  • 8/10/2019 Fort York Bridge-Display Boards for Jan 8 Meeting

    1/10

    C O M M U N I T Y I N F O R M A T I O N M E E T I N G

    Please sign in!

    Provide your email address if you would like to be kept

    informed of project updates and meetings.

    WELCOM

    January 8, 20156:30 to 8:30 pm

    Fort York

    Pedestrian and Cycle Bridge

  • 8/10/2019 Fort York Bridge-Display Boards for Jan 8 Meeting

    2/10

    F O R M A T O F T H E M E E T I N G

    Please feel free to review the Project Boards 1 - 9 at your own pace and speak with the teammembers stationed throughout the room.

    Capturing Your Thoughts

    What is important to you about the Fort York Pedestrian and CycleBridge?

    There are 3 ways for you to provide us with feedback:

    1. Provide your feedback on Post Itnotes directly onBoard 8.

    2. Fill out a comment sheetand provide to the project teambefore you leave.

    3. Send us an email at [email protected]

    1

  • 8/10/2019 Fort York Bridge-Display Boards for Jan 8 Meeting

    3/10

  • 8/10/2019 Fort York Bridge-Display Boards for Jan 8 Meeting

    4/10

    Preliminary

    DesignDetailed

    DesignConstructionBid

    BidConceptualDesign via

    RFP

    Detailed

    DesignConstruction

    TRADITIONAL METHOD

    DESIGN/BUILD METHODAgency/Consultant

    Contractor

    Bid

    LEGEND

    Qualifi-

    cations

    Technical

    Proposal

    24 -30 months

    36 - 42 months

    D E S I G N - B U I L D M O D E L

    What is a Design-Build Model?A project delivery method in which the design and construction services are contractedfrom a single entity known as the design-builder. This model gives the design-builderflexibility and the responsibility to design and construct based on a set of requirementsand a fixed budget.

    How the Design-Build Model

    Best Supports the Needs of

    Fort York Pedestrian and Cycle

    Bridge:

    Single point of responsibility helps tominimize risks to the City.

    Reduces the overall project time frame.

    Provides opportunity for design innovationand budget management within technicalrequirements.

    3

  • 8/10/2019 Fort York Bridge-Display Boards for Jan 8 Meeting

    5/10

    BUILDTORONTO

    CitysWa

    terfrontSecreta

    ria

    t

    Design-Build

    er

    MMMGroupLimited

    City ofToronto

    P R O J E C T T E A M

    MMM Group Limited, a leader in thetransportation industry, was retained byBUILD TORONTOas the Owners Advisor andresponsible for:

    Community consultation process Design oversight Construction oversight Scheduling and management of the proje Quality checking of all work

    4

    The City of Toronto directed BUILDTORONTOto work with the Citys WaterfrontSecretariat on this project and is responsiblefor:

    Input to the performance baserequirements

    Assistance with evaluation Future maintenance

    BUILD TORONTO, an independentdevelopment investment corporationestablished by the City of Toronto, isresponsible for:

    Overall delivery of project Management of design-build process and

    procedures

    Reviewing and providing analysis ofRequest for Supplier Qualifications andRequest for Proposals

  • 8/10/2019 Fort York Bridge-Display Boards for Jan 8 Meeting

    6/10

    K E Y M I L E S T O N E S 5

    RFSQ

    Issued

    Oct

    14

    RFP

    Closes

    Award of

    Contract

    Community

    Information

    Meeting(Design Concepts)

    Constructio

    Completed

    Dec

    19

    Apr

    30

    Jun

    Summer Spring

    Construction

    Start

    Fall

    RFSQ

    Closes

    Nov

    17

    Shortlisted

    Bidders

    Finalized

    Dec

    22

    WE

    ARE

    HERE

    Jan

    8

    Community

    Information

    Meeting(Updated Process)

    RFP

    Issued

    Jan

    15

    Sept

    Tentative

    Community

    Information

    Meeting(Construction Information)

    EA Addendum

    Finalized

  • 8/10/2019 Fort York Bridge-Display Boards for Jan 8 Meeting

    7/10

    D E V E L O P M E N T O B J E C T I V E S

    Development Objectives

    Foster a new connection for communities aroundFort York

    Deliver a visually appealing, functional bridgedesign

    Focus on cost-effective design that falls within theCity of Torontos fixed project budget

    Evoke high quality urban design while meeting alltechnical and quality requirements

    Honour the history of Fort York and Garrison Creek

    Take into consideration previous and current publiccomments

    6

    Project Challenges

    Strict project budget

    Complex timeline that is coordinated with the

    surrounding development initiatives

    Technical requirements (elevation, air rights

    above rail, national historic site)

    Construction over active rail lines andpedestrian/cyclist/vehicle interaction

    Material selection to construct visuallyappealing bridge that compliments the

    surroundings

  • 8/10/2019 Fort York Bridge-Display Boards for Jan 8 Meeting

    8/10

    |Desig

    nVision

    |

    InnovativeIdeas|

    |Con

    structabi

    lity |IntegrationofGoals|

    |WithinBud

    get|Cost

    SavingsthroughInn

    ovatio

    n|

    |Work

    Schedu

    le

    |

    ResourceM

    anagem

    ent|

    |Consultat

    i on&

    Communicatio

    n|

    |Const

    ructi

    on

    Managem

    ent|

    |Safe

    tyand

    Ris

    kM

    an

    agem

    en

    t

    |

    Si

    te

    Challenges

    |

    |ValueforMoney|

    DESIGN

    PRICE

    CONSTRUCTI

    ON

    PROJECT

    M

    ANAGEMENT

    EVALUATION

    CRITERIA

    E V A L UAT I O N C R I T E R I A

    The three proposals will be evaluatedagainst the established criteria by aCommittee comprised of members fromboth the City and private sector.

    A weighting system will be applied inorder to ensure that the key developmentobjectives of connectivity, visual appealand high quality urban design are achievedwithin the fixed budget.

    7

  • 8/10/2019 Fort York Bridge-Display Boards for Jan 8 Meeting

    9/10

    SOUTH STANLEY PARK

    EXTENSION

    TO BE DEVELOPED AS A SMALL

    MUNICIPAL PARK EXTENDING

    STANLEY PARK ON THE

    IMMEDIATE NORTHBARRIER-FREE

    PEDESTRIAN AND

    CYCLING PATH

    BRIDGE LANDING/ RAMP

    BASE PARK CONDITIONS

    PROPOSED RAMP

    SYSTEM WHICH

    ANTICIPATES A BASE

    PARK LAYOUT

    ORDNANCE PARK

    BRIDGE OVER RAIL

    CORRIDOR

    PROJECT CONTEXT

    W H AT I S I M P O R TA N T T O Y O U ? 8

  • 8/10/2019 Fort York Bridge-Display Boards for Jan 8 Meeting

    10/10

    N E X T S T E P S 9

    THANK YOUFOR ATTENDING TODAYS

    COMMUNITY INFORMATION MEETING

    BUILD TORONTO

    [email protected]

    416.981.3889

    200 King Street W, Suite 200

    Toronto, ON, M5H 3T4Please go online and visit the website

    fortyorkbridge.mmm.ca

    CONTACT

    The next Community Information Meeting is planned for June 2015.

    Please make sure we have your email addressif you want to be kept informed.