The Replacement of Fort Avenue Bridge over CSXT November 9, 2010 To: Fort McHenry Business Association (FMBA)

Upload: paulday1211

Post on 22-Nov-2014

119 views

Category:

Documents


2 download

DESCRIPTION

Fort Avenue Bridge, transportation planning, Baltimore

TRANSCRIPT

Page 1: Fort Avenue Bridge Replacement Presentation

The Replacement of Fort Avenue Bridge over CSXT The Replacement of Fort Avenue Bridge over CSXT November 9, 2010

To: Fort McHenry Business Association (FMBA)

Page 2: Fort Avenue Bridge Replacement Presentation

Originally Constructed in 1920 by Baltimore & Ohio (B&O) Railroad

50 Ton Trolley Cars & 20 Ton Trucks Vertical Clearance of 17’-10” Last Bridge Inspection – 2007 BSR – 36.4 Structurally Obsolete and Structurally Deficient

Existing Fort Avenue BridgeExisting Fort Avenue Bridge

Page 3: Fort Avenue Bridge Replacement Presentation

Existing Fort Avenue BridgeExisting Fort Avenue Bridge

Page 4: Fort Avenue Bridge Replacement Presentation

Existing Fort Avenue BridgeExisting Fort Avenue Bridge

Page 5: Fort Avenue Bridge Replacement Presentation

Impact to the Public and Neighborhood

(Under Full Closure) Limited Load Capacity Historical Impacts Environmental Impacts Other State and/or Federal Requirements

Code Regulations of Maryland (COMAR) Regulation 09.12.91.04C(1) Minimum of 21’-0” Vertical Clearance above Railroad

Replacement ConsiderationsReplacement Considerations

Page 6: Fort Avenue Bridge Replacement Presentation

21’-0” Minimum Vertical Clearance Maintain Existing Roadway Width and Sidewalks Add Green Space (Trees & Planters) Increase Bridge Capacity Add Bike Lanes Baltimore City DOT and CSXT Partnership

Proposed Fort Avenue BridgeProposed Fort Avenue Bridge

Page 7: Fort Avenue Bridge Replacement Presentation

Proposed Fort Avenue BridgeProposed Fort Avenue Bridge

ELEVATION

Page 8: Fort Avenue Bridge Replacement Presentation

Proposed Fort Avenue Bridge

Typical Section

Page 9: Fort Avenue Bridge Replacement Presentation

640’ of East Fort Avenue to be Reconstructed Two 20” Dia. Water Mains, One 10” Fire Main One 12” Gas Main , Electrical Duct Bank Verizon Duct Bank

Proposed Work LimitsProposed Work Limits

Page 10: Fort Avenue Bridge Replacement Presentation

WEST APPROACH OF BRIDGE (TOWARDS FORT McHENRY)

EAST APPROACH OF BRIDGE (TOWARDS FORT McHENRY)

Proposed Roadway SectionsProposed Roadway Sections

Page 11: Fort Avenue Bridge Replacement Presentation

South Bridge ApproachSouth Bridge Approach

To Federal Hill

Page 12: Fort Avenue Bridge Replacement Presentation

North Bridge ApproachNorth Bridge Approach

To Federal Hill

Page 13: Fort Avenue Bridge Replacement Presentation

Access toStreet Parking

Wall Height

< 2’-0” in front of Homes

Along North ApproachAlong North Approach

Page 14: Fort Avenue Bridge Replacement Presentation

Maintenance of Traffic ConsiderationsMaintenance of Traffic Considerations

Plans are Being Developed Fort McHenry Events Truck - Bus Issues – School Bus Issues Fire /Emergency Access Local Traffic Access No Night Work CSX Coordination

Page 15: Fort Avenue Bridge Replacement Presentation

Detour / Maintenance of TrafficDetour / Maintenance of Traffic

Fort Ave. Bridge

Project Location

FS-Key School

N

Page 16: Fort Avenue Bridge Replacement Presentation

ConstructionConstruction

Construction Start May 2011 Construction End May 2012 Construction Type – Full Closure Anticipated Construction Duration: 12 Months Funded by CSXT and Federal Sources