experience with detector r/d and construction for electron

25
Th. M Th. M ü ü ller, IEKP Karlsruhe Meeting ller, IEKP Karlsruhe Meeting for for Proto Proto - - collaboration collaboration for for SuperKEKB SuperKEKB 19.03.08 19.03.08 Experience Experience with with Detector Detector R/D and Construction R/D and Construction For For Electron Electron Positron Positron and and Hadron Hadron Colliders Colliders in Karlsruhe in Karlsruhe Introduction: Universität Karlsruhe (TH) oldest technical University in Germany 1825 Foundation following the example of the Ecole Polytechnique in Paris. (The ETH Zürich and MIT then followed the example of Karlsruhe) 1962 Foundation of the Institut für Experimentelle Kernphysik IEKP 2008 Foundation of Karlsruhe Institute of Technology KIT: merger of University and Forschungszentrum Karlsruhe; 18000 Students, 6000 Employes

Upload: others

Post on 12-Jun-2022

4 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Experience with Detector R/D and Construction For Electron

Th. MTh. Müüller, IEKP Karlsruhe Meeting ller, IEKP Karlsruhe Meeting forfor ProtoProto--collaborationcollaboration forfor SuperKEKBSuperKEKB 19.03.0819.03.08

ExperienceExperience withwith DetectorDetector R/D and ConstructionR/D and ConstructionFor For ElectronElectron PositronPositron and and HadronHadron CollidersColliders in Karlsruhein Karlsruhe

Introduction:

Universität Karlsruhe (TH) oldest technical University in Germany

1825 Foundation following the example of the Ecole Polytechnique in Paris. (The ETH Zürich and MIT then followed the example of Karlsruhe)

1962 Foundation of the Institut für Experimentelle Kernphysik IEKP

2008 Foundation of Karlsruhe Institute of Technology KIT: merger of University and Forschungszentrum Karlsruhe; 18000 Students, 6000 Employes

Page 2: Experience with Detector R/D and Construction For Electron

Th. MTh. Müüller, IEKP Karlsruhe Meeting ller, IEKP Karlsruhe Meeting forfor ProtoProto--collaborationcollaboration forfor SuperKEKBSuperKEKB 19.03.0819.03.08

Physics

TheThe University University

Page 3: Experience with Detector R/D and Construction For Electron

Th. MTh. Müüller, IEKP Karlsruhe Meeting ller, IEKP Karlsruhe Meeting forfor ProtoProto--collaborationcollaboration forfor SuperKEKBSuperKEKB 19.03.0819.03.08

Ferdinand Braun: 1883-85Nobel price 1909

Heinrich Hertz: 1885-88 Detection of electromagnetic waves

Otto Lehmann: 1888-1919 Liquid crystals

Wolfgang Gaede: 1919-33 Vacuum physics

Herwig Schopper:1925Founder of IEKPCERN Director 1981-88

Heinrich HertzFerdinand Braun

Wolfgang GaedeOtto Lehmann

ImportantImportant PhysisistsPhysisists

Page 4: Experience with Detector R/D and Construction For Electron

Th. MTh. Müüller, IEKP Karlsruhe Meeting ller, IEKP Karlsruhe Meeting forfor ProtoProto--collaborationcollaboration forfor SuperKEKBSuperKEKB 19.03.0819.03.08

Kascade-Grande /

LopesKATRIN

IEKP

Forschungszentrum Karlsruhe Forschungszentrum Karlsruhe

Located 12 km north of Karlsruhe

Clean Area

Page 5: Experience with Detector R/D and Construction For Electron

Th. MTh. Müüller, IEKP Karlsruhe Meeting ller, IEKP Karlsruhe Meeting forfor ProtoProto--collaborationcollaboration forfor SuperKEKBSuperKEKB 19.03.0819.03.08

• 6 Professors, 1 Assistent Professor• 30 Scientists with PhD• 40 Graduate Students• 25 Master Students• 4 Technicians• Elektronics Workshop (3 people)• Mechanical Workshop (15 people)

IEKP Institut fIEKP Institut füür Experimentelle Kernphysik r Experimentelle Kernphysik

Participationin

Experiments

Page 6: Experience with Detector R/D and Construction For Electron

Th. MTh. Müüller, IEKP Karlsruhe Meeting ller, IEKP Karlsruhe Meeting forfor ProtoProto--collaborationcollaboration forfor SuperKEKBSuperKEKB 19.03.0819.03.08

IEKP Research at IEKP Research at ParticleParticle AcceleratorsAccelerators

2008 :

Page 7: Experience with Detector R/D and Construction For Electron

Th. MTh. Müüller, IEKP Karlsruhe Meeting ller, IEKP Karlsruhe Meeting forfor ProtoProto--collaborationcollaboration forfor SuperKEKBSuperKEKB 19.03.0819.03.08

W. de BoerW. de BoerCMS, AMS, ILCCMS, AMS, ILC

G. DrexlinKATRIN M. Feindt

CDF, CMS

J. BlümerAUGER; KASKADE;EDELWEISS

Th. MüllerCMS, CDF, ILC

G. QuastG. QuastCMS, GRIDCMS, GRID

Professors of Professors of thethe IEKP IEKP

S-KEKB

Page 8: Experience with Detector R/D and Construction For Electron

Th. MTh. Müüller, IEKP Karlsruhe Meeting ller, IEKP Karlsruhe Meeting forfor ProtoProto--collaborationcollaboration forfor SuperKEKBSuperKEKB 19.03.0819.03.08

Johannes Kühn Matthias Steinhauser

Dieter Zeppenfeld Frans Klinkhamer

Uli Nierste

TheoreticalTheoretical ParticleParticle PhysicistsPhysicists in Karlsruhe in Karlsruhe

Precision PhysicsCollider PhysicsBeauty PhysicsPhysics beyond the SMCosmology

Page 9: Experience with Detector R/D and Construction For Electron

Th. MTh. Müüller, IEKP Karlsruhe Meeting ller, IEKP Karlsruhe Meeting forfor ProtoProto--collaborationcollaboration forfor SuperKEKBSuperKEKB 19.03.0819.03.08

Karlsruhe: Member since 1996

Properties of Top-QuarksSearch for SM HiggsPhysics with Beauty-Hadrons

TEVATRON-Programme:Proton-Antiproton-Collisions at 1.96 TeV CMS Energie

April 2001: Begin of Run II, L=2x1031/cm2s

March 2008: Data taking at L=24x1031/cm2s

Plan: By 2009: 4-6 fb-1

µ

µ

jet

jet

ET

CDF at CDF at TevatronTevatron, FNAL , FNAL

Page 10: Experience with Detector R/D and Construction For Electron

Th. MTh. Müüller, IEKP Karlsruhe Meeting ller, IEKP Karlsruhe Meeting forfor ProtoProto--collaborationcollaboration forfor SuperKEKBSuperKEKB 19.03.0819.03.08

From 04/08: Professor in Mainz

KLOE and BABAR KLOE and BABAR

Page 11: Experience with Detector R/D and Construction For Electron

Th. MTh. Müüller, IEKP Karlsruhe Meeting ller, IEKP Karlsruhe Meeting forfor ProtoProto--collaborationcollaboration forfor SuperKEKBSuperKEKB 19.03.0819.03.08

Assembley of CMS Magnet

Search for the Higgs-BosonQCD and Top-PhysicsSearch for Supersymmetrie

16 m

LHC-Programme:

Proton-Proton Collisions at 14 TeV1995: Start R/D for CMS-Tracker in Karlsruhe2003: Start construction, preparing for data taking2008: Cabling, commissioning

Summer 2008: First collisions expected

CMS at CMS at thethe LHCLHC

Page 12: Experience with Detector R/D and Construction For Electron

Th. MTh. Müüller, IEKP Karlsruhe Meeting ller, IEKP Karlsruhe Meeting forfor ProtoProto--collaborationcollaboration forfor SuperKEKBSuperKEKB 19.03.0819.03.08

• Delphi:– Quality control on sensors and modules, Assembly of Pixel and

Outer Barrel modules (Update ’97)• CDF II – ISL:

– Sensor Prototype evaluation– Quality control, Assembly fixture design and construction

• CMS– Prototyping (sensor & modules)– Definition of QA procedure, Design of sensors– Material Analysis– Long term Testing– Irradiation– Definition of QA procedure for modules

• Dedicated pinhole test, beam dump test, current/noise correlations …

– Bonding– Integration– Detector Control & Safety System

• SLHC – Design of new Sensors, evaluation– Radiation hardness studies

1996

2000

Today

ExperienceExperience withwith Silicon Silicon DetectorsDetectors

Page 13: Experience with Detector R/D and Construction For Electron

Th. MTh. Müüller, IEKP Karlsruhe Meeting ller, IEKP Karlsruhe Meeting forfor ProtoProto--collaborationcollaboration forfor SuperKEKBSuperKEKB 19.03.0819.03.08

Coordinate Measurement Machine Micro Bonder

Precision mashiningProbestation

Radiation hardness Assembly of Supermodulesstudies at FZK Zyklotron 102 „Petals”

20% of CMS-Tracker

Construction of Part of CMS Silicon Construction of Part of CMS Silicon TrackerTracker in IEKPin IEKP

0.8 m

Page 14: Experience with Detector R/D and Construction For Electron

Th. MTh. Müüller, IEKP Karlsruhe Meeting ller, IEKP Karlsruhe Meeting forfor ProtoProto--collaborationcollaboration forfor SuperKEKBSuperKEKB 19.03.0819.03.08

14

ROD INTEGRATION

AachenKarlsruheStrasbourgZurichWien

PETALS INTEGRATION Aachen

Brussels Karlsruhe

Louvain

Lyon Strasbourg

Wien Lyon

TEC assemblyTEC assembly

Pitch adapter:Factories Brussels

TK ASSEMBLYCERN

LouvainStrasbourgFirenze

Wien

BariPerugia

Bari FirenzeTorinoPisaPadova

TIB-TID INTEGRATION

FNAL

UCSB

TOB assembly TIB/TID assemblyCERN Pisa Aachen CERN (Lyon)

Karlsruhe

FNAL Pisa

Sensor QAC

Moduleassembly

Bonding & testing

Sub-assemblies

UCSB

FNAL

Integrationinto mechanics UCSB Hamburg

Hybrids:Factory-Strasbourg

Sensors:Factories

Kapton:Factory Aachen, Bari

Frames:Brussels,Pisa,Pakistan

Pisa Perugia

FE-APV:Factory IC,RAL

Control ASICS:Factory Company (QA)

Brussels

HH

CERN

CF cuttingFactory

CF plates:Factory Brussels

CF cuttingFactory

Torino

Page 15: Experience with Detector R/D and Construction For Electron

Th. MTh. Müüller, IEKP Karlsruhe Meeting ller, IEKP Karlsruhe Meeting forfor ProtoProto--collaborationcollaboration forfor SuperKEKBSuperKEKB 19.03.0819.03.08

GR

ID C

ompu

ting

LHC Datenrate 1 Petabyte / sec = 1 Mio CD´s / secnach mehrstufigem on-line Filter: pro Jahr ~1 Petabyte abgespeichern

dt. Tier 1 Zentrum

GridGrid ComputingComputing

Page 16: Experience with Detector R/D and Construction For Electron

Th. MTh. Müüller, IEKP Karlsruhe Meeting ller, IEKP Karlsruhe Meeting forfor ProtoProto--collaborationcollaboration forfor SuperKEKBSuperKEKB 19.03.0819.03.08

FurtherFurther Hardware Hardware DevelopmentsDevelopments

• Micro Strip Gas Detectors (MSGC) for CMS

First cathodeplanes weregold on glass(evaporated in Karlsruhe)

Page 17: Experience with Detector R/D and Construction For Electron

Th. MTh. Müüller, IEKP Karlsruhe Meeting ller, IEKP Karlsruhe Meeting forfor ProtoProto--collaborationcollaboration forfor SuperKEKBSuperKEKB 19.03.0819.03.08

•TPC for ILC

Karlsruhe Prototypeat CERN

Tracks ofPions

Page 18: Experience with Detector R/D and Construction For Electron

Th. MTh. Müüller, IEKP Karlsruhe Meeting ller, IEKP Karlsruhe Meeting forfor ProtoProto--collaborationcollaboration forfor SuperKEKBSuperKEKB 19.03.0819.03.08

At the beginning:

Team:

Two professors (0.5, 0.3 FTE)Three Postdocs (0.5, 0.5, and starting 2009 1 FTE)Several Graduate StudentsElectrical and mechanical workshop (about 3 FTE)

Contributions:

• Precision mashining of mechanical elements (3-5 µm)• Sensor R/D• Radiation hardness studies• Assembley and tests of silicon tracker modules or other detectors• Contributions to event reconstruction and data analysis

(see talk of Prof. Feindt)

Possible contributions of the institute IEKP to SKEKB

Page 19: Experience with Detector R/D and Construction For Electron

Th. MTh. Müüller, IEKP Karlsruhe Meeting ller, IEKP Karlsruhe Meeting forfor ProtoProto--collaborationcollaboration forfor SuperKEKBSuperKEKB 19.03.0819.03.08

Page 20: Experience with Detector R/D and Construction For Electron

Th. MTh. Müüller, IEKP Karlsruhe Meeting ller, IEKP Karlsruhe Meeting forfor ProtoProto--collaborationcollaboration forfor SuperKEKBSuperKEKB 19.03.0819.03.08

CDF: Top-Physik in KarlsruheSuche nach Einzel-Top-Quark-

Produktion mit Neuronalen Netzen

Messung der Ladungsasymmetrie in Top-Antitop-Ereignissen

Karlsruhe Jet-Flavor-Separator

Suche nach FCNC Produktion einzelner Top-Quarks

W-Helizität in Top-Quark-Zerfällen

z.B: W+1 jet bin

PRD 75, 052001 (2007) mit 320 pb-1

PRL mit Resultaten von 1.9 fb-1 in Arbeit

Erwartete Sensitivität: ≈ 4 σ

CDF-Karlsruhe Top-Higgs-Gruppe:

3 Postdoktoranden

4 Doktoranden

3 Diplomanden

Plan:

Publikation der Analysen mit 2 fb-1 in 2008, danach größtenteils Übergang zu CMS.

Wird von allen CDFEinzel-Top-Analysen benutzt !

Page 21: Experience with Detector R/D and Construction For Electron

Th. MTh. Müüller, IEKP Karlsruhe Meeting ller, IEKP Karlsruhe Meeting forfor ProtoProto--collaborationcollaboration forfor SuperKEKBSuperKEKB 19.03.0819.03.08

CDF: B-Physik in KarlsruheWinkelanalyse von

B0 → J/ψ K* ZerfällenWeitere Analysen•BR(Bs →DsDs)•Produktionsrate und Breite von Bs**

•Charm-Spektroskopie•X(3872)-Eigenschaften•Suche nach Xb

Massen- und Zerfallsbreiten von orbital angeregten B-Mesonen

Lebensdauer, Zerfallsbreiten-Differenz und CP-Verletzung

in Bs → J/ψ φ Zerfällen (Suche nach neuer Physik)

CDF-Karlsruhe B-Gruppe:

2 Postdoktoranden

7 Doktoranden

5 Diplomanden

Plan:

Fortsetzung mit CDF, Weiterentwicklung der Analysen bis nach 2010.

Publikationen in 2007• X(3872) JPC

Phys. Rev. Lett. 98,132002

• Bs**-MesonenEingereicht bei PRLarXiv 0710.4199

Page 22: Experience with Detector R/D and Construction For Electron

Th. MTh. Müüller, IEKP Karlsruhe Meeting ller, IEKP Karlsruhe Meeting forfor ProtoProto--collaborationcollaboration forfor SuperKEKBSuperKEKB 19.03.0819.03.08

Testing Equipment

2 homemade flexible probestations• 6”• cold chuck -10°C (+100°C to -10°C)• very flexible

• individual needles • bias travels with sensor

• switching matrix• RH control• LCR, electrometer, HV, quasistatic CV!• Camera (incl. frame grabber)

Measurements (all implemented):• Global: IV,CV• Strip:

• current, CaC, diel current• interstrip cap, resistance

• Special: VFlat, Isurf• All paramaters vs. time

Suitable for strip characterization of sensors and full modules

Page 23: Experience with Detector R/D and Construction For Electron

Th. MTh. Müüller, IEKP Karlsruhe Meeting ller, IEKP Karlsruhe Meeting forfor ProtoProto--collaborationcollaboration forfor SuperKEKBSuperKEKB 19.03.0819.03.08

23The ART of Sensor The ART of Sensor DefectsDefects

Leaky strippinhole

nothing

?

back

Page 24: Experience with Detector R/D and Construction For Electron

Th. MTh. Müüller, IEKP Karlsruhe Meeting ller, IEKP Karlsruhe Meeting forfor ProtoProto--collaborationcollaboration forfor SuperKEKBSuperKEKB 19.03.0819.03.08

CMM and bonderCMM and bonderCMS module on our 50*50*50cm³ 3D CMM

Full automatic bonder

Page 25: Experience with Detector R/D and Construction For Electron

Th. MTh. Müüller, IEKP Karlsruhe Meeting ller, IEKP Karlsruhe Meeting forfor ProtoProto--collaborationcollaboration forfor SuperKEKBSuperKEKB 19.03.0819.03.08

25Andauernde StrahlenhAndauernde Strahlenhäärtekontrolle rtekontrolle wwäährend der Sensorproduktion fhrend der Sensorproduktion füür r

CMS in KarlsruheCMS in Karlsruhe5% der Teststrukturen 1% der Sensoren

In Realität wurde die Bestrahlung hauptsächlich für spezielle Fragestellungen (Module und Sensoren) genutzt:

• Signal zu Rausch Studien• Evaluation vom Thermal-Run-Away• Nachbestrahlungsverhalten von Sensoren mit

• hoher Resistivität• hoher Flachbandspannung• etc.