fiscal year (fy) 2013 national training and technical assistance cooperative agreements (nca)...
TRANSCRIPT
Fiscal Year (FY) 2013
National Training and Technical Assistance Cooperative Agreements
(NCA)Non-Competing Continuation
HRSA 5-U30-13-001
NCA TA Website:http://www.hrsa.gov/grants/apply/assistance/nca
Technical Assistance Call
Date: Tuesday, March 12, 2013Time: 1 PM EasternDial-In Number: 1-888-946-7304Participant Passcode: 7083266Web Meeting Link: https://hrsa.connectsolutions.com/ncanccta
A replay will be posted within one week of the call at http://www.hrsa.gov/grants/apply/assistance/nca
2
FY 2013 NCA NCC
• Overview• Submission Process• Standard Form SF-PPR• Budget (Forms & Justification/Narrative)• Program Narrative Update • Project Work Plan• Performance Measures• Resources• TA Contacts
3
Overview
• NCAs applying for FY 2013 non-competing continuation funding must submit a progress report in the Electronic Handbooks (EHB)
• FY 2013 begins July 1, 2013 and ends June 30, 2014
• Instructions for completing the progress report are available in EHB and on the NCA TA webpage at http://www.hrsa.gov/grants/apply/assistance/nca
• Progress reports must be submitted in EHB by 5 PM ET on April 24, 2013
• Progress reports may not exceed 40 pages
4
Submission Process
• System-generated e-mail notifications that the progress report is available in EHB were sent to NCA Project Directors and other individuals who have non-competing continuation edit and submit privileges in EHB
5
NCC Components
REQUIRED:
• Standard Form SF-PPR
• Standard Form SF-PPR2
• Budget Information: Budget Details Form
• Budget Narrative
• Form 12: Organization Contacts
• Project Work Plan
• Performance Measures
• Attachment 1: Program Narrative Update
As Applicable:
• Attachment 2: Staffing Plan
• Attachment 3: Position Descriptions for Key Personnel
• Attachment 4: Biographical Sketches for Key Personnel
• Attachment 5: Summary of Contracts/Agreements
• Attachment 6: Other Relevant Documents
6
Budget Forms
Section A: Budget Summary •The NCA grant request in the federal column is pre-populated and cannot be edited [this figure should correspond with the recommended future support figure (Line 13) on the most recent Notice of Award]
Section B: Budget Categories•Provide a breakdown of the budgeted funds by Object Class Category (e.g., Personnel, Fringe Benefits) •Refer to SF-424A submitted with the most recent NCA application or the Budget Form submitted with the last NCA NCC as a reference point
Section C: Non-Federal Resources•Do not provide other sources of funding
7
Budget Narrative
• Provide a detailed line-item budget that explains each cost for the upcoming budget period (July 1, 2013 through June 30, 2014)
• Additional narrative for the budget justification should describe each cost element and explain how each contributes to meeting the project’s objectives
Line Items:•Personnel•Fringe Benefits•Travel•Equipment•Supplies•Contracts•Other•Indirect Costs
8
Project Work Plan
• EHB will pre-populate the Project Work Plan with information submitted in the FY 2012 NCA NCC
• An abbreviated sample Project Work Plan is available at http://www.hrsa.gov/grants/apply/assistance/nca
Project Work Plan Fields:•Goal •Objective Description•Progress Report•Activity•Expected Outcome•Data Evaluation Measurements•Person/Area Responsible•Time Frame•Comments
9
Project Work Plan
• Instructions for completing the Project Work Plan are available in Appendix A of the NCA NCC Instructions.
• There are two options for reporting progress for every objective:– If the pre-populated objective will be retained, use the Progress
Report field to report progress made since July 1, 2012 and edit the Objective Description field as needed to indicate plans for FY 2013.
– If the pre-populated objective will be significantly changed or replaced with something completely new for FY 2013, delete the objective and use the narrative box that appears to both report progress and justify the deletion. A new objective can then be added to replace the deleted objective. Provide an update for each objective in the Progress Report text box of the form.
• Additional Goals, Objective Descriptions, Activities, Expected Outcomes, Data Evaluation Measurements, Person/Area Responsible, and Time Frames may be added, edited, or deleted. Comments must be provided.
10
Performance Measures Form
• The Performance Measures Form will pre-populate with data from the FY 2012 NCA NCC
• Provide quantitative and qualitative updates in the Progress Towards Goal field for each performance measure
• Do not edit information pre-populated for the four required performance measures. For these measures, complete the Progress Towards Goal field and Comments field, as applicable
• Grantees may edit all data for additional performance measures and/or add new performance measures
11
Required Performance Measures
1. National Grantee Satisfaction 2. Program Requirements T/TA3. Performance Improvement T/TA 4. Program Development/Analysis T/TA
• The HRSA BPHC 2012 Grantee Satisfaction Survey did not address the four Performance Measures. NCAs should base progress on other available data sources such as Uniform Data System information and organizational surveys. If such data sources are not available, use the HRSA BPHC 2011 Grantee Satisfaction Survey data for the Quantitative Progress Toward Goal subfield and use anecdotal evidence for the Qualitative Progress Toward Goal subfield.
• Detailed instructions are provided in Appendix B of the NCA NCC Instructions 12
Program Narrative Update
Attachment 1•Discuss broad issues and changes that have impacted the target audiences served and the NCA, as well as overarching progress on the work plan since July 1, 2012
Program Narrative Update Items:1.Any significant progress/proposed changes to the project2.Any significant changes or outcomes3.Any significant changes/updates to linkages or partnerships4.Any significant changes/updates to the staffing plan5.Any major expected changes/plans/considerations for activities beyond the upcoming budget period
Note: Grantees should discuss any significant anticipated changes to their Project Work Plan with their Project Officer prior to submission.
13
Attachments 2-6 (As Applicable)
• Attachment 2: Staffing Plan• Attachment 3: Position Descriptions for
Key Personnel• Attachment 4: Biographical Sketches for
Key Personnel• Attachment 5: Summary of
Contracts/Agreements• Attachment 6: Other Relevant
Documents
14
Important Reminders
• Progress reports must be submitted in EHB by 5 PM ET on April 24, 2013
• Progress reports may not exceed 40 pages
• Failure to submit the NCC by the established deadline or submission of an incomplete or non-responsive progress report may result in a delay of NoA issuance or a lapse in funding
15
Resources
NCA TA Webpage http://www.hrsa.gov/grants/apply/assistance/nca
Health Center Program Requirements http://bphc.hrsa.gov/about/requirements
16
Technical Assistance Contacts
Program related questions• Consult with your Project Officer
NCA NCC Instructions related questions• Beth Levitz: [email protected] or 301.594.4300
Budget related questions• Brian Feldman: [email protected] or
301.443.3190
Electronic completion and submission questions•BPHC Helpline: [email protected] or 877.974.2742
17