from woof to wow and the cats meow bacon2

22
Rick Bacon, AIA Bacon Group, Inc. Architecture © Bacon Group, Inc. HSUS Animal Care Expo Shelter Design Workshop Nashville, May 8, 2013 Workshop Handouts This document is digital friendly and it is formatted for double-sided printing.

Upload: 201321

Post on 18-Nov-2014

247 views

Category:

Lifestyle


2 download

DESCRIPTION

 

TRANSCRIPT

Page 1: From woof to wow and the cats meow bacon2

Rick Bacon, AIABacon Group, Inc. Architecture

© Bacon Group, Inc.

HSUS Animal Care ExpoShelter Design Workshop

Nashville, May 8, 2013

Wo

rksh

op

Han

do

uts

This document is digital friendly and it is formatted for double-sided printing.

Page 2: From woof to wow and the cats meow bacon2

HSUS Animal Care Expo Daylong Shelter Design Workshop

May 8, 2013 Nashville, Tennessee

The handouts support the following workshop sessions presented by Rick Bacon, AIA:

Design & Construction Project Organization, Roles & Responsibilities

Architectural Design & Materials

Construction Observation & Quality Control Handouts included are:

Design and Construction Project Definitions and Related Information

Twenty Questions to Ask Your Architect

Sustainability Checklist for Architects

Cost Estimates

Design Schedule Examples

Construction Schedule Example

Materials and Equipment – Animal Care Facilities

Tips for Selecting a Contractor

Contractor Reference Check

Additional Resources © Richard S. Bacon, AIA, Architect / Bacon Group, Inc., Clearwater, FL Bacon Group, Inc. 2641 Sunset Point Road Clearwater, FL 33759 727.725.0111 phone www.BGArchitects.com If you have questions or need additional information, please contact Mindy Bacon at [email protected].

Page 3: From woof to wow and the cats meow bacon2

Page 1© 2009 Bacon Group, Inc., www.BGArchitects.com, 800.961.1967 Richard S. Bacon, AIA, LEED AP BD+C, CGC

Design and Construction Project Definitions and Related Information

Design Consultants and Construction Related Professionals (List is not exhaustive.)

Acoustical Consultant - state licensed consultant who is qualified to test noise levels and design or recommend design features that will moderate ambient, external or internal noise levels.

Architect - state-licensed consultant who is responsible for the design and coordination of the overall project including site, building and systems. The project architect will serve as the interface between the Owner, consultants and outside agencies.

Architectural/Engineering Consultant - design consultant, usually licensed, who has special knowledge of and experience with specific building types or systems required for a project, e.g. swimming pool engineer.

Civil Engineer - state-licensed consultant responsible for a project site design including drainage, water management, paving, roadways and utilities related to the project. The civil engineer does not design or landscaping. On larger projects, this engineer is responsible for assisting in the site master planning including traffic flow.

Cost Estimator - consultant qualified to review the design documents and prepare Statements of Probable Construction Cost based on project type, prevailing materials costs and labor conditions of the project location. This consultant may also provide value engineering, review construction schedules, pay requests and contractor Change Orders.

Designer/Computer Drafter - individuals of widely varying degrees of skill who work under the direct supervision of a licensed architect or engineer to design portions of a project. While manual drafting is still used in some cases, most projects are now designed and drafted with the aid of computer programs such as CADD (computer aided drafting and design). Some advantages of computer drafting are greater accuracy in the construction documents, easier redesigns, and direct communication with engineering consultants and files management. Disciplines transfer current digital drawings to each other via the Internet.

Electrical Engineer - state-licensed consultant responsible for all electrical (power and lighting) including site designs for the project; concerned with all communications including telephone and computers, television and power generation, etc.

Environmental Consultant - a variety of usually industry certified or state-licensed consultants qualified to study, recommend, design and perform remedial work concerning a myriad of environmental tasks such as wetlands mitigation, endangered flora and fauna on a site, chemical/fuels contamination or asbestos and lead-based paint abatement.

Geotechnical Engineer - state-licensed consultant responsible for testing and determining soil and sub-surface conditions. These test results help determine building placement as well as foundation and pavement design. Investigation may further define environmental and hidden conditions.

Landscape Architect - state-licensed consultant responsible for the landscape design, plantings, and irrigation system, some site permitting, and site amenities including lighting, furnishings, accessories, etc.

LEED® AP - Acronym that means Leadership in Energy and Environmental Design Accredited Professional, an accreditation from the U.S. Green Building Council in sustainable design. There may be additional letters after “AP” such as, BD+C that stands for Building Design and Construction.

Mechanical Engineer - state-licensed consultant responsible for all the mechanical systems such as HVAC (heating, ventilating, air conditioning) systems. This consultant is often the plumbing engineer, too.

Plumbing Engineer - state-licensed consultant responsible for the plumbing and fire suppression systems and may include the water supply, waste water and storm water systems, etc.

Roofing Consultant - qualified, and often industry-certified, consultant who evaluates, recommends, designs and reviews the construction of roofing systems for structures. This consultant is often involved in renovations and remedial projects.

Structural Engineer - state-licensed consultant responsible for the structural infrastructure of a building including foundations, wall construction, roof framing, etc., conforming to all code requirements including wind and hurricane and snow loads. Threshold Inspectors are also structural engineers.

Surveyor - state-licensed consultant responsible for establishing site boundaries including legal descriptions, set backs, easements, etc., existing and new building locations, elevations (grades), utilities, wetlands, trees, etc.

These definitions are intended to provide rudimentary information about the

professionals and processes commonly encountered during a design and

construction project.

Almost all design and construction professionals are licensed and regulated

by state government. While there are many similarities, these laws vary from

state to state. Take the time to educate yourself about the laws, requirements, and regulations of your state before you start your project. Many state licensing boards have consumer education sections on their

web sites.

Page 4: From woof to wow and the cats meow bacon2

Page 2© 2009 Bacon Group, Inc., www.BGArchitects.com, 800.961.1967 Richard S. Bacon, AIA, LEED AP BD+C, CGC

Design and Construction Project Definitions and Related Information

Design Phases

Programming - this phase determines both internal and external spaces required for the project. This may include the size, location, relationship to other spaces, furnishings, equipment, and all other support information.

Pre-design - site evaluation, existing structure evaluation, space needs planning, investigation into development and permitting requirements, programming, and preliminary floor plans.

Schematic - this phase develops the program into a two or three dimensional graphic format. Scale is developed, relationships are further refined, systems are reviewed and materials are evaluated. Basic costs are established.

Design Development - this phase refines the schematic phase and establishes in graphic and written format, the entire building including plans, elevations, systems, materials, equipment, etc. A more detailed Statement of Probable Construction Cost is provided.

Construction Documents - this phase sets forth in both graphic and written format the construction documents for both bidding and construction. This is the culmination of the design process. A comprehensive Statement of Probable Construction Cost is provided.

Bidding - during this phase contractors review the contract documents and contract requirements and submit a fee proposal to complete the construction. This usually includes both cost and construction schedule. The architect is responsible for plan interpretation, clarifications, bid review and recommendations.

Negotiation - In lieu of bidding, one to three pre-qualified contractors may be asked to submit a fee for construction that is a negotiated price. This avenue of contractor selection eliminates the time expended during a formal bidding procedure. This may not be possible for government projects.

Construction - this is the time where the successful bidder is contracted to complete the construction of the project. Architects/engineers provide construction observation services where members of the design team observe the progress of construction to monitor the building is built according to the intent of the design and according to the permitted construction documents.

Product / system submittals and shop drawings are provided by the contractor / sub-contractor for review by the design team to monitor the products and systems specified are being installed. Architects also review/approve contractor’s pay request, perform a “punch-list” review and substantial completion walk-through review.

Close-out documents, technical manuals, as-built drawings, and warranty information on the building’s systems, etc., are submitted to the architect for review and submission to the owner.

Standard Design Phases, Basic and Extended Design Services, and Non-Basic Design Services

The standard design and construction phases are sequential. The list of what is considered Basic and Extended Design Services and the services that are Non-Basic Design Services follow.

Standard Design and Construction PhasesSchematic Design•Design Development•Construction Documents•Bidding•Construction Observation•

Basic and Extended Design ServicesBasic Design Services•- Architecture design- Mechanical, electrical, plumbing engineering design- Structural engineering designExtended Design Services•- Site / civil engineering design- Landscape architecture and irrigation system design- Acoustical design- Fire suppression system design

Non-Basic Design ServicesProgramming•Boundary and Topographical Surveys•Geotechnical Engineering and Soils Testing•Environmental Evaluation, i.e., asbestos and lead-based •paint surveys and testingLEED® Certification•Acoustical Engineering and testing•Security / CCTV systems design •Furniture, Fixtures & Equipment (FF&E) specifications•Permitting and Permit Expediting•Extensive Interiors Design, i.e., furniture systems•Detailed cost estimating•Value Engineering (VE)•Construction Administration (a more extensive version •of Construction Observation that has greater legal implications)

Permitting

Permit Expediter – Individual who coordinates and monitors the site and building documents permitting process, especially in jurisdictions known to have lengthy and complicated review requirements.

Plans Reviewers – this representative of a local, state or federal entity is responsible for reviewing and qualifying that construction plans meet local, state, and national building codes, fire safety codes, accessibility codes, etc.

Page 5: From woof to wow and the cats meow bacon2

Design and Construction Project Definitions and Related Information

Page 3© 2009 Bacon Group, Inc., www.BGArchitects.com, 800.961.1967 Richard S. Bacon, AIA, LEED AP BD+C, CGC

Construction

Building Inspector - this representative of a local, state or federal entity is responsible for reviewing the construction relative to the codes of his/her jurisdiction.

General Contractor - this entity is responsible for the overall construction of the project including coordination of the sequence of work, sub-contractors and schedule. The contractor is legally contracted with the Owner, not the architect. General Contractors (GC’s) are regulated by the state and usually are state licensed.

Sub-contractor - this entity works for the prime contractor for specific areas of construction. The sub-contractor is legally contracted with the prime contractor and most are state licensed in their specialty.

Project Manager - works for and is assigned overall construction responsibility from the GC. The superintendent reports primarily to the project manager. The project manager interfaces with the Owner and the architect and engineers (A/E) team.

Superintendent - works for the GC and is responsible for the day-to-day supervision of the job site.

Project Delivery Methods

Design / Bid / Build - this is the most recognized method of project delivery. The Owner selects a design entity to design the project to budget and the Owner’s needs. The contract documents are then bid with the contract awarded to the most responsive (and often the lowest) bidder. The Owner then enters into a contractual relationship with the contractor. The architect and contractor do not have a contractual relationship.

Advantages of this method are it is suitable for competitive bidding, has a system of checks and balances, and insurance/bonding programs are well defined. Disadvantages include diffused responsibility and project delivery may be slow. Always selecting only the lowest bidder may exclude a more qualified contractor who can deliver a better finished product.

Design / Build - this method of project delivery is used when the Owner desires a single source of contact and responsibility. Both the architect and contractor act as a single contractual entity.

The advantages for the Owner may include faster delivery time, earlier knowledge of construction costs, and lower incidence of claims. Some disadvantages include reduction of checks and balances and not as much assurance that materials and equipment of lesser quality are not being substituted without the Owner’s knowledge.

Partnering - this method of project delivery requires the owner to enter into contracts with the architect and contractor at about the same time. All three entities work together to establish the most cost effective project. This method endeavors to eliminate adversarial relationships.

Construction Management (CM) - a project delivery method where the Owner contracts directly with a Construction Management firm that in turn contracts with the trade contractors. The Owner contracts with the architect.

Advantages include preconstruction involvement by the contractor, cost savings and better scheduling. Disadvantages may include too much risk and burden on the Owner while modified CM is not very different from design / bid / build.

Contract for Services with Your Design Professional

The complexity of your project may determine what kind of contract you will have. Forms of contract include an oral contract, a written contract (letter of intent or letter agreement), a standard form contract (such as one from the American Institute of Architects, AIA), or a customized contract. The purpose of a contact is:

To appropriately allocate the risk between parties.•To avoid ambiguity in connection with the material •obligations and responsibilities between parties.To establish timelines and compensation.•

The agreement for services with your design professional should include the following elements:

Responsibilities on the project•Responsibilities of the contracting parties•The specific scope of work•Compensation for services, including additional services, •and how reimbursable expenses will be paidThe time period in which work should be performed•Under what conditions the relationship may be •terminated.

Construction requires observation to monitor that the project is being constructed according to the

permitted plans and your design intent. Eliminating this critical design service in an effort to save money may end up costing you more later to correct changes made in the field or substitutions of different products, finishes, or equipment that do not meet the design criteria.

Page 6: From woof to wow and the cats meow bacon2

Design and Construction Project Definitions and Related Information

Page 4© 2009 Bacon Group, Inc., www.BGArchitects.com, 800.961.1967 Richard S. Bacon, AIA, LEED AP BD+C, CGC

Design Professionals’ Education, Training, and Licensing

Services provided by an architect or engineer are considered professional services like those of a Certified Public Accountant (CPA), medical doctor, or attorney. In general, the following applies:

Architects have earned a professional Bachelor of •Architecture or Master of Architecture degree from a college or university that is accredited by the National Architectural Accrediting Board.

Architects have completed a three-year internship under •the supervision of a registered architect before they can sit for their licensing exams.

Architects have passed a multi-part licensing exam •administered by the National Council of Architectural Registration Boards (NCARB).

Architects are licensed and regulated by individual state •governments.

Individuals must be licensed before they are allowed to •use the title “architect.”

Most states require architects to complete continuing •education classes before license renewal.

Some states license commercial building design •architects and residential design architects separately.

Engineers and Landscape Architects are similarly •educated, tested, and licensed.

Interior Designers are similarly educated, tested, and •licensed (in some states).

Architects may offer all the same services as licensed •Interior Designers but not vice versa.

Licensing for General Contractors and construction sub-•contractors vary widely so check with your state or local construction licensing board for regulations in your area.

Additional Resources

A web search for design and construction associations will result in a myriad of choices. Listed below are sources of additional information.

American Institute of Architects, www.aia.org (There are •state and local AIA chapters, too.)

National Council of Architectural Registration Boards, •www.ncarb.org

American Society of Civil Engineers, www.asce.org•

National Society of Professional Engineers,•www.nspe.org

Construction web links, www.constructionweblinks.com •(See licensing section for links to state licensing boards.)

Associated Builders and Contractors, Inc., www.abc.org•

The Associated General Contractors of America,•www.agc.org

Design-Build Institute of America, www.dbia.org•

U.S. Green Building Council, www.usgbc.org •(sustainability design)

Green Globes, www.greenglobes.com (sustainability •design)

Richard S. Bacon, AIA, LEED AP BD+C, CGC

Rick Bacon is an architect who specializes in design for the animal care community. He works with humane sheltering, animal control, veterinary, and boarding and day care professionals to design and improve animal care facilities. Rick is the president and principal architect at Bacon Group, Inc., located in Clearwater, Florida. He is a member of the American Institute of Architects (AIA), is a registered architect in 23 states, holds a certificate from the National Council of Architectural Registration Boards (NCARB), is a LEED Accredited Professional in sustainable building design and construction, and is a Certified General Contractor in the state of Florida. Rev. 02/2013

Page 7: From woof to wow and the cats meow bacon2

Twenty Questions to Ask Your Architect

Page 1Bacon Group, Inc., www.BGArchitects.com, 800.961.1967 Richard S. Bacon, AIA, LEED AP BD+C, CGC

What does the architect see as important issues of 1. consideration in your project?

How will the architect approach your project?2.

How will the architect gather information about your 3. needs, goals, etc.?

How will the architect establish priorities and make 4. decisions?

Who from the architecture firm will be dealing with you 5. directly? Is that the same person who will be designing the project? Who will be designing the project?

How interested is the architect in this project?6.

How busy is the architect?7.

What sets this architect apart from the rest?8.

How does the architect establish fees?9.

What would the architect expect the fee to be for this 10. project?

What are the steps in the design process?11.

How does the architect organize the process?12.

What does the architect expect you to provide?13.

What is the architect’s design philosphy?14.

What is the architect’s experience / track record with cost 15. estimating?

What will the architect show you along the way to explain 16. the project? Will you see models, drawings or sketches?

If the scope of the project changes later in the project, will 17. there be additional fees? How will these fees be justified?

What services does the architect provide during 18. construction?

How disruptive will construction be? How long does the 19. architect expect it to take to complete construction?

Can the architect provide a list of client references?20.

HOW DESIGN WORKS

FOR YOU

Source: American Institute of Architectshowdesignworks.aia.org

Page 8: From woof to wow and the cats meow bacon2

Sustainability Checklist for Architects

Page 1Bacon Group, Inc., www.BGArchitects.com, 800.961.1967 Richard S. Bacon, AIA, LEED AP BD+C, CGC

SITE DESIGN AND SELECTIONSelect site near transit, daily shopping needs and •work.Select infill site – reduce sprawl.•Restore sites natural system functions.•Design for bioclimatic conditions – passive comfort •controls.

WATERConserve and reuse stormwater.•Reduce potable water consumption for non potable •uses.Reduce off-site treatment of wastewater.•Use gray water systems.•Conserve building water consumption.•

ENERGYUse alternative energies and appropriate •technologies.Reduce all energy loads.•Optimize building placement and configuration for •passive energy use.Optimize building envelope thermal performance.•Provide daylighting – all rooms lighting during •daylight.Design efficient systems.•Use efficient electric lighting systems and controls.•Maximize mechanical systems performance.•Use efficient equipment and appliances. •Use renewable or other alternative energy sources.•Simulate total building energy use.•Integrate all systems and reduce total energy use.•

INDOOR AIR QUALITY (IAQ)Minimize production and transmission of air •pollution.Zone manage controls to maximize personal •comforts. Control moisture to prevent microbial •contamination.Provide ample ventilation for pollutant control and •thermal comfort.Provide appropriate thermal conditions.•Provide effective lighting.•Provide appropriate building acoustical and •vibration conditions.Provide views, viewspace, and connection to natural •environment.

MATERIALSMinimize consumption and depletion of material •resources.Minimize the life-cycle impact of materials on the •environment.Minimize the impact of materials on indoor •environmental quality.Use materials with low environmental impact during •their life cycle production.Use salvaged and remanufactured materials.•Use recycled content products and materials.•Use materials from renewable sources distribution.•Use locally manufactured materials installation.•Use low voc-emitting materials.•Use durable materials.•

WASTEIn view of these environmental concerns, sustainable design embodies the following goals:

Minimize use of resources.•Minimize waste generated from construction, •renovation and demolition of buildings.Minimize waste generated during building •occupancy.Encourage better management of waste.•Reuse existing buildings.•Design for less material use.•Design building for adaptability.•Design building for disassembly.•

Source: American Institute of Architects

Page 9: From woof to wow and the cats meow bacon2

Cost Estimates

Page 1© Bacon Group, Inc., www.BGArchitects.com, 800.961.1967 Richard S. Bacon, AIA, LEED AP BD+C, CGC

Example of Preliminary

Cost Estimate by construction

specification divisions.

COST ESTIMATES

Preliminary Cost Estimate

Bank/Finance Cost Estimate

Schematic Design Phase

Design Development Phase

Construction Documents Phase

Construction Bid Estimate

Guaranteed Maximum Price (GMP)

This is the last estimate provided by the design team and is the closest estimate without formal bidding. Contingency should be around 5%.

This estimate reflects the actual bid prices provided by the contractor or construction manager prior to any negotiations.

This is the final construction price after negotiations. This will be the basis of the contract for construction.

These are done at the beginning of a project once a program and space needs analysis is complete. For an animal shelter facility, this estimate should reflect your programs and services provided.

This is an estimate that might be required by the bank if you are seeking financing. It is not an accurate estimate since the estimate is based on very preliminary design.

This estimate is usually a per square foot estimate reflecting this level of design and material concepts.

The Design Development estimate is a more detailed and accurate. It should now include quantities and labor based on specification divisions. It should also better define additional costs such as overhead, profit, bond, etc.

Cost estimates increase in accuracy

as the design documents progress.

The most accurate estimate is obtained through construction

estimating and bidding.

16-Feb-13

Division Item Total

DIVISION 2 - SITE WORK 60,000.00DIVISION 3 - CONCRETE 130,000.00DIVISION 4 - MASONRY 215,000.00DIVISION 5 - METALS 125,000.00DIVISION 6 - WOOD AND PLASTICS 70,000.00DIVISION 7 - THERMAL AND MOISTURE PROTECTION 260,000.00DIVISION 8 - DOORS, WINDOWS AND GLASS 50,000.00DIVISION 9 - FINISHES 120,000.00DIVISION 10 -SPECIALTIES 80,000.00DIVISION 11 - EQUIPMENT 50,000.00DIVISION 12 - FURNISHINGS 25,000.00DIVISION 13 - SPECIAL CONSTRUCTION 180,000.00DIVISION 14 - CONVEYING SYSTEMS 0.00DIVISION 15 - MECHANICAL FIRE PROTECTION 50,000.00 PLUMBING 225,000.00 HVAC 300,000.00DIVISION 16 - ELECTRICAL 200,000.00Building Sub-Total $2,140,000.00

Contractor General Conditions (10%) 214,000.00Subtotal $2,354,000.00

Contractor's OH&P (5%) 117,700.00Design Contingency (10%) 235,400.00Subtotal $2,707,100.00

P & P Bond & Insurance (0.025%) 67,677.50Estimate $2,774,777.50

Cost per Square Foot $184.99

Prepared by Bacon Group, Inc., February 16, 2013

Note: This cost estimate is a format example for a preliminary cost estimate and is not representative of all projects.

Fantasy Humane Society New ShelterExample Preliminary Cost Estimate

Page 10: From woof to wow and the cats meow bacon2

Cost Estimates

Page 2© Bacon Group, Inc., www.BGArchitects.com, 800.961.1967 Richard S. Bacon, AIA, LEED AP BD+C, CGC

February 18, 2013

Project: Your Humane Society (new + renovation construction) BG13-007Format Example for a Preliminary Cost Estimate Richard S. Bacon, AIA

Items Quantity Unit Material Line Total

Training FacilityTraining Center, Public Seating, Storage, etc. 7,140.00 S.F. $150.00 $1,071,000.00Foyer, Restrooms, Mechanical/Electrical Rooms, Etc. 1,326.00 S.F. $175.00 $232,050.00

Subtotal Training Facility 8,466.00 $1,303,050.00$153.92

Dog Housing AreasSuites / Housing, Socialization Areas, Staff Areas, etc. 4,240.00 S.F. $250.00 $1,060,000.00Circulation 2,884.00 S.F. $125.00 $360,500.00

Subtotal Dog Housing Facility 7,124.00 $1,420,500.00$199.40

Cat Boarding FacilityFree Roaming, Housing Rooms, and Staff Areas, etc. 3,850.00 S.F. $250.00 $962,500.00Circulation 2,809.00 S.F. $125.00 $351,125.00

Subtotal Cat Housing Facility 6,659.00 $1,313,625.00$197.27

Administration Facility Renovation/AdditionRenovations 2,930.00 S.F. $200.00 $586,000.00Addition (Conference Room, Vestibule, etc.) 575.00 S.F. $187.50 $107,812.50

Subtotal Administration Renovation/Addition 3,505.00 $693,812.50$197.95

Sub-Total 25,754.00 $4,730,987.50

Estimate Contingency (10%) $473,098.75Total Construction Estimate $5,204,086.25

Average Cost per Square Foot $202.07of all affected areas including the new facilities and the renovation/addition

Example Preliminary Cost Estimate

Bacon Group, Inc.

Example of Preliminary Cost Estimate using per square foot cost applied to gross

square feet per area.

Page 11: From woof to wow and the cats meow bacon2

BA

CO

N G

RO

UP

, IN

C.

PR

OJE

CT

SCH

EDU

LE

Aw

ard

Co

ntr

act

Site

& B

uild

ing

Pro

gram

min

g

Site

Su

rvey

& G

eote

chn

ical

Inve

stig

atio

n

Sch

emat

ic D

esig

n P

has

e

Co

nst

ruct

ion

Co

st E

stim

ate

Ow

ner

Rev

iew

& A

pp

rova

l

Des

ign

Dev

elo

pm

ent

Ph

ase

Dra

ft S

pec

ific

atio

ns

Co

nst

ruct

ion

Co

st E

stim

ate

Ow

ner

Rev

iew

& A

pp

rova

l

Co

nst

ruct

ion

Do

cum

enta

tio

n

Fin

al S

pec

ific

atio

ns;

Fin

al Q

A/Q

C

Co

nst

ruct

ion

Co

st E

stim

ate

Ow

ner

Rev

iew

& A

pp

rova

l

Pre

par

e &

Su

bm

it f

or

Site

Per

mit

tin

g

Bu

ildin

g P

erm

itti

ng

Bid

Ad

vert

isin

g

RFI

Rev

iew

& A

dd

end

um

Bid

Neg

oti

atio

n &

Rec

om

men

dat

ion

Ow

ner

Ap

pro

val

Co

nst

ruct

ion

Ph

ase

10

-12

mo

nth

s

Sub

stan

tial

Co

mp

leti

on

Pu

nch

Lis

t

Clo

se-O

ut

Do

cum

enta

tio

n

Co

nst

ruct

ion

Ph

ase

Sch

ed

ule

d T

asks

/ M

ilest

on

es

Mo

nth

9M

on

th1

0M

on

th 1

2Q

uar

ter

1

Bid

& N

ego

tiat

ion

Pla

nn

ing

& D

esig

n P

has

e

Year

2 (

Qu

arte

rs)

Qu

arte

r 3

Qu

arte

r 4

SAM

PLE

PR

OJE

CT

DES

IGN

SC

HED

ULE

Mo

nth

6M

on

th 1

Mo

nth

2M

on

th 3

Mo

nth

4M

on

th 5

Mo

nth

7M

on

th 8

Year

1 (

Mo

nth

s)

Qu

arte

r 2

Mo

nth

11

Page 12: From woof to wow and the cats meow bacon2
mbacon
Typewritten Text
EXAMPLE OF A DESIGN SCHEDULE
Page 13: From woof to wow and the cats meow bacon2
Page 14: From woof to wow and the cats meow bacon2

This page is left blank on purpose.

Page 15: From woof to wow and the cats meow bacon2

Materials and Equipment - Animal Care Facilities

Page 1© Bacon Group, Inc., www.BGArchitects.com, 800.961.1967 Richard S. Bacon, AIA, LEED AP BD+C, CGC Page 1

Vinyl Composition TileCost Per SF: $•Suppliers: Armstrong, Azrock and Tarkett (see below)•

Sheet VinylCost Per SF: (Can vary from reasonable to astronomical) $$ - $$$$•Suppliers: Armstrong (www.armstrong.com)•

Forbo, Marmoleum (www.forbo.com)•Tarkett Granit Acoustiflor (www.tarkettna.com)•Mondo Flooring (www.mondoworldwide.com)•

Porcelain TileCost Per Square Foot: $$$•Suppliers:•

Dal-Tile Corporation (www.daltile.com)•American Olean Tile Co. (www.americanolean.com)•Crossville (www.crossvilleinc.com)•StonePeak Ceramics (www.stonepeakceramics.com)•

Quarry TileCost Per SF : $$•Suppliers: American Olean, Dal-Tile Corporation, Lafaenza, Florida Tile, •and Buchtal

Ceramic TileCost Per SF: $$•Suppliers: American Olean, Dal Tile, Lafaenza, Florida Tile, and Buchtal, •StonePeak Ceramics, among others

GroutsCost Per SF: $•Suppliers: Latapoxy SP100 Epoxy Grout, Laticrete Adhesive #4237, and •Mapei Karapoxy (www.laticrete.com)

Resinous FlooringCost Per SF: $$$•Suppliers:•

Stonhard (www.stonhard.com)•Sika Corp. (http://usa.sika.com)•Dur-a-flex, (www.dur-a-flex.com)•Dex-O-Tex, Cheminert, Neotex (www.dex-o-tex.com)•

TerrazzoCost Per SF: $$$•Vendors like Dex-O-Tex, have a plastic epoxy poured terrazzo-type product •that is far less expensive than real terrazzo, yet is as durable.

Flooring MaterialsResinous Flooring (See above)•Concrete Sealers, Colors and Hardeners •Integrally colored concrete:•Suppliers:

True Tone Cement Colors (Davis Colors)Solomon Grind (Chemical Service)

Cost Scale$ = least expensive$$$$ = most expensive

When choosing materials

remember theCost Triangle:

Quality vs. Maintenance vs.

Location

Cost

MaterialLocation

Quality

Maintenance

Flooring Materials

Kennel / Cages / CondoDog & Cat Housing Materials

COST TRIANGLE

Page 16: From woof to wow and the cats meow bacon2

Materials and Equipment - Animal Care Facilities

Page 2© Bacon Group, Inc., www.BGArchitects.com, 800.961.1967 Richard S. Bacon, AIA, LEED AP BD+C, CGC Page 2

Nonmetallic Grit:•Supplier: The Burke CompanyDry Shake, Nonmetallic Hardeners: •Suppliers:

Dry Shake (Sonneborn)•Colorcron (Master Builders)•Tnemec•

Acid Staining, Supplier: L.M. Scoffield•

Wall MaterialsStructural Glazed Tile or Structural Glazed Brick•Suppliers:

Elgin-Butler•Astra-Glaze (Trenwyth Industries)•Hanley Brick•Spectra Glaze, the Burns and Russell Company•

Fiberglass Wall Board / FRP •Suppliers:

Glasboard (Crane Composites)•Glasboard (Kemlite)•Dipcraft MFG (Braddock, PA)•Earth Science•

Glass Block Walls•Suppliers:

Pittsburgh Corning•Altempco (Amiran)•

Cages, Modular Kennel Systems, EquipmentSuppliers:

Clark Cages (800.461.9972, www.clarkcages.com)•LGL Animal Care Products (979.690.3434, www.lglacp.com)•Mason Co. (800.543.5567, www.masonco.com)•Shor-line / Schroer Manufacturing (800.444.1579, www.Shor-line.com)•Snyder Manufacturing (800.422.1932, www.snydermfg.com)•Suburban Surgical Company (800.323.7366, www.suburbansurgical.com) •T Kennel System (888.551.4060, www.t-kennel.com)•The Cat’s Inn (877.228.7466, www.thecatsinn.com)•Tri-star Metals, Inc. (877.459.7827, www.tristarvet.com) and Direct •Animal Products (www.directanimal.com)VSSI Kennels (800.299.9525, www.vssi.com)•

Other:Companion Habitats (pocket pets, reptiles, etc. (888.831.1226,•www.companionhabitats.com)Cat Fence-In (888.738.9099, wwwcatfencein.com)•Houndquarters (custom dog doors) (480.502.9622, www.houndquarters.com)•PurrfectFence (888.280.4066, www.PurrfectFence.com)•

(continued)Kennel / Cages / Condo

Dog & Cat Housing Materials

Cost Scale$ = least expensive$$$$ = most expensive

Page 17: From woof to wow and the cats meow bacon2

Materials and Equipment - Animal Care Facilities

Page 3© Bacon Group, Inc., www.BGArchitects.com, 800.961.1967 Richard S. Bacon, AIA, LEED AP BD+C, CGC

Sound BlockCost Per SF: $$ - $$$•

Acoustical DecksMost deck manufacturers fabricate decking•

Acoustical PlastersCost Per SF: $$$•Manufacturers:•

Pyrok•3-M acoustical spray•

Sound Absorbing Wall PanelsCost Per SY: $$•Suppliers:•

Soundsoak (Armstrong)•Softscape, Capaul, Acoustiflex Corp.•Acoustone Space Units, US Gypsum•Silent Auratone Panels, US Gypsum Company•Tectum, Inc.•

Sound Stop FiberboardCost Per SY: $$•Suppliers:•

Knight - Celotex (www.blueridgefiberboard.com)

Epoxy Paint:Cost Per SF: $•Supplier:•

Tile & Epoxy Coating•Porter International•Tile Clad II (Sherwin Williams)•Try-Glaze 4, Gloss or Semi-Gloss (Moore)•

Acoustical Paints: Latex Acoustical Ceiling and Wall Paint with ceramic micro-spheres and •special sound absorbing filters AND additives that can be mixed with regular paintManufacturer: Hy-Tech Thermal Solutions •

Painted DrywallSuspended Acoustical Tile

Cost Per SF: $1.00, or more if patterned.•Suppliers: Armstrong, US Gypsum Company, Owens Corning, Celotex•

Floor Drains SystemsFlushing Floor Drains: The Sani-ceptor flushing floor drain is the •most commonly used drain. It is 14 inches in diameter with a hinged, perforated grate cover. The inside of the drain is porcelain enamel. The important benefit of this drain is that it can be flushed from controls on the wall so solids can be forced out of the system, which includes out of the P-trap.

Paints/Coatings

Ceiling Finishes

Special Systems or Equipment

Cost Scale$ = least expensive$$$$ = most expensive

Acoustical Materials

Page 18: From woof to wow and the cats meow bacon2

Materials and Equipment - Animal Care Facilities

Page 4© Bacon Group, Inc., www.BGArchitects.com, 800.961.1967 Richard S. Bacon, AIA, LEED AP BD+C, CGC

Trench Drains: Hydraulic Trench Systems, such as those from ACO •Polymer Products (800.543.4764, www.acousa.com) or Polydrain Trench Drain System (800.438.6057, abtdrains.com), have been used successfully in canine runs. These can be installed for each individual run so cross-contamination is eliminated.

Individual Kennel Drains: Separate drains in each run are an alternative •that reduces the chance of cross-contamination and eliminates the mechanical parts of the above system. Six-inch diameter drains are the smallest indicated unless ALL solids are to be collected before washing the run; with a solid-removal program, four-inch drains are usually adequate. A drawback is the staff washes toward one small target.

Drain Covers: Materials include plastics to stainless steel with stainless •preferred.

Plants and GreeneryDon’t forget plants. They add color, help with acoustics and scale, and provide comfort for animals and people.

Incinerators & CrematoriumsCost: $15,000 and up installed.Suppliers:

B&L Cremation Systems (800.622.5411 www.blcremationsystems.com)•Onex (800.282.6639, www.onexnet.com)•NCE-Crawford-EMCOTEX (800.228.0884, www.animal-creamation.com)•Matthews Cremation Division (888.726.1474,•www.matthewscremation.com)Shenandoah Manufacturing / Agile Mfg., Inc. (800.704.7356,•www.shenmfg.com)Therm-tec (800.292.9163, www.thermtec.com)•

Note: Do not forget: most of these vendors will guarantee local environmental clearance as part of the sale. Make them put the guarantee in writing!

Glass/windows/store-front systemsAdds more light, opens facility and allows viewing of pet care areas, surgery, grooming, boarding, etc.

Corner GuardsSuppliers:

Acrovyn •Tepromark International•

Notes: As with all such information, manufacturer’s names, phone numbers and 1.prices are guaranteed to change!

Many of the products listed here are used for our environmental and 2.sustainable design projects; however, this is not a “green” list of materials.

Other vendors for the pet care market can be found in The Humane Society 3.of the United States’ Shelter Pages catalog. http://marketplace.animalsheltering.org/product/shelter

Richard S. Bacon, AIA, LEED AP BD+C, CGC

Rick Bacon is an architect who specializes in design for the animal care community. He works with humane sheltering, animal control, veterinary, and boarding and day care professionals to design and improve animal care facilities. Rick is the president and principal architect at Bacon Group, Inc. located in Clearwater, Florida. He is a member of the American Institute of Architects (AIA), is a registered architect in 23 states, holds a certificate from the National Council of Architectural Registration Boards (NCARB), is a LEED Accredited Professional in sustainable building design and construction, and is a Certified General Contractor in the state of Florida. Rev. 02/16/2013

(continued)Special Systems or Equipment

Page 19: From woof to wow and the cats meow bacon2

Tips for Selecting a Contractor

Page 1© 2009 Bacon Group, Inc., www.BGArchitects.com, 800.961.1967 Richard S. Bacon, AIA, LEED AP BD+C, CGC

Use a local contractor who will have to live in the community •after the project is finished. Local reputation is everything for a contractor who makes his/her living in the community.

Choose a contractor whose volume of business is •approximately three times your project’s value. This way your project will be a significant part of his/her business. On the other hand you don’t want a contractor that is so small that your project represents most of his/her business. If the contractor has problems on the job he/she must have the resources to correct the problem and finish the project.

Visit projects completed by the prospective contractors and •talk with the owners. Did the contractor finish on time; did the contractor take care of the punch list in a timely manner; and did the contractor come up with a lot of extra charges?

Does the contractor self-perform much of his/her own work? •Contractors who self-perform more of the work simply have more control of the project.

Choose a contractor who has experience building the type of •end-use intended for your project.

(Note: This is not always an option when constructing an animal care facility. If you are not hiring a designer or contractor that specializes in animal care facilities, compare projects that are similarly complicated such as medical / hospital, institutional / laboratory, and small manufacturing facilities. Knowledge of the requirements and installation of specialized clean environments, HVAC systems, floor finishes, and wall finishes are key.)

Don’t just choose the low bidder. Many times the low bidder •did not really study the plans and specs or they desperately need a job for financial reasons. You should closely evaluate bids when there is a 7% difference between the lowest bidder and the next highest bidder.

Verify the contractor’s bonding capability.•

Original Source: From Architectural Record forum on-line, posted 7/2/08; McGraw Hill Construction. Edits / notes by Bacon Group, Inc.

Page 20: From woof to wow and the cats meow bacon2

Contractor Reference Check

Page 2© 2009 Bacon Group, Inc., www.BGArchitects.com, 800.961.1967 Richard S. Bacon, AIA, LEED AP BD+C, CGC

Contractor Name:

Project Name:

Name of Reference:

Date:

Did the contractor meet the construction schedule? If not, was the reason due to the architect 1.or owner or contractor and what caused the delay?

Were there any change orders during construction? If so, what was the basis of the change 2.order(s)?

Were there any problems with the project that the contractor was responsible for causing?3.

Were there any warranty issues that the contractor failed to take care of?4.

Would you hire the contractor again? If so why? If not, why not?5.

Signature of person checking reference:

Page 21: From woof to wow and the cats meow bacon2

Additional Resources & Workshop Presentations

Page 1Bacon Group, Inc., www.BGArchitects.com, 800.961.1967 Richard S. Bacon, AIA, LEED AP BD+C, CGC

These resources are available from Bacon Group. Contact Mindy Bacon at 727.725.0111 or email [email protected].

Bacon Group’sBasic Guide to Reading Architectural Drawings.

Please note that Rick Bacon’s presentations may not be available until after the conference.

We recommend you download ASV’s Guidelines for Standards of Care in Animal Shelters. It contains a lot of valuable recommendations related to facility design and primary enclosures for animals. Association of

Shelter Veterinarianshttp://www.sheltervet.org/

To learn more about Bacon Group and its design work for the animal care community.

Bacon Group, Inc. Architecturewww.BGArchitects.com•www.S3Shelters.com•Find us on Facebook•Bacon Group, Inc. Architecture

Page 22: From woof to wow and the cats meow bacon2

Rick Bacon, AIA

HSUS Animal Care ExpoShelter Design Workshop

Nashville, May 8, 2013

Works

hop

Hand