    FLUSHING OF

    TURBINE LUB OIL& JACKING OIL

    SYSTEM

  • 7/31/2019 Flushing of Turbine

    2/11

    PLANT DETAILS

    LUB OIL SYSTEM : 2 NOS. AC AOPLUB OIL SYSTEM : 2 NOS. AC AOP

    1 NOS. DC EOP1 NOS. DC EOP

    JACKING OIL SYSTEM: 1 NOS. AC JOPJACKING OIL SYSTEM: 1 NOS. AC JOP

    1 NOS. DC JOP1 NOS. DC JOP

    1 NOS. MAIN OIL PUMP1 NOS. MAIN OIL PUMP

    2 NOS. OF INJECTORS.2 NOS. OF INJECTORS. 2 NOS. OF OIL COOLERS.2 NOS. OF OIL COOLERS.

    2 NOS. OF DUPLEX FILTERS.2 NOS. OF DUPLEX FILTERS.

  • 7/31/2019 Flushing of Turbine

    3/11

    PLANT DETAILS

    OIL TEMPERATURE CONTROL VALVE.OIL TEMPERATURE CONTROL VALVE.

    THROTTLES.THROTTLES.

    HYDRAULIC TURNING GEAR SHUT OFFHYDRAULIC TURNING GEAR SHUT OFF

    VALVE.VALVE.

    MAIN OIL TANK.MAIN OIL TANK.

    2 NOS. OF VAPOUR EXHAUSTER FANS.2 NOS. OF VAPOUR EXHAUSTER FANS.

  • 7/31/2019 Flushing of Turbine

    4/11

    SERVICES REQUIRED

    TURBINE OILTURBINE OIL

    SERVICE AIR & PETROL FOR FILTERSERVICE AIR & PETROL FOR FILTER

    CLEANINGCLEANING

    LABORATORY FACILITYLABORATORY FACILITY

    AUXILIARY STEAM & ARRANGEMENTAUXILIARY STEAM & ARRANGEMENT

    FOR HEATING THE WATERFOR HEATING THE WATER

  • 7/31/2019 Flushing of Turbine

    5/11

    SAFETY PRECAUTIONS

    FIRE FIGHTING ARRANGEMENT INSIDE MOTFIRE FIGHTING ARRANGEMENT INSIDE MOTROOMROOM

    FIRST AID KITFIRST AID KIT

    STAIRCASES,PLATFORMS,HAND-RAILS FORSTAIRCASES,PLATFORMS,HAND-RAILS FOR

    MOT SHOULD BE READYMOT SHOULD BE READYNO WELDING/CUTTING JOBNO WELDING/CUTTING JOB

    LOAD ON AOP SHOULD NOT EXCEED FULLLOAD ON AOP SHOULD NOT EXCEED FULL

    LOAD CURRENT OF THE MOTORLOAD CURRENT OF THE MOTOR

    PROVISION FOR EMERGENCY STOPPINGPROVISION FOR EMERGENCY STOPPINGOF OIL PUMP FROM LOCAL/UCBOF OIL PUMP FROM LOCAL/UCB

    PROVISION FOR EMERGENCY DRAINING OFPROVISION FOR EMERGENCY DRAINING OFMOT TO THE COPU TANKMOT TO THE COPU TANK

    ROUND THE CLOCK MANNINGROUND THE CLOCK MANNING

  • 7/31/2019 Flushing of Turbine

    6/11

    STATE OF THE PLANT

    GENERALGENERAL

    MAIN OIL TANKMAIN OIL TANK

    LUB OIL SYSTEMLUB OIL SYSTEM

    JACKING OIL SYSTEMJACKING OIL SYSTEM

  • 7/31/2019 Flushing of Turbine

    7/11

    METHOD

    OIL FILLINGOIL FILLING

    LUB OIL SYSTEM FLUSHING : STAGE ILUB OIL SYSTEM FLUSHING : STAGE I

    STAGE IISTAGE II JACKING OIL SYSTEM FLUSHINGJACKING OIL SYSTEM FLUSHING

    FINAL STAGE FLUSHINGFINAL STAGE FLUSHING

    HYDRAULIC TESTING OF LINESHYDRAULIC TESTING OF LINES

    NORMALISATIONNORMALISATION

  • 7/31/2019 Flushing of Turbine

    8/11

    G E

    cooler

    cooler

    filter

    filter

    HP I P L P

    filter

    AOP1

    INJ

    AOP2

    EOP

    JOP1

    JOP2

    Drain header

    L O supply header

    J O header

    M O T

    MOPHTG

    INJ

    Flushing of LO & J Osystem

  • 7/31/2019 Flushing of Turbine

    9/11

    Cooler

    Cooler

    Tank

    Hot Water

    Steam inlet

    Recirculation

    Drain

    Oil

    inlet

    Cooling

    water outlet

    Cooling

    water inlet

    Oil

    outlet

    Arrangement for Thermal Shock

    Make-up water

  • 7/31/2019 Flushing of Turbine

    10/11

    COMPLETION CRITERIA

    MECHANICAL IMPURITIES &MECHANICAL IMPURITIES &MOISTURE EACH LESS THAN 100 PPMMOISTURE EACH LESS THAN 100 PPM(BY WEIGHT)(BY WEIGHT)

    MOT FILTER (Bucket Strainer) SHOULDMOT FILTER (Bucket Strainer) SHOULDREMAIN CLEAN AFTER 24 Hrs OFREMAIN CLEAN AFTER 24 Hrs OFFLUSHINGFLUSHING

    DUPLEX FILTER ELEMENT SHOULDDUPLEX FILTER ELEMENT SHOULDREQUIRE CLEANING AFTER 24 Hrs OFREQUIRE CLEANING AFTER 24 Hrs OFFLUSHINGFLUSHING