RANDAL BROWN & ASSOCIATES ENGINEERING LTD. CONSULTING ENGINEERS | LIFE SAFETY & FIRE PROTECTION 105 – 6 LANSING SQUARE TORONTO, ONTARIO RANDAL BROWN & ASSOCIATES ENGINEERING LTD. CONSULTING ENGINEERS | LIFE SAFETY & FIRE PROTECTION 105 – 6 LANSING SQUARE TORONTO, ONTARIO MAY 23, 2012 FIRE PROTECTION COMMISSIONING & THE CAN/ULC-S1001-11 STANDARD CANADIAN FIRE ALARM ASSOCIATION 2012 ONTARIO ANNUAL TECHNICAL SEMINAR ©2012 Randal Brown & Associates Engineering Ltd. 1

Upload: phungnguyet

Post on 06-Mar-2018

222 views

Category:

Documents


3 download

TRANSCRIPT

Page 1: FIRE PROTECTION COMMISSIONING & THE CAN/ULC … Commissioning S1001.pdf · Where life safety and fire protection systems are installed to ... • Test Method appropriate for the integration

RANDAL BROWN & ASSOCIATES ENGINEERING

LTD.CONSULTING ENGINEERS | LIFE SAFETY & FIRE PROTECTION

105 – 6 LANSING SQUARE TORONTO, ONTARIO

RANDAL BROWN & ASSOCIATES ENGINEERING

LTD.CONSULTING ENGINEERS | LIFE SAFETY & FIRE PROTECTION

105 – 6 LANSING SQUARE TORONTO, ONTARIO

MAY 23, 2012

FIRE PROTECTION COMMISSIONING

& THE CAN/ULC-S1001-11 STANDARD

CANADIAN FIRE ALARM ASSOCIATION

2012 ONTARIO ANNUAL TECHNICAL SEMINAR

© 2012 Randal Brown & Associates Engineering Ltd. 1

Page 2: FIRE PROTECTION COMMISSIONING & THE CAN/ULC … Commissioning S1001.pdf · Where life safety and fire protection systems are installed to ... • Test Method appropriate for the integration

PRESENTED BY

Simon Crosby, CET, CFPS

Project Manager

Randal Brown & Associates Engineering Ltd.

© 2012 Randal Brown & Associates Engineering Ltd. 2

Page 3: FIRE PROTECTION COMMISSIONING & THE CAN/ULC … Commissioning S1001.pdf · Where life safety and fire protection systems are installed to ... • Test Method appropriate for the integration

WHY COMMISSIONING?

• Requirement was included as a Technical

Change to the 2010 NBCC & NFCC

– 2010 NBCC Article 3.2.4.6

– 2010 NFCC Article 2.1.3.8

Where life safety and fire protection systems are installed to

comply with the provisions of the NBC or the NFC, the

commissioning of these integrated systems must be performed

as a whole to ensure the proper operation and inter-relationship

between the systems.

© 2012 Randal Brown & Associates Engineering Ltd. 3

Page 4: FIRE PROTECTION COMMISSIONING & THE CAN/ULC … Commissioning S1001.pdf · Where life safety and fire protection systems are installed to ... • Test Method appropriate for the integration

WHAT IS COMMISSIONING?

• Subcommittee / Working Group discussions as

to what “commissioning” is

• Two different processes identified:

– Commissioning – Owners Process

– Integrated Systems Testing – Code Requirement

Intent of the NBCC / NFCC reviewed with NRC to

ensure Standard in-line with Codes

© 2012 Randal Brown & Associates Engineering Ltd. 4

Page 5: FIRE PROTECTION COMMISSIONING & THE CAN/ULC … Commissioning S1001.pdf · Where life safety and fire protection systems are installed to ... • Test Method appropriate for the integration

COMMISSIONING VS.

INTEGRATED SYSTEMS TESTING

• Commissioning

A process of documentation, adjustment, testing, verification

and training, performed specifically to ensure that the

finished facility operates in accordance with the Owner’s

documented project requirements and the construction

documents

• Integrated Systems Testing

A methodology for verifying and documenting that all

interconnections between systems provided for fire

protection and life safety functions are installed and

operating in conformance with their design criteria

© 2012 Randal Brown & Associates Engineering Ltd. 5

Page 6: FIRE PROTECTION COMMISSIONING & THE CAN/ULC … Commissioning S1001.pdf · Where life safety and fire protection systems are installed to ... • Test Method appropriate for the integration

COMMISSIONING PROCESS

• Highlights

– Owner Driven and Quality Focused

• Ensures Owners get what they paid for

– Process from Pre-Design to Turn-Over

• Develop Owner’s Project Requirements

• Develop Commissioning Scope and Plan

• Review of Design Documents

• Construction Checklists and Submittals

• Review Construction and Testing

• Training and Closeout Documents and Activities

© 2012 Randal Brown & Associates Engineering Ltd. 6

Page 7: FIRE PROTECTION COMMISSIONING & THE CAN/ULC … Commissioning S1001.pdf · Where life safety and fire protection systems are installed to ... • Test Method appropriate for the integration

COMMISSIONING PROCESS

• Highlights

– Documentation of Design Changes and Resolutions,

Verification, and Acceptance Testing

– Owner gets more out of their investment

• Better Operating Systems

• Properly Maintained Systems

• Properly Training Building Staff

– Fire Commissioning is the fire protection and life

safety component of Building Commissioning

© 2012 Randal Brown & Associates Engineering Ltd. 7

Page 8: FIRE PROTECTION COMMISSIONING & THE CAN/ULC … Commissioning S1001.pdf · Where life safety and fire protection systems are installed to ... • Test Method appropriate for the integration

COMMISSIONING PROCESS

• What Commissioning is not

– Completing Standard Forms

– Contractor’s QA/QC program

– Verification of Contractor’s QA/QC program

– Construction General Review Inspections

– Construction Management

© 2012 Randal Brown & Associates Engineering Ltd. 8

Page 9: FIRE PROTECTION COMMISSIONING & THE CAN/ULC … Commissioning S1001.pdf · Where life safety and fire protection systems are installed to ... • Test Method appropriate for the integration

INTEGRATED SYSTEMS TESTING

• Highlights

– Code Driven

– Minimum level of testing required to prove

integration between two systems

• System A works with System B

– Addresses “gaps” in existing Standards

– Documents the Integrated System Testing

– Forms part of Building or Fire Commissioning

© 2012 Randal Brown & Associates Engineering Ltd. 9

Page 10: FIRE PROTECTION COMMISSIONING & THE CAN/ULC … Commissioning S1001.pdf · Where life safety and fire protection systems are installed to ... • Test Method appropriate for the integration

INTEGRATED SYSTEMS TESTING

• What Integrated Systems Testing is not

– Replacement of Design Professionals review and

acceptance of systems

– Not reviewing designs, only system integrations

– Duplication of existing inspection, testing, and

verification requirements

© 2012 Randal Brown & Associates Engineering Ltd. 10

Page 11: FIRE PROTECTION COMMISSIONING & THE CAN/ULC … Commissioning S1001.pdf · Where life safety and fire protection systems are installed to ... • Test Method appropriate for the integration

CAN/ULC-S1001-11

Integrated Systems Testing of Fire

Protection and Life Safety Systems

© 2012 Randal Brown & Associates Engineering Ltd. 11

Page 12: FIRE PROTECTION COMMISSIONING & THE CAN/ULC … Commissioning S1001.pdf · Where life safety and fire protection systems are installed to ... • Test Method appropriate for the integration

© 2012 Randal Brown & Associates Engineering Ltd. 12

Page 13: FIRE PROTECTION COMMISSIONING & THE CAN/ULC … Commissioning S1001.pdf · Where life safety and fire protection systems are installed to ... • Test Method appropriate for the integration

HIGHLIGHTS

• Published September 2011

• First ULC Commissioning Standard

• Proposed for reference in the 2015 NBCC/NFCC

• Requires testing with systems in situ

• One input activated to confirm outputs

• Not replacing the design professional review

and approval of systems

© 2012 Randal Brown & Associates Engineering Ltd. 13

Page 14: FIRE PROTECTION COMMISSIONING & THE CAN/ULC … Commissioning S1001.pdf · Where life safety and fire protection systems are installed to ... • Test Method appropriate for the integration

SECTIONS

• Integrated Systems Testing Requirements

– Qualifications

– Process

– Testing Requirements

– Documentation

– Periodic Integrated Systems Testing

– Retro Integrated Systems Testing

– Integrated Systems Testing for Modifications

© 2012 Randal Brown & Associates Engineering Ltd. 14

Page 15: FIRE PROTECTION COMMISSIONING & THE CAN/ULC … Commissioning S1001.pdf · Where life safety and fire protection systems are installed to ... • Test Method appropriate for the integration

QUALIFICATIONS

• Participants in the Integrated Testing Plan

– Design Professionals, Installing Contractors, and

Verifying Parties

– Knowledge and Experience in the Design,

Installation, and Operation of their Relevant

Systems

– Regulations may exist for licensing and/or

certification of these individuals

© 2012 Randal Brown & Associates Engineering Ltd. 15

Page 16: FIRE PROTECTION COMMISSIONING & THE CAN/ULC … Commissioning S1001.pdf · Where life safety and fire protection systems are installed to ... • Test Method appropriate for the integration

QUALIFICATIONS

• Integrated Testing Coordinator

– Maybe a person, firm, or corporation

– Knowledge and Experience of Integrated Systems,

Operation under Normal and Fire Conditions, and

Methods of Validation

– Licenses and Certifications?

• Standard can’t dictate professional qualifications

• To be part of the adoption in Regulations

• Could also be in Owner’s contractual requirements

© 2012 Randal Brown & Associates Engineering Ltd. 16

Page 17: FIRE PROTECTION COMMISSIONING & THE CAN/ULC … Commissioning S1001.pdf · Where life safety and fire protection systems are installed to ... • Test Method appropriate for the integration

PROCESS

• Planning Phase

– Information gathering from Design Professionals

• Building Floor Plans

• Fire Protection / Life Safety System Design Documents

• Sequencing descriptions and coordination of systems

• M&E Riser Diagrams

• Operating and Testing Instructions

• Alternative Solutions

• Miscellaneous

© 2012 Randal Brown & Associates Engineering Ltd. 17

Page 18: FIRE PROTECTION COMMISSIONING & THE CAN/ULC … Commissioning S1001.pdf · Where life safety and fire protection systems are installed to ... • Test Method appropriate for the integration

PROCESS

• Planning Phase

– Preparation of the Integrated Testing Plan

• Functional Objectives of System Integrations

• Sequences of Operation

• Integrated Testing Protocols and Procedures

• Occupant Notification Procedures

• Alternative Measures

– Appendix B Guidelines

© 2012 Randal Brown & Associates Engineering Ltd. 18

Page 19: FIRE PROTECTION COMMISSIONING & THE CAN/ULC … Commissioning S1001.pdf · Where life safety and fire protection systems are installed to ... • Test Method appropriate for the integration

PROCESS

• Planning Phase

– Integrated Testing Plan

• Consider safety of personnel

• Consider safe operation of systems

• Consider Phased Occupancy, where applicable

• Approved by the Design Professionals

• Reviewed by the AHJs, where required

• Revised when changes to systems are made

© 2012 Randal Brown & Associates Engineering Ltd. 19

Page 20: FIRE PROTECTION COMMISSIONING & THE CAN/ULC … Commissioning S1001.pdf · Where life safety and fire protection systems are installed to ... • Test Method appropriate for the integration

PROCESS

• Implementation Phase

– Prior to implementing the Integrated Testing Plan

• Confirmation from Design Professionals and Installing

Contractors that systems are ready for testing

• Verification documentation from Verifying Parties

• Inspection Certificates from Local Authorities

• Occupant notification procedures implemented

• Alternate measures implemented

• Notify AHJs, where required

© 2012 Randal Brown & Associates Engineering Ltd. 20

Page 21: FIRE PROTECTION COMMISSIONING & THE CAN/ULC … Commissioning S1001.pdf · Where life safety and fire protection systems are installed to ... • Test Method appropriate for the integration

PROCESS

• Implementation Phase

– Implementation of Test Protocols

• As per the Integrated Testing Plan

• Design Professionals, Installing Contractor, and Verifying

Party participation required

– Retesting of Failed Tests

– Documentation of Tests

© 2012 Randal Brown & Associates Engineering Ltd. 21

Page 22: FIRE PROTECTION COMMISSIONING & THE CAN/ULC … Commissioning S1001.pdf · Where life safety and fire protection systems are installed to ... • Test Method appropriate for the integration

TESTING REQUIREMENTS

• Project Specific Testing

– Procedures to demonstrate proper operation of

integrated systems based on design criteria

– Functional operation of input devices

• Simulated operation permitted for non-restorable devices

or where tests could harm persons or damage systems

– Acceptance of other documented testing at the

discretion of the Integrated Testing Coordinator

– Performance Based Testing Requirements

© 2012 Randal Brown & Associates Engineering Ltd. 22

Page 23: FIRE PROTECTION COMMISSIONING & THE CAN/ULC … Commissioning S1001.pdf · Where life safety and fire protection systems are installed to ... • Test Method appropriate for the integration

TESTING REQUIREMENTS

• Systems Considered– Fire Alarm Systems

– Mass Notification Systems

– Elevators

– Emergency Generators

– A/V and Lighting Control Systems

– Notification Systems

– Sprinkler Systems

– Standpipe Systems

– Fire Pumps

– Water Supplies

– Water Supply Control Valves

– Freeze Protection Systems

– Fixed Fire Suppression Systems

– Cooking Suppression Systems

– Hold-Open Devices

– Electromagnetic Locks

– Smoke Control Systems

– Hazardous Protection Monitoring

– Smoke Alarms

© 2012 Randal Brown & Associates Engineering Ltd. 23

Page 24: FIRE PROTECTION COMMISSIONING & THE CAN/ULC … Commissioning S1001.pdf · Where life safety and fire protection systems are installed to ... • Test Method appropriate for the integration

SAMPLE TESTING

REQUIREMENTS

• Fire Pumps

– Testing of each interconnection, as provided

• Fire Pump Running,

• Trouble,

• Phase Reversal,

• Loss of Phase,

• Connected to an Alternate Source,

• Controller Main Switch in Off or Manual Position,

• etc.

© 2012 Randal Brown & Associates Engineering Ltd. 24

Page 25: FIRE PROTECTION COMMISSIONING & THE CAN/ULC … Commissioning S1001.pdf · Where life safety and fire protection systems are installed to ... • Test Method appropriate for the integration

SAMPLE TEST REQUIREMENTS

• Fire Pumps

– Each monitored condition is created on the Fire

Pump to show the correct integration is provided

i.e., Fire Pump is manually started and “Fire Pump

Running” annunciation is confirmed at the Fire Alarm

System

© 2012 Randal Brown & Associates Engineering Ltd. 25

Page 26: FIRE PROTECTION COMMISSIONING & THE CAN/ULC … Commissioning S1001.pdf · Where life safety and fire protection systems are installed to ... • Test Method appropriate for the integration

SAMPLE TEST REQUIREMENTS

• Emergency Generators

– Similar to Fire Pumps

• Testing of each interconnection, as provided

• Generator Running, Trouble, etc.

• Each monitored condition is created on the Emergency

Generator to show the correct integration is provided

© 2012 Randal Brown & Associates Engineering Ltd. 26

Page 27: FIRE PROTECTION COMMISSIONING & THE CAN/ULC … Commissioning S1001.pdf · Where life safety and fire protection systems are installed to ... • Test Method appropriate for the integration

SAMPLE TEST REQUIREMENTS

• Emergency Generators

– Additional required Generator Start-Up Test

• Full load test

• All systems running at full design capacity

• Simulated loss of normal power

• All systems confirmed as operating under emergency

power

© 2012 Randal Brown & Associates Engineering Ltd. 27

Page 28: FIRE PROTECTION COMMISSIONING & THE CAN/ULC … Commissioning S1001.pdf · Where life safety and fire protection systems are installed to ... • Test Method appropriate for the integration

SAMPLE TEST REQUIREMENTS

• Sprinkler Systems

– Testing of Each Interconnection

• Typically Alarm and Supervisory monitoring

• Test Method appropriate for the integration

• CAN/ULC-S537 Verification acceptable, at Integrated

Testing Coordinators discretion

© 2012 Randal Brown & Associates Engineering Ltd. 28

Page 29: FIRE PROTECTION COMMISSIONING & THE CAN/ULC … Commissioning S1001.pdf · Where life safety and fire protection systems are installed to ... • Test Method appropriate for the integration

DOCUMENTATION

• Integrated Systems Testing Report

– Final Report consists of the

• Integrated Testing Plan

• Integrated Testing Forms for Initial Test

• Integrated Testing Forms for Re-Tests

• Documentation collected during Implementation Phase

– Future use throughout the building’s life cycle

© 2012 Randal Brown & Associates Engineering Ltd. 29

Page 30: FIRE PROTECTION COMMISSIONING & THE CAN/ULC … Commissioning S1001.pdf · Where life safety and fire protection systems are installed to ... • Test Method appropriate for the integration

BUILDING LIFE CYCLE TESTING

• On-Going Integrated Systems Testing

– On-Going Testing or Testing of Existing Systems

– Re-Testing after system modifications

– Implementation to be by Governing Bodies

• Building and Fire Codes

• Other Legislation

• Contract Requirements

© 2012 Randal Brown & Associates Engineering Ltd. 30

Page 31: FIRE PROTECTION COMMISSIONING & THE CAN/ULC … Commissioning S1001.pdf · Where life safety and fire protection systems are installed to ... • Test Method appropriate for the integration

BUILDING LIFE CYCLE TESTING

• Periodic Integrated Systems Testing

– Routine Integrated Systems Testing throughout the

building’s life cycle

– Ensure system integrations are maintained

– 1 Year Confirmation Test

– 5 Year Periodic Testing

© 2012 Randal Brown & Associates Engineering Ltd. 31

Page 32: FIRE PROTECTION COMMISSIONING & THE CAN/ULC … Commissioning S1001.pdf · Where life safety and fire protection systems are installed to ... • Test Method appropriate for the integration

BUILDING LIFE CYCLE TESTING

• Retro Integrated Systems Testing

– Integrated Systems Testing for Existing Buildings

– Confirmation that systems are properly integrated

– Similar process as new construction

– Lack of System Design requires detailed review

• Integrated Systems Testing for Modifications

– Amended Integrated Systems Testing

– Implement testing for effected systems

© 2012 Randal Brown & Associates Engineering Ltd. 32

Page 33: FIRE PROTECTION COMMISSIONING & THE CAN/ULC … Commissioning S1001.pdf · Where life safety and fire protection systems are installed to ... • Test Method appropriate for the integration

APPENDIX A –

GENERAL INFORMATION

• Informative Information

– Aligned with the Standard Numbering (e.g., A1.1)

– Provides background from the Working Group on

the intent of requirements

– Examples of procedures and approaches that can be

considered

– Examples of existing tests and reports

– Examples of Fire Protection and Life Safety Systems

© 2012 Randal Brown & Associates Engineering Ltd. 33

Page 34: FIRE PROTECTION COMMISSIONING & THE CAN/ULC … Commissioning S1001.pdf · Where life safety and fire protection systems are installed to ... • Test Method appropriate for the integration

APPENDIX B – GUIDELINES FOR

INTEGRATED TESTING PLANS

– Introduction

– Sequence of Operation

– Test Protocols and Procedures

– Notifications

– Personnel Safety

– Phased Occupancies

– Pre-Testing Documentation

– Testing Forms

– Ongoing Integrated Systems Testing

© 2012 Randal Brown & Associates Engineering Ltd. 34

Page 35: FIRE PROTECTION COMMISSIONING & THE CAN/ULC … Commissioning S1001.pdf · Where life safety and fire protection systems are installed to ... • Test Method appropriate for the integration

ULC SUBCOMMITTEE ON

COMMISSIONING

Current Projects

© 2012 Randal Brown & Associates Engineering Ltd. 35

Page 36: FIRE PROTECTION COMMISSIONING & THE CAN/ULC … Commissioning S1001.pdf · Where life safety and fire protection systems are installed to ... • Test Method appropriate for the integration

ULC SUBCOMMITTEE ON

COMMISSIONING

• Current Projects

– ULC-S1002

• Guidelines on Fire Commissioning

– ULC-S1003

• Recommended Practice for Acceptance Testing of Active

Fire Protection and Life Safety Systems

– ULC-S1004

• Recommended Practice for Acceptance Testing of Passive

Fire Protection and Life Safety Systems

© 2012 Randal Brown & Associates Engineering Ltd. 36

Page 37: FIRE PROTECTION COMMISSIONING & THE CAN/ULC … Commissioning S1001.pdf · Where life safety and fire protection systems are installed to ... • Test Method appropriate for the integration

ULC-S1002 PRELIMINARY ITEMS

• Commissioning Process

– Project Inception

– Planning & Pre-Design

– Detailed Design

– Construction

– Verification

– Acceptance Testing

– Occupancy and Close-Out

© 2012 Randal Brown & Associates Engineering Ltd. 37

Page 38: FIRE PROTECTION COMMISSIONING & THE CAN/ULC … Commissioning S1001.pdf · Where life safety and fire protection systems are installed to ... • Test Method appropriate for the integration

ULC-S1002 PRELIMINARY ITEMS

• Documentation Requirements

– Owners Project Requirements

– Commissioning Plans and Schedules

– Commissioning Documents and Forms

• Design Phase

• Construction Rough-In Phase

• Construction Finishing Phase

• Acceptance Testing Phase

• Closeout Phase

© 2012 Randal Brown & Associates Engineering Ltd. 38

Page 39: FIRE PROTECTION COMMISSIONING & THE CAN/ULC … Commissioning S1001.pdf · Where life safety and fire protection systems are installed to ... • Test Method appropriate for the integration

ULC-S1002 PRELIMINARY ITEMS

• Fire Commissioning Team

– Owner & Facility Personnel

– Fire Commissioning Team

– Design Professionals / Contractors / Verifying

Parties

– Authorities Having Jurisdiction

• Fire Commissioning Phases

– New Construction

– Re-Commissioning

– Retro-Commissioning

© 2012 Randal Brown & Associates Engineering Ltd. 39

Page 40: FIRE PROTECTION COMMISSIONING & THE CAN/ULC … Commissioning S1001.pdf · Where life safety and fire protection systems are installed to ... • Test Method appropriate for the integration

ULC-S1003 & ULC-S1004

PRELIMINARY ITEMS

• ULC-S1003 & ULC-S1004

– Recommended Practices for Acceptance Testing

– Active and Passive Systems

– Guidelines for Design Professionals to ensure proper

review and testing of systems

– Acceptance Testing

• Active Systems

• Fire Rated Assemblies / Closures / Fire Stopping

• Exit and Means of Egress

• Etc

© 2012 Randal Brown & Associates Engineering Ltd. 40

Page 41: FIRE PROTECTION COMMISSIONING & THE CAN/ULC … Commissioning S1001.pdf · Where life safety and fire protection systems are installed to ... • Test Method appropriate for the integration

ADDITIONAL INDUSTRY

STANDARDS AND REFERENCES

© 2012 Randal Brown & Associates Engineering Ltd. 41

Page 42: FIRE PROTECTION COMMISSIONING & THE CAN/ULC … Commissioning S1001.pdf · Where life safety and fire protection systems are installed to ... • Test Method appropriate for the integration

ADDITIONAL INDUSTRY

STANDARDS AND REFERENCES

• NFPA

• NFPA 3 – Recommended Practice on Commissioning

• NFPA 4 – Standard on Acceptance Testing

• CSA

• CSA Z320, Building Commissioning

• ICC

• Draft Commissioning Guideline

• NIBS

• Building and Facility Commissioning Guides

© 2012 Randal Brown & Associates Engineering Ltd. 42

Page 43: FIRE PROTECTION COMMISSIONING & THE CAN/ULC … Commissioning S1001.pdf · Where life safety and fire protection systems are installed to ... • Test Method appropriate for the integration

THANK-YOU, QUESTIONS?

Simon Crosby, CET, CFPS

Randal Brown & Associates Engineering Ltd.

416-492-5886 x234

[email protected]

© 2012 Randal Brown & Associates Engineering Ltd. 43