EUR PBN TF
PBN ICAO HQ Activities Overview
page 2
PBN - Where are we now?
• Current PBN concept– Globally harmonized navigation specification based
on existing national or regional requirement– Objective: facilitation of standardization with the aim
to reduce cost, confusion and accelerate implementation
02 July 2012
PBN - Where are we now?
• PBN concept developments– Builds on existing requirements– Adds new specifications to address operational
requirements– Curtails the proliferation of number of navigation
specifications
page 3
New Edition
• Updated PBN Manual (Advance copy):– 1st week of July 2012
02 July 2012
PBN - Where are we now?
• Updated PBN Manual - highlights
• RNP 2– High continuity (typically oceanic/remote applications)– Low continuity (typically continental applications)
• RNP 0.3– Intended for slow moving aircraft
• Radius-to-fix (RF) (terminal and approach)• Fixed Radius Transitions (FRT) (en-route)• Advanced RNP (umbrella navigation specification)• High level ops approval guidance• Improved implementation process description
02 July 2012 page 4
Advanced RNP
RNAV 1
RNAV 2
RNAV 5 RNP APCH
RNP 1
A-RNP
RNAV 10
RNP 4
RF legsParallel offsetRNAV holding
Optional Performance/Functionality
RNP ScalabilityRNP 2 oceanic/remote
Fixed Radius Transition (FRT)Time of Arrival Control
Barometric VNAV
Continental en-route: RNP 2,1Final approach: RNP 0.3
A-RNP + options
02 July 2012 page 5
Just Published
page 6
Flight Validation
02 July 2012
Validation Process
page 702 July 2012
ATM / Airspace Planning and Design Support
• Continuous Climb Operations (CCO) Manual– Advance copy by July 2012
• PBN Airspace Concepts Manual– Advance copy by July 2012
• ilearn information/workshop package on PBN airspace design– August 2012
page 802 July 2012
Flight Operations Support
• PBN Operations Approval Manual– Under review by PBN Operations Approval
Tiger Team– Advance copy by September 2012
• ilearn information/workshop package on PBN Operations Approval– September 2012
page 902 July 2012
PBN General
• PBN Manual next edition– Advance copy July 2012
• ilearn information/workshop package on PBN overview– September 2012
• Online PBN implementation status tool– September 2012
page 1002 July 2012
PBN General
• PBN Implementation toolkit addressing:– Executives– Regulators– ANSPs– Aircraft operators– Manufacturers
• September 2012
page 1102 July 2012
PBN General
Instrument Flight Procedures (a summary)• Criteria to support new edition of PBN
Manual• Improved Baro-VNAV criteria• Helicopter criteria• Sample charts
– State Letter after IFPP/11(December 2012)
page 1202 July 2012
PBN General (Planning)
• ilearn information/workshop/training package on PBN for other domains – ATC– Pilots– Flight validation
• Endorsement programme for service providers
page 13
Planning
02 July 2012
PBN General (Planning)
• Collision Risk Model for PBN obstacle clearance and air-to-air separation– Combined effort IFPP and SASP
• PBN Procedure Design Safety Assessment Manual
• Advanced RNP support document
page 14
Planning
02 July 2012
Objectives• New PBN documentation information• Status of global implementation• Identify implementation issues and problems• Development of a global action plan to support
implementation • Plan to be presented to ANC/12
Register at www.icao.int/meetings/pbn-symposium
02 July 2012 page 15