Page 1: Environmental monitoring program at  Offshore Wind farm Egmond aan Zee

vrijdag 21 april 2023 1

Environmental monitoring program at Offshore Wind farm Egmond aan Zee

SenterNovem Neeltje Muselaers The Netherlands NoordzeeWind Henk Kouwenhoven The Netherlands

Page 2: Environmental monitoring program at  Offshore Wind farm Egmond aan Zee

vrijdag 21 april 2023 2

Contents

The project Monitoring program Results on birds Results on marine mammals Results on public opinion Organizational setup Lessons learned Conclusions

Page 3: Environmental monitoring program at  Offshore Wind farm Egmond aan Zee

vrijdag 21 april 2023 3

Main project data

36 Vestas 3 MW V90 wind turbines 1 meteo mast, 116 m high Hub height 70 m, rotor diameter 90 m Monopiles with scour protection Water depth 20 m 10 – 18 km off shore 3 x 34 kV cables to the shore 34/150 kV substation on shore Renewable electricity for +/-

100.000 house holds Design life 20 years In operation since 1/1/2007

Page 4: Environmental monitoring program at  Offshore Wind farm Egmond aan Zee

vrijdag 21 april 2023 4

Monitoring program

Impact of wind farm on marine environment:

•Birds

•Sea mammals, fish and benthos

•Societal aspects

•Shipping and safety

Page 5: Environmental monitoring program at  Offshore Wind farm Egmond aan Zee

vrijdag 21 april 2023 5

Results on birds

Collision not measured Feasibility and scouting studies ongoing

No effect of construction was seen Piling during season of low bird intensity

2 years monitoring (surveys and radar) 6 Boat surveys / year / smart timing Horizontal and vertical radar (24/7)

No large effects on local birds Stepping stone for Great Cormorants

Deflection of flight paths for most species Distance 200 m to 3200 m

Research is ongoingduring 2009

Page 6: Environmental monitoring program at  Offshore Wind farm Egmond aan Zee

vrijdag 21 april 2023 6

Results on marine mammals

Harbour porpoise occurrence Base line: 2003 Operations phase: 2007 - 2009

Acoustic measurement 8 TPOD’s in and around OWEZ

Significant more acoustic activity in OWEZ compared to ref. area’s

Increasedprey occurrence?

0

10

20

30

40

50

60

baseline operation

Clic

k P

PM

(clic

ks/m

in)

.

Reference area

Impact area

Page 7: Environmental monitoring program at  Offshore Wind farm Egmond aan Zee

vrijdag 21 april 2023 7

Public opinion

4 Years of opinion surveys: 2005 (before construction) 2006 (during construction) 2007 – 2008 (after construction)

4 Interest groups: Resident coastal towns Business coastal towns Dutch holiday makers German holiday makers All within +/- 20 km from

Egmond aan Zee

Project is visible from the beach

Page 8: Environmental monitoring program at  Offshore Wind farm Egmond aan Zee

vrijdag 21 april 2023 8

Final results on public opinion (2008)

75% in favor of off shore wind 25% thinks wind off shore is no problem for birds

or sea currents 50% of the residents say visible wind farm effects

experience of the sea and the beach German holiday makers < 25% (2005: 66%)

30% feel view is disruptive German holiday makers 10%

80% of residents and holiday makerswill visit the beach as often as before

Page 9: Environmental monitoring program at  Offshore Wind farm Egmond aan Zee

vrijdag 21 april 2023 9

Ministry of Economic affairs (EZ)

NoordzeeWind

Imares et al (environment)

ECN et al (technology)

IntomartGfK (public opinion)

Organizational set up

Reference group

Nuon

Shell

SenterNovem and Waterdienst (mgt

monitoring on behalf of EZ)

: Contract

: Important relation

Ministry of Transport, Public works and Water

management (RWS)

: Environmental permit

Page 10: Environmental monitoring program at  Offshore Wind farm Egmond aan Zee

vrijdag 21 april 2023 10

Environmental monitoring in Public Private Partnership is feasible

Monitoring and commercial operation go together Take into account different dynamics of industry

and government Define monitoring in terms of learning objectives

Carefully consider required level of detail Leave room to adapt methods as result of advancing

knowledge and development Standardization of research methods will support

interpretation of results Create single line of responsibility and approach

with governmental bodies that are involved

Lessons learnt

Page 11: Environmental monitoring program at  Offshore Wind farm Egmond aan Zee

vrijdag 21 april 2023 11

Monitoring so far executed successfully No LTI’s A lot of data and reports available

Indications of limited influence of operation of OWEZ on environment

Bird collision monitoring still to be executed Public acceptance showed continuously increasing

trend since 2005 OWEZ monitoring does not answer all questions

Outcomes generate new ones Cumulative effects

Reports available on websites of NoordzeeWind and SenterNovem

Conclusions

Page 12: Environmental monitoring program at  Offshore Wind farm Egmond aan Zee

vrijdag 21 april 2023 12

Questions?

Project Organisation MEP-NSW

www.offshorewind.nl

NoordzeeWind

www.noordzeewind.nl