fhwa traffic incident management program overview

19
FHWA Traffic Incident FHWA Traffic Incident Management Program Management Program Overview Overview Talking Freight Webinar August 15, 2012

Upload: mandel

Post on 28-Jan-2016

48 views

Category:

Documents


0 download

DESCRIPTION

FHWA Traffic Incident Management Program Overview. Talking Freight Webinar August 15, 2012. Quantifying the Problem – Responder Safety and Costs. Responder Safety - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: FHWA Traffic Incident Management  Program Overview

FHWA Traffic Incident FHWA Traffic Incident Management Program OverviewManagement Program Overview

Talking Freight Webinar

August 15, 2012

Page 2: FHWA Traffic Incident Management  Program Overview

Source: Emergency Responder Safety Institute, AAA

Responder SafetyAnnually, dozens of Fire/EMS, Law Enforcement, Towing and Highway responders are struck, injured or killed nationally while working in or near traffic.

Quantifying the Problem – Quantifying the Problem – Responder Safety and Costs Responder Safety and Costs

Societal CostsAnnual cost of congestion and traffic crashes nearly $400B, an increase of 45-83% from 2008 figures.

Page 3: FHWA Traffic Incident Management  Program Overview

National TIM Program Vision… National TIM Program Vision…

Through continuous and enhanced planning and training of all TIM personnel:

1.Reduce or eliminate responder and motorist injuries and fatalities

2.Promote rapid incident clearance thereby reducing traffic congestion and vulnerability

3.Develop or enhance local TIM Programs that ultimately benefit corridors, regions and states

4.Measure performance that demonstrates improved TIM responses and programs over time

5.Emphasize TIM as a system operations “core mission” for all responders

Page 4: FHWA Traffic Incident Management  Program Overview

2012 Major TIM Initiatives2012 Major TIM Initiatives

• SHRP 2 National TIM Responder Training Course

• Advanced Workshops

• Senior Executive Outreach

• Self Assessment (Big move nationally in 2011)

• Traffic Incident Management Framework

• Training Standardization

• Public Outreach Toolkit

• Performance Metrics

Page 5: FHWA Traffic Incident Management  Program Overview

Advanced TIM Workshops: Advanced TIM Workshops: 42 Top 40 Metro’s/ 3 Rural Completed42 Top 40 Metro’s/ 3 Rural Completed

Orlando, FL

Memphis, TNMemphis, TNNashville, TNNashville, TN

Greensboro, NCCharlotte, NC

Dallas, TXDallas, TX

Houston, TX

Austin, TXAustin, TX

San Antonio, TX

Cheyenne, WYCheyenne, WY

Denver, CODenver, CO

Phoenix, AZPhoenix, AZ

Las Vegas, NVLas Vegas, NV

Portland, ORPortland, OR

Seattle, WASeattle, WA

Los Angeles-Orange Co, CA

San Diego, CA

Chicago, ILChicago, ILCleveland, OHCleveland, OH

Pittsburg, Pittsburg, PAPA

Columbus, OHColumbus, OH

Boston, MAProvidence, RI

Indianapolis, INIndianapolis, INDC Capital Region

Workshops Completed

Workshops Anticipated 2012

TIM Technical Assistance

Legend:

Puerto Rico

Alaska

Hawaii

Sacramento, CASacramento, CA

Kansas City, MOKansas City, MO

Minneapolis-Minneapolis-St. Paul, MNSt. Paul, MN

St. Louis, MOSt. Louis, MO

Oklahoma City, OKOklahoma City, OK

Baltimore, MD

Cincinnati, OHCincinnati, OH

Philadelphia, PA

Detroit, MIDetroit, MI

San Bernardino-San Bernardino-Riverside, CARiverside, CA

Bay Area, CA

Boise, IDBoise, ID

Miami, FLTampa, FL

Atlanta, GAAtlanta, GA

Hampton Roads, VA

Jacksonville, FL

New York, NY

Milwaukee, WIMilwaukee, WI

Page 6: FHWA Traffic Incident Management  Program Overview

Advanced TIM Workshop ObjectivesAdvanced TIM Workshop Objectives

• Discuss TIM gaps/needs and identify specific strategies for regional TIM improvement

• Understand the importance of sustained TIM programs in the overall context of safe, efficient highway system operations

• Leverage the TIM National Unified Goal as a foundation for continuous program enhancement

• Recognize the importance of monitoring/measuring TIM performance

Page 7: FHWA Traffic Incident Management  Program Overview

TIM Program Components TIM Program Components

TIM Components

Program• Relationships• Needs Assessment• Training• Performance Evaluation• Administration & Staffing • Asset Management• Finance/Budget

Response• TIM Process

Page 8: FHWA Traffic Incident Management  Program Overview

Framework Framework

3

Objective

s

18Str

ategies

6 Cross-Cutting Foundational Strategies

Responder Safety Safe, Quick Clearance

Prompt, Reliable Interoperable Communications

National Unified Goal (NUG) for TIM

Page 9: FHWA Traffic Incident Management  Program Overview

Freight IssuesFreight Issues

• High volume long haul trucking

• Lack of alternate route options

• Motor Carrier Regulations – 11 hours behind wheel

• Parking and rest areas

9

Page 10: FHWA Traffic Incident Management  Program Overview
Page 11: FHWA Traffic Incident Management  Program Overview
Page 12: FHWA Traffic Incident Management  Program Overview

Are we making a difference? Are we making a difference? Measuring Success Measuring Success

What Gets Measured Gets Performed...

• Quantifying TIM benefits will advance program continuity:

– Builds critical mass for program support from managers and elected officials:

• Supporting what works

– Ensures buy-in from diverse stakeholders:

• Multiple agencies, coordinated response

• Three measures: Roadway Clearance Time, Incident Clearance Time, Secondary Incidents

Page 13: FHWA Traffic Incident Management  Program Overview
Page 14: FHWA Traffic Incident Management  Program Overview

What is SHRP2?What is SHRP2?

• $218 million, federally funded research program to address critical transportation challenges:

– Making highways safer

– Fixing deteriorating infrastructure

– Reducing congestion

• Collaborative effort of AASHTO, FHWA, and TRB

• Aims to advance innovative ways to plan, renew, operate, and improve safety on the Nation's highways 14

Save lives. Save money. Save time.

Page 15: FHWA Traffic Incident Management  Program Overview

SHRP2–L12: Training Course SHRP2–L12: Training Course ElementsElements

• Course Design:

– Final course developed so it can be taught by experienced trainers from all disciplines

– Presented in its entirety or through selected modules

– Four Hour Version will be available

• Course Delivery Mechanisms:

– Provide course to existing entities already conducting training – central body sets course

– Flexible approach – delivery provided at local level

– Instructors from different disciplines

Page 16: FHWA Traffic Incident Management  Program Overview

DeliveryDelivery

• Train the Trainer (TtT): Multi- discipline full curriculum developed in SHRP2 L12 project. After completing the TtT, course participants will be equipped to provide the training to a larger audience of incident responders in their discipline.

• Classroom Training: Multi-discipline trainers trained through the TtT courses will conduct classroom-based training for a broader audience of incident responders across that state and/or region.

Page 17: FHWA Traffic Incident Management  Program Overview

Senior Executive Support Senior Executive Support

• Every Day Counts 2 Initiative

• AASHTO priority project

• ICAP – Formally Endorsed Sept

• IAFC- Formally Endorsed

• NVFC – Formally Endorsed

Page 18: FHWA Traffic Incident Management  Program Overview

SHRP2-L32: Implementation GoalsSHRP2-L32: Implementation Goals

By August 2012:– Conduct 4 TtT pilot workshops (TRB)

By August 2014:– Conduct 60-85 additional TtT sessions

– Train 1000-1500 State/local responders to deliver classroom training

– Deliver Classroom Training to 30K-70K responders

Within 5 Years: – Train 4500 State/local responders to deliver classroom training

– Deliver Classroom Training to 425K-900K responders

– Deliver E-Learning to 1.2M responders

Page 19: FHWA Traffic Incident Management  Program Overview

Questions/CommentsQuestions/Comments

For more information, please contact:

Mark Kehrli

Director, Office of Transportation Operations

Email: Mark. [email protected]

Paul Jodoin

FHWA TIM Program Manager

Telephone: 202-366-5465 • Email: [email protected]

Thomas “Tim” Lane

FHWA TIM Law Enforcement Program Manager

Telephone: 202-366-0731 • Email: [email protected]