EXPAND YOUR RETAIL OPPORTUNITY
STANDARD FEATURES:
• Bi-panel locking safety gates restrict unauthorized access.
• Touch screen display provides instructions to passengers and fault diagnostics to staff.
• Photoelectric entry and exit sensors detect non-cart presences and disables unit.
• Physical archway at infeed blocks carts with overhanging loads.
www.cartveyor.com(414) 352-90006720 N Teutonia AvenueMilwaukee, WI 53209
CARTVEYOR™ THE SAFE, EFFICIENT WAY TO MOVE SHOPPING CARTS BETWEEN LEVELS.
MATERIAL HANDLING SOLUTIONS
“P”P = K + (2L) + (2m) + (2N)
O.A. PIT/FLOOR OPENING WIDTH
“K”SINGLE
CARTVEYORFINISHED
WIDTH3’- 4” [1016]
“M”ESCALATOR
FINISHED WIDTH
“N”PIT/FLOOROPENING
CLEARANCE(1 1/4” [30]’ REF.)
“N”PIT/FLOOROPENING
CLEARANCE(1 1/4” [30]’ REF.)
“L”CARTVEYOR TO
ESCALATORCLEARANCE(1/2” TYP.)
STANDARDSTAINLESS STEELEXTERIOR CLADDINGCAP ON SIDEOPPOSITE ESCALATORBY PFLOW (SHOWN)OTHER CLADDINGOPTIONS ARE AVAILABLE
ONE-PIECE SHIPMENT (STANDARD)
CARTVEYOR SHIPPING DETAILCARTVEYORS CAN BE KNOCKED-DOWN FOR
CERTAIN APPLICATIONS. ONE PIECE, TWO PIECE, AND THREE PIECE KNOCK-DOWN CAPABILITY.
“P”P = K + L + M + (2N)
O.A. PIT/FLOOR OPENING WIDTH
STANDARDSTAINLESS STEELEXTERIOR CLADDINGDOWN CHORDLINE ON SIDE ADJACENTTO ESCALATORBY PFLOW
1/2”CLEARANCE BETWEEN
CARTVEYOR STRUCTURE
SHARED STAINLESSSTEEL CAP ONADJACENT CARTVEYORSIDERAILS BY PFLOW
CLEAR ACRYLIC BARRIERON TOP OF CARTVEYORSIDERAIL ADJACENT TOESCALATOR BY PFLOW CLEAR ACRYLIC BARRIER
ON TOP OF CARTVEYORSIDERAILS BY PFLOW
“N”PIT/FLOOROPENING
CLEARANCE(1 1/4” REF)
“N”PIT/FLOOROPENING
CLEARANCE(1 1/4” REF)
“L”CARTVEYOR TO
ESCALATORCLEARANCE(1/2” TYP.)
“M”ESCALATOR
FINISHED WIDTH
“M”ESCALATOR
FINISHED WIDTH
“L”CARTVEYOR TO
ESCALATORCLEARANCE(1/2” TYP.)
“K”PAIRED CARTVEYOR
FINISHED WIDTH6’ 8 1/2” [2045]
OPTIONAL: 120VACDUPLEX GFCIRECEPTACLE &SERICE LIGHTWITHIN PIT AREASOF TRUSS (NOT BY PFLOW) TYP@ BOTH LANDINGS
“E”UPPER WORK POINT
UPPER EDGE8’ - 2 5/16” [2497]
“B”EDGE TO EDGE
50’ - 2” ± 1/4” [15290 ± 6.35] “D”WORK POINT TO WORK POINT
34’ - 7 11/16” [10558]
1/2” STANDARD CLEAR ACRYLICBARRIER ON TOP OF CARTVEYOR
SIDERAIL ON BOTH SIDES BY PFLOW
STAINLESS STEELEXTERIOR CLADDINGFROM CHORD LINE
TO TOP OF UNITBY PFLOW
“R”CLEAR TO CEILINGFROM CHORD LINE
7’ - 0” MIN
3’ - 0”TYP. ENDS
PLEASESEE MOUNTING
DETAIL-SIM(PG. 4 OF 4)
DISCONNECT FORMAIN DRIVE
MOTORBY PFLOW
“A”VERTICAL TRAVEL
20’ - 0” ± 1/4”[6096 ± 6.35]
PROVISIONS FOR ATTACHMENT OF5/8” GYPSUM BOARD TO BOTTOMAND LOWER SIDES OF TRUSS BY PFLOW (GYPSUM BOARDNOT BY PFLOW)
1’ - 8”
2’ - 0”
“C”LOWER EDGE
TO LOWER WORK POINT7’ - 4” [2235]
PLEASE SEE MOUNTINGDETAIL(SHT. 4 OF 4)
DRAIN REQUIRED,SUMP PUMP RECOMMENDED(NOT BY PFLOW)
G.C. NOTE: CONFIRM & COORDINATE PIT DIMS.
“G”MIN PIT OPENING LENGTH
14’ - 6” [4420]
“F”MIN. PIT DEPTH BELOW
FINISH FLR.4’ - 0” [1220]
5”
30”
MAIN POWER CONDUIT PROVIDEDBY PFLOW
CHORD LINE
CHORD LINE
3’ - 2”
2’ - 6”
MAIN CONTROL PANELBY PFLOW
TWO-PIECE SHIPMENT (OPTIONAL)
THREE-PIECE SHIPMENT (OPTIONAL)