from material balance to operational accounting...the role of data reconciliation and material...
TRANSCRIPT
From Material Balance to Metallurgical and Operational Accounting
Luis YacherSigmafine Users ConferenceSan Francisco, April 23, 2012
AGENDA
CONTEXT, the Overall Picture
The Role of Data Reconciliation and Material Balance
Data Reconciliation and Material Balance, AMIRA Reference Model
Data Reconciliation and Material Balance, Execution Fast Tour
The CORE, the Process Model
The CORE, the ENHANCED Process Model
The System Architecture
Met Accounting Implementation
SF in M&M
CONTEXT, Met. & Op. Accounting, the Overall Picture
Business Systems
Total Values
Avg, Cummulated
Production Stats.
Real vs. ProgramOperational KPI
Line/Area Values
Process Values
Consumables
?What isneeded in ?
Inventories
the gap?
Real time DataLab DataMine Systems DataEquipment Data
LevelsOre
CharacteristicsDown Times
PROCESS
FlowsAnalysis
CONTEXT, Met. & Op. Accounting, the Overall Picture
Business Systems
Total Values
Avg, Cummulated
Production Stats.
Real vs. ProgramOperational KPI
Line/Area Values
Process Values
Consumables
Operational ContextsData Validation Aggregation
Inventories
Functional contexts
Info. Workflow Mgmt.
Adjustments
Reconciliation
Calculations
KPI´s calcs
Real time DataLab DataMine Systems DataEquipment Data
LevelsOre
CharacteristicsDown Times
PROCESS
FlowsAnalysis
The Role of Data Reconciliation and Material Balance
…just in one slide
For:For:
• Material Flows, Inventories and Analysis• Process Water, Water make-up, Inventories and
consumptions To get a single, To get a single, p• Effluents
From Mine to Port:
For every process area and line
g gobjective and shared version of the truth
g gobjective and shared version of the truth
• For every process area and line• For every critical process
HOW?HOW?
Starting from:• Real time Data• Lab Data
A formalprocedure to
That complies with the following basic principle:
what i
what t
Inventory 0+- =• Mine Systems Data• Equipment Data
get a set of data
goes in goes out variation
Data Reconciliation and Material Balance, AMIRA Reference Model
• DATA IS AN ASSET• DATA IS SHARED AND ACCESIBLE• DATA QUALITY IS FIT FOR PURPOSE• DATA QUALITY IS FIT FOR PURPOSE• DATA IS SECURE• DATA IS NOT DUPLICATED
(AMIRA P754)
Data Reconciliation and Material Balance, AMIRA Reference Model
BALANCEMET ACCOUNTING MODEL
DATAMANAGEMENT
REPORTING TRACEABILITY
Data Results Meta Data
Data Reconciliation and Material Balance, AMIRA Reference Model
Data Collection
Data Processing
Data Validation
Data PreFilteringCollection Processing ValidationPreFiltering
DATA MANAGEMENT MET ACCOUNTING MODEL
Error Identification
Errors Calculation
BALANCE
Close and Publish
Reconcilation Results Analysis
MET ACCOUNTING MODEL
Data ManagementData Reconciliation and Material Balance, AMIRA Reference Model
DATA COLLECTION (ENTRY)
DATA COLLECTION FROM VARIOUS SOURCES (SCADA, Plant Historian, LIMS)
PIAF – Data References (PI, SQL Queries, Ad‐Hoc queries)
AUDITABLE DATA ENTRY
• Manual Checks• Range Checking• Double entry and validationy
Data ManagementData Reconciliation and Material Balance, AMIRA Reference Model
DATA PREFILTERING
• NO DATA AVAILABLE (Instrument maintenance Interface Error DCS Error etc )NO DATA AVAILABLE (Instrument maintenance, Interface Error, DCS Error, etc.)• Use the last value• Use the average for the last x‐values• Use signal from close meterg
PIAF – Analysis RulesPIAF Analysis RulesPIAF ‐ FormulasPI‐ACE
Data ManagementData Reconciliation and Material Balance, AMIRA Reference Model
DATA PROCESSING
• AGGREGATE DATA• CALCULATE ESTIMATORS (VIRTUAL SENSORS)
PIAF – Analysis RulesPIAF ‐ FormulasPIAF FormulasPI‐ACE
Data ManagementData Reconciliation and Material Balance, AMIRA Reference Model
DATA VALIDATION
• CHECK DATA BEFORE RECONCILIATION• CHECK DATA BEFORE RECONCILIATION• AUTHORIZED CHANGES
PIAF – Tools‐ Excel Add‐InnExcel Add Inn‐ Ad‐Hoc functions
Data ManagementData Reconciliation and Material Balance, AMIRA Reference Model
ERRORS ID AND CALCULATIONS
DEFINE TOLERANCES BASED ON STATISTICAL ANALYSIS• DEFINE TOLERANCES BASED ON STATISTICAL ANALYSIS
Variogram Application
Metal BalanceData Reconciliation and Material Balance, AMIRA Reference Model
MET ACCOUNTING MODEL
• PRIMARY – SECONDARY ACCOUNTING MODELSPRIMARY SECONDARY ACCOUNTING MODELS• MODELING DIFFERENT PROCESS (Concentrators, Smelters, Refineries, Leaching, SX‐EW, etc.)• HANDLE MODEL CHANGES (Model Versioning)
SIGMAFINE – Templates and Elements
PROCESS BOOK Representation
Metal BalanceData Reconciliation and Material Balance, AMIRA Reference Model
RECONCILIATION
SOLVER FOR MASS AND ASSAYS ADJUSTMENTS SOLUTION• SOLVER FOR MASS AND ASSAYS ADJUSTMENTS SOLUTION
SIGMAFINE ALGORITHM
2Ν
)Rawi - Reconciledi
Absolute Tolerancei(ΣMinimize )Absolute Tolerancei(Σ
i = 1
Metal BalanceData Reconciliation and Material Balance, AMIRA Reference Model
RESULTS ANALYSIS
• ADJUSTMENTS REVIEWADJUSTMENTS REVIEW• GROSS ERROR DETECTION• BIAS DETECTION• IMBALANCE ANALYSIS
SIGMAFINE TOOLS
• Test1, Test2 statistical parameters for i bl d i ti l tivariable deviation evaluation
• Test3, Test4 statistical parameters for imbalance evaluation• Influence determination
Meter 18
-30.00
-20.00
-10.00
.00
• Influence determination
y = 0.7732x - 13.639-90.00
-80.00
-70.00
-60.00
-50.00
-40.00
-100.00 .00meter18 Linear (meter18)
Meter 8
650.00
700.00
750.00
Meter 11550.00
y = 0.6773x + 121.01400.00
450.00
500.00
550.00
600.00
350.00
400.00
450.00
500.00
600.00 700.00 800.00meter8 Linear (meter8)
y = 1.3984x - 196.99 y = 0.9556x - 15.071300.00
300.00 400.00 500.00 600.00
meter11 Linear (meter11) Linear (meter11)
SCM SFData Reconciliation and Material Balance, Execution Fast Tour
Shall be a “MET” user experience
EXECUTE
REVIEW (Audit)
CONFIGURE
17
Data Reconciliation and Material Balance, Execution Fast Tour
SELECT (CREATE) A BALANCE CASESELECT (CREATE) A BALANCE CASE
18
Data Reconciliation and Material Balance, Execution Fast Tour
Analysis Functions
Balance FunctionsRun and Publish Functions
19
Data Reconciliation and Material Balance, Execution Fast Tour
Initial ImbalancesInitial Imbalances (Overview)
22
Data Reconciliation and Material Balance, Execution Fast Tour
Initial Imbalances (Detail)Initial Imbalances (Detail)
23
SCM SF – AnalysisData Reconciliation and Material Balance, Execution Fast Tour
DeviationsDeviations
24
SCM SF – Raw DataData Reconciliation and Material Balance, Execution Fast Tour
Reviewing the DataReviewing the Data
Escritorio SF – Auditoría ToleranciasData Reconciliation and Material Balance, Execution Fast Tour
Reviewing the TolerancesReviewing the Tolerances
26
The CORE, the Process Model
A PI-AF(SF) model of:
• Process Flows• Flows characterizations• Inventories
• Measurements
• Sources of data
• Data processing methods
• Calculation RULES• Calculation RULES
• Balance RULES
The CORE, the ENHANCED Process Model
Met. Accounting Rules and Processes
Op. Accounting Rules and Processes
Base (SF-AF) Model
Reconciled (balanced) values of:
Base (SF-AF) Model
Reconciled (balanced) values of:
Context (Model) related values of:
• Program
Context (Model) related values of:
• Program
Processes Processes
Reconciled (balanced) values of:
• Material flows & Composition• Inventories & Composition
Water s ppl reco er se
Reconciled (balanced) values of:
• Material flows & Composition• Inventories & Composition
Water s ppl reco er se
• Target• Target
Context (Model) related values of:Context (Model) related values of:+• Water:supply-recovery-use-inventory.
Contextual reference to:
• Water:supply-recovery-use-inventory.
Contextual reference to:
• Key consumablesSteelEnergyReagents
• Key consumablesSteelEnergyReagents
+Traceability & Data Quality fit for purpose:
• Values from instrumentsV l f i t
• Real time and history of related measurements and lab data
• Real time and history of related measurements and lab data
Reagents
• Key asset KPIAvailabilityUse
Reagents
• Key asset KPIAvailabilityUse
• Values from inventory variation
• Values from the ERP
SCM SFThe System Architecture
M tData CollectionD t P Filt i OpMet
Accounting Rules & Processes
Data Pre FilteringData ProcessingData ValidationError Id and CalculationAnalysis Results
Op. Accounting Rules & Processes
SIGMAFINE
ocessesy
PI-AF ENHANCED MODELMetadata
PI LIMS OTHERS
The System Architecture
Business Systems
Total Values
Avg, Cummulated
Production Stats.
Real vs. ProgramOperational KPI
Line/Area Values
Process Values
Consumables
Operational Contexts
Functional contexts
Data Validation
Adjustments
Aggregation
Calculations Functional contexts
Workflow
Adjustments
Reconciliation
Calculations
KPI´s calcs
Real time DataLab DataMine Systems DataEquipment Data
Inventories
LevelsOre
CharacteristicsDown Times
PROCESS
FlowsAnalysis
The System Architecture
Business Systems
Total Values
Avg, Cummulated
Production Stats.
Real vs. ProgramOperational KPI
Line/Area Values
Process Values
Consumables
Real time DataLab DataMine Systems DataEquipment Data
Inventories
LevelsOre
CharacteristicsDown Times
PROCESS
FlowsAnalysis
Met Accounting Implementation
Process Model Definition
Execution, validation and publishingpublishing procedures
Met Accounting Implementation
Process Definitions Model Definitions
Model Analysis• Solvability • Redundancies • Consistency
PROJECT METHODOLOGY REFERENCEREFERENCE
Activity Site Responsible DeliverablesKickoff Meeting Customer Site SF - Customer - Scope
Functional Specs- Functional Specs.
System Platform and Infrastructure
Customer Customer - Prepared Infraestructure for the System
Data Gathering Documents
SF SF - Flowsheet Diagram- Data Gathering Spreadsheets- Data Gathering Spreadsheets
Data Gathering Customer Customer - Complete Data Gathering Spreadsheets
Preliminary Model and Redundancy Test
SF- One / two weeks in
SF - Preliminary Modely
customer site for Model adjustments
Prepare Data for Model Validation
Customer Customer - Data for Model ValidationModel Validation
Model Validation SF- One/two weeks in customer site for final model adjustments
SF - Model validated
adjustments
Model installation Customer Site SF - Customer - Model installed
SF in M&M
Copper-Moly Conc. Smelter Refinery Leaching SX/EWCopper MolyCodelco-North * * * * *Codelco-Andina *Codelco-Teniente * *Antofagasta Minerals-MLP *Xstrata&AngloCollahuasi * * *KUCC-Pilot * *
GOLD Conc. Leahing Carbon in Column
Merrill Crowe
Smelter
Plant XX (project in * * * * *progress)
SF in M&M
Xstrata&Anglo Collahuasi
Antofagasta Minerals-MLP
Fresh water supply, consumptions, water recovery
Luis [email protected]