The Ammonium Sulphate (AS-I) plant was established before 2006 and currently it is
not in operation. Hence there is no environmental clearance for the proposed project. It is
revamping of existing facilities of AS-I plant.
GSFC Vadodara is situated at PO Fertilizernagar Vadodara. There were 3
Ammonium Sulphate plants under operation before 2006 with valid CCA (AS-I, AS-II & AS-
III). After 2006, GSFC has stopped production of Ammonium Sulphate from AS-1 plant due
to problems faced in disposal of CaCO3 (Chalk). Now, the management has decided to
revamp AS-I plant in existing facility for the production of Ammonium Sulphate with
production capacity of 1,46,000 TPA through direct neutralization route where CaCO3
(Chalk) will not be produced.
The latest EC received for Melamine Plant SEIAA/GJ/EC/5(f)/228/2016 dated
31/03/2016 and J-11011/901/2007-IA(II) dated 31/07/2008 is attached herewith for your