Fixed Scope Offering for Implementation of
Recruiting Cloud Service (SaaS)
Index
• Organizational Drivers
• What is Recruiting Cloud Service?
• Implementation Scope
• Implementation Approach
• Assumptions & Client Responsibilities
• Optional Expansion Packs
• Why Ejada?
1
Index
• Organizational Drivers
• What is Recruiting Cloud Service?
• Implementation Scope
• Implementation Approach
• Assumptions & Client Responsibilities
• Optional Expansion Packs
• Why Ejada?
2
• Reach hard to find Talent
• Lower sourcing costs
• Enhance employment brand
• Increase quality of hire
• Reduce time to hire
• Speed new hire productivity
• Improve visibility to internal talent
Organizational Drivers
Index
• Organizational Drivers
• What is Recruiting Cloud Service?
• Implementation Scope
• Implementation Approach
• Assumptions & Client Responsibilities
• Optional Expansion Packs
• Why Ejada?
4
What is Recruiting Cloud Service?
Source
Screen
Select
Hire
• Requisition Management
• Job posting and Database Sourcing
• Career Site and Employer Branding
• Prescreening and Assessment
• Candidate Management
• Interview Management
• Selection and Offer Management
• New Hire On-boarding
• Reporting and Analytics
What is Recruiting Cloud Service?
What is Recruiting Cloud Service?
Source
Screen
Select
Hire
Career Site
• Monster Job
Boards
Social Sharing
• Yahoo SEO
Talent Pools
What is Recruiting Cloud Service?
Source
Screen
Select
Hire
What is Recruiting Cloud Service?
Source
Screen
Select
Hire
Disqualification Questions
Prescreening Questions
Tailored Assessments
Background Checks
What is Recruiting Cloud Service?
Source
Screen
Select
Hire
•New
•To Be Reviewed
•Reviewed
•Rejected
New
•To Be Scheduled
•Scheduled
•Completed
•Rejected
Phone Screen
•To Be Scheduled
•Scheduled
•Short Listed
•Rejected
1st Interview
•To Be Scheduled
•Scheduled
•Considered
•Rejected
2nd Interview
Multiple Selection Workflows
What is Recruiting Cloud Service?
Source
Screen
Select
Hire Hire
Start Date Fill Requisition
Offer
Prepare Extend Capture Response
Index
• Organizational Drivers
• What is Recruiting Cloud Service?
• Implementation Scope
• Implementation Approach
• Assumptions & Client Responsibilities
• Optional Expansion Packs
• Why Ejada?
12
Recruiting & Onboarding Business Process
Recruiting Business Process
Implementation Scope
Recruiting
12 Weeks
Recruiting
Onboarding
16 Weeks
• 1 External Career site (1 Application flow, 1 Profile flow, 1 Theme)
• 1 Internal Career site (with Employee Referral)
• 1 Candidate Selection Workflow (Manual)
• 1 version of Recruiter Interface (1 list format, 1 configuration profile)
• 1 version of Manager Interface (1 list format, 1 configuration profile)
• 1 Requisition form with up to 10 User Defined Fields
• 2 Candidate Record Formats (profile + job submission) with up to 10 User Defined Fields
• 3 Requisition Templates
• System Correspondence with Personalized Branding
• System Settings
• 1 Source list (maximum of 100 entries)
• Requisition & Offer Manual Approval workflow configurations
• One time Data Upload (1 test + 1 Production)
Organization, Location, Job Function, User, Departments
• Offer Management Configuration with up to 3 custom offer letters
• Review of Standard reports and 3 custom reports
Scope – Recruiting
The scope of the Taleo Onboarding implementation includes the design and configuration
of the prototype to address the collection of new hire data , the communication with new
hires and the definition and configuration of a provisioning using the Transitions and
Onboarding module
- Workflow for new hires
- 1 New hire portal
- E-Signature Enablement
- Single Page form pack (up to 5 forms)
- Up to 5 onboarding tasks
Scope – Onboarding
Index
• Organizational Drivers
• What is Recruiting Cloud Service?
• Implementation Scope
• Implementation Approach
• Assumptions & Client Responsibilities
• Optional Expansion Packs
• Why Ejada?
16
Implementation Approach
Plan Prototype
Validate
Transition
Sustain
12 to 16 Weeks
OUM Solution Driven Rapid Implementation for Taleo SaaS
Inception Elaboration Construction Transition Production
9 to 12 months
OUM Solution Driven Implementation
Iterative Oracle Unified Method (OUM)
Implementation Activities
Conduct Kick-off Meeting
Schedule Workshops
Conduct Integration and Data Load workshops
Gather Setup Information
Conduct Implementation Checkpoint
Perform Setup
Conduct Workshops & Prototype Configuration
Capture & Prioritize Changes
Conduct Implementation Checkpoint
Load, Reconcile & Validate Data Loads
Update Business Processes and Validation Cases
Conduct End-to-End Review
Migrate Configuration to Production
Manage Transition to Steady-state Operations
Load, Reconcile & Validate Data Loads in Production
Conduct Implementation Checkpoint
Begin system use
Prepare Training Material Verify Production &
Operational Readiness
Apply & Validate Setup Changes
Final Validation Review with Users & Stakeholders
Review In-Scope High-Level Business Processes Plan for Next Release
Post Go-Live Support
Shared responsibility
Client responsibility
Ejada
responsibility
Create Detailed Release Plan
Plan Prototype Validate Transition Sustain
Prepare Integration Details
Conduct Train-the-Trainer Workshops
Apply & Validate Extensible Items
Implement & Validate Integrations
Load & Validate Data
Populate Data Load Templates
Project Management
Implementation High Level Plan
Plan W1 Prototype W3 Validate W7 Transition W10 Sustain W11
Recruiting Implementation Plan (12 Weeks)
Additional requirements out of this fixed scope offering are subject to extra time and cost
Please Refer to Optional Expansion Packs section for more details
Release 2 (Onboarding)
Release 1 (Recruiting)
Implementation High Level Plan
Recruiting + Onboarding Implementation Plan (16 Weeks)
Plan W1 Prototype W3 Validate W7 Transition W10 Sustain W11
Plan W10 Prototype W11 Validate W13 Transition W15 Sustain W16
Additional requirements out of this fixed scope offering are subject to extra time and cost
Please Refer to Optional Expansion Packs section for more details
Implementation Key Deliverables
Rapid Phase Key Deliverable Responsible
Plan Project Charter The project charter would include further details of the project mission statement, approach and execution
Ejada & Client
Project Work Plan A plan that describes the high-level tasks and timelines for all project activities
Ejada
Data Loading Templates Ejada will provide the data loading templates in required standard format to be filled by the client
Ejada
Prototype Configured Application An application configured in accordance with the descriptions in the Configuration Workbook
Ejada
Setup Document A document that summarizes the configurations to be provided based on the collected business information
Ejada
Validate Test Plan and Test Scripts Test Scripts for testing the configured functionality in the scope of standard offering. Any further changes to this document will be performed by the Client
Ejada
Training Material Material to support Familiarization sessions on tools for ongoing customers use (Reports, Personalization, System Administration)
Ejada
Configuration Workbook Details of how the solution is configured Ejada
Transition Validated Solution on Production Configured Solution , validated for go live use Ejada & Client
• Client Project Sponsor
Client Project Sponsor should be assigned with sufficient authority to
decide/solve issues addressed by the project management team to drive the
project to mission goals
• Steering Committee
Project steering committee will comprise members of client senior
management. This committee functions as the highest decision-maker for the
project. As such, it represents business management ownership of the project,
and is responsible for ensuring that the project delivers its goals and benefits
• Client Project Manager
Client Project Manager will be the single point of contact for Ejada team for
inputs from Client. He will be responsible for coordinating with client
stakeholders and organize all the logistics for successful delivery of the project.
He will work jointly with Ejada Project Manager to coordinate day to day project
tasks and activities
Project Team Structure
• Ejada Project Manager
Ejada Project Manager shall be the single point of contact for the client for any
issues relating to the delivery of services. He shall be responsible for the day-
to-day Ejada implementation activities. He will manage Ejada resources on the
project and keep the Steering Committee appraised of the progress. Ejada
consultants will report to Ejada Project Manager
• Ejada Functional Consultant
Ejada Functional Consultant is product and implementation expert in his
specific functional areas. He has skills and expertise in Taleo implementation
and also have understanding of business process. He will work with client team
as “one team” to achieve success for this project and to understand and
configure Taleo to meet client business requirements
Project Team Structure Cntd.
Index
• Organizational Drivers
• What is Recruiting Cloud Service?
• Implementation Scope
• Implementation Approach
• Assumptions & Client Responsibilities
• Optional Expansion Packs
• Why Ejada?
24
• Oracle’s OUM for Cloud Implementation Approach will be used for the
implementation
• The implementation is based on the Cloud deployment model, hosted at Oracle
• Common and Unified Business Processes Definition
• Common Organization-Location-Job Field structure
• Common Set of Permissions
• Integration to Taleo is out of scope
• Taleo Anywhere is out of scope
• Data migration to Taleo subject to provide data in Ejada Template
• All development and documentation in English
• No Customization, only custom configuration within the standard system
• Establish “Train the Trainer” approach for user training
• Single sign-on solution is out of scope
• Organization change management and end user training is client responsibility
• Application bug repairs is Oracle responsibility and not included in estimates
Implementation Assumptions
Implementation Assumptions
Activity Assumption
Go-Live Support Ejada will deliver two (2) weeks of post go-live support for the recruiting module and one (1) week for the onboarding module
Project Team Training Ejada will organize a training for the customer's core project team members, in a lecture/demo format workshop. Training is assumed to be one workshop per module, for up to 10 attendees
Familiarization Session Ejada will organize a session of maximum 1 day, to make the customer familiar with the standard Taleo navigation and Personalization's
End User Training Not included in scope of current project
Interfaces Not included in scope of current project
Taleo Anywhere Not included in scope of current project
User Guide Not included in scope of current project
Administration Guide Not included in scope of current project
Additional Requirements and Optional Expansion Packs
Ejada delivery for additional requirements and optional expansion packs out of this fixed scope offering are subject to extra time and cost and can be assessed and planned for future releases
• Finalize Subscription Agreements with Oracle
• Get environment ready from Oracle prior to implementation start
• Arrange project sponsor and steering committee
• Assign project manager to lead client efforts
• Business Process owners are available for the project
• Perform assigned project tasks according to project plan
• Process standardization should be ready prior to implementation
• Decisions and feedbacks will be given without unnecessary delay
• Provide project work rooms and related furnishings/equipments
• Ejada will have access to the client key users and project team throughout the
project lifecycle to complete the project on time
• Accept that part of the work performed by Ejada Consulting will not be on-site
Client Responsibilities
Index
• Organizational Drivers
• What is Recruiting Cloud Service?
• Implementation Scope
• Implementation Approach
• Assumptions & Client Responsibilities
• Optional Expansion Packs
• Why Ejada?
28
• Arabization Expansion Pack
The scope of the Arabization expansion pack includes collection and configuration of
translated content to Arabic language. It is the customer's responsibility to create and
validate all translated content in advance of its configuration. The availability of customer
translation resources, the volume of translatable content, and the configuration of this
content may impact the overall project timeline, which could result in a change order
- Configuration of 1 career site and related content in Arabic language including
Field Labels, Application Flow, Instructional Text, System Messages, Correspondence Templates
- Configuration of internal interfaces and related content in Arabic language including 1 recruiter interface, 1 manager interface, Instructional Text, System Messages, Correspondence Templates
Optional Expansion Packs
• Recruitment Process Segmentation Expansion Pack
The scope of the Recruitment Process Segmentation Expansion Pack includes the
design and configuration of the prototype to address the requisitioning, sourcing,
selection and hiring of additional specific single segment (hire-type) candidates
- 1 External Career Site
- 1 Internal Career Site (with Employee Referral)
- 1 Candidate Selection Workflow
- Field & Form Adjustments (Requisition, Candidate & Offer)
- User Permission Adjustments
Optional Expansion Packs
Index
• Organizational Drivers
• What is Recruiting Cloud Service?
• Implementation Scope
• Implementation Approach
• Assumptions & Client Responsibilities
• Optional Expansion Packs
• Why Ejada?
31
• Have 360 Degree implementation capabilities (ERP, Integration…etc)
• Highly qualified, skilled, and certified resources
• Presence in the region
• Partnerships with worldwide class top companies
• Comprehensive system integration solutions
• Solid record of success implementations in wide industries
• Committed to Saudi Market
Why Ejada?
Questions & Answers
Thank You …