ETSI TC ITS WORKSHOP09-11 February 2011 • Venice • Italy
© ETSI 2011. All rights reserved
WG1 STANDARDIZATION ACTIVITIES
Lan LIN, Hitachi, ETSI TC ITS WG1 Vice-Chairman
© ETSI 2011. All rights reserved
Transportation
Agenda
WG1 work scope
Work status in WG1
• Main achievements • Main achievements
• Current activities
Collaborations and international
harmonization
Next steps
3 © ETSI 2011. All rights reserved
WG1 work scope and work
method
Current work scope• WG1 focus on the applications and facilities layer
• WG1 set up work items based on Minimum Set of Standards defined for EC mandate 453 • Most of WIs are already started
• WG1 collaborates with other WGs for harmonization• WG2 architecture
• WG3 networking and transport
• WG5 security• WG5 security
• WG1 works closely with industrial organization Car 2 Car Communication Consortium
• WG1 exchanges information with Field Operational Test and R&D projects
• WG1 works on international harmonization
Work methods:• Regular WG meetings
• Ad hoc work meetings
• Joint meetings with other WGs
• Email discussions
• Special Task Force (STF)
4
ETSI WG1 Work items
APPLICATIONS LAYER
FACILITIES LAYER
FA-SAP
Cooperative Awareness
Longitudinal Collision risk warning
Intersection Collision risk warning
BSA definitionFunctional requirements Operational requirements
Facilities layer architecture
EV Charging Spot PoI
Published
Ongoing
Not started
Forum10.02.20115
Domain facilitiesCommon Facilities
Application support
Information support
Communication support
Facility layer management
NF-SAP
CAM DENM
LDM
Man
agem
ent
Service announcement
Position and time
Communication. Management
Congestion control
Message data container
Sec
urityM
F-SA
P
SF-S
AP
Main achievements
TR 102 638: Basic set of applications• A set of applications that scope our current specification work
• A set of applications that are considered deployable at first step after standardization completion
• Safety, traffic efficiency and other applications are included in the BSA
TS 102 637 sets:• TS 102 637 – 1: BSA functional requirements• TS 102 637 – 1: BSA functional requirements
• Functional analysis of all use cases belonging to the BSA
• TS 102 637 – 2: Cooperative Awareness Basic Service• A heartbeat message that is sent periodically by vehicles and road side
• TS 102 637 – 3: Decentralized Environmental Notification Basic Service• An event driven message that announces the detected road hazard
• TS 102 637 – 4: BSA operational requirements (stable draft)
Test specifications • CAM, DENM specifications (collaboration with STF experts)
Footer text (edit in View : Header and Footer)6
Ongoing work - applications 1/2
WG1 has initiated the work since October 2010• The WI scope is defined based on Minimum Set of Applications and
agreement of work split between ETSI and CEN
• All applications are from BSA
Three WIs on safety applications (V2V based)• TS 101 539 – 1: Co-operative Awareness application
• Cooperative awareness of the driving environment • Cooperative awareness of the driving environment
• No collision risk
• TS 101 539 – 2: Intersection Collision Risk Warning• Detection of collision risk with detection means and/or from received CAM/DENM
• Triggering of intersection collision risk warning message DENM
• TS 101 539 – 3: Longitudinal Collision Risk Warning • Detection of collision risk by vehicles or by a third part (e.g. from road side)
• Triggering of longitudinal collision risk warning message DENM
One WI on electric vehicle Points of Interest application • TS: Electric Vehicle Charging Spot Notification Specification
7
Ongoing work - applications 2/2
Exemple of Longitudinal collision risk warning
8
Cooperative awareness
Longitudinal collision risk
warning
Intersection collision
risk warning
supportsupport
Close collaboration is set up
between ESTI TC ITS WG1 and ISO
TC 204 WG14 to harmonize the
application specifications !
Ongoing work – facilities
TS 102 894 : Facilities layer architecture (stable draft)• To define the overall functional architecture of the facilities
• To identify the main components of the facilities layer
TR 102 863 : Local dynamic Map (stable draft ongoing STF)• To identify the standard needs for the LDM
TS: Service announcement • To announce the available services
• To announce the communication profile to be used to access to the service• To announce the communication profile to be used to access to the service
• Close collaboration with WG2
TS: Communication management • To define the communication profile
• To define the policies to select the communication profile for communication
• Close collaboration with WG2
TS: position and time• Specifications of position and time information used in messages
• Data quality based on application requirements
9
Collaborations and harmonisation
1/2
Close collaboration with Car to car
communication consortium C2CCC
• Contributions of technical specifications from
C2CCC APP WGC2CCC APP WG
• Common agreement on standard needs
• Information exchange with C2CC RM WG
Liaisons with Field Operational Test (FoT)
projects
• FoTs contribute to the ETSI specification work
• WG1 provides basic specifications to FoT
• FoTs provide feedbacks and changes requests to Footer text (edit in View : Header and Footer)10
International harmonisation 2/2
WG1 contributes to the discussions of the
international harmonization in the task force
Application specificationsApplication specifications
• Close collaborations with ISO TC 204 WG14
International harmonization of message sets
• Harmonization needs and work method are under
discussions
• Harmonized data element definition
• Harmonized message general structure
• Messages content may vary depending on needs of Footer text (edit in View : Header and Footer)11
Future steps
Continuation of ongoing work
Launch of new work
• Release 2 of CAM, DENM specifications based on
FoT feedbacksFoT feedbacks
• Validation test of CAM/DENM (STF) and other test
specifications
• Common data container for messages (probably
needs international harmonization)
• Facilities layer congestion control
Collaboration with CEN
• New messages sent from infrastructure to Footer text (edit in View : Header and Footer)12
Thank you.
Any questions?