIATION (NEMA)

ANSI C80.1 (2005) American National Standard for Electrical Rigid Steel Conduit (ERSC)

ANSI C80.3 (2005) American National Standard for Electrical Metallic Tubing (EMT)

NEMA 250 (2008) Enclosures for Electrical Equipment (1000 Volts Maximum)

NEMA FU 1 (2012) Low Voltage Cartridge Fuses

NEMA ICS 1 (2000; R 2008; E 2010) Standard for Industrial Control and Systems: General Requirements

SECTION 26 20 00 Page 1

Page 158: GA106 – ROLL -UP DOOR RESET Augusta, GA...GA106 - Roll-Up Door Reset May 22, 2015 Augusta, GA SECTION 01 33 00.00 13 SUBMITTAL REGISTER COVER PAGE 07/13 PART 1 GENERAL 1.1 SUBMITTAL

GA106 - Roll-Up Door Reset May 22, 2015Augusta, GA

NEMA ICS 2 (2000; R 2005; Errata 2008) Standard for Controllers, Contactors, and Overload Relays Rated 600 V

NEMA ICS 4 (2010) Terminal Blocks

NEMA ICS 6 (1993; R 2011) Enclosures

NEMA KS 1 (2013) Enclosed and Miscellaneous Distribution Equipment Switches (600 V Maximum)

NEMA MG 1 (2011; Errata 2012) Motors and Generators

NEMA MG 10 (2013) Energy Management Guide for Selection and Use of Fixed Frequency Medium AC Squirrel-Cage Polyphase Induction Motors

NEMA ST 20 (1992; R 1997) Standard for Dry-Type Transformers for General Applications

NEMA TP 1 (2002) Guide for Determining Energy Efficiency for Distribution Transformers

NEMA WD 1 (1999; R 2005; R 2010) Standard for General Color Requirements for Wiring Devices

NEMA WD 6 (2012) Wiring Devices Dimensions Specifications

NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)

NFPA 70 (2014; AMD 1 2013; Errata 1 2013; AMD 2 2013; Errata 2 2013; AMD 3 2014; Errata 3 2014) National Electrical Code

NFPA 70E (2012; Errata 2012) Standard for Electrical Safety in the Workplace

TELECOMMUNICATIONS INDUSTRY ASSOCIATION (TIA)

TIA-607 (2011b) Generic Telecommunications Bonding and Grounding (Earthing) for Customer Premises

U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)

29 CFR 1910.147 Control of Hazardous Energy (Lock Out/Tag Out)

UNDERWRITERS LABORATORIES (UL)

UL 1 (2005; Reprint Jul 2012) Standard for Flexible Metal Conduit

UL 1063 (2006; Reprint Jul 2012) Machine-Tool

SECTION 26 20 00 Page 2

Page 159: GA106 – ROLL -UP DOOR RESET Augusta, GA...GA106 - Roll-Up Door Reset May 22, 2015 Augusta, GA SECTION 01 33 00.00 13 SUBMITTAL REGISTER COVER PAGE 07/13 PART 1 GENERAL 1.1 SUBMITTAL

GA106 - Roll-Up Door Reset May 22, 2015Augusta, GA

Wires and Cables

UL 1203 (2013) UL Standard for Safety Explosion-Proof and Dust-Ignition-Proof Electrical Equipment for Use in Hazardous (Classified) Locations

UL 1283 (2005; Reprint Feb 2013) Electromagnetic Interference Filters

UL 1449 (2014) Surge Protective Devices

UL 198M (2003; Reprint Feb 2013) Standard for Mine-Duty Fuses

UL 20 (2010; Reprint Feb 2012) General-Use Snap Switches

UL 360 (2013; Reprint Aug 2014) Liquid-Tight Flexible Steel Conduit

UL 4248-1 (2007; Reprint Oct 2013) UL Standard for Safety Fuseholders - Part 1: General Requirements

UL 4248-12 (2007; Reprint Dec 2012) UL Standard for Safety Fuseholders - Part 12: Class R

UL 44 (2014; Reprint Jun 2014) Thermoset-Insulated Wires and Cables

UL 486A-486B (2013; Reprint Feb 2014) Wire Connectors

UL 486C (2013; Reprint Feb 2014) Splicing Wire Connectors

UL 498 (2012; Reprint Feb 2014) Attachment Plugs and Receptacles

UL 5 (2011) Surface Metal Raceways and Fittings

UL 50 (2007; Reprint Apr 2012) Enclosures for Electrical Equipment, Non-environmental Considerations

UL 506 (2008; Reprint Oct 2013) Specialty Transformers

UL 508 (1999; Reprint Oct 2013) Industrial Control Equipment

UL 510 (2005; Reprint Jul 2013) Polyvinyl Chloride, Polyethylene and Rubber Insulating Tape

UL 514A (2013) Metallic Outlet Boxes

UL 514B (2012; Reprint Jun 2014) Conduit, Tubing and Cable Fittings

SECTION 26 20 00 Page 3

Page 160: GA106 – ROLL -UP DOOR RESET Augusta, GA...GA106 - Roll-Up Door Reset May 22, 2015 Augusta, GA SECTION 01 33 00.00 13 SUBMITTAL REGISTER COVER PAGE 07/13 PART 1 GENERAL 1.1 SUBMITTAL

GA106 - Roll-Up Door Reset May 22, 2015Augusta, GA

UL 6 (2007; reprint Nov 2010) Electrical Rigid Metal Conduit-Steel

UL 674 (2011; Reprint Jul 2013) Electric Motors and Generators for Use in Division 1 Hazardous (Classified) Locations

UL 797 (2007; Reprint Dec 2012) Electrical Metallic Tubing -- Steel

UL 83 (2014) Thermoplastic-Insulated Wires and Cables

UL 870 (2008; Reprint Feb 2013) Standard for Wireways, Auxiliary Gutters, and Associated Fittings

UL 943 (2006; Reprint Jun 2012) Ground-Fault Circuit-Interrupters

UL 984 (1996; Reprint Sep 2005) Hermetic Refrigerant Motor-Compressors

1.2 DEFINITIONS

Unless otherwise specified or indicated, electrical and electronics terms used in these specifications, and on the drawings, are as defined in IEEE 100 .

1.3 SUBMITTALS

Government approval is required for submittals with a "G" designation; submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00.

SD-02 Shop Drawings

Transformers; G

Include wiring diagrams and installation details of equipment indicating proposed location, layout and arrangement, control panels, accessories, piping, ductwork, and other items that must be shown to ensure a coordinated installation. Identify circuit terminals on wiring diagrams and indicate the internal wiring for each item of equipment and the interconnection between each item of equipment. Indicate on the drawings adequate clearance for operation, maintenance, and replacement of operating equipment devices.

Marking strips drawings; G

SD-03 Product Data

Receptacles; G

Circuit breakers; G

SECTION 26 20 00 Page 4

Page 161: GA106 – ROLL -UP DOOR RESET Augusta, GA...GA106 - Roll-Up Door Reset May 22, 2015 Augusta, GA SECTION 01 33 00.00 13 SUBMITTAL REGISTER COVER PAGE 07/13 PART 1 GENERAL 1.1 SUBMITTAL

GA106 - Roll-Up Door Reset May 22, 2015Augusta, GA

Switches; G

Transformers; G

Motor controllers; G

Combination motor controllers; G

Manual motor starters; G

Surge protective devices; G

Include performance and characteristic curves.

SD-06 Test Reports

600-volt wiring test; G

Grounding system test; G

Transformer tests; G

Ground-fault receptacle test; G

SD-07 Certificates

Fuses; G

SD-09 Manufacturer's Field Reports

Transformer factory tests

SD-10 Operation and Maintenance Data

Electrical Systems, Data Package 5; G

Submit operation and maintenance data in accordance with Section 01 78 23, OPERATION AND MAINTENANCE DATA and as specified herein.

1.4 QUALITY ASSURANCE

1.4.1 Fuses

Submit coordination data as specified in paragraph, FUSES of this section.

1.4.2 Regulatory Requirements

In each of the publications referred to herein, consider the advisory provisions to be mandatory, as though the word, "shall" or "must" had been substituted for "should" wherever it appears. Interpret references in these publications to the "authority having jurisdiction," or words of similar meaning, to mean the Contracting Officer. Provide equipment, materials, installation, and workmanship in accordance with the mandatory and advisory provisions of NFPA 70 unless more stringent requirements are specified or indicated.

SECTION 26 20 00 Page 5

Page 162: GA106 – ROLL -UP DOOR RESET Augusta, GA...GA106 - Roll-Up Door Reset May 22, 2015 Augusta, GA SECTION 01 33 00.00 13 SUBMITTAL REGISTER COVER PAGE 07/13 PART 1 GENERAL 1.1 SUBMITTAL

GA106 - Roll-Up Door Reset May 22, 2015Augusta, GA

1.4.3 Standard Products

Provide materials and equipment that are products of manufacturers regularly engaged in the production of such products which are of equal material, design and workmanship and:

a. Have been in satisfactory commercial or industrial use for 2 years prior to bid opening including applications of equipment and materials under similar circumstances and of similar size.

b. Have been on sale on the commercial market through advertisements, manufacturers' catalogs, or brochures during the 2-year period.

c. Where two or more items of the same class of equipment are required, provide products of a single manufacturer; however, the component parts of the item need not be the products of the same manufacturer unless stated in this section.

1.4.3.1 Alternative Qualifications

Products having less than a 2-year field service record will be acceptable if a certified record of satisfactory field operation for not less than 6000 hours, exclusive of the manufacturers' factory or laboratory tests, is furnished.

1.4.3.2 Material and Equipment Manufacturing Date

Products manufactured more than 3 years prior to date of delivery to site are not acceptable.

1.5 MAINTENANCE

1.5.1 Electrical Systems

Submit operation and maintenance manuals for electrical systems that provide basic data relating to the design, operation, and maintenance of the electrical distribution system for the building. Include the following:

a. Single line diagram of the "as-built" building electrical system.

b. Schematic diagram of electrical control system (other than HVAC, covered elsewhere).

c. Manufacturers' operating and maintenance manuals on active electrical equipment.

1.6 WARRANTY

Provide equipment items supported by service organizations that are reasonably convenient to the equipment installation in order to render satisfactory service to the equipment on a regular and emergency basis during the warranty period of the contract.

PART 2 PRODUCTS

2.1 MATERIALS AND EQUIPMENT

As a minimum, meet requirements of UL, where UL standards are established

SECTION 26 20 00 Page 6

Page 163: GA106 – ROLL -UP DOOR RESET Augusta, GA...GA106 - Roll-Up Door Reset May 22, 2015 Augusta, GA SECTION 01 33 00.00 13 SUBMITTAL REGISTER COVER PAGE 07/13 PART 1 GENERAL 1.1 SUBMITTAL

GA106 - Roll-Up Door Reset May 22, 2015Augusta, GA

for those items, and requirements of NFPA 70 for all materials, equipment, and devices.

2.2 CONDUIT AND FITTINGS

Conform to the following:

2.2.1 Rigid Metallic Conduit

2.2.1.1 Rigid, Threaded Zinc-Coated Steel Conduit

ANSI C80.1 , UL 6 .

2.2.2 Electrical, Zinc-Coated Steel Metallic Tubing (EMT)

UL 797 , ANSI C80.3 .

2.2.3 Flexible Metal Conduit

UL 1 .

2.2.3.1 Liquid-Tight Flexible Metal Conduit, Steel

UL 360 .

2.2.4 Fittings for Metal Conduit, EMT, and Flexible Metal Conduit

UL 514B . Ferrous fittings: cadmium- or zinc-coated in accordance with UL 514B .

2.2.4.1 Fittings for Rigid Metal Conduit and IMC

Threaded-type. Split couplings unacceptable.

2.2.4.2 Fittings for EMT

Steel compression type.

2.3 SURFACE RACEWAY

2.3.1 Surface Metal Raceway

UL 5 , two-piece painted steel, totally enclosed, snap-cover type.

2.4 OUTLET BOXES AND COVERS

UL 514A , cadmium- or zinc-coated, if ferrous metal.

2.5 CABINETS, JUNCTION BOXES, AND PULL BOXES

Volume greater than 100 cubic inches, UL 50 , hot-dip, zinc-coated, if sheet steel.

2.6 WIRES AND CABLES

Provide wires and cables in accordance applicable requirements of NFPA 70 and UL for type of insulation, jacket, and conductor specified or indicated. Do not use wires and cables manufactured more than 12 months prior to date of delivery to site.

SECTION 26 20 00 Page 7

Page 164: GA106 – ROLL -UP DOOR RESET Augusta, GA...GA106 - Roll-Up Door Reset May 22, 2015 Augusta, GA SECTION 01 33 00.00 13 SUBMITTAL REGISTER COVER PAGE 07/13 PART 1 GENERAL 1.1 SUBMITTAL

GA106 - Roll-Up Door Reset May 22, 2015Augusta, GA

2.6.1 Conductors

Provide the following:

a. Conductor sizes and capacities shown are based on copper, unless indicated otherwise.

b. Conductors No. 8 AWG and larger diameter: stranded.

c. Conductors No. 10 AWG and smaller diameter: solid.

d. Conductors for remote control, alarm, and signal circuits, classes 1, 2, and 3: stranded unless specifically indicated otherwise.

e. All conductors: copper.

2.6.1.1 Minimum Conductor Sizes

Provide minimum conductor size in accordance with the following:

a. Branch circuits: No. 12 AWG.

b. Class 1 remote-control and signal circuits: No. 14 AWG.

c. Class 2 low-energy, remote-control and signal circuits: No. 16 AWG.

d. Class 3 low-energy, remote-control, alarm and signal circuits: No. 22 AWG.

2.6.2 Color Coding

Provide color coding for service, feeder, branch, control, and signaling circuit conductors.

2.6.2.1 Ground and Neutral Conductors

Provide color coding of ground and neutral conductors as follows:

a. Grounding conductors: Green.

b. Neutral conductors: White.

c. Exception, where neutrals of more than one system are installed in same raceway or box, other neutrals color coding: white with a different colored (not green) stripe for each.

2.6.2.2 Ungrounded Conductors

Provide color coding of ungrounded conductors in different voltage systems as follows:

a. 208/120 volt, three-phase

(1) Phase A - black

(2) Phase B - red

(3) Phase C - blue

SECTION 26 20 00 Page 8

Page 165: GA106 – ROLL -UP DOOR RESET Augusta, GA...GA106 - Roll-Up Door Reset May 22, 2015 Augusta, GA SECTION 01 33 00.00 13 SUBMITTAL REGISTER COVER PAGE 07/13 PART 1 GENERAL 1.1 SUBMITTAL

GA106 - Roll-Up Door Reset May 22, 2015Augusta, GA

b. 480/277 volt, three-phase

(1) Phase A - brown

(2) Phase B - orange

(3) Phase C - yellow

2.6.3 Insulation

Unless specified or indicated otherwise or required by NFPA 70 , provide power and lighting wires rated for 600-volts, Type THWN/THHN conforming to UL 83 , except that grounding wire may be type TW conforming to UL 83 ; remote-control and signal circuits: Type TW or TF, conforming to UL 83 . Where lighting fixtures require 90-degree Centigrade (C) conductors, provide only conductors with 90-degree C insulation or better.

2.6.4 Bonding Conductors

ASTM B1, solid bare copper wire for sizes No. 8 AWG and smaller diameter; ASTM B8, Class B, stranded bare copper wire for sizes No. 6 AWG and larger diameter.

2.7 SPLICES AND TERMINATION COMPONENTS

UL 486A-486B for wire connectors and UL 510 for insulating tapes. Connectors for No. 10 AWG and smaller diameter wires: insulated, pressure-type in accordance with UL 486A-486B or UL 486C (twist-on splicing connector). Provide solderless terminal lugs on stranded conductors.

2.8 DEVICE PLATES

Provide the following:

a. UL listed, one-piece device plates for outlets to suit the devices installed.

b. For metal outlet boxes, plates on unfinished walls: zinc-coated sheet steel or cast metal having round or beveled edges.

c. For nonmetallic boxes and fittings, other suitable plates may be provided.

d. Plates on finished walls: nylon or lexan, minimum 0.03 inch wall thickness and same color as receptacle or toggle switch with which they are mounted.

e. Screws: machine-type with countersunk heads in color to match finish of plate.

f. Sectional type device plates are not be permitted.

g. Plates installed in wet locations: gasketed and UL listed for "wet locations."

SECTION 26 20 00 Page 9

Page 166: GA106 – ROLL -UP DOOR RESET Augusta, GA...GA106 - Roll-Up Door Reset May 22, 2015 Augusta, GA SECTION 01 33 00.00 13 SUBMITTAL REGISTER COVER PAGE 07/13 PART 1 GENERAL 1.1 SUBMITTAL

GA106 - Roll-Up Door Reset May 22, 2015Augusta, GA

2.9 SWITCHES

2.9.1 Toggle Switches

NEMA WD 1, UL 20 , single pole, double pole, three-way, and four-way, totally enclosed with bodies of thermoplastic or thermoset plastic and mounting strap with grounding screw. Include the following:

a. Handles: ivory thermoplastic.

b. Wiring terminals: screw-type, side-wired.

c. Contacts: silver-cadmium and contact arm - one-piece copper alloy.

d. Switches: rated quiet-type ac only, 120/277 volts, with current rating and number of poles indicated.

2.9.2 Disconnect Switches

NEMA KS 1. Provide heavy duty-type switches where indicated, where switches are rated higher than 240 volts, and for double-throw switches. Utilize Class R fuseholders and fuses for fused switches, unless indicated otherwise. Provide horsepower rated for switches serving as the motor-disconnect means. Provide switches in NEMA enclosure as indicated per NEMA ICS 6 .

2.10 FUSES

NEMA FU 1. Provide complete set of fuses for each fusible switch. Coordinate time-current characteristics curves of fuses serving motors or connected in series with circuit breakers or other circuit protective devices for proper operation. Submit coordination data for approval. Provide fuses with a voltage rating not less than circuit voltage.

2.10.1 Fuseholders

Provide in accordance with UL 4248-1 .

2.10.2 Cartridge Fuses, Current Limiting Type (Class R)

UL 198M , Class RK-5 time-delay type. Provide only Class R associated fuseholders in accordance with UL 4248-12 .

2.10.3 Cartridge Fuses, High-Interrupting Capacity, Current Limiting Type (Classes J, L, and CC)

UL 198M , Class J for zero to 600 amperes, Class L for 601 to 6,000 amperes, and Class CC for zero to 30 amperes.

2.10.4 Cartridge Fuses, Current Limiting Type (Class T)

UL 198M , Class T for zero to 1,200 amperes, 300 volts; and zero to 800 amperes, 600 volts.

2.11 RECEPTACLES

Provide the following:

a. UL 498 , hard use (also designated heavy-duty), grounding-type.

SECTION 26 20 00 Page 10

Page 167: GA106 – ROLL -UP DOOR RESET Augusta, GA...GA106 - Roll-Up Door Reset May 22, 2015 Augusta, GA SECTION 01 33 00.00 13 SUBMITTAL REGISTER COVER PAGE 07/13 PART 1 GENERAL 1.1 SUBMITTAL

GA106 - Roll-Up Door Reset May 22, 2015Augusta, GA

b. Ratings and configurations: as indicated.

c. Bodies: ivory as per NEMA WD 1.

d. Face and body: thermoplastic supported on a metal mounting strap.

e. Dimensional requirements: per NEMA WD 6.

f. Screw-type, side-wired wiring terminals or of the solderless pressure type having suitable conductor-release arrangement.

g. Grounding pole connected to mounting strap.

h. The receptacle: containing triple-wipe power contacts and double or triple-wipe ground contacts.

2.11.1 Switched Duplex Receptacles

Provide separate terminals for each ungrounded pole. Top receptacle: switched when installed.

2.11.2 Weatherproof Receptacles

Provide receptacles, UL listed for use in "wet locations". Include cast metal box with gasketed, hinged, lockable and weatherproof while-in-use, polycarbonate, UV resistant/stabilized cover plate.

2.11.3 Ground-Fault Circuit Interrupter Receptacles

UL 943 , duplex type for mounting in standard outlet box. Provide device capable of detecting current leak of 6 milliamperes or greater and tripping per requirements of UL 943 for Class A ground-fault circuit interrupter devices. Provide screw-type, side-wired wiring terminals or pre-wired (pigtail) leads.

2.12 TRANSFORMERS

Provide transformers in accordance with the following:

a. NEMA ST 20 , general purpose, dry-type, self-cooled, ventilated.

b. Provide transformers in NEMA 1 enclosure.

c. Transformer insulation system:

(1) 220 degrees C insulation system for transformers 15 kVA and greater, with temperature rise not exceeding 115 degrees C under full-rated load in maximum ambient of 40 degrees C.

(2) 180 degrees C insulation for transformers rated 10 kVA and less, with temperature rise not exceeding 115 degrees C under full-rated load in maximum ambient of 40 degrees C.

d. Transformers: quiet type with maximum sound level at least 3 decibels less than NEMA standard level for transformer ratings indicated.

SECTION 26 20 00 Page 11

Page 168: GA106 – ROLL -UP DOOR RESET Augusta, GA...GA106 - Roll-Up Door Reset May 22, 2015 Augusta, GA SECTION 01 33 00.00 13 SUBMITTAL REGISTER COVER PAGE 07/13 PART 1 GENERAL 1.1 SUBMITTAL

GA106 - Roll-Up Door Reset May 22, 2015Augusta, GA

2.12.1 Specified Transformer Efficiency

Transformers, indicated and specified with: 480V primary, 80 degrees C or 115 degrees C temperature rise, kVA ratings of 37.5 to 100 for single phase or 30 to 500 for three phase, energy efficient type. Minimum efficiency, based on factory test results: not be less than NEMA Class 1 efficiency as defined by NEMA TP 1 .

2.13 MOTORS

Provide motors in accordance with the following:

a. NEMA MG 1.

b. Hermetic-type sealed motor compressors: Also comply with UL 984 .

c. Provide the size in terms of HP, or kVA, or full-load current, or a combination of these characteristics, and other characteristics, of each motor as indicated or specified.

d. Determine specific motor characteristics to ensure provision of correctly sized starters and overload heaters.

e. Rate motors for operation on 208-volt, 3-phase circuits with a terminal voltage rating of 200 volts, and those for operation on 480-volt, 3-phase circuits with a terminal voltage rating of 460 volts.

f. Use motors designed to operate at full capacity with voltage variation of plus or minus 10 percent of motor voltage rating.

g. Unless otherwise indicated, use continuous duty type motors if rated 1 HP and above.

h. Where fuse protection is specifically recommended by the equipment manufacturer, provide fused switches in lieu of non-fused switches indicated.

2.13.1 Premium Efficiency Polyphase Motors

Select polyphase motors based on high efficiency characteristics relative to typical characteristics and applications as listed in NEMA MG 10. In addition, continuous rated, polyphase squirrel-cage medium induction motors must meet the requirements for premium efficiency electric motors in accordance with NEMA MG 1, including the NEMA full load efficiency ratings. In exception, for motor-driven equipment with a minimum seasonal or overall efficiency rating, such as a SEER rating, provide equipment with motor to meet the overall system rating indicated.

2.13.2 Wiring and Conduit

Provide internal wiring for components of packaged equipment as an integral part of the equipment. Provide power wiring and conduit for field-installed equipment, and motor control equipment forming part of motor control centers or switchgear assemblies, the conduit and wiring connecting such centers, assemblies, or other power sources to equipment as specified herein. Power wiring and conduit: conform to the requirements specified herein. Control wiring: provided under, and conform to, the requirements of the section specifying the associated

SECTION 26 20 00 Page 12

Page 169: GA106 – ROLL -UP DOOR RESET Augusta, GA...GA106 - Roll-Up Door Reset May 22, 2015 Augusta, GA SECTION 01 33 00.00 13 SUBMITTAL REGISTER COVER PAGE 07/13 PART 1 GENERAL 1.1 SUBMITTAL

GA106 - Roll-Up Door Reset May 22, 2015Augusta, GA

equipment.

2.14 MOTOR CONTROLLERS

Provide motor controllers in accordance with the following:

a. UL 508 , NEMA ICS 1 , and NEMA ICS 2 .

b. Provide controllers with thermal overload protection in each phase, and one spare normally open auxiliary contact, and one spare normally closed auxiliary contact.

c. Provide controllers for motors rated 1-hp and above with electronic phase-voltage monitors designed to protect motors from phase-loss, undervoltage, and overvoltage.

d. Provide protection for motors from immediate restart by a time adjustable restart relay.

e. When used with pressure, float, or similar automatic-type or maintained-contact switch, provide a hand/off/automatic selector switch with the controller.

f. Connections to selector switch: wired such that only normal automatic regulatory control devices are bypassed when switch is in "hand" position.

g. Safety control devices, such as low and high pressure cutouts, high temperature cutouts, and motor overload protective devices: connected in motor control circuit in "hand" and "automatic" positions.

h. Control circuit connections to hand/off/automatic selector switch or to more than one automatic regulatory control device: made in accordance with indicated or manufacturer's approved wiring diagram.

i. Provide selector switch with the means for locking in any position.

j. Provide a disconnecting means, capable of being locked in the open position, for the motor that is located in sight from the motor location and the driven machinery location. As an alternative, provide a motor controller disconnect, capable of being locked in the open position, to serve as the disconnecting means for the motor if it is in sight from the motor location and the driven machinery location.

l. Overload protective devices: provide adequate protection to motor windings; be thermal inverse-time-limit type; and include manual reset-type pushbutton on outside of motor controller case.

m. Cover of combination motor controller and manual switch or circuit breaker: interlocked with operating handle of switch or circuit breaker so that cover cannot be opened unless handle of switch or circuit breaker is in "off" position.

n. Minimum short circuit withstand rating of combination motor controller: 25,000 rms symmetrical amperes.

o. Provide controllers in hazardous locations with classifications as indicated.

SECTION 26 20 00 Page 13

Page 170: GA106 – ROLL -UP DOOR RESET Augusta, GA...GA106 - Roll-Up Door Reset May 22, 2015 Augusta, GA SECTION 01 33 00.00 13 SUBMITTAL REGISTER COVER PAGE 07/13 PART 1 GENERAL 1.1 SUBMITTAL

GA106 - Roll-Up Door Reset May 22, 2015Augusta, GA

2.14.1 Control Wiring

Provide control wiring in accordance with the following:

a. All control wire: stranded tinned copper switchboard wire with 600-volt flame-retardant insulation Type SIS meeting UL 44 , or Type MTW meeting UL 1063 , and passing the VW-1 flame tests included in those standards.

b. Hinge wire: Class K stranding.

c. Current transformer secondary leads: not smaller than No. 10 AWG.

d. Control wire minimum size: No. 14 AWG.

e. Power wiring for 480-volt circuits and below: the same type as control wiring with No. 12 AWG minimum size.

f. Provide wiring and terminal arrangement on the terminal blocks to permit the individual conductors of each external cable to be terminated on adjacent terminal points.

2.14.2 Control Circuit Terminal Blocks

Provide control circuit terminal blocks in accordance with the following:

a. NEMA ICS 4 .

b. Control circuit terminal blocks for control wiring: molded or fabricated type with barriers, rated not less than 600 volts.

c. Provide terminals with removable binding, fillister or washer head screw type, or of the stud type with contact and locking nuts.

d. Terminals: not less than No. 10 in size with sufficient length and space for connecting at least two indented terminals for 10 AWG conductors to each terminal.

e. Terminal arrangement: subject to the approval of the Contracting Officer with not less than four (4) spare terminals or 10 percent, whichever is greater, provided on each block or group of blocks.

f. Modular, pull apart, terminal blocks are acceptable provided they are of the channel or rail-mounted type.

g. Submit data showing that any proposed alternate will accommodate the specified number of wires, are of adequate current-carrying capacity, and are constructed to assure positive contact between current-carrying parts.

2.14.3 Control Circuits

Control circuits: maximum voltage of 120 volts derived from control transformer in same enclosure. Transformers: conform to UL 506 , as applicable. Transformers, other than transformers in bridge circuits: provide primaries wound for voltage available and secondaries wound for correct control circuit voltage. Size transformers so that 80 percent of rated capacity equals connected load. Provide disconnect switch on primary side. Provide one fused secondary lead with the other lead

SECTION 26 20 00 Page 14

Page 171: GA106 – ROLL -UP DOOR RESET Augusta, GA...GA106 - Roll-Up Door Reset May 22, 2015 Augusta, GA SECTION 01 33 00.00 13 SUBMITTAL REGISTER COVER PAGE 07/13 PART 1 GENERAL 1.1 SUBMITTAL

GA106 - Roll-Up Door Reset May 22, 2015Augusta, GA

grounded.

2.14.4 Enclosures for Motor Controllers

As indicated on drawings.

2.14.5 Pilot and Indicating Lights

Provide LED cluster lamps.

2.15 MANUAL MOTOR STARTERS (MOTOR RATED SWITCHES)

Single pole designed for mounting as indicated on drawings with overload protection and pilot lights.

2.15.1 Pilot Lights

Provide yoke-mounted, seven element LED cluster light module. Color: red in accordance with NEMA ICS 2 .

2.16 LOCKOUT REQUIREMENTS

Provide disconnecting means capable of being locked out for machines and other equipment to prevent unexpected startup or release of stored energy in accordance with 29 CFR 1910.147 . Comply with requirements of Division 23, "Mechanical" for mechanical isolation of machines and other equipment.

2.17 HAZARDOUS LOCATIONS

Electrical materials, equipment, and devices for installation in hazardous locations, as defined by NFPA 70 : specifically approved by Underwriters' Laboratories, Inc., or Factory Mutual for particular "Class," "Division," and "Group" of hazardous locations involved. Boundaries and classifications of hazardous locations: as indicated. Equipment in hazardous locations: comply with UL 1203 for electrical equipment and industrial controls and UL 674 for motors.

2.18 MANUFACTURER'S NAMEPLATE

Provide on each item of equipment a nameplate bearing the manufacturer's name, address, model number, and serial number securely affixed in a conspicuous place; the nameplate of the distributing agent will not be acceptable.

2.19 FIELD FABRICATED NAMEPLATES

Provide field fabricated nameplates in accordance with the following:

a. ASTM D709.

b. Provide laminated plastic nameplates for each equipment enclosure, relay, switch, and device; as specified or as indicated on the drawings.

c. Each nameplate inscription: identify the function and, when applicable, the position.

d. Nameplates: melamine plastic, 0.125 inch thick, white with black center core.

SECTION 26 20 00 Page 15

Page 172: GA106 – ROLL -UP DOOR RESET Augusta, GA...GA106 - Roll-Up Door Reset May 22, 2015 Augusta, GA SECTION 01 33 00.00 13 SUBMITTAL REGISTER COVER PAGE 07/13 PART 1 GENERAL 1.1 SUBMITTAL

GA106 - Roll-Up Door Reset May 22, 2015Augusta, GA

e. Surface: matte finish. Corners: square. Accurately align lettering and engrave into the core.

f. Minimum size of nameplates: one by 2.5 inches.

g. Lettering size and style: a minimum of 0.25 inch high normal block style.

2.20 FIRESTOPPING MATERIALS

Provide firestopping around electrical penetrations in accordance with Section 07 84 00, FIRESTOPPING.

2.21 WIREWAYS

UL 870 . Material: steel galvanized 16 gauge for heights and depths up to 6 by 6 inches, and 14 gauge for heights and depths up to 12 by 12 inches. Provide in length required for the application with screw- cover NEMA 1 enclosure per NEMA ICS 6 .

2.22 SURGE PROTECTIVE DEVICES

Provide parallel type surge protective devices (SPD) which comply with UL 1449 at the service entrance and panelboards. Provide surge protectors in a NEMA 1 enclosure per NEMA ICS 6 . Use Type 1 or Type 2 SPD and connect on the load side of a dedicated circuit breaker.

Provide the following modes of protection:

FOR SINGLE PHASE AND THREE PHASE WYE CONNECTED SYSTEMS- Phase to phase ( L-L ) Each phase to neutral ( L-N ) Neutral to ground ( N-G ) Phase to ground ( L-G )

SPDs at the service entrance: provide with a minimum surge current rating of 80,000 amperes for L-L mode minimum and 40,000 amperes for other modes (L-N, L-G, and N-G) and downstream SPDs rated 40,000 amperes for L-L mode minimum and 20,000 amperes for other modes (L-N, L-G, and N-G).

Provide SPDs. Maximum L-N, L-G, and N-G Voltage Protection Rating:

700V for 120V, single phase system 700V for 120/240V, single phase system 700V for 208Y/120V, three phase system 1,200V for 480Y/277V, three phase system

Maximum L-L Voltage Protection Rating:

1,200V for 120V, single phase system 1,200V for 120/240V, single phase system 1,200V for 208Y/120V, three phase system 2,000V for 480Y/277V, three phase system

The minimum MCOV (Maximum Continuous Operating Voltage) rating for L-N and L-G modes of operation: 120% of nominal voltage for 240 volts and below;

SECTION 26 20 00 Page 16

Page 173: GA106 – ROLL -UP DOOR RESET Augusta, GA...GA106 - Roll-Up Door Reset May 22, 2015 Augusta, GA SECTION 01 33 00.00 13 SUBMITTAL REGISTER COVER PAGE 07/13 PART 1 GENERAL 1.1 SUBMITTAL

GA106 - Roll-Up Door Reset May 22, 2015Augusta, GA

115% of nominal voltage above 240 volts to 480 volts.

Provide EMI/RFI filtering per UL 1283 for each mode with the capability to attenuate high frequency noise. Minimum attenuation: 20db.

2.23 FACTORY APPLIED FINISH

Provide factory-applied finish on electrical equipment in accordance with the following:

a. NEMA 250 corrosion-resistance test and the additional requirements as specified herein.

b. Interior and exterior steel surfaces of equipment enclosures: thoroughly cleaned followed by a rust-inhibitive phosphatizing or equivalent treatment prior to painting.

c. Exterior surfaces: free from holes, seams, dents, weld marks, loose scale or other imperfections.

d. Interior surfaces: receive not less than one coat of corrosion-resisting paint in accordance with the manufacturer's standard practice.

e. Exterior surfaces: primed, filled where necessary, and given not less than two coats baked enamel with semigloss finish.

f. Equipment located indoors: ANSI Light Gray, and equipment located outdoors: ANSI Dark Gray.

g. Provide manufacturer's coatings for touch-up work and as specified in paragraph FIELD APPLIED PAINTING.

2.24 SOURCE QUALITY CONTROL

2.24.1 Transformer Factory Tests

Submittal: include routine NEMA ST 20 transformer test results on each transformer and also provide the results of NEMA "design" and "prototype" tests that were made on transformers electrically and mechanically equal to those specified.

PART 3 EXECUTION

3.1 INSTALLATION

Electrical installations, including weatherproof and hazardous locations and ducts, plenums and other air-handling spaces: conform to requirements of NFPA 70 and IEEE C2 and to requirements specified herein.

3.1.1 Underground Service

Underground service conductors and associated conduit: continuous from service entrance equipment to outdoor power system connection.

3.1.2 Hazardous Locations

Perform work in hazardous locations, as defined by NFPA 70 , in strict accordance with NFPA 70 for particular "Class," "Division," and "Group" of

SECTION 26 20 00 Page 17

Page 174: GA106 – ROLL -UP DOOR RESET Augusta, GA...GA106 - Roll-Up Door Reset May 22, 2015 Augusta, GA SECTION 01 33 00.00 13 SUBMITTAL REGISTER COVER PAGE 07/13 PART 1 GENERAL 1.1 SUBMITTAL

GA106 - Roll-Up Door Reset May 22, 2015Augusta, GA

hazardous locations involved. Provide conduit and cable seals where required by NFPA 70 . Provide conduit with tapered threads.

3.1.3 Service Entrance Identification

Service entrance disconnect devices, switches, and enclosures: labeled and identified as such.

3.1.3.1 Labels

Wherever work results in service entrance disconnect devices in more than one enclosure, as permitted by NFPA 70 , label each enclosure, new and existing, as one of several enclosures containing service entrance disconnect devices. Label, at minimum: indicate number of service disconnect devices housed by enclosure and indicate total number of enclosures that contain service disconnect devices. Provide laminated plastic labels conforming to paragraph FIELD FABRICATED NAMEPLATES. Use lettering of at least 0.25 inch in height, and engrave on black-on-white matte finish. Service entrance disconnect devices in more than one enclosure: provided only as permitted by NFPA 70 .

3.1.4 Wiring Methods

Provide insulated conductors installed in rigid steel conduit or EMT, except where specifically indicated or specified otherwise or required by NFPA 70 to be installed otherwise. Grounding conductor: separate from electrical system neutral conductor. Provide insulated green equipment grounding conductor for circuit(s) installed in conduit and raceways. Shared neutral, or multi-wire branch circuits, are not permitted with arc-fault circuit interrupters. Minimum conduit size: 1/2 inch in diameter for low voltage lighting and power circuits. Firestop conduit which penetrates fire-rated walls, fire-rated partitions, or fire-rated floors in accordance with Section 07 84 00, FIRESTOPPING.

3.1.4.1 Pull Wire

Install pull wires in empty conduits. Pull wire: plastic having minimum 200-pound force tensile strength. Leave minimum 36 inches of slack at each end of pull wire.

3.1.5 Conduit Installation

Unless indicated otherwise, conceal conduit within finished walls, ceilings, and floors. Keep conduit minimum 6 inches away from parallel runs of flues and steam or hot water pipes. Install conduit parallel with or at right angles to ceilings, walls, and structural members where located above accessible ceilings and where conduit will be visible after completion of project.

3.1.5.1 Restrictions Applicable to EMT

a. Do not install underground.

b. Do not encase in concrete, mortar, grout, or other cementitious materials.

c. Do not use in areas subject to severe physical damage including but not limited to equipment rooms where moving or replacing equipment could physically damage the EMT.

SECTION 26 20 00 Page 18

Page 175: GA106 – ROLL -UP DOOR RESET Augusta, GA...GA106 - Roll-Up Door Reset May 22, 2015 Augusta, GA SECTION 01 33 00.00 13 SUBMITTAL REGISTER COVER PAGE 07/13 PART 1 GENERAL 1.1 SUBMITTAL

GA106 - Roll-Up Door Reset May 22, 2015Augusta, GA

d. Do not use in hazardous areas.

e. Do not use outdoors.

3.1.5.2 Restrictions Applicable to Flexible Conduit

Use only as specified in paragraph FLEXIBLE CONNECTIONS.

3.1.5.3 Conduit Support

Support conduit by pipe straps, wall brackets, threaded rod conduit hangers, or ceiling trapeze. Fasten by wood screws to wood; by toggle bolts on hollow masonry units; by concrete inserts or expansion bolts on concrete or brick; and by machine screws, welded threaded studs, or spring-tension clamps on steel work. Threaded C-clamps may be used on rigid steel conduit only. Do not weld conduits or pipe straps to steel structures. Do not exceed one-fourth proof test load for load applied to fasteners. Provide vibration resistant and shock-resistant fasteners attached to concrete ceiling. Do not cut main reinforcing bars for any holes cut to depth of more than 1 1/2 inches in reinforced concrete beams or to depth of more than 3/4 inch in concrete joints. Fill unused holes. In partitions of light steel construction, use sheet metal screws. In suspended-ceiling construction, run conduit above ceiling. Do not support conduit by ceiling support system. Conduit and box systems: supported independently of both (a) tie wires supporting ceiling grid system, and (b) ceiling grid system into which ceiling panels are placed. Do not share supporting means between electrical raceways and mechanical piping or ducts. Coordinate installationwith above-ceiling mechanical systems to assure maximum accessibility to all systems. Spring-steel fasteners may be used for lighting branch circuit conduit supports in suspended ceilings in dry locations. Where conduit crosses building expansion joints, provide suitable expansion fitting that maintains conduit electrical continuity by bonding jumpers or other means. For conduits greater than 2 1/2 inches inside diameter, provide supports to resist forces of 0.5 times the equipment weight in any direction and 1.5 times the equipment weight in the downward direction.

3.1.5.4 Directional Changes in Conduit Runs

Make changes in direction of runs with symmetrical bends or cast-metal fittings. Make field-made bends and offsets with hickey or conduit-bending machine. Do not install crushed or deformed conduits. Avoid trapped conduits. Prevent plaster, dirt, or trash from lodging in conduits, boxes, fittings, and equipment during construction. Free clogged conduits of obstructions.

3.1.5.5 Locknuts and Bushings

Fasten conduits to sheet metal boxes and cabinets with two locknuts where required by NFPA 70 , where insulated bushings are used, and where bushings cannot be brought into firm contact with the box; otherwise, use at least minimum single locknut and bushing. Provide locknuts with sharp edges for digging into wall of metal enclosures. Install bushings on ends of conduits, and provide insulating type where required by NFPA 70 .

3.1.5.6 Flexible Connections

Provide flexible steel conduit between 3 and 6 feet in length for recessed

SECTION 26 20 00 Page 19

Page 176: GA106 – ROLL -UP DOOR RESET Augusta, GA...GA106 - Roll-Up Door Reset May 22, 2015 Augusta, GA SECTION 01 33 00.00 13 SUBMITTAL REGISTER COVER PAGE 07/13 PART 1 GENERAL 1.1 SUBMITTAL

GA106 - Roll-Up Door Reset May 22, 2015Augusta, GA

and semirecessed lighting fixtures; for equipment subject to vibration, noise transmission, or movement; and for motors. Install flexible conduit to allow 20 percent slack. Minimum flexible steel conduit size: 1/2 inch diameter. Provide liquidtight flexible conduit in wet and damp locations for equipment subject to vibration, noise transmission, movement or motors. Provide separate ground conductor across flexible connections.

3.1.6 Boxes, Outlets, and Supports

Provide boxes in wiring and raceway systems wherever required for pulling of wires, making connections, and mounting of devices or fixtures. Boxes for metallic raceways: cast-metal, hub-type when located in wet locations, when surface mounted on outside of exterior surfaces, when surface mounted on interior walls exposed up to 7 feet above floors and walkways, or when installed in hazardous areas and when specifically indicated. Boxes in other locations: sheet steel. Provide each box with volume required by NFPA 70 for number of conductors enclosed in box. Boxes for mounting lighting fixtures: minimum 4 inches square, or octagonal, except that smaller boxes may be installed as required by fixture configurations, as approved. Boxes for use in masonry-block or tile walls: square-cornered, tile-type, or standard boxes having square-cornered, tile-type covers. Provide gaskets for cast-metal boxes installed in wet locations and boxes installed flush with outside of exterior surfaces. Provide separate boxes for flush or recessed fixtures when required by fixture terminal operating temperature; provide readily removable fixturesfor access to boxes unless ceiling access panels are provided. Support boxes and pendants for surface-mounted fixtures on suspended ceilings independently of ceiling supports. Fasten boxes and supports with wood screws on wood, with bolts and expansion shields on concrete or brick, with toggle bolts on hollow masonry units, and with machine screws or welded studs on steel. In open overhead spaces, cast boxes threaded to raceways need not be separately supported except where used for fixture support; support sheet metal boxes directly from building structure or by bar hangers. Where bar hangers are used, attach bar to raceways on opposite sides of box, and support raceway with approved-type fastener maximum 24 inches from box. When penetrating reinforced concrete members, avoid cutting reinforcing steel.

3.1.6.1 Boxes

Boxes for use with raceway systems: minimum 1 1/2 inches deep, except where shallower boxes required by structural conditions are approved. Boxes for other than lighting fixture outlets: minimum 4 inches square, except that 4 by 2 inch boxes may be used where only one raceway enters outlet. Mount outlet boxes flush in finished walls, unless otherwise noted.

3.1.6.2 Pull Boxes

Construct of at least minimum size required by NFPA 70 of code-gauge galvanized sheet steel, except where cast-metal boxes are required in locations specified herein. Provide boxes with screw-fastened covers. Where several feeders pass through common pull box, tag feeders to indicate clearly electrical characteristics, circuit number, and panel designation.

3.1.7 Mounting Heights

Mount panelboards, circuit breakers, motor controller and disconnecting switches so height of operating handle at its highest position is maximum

SECTION 26 20 00 Page 20

Page 177: GA106 – ROLL -UP DOOR RESET Augusta, GA...GA106 - Roll-Up Door Reset May 22, 2015 Augusta, GA SECTION 01 33 00.00 13 SUBMITTAL REGISTER COVER PAGE 07/13 PART 1 GENERAL 1.1 SUBMITTAL

GA106 - Roll-Up Door Reset May 22, 2015Augusta, GA

78 inches above floor. Mount lighting switches 48 inches above finished floor. Mount receptacles 18 inches above finished floor, unless otherwise indicated. Mount other devices as indicated. Measure mounting heights of wiring devices and outlets in non-hazardous areas to center of device or outlet. Measure mounting heights of receptacle outlet boxes in the hazardous area to the bottom of the outlet box.

3.1.8 Conductor Identification

Provide conductor identification within each enclosure where tap, splice, or termination is made. For conductors No. 6 AWG and smaller diameter, provide color coding by factory-applied, color-impregnated insulation. For conductors No. 4 AWG and larger diameter, provide color coding by plastic-coated, self-sticking markers; colored nylon cable ties and plates; or heat shrink-type sleeves. Identify control circuit terminations in accordance with manufacturer's recommendations.

3.1.8.1 Marking Strips

Provide marking strips in accordance with the following:

a. Provide white or other light-colored plastic marking strips, fastened by screws to each terminal block, for wire designations.

b. Use permanent ink for the wire numbers

c. Provide reversible marking strips to permit marking both sides, or provide two marking strips with each block.

d. Size marking strips to accommodate the two sets of wire numbers.

e. Assign a device designation in accordance with NEMA ICS 1 to each device to which a connection is made. Mark each device terminal to which a connection is made with a distinct terminal marking corresponding to the wire designation used on the Contractor's schematic and connection diagrams.

f. The wire (terminal point) designations used on the Contractor's wiring diagrams and printed on terminal block marking strips may be according to the Contractor's standard practice; however, provide additional wire and cable designations for identification of remote (external) circuits for the Government's wire designations.

g. Prints of the marking strips drawings submitted for approval will be so marked and returned to the Contractor for addition of the designations to the terminal strips and tracings, along with any rearrangement of points required.

3.1.9 Splices

Make splices in accessible locations. Make splices in conductors No. 10 AWG and smaller diameter with insulated, pressure-type connector. Make splices in conductors No. 8 AWG and larger diameter with solderless connector, and cover with insulation material equivalent to conductor insulation.

3.1.10 Covers and Device Plates

Install with edges in continuous contact with finished wall surfaces

SECTION 26 20 00 Page 21

Page 178: GA106 – ROLL -UP DOOR RESET Augusta, GA...GA106 - Roll-Up Door Reset May 22, 2015 Augusta, GA SECTION 01 33 00.00 13 SUBMITTAL REGISTER COVER PAGE 07/13 PART 1 GENERAL 1.1 SUBMITTAL

GA106 - Roll-Up Door Reset May 22, 2015Augusta, GA

without use of mats or similar devices. Plaster fillings are not permitted. Install plates with alignment tolerance of 1/16 inch. Use of sectional-type device plates are not permitted. Provide gasket for plates installed in wet locations.

3.1.11 Electrical Penetrations

Seal openings around electrical penetrations through fire resistance-rated walls, partitions, floors, or ceilings in accordance with Section 07 84 00 FIRESTOPPING.

3.1.12 Grounding and Bonding

Provide in accordance with NFPA 70 . Ground exposed, non-current-carrying metallic parts of electrical equipment, metallic raceway systems, grounding conductor in metallic and nonmetallic raceways, telecommunications system grounds, and neutral conductor of wiring systems. Make ground connection at main service equipment, and extend grounding conductor to point of entrance of metallic water service. Make connection to water pipe by suitable ground clamp or lug connection to plugged tee. If flanged pipes are encountered, make connection with lug bolted to street side of flanged connection. Supplement metallic water service grounding system with additional made electrode in compliance with NFPA 70 . Make ground connection to driven ground rods on exterior of building. Interconnect all grounding media in or on the structure to provide a common ground potential. This includes lightning protection, electrical service, telecommunications system grounds, as well as underground metallic piping systems. Make interconnection to the gas line on the customer's side of the meter. Use main size lightning conductors for interconnecting these grounding systems to the lightning protection system. In addition to the requirements specified herein, provide telecommunications grounding in accordance with TIA-607 . Where ground fault protection is employed, ensure that connection of ground and neutral does not interfere with correct operation of fault protection.

3.1.12.1 Ground Rods

Provide cone pointed ground rods. Measure the resistance to ground using the fall-of-potential method described in IEEE 81 . Do not exceed 25 ohms under normally dry conditions for the maximum resistance of a driven ground. If this resistance cannot be obtained with a single rod, 2 additional rods, spaced on center, not less than twice the distance of the length of the rod may be coupled and driven with the first rod. In high-ground-resistance, UL listed chemically charged ground rods may be used. If the resultant resistance exceeds 25 ohms measured not less than 48 hours after rainfall, notify the Contracting Officer who will decide on the number of ground rods to add.

3.1.12.2 Grounding Connections

Make grounding connections which are buried or otherwise normally inaccessible by exothermic weld or compression connector.

a. Make exothermic welds strictly in accordance with the weld manufacturer's written recommendations. Welds which are "puffed up" or which show convex surfaces indicating improper cleaning are not acceptable. Mechanical connectors are not required at exothermic welds.

SECTION 26 20 00 Page 22

Page 179: GA106 – ROLL -UP DOOR RESET Augusta, GA...GA106 - Roll-Up Door Reset May 22, 2015 Augusta, GA SECTION 01 33 00.00 13 SUBMITTAL REGISTER COVER PAGE 07/13 PART 1 GENERAL 1.1 SUBMITTAL

GA106 - Roll-Up Door Reset May 22, 2015Augusta, GA

b. Make compression connections using a hydraulic compression tool to provide the correct circumferential pressure. Provide tools and dies as recommended by the manufacturer. Use an embossing die code or other standard method to provide visible indication that a connector has been adequately compressed on the ground wire.

3.1.12.3 Ground Bus

Provide a copper ground bus in the electrical equipment rooms as indicated. Noncurrent-carrying metal parts of electrical equipment: effectively grounded by bonding to the ground bus. Bond the ground bus to both the entrance ground, and to a ground rod or rods as specified above having the upper ends terminating approximately 4 inches above the floor. Make connections and splices of the brazed, welded, bolted, or pressure-connector type, except use pressure connectors or bolted connections for connections to removable equipment.

3.1.12.4 Resistance

Maximum resistance-to-ground of grounding system: do not exceed 10 ohms under dry conditions. Where resistance obtained exceeds 10 ohms, contact Contracting Officer for further instructions.

3.1.13 Equipment Connections

Provide power wiring for the connection of motors and control equipment under this section of the specification. Except as otherwise specifically noted or specified, automatic control wiring, control devices, and protective devices within the control circuitry are not included in this section of the specifications and are provided under the section specifying the associated equipment.

3.1.14 Repair of Existing Work

Perform repair of existing work, demolition, and modification of existing electrical distribution systems as follows:

3.1.14.1 Workmanship

Lay out work in advance. Exercise care where cutting, channeling, chasing, or drilling of floors, walls, partitions, ceilings, or other surfaces is necessary for proper installation, support, or anchorage of conduit, raceways, or other electrical work. Repair damage to buildings, piping, and equipment using skilled craftsmen of trades involved.

3.1.14.2 Existing Concealed Wiring to be Removed

Disconnect existing concealed wiring to be removed from its source. Remove conductors; cut conduit flush with floor, underside of floor, and through walls; and seal openings.

3.1.14.3 Removal of Existing Electrical Distribution System

Removal of existing electrical distribution system equipment includes equipment's associated wiring, including conductors, cables, exposed conduit, surface metal raceways, boxes, and fittings, back to equipment's power source as indicated.

SECTION 26 20 00 Page 23

Page 180: GA106 – ROLL -UP DOOR RESET Augusta, GA...GA106 - Roll-Up Door Reset May 22, 2015 Augusta, GA SECTION 01 33 00.00 13 SUBMITTAL REGISTER COVER PAGE 07/13 PART 1 GENERAL 1.1 SUBMITTAL

GA106 - Roll-Up Door Reset May 22, 2015Augusta, GA

3.1.14.4 Continuation of Service

Maintain continuity of existing circuits of equipment to remain. Maintain existing circuits of equipment energized. Restore circuits wiring and power which are to remain but were disturbed during demolition back to original condition.

3.1.15 Surge Protective Devices

Connect the surge protective devices in parallel to the power source, keeping the conductors as short and straight as practically possible. Maximum allowed lead length is 3 feet.

3.2 FIELD FABRICATED NAMEPLATE MOUNTING

Provide number, location, and letter designation of nameplates as indicated. Fasten nameplates to the device with a minimum of two sheet-metal screws or two rivets.

3.3 WARNING SIGN MOUNTING

Provide the number of signs required to be readable from each accessible side. Space the signs in accordance with NFPA 70E.

3.4 FIELD APPLIED PAINTING

Paint electrical equipment as required to match finish of adjacent surfaces or to meet the indicated or specified safety criteria. Where field painting of enclosures for panelboards, load centers or the like is specified to match adjacent surfaces, to correct damage to the manufacturer's factory applied coatings, or to meet the indicated or specified safety criteria, provide manufacturer's recommended coatings and apply in accordance to manufacturer's instructions.

3.5 FIELD QUALITY CONTROL

Furnish test equipment and personnel and submit written copies of test results. Give Contracting Officer 5 working days notice prior to each test.

3.5.1 Devices Subject to Manual Operation

Operate each device subject to manual operation at least five times, demonstrating satisfactory operation each time.

3.5.2 600-Volt Wiring Test

Test wiring rated 600 volt and less to verify that no short circuits or accidental grounds exist. Perform insulation resistance tests on wiring No. 6 AWG and larger diameter using instrument which applies voltage of approximately 500 volts to provide direct reading of resistance. Minimum resistance: 250,000 ohms.

3.5.3 Transformer Tests

Perform the standard, not optional, tests in accordance with the Inspection and Test Procedures for transformers, dry type, air-cooled, 600 volt and below; as specified in NETA ATS. Measure primary and secondary voltages for proper tap settings. Tests need not be performed by a recognized independent testing firm or independent electrical consulting

SECTION 26 20 00 Page 24

Page 181: GA106 – ROLL -UP DOOR RESET Augusta, GA...GA106 - Roll-Up Door Reset May 22, 2015 Augusta, GA SECTION 01 33 00.00 13 SUBMITTAL REGISTER COVER PAGE 07/13 PART 1 GENERAL 1.1 SUBMITTAL

GA106 - Roll-Up Door Reset May 22, 2015Augusta, GA

firm.

3.5.4 Ground-Fault Receptacle Test

Test ground-fault receptacles with a "load" (such as a plug in light) to verify that the "line" and "load" leads are not reversed.

3.5.5 Grounding System Test

Test grounding system to ensure continuity, and that resistance to ground is not excessive. Test each ground rod for resistance to ground before making connections to rod; tie grounding system together and test for resistance to ground. Make resistance measurements in dry weather, not earlier than 48 hours after rainfall. Submit written results of each test to Contracting Officer, and indicate location of rods as well as resistance and soil conditions at time measurements were made.

-- End of Section --

SECTION 26 20 00 Page 25

Page 182: GA106 – ROLL -UP DOOR RESET Augusta, GA...GA106 - Roll-Up Door Reset May 22, 2015 Augusta, GA SECTION 01 33 00.00 13 SUBMITTAL REGISTER COVER PAGE 07/13 PART 1 GENERAL 1.1 SUBMITTAL

GA106 - Roll-Up Door Reset May 22, 2015Augusta, GA

SECTION 26 24 16.00 40

PANELBOARDS08/10

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

NATIONAL ELECTRICAL MANUFACTURERS ASSOCIATION (NEMA)

NEMA 250 (2008) Enclosures for Electrical Equipment (1000 Volts Maximum)

NEMA PB 1 (2011) Panelboards

U.S. GENERAL SERVICES ADMINISTRATION (GSA)

FED-STD-595 (Rev C; Notice 1) Colors Used in Government Procurement

UNDERWRITERS LABORATORIES (UL)

UL 489 (2013; Reprint Mar 2014) Molded-Case Circuit Breakers, Molded-Case Switches, and Circuit-Breaker Enclosures

UL 67 (2009; Reprint Jan 2013) Standard for Panelboards

1.2 GENERAL REQUIREMENTS

Section 26 00 00.00 20 BASIC ELECTRICAL MATERIALS AND METHODS applies to work specified in this section.

Submit Detail Drawings for the panelboards consisting of fabrication and assembly drawings for all parts of the work in sufficient detail to enable the Government to check conformity with the requirements of the contract documents. Include within drawings details of bus layout.

Ensure Outline Drawings for panelboards indicate overall physical features, dimensions, ratings, service requirements, and weights of equipment.

Statements signed by responsible officials of a manufacturer of a product, system, or material attesting that the product, system or material meet specified requirements. Statements must be dated after the award of this contract, name the project, and list the specific requirements which it is intended to address.

1.3 SUBMITTALS

Government approval is required for submittals with a "G" designation; submittals not having a "G" designation are for information only. When

SECTION 26 24 16.00 40 Page 1

Page 183: GA106 – ROLL -UP DOOR RESET Augusta, GA...GA106 - Roll-Up Door Reset May 22, 2015 Augusta, GA SECTION 01 33 00.00 13 SUBMITTAL REGISTER COVER PAGE 07/13 PART 1 GENERAL 1.1 SUBMITTAL

GA106 - Roll-Up Door Reset May 22, 2015Augusta, GA

used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:

SD-02 Shop Drawings

Submit Detail Drawings and Outline Drawings for panelboards in accordance with paragraph entitled, "General Requirements," of this section.

SD-03 Product Data

Submit manufacturer's catalog data for the following items:

Panelboards; G

Directory Card and Holder; G

SD-04 Samples

Ensure that Keys are properly tagged and delivered to the Contracting Officer.

SD-06 Test Reports

Submit test reports for the following tests in accordance with the paragraph entitled, "Site Testing," of this section. Do not energize panelboards until the recorded test data has been submitted to and approved by the Contracting Officer.

Continuity Tests; G

Insulation Tests; G

SD-07 Certificates

Submit Statements in accordance with paragraph entitled, "General Requirements," of this section.

SD-08 Manufacturer's Instructions

Submit manufacturer's instructions for Panelboards including special provisions required to install equipment components and system packages. Special notices shall detail impedances, hazards and safety precautions.

PART 2 PRODUCTS

2.1 PANELBOARDS

Totally enclose power-distribution panelboards and lighting and appliance branch-circuit panelboards in a steel cabinet, dead-front circuit breaker type with copper buses, surface- or flush-mounted as indicated. Ensure panelboards conform to NEMA PB 1 and UL 489 . Branch circuit panels shall have buses fabricated for bolt-on type circuit breakers.

An outer door or cover, hinged on one side, shall be provided on surface-mounted panelboards to provide gutter space access. Provide a center door for circuit breaker/switch access only.

SECTION 26 24 16.00 40 Page 2

Page 184: GA106 – ROLL -UP DOOR RESET Augusta, GA...GA106 - Roll-Up Door Reset May 22, 2015 Augusta, GA SECTION 01 33 00.00 13 SUBMITTAL REGISTER COVER PAGE 07/13 PART 1 GENERAL 1.1 SUBMITTAL

GA106 - Roll-Up Door Reset May 22, 2015Augusta, GA

Voltage and current rating, number of phases, and number of wires shall be as indicated. Provide four-wire distribution panelboards and lighting and appliance branch-circuit panelboards with an isolated full-capacity neutral bus. Ensure panelboards are rated for 120/208-volt, three-phase, 60-hertz current.

Provide three-phase, 4-wire distribution lighting and branch circuit panelboards with an isolated full-capacity bus providing spaces for single-pole circuit breakers/switches and spaces indicated as spare.

Provide panelboards with a separate grounding bus bonded to the enclosure. Grounding bus shall be a solid bus bar of rectangular cross section equipped with binding screws for the connection of equipment grounding conductors.

Each panelboard, as a complete unit, shall have a short-circuit current rating equal to or greater than the integrated equipment rating shown on the panelboard schedule or as indicated.

Ensure panelboards and main lugs or main breaker have current ratings as shown on the panelboard schedule.

Bus bar connections to the branch circuit breakers shall be the "distributed phase" or "phase sequence" type. Three-phase, four-wire busing shall be such that when any three adjacent single-pole breakers are individually connected to each of the three different phases, two- or three-pole breakers can be installed at any location. Current-carrying parts of the bus assembly shall be plated. Mains ratings shall be as shown.

Mechanical lugs furnished with panelboards shall be cast copper or copper alloys of sizes suitable for the conductors indicated to be connected thereto.

Boxes shall have the manufacturer's standard knockouts and shall be galvanized code-gage sheet steel. Fronts shall be of code-gage sheet steel furnished with hinged doors with adjustable trim clamps for securing the fronts to the boxes.

Panelboard enclosures shall be NEMA 250, Type 1. Provide enclosures with hinged fronts and corrosion-resistant steel pin-tumbler cylinder locks. Key locks alike and provide two keys for each enclosure.

Finish panelboards with fast drying enamel. Finish color is to be No. 61 gray conforming to FED-STD-595 .

2.2 CIRCUIT BREAKERS

Circuit breakers shall be the molded-case type. Frame and trip ratings shall be as indicated.

Interrupting rating of circuit breakers shall be as indicated. If not shown, the interrupting rating for circuit breakers in 120/208-volt panelboards shall be not less than 10,000 amperes rms symmetrical.

Circuit breakers shall be bolt-on type. Plug-in type is not acceptable.

Provide shunt trips where indicated.

SECTION 26 24 16.00 40 Page 3

Page 185: GA106 – ROLL -UP DOOR RESET Augusta, GA...GA106 - Roll-Up Door Reset May 22, 2015 Augusta, GA SECTION 01 33 00.00 13 SUBMITTAL REGISTER COVER PAGE 07/13 PART 1 GENERAL 1.1 SUBMITTAL

GA106 - Roll-Up Door Reset May 22, 2015Augusta, GA

In branch circuit panelboards, branch circuit breakers feeding convenience outlets shall have sensitive instantaneous trip settings of not more than 10 times the trip rating of the breaker to prevent repeated arcing shorts resulting from frayed appliance cords. Single-pole 15- and 20-ampere circuit breakers shall be UL listed as "Switching Breakers" at 120 volts ac. Provide UL Class A (5-milliampere sensitivity) ground fault circuit protection on 120-volt ac branch circuit as indicated. This protection is an integral part of the branch circuit breaker that also provides overload and short-circuit protection for branch circuit wiring. Tripping of a branch circuit breaker containing ground fault circuit interruption is not to disturb the feeder circuit to the panelboard. A single-pole circuit breaker with integral ground fault circuit interruption requires no more panelboard branch circuit space than a conventional slide pole circuit breaker.

Ensure connections to the bus are bolt-on type.

When multiple wires per phase are specified, furnish the circuit breakers with connectors made to accommodate multiple wires.

Ensure circuit breaker spaces called out on the drawings are complete with mounting hardware to permit ready installation of the circuit breakers.

2.3 DIRECTORY CARD AND HOLDER

Mount a directory card on the inside of hinged fronts and doors under glass in a metal frame, with spaces for circuit numbers, outlets controlled, and room numbers. Where hinged fronts or doors are not required, provide the directory card under glass in a metal frame mounted on the left-hand side of the front trim. Directory card shall identify each branch circuit with its respective and numbered circuit breaker.

2.4 FACTORY TESTING

Test complete panelboards in accordance with UL 67 .

2.5 PRECAUTIONARY LABEL

To ensure persons are aware of immediate or potential hazard in the application, installation, use, or maintenance of panelboards, each panelboard shall be conspicuously marked on the trim or dead front shield with the text (or equivalent) DANGER symbol. If the panel is supplied with a door, ensure the label is visible when the door is in the open position.

PART 3 EXECUTION

3.1 INSTALLATION

Install panelboards as indicated and in accordance with the manufacturer's instructions. Fully align and mount panels so that the height of the top operating handle does not exceed 72-inches above the finished floor.

Directory-card information shall be typewritten in capital letters to indicate outlets controlled and final room numbers served by each circuit and shall be mounted in holders behind protective covering.

SECTION 26 24 16.00 40 Page 4

Page 186: GA106 – ROLL -UP DOOR RESET Augusta, GA...GA106 - Roll-Up Door Reset May 22, 2015 Augusta, GA SECTION 01 33 00.00 13 SUBMITTAL REGISTER COVER PAGE 07/13 PART 1 GENERAL 1.1 SUBMITTAL

GA106 - Roll-Up Door Reset May 22, 2015Augusta, GA

3.2 SITE TESTING

Each panelboard enclosure key shall be shown to operate the enclosure locks in the presence of the Contracting Officer.

Panelboards shall be given continuity and insulation tests after the installation has been completed and before the panelboard is energized.

Provide test equipment, labor, and personnel as required to perform the tests as specified.

Conduct insulation tests on panelboards rated 300 volts or less using a 500-volt minimum insulation-resistance test set. Record readings after 1 minute and until the reading is constant for 15 seconds. Resistance between phase conductors and between phase conductors and ground shall be not less than 25 megohms.

Record test data and include the location and identification of panelboards and megohm readings versus time.

-- End of Section --