Environmental Monitoring Report Semi-Annual Environmental Monitoring Report No. 6 (July December 2016) May 2017 VIE: Central Mekong Delta Region Connectivity Project Annex 4 (CW1A, CW1B, CW1C) (2nd of 3 files) This environmental monitoring report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area. Prepared by Detailed Design and Implementation Support Consultant: Joint Venture of CDM Smith, WSP Finland Limited and Yooshin Engineering Corporation for the Ministry of Transport and the Asian Development Bank.

Upload: others

Post on 03-Aug-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Environmental Monitoring Report...ENVIRONMENTAL INSPECTION REPORT Period observation Deadline Package Location Weather Observers 13 July 2016 20 July 2016 CW1A 0 - 3+800 Sunny Ms

Environmental Monitoring Report Semi-Annual Environmental Monitoring Report No. 6 (July – December 2016) May 2017

VIE: Central Mekong Delta Region Connectivity

Project

Annex 4 (CW1A, CW1B, CW1C) (2nd of 3 files)

This environmental monitoring report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.

Prepared by Detailed Design and Implementation Support Consultant: Joint Venture of CDM Smith, WSP Finland Limited and Yooshin Engineering Corporation for the Ministry of Transport and the Asian Development Bank.

Page 2: Environmental Monitoring Report...ENVIRONMENTAL INSPECTION REPORT Period observation Deadline Package Location Weather Observers 13 July 2016 20 July 2016 CW1A 0 - 3+800 Sunny Ms

CMDRCP SEMR July - December 2016

Revision February 2017

ANNEX 4

Environmental Inspection Reports

Page 3: Environmental Monitoring Report...ENVIRONMENTAL INSPECTION REPORT Period observation Deadline Package Location Weather Observers 13 July 2016 20 July 2016 CW1A 0 - 3+800 Sunny Ms

CW1A

Page 4: Environmental Monitoring Report...ENVIRONMENTAL INSPECTION REPORT Period observation Deadline Package Location Weather Observers 13 July 2016 20 July 2016 CW1A 0 - 3+800 Sunny Ms

ENVIRONMENTAL INSPECTION REPORT Period observation Deadline Package Location Weather Observers

13 July 2016 20 July 2016 CW1A 0 - 3+800 Sunny Ms. Le Thi Phuong Loan – NES

Mr. Nguyen Van Cuong – CW1A EO

No. Observation Issued Pictures by DDIS Environment Team Corrective pictures by Contractor

001 Location: CRBC batching

plant

The sludge of concrete

waste is full in the

temperary disposal storage

on site.

Necessary action:

Contractor need to remove

this waste to the disposal

area. Alternatively,

contractor need to fully

barricade this area before

removing.

Full concrete waste in CRBC office Date of action:

002 Location: Thang Long

fabrication yards

Some fuel drums are not

properly stored.

Necessary action:

Contractor need to provide

hazardous waste area for

hazardous area (particularly

these empty fuel drums).

Page 5: Environmental Monitoring Report...ENVIRONMENTAL INSPECTION REPORT Period observation Deadline Package Location Weather Observers 13 July 2016 20 July 2016 CW1A 0 - 3+800 Sunny Ms

No storage for empty fuel drums Date of action:

003 Location: Thang Long

fabrication yards

The fuel equipment leak fuel

to the steel.

Necessary action:

Contractor need to provide

drip tray or drip pan for this

equipment.

No drip tray for fuel equipment Date of action:

004 Location: Tinh Thoi bridge –

Hoang An site

There is no collection of

empty bentonite bags on

site.

Necessary action:

Contractor must collect

these empty bags to

hazardous waste storage.

No storage for empty bentonite bags Date of action:

Page 6: Environmental Monitoring Report...ENVIRONMENTAL INSPECTION REPORT Period observation Deadline Package Location Weather Observers 13 July 2016 20 July 2016 CW1A 0 - 3+800 Sunny Ms

005 Location: Tinh Thoi bridge –

Hoang An site

Missing roof for hazardous

material storage.

Necessary action:

Contractor must provide

additional roof to fully cover

the storage to avoid the

weather impact.

Missing roof of hazardous materials storage Date of action:

006 Location: Tuan Loc

subcontractor office

Many fuel drums locates on

site without any

environmental protection.

Necessary action: Either

contractor must remove

these fuel drums to

hazardous materials/waste

storage or provide the

environmental protection

for this material (e.g. drip

tray).

No storage for fuel drums Date of action:

Page 7: Environmental Monitoring Report...ENVIRONMENTAL INSPECTION REPORT Period observation Deadline Package Location Weather Observers 13 July 2016 20 July 2016 CW1A 0 - 3+800 Sunny Ms

007 Location: Linh Son batching

plant

The settling pond in Linh

Son batching plant contain

only 1 pond without any

outlet.

Necessary action:

Contractor need to repair

this settling pond system for

batching plant operation.

The settling pond should

contain at least 3 ponds and

outlet to the public water

source.

Wrong design of settling pond Date of action:

008 Location: Dinh Chung

fabrication yards

Fuel tank leak fuel to the

ground.

Necessary action:

Contractor must provide the

adsorbant materials for fuel

leakage. The contaminated

materials should be

collected for hazardous

waste treatment company.

Fuel leakage to the ground Date of action:

Page 8: Environmental Monitoring Report...ENVIRONMENTAL INSPECTION REPORT Period observation Deadline Package Location Weather Observers 13 July 2016 20 July 2016 CW1A 0 - 3+800 Sunny Ms

ENVIRONMENTAL INSPECTION REPORT Period observation Deadline Package Location Weather Observers

13 July 2016 20 July 2016 CW1A 0 - 3+800 Sunny Ms. Le Thi Phuong Loan – NES

Mr. Nguyen Van Cuong – CW1AEO

No. Observation Issued Pictures by DDIS Environment Team Corrective pictures by Contractor

001 Location:CRBC batching

plant

The sludge of concrete

waste is full in the

temperary disposal storage

on site.

Necessary action:

Contractor need to remove

this waste to the disposal

area. Alternatively,

contractor need to fully

barricade this area before

removing.

Full concrete waste in CRBC office Date of action: 20 July 2016

Transport cement waste from mixing plant to level the site

Page 9: Environmental Monitoring Report...ENVIRONMENTAL INSPECTION REPORT Period observation Deadline Package Location Weather Observers 13 July 2016 20 July 2016 CW1A 0 - 3+800 Sunny Ms

002 Location:Thang Long

fabrication yards

Some fuel drums are not

properly stored.

Necessary action:

Contractor need to provide

hazardous waste area for

hazardous area (particularly

these empty fuel drums).

No storage for empty fuel drums Date of action: 14 July 2016

Fuel drums was collectors put into the archive

003 Location:Thang Long

fabrication yards

The fuel equipment leak fuel

to the steel.

Necessary action:

Contractor need to provide

drip tray or drip pan for this

equipment.

No drip tray for fuel equipment Date of action: 15 July 2016

Employees collection, cleanup the spill fuel out outside

Page 10: Environmental Monitoring Report...ENVIRONMENTAL INSPECTION REPORT Period observation Deadline Package Location Weather Observers 13 July 2016 20 July 2016 CW1A 0 - 3+800 Sunny Ms

004 Location:Tinh Thoi bridge –

Hoang An site

There is no collection of

empty bentonite bags on

site.

Necessary action:

Contractor must collect

these empty bags to

hazardous waste storage.

No storage for empty bentonite bags Date of action: 19 July 2016

Employees collection packaging bentonite

005 Location:Tinh Thoi bridge –

Hoang An site

Missing roof for hazardous

material storage.

Necessary action:

Contractor must provide

additional roof to fully cover

the storage to avoid the

weather impact.

Missing roof of hazardous materials storage Date of action: 18 July 2016

Contractors were building additional roof

Page 11: Environmental Monitoring Report...ENVIRONMENTAL INSPECTION REPORT Period observation Deadline Package Location Weather Observers 13 July 2016 20 July 2016 CW1A 0 - 3+800 Sunny Ms

006 Location:Tuan Loc

subcontractor office

Many fuel drums locates on

site without any

environmental protection.

Necessary action: Either

contractor must remove

these fuel drums to

hazardous materials/waste

storage or provide the

environmental protection for

this material (e.g. drip tray).

No storage for fuel drums Date of action: 20 July 2016

Fuel was collectors put into the archive

007 Location:Linh Son batching

plant

The settling pond in Linh Son

batching plant contain only 1

pond without any outlet.

Necessary action:Contractor

need to repair this settling

pond system for batching

plant operation. The settling

pond should contain at least

3 ponds and outlet to the

public water source.

Wrong design of settling pond Date of action:

Page 12: Environmental Monitoring Report...ENVIRONMENTAL INSPECTION REPORT Period observation Deadline Package Location Weather Observers 13 July 2016 20 July 2016 CW1A 0 - 3+800 Sunny Ms

008 Location: Dinh Chung

fabrication yards

Fuel tank leak fuel to the

ground.

Necessary action:

Contractor must provide the

adsorbant materials for fuel

leakage. The contaminated

materials should be collected

for hazardous waste

treatment company.

Fuel leakage to the ground Date of action: 17 July 2016

For employees cleans all fuel spills to the ground

Page 13: Environmental Monitoring Report...ENVIRONMENTAL INSPECTION REPORT Period observation Deadline Package Location Weather Observers 13 July 2016 20 July 2016 CW1A 0 - 3+800 Sunny Ms

CDI\Ilth Sml

Central Mekong Delta Connectivity Project- (CMDCP)

TA 7822-VIE, Loan 3013-VIE, Grant 0353-VIE

COM Smith- WSP -Yooshin Consultant JV セ@ Group 5, Tan Tich Hamlet, Tinh Thoi Commune, Cao Lanh City, Dong Thap Province, Vietnam

セ@ WSP .... • Tel: (84) 067-3881-255; Fax: (84) 067-3881-256 <;-' oos/:.:-...

Ref. No. : DDIS/CW1N0872

Date : 15 August 2016

To: Mr. Dang Xuan Lich Contractor's Kepresentat1ve

Contractor's Office: No. 97, Chi Lang street, Ward 03, Cao Lanh city Dong Thap Tel : (84) 0673 535 466 ; Fax: 0673 535 466

Subject: Package CW1A- Environmental Inspection Report 10 Aug 2016

Dear Mr. Lich,

After our DDIS environmental inspection dated 10 August 2016, we hereby give you the inspection

report for your action. The deadline of your closed-observations is 20 August 2016. If you fail to

rectify, we will issue the Notice to Correct via official letter after 10 days issuing this letter.

Your prompt action is highly recommended.

Cc: - As above - Cao Lanh Bridge Project Manager, CIPM

Site Construction Team, CIPM - File: DO IS Consultant JV Office

..-------·

Page 1 ofl

Attachment: Environmental Inspection Report 10 Aug 2016

..

Page 14: Environmental Monitoring Report...ENVIRONMENTAL INSPECTION REPORT Period observation Deadline Package Location Weather Observers 13 July 2016 20 July 2016 CW1A 0 - 3+800 Sunny Ms

Dự án Kết nối khu vực trung tâm Đồng bằng sông Cửu Long - (CMDCP) TA 7822-VIE, Khoản vay 3013-VIE, Khoản viện trợ 0353-VIE

Liên danh Tư vấn CDM Smith - WSP –Yooshin Tổ 5, p Tân Tịch, Xã Tịnh Thới, TP Cao Lãnh, Tỉnh Đồng Tháp, Việt Nam

ĐT: (84) 067-3881-255 ; Fax: (84) 067-3881-256

__________________________________________________________

Trang 1 / 1

Kính gửi: Ông Lịch

Sau khi chuyên gia môi trường Tư V n kiểm tra công trường ngày 10/08/2016, nay chúng tôi xin gửi báo cáo để các ông thực hiện. Thời hạn chót để các ông xem xét thực hiện là ngày 20/08/2016. Nếu các ông không thực hiện công tác điều chỉnh theo yêu cầu, chúng tôi sẽ phát hành thông báo sửa chữa bằng văn b n chính thức 10 ngày kể từ ngày ban hành văn b n này.

Trân trọng,

{Đã ký}

Victoriano L. Hamlig

Kỹ sư thường trú

Cc: - Như trên - Giám đốc gói đường - dự án Cầu Cao Lãnh, CIPM - Nhóm qu n lý công trường, CIPM - Lưu: Liên danh TVGS - DDIS

Đính kèm:

- Báo cáo kiểm tra môi trường ngày 10/08/2016

Số thư : DDIS/CW1A/0872 Ngày : 15/08/2016 Gửi đến: Ông Đặng Xuân Lịch

Đại diện Nhà thầu

VPDA: 97 đường Chi Lăng- Phường 03 – TP Cao Lãnh, Tỉnh Đồng Tháp

ĐT: +(84) 0673 535 466 ; Fax: 0673 535 466

Chủ đề: Gói CW1A – Báo Cáo Kiểm Tra Môi Trường ngày 10/08/2016

Page 15: Environmental Monitoring Report...ENVIRONMENTAL INSPECTION REPORT Period observation Deadline Package Location Weather Observers 13 July 2016 20 July 2016 CW1A 0 - 3+800 Sunny Ms

ENVIRONMENTAL INSPECTION REPORT Period observation Deadline Package Location Weather Observers

10 August 2016 20 August

2016

CW1A 0 - 3+800 Sunny Ms. Le Thi Phuong Loan – NES

Mr. Le Anh Tin – NES

Mr. Nguyen Van Cuong – CW1A EO

No. Observation Issued Pictures by DDIS Environment Team Corrective pictures by Contractor

007 Location: Linh Son batching

plant

The settling pond in Linh

Son batching plant contain

only 1 pond without any

outlet.

Necessary action:

Contractor need to repair

this settling pond system for

batching plant operation.

The settling pond should

contain at least 3 ponds and

outlet to the public water

source.

Wrong design of settling pond Date of action:

Page 16: Environmental Monitoring Report...ENVIRONMENTAL INSPECTION REPORT Period observation Deadline Package Location Weather Observers 13 July 2016 20 July 2016 CW1A 0 - 3+800 Sunny Ms

009 Location: Dinh Chung

fabrication yards

Some metal wastes are not

properly collected and

stored in storage.

Necessary action:

Contractor need to provide

storage for this metal waste

and remove the metal to its

storage.

No storage for metal waste Date of action:

010 Location: Dinh Chung

fabrication yards

Concrete pile head was not

stored in its designated

area.

Necessary action:

Contractor need to remove

this concrete pile head to

the storage of concrete

waste in the designated

disposal area.

Concrete pile head on site Date of action:

Page 17: Environmental Monitoring Report...ENVIRONMENTAL INSPECTION REPORT Period observation Deadline Package Location Weather Observers 13 July 2016 20 July 2016 CW1A 0 - 3+800 Sunny Ms

011 Location: Dinh Chung

fabrication yards

No drip tray for fuel spillage.

Necessary action:

Contractor must provide drip

tray as requirement.

No drip tray for fuel spillage Date of action:

012 Location: Dinh Chung

fabrication yards

Solid waste near by the fuel

tank.

Necessary action:

Contractor must remove this

domestic waste to avoid the

hazard of buring materials

when this waste locates

near by fuel tank.

No collection of domestic waste near by fuel tank Date of action:

Page 18: Environmental Monitoring Report...ENVIRONMENTAL INSPECTION REPORT Period observation Deadline Package Location Weather Observers 13 July 2016 20 July 2016 CW1A 0 - 3+800 Sunny Ms

013 Location: Linh Son batching

plant

Concrete waste and

wastewater spead out of the

access way to Linh Son

batching pant.

Necessary action:

Contractor need to create a

dranage system for

wastewater and concrete

waste treatment before

discharge to outside.

No drainage system for Linh Son CBP Date of action:

014 Location: Linh Son batching

plant

The settling pond in Linh

Son batching plant contain

only 1 pond without any

outlet.

Necessary action:

Contractor need to repair

this settling pond system for

batching plant operation.

The settling pond should

contain at least 3 ponds and

outlet to the public water

source.

Wrong design of settling pond Date of action:

Page 19: Environmental Monitoring Report...ENVIRONMENTAL INSPECTION REPORT Period observation Deadline Package Location Weather Observers 13 July 2016 20 July 2016 CW1A 0 - 3+800 Sunny Ms

015 Location: Tinh Thoi bridge

Concrete pile head was not

stored in its designated

area.

Necessary action:

Contractor need to remove

this concrete pile head to

the storage of concrete

waste in the designated

disposal area.

Concrete pile heads on site Date of action:

016 Location: Linh Son batching

plant

Many fuel drums locates on

site without any

environmental protection.

Necessary action: Either

contractor must remove

these fuel drums to

hazardous materials/waste

storage or provide the

environmental protection

for this material (e.g. drip

tray).

No storage for fuel drums Date of action:

Page 20: Environmental Monitoring Report...ENVIRONMENTAL INSPECTION REPORT Period observation Deadline Package Location Weather Observers 13 July 2016 20 July 2016 CW1A 0 - 3+800 Sunny Ms

017 Location: Hoang An

batching plant

The settling pond in Hoang

An batching plant is full of

concrete sludge.

Necessary action:

Contractor need to remove

the concrete sludge in the

settling tank system.

Full of concrete sludge in settling tank Date of action:

018 Location: Hoang An

batching plant

No domestic waste near in

Hoang An batching plant.

Necessary action:

Contractor need to provide

domestic waste trash-bin

and transfer these wastes in

the transbin to domestic

waste collection company.

No domestic waste collection Date of action:

Page 21: Environmental Monitoring Report...ENVIRONMENTAL INSPECTION REPORT Period observation Deadline Package Location Weather Observers 13 July 2016 20 July 2016 CW1A 0 - 3+800 Sunny Ms
Page 22: Environmental Monitoring Report...ENVIRONMENTAL INSPECTION REPORT Period observation Deadline Package Location Weather Observers 13 July 2016 20 July 2016 CW1A 0 - 3+800 Sunny Ms
Page 23: Environmental Monitoring Report...ENVIRONMENTAL INSPECTION REPORT Period observation Deadline Package Location Weather Observers 13 July 2016 20 July 2016 CW1A 0 - 3+800 Sunny Ms

CLOSED - ENVIRONMENTAL INSPECTION REPORT Period observation Deadline Package Location Weather Observers

10 August 2016 and

17 August 2016 20 August

2016

CW1A 0 - 3+800 Sunny Ms. Le Thi Phuong Loan – NES

Mr. Le Anh Tin – NES

Mr. Nguyen Van Cuong – CW1A EO

Mr. Nguyen Van Kien - HSO

No. Observation Issued Pictures by DDIS Environment Team Corrective pictures by Contractor

007 Location: Linh Son batching

plant

The settling pond in Linh

Son batching plant contain

only 1 pond without any

outlet.

Necessary

action:Contractor need to

repair this settling pond

system for batching plant

operation. The settling pond

should contain at least 3

ponds and outlet to the

public water source.

Wrong design of settling pond Date of action:

Page 24: Environmental Monitoring Report...ENVIRONMENTAL INSPECTION REPORT Period observation Deadline Package Location Weather Observers 13 July 2016 20 July 2016 CW1A 0 - 3+800 Sunny Ms

009 Location: Dinh Chung

fabrication yards

Some metal wastes are not

properly collected and stored

in storage.

Necessary action:

Contractor need to provide

storage for this metal waste

and remove the metal to its

storage.

No storage for metal waste Date of action: 17 August 2016

Workers collected and cleanup metal waste

010 Location: Dinh Chung

fabrication yards

Concrete pile head was not

stored in its designated area.

Necessary action:

Contractor need to remove

this concrete pile head to the

storage of concrete waste in

the designated disposal

area.

Concrete pile head on site Date of action:

Page 25: Environmental Monitoring Report...ENVIRONMENTAL INSPECTION REPORT Period observation Deadline Package Location Weather Observers 13 July 2016 20 July 2016 CW1A 0 - 3+800 Sunny Ms

011 Location: Dinh Chung

fabrication yards

No drip tray for fuel

spillage.

Necessary action:

Contractor must provide

drip tray as requirement.

No drip tray for fuel spillage Date of action:

012 Location: Dinh Chung

fabrication yards

Solid waste near by the fuel

tank.

Necessary action:

Contractor must remove this

domestic waste to avoid the

hazard of buring materials

when this waste locates near

by fuel tank.

No collection of domestic waste near by fuel tank Date of action: 15 August 2016

Domestic waste is collected

Page 26: Environmental Monitoring Report...ENVIRONMENTAL INSPECTION REPORT Period observation Deadline Package Location Weather Observers 13 July 2016 20 July 2016 CW1A 0 - 3+800 Sunny Ms

013 Location: Linh Son batching

plant

Concrete waste and

wastewater spead out of the

access way to Linh Son

batching pant.

Necessary action:

Contractor need to create a

dranage system for

wastewater and concrete

waste treatment before

discharge to outside.

No drainage system for Linh Son CBP Date of action: 18 August 2016

Laying stone to prevent from drainage

014 Location: Linh Son batching

plant

The settling pond in Linh

Son batching plant contain

only 1 pond without any

outlet.

Necessary

action:Contractor need to

repair this settling pond

system for batching plant

operation. The settling pond

should contain at least 3

ponds and outlet to the

public water source.

Wrong design of settling pond

Page 27: Environmental Monitoring Report...ENVIRONMENTAL INSPECTION REPORT Period observation Deadline Package Location Weather Observers 13 July 2016 20 July 2016 CW1A 0 - 3+800 Sunny Ms

015 Location: Tinh Thoibridge

Concrete pile head was not

stored in its designated area.

Necessary action:

Contractor need to remove

this concrete pile head to the

storage of concrete waste in

the designated disposal

area.

Concrete pile heads on site Date of action:

016 Location: Linh Son batching

plant

Many fuel drums locates on

site without any

environmental protection.

Necessary action: Either

contractor must remove

these fuel drums to

hazardous materials/waste

storage or provide the

environmental protection for

this material (e.g. drip tray).

No storage for fuel drums Date of action: 14 August 2016

Workers collect empty tank in to the storage

Page 28: Environmental Monitoring Report...ENVIRONMENTAL INSPECTION REPORT Period observation Deadline Package Location Weather Observers 13 July 2016 20 July 2016 CW1A 0 - 3+800 Sunny Ms

017 Location: Hoang An

batching plant

The settling pond in Hoang

An batching plant is full of

concrete sludge.

Necessary action:

Contractor need toremove

the concrete sludge in the

settling tank system.

Full of concrete sludge in settling tank Date of action: 17 August 2016

Backhole dredge the mud from concrete

018 Location: Hoang An

batching plant

No domestic waste near in

Hoang An batching plant.

Necessary action:

Contractor need toprovide

domestic waste trash-bin

and transfer these wastes in

the transbin to domestic

waste collection company.

No domestic waste collection Date of action: 15 August 2016

Workers domestic waste collection

Page 29: Environmental Monitoring Report...ENVIRONMENTAL INSPECTION REPORT Period observation Deadline Package Location Weather Observers 13 July 2016 20 July 2016 CW1A 0 - 3+800 Sunny Ms

019 Location: Pier 1 CaoLanh

Bridge

The concrete waste dumped

within the project site.

Necessaryaction:

Contractor remove this

concrete waste from project

site and dump on the

designated area for solid

waste.This action should

not be repeated again.

Wrong design of settling pond Date of action: 20 August 2016

Backhole dredge the waste from concrete

Page 30: Environmental Monitoring Report...ENVIRONMENTAL INSPECTION REPORT Period observation Deadline Package Location Weather Observers 13 July 2016 20 July 2016 CW1A 0 - 3+800 Sunny Ms

CDMth Sml

Central Mekong Delta Connectivity Project - (CMDCP)

TA 7822-VIE, Loan 3013-VIE, Grant 0353-VIE

CDM Smith - WSP -Yooshin Consultant JV セ@ Group 5, Tan Tich Hamlet, Tinh Thoi Commune, Cao Lanh City, Dong Thap Province, Vietnam

セ@ WSP .. • Tel: (84) 067-3881-255; Fax: {84) 067-3881-256 <?oo,.h..:....

Ref. No. : DDIS/CW1N0895

Date : 01 September 2016

To: Mr. Dang Xuan Lich Contractor's Representative

Contractor's Office: No. 97, Chi Lang street, Ward 03, Cao Lanh city Dong Thap Tel: (84) 0673 535 466; Fax: 0673 535 466

Subject: Package CW1A - Notice to Correct: Outstanding environmental issues and Environmental Inspection Report 25 Aug 2016

Dear Mr. Lich,

We refer your letter no. CW1NDDIS/081 0 dated 23 August 2016 for your site improvement, we had

inspected your site in 25 August 2016. We appreciated your prompt action and improvement on site

condition; however, there still remain many outstanding issues as followings:

1. No waste disposing activity on site though many concrete pile head and excavated soil

locates on site which are reminded by DDIS for removal since 2015.

2. No change of Linh Son settling pond system in Linh Son batching plant. This issue is

reminded through several ADB Mission in 2016. [substantially important]

3. No drip tray or drip pan for fuel equipment on site.

4. No hazardous waste storage (e.g. empty bentonite bags)

Please see detail outstanding issues in the attachment. The ADS External Environmental Specialist

will revisit and check your site from 12 September 2016, we expect your significant improvement in

your site condition. We hereby remind you to take strong action for those remaining items to expedite

no later than 10 September 2016.

Cc: - As above

Cao Lanh Bridge Project Manager, CIPM - Site Construction Team, CIPM

File: DDIS Consultant JV Office

Page 1 ofl

Attachment: Environmental Inspection Report 25 August 2016.

Page 31: Environmental Monitoring Report...ENVIRONMENTAL INSPECTION REPORT Period observation Deadline Package Location Weather Observers 13 July 2016 20 July 2016 CW1A 0 - 3+800 Sunny Ms

CDMth Smt

01,1' an k セ エ@ n6i khu VI,J'C trung tam £>6ng 「 セ ョ ァ@ song C.:Vu Long - (CMDCP) TA 7822-VIE, Khoan vay 3013-VIE, Khoan カゥセョ@ trQ' 0353-VIE

a.WSP セ@

Lien danh TLP v§n COM Smith - WSP -Yooshin T6 5, Ap Tan Tjch, Xa Tinh Th&i, TP Cao Lanh, Tinh £>6ng Thap, Vi$t Nam

£>T: (84) 067-3881-255 ; Fax: (84) 067-3881 -256 ,..- qOC> .. セ@

S6 thU' : DDIS/CW1N0895 Ngay : 01/09/2016

GLI'i 、セョ Z@ 6ng ヲIセョァ@ Xuan L!ch Xセゥ@ di$n Nha エィセオ@

Van phong dl! an: 97 dU'<Yng Chi Lang- PhU'<Yng 03- TP Cao Lanh, Tinh 86ng Thap

f)T: +(84) 0673 535 466; Fax: 0673 535 466

chu d@: G6i CW1A- Thong Sao St'Pa Chifa: Cac Van D@ Moi TrU'6'ng Ttm Dong va Sao cao K i@m Tra Moi TrU'6'ng ngay 25/08/2016 .

Kinh gU>i: 6ng Ljch,

Sau khi tham 」ィゥセオ@ thU' cua Nha tィセオ@ s6 CW1NDDIS/0810 ngay 23/08/2016 カセ@ cai thi$n tlnh hlnh

cong tru<Yng, chung toi da kit§m tra cong tru<Yng cua cac eng ngay 25/08/2016. Chung toi danh gia

cao Vi$C thl,l'C hi$n kip thcYi CUa CaC eng va cai thi$n 、ゥセu@ ki$n tren cong trU'cYng, tuy nhien van con Nセ@ セ@ ). ). h

nh1eu van de ton dong n U' sau:

1. Khong c6 ィッセエ@ dong d6 thai tren cong trU'<Yng ュセ」@ du ョィゥセオ@ cong tac 、セオ@ coc be tong va cong

tac dao 、セエ@ ョィゥセオ@ vi tri tren cong tru<Yng da dU'Q'C DDIS nhac nh& ャッセゥ@ bo tl.r nam 2015.

2. Khong cai エ ィゥ セ ョ@ ィセ@ th6ng 「 セ@ lang (y エイセュ@ tr(>n Linh SO'n. Van d@ nay da dlPQ'C doan ォ ゥ セ ュ@

tra ADS dU'Q'C nh.ic nha vai lan nam 2016. ( van d@ quan trQng)

3. Khong c6 khay 16t 、セオ@ dcSi v&i cac dt,mg c1,1 chll'a nhien lieu tren cong trU'<Yng.

4. Khong c6 kho chll'a 」ィセエ@ thai doc ィセゥ@ (vi d1,1 nhU' bao chll'a bentonite rong).

Xin vui long xem bang dfnh kem cac カセョ@ 、セ@ t6n dong. Chuyen gia moi trU'<Yng noi ADB se kit§m

tra ャセゥ@ エセゥ@ cong trU'cYng cua cac eng tl.r ngay 12/09/2016, chung toi mong rang cac eng c6 cai thi$n

dang kt§ tlnh hlnh cong tru<Yng cua cac eng. Nay chung toi xin nhac nh& cac eng phai thl,l'C hi$n

nghiem tUc dt§ giai アオケセエ@ CaC vセョ@、セ@ tbn dong nay trU'OC ngay 10/09/2016.

Chung toi danh gia cao Sl,l' hqp tac cua cac eng.

Tran trong,

{EJa kyJ Victoriano L. Hamlig

Ky sU' thU'<Yng tru

Cc: - NhU' tren

Giam d6c g6i dU'O'ng - dl,J' an Ct3u Cao U!nh, CIPM - Nh6m quan ly cong trU'O'ng, CIPM - LU'u: Lien danh TVGS - DDIS

Trang 1/1

Drnh kem:

Bao cao kit§m tra moi tru<Yng ngay

25/08/2016

Page 32: Environmental Monitoring Report...ENVIRONMENTAL INSPECTION REPORT Period observation Deadline Package Location Weather Observers 13 July 2016 20 July 2016 CW1A 0 - 3+800 Sunny Ms

ENVIRONMENTAL INSPECTION REPORT Period observation Deadline Package Location Weather Observers

25 August 2016 10 September

2016

CW1A 0 - 3+800 Sunny Ms. Le Thi Phuong Loan – NES

No. Observation Issued Pictures by DDIS Environment Team Corrective pictures by Contractor

007 Location: Linh Son batching

plant

The settling pond in Linh

Son batching plant contain

only 1 pond without any

outlet.

Necessary action:

Contractor need to repair

this settling pond system for

batching plant operation.

The settling pond should

contain at least 3 ponds and

outlet to the public water

source.

Wrong design of settling pond Date of action:

010 Location: Dinh Chung

fabrication yards

Concrete pile head was not

stored in its designated

area.

Necessary action:

Contractor need to remove

this concrete pile head to

the storage of concrete

waste in the designated

disposal area.

Page 33: Environmental Monitoring Report...ENVIRONMENTAL INSPECTION REPORT Period observation Deadline Package Location Weather Observers 13 July 2016 20 July 2016 CW1A 0 - 3+800 Sunny Ms

Concrete pile head on site Date of action:

011 Location: Dinh Chung

fabrication yards

No drip tray for fuel spillage.

Necessary action:

Contractor must provide drip

tray as requirement.

No drip tray for fuel spillage Date of action:

014 Location: Tinh Thoi bridge

The dirty working

environment on site due to

poor housekeeping and no

proper drainage and storage

for excavated spoil.

Necessary action:

Contractor arrange all

materials for good

housekeeping and create

the efficient drainage for

rainstorm run-off and

wastewater from

excavation. The spoil of

excavation process will be

temperarily stored on site

with good barricades.

Wrong design of settling pond Date of action:

Page 34: Environmental Monitoring Report...ENVIRONMENTAL INSPECTION REPORT Period observation Deadline Package Location Weather Observers 13 July 2016 20 July 2016 CW1A 0 - 3+800 Sunny Ms

015 Location: Tinh Thoi bridge

Concrete pile head was not

stored in its designated

area.

Necessary action:

Contractor need to remove

this concrete pile head to

the storage of concrete

waste in the designated

disposal area.

Concrete pile heads on site Date of action:

020 Location: Hoang An

batching plant

Some concrete debrises

locates in front of the Hoang

An batching plant without

any collection.

Necessary action:

Contractor must transfer

this waste to the desginated

area for concrete waste

storage.

No proper concrete waste storage Date of action:

Page 35: Environmental Monitoring Report...ENVIRONMENTAL INSPECTION REPORT Period observation Deadline Package Location Weather Observers 13 July 2016 20 July 2016 CW1A 0 - 3+800 Sunny Ms

021 Location: Tinh Thoi bridge –

Hoang An site

There is no collection of

empty bentonite bags on

site.

Necessary action:

Contractor must collect

these empty bags to

hazardous waste storage.

No storage for empty bentonite bags Date of action:

022 Location: Thang Long site

The poor drainage system in

the Thang Long site cause

the floating resulting the

damage to access road in

this section.

Necessary action:

Contractor need to improve

the drainage system for

waterstorm run-off avoiding

the floating on the access

road.

Poor drainage system during rainy day Date of action:

Page 36: Environmental Monitoring Report...ENVIRONMENTAL INSPECTION REPORT Period observation Deadline Package Location Weather Observers 13 July 2016 20 July 2016 CW1A 0 - 3+800 Sunny Ms
Page 37: Environmental Monitoring Report...ENVIRONMENTAL INSPECTION REPORT Period observation Deadline Package Location Weather Observers 13 July 2016 20 July 2016 CW1A 0 - 3+800 Sunny Ms
Page 38: Environmental Monitoring Report...ENVIRONMENTAL INSPECTION REPORT Period observation Deadline Package Location Weather Observers 13 July 2016 20 July 2016 CW1A 0 - 3+800 Sunny Ms

CLOSED - ENVIRONMENTAL INSPECTION REPORT

Period observation Deadline Package Location Weather Observers

25 August 2016 10 September 2016 CW1A 0 - 3+800 Sunny Ms. Le Thi Phuong Loan – NES

No. Observation Issued Pictures by DDIS Environment Team Corrective pictures by Contractor

007 Location: Linh Son batching

plant

The settling pond in Linh

Son batching plant contain

only 1 pond without any

outlet.

Necessary

action:Contractor need to

repair this settling pond

system for batching plant

operation. The settling pond

should contain at least 3

ponds and outlet to the

public water source.

Wrong design of settling pond Date of action:

Page 39: Environmental Monitoring Report...ENVIRONMENTAL INSPECTION REPORT Period observation Deadline Package Location Weather Observers 13 July 2016 20 July 2016 CW1A 0 - 3+800 Sunny Ms

010 Location: Dinh Chung

fabrication yards

Concrete pile head was not

stored in its designated area.

Necessary action: Contractor

need to remove this concrete

pile head to the storage of

concrete waste in the

designated disposal area.

Concrete pile head on site Date of action:

011 Location: Dinh Chung

fabrication yards

No drip tray for fuel

spillage.

Necessary action:

Contractor must provide

drip tray as requirement.

No drip tray for fuel spillage Date of action:

Page 40: Environmental Monitoring Report...ENVIRONMENTAL INSPECTION REPORT Period observation Deadline Package Location Weather Observers 13 July 2016 20 July 2016 CW1A 0 - 3+800 Sunny Ms

014 Location: Linh Son bridge

The dirty working

environment on site due to

poor housekeeping and no

proper drainage and storage

for excavated spoil.

Necessary action:

Contractor arrange all

materials for good

housekeeping and create

the efficient drainage for

rainstorm run-off and

wastewater from

excavation. The spoil of

excavation process will be

temperarily stored on site

with good barricades.

Wrong design of settling pond Date of action: 04 september 2016

Arrangement materials clean and tidy

015 Location: Tinh Thoibridge

Concrete pile head was not

stored in its designated area.

Necessary action:

Contractor need to remove

this concrete pile head to the

storage of concrete waste in

the designated disposal

area.

Concrete pile heads on site Date of action: 06 september 2016

Concrete pile is collected and transported to make

temporary bridge foundations

Page 41: Environmental Monitoring Report...ENVIRONMENTAL INSPECTION REPORT Period observation Deadline Package Location Weather Observers 13 July 2016 20 July 2016 CW1A 0 - 3+800 Sunny Ms

020 Location: Hoang An

batching plant

Some concrete debrises

locates in front of the Hoang

An batching plant without

any collection.

Necessary action:

Contractor must transfer

this waste to the desginated

area for concrete waste

storage.

No proper concrete waste storage Date of action: 08 September 2016

Concrete waste is collected and transported

021 Location: Tinh Thoi bridge –

Hoang An site

There is no collection of

empty bentonite bags on

site.

Necessary action:

Contractor must collect

these empty bags to

hazardous waste storage.

No storage for empty bentonite bags Date of action: 10 September 2016

Packaging bentonite is collected, clean

Page 42: Environmental Monitoring Report...ENVIRONMENTAL INSPECTION REPORT Period observation Deadline Package Location Weather Observers 13 July 2016 20 July 2016 CW1A 0 - 3+800 Sunny Ms

022 Location: Thang Long site

The poor drainage system in

the Thang Long site cause

the floating resulting the

damage to access road in

this section.

Necessary action:

Contractor need to improve

the drainage system for

waterstorm run-off avoiding

the floating on the access

road.

Poor drainage system during rainy day Date of action: 06 September 2016

Water drainage trenching next to roadside

Page 43: Environmental Monitoring Report...ENVIRONMENTAL INSPECTION REPORT Period observation Deadline Package Location Weather Observers 13 July 2016 20 July 2016 CW1A 0 - 3+800 Sunny Ms
Page 44: Environmental Monitoring Report...ENVIRONMENTAL INSPECTION REPORT Period observation Deadline Package Location Weather Observers 13 July 2016 20 July 2016 CW1A 0 - 3+800 Sunny Ms
Page 45: Environmental Monitoring Report...ENVIRONMENTAL INSPECTION REPORT Period observation Deadline Package Location Weather Observers 13 July 2016 20 July 2016 CW1A 0 - 3+800 Sunny Ms

ENVIRONMENTAL INSPECTION REPORT A. Repeated Observations

No. Observation Issued Pictures by DDIS Environment Team Corrective pictures by Contractor

007 Location: Linh Son batching

plant

Obervation in

Environmental Inspection

Report dated dated 13 July

2016 and reminded in 10

and 25 August 2016 (Ref:

DDIS/CW1A/0895 dated 01

September2016)

Ref: item 10b, table 1, EMP

of contractor CW1A

(4213A/CIPM-HDKT)

DDIS comments:Contractor need to repair this settling

pond system for batching plant operation. The settling

pond should contain at least 3 ponds and outlet to the

public water source.

Contractor reply date:

Wrong design of settling pond Status: unclose

010 Location: Dinh Chung

fabrication yards

Obervation in

Environmental Inspection

Report dated 10 and

reminded in 25 August 2016

(Ref: DDIS/CW1A/0895

dated 01 September2016)

Ref: item 11f, table 1, EMP

of contractor CW1A

(4213A/CIPM-HDKT)

DDIS comments:Contractor need to remove this

concrete pile head to the storage of concrete waste in

the designated disposal area.

Contractor reply date:

Concrete pile head on site Status: unclose

Page 46: Environmental Monitoring Report...ENVIRONMENTAL INSPECTION REPORT Period observation Deadline Package Location Weather Observers 13 July 2016 20 July 2016 CW1A 0 - 3+800 Sunny Ms

011 Location: Dinh Chung

fabrication yards

Obervation in

Environmental Inspection

Report dated 10 and

reminded in 25 August 2016

(Ref: DDIS/CW1A/0895

dated 01 September2016)

Ref: item 7g and 7h, table 1,

EMP of contractor CW1A

(4213A/CIPM-HDKT)

DDIS comments:Contractor must provide drip tray as

requirement.

Contractor reply date:

No drip tray for fuel spillage Status: unclose

015 Location: Tinh Thoi bridge

Obervation in

Environmental Inspection

Report dated 10 and

reminded in 25 August 2016

(Ref: DDIS/CW1A/0895

dated 01 September2016)

Ref: item 11f, table 1, EMP

of contractor CW1A

(4213A/CIPM-HDKT)

DDIS comments:Contractor need to remove this

concrete pile head to the storage of concrete waste in

the designated disposal area.

According to the close-report by contractor Ref.

CW1A/DDIS/0834 dated 13 September 2016, the close-

observation is not accepted since the bridge foundation

is not designated for temperary storage of concrete

waste. The temperary storage should contain separate

area with barricade. The last desination of concrete

storage should be in the approved disposal area by

DDIS.

Contractor reply date:

Concrete pile heads on site Status: unclose

Page 47: Environmental Monitoring Report...ENVIRONMENTAL INSPECTION REPORT Period observation Deadline Package Location Weather Observers 13 July 2016 20 July 2016 CW1A 0 - 3+800 Sunny Ms

020 Location: Hoang An

batching plant

Obervation in

Environmental Inspection

Report dated 25 August

2016 (Ref: DDIS/CW1A/0895

dated 01 September2016)

Ref: item 11f, table 1, EMP

of contractor CW1A

(4213A/CIPM-HDKT)

DDIS comments: Contractor must transfer this waste to

the desginated area for concrete waste storage.

Contractor reply date:

No proper concrete waste storage Status: unclose

Page 48: Environmental Monitoring Report...ENVIRONMENTAL INSPECTION REPORT Period observation Deadline Package Location Weather Observers 13 July 2016 20 July 2016 CW1A 0 - 3+800 Sunny Ms

ENVIRONMENTAL INSPECTION REPORTPeriod observation Deadline Package Location Weather Observers

05 October 2016 24 O to er 2016

CW1A 0 - 3+800 Sunny Ms. Le Thi Phuong Loan – NES

Mr. Nguyen Van Cuong – EO

New observations

022 Location: Thang Long site –

Rach Mieu access road

Ref: Clause 4.15a, contractor

CW1A (4213A/CIPM-HDKT)

DDIS comments:Contractor frequent repair and

maintain the good access road for transportation along

the project alignment.

No access road Status: unclose

023 Location: Linh Son bridge –

Tuan Loc site

There is no collection of

empty bentonite bags on

site.

Ref: item 7f and 7o table 1,

EMP of contractor CW1A

(4213A/CIPM-HDKT)

DDIS comments:Contractor must collect these empty

bags to hazardous waste storage.

Page 49: Environmental Monitoring Report...ENVIRONMENTAL INSPECTION REPORT Period observation Deadline Package Location Weather Observers 13 July 2016 20 July 2016 CW1A 0 - 3+800 Sunny Ms

No storage for empty bentonite bags Status: unclose

024 Location: Tuan Loc site –

Linh Son bridge

Ref: item 6, table 1, EMP of

contractor CW1A

(4213A/CIPM-HDKT)

DDIS comments: Contractor record and inform to DDIS

of your spoil/ecavated soil for dilivery to disposal area.

No recording of excavated soil transportation Status: unclose

Page 50: Environmental Monitoring Report...ENVIRONMENTAL INSPECTION REPORT Period observation Deadline Package Location Weather Observers 13 July 2016 20 July 2016 CW1A 0 - 3+800 Sunny Ms
Page 51: Environmental Monitoring Report...ENVIRONMENTAL INSPECTION REPORT Period observation Deadline Package Location Weather Observers 13 July 2016 20 July 2016 CW1A 0 - 3+800 Sunny Ms
Page 52: Environmental Monitoring Report...ENVIRONMENTAL INSPECTION REPORT Period observation Deadline Package Location Weather Observers 13 July 2016 20 July 2016 CW1A 0 - 3+800 Sunny Ms

ENVIRONMENTAL INSPECTION REPORT

No. Observation Issued Pictures by DDIS Environment Team Corrective pictures by Contractor

007 Location: Linh Son batching

plant

Obrvation in environmental

inspection report dated13

July 2016 and reminded in

10 and 25 August 2016 (Ref:

DDIS/CW1A/0895 dated 01

September 2016)

Ref: item 10b, table 1, EMP

of contractor CW1A

(4213A/CIPM-HDKT)

DDIS Comments:Contractor need to repair this settling

pond sytem for batching plant operation. The settling

pond should contain at least 3 ponds and putlet to the

public water source.

Contractor reply date:

Wrong design of settling pond Status: unclose

010 Location: Dinh Chung

fabrication yards

Obrvation in environmental

inspection report dated 10

and reminded in 25 August

2016

(Ref: DDIS/CW1A/0895

dated 01 September 2016)

Ref: item 10f, table 1, EMP

of contractor CW1A

(4213A/CIPM-HDKT)

Concrete pile head on site Contractor reply date: 10 October 2016

Page 53: Environmental Monitoring Report...ENVIRONMENTAL INSPECTION REPORT Period observation Deadline Package Location Weather Observers 13 July 2016 20 July 2016 CW1A 0 - 3+800 Sunny Ms

The concrete pile head is moved on the storage

011 Location: Dinh Chung

fabrication yards

Obrvation in environmental

inspection report dated 10

and reminded in 25 August

2016

(Ref: DDIS/CW1A/0895

dated 01 September 2016)

Ref: item 7g and 7h,table 1,

EMP of contractor CW1A

(4213A/CIPM-HDKT)

No drip tray for fuel spillage Contractor reply date: 25 October 201

Building the roof in order to avoid fuel spillage into the

the outside environment.

015 Location: Tinh Thoibridge

Obrvation in environmental

inspection report dated 10

and reminded in 25 August

2016

(Ref: DDIS/CW1A/0895

dated 01 September 2016)

Ref: item 11f,table 1, EMP

of contractor CW1A

(4213A/CIPM-HDKT)

DDIS comments: contractor need to remove this

concrete pile head to the storage of concrete waste

in the designated disposal area.

According to the close-report by contractor

Ref.CW1A/DDIS/0834 dated 13 september 2016,

the close-observation is not accepted since the

bridge foundation is not designated for temperary

storage of concrete waste. The temperary storage

should contain separate area with barricade. The

last desination of concrete storage should be in the

approved disposal area by DDIS

Concrete pile heads on site Status: unclose

Page 54: Environmental Monitoring Report...ENVIRONMENTAL INSPECTION REPORT Period observation Deadline Package Location Weather Observers 13 July 2016 20 July 2016 CW1A 0 - 3+800 Sunny Ms

020 Location: Hoang An

batching plant

Obrvation in environmental

inspection report 25 August

2016

(Ref: DDIS/CW1A/0895

dated 01 September 2016)

Ref: item 11f,table 1, EMP

of contractor CW1A

(4213A/CIPM-HDKT)

No proper concrete waste storage Contractor reply date: 28 October 2016

The conctrete waste are collected and moved on the

storage.

Page 55: Environmental Monitoring Report...ENVIRONMENTAL INSPECTION REPORT Period observation Deadline Package Location Weather Observers 13 July 2016 20 July 2016 CW1A 0 - 3+800 Sunny Ms

ENVIRONMENTAL INSPECTION REPORT

Period observation Deadline Package Location Weather Observers

05 October 2016 24 September 2016 CW1A 0 - 3+800 Sunny Ms. Le Thi Phuong Loan – NES

Mr. Nguyen Van Cuong - EO

New observations

022 Location: Thang Long site –

Rach Mieu access road

Ref: clause 4.15a, contracor

CW1A (4213/CIPM-HDKT)

No access road Contractor reply date: 30 October 2016

Regularly dredging and spreading stones to avoid mud

on the access road

Page 56: Environmental Monitoring Report...ENVIRONMENTAL INSPECTION REPORT Period observation Deadline Package Location Weather Observers 13 July 2016 20 July 2016 CW1A 0 - 3+800 Sunny Ms

023 Location: Linh Son bridge –

Tuan Loc site

There is no collection of

empty bentonite bags on site.

Ref: item 7f and 7o table 1,

EMP of contractor CW1A

(4213/CIPM-HDKT)

No storage for empty bentonite bags Contractor reply date: 25 October 2016

The betonite bags are collected on the site

024 Location: Tuan Loc site –

Linh Son bridge

Ref: item 6, table 1, EMP of

contractor CW1A

(4213A/CIPM-HDKT)

DDIS comments: contractor record and inform to DDIS

of your spoil/ecavated soil for dilivery to disposal area.

No recording of excavated soil transportation Status: unclose

Page 57: Environmental Monitoring Report...ENVIRONMENTAL INSPECTION REPORT Period observation Deadline Package Location Weather Observers 13 July 2016 20 July 2016 CW1A 0 - 3+800 Sunny Ms
Page 58: Environmental Monitoring Report...ENVIRONMENTAL INSPECTION REPORT Period observation Deadline Package Location Weather Observers 13 July 2016 20 July 2016 CW1A 0 - 3+800 Sunny Ms
Page 59: Environmental Monitoring Report...ENVIRONMENTAL INSPECTION REPORT Period observation Deadline Package Location Weather Observers 13 July 2016 20 July 2016 CW1A 0 - 3+800 Sunny Ms

ENVIRONMENTAL INSPECTION REPORT A. Repeated Observations

No. Observation Issued Pictures by DDIS Environment Team Corrective pictures by Contractor

007 Location: Linh Son batching

plant

Obervation in

Environmental Inspection

Report dated dated 13 July

2016 and reminded in 10

and 25 August 2016 (Ref:

DDIS/CW1A/0895 dated 01

September2016 and

DDIS/CW1A/0939 dated 21

October 2016)

Ref: item 10b, table 1, EMP

of contractor CW1A

(4213A/CIPM-HDKT)

DDIS comments:Contractor need to repair this settling

pond system for batching plant operation. The settling

pond should contain at least 3 ponds and outlet to the

public water source.

Contractor reply date:

Wrong design of settling pond Status: unclose

010 Location: Dinh Chung

fabrication yards

Obervation in

Environmental Inspection

Report dated 10 and

reminded in 25 August 2016

(Ref: DDIS/CW1A/0895

dated 01 September2016

and DDIS/CW1A/0939 dated

21 October 2016)

Ref: item 11f, table 1, EMP

of contractor CW1A

(4213A/CIPM-HDKT)

DDIS comments:Contractor need to remove this

concrete pile head to the storage of concrete waste in

the designated disposal area.

According to the close-report by contractor Ref.

CW1A/DDIS/0 dated 10 October 2016, the close-

observation is not accepted since the bridge foundation

is not designated for temperary storage of concrete

waste. The temperary storage should contain separate

area with barricade. The last desination of concrete

storage should be in the approved disposal area by

DDIS.

Contractor reply date:

Concrete pile head on site Status: unclose

Page 60: Environmental Monitoring Report...ENVIRONMENTAL INSPECTION REPORT Period observation Deadline Package Location Weather Observers 13 July 2016 20 July 2016 CW1A 0 - 3+800 Sunny Ms

011 Location: Tuan Loc site -

Dinh Chung fabrication

yards

Obervation in

Environmental Inspection

Report dated 10 and

reminded in 25 August 2016

(Ref: DDIS/CW1A/0895

dated 01 September2016

and DDIS/CW1A/0939 dated

21 October 2016)

Ref: item 7g and 7h, table 1,

EMP of contractor CW1A

(4213A/CIPM-HDKT)

DDIS comments:Contractor must provide drip tray or

bund wall as requirement.

According to the close-report by contractor Ref.

CW1A/DDIS/0 dated 25 October 2016, the close-

observation is not accepted since there is still no bund

wall or drip tray for oil tank.

Contractor reply date:

No drip tray for fuel spillage Status: unclose

Page 61: Environmental Monitoring Report...ENVIRONMENTAL INSPECTION REPORT Period observation Deadline Package Location Weather Observers 13 July 2016 20 July 2016 CW1A 0 - 3+800 Sunny Ms

015 Location: Hoang An site -

Tinh Thoi bridge

Obervation in

Environmental Inspection

Report dated 10 and

reminded in 25 August 2016

(Ref: DDIS/CW1A/0895

dated 01 September2016

and DDIS/CW1A/0939 dated

21 October 2016)

Ref: item 11f, table 1, EMP

of contractor CW1A

(4213A/CIPM-HDKT)

DDIS comments:Contractor need to remove this

concrete pile head to the storage of concrete waste in

the designated disposal area.

According to the close-report by contractor Ref.

CW1A/DDIS/0834 dated 13 September 2016, the close-

observation is not accepted since the bridge foundation

is not designated for temperary storage of concrete

waste. The temperary storage should contain separate

area with barricade. The last desination of concrete

storage should be in the approved disposal area by

DDIS.

Contractor reply date:

Concrete pile heads on site Status: unclose

024 Location: Tuan Loc site –

Linh Son bridge

Obervation in

Environmental Inspection

Report dated October 2016

(Ref: DDIS/CW1A/0939

dated 21 October 2016)

Ref: item 6, table 1, EMP of

contractor CW1A

(4213A/CIPM-HDKT)

DDIS comments: Contractor record and inform to DDIS

of your spoil/ecavated soil for dilivery to disposal area.

No recording of excavated soil transportation Status: unclose

Page 62: Environmental Monitoring Report...ENVIRONMENTAL INSPECTION REPORT Period observation Deadline Package Location Weather Observers 13 July 2016 20 July 2016 CW1A 0 - 3+800 Sunny Ms

ENVIRONMENTAL INSPECTION REPORT

Period observation Deadline Package Location Weather Observers

15 November 2016 30 November

2016

CW1A 0 - 3+800 Sunny Ms. Le Thi Phuong Loan – NES

Mr. Nguyen Van Cuong – EO

New observations

025 Location: Linh Son bridge

Ref: item 11f, table 1, EMP

of contractor CW1A

(4213A/CIPM-HDKT)

DDIS comments:Contractor need to remove this

concrete pile head to the storage of concrete waste in

the designated disposal area.

Contractor reply date:

No recording of excavated soil transportation Status: unclose

026 Location: Linh Son batching

plant

Ref: item 11 and 13, table 1,

EMP of contractor CW1A

(4213A/CIPM-HDKT)

DDIS comments: Contractor collect the waste and

create a effient drainage system.

No recording of excavated soil transportation Status: unclose

Page 63: Environmental Monitoring Report...ENVIRONMENTAL INSPECTION REPORT Period observation Deadline Package Location Weather Observers 13 July 2016 20 July 2016 CW1A 0 - 3+800 Sunny Ms

027 Location: Hoang An site –

Tinh Thoi bridge

Ref: item 6, table 1, EMP of

contractor CW1A

(4213A/CIPM-HDKT)

DDIS comments: Contractor record and inform to DDIS

of your spoil/ecavated soil for dilivery to disposal area.

No recording of excavated soil transportation Status: unclose

028 Location: Hoang An

batching plant

Ref: item 11, table 1, EMP of

contractor CW1A

(4213A/CIPM-HDKT)

DDIS comments: Contractor must regularly desludge the

accumulated concrete waste in the settling ponds and

maintain the good condition of this settling system.

No recording of excavated soil transportation Status: unclose

Page 64: Environmental Monitoring Report...ENVIRONMENTAL INSPECTION REPORT Period observation Deadline Package Location Weather Observers 13 July 2016 20 July 2016 CW1A 0 - 3+800 Sunny Ms

029 Location: Hoang An site –

Tinh Thoi bridge

Ref: item 7e, table 1, EMP of

contractor CW1A

(4213A/CIPM-HDKT)

DDIS comments: Contractor should provide roof to

avoid the rainy water.

No recording of excavated soil transportation Status: unclose

Page 65: Environmental Monitoring Report...ENVIRONMENTAL INSPECTION REPORT Period observation Deadline Package Location Weather Observers 13 July 2016 20 July 2016 CW1A 0 - 3+800 Sunny Ms
Page 66: Environmental Monitoring Report...ENVIRONMENTAL INSPECTION REPORT Period observation Deadline Package Location Weather Observers 13 July 2016 20 July 2016 CW1A 0 - 3+800 Sunny Ms
Page 67: Environmental Monitoring Report...ENVIRONMENTAL INSPECTION REPORT Period observation Deadline Package Location Weather Observers 13 July 2016 20 July 2016 CW1A 0 - 3+800 Sunny Ms

ENVIRONMENTAL INSPECTION REPORT A. Repeated Observations

No. Observation Issued Pictures by DDIS Environment Team Corrective pictures by Contractor

007 Location: Linh Son batching

plant

Obervation in

Environmental Inspection

Report dated dated 13 July

2016 and reminded in 10

and 25 August 2016 (Ref:

DDIS/CW1A/0895 dated 01

September2016 and

DDIS/CW1A/0939 dated 21

October 2016)

Ref: item 10b, table 1, EMP

of contractor CW1A

(4213A/CIPM-HDKT)

DDIS comments:Contractor need to repair this settling

pond system for batching plant operation. The settling

pond should contain at least 3 ponds and outlet to the

public water source.

Contractor reply date:

Wrong design of settling pond Status: unclose

010 Location: Dinh Chung

fabrication yards

Obervation in

Environmental Inspection

Report dated 10 and

reminded in 25 August 2016

(Ref: DDIS/CW1A/0895

dated 01 September2016

and DDIS/CW1A/0939 dated

21 October 2016)

Ref: item 11f, table 1, EMP

of contractor CW1A

(4213A/CIPM-HDKT)

DDIS comments:Contractor need to remove this

concrete pile head to the storage of concrete waste in

the designated disposal area.

According to the close-report by contractor Ref.

CW1A/DDIS/0878 dated 07 November 2016, the close-

observation is not accepted since the bridge foundation

is not designated for temperary storage of concrete

waste. The temperary storage should contain separate

area with barricade. The last desination of concrete

storage should be in the approved disposal area by

DDIS.

Contractor reply date:

Concrete pile head on site Status: unclose

Page 68: Environmental Monitoring Report...ENVIRONMENTAL INSPECTION REPORT Period observation Deadline Package Location Weather Observers 13 July 2016 20 July 2016 CW1A 0 - 3+800 Sunny Ms

011 Location: Tuan Loc site -

Dinh Chung fabrication

yards

Obervation in

Environmental Inspection

Report dated 10 and

reminded in 25 August 2016

(Ref: DDIS/CW1A/0895

dated 01 September2016

and DDIS/CW1A/0939 dated

21 October 2016)

Ref: item 7g and 7h, table 1,

EMP of contractor CW1A

(4213A/CIPM-HDKT)

DDIS comments:Contractor must provide drip tray or

bund wall as requirement.

According to the close-report by contractor Ref.

CW1A/DDIS/0878 dated 07 November 2016, the close-

observation is not accepted since there is still no bund

wall or drip tray for oil tank.

Contractor reply date:

No drip tray for fuel spillage Status: unclose

Page 69: Environmental Monitoring Report...ENVIRONMENTAL INSPECTION REPORT Period observation Deadline Package Location Weather Observers 13 July 2016 20 July 2016 CW1A 0 - 3+800 Sunny Ms

015 Location: Hoang An site -

Tinh Thoi bridge

Obervation in

Environmental Inspection

Report dated 10 and

reminded in 25 August 2016

(Ref: DDIS/CW1A/0895

dated 01 September2016

and DDIS/CW1A/0939 dated

21 October 2016)

Ref: item 11f, table 1, EMP

of contractor CW1A

(4213A/CIPM-HDKT)

DDIS comments:Contractor need to remove this

concrete pile head to the storage of concrete waste in

the designated disposal area.

According to the close-report by contractor Ref.

CW1A/DDIS/0834 dated 13 September 2016, the close-

observation is not accepted since the bridge foundation

is not designated for temperary storage of concrete

waste. The temperary storage should contain separate

area with barricade. The last desination of concrete

storage should be in the approved disposal area by

DDIS.

Contractor reply date:

Concrete pile heads on site Status: unclose

024 Location: Tuan Loc site –

Linh Son bridge

Obervation in

Environmental Inspection

Report dated October 2016

(Ref: DDIS/CW1A/0939

dated 21 October 2016)

Ref: item 6, table 1, EMP of

contractor CW1A

(4213A/CIPM-HDKT)

DDIS comments: Contractor record and inform to DDIS

of your spoil/ecavated soil for dilivery to disposal area.

No recording of excavated soil transportation Status: unclose

Page 70: Environmental Monitoring Report...ENVIRONMENTAL INSPECTION REPORT Period observation Deadline Package Location Weather Observers 13 July 2016 20 July 2016 CW1A 0 - 3+800 Sunny Ms

ENVIRONMENTAL INSPECTION REPORT

Period observation Deadline Package Location Weather Observers

15 November 2016 30 November 2016 CW1A 0 - 3+800 Sunny Ms. Le Thi Phuong Loan – NES

Mr. Nguyen Van Cuong – EO

New observations

025 Location: Linh Son bridge

Ref: item 11f, table 1, EMP

of contractor CW1A

(4213A/CIPM-HDKT)

DDIS comments: Contractor need to remove this

concrete pile head to the storage of concrete waste in

the designated disposal area.

Contractor reply date:

Concrete pile heads Status: unclose

026 Location: Linh Son batching

plant

Ref: item 11 and 13, table 1,

EMP of contractor CW1A

(4213A/CIPM-HDKT)

Dust Collect the waste and concreting anti flooded

Page 71: Environmental Monitoring Report...ENVIRONMENTAL INSPECTION REPORT Period observation Deadline Package Location Weather Observers 13 July 2016 20 July 2016 CW1A 0 - 3+800 Sunny Ms

027 Location: Hoang An site –

Tinh Thoi bridge

Ref: item 6, table 1, EMP of

contractor CW1A

(4213A/CIPM-HDKT)

Fuel drums without protection measures Fuel drums was collectors put into the archive

028 Location: Hoang An

batching plant

Ref: item 11, table 1, EMP of

contractor CW1A

(4213A/CIPM-HDKT)

Full concrete sludge in settling pond system Dredging settling ponds for water flow

Page 72: Environmental Monitoring Report...ENVIRONMENTAL INSPECTION REPORT Period observation Deadline Package Location Weather Observers 13 July 2016 20 July 2016 CW1A 0 - 3+800 Sunny Ms

029 Location: Hoang An site –

Tinh Thoi bridge

Ref: item 7e, table 1, EMP of

contractor CW1A

(4213A/CIPM-HDKT)

No roof protection for fuel storage Rebuilding roof for fuel storage

Page 73: Environmental Monitoring Report...ENVIRONMENTAL INSPECTION REPORT Period observation Deadline Package Location Weather Observers 13 July 2016 20 July 2016 CW1A 0 - 3+800 Sunny Ms
Page 74: Environmental Monitoring Report...ENVIRONMENTAL INSPECTION REPORT Period observation Deadline Package Location Weather Observers 13 July 2016 20 July 2016 CW1A 0 - 3+800 Sunny Ms
Page 75: Environmental Monitoring Report...ENVIRONMENTAL INSPECTION REPORT Period observation Deadline Package Location Weather Observers 13 July 2016 20 July 2016 CW1A 0 - 3+800 Sunny Ms

ENVIRONMENTAL INSPECTION REPORT A. Repeated Observations

No. Observation Issued Pictures by DDIS Environment Team Corrective pictures by Contractor

007 Location: Linh Son batching

plant

Obervation in

Environmental Inspection

Report dated dated 13 July

2016 and reminded in 10

and 25 August 2016 (Ref:

DDIS/CW1A/0895 dated 01

September2016 and

DDIS/CW1A/0939 dated 21

October 2016)

Ref: item 10b, table 1, EMP

of contractor CW1A

(4213A/CIPM-HDKT)

DDIS comments:Contractor need to repair this settling

pond system for batching plant operation. The settling

pond should contain at least 3 ponds and outlet to the

public water source.

Contractor reply date:

Wrong design of settling pond Status: unclose

010 Location: Dinh Chung

fabrication yards

Obervation in

Environmental Inspection

Report dated 10 and

reminded in 25 August 2016

(Ref: DDIS/CW1A/0895

dated 01 September2016

and DDIS/CW1A/0939 dated

21 October 2016)

Ref: item 11f, table 1, EMP

of contractor CW1A

(4213A/CIPM-HDKT)

DDIS comments:Contractor need to remove this

concrete pile head to the storage of concrete waste in

the designated disposal area.

According to the close-report by contractor Ref.

CW1A/DDIS/0878 dated 07 November 2016, the close-

observation is not accepted since the bridge foundation

is not designated for temperary storage of concrete

waste. The temperary storage should contain separate

area with barricade. The last desination of concrete

storage should be in the approved disposal area by

DDIS.

Contractor reply date:

Concrete pile head on site Status: unclose

Page 76: Environmental Monitoring Report...ENVIRONMENTAL INSPECTION REPORT Period observation Deadline Package Location Weather Observers 13 July 2016 20 July 2016 CW1A 0 - 3+800 Sunny Ms

011 Location: Tuan Loc site -

Dinh Chung fabrication

yards

Obervation in

Environmental Inspection

Report dated 10 and

reminded in 25 August 2016

(Ref: DDIS/CW1A/0895

dated 01 September2016

and DDIS/CW1A/0939 dated

21 October 2016)

Ref: item 7g and 7h, table 1,

EMP of contractor CW1A

(4213A/CIPM-HDKT)

DDIS comments:Contractor must provide drip tray or

bund wall as requirement.

According to the close-report by contractor Ref.

CW1A/DDIS/0878 dated 07 November 2016, the close-

observation is not accepted since there is still no bund

wall or drip tray for oil tank.

Contractor reply date:

No drip tray for fuel spillage Status: unclose

Page 77: Environmental Monitoring Report...ENVIRONMENTAL INSPECTION REPORT Period observation Deadline Package Location Weather Observers 13 July 2016 20 July 2016 CW1A 0 - 3+800 Sunny Ms

015 Location: Hoang An site -

Tinh Thoi bridge

Obervation in

Environmental Inspection

Report dated 10 and

reminded in 25 August 2016

(Ref: DDIS/CW1A/0895

dated 01 September2016

and DDIS/CW1A/0939 dated

21 October 2016)

Ref: item 11f, table 1, EMP

of contractor CW1A

(4213A/CIPM-HDKT)

DDIS comments: Contractor need to remove this

concrete pile head to the storage of concrete waste in

the designated disposal area.

According to the close-report by contractor Ref.

CW1A/DDIS/0834 dated 13 September 2016, the close-

observation is not accepted since the bridge foundation

is not designated for temperary storage of concrete

waste. The temperary storage should contain separate

area with barricade. The last desination of concrete

storage should be in the approved disposal area by

DDIS.

Contractor reply date:

Concrete pile heads on site Status: unclose

024 Location: Tuan Loc site –

Linh Son bridge

Obervation in

Environmental Inspection

Report dated October 2016

(Ref: DDIS/CW1A/0939

dated 21 October 2016)

Ref: item 6, table 1, EMP of

contractor CW1A

(4213A/CIPM-HDKT)

DDIS comments: Contractor record and inform to DDIS

of your spoil/ecavated soil for dilivery to disposal area.

No recording of excavated soil transportation Status: unclose

Page 78: Environmental Monitoring Report...ENVIRONMENTAL INSPECTION REPORT Period observation Deadline Package Location Weather Observers 13 July 2016 20 July 2016 CW1A 0 - 3+800 Sunny Ms

025 Location: Linh Son bridge

Ref: item 11f, table 1, EMP

of contractor CW1A

(4213A/CIPM-HDKT)

DDIS comments:Contractor need to remove this

concrete pile head to the storage of concrete waste in

the designated disposal area.

Contractor reply date:

Concrete pile heads Status: unclose

028 Location: Hoang An

batching plant

Ref: item 11, table 1, EMP of

contractor CW1A

(4213A/CIPM-HDKT)

DDIS comments: Contractor must regularly desludge the

accumulated concrete waste in the settling ponds and

maintain the good condition of this settling system.

According to the close-report by contractor Ref.

CW1A/DDIS/0913 dated 02 December 2016, the close-

observation is not accepted. In fact, the concrete sludge

is not removed yet.

Full concrete sludge in settling pond system Status: unclose

Page 79: Environmental Monitoring Report...ENVIRONMENTAL INSPECTION REPORT Period observation Deadline Package Location Weather Observers 13 July 2016 20 July 2016 CW1A 0 - 3+800 Sunny Ms

ENVIRONMENTAL INSPECTION REPORT

Period observation Deadline Package Location Weather Observers

12 December 2016 20 December

2016

CW1A 0 - 3+800 Rainy &

cloudy

Ms. Le Thi Phuong Loan – NES

Mr. Nguyen Van Cuong – EO

New observations

030 Location: Dinh Chung bridge

area

DDIS comments: Contractor should remove the waste to

waste-bin.

No collection of domestic waste Status: unclose

031 Location: Linh Son

temperary bridge area

DDIS comments: Contractor should provide the drip tray

with bund-wall under the concrete pump machine and

the contaminated waste should be collected for

treatment.

Fuel leakage on the ground Status: unclose

Page 80: Environmental Monitoring Report...ENVIRONMENTAL INSPECTION REPORT Period observation Deadline Package Location Weather Observers 13 July 2016 20 July 2016 CW1A 0 - 3+800 Sunny Ms

032 Location: Dinh Chung bridge

area

DDIS comments: Contractor collect the emty bags of

materials to waste storage and clean this area

Full of empty bags waste Status: unclose

Page 81: Environmental Monitoring Report...ENVIRONMENTAL INSPECTION REPORT Period observation Deadline Package Location Weather Observers 13 July 2016 20 July 2016 CW1A 0 - 3+800 Sunny Ms

033 Location: Tinh Thoi bridge

area

DDIS comments: Contractor collect the emty bags of

materials to hazardous waste storage.

Full concrete sludge in settling pond system Status: unclose

034 Location: Dinh Chung bridge

area

DDIS comments: Contractor need to remove this

concrete pile head to the storage of concrete waste in

the designated disposal area.

No storage of concrete pile heads Status: unclose

Page 82: Environmental Monitoring Report...ENVIRONMENTAL INSPECTION REPORT Period observation Deadline Package Location Weather Observers 13 July 2016 20 July 2016 CW1A 0 - 3+800 Sunny Ms

035 Location: Tinh Thoi bridge

area

DDIS comments: The rain causes muddy condition for

access road. Contractor must repair the road condition

to avoid the sliperary transport on this service road.

Full concrete sludge in settling pond system Status: unclose

Page 83: Environmental Monitoring Report...ENVIRONMENTAL INSPECTION REPORT Period observation Deadline Package Location Weather Observers 13 July 2016 20 July 2016 CW1A 0 - 3+800 Sunny Ms
Page 84: Environmental Monitoring Report...ENVIRONMENTAL INSPECTION REPORT Period observation Deadline Package Location Weather Observers 13 July 2016 20 July 2016 CW1A 0 - 3+800 Sunny Ms
Page 85: Environmental Monitoring Report...ENVIRONMENTAL INSPECTION REPORT Period observation Deadline Package Location Weather Observers 13 July 2016 20 July 2016 CW1A 0 - 3+800 Sunny Ms

ENVIRONMENTAL INSPECTION REPORT A. Repeated Observations

No. Observation Issued Pictures by DDIS Environment Team Corrective pictures by Contractor

007 Location: Linh Son batching

plant

Obervation in

Environmental Inspection

Report dated dated 13 July

2016 and reminded in 10

and 25 August 2016 (Ref:

DDIS/CW1A/0895 dated 01

September2016 and

DDIS/CW1A/0939 dated 21

October 2016)

Ref: item 10b, table 1, EMP

of contractor CW1A

(4213A/CIPM-HDKT)

DDIS comments:Contractor need to repair this settling

pond system for batching plant operation. The settling

pond should contain at least 3 ponds and outlet to the

public water source.

Contractor reply date:

Wrong design of settling pond Status: unclose

010 Location: Dinh Chung

fabrication yards

Obervation in

Environmental Inspection

Report dated 10 and

reminded in 25 August 2016

(Ref: DDIS/CW1A/0895

dated 01 September2016

and DDIS/CW1A/0939 dated

21 October 2016)

Ref: item 11f, table 1, EMP

of contractor CW1A

(4213A/CIPM-HDKT)

DDIS comments:Contractor need to remove this

concrete pile head to the storage of concrete waste in

the designated disposal area.

According to the close-report by contractor Ref.

CW1A/DDIS/0878 dated 07 November 2016, the close-

observation is not accepted since the bridge foundation

is not designated for temperary storage of concrete

waste. The temperary storage should contain separate

area with barricade. The last desination of concrete

storage should be in the approved disposal area by

DDIS.

Contractor reply date:

Concrete pile head on site Status: unclose

Page 86: Environmental Monitoring Report...ENVIRONMENTAL INSPECTION REPORT Period observation Deadline Package Location Weather Observers 13 July 2016 20 July 2016 CW1A 0 - 3+800 Sunny Ms

011 Location: Tuan Loc site -

Dinh Chung fabrication

yards

Obervation in

Environmental Inspection

Report dated 10 and

reminded in 25 August 2016

(Ref: DDIS/CW1A/0895

dated 01 September2016

and DDIS/CW1A/0939 dated

21 October 2016)

Ref: item 7g and 7h, table 1,

EMP of contractor CW1A

(4213A/CIPM-HDKT)

DDIS comments:Contractor must provide drip tray or

bund wall as requirement.

According to the close-report by contractor Ref.

CW1A/DDIS/0878 dated 07 November 2016, the close-

observation is not accepted since there is still no bund

wall or drip tray for oil tank.

Contractor reply date:

No drip tray for fuel spillage Status: unclose

Page 87: Environmental Monitoring Report...ENVIRONMENTAL INSPECTION REPORT Period observation Deadline Package Location Weather Observers 13 July 2016 20 July 2016 CW1A 0 - 3+800 Sunny Ms

015 Location: Hoang An site -

Tinh Thoi bridge

Obervation in

Environmental Inspection

Report dated 10 and

reminded in 25 August 2016

(Ref: DDIS/CW1A/0895

dated 01 September2016

and DDIS/CW1A/0939 dated

21 October 2016)

Ref: item 11f, table 1, EMP

of contractor CW1A

(4213A/CIPM-HDKT)

DDIS comments: Contractor need to remove this

concrete pile head to the storage of concrete waste in

the designated disposal area.

According to the close-report by contractor Ref.

CW1A/DDIS/0834 dated 13 September 2016, the close-

observation is not accepted since the bridge foundation

is not designated for temperary storage of concrete

waste. The temperary storage should contain separate

area with barricade. The last desination of concrete

storage should be in the approved disposal area by

DDIS.

Contractor reply date:

Concrete pile heads on site Status: unclose

024 Location: Tuan Loc site –

Linh Son bridge

Obervation in

Environmental Inspection

Report dated October 2016

(Ref: DDIS/CW1A/0939

dated 21 October 2016)

Ref: item 6, table 1, EMP of

contractor CW1A

(4213A/CIPM-HDKT)

DDIS comments: Contractor record and inform to DDIS

of your spoil/ecavated soil for dilivery to disposal area.

No recording of excavated soil transportation Status: unclose

Page 88: Environmental Monitoring Report...ENVIRONMENTAL INSPECTION REPORT Period observation Deadline Package Location Weather Observers 13 July 2016 20 July 2016 CW1A 0 - 3+800 Sunny Ms

025 Location: Linh Son bridge

Ref: item 11f, table 1, EMP

of contractor CW1A

(4213A/CIPM-HDKT)

DDIS comments:Contractor need to remove this

concrete pile head to the storage of concrete waste in

the designated disposal area.

Contractor reply date:

Concrete pile heads Status: unclose

028 Location: Hoang An

batching plant

Ref: item 11, table 1, EMP of

contractor CW1A

(4213A/CIPM-HDKT)

Full concrete sludge in settling pond system 22 December 2016

Dredging settling ponds for water flow

Page 89: Environmental Monitoring Report...ENVIRONMENTAL INSPECTION REPORT Period observation Deadline Package Location Weather Observers 13 July 2016 20 July 2016 CW1A 0 - 3+800 Sunny Ms

ENVIRONMENTAL INSPECTION REPORT

Period observation Deadline Package Location Weather Observers

12 December 2016 20 December

2016

CW1A 0 - 3+800 Rainy &

cloudy

Ms. Le Thi Phuong Loan – NES

Mr. Nguyen Van Cuong – EO

New observations

030 Location: Dinh Chung bridge

area

No collection of domestic waste 15 Decemer 2016

Employees collection, cleanup

031 Location: Linh Son

temperary bridge area

DDIS comments: Contractor should provide the drip tray

with bund-wall under the concrete pump machine and

the contaminated waste should be collected for

treatment.

Page 90: Environmental Monitoring Report...ENVIRONMENTAL INSPECTION REPORT Period observation Deadline Package Location Weather Observers 13 July 2016 20 July 2016 CW1A 0 - 3+800 Sunny Ms

Fuel leakage on the ground Status: unclose

032 Location: Dinh Chung bridge

area

Full of empty bags waste 15 Decemer 2016

Employees collection, cleanup

Page 91: Environmental Monitoring Report...ENVIRONMENTAL INSPECTION REPORT Period observation Deadline Package Location Weather Observers 13 July 2016 20 July 2016 CW1A 0 - 3+800 Sunny Ms

033 Location: Tinh Thoi bridge

area

Full concrete sludge in settling pond system 17 December 2016

Employees collection, cleanup

034 Location: Dinh Chung bridge

area

DDIS comments: Contractor need to remove this

concrete pile head to the storage of concrete waste in

the designated disposal area.

No storage of concrete pile heads Status: unclose

Page 92: Environmental Monitoring Report...ENVIRONMENTAL INSPECTION REPORT Period observation Deadline Package Location Weather Observers 13 July 2016 20 July 2016 CW1A 0 - 3+800 Sunny Ms

CW1B

Page 93: Environmental Monitoring Report...ENVIRONMENTAL INSPECTION REPORT Period observation Deadline Package Location Weather Observers 13 July 2016 20 July 2016 CW1A 0 - 3+800 Sunny Ms

CDIVIth sm•

Central Mekong Delta Connectivity Project - (CMDCP)

TA 7822-VIE, Loan 3013-VIE, Grant 0353-VIE

CDMSmith- WSP -YooshinConsultant JV

セwspセ@セ \xN^ sセ@

Group 5, Tan Tich Hamlet, TinhThoi Commune, Gao Lanh City, Dong Thap Province, Vietnam

Tel: (84) 067-3881-255; Fax: (84) 067-3881-256

Ref. No. : DD1S/CW1B/1443

Date : 15 August 2016

To: Mr. Xue Zhi Guo Acting Project Manager Contractor's Representative

Project Site Office: Group 5, Tan Tich Hamlet, Tinh Thai Commune, Cao Lanh City, Dong Thap Province, Vietnam; Tel: (84) 067-3881-255; Fax: (84) 067-3881-256

Subject: Package CW18- Environmental Inspection Report 13 Aug 2016

Dear Mr. Xue,

After our DDlS environmental inspection dated 10 and 13 August 2016, we hereby give you the

inspection report for your action. The deadline of your closed-observations is 25 August 2016. If you

fail to rectify, we will issue the Notice to Correct via official letter after 10 days issuing this letter.

Your prompt action is highly recommended.

Cc: - As above

Cao Lanh Bridge Project Manager, CIPM - Site Construction Team, CIPM

File: DDIS Consultant JV Office

Page 1 ofl

Attachment: Environmental Inspection Report 13 Aug 2016

Page 94: Environmental Monitoring Report...ENVIRONMENTAL INSPECTION REPORT Period observation Deadline Package Location Weather Observers 13 July 2016 20 July 2016 CW1A 0 - 3+800 Sunny Ms

Dự án Kết nối khu vực trung tâm Đồng bằng sông Cửu Long - (CMDCP)

TA 7822-VIE, Khoản vay 3013-VIE, Khoản viện trợ 0353-VIE

Liên danh Tư vấn CDM Smith - WSP –Yooshin Tổ 5, p Tân Tịch, Xã Tịnh Thới, TP Cao Lãnh, Tỉnh Đồng Tháp, Việt Nam

ĐT: (84) 067-3881-255; Fax: (84) 067-3881-256

__________________________________________________________

Trang 1 / 1

Số thư : DDIS/CW1B/1443 Ngày : 15/08/2016

Gửi đến: Ông Xue Zhi Guo Quyền Giám Đốc Dự án Đại diện Nhà thầu

VP Dự án: Tổ 5, p Tân Tịch, Xã Tịnh Thới, TP Cao Lãnh, Tỉnh Đồng Tháp, Việt Nam ĐT: (84) 067.352.6868 Fax: (84) 067.352.6969

Chủ đề: Gói CW1B – Báo cáo Kiểm tra Môi trường ngày 13/08/2016

Kính gửi ông Xue,

Sau khi Tư v n DDIS thực hiện kiểm tra môi trường ngày 10 và 13/08/2016, Tư v n gửi theo thư báo

cáo kiểm tra để Nhà thầu thực hiện. Hạn cuối để kết thúc việc thực hiện của Nhà thầu là ngày

25/08/2016. Nếu Nhà thầu không hoàn thành chỉnh sửa, Tư v n sẽ phát hành Thông báo Chỉnh sửa

bằng văn b n chính thức sau 10 ngày phát hành thư này.

Đề nghị Nhà thầu khẩn trương thực hiện.

Trân trọng,

{Đã ký}

Victoriano L. Hamlig

Kỹ Sư Thường Trú

Cc: - Như trên - Giám đốc dự án Cầu Cao Lãnh, CIPM - Nhóm qu n lý công trường, CIPM - Lưu: Liên danh TVGS - DDIS

Đính kèm: Báo cáo Kiểm tra Môi trường ngày 13/8/2016

Page 95: Environmental Monitoring Report...ENVIRONMENTAL INSPECTION REPORT Period observation Deadline Package Location Weather Observers 13 July 2016 20 July 2016 CW1A 0 - 3+800 Sunny Ms

Period observation Deadline Package Location Weather Observers

10, 13 August 2016 25 August

2016

CW1B 3+800 - 6+200 Cloudy Ms. Le Thi Phuong Loan – NES

Mr. Le Anh Tin – NES

Mr. Ngo Quoc Cuong – CW1B staff

No. Observation Issued Pictures by DDIS Environment Team Corrective pictures by Contractor

007 Location: Bridge 12

fabrication yards

Many metal wastes were

not stored properly.

Necessary action:

Contractor need to remove

this waste to outside of

contruction area.

Alternatively, contractor

need to provide the roof to

cover the weather impact

cause eroded metal to the

ground.

Page 96: Environmental Monitoring Report...ENVIRONMENTAL INSPECTION REPORT Period observation Deadline Package Location Weather Observers 13 July 2016 20 July 2016 CW1A 0 - 3+800 Sunny Ms

Many metals wastes locates on site without any

protection measure in Bridge 12 fabrication yards.

Date of action:

014 Location: Bridge #12

batching plant

Metal waste was not stored

properly in font of the Tuan

Loc subcontractor.

Necessary action:

Contractor need to remove

this metal to proper metal

waste storage. If this metal

still use on site, please

barricade and use

notification board for

information.

Metal waste on site in Tuan Loc office Date of action:

015 Location: Bridge #12 worker

accommodation

Many plastic wastes were

not collected to waste-bin.

Necessary action:

Contractor need to provide

waste-bin for solid waste in

this area and regularly

collect waste to waste-bin.

Waste in 624 worker accommodation Date of action:

Page 97: Environmental Monitoring Report...ENVIRONMENTAL INSPECTION REPORT Period observation Deadline Package Location Weather Observers 13 July 2016 20 July 2016 CW1A 0 - 3+800 Sunny Ms

016 Location: 624 worker

accommodation

Contractor did not remove

waste for waste collection.

Necessary action:

Contractor need to provide

additional waste-bin for

solid waste in this area and

regularly collect waste to

waste-bin.

Full waste in the waste-bin Date of action:

017 Location: 624 worker

accommodation

There is not efficient

drainage sytem in the

worker accomodation due

to the wastewater discharge

from CRBC office.

Necessary action:

Contractor CRBC must use

the tube to avoid the

discharge of wastewater

clogging.

Water spreading the 624 worker accommodation Date of action:

Page 98: Environmental Monitoring Report...ENVIRONMENTAL INSPECTION REPORT Period observation Deadline Package Location Weather Observers 13 July 2016 20 July 2016 CW1A 0 - 3+800 Sunny Ms

018 Location: Bridge 12 office

NO proper waste-bin for

waste collection.

Necessary action:

Contractor should remove

these wastes to proper

storage.

Full waste in the bridge 12 office Date of action:

019 Location: Bridge 12 worker

accommodation

Many water tanks for

washing and showering

contain many mosses which

is unsafe for worker health.

Necessary action:

Contractor should require to

regularly clean and remove

mosses in the bottom of

water tank.

Water tank is dirty in Bridge 12 worker

accommodation.

Date of action:

Page 99: Environmental Monitoring Report...ENVIRONMENTAL INSPECTION REPORT Period observation Deadline Package Location Weather Observers 13 July 2016 20 July 2016 CW1A 0 - 3+800 Sunny Ms

020 Location: Tuan Loc

subcontractor office

Many fuel drums were not

protected with roof and

impermable layer to avoid

leaking and spillage.

Necessary action:

Contractor must provide the

roof and drip tray/pan to

avoid leakage and spillage

due to mishandling or

weather impact.

No drip tray or drip pan Date of action:

021 Location: Bridge 12 office

Tuan Loc worker

accomodation keep good

housekeeping and clean

environment for worker

living area.

Good performance - No action necessary

Clean living area for workers

Page 100: Environmental Monitoring Report...ENVIRONMENTAL INSPECTION REPORT Period observation Deadline Package Location Weather Observers 13 July 2016 20 July 2016 CW1A 0 - 3+800 Sunny Ms

022 Location: Tuan Loc worker

accommodation

The drainage area in front of

toilets are efficient and

maintain clean. The water

tank was removed the dirt

and algea in the bottom.

The Tuan Loc subcontractor

should maintain this good

performance.

Good performance - No action necessary

Clean water tank and toilets area

Page 101: Environmental Monitoring Report...ENVIRONMENTAL INSPECTION REPORT Period observation Deadline Package Location Weather Observers 13 July 2016 20 July 2016 CW1A 0 - 3+800 Sunny Ms

023 Location: Bridge#12 worker

accommodation

The fence had installed

between the worker living

area and local residentials.

Good performance - No action necessary

New fence installation

Page 102: Environmental Monitoring Report...ENVIRONMENTAL INSPECTION REPORT Period observation Deadline Package Location Weather Observers 13 July 2016 20 July 2016 CW1A 0 - 3+800 Sunny Ms

1/2zyxwvutsrqponmlkjihgfedcbaZYXWVUTSRQPONMLKJIHGFEDCBA

- As above;

- Cao Lanh Bridge Project Manager, Cuu Long CIPM;

- Site Construction Team of CIPM;

- File: CWIB Contractor JV Office.

cc:

Attached: Environmental reply file posterior to corrective actions (3 copies)

anager of Package CWIB, Central Mekong Delta Region Connectivity Project

l~

Pursuant to the Engineer's letterzyxwvutsrqponmlkjihgfedcbaZYXWVUTSRQPONMLKJIHGFEDCBANo.DDIS/CWIB/1443 dated 15 August 2016 dated Environmental

Inspection Report 13 Aug 2016, the Contractor has corrected the mentioned environmental issues and

now would like to respond to you as in the attachment.

Your review and instruction will be highly appreciated.

Yours sincerely,

Dear Sir,

Subject: Pacl{age CW1B, Central Mekong Delta Region Connectivity Project

Reply to the Letter on Checking the Environmental Report Dated 10-13 August 2016

JV CONSULTANT OF CDM SMITH ASSOCIATES INC. - WSP FINLAND LIMITED

YOOSHIN ENGINEERING CORPORATION (JV OF CDM, WSP & YOOSHINGroup 5, Tan Tich Hamlet, Tinh Thoi Commune, Cao Lanh City, Dong Thap Province, Vietnam

Cc: Mr. Anders Loof - Project Manager

To: Mr. Victoriano Hamlig - Resident Engineer

Date: August 24,20] 6Ref. No.: CWIB/DDISIl378

CHINA ROAD AND BRIDGE CORPORATION AND VINACONEX E&C

JOINT VENTURE (CRBC-VINACONEX E&C JV)

Page 103: Environmental Monitoring Report...ENVIRONMENTAL INSPECTION REPORT Period observation Deadline Package Location Weather Observers 13 July 2016 20 July 2016 CW1A 0 - 3+800 Sunny Ms

2/2

- Nhutren;- Gi{uTIzyxwvutsrqponmlkjihgfedcbaZYXWVUTSRQPONMLKJIHGFEDCBAd6e du an du Cao Lanh, Ciru Long CIPM;

- Nh6m quan Iy cong tnrong cua CIPM;

Luu: Van phong Thftu ehinh CW1B.

CC:

XUEZHIGUO

Quyen Giam 06c D\l' an G6i ThAu CWIB, D\l' An K~t N6i KI1U V\rc Trung Tam D6ng B~ng Me Kong

Dlnh kern: File hlnh anh h6i Gapmoi tnrong sau khi khac phuc (3 ban)

{Da ky}

Q. Ciam d6c dl}' an

Tran trong,

Nha thau danh gia cao SlJ xem xet va cua eng,

Thua ong,

Tham chieu thu s6 DDIS/CWIBI1443 ngay 15 thang 8 nam 2016 cua Tu vc1nv~ viec bao cao cong tac

kiSm tra l110itruong ngay 10-13 thang 8 narn 2016, Nha thau oa ti~n hanh kh~c phuc cac v~n o~duoc

neu ra trong thu va nay xin h6i dap lai ong rum trong file dinh kern.

V/v: G6i Thfiu CWIB, DO'An K~t N&iKim VO'c Trung Tam Bang B~ng Me Kong

Hai Bap thu' Ki~m Tra Bao Cao Moi Tru'o'ng Ngay 10 -13 Thang 8 Nam 2016

CDM Smith - WSP - Yooshin Consultant JVT6 5, Ap Tan Tieh, xs Tinh Thai, TP Cao Lanh, Tinh D6ng Thap, Vi~t NaillDT: (84) 067-3881-255; Fax: (84) 067-3881.-256

Cc: Ong. Anders Loof - Giam d&c d\l' an

B~n: Ong. Victoriano Hamlig - Ky su' thuong tru

Ngay: 24/08/2016TIm s6: CWIB/DDISI1378

CHINA ROAD AND BRIDGE CORPORATION AND VINACONEX E&C.~

~ JOINT VENTURE (CRBC-VINACONEX E&C JV)

Page 104: Environmental Monitoring Report...ENVIRONMENTAL INSPECTION REPORT Period observation Deadline Package Location Weather Observers 13 July 2016 20 July 2016 CW1A 0 - 3+800 Sunny Ms

CHINA ROAD AND BRIDGE CORPORATION AND VINACONEX E&C

JOINT VENTURE CRBC-VINACONEX E&C JV

1/4

Period observation Deadline Package Location Weather Observation

10, 13 August 2016 25 August

2016

CW1B 3+800 -

6+200

Cloudy Ms. Le Thi Phuong Loan –

NES

Mr. Le Anh Tin – NES

Mr. Ngo Quoc Cuong –

CW1B staff

Observation Issued Pictures by DDIS Environment

Team

Corrective pictures by Contractor

Location: Bridge

12 fabrication

yards

Many metal wastes

were not stored

properly.

Necessary action:

Contractor need to

remove this waste

to outside of

contruction area.

Alternatively,

contractor need to

provide the roof to

cover the weather

impact cause

eroded metal to

the ground.

Many metals wastes locates on site

without any protection measure in Bridge

12 fabrication yards.

Date of action: 18th August 2016

Location: Bridge

#12 batching plant

Metal waste was

not stored properly

in font of the Tuan

Loc subcontractor.

Necessary action:

Contractor need to

remove this metal

to proper metal

waste storage. If

this metal still use

on site, please

barricade and use

notification board

for information.

Metal waste on site in Tuan

Loc office

Date of action: 18th August 2016

Page 105: Environmental Monitoring Report...ENVIRONMENTAL INSPECTION REPORT Period observation Deadline Package Location Weather Observers 13 July 2016 20 July 2016 CW1A 0 - 3+800 Sunny Ms

CHINA ROAD AND BRIDGE CORPORATION AND VINACONEX E&C

JOINT VENTURE CRBC-VINACONEX E&C JV

2/4

Location: Bridge

#12 worker

accommodation

Many plastic

wastes were not

collected to waste-

bin.

Necessary action:

Contractor need to

provide waste-bin

for solid waste in

this area and

regularly collect

waste to waste-bin.

Waste in 624 worker accommodation Date of action: 18th August 2016

Location: 624

worker

accommodation

Contractor did not

remove waste for

waste collection.

Necessary action:

Contractor need to

provide additional

waste-bin for solid

waste in this area

and regularly

collect waste to

waste-bin.

Full waste in the waste-bin Date of action: 18th August 2016

Location: 624

worker

accommodation

There is not

efficient drainage

sytem in the

worker

accomodation due

to the wastewater

discharge from

CRBC office.

Necessary action:

Contractor CRBC

must use the tube

to avoid the

discharge of

wastewater

clogging.

Water spreading the 624 worker

accommodation

Date of action: 18th August 2016

Page 106: Environmental Monitoring Report...ENVIRONMENTAL INSPECTION REPORT Period observation Deadline Package Location Weather Observers 13 July 2016 20 July 2016 CW1A 0 - 3+800 Sunny Ms

CHINA ROAD AND BRIDGE CORPORATION AND VINACONEX E&C

JOINT VENTURE CRBC-VINACONEX E&C JV

3/4

Location: Bridge

12 office

NO proper waste-

bin for waste

collection.

Necessary action:

Contractor should

remove these

wastes to proper

storage.

Full waste in the bridge 12 office Date of action: 18th August 2016

Location: Bridge

12 worker

accommodation

Many water tanks

for washing and

showering contain

many mosses

which is unsafe for

worker health.

Necessary action:

Contractor should

require to

regularly clean

and remove

mosses in the

bottom of water

tank.

Water tank is dirty in Bridge 12 worker

accommodation.

Date of action: 17th August 2016

Location: Tuan

Loc subcontractor

office

Many fuel drums

were not protected

with roof and

impermable layer

to avoid leaking

and spillage.

Necessary action:

Contractor must

provide the roof

and drip tray/pan

to avoid leakage

and spillage due to

mishandling or

weather impact.

Not finish yet. The subcontractor on improve

it, when finish will reply to consultant

No drip tray or drip pan Date of action:

Page 107: Environmental Monitoring Report...ENVIRONMENTAL INSPECTION REPORT Period observation Deadline Package Location Weather Observers 13 July 2016 20 July 2016 CW1A 0 - 3+800 Sunny Ms

CHINA ROAD AND BRIDGE CORPORATION AND VINACONEX E&C

JOINT VENTURE CRBC-VINACONEX E&C JV

4/4

Location: Bridge

12 office

Tuan Loc worker

accomodation keep

good

housekeeping and

clean environment

for worker living

area.

Good performance - No action necessary

Clean living area for workers

Location: Tuan

Loc worker

accommodation

The drainage area

in front of toilets

are efficient and

maintain clean.

The water tank

was removed the

dirt and algea in

the bottom. The

Tuan Loc

subcontractor

should maintain

this good

performance.

Clean water tank and toilets area Dade of action: 18th August 2016

Location:

Bridge#12 worker

accommodation

The fence had

installed between

the worker living

area and local

residentials.

New fence installation

Page 108: Environmental Monitoring Report...ENVIRONMENTAL INSPECTION REPORT Period observation Deadline Package Location Weather Observers 13 July 2016 20 July 2016 CW1A 0 - 3+800 Sunny Ms

CDMth sm•

Central Mekong Delta Connectivity Project - (CMDCP)

TA 7822-VIE, Loan 3013-VIE, Grant 0353-VIE

COM Smith - WSP-YooshinConsultant JV

ィwspセ@\ヲG ッッ ウセ@

Group 5, Tan Tich Hamlet, TinhThoi Commune, Cao Lanh City, Dong Thap Province, Vietnam

Tel: (84) 067-3881-255; Fax: (84) 067-3881 -256

Ref. No. : DDIS/CW1 B/1505

Date : 15 October 2016

To: Mr. Xue Zhi Guo Acting Project Manager Contractor's Representative

Project Site Office: Group 5, Tan Tich Hamlet, Tinh Thoi Commune, Cao Lanh City, Dong Thap Province, Vietnam; Tel: (84) 067-3881-255; Fax: (84) 067-3881 -256

Subject: Package CW18 - Environmental Inspection Report 05 Oct 2016

Dear Mr. Xue,

During the DDIS Environmental Team's visit and inspection to your construction site on the above

date, was witnessed that you fail to comply with your obligations and is evidenced by the attached

Environmental Inspection Report:

A - Repeat Observations - Notice to Correct

This letter serves as a notice to correct the repeat observation in the attached Environmental

Inspection Report, in accordance with sub-clause 15.1 of the General Condition of Contract:

Observation Nos: 007,014,015,020 - 008 in Ref. No. DDIS/CW1B/1443 dated 15 August

2016

These observations were issued in a prior Environmental Inspection Report but you have not taken

the required action. You are required to make good the failure and remedy it within 7 days.

8 - New Observations

During the DDIS visit and inspection to your construction site, the DDIS Environmental Tea·m also

made new observations as per the attached:

Observation Nos: 024 - 034

We will appreciate your cooperation to timely correct as per these comments and your report to our

office within the requested deadline. Your prompt actions on the matter would be highly appreciated.

Cc: - As above

Cao Lanh Bridge Project Manager, CIPM Site Construction Team, CIPM File: DDIS Consultant JV Office

Page 1 ofl

Attachment: Environmental Inspection Report 05 Oct 2016

Page 109: Environmental Monitoring Report...ENVIRONMENTAL INSPECTION REPORT Period observation Deadline Package Location Weather Observers 13 July 2016 20 July 2016 CW1A 0 - 3+800 Sunny Ms

CDIVIth Sm1

Dl;P an kセエ@ n6i khu Vl;J'C trung tam Df>ng 「セョァ@ song CU>u Long - (CMDCP)

TA 7822-VIE, Khoan vay 3013-VIE, Khoan カゥセョ@ trq 0353-VIE

Lien danh TU' カセョ@ COM Smith - WSP-Yooshin

セwspセ@T6 5, Ap Tan Tich, Xa Tinh Th&i, TP Cao Lanh, Tinh 8ong Thap, Vi$t Nam

<?oos/:;.....

s6thU'

Ngay

Gui den:

: DDIS/CW18/1505

: 15/10/2016

Ong Xue Zhi Guo qオケセョ@ Giam 86c Dl,J' an 8c;ii di$n Nha th§u

8T: (84) 067-3881-255; Fax: (84) 067-3881 -256

VP Dl,J' an: T6 5, Ap Tan Tich, Xa Tinh Th&i, TP Cao Lanh, Tinh 86ng Thap, Vi$t Nam

8T: (84) 067.352.6868 Fax: (84) 067.352.6969

Chu 、セZ@ G6i CW1B- Bao cao kゥセュ@ tra M6i tnvO>ng ngay 05/10/2016

Kinh gui 6ng Xue,

Trong thai gian doi ngO nhan vien m6i trU'ang TU' v!in den kiem tra hi$n trU'ang thi c6ng cua Nha th§u :

vao ngay neu tren, chung t6i phat hi$n Nha th§u kh6ng thl,J'C hi$n theo nghia Vl:J cua Nha th§u va dU'Q'C

chung minh v&i Bao cao Kiem tra M6i trU'ang dinh kern:

A- nィセ」@ ャセゥ@ cac van 、セ@ theo doi- Thong bao Chinh sll'a

Van ban nay nhU' Ia mot thong bao chinh sua cac vfln 、セ@ theo d6i dU'Q'C nhac lc;ii trong Bao cao Kiem

tra M6i trU'ang dinh kern theo tieu khoan 15.1 thuoc 8i€!u khoan chung cua Hqp dbng:

Vfln d€! s6: 007,014,015,020-008 trong van ban s6 DDIS/CW1B/1443 ky ngay 15/08/2016

NhO>ng vfln d€! nay da phat hanh trong Bao cao Kiem tra M6i tmang trU'&c d6 nhU'ng Nha th§u カセョ@

kh6ng tien hanh thl,J'c hi$n theo yeu du. Xセ@ nghi Nha th§u dam bao thl,J'c hi$n t6t cac v!in d€! chU'a hoan

thanh va chinh sua trong vong 07 ngay.

B - Cac van 、セ@ theo doi m&i

Trong khi TU' v!in den kiem tra hi$n tmang thi c6ng cua Nha th§u, nh6m nhan vien m6i trU'ang TU' v!in

cOng l;fip mot s6 vfln d€! m&i nhU' dinh kern:

Vfln d€! s6: 024 - 034

Chung t6i se danh gia cao Sl,J' hqp tac cua Nha th§u khi thl,J'C hi$n chinh sua dung hc;in cac y kien nay

va trlnh bao cao cua Nha th§u den van phong TU' vfln trong thai hc;in yeu c§u. 8€! nghi Nha thau ォィセョ@

trU'O'ng thl,J'C hi$n vfln d€! nay.

T ran trc;>ng ,

{£Jtj ky}

nァオケセョ@ tィセ@ Vli'O'ng Ph6 Giam d6c Dl,J' an

Cc: - Nhll' tren

Giam doc dtY an c§u Cao Uinh, CIPM - Nh6m quan IY cong tmcmg, CIPM - LU'u: Lien danh TVGS - DDIS

8inh kern: Bao cao ォゥ セ ュ@ tra moi trll'cmg ngay 05/10/2016

Trang 1/1

Page 110: Environmental Monitoring Report...ENVIRONMENTAL INSPECTION REPORT Period observation Deadline Package Location Weather Observers 13 July 2016 20 July 2016 CW1A 0 - 3+800 Sunny Ms

A. Repeated observations

No. Observations Comments and Resolution

007 Location: Bridge 12

fabrication yards

Obervation in

Environmental Inspection

Report dated dated 12 July

2016 and reminded in 10

and 13 August 2016 (Ref:

DDIS/CW1B/1443 dated 15

August 2016)

Ref: item 11, table 1, EMP of

contractor CW1B

(3712A/CIPM-HDKT)

DDIS comments: Contractor need to remove this waste

to outside of contruction area. Alternatively, contractor

need to provide the roof to cover the weather impact

cause eroded metal to the ground.

Contractor reply date:

Many metals wastes locates on site without any

protection measure in Bridge 12 fabrication yards.

Status: unclose

014 Location: Bridge #12

batching plant

Obervation in

Environmental Inspection

Report dated 10 and 13

August 2016 (Ref:

DDIS/CW1B/1443 dated 15

August 2016)

DDIS comments: Contractor need to remove this metal

to proper metal waste storage. If this metal still use on

site, please barricade and use notification board for

information.

Contractor reply date:

Page 111: Environmental Monitoring Report...ENVIRONMENTAL INSPECTION REPORT Period observation Deadline Package Location Weather Observers 13 July 2016 20 July 2016 CW1A 0 - 3+800 Sunny Ms

Ref: item 11, table 1, EMP of

contractor CW1B

(3712A/CIPM-HDKT)

Metal waste on site in Bridge 12 batching plant Status: unclose

015 Location: Bridge #12 worker

accommodation

Obervation in

Environmental Inspection

Report dated 10 and 13

August 2016 (Ref:

DDIS/CW1B/1443 dated 15

August 2016)

Ref: item 11f and 17q, table

1, EMP of contractor CW1B

(3712A/CIPM-HDKT)

DDIS comments: Contractor need to provide waste-bin

for solid waste in this area and regularly collect waste to

waste-bin.

Contractor reply date:

Waste in 624 worker accommodation Status: unclose

020 Location: Tuan Loc

subcontractor office

Obervation in

Environmental Inspection

Report dated 10 and 13

August 2016 (Ref:

DDIS/CW1B/1443 dated 15

August 2016)

Ref: item 7g, table 1, EMP of

contractor CW1B

(3712A/CIPM-HDKT)

DDIS comments: Contractor must provide the roof and

drip tray/pan to avoid leakage and spillage due to

mishandling or weather impact.

Contractor reply date:

No drip tray or drip pan Status: unclose

Page 112: Environmental Monitoring Report...ENVIRONMENTAL INSPECTION REPORT Period observation Deadline Package Location Weather Observers 13 July 2016 20 July 2016 CW1A 0 - 3+800 Sunny Ms

Period observation Deadline Package Location Weather Observers

05 October 2016 24 Oct 2016 CW1B 3+800 - 6+200 Cloudy Ms. Le Thi Phuong Loan – NES

Mr. Le Anh Tin – NES

Mr. Ngo Quoc Cuong – Contractor staff

B. New observations

No. Observation Issued Pictures by DDIS Environment Team Resolution

024 Location: Bridge 12 site near

Pier 22

There are many materials

and debris waste on site.

Ref: item 11f, table 1, EMP

of contractor CW1B

(3712A/CIPM-HDKT)

DDIS comments: Contractor need to rearrange

materials and remove the debris out of site.

Contractor reply date:

Poor housekeeping Status: unclose

025 Location: Bridge 12 site near

Pier 23 and fabrication yard

Some fuel leakages on the

ground cause the soil

contamination.

Ref: item 7h, table 1, EMP of

contractor CW1B

(3712A/CIPM-HDKT)

DDIS comments: Contractor must collect this

contanimated waste to the hazardous waste storage

and treat by authorized hazardous treatment company.

Contractor reply date:

Page 113: Environmental Monitoring Report...ENVIRONMENTAL INSPECTION REPORT Period observation Deadline Package Location Weather Observers 13 July 2016 20 July 2016 CW1A 0 - 3+800 Sunny Ms

Soil contamination by fuel leakage Status: unclose

026 Location: Bridge 12

fabrication yard

After heavy rain, the access

road to fabrication is slipery

and migh cause danger for

workers.

Ref: Clause 4.15a, contractor

CW1B (3712A/CIPM-HDKT)

DDIS comments: Contractor should repair the access

road to avoid slipery condition during rainy season.

Contractor reply date:

Slipery access to Bridge 12 fabrication yard Status: unclose

027 Location: Bridge 12 batching

plant

The settling tank is full of

concrete sludge.

Ref: item 10c, table 1, EMP

of contractor CW1B

(3712A/CIPM-HDKT)

DDIS comments: Contractor should remove this

concrete waste in the settling tank.

Contractor reply date:

Full concrete sludge in Bridge 12 settling tank Status: unclose

Page 114: Environmental Monitoring Report...ENVIRONMENTAL INSPECTION REPORT Period observation Deadline Package Location Weather Observers 13 July 2016 20 July 2016 CW1A 0 - 3+800 Sunny Ms

028 Location: Bridge 12 batching

plant

The wastewater from

washing of concrete truck

run to the adjacent area.

Ref: item 10b, table 1, EMP

of contractor CW1B

(3712A/CIPM-HDKT)

DDIS comments: Contractor must close the access of

wastewater to the adjacent area. All contaminated

wastewater in this area should be recollect to the

settling tank.

Contractor reply date:

Improper discharge of wastewater Status: unclose

029 Location: Bridge 12 worker

accomodation

Many domestic wastes are

not collected to the waste

storage area.

Ref: item 11f and 17q, table

1, EMP of contractor CW1B

(3712A/CIPM-HDKT)

DDIS comments: Contractor remove all domestic to

waste-bin, in order to keep good housekeeping.

Contractor reply date:

Full domestic waste in worker accomodation Status: unclose

Page 115: Environmental Monitoring Report...ENVIRONMENTAL INSPECTION REPORT Period observation Deadline Package Location Weather Observers 13 July 2016 20 July 2016 CW1A 0 - 3+800 Sunny Ms

030 Location: Bridge 12 worker

accomodation

Burning waste is prohibited.

Ref: item 3m, table 1, EMP

of contractor CW1B

(3712A/CIPM-HDKT)

DDIS comments: Contractor must clean the burning

waste and re-train for workers of project environmental

regulations.

Contractor reply date:

Burning waste Status: unclose

031 Location: Bridge#12 office

Fuel spillage to water

drainage in bridge 12 office.

Ref: item 7h, table 1, EMP of

contractor CW1B

(3712A/CIPM-HDKT)

DDIS comments: Contractor must check the fuel spillage

and treat of contaminated wastewater in the drainage

before entering to public waterbody.

Contractor reply date:

Water contamination Status: unclose

Page 116: Environmental Monitoring Report...ENVIRONMENTAL INSPECTION REPORT Period observation Deadline Package Location Weather Observers 13 July 2016 20 July 2016 CW1A 0 - 3+800 Sunny Ms

032 Location: Bridge 12

fabrication yard

Some pieces of roof are

missing.

Ref: item 5l, table 1, EMP of

contractor CW1B

(3712A/CIPM-HDKT)

DDIS comments: Contractor should maintain and fully

cover the roof of the fuel tank storage.

Contractor reply date:

Inadequate roof of hazardous fuel storage Status: unclose

033 Location: Tuan Loc site near

Pier 17 and Pier 18

Contractor wash the

concrete basket in the Tien

river.

Ref: item 10, table 1, EMP of

contractor CW1B

(3712A/CIPM-HDKT)

DDIS comments: Contractor should not wash the

remaining concrete waste and its wastewater to the

Tien river. These wastes should be clean and remove to

settling tank for treatment.

Contractor reply date:

Clean water tank and toilets area Status: unclose

Page 117: Environmental Monitoring Report...ENVIRONMENTAL INSPECTION REPORT Period observation Deadline Package Location Weather Observers 13 July 2016 20 July 2016 CW1A 0 - 3+800 Sunny Ms

034 Location: Tuan Loc site near

Pier 17 and Pier 18

Fuel spillage and leakage

from crane spead on the

barges and might

contaminate the river water.

Ref: item 7, table 1, EMP of

contractor CW1B

(3712A/CIPM-HDKT)

DDIS comments: Contractor must check the crane

function to avoid fuel leakage. The drip pan/tray must

be avaiable on site for any equipment using fuel.

Contractor must clean this fuel leakage by rags and

these rags are collected as hazardous waste.

Contractor reply date:

Clean water tank and toilets area Status: unclose

Page 118: Environmental Monitoring Report...ENVIRONMENTAL INSPECTION REPORT Period observation Deadline Package Location Weather Observers 13 July 2016 20 July 2016 CW1A 0 - 3+800 Sunny Ms

CHINA ROAD AND BRIDGE CORPORATION AND VINACONEX E&C

JOINT VENTURE (CRBC-VINACONEX E&C JV)

Ref. No.: CWIBIDDISI1453 Date: October 22, 2016

To; Mr. Victoriauo Hamlig - Resident Engineer

Cc; Mr. Anders Loof - Project Manager

JY CONSULT ANT OF CDM SMITH ASSOCIATES INC. - WSP FINLAND LIMITED

VOOSHIN ENGINEERING CORPORATION (JY OF CDM, WSP & YOOSHIN) Group 5, Tan Tich Hamlet, Tjnh Thai Commune, Cao Lanh City, Dong Thap Province, Vietnam

Subject: Package CWIB, Central Mekong Delta Region Connectivitv Project

Reply to the Letter on Checking the Environmental Rerort Dated 05 October 2016

Dear Sir,

Pursuant to the Engineer's letter No.DDIS/CW1B!1505 dated 15 October 2016 regarding

Environmental Inspection Report on 05 October 2016, the Contractor has corrected the mentioned

environmental issues and now would like to respond to you as in the attached file.

Your review and further instruction will be highly appreciated.

Yours sincerely,

Acting Project Manager iセ@

セL@

セ@ェォh ゥNゥB@ ゥhBセc B BGPZGIセ01( uiセ@ f IJITHA ;.

セ@ . 1 !O x • >'i XA) \ ).'

|セPBL@ Wi;ll セ j N IG i o@ . . . . セLiM」 N@ £tJng ·fl:.oj0ct Manager of Package CW lB, Central Mekong Delta Region ConnectIvIty Project

:;-". ⦅ゥGNセQQ@ ェMセB@ .;Y .,- -- <:;/

Attached: Reply to the Letter on Checking the Environmental Report Dated 05 October 2016 (3 copies)

cc:

- As above;

- Cao Lanh Bridge Project Manager, Cuu Long CIPM;

- Site Construction Team of CIPM;

- File: CW! B Contractor JV Office.

1/2

Page 119: Environmental Monitoring Report...ENVIRONMENTAL INSPECTION REPORT Period observation Deadline Package Location Weather Observers 13 July 2016 20 July 2016 CW1A 0 - 3+800 Sunny Ms

CHINA aOAI) AND fJRIDC£ CQl"tPOHATlON AND V INACO.N£X E&C

JOI NT VENTURI': (CRnCNINACON£X £&C JV)

Thlf S5: CWl ll/DDISII4S} Ngay: 2211 0120 16

dセョ Z@ Ong. Victoriano HflUllig - Kji suo thm"rng tn!

C c: Ong. Andel's Loof - Giam d6c dl.r an

CDM Smith - WSI' - Yooshin Consultant JV T6.5, Ap Tiin Tieh, X:\ Tinh Th&i, TP C IO L1\nh, Tinh D6ng, Thflp, Vi?1 Naill

DT: (84 ) 067-388 ! -255; Fax: (84) 067-3881-256

V/v : G6i ThAu_ CWIB, Du' An Ket N6i Kim VlfC Trung Tfim D6ng B:1ng Me Kong

H6i IHp thu' kゥセュ@ Tnt Bao Cao MOi TI'u'<mg Ngny 05 Thang 10 Ni'im 2016

Thua 6ng,

TlIam chiEu tlm sa DDIS/CWIBI150S ngay 15 thang 10 nilm 2016 cua Tu vfin カセ@ カ ゥ セ」@ bac CflO c6ng tac ki€m tra mai tmang ngay 05 thang 10 nam 2016, Nha thAu eta エゥ セ ョ@ hanh kllaCph\-lc cae vfi n dS dll'Q'c

m!u ra trong tbu va nay xin h6i Gap l;:ti ang nhu trong file dfnh kemo

Nha thill (tanh gia cao sv xem xet va chi 、セッ@ them Clla 6ng,

Tran t.n;mg,

Q. Gi3In d6c dl)° an

{Oaky)

XUEZHIGUO Quy€n Giam d6c OI,l" an G6i Thau CW IB, Dv An KSt N6i Khu V!fC Trung Tam D6ng Bimg Me Kong

Olnh kem; H6i dap 1Iur ki&nl Ira baa cao m6i tll1ang ngay 05 Ih{lllg lO nam 20 16 (03 ban)

cc:

Nhu Iren;

Giam d6e d\f an cAl! Cao Uinh , Cuu Long CJPM;

Nh6m quo'lIl Iy e6ng Lnn'mg eua CIPM;

Luu: Vtin phbng Thau ehlnh CWI B,

212

Page 120: Environmental Monitoring Report...ENVIRONMENTAL INSPECTION REPORT Period observation Deadline Package Location Weather Observers 13 July 2016 20 July 2016 CW1A 0 - 3+800 Sunny Ms

A. Repeated observations No. Observations  Comments and Resolution 007  Location: Bridge 12 

fabrication yards  Obervation in Environmental Inspection Report dated dated 12 July 2016 and reminded in 10 and 13 August 2016 (Ref: DDIS/CW1B/1443 dated 15 August 2016)    Ref: item 11, table 1, EMP of contractor CW1B (3712A/CIPM‐HDKT) 

  

DDIS comments: Contractor need to remove this waste to outside of contruction area. Alternatively, contractor need to provide the roof to cover the weather impact cause eroded metal to the ground. 

   

    Contractor reply date: 20th October 2016  

Many metals wastes locates on site without any protection measure in Bridge 12 fabrication yards. 

Status: unclose 

Page 121: Environmental Monitoring Report...ENVIRONMENTAL INSPECTION REPORT Period observation Deadline Package Location Weather Observers 13 July 2016 20 July 2016 CW1A 0 - 3+800 Sunny Ms

014  Location: Bridge #12 batching plant  Obervation in Environmental Inspection Report dated 10 and 13 August 2016 (Ref: DDIS/CW1B/1443 dated 15 August 2016)   Ref: item 11, table 1, EMP of contractor CW1B (3712A/CIPM‐HDKT) 

DDIS comments: Contractor need to remove this metal to proper metal waste storage. If this metal still use on site, please barricade and use notification board for information. 

       Contractor reply date: 20th October 2016 

Metal waste on site in Bridge 12 batching plant  Status: unclose 

Page 122: Environmental Monitoring Report...ENVIRONMENTAL INSPECTION REPORT Period observation Deadline Package Location Weather Observers 13 July 2016 20 July 2016 CW1A 0 - 3+800 Sunny Ms

015  Location: Bridge #12 worker accommodation  Obervation in Environmental Inspection Report dated 10 and 13 August 2016 (Ref: DDIS/CW1B/1443 dated 15 August 2016)  Ref: item 11f and 17q, table 1, EMP of contractor CW1B (3712A/CIPM‐HDKT) 

DDIS comments: Contractor need to provide waste‐bin for solid waste in this area and regularly collect waste to waste‐bin. 

Contractor reply date:20th October 2016 Waste in 624 worker accommodation  Status: unclose 

020  Location: Tuan Loc subcontractor office  Obervation in Environmental Inspection Report dated 10 and 13 August 2016 (Ref: DDIS/CW1B/1443 dated 15 August 2016) Ref: item 7g, table 1, EMP of contractor CW1B (3712A/CIPM‐HDKT) 

DDIS comments: Contractor must provide the roof and drip tray/pan to avoid leakage and spillage due to mishandling or weather impact. Contractor reply date: 

 No drip tray or drip pan  Status: unclose 

 

 

Page 123: Environmental Monitoring Report...ENVIRONMENTAL INSPECTION REPORT Period observation Deadline Package Location Weather Observers 13 July 2016 20 July 2016 CW1A 0 - 3+800 Sunny Ms

 

Period observation  Deadline  Package  Location  Weather Observers 05 October 2016  24 Oct 2016  CW1B  3+800 ‐ 6+200  Cloudy  Ms. Le Thi Phuong Loan – NES 

Mr. Le Anh Tin – NES Mr. Ngo Quoc Cuong – Contractor staff 

B. New observations No. Observation  Issued Pictures by DDIS Environment Team  Resolution 024  Location: Bridge 12 site near 

Pier 22  There are many materials and debris waste on site.   Ref: item 11f, table 1, EMP of contractor CW1B (3712A/CIPM‐HDKT) 

DDIS comments: Contractor need to rearrange materials and remove the debris out of site. Contractor reply date: 

Poor housekeeping  Status: unclose 025  Location: Bridge 12 site near 

Pier 23 and fabrication yard  Some fuel leakages on the ground cause the soil contamination.    Ref: item 7h, table 1, EMP of 

DDIS comments: Contractor must collect this contanimated waste to the hazardous waste storage and treat by authorized hazardous treatment company. Contractor reply date: 20th October 2016  

Page 124: Environmental Monitoring Report...ENVIRONMENTAL INSPECTION REPORT Period observation Deadline Package Location Weather Observers 13 July 2016 20 July 2016 CW1A 0 - 3+800 Sunny Ms

contractor CW1B (3712A/CIPM‐HDKT) 

Soil contamination by fuel leakage  Status: unclose 026  Location: Bridge 12 

fabrication yard  After heavy rain, the access road to fabrication is slipery and migh cause danger for workers.  Ref: Clause 4.15a, contractor CW1B (3712A/CIPM‐HDKT) 

DDIS comments: Contractor should repair the access road to avoid slipery condition during rainy season. 

 Contractor reply date: 20th October 2016 

Slipery access to Bridge 12 fabrication yard  Status: unclose 

Page 125: Environmental Monitoring Report...ENVIRONMENTAL INSPECTION REPORT Period observation Deadline Package Location Weather Observers 13 July 2016 20 July 2016 CW1A 0 - 3+800 Sunny Ms

027  Location: Bridge 12 batching plant  The settling tank is full of concrete sludge.  Ref: item 10c, table 1, EMP of contractor CW1B (3712A/CIPM‐HDKT) 

DDIS comments: Contractor should remove this concrete waste in the settling tank. Contractor reply date: 20th October 2016  

Full concrete sludge in Bridge 12 settling tank  Status: unclose 028  Location: Bridge 12 batching 

plant  The wastewater from washing of concrete truck run to the adjacent area.  Ref: item 10b, table 1, EMP of contractor CW1B (3712A/CIPM‐HDKT) 

DDIS comments: Contractor must close the access of wastewater to the adjacent area. All contaminated wastewater in this area should be recollect to the settling tank. 

  Contractor reply date: 20th October 2016  

Improper discharge of wastewater  Status: unclose 

Page 126: Environmental Monitoring Report...ENVIRONMENTAL INSPECTION REPORT Period observation Deadline Package Location Weather Observers 13 July 2016 20 July 2016 CW1A 0 - 3+800 Sunny Ms

029  Location: Bridge 12 worker accomodation  Many domestic wastes are not collected to the waste storage area.   Ref: item 11f and 17q, table 1, EMP of contractor CW1B (3712A/CIPM‐HDKT) 

DDIS comments: Contractor remove all domestic to waste‐bin, in order to keep good housekeeping. 

 

 Contractor reply date: 2oth October 2016   

Full domestic waste in worker accomodation  Status: unclose 

Page 127: Environmental Monitoring Report...ENVIRONMENTAL INSPECTION REPORT Period observation Deadline Package Location Weather Observers 13 July 2016 20 July 2016 CW1A 0 - 3+800 Sunny Ms

030  Location: Bridge 12 worker accomodation  Burning waste is prohibited. Ref: item 3m, table 1, EMP of contractor CW1B (3712A/CIPM‐HDKT) 

DDIS comments: Contractor must clean the burning waste and re‐train for workers of project environmental regulations. Contractor reply date: 20th October 2016  

Burning waste  Status: unclose 031  Location: Bridge#12 office 

 Fuel spillage to water drainage in bridge 12 office. Ref: item 7h, table 1, EMP of contractor CW1B (3712A/CIPM‐HDKT) 

DDIS comments: Contractor must check the fuel spillage and treat of contaminated wastewater in the drainage before entering to public waterbody. Contractor reply date: 20th October 2016  

Water contamination  Status: unclose 

Page 128: Environmental Monitoring Report...ENVIRONMENTAL INSPECTION REPORT Period observation Deadline Package Location Weather Observers 13 July 2016 20 July 2016 CW1A 0 - 3+800 Sunny Ms

032  Location: Bridge 12 fabrication yard  Some pieces of roof are missing.   Ref: item 5l, table 1, EMP of contractor CW1B (3712A/CIPM‐HDKT) 

DDIS comments: Contractor should maintain and fully cover the roof of the fuel tank storage. Contractor reply date: 20th October 2016  

 Inadequate roof of hazardous fuel storage  Status: unclose 

033  Location: Tuan Loc site near Pier 17 and Pier 18   Contractor wash the concrete basket in the Tien river.   Ref: item 10, table 1, EMP of contractor CW1B (3712A/CIPM‐HDKT) 

 

DDIS comments: Contractor should not wash the remaining concrete waste and its wastewater to the Tien river. These wastes should be clean and remove to settling tank for treatment. 

 Contractor reply date: 20th October 2016 

Clean water tank and toilets area  Status: unclose 

Page 129: Environmental Monitoring Report...ENVIRONMENTAL INSPECTION REPORT Period observation Deadline Package Location Weather Observers 13 July 2016 20 July 2016 CW1A 0 - 3+800 Sunny Ms

034  Location: Tuan Loc site near Pier 17 and Pier 18  Fuel spillage and leakage from crane spead on the barges and might contaminate the river water. Ref: item 7, table 1, EMP of contractor CW1B (3712A/CIPM‐HDKT) 

DDIS comments: Contractor must check the crane function to avoid fuel leakage. The drip pan/tray must be avaiable on site for any equipment using fuel. Contractor must clean this fuel leakage by rags and these rags are collected as hazardous waste. 

 Contractor reply date: 18th October 2016  

 Clean water tank and toilets area  Status: unclose 

 

Page 130: Environmental Monitoring Report...ENVIRONMENTAL INSPECTION REPORT Period observation Deadline Package Location Weather Observers 13 July 2016 20 July 2016 CW1A 0 - 3+800 Sunny Ms

CDM.th Sma

Central Mekong Delta Connectivity Project- (CMDCP)

TA 7822-VIE, Loan 3013-VIE, Grant 0353-VIE

CDMSmith- WSP -YooshinConsultant JV

セ [キウp@ 0 !AI- <? <><>sh:-...

Group 5, Tan Tich Hamlet, TinhThoi Commune, Cao Lanh City, Dong Thap Province, Vietnam

Tiil: (Sr1) 067-3881 -:155; F11:v.: (8t1) 067-181il1-:156

Ref. No. : DDIS/CW1 B/1554

Date : 22 November 2016

To: Mr. Xue Zhi Guo Acting Project Manager Contractor's Representative

Project Site Office: Group 5, Tan Tich Hamlet, Tinh Thoi Commune, Cao Lanh City, Dong Thap Province, Vietnam; Tel: (84) 067-3881-255; Fax: (84) 067-3881-256

Subject: Package CW1B- Environmental Inspection Report 16 Nov 2016

Dear Mr. Xue,

During the DDIS Environmental Team's visit and inspection to your construction site on the above

date, was witnessed that you fail to comply with your obligations and is evidenced by the attached

Environmental Inspection Report:

A- Repeat Observations- Notice to Correct

This letter serves as a notice to correct the repeat observation in the attached Environmental

Inspection Report, in accordance with sub-clause 15.1 of the General Condition of Contract:

Observation Nos: 007,014, 015, 020, 026, 027, 028, 033, 034

These observations were issued in a prior Environmental Inspection Report but you have not taken

the required action. You are required to make good the failure and remedy it within 7 days.

B - New Observations

During the DDIS visit and inspection to your construction site, the DDIS Environmental Team also

made new observations as per the attached:

Observ.ation Nos: 035 - 044

We will appreciate your cooperation to timely correct as per these comments and your report to our

office within the requested deadline. Your prompt actions on the matter would be highly appreciated.

(

Cc: - As above

Cao Lanh Bridge Project Manager, CIPM Site Construction Team, CIPM File: DDIS Consultant JV Office

Page 1 of l

Attachment: Environmental Inspection Report 16 Nov 2016

Page 131: Environmental Monitoring Report...ENVIRONMENTAL INSPECTION REPORT Period observation Deadline Package Location Weather Observers 13 July 2016 20 July 2016 CW1A 0 - 3+800 Sunny Ms

CDIVIth Smt

Olf an kセエ@ n6i khu VlfC trung tam D6ng 「 セ ョ ァ@ song Ctvu Long - (CMDCP)

TA 7822-VIE, Khoan vay 3013-VIE, Khoan カゥセョ@ tr9' 0353-VIE

Li€m danh TU' カセョ@ CDM Smith- WSP -Yooshin

ィ ws p セ@T6 5, Ap Tan Tich, Xa Tinh Th&i, TP Cao U inh, Tinh £>6ng Thap, Vl$t Nam

セ oc^sセ@

S6 thU' : DDIS/CW1 S/1554

Ngay : 22/11/2016

Gii'i 、セョ Z@ 6ng Xue Zhi Guo Quyen Giam 86c Dl! an 8<;1i di$n Nha エィセオ@

£>T: (84) 067-3881-255; Fax: (84) 067-3881-256

VP Dl! an: To 5, Ap Tan Tjch, Xa Tinh Th&i, TP Cao Lanh, Tinh 86ng Thap, Vi$t Nam

8T: (84) 067.352.6868 Fax: (84) 067.352.6969

Chu 、セZ@ G6i CW18 - Bao cao kゥセュ@ tra Moi trU'cYng ngay 16/11/2016

Kinh gii'i 6ng Xue,

Trong thai gian doi ngG nhan vien moi trU'ang TU' vim 、セョ@ ォ ゥ セュ@ tra ィゥセュ@ trlfang thi cong cua Nha エィセオ@

vao ngay neu tren, Chung t6i phat hi$n Nha エィセオ@ kh6ng thl!C ィゥ セ ュ@ theo nghia VI) cua Nha エィセオ@ va dU'Q'C

ch(rng minh v&i Sao cao k ゥ セュ@ tra M6i trlfang dinh kern:

A - Nhac ャセゥ@ cac van 、セ@ theo doi - Thong bao Chinh si.Pa

Van ban nay nhlf Ia mot thong bao chinh sii'a cac カセョ@ de theo doi dU'Q'C nhac lc;1i trong Sao cao kゥセュ@

tra M6i trlfang dinh kern theo エゥセオ@ khoan 15.1 thuoc Xゥセオ@ khoan chung cua Hqp dbng:

カセョ@ de so: oo7,014, 015, 020. 026, 027, 028, 033, 034

NhCmg カセョ@ de nay da phat hanh trong Sao cao kゥセュ@ tra Moi trlfang trU'&c d6 nhlfng Nha エィセオ@ カセョ@

khong エゥセョ@ hanh thl!c hi$n theo yeu 」セオN@ Be nghi Nha エィセオ@ dam bao thl!c hi$n t6t cac カセョ@ de chlfa hoan

thanh va chinh sii'a trong vong 07 ngay.

8 - Cac van 、セ@ theo doi m&i

Trong khi TU' vim 、セョ@ ォゥセュ@ tra hi$n trU'ang thi c6ng cua Nha エィセオ N@ nh6m nhan vien m6i trlfang TU' カセョ@

cGng ャセー@ mot so カセョ@ de m&i nhlf dinh kern:

van de so: o35 - 044

Chung t6i se danh gia cao Sl! hqp tac cua Nha エィセオ@ khi thl!C hi$n chinh sii'a dung h<;in cac y ォゥセョ@ nay

va trinh bao cao cua Nha エィセオ@ 、セョ@ van phong TU' van trong thai hc;1n yeu 」セオ N@ 8e nghi Nha エィセオ@ khfln

trll'O'ng thl!C hi$n van de nay.

Tran trQng,

{Da k9J

nァオケセョ@tィセ@ VU'O'ng Ph6 Giam doc Dl! an

Cc: - Nhll' tren - Giam 66c dV' an c セオ@ Cao Lanh, CIPM - Nh6m quan ly cong trll'ang, CIPM - LU'u: Lien danh TVGS - DDIS

£>fnh kern: Bao cao ォゥ セ ュ@ tra moi tmcmg ngay 16/11/2016

Trang 1/1

--------------------- ·------------------- ·------------------- -

Page 132: Environmental Monitoring Report...ENVIRONMENTAL INSPECTION REPORT Period observation Deadline Package Location Weather Observers 13 July 2016 20 July 2016 CW1A 0 - 3+800 Sunny Ms

A. Repeated observations

No. Observations Comments and Resolution

007 Location: Bridge 12

fabrication yards

Obervation in

Environmental Inspection

Report dated dated 12 July

2016 and reminded in 10

and 13 August 2016 (Ref:

DDIS/CW1B/1443 dated 15

August 2016), and in 05 Oct

2016 (Ref. DDIS/CW1B/1505

dated 15 Oct 2016)

Ref: item 11, table 1, EMP of

contractor CW1B

(3712A/CIPM-HDKT)

DDIS comments: Contractor need to remove this waste

to outside of contruction area. Alternatively, contractor

need to provide the roof to cover the weather impact

cause eroded metal to the ground.

Contractor reply date:

Unprotected metal waste Status: unclose

014 Location: Bridge #12

batching plant

Obervation in

Environmental Inspection

Report dated 10 and 13

August 2016 (Ref:

DDIS/CW1B/1443 dated 15

August 2016), and in 05 Oct

2016 (Ref. DDIS/CW1B/1505

dated 15 Oct 2016)

DDIS comments: Contractor need to remove this metal

to proper metal waste storage. If this metal still use on

site, please barricade and use notification board for

information.

Contractor reply date:

Metal waste on site in Bridge 12 batching plant Status: unclose

Page 133: Environmental Monitoring Report...ENVIRONMENTAL INSPECTION REPORT Period observation Deadline Package Location Weather Observers 13 July 2016 20 July 2016 CW1A 0 - 3+800 Sunny Ms

Ref: item 11, table 1, EMP of

contractor CW1B

(3712A/CIPM-HDKT)

015 Location: Bridge #12 worker

accommodation

Obervation in

Environmental Inspection

Report dated 10 and 13

August 2016 (Ref:

DDIS/CW1B/1443 dated 15

August 2016), and in 05 Oct

2016 (Ref. DDIS/CW1B/1505

dated 15 Oct 2016)

Ref: item 11f and 17q, table

1, EMP of contractor CW1B

(3712A/CIPM-HDKT)

DDIS comments: Contractor need to provide waste-bin

for solid waste in this area and regularly collect waste to

waste-bin.

Contractor reply date:

Waste in 624 worker accommodation Status: unclose

020 Location: Tuan Loc

subcontractor office

Obervation in

Environmental Inspection

Report dated 10 and 13

August 2016 (Ref:

DDIS/CW1B/1443 dated 15

August 2016), and in 05 Oct

2016 (Ref. DDIS/CW1B/1505

dated 15 Oct 2016)

Ref: item 7g, table 1, EMP of

contractor CW1B

(3712A/CIPM-HDKT)

DDIS comments: Contractor must provide the roof and

drip tray/pan to avoid leakage and spillage due to

mishandling or weather impact.

Contractor reply date:

No drip tray or drip pan Status: unclose

Page 134: Environmental Monitoring Report...ENVIRONMENTAL INSPECTION REPORT Period observation Deadline Package Location Weather Observers 13 July 2016 20 July 2016 CW1A 0 - 3+800 Sunny Ms

026 Location: Bridge 12

fabrication yard

Obervation in

Environmental Inspection

Report dated 05 Oct 2016

(Ref. DDIS/CW1B/1505

dated 15 Oct 2016)

Ref: Clause 4.15a, contractor

CW1B (3712A/CIPM-HDKT)

DDIS comments: Contractor should repair the access

road to avoid slipery condition during rainy season.

Contractor reply date:

Slipery access to Bridge 12 fabrication yard Status: unclose

027 Location: Bridge 12 batching

plant

Obervation in

Environmental Inspection

Report dated 05 Oct 2016

(Ref. DDIS/CW1B/1505

dated 15 Oct 2016)

Ref: item 10c, table 1, EMP

of contractor CW1B

(3712A/CIPM-HDKT)

DDIS comments: Contractor should remove this

concrete waste in the settling tank.

Contractor reply date:

Full concrete sludge in Bridge 12 settling tank Status: unclose

Page 135: Environmental Monitoring Report...ENVIRONMENTAL INSPECTION REPORT Period observation Deadline Package Location Weather Observers 13 July 2016 20 July 2016 CW1A 0 - 3+800 Sunny Ms

028 Location: Bridge 12 batching

plant

Obervation in

Environmental Inspection

Report dated 05 Oct 2016

(Ref. DDIS/CW1B/1505

dated 15 Oct 2016)

Ref: item 10b, table 1, EMP

of contractor CW1B

(3712A/CIPM-HDKT)

DDIS comments: Contractor must close the access of

wastewater to the adjacent area. All contaminated

wastewater in this area should be recollect to the

settling tank.

Contractor reply date:

Improper discharge of wastewater Status: unclose

033 Location: Tuan Loc site near

Pier 17 and Pier 18

Obervation in

Environmental Inspection

Report dated 05 Oct 2016

(Ref. DDIS/CW1B/1505

dated 15 Oct 2016)

Ref: item 10, table 1, EMP of

contractor CW1B

(3712A/CIPM-HDKT)

DDIS comments: Contractor should not wash the

remaining concrete waste and its wastewater to the

Tien river. These wastes should be clean and remove to

settling tank for treatment.

Contractor reply date:

Clean water tank and toilets area Status: unclose

Page 136: Environmental Monitoring Report...ENVIRONMENTAL INSPECTION REPORT Period observation Deadline Package Location Weather Observers 13 July 2016 20 July 2016 CW1A 0 - 3+800 Sunny Ms

034 Location: Tuan Loc site near

Pier 17 and Pier 18

Obervation in

Environmental Inspection

Report dated 05 Oct 2016

(Ref. DDIS/CW1B/1505

dated 15 Oct 2016)

Ref: item 7, table 1, EMP of

contractor CW1B

(3712A/CIPM-HDKT)

DDIS comments: Contractor must check the crane

function to avoid fuel leakage. The drip pan/tray must

be avaiable on site for any equipment using fuel.

Contractor must clean this fuel leakage by rags and

these rags are collected as hazardous waste.

Contractor reply date:

Clean water tank and toilets area Status: unclose

Page 137: Environmental Monitoring Report...ENVIRONMENTAL INSPECTION REPORT Period observation Deadline Package Location Weather Observers 13 July 2016 20 July 2016 CW1A 0 - 3+800 Sunny Ms

Period observation Deadline Package Location Weather Observers

16 November 2016 24 November

2016

CW1B 3+800 - 6+200 Sunny Ms. Le Thi Phuong Loan – NES

Mr. Nguyen Trung Kien– Safety Officer

Mr. Nguyen Huu Tue – Safety Officer

B. New observations

No. Observation Issued Pictures by DDIS Environment Team Resolution

035 Location: Song Da worker

camp near Pier 10

Ref: item 11, table 1, EMP of

contractor CW1B

(3712A/CIPM-HDKT)

DDIS comments: Contractor collect this domestic waste

to the domestic waste storage and transfer to the

licenced waste collection company.

Contractor reply date:

Uncollected domestic waste Status: unclose

036 Location: Song Da worker

camp near Pier 10

Ref: item 11, table 1, EMP of

contractor CW1B

(3712A/CIPM-HDKT)

DDIS comments: Contractor collect this domestic waste

to the domestic waste storage and transfer to the

licenced waste collection company.

Contractor reply date:

Page 138: Environmental Monitoring Report...ENVIRONMENTAL INSPECTION REPORT Period observation Deadline Package Location Weather Observers 13 July 2016 20 July 2016 CW1A 0 - 3+800 Sunny Ms

Uncollected domestic waste Status: unclose

037 Location: Vinaconex site

near Pier 36

Ref: item 13, table 1, EMP of

contractor CW1B

(3712A/CIPM-HDKT)

DDIS comments: Contractor must collect this concrete

waste and transfer to your disposal area.

Contractor reply date:

Concrete spilled near by the irrigation water course Status: unclose

038 Location: Vinaconex site

near Pier 36

Ref: item 7, table 1, EMP of

contractor CW1B

(3712A/CIPM-HDKT)

DDIS comments: Contractor must provide the drip tray

to avoid any leak to the ground.

Contractor reply date:

Unprotected oil drums on site Status: unclose

Page 139: Environmental Monitoring Report...ENVIRONMENTAL INSPECTION REPORT Period observation Deadline Package Location Weather Observers 13 July 2016 20 July 2016 CW1A 0 - 3+800 Sunny Ms

039 Location: Bridge 12 batching

plant

Ref: item 7, table 1, EMP of

contractor CW1B

(3712A/CIPM-HDKT)

DDIS comments: Contractor must remove the concrete

sludge filled in the settling pond and this concrete waste

should be transferred to the disposal site.

Contractor reply date:

Clean water tank and toilets area Status: unclose

040 Location: Bridge 12 batching

plant

Ref: item 7, table 1, EMP of

contractor CW1B

(3712A/CIPM-HDKT)

DDIS comments: This area is shallow and be always

stucked by wastewater from batching plant. Contractor

should redesign this area as settling pond system to

treat the wastewater.

Contractor reply date:

Wastewater from batching plant contaminated the

adjacent land area

Status: unclose

Page 140: Environmental Monitoring Report...ENVIRONMENTAL INSPECTION REPORT Period observation Deadline Package Location Weather Observers 13 July 2016 20 July 2016 CW1A 0 - 3+800 Sunny Ms

041 Location: Bridge 12 batching

plant

Ref: item 7, table 1, EMP of

contractor CW1B

(3712A/CIPM-HDKT)

DDIS comments: Contractor often dump the wastewater

after cleaning the concrete mixer truck in this area.

Contractor should create a settling pond system for this

area with efficient drainage system.

Contractor reply date:

Contaminated land by wastewater washing from

mixer trucks

Status: unclose

Page 141: Environmental Monitoring Report...ENVIRONMENTAL INSPECTION REPORT Period observation Deadline Package Location Weather Observers 13 July 2016 20 July 2016 CW1A 0 - 3+800 Sunny Ms

042 Location: Bridge 12 worker

camp

Ref: item 7, table 1, EMP of

contractor CW1B

(3712A/CIPM-HDKT)

DDIS comments: Contractor should arrange the

quipments to dredge the sewage system in the

adjament canal of the Bridge 12 worker camp.

Contractor reply date:

Clean water tank and toilets area Status: unclose

Page 142: Environmental Monitoring Report...ENVIRONMENTAL INSPECTION REPORT Period observation Deadline Package Location Weather Observers 13 July 2016 20 July 2016 CW1A 0 - 3+800 Sunny Ms

043 Location: Bridge 12 worker

camp

Ref: item 3, table 1, EMP of

contractor CW1B

(3712A/CIPM-HDKT)

DDIS comments: Burning waste is forbidden in this

project. Contractor must remind this issue to all workers

during environmental and safety re-tranining. The

record of re-training should submit to DDIS.

Contractor reply date:

Burning waste Status: unclose

044 Location: Freyssinet site

Ref: item 7, table 1, EMP of

contractor CW1B

(3712A/CIPM-HDKT)

DDIS comments: Contractor must collect this

contaminated soil to hazardous waste storage and

transfer this waste for licenced hazardous waste

company.

Contractor reply date:

Contaminated soil by fuel leak Status: unclose

Page 143: Environmental Monitoring Report...ENVIRONMENTAL INSPECTION REPORT Period observation Deadline Package Location Weather Observers 13 July 2016 20 July 2016 CW1A 0 - 3+800 Sunny Ms

CHINA ROAD AND BHIDGE CORPO HATI ON AND VINACONITX IZ&C

JOINT VENTURE. (CIWC-VINACONEX E&C JV)

Ref. No.: CWIB/DDISIl 529 Date: December 14,2016

To: Mr. Victoriano H rulllig - Rcsidcnt Engineer

Cc: MI". Francis G. Flanagan - Pl-Ojcct Manager

JV CONSULTANT OF CDM SMITH ASSOC IATES INC. - WSP FINLAND LIMITED

YOOSHI N ENGINEERING CO RPORATION (JV Of CDM, wsr & YOOSHTN) Group 5, Tan T iel! I-hulilel , T inh Tho. Commune, Coo Lanh City, Dong ThaI' Province, Vietnam

Subject: Package CWIB, Cent ra l Mcl{ong Delta R egion Connectiv ity Projcct

Reply to the LcUC1' on C hecking the Environmental Rcport Dated 16 Novembcl" 2016

Dear Sir,

Pursuant to the Engineer's letter No. DDIS/CW IB/ 1554 dated 22 November 2016 about

Environmental Inspection Report l 6 November 2016, the Contractor has corrected the ment ioned

environmenta l issues and now would like to respond to YOli as in the attachment.

For Your review and morc instruction.

anaget of Package CW 1 B, Centra l Meko ng Delta RegIOn ConnecttVlty PIoject

Auached: Environmentolln spection RepOlt (03 cop ies)

cc:

Maセ。「 ッ カ・[@

- Cao Lanh Bridge Proj ect Manager, CIIIl Long CIPM;

- Si te ConstrucLion Te,un or C1PM;

- File : CW JB Contractor JV o m cc. セᆪeャvfQセ イ@Date: 45:/MfJlt.. ... . .

1/2

Page 144: Environmental Monitoring Report...ENVIRONMENTAL INSPECTION REPORT Period observation Deadline Package Location Weather Observers 13 July 2016 20 July 2016 CW1A 0 - 3+800 Sunny Ms

CHINA ROAD AND BRIJ)GE CORPORATION ANI) V1NACONEX £&C

JOINT VENTURE (CRO C·VINA CO NEX E&C JV )

ThLr s5: CW IBIDD1SII 529 Ngay : 1411 212016

Den: Ong, Vi do I'ia no Hamlig - Ky su'lhu'(rng tru

Cc; Qng, Ft'ancis G , Flanagan - Giam d6c dt,r セョ@

CDM Smith - WSP -Vooshi n Consu ltant JV T6 5, Ap Tao Tich, Xii Tinh Thai, TP C1l0 U nh, Tlllh W il l:; Thill), v ゥ セ エ@ Nll nl

V/v: G6i tィセオ@ C"VIB, Du' An Kt , N6i Kilu Vu'c Tr'ung Tiim Dang ョセャャZA@ Me Kong

H8i Dap Tilt!' J<iem Tra Bao Cao M8i Trm'rng Ngil)' 16 Tlulng 11 Nam 2016

Thua ang,

Tham ・ ィ ェ セ オ@ thl! s6 DDJ S/CW IB/ l 554 ngay 22 lhang II ョ セ ュ 2016 elm Tu vAn カセ@ カ ゥ セ」@ bilo cao c6ng

hie ォゥセ ュ@ tra moi trua ng ngay 16 1hfmg 11 ョ セ ュ@ 201 6, Nha th§u da ti€n himh khAc ph,lc cac v§n dt duqe

neu ra trong tIm va nay xin h6i da p ャ セ ゥ@ ang nhu trong file dinh kem.,

Nhil 1hAu eM,nh gia cao ウセ イ@ xem xet va chi 、 セッ@ them eua セ ョ ァ N@

Tran w;mg,

(Daky)

XUEZHlGUO qオケセョ@ Gi<lITI d6c d セイ@ an G6i ThAll CW I B, DV An K St N 6i Khu V\fC Trung Tam 86ng bセョァ@ Me Kong

Dinh kem: Sao ctto ki$m Ira rn6; tfll'cmg (3 bon)

cc:

Nhl! エョ セ ョ [@

Giam d6c d\r an c5u Cao Li\nh, Cftu Long C[PM ;

Nh6m qUi'l n I)' cong tmallg CUll C' PM;

LUll : V1in phong Th &u chlnh CW I B.

212

Page 145: Environmental Monitoring Report...ENVIRONMENTAL INSPECTION REPORT Period observation Deadline Package Location Weather Observers 13 July 2016 20 July 2016 CW1A 0 - 3+800 Sunny Ms

A. Repeated observations

No. Observations Comments and Resolution

007 Location: Bridge 12

fabrication yards

Obervation in

Environmental Inspection

Report dated dated 12 July

2016 and reminded in 10

and 13 August 2016 (Ref:

DDIS/CW1B/1443 dated 15

August 2016), and in 05 Oct

2016 (Ref. DDIS/CW1B/1505

dated 15 Oct 2016)

Ref: item 11, table 1, EMP of

contractor CW1B

(3712A/CIPM-HDKT)

DDIS comments: Contractor need to remove this waste

to outside of contruction area. Alternatively, contractor

need to provide the roof to cover the weather impact

cause eroded metal to the ground.

Contractor reply date:

Unprotected metal waste Status:

Page 146: Environmental Monitoring Report...ENVIRONMENTAL INSPECTION REPORT Period observation Deadline Package Location Weather Observers 13 July 2016 20 July 2016 CW1A 0 - 3+800 Sunny Ms

014 Location: Bridge #12

batching plant

Obervation in

Environmental Inspection

Report dated 10 and 13

August 2016 (Ref:

DDIS/CW1B/1443 dated 15

August 2016), and in 05 Oct

2016 (Ref. DDIS/CW1B/1505

dated 15 Oct 2016)

Ref: item 11, table 1, EMP of

contractor CW1B

(3712A/CIPM-HDKT)

DDIS comments: Contractor need to remove this metal

to proper metal waste storage. If this metal still use on

site, please barricade and use notification board for

information.

Contractor reply date:

Metal waste on site in Bridge 12 batching plant Status: unclose

015 Location: Bridge #12 worker

accommodation

Obervation in

Environmental Inspection

Report dated 10 and 13

August 2016 (Ref:

DDIS/CW1B/1443 dated 15

August 2016), and in 05 Oct

2016 (Ref. DDIS/CW1B/1505

dated 15 Oct 2016)

Ref: item 11f and 17q, table

DDIS comments: Contractor need to provide waste-bin

for solid waste in this area and regularly collect waste to

waste-bin.

Contractor reply date:

Page 147: Environmental Monitoring Report...ENVIRONMENTAL INSPECTION REPORT Period observation Deadline Package Location Weather Observers 13 July 2016 20 July 2016 CW1A 0 - 3+800 Sunny Ms

1, EMP of contractor CW1B

(3712A/CIPM-HDKT)

Waste in 624 worker accommodation Status: unclose

020 Location: Tuan Loc

subcontractor office

Obervation in

Environmental Inspection

Report dated 10 and 13

August 2016 (Ref:

DDIS/CW1B/1443 dated 15

August 2016), and in 05 Oct

2016 (Ref. DDIS/CW1B/1505

dated 15 Oct 2016)

Ref: item 7g, table 1, EMP of

contractor CW1B

(3712A/CIPM-HDKT)

DDIS comments: Contractor must provide the roof and

drip tray/pan to avoid leakage and spillage due to

mishandling or weather impact.

Contractor reply date:

No drip tray or drip pan Status: unclose

026 Location: Bridge 12

fabrication yard

Obervation in

Environmental Inspection

Report dated 05 Oct 2016

(Ref. DDIS/CW1B/1505

dated 15 Oct 2016)

Ref: Clause 4.15a, contractor

CW1B (3712A/CIPM-HDKT)

DDIS comments: Contractor should repair the access

road to avoid slipery condition during rainy season.

Contractor reply date:

Slipery access to Bridge 12 fabrication yard Status: unclose

Page 148: Environmental Monitoring Report...ENVIRONMENTAL INSPECTION REPORT Period observation Deadline Package Location Weather Observers 13 July 2016 20 July 2016 CW1A 0 - 3+800 Sunny Ms

027 Location: Bridge 12 batching

plant

Obervation in

Environmental Inspection

Report dated 05 Oct 2016

(Ref. DDIS/CW1B/1505

dated 15 Oct 2016)

Ref: item 10c, table 1, EMP

of contractor CW1B

(3712A/CIPM-HDKT)

DDIS comments: Contractor should remove this

concrete waste in the settling tank.

Contractor reply date:

Full concrete sludge in Bridge 12 settling tank Status: unclose

028 Location: Bridge 12 batching

plant

Obervation in

Environmental Inspection

Report dated 05 Oct 2016

(Ref. DDIS/CW1B/1505

dated 15 Oct 2016)

Ref: item 10b, table 1, EMP

of contractor CW1B

(3712A/CIPM-HDKT)

DDIS comments: Contractor must close the access of

wastewater to the adjacent area. All contaminated

wastewater in this area should be recollect to the

settling tank.

Contractor reply date:

Improper discharge of wastewater Status: unclose

Page 149: Environmental Monitoring Report...ENVIRONMENTAL INSPECTION REPORT Period observation Deadline Package Location Weather Observers 13 July 2016 20 July 2016 CW1A 0 - 3+800 Sunny Ms

033 Location: Tuan Loc site near

Pier 17 and Pier 18

Obervation in

Environmental Inspection

Report dated 05 Oct 2016

(Ref. DDIS/CW1B/1505

dated 15 Oct 2016)

Ref: item 10, table 1, EMP of

contractor CW1B

(3712A/CIPM-HDKT)

DDIS comments: Contractor should not wash the

remaining concrete waste and its wastewater to the

Tien river. These wastes should be clean and remove to

settling tank for treatment.

Contractor reply date:

This act is haven’t happen again, the contractor when

casting concreate

Clean water tank and toilets area Status: unclose

034 Location: Tuan Loc site near

Pier 17 and Pier 18

Obervation in

Environmental Inspection

Report dated 05 Oct 2016

(Ref. DDIS/CW1B/1505

dated 15 Oct 2016)

Ref: item 7, table 1, EMP of

contractor CW1B

(3712A/CIPM-HDKT)

DDIS comments: Contractor must check the crane

function to avoid fuel leakage. The drip pan/tray must

be avaiable on site for any equipment using fuel.

Contractor must clean this fuel leakage by rags and

these rags are collected as hazardous waste.

Contractor reply date:

Page 150: Environmental Monitoring Report...ENVIRONMENTAL INSPECTION REPORT Period observation Deadline Package Location Weather Observers 13 July 2016 20 July 2016 CW1A 0 - 3+800 Sunny Ms

Clean water tank and toilets area Status: unclose

Page 151: Environmental Monitoring Report...ENVIRONMENTAL INSPECTION REPORT Period observation Deadline Package Location Weather Observers 13 July 2016 20 July 2016 CW1A 0 - 3+800 Sunny Ms

Period observation Deadline Package Location Weather Observers

16 November 2016 24 November

2016

CW1B 3+800 - 6+200 Sunny Ms. Le Thi Phuong Loan – NES

Mr. Nguyen Trung Kien– Safety Officer

Mr. Nguyen Huu Tue – Safety Officer

B. New observations

No. Observation Issued Pictures by DDIS Environment Team Resolution

035 Location: Song Da worker

camp near Pier 10

Ref: item 11, table 1, EMP of

contractor CW1B

(3712A/CIPM-HDKT)

DDIS comments: Contractor collect this domestic waste

to the domestic waste storage and transfer to the

licenced waste collection company.

Contractor reply date:

Uncollected domestic waste Status:

Page 152: Environmental Monitoring Report...ENVIRONMENTAL INSPECTION REPORT Period observation Deadline Package Location Weather Observers 13 July 2016 20 July 2016 CW1A 0 - 3+800 Sunny Ms

036 Location: Song Da worker

camp near Pier 10

Ref: item 11, table 1, EMP of

contractor CW1B

(3712A/CIPM-HDKT)

DDIS comments: Contractor collect this domestic waste

to the domestic waste storage and transfer to the

licenced waste collection company.

Contractor reply date:

Uncollected domestic waste Status:

037 Location: Vinaconex site

near Pier 36

Ref: item 13, table 1, EMP of

contractor CW1B

(3712A/CIPM-HDKT)

DDIS comments: Contractor must collect this concrete

waste and transfer to your disposal area.

Contractor reply date:

Concrete spilled near by the irrigation water course Status: unclose

Page 153: Environmental Monitoring Report...ENVIRONMENTAL INSPECTION REPORT Period observation Deadline Package Location Weather Observers 13 July 2016 20 July 2016 CW1A 0 - 3+800 Sunny Ms

038 Location: Vinaconex site

near Pier 36

Ref: item 7, table 1, EMP of

contractor CW1B

(3712A/CIPM-HDKT)

DDIS comments: Contractor must provide the drip tray

to avoid any leak to the ground.

Contractor reply date: 4th December 2016

Unprotected oil drums on site Status: empty and removing to the warehouse

039 Location: Bridge 12 batching

plant

Ref: item 7, table 1, EMP of

contractor CW1B

(3712A/CIPM-HDKT)

DDIS comments: Contractor must remove the concrete

sludge filled in the settling pond and this concrete waste

should be transferred to the disposal site.

Contractor reply date:

Clean water tank and toilets area Status: unclose

Page 154: Environmental Monitoring Report...ENVIRONMENTAL INSPECTION REPORT Period observation Deadline Package Location Weather Observers 13 July 2016 20 July 2016 CW1A 0 - 3+800 Sunny Ms

040 Location: Bridge 12 batching

plant

Ref: item 7, table 1, EMP of

contractor CW1B

(3712A/CIPM-HDKT)

DDIS comments: This area is shallow and be always

stucked by wastewater from batching plant. Contractor

should redesign this area as settling pond system to

treat the wastewater.

Contractor reply date:

Wastewater from batching plant contaminated the

adjacent land area

Status: unclose

041 Location: Bridge 12 batching

plant

Ref: item 7, table 1, EMP of

contractor CW1B

(3712A/CIPM-HDKT)

DDIS comments: Contractor often dump the wastewater

after cleaning the concrete mixer truck in this area.

Contractor should create a settling pond system for this

area with efficient drainage system.

Contractor reply date:

Contaminated land by wastewater washing from

mixer trucks

Status: unclose

Page 155: Environmental Monitoring Report...ENVIRONMENTAL INSPECTION REPORT Period observation Deadline Package Location Weather Observers 13 July 2016 20 July 2016 CW1A 0 - 3+800 Sunny Ms

042 Location: Bridge 12 worker

camp

Ref: item 7, table 1, EMP of

contractor CW1B

(3712A/CIPM-HDKT)

DDIS comments: Contractor should arrange the

quipments to dredge the sewage system in the

adjament canal of the Bridge 12 worker camp.

Contractor reply date:

Clean water tank and toilets area Status: unclose

Page 156: Environmental Monitoring Report...ENVIRONMENTAL INSPECTION REPORT Period observation Deadline Package Location Weather Observers 13 July 2016 20 July 2016 CW1A 0 - 3+800 Sunny Ms

043 Location: Bridge 12 worker

camp

Ref: item 3, table 1, EMP of

contractor CW1B

(3712A/CIPM-HDKT)

DDIS comments: Burning waste is forbidden in this

project. Contractor must remind this issue to all workers

during environmental and safety re-tranining. The

record of re-training should submit to DDIS.

Contractor reply date:

Burning waste Status: unclose

044 Location: Freyssinet site

Ref: item 7, table 1, EMP of

contractor CW1B

(3712A/CIPM-HDKT)

DDIS comments: Contractor must collect this

contaminated soil to hazardous waste storage and

transfer this waste for licenced hazardous waste

company.

Contractor reply date:

Contaminated soil by fuel leak Status: unclose

Page 157: Environmental Monitoring Report...ENVIRONMENTAL INSPECTION REPORT Period observation Deadline Package Location Weather Observers 13 July 2016 20 July 2016 CW1A 0 - 3+800 Sunny Ms

Central Mekong Delta Connectivity Project- (CMDCP)

TA 7622-VIE, Loan 3013-VIC, Grant 03!i3-VIE

CDMSmith- WSP -YooshinConsultant JV

Group 5, Tan Tich Hamlet, TinhThoi Commune, Cao Lanh City, Dong Thap Province, Vietnam

Tel: (84) 067-3881-255; Fax: (84) 067-3881-256

Ref. No. : DDIS/CW1 B/1580

Date : 16 December 2016

To: Mr. Xue Zhi Guo Acting Project Manager Contractor's Representative

Project Site Office: Group 5, Tan Tich Hamlet, Tinh Thoi Commune, Cao Lanh City, Dong Thap Province, Vietnam; Tel : (84) 067-3881-255; Fax: (84) 067-3881-256

Subject: Package CW18- Environmental Inspection Report 16 Dec 2016

Dear Mr. Xue,

During the DDIS Environmental Team's visit and inspection to your construction site on the above

date, was witnessed that you fail to comply with your obligations and is evidenced by the attached

Environmental Inspection Report:

A - Repeat Observations - Notice to Correct

This letter serves as a notice to correct the repeat observation in the attached Environmental

Inspection Report, in accordance with sub-clause 15.1 of the General Condition of Contract:

Observation Nos: 007,014, 026, 027, 028, 035, 038, 039, 040, 041, 042, and 043

These observations were issued in a prior Environmental Inspection Report but you have not taken

the required action. You are required to make good the failure and remedy it within 7 days.

8 - New Observations

During the DDIS visit and inspection to your construction site, the DDIS Environmental Team also

made new observations as per the attached:

Observation Nos: 045- 047

We will appreciate your cooperation to timely correct as per these comments and your report to our

office within the requested deadline. Your prompt actions on the matter would be highly appreciated.

Cc: - As above

Cao Lanh Bridge Project Manager, CIPM Site Construction Team, CIPM File: DDIS Consultant JV Office

Pagel ofl

Attachment: Environmental Inspection Report 16 Dec 2016

Page 158: Environmental Monitoring Report...ENVIRONMENTAL INSPECTION REPORT Period observation Deadline Package Location Weather Observers 13 July 2016 20 July 2016 CW1A 0 - 3+800 Sunny Ms

A. Repeated observations

No. Observations Comments and Resolution

007 Location: Bridge 12

fabrication yards

Obervation in

Environmental Inspection

Report dated dated 12 July

2016 and reminded in 10

and 13 August 2016 (Ref:

DDIS/CW1B/1443 dated 15

August 2016), and in 05 Oct

2016 (Ref. DDIS/CW1B/1505

dated 15 Oct 2016)

Ref: item 11, table 1, EMP of

contractor CW1B

(3712A/CIPM-HDKT)

DDIS comments: Contractor need to remove this waste

to outside of contruction area. Alternatively, contractor

need to provide the roof to cover the weather impact

cause eroded metal to the ground.

According to the close-report by contractor Ref.

CW1B/DDIS/1529 dated 14 December 2016, the close-

observation is not accepted. The real situation has not

change during DDIS inspection.

Contractor reply date:

Unprotected metal waste Status: unclose

014 Location: Bridge #12

batching plant

Obervation in

Environmental Inspection

Report dated 10 and 13

August 2016 (Ref:

DDIS/CW1B/1443 dated 15

August 2016), and in 05 Oct

2016 (Ref. DDIS/CW1B/1505

dated 15 Oct 2016)

DDIS comments: Contractor need to remove this metal

to proper metal waste storage. If this metal still use on

site, please barricade and use notification board for

information.

According to the close-report by contractor Ref.

CW1B/DDIS/1529 dated 14 December 2016, the close-

observation is not accepted. The real situation has not

change during DDIS inspection.

Contractor reply date:

Metal waste on site in Bridge 12 batching plant Status: unclose

Page 159: Environmental Monitoring Report...ENVIRONMENTAL INSPECTION REPORT Period observation Deadline Package Location Weather Observers 13 July 2016 20 July 2016 CW1A 0 - 3+800 Sunny Ms

Ref: item 11, table 1, EMP of

contractor CW1B

(3712A/CIPM-HDKT)

026 Location: Bridge 12

fabrication yard

Obervation in

Environmental Inspection

Report dated 05 Oct 2016

(Ref. DDIS/CW1B/1505

dated 15 Oct 2016)

Ref: Clause 4.15a, contractor

CW1B (3712A/CIPM-HDKT)

DDIS comments: Contractor should repair the access

road to avoid slipery condition during rainy season.

According to the close-report by contractor Ref.

CW1B/DDIS/1529 dated 14 December 2016, the close-

observation is not accepted. The real situation has not

change during DDIS inspection.

Contractor reply date:

Slipery access to Bridge 12 fabrication yard Status: unclose

Page 160: Environmental Monitoring Report...ENVIRONMENTAL INSPECTION REPORT Period observation Deadline Package Location Weather Observers 13 July 2016 20 July 2016 CW1A 0 - 3+800 Sunny Ms

027 Location: Bridge 12 batching

plant

Obervation in

Environmental Inspection

Report dated 05 Oct 2016

(Ref. DDIS/CW1B/1505

dated 15 Oct 2016)

Ref: item 10c, table 1, EMP

of contractor CW1B

(3712A/CIPM-HDKT)

DDIS comments: Contractor should remove this

concrete waste in the settling tank.

According to the close-report by contractor Ref.

CW1B/DDIS/1529 dated 14 December 2016, the close-

observation is not accepted. The real situation has not

change during DDIS inspection.

Contractor reply date:

Full concrete sludge in Bridge 12 settling tank Status: unclose

028 Location: Bridge 12 batching

plant

Obervation in

Environmental Inspection

Report dated 05 Oct 2016

(Ref. DDIS/CW1B/1505

dated 15 Oct 2016)

Ref: item 10b, table 1, EMP

of contractor CW1B

(3712A/CIPM-HDKT)

DDIS comments: Contractor must close the access of

wastewater to the adjacent area. All contaminated

wastewater in this area should be recollect to the

settling tank.

According to the close-report by contractor Ref.

CW1B/DDIS/1529 dated 14 December 2016, the close-

observation is not accepted. The real situation has not

change during DDIS inspection.

Contractor reply date:

Improper discharge of wastewater Status: unclose

Page 161: Environmental Monitoring Report...ENVIRONMENTAL INSPECTION REPORT Period observation Deadline Package Location Weather Observers 13 July 2016 20 July 2016 CW1A 0 - 3+800 Sunny Ms

035 Location: Song Da – 624

worker camp near Pier 10

(fabrication yard)

Obervation in

Environmental Inspection

Report dated 16 Nov 2016

(Ref. DDIS/CW1B/1554

dated 22 Nov 2016)

Ref: item 11, table 1, EMP of

contractor CW1B

(3712A/CIPM-HDKT)

DDIS comments: Contractor collect this domestic waste

to the domestic waste storage and transfer to the

licenced waste collection company.

According to the close-report by contractor Ref.

CW1B/DDIS/1529 dated 14 December 2016, the close-

observation is not accepted. The real situation has not

change during DDIS inspection.

Contractor reply date:

Uncollected domestic waste Status: unclose

038 Location: Vinaconex site

(624 working area) near Pier

36

Obervation in

Environmental Inspection

Report dated 16 Nov 2016

(Ref. DDIS/CW1B/1554

dated 22 Nov 2016)

Ref: item 7, table 1, EMP of

contractor CW1B

(3712A/CIPM-HDKT)

DDIS comments: Contractor must provide the drip tray

to avoid any leak to the ground.

According to the close-report by contractor Ref.

CW1B/DDIS/1529 dated 14 December 2016, the close-

observation is not accepted. The real situation has not

change during DDIS inspection.

Contractor reply date:

Unprotected oil drums on site Status: unclose

Page 162: Environmental Monitoring Report...ENVIRONMENTAL INSPECTION REPORT Period observation Deadline Package Location Weather Observers 13 July 2016 20 July 2016 CW1A 0 - 3+800 Sunny Ms

039 Location: Bridge 12 batching

plant

Obervation in

Environmental Inspection

Report dated 16 Nov 2016

(Ref. DDIS/CW1B/1554

dated 22 Nov 2016)

Ref: item 7, table 1, EMP of

contractor CW1B

(3712A/CIPM-HDKT)

DDIS comments: Contractor must remove the concrete

sludge filled in the settling pond and this concrete waste

should be transferred to the disposal site.

According to the close-report by contractor Ref.

CW1B/DDIS/1529 dated 14 December 2016, the close-

observation is not accepted. The real situation has not

change during DDIS inspection.

Contractor reply date:

Clean water tank and toilets area Status: unclose

040 Location: Bridge 12 batching

plant

Obervation in

Environmental Inspection

Report dated 16 Nov 2016

(Ref. DDIS/CW1B/1554

dated 22 Nov 2016)

Ref: item 7, table 1, EMP of

contractor CW1B

(3712A/CIPM-HDKT)

DDIS comments: This area is shallow and be always

stucked by wastewater from batching plant. Contractor

should redesign this area as settling pond system to

treat the wastewater.

According to the close-report by contractor Ref.

CW1B/DDIS/1529 dated 14 December 2016, the close-

observation is not accepted. The real situation has not

change during DDIS inspection.

Contractor reply date:

Wastewater from batching plant contaminated the

adjacent land area

Status: unclose

Page 163: Environmental Monitoring Report...ENVIRONMENTAL INSPECTION REPORT Period observation Deadline Package Location Weather Observers 13 July 2016 20 July 2016 CW1A 0 - 3+800 Sunny Ms

041 Location: Bridge 12 batching

plant

Obervation in

Environmental Inspection

Report dated 16 Nov 2016

(Ref. DDIS/CW1B/1554

dated 22 Nov 2016)

Ref: item 7, table 1, EMP of

contractor CW1B

(3712A/CIPM-HDKT)

DDIS comments: Contractor often dump the wastewater

after cleaning the concrete mixer truck in this area.

Contractor should create a settling pond system for this

area with efficient drainage system.

According to the close-report by contractor Ref.

CW1B/DDIS/1529 dated 14 December 2016, the close-

observation is not accepted. The real situation has not

change during DDIS inspection.

Contractor reply date:

Contaminated land by wastewater washing from

mixer trucks

Status: unclose

Page 164: Environmental Monitoring Report...ENVIRONMENTAL INSPECTION REPORT Period observation Deadline Package Location Weather Observers 13 July 2016 20 July 2016 CW1A 0 - 3+800 Sunny Ms

042 Location: Bridge 12 worker

camp

Obervation in

Environmental Inspection

Report dated 16 Nov 2016

(Ref. DDIS/CW1B/1554

dated 22 Nov 2016)

Ref: item 7, table 1, EMP of

contractor CW1B

(3712A/CIPM-HDKT)

DDIS comments: Contractor should arrange the

quipments to dredge the sewage system in the

adjament canal of the Bridge 12 worker camp.

According to the close-report by contractor Ref.

CW1B/DDIS/1529 dated 14 December 2016, the close-

observation is not accepted. Building a fence is not

effective for this pollutant canal. The real situation has

not change during DDIS inspection.

Contractor reply date:

Clean water tank and toilets area Status: unclose

Page 165: Environmental Monitoring Report...ENVIRONMENTAL INSPECTION REPORT Period observation Deadline Package Location Weather Observers 13 July 2016 20 July 2016 CW1A 0 - 3+800 Sunny Ms

043 Location: Bridge 12 worker

camp

Obervation in

Environmental Inspection

Report dated 16 Nov 2016

(Ref. DDIS/CW1B/1554

dated 22 Nov 2016)

Ref: item 3, table 1, EMP of

contractor CW1B

(3712A/CIPM-HDKT)

DDIS comments: Burning waste is forbidden in this

project. Contractor must remind this issue to all workers

during environmental and safety re-tranining. The

record of re-training should submit to DDIS.

Furtheremore, contractor should build a barbecue grill

equipment which distant from the ground.

According to the close-report by contractor Ref.

CW1B/DDIS/1529 dated 14 December 2016, the close-

observation is not accepted. The real situation has not

change during DDIS inspection.

Contractor reply date:

Burning waste Status: unclose

Page 166: Environmental Monitoring Report...ENVIRONMENTAL INSPECTION REPORT Period observation Deadline Package Location Weather Observers 13 July 2016 20 July 2016 CW1A 0 - 3+800 Sunny Ms

Period observation Deadline Package Location Weather Observers

14 - 16 December 2016 22 December

2016

CW1B 3+800 - 6+200 Rainy Ms. Le Thi Phuong Loan – NES

Mr. Ngo Quoc Cuong– Contractor Staff

B. New observations

No. Observation Issued Pictures by DDIS Environment Team Resolution

045 Location: Access road in

North and South sides

DDIS comments: Contractor either create an effective

drainage system for this access road.

Contractor reply date:

Uncollected domestic waste Status: unclose

Page 167: Environmental Monitoring Report...ENVIRONMENTAL INSPECTION REPORT Period observation Deadline Package Location Weather Observers 13 July 2016 20 July 2016 CW1A 0 - 3+800 Sunny Ms

046 Location: Song Da and 624

worker camp

DDIS comments: Contractor must collect the domestic

waste from the adjment canal and store in the domestic

storage for collection and treatment.

Contractor reply date:

Contaminated soil by fuel leak Status: unclose

047 Location: Song Da and 624

worker camp

DDIS comments: Contractor must collect the domestic

waste from the adjment canal and store in the domestic

storage for collection and treatment. Furthermore,

contractor should provide additional waste-bin to store

the domestic waste in worker camp.

Contractor reply date:

Contaminated soil by fuel leak Status: unclose

Page 168: Environmental Monitoring Report...ENVIRONMENTAL INSPECTION REPORT Period observation Deadline Package Location Weather Observers 13 July 2016 20 July 2016 CW1A 0 - 3+800 Sunny Ms

CDMth Sml

01:1' an kセエ@ n6i khu VI:"C t rung tam fl6ng 「セョァ@ song CU>u Long - (CMDCP)

TA 7822-VIE, Khoan vay 3013-VIE, Khoan カゥセョ@ trc;» 0353-VIE

Lien danh TU' v§n COM Smith - WSP -Yooshin

セwspセ@To 5, Ap Tan T!ch, Xa T!nh Th&i, TP Cao Lanh, Tinh Bong Thap, Vi$t Nam

yG ッッ ウ セ@

S6 thU' : DDIS/CW1S/1580

Ngay : 16/12/2016

GLI'i 、セョZ@ 6ng Xue Zhi Guo Quy§n Giam 86c Dl,l' an bセ ゥ@ di$n Nha エィセiu@

8T: (84) 067-3881-255; Fax: (84) 067-3881-256

VP Dl,l' an: T6 5, Ap Tan Tjch, Xa Tjnh Th&i, TP Cao Lanh, Tinh Bong Thap, Vi$t Nam

BT: (84) 067.352.6868 Fax: (84) 067.352.6969

Chu 、セZ@ G6i CW18- Sao cao kゥセュ@ tra M6i t rus<Yng ngay 16/12/2016

Kinh gll'i 6ng Xue,

Trong thai gian d9i ngu nhan vien m6i trU'ang TU' van 、セョ@ kiE§m tra hi$n trU'ang thi c6ng cua Nha エィセオ@

vao ngay neu tren, chung t6i phat hi$n Nha thau kh6ng thl,I'C hi$n theo nghia Vl,l cua Nha thau va dU'Q'C

chung minh v&i Bao cao KiE§m tra M6i trU'ang dinh kem:

A- Nhac lf1li cac van 、セ@ theo doi- Thong bao Chinh slJ.sa

Van ban nay nhU' Ia m<)t thong bao chinh sll'a cac van d§ theo doi dU'Q'C nhac ャセゥ@ trong Sao cao KiE§m

tra M6i tmang dlnh kern theo エゥセオ@ khoan 15.1 thu<)c 8ieu khoan chung cua Hqp dong:

Van d§ s6: 007,014, 026, 027, 028, 035, 038, 039, 040, 041 , 042, va 043

NhCmg van de nay da phat hanh trong Sao cao kゥセュ@ tra M6i trU'ang trU'&c d6 nhU'ng Nha thau カセョ@

khong エゥセョ@ hanh thl,I'C hi$n theo yeu cau. f)e nghj Nha thau dam bao thl,J'C hi$n t6t cac van de chU'a hoan

thanh va chinh sll'a trong vong 07 ngay.

8 - Cac van 、セ@ theo doi m&i

Trong khi TU' van 、セョ@ kiE§m tra hi$n trU'ang thi cong cua Nha thau, nh6m nhan vien moi trU'ang TU' van

cung ャセー@ m9t s6 van de m&i nhU' dinh kern:

Van de s6: 045- 047

Chung t6i se danh gia cao Sl,l' hqp tac cua Nha thau khi thl,I'C hi$n chinh sll'a dung ィセョ@ theo cac y ォゥセョ@

nay va trlnh bao cao cua Nha thau 、セョ@ van phong TU' van trong thai ィセョ@ yeu 」セオ N@ 8§ nghi Nha エィセオ@

ォィセョ@ trU'O'ng thl,I'C hi$n van de nay.

Tran trQng,

{Da kyJ

Victoriano L. Hamlig Ky sU' thU'ang tru

Cc: - Nhll' tren - Giam d6c dl! an C§u Cao U1nh, CIPM - Nh6m qufm ly cong trU"ang , CIPM - LU'u: Lien danh TVGS - DDIS

£>inh kern: Bao cao kiem tra moi trU"O>ng ngay 16/12/2016

Trang 1/1

Page 169: Environmental Monitoring Report...ENVIRONMENTAL INSPECTION REPORT Period observation Deadline Package Location Weather Observers 13 July 2016 20 July 2016 CW1A 0 - 3+800 Sunny Ms

CW1C

Page 170: Environmental Monitoring Report...ENVIRONMENTAL INSPECTION REPORT Period observation Deadline Package Location Weather Observers 13 July 2016 20 July 2016 CW1A 0 - 3+800 Sunny Ms

CDMth Sml

Central Mekong Delta Connectivity Project - (CMDCP)

TA 7822-VIE, Loan 3013-VIE, Grant 0353-VIE

COM Smith - WSP - Yooshin Consultant JV

セwspセ@Group 5, Tan Tich Hamlet, Tinh Thoi Commune, Cao lanh City, Dong Thap Province, Vietnam

Tel: (84) 067-3881 -255 ; Fax: (84) 067-3881 -256 \NヲGッッ ウ セ@

Ref. No. : DDIS/CW1 C/0445

Date : 15 August 2016

To: Mr. Nguyen Van Huang Contractor's Representative

Contract Office: No.61 -Provincial Road 848, Tan Trang Village, Tan My Commune, Lap Vo District, Dong Thap Province

Tel: (84) 043 7830856; Fax: (84) 043 7830859

Subject: Package CW1C - Environmental Inspection Report 10 Aug 2016

Dear Mr. Huang,

After our DDIS environmental inspection dated 10 August 2016, we hereby give you the inspection

report for your action. The deadline of your closed-observations is 20 August 2016. If you fail to

rectify, we will issue the Notice to Correct via official letter after 1 0 days issuing this letter.

Your prompt action is highly recommended.

(

L.Hamlig

Cc: - As above

Cao Lanh Bridge Project Manager, CIPM Site Construction Team, CIPM File: DDIS Consultant JV Office

Page 1 ofl

Attachment: Environmental Inspection Report 10 Aug 2016

Page 171: Environmental Monitoring Report...ENVIRONMENTAL INSPECTION REPORT Period observation Deadline Package Location Weather Observers 13 July 2016 20 July 2016 CW1A 0 - 3+800 Sunny Ms

10 August 2016

Location: Tan My botching plant

No drainage system for the

Tan My batching plant.

Necessary action:

Contractor need to create

effective drainage system

for Tan My botching plant.

002 I Location: Tan My botching

plant

No collection and removal

of concrete and metal

waste.

Necessary action:

Contractor need to provide

storage for these metal

waste and concrete waste.

These unused materials

should be transferred to the

designate area aftermath.

ENVIRONMENTAL INSPECTION REPORT

20 August

2016

CWlC 6+200- 7+800 Rainy Ms. Le Thi Phuong Loan- NES

Mr. Le Anh Tin- NES

Vinh- CW1C EO

Page 172: Environmental Monitoring Report...ENVIRONMENTAL INSPECTION REPORT Period observation Deadline Package Location Weather Observers 13 July 2016 20 July 2016 CW1A 0 - 3+800 Sunny Ms

003 I Location: Tan My botching plant

The settling pond system is

ineffective.

Necessary action:

Contractor need to re-design

and replace this ineffective

settling pond system.

004 I Location: Tan My botching plant

No domestic waste

collection.

Necessary action:

Contractor must provide

domestic waste trash-bin for

this waste.

Page 173: Environmental Monitoring Report...ENVIRONMENTAL INSPECTION REPORT Period observation Deadline Package Location Weather Observers 13 July 2016 20 July 2016 CW1A 0 - 3+800 Sunny Ms

005 I Location: Transimexco office

Two fuel tanks are on site

without any environmental

protection.

Necessary action:

Contractor must provide the

roof and drip tray to avoid

fuel leakage to the ground.

Page 174: Environmental Monitoring Report...ENVIRONMENTAL INSPECTION REPORT Period observation Deadline Package Location Weather Observers 13 July 2016 20 July 2016 CW1A 0 - 3+800 Sunny Ms

Dự án Kết nối khu vực trung tâm Đồng bằng sông Cửu Long - (CMDCP)

TA 7822-VIE, Khoản vay 3013-VIE, Khoản viện trợ 0353-VIE

Liên danh Tư vấn CDM Smith - WSP –Yooshin Tổ 5, p Tân Tịch, Xã Tịnh Thới, TP Cao Lãnh, Tỉnh Đồng Tháp, Việt Nam

ĐT: (84) 067-3881-255; Fax: (84) 067-3881-256

__________________________________________________________

Trang 1 / 1

Số thư : DDIS/CW1C/0445 Ngày : 15/08/2016 Gửi đến: Ông Nguyễn Văn Hưởng

Đại diện Nhà thầu

VP: số 61- Đường liên tỉnh 848, p Tân Trong, Xã Tân Mỹ, Huyện L p Vò, Tỉnh Đồng Tháp

ĐT: (84) 043 7830856 Fax: (84) 043 7830859

Chủ đề: Gói CW1C – Báo cáo Kiểm tra Môi trường ngày 10/08/2016

Kính gửi ông Hưởng,

Sau khi Tư v n DDIS thực hiện kiểm tra môi trường ngày 10/08/2016, Tư v n gửi theo thư báo cáo

kiểm tra để Nhà thầu thực hiện. Hạn cuối để kết thúc việc thực hiện của Nhà thầu là ngày

20/08/2016. Nếu Nhà thầu không hoàn thành chỉnh sửa, Tư v n sẽ phát hành Thông báo Chỉnh

sửa bằng văn b n chính thức sau 10 ngày phát hành thư này.

Đề nghị Nhà thầu khẩn trương thực hiện.

Trân trọng,

{Đã ký}

Victoriano L. Hamlig Kỹ sư thường trú

Cc: - Như trên - Giám đốc dự án Cầu Cao Lãnh, CIPM - Nhóm qu n lý công trường, CIPM - Lưu: Liên danh TVGS - DDIS

Đính kèm:

Báo cáo Kiểm tra Môi trường ngày 10/8/2016