etsi tc its workshopdocbox.etsi.org/workshop/2011/201102_itsworkshop/04_coope… · wg1 work scope...

13
ETSI TC ITS WORKSHOP 09-11 February 2011 • Venice • Italy © ETSI 2011. All rights reserved

Upload: others

Post on 06-Oct-2020

5 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: ETSI TC ITS WORKSHOPdocbox.etsi.org/Workshop/2011/201102_ITSWORKSHOP/04_COOPE… · WG1 work scope and work method Current work scope • WG1 focus on the applications and facilities

ETSI TC ITS WORKSHOP09-11 February 2011 • Venice • Italy

© ETSI 2011. All rights reserved

Page 2: ETSI TC ITS WORKSHOPdocbox.etsi.org/Workshop/2011/201102_ITSWORKSHOP/04_COOPE… · WG1 work scope and work method Current work scope • WG1 focus on the applications and facilities

WG1 STANDARDIZATION ACTIVITIES

Lan LIN, Hitachi, ETSI TC ITS WG1 Vice-Chairman

© ETSI 2011. All rights reserved

Page 3: ETSI TC ITS WORKSHOPdocbox.etsi.org/Workshop/2011/201102_ITSWORKSHOP/04_COOPE… · WG1 work scope and work method Current work scope • WG1 focus on the applications and facilities

Transportation

Agenda

WG1 work scope

Work status in WG1

• Main achievements • Main achievements

• Current activities

Collaborations and international

harmonization

Next steps

3 © ETSI 2011. All rights reserved

Page 4: ETSI TC ITS WORKSHOPdocbox.etsi.org/Workshop/2011/201102_ITSWORKSHOP/04_COOPE… · WG1 work scope and work method Current work scope • WG1 focus on the applications and facilities

WG1 work scope and work

method

Current work scope• WG1 focus on the applications and facilities layer

• WG1 set up work items based on Minimum Set of Standards defined for EC mandate 453 • Most of WIs are already started

• WG1 collaborates with other WGs for harmonization• WG2 architecture

• WG3 networking and transport

• WG5 security• WG5 security

• WG1 works closely with industrial organization Car 2 Car Communication Consortium

• WG1 exchanges information with Field Operational Test and R&D projects

• WG1 works on international harmonization

Work methods:• Regular WG meetings

• Ad hoc work meetings

• Joint meetings with other WGs

• Email discussions

• Special Task Force (STF)

4

Page 5: ETSI TC ITS WORKSHOPdocbox.etsi.org/Workshop/2011/201102_ITSWORKSHOP/04_COOPE… · WG1 work scope and work method Current work scope • WG1 focus on the applications and facilities

ETSI WG1 Work items

APPLICATIONS LAYER

FACILITIES LAYER

FA-SAP

Cooperative Awareness

Longitudinal Collision risk warning

Intersection Collision risk warning

BSA definitionFunctional requirements Operational requirements

Facilities layer architecture

EV Charging Spot PoI

Published

Ongoing

Not started

Forum10.02.20115

Domain facilitiesCommon Facilities

Application support

Information support

Communication support

Facility layer management

NF-SAP

CAM DENM

LDM

Man

agem

ent

Service announcement

Position and time

Communication. Management

Congestion control

Message data container

Sec

urityM

F-SA

P

SF-S

AP

Page 6: ETSI TC ITS WORKSHOPdocbox.etsi.org/Workshop/2011/201102_ITSWORKSHOP/04_COOPE… · WG1 work scope and work method Current work scope • WG1 focus on the applications and facilities

Main achievements

TR 102 638: Basic set of applications• A set of applications that scope our current specification work

• A set of applications that are considered deployable at first step after standardization completion

• Safety, traffic efficiency and other applications are included in the BSA

TS 102 637 sets:• TS 102 637 – 1: BSA functional requirements• TS 102 637 – 1: BSA functional requirements

• Functional analysis of all use cases belonging to the BSA

• TS 102 637 – 2: Cooperative Awareness Basic Service• A heartbeat message that is sent periodically by vehicles and road side

• TS 102 637 – 3: Decentralized Environmental Notification Basic Service• An event driven message that announces the detected road hazard

• TS 102 637 – 4: BSA operational requirements (stable draft)

Test specifications • CAM, DENM specifications (collaboration with STF experts)

Footer text (edit in View : Header and Footer)6

Page 7: ETSI TC ITS WORKSHOPdocbox.etsi.org/Workshop/2011/201102_ITSWORKSHOP/04_COOPE… · WG1 work scope and work method Current work scope • WG1 focus on the applications and facilities

Ongoing work - applications 1/2

WG1 has initiated the work since October 2010• The WI scope is defined based on Minimum Set of Applications and

agreement of work split between ETSI and CEN

• All applications are from BSA

Three WIs on safety applications (V2V based)• TS 101 539 – 1: Co-operative Awareness application

• Cooperative awareness of the driving environment • Cooperative awareness of the driving environment

• No collision risk

• TS 101 539 – 2: Intersection Collision Risk Warning• Detection of collision risk with detection means and/or from received CAM/DENM

• Triggering of intersection collision risk warning message DENM

• TS 101 539 – 3: Longitudinal Collision Risk Warning • Detection of collision risk by vehicles or by a third part (e.g. from road side)

• Triggering of longitudinal collision risk warning message DENM

One WI on electric vehicle Points of Interest application • TS: Electric Vehicle Charging Spot Notification Specification

7

Page 8: ETSI TC ITS WORKSHOPdocbox.etsi.org/Workshop/2011/201102_ITSWORKSHOP/04_COOPE… · WG1 work scope and work method Current work scope • WG1 focus on the applications and facilities

Ongoing work - applications 2/2

Exemple of Longitudinal collision risk warning

8

Cooperative awareness

Longitudinal collision risk

warning

Intersection collision

risk warning

supportsupport

Close collaboration is set up

between ESTI TC ITS WG1 and ISO

TC 204 WG14 to harmonize the

application specifications !

Page 9: ETSI TC ITS WORKSHOPdocbox.etsi.org/Workshop/2011/201102_ITSWORKSHOP/04_COOPE… · WG1 work scope and work method Current work scope • WG1 focus on the applications and facilities

Ongoing work – facilities

TS 102 894 : Facilities layer architecture (stable draft)• To define the overall functional architecture of the facilities

• To identify the main components of the facilities layer

TR 102 863 : Local dynamic Map (stable draft ongoing STF)• To identify the standard needs for the LDM

TS: Service announcement • To announce the available services

• To announce the communication profile to be used to access to the service• To announce the communication profile to be used to access to the service

• Close collaboration with WG2

TS: Communication management • To define the communication profile

• To define the policies to select the communication profile for communication

• Close collaboration with WG2

TS: position and time• Specifications of position and time information used in messages

• Data quality based on application requirements

9

Page 10: ETSI TC ITS WORKSHOPdocbox.etsi.org/Workshop/2011/201102_ITSWORKSHOP/04_COOPE… · WG1 work scope and work method Current work scope • WG1 focus on the applications and facilities

Collaborations and harmonisation

1/2

Close collaboration with Car to car

communication consortium C2CCC

• Contributions of technical specifications from

C2CCC APP WGC2CCC APP WG

• Common agreement on standard needs

• Information exchange with C2CC RM WG

Liaisons with Field Operational Test (FoT)

projects

• FoTs contribute to the ETSI specification work

• WG1 provides basic specifications to FoT

• FoTs provide feedbacks and changes requests to Footer text (edit in View : Header and Footer)10

Page 11: ETSI TC ITS WORKSHOPdocbox.etsi.org/Workshop/2011/201102_ITSWORKSHOP/04_COOPE… · WG1 work scope and work method Current work scope • WG1 focus on the applications and facilities

International harmonisation 2/2

WG1 contributes to the discussions of the

international harmonization in the task force

Application specificationsApplication specifications

• Close collaborations with ISO TC 204 WG14

International harmonization of message sets

• Harmonization needs and work method are under

discussions

• Harmonized data element definition

• Harmonized message general structure

• Messages content may vary depending on needs of Footer text (edit in View : Header and Footer)11

Page 12: ETSI TC ITS WORKSHOPdocbox.etsi.org/Workshop/2011/201102_ITSWORKSHOP/04_COOPE… · WG1 work scope and work method Current work scope • WG1 focus on the applications and facilities

Future steps

Continuation of ongoing work

Launch of new work

• Release 2 of CAM, DENM specifications based on

FoT feedbacksFoT feedbacks

• Validation test of CAM/DENM (STF) and other test

specifications

• Common data container for messages (probably

needs international harmonization)

• Facilities layer congestion control

Collaboration with CEN

• New messages sent from infrastructure to Footer text (edit in View : Header and Footer)12

Page 13: ETSI TC ITS WORKSHOPdocbox.etsi.org/Workshop/2011/201102_ITSWORKSHOP/04_COOPE… · WG1 work scope and work method Current work scope • WG1 focus on the applications and facilities

Thank you.

Any questions?