Fire Science Research Group Page 1 of 43 SERVICE PENETRATION SEAL FIRE RESISTANCE TEST REPORT A-09-576 REPORT NAME SIGNED DATE Prepared By: Michael Loller (Fire Test Engineer) 26/6/09 Reviewed By: Rick Fox (Manager - Fire Testing) 26/6/09 This document is issued in accordance with NATA’s accreditation requirements. Accredited for compliance with ISO/IEC 17025. This test report shall only be reproduced in full. Modifications, extracts and/or copies shall not be made by any organisation or person without the written permission from the laboratory manager of FSRG. Accreditation No. 15580 Fire Resistance Test A-09-576 Electrical services penetrating 60mm thick VERMICULUX ® in accordance with AS 1530.4-2005 & AS 4072.1-2005 Prepared for: Intumex Asia Pacific, 1 Scotland Road, Mile End, Adelaide, SA 5031 Test Date: 18 th February 2009 Test Facility: Fire Science Research Group (Adelaide Division) 1 Scotland Road, Mile End Adelaide, SA 5031

Upload: others

Post on 05-Sep-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Fire Resistance Test Report of...Fire Science Research Group (Adelaide Division) 1 Scotland Road, Mile End Adelaide, SA 5031 Fire Science Research Group Page 2 of 43 A-09-6 Fire Resistance

Fire Science Research Group

Page 1 of 43

SE

RV

ICE

PE

NE

TR

AT

ION

SE

AL

FIR

E R

ES

IST

AN

CE

TE

ST

RE

PO

RT

A-0

9-5

76

REPORT NAME SIGNED DATE

Prepared By: Michael Loller

(Fire Test Engineer)

26/6/09

Reviewed By: Rick Fox

(Manager - Fire Testing) 26/6/09

This document is issued in accordance with NATA’s accreditation requirements. Accredited for compliance with ISO/IEC 17025. This test report shall only be reproduced in full. Modifications, extracts and/or copies shall not be made by any organisation or person without the written permission from the laboratory manager of FSRG. Accreditation No. 15580

Fire Resistance Test A-09-576

Electrical services penetrating 60mm

thick VERMICULUX® in accordance with

AS 1530.4-2005 & AS 4072.1-2005

Prepared for: Intumex Asia Pacific,

1 Scotland Road, Mile End,

Adelaide, SA 5031

Test Date: 18th February 2009

Test Facility:

Fire Science

Research Group

(Adelaide Division)

1 Scotland Road, Mile End

Adelaide, SA 5031

Page 2: Fire Resistance Test Report of...Fire Science Research Group (Adelaide Division) 1 Scotland Road, Mile End Adelaide, SA 5031 Fire Science Research Group Page 2 of 43 A-09-6 Fire Resistance

Fire Science Research Group

Page 2 of 43

SE

RV

ICE

PE

NE

TR

AT

ION

SE

AL

FIR

E R

ES

IST

AN

CE

TE

ST

RE

PO

RT

A-0

9-5

76 Fire Resistance Test Report

SERVICE PENETRATION SEAL TEST

SUMMARY

On the 18th of February 2009 a fire resistance test was carried out on electrical services penetrating 800mm x 800mm x 60mm thick VERMICULUX® barrier within a 120mm thick concrete slab. Each specimen satisfied the performance requirements as specified in AS1530.4-2005 and AS4072.1-2005 for the following periods. For all specimens the main fire-stopping system was 60mm thick VERMICULUX®. Main Fire-Stopping System VERMICULUX® Integrity: 244 minutes1 Insulation: 146 minutes Achieved FRL: - / 240 / 120 Specimen A AN Sealant protecting bundle of 10, 3-core cables Integrity: 244 minutes1 Insulation: 60 minutes Achieved FRL: - / 240 / 60 Specimen B AN Sealant protecting cable tray with cables Integrity: 244 minutes1 Insulation: 71 minutes Achieved FRL: - / 240 / 60 1 No failure recorded for the duration of test

Page 3: Fire Resistance Test Report of...Fire Science Research Group (Adelaide Division) 1 Scotland Road, Mile End Adelaide, SA 5031 Fire Science Research Group Page 2 of 43 A-09-6 Fire Resistance

Fire Science Research Group

Page 3 of 43

SE

RV

ICE

PE

NE

TR

AT

ION

SE

AL

FIR

E R

ES

IST

AN

CE

TE

ST

RE

PO

RT

A-0

9-5

76 Fire Resistance Test Report

SERVICE PENETRATION SEAL TEST

Contents

TEST METHODS 1. Introduction ........................................................................................... Page 4 2. Scope ................................................................................................... Page 4 3. Manufacturer ........................................................................................ Page 4 4. Test Standards ..................................................................................... Page 5 5. Instrumentation ..................................................................................... Page 5 6. Test Procedure ..................................................................................... Page 6 7. Specimen Selection .............................................................................. Page 6 TEST SPECIMEN SPECIFICATIONS & DETAILS 8. Service Specifications - Table 1 ............................................................ Page 7 9. Test Specimen Description ................................................................... Page 8 10. Separating Element .............................................................................. Page 9 11. Orientation ............................................................................................ Page 9 12. Environmental Conditions ..................................................................... Page 9 TEST RESULTS & PERFORMANCE CRITERIA 13. Test Results ........................................................................................ Page 10 14. Performance Criteria ........................................................................... Page 11 15. Field of Direct Application ................................................................... Page 12 16. Furnace Temperature ......................................................................... Page 13 17. Furnace Pressure Differential ............................................................. Page 14 18. Specimen Temperature Graphs ................................................... Pages 15-17 APPENDIX A - TEMPERATURE TABLES Thermocouples A1-A4, B1-B6. ................................................................ Pages 18-23 Thermocouples C1-C5,D1-D5,E1-E3. ..................................................... Pages 24-29 APPENDIX B - OBSERVATIONS Specimen A Observations .............................................................................. Page 30 Specimen B Observations ....................................................................... Pages 31-32

APPENDIX C - TEST DRAWINGS 576-01 ............................................................................................................ Page 33 576-02 ............................................................................................................ Page 34 576-03 ............................................................................................................ Page 35 576-04 ............................................................................................................ Page 36 576-05 ............................................................................................................ Page 37 APPENDIX D - TEST PICTURES Test Pictures ........................................................................................... Pages 38-43

Page 4: Fire Resistance Test Report of...Fire Science Research Group (Adelaide Division) 1 Scotland Road, Mile End Adelaide, SA 5031 Fire Science Research Group Page 2 of 43 A-09-6 Fire Resistance

Fire Science Research Group

Page 4 of 43

SE

RV

ICE

PE

NE

TR

AT

ION

SE

AL

FIR

E R

ES

IST

AN

CE

TE

ST

RE

PO

RT

A-0

9-5

76 Fire Resistance Test Report

SERVICE PENETRATION SEAL TEST

1. Introduction

1.1 Fire resistance test carried out in accordance with AS 1530.4-2005 and

AS 4072.1-2005 to measure the fire resistance of AN Sealant protecting electrical services penetrating 800mm x 800mm x 60mm thick VERMICULUX® barrier. See Table 1 on page 7 for details.

2. Scope 2.1 This test report evaluates the fire performance of all specimens for integrity and

insulation criteria according to AS 1530.4-2005 and AS 4072.1-2005. 2.2 The results of these fire tests may be used to directly assess fire hazard, but it

should be recognised that a single test method will not provide a full assessment of fire hazard under all fire conditions.

2.3 This report details methods of construction, the test conditions and the results

obtained when the specific element of construction described herein was tested following the procedure outlined in AS 1530.4-2005. Any significant variation in respect to size, construction details, loads, stresses, edge or end conditions, other than those allowed under the field of direct application in the relevant test method, is not covered by this report.

2.4 Because of the nature of fire resistance testing and the consequent difficulty in

quantifying the uncertainty of measurement of fire resistance, it is not possible to provide a stated degree of accuracy of the result.

3. Manufacturer

3.1 PROMASEAL® AN Sealant was manufactured by Promat International.

3.2 VERMICULUX® was manufactured by Intumex Pty Ltd.

3.3 Electrical cables manufactured by Prysmian Power Cables & Systems Pty Ltd and

Olex Pty Ltd.

Page 5: Fire Resistance Test Report of...Fire Science Research Group (Adelaide Division) 1 Scotland Road, Mile End Adelaide, SA 5031 Fire Science Research Group Page 2 of 43 A-09-6 Fire Resistance

Fire Science Research Group

Page 5 of 43

SE

RV

ICE

PE

NE

TR

AT

ION

SE

AL

FIR

E R

ES

IST

AN

CE

TE

ST

RE

PO

RT

A-0

9-5

76 Fire Resistance Test Report

SERVICE PENETRATION SEAL TEST

4. Test Standards 4.1 Australian Standard™ 1530 Part 4-2005

Methods for fire tests on building materials, components and structures. Part 4: Fire-resistance test of elements of construction.

4.2 Australian Standard™ 4072 Part 1-2005

Components for the protection of openings in fire-resistant separating elements. Part 1: Service penetrations and control joints.

Deviations from Test Standard 4.3 The percentage deviation in the area of the curve of the average temperature

recorded by the furnace thermocouples versus time from the standard time-temperature curve was at times throughout the test lower than the standard permits. Given the nature of the test specimen and the results achieved it is the opinion of the testing authority that this would not have affected the results in a manner significant enough to alter the outcome of the test.

5. Instrumentation 5.1 Temperature measurement obtained with Intech Micro 2100 - A16 Analogue input

(serial no.'s 0813423, 0811140, 0813415, 0811139) temperature logger. Temperature range of 0°C to 1200°C.

5.2 Furnace pressure differential measured with Magnehelic pressure gauge. Pressure

range of 0 Pa to 60 Pa. 5.3 Test environment measurement obtained with FLUKE 971 Temperature Humidity

meter (serial no. 2418208). Temperature range of -20°C to 60°C with humidity range of 5% to 95%.

Page 6: Fire Resistance Test Report of...Fire Science Research Group (Adelaide Division) 1 Scotland Road, Mile End Adelaide, SA 5031 Fire Science Research Group Page 2 of 43 A-09-6 Fire Resistance

Fire Science Research Group

Page 6 of 43

SE

RV

ICE

PE

NE

TR

AT

ION

SE

AL

FIR

E R

ES

IST

AN

CE

TE

ST

RE

PO

RT

A-0

9-5

76 Fire Resistance Test Report

SERVICE PENETRATION SEAL TEST

6. Test Procedure 6.1 General

Fire resistance test carried out on the 18th February 2009. Initial ambient laboratory temperature recorded to be 31°C.

6.2 Furnace Heating Conditions

Furnace temperature controlled so that the average temperature followed the time/temperature curve [T =345 log10 (8t +1) +20].

6.3 Furnace Pressure Differential

Furnace pressure measured with Magnehelic pressure gauge, with probe located 100mm below the exposed face of the separating element. See Table 4 on page 14.

6.4 Specimen Temperatures Specimen temperatures measured with type K thermocouples soldered to 12mm copper discs. Each thermocouple covered with 30 ±0.5mm x 30 ±0.5mm x 2.0 ± 0.5mm thick Millboard squares. Initial temperatures taken from the average measured on the unexposed face for each specimen are listed below.

Specimen Initial Temperature

Main Fire-Stopping System 28.8°C

A 31.4°C

B 30.6°C

7. Specimen Selection 7.1 This laboratory was not involved in the selection of the test specimens for this test.

7.2 AN Sealant supplied by Promat Australia Pty Ltd.

7.3 Electrical cables supplied by Bunnings Warehouse Pty Ltd and

P & R Electrical Wholesalers Pty Ltd.

7.4 VERMICULUX® supplied by Promat Australia Pty Ltd.

Page 7: Fire Resistance Test Report of...Fire Science Research Group (Adelaide Division) 1 Scotland Road, Mile End Adelaide, SA 5031 Fire Science Research Group Page 2 of 43 A-09-6 Fire Resistance

Fire Science Research Group

Page 7 of 43

SE

RV

ICE

PE

NE

TR

AT

ION

SE

AL

FIR

E R

ES

IST

AN

CE

TE

ST

RE

PO

RT

A-0

9-5

76 Fire Resistance Test Report

SERVICE PENETRATION SEAL TEST

8. Specimen Specifications - Table 1

Specimen Product Service Type

A AN Sealant Bundle of

cables

B AN Sealant Cable tray

9. Test Specimen Description

9.1 Specimen A

Bundle of 10, 3-core cables penetrating a single layer of 60mm thick

VERMICULUX® board protected locally by AN Sealant. Service extended 500mm

from the exposed face and 500mm from the unexposed face, supported twice on

unexposed side at 200mm and 300mm. AN sealant was built up around the

penetration on the unexposed face of the main fire-stopping system in a conical

shape that extended 75mm along the service from the main fire-stopping system

and 50mm from the edge of the service penetration onto the main fire-stopping

system. AN Sealant was used to fill an annular gap of approximately 5mm between

the service and main fire-stopping system, to the depth of the VERMICULUX®

barrier.

9.2 Specimen B

Group A configuration cable tray penetrating a single layer of 60mm thick

VERMICULUX® board protected locally by AN Sealant. Service extended 500mm

from the exposed face and 500mm from the unexposed face, supported twice on

unexposed side at 200mm and 300mm. AN sealant was built up around the

penetration on the unexposed face of the main fire-stopping system in a conical

shape that extended 75mm along the service from the main fire-stopping system

and 50mm from the edge of the service penetration onto the main fire-stopping

system. AN Sealant was used to fill an annular gap of approximately 5mm between

the service and main fire-stopping system, to the depth of the VERMICULUX®

barrier.

Page 8: Fire Resistance Test Report of...Fire Science Research Group (Adelaide Division) 1 Scotland Road, Mile End Adelaide, SA 5031 Fire Science Research Group Page 2 of 43 A-09-6 Fire Resistance

Fire Science Research Group

Page 8 of 43

SE

RV

ICE

PE

NE

TR

AT

ION

SE

AL

FIR

E R

ES

IST

AN

CE

TE

ST

RE

PO

RT

A-0

9-5

76 Fire Resistance Test Report

SERVICE PENETRATION SEAL TEST

10. Separating Element 10.1 Separating element consisted of a 1860mm x 1860mm x 120mm thick concrete

slab with a 800mm x 800mm opening for test purposes at its centre.

10.2 VERMICULUX® barrier was mounted above the opening, on top of the slab and

overlapping the opening by approximately 100mm on all sides. A bead of 10mm x 10mm PROMASEAL® AN Sealant was applied to the perimeter of the VERMICULUX® barrier on both the exposed and unexposed sides, as well as the interface between the VERMICULUX® barrier and concrete slab overlap.

See drawings in Appendix C for details.

11. Orientation 11.1 Assembly tested in a horizontal orientation with furnace opening of 1100mm x

1100mm.

12. Environmental Conditions 12.1 Test specimen was stored in an indoor environment for 5 days.

Page 9: Fire Resistance Test Report of...Fire Science Research Group (Adelaide Division) 1 Scotland Road, Mile End Adelaide, SA 5031 Fire Science Research Group Page 2 of 43 A-09-6 Fire Resistance

Fire Science Research Group

Page 9 of 43

SE

RV

ICE

PE

NE

TR

AT

ION

SE

AL

FIR

E R

ES

IST

AN

CE

TE

ST

RE

PO

RT

A-0

9-5

76 Fire Resistance Test Report

SERVICE PENETRATION SEAL TEST

13. Test Results

Specimen Structural Adequacy

Integrity Insulation

Main Fire-Stopping System

N/A 244 146

A N/A 244 60

B N/A 244 71

For the purposes of the Building Code of Australia, the specimens achieved the following FRL (fire resistance level) For all specimens the main fire-stopping system was 60mm thick VERMICULUX®. Main Fire-Stopping System VERMICULUX® Integrity: 244 minutes1 Insulation: 146 minutes Achieved FRL: - / 240 / 120 Specimen A AN Sealant protecting bundle of 10, 3-core cables Integrity: 244 minutes1 Insulation: 60 minutes Achieved FRL: - / 240 / 60 Specimen B AN Sealant protecting cable tray with cables Integrity: 244 minutes1 Insulation: 71 minutes Achieved FRL: - / 240 / 60 1 No failure recorded for the duration of test

Page 10: Fire Resistance Test Report of...Fire Science Research Group (Adelaide Division) 1 Scotland Road, Mile End Adelaide, SA 5031 Fire Science Research Group Page 2 of 43 A-09-6 Fire Resistance

Fire Science Research Group

Page 10 of 43

SE

RV

ICE

PE

NE

TR

AT

ION

SE

AL

FIR

E R

ES

IST

AN

CE

TE

ST

RE

PO

RT

A-0

9-5

76 Fire Resistance Test Report

SERVICE PENETRATION SEAL TEST

14. Performance Criteria Structural adequacy Structural adequacy for service penetrations is not considered in AS 1530.4-2005. AS 1530.4-2005 states that integrity and insulation failure shall be deemed to have occurred if the following occurs; Integrity A failure of the test construction to maintain integrity shall be deemed to have occurred when collapse or sustained flaming on the unexposed face occurs or the criteria given below are exceeded. Failure shall be deemed to have occurred when one or other of the following conditions prevail. For situations where the cotton pad is suitable, failure shall be deemed to have occurred when flames and/or hot gases cause flaming or glowing of the cotton fibre pad. Sustained flaming on the surface of the unexposed face for 10 seconds or longer. *Note: Gap gauges are not used for service penetrations Insulation The fire resistance of the penetrated element as built within this test has already been established. As a result, insulation criteria have only been measured at the penetration seals. Insulation failure shall be deemed to have occurred when; Temperature at any location on the unexposed face of test specimen exceeds the initial temperature by 180°C

Page 11: Fire Resistance Test Report of...Fire Science Research Group (Adelaide Division) 1 Scotland Road, Mile End Adelaide, SA 5031 Fire Science Research Group Page 2 of 43 A-09-6 Fire Resistance

Fire Science Research Group

Page 11 of 43

SE

RV

ICE

PE

NE

TR

AT

ION

SE

AL

FIR

E R

ES

IST

AN

CE

TE

ST

RE

PO

RT

A-0

9-5

76 Fire Resistance Test Report

SERVICE PENETRATION SEAL TEST

15. Field of Direct Application Electrical and communication cable The test results on the standard configurations specified in AS1530.4-2005, Appendix D may be applied to all PVC-insulated and sheathed power and communications cables with copper conductors. See excerpt below.

Page 12: Fire Resistance Test Report of...Fire Science Research Group (Adelaide Division) 1 Scotland Road, Mile End Adelaide, SA 5031 Fire Science Research Group Page 2 of 43 A-09-6 Fire Resistance

Fire Science Research Group

Page 12 of 43

SE

RV

ICE

PE

NE

TR

AT

ION

SE

AL

FIR

E R

ES

IST

AN

CE

TE

ST

RE

PO

RT

A-0

9-5

76 Fire Resistance Test Report

SERVICE PENETRATION SEAL TEST

15. Field of Direct Application

Separating Elements results obtained for sealing systems in various types of masonry and concrete construction may be applied as follows: For elements manufactured from similar types of concrete or masonry, the results of the prototype test may be applied to materials of density within ±15% of the tested specimen. For greater variations, the opinion of a registered testing authority shall be obtained.

Page 13: Fire Resistance Test Report of...Fire Science Research Group (Adelaide Division) 1 Scotland Road, Mile End Adelaide, SA 5031 Fire Science Research Group Page 2 of 43 A-09-6 Fire Resistance

Fire Science Research Group

Page 13 of 43

SE

RV

ICE

PE

NE

TR

AT

ION

SE

AL

FIR

E R

ES

IST

AN

CE

TE

ST

RE

PO

RT

A-0

9-5

76 Fire Resistance Test Report

SERVICE PENETRATION SEAL TEST

16. Furnace Temperature Measurement

Note: Average furnace temperature plotted against the time/temperature curve.

Note: See Deviations from Test Standard on page 5.

Page 14: Fire Resistance Test Report of...Fire Science Research Group (Adelaide Division) 1 Scotland Road, Mile End Adelaide, SA 5031 Fire Science Research Group Page 2 of 43 A-09-6 Fire Resistance

Fire Science Research Group

Page 14 of 43

SE

RV

ICE

PE

NE

TR

AT

ION

SE

AL

FIR

E R

ES

IST

AN

CE

TE

ST

RE

PO

RT

A-0

9-5

76 Fire Resistance Test Report

SERVICE PENETRATION SEAL TEST

17. Furnace Pressure Differential - Table 4

Average Furnace Pressure

Test Time (Minutes) Pressure (Pa)

Test Time (Minutes) Pressure (Pa)

5 19

135 20

15 20

145 18

25 21

155 19

35 20

165 20

45 19

175 22

55 20

185 19

65 20

195 18

75 20

205 20

85 20

215 20

95 20

225 20

105 20

235 18

115 20

240 18

125 20

Page 15: Fire Resistance Test Report of...Fire Science Research Group (Adelaide Division) 1 Scotland Road, Mile End Adelaide, SA 5031 Fire Science Research Group Page 2 of 43 A-09-6 Fire Resistance

Fire Science Research Group

Page 15 of 43

SE

RV

ICE

PE

NE

TR

AT

ION

SE

AL

FIR

E R

ES

IST

AN

CE

TE

ST

RE

PO

RT

A-0

9-5

76 Fire Resistance Test Report

SERVICE PENETRATION SEAL TEST

18. Specimen Temperature Measurement

*Note: For Thermocouple locations refer to Appendix C.

*Note: For Thermocouple locations refer to Appendix C.

Page 16: Fire Resistance Test Report of...Fire Science Research Group (Adelaide Division) 1 Scotland Road, Mile End Adelaide, SA 5031 Fire Science Research Group Page 2 of 43 A-09-6 Fire Resistance

Fire Science Research Group

Page 16 of 43

SE

RV

ICE

PE

NE

TR

AT

ION

SE

AL

FIR

E R

ES

IST

AN

CE

TE

ST

RE

PO

RT

A-0

9-5

76 Fire Resistance Test Report

SERVICE PENETRATION SEAL TEST

18. Specimen Temperature Measurement

*Note: For Thermocouple locations refer to Appendix C.

*Note: For Thermocouple locations refer to Appendix C.

Page 17: Fire Resistance Test Report of...Fire Science Research Group (Adelaide Division) 1 Scotland Road, Mile End Adelaide, SA 5031 Fire Science Research Group Page 2 of 43 A-09-6 Fire Resistance

Fire Science Research Group

Page 17 of 43

SE

RV

ICE

PE

NE

TR

AT

ION

SE

AL

FIR

E R

ES

IST

AN

CE

TE

ST

RE

PO

RT

A-0

9-5

76 Fire Resistance Test Report

SERVICE PENETRATION SEAL TEST

18. Specimen Temperature Measurement

*Note: For Thermocouple locations refer to Appendix C.

Page 18: Fire Resistance Test Report of...Fire Science Research Group (Adelaide Division) 1 Scotland Road, Mile End Adelaide, SA 5031 Fire Science Research Group Page 2 of 43 A-09-6 Fire Resistance

Fire Science Research Group

Page 18 of 43

SE

RV

ICE

PE

NE

TR

AT

ION

SE

AL

FIR

E R

ES

IST

AN

CE

TE

ST

RE

PO

RT

A-0

9-5

76 Fire Resistance Test Report

SERVICE PENETRATION SEAL TEST

APPENDIX A - Temperature Tables

Time TC A1 TC A2 TC A3 TC A4 TC B1 TC B2 TC B3 TC B4 TC B5 TC B6

0 31.4 31.5 31.4 31.4 31.3 31.3 31.6 31.7 31.6 31.9

1 31.3 31.4 31.3 31.4 31.3 31.3 31.6 31.6 31.5 31.9

2 31.3 31.4 31.3 31.4 31.3 31.3 31.5 31.7 31.6 31.9

3 31.4 31.6 31.5 31.8 31.5 31.3 31.7 31.7 31.6 32.0

4 31.6 31.7 31.8 32.6 32.1 31.3 32.2 31.7 31.6 31.9

5 31.5 31.7 32.4 34.0 33.2 31.4 33.2 31.6 31.7 31.9

6 31.6 31.8 33.5 35.8 35.1 31.4 34.5 31.7 31.8 31.9

7 31.7 31.9 34.6 37.4 37.2 31.4 36.1 31.8 31.9 32.0

8 31.8 32.1 35.9 39.3 39.3 31.4 38.0 31.9 32.2 32.1

9 32.2 32.4 37.6 41.6 41.4 31.5 40.0 32.0 32.5 32.1

10 32.8 33.2 39.3 43.9 43.9 31.5 42.2 32.3 33.0 32.2

11 33.9 34.6 41.2 46.2 46.5 31.6 44.5 32.5 33.6 32.3

12 35.6 36.8 43.3 48.5 49.0 31.8 47.1 33.0 34.6 32.5

13 38.7 40.5 45.8 51.8 51.5 31.9 50.2 33.4 35.8 32.8

14 42.8 46.5 48.5 55.8 54.1 32.1 53.6 34.0 37.3 33.1

15 48.1 53.6 51.1 59.6 56.9 32.3 58.1 34.7 39.2 33.4

16 54.4 62.1 53.8 63.7 59.8 32.5 63.7 35.5 41.5 34.1

17 61.4 70.3 56.3 66.5 63.2 32.7 69.3 36.4 43.9 34.5

18 67.8 76.9 59.0 69.1 66.0 33.2 75.2 37.6 46.7 35.3

19 72.9 80.3 61.9 71.7 69.4 33.6 81.9 39.1 49.8 36.2

20 76.6 82.3 64.4 75.0 72.4 34.0 88.7 40.6 53.0 37.1

21 79.2 83.2 67.2 80.4 76.0 34.5 95.3 42.6 56.2 38.4

22 80.9 83.8 70.8 82.1 79.8 34.6 103.1 44.4 59.4 39.4

23 82.3 84.6 75.5 85.0 83.5 35.4 111.1 46.8 62.4 40.9

24 83.2 85.1 81.3 87.4 88.4 35.8 118.5 49.1 65.2 42.3

25 83.9 85.3 86.2 90.8 92.6 36.2 124.7 51.1 67.3 43.7

26 84.4 86.1 90.0 94.7 96.1 36.4 130.3 53.3 69.8 45.1

27 84.9 86.9 93.0 99.1 94.0 37.0 136.0 55.8 73.1 46.9

28 85.2 87.0 96.4 103.7 96.9 37.5 141.1 58.6 78.1 48.7

29 85.6 87.4 99.5 109.2 99.2 37.8 145.9 60.9 82.1 50.5

30 85.9 87.6 103.4 114.9 102.6 38.9 152.7 64.0 85.2 52.9

31 86.2 87.8 107.4 120.8 103.2 40.0 156.2 67.3 88.9 55.3

32 86.4 87.9 111.6 125.9 105.1 40.4 157.3 70.2 95.8 57.3

33 86.5 88.1 116.0 131.4 107.0 40.6 154.6 72.3 102.8 59.1

34 86.9 88.2 120.2 136.9 108.9 40.9 157.9 74.2 109.5 60.6

35 86.9 88.2 124.3 140.8 112.1 41.4 160.2 76.6 117.9 62.4

36 87.2 88.6 128.7 145.1 116.7 42.5 162.8 79.5 123.3 64.8

37 87.5 88.6 133.4 148.5 121.8 43.3 165.2 82.0 127.8 66.7

38 87.7 88.7 136.2 152.6 123.5 43.4 165.8 83.9 132.1 67.5

39 87.9 88.9 140.7 156.0 126.6 44.3 166.6 86.6 132.4 69.6

40 88.0 88.9 145.2 160.4 127.0 45.1 168.5 89.4 133.7 71.4

Page 19: Fire Resistance Test Report of...Fire Science Research Group (Adelaide Division) 1 Scotland Road, Mile End Adelaide, SA 5031 Fire Science Research Group Page 2 of 43 A-09-6 Fire Resistance

Fire Science Research Group

Page 19 of 43

SE

RV

ICE

PE

NE

TR

AT

ION

SE

AL

FIR

E R

ES

IST

AN

CE

TE

ST

RE

PO

RT

A-0

9-5

76 Fire Resistance Test Report

SERVICE PENETRATION SEAL TEST

APPENDIX A - Temperature Tables

Time TC A1 TC A2 TC A3 TC A4 TC B1 TC B2 TC B3 TC B4 TC B5 TC B6

41 88.3 89.0 149.1 164.4 130.1 45.9 171.3 92.0 135.2 73.1

42 88.5 89.2 153.2 167.9 132.2 46.7 172.4 94.4 137.1 74.5

43 88.9 89.2 156.7 172.0 134.2 46.7 174.7 96.3 139.4 76.1

44 88.9 89.4 160.1 175.7 136.9 47.9 176.8 99.8 141.8 78.5

45 89.2 89.5 163.3 180.0 139.6 48.6 178.6 103.1 144.2 80.6

46 89.3 89.7 166.3 183.7 142.2 49.3 179.7 106.2 146.0 82.8

47 89.4 89.9 168.1 187.5 144.4 49.9 181.4 109.5 146.8 85.1

48 89.5 90.0 169.8 190.8 146.8 50.8 182.5 112.9 148.2 86.8

49 89.8 90.2 171.8 193.2 148.8 51.5 182.9 115.7 149.5 88.5

50 89.9 90.3 173.2 195.3 150.9 52.1 183.5 118.6 151.3 90.6

51 90.1 90.5 174.5 197.0 152.6 52.4 185.7 121.6 152.2 92.5

52 90.3 90.4 176.1 198.8 154.5 53.6 187.2 125.4 155.6 94.7

53 90.6 90.7 177.8 200.7 155.8 54.1 189.7 127.7 158.2 95.8

54 90.8 91.0 179.5 202.3 156.4 54.4 190.8 130.2 160.6 97.3

55 91.0 91.1 181.4 203.2 158.3 55.6 191.4 132.9 162.4 98.9

56 91.1 91.3 183.5 205.3 160.1 56.3 192.4 135.6 165.3 100.4

57 91.5 91.6 185.3 207.3 161.3 57.0 193.7 137.8 168.3 101.5

58 91.7 91.8 186.3 208.7 162.4 57.5 195.9 139.9 172.0 102.4

59 91.8 91.9 187.6 210.5 163.5 58.5 195.4 142.1 175.1 103.4

60 92.0 92.0 189.0 214.4 164.6 59.3 195.1 144.9 176.1 104.8

61 92.1 92.3 188.8 215.3 165.6 60.0 195.2 147.5 175.8 106.3

62 92.3 92.7 189.3 213.7 168.0 60.9 196.9 149.3 175.7 106.7

63 92.6 93.3 190.1 212.9 169.5 61.7 199.3 150.7 174.9 106.4

64 92.8 94.2 190.1 213.6 170.4 62.3 200.3 152.7 176.1 108.7

65 93.3 95.5 189.9 215.0 171.5 62.7 201.1 154.6 176.4 110.8

66 93.8 96.9 189.7 217.3 172.9 63.2 203.1 155.8 177.1 112.5

67 94.6 98.6 189.5 218.9 173.4 63.6 206.2 157.1 180.1 115.5

68 96.0 100.6 189.2 219.4 175.0 64.7 206.9 158.9 180.1 119.5

69 98.2 103.4 189.1 220.5 176.2 65.6 208.3 160.4 180.3 122.7

70 100.2 106.6 189.0 223.4 176.5 65.7 209.9 161.3 181.1 125.8

71 102.2 110.0 189.2 224.4 177.5 66.6 212.0 163.0 182.4 128.1

72 104.2 113.0 189.1 226.3 178.9 67.4 213.0 166.2 184.9 130.5

73 106.7 116.6 189.7 227.9 179.9 68.1 213.5 166.8 186.8 131.4

74 109.1 119.6 190.1 230.4 181.1 68.6 214.1 167.0 189.5 132.6

75 111.7 122.4 191.0 232.8 181.8 69.4 214.2 166.9 195.8 133.3

76 114.2 125.0 191.0 235.0 183.1 69.9 214.3 167.5 199.3 134.4

77 117.1 127.6 191.6 237.6 182.9 70.1 214.5 167.6 202.6 134.8

78 119.8 130.1 192.2 239.7 182.9 70.6 214.9 168.4 207.2 136.0

79 122.3 132.6 192.9 241.9 183.5 71.2 215.5 168.5 210.6 136.0

80 124.4 134.5 193.9 243.7 183.9 71.9 216.0 169.2 222.0 137.2

81 126.5 136.1 194.4 246.9 184.3 72.2 216.8 169.3 236.7 137.6

Page 20: Fire Resistance Test Report of...Fire Science Research Group (Adelaide Division) 1 Scotland Road, Mile End Adelaide, SA 5031 Fire Science Research Group Page 2 of 43 A-09-6 Fire Resistance

Fire Science Research Group

Page 20 of 43

SE

RV

ICE

PE

NE

TR

AT

ION

SE

AL

FIR

E R

ES

IST

AN

CE

TE

ST

RE

PO

RT

A-0

9-5

76 Fire Resistance Test Report

SERVICE PENETRATION SEAL TEST

APPENDIX A - Temperature Tables

Time TC A1 TC A2 TC A3 TC A4 TC B1 TC B2 TC B3 TC B4 TC B5 TC B6

82 128.8 138.3 195.4 248.9 184.4 72.7 217.6 169.9 251.7 138.8

83 130.8 140.0 197.0 251.2 185.0 73.4 219.0 171.2 269.3 139.8

84 132.8 142.1 197.3 255.8 184.6 73.8 220.2 173.1 283.7 140.6

85 134.6 144.0 197.9 261.3 184.3 74.3 221.6 174.4 301.4 141.1

86 136.6 146.0 198.9 266.5 184.2 74.5 224.0 176.0 308.4 142.1

87 138.3 147.2 200.3 271.7 184.7 75.3 232.8 177.5 310.7 142.6

88 140.1 149.0 202.9 276.1 184.8 75.5 249.2 178.2 308.8 142.0

89 141.4 150.5 203.9 281.0 185.7 76.3 252.5 179.7 308.2 143.3

90 142.7 152.2 205.3 284.5 186.2 77.1 256.5 180.2 310.5 143.2

91 144.4 153.9 206.5 289.9 187.5 78.1 269.5 181.6 311.7 144.4

92 145.9 155.2 207.7 295.2 188.8 79.5 283.7 182.8 307.9 144.8

93 147.3 157.0 209.7 299.6 189.2 80.0 289.9 183.7 307.0 145.8

94 148.9 158.9 211.1 303.9 189.4 80.0 296.7 184.5 306.1 146.8

95 150.4 160.1 212.8 307.5 189.2 80.6 301.0 185.2 303.8 147.9

96 151.9 161.5 214.0 310.9 190.3 80.8 304.9 185.5 301.3 147.3

97 153.2 162.4 215.6 313.3 192.6 81.2 312.2 185.8 299.8 147.8

98 154.9 164.0 217.4 316.0 194.7 81.8 321.0 186.3 303.5 150.0

99 155.9 165.1 218.6 318.5 195.1 82.5 324.9 187.4 307.5 150.0

100 157.8 166.7 220.2 319.9 194.4 82.8 330.3 188.6 310.9 151.8

101 159.0 167.9 221.8 321.4 193.7 82.9 336.1 189.3 317.4 152.4

102 160.4 169.0 223.6 322.1 193.6 83.2 341.2 189.8 321.2 153.0

103 161.6 170.1 224.9 323.3 193.7 83.7 346.9 190.6 318.2 154.5

104 163.0 171.3 226.3 323.6 194.5 84.0 351.3 191.3 322.7 155.2

105 163.7 172.4 227.7 323.7 195.5 84.5 353.8 192.1 332.3 154.5

106 164.9 173.1 229.8 323.7 196.5 85.1 355.9 192.6 331.5 154.1

107 165.8 173.8 230.9 325.0 198.4 85.4 356.0 194.0 326.0 155.3

108 167.3 175.0 236.4 325.3 197.7 85.7 353.0 195.2 314.8 157.7

109 168.1 176.7 241.5 325.1 197.7 86.4 352.4 195.8 314.8 157.0

110 169.2 177.7 245.1 325.5 197.9 86.9 352.9 195.9 315.0 157.2

111 170.5 179.5 249.4 325.4 198.3 87.5 353.3 196.6 315.6 156.8

112 171.6 180.4 253.7 325.6 199.2 87.9 353.6 196.8 315.6 157.7

113 172.3 181.2 256.7 326.2 202.4 88.0 353.9 197.2 316.5 159.8

114 173.4 182.0 258.2 327.0 206.5 88.2 355.2 197.6 317.8 161.3

115 174.4 182.6 260.1 327.3 208.9 88.1 356.1 197.1 319.3 162.7

116 175.8 183.9 261.7 327.7 211.9 88.4 356.8 197.8 320.6 163.9

117 176.9 184.7 262.8 329.1 214.8 88.6 357.8 198.1 321.9 165.0

118 177.7 185.5 263.5 329.7 217.1 89.1 359.3 198.9 323.3 165.8

119 178.2 186.6 264.1 329.3 219.2 89.6 360.7 199.6 325.0 167.3

120 179.1 187.5 265.0 329.6 221.2 90.1 362.2 199.7 325.5 166.6

121 180.4 188.6 265.2 329.7 223.3 90.8 363.0 199.5 327.4 168.4

122 181.5 189.4 265.6 330.5 225.2 91.0 363.9 199.7 328.2 168.9

Page 21: Fire Resistance Test Report of...Fire Science Research Group (Adelaide Division) 1 Scotland Road, Mile End Adelaide, SA 5031 Fire Science Research Group Page 2 of 43 A-09-6 Fire Resistance

Fire Science Research Group

Page 21 of 43

SE

RV

ICE

PE

NE

TR

AT

ION

SE

AL

FIR

E R

ES

IST

AN

CE

TE

ST

RE

PO

RT

A-0

9-5

76 Fire Resistance Test Report

SERVICE PENETRATION SEAL TEST

APPENDIX A - Temperature Tables

Time TC A1 TC A2 TC A3 TC A4 TC B1 TC B2 TC B3 TC B4 TC B5 TC B6

123 182.3 190.0 265.8 330.7 226.9 91.5 364.8 199.9 330.1 169.5

124 183.0 190.6 266.0 331.1 228.6 91.3 366.3 199.7 332.5 171.0

125 184.0 191.3 266.2 331.9 231.3 91.6 367.5 200.1 333.8 171.9

126 184.5 191.9 266.6 332.0 232.8 92.3 369.0 201.0 335.7 172.5

127 185.6 193.0 267.7 331.8 234.4 92.8 370.9 201.3 337.4 173.9

128 186.7 194.1 268.3 332.3 236.8 92.6 372.8 201.4 339.1 174.8

129 187.2 195.1 268.5 331.9 239.8 93.5 374.6 201.0 341.8 173.9

130 188.4 196.3 269.6 332.8 242.2 94.4 376.4 201.4 344.5 174.3

131 189.7 197.3 271.6 332.3 245.2 94.5 378.0 201.3 346.1 173.9

132 190.9 198.3 273.3 334.4 247.8 95.2 380.0 200.9 346.8 174.2

133 191.3 199.1 274.0 335.0 250.2 95.6 382.1 200.5 347.2 174.4

134 192.4 200.2 274.9 335.5 252.7 96.2 383.0 201.2 349.1 174.1

135 193.1 201.0 276.3 336.1 255.4 96.7 384.0 201.3 351.3 172.7

136 194.1 202.1 277.6 337.0 258.1 97.0 386.0 201.5 351.5 173.6

137 194.7 202.4 278.2 338.7 261.3 96.9 387.1 201.7 352.3 174.9

138 196.0 203.3 279.0 338.5 264.1 97.3 389.4 203.1 353.7 174.4

139 196.5 203.9 280.0 339.4 267.0 97.9 391.5 205.0 354.6 175.0

140 197.1 204.8 280.7 341.0 269.7 98.0 393.8 206.8 355.6 175.3

141 198.2 205.9 282.1 340.5 273.6 98.8 395.6 207.8 357.4 175.1

142 198.8 206.4 282.9 341.3 277.5 99.0 398.2 208.1 360.2 174.5

143 199.8 207.2 284.3 341.8 281.7 99.1 400.5 208.3 361.7 174.9

144 200.0 207.8 284.3 342.7 285.7 98.8 402.5 208.2 363.6 174.9

145 200.5 208.1 284.3 344.4 289.4 98.3 404.5 208.4 365.4 175.2

146 200.6 208.8 284.9 344.3 293.0 99.0 406.5 208.9 367.2 175.4

147 201.6 209.4 286.1 345.4 296.7 100.0 408.6 209.3 369.9 175.4

148 202.6 210.8 287.5 345.8 299.8 100.6 411.1 209.9 372.1 175.4

149 203.7 211.5 288.6 346.4 303.2 100.7 413.5 210.0 374.2 176.1

150 203.7 211.6 288.5 346.9 306.1 100.6 416.0 210.3 374.5 177.0

151 203.7 211.9 288.8 348.5 308.3 101.1 418.5 211.2 375.9 177.8

152 204.6 211.7 289.4 348.4 310.7 102.2 420.8 212.0 378.6 177.1

153 205.5 212.7 290.2 349.7 313.0 102.5 422.1 212.5 382.4 177.6

154 206.0 213.5 291.0 349.9 315.2 102.5 425.1 213.8 383.6 179.5

155 206.0 213.9 291.5 350.3 316.9 102.2 427.6 214.8 385.6 180.5

156 206.3 215.0 293.0 350.0 318.6 102.6 429.6 215.0 388.2 181.5

157 206.8 215.3 294.6 350.1 320.3 103.2 431.6 215.6 393.7 183.8

158 207.2 215.7 295.9 350.1 322.1 103.7 433.2 216.3 397.6 185.4

159 208.0 216.2 296.9 350.4 323.8 103.9 434.3 216.3 399.1 186.8

160 208.9 216.8 299.8 347.3 325.4 104.0 435.9 216.2 401.3 188.3

161 210.0 217.3 302.1 345.5 326.8 103.9 437.1 216.1 403.6 188.4

162 209.6 217.5 300.6 350.3 327.6 103.8 438.5 217.1 403.1 187.7

163 210.3 217.4 300.7 349.8 328.4 104.1 440.6 218.6 404.9 186.7

Page 22: Fire Resistance Test Report of...Fire Science Research Group (Adelaide Division) 1 Scotland Road, Mile End Adelaide, SA 5031 Fire Science Research Group Page 2 of 43 A-09-6 Fire Resistance

Fire Science Research Group

Page 22 of 43

SE

RV

ICE

PE

NE

TR

AT

ION

SE

AL

FIR

E R

ES

IST

AN

CE

TE

ST

RE

PO

RT

A-0

9-5

76 Fire Resistance Test Report

SERVICE PENETRATION SEAL TEST

APPENDIX A - Temperature Tables

Time TC A1 TC A2 TC A3 TC A4 TC B1 TC B2 TC B3 TC B4 TC B5 TC B6

164 210.6 217.8 301.2 350.4 329.5 104.4 441.3 219.4 406.8 186.4

165 211.5 218.8 301.6 352.5 330.6 105.0 441.9 220.5 408.6 185.7

166 211.3 219.2 300.8 355.1 331.4 105.0 443.2 221.9 409.0 184.6

167 212.4 220.5 302.1 355.4 332.3 105.1 445.1 222.4 410.3 184.2

168 212.8 221.2 304.2 354.4 333.3 105.5 446.8 222.7 413.1 185.0

169 213.6 221.7 305.6 353.9 334.5 105.5 447.9 222.6 416.3 185.4

170 214.2 222.4 306.2 356.3 335.4 106.1 449.0 223.1 417.0 185.0

171 214.0 222.5 306.4 356.5 336.2 106.1 450.4 222.5 418.9 185.5

172 214.9 223.0 307.2 357.0 337.0 106.3 451.1 222.3 420.6 186.1

173 214.9 223.1 307.2 358.0 337.6 106.2 452.6 222.3 421.4 186.4

174 215.3 223.6 307.8 358.0 338.6 106.7 454.3 222.6 422.7 188.3

175 215.7 223.6 308.2 359.1 339.6 107.2 455.4 223.2 422.8 189.2

176 216.5 224.2 307.9 361.2 340.8 107.5 456.7 223.6 423.3 190.7

177 216.8 224.6 308.8 360.6 342.0 107.4 458.0 224.1 422.7 190.7

178 217.2 225.3 309.3 361.8 342.9 107.5 459.5 224.6 422.7 191.1

179 218.1 225.9 310.3 361.6 344.0 107.7 461.0 224.9 423.5 191.9

180 219.1 226.6 310.8 362.8 345.1 108.0 462.1 225.2 422.7 192.0

181 218.7 226.6 311.4 363.9 346.1 107.9 463.5 225.7 422.6 192.3

182 219.0 226.9 311.8 364.2 347.1 108.1 464.9 226.7 422.9 192.9

183 219.8 227.2 312.1 364.9 348.2 108.7 466.2 227.3 424.1 192.9

184 220.0 226.9 312.6 363.4 350.1 110.1 467.3 227.6 424.6 192.5

185 220.0 227.7 312.9 364.2 351.1 109.4 469.2 228.3 425.7 193.6

186 220.8 228.2 313.1 366.3 351.7 109.4 470.6 229.0 426.9 193.1

187 220.5 228.9 313.7 366.5 352.4 109.4 471.9 229.5 427.9 192.8

188 221.1 229.5 314.5 366.0 353.1 109.5 472.7 230.3 428.5 192.2

189 221.8 229.9 314.8 368.2 354.5 109.8 473.5 230.9 428.3 191.5

190 221.9 230.2 315.3 368.4 355.3 109.8 475.5 231.7 427.9 190.8

191 222.5 230.7 315.8 369.1 356.4 110.2 476.7 232.5 428.9 190.0

192 222.9 230.7 316.0 370.1 357.6 110.6 477.5 233.5 430.3 189.0

193 223.1 231.3 316.3 370.1 359.0 110.6 478.3 234.1 431.0 188.4

194 223.6 231.6 316.5 371.7 360.2 111.0 480.2 235.5 432.5 188.8

195 223.6 231.5 316.9 370.9 361.3 111.4 480.7 236.1 434.5 189.1

196 224.4 232.0 317.5 371.3 362.6 111.2 481.5 236.6 435.7 190.2

197 224.9 232.3 318.0 372.1 363.6 111.7 482.4 237.2 436.4 190.7

198 225.2 232.9 317.6 375.0 364.9 111.9 485.1 237.2 437.1 190.7

199 225.7 233.4 318.2 375.2 366.2 112.1 485.2 237.3 438.9 190.8

200 226.0 233.7 319.0 374.9 367.5 112.2 487.1 237.9 439.6 190.8

201 225.9 234.0 319.6 375.1 368.7 111.9 487.8 238.3 439.9 191.6

202 226.1 234.0 319.8 375.9 370.0 112.4 488.8 239.2 439.8 192.1

203 226.2 234.2 319.8 376.4 371.1 112.4 488.9 239.6 440.1 192.2

204 226.6 234.0 320.1 375.9 372.5 112.7 490.3 240.0 440.2 192.4

Page 23: Fire Resistance Test Report of...Fire Science Research Group (Adelaide Division) 1 Scotland Road, Mile End Adelaide, SA 5031 Fire Science Research Group Page 2 of 43 A-09-6 Fire Resistance

Fire Science Research Group

Page 23 of 43

SE

RV

ICE

PE

NE

TR

AT

ION

SE

AL

FIR

E R

ES

IST

AN

CE

TE

ST

RE

PO

RT

A-0

9-5

76 Fire Resistance Test Report

SERVICE PENETRATION SEAL TEST

APPENDIX A - Temperature Tables

Time TC A1 TC A2 TC A3 TC A4 TC B1 TC B2 TC B3 TC B4 TC B5 TC B6

205 227.1 234.7 320.5 377.7 373.6 112.9 491.7 240.5 440.7 192.3

206 227.9 235.4 321.3 378.0 374.8 113.0 492.5 240.8 440.9 193.2

207 228.2 235.4 321.2 380.0 376.1 113.8 493.3 241.6 442.8 193.2

208 229.3 236.0 321.7 381.4 377.7 114.5 493.2 242.0 443.2 192.1

209 229.6 236.8 322.9 380.3 379.2 114.2 493.5 242.6 443.0 191.9

210 229.6 236.8 323.1 380.4 380.4 114.3 493.8 243.1 443.2 191.7

211 229.3 237.2 323.0 381.0 381.6 114.6 494.6 243.7 443.4 191.7

212 229.6 237.4 323.4 380.7 383.1 114.9 494.7 244.2 443.1 191.5

213 230.6 238.1 324.3 381.3 384.4 114.7 494.9 244.6 442.5 191.6

214 230.8 238.1 324.5 382.0 385.7 115.0 494.8 244.8 442.4 191.3

215 230.4 238.0 324.1 384.0 386.8 115.5 496.0 245.6 441.7 191.1

216 231.1 238.3 324.5 386.0 388.3 115.8 496.7 246.1 441.4 191.0

217 231.8 239.1 325.4 386.0 389.6 116.0 497.1 246.4 441.6 190.7

218 231.2 238.9 325.4 386.1 390.8 116.2 497.9 246.7 442.5 190.6

219 231.8 239.3 326.1 386.4 391.8 116.6 498.4 247.3 442.8 190.8

220 231.9 239.3 326.1 388.0 393.0 117.0 498.3 247.4 442.7 191.2

221 232.0 239.4 325.9 387.9 394.0 116.9 499.0 247.8 442.3 191.8

222 232.6 239.8 326.6 387.5 395.3 117.2 498.8 248.1 442.6 191.9

223 232.7 240.2 327.7 387.0 396.8 117.3 499.3 248.3 442.6 191.9

224 232.8 240.8 327.9 388.2 398.0 117.6 499.4 248.7 443.6 192.2

225 232.8 240.6 327.6 388.7 399.5 117.7 500.0 248.9 444.9 192.4

226 233.1 240.7 327.7 389.2 400.5 117.9 501.1 248.7 447.7 192.7

227 233.5 240.9 328.1 390.5 401.5 117.9 502.2 249.0 455.0 192.8

228 234.0 241.5 328.7 389.9 403.1 118.2 502.8 249.6 458.0 192.8

229 234.3 241.8 328.9 391.1 404.3 118.6 504.0 250.0 458.9 192.1

230 234.8 241.9 329.7 390.6 405.5 118.3 505.6 249.7 459.1 191.9

231 235.1 242.0 329.8 391.8 406.6 118.6 507.1 250.1 459.5 191.6

232 235.8 242.4 330.7 393.2 407.6 118.8 508.3 250.3 459.9 191.5

233 236.2 242.8 330.8 394.5 409.0 119.4 510.2 250.6 460.2 190.9

234 236.1 242.6 331.3 394.5 410.4 119.4 510.5 250.6 460.3 191.0

235 235.7 242.4 331.2 394.9 411.7 119.5 511.6 250.7 461.0 190.8

236 236.1 242.9 331.4 395.9 412.9 120.0 511.1 251.0 460.5 190.9

237 237.1 243.6 331.6 397.9 413.9 120.7 512.6 251.6 461.2 190.7

238 237.0 243.7 331.8 398.5 415.4 120.8 513.0 252.2 461.3 190.5

239 237.5 244.3 333.0 398.4 416.6 120.5 513.1 251.8 461.9 190.6

240 237.1 244.2 332.8 398.8 418.1 120.9 512.8 252.5 461.3 190.6

241 237.3 244.7 333.1 399.2 419.9 121.3 513.4 252.9 461.6 190.0

242 237.1 244.7 333.2 400.7 420.9 121.2 513.4 253.0 462.3 189.8

243 238.1 245.0 333.7 400.4 422.4 121.9 514.1 253.6 462.3 189.8

244 238.0 244.6 333.4 402.4 423.7 122.4 514.4 254.3 462.7 190.6

Page 24: Fire Resistance Test Report of...Fire Science Research Group (Adelaide Division) 1 Scotland Road, Mile End Adelaide, SA 5031 Fire Science Research Group Page 2 of 43 A-09-6 Fire Resistance

Fire Science Research Group

Page 24 of 43

SE

RV

ICE

PE

NE

TR

AT

ION

SE

AL

FIR

E R

ES

IST

AN

CE

TE

ST

RE

PO

RT

A-0

9-5

76 Fire Resistance Test Report

SERVICE PENETRATION SEAL TEST

APPENDIX A - Temperature Tables

Time TC C1 TC C2 TC C3 TC C4 TC C5 TC D1 TC D2 TC D3 TC D4 TC D5 TC E1 TC E2 TC E3

0 29.2 27.1 29.6 28.2 30.1 29.9 30.1 29.7 29.6 30.5 29.7 29.7 29.8

1 29.1 27.1 29.6 28.2 30.1 29.9 30.1 29.7 29.6 30.5 29.7 29.7 29.8

2 29.2 27.1 29.8 28.2 30.1 30.0 30.1 29.7 29.6 30.5 29.7 29.7 29.7

3 29.4 27.1 29.8 28.3 30.2 30.0 30.2 29.8 29.7 30.6 29.7 29.7 29.8

4 29.5 27.1 29.9 28.3 30.3 30.0 30.1 29.9 29.8 30.6 29.8 29.8 29.8

5 29.5 27.1 29.9 28.3 30.3 30.3 30.1 29.9 29.9 30.7 29.8 30.0 29.8

6 29.5 27.2 30.0 28.3 30.3 30.8 30.2 30.0 29.9 30.8 29.9 30.3 29.8

7 29.7 27.2 30.1 28.4 30.5 31.4 30.3 30.1 30.0 30.9 30.0 30.8 29.9

8 29.7 27.3 30.2 28.4 30.6 32.5 30.3 30.2 30.2 31.0 30.2 31.2 30.0

9 29.8 27.3 30.3 28.5 30.8 33.6 30.3 30.6 30.5 31.3 30.5 32.0 30.0

10 30.0 27.4 30.4 28.6 31.5 35.1 30.5 31.2 31.1 31.8 31.5 32.7 30.1

11 30.1 27.5 30.4 28.7 32.7 36.8 30.6 32.5 32.1 32.8 33.2 33.5 30.2

12 30.2 27.7 30.6 28.8 35.0 38.8 30.7 34.4 33.6 34.5 36.5 34.3 30.3

13 30.3 27.8 30.6 29.0 39.0 41.1 30.9 37.5 36.2 37.3 41.3 35.2 30.5

14 30.3 28.2 30.6 29.3 44.6 43.4 31.0 41.5 40.1 41.6 48.0 36.6 30.6

15 30.5 28.5 30.8 29.8 51.7 45.7 31.3 46.5 45.1 46.7 55.3 37.8 30.7

16 30.5 29.0 30.8 30.3 58.3 48.2 31.8 52.3 51.7 53.0 62.3 39.0 30.9

17 30.7 29.6 30.9 30.9 63.5 50.8 32.0 57.7 57.4 58.7 67.9 40.1 31.1

18 30.7 30.2 30.9 31.6 67.2 53.6 32.4 62.8 62.9 63.3 71.8 41.4 31.5

19 30.8 31.0 31.0 32.5 69.1 56.5 33.1 66.9 67.0 67.3 74.3 42.6 31.7

20 30.9 31.9 31.1 33.4 70.4 59.2 33.4 70.3 70.3 69.1 75.4 44.0 32.2

21 31.0 32.8 31.2 34.5 70.6 62.5 34.1 72.4 72.0 70.7 76.7 44.9 32.3

22 31.2 34.0 31.4 35.7 70.6 65.7 34.5 73.6 73.6 71.9 77.1 46.3 32.5

23 31.4 35.4 31.6 37.2 70.6 68.9 35.2 75.3 74.8 72.8 77.6 47.6 32.8

24 31.6 36.8 31.7 38.6 70.6 71.9 35.6 76.4 75.7 73.1 77.8 48.9 33.1

25 31.9 38.6 31.9 40.3 70.3 75.1 35.9 76.7 75.9 73.0 77.9 50.1 33.4

26 32.2 40.7 32.1 42.1 70.2 79.0 36.5 77.4 76.6 73.8 78.0 51.2 33.6

27 32.5 43.0 32.3 44.1 70.1 83.3 37.1 78.3 76.9 74.1 78.1 52.5 33.9

28 33.1 45.5 32.7 46.5 70.0 87.2 37.9 78.4 77.6 74.4 78.2 53.9 34.0

29 33.5 47.8 33.0 48.9 70.0 90.1 38.6 79.2 78.1 73.8 78.4 55.3 34.3

30 34.1 50.3 33.4 51.4 69.7 91.4 39.7 79.7 78.6 74.7 78.9 56.9 35.0

31 34.7 52.7 34.0 54.1 69.7 93.5 40.8 80.0 79.1 74.7 79.1 58.0 35.5

32 35.3 54.9 34.4 56.5 70.0 95.5 41.7 80.6 79.3 74.4 79.2 59.5 35.8

33 35.9 57.3 35.0 59.1 69.9 98.2 42.3 81.0 79.6 74.8 79.3 60.7 35.8

34 36.6 59.6 35.6 61.3 69.9 101.0 43.1 81.5 79.8 75.1 79.3 62.0 36.1

35 37.4 61.8 36.3 63.7 69.9 103.2 44.3 82.1 79.8 75.3 79.5 63.5 36.2

36 37.3 64.1 36.9 66.1 69.8 105.4 45.4 82.3 80.0 76.0 79.5 64.6 36.8

37 38.1 66.2 37.7 68.4 69.9 108.0 46.5 83.0 80.5 75.9 79.8 65.7 37.1

38 39.0 68.3 38.5 70.8 70.2 110.6 47.1 83.2 80.5 75.6 79.8 67.1 37.2

39 39.7 70.3 39.3 73.3 70.2 114.5 48.5 83.7 81.3 76.3 80.2 68.4 37.6

40 40.5 72.2 40.0 75.6 70.1 118.2 49.7 84.4 81.4 76.6 80.6 69.5 37.9

Page 25: Fire Resistance Test Report of...Fire Science Research Group (Adelaide Division) 1 Scotland Road, Mile End Adelaide, SA 5031 Fire Science Research Group Page 2 of 43 A-09-6 Fire Resistance

Fire Science Research Group

Page 25 of 43

SE

RV

ICE

PE

NE

TR

AT

ION

SE

AL

FIR

E R

ES

IST

AN

CE

TE

ST

RE

PO

RT

A-0

9-5

76 Fire Resistance Test Report

SERVICE PENETRATION SEAL TEST

APPENDIX A - Temperature Tables

Time TC C1 TC C2 TC C3 TC C4 TC C5 TC D1 TC D2 TC D3 TC D4 TC D5 TC E1 TC E2 TC E3

41 41.7 74.1 41.0 77.8 70.4 122.2 50.8 84.7 81.8 76.8 81.0 70.4 38.5

42 42.4 75.8 41.7 80.0 70.7 126.0 51.8 85.3 82.3 76.7 81.5 70.5 38.7

43 42.6 77.6 42.3 82.0 71.0 129.5 52.7 85.7 82.4 77.1 81.8 71.7 39.0

44 43.2 79.3 43.3 84.1 70.9 132.9 54.0 86.1 82.8 77.6 82.0 72.4 39.2

45 44.1 80.8 44.1 86.0 71.2 136.0 55.4 86.4 82.8 77.7 81.9 73.6 39.7

46 44.8 82.2 44.7 87.9 71.0 138.8 56.5 87.0 83.1 78.0 82.1 74.8 40.3

47 45.4 83.7 45.3 89.5 71.2 141.2 57.7 87.7 83.6 78.1 81.5 75.4 40.3

48 46.2 85.0 46.2 91.3 71.7 144.2 58.9 88.3 85.2 78.4 81.7 76.7 40.9

49 46.8 86.4 46.9 92.9 72.3 146.4 60.0 89.2 85.8 78.9 81.6 77.3 41.1

50 47.1 87.6 47.3 94.2 72.7 148.3 61.6 89.7 86.2 79.2 82.0 77.5 41.1

51 47.1 88.9 47.5 95.6 73.6 149.8 62.9 90.3 86.4 79.9 82.3 78.1 41.2

52 47.6 90.1 48.0 96.6 74.7 151.2 64.6 91.2 85.5 80.5 83.0 78.7 41.6

53 48.1 91.3 48.3 97.5 76.1 152.4 66.0 91.9 84.9 81.0 83.6 79.2 41.9

54 48.6 92.4 48.7 98.4 77.8 154.1 67.0 92.6 85.7 81.7 84.0 79.8 41.8

55 49.3 93.4 49.4 99.2 79.6 156.2 68.9 92.4 85.2 82.7 85.0 80.6 42.4

56 49.5 94.6 49.5 99.6 82.0 158.5 70.2 92.5 84.5 83.7 85.7 80.8 42.6

57 50.2 95.5 49.8 100.2 85.3 161.1 71.8 92.5 84.5 84.1 86.2 81.6 42.9

58 49.6 96.4 49.9 100.5 87.9 163.5 73.3 92.3 84.8 85.2 86.6 82.7 42.9

59 50.0 97.3 50.3 101.0 90.3 166.0 75.1 92.5 85.5 86.3 87.9 83.4 43.2

60 50.1 98.2 50.5 101.4 93.3 168.8 76.8 92.8 85.6 87.4 88.8 85.0 43.7

61 50.1 99.0 50.9 101.8 96.9 171.4 78.4 92.9 86.1 89.1 90.2 84.7 44.0

62 50.7 99.7 51.5 102.3 100.9 174.2 79.9 93.3 86.7 90.8 91.6 85.5 44.4

63 50.6 100.3 51.9 102.6 104.2 176.9 81.0 93.6 87.0 92.9 94.0 86.7 45.0

64 50.9 100.9 51.6 102.8 107.3 179.2 82.7 93.8 87.3 95.7 96.7 87.8 45.2

65 51.0 101.5 51.9 102.9 110.4 181.7 84.3 93.7 87.9 99.0 100.1 89.1 45.4

66 51.1 102.2 51.8 103.0 113.2 184.2 85.0 94.4 89.1 102.3 103.5 90.1 45.5

67 51.6 102.9 51.7 103.1 116.1 186.5 85.7 95.0 90.8 105.0 106.4 90.4 45.3

68 52.0 103.4 52.2 103.5 118.5 188.9 86.3 95.5 93.8 107.7 109.8 90.5 45.7

69 53.0 103.9 52.5 103.8 121.1 191.4 87.0 96.4 97.1 110.6 113.2 91.3 46.1

70 52.8 104.4 52.3 103.8 123.4 194.3 87.8 97.5 100.6 112.6 115.6 92.3 46.0

71 53.0 104.9 52.7 104.1 125.7 197.1 88.8 100.1 104.8 115.3 119.0 93.0 46.3

72 53.4 105.4 52.9 104.2 127.7 199.4 90.3 105.1 108.3 117.7 121.8 94.3 46.8

73 53.6 105.8 53.2 104.6 130.2 202.5 91.5 109.3 111.3 119.8 124.1 95.4 47.3

74 53.5 106.3 53.2 104.9 132.5 205.2 92.6 113.1 114.1 122.1 126.2 96.5 47.7

75 53.4 106.8 53.4 105.1 134.8 207.2 93.6 116.2 117.1 124.0 128.5 97.2 48.5

76 53.1 107.3 53.6 105.5 136.9 209.8 94.8 118.5 119.9 126.1 130.2 97.9 48.9

77 53.7 107.8 53.8 105.6 138.9 211.8 95.5 121.0 121.9 128.0 131.9 98.5 48.6

78 53.6 108.2 53.9 105.9 140.8 213.9 97.1 123.3 124.2 129.7 133.7 98.6 48.6

79 53.8 108.6 54.3 106.2 142.9 215.7 97.6 125.9 126.8 131.9 135.7 99.4 49.0

80 53.8 109.0 54.5 106.3 144.7 217.6 99.0 127.9 129.2 133.3 137.9 99.8 49.1

81 54.2 109.5 54.6 106.6 146.9 219.9 100.0 130.2 131.8 135.0 139.4 100.9 49.2

Page 26: Fire Resistance Test Report of...Fire Science Research Group (Adelaide Division) 1 Scotland Road, Mile End Adelaide, SA 5031 Fire Science Research Group Page 2 of 43 A-09-6 Fire Resistance

Fire Science Research Group

Page 26 of 43

SE

RV

ICE

PE

NE

TR

AT

ION

SE

AL

FIR

E R

ES

IST

AN

CE

TE

ST

RE

PO

RT

A-0

9-5

76 Fire Resistance Test Report

SERVICE PENETRATION SEAL TEST

APPENDIX A - Temperature Tables

Time TC C1 TC C2 TC C3 TC C4 TC C5 TC D1 TC D2 TC D3 TC D4 TC D5 TC E1 TC E2 TC E3

82 54.7 110.0 54.2 106.6 148.6 222.6 101.5 132.4 134.1 136.7 141.3 101.6 49.2

83 55.0 110.5 54.3 107.1 150.5 226.1 102.6 134.0 136.1 138.3 143.6 102.3 49.7

84 55.1 110.9 54.6 107.3 152.4 229.2 103.7 135.8 138.6 140.1 145.5 103.2 49.9

85 55.1 111.3 54.9 107.8 154.2 232.8 104.2 137.7 140.8 141.3 147.3 104.1 50.3

86 55.3 111.6 54.8 108.0 156.0 236.9 106.0 139.3 142.6 142.8 148.2 105.3 50.2

87 55.4 111.9 54.8 108.3 157.6 240.6 107.2 141.4 144.2 144.4 150.2 105.6 50.4

88 55.8 112.3 54.7 108.8 159.6 244.6 107.6 143.2 146.2 145.7 151.4 106.1 50.6

89 55.8 112.5 55.1 109.4 161.3 248.6 109.0 144.9 147.8 147.3 153.1 106.8 50.4

90 56.0 112.9 55.5 110.0 163.3 252.5 109.7 146.8 92.0 148.5 155.4 107.6 51.0

91 55.8 113.1 55.2 110.6 165.0 256.7 111.3 148.5 81.1 149.5 157.2 108.8 51.2

92 55.8 113.4 55.6 111.3 166.8 260.8 112.1 150.0 78.7 150.9 158.2 110.1 51.7

93 55.9 113.7 55.6 111.8 168.4 264.4 113.5 151.6 78.4 152.4 160.0 110.7 52.1

94 56.2 113.9 55.6 112.4 169.9 267.7 114.8 153.3 78.0 153.7 161.9 111.7 52.5

95 56.5 114.2 55.6 113.1 171.4 271.6 115.9 155.0 77.7 154.9 163.5 112.6 52.9

96 56.4 114.5 56.2 113.8 173.5 275.1 116.4 156.5 78.7 156.1 164.4 113.6 53.4

97 56.9 114.9 56.4 114.7 175.3 279.5 117.3 158.2 79.5 156.6 165.6 114.2 53.8

98 56.6 115.1 56.6 115.6 176.9 285.1 118.5 159.9 81.4 157.3 166.9 115.2 54.1

99 56.8 115.4 56.6 116.2 178.5 291.7 119.4 161.4 82.0 157.7 168.5 116.1 54.7

100 57.1 116.0 56.2 117.0 179.7 298.7 120.7 163.1 83.3 158.7 169.4 116.5 54.6

101 57.5 116.5 56.5 117.9 181.3 305.3 121.6 164.4 87.8 160.1 170.5 116.0 53.9

102 57.8 116.9 56.7 118.8 182.7 312.6 122.7 165.6 95.6 161.0 171.7 117.2 53.7

103 57.8 117.3 57.2 120.2 184.4 319.2 123.5 167.1 103.8 162.4 173.2 117.9 54.0

104 57.0 117.6 57.1 121.1 185.7 325.3 124.9 168.2 112.4 163.6 174.7 119.3 54.4

105 57.4 118.1 57.2 122.0 187.1 330.5 125.9 169.6 121.8 165.2 175.5 120.6 54.7

106 57.5 118.8 57.5 123.4 188.5 333.9 126.6 170.8 131.7 166.7 177.3 121.6 55.2

107 57.6 119.4 57.3 124.8 189.3 337.8 129.3 171.7 142.9 167.9 178.6 122.9 55.5

108 57.6 120.0 57.2 126.0 190.1 341.0 131.3 173.1 151.6 169.4 180.2 124.4 55.9

109 57.4 120.6 58.0 127.5 191.8 343.4 132.6 174.4 161.2 170.3 181.2 125.9 56.4

110 57.6 121.2 58.7 129.4 193.2 345.3 134.2 176.0 168.6 171.2 182.9 126.9 57.0

111 57.6 121.9 58.7 131.0 194.4 347.0 135.6 177.5 173.8 171.4 183.3 127.9 57.5

112 57.3 122.6 58.7 133.0 195.1 348.8 137.1 178.8 177.8 172.4 184.8 128.6 57.9

113 57.9 123.4 58.9 134.6 195.4 351.0 138.9 179.9 181.9 173.2 185.4 129.8 57.9

114 58.7 124.3 59.0 136.5 196.3 352.9 140.5 181.2 184.7 174.1 185.6 130.3 57.7

115 58.8 125.3 59.1 138.3 197.3 355.2 142.0 182.7 187.7 175.4 186.0 130.4 57.1

116 59.2 126.2 59.5 140.5 198.0 357.2 143.3 184.2 190.4 176.8 188.1 131.0 57.6

117 59.1 127.4 60.2 142.8 198.9 359.4 144.7 185.5 193.3 178.5 189.8 132.3 57.8

118 59.0 128.3 60.3 144.8 199.6 362.0 145.9 186.8 196.3 179.4 190.2 133.5 57.7

119 59.0 129.2 60.6 146.9 199.9 364.8 147.4 188.7 198.9 179.7 191.2 134.8 58.4

120 59.2 130.4 61.7 149.1 200.7 366.5 148.4 190.0 200.5 180.7 192.0 135.7 58.6

121 59.6 131.5 61.6 150.8 201.4 369.8 149.4 190.9 202.9 182.0 192.6 136.6 59.1

122 59.5 132.9 62.4 152.8 202.1 372.5 150.6 192.3 205.3 183.2 194.8 136.7 59.4

Page 27: Fire Resistance Test Report of...Fire Science Research Group (Adelaide Division) 1 Scotland Road, Mile End Adelaide, SA 5031 Fire Science Research Group Page 2 of 43 A-09-6 Fire Resistance

Fire Science Research Group

Page 27 of 43

SE

RV

ICE

PE

NE

TR

AT

ION

SE

AL

FIR

E R

ES

IST

AN

CE

TE

ST

RE

PO

RT

A-0

9-5

76 Fire Resistance Test Report

SERVICE PENETRATION SEAL TEST

APPENDIX A - Temperature Tables

Time TC C1 TC C2 TC C3 TC C4 TC C5 TC D1 TC D2 TC D3 TC D4 TC D5 TC E1 TC E2 TC E3

123 59.7 134.1 62.9 154.6 202.9 375.1 151.6 193.2 207.7 184.5 195.4 138.1 59.6

124 60.1 135.4 63.0 156.1 203.0 376.8 152.5 194.2 210.8 185.5 195.7 139.3 59.3

125 60.7 136.5 63.4 158.0 203.6 379.9 153.8 195.7 214.1 186.1 196.9 139.8 59.3

126 60.3 137.8 64.1 159.9 203.8 383.7 155.2 196.9 217.5 186.2 197.8 140.9 59.5

127 60.2 139.1 64.3 161.5 204.1 387.7 156.4 198.7 220.3 186.8 198.6 141.8 59.9

128 60.9 140.5 64.5 162.8 204.4 391.0 157.9 200.2 223.3 186.9 197.4 142.8 59.5

129 61.7 141.9 65.5 165.0 205.3 393.5 158.6 201.7 226.2 188.9 198.9 142.9 59.9

130 61.4 143.3 66.0 166.5 206.1 395.6 159.7 203.0 229.3 190.5 201.1 143.9 61.0

131 60.9 144.6 66.4 168.0 206.4 398.0 160.6 204.3 233.0 191.6 202.1 144.8 61.0

132 61.5 145.9 67.0 169.6 206.5 401.0 161.3 205.5 236.2 193.0 202.9 146.0 61.4

133 62.3 147.2 67.2 170.9 207.0 403.7 161.6 207.2 238.9 193.9 203.7 146.8 61.5

134 62.7 148.6 67.8 172.5 207.1 403.6 162.0 208.3 241.2 196.1 205.0 147.2 61.6

135 63.3 150.1 68.4 174.0 207.5 403.3 162.5 209.6 243.4 197.6 205.0 148.2 62.0

136 63.3 151.3 68.9 175.3 207.5 403.9 163.4 211.2 246.5 198.8 206.5 149.1 62.3

137 64.1 152.9 69.1 177.1 207.7 406.7 164.2 212.9 249.1 199.8 205.3 149.6 61.7

138 64.4 154.3 69.7 178.3 208.0 408.4 164.9 214.8 251.5 201.2 207.1 149.6 61.9

139 64.5 155.5 70.2 179.5 208.0 409.8 165.4 216.6 254.0 201.8 207.5 150.8 62.3

140 65.1 156.9 70.6 180.9 208.2 412.4 166.0 218.7 256.4 202.2 207.5 151.6 62.2

141 64.8 158.0 71.1 182.1 208.5 415.1 167.0 221.1 254.2 202.6 209.2 152.6 63.0

142 65.5 159.3 71.6 183.5 208.7 417.7 168.6 222.9 255.5 204.2 210.2 153.1 62.9

143 65.6 160.6 71.8 184.8 208.7 421.3 171.4 225.0 257.7 204.6 209.7 154.6 62.7

144 66.7 162.0 72.2 186.0 208.7 423.7 171.4 227.0 260.3 205.4 208.4 154.7 62.3

145 67.2 163.4 71.9 186.7 208.7 427.3 171.6 228.8 262.3 206.4 208.1 155.0 61.2

146 67.2 164.5 72.7 188.4 209.0 430.7 172.3 231.0 264.9 207.0 210.3 155.4 61.6

147 67.4 165.6 73.4 189.6 209.5 432.9 173.0 233.2 266.9 207.3 211.4 157.1 62.3

148 67.6 166.8 73.9 191.0 209.8 436.5 173.5 234.8 268.9 207.9 212.9 157.9 63.2

149 67.9 167.8 73.9 192.1 209.9 440.6 174.0 237.0 271.0 208.7 214.7 158.7 63.7

150 69.1 169.3 74.2 193.2 210.1 443.2 174.3 239.0 272.8 209.5 213.2 159.3 62.9

151 68.9 170.5 75.0 194.7 210.2 446.7 174.7 241.1 274.7 210.5 214.4 160.1 63.2

152 68.7 171.5 75.7 195.8 210.4 448.5 175.4 243.0 276.9 211.4 216.0 160.7 63.8

153 68.8 172.6 76.1 197.2 210.8 452.0 175.6 244.8 278.9 212.2 216.1 161.9 64.1

154 69.4 173.4 76.0 198.0 210.3 455.0 177.6 246.6 280.8 212.5 215.7 162.7 64.0

155 69.6 174.6 76.2 198.6 210.2 457.5 178.2 248.0 282.8 213.2 214.3 163.2 63.4

156 69.6 175.6 76.9 200.1 210.3 460.8 178.7 249.8 284.8 214.0 215.2 163.4 63.4

157 70.0 176.5 77.8 201.3 210.6 462.1 179.1 251.6 286.6 198.6 216.3 164.0 63.0

158 70.1 177.8 78.4 202.4 210.6 462.9 179.6 252.8 288.2 202.5 215.7 164.7 63.2

159 70.3 178.9 78.9 203.5 210.7 464.9 180.0 254.4 290.0 204.1 215.2 165.2 63.3

160 70.5 179.9 79.3 204.6 210.5 466.6 180.2 255.6 291.5 204.7 217.5 165.8 62.9

161 71.1 180.9 79.7 205.6 210.6 468.3 180.6 256.7 293.3 204.3 216.0 165.9 62.9

162 72.3 182.1 80.5 206.6 211.5 469.8 181.2 258.7 295.6 204.6 215.2 166.5 62.3

163 72.7 183.2 80.9 207.2 211.0 470.9 182.1 259.8 297.4 204.9 214.2 166.7 62.4

Page 28: Fire Resistance Test Report of...Fire Science Research Group (Adelaide Division) 1 Scotland Road, Mile End Adelaide, SA 5031 Fire Science Research Group Page 2 of 43 A-09-6 Fire Resistance

Fire Science Research Group

Page 28 of 43

SE

RV

ICE

PE

NE

TR

AT

ION

SE

AL

FIR

E R

ES

IST

AN

CE

TE

ST

RE

PO

RT

A-0

9-5

76 Fire Resistance Test Report

SERVICE PENETRATION SEAL TEST

APPENDIX A - Temperature Tables

Time TC C1 TC C2 TC C3 TC C4 TC C5 TC D1 TC D2 TC D3 TC D4 TC D5 TC E1 TC E2 TC E3

164 72.7 184.1 81.8 208.5 211.1 471.8 182.5 261.4 299.2 205.2 216.8 167.7 62.8

165 73.1 185.2 82.9 209.9 211.4 472.7 183.4 262.7 301.2 205.5 218.4 168.7 63.3

166 73.6 186.3 83.1 210.7 211.6 474.6 184.0 264.5 303.6 206.4 217.6 169.7 63.3

167 74.2 187.3 83.8 211.7 211.8 477.0 184.3 266.0 305.5 207.4 219.5 170.0 63.6

168 74.2 188.3 84.7 213.1 212.1 479.1 184.6 267.3 307.2 207.9 220.3 171.1 63.5

169 74.5 189.2 85.6 214.5 212.3 481.5 185.3 268.3 308.9 209.0 220.1 172.0 63.6

170 74.7 189.9 85.9 215.6 212.8 483.9 185.6 269.7 310.6 210.0 221.6 173.1 64.2

171 75.3 191.0 86.6 216.6 213.0 486.4 185.9 271.0 312.7 210.9 221.7 173.6 64.0

172 75.8 192.0 87.3 217.8 213.3 487.8 186.1 272.7 314.4 211.6 222.9 174.2 64.3

173 76.6 193.1 87.9 218.7 213.4 490.7 186.0 274.2 316.1 212.7 222.6 174.8 64.3

174 77.1 193.9 89.1 219.6 213.5 492.7 186.5 275.7 317.4 213.6 222.5 175.6 64.3

175 77.7 194.8 89.6 221.1 213.7 493.5 186.7 277.0 319.2 214.7 224.6 176.4 64.7

176 78.0 195.5 90.5 222.1 214.1 494.8 186.6 278.6 320.5 215.6 224.8 177.4 65.3

177 78.8 196.7 90.3 222.4 214.2 497.0 187.0 280.1 322.3 216.6 223.6 178.2 65.4

178 79.1 197.4 91.0 223.6 214.6 499.6 187.1 281.3 323.7 217.5 225.0 178.8 65.8

179 80.5 198.4 91.6 224.7 214.4 502.7 187.6 282.7 325.3 218.2 225.2 179.1 65.9

180 81.0 199.4 92.2 225.8 214.8 505.1 188.4 284.0 326.7 219.7 225.4 180.1 66.2

181 81.8 200.4 92.8 226.8 214.9 507.2 189.0 285.6 328.6 221.3 226.2 180.4 66.1

182 82.6 201.4 93.2 227.7 214.8 509.7 189.4 286.7 329.8 222.9 226.3 181.1 66.3

183 83.2 202.3 93.8 228.8 214.7 511.1 189.9 288.0 331.4 224.0 227.4 181.5 66.5

184 83.3 203.1 94.3 229.6 214.6 513.7 190.2 289.4 333.0 225.1 226.5 182.3 66.2

185 83.8 203.9 94.8 230.7 214.6 515.5 190.6 290.9 334.5 225.8 225.7 182.8 66.2

186 84.5 204.9 95.4 231.6 214.5 518.2 191.1 292.2 335.9 227.0 228.0 182.7 66.5

187 84.5 205.6 96.1 232.2 214.6 520.8 191.7 293.8 337.3 227.8 226.7 183.8 66.5

188 85.2 206.2 96.6 233.1 214.8 522.2 192.0 295.2 338.9 228.3 226.7 184.5 66.3

189 85.6 207.2 96.9 234.2 214.7 524.3 192.5 296.8 340.3 229.3 227.8 185.0 66.9

190 86.1 207.8 97.5 235.1 215.0 526.6 192.7 298.5 341.5 230.6 227.4 185.8 66.8

191 86.4 208.8 98.3 236.2 214.9 528.4 193.1 300.4 342.7 231.4 229.1 186.6 67.0

192 86.8 209.5 98.6 236.9 215.0 530.1 193.5 302.0 344.3 232.2 229.0 187.3 67.5

193 87.1 210.2 99.2 238.0 215.1 531.0 193.8 303.6 346.1 233.4 229.3 187.7 67.3

194 87.6 211.0 99.5 238.8 215.2 533.2 194.2 304.4 347.0 233.8 229.5 188.4 67.5

195 88.2 211.8 99.9 239.5 215.0 532.1 194.3 305.7 348.0 234.5 228.7 189.0 67.6

196 88.7 212.4 100.4 240.3 215.0 534.9 194.5 306.8 349.3 235.6 228.7 188.9 67.7

197 89.0 213.2 100.7 241.3 215.2 534.9 195.0 307.5 350.5 236.5 229.3 190.1 68.0

198 89.4 214.1 101.3 242.1 215.1 535.8 195.4 308.7 352.2 237.2 230.8 190.4 68.3

199 89.6 214.7 101.8 243.1 215.2 536.8 195.7 310.2 353.5 238.0 231.9 190.6 68.3

200 90.0 215.3 102.1 243.4 214.9 536.9 196.2 311.5 354.5 237.9 230.9 191.5 68.2

201 90.5 216.2 102.1 244.2 215.1 537.8 197.0 312.6 356.0 239.1 230.3 191.8 67.7

202 90.8 216.9 102.8 245.3 215.3 537.3 197.4 313.6 356.9 239.5 231.2 192.5 68.0

203 91.3 217.7 103.4 246.1 215.1 538.1 198.2 314.8 358.1 240.2 232.2 192.2 67.8

204 91.5 218.2 103.4 246.7 215.2 538.6 198.6 316.1 359.1 240.6 230.2 193.2 67.8

Page 29: Fire Resistance Test Report of...Fire Science Research Group (Adelaide Division) 1 Scotland Road, Mile End Adelaide, SA 5031 Fire Science Research Group Page 2 of 43 A-09-6 Fire Resistance

Fire Science Research Group

Page 29 of 43

SE

RV

ICE

PE

NE

TR

AT

ION

SE

AL

FIR

E R

ES

IST

AN

CE

TE

ST

RE

PO

RT

A-0

9-5

76 Fire Resistance Test Report

SERVICE PENETRATION SEAL TEST

APPENDIX A - Temperature Tables

Time TC C1 TC C2 TC C3 TC C4 TC C5 TC D1 TC D2 TC D3 TC D4 TC D5 TC E1 TC E2 TC E3

205 92.1 218.9 103.9 247.5 215.2 537.9 199.0 317.2 360.3 240.7 231.6 194.0 68.2

206 92.7 219.7 104.3 248.5 215.0 538.3 199.1 318.1 361.3 242.0 232.9 193.8 68.1

207 93.2 220.6 105.0 249.6 215.2 537.1 199.3 319.2 362.6 242.5 233.6 194.8 68.8

208 92.9 221.0 104.9 250.4 215.2 537.2 199.7 320.2 363.8 242.9 234.3 196.0 69.4

209 93.7 221.9 105.3 250.8 215.4 537.7 200.3 321.2 364.7 243.4 233.1 196.4 68.9

210 93.8 222.5 105.8 251.8 215.3 536.9 200.9 322.4 365.7 243.9 233.3 196.1 68.9

211 93.8 222.9 106.0 252.4 215.4 537.4 201.5 323.1 366.6 244.4 233.6 197.3 68.9

212 94.2 223.6 106.5 253.3 215.7 537.4 202.0 324.4 367.6 245.0 233.3 197.3 69.0

213 95.0 224.6 106.3 253.7 215.8 537.7 202.2 325.2 368.5 245.8 232.6 197.3 68.9

214 95.4 225.2 106.9 254.3 215.9 536.7 202.5 326.3 369.2 246.3 233.5 197.7 68.8

215 95.2 225.7 107.4 255.8 216.2 536.4 203.1 327.5 370.6 246.0 235.0 198.6 69.3

216 95.2 226.3 108.0 256.4 216.4 536.2 203.2 328.1 371.5 246.7 236.3 199.6 69.8

217 95.6 227.0 107.6 256.9 216.2 536.8 203.9 329.3 372.3 246.7 236.3 200.1 69.9

218 95.6 227.5 107.6 257.4 216.2 535.7 204.2 330.4 372.9 247.5 235.9 200.8 70.1

219 96.3 228.2 108.2 258.4 216.1 535.9 204.8 331.0 373.7 248.3 235.8 200.9 70.2

220 96.2 228.6 108.6 259.4 216.0 535.6 205.1 331.5 374.5 248.4 236.4 201.9 70.4

221 97.0 229.5 108.7 259.9 216.3 534.1 205.4 332.3 375.0 249.1 236.4 202.0 70.5

222 96.8 229.9 109.1 260.3 216.5 534.2 205.7 333.2 375.6 250.0 236.1 202.7 70.2

223 97.2 230.5 109.5 261.3 216.7 533.9 206.4 334.1 376.3 250.6 236.1 202.8 70.2

224 97.6 231.3 110.0 262.3 216.8 534.1 206.7 334.9 376.9 250.7 236.9 203.0 70.2

225 98.2 231.9 110.4 263.0 216.9 533.0 207.1 335.5 377.4 251.3 237.3 203.4 70.3

226 98.5 232.6 110.8 263.7 217.3 532.7 207.2 336.3 378.0 251.3 236.7 203.9 70.4

227 99.0 233.4 111.0 264.6 217.3 533.3 207.6 336.9 378.2 251.8 237.8 204.1 70.4

228 99.0 234.0 111.4 265.3 217.4 533.1 208.2 337.7 378.9 251.7 237.4 204.9 70.6

229 98.9 234.2 111.4 265.8 217.5 533.3 208.6 338.8 379.4 252.2 237.8 205.6 70.4

230 99.6 234.9 111.5 266.5 217.6 533.4 208.6 339.5 379.8 253.3 238.0 205.9 70.3

231 100.1 235.8 111.7 266.9 217.7 533.5 209.0 340.9 380.4 253.0 237.7 205.9 70.3

232 100.4 236.2 112.5 268.0 218.0 533.5 209.5 341.5 381.2 253.4 238.9 206.4 70.8

233 100.8 236.6 112.1 268.5 218.2 533.6 209.9 341.9 381.8 253.8 238.4 206.9 71.2

234 100.8 237.2 112.5 269.2 218.6 534.0 210.2 342.9 382.3 254.7 237.3 207.2 71.4

235 100.7 237.8 112.6 269.2 218.6 533.9 210.6 343.5 382.8 255.8 236.2 208.0 71.1

236 100.5 238.3 113.7 270.4 218.8 534.3 210.9 344.6 383.0 256.2 238.5 208.4 71.7

237 100.8 238.8 114.0 271.4 219.0 534.7 211.4 345.8 383.3 257.0 240.1 209.1 71.9

238 100.8 239.4 114.3 272.0 218.9 535.5 211.9 346.7 383.5 257.2 240.0 209.6 71.8

239 101.4 240.0 115.0 273.0 219.3 535.7 212.1 347.5 383.7 257.6 240.5 209.5 71.8

240 101.5 240.5 115.1 273.4 219.4 536.7 212.5 348.4 384.2 257.9 240.0 210.2 72.0

241 101.6 240.9 115.4 274.1 219.6 536.7 213.0 349.5 384.4 258.0 239.8 210.8 72.0

242 102.3 241.6 115.8 275.2 219.9 537.3 213.4 350.7 384.9 258.6 241.1 210.8 71.7

243 102.8 242.5 116.0 275.8 220.0 537.9 214.1 351.6 385.3 259.0 240.9 210.5 71.8

244 103.1 243.0 116.9 276.4 220.5 539.4 214.2 352.8 385.7 259.3 240.8 211.6 72.4

Page 30: Fire Resistance Test Report of...Fire Science Research Group (Adelaide Division) 1 Scotland Road, Mile End Adelaide, SA 5031 Fire Science Research Group Page 2 of 43 A-09-6 Fire Resistance

Fire Science Research Group

Page 30 of 43

SE

RV

ICE

PE

NE

TR

AT

ION

SE

AL

FIR

E R

ES

IST

AN

CE

TE

ST

RE

PO

RT

A-0

9-5

76 Fire Resistance Test Report

SERVICE PENETRATION SEAL TEST

APPENDIX B - Observations: Specimen A *Note: The below observations include observations of significant behaviour of specimens.

TIME OBSERVATIONS

MINS SECS

5 00 Smoke has begun to emit from the base of penetration.

6 30 Smoke emitting from the base of penetration. has ceased.

30 00 Smoke is escaping from a gab in the sealant between the

VERMICULUX® and the concrete slab.

40 00 The sealant surrounding penetration has begun to swell.

60 00 Specimen has failed insulation criteria, recorded on TC A4

located on service.

110 00 Smoke is escaping from the base of penetration.

244 00 Test discontinued at the request of the sponsor.

Page 31: Fire Resistance Test Report of...Fire Science Research Group (Adelaide Division) 1 Scotland Road, Mile End Adelaide, SA 5031 Fire Science Research Group Page 2 of 43 A-09-6 Fire Resistance

Fire Science Research Group

Page 31 of 43

SE

RV

ICE

PE

NE

TR

AT

ION

SE

AL

FIR

E R

ES

IST

AN

CE

TE

ST

RE

PO

RT

A-0

9-5

76 Fire Resistance Test Report

SERVICE PENETRATION SEAL TEST

APPENDIX B - Observations: Specimen B *Note: The below observations include observations of significant behaviour of specimens.

TIME OBSERVATIONS

MINS SECS

6 00 Smoke has begun to emit from the base of penetration.

10 00 Smoke has begun to emit from the end of the single 3-core plus

earth cable.

15 00 Smoke emitting from the base of penetration has ceased.

25 00 Smoke is escaping from a gap near the large 3-core plus earth

cable.

30 00 Smoke is escaping from a gab in the sealant between the

VERMICULUX® and the concrete slab.

35 00 The sealant surrounding penetration has begun to bubble near the

large 3-core plus earth cable.

40 00 The sealant surrounding penetration has begun to swell.

43 00 Smoke is escaping from the base of the large single-core (630mm2)

cable.

49 00 Smoke has begun to emit from the end of the large single-core

(630mm2) cable.

57 00 Smoke is escaping from the base of the large 3-core plus earth

cable.

71 00 Specimen has failed insulation criteria, recorded on TC B3

located on service (630mm2 single core cable).

75 00 Smoke escaping from the base of the large 3-core plus earth cable

has increased.

76 00 The PVC sheathing of the large single-core and bundle of 8 3-core

cables has begun to soften.

95 00 The sealant surrounding penetration has swelled further.

102 00 The copper cores are visible on the large 3-core plus earth and

large single (630mm2) cable.

105 00 Cotton pad integrity test passed on specimen, no discolouration.

150 00 Cotton pad integrity test passed on specimen, no discolouration.

178 00 Cotton pad integrity test passed on specimen, no discolouration.

Page 32: Fire Resistance Test Report of...Fire Science Research Group (Adelaide Division) 1 Scotland Road, Mile End Adelaide, SA 5031 Fire Science Research Group Page 2 of 43 A-09-6 Fire Resistance

Fire Science Research Group

Page 32 of 43

SE

RV

ICE

PE

NE

TR

AT

ION

SE

AL

FIR

E R

ES

IST

AN

CE

TE

ST

RE

PO

RT

A-0

9-5

76 Fire Resistance Test Report

SERVICE PENETRATION SEAL TEST

APPENDIX B - Observations: Specimen B

TIME OBSERVATIONS

MINS SECS

239 00

Reduced cotton pad integrity test passed on specimen, no

discolouration.

The bare cables of the large 3-core plus earth cable have begun to

glow faintly near the base of the penetration.

244 00 Test discontinued at the request of the sponsor.

Page 33: Fire Resistance Test Report of...Fire Science Research Group (Adelaide Division) 1 Scotland Road, Mile End Adelaide, SA 5031 Fire Science Research Group Page 2 of 43 A-09-6 Fire Resistance

Fire Science Research Group

Page 33 of 43

SE

RV

ICE

PE

NE

TR

AT

ION

SE

AL

FIR

E R

ES

IST

AN

CE

TE

ST

RE

PO

RT

A-0

9-5

76 Fire Resistance Test Report

SERVICE PENETRATION SEAL TEST

APPENDIX C - Test Drawings

Page 34: Fire Resistance Test Report of...Fire Science Research Group (Adelaide Division) 1 Scotland Road, Mile End Adelaide, SA 5031 Fire Science Research Group Page 2 of 43 A-09-6 Fire Resistance

Fire Science Research Group

Page 34 of 43

SE

RV

ICE

PE

NE

TR

AT

ION

SE

AL

FIR

E R

ES

IST

AN

CE

TE

ST

RE

PO

RT

A-0

9-5

76 Fire Resistance Test Report

SERVICE PENETRATION SEAL TEST

APPENDIX C - Test Drawings

Page 35: Fire Resistance Test Report of...Fire Science Research Group (Adelaide Division) 1 Scotland Road, Mile End Adelaide, SA 5031 Fire Science Research Group Page 2 of 43 A-09-6 Fire Resistance

Fire Science Research Group

Page 35 of 43

SE

RV

ICE

PE

NE

TR

AT

ION

SE

AL

FIR

E R

ES

IST

AN

CE

TE

ST

RE

PO

RT

A-0

9-5

76 Fire Resistance Test Report

SERVICE PENETRATION SEAL TEST

APPENDIX C - Test Drawings

Page 36: Fire Resistance Test Report of...Fire Science Research Group (Adelaide Division) 1 Scotland Road, Mile End Adelaide, SA 5031 Fire Science Research Group Page 2 of 43 A-09-6 Fire Resistance

Fire Science Research Group

Page 36 of 43

SE

RV

ICE

PE

NE

TR

AT

ION

SE

AL

FIR

E R

ES

IST

AN

CE

TE

ST

RE

PO

RT

A-0

9-5

76 Fire Resistance Test Report

SERVICE PENETRATION SEAL TEST

APPENDIX C - Test Drawings

Page 37: Fire Resistance Test Report of...Fire Science Research Group (Adelaide Division) 1 Scotland Road, Mile End Adelaide, SA 5031 Fire Science Research Group Page 2 of 43 A-09-6 Fire Resistance

Fire Science Research Group

Page 37 of 43

SE

RV

ICE

PE

NE

TR

AT

ION

SE

AL

FIR

E R

ES

IST

AN

CE

TE

ST

RE

PO

RT

A-0

9-5

76 Fire Resistance Test Report

SERVICE PENETRATION SEAL TEST

APPENDIX C - Test Drawings

Page 38: Fire Resistance Test Report of...Fire Science Research Group (Adelaide Division) 1 Scotland Road, Mile End Adelaide, SA 5031 Fire Science Research Group Page 2 of 43 A-09-6 Fire Resistance

Fire Science Research Group

Page 38 of 43

SE

RV

ICE

PE

NE

TR

AT

ION

SE

AL

FIR

E R

ES

IST

AN

CE

TE

ST

RE

PO

RT

A-0

9-5

76 Fire Resistance Test Report

SERVICE PENETRATION SEAL TEST

APPENDIX D - Test Pictures

Picture 1: Exposed face of specimen before test.

Picture 2: Unexposed face of specimen at start of test.

Page 39: Fire Resistance Test Report of...Fire Science Research Group (Adelaide Division) 1 Scotland Road, Mile End Adelaide, SA 5031 Fire Science Research Group Page 2 of 43 A-09-6 Fire Resistance

Fire Science Research Group

Page 39 of 43

SE

RV

ICE

PE

NE

TR

AT

ION

SE

AL

FIR

E R

ES

IST

AN

CE

TE

ST

RE

PO

RT

A-0

9-5

76 Fire Resistance Test Report

SERVICE PENETRATION SEAL TEST

APPENDIX D - Test Pictures

Picture 3: Exposed face of specimen before test.

Picture 4: Unexposed face of specimen at start of test.

Page 40: Fire Resistance Test Report of...Fire Science Research Group (Adelaide Division) 1 Scotland Road, Mile End Adelaide, SA 5031 Fire Science Research Group Page 2 of 43 A-09-6 Fire Resistance

Fire Science Research Group

Page 40 of 43

SE

RV

ICE

PE

NE

TR

AT

ION

SE

AL

FIR

E R

ES

IST

AN

CE

TE

ST

RE

PO

RT

A-0

9-5

76 Fire Resistance Test Report

SERVICE PENETRATION SEAL TEST

APPENDIX D - Test Pictures

Picture 5: Approximately 30 minutes into the test.

Picture 6: Approximately 45 minutes into the test.

Page 41: Fire Resistance Test Report of...Fire Science Research Group (Adelaide Division) 1 Scotland Road, Mile End Adelaide, SA 5031 Fire Science Research Group Page 2 of 43 A-09-6 Fire Resistance

Fire Science Research Group

Page 41 of 43

SE

RV

ICE

PE

NE

TR

AT

ION

SE

AL

FIR

E R

ES

IST

AN

CE

TE

ST

RE

PO

RT

A-0

9-5

76 Fire Resistance Test Report

SERVICE PENETRATION SEAL TEST

APPENDIX D - Test Pictures

Picture 7: Approximately 75 minutes into the test.

Picture 8: Approximately 90 minutes into the test.

Page 42: Fire Resistance Test Report of...Fire Science Research Group (Adelaide Division) 1 Scotland Road, Mile End Adelaide, SA 5031 Fire Science Research Group Page 2 of 43 A-09-6 Fire Resistance

Fire Science Research Group

Page 42 of 43

SE

RV

ICE

PE

NE

TR

AT

ION

SE

AL

FIR

E R

ES

IST

AN

CE

TE

ST

RE

PO

RT

A-0

9-5

76 Fire Resistance Test Report

SERVICE PENETRATION SEAL TEST

APPENDIX D - Test Pictures

Picture 9: Approximately 120 minutes into the test.

Picture 10: Approximately 150 minutes into the test.

Page 43: Fire Resistance Test Report of...Fire Science Research Group (Adelaide Division) 1 Scotland Road, Mile End Adelaide, SA 5031 Fire Science Research Group Page 2 of 43 A-09-6 Fire Resistance

Fire Science Research Group

Page 43 of 43

SE

RV

ICE

PE

NE

TR

AT

ION

SE

AL

FIR

E R

ES

IST

AN

CE

TE

ST

RE

PO

RT

A-0

9-5

76 Fire Resistance Test Report

SERVICE PENETRATION SEAL TEST

APPENDIX D - Test Pictures

Picture 11: Approximately 239 minutes into the test.

Picture 12: Approximately 244 minutes into the test.

End of Report