Fixed Asset Quantity Units
Land sqmtr
Leveling and Excavation sqmtr
Landscaping sqmtr
Factory shed sqmtr
Raw material storage Shed sqmtr
Beneficated iron ore storage shed sqmtr
Finshed good storage Shed sqmtr
Factory Building sqmtr
Plant and Machinery
Beneficiation Nos
Pelletisation plant Nos
Material handling system Nos
Fuel Storage sqmtr
Basic Amenities sqmtr
Working Capital
Raw material
Iron ore fines Tons
Coal fines Tons
Labour
Consumable
Water
Power
Fuel
-
8/8/2019 Financial Model- MSP(1)
2/47
Rate Total
-
8/8/2019 Financial Model- MSP(1)
3/47
Capacity and Utilisation
Description Unit 2010-11
Iron ore Beneficiation plant
Installed capacity Ton 1,000,000
Capacity utilisation % 0%
Number of operational days days 0
Number of days per yr 330
Pelletization Plant
Installed capacity Ton 600,000
Capacity utilisation %
Number of operational days days 0
Number of operational days days 330
Sensitivity 0%
Product mix
Description Unit 2010-11
Iron ore Beneficiation plant
Captive Consumption ton 0
Open Market ton 0
Pelletization Plant
Captive Consumption ton 0
Open Market ton 0
Sensitivity 0%
Sales Mix
Description Unit 2010-11
Iron ore Beneficiation plant
Domestic % 100%
Export % 0%
Pelletization Plant
Domestic % 100%
Export % 0%
Selling Prices
Description Unit 2010-11
Beneficated Iron ore Rs./ Ton 3,500
Pellet Rs./ Ton 5,300
Sensitivity 0%
Consumption Norm
Description Unit 2010-11
Raw Material
-
8/8/2019 Financial Model- MSP(1)
4/47
Benefication Plant
Iron ore fines Ton/Ton 1.25
Pelletization
Beneficated iron ore Ton/Ton 1.03
Bentonite Ton/Ton 0.01
Coal fines Ton/Ton 0.04
Spares and Consumables
Benification palnt
Flocculant Ton/Ton 0.020
Lubricant Ton/Ton 0.100
Spares Ton/Ton 0.010
Pelletization
Fluxes Ton/Ton 1
UtilitiesWater
Benefication Plant M3/Ton 0.6
Pellet plant M3/Ton 0.3
Power
Benefication Plant Kwh/Ton 20
Pellet plant Kwh/Ton 45
Fuel
Pellet plant Kl/Ton 0.015
Water Disposal
Benefication Plant Ton/Ton 0.6
Pellet plant Ton/Ton 0.05
Rate per ton
Description Unit 2010-11
Raw Material
Benefication Plant
Iron ore fines Rs./ Ton 350
Pelletization
Beneficated iron ore Market Rs./ Ton 0
Beneficated iron ore transfer Rs./ Ton 0
Bentonite Rs./ Ton 3500
Coal fines Rs./ Ton 2500
Spares and Consumables
Benification palnt
Flocculant Rs./ Ton 27000
Lubricant Rs./ Ton 50
Spares Rs./ Ton 500
Pelletization
Fluxes(RM) Rs./ Ton 250Lubricant Rs./ Ton 50
-
8/8/2019 Financial Model- MSP(1)
5/47
Spares Rs./ Ton 500
Utilities
Water
Benefication Plant Rs./M3 5
Pellet plant Rs./M3 5
Power
Benefication Plant Rs./Kwh 4
Pellet plant Rs./Kwh 4
Fuel (light disel)
Iron ore fines Rs./KL 32000
Water Disposal
Benefication Plant Rs/ ton 80
Pellet plant Rs/ ton 25
Sensitivity 0%
Other Cost
Description Unit 2010-11
Repairs And maintenace
Benefication Plant Rs/ ton 250
Iron ore fines Rs/ ton 250
Material Handling
Benefication Plant Rs/ ton 250Iron ore fines Rs/ ton 225
Sensitivity 0%
Fixed Cost
Fuel 0 0
Administrative Expenses % of NS 1.0%
Selling and Distribution Expenses % of NS 1.5%
Miscellaneous Expenses % of NS 0.5%
Man power
Beneficiation Plant
Description Unit 2010-11
General Manager Nos 1
Shift Incharge Nos 4
Supervisor Nos 12
Operators Nos 20
Seniors Manager Nos 1
Maintenance Engineer Nos 3
Fitters Nos 6Helpers Nos 6
-
8/8/2019 Financial Model- MSP(1)
6/47
Assitants Nos 6
Semi skilled workers Nos 20
Unskilled Workers Nos 35
Secuirity Guard Nos 2
Peons Nos 3
119
Pellet Plant
Description Unit 2010-11
General Manager Nos 0
Shift Incharge Nos 4
Supervisor Nos 10
Operators Nos 15
Seniors Manager Nos 1
Maintenance Engineer Nos 3
Fitters Nos 6Helpers Nos 6
Assitants Nos 6
Semi skilled workers Nos 15
Unskilled Workers Nos 25
Secuirity Guard Nos 0
Peons Nos 0
91
Annual Salary
Description Unit 2010-11
General Manager Rs 480000
Shift Incharge Rs 216000
Supervisor Rs 180000
Operators Rs 102000
Seniors Manager Rs 270000
Maintenance Engineer Rs 204000
Fitters Rs 96000
Helpers Rs 36000
Assitants Rs 42000
Semi skilled workers Rs 54000
Unskilled Workers Rs 42000
Secuirity Guard Rs 30000
Peons Rs 30000
1,782,000.00
Capital Cost
Description Cost (Rs Million)
Land & Site Development 75
Factory Building 568Plant and Machinery 1329
-
8/8/2019 Financial Model- MSP(1)
7/47
Miscellaneous Fixed Assets 244
Preliminary & Preoperative Expenses 299
Contingency @ 5% 107
Margin Money 106
TOTAL 2727
Description
Debt-Equity Ratio 0.000
Cost of Equity 12.00%
Cost of Debt 12.00%
Cost of Working Capital 12.00%
Income Tax Rate 33.99%
Post Tax Cost of Capital 12.00%
VAT 4.00%
Exchange Rate for 1 US$ 43
Beneficiation Pelletisation
Raw Material 45 30
Stores and Consumables 30 30
Work In Progress 2 3
Finished Goods 10 15
Debtors 45 90
Current Liabilities
Creditors 15 15
Net Current Assets
Working Capital Required
Margin Money 25% 25%
Bank Borrowings
-
8/8/2019 Financial Model- MSP(1)
8/47
2011-12 2012-13 2013-14 2014-15 2015-16 2016-17
1,000,000 1,000,000 1,000,000 1,000,000 1,000,000 1,000,000
0% 70% 80% 90% 90% 90%
0 165 330 330 330 330
330 330 330 330 330 330
600,000 600,000 600,000 600,000 600,000 600,000
70% 80% 90% 90% 90%
0 165 330 330 330 330
330 330 330 330 330 330
0% 100% 100% 100% 100% 100%
2011-12 2012-13 2013-14 2014-15 2015-16 2016-17
0 700,000 800,000 900,000 900,000 900,000
0 0 0 0 0 0
0 124,800 124,800 124,800 124,800 124,800
0 295,200 355,200 415,200 415,200 415,200
0% 100% 100% 100% 100% 100%
2011-12 2012-13 2013-14 2014-15 2015-16 2016-17
100% 100% 100% 100% 100% 100%
0% 0% 0% 0% 0% 0%
100% 100% 100% 100% 100% 100%
0% 0% 0% 0% 0% 0%
2011-12 2012-13 2013-14 2014-15 2015-16 2016-17
3,500 3,500 3,500 3,500 3,500 3,500
5,300 5,300 5,300 5,300 5,300 5,300
0% 100% 100% 100% 100% 100%
2011-12 2012-13 2013-14 2014-15 2015-16 2016-17
-
8/8/2019 Financial Model- MSP(1)
9/47
1.25 1.25 1.25 1.25 1.25 1.25
1.03 1.03 1.03 1.03 1.03 1.03
0.01 0.01 0.01 0.01 0.01 0.01
0.04 0.04 0.04 0.04 0.04 0.04
0.02 0.02 0.02 0.02 0.02 0.02
0.10 0.10 0.10 0.10 0.10 0.10
0.01 0.01 0.01 0.01 0.01 0.01
1 1 1 1 1 1
0.6 0.6 0.6 0.6 0.6 0.6
0.3 0.3 0.3 0.3 0.3 0.3
20.0 20.0 20.0 20.0 20.0 20.0
45.0 45.0 45.0 45.0 45.0 45.0
0.015 0.015 0.015 0.015 0.015 0.015
0.600 0.600 0.600 0.600 0.600 0.600
0.050 0.050 0.050 0.050 0.050 0.050
2011-12 2012-13 2013-14 2014-15 2015-16 2016-17
350 350 350 350 350 350
0 2250 1619 1619 1619 1619
0 2250 1619 1619 1619 1619
3500 3500 3500 3500 3500 3500
2500 2500 2500 2500 2500 2500
27000 27000 27000 27000 27000 27000
50 50 50 50 50 50
500 500 500 500 500 500
250 250 250 250 250 25050 50 50 50 50 50
-
8/8/2019 Financial Model- MSP(1)
10/47
500 500 500 500 500 500
5 5 5 5 5 5
5 5 5 5 5 5
4 4 4 4 4 4
4 4 4 4 4 4
32000 32000 32000 32000 32000 32000
80.000 80.000 80.000 80.000 80.000 80.000
25.000 25.000 25.000 25.000 25.000 25.000
0% 100% 100% 100% 100% 100%
2011-12 2012-13 2013-14 2014-15 2015-16 2016-17
250 250 250 250 250 250
250 250 250 250 250 250
250 250 250 250 250 250225 225 225 225 225 225
0% 100% 100% 100% 100% 100%
0 0 0 0 0 0
1.0% 1.0% 1.0% 1.0% 1.0% 1.0%
1.5% 1.5% 1.5% 1.5% 1.5% 1.5%
0.5% 0.5% 0.5% 0.5% 0.5% 0.5%
2011-12 2012-13 2013-14 2014-15 2015-16 2016-17
1 1 1 1 1 1
4 4 4 4 4 4
12 12 12 12 12 12
20 20 20 20 20 20
1 1 1 1 1 1
3 3 3 3 3 3
6 6 6 6 6 66 6 6 6 6 6
-
8/8/2019 Financial Model- MSP(1)
11/47
6 6 6 6 6 6
20 20 20 20 20 20
35 35 35 35 35 35
2 2 2 2 2 2
3 3 3 3 3 3
119 119 119 119 119 119
2011-12 2012-13 2013-14 2014-15 2015-16 2016-17
0 0 0 0 0 0
4 4 4 4 4 4
10 10 10 10 10 10
15 15 15 15 15 15
1 1 1 1 1 1
3 3 3 3 3 3
6 6 6 6 6 66 6 6 6 6 6
6 6 6 6 6 6
15 15 15 15 15 15
25 25 25 25 25 25
0 0 0 0 0 0
0 0 0 0 0 0
91 91 91 91 91 91
2011-12 2012-13 2013-14 2014-15 2015-16 2016-17
480000 480000 480000 480000 480000 480000
216000 216000 216000 216000 216000 216000
180000 180000 180000 180000 180000 180000
102000 102000 102000 102000 102000 102000
270000 270000 270000 270000 270000 270000
204000 204000 204000 204000 204000 204000
96000 96000 96000 96000 96000 96000
36000 36000 36000 36000 36000 36000
42000 42000 42000 42000 42000 42000
54000 54000 54000 54000 54000 54000
42000 42000 42000 42000 42000 42000
30000 30000 30000 30000 30000 30000
30000 30000 30000 30000 30000 30000
1782000 1782000 1782000 1782000 1782000 1782000
-
8/8/2019 Financial Model- MSP(1)
12/47
Description Unit 2010-11
General Manage Nos 1
Shift Incharge Nos 8
Supervisor Nos 22
Operators Nos 35
Seniors Manage Nos 2
Maintenance Engin Nos 6
Fitters Nos 12
Helpers Nos 12Assitants Nos 12
Semi skilled worke Nos 35
Unskilled Worker Nos 60
Secuirity Guard Nos 2
Peons Nos 3
210
-
8/8/2019 Financial Model- MSP(1)
13/47
2017-18 2018-19 2019-20 2020-21 2021-22
1,000,000 1,000,000 1,000,000 1,000,000 1,000,000
90% 90% 90% 90% 90%
330 330 330 330 330
330 330 330 330 330
600,000 600,000 600,000 600,000 600,000
90% 90% 90% 90% 90%
330 330 330 330 330
330 330 330 330 330
100% 100% 100% 100% 100%
2017-18 2018-19 2019-20 2020-21 2021-22
900,000 900,000 900,000 900,000 900,000
0 0 0 0 0
124,800 124,800 124,800 124,800 124,800
415,200 415,200 415,200 415,200 415,200
100% 100% 100% 100% 100%
2017-18 2018-19 2019-20 2020-21 2021-22
100% 100% 100% 100% 100%
0% 0% 0% 0% 0%
100% 100% 100% 100% 100%
0% 0% 0% 0% 0%
2017-18 2018-19 2019-20 2020-21 2021-22
3,500 3,500 3,500 3,500 3,500
5,300 5,300 5,300 5,300 5,300
100% 100% 100% 100% 100%
2017-18 2018-19 2019-20 2020-21 2021-22
-
8/8/2019 Financial Model- MSP(1)
14/47
1.25 1.25 1.25 1.25 1.25
1.03 1.03 1.03 1.03 1.03
0.01 0.01 0.01 0.01 0.01
0.04 0.04 0.04 0.04 0.04
0.02 0.02 0.02 0.02 0.02
0.10 0.10 0.10 0.10 0.10
0.01 0.01 0.01 0.01 0.01
1 1 1 1 1
0.6 0.6 0.6 0.6 0.6
0.3 0.3 0.3 0.3 0.3
20.0 20.0 20.0 20.0 20.0
45.0 45.0 45.0 45.0 45.0
0.015 0.015 0.015 0.015 0.015
0.600 0.600 0.600 0.600 0.600
0.050 0.050 0.050 0.050 0.050
2017-18 2018-19 2019-20 2020-21 2021-22
350 350 350 350 350
1619 1619 1619 1619 1619
1619 1619 1619 1619 1619
3500 3500 3500 3500 3500
2500 2500 2500 2500 2500
27000 27000 27000 27000 27000
50 50 50 50 50
500 500 500 500 500
250 250 250 250 25050 50 50 50 50
-
8/8/2019 Financial Model- MSP(1)
15/47
500 500 500 500 500
5 5 5 5 5
5 5 5 5 5
4 4 4 4 4
4 4 4 4 4
32000 32000 32000 32000 32000
80.000 80.000 80.000 80.000 80.000
25.000 25.000 25.000 25.000 25.000
100% 100% 100% 100% 100%
2017-18 2018-19 2019-20 2020-21 2021-22
250 250 250 250 250
250 250 250 250 250
250 250 250 250 250225 225 225 225 225
100% 100% 100% 100% 100%
0 0 0 0 0
1.0% 1.0% 1.0% 1.0% 1.0%
1.5% 1.5% 1.5% 1.5% 1.5%
0.5% 0.5% 0.5% 0.5% 0.5%
2017-18 2018-19 2019-20 2020-21 2021-22
1 1 1 1 1
4 4 4 4 4
12 12 12 12 12
20 20 20 20 20
1 1 1 1 1
3 3 3 3 3
6 6 6 6 66 6 6 6 6
-
8/8/2019 Financial Model- MSP(1)
16/47
6 6 6 6 6
20 20 20 20 20
35 35 35 35 35
2 2 2 2 2
3 3 3 3 3
119 119 119 119 119
2017-18 2018-19 2019-20 2020-21 2021-22
0 0 0 0 0
4 4 4 4 4
10 10 10 10 10
15 15 15 15 15
1 1 1 1 1
3 3 3 3 3
6 6 6 6 66 6 6 6 6
6 6 6 6 6
15 15 15 15 15
25 25 25 25 25
0 0 0 0 0
0 0 0 0 0
91 91 91 91 91
2017-18 2018-19 2019-20 2020-21 2021-22
480000 480000 480000 480000 480000
216000 216000 216000 216000 216000
180000 180000 180000 180000 180000
102000 102000 102000 102000 102000
270000 270000 270000 270000 270000
204000 204000 204000 204000 204000
96000 96000 96000 96000 96000
36000 36000 36000 36000 36000
42000 42000 42000 42000 42000
54000 54000 54000 54000 54000
42000 42000 42000 42000 42000
30000 30000 30000 30000 30000
30000 30000 30000 30000 30000
1782000 1782000 1782000 1782000 1782000
-
8/8/2019 Financial Model- MSP(1)
17/47
480000
1728000
3960000
3570000
540000
1224000
1152000
432000504000
1890000
2520000
60000
90000
18150000
86429
-
8/8/2019 Financial Model- MSP(1)
18/47
Sales Value
Description 2010-11 2011-12 2012-13 2013-14 2014-15 2015-16
Benficiated Ore
Captive Consumption
Market 0 0 467.95 467.95 467.95 467.95
Pellets
Captive Consumption
Market 0 0 451.56 1882.56 2200.56 2200.56
Gross sales 0 0 919.51 2350.51 2668.51 2668.51
VAT 35 90 103 103
Total - Net Market Sales 884 2260 2566 2566
Production Volume
Description 2010-11 2011-12 2012-13 2013-14 2014-15 2015-16
Beneficiation unit
Total Prodution 0 0 350000 800000 900000 900000
Captive Consumption 0 0 216300 494400 556200 556200
Market 0 0 133700 305600 343800 343800
% Market sales 0% 0% 38% 38% 38% 38%
Pellets
Total Prodution 0 0 210000 480000 540000 540000
Captive Consumption 0 0 124800 124800 124800 124800
Market 85200 355200 415200 415200
% Market sales 0% 0% 41% 74% 77% 77%
-
8/8/2019 Financial Model- MSP(1)
19/47
2016-17 2017-18 2018-19 2019-20 2020-21 2021-22
467.95 467.95 467.95 467.95 467.95 467.95
2200.56 2200.56 2200.56 2200.56 2200.56 2200.56
2668.51 2668.51 2668.51 2668.51 2668.51 2668.51
103 103 103 103 103 103
2566 2566 2566 2566 2566 2566
All figures in Million Tonnes
2016-17 2017-18 2018-19 2019-20 2020-21 2021-22
900000 900000 900000 900000 900000 900000
556200 556200 556200 556200 556200 556200
343800 343800 343800 343800 343800 343800
38% 38% 38% 38% 38% 38%
540000 540000 540000 540000 540000 540000
124800 124800 124800 124800 124800 124800
415200 415200 415200 415200 415200 415200
77% 77% 77% 77% 77% 77%
-
8/8/2019 Financial Model- MSP(1)
20/47
Variable Cost
Description Unit 2010-11 2011-12 2012-13
Raw Material Rs. Million - - 342.13
Spare and Consumables Rs. Million - - 56.00Utilities Rs. Million Err:509 Err:509 335.93
Repairs and Maintenance Rs. Million - - 280.00
Material Handling and TrasnportatiRs. Million - - 269.50
Waste Diposal Rs. Million - - 34.13
Total s. Millio Err:509 Err:509 1,317.68
Total Cost per ton Err:509 Err:509 3,137.33
Contribution Rs. Million - - -433.54
Contribution Margin % #DIV/0! #DIV/0! -49%
Iron Ore Beneficiation
Only for Transfer Price Calculations
Description Unit 2010-11 2011-12 2012-13
Raw Material Rs. Million - - 342.13
Spare and Consumables Rs. Million - - 3.50
Utilities Rs. Million - - 58.10
Repairs and Maintenance Rs. Million - - 175.00
Material Handling and TransportatiRs. Million - - 175.00
Waste Disposal Rs. Million - - 33.60
Total s. Millio - - 787.33
Total Cost/ Ton 2,249.50
725.69
Pelletisation
Description Unit 2010-11 2011-12 2012-13
Raw Material 1(Internal transfer) Rs. Million - - 486.57
Raw Material (Market purchase)
Spare and Consumables Rs. Million - - 52.50
Utilities Rs. Million Err:509 Err:509 277.83
Repairs and Maintenance Rs. Million - - 105.00
Material Handling and TransportatiRs. Million - - 94.50
Waste Disposal Rs. Million - - 0.53
Total s. Millio Err:509 Err:509 1,016.92Total Cost/ Ton
-
8/8/2019 Financial Model- MSP(1)
21/47
2013-14 2014-15 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21 2021-22
782.00 879.75 879.75 879.75 879.75 879.75 879.75 879.75 879.75
128.00 144.00 144.00 144.00 144.00 144.00 144.00 144.00 144.00383.92 431.91 431.91 431.91 431.91 431.91 431.91 431.91 431.91
320.00 360.00 360.00 360.00 360.00 360.00 360.00 360.00 360.00
308.00 346.50 346.50 346.50 346.50 346.50 346.50 346.50 346.50
39.00 43.88 43.88 43.88 43.88 43.88 43.88 43.88 43.88
### ### ### ### ### ### ### ### ###
### ### ### ### ### ### ### ### ###
299.19 359.84 359.84 359.84 359.84 359.84 359.84 359.84 359.84
13% 14% 14% 14% 14% 14% 14% 14% 14%
2013-14 2014-15 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21 2021-22
782.00 879.75 879.75 879.75 879.75 879.75 879.75 879.75 879.75
8.00 9.00 9.00 9.00 9.00 9.00 9.00 9.00 9.00
66.40 74.70 74.70 74.70 74.70 74.70 74.70 74.70 74.70
200.00 225.00 225.00 225.00 225.00 225.00 225.00 225.00 225.00
200.00 225.00 225.00 225.00 225.00 225.00 225.00 225.00 225.00
38.40 43.20 43.20 43.20 43.20 43.20 43.20 43.20 43.20
### ### ### ### ### ### ### ### ###
### ### ### ### ### ### ### ### ###
### ### ### ###
2013-14 2014-15 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21 2021-22
800.19 900.21 900.21 900.21 900.21 900.21 900.21 900.21 900.21
120.00 135.00 135.00 135.00 135.00 135.00 135.00 135.00 135.00
317.52 357.21 357.21 357.21 357.21 357.21 357.21 357.21 357.21
120.00 135.00 135.00 135.00 135.00 135.00 135.00 135.00 135.00
108.00 121.50 121.50 121.50 121.50 121.50 121.50 121.50 121.50
0.60 0.68 0.68 0.68 0.68 0.68 0.68 0.68 0.68
### ### ### ### ### ### ### ### ###
-
8/8/2019 Financial Model- MSP(1)
22/47
Description Unit 2010-11 2011-12 2012-13 2013-14
Manpower Expenses-BeneficiatiRs Million - - 10.17 10.17
Manpower Expenses-Pelletisati Rs Million 7.98 7.98
Administrative Expenses Rs Million - - 8.84 22.60Selling & Distribution ExpensesRs Million - - 13.26 33.90
Miscellaneous Expenses Rs Million - - 4.42 11.30
Total Fixed Cost Rs Million - - 44.67 85.95
-
8/8/2019 Financial Model- MSP(1)
23/47
2014-15 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21 2021-22
10.17 10.17 10.17 10.17 10.17 10.17 10.17 10.17
7.98 7.98 7.98 7.98 7.98 7.98 7.98 7.98
25.66 25.66 25.66 25.66 25.66 25.66 25.66 25.6638.49 38.49 38.49 38.49 38.49 38.49 38.49 38.49
12.83 12.83 12.83 12.83 12.83 12.83 12.83 12.83
95.13 95.13 95.13 95.13 95.13 95.13 95.13 95.13
-
8/8/2019 Financial Model- MSP(1)
24/47
Description Unit 2010-11 2011-12 2012-13 2013-14
Net Sales s. Millio - - 884.14 ###
Variable Costs s. Millio Err:509 Err:509 ### ###Raw Material Rs. Million - - 342.13 782.00
Spare and Consumables Rs. Million - - 56.00 128.00
Utilities Rs. Million Err:509 Err:509 335.93 383.92
Repairs and Maintenance Rs. Million - - 280.00 320.00
Material Handling and TrasnportatiRs. Million - - 269.50 308.00
Waste Disposal Rs. Million - - 34.13 39.00
Fixed Costs s. Millio - - 44.67 85.95
Manpower Expenses Rs. Million - - 10.17 10.17
Administrative Expenses Rs. Million - - 7.98 7.98
Selleing & Distribution Expenses Rs. Million - - 8.84 22.60
Miscellaneous Expenses Rs. Million - - 13.26 33.90Cost of Sales s. Millio Err:509 Err:509 ### ###
EBDIT s. Millio Err:509 Err:509 -478.21 213.23
EBDIT % % Err:509 Err:509 0.0% 9.4%
-
8/8/2019 Financial Model- MSP(1)
25/47
2014-15 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21 2021-22
### ### ### ### ### ### ### ###
### ### ### ### ### ### ### ###879.75 879.75 879.75 879.75 879.75 879.75 879.75 879.75
144.00 144.00 144.00 144.00 144.00 144.00 144.00 144.00
431.91 431.91 431.91 431.91 431.91 431.91 431.91 431.91
360.00 360.00 360.00 360.00 360.00 360.00 360.00 360.00
346.50 346.50 346.50 346.50 346.50 346.50 346.50 346.50
43.88 43.88 43.88 43.88 43.88 43.88 43.88 43.88
95.13 95.13 95.13 95.13 95.13 95.13 95.13 95.13
10.17 10.17 10.17 10.17 10.17 10.17 10.17 10.17
7.98 7.98 7.98 7.98 7.98 7.98 7.98 7.98
25.66 25.66 25.66 25.66 25.66 25.66 25.66 25.66
38.49 38.49 38.49 38.49 38.49 38.49 38.49 38.49### ### ### ### ### ### ### ###
264.71 264.71 264.71 264.71 264.71 264.71 264.71 264.71
10.3% 10.3% 10.3% 10.3% 10.3% 10.3% 10.3% 10.3%
-
8/8/2019 Financial Model- MSP(1)
26/47
Profitability Statement
Description 2010-11 2011-12 2012-13 2013-14 2014-15
Income - - ### ### ###
Net Sales - - ### ### ###
Expenditure - - ### ### ###
Operating Cost - - ### ### ###Depreciation - - 110.35 110.35 110.35
Interest - - 168.57 182.12 175.43
Non-Operating Expenses - - - - -
Exp written off - - 34.27 34.27 34.27
Gross Profit - - 723.19 843.36 850.05
Under(-)/ Over(+) Recovery - - - - -
Profit Before Tax - - 723.19 843.36 850.05
Income Tax 33.99% - - 176.73 236.25 253.61
Profit After Tax - - 546.46 607.12 596.44
NPM #DIV/0! #DIV/0! 11.88% 11.73% 11.53%
-
8/8/2019 Financial Model- MSP(1)
27/47
Rs. Million
2015-16 2016-17 2017-18 2018-19 2019-20 2020-21 2021-22
### ### ### ### ### ### ###
### ### ### ### ### ### ###
### ### ### ### ### ### ###
### ### ### ### ### ### ### 77.4%110.35 110.35 110.35 110.35 110.35 110.35 110.35 2.1%
168.75 162.06 155.37 152.03 152.03 152.03 152.03 2.9%
- - - - - - -
34.27 34.27 34.27 34.27 - - -
856.73 863.42 870.10 873.45 907.72 907.72 907.72 17.5%
- - - - - - -
856.73 863.42 870.10 873.45 907.72 907.72 907.72
268.14 280.40 290.84 296.88 308.53 308.53 308.53
588.60 583.02 579.26 576.56 599.18 599.18 599.18
11.37% 11.27% 11.19% 11.14% 11.58% 11.58% 11.58%
-
8/8/2019 Financial Model- MSP(1)
28/47
Interest Sheet
Beneficiation & Pelletisation
Descripti 0 2010-11 2011-12 2012-13 2013-14 2014-15 2015-16 2016-17
Long Term LoanRate of Interest 12.00% 12.00% 12.00% 12.00% 12.00% 12.00% 12.00%
Outstandi Rs Million 96.98 278.57 278.57 222.85 167.14 111.43 55.71
Interest Rs Million - 33.43 30.09 23.40 16.71 10.03
Repayme Rs Million - - - 55.71 55.71 55.71 55.71
Working Capital Loan
Rate of Interest 12.00% 12.00% 12.00% 12.00% 12.00% 12.00% 12.00%
Outstandi Rs Million - - ### ### ### ### ###
Interest Rs Million - - 135.14 152.03 152.03 152.03 152.03
Total Int Rs Million - - 168.57 182.12 175.43 168.75 162.06
Pre-Operative Expenses
Amount Rs Million 119.95 239.89 239.89 205.62 171.35 137.08 102.81
Written O Rs Million 34.27 34.27 34.27 34.27 34.27IDC 11.64 22.53
61.88 116.14
-
8/8/2019 Financial Model- MSP(1)
29/47
2017-18 2018-19 2019-20 2020-21 2021-22
12.00% 12.00% 12.00% 12.00% 12.00%
- - - - -
3.34 - - - -
55.71 - -
12.00% 12.00% 12.00% 12.00% 12.00%
### ### ### ### ###
152.03 152.03 152.03 152.03 152.03
155.37 152.03 152.03 152.03 152.03
68.54 34.27 - - -
34.27 34.27 - - -
-
8/8/2019 Financial Model- MSP(1)
30/47
Rs. MillionDescription Unit 2010-1 2011-12 TotalLand Acquisition Cost
Land Development Cost
Development of Tailing Pond
Plant and Machinery
MFA
Utilities
Mining Development
Preliminary and Pre-operative Expenses
Margin Money
Interest During Construction (IDC)
Contingency
Total
-Capital Structure
Description Unit 010-112011-12 TotalEquity #DIV/0!
Long Term Debt #DIV/0!
Total
Cost
-
8/8/2019 Financial Model- MSP(1)
31/47
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
-
8/8/2019 Financial Model- MSP(1)
32/47
Depreciation
Description 2010-11 2011-12 2012-13 2013-14 2014-15
Gross Fixed Assets Rs Million
Land Rs Million
Tailing Pond Rs MillionBuilding and Civil WorkRs Million
Plant and Machinery Rs Million
MFA Rs Million
Depreciation Rs Million
Land 0.00%
Tailing Pond 3.33%
Building and Civil Work 3.33%
Plant and Machinery 5.28%
MFA 7.50%
Cumulative Depreci Rs Million
Land Rs Million
Tailing Pond Rs MillionBuilding and Civil WorkRs Million
Plant and Machinery Rs Million
MFA Rs Million
Net Fixed Assets Rs Million
Land Rs Million
Tailing Pond Rs Million
Building and Civil WorkRs Million
Plant and Machinery Rs Million
MFA Rs Million
WDV0 2010-11 2011-12 2012-13 2013-14 2014-15
Gross Fixed Assets Rs Millio - - - - -
Land Rs Million - - - - -
Tailing Pond Rs Million - - - - -
Building and Civil WorkRs Million - - - - -
Plant and Machinery Rs Million - - - - -
MFA Rs Million - - - - -
Depreciation Rs Million - - - - -
Land 0.00% - - - - -
Tailing Pond 5.00% - - -
Building and Civil Work 5.00% - - - - -
Plant and Machinery 15.00% - - - - -MFA 25.00% - - -
Cumulative Depreci Rs Million - - - - -
Land Rs Million - - - - -
Tailing Pond Rs Million - - - - -
Building and Civil WorkRs Million - - - - -
Plant and Machinery Rs Million - - - - -
MFA Rs Million - - - - -
-
8/8/2019 Financial Model- MSP(1)
33/47
-
8/8/2019 Financial Model- MSP(1)
34/47
2015-16 2016-17 2017-18 2018-19 2019-20 2020-21 2021-22
2015-16 2016-17 2017-18 2018-19 2019-20 2020-21 2021-22
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
-
8/8/2019 Financial Model- MSP(1)
35/47
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
-
8/8/2019 Financial Model- MSP(1)
36/47
Overall Project Working Capital
Description Days 2010-11 2011-12 2012-13 2013-14
Current Assets - - ### ###
Raw Material - - 106.09 121.02
Stores and Consumables - - 20.36 22.92Work In Progress - - 12.32 12.42
Finished Goods - - 132.90 118.65
Debtors - - ### ###
Current Liabilities - - Err:509 Err:509
Creditors - - Err:509 Err:509
Net Current Assets - - Err:509 Err:509
Working Capital Required #REF! #REF! Err:509 Err:509
Margin Money - - Err:509 Err:509
Bank Borrowings - - Err:509 Err:509
Iron Ore Beneficiation
Description Days 2010-11 2011-12 2012-13 2013-14
Current Assets
Raw Material 45 - - 93 107
Stores and Consumables 30 - - 1 1
Work In Progress 2 - - 5 4
Finished Goods 10 - - 83 62
Debtors 45 - - 241 308
Total Current Assets - - 422 482
Current Liabilities
Creditors 15 - - 31 36Working Capital Gap - - 391 446
Margin Money 25% - - 106 120
Bank Borrowings - - 285 325
Pelletisation
Description Days 2010-11 2011-12 2012-13 2013-14
Current Assets - - ### ###
Raw Material 30 - - 12.78 14.38
Stores and Consumables 30 - - 19.73 22.19
Work In Progress 3 - - 7.55 8.49
Finished Goods 15 - - 50.33 56.62Debtors 90 - - ### ###
Current Liabilities - - Err:509 Err:509
Creditors 15 - - Err:509 Err:509
Net Current Assets - - Err:509 Err:509
Working Capital Required - - Err:509 Err:509
Margin Money 25% - - Err:509 Err:509
-
8/8/2019 Financial Model- MSP(1)
37/47
Bank Borrowings - - Err:509 Err:509
-
8/8/2019 Financial Model- MSP(1)
38/47
2014-15 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21 2021-22
### ### ### ### ### ### ### ###
134.35 134.35 134.35 134.35 134.35 134.35 134.35 134.35
23.01 23.01 23.01 23.01 23.01 23.01 23.01 23.0112.91 12.91 12.91 12.91 12.91 12.91 12.91 12.91
126.36 126.36 126.36 126.36 126.36 126.36 126.36 126.36
### ### ### ### ### ### ### ###
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
2014-15 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21 2021-22
120 120 120 120 120 120 120 120
1 1 1 1 1 1 1 1
4 4 4 4 4 4 4 4 -31.42
70 70 70 70 70 70 70 70 0
350 350 350 350 350 350 350 350 -31.42
545 545 545 545 545 545 545 545
40 40 40 40 40 40 40 40504 504 504 504 504 504 504 504
136 136 136 136 136 136 136 136
368 368 368 368 368 368 368 368
2014-15 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21 2021-22
### ### ### ### ### ### ### ###
14.38 14.38 14.38 14.38 14.38 14.38 14.38 14.38
22.19 22.19 22.19 22.19 22.19 22.19 22.19 22.19
8.49 8.49 8.49 8.49 8.49 8.49 8.49 8.49
56.62 56.62 56.62 56.62 56.62 56.62 56.62 56.62### ### ### ### ### ### ### ###
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
-
8/8/2019 Financial Model- MSP(1)
39/47
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
-
8/8/2019 Financial Model- MSP(1)
40/47
0 0 0 0 0 0 0 0 0
Sources of Fund
PAT Rs Million - - 723.19 843.36 850.05 856.73 863.42
Depreciati Rs Million - - ### ### ### ### ###
Equity InveRs Million - - - - - - -
Increase inRs Million 2010-11 2011-12 2012-13 - - - -Expenses Rs Million - - 168.57 182.12 175.43 168.75 162.06
Increase inRs Million - - - - - - -
Total Sou Rs Million - - ### ### ### ### ###
Uses of Fund
Gross Fixe Rs Million - - - - - - -
Increase inRs Million - - 127.12 15.89 - - -
Other Pay Rs Million - - - - - - -
Repaymen Rs Million 96.98 278.57 278.57 222.85 167.14 111.43 55.71
Total Use Rs Million 96.98 278.57 405.69 238.74 167.14 111.43 55.71
Net Cash Rs Million -96.98 -278.57 ### ### ### ### ###
Opening B Rs Million 0 -96.98 -375.54 ### ### ### ###Closing BalRs Million -96.98 -375.54 ### ### ### ### ###
-
8/8/2019 Financial Model- MSP(1)
41/47
0 0 0 0 0
870.10 873.45 907.72 907.72 907.72
### ### ### ### ###
- - - - -
- - - - -155.37 152.03 152.03 152.03 152.03
- - - - -
### ### ### ### ###
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
### ### ### ### ###
### ### ### ### ###### ### ### ### ###
-
8/8/2019 Financial Model- MSP(1)
42/47
Profitabi 0 0 0 0 0 0 0 0
Shareholders Fund
Capital Rs. Million 870.32 - - - - - -
Reserve aRs. Million - - 723.19 ### ### ### ###
Total Rs. Milli 870.32 - 723.19 ### ### ### ###
Loan Funds
Secured Rs. Milli - - - - - - -
Term Loa Rs. Million - - - - - - -
WC Loan Rs. Million - - - - - - -
Unsecur Rs. Milli - - - - - - -
Other LoaRs. Million - - - - - - -
Total Rs. Milli - - - - - - -
Total So Rs. Milli 870.32 - 723.19 ### ### ### ###
Rs. Million
Fixed As Rs. Milli - - -71.69 -71.69 -71.69 -71.69 -71.69
Gross Blo Rs. Million - - - - - - -
Less: Cu Rs. Million - - 71.69 71.69 71.69 71.69 71.69Investme Rs. Million - - - - - - -
Current Rs. Milli - 422.31 ### ### ### ### ###
Inventori Rs. Million - - ### ### ### ### ###
Debtors Rs. Million - - 14.85 16.71 16.71 16.71 16.71
Cash Rs. Million - 422.31 315.70 649.10 685.34 677.50 671.93
Less: Cu Rs. Milli - - - - - - -
Creditors Rs. Million - - - - - - -
Provision Rs. Million - - - - - - -
Net Curr Rs. Milli - 422.31 ### ### ### ### ###
Miscellan Rs. Million - - 168.57 182.12 175.43 168.75 162.06
Total Us Rs. Milli - 422.31 ### ### ### ### ###
870.32 -422.31 ### ### -457.75 413.51 ###
### ### 264.71 820.49 871.26 875.68
-
8/8/2019 Financial Model- MSP(1)
43/47
0 0 0 0 Rs. Million
- - - - -
### ### ### ### ###
### ### ### ### ###
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
### ### ### ### ###
-71.69 -71.69 -71.69 -71.69 -71.69
- - - - -
71.69 71.69 71.69 71.69 71.69- - - - -
### ### ### ### ###
### ### ### ### ###
16.71 16.71 16.71 16.71 16.71
668.17 721.18 709.54 709.54 709.54
- - - - -
- - - - -
- - - - -
### ### ### ### ###
155.37 152.03 152.03 152.03 152.03
### ### ### ### ###
### ### ### ### ###
880.55 823.77 919.37 907.72 907.72
-
8/8/2019 Financial Model- MSP(1)
44/47
Description 0 2010-11 2011-12 2012-13 2013-14
Initial Cash Flows
Capital Investment Rs Million -967.29 -1,388.96 -
Margin Money Rs Million - -422.31Total Rs Million -967.29 ### -
Operating Cash Flows
PAT Rs Million - - 546.46 607.12
Depreciation Rs Million - - 110.35 110.35
Interest Coverage Rs Million - - 111.27 120.22
Misc Expenses Written off Rs Million - - 34.27 34.27
Total Rs Million - - 802.36 871.95
Terminal Cash Flows
Salvage Value Rs Million
Working Capital Rs Million
Total Rs Million - - - -
Total Free Cash Flows Rs Million -967.29 -1811.27 802.36 871.95NPV Rs Million 1,903.10
IRR % 26.03%
Payback Period (months) Months 63
Post tax capital % 11.59%
PD (yrs) 1 2 3 4
CF -967.29 -1811.27 802.36 871.95
CCF -967.29 -2778.57 ### -1104.26
PP (months) na na na na
Initial Cash Flows 0 2010-11 2011-12 2012-13 2013-14
Leverage Ratio
Debt Equity 1.46 1.41
Average DE Ratio 1.32
DSCR 21.67 9.11
Average DSCR 12.39
Profitability Ratio
Operating Profit Margin 0.00% 0.00% 22.53% 22.61%
Net Profit Margin #DIV/0! #DIV/0! 11.88% 11.73%
-
8/8/2019 Financial Model- MSP(1)
45/47
2014-15 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21 2021-22
596.44 588.60 583.02 579.26 576.56 599.18 599.18 599.18
110.35 110.35 110.35 110.35 110.35 110.35 110.35 110.35
115.80 111.39 106.98 102.56 100.36 100.36 100.36 100.36
34.27 34.27 34.27 34.27 34.27 - - -
856.86 844.61 834.62 826.44 821.54 809.89 809.89 809.89
1,012.85
422.31
- - - - - - - ###
856.86 844.61 834.62 826.44 821.54 809.89 809.89 2245.05
5 6 7 8 9 10 11 12
856.86 844.61 834.62 826.44 821.54 809.89 809.89 2245.05
-247.40 597.21 1431.82 2258.27 3079.81 3889.70 4699.59 6944.65
na 63.52 63.41 63.21 63.01 62.37 62.37 106.88
2014-15 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21 2021-22
1.34 1.28 1.24 1.21 1.19 1.18 1.16 1.15
9.66 10.35 11.22 12.31 - - - -
22.61% 22.61% 22.61% 22.61% 22.61% 22.61% 22.61% 22.61%
11.53% 11.37% 11.27% 11.19% 11.14% 11.58% 11.58% 11.58%
-
8/8/2019 Financial Model- MSP(1)
46/47
Sr. No.
2010-11 2011-12
Q1 Q2. Q3 Q4 Q1 Q2. Q3
1 Land & Land Development
Preliminary Studies / Surveys
Land Levelling
2 Statutory Approvals3 Facilities
Architectural Drawings
Detailed Enginnering
Obtaining Technical Approvals
Finalisation of orders
Civil Works
Receipt of Equipments
Mechanical Completion
Commissioning
Description
-
8/8/2019 Financial Model- MSP(1)
47/47
2012-13
Q4 Q1 Q2. Q3 Q4