MINISTRY OF INDUSTRY AND TRADE THE WORLD BANK
RENEWABLE ENERGY DEVELOPMENT PROGRAM
Credit code: IDA Cr.4564-VN
ENVIRONMENTAL MANAGEMENT PLAN
BAO LAM 1 SMALL HYDRO POWER PROJECT
CAO BANG PROVINCE
Cao Bang, September 2014
SFG2200 V8 P
ublic
Dis
clos
ure
Aut
horiz
edP
ublic
Dis
clos
ure
Aut
horiz
edP
ublic
Dis
clos
ure
Aut
horiz
edP
ublic
Dis
clos
ure
Aut
horiz
ed
EMP - Bao Lam 1 Hydropower plant - Cao Bang Province
Page i
TABLE OF CONTENTS
SCREENING OF SAFEGUAR POLICIES FOR SUBPROJECT UNDER REDP 1
1. INTRODUCTION 13
1.1. Project background 13
1.2. Project Donor and Participating Bank 13
1.3. Project objectives 13
1.4. Project management & EMP implementation 14
1.5. Legal documents of Vietnam Goverment on Environmental Imapct Assessment14
2. PROJECT DESCRIPTION 18
2.1. Location of project 18
2.2. Project description 19
2.3. Construction method 20
3. KEY ENVIRONMENTAL AND SOCIAL ISSUES 23
3.1. Environmental issues 23
3.2. Key Social Issues 39
4. MITIGATION MEASURES FOR NEGATIVE IMPACTS 41
5. ENVIRONMENTAL MONITORING PLAN 68
6. COMPLAINATION ON ENVIRONMENT AND PENALTY 86
7. ENVIRONMENTAL MANAGEMENT CAPACITY BUILDING PLAN 87
7.1. In the preparation phase 87
7.2. In the construction and operation phase 87
8. ENVIRONMENTAL MANAGEMENT COST ESTIMATION 88
9. PUBLIC CONSULTATION AND DISCLOSURE 89
9.1. Public consultation 89
9.2. Disclosure 93
Annex 1. List of EMP preparers 96
Annex 2. Responsibility of safe and environmental supervising officer 97
Annex 3. The approval documents on EIA of Bao Lam 1 HP 102
Annex 4. Minute of Public Consultation Meetings 109
Annex 5. Some pictures of consultation meetings 136
EMP - Bao Lam 1 Hydropower plant - Cao Bang Province
Page ii
LIST OF TABLE
Table 2-1: Parameters of main components of Bao Lam 1 Hydro Power Project 19
Table 3-1 Environmental issues of project 23
Table 3-2 Land acquisition by main components in detail 38
Table 3-3 Permanent acquistion by land use in detail 39
Table 3-4 Key Social Issues 39
Table 4-1 Key Mitigation and Management Measures 42
Table 5-1 Parties involved in environmental monitoring 68
Table 5-2 Environmental monitoring plan 70
Table 5-3 Form of in-site environmental monitoring report 78
Table 5-4 Form of EMP implementation monitoring report 81
Table 5-5 Requirements on environmental management reporting system 84
Table 6-1 Cost estimation for environmental management capacity building 87
Table 7-1 Estimated cost for EMP implementation 88
LIST OF FIGURE
Figure 1: Location of Bao Lam 1 Hydro Power Plant in Cao Bang Province 18
EMP - Bao Lam 1 Hydropower plant - Cao Bang Province
Page iii
ABBREVIATIONS
BIDV Bank for Investment and Development of Vietnam
MONRE Ministry of Natural Resource and Environment
DSP Dam Safety Panel
EIA Environmental Impact Assessment
EMP Environmental Management Plan
ESF Environmental Safeguard Framework
GDoE General Department of Energy
MOIT Ministry of Industrial and Trade
REDP Renewable Energy Development Project
SHP Small Hydropower Project
TCVN Vietnam Standard
PPC Provincial People’s Committee
PMU Project Management Unit
WB World Bank
EMP - Bao Lam 1 Hydropower plant - Cao Bang Province
Page 1
SCREENING OF SAFEGUAR POLICIES FOR SUBPROJECT UNDER REDP
TABLE A. BAO LAM 1 HYDRO POWER PROJECT SCOPING CHECKLIST
ISSUE RELEVANT? OUTCOME
Is the subproject located in or near a
national park or other government
designated protected area?
No
If a dam, is the subproject more than
15 m in height? Yes DSP has reviewed
If a dam, is the subproject more than
3 million cubic meters in capacity? Yes DSP has reviewed
Will the subproject result in change
of land use and resettlement of
affected people?
Yes
- Project acquired
agricultural and
residential land and
need to resettle people;
- Resettlement plan
has been made
Do ethnic minorities live or use the
area affected by the project? Yes
Ethnic plan has been
made.
Will the subproject affect physical
or cultural resources that may be
significant?
No
Is the subproject situated on or near
to an international waterway? Yes
The Bao Lam 1 small
hydropower plant
located on the Gam
river after intersection
of Gam river and Nho
Que river. Gam River
is an international river
originates from Yunnan
Province (China),
enters into Vietnam in
the province of Cao
Bang. Nho Que River
(up stream, called Pho
Mai River in China) is
a river originating from
mountainous Son
Nghiem (Yunnan,
EMP - Bao Lam 1 Hydropower plant - Cao Bang Province
Page 2
ISSUE RELEVANT? OUTCOME
China) 1,500 m high,
running from
northwest-southeast,
sawed through Dong
Van Plateau, through
the districts of Dong
Van, Meo Vac, Ha
Giang province to join
the Gam river at Na
Nat commune in Ly
Bon, Bao Lam district,
Cao Bang province.
Therefore, the policy of
international
watercourses have
applied for this project.
Has an EIA been completed?
Yes
EIA was approved by
Cao Bang PPC by
Decision No.
1100/QD-UBND dated
4th
August 2014.
Have all Approvals from Cao Bang
Province’s People’s Committee
been obtained?
Yes
Has public consultation of those
people potentially affected by the
subproject been undertaken?
Yes
Consultation meetings
were held by investor
with participants from
representatives of
affected households
and local authorities
Bao Toan commune,
Bao Lac district and
Vinh Quang, Ly Bon
communes, Bao Lam
district, Cao Bang
province.
Has an environmental management
plan been completed? Yes
Will the subproject affect
downstream flows, ecology and Yes Consideration was
taken during
EMP - Bao Lam 1 Hydropower plant - Cao Bang Province
Page 3
ISSUE RELEVANT? OUTCOME
those living downstream? preparation of EMP
Have construction impacts been
fully mitigated? Yes
Consideration was
taken during
preparation of EMP
Will the subproject result in
construction of new access roads
and how will access be managed?
Yes
Consideration was
taken during
preparation of EMP
Will the subproject result in
construction of a new transmission
line?
Yes
Consideration was
taken during
preparation of EMP
TABLE B: BAO LAM 1 HYDRO POWER PROJECT
PRESCREENING DOCUMENT CHECKLIST
DOCUMENT
INCLUDED?
Feasibility Study Yes
Approved EIA Yes
Environmental Management Plan Yes
Resettlement Plan Yes
Ethnic Minority Plan Yes
EIA Approvals from Cao Bang PPC Yes
Dam safety review by Dam Safety Panel Yes
Other approvals: if required
EMP - Bao Lam 1 Hydropower plant - Cao Bang Province
Page 4
TABLE C. SCREENING OF WB’S SAFEGUARD POLICIES
Environmental Assessment (OP/BP 4.01): potential environmental impacts of the
subproject includes those relevant to land acquisition and construction activities; those
relevant to conversing land to reservoir and changing flows in downstream
environment; impacts at downstream on water quality and aquatic bio-diversity; those
relevant to finding, collecting, transporting and storing biomass fuel; land using
contradict biomass production or reservoir construction; and those in operation phase
such as noise and waste management. These impacts can increase cumulative effects
of the rapid development such as upstream and downstream hydropower and
environmental flows. However, these impacts are mitigative.
ENVIRONMENTAL SAFEGUARD
SCREENING CRITERIA
APPLIES, YES
OR NO
(tick )
OP/BP 4.04: Natural Habitats
Natural habitats are defined as land and water areas where the ecosystems'
biological communities are formed largely by native plant and animal species,
and human activity has not essentially modified the area's primary ecological
functions
1. Is the subproject located within any National Biological
Conservation Areas, (NBCAs),
National/Provincial/District Protected Areas (NPAS,
PPAs, DPAs)? (If yes, subproject is excluded)
Yes
□
No
2. Will the subproject result in significant degradation or
conversion of habitats and/or forests in protected areas,
proposed protected areas or areas that are considered of
special ecological significance? If yes, what is the
consequence? (If yes, subproject is excluded)
Yes
□ No
3. Will the subproject aim to bring about changes to the
management, protection, or utilization of natural forests or
plantations, whether they are publicly, privately, or
communally owned? (If yes, subproject is excluded)
Yes
□ No
4. In the case of a biomass subproject, will the subproject
undertake commercial harvesting of forests (e.g., for fuel
for biomass plant)?
(If yes, subproject is excluded)
Yes
□
No
EMP - Bao Lam 1 Hydropower plant - Cao Bang Province
Page 5
* The Project does not withdraw land at sensitive area, the the project will not
enchroament any forested area.
ENVIRONMENTAL SAFEGUARD
SCREENING CRITERIA
APPLIES, YES OR
NO
(tick )
OP/BP 4.10: Ethnic Minorities (Indigenous People)
Are ethnic minority people present/reside in the
project area?*
YES
NO
* Result from the surveys shows that land from sensitive areas is not acquired for
project
5. Is the subproject located within the buffer zone of any
National Biological Conservation Areas, (NBCAs),
National/Provincial/District Protected Areas (NPAS,
PPAs, DPAs)? (if yes, subproject is eligible but requires
permit)
Yes
□ No
6. Will the subproject affect a forested area? (If yes,
subproject is eligible but requires permit of the owner or
of the district’s People’s Committee).
Yes
□
No
Based on the above screening, does OP/BP 4.04 apply? Yes
□ No
If the answer to any of Questions 1-4 is YES, OP/BP 4.04 will apply and the
subproject is NOT ELIGIBLE for refinancing.
ENVIRONMENTAL SAFEGUARD
SCREENING CRITERIA
APPLIES, YES
OR NO
(tick )
OP/BP 4.11: Physical Cultural Resources Physical cultural resources
include movable or immovable objects, sites, and structures, groups of
structures, natural features and landscapes that have archeological,
paleontological, historical, architectural, religious, aesthetic or other cultural
significance.
Will the subproject cause temporary or permanent
relocation or any other type of impact on physical
cultural resources known to be of local, regional or
YES
□
NO
EMP - Bao Lam 1 Hydropower plant - Cao Bang Province
Page 6
national significance based on national or Provincial lists,
proposed national or Provincial lists and/or identified
during public consultation with local affected groups?
Are any physical cultural resources considered especially
important or sensitive particularly to local groups (e.g.
tomb sites)?
YES
□ NO
Are chance find procedures in place? YES
NO
□
Based on the above screening, does the physical Cultural
Resources Apply?
NO
ENVIRONMENTAL SAFEGUARD
SCREENING CRITERIA
APPLIES,
YES OR NO
(tick )
OP/BP 4.12 Involuntary Resettlement
The Involuntary Resettlement safeguard will apply in those situations
involving involuntary taking of land and involuntary restrictions of access to
legally designated parks and protected areas. The policy aims to avoid
involuntary resettlement to the extent feasible, or to minimize and mitigate its
adverse social and economic impacts
1. Is any land used by people/organizations likely to be
acquired as a result of the subproject? Yes
No
□
2. Will any subproject activity involve restrictions of use
on adjoining land?
Yes
□
No
3. Is land ownership affected by the subproject? Yes
No
□
4. Will there be a loss of housing or assets or incomes of
local people/organizations? Yes
No
□
5. Will there be a loss of housing ? Yes
No
□
6. Will there be a loss of crops, trees, and other fixed assets?? Yes
No
□
7. Will there be a loss of incomes and livelihoods? Yes
No
□
EMP - Bao Lam 1 Hydropower plant - Cao Bang Province
Page 7
*There are 9 households have to resettlement, compensation plan was prepared.
ENVIRONEMENTAL SAFEGUARD
SCREENING CRITERIA
APPLIES, YES
OR NO (tick )
8. Will there be a loss of infrastructure, services and
resources? YES
□ NO
9. Will there be a loss of job or business? YES
□
NO
10. Will any social or economic activities be affected by land
use related changes? Yes
No
□
11. Will there be a loss of common land, grazing land, fishing
area of local community? YES
□ NO
12. Will there be a loss of medical stations, cemeteries,
pagodas, community center or local traffic roads? YES
□ NO
13. Will local people’s access to drinking water source, water
supply system, internal roads, power source and other energy
sources be affected?
YES
□
NO
14. Based on the above screening, does OP/BP 4.12
Apply and is a Resettlement Plan required?* Yes
No
□
OP/BP 4.37 Dame Safety Policy
1. Is the dam height is 15 meters or greater? Yes
No
2. Is dam storage 3 million cubic meter or more? Yes
No
3. The dam height is between 10 and 15 meters but the
dam presents special complexities (for example large
flood-handling requirement, location in a zone of high
seismicity, foundations that are complex and difficult to
prepare, or retention of toxic materials?
Yes No
4. Is the dam is expected to become a large dam during the
operation of the facility?
Yes
□
No
5. Based on the above screening is the REDP subproject
considered to be a large dam and will a Dam Safety
Assessment be required?
Yes
No
EMP - Bao Lam 1 Hydropower plant - Cao Bang Province
Page 8
ENVIRONMENTAL SAFEGUARD
SCREENING CRITERIA
APPLIES, YES
OR NO (tick )
* The Bao Lam 1 small hydropower plant located on the Gam river after
intersection of Gam river and Nho Que river. Gam River is an international river
originates from Yunnan Province (China), enters into Vietnam in the province of
Cao Bang. Nho Que River (up stream, called Pho Mai River in China) is a river
originating from mountainous Son Nghiem (Yunnan, China) 1,500 m high, running
from northwest-southeast, sawed through Dong Van Plateau, through the districts
of Dong Van, Meo Vac, Ha Giang province to join the Gam river at Na Nat
commune in Ly Bon, Bao Lam district, Cao Bang province. Therefore, the policy of
international watercourses have applied for this project.
OP/BP 7.50 Projects on International Waterways
The objective of OP/BP 7.50 is to ensure that World Bank-financed projects
affecting international waterways would not affect relations between the World
Bank and its Borrowers and between states and also not affect the efficient
utilization and protection of international waterways. It applies to projects that
involve the use and/or potential pollution of international waterways. OP/BP
7.50 does not apply to run of the river projects.
Is the subproject the first subproject downstream of a river
that flows from another country? YES
NO
Is the proposed subproject the last project on a river that
flows into another country? YES
NO
Will the subproject utilize water from or into a river or
river tributary that flows to or through or forms a border
with a neighboring country?
YES
NO
Will the subproject discharge water from or into a river or
river tributary that flows to or through or forms a border
with a neighboring country?
YES NO
If a biomass subproject, does the subproject utilize or
discharge water from, or into a river or river tributary that
flows to a neighboring country, or that forms a boundary
with a neighboring country.
YES NO
EMP - Bao Lam 1 Hydropower plant - Cao Bang Province
Page 9
Overall Safeguard Compliance
Does the subproject comply with the aforementioned
World Bank Safeguards?
YES
NO □
Based on the screening results above it could conclude that Bao Lam 1 Hydro Power
project is categorized B level of WB environmental safeguard policy.
EMP - Bao Lam 1 Hydropower plant - Cao Bang Province
Page 10
TABLE D: ENVIRONMENTAL CONCERNS AND EMP REQUIREMENTS
Issue or Environmental Concern
(Note: Social issues and concerns are dealt
elsewhere)
Is Issue or Concern
Addressed in EIA? Yes
or No
(tick )
Is Issue or Concern
Addressed in EMP?
Yes or No
(tick )
Required Action or
Follow-up
YES NO YES NO YES
Air quality impacts on local communities?
Noise?
Dust?
Is in a Seismically Active or Geotechnical
Unstable Area?
Affects Integrity of Protected Areas?
Impacts on Migratory, Rare, Threatened or
Endangered Species?
Impacts on Biodiversity?
Considers Downstream Impacts?
Affect Environmental Flows?
Affect Downstream Water Quality?
EMP - Bao Lam 1 Hydropower plant - Cao Bang Province
Page 11
Issue or Environmental Concern
(Note: Social issues and concerns are dealt
elsewhere)
Is Issue or Concern
Addressed in EIA? Yes
or No
(tick )
Is Issue or Concern
Addressed in EMP?
Yes or No
(tick )
Required Action or
Follow-up
YES NO YES NO YES
Affects Fish or Fisheries?
Considers Off-site Impacts (e.g. Borrow
Pits and Aggregates)?
Aesthetic and Visual Impacts?
Impacts Cultural Property or Resources?
Causes Increased Erosion and
Sedimentation During Construction?
Involves Construction of New Access
Roads?
Involves Construction of Worker
Camp(s)?
Has Chance Find Procedures In Place for
Physical and Cultural Resources?
Has Waste Management Plan (Solid and
EMP - Bao Lam 1 Hydropower plant - Cao Bang Province
Page 12
Issue or Environmental Concern
(Note: Social issues and concerns are dealt
elsewhere)
Is Issue or Concern
Addressed in EIA? Yes
or No
(tick )
Is Issue or Concern
Addressed in EMP?
Yes or No
(tick )
Required Action or
Follow-up
YES NO YES NO YES
Liquid Wastes) in Place?
Is there a Reclamation Plan In Place?
Have Subproject Contingency and
Notification Plan in case of Accident or
Event (e.g. Release)?
Has Included EMP and Environmental
Protection Measures as Part of Contract
Provisions?
Has EMP Monitoring and Supervision
Procedures in Place?
Includes Costs and Timeline for EMP?
Are there any other issues of concern
about the subproject that is listed in the
EIA over and above the aforementioned
issues that should be addressed?
EMP - Bao Lam 1 Hydropower plant - Cao Bang Province
Page 13
1. INTRODUCTION
1.1. Project background
Bao Lam 1 small hydropower project is invested by Hydropower Construction Joint
Stock Company 1. The project is located on Gam river which flows through
communes of Ly Bon, Vinh Quang communes, Bao Lam district and Bao Toan, Bao
Lac district, Cao Bang province
Gam river is the primary tributary of Lo river and the second tributaty of Red river. It
derives from the high mountain region at altitude over 1600 m of Van Nam, China.
Total basin area of Gam river is 17,200km2, the area located in China is 7,420km2
share of 43%, with total length is 297km, where about 217km located in Vietnam. Nho
Que 3 Hydropower plant is the upper-level of Bao Lam 1 hydropower plant.
Bao Lam 1 hydropower project utilize the water energy from Gam and Nho Que river.
The headwork of Bao Lam 1 hydro power located along Gam river and closed to
National highway No. 34 and No. 4C. The dam of Bao Lam 1 hydro power located
after intersection of Gam river and Nho Que river and around 500m far from Ly Bon
bridge in upstream in Ly Bon commune, Bao Lam district, Cao Bang province. The
reservoir of project is located in communes of Vinh Quang and Ly Bon, Bao Lam
district, and Bao Toan, Bao Lac district, Cao Bang province.
It is located at Northern latitude: 22o56’30’’ and Eastern longitude 105
o32’56’’.
The Bao Lam 1 small hydro power project with the capacity of 30 MW, annual
electricity production of 115,7 x 106 kWh, categorized open after dam with
impoundment, regulated by reservoir. The headwork consists of gravity concrete dam
with 28 m length, 24.5 m height, spillway located between main dam and regulated
valve with 107.5 m length. The left bank energy route includes intake, powerhouse,
discharge canal, and 110kV distribution station.
Bao Lam 1 hydropower was additional into master plan of small hydropower of Cao
Bang province and it was approved by Cao Bang Provincial People’s Committee to
allow Hydropower Construction Joint Stock Company No.1 preparing investment
report in Investment Letter No. 11121000149 dated 21/8/2013.
1.2. Project Donor and Participating Bank
Bao Lam 1 small hydropower plan project expects to be refinanced from REDP
funded by WB through the Bank of investment development Vietnam (BIDV), Hanoi
branch.
1.3. Project objectives
The main objective of subproject is to exploit effectively the water resource and
natural topographical features of the local area to produce electricity with its annual
average power generation up to 115.7 million kWh. It supports to increase power
generation of the national power system, it helps to meet local electrical power
demand and to improve the local budget.
EMP - Bao Lam 1 Hydropower plant - Cao Bang Province
Page 14
The project also brings great significance to improve infrastructure, life quality for the
local people in the remote area of Bao Lam and Bao Lac districts, Cao Bang province
that is facing many difficulties due to its poor infrastructure and backward customs.
1.4. Project management & EMP implementation
Investor: Power Construction Joint Stock Company No.1
Feasibility Study consultant: Power Engineering Consultant Company No 1 (PECC1)
The investor assigned for Project Management Unit under Power Construction Joint
Stock Company No.1 to manage and supervise the project implementation. An
environmental and social staff has been assigned by project management unit to
manage all projects’ environmental activities.
According to the WB regulations, investor is responsible for preparing and complying
to EMP. The environmental consultant supports investor to prepare EMP following
ESF under REDP which was approved by MOIT and no objection by WB.
According to the Vietnamese regulations, the reservoir’s gross storage corresponding
to the normal water level I 8,89 million m3 so the Environmental Impact Assessment
Report was prepared by investor and it was approved by Cao Bang PPC by the
decision No. 1100/QD-UBND dated 04/8/2014.
1.5. Legal documents of Vietnam Goverment on Environmental Imapct
Assessment
Government legal framework
The Law on Land approved by National Assembly of the Socialist Republic
of Vietnam dated 29/11/2013
Law on Water resources passed on June 21, 2012, by the 13th National
Assembly of the Socialist Republic of Vietnam at its 3rd session
The Law on Environmental Protection approved by the National Assembly of
the Socialist Republic of Vietnam dated 29th November, 2005.
The Law on Forest Protection and Development approved by the National
Assembly of the Socialist Republic of Vietnam dated 3/12/2004
The Electricity Law approved by the National Assembly of the Socialist
Republic of Vietnam dated 03/12/2004
Decree No: 44/2014/ND-CP date 15/05/2014 Regulation on Land Price.
Decree No. 47/2014/ND-CP providing compensation, support, resettlement
when land is recovered by the State
Decree No. 106/2005/ND-CP date 17/08/2005 regulation on detailing and
guiding the implementation of a number of articles of the electricity law on
protection of safety of high-voltage power grid works
EMP - Bao Lam 1 Hydropower plant - Cao Bang Province
Page 15
Decree No. 23/2006/ND-CP date 3/3/2004 on the implementation of the law
on forest protection and development
Decree No. 59/2007/NĐ-CP dated 9/4/2007 on solid waste management.
Decree No. /2007/NĐ-CP dated 7/5/2007 on Dam safety management
Decree No. 112/2008/NĐ-CP dated 20/10/2008 on management, protection
and integrated exploitation of resources and environment of hydropower and
irrigation reservoirs.
Decree No. 81/2009/NĐ-CP dated 12/10/2009 on Amending or supplementing
a number of Articles of the Government's Decree No. 106/ 2005NĐ-CP dated
August 17, 2005, which details and guides a number of articles of the electricity
law regarding the safe protection of high-voltage power grid works
Decree No.29/20 II/ND-CP dated 18th April, 20 II of the Government on
strategic environmental assessment, environmental impact assessment and
environmental protection commitment.
Decree No. 67/2012/NĐ-CP dated 10/9/2012 on Amending or supplementing
a number of Articles of the Government's Decree No. 143/2003/NĐ-CP dated
28/11/2003 on Detailing the implementation of a number of articles of the
ordinance on exploitation and protection of irrigation works.
Decree No. 201/2013/NĐ-CP dated 27/11/2013 of the Government on details
regulation of some articles of Water Resource Law.
Circular No24/2013/TT-BNNPTNT date 06/5/2013 of MARD on provisions
on replacement afforestation upon conversion of forest use purpose to other
purposes.
Circular No.26/20111TT-BTNMT dated 18th July, 2011 of the Ministry of
Natural Resources and Environment, detailing a number of articles of the
Government's Decree No. 29/2011lND-CP dated 18th April, 2011 on strategic
environmental assessment, environmental impact assessment and environmental
protection commitment.
Circular No. 12/2011lTT-BTNMT dated April 14th , 2011 of the Ministry Of
Natural Resources and Environment stipulating hazardous waste management.
Decision No. 186/2006/QĐ-TTg dated14/8/2006 pf Prime Minister on
promulgating the regulation on forest management
Decision No. 2704/2008/QD-BCT dated 02/08/2008 of MoIT to approve the
Master plan of cascade Hydro powerplant on Gam River.
EMP - Bao Lam 1 Hydropower plant - Cao Bang Province
Page 16
Decision No. 12/2008/QĐ-BCT dated 17/ 6/2008 of MoIT to promulgate the
national technical regulation on electrical safety
Decision No. 2154/QĐ-BCT dated 07/4/2008 MoIT on Approving the
Adjusment of Small hydropower development plan .
Decision No. 16/2008/QĐ-BTNMT dated 31/12/2009 of MARD on
Promulgation of national technical regulation on environment.
Circular No. 28/2011/TT-BTNMT dated 01/8/2011 of the Ministry of Natural
Resources and Environment on regulating monitoring technique procedure on
ambient air quality and noise;
Circular No. 29/2011/TT-BTNMT dated 01/8/2011 of the Ministry of Natural
Resources and Environment on regulating monitoring technique procedure on
inland surface water quality;
Circular No. 30/2011/TT-BTNMT dated 01/8/2011 of the Ministry of Natural
Resources and Environment on regulating monitoring technique procedure on
underground water quality
Decision No. 3221/2009/QĐ-UBND dated 28/12/2009 of Cao Bang PC on
Assigning the environmental and natural resources management responsibility in
Cao Bang Province.
Decision No. 878/QĐ-TCMT dated 01/7/2011of National Environmental
Protection Agency on technical guidance on air quality index evaluation.
Decision No. 1208/QĐ-TTg dated 21/7/2011 on Approving the National
master plan for Power development in the 2011-2020 period, with considerations
to 2030.
The master plan for Power development in Northern Mountain areas in the
2011-2020 period, with considerations to 2025 which prepared by Energy Institute
10/2011.
Decision No. 6620/QD-BCT dated 19/12/2011 of MoIT to approve the
adjusment of master plan of cascade hydro powerplant on Gam River.
Decision No. 2011/QĐ-UBND dated 19/12/2012 of Cao Bang PC on approval
the Master plan on exploying and protection the water resources within Cao Bang
provice to 2020;
Decision No. 2324/QĐ-UBND dated 23/12/2013 of Cao Bang PC on approval
the Master plan on Provincial Solid waste management to 2025
Decision No. 259/QĐ-UBND dated 17/03/2014 of Cao Bang PC on
Promulgation of the list of natural resource and environmental databases.
Technical standards
EMP - Bao Lam 1 Hydropower plant - Cao Bang Province
Page 17
QCVN 05:2013/BTNMT - National technical regulation for ambient air quality.
QCVN 40:2011/BTNMT - National technical regulation on industrial
wastewater quality
QCVN 26:2010/BTNMT - National technical regulation on noise
QCVN 27:2010/BTNMT - National technical regulation on vibration
QCVN 19: 2009/BTNMT - National Technical Regulation on Industrial
Emission of Inorganic Substances and Dusts.
QCVN 02 : 2009/BYT- National technical regulation on domestic water
quality.
QCVN 03:2008/BTNMT - National technical regulation on the allowable limits
of heavy metals in the soils.
QCVN 08:2008/BTNMT - National technical regulation on surface water
quality.
QCVN 09:2008/BTNMT - National technical regulation on underground water
quality.
QCVN 14:2008/BTNMT - National technical regulation on domestic
wastewater quality.
QCVN 02:2008/BCT - National technical regulation on safety in the storage,
transportation, use and disposal of industrial explosive materials
TCXDVN 33:2006 Water supply - Distribution System and Facilities Design
Standard
EMP - Bao Lam 1 Hydropower plant - Cao Bang Province
Page 18
2. PROJECT DESCRIPTION
2.1. Location of project
Bao Lam 1 hydropower project utilize the water energy from Gam and Nho Que river.
The headwork of Bao Lam 1 hydro power located along Gam river and closed to
National highway No. 34 and No. 4C. The dam of Bao Lam 1 hydro power located
after intersection of Gam river and Nho Que river and around 500m far from Ly Bon
bridge in upstream in Ly Bon commune, Bao Lam district, Cao Bang province. The
reservoir of project is located in communes of Vinh Quang and Ly Bon, Bao Lam
district, and Bao Toan, Bao Lac district, Cao Bang province.
The location of Hydropower is in the right bank energy route - Figure 1.
It is located at Northern latitude: 22o56’30’’ and Eastern longitude 105
o32’56’’.
The main project components including headwork and energy route. The headwork
consists of concrete dam, spillway, flooding discharge drain and sand discharge drain.
The energy route includes intake, power house and switchyard. The whole project
components are located in Ly Bon commune, Bao Lam, Cao Bang province.
A 100m transmission line will be constructed to national grid by 110 kV transmission
line and 110 kV transmission station which will be located about 100 m from Bao Lam
1 hydropower plan. The transmission line is within Ly Bon commune, which also
located in the vacant or cultivation areas, there are no households in this area.
Figure 1: Location of Bao Lam 1 Hydro Power Plant in Cao Bang Province
Bao Lam 1 Hydro
power project
EMP - Bao Lam 1 Hydropower plant - Cao Bang Province
Page 19
2.2. Project description
Table 2-1: Parameters of main components of Bao Lam 1 Hydro Power Project
No. Parameter Unit Value
1 2 3 4
I Catchment
1 Catchment area Km2 10,356
2 Main river length Km 123
3 Annual average rainfall mm 1,624
4 Annual average flow rate (Q0) m3/s 193
5 Gross storage 106
m3 6,090
6 Maximize flooding
P = 0,2% (and NQ3) m3/s 9,346
P = 1% m3/s 6,508
P = 5% m3/s 4,611
P = 10% m3/s 3,860
II Reservoir
1 Normal water level (MNDBT) m 163.00
2 Death water level (MNC) m 160.00
3 Water level corresponding to P=0,2% m 168.01
4 Water level corresponding to P=1% m 163.75
5 Total reservoir capacity (Wtb) 106
m3 8.89
6 Useful capacity (Whi) 106
m3 3.41
7 Death capacity (Wc) 106
m3 5.48
8 Surface area corresponding to normal water
level Km
2 1.19
III Water flow through powerhouse
1 Maximize water flow Qmax m3/s 365
IV Water volume
1 Max height of water level (Hmax) m 13.1
2 Min height of water level (Hmin) m 7.3/4.3
EMP - Bao Lam 1 Hydropower plant - Cao Bang Province
Page 20
No. Parameter Unit Value
3 Average height of water level (Htb) m 10.0
4 Designed height of water level (Htt) m 9.20
V Water level in down stream
1 Max height of water level corresponding to
P=0,2% m 163.7
2 Max height of water level corresponding to
P=1% m 161.2
2 Max height of water level corresponding Qmax
2 (two generator operation) m 152.01
3 Max height of water level corresponding Qmax
1 (one generator operation) m 151.04
VI Capacity
1 Installed capacity (Nlm) MW 30
2 Capacity with Operation 90% MW 3.0
VII Electricity production
1 Annual electricity production Eo 106
kWh 115.7
2 Operation with installed capacity Hours 3,857
Source: Feasibility study report of Bao Lam 1 Hydropower subproject
2.3. Construction method
Material, equipments: Total rock demand for project construction is 70.103
m3. This
amound of material will be exploited in the near by mine which located on national
highway No. 43. The total sand demand is 45.103 m
3 which will be produced in rocks
mine and transported to the project site. The Investor has been submited the documents
for license of stone exploition at Khuoi Choong quarry located at the pac Ra village,
Ly Bon commune, Bao Lam district. The intend exploited vollume is around 30,000
m3 and exploited area is 0.5ha, the exploited duration is until 31/12/2015 . The
documents have been submited to Cao Bang DONRE for approval, thus the types and
copce of impacts from sand exploition activities will be updated since the permission
license has been issued.
Other material such as concrete, steel, fuel, lubricant etc is bought from Ha Giang city
with around 102km far from the site or from Cao Bang city with 153 km far from the
project site.
For the imported equipment will be transported by sea ships to Haiphong Port then
carried by trucks thourgh NH 2 and 34 to the site, with total lengh of these route is
500km.
EMP - Bao Lam 1 Hydropower plant - Cao Bang Province
Page 21
Other domestic equipment will be transported by railway or inland waterway/seaway
to Hanoi city then arried by trucks to the project site via NH 2 and 24 with total lengh
is 380 km.
Transportation:
Access road: is the main road being to use in the operation phase and also used during
construction phase.
Temporary road for construction activites: is the main road being to use only in the
whole construction phase .
Temporary road several construction activites: is the road that use for only several
certain construction activites and will be closed since these activties completed. Totol
length of this type of road is 0.8 km.
Swichtyard and transmission line: Electricity supply for main activties on the site
such as equipment operation, worker camps, management house ...with total demand
for consutruction sites is 2MW via 5 transformer stations. Electricity for construction
is suplied from 35kV national transmission line at Ly Bon about 500m far from the
site. The 35/0.4 kV transformers are provided at construction/auxility facilities areas.
Moreover, diesel electric generators with total capacity of 500 KVA will be provided
on the management houses for the case of electricity shutdown from 35kV line.
Electricity grid for construction activities combine transformal and distribution
stations (35/0,4kV), and sublines (0,4kV). 0,4 kV lines will be provided from
35/0,4kV transformers to households. The 0,4 kV lines will only use in the
consutruction phase with simple structures and removablility, foundation by
prefabricated concrete, steel colume 130 mm and 0.5m in height.
Construction organization: Bao Lam 1 hydropower project may take 2 years to
complete the construction phase. The fist year (10/2014 - 9/2015) will focus on
resetlement activities, auxility facilities area preparation, excavation/backfilling and
placing concrete at spillway, dam foundation excavation on right banks. The second
year will focus on dam foundation excavation on right banks, placing concrete at
spillway.
Water supply: Water for construction is taken from Gam river. Total demand of
consutruction water is 700 m3/day.night. Water for fire prevention is 30 l/s. A water
treamant station will be provided at the left hand site of main dam, the water will be
taken from Gam river (at the section before confluence with Nho Que river). The
water after treating will be disbuted to construction site, D = 200mm line will be used
to take water from river to treatment station and D = 50mm line will be used to
distribute water to construction site.
Domestic water supply: Domestic water is taken from slots in the higher regions and
wells then filtered by man-made. Total domestic water volume is estimated around 12
m3/day. night.
Campsites and auxility facilities: Total are of construction site is 8.6 ha, where 7.1 ha
of auxility facilities, 0.4 ha of public areas, 0.5 ha of worker camps and management
EMP - Bao Lam 1 Hydropower plant - Cao Bang Province
Page 22
area. The auxility facilities ussualy will be used in very short time, which constructed
by the temporary structures and material which could be easy for assemble.
EMP - Bao Lam 1 Hydropower plant - Cao Bang Province
Page 23
3. KEY ENVIRONMENTAL AND SOCIAL ISSUES
3.1. Environmental issues
Table 3-1 Environmental issues of project
No. Impacts Impact description
PREPARATION AND CONSTRUCTION PHASE
1 Land acquisition Total area of acquired land for project is 103.91
ha
Permanent acquired land is 103.91 ha of which:
- 24.09 ha of agricultural land (4.05ha of one
harvest time rice land ), 0.93 ha of residential
land , 12.95 ha of forest product trees and 65.94
ha of other land;
- The whole of acquired land is located in Ly Bon,
Vinh Quang and Bao Toan communes.
Temporary acquired land: to build up worker
camps, disposal sites, and materials field.
(Refer Table 3.2 for more details).
Impact assement: Moderate Negative, but a Rap
will be prerared to ensure safeguard pollicies
application for APs
2 Landslide, erosion and
sedimentation
Cause of landslide/erosion:
- Implementation of excavation/backfilling of
rock/soil at the main components of headwork
such as dam, intake, and powerhouse during
construction phase leading to risk of
landslide/erosion.
- Construction of dam and storage water in
reservoir will impulse landslide especially at
unstable ground. Moreover, in case of long,
heavy rain, water level rises; the new land is
submerged leading to locally landslide.
Geological features of project site:
- Bao Lam 1 hydropower located within the Song
Hien terrigenous formation. Petrographic
compositon includes shale, quartz, lime clay,
pale or ashy adhesive clay, average to shaply
EMP - Bao Lam 1 Hydropower plant - Cao Bang Province
Page 24
No. Impacts Impact description
faults.
- There are several faults level III cuting through
gristone and sandstone and the stone are
wrinkled and schit. However, these faults is old,
undiscovers new activity signs and no relative to
land movement. These faults have not gone
through limestone formation and fullfill by the
secondary material which ensure that ther will be
not water loss along these faults.
- As in the map scale 1/200.000, Bao Lac (F-48-
X), no high economic value mine have been
discovered in the project areas, there are only
several normal construction material mines.
- The main faulting systems in the region namely
NorthEast-SouthWest, NorthWest-SouthEast,
sub latitude and meridian.
Impacts of landslide/erosion:
- Sedimentation of Gam and Nho Que river and
reservoir.
- Reduce surface water quality.
- Changing of water flow in downstream.
Features of project:
- Project site is located on long narrow valley,
nearby confluence of Gam river and Nho Que
river.
- Suitable geological condition, so the risk of
landslide at large scale to reform reservoir bank
is limitation.
- Reservoir, with small scale, is mainly formed
base on riverbed
- Topography include two sharp slopes from 350
to 400 and faulted. There are not high cascade
and waterfal, low segment vertical in the
riverbed.
- Process of landslide as well as reformation of
reservoir bank is small scale. Process of
sedimentation is estimated at low speed.
- Foundations cut through rock layers leading to
EMP - Bao Lam 1 Hydropower plant - Cao Bang Province
Page 25
No. Impacts Impact description
easy erosion of foundations.
- Discharging water through spillway may cause
localized flood and erosion in this area (behind
the spillway).
Impact assement: Moderate Negative
3 Impacts on surface
water quality
The main seasons cause to water surface
pollution in the construction phase:
- Domestic waste water from 300 workers in
project site (at peak time).
- This type of waste water contains BOD5, residue,
TSS, and organic substance....
- In average, each worker uses 40 water litters per
day. Total domestic waste water discharge from
300 workers is 12 m3 per day.
- Constructed waste water from auxiliary facilities
such as machine repaired workshop, concrete
mixed stations, rock washed grounds etc. This
waste water contains mainly TSS, oil and grease,
organic substances, metals etc.
- Run-off water from the whole of project site
sweeps out impurities especially scattered oil,
grease, dust which come from concrete mixed
workshops, fuel storages,
machines/equipment/vehicles loading etc.
- Scattered fuel: as estimated, the average volume
of fuel which is extracted from stored tanks to
machines/vehicles is 1,500 liters per day. The
loss of fuel is around 7.5 litters/day (lost norm of
0.5%).
- Domestic and constructed solid waste: in case of
not control well, this waste impacts remarkable
to surface water when solid waste is discharged
directly into rivers, reservoir...
- Organic waste is decomposed from dead bodies
of animal and vegetation in the reservoir.
Impacts of surface water pollution:
- Increasing of turbidity, reducing of water quality
of Gam and Nho Que river water.
EMP - Bao Lam 1 Hydropower plant - Cao Bang Province
Page 26
No. Impacts Impact description
- Affecting to life of aquatic species.
Project features:
- The results from site survey shows that due to
sloping terrain and low density of population
that there are not any activities of small industry,
aquaculture or agriculture in project site. And the
river water in downstream have not used for
domestic or agricultural irrigation purpose.
Impact assement: Moderate Negative in case the
proposed mitigation measure will not be
compliance
4 Impact on air quality Causes of air pollution:
- Blasting for construction of internal road,
digging of foundations, quarrying, due to need
to small realignment (100m) of road from Ly
Bon bridge to Lung Cu, Ha Giang.
- Rock/soil excavation and backfilling.
- Material transportation, loading and unloading.
- Operation of rock grinded/screened stations;
concrete mixed workshops; vehicles;
constructed machines/equipment.
For above items, estimated quantity of main
works are:
- Excavation/backfilling of soil and rock: 926.62 x
103 m
3
- Concrete works: 76.87 x 103 m
3
- Steels of any kind: 3,500 tons
Estimated dust quantity is emitted from
excavation and backfill activities:
- Total quantity of excavation and backfilling:
926.62 x 103 m
3 x 2 tons/m
3 = 1,853.24 x 10
3
tons
- Total dust quantity is generated: 926.62 x 103
tons x 0,4 kg/ton = 370,65 x 103
kg
Dust is also strongly generated from quarry and
road construction parallel with activities of
EMP - Bao Lam 1 Hydropower plant - Cao Bang Province
Page 27
No. Impacts Impact description
rock/soil excavation and backfilling;
material/rock/soil transportation; blasting for
digging foundations.
In comparing with standard of QCVN 05:
2013/BTNMT, the dust concentration which
emits in project site may be exceeded the
permission.
Beside, the operation of constructed machines,
trucks will emit toxic gas such as CO2, CO, SO2,
NOx, and dust.
As estimated, materials/equipments/machines
that serve for project construction are transported
in sequence along Province road No 4C, internal
district, communal roads to project site.
All main project components located very close
with district roads, but keep distance to commune
roads. The project location is only 200 far from
Ly Bon market, which present public facilities
and irrigation system.
The rock and sand supply for project activities
will be taken from rock mine located on the
national road 43, about 7km far from the project
site. This quarry is separated to the surrounding
areas by hills/mountains that are covered by tree
so that the impact of dust will be mitigated.
Dust and toxic gas pollution which emit in the
construction phase only affect to narrow, partly
areas and in short term depending to the
construction time.
Air pollution not only affects directly to workers
who are working in constructed sites but also
affected to surrounded communities of Ly Bon
commune, if without appropriate mitigation
measures.
Dust and toxic gas generated during
transportation of materials/equipments may
affect to local people who live along two sides of
roads.
Impact assement: Moderate Negative and in the
short time in case the proposed mitigation measure
EMP - Bao Lam 1 Hydropower plant - Cao Bang Province
Page 28
No. Impacts Impact description
will not be stricly compliance
5 Noise Main causes of noise pollution:
- Construction equipment.
- Materials/equipments transported vehicles.
- Operation of concrete mixed stations, rock
grinded/screened workshops.
- Blasting, using drilling machines.
According to statistic data: 8-12 tons loaded
trucks, excavator, air pressed driller have the
noise level of 91-98 dBA, 90-96 dBA, and 94
dBA; respectively.
As calculation, the average noise level of
machines is around 72-80 dBA within the
distance of 120-200 m. This noise level exceeds
the permission following the standards of QCVN
26:2010/BTNMT so it may affect to workers
who are working in the constructed site.
Noise pollution may cause seriously negative
impacts to workers who hand directly with
blasting, using driller if they are not quipped by
labor safe equipments. The noise level is not only
generated by blasting, driller but it is increased
strongly by phenomenon of reverberation in
narrow mountainous terrain.
Due to main project components are located
quite close to residential areas of Ly Bon
commune thus the generated noise may create
negative impact on local people and affect
directly to the workers on the sites during
construction and local people who live along 2
sides of roads during transportation.
Impact assement: Moderate Negative and in the
short time but the impact could be managed with an
appropriate management plan
6 Pollution cause by
solid waste
Sources of solid waste:
- Scattering rock/soil from quarries, material
transportation and discarded rock/soil from
excavation, drilling, blasting etc.
EMP - Bao Lam 1 Hydropower plant - Cao Bang Province
Page 29
No. Impacts Impact description
- Scattering concrete: from concrete mixed
stations, constructed sites, concrete scattering in
transportation process.
- Scattering steel: from constructed sites and
productive workshops.
- Wood, bamboo: from constructed sites, reservoir.
- Domestic solid waste: from campsites,
constructed sites.
During construction phase, discarded rock/soil
will be discharged from excavation of topsoil,
reservoir vegetation clearance, quarries and
constructed waste containing cement, steel,
wood etc. Disposal of constructed waste without
controlling may lead to trespass forest/cultivated
land and water pollution.
Domestic solid waste: 0.3 kg/person/day x 300
persons = 90 kg/day (at peak time)
Domestic solid waste contains different types of
waste such as food waste, paper, cover of
canned food. It may cause unpleasant odor
incase of not well controlling.
In case if clearance of reservoir does not well
leading to disintegrate animals/vegetable bodies
that causes surface water polution.
The vegetation cover that collected after
clearance may cause risks of forest fire if it is not
well controlled..
Impact assement: Moderate Negative and in the
short time but the impact could be minimized with
an appropriate management plan
7 Loss of partly
vegetation cover
Total permanent acquisition land for project is
around 103.91 ha.
Since the terrain feature of project site is mainly
mountain and hill with high slope so the
vegetation here is poor. Almost the lost
vegetation for project construction is mixed
forest such as brush, trees and agricultural trees
such as paddy, maize, cassava etc.
The loss of temporary vegetation cover for
EMP - Bao Lam 1 Hydropower plant - Cao Bang Province
Page 30
No. Impacts Impact description
disposals, borrowed pits etc will be restored after
construction phase...
Impact assement: Minor Negative due to poor
vegetable cover and low valua ecosystem arround
the project area.
8 Impacts of mining
(sand, stone quarry
etc) for construction
The total volume of sand needed for
construction is about 45.103 m
3. Due to no
natural sand quarry, the needed sand will be
grinded from stone quarry then transported to
the project site.
Stone is exploited from Khuoi Choong quarry,
Pac Ra village, Ly Bon commune, Bao Lam
District. The developer is submitting request to
Cao Bang DONRE for exploiting stone at Khuoi
Choong quarry. The intend exploited vollume is
around 30,000 m3 and exploited area is 0.5ha,
the exploited duration is until 31/12/2015.
Embankment soil is mainly for small dyke and
transport roads. All the embankment soil will be
salvaged from the foundation works.
Quarry by blasting on the surface of mine must
to use the explosive. It may cause accident at
work due to mine collapse leading to
death/wounded of workers, residents or asset
losses in case if contractors do not comply with
safe regulations.
Blasting for quarry and process of transportation
of rock, sand from the borrow pits to project site
may cause air pollution by dust, toxic gases,
noise, vibration.
Due to sloping terrain, difficult transportation
and almost none of resident live nearby mines
and project site so these impacts only effect to
workers who work directly in project site and
local people who transports nearby and they
could be mitigated.
Impact assement: Moderate Negative and in the
short time but the impact could be managed with an
appropriate management plan
EMP - Bao Lam 1 Hydropower plant - Cao Bang Province
Page 31
No. Impacts Impact description
9 Impacts due to
construction of
transmission line and
access road
The investor has to do following items during
construction phase:
- Building newly 0.8 km length of internal
roads, include one access road in left bank
and 2 access roads in right bank.
- A 110 kV transmission station will be
constructed on the left bank and connecting
to national grid by 110 kV transmission line.
The 110 kV transmission station intend to
locate about 100m far from Bao Lam 1
hydropower.
Construction of access/internal roads and
transmission line may cause the following
impacts:
- Due to high slope so the vegetation cover of
project area does not diversify, mainly
treeless hill with brush, trees and partly
agricultural trees such as paddy, maize,
cassava etc.
- Acquisition land for road and transmission
line is not much. The transmission line is
designed compling with regulations of
transmission line corridor safety. There are
almost none local residents living nearby so
the effect is negligible comparing to other
hydropower projects.
- The terrain of project area is mainly
hill/mountain so it is exposed to landslide
leading to risks of health and life for workers
during excavation of pole foundation if the
safe measures are not complied. Because of
almost none of resident living nearby along
the transmission line so landslide does not
effect to houses however, landslide or
soil/rock that are swept away to farm will
effect to cultivation.
- Construction activities of access/internal
roads, 110 kV transmission line will lead air
pollution those causes by dust during
excavation/backfilling of soil/rock, toxic
exhaust from operation of vehicles/machines,
EMP - Bao Lam 1 Hydropower plant - Cao Bang Province
Page 32
No. Impacts Impact description
noise by blasting, digging foundation and
effect to transportation safety. These impacts
are not remarkable since the almost none of
local communities nearby project site.
- The transmission line does not cross the army
areas and effect to the historical/cultural
monuments of Cao Bang province.
Terrain of project area is mainly sloping
mountain/hill so it may expose to risks of
damaging to health or life of workers/local
residents if the safe measures are not complied
during construction.
Impact assement: Minor Negative and could be
controlled with an appropriate management plan
10 Effect to terrestrial
ecosystem
During construction phase, the below activities
will cause affects to terrestrial ecosystem:
- Gathering of workers with high density in
project site
- Access road system is constructed by
investor that facilitates for accessing to
project surrounded areas
- Operation of heavy trucks with high
frequency
- Blasting
The wild animals rarely appear in the project site.
There are only birds, small animals, fox, reptile
etc. The above activities will make the terrestrial
fauna trending to move far away from project site
during construction phase.
Impact assement: Minor Negative
11 Impacts on fish and aquatic life
The aquatic ecosystem will lose temporary living
environment due to water resource is
contaminated by high turbidity, run-off water
contained cement, fuel, oil and grease rock, soil,
etc.
However, these impacts are not remarkable; only
occur in the short term because the civil
constructed works are almost done in the dry
EMP - Bao Lam 1 Hydropower plant - Cao Bang Province
Page 33
No. Impacts Impact description
seasons.
After construction phase, the presence of
reservoir facilitates for animals to return and live
surrounding the reservoir because of its good
living conditions.
And the project could be impacted on fishs which
move up or down stream during reproductive
period. For these fishes, the impacts could be on
2-5km before and after dam.
12 Effect to traffic Project needs to realignment about 100 m of road
on left bank which goes from Ly Bon bridge to
Lung Cu, Ha Gang, the realignment activites
could be created impact on the traffic movement
on this road, although the traffic volume is low,
but the PMU also need to develop and apply
appropriate measure to ensure traffic flow and
traffic safety.
Rock and sand material is exploited from mines
and transported via national road 43, about 7km
far from construction site. Other construction
material is boutgh from shops in Ha Giang city
which are 102 km far form project site and rock
is also reused from foundation excavation.
Transportation of mterials/machines/equipments
in general do not affect to traffic of local people
due to low density of population and travelling of
communities is not much.
Increase the worker population on the site also
create high risk of traffic conflicts between
workers and local poeple, if safety traffic
education are not provided for workers.
Impact assement: Minor Negative due to the
recover capacity of ecosystem since the project turn
in to operation phase;
13 Effect on cultural/
historical properties
The Cao Bang Department of Cultural and Sport
had been certificated that there is not any ranked
cultural/historical properties which are managed
by the district/provincial/national authorities in
the project areas. There are also not any cultural
and non-cultural properties that relate to the
EMP - Bao Lam 1 Hydropower plant - Cao Bang Province
Page 34
No. Impacts Impact description
ethnic minority people in the project area has
been identified during public consultation
meetings
As servey result shows that there is not
concentrated tomb in the project area, but still
there are two graves located in the high places,
over 162m.
The investor will prepare action plan in case if
cultural/historical properties are discovered in the
construction phase.
Impact assement: Moderate Negative in the short
time
14 Effects to natural
preservation area/
national park
The project site is located quite far from the
natural preservative areas. The project activities
do not impact to natural preservation parks areas
of Cao Bang province.
Impact assement: Minor Negative
15 Risks of mine and
underground works
It may expose risks of mine/bomb during
construction/operation phase that may be left
after the war incase do not detect carefully.
During construction process, the internal roads;
110 kV transmission line, etc must be built
newly.
It is forced to blasting for construction such kind
of works because two sides of streams are
mountainous with high sloping terrain.
Process of constructing underground works,
blasting may cause health, life damaged risks to
workers and local people in case safe measures
are not complied.
Impact assement: Moderate Negative and in the
short time in case the proposed mitigation measure
will not be stricly compliance
OPERATION PHASE
16 Environmental flow in
downstream
Bao Lam 1 small hydro power plant is under
Gam river cascade. Thus the regulation regime of
Bao Lam 1 power plant depends on the ones of
other plants in the same cascade.
EMP - Bao Lam 1 Hydropower plant - Cao Bang Province
Page 35
No. Impacts Impact description
After construction phase has been completed,
will form areservoir with the capacity of 8.9
million m3. Formation of reservoir and regulation
regime of Bao Lam 1 hydro power plant will
change the flow in downstream of Gam and Nho
Que rivers on the section behind the dam.
The project is categorized impoundment
hydropower plant. The water which is used to
generate electricity will be discharged back into
the main river behind the dam so it is not affected
by flow change or breaking off.
The flow is always maintained at least of 37.1
m3/s through turbines in the low peak hours in
dry season. Moreover, Bao Lam 1 hydropower is
under Gam and Nho Que river basin which has a
munber of stream branches with small flow
adding water to the river.
Impact assement: Moderate Negative due to dail
water monderated operation and the water flow
after dam will be maintained;
17 Impairment on water
quality
In case if the waste such as domestic solid waste,
domestic waste water, lubricant contained waste
water from maintaining machines/vehicles is not
well control, it will lead to pollution of Gam and
Nho Que river. However, this impact is not
remarkable and could be mitigated.
When blocking water, if the reservoir is not
cleared, biomass (tree roots, regenerated grass,
organism death...) and other substance (humus,
mineral salt) which are immerged in the reservoir
will be decomposed leading to water pollution
due to reduce DO and increase BOD5. Water
pollution will cause negative to aquatic life. This
impact is negligible and may mitigate if investor
follows fully plan of reservoir clearance.
In case if the amount of phosphoric that
discharges into reservoir is higher 8.15 tons/year,
eutrophication phenomenom may occured
leading to reduction of water quality and affect
to aquatic life.
EMP - Bao Lam 1 Hydropower plant - Cao Bang Province
Page 36
No. Impacts Impact description
Impact assement: Moderate Negative
18 Impacts on flora After formation of reservoir, climate in the
project area becomes cooler with higher humidity
that facilitates for development of vegetation
cover.
Impact assement: Moderate Negative due to the
ecosystem will be seft recover and high adative
capacity with the change of living enviroment.
19 Impacts on fauna After formation of reservoir, small animals (dog,
fox, mouse...), birds, reptiles, frog etc will
comeback to live in the reservoir surrounded
area.
Impact assement: Insignificant
20 Impacts on fish and
aquatic species
Increasing to turbidity of water river when
construction project will impact to aquatic
species that leave in the section from project site
to downstream of project.
In the operation phase, the dam has negative
impacts to aquatic species and fishs that has
emigration habit. This impact do not prevent
when constructing and operating the hydropower
plants.
Impact assement: Minor Negative
21 Noise The operation of two units with installed
capacity of 15 MW/unit and other machines such
as lubricant pumped equipment will cause noise.
As experience from other small hydro power
plants, Bao Lam 1 power plant is categorized
impoundment power plant but not type of high
water column so the noise is not very high (only
around 80 dB at distance of 1 m). This value of
noise meets the National standard QCVN
26:2010/BTNMT on noise.
Impact assement: Moderate Negative need
preparing an appropriate opration plan to minize
the impacts on local people.
EMP - Bao Lam 1 Hydropower plant - Cao Bang Province
Page 37
No. Impacts Impact description
22 EMF Operation of electrical equipment such as
electrical generator, transfomer will arise the
EMF. The EMF only affects to workers who
operate the electrical equipments mentioned
above if they do not comply strictly to
regulations on operation of electrical equipments.
The EMF does not affect to surrounding
communities since there is not any residents
living nearby and this impact could mitigate.
- In case the transmission line does not comply
with regulation on transmission line safe
corridor, the EMF will affect to person who
work or living under in the unsafe distance.
The statistic data shows that the intensity of
EMF within safe distance is less than 5kV/m that
meet to WHO standard on EMF.
Impact assement: Minor Negative due to the project
and transmission line (100m) located in the remove
area.
23 Emergency case Emmergency case in the power house: the
electrical accidents such as electrical leakage,
short circuit, fire etc may occur if do not comply
to safe regulations on powerhouse or electrical
equipment operation. These accidents may lead
to damage the power plant.
Emmergency case in the switchyard/transformer
station: fire accident due to short circuit/electrical
leakage may occur easily if do not follow strictly
technological design and regulations during
construction and operation. Compliance to
procedures on transmission line safety is
extreamly important task. It requires workers
have to obey strictly, fully all technological and
safe reguations during operation transmission
line.
Emmergency case in broken of dam, reservoir:
these disasters may orccur in case of
extraordinary weather such as sweep flood or
geological altering (earthquake, crack, depression
etc). These disasters cause serious cosequences
EMP - Bao Lam 1 Hydropower plant - Cao Bang Province
Page 38
No. Impacts Impact description
leading damage to health and life as well as
assets especially in downstream area. The main
impacts include: high risk of broken of dam in
the downstream hydropower plants, flooding
cause for downstream communities, block
transport routes, negative impacts on activities
and incomes of downstream communities, high
risks of diseases dispersion and insanitation
enviromnement condition;
Impact assement: Minor Negative due to seldom
frequency. However, the responding plan need
caryfully prepare annualy.
Table 3-2 Land acquisition by main components in detail
No. Item Acquired land Unit
A Permanent acquisition 103.91 ha
B Temporary acquisition
Supported facility 9.0 ha
Total A + B 112.91 ha
Source: Feasibility study report of Bao Lam 1 Hydropower subproject
EMP - Bao Lam 1 Hydropower plant - Cao Bang Province
Page 39
Table 3-3 Permanent acquistion by land use in detail
No. Type of Land ha
1 Agricultural land 24.09
2 Residential land 0.93
3 Forestry land 12.95
4 - Others (alluvial deposit along
rivers, streaams) 65.94
Total 103.91
Source: Feasibility study report of Bao Lam 1 Hydropower subproject
3.2. Key Social Issues
Table 3-4 Key Social Issues
No. Social issues Information
PREPARATION AND CONSTRUCTION PHASES
1 Impacts to communities There are 09 relocated households (36 people).
The most local people there are Tay and Nung
ethnic minorities who still keep their
backward customs thus, the project may
impacts their daily life. However, this disorder
only affects within construction time of
project.
The transportation of materials and equipments
does not affect much to the local people.
Most of local people expect that development
of project will faciliate to improve their
production and living standards.
2 Labor influx due to
construction workers and
conflict between workers
and communities
According to fesibility study, there are around
300 staffs/workers who are mobilized for
project construction at the project site in the
peak time.
Complementary areas are located at both sides
of the river, but mostly on the left side of the
dam. At the upstream of the dam, there is a
EMP - Bao Lam 1 Hydropower plant - Cao Bang Province
Page 40
No. Social issues Information
concrete mixing plant. The crushing plant is
located at the stone quarry, 7 km away from
the site along the national road 43.
The relationship between the investor and
local people who are living in affected area is
quite good. The investor has experience in
management of workers and security in the
local area when building the former projects.
The security of Ly Bon and Vinh Quang
communes, Bao Lam District and Bao Toan
commune in Bao Lac District is quite good.
The social evils such as drugs, theft and fight
are seldom therefore conflicts between
workers and local people will be low.
The results from site survey show that there is
an primary school located about 500m away
from left hand site of the dam which will be
not seriously impacted by project. There are
also 2 schools (secondary and highschool)
which located on other site of Nho Que river,
thus the project will create impacts on the
access road to schools of the pupils since the
iron bridge will be removed, therefore, the
replacement access road need to be provided
to ensure all pupil will be safety on the way to
schools.
3 Increase income sources for
the local people
At the beggining of construction phase,
project will gather large amount of
staffs/workers thus, it could provide jobs and
stable income for a part of local residents in
project site.
Demand in foodstuff and a series of services
facilitate for development of production and
trading of the local people.
OPERATION PHASE
4 Positive impacts on the local
socio-economic
development
When finishing, project will supply stable
power with high quality for the local people. It
will support to development of industrial,
handicraft and traditional sectors in the
locality …
EMP - Bao Lam 1 Hydropower plant - Cao Bang Province
Page 41
No. Social issues Information
During construction and operation phases,
project creates jobs for local people.
Income from tax of water resource usage
which is provided from project will be added
to provincial budget.
The reservoir will allow to development of
aquaculture in the future which benefit for
local people in term of getting jobs and
improving their income.
4. MITIGATION MEASURES FOR NEGATIVE IMPACTS
During construction phase, the contracts will be signed between investor and
contractors who construct internal roads, switchyard and transmission line, main
components such as dam, powerhouse etc. These contractors will sign the subcontracts
with the sub-contractors who provide material/equipment. The responsibilities of
developer/contractors/subcontractors who must comply with mitigation measures are
presented in Table 4.1.
The mitigation measures must be put into the bid documents/contractors by
investor/contractors as requested conditions to the material provided/constructed
contractors. Power Construction Joint Stock Company No. 1 has responsible to
integrate the EMP into the detail design and bidding contracts. Power Construction
JSC No. 1 assigned one staff who is in charged in environmental management for Bao
Lam 1 Hydropower plant. This staff presides and coordinates to the relevant agencies
to: (i) Monitoring the implementation of mitigation measures following EMP and EIA;
(ii) Supervising, suggesting measures to deal with negative impacts on environment (if
any); (iii) Making report on environmental management implementation and submit to
the district’s Department of Natural resource and Environment and leaders of Power
Construction Joint Stock Company No. 1, BIDV Hanoi; (iv) Participating courses on
environmental management which are held by GdoE PMB and WB.
EMP - Bao Lam 1 Hydropower plant - Cao Bang Province
Page 42
Table 4-1 Key Mitigation and Management Measures
Issues/Responsibilities Mitigation and Management Measures
PREPARATION PHASE (Power Construction Joint Stock Company No. 1 is responsible for implementation of mitigation measures)
1. Selection of project location Dam route location is chosen at Ly Bon commune (includes 4 villages: Na Khang, Na
Mat, Na Pong and Tong Ac). The dam site is located at the section of high slope river
banks, narrow riverbed the width of 30-40m. This location facilitates for arrangement of
dam route.
Selection of project site as presented above may mitigate the negative impacts to
environment due to minimized land acqusition, limitation of loss of vegetation cover,
forest, convenience for construction arrangement etc. It also limits to social impacts of
local communities since the agricultural land acquisition is reduced as well as dam site
is quite far from local residents.
Supported facilities of project is chosen based on the criteria such as far from surface
water resource at least 100 m, explosive storage is arranged far from communities with
minimum radius of 500 m.
Transmission line and switchyard are chosen following the regulations and standards
presented in Decision No 34/2006/QD-BCN on safety of low voltage works.
2. Affected people Consulting with authorities of communes Ly Bon, Vinh Quang, Bao Lam District, Bao
Toan commune, Bao Lac District and affected households to propose the appropriate
compensation plan which should meet expectation of affected people;
Compensation plan and its implementation must be monitored by local authorities;
Consulting with representative authorities and households of Ly Bon, Vinh Quang
communes on the location of two disposals to prevent the negative impacts to public
EMP - Bao Lam 1 Hydropower plant - Cao Bang Province
Page 43
Issues/Responsibilities Mitigation and Management Measures
health;
To minimize the acquisition of cultivated land and roads when arrangement of
campsites, material temporary loading or during construction of transmission line;
(See reports of Resettlement plan and Ethnic plan for more details).
3. Risk of bombs and mines Hiring Cao Bang Military Steering Committee to detect bombs and mines at the
following sites:
- Area of all project component sites such as: powerhouse, dam, internal road...;
- Reservoir area corresponding to normal water level;
- Transmission line;
- Auxiliary facilities (campsites, borrow pits, quarries, construction sites etc);
- Compensation land areas.
CONSTRUCTION PHASE (Investor/contractors/material, equippment provided sub-contractors are responsible for implementation of
mitigation measures)
4. Risks of mine Investor Coordinating with constructed contractors to arrangement of appropriate blasting plan;
Responsible for informing of blasting plan to local authorities and residents that aims to
avoid transportation and animal grazing at blasting areas;
Coordinating with constructed contractors to assigning the guard, using the warning
alarm and traffic arrangement when blasting;
Monitoring safe measures relating to management and using explosives which are done
EMP - Bao Lam 1 Hydropower plant - Cao Bang Province
Page 44
Issues/Responsibilities Mitigation and Management Measures
by contractors.
Contractors To discuss and inform to investor on blasting plan so thatInvestorcan inform to local
authorities and communities on time;
To comply strictly with current regulations on explosive safety;
Workers using explosives must be trained and certificated by the relevant authorities;
To prohibit strictly person who do not have certification handing with the explosives;
To disseminate frequently to workers on safe regulations in handing with explosives;
Blasting should be conducted at fix time to create watchful habit for local people. The
time of blasting should be arranged at low density of traffic so that it can mitigate
impacts to local transportation. The best is lunch time (from 11 am to 1 pm);
To coordinate withInvestorfor assigning the guard, using the warning alarm and traffic
arrangement when blasting.
5. Mining of
quarries
Investor Coordinating with contractors to inform local authorities on plan of mining (sand, quarry
etc)
Supervising safety of contractors in mining
Supervising environmental rehabilitation by contractors after closing the mine
Contractors To establish the plan of mining that provides in detail technologies and machines as well
as do procedures to getting the permission by written from local authorities.
To deposit environmental fund before exploiting.
EMP - Bao Lam 1 Hydropower plant - Cao Bang Province
Page 45
Issues/Responsibilities Mitigation and Management Measures
To comply strictly rules and regulations on technology and safety as well as
environmental standards during mining.
To ensure saving resources
Rehabilitation of environment after closing the mines (leveling and ramming the ground,
plant trees in the surface of mines)
6. Management
of construction
& solid waste
Investor To arrange 03 solid waste disposal sites with the total area of 5.3 ha. They must meet
criteria such as at least 100 m far from surface water resources, do not effect to surface
water flow, cultivated land, do not locate in the areas which are exposed dangers of
landslide/erosion, should located in the hollow grounds to prevent run-off water;
These 02 solid waste disposal sites have the agrrement with local authorities;
Prohibit workers to discharge the domestic and construction solid waste into non-
permitted places especially where it can easily sweep out in to surface water flows;
Disinfected waste is treated by septic tank at worker camps and inhabited areas. When
the Project finishes, the contractors have responsibility to fill up and septic tanks
treatment as prescribed hygiene;
Solid waste is collected and gathered to dumping sites. The dumping sites are arranged
according to regulations, located in unflood area and no impacts of inundation. The
investor has responsibility to coordinate with Department of Environment of Cao Bang
Province and Bao Lam District about the dumping sites. The average volumn of each
dumping site is 20 m3 with estimated dimention per each pit of 5m x 2m x 2m (5m
depth). Each dumping site is lined by anti-penetrative material called HDPE with 1.5
mm thick. Spraying EM bio-product on the surface of waste, covering on the waste
surface by the 3-5 cm thick soil layer with frequency of 2-3 days to avoid odor and
EMP - Bao Lam 1 Hydropower plant - Cao Bang Province
Page 46
Issues/Responsibilities Mitigation and Management Measures
insects. Isolation of dumping sites by gutter, cover is arranged to prevent run-off water
when raining. Ramming, filling up the soil, planting the tree on the top when finishing;
In case there are local Urban environment Companies, the investor or contractors can
sign a contract to collect, transport and treat solid waste;
Monitoring the solid waste management of contractors which is presented in article No.
5 below;
Prohibiting to burn solid waste to precause risk of fire the vegetable cover.
Contractors Top soil layer which is generated in process of excavation, road/transmission line
construction is kept in rock/soil storage sites and reused for planting trees after
construction phase;
Soil/rock which is generated from excavation, blasting, penstock construction etc is kept
in rock/soil storage sites and reused to backfilling the foundation of main components as
well as borrowed pits (material loadings, concrete mixed stations, campsites etc);
The discarded soil/rock at disposal sites is leveled, rammed closely. The proposed
dumping sites are located along Nho Que Bank, thus there should be permanent
embankment to avoid soil/rocks run into the riverbed, to prevent blocking the existing
flow in the area, to plant tree around to capture soil, etc. To avoid washout, it should
plant trees at areas which finishing the disposal and revert to the orginal state when
complete the construction phase;
Distribute waste bins on sites to ensure the collection of solid waste and transported to
landfills everyday;
Prohibiting workers to discharge the domestic and constructed solid waste into non-
EMP - Bao Lam 1 Hydropower plant - Cao Bang Province
Page 47
Issues/Responsibilities Mitigation and Management Measures
permitted places especially where it can easily sweep out into surface water;
Prohibiting to burn solid waste to precause risk of fire.
7. Vegetation
clearance of the
reservoirs and
construction sites
Investor Before flooding, the reservoir is cleared carefully to mitigate eutrophication and
reduction of water quality;
The landmarks which determine boundary of reservoir area for vegetation clearance will
be marked;
Prohibiting to cut off trees in the areas that are outside of the reservoir boundary;
To harvest agricultural products before flooding reservoir;
Big trees must be cut off at the foot and used for making formwork. Brushwood is
cleared and pulled out with the remaining part less than 20 cm;
If safe condition is ensured (without construction activities, transportation of vehicle,
blasting, water flooding and not in flood season etc), it is allowed to local people
collecting trees, products for their usage;
Investor is responsible for coordinating with local authorities and residents in the
process of vegetation removal in the reservoir and also checking safe conditions prior to
permit people collecting trees;
Burning of disposal biomass must be followed the plan preparing byInvestorand ensured
compliance with regulations on forest fire prevention. Site of burning points must be far
away each other at least 500 m. Do not burn trees in strong wind conditions to avoid the
spread to surrounding areas.
EMP - Bao Lam 1 Hydropower plant - Cao Bang Province
Page 48
Issues/Responsibilities Mitigation and Management Measures
8. Erosion and
sedimentation
Investor After construction phase, quarries, disposal sites... are backfilled by soil then rammed,
pressed and planted trees on the top to avoid erosion;
Planting trees and managing well vegetation cover at surrounded areas of reservoir
especially at semi-flooding areas to stabilize the foundation of the reservoir bank, main
components and the new sedimentation areas;
To coordinate closely with local authorities to manage well upstream watershed forest to
prevent swept-flood that cause landslide leading to reservoir sedimentation;
To dredge reservoir bed every 1-2 years/time;
To prohibit exploiting of rock/soil or cultivation in the semi-flood areas within reservoir;
Monitoring compliance of landslide/erosion mitigation measures of contractors.
Contractors It is necessary to describe foundations, monitoring blocks of rock which are exposed to
risk of landslide so that could provide warning and suggest the dealing measures during
excavation of foundation;
It should not drill, blast with large amount of rock. The excavation should blast oriently
to create border of excavation;
Should have the measures to prevent landslide/erosion of rock which may be rolled from
the top to constructing foundation. The gutters that discharge water from the top should
be digged to prevent water run into the foundation. The gutters which could discharge
water rapidly in the foundation area should be created;
It must consolidate the embankments at the sites that are exposed to high risk of
landslide/erosion at the beginning of construction of new roads;
EMP - Bao Lam 1 Hydropower plant - Cao Bang Province
Page 49
Issues/Responsibilities Mitigation and Management Measures
The isolated gutters are built at material temporary loadings, concrete mixed stations,
rock grinded/screened workshops etc to prevent run-off water which can sweep out
rock/soil into stream;
After construction phase, the borrowed pits are backfilled by soil then rammed, pressed
and planted trees on the top to avoid erosion;
Activities of construction/excavation/backfilling are priority done in dry seasons.
9. Traffic and
transportation
Investor Monitoring implementation of mitigated measures which are done by contractors;
Coordinating to contractors for repairing the damaged road in case the road is damaged
because of overload transportation;
Propagandize to improve awareness of compliance with traffic safe regulations for
drivers.
Construction/ma
terials,
equipment
supplied
contractors
Develop traffic management plan and ensure traffic safety during construction phase,
submit the plan to the investor for approval and monitoring the implementation;
To ensure all vehicles that use for transportation in project site have to meet standards of
technical safety and emission which are applied for vehicles;
Provide Project Site Signs at area near roads on both sides of the river;
Uphold red light on the project site during night time;
Appropriate regulation of vehicles during construction phase to avoid traffic obstacles
for local people;
Due to sloping terrain with quite a lot of bends so contractors should consider carefully
EMP - Bao Lam 1 Hydropower plant - Cao Bang Province
Page 50
Issues/Responsibilities Mitigation and Management Measures
in case sending vehicles in the night time to ensure safety for drivers and local people;
To ensure all vehicles meeting loaded permission so that it could mitigate the damage of
road. Responsible for repairing the damaged road in case the road is damaged by
contractors because of overload transportation;
Propagandize to improve awareness of compliance with traffic safe regulations for
drivers.
10. Construction
of access road
and transmission
line
Contractors The roads which will be newly built must meet the designed standards of road presented
in TCVN 4054-2005 (width of surface/foundation, slope, radius, visibility, angle of
rotation, gutter etc).
Transmission line and switchyard are complied with the regulations and standards
presented in Decision No 34/2006/QD-BCN on safety of low voltage works.
Location of electricity poles is chosen to avoid sloping points (the slope should be less
than 300). It should limit excavation/backfilling in case of sloping sites.
To arrange the appropriate distance of poles to ensure the distance of transmission lines
at the intersection is larger than 3m-5m depending on each intersection. The fixing wire
board is used for insulator in the whole transmission line.
In the intersection between transmission line and the National/Provincial roads, the
distance from transmission line to the surface of road is larger than 7m to ensure
meeting the safe standard.
The contractors are responsible for repairing the existing medium and low voltage
transmission lines or telecom lines if they are damaged by contractors during
construction and drawing the cable.
EMP - Bao Lam 1 Hydropower plant - Cao Bang Province
Page 51
Issues/Responsibilities Mitigation and Management Measures
During drawing the cable, the warning signals must be arranged at the intersection
between transmission line and the roads as well as the person to guiding transportation
must be assigned.
To comply strictly regulations on safe corridor of transmission line (level of height, sag) to
meet EMF standards during operation phase.
Application of safe constructed measures and prevention of traffic obstacles to local
people.
Priority to reuse topsoil from excavation process to backfilling the foundation, do not
use new soil for that work;
Topsoil must be kept and stored in the right of way then reused to recover vegetation;
To backfill the borrowed pits, creation of the embankments, planting trees on the surface
to prevent erosion/landslide and landscape after construction phase.
11. Management
of hazardous
materials (fuels,
lubricants,
explosives etc.)
Contractors Ensuring of safely hazardous materials storing was agreed by the Employer and was
approved/liciensed by Department of Natural Resources and Environment and by Local
Government;
01 fuel/lubricant storehouse is arranged at the left side, downstream of dam. It is ensured
at least 300 m far from surface water and residential areas;
Storehouse floor must be lined by anti-seepage materials (thick nylon) or 5 cm thick
concrete layer to avoid contamination of oil and grease into ground and underground
water;
Gutter to collect oil/grease is designed surrounding storage in case of oil spilling;
EMP - Bao Lam 1 Hydropower plant - Cao Bang Province
Page 52
Issues/Responsibilities Mitigation and Management Measures
To prepare the extinguishers and oil suction apparatus in case of happening incidents;
Hazardous chemicals (gasoline, diesel…) must be stored in the tanks with their volume
must be 110% of volume as required, in good conditions with labels;
To comply strictly with regulations of storage, transportation and usage of hazardous
chemicals and explosives as regulated in Vietnamese Standard 5507:2002 Hazardous
Chemicals - Safety Regulations in production, business, usage, storage and
transportation;
Labors who work directly with fuel, explosives must be trained on safety technique
relating to chemical, explosive, fire precaution, oil spilling etc;
To minimize storage of explosives at most on the construction site. In case of explosives
are used and stored in the short term, explosive storage must be located more than 100 m
far from surface water sources and 500 m from residential area;
Disseminating safety procedure to labors who hand directly with hazardous chemicals.
To mark warning notices and regulations of safety on site when handling with hazardous
chemicals;
It is compulsory for workers to use the labor safe equipments when handling with
hazardous chemicals;
Refueling operation and construction equipment maintenance must be conducted in the
area which was approved in case of oil and material spilling;
Collection, transportation and disposal must be carried by the company who was
licensed in dealing with hazardous waste as regulated in Circular 12/2011/TT-BTNMT
dated April 14 2011 of MONRE.
EMP - Bao Lam 1 Hydropower plant - Cao Bang Province
Page 53
Issues/Responsibilities Mitigation and Management Measures
12. Noise Investor Monitoring implementation of mitigated measures which are done by contractors;
Propagandizing to improve drivers’ awareness to avoid impact of noise to local people;
Investor must coordinate to contractors for consulting Ly Bon commune authorities and
local people in case of necessary to blasting or construction in night time.
Constructed/materi
al supplied
contractors
Noise control planning in construction stage should be built and submitted to investor
for approval and management;
Requesting to check regularly on technical status of machines and equipments to ensure
they meet the noise standards which are presented in QCVN 26:2010/BTNMT to
mitigate impacts to workers;
The appropriate working time should be arranged, avoiding to blasting and construction
in night time;
Must coordinate to investor for permission of Ly Bon commune authorities and related
local people in case of necessary to blasting or construction in night time;
Vehicles that transport the materials, machines have to use the horn with noise level
meeting the standards of noise for transportation;
Propagandizing to improve drivers’ awareness so that they do not make impact of noise
to local people;
To avoid sending vehicles during night time to mitigate noise that affects to local people
living along roads.
EMP - Bao Lam 1 Hydropower plant - Cao Bang Province
Page 54
Issues/Responsibilities Mitigation and Management Measures
13. Dust Investor Monitoring in order to ensure that mitigate measures be fully carried out by the
Contractors;
Personel and budget resources for conducting and monitoring EMP of project must be
allocated sufficiently.
Contractors Machines and equipment in compliance with the national standards of emission as
regulated in 249/2005/QD-TTg issued by Prime Minister of Emission Regulations for
transportation vehicles;
Humidifier should be applied in dry season to ensure the site hygiene as well as
workers’ health;
Material should be mobilized reasonably in order to mitigate stagnant in the site causing
traffic congestion and dust;
Transported trucks must be covered by tarpaulin to avoid scattering and dust. All
transported trucks’sizes must be matched and not over loaded in transportation;
Trucks’ Wheels must be washed before leaving the site at car washing stations supplied
at the site’s entrances in order to mitigate dust in transportation roads;
Roads should be clean up immediately if there are any scattering.
Material Supply
Contractors
Material transported trucks must be covered by tarpaulin to avoid scattering and dust.
During transportation along the roads or through the residential areas, drivers should
give up way for local people to prevent dust for them.
EMP - Bao Lam 1 Hydropower plant - Cao Bang Province
Page 55
Issues/Responsibilities Mitigation and Management Measures
14. Domestic
waste water
management
Investor Each worker camp is arranged septic tanks to collect and treat domestic waste water of
workers. The waste water must meet the permission standards before discharging into
the environment.
Contractor Propagandizing to improve workers’ awareness on environmental hygiene;
To prohibit workers discharging waste into streams which lead to contaminate domestic
water of the local people;
Punishing workers who do not comply with the above regulations.
15. Constructed
waste water
Constructed
Contractor
To collect grease and oil generated from car parking and equipments/machines
maintenance stations then sell to companies who is allowed to treat the hazardous waste
as regulated in Circular 12/2011/TT-BTNMT dated April 14 2011 issued by Ministry of
Natural Resources and Environment;
To build the pits which collect mud/sand in the following sites before discharging waste
water in to environment:
- Rock grinded stations
- Concrete mixed stations
- Cement waste water contained grounds etc
16. Exploitation
of Natural
Resources
Investor To recommend to Cao Bang Department of Natural Resources and Environment not
allow constructed agencies to exploit natural resources in riverbed (sand, gravel) but in
fact gold mining.
EMP - Bao Lam 1 Hydropower plant - Cao Bang Province
Page 56
Issues/Responsibilities Mitigation and Management Measures
Contractors Exploitation natural resources in riverbed serving to construction should be prohibited.
Materials must be exploited at the licensed material quarries with commitment of
environmental protection.
17. Chance find
of cultural
artifacts, and
areas/structures
of local cultural
value
Investor To prepare the procedure in case of finding historical/cultural/archeological artifacts and
request constructed contractors must to comply during construction phase;
If main components (transmission line, internal road, etc) go through or locate in the
areas that have tombs, the investor must cooperate closely with consultant to adjust
design;
Beside, the investor consults authorities and local people to find suitable solutions to
move ashes following the local customs.
Contractor In case of any historical/cultural/archeological artifacts that may be encountered during
excavation: excavation works must be stopped and the Investor, Ly Bon and Vinh
Quang Commune People Committees, Bao Lam District, and Cao Bang Department of
Culture, Sport and Tourism must be immediately informed; the locale must be guarded
to solve by local authorities;
Prohibiting workers to remove any historical/cultural/archaeological artifacts. This is
supposed to be illegal actions;
Construction work will only be continued after being permitted with notice in writing
from the authorities;
Coordinate with local authorities and local people to compensate, remove in accordance
with customary in case of finding graves in the bed of lake.
EMP - Bao Lam 1 Hydropower plant - Cao Bang Province
Page 57
Issues/Responsibilities Mitigation and Management Measures
18. Water Supply
for workers
Contractror To arrange pipelines which take water from higher mountain/hill parallel with digging
wells for domestic water usage;
To build man-made tanks which use to filter for domestic usage of workers.
19.Safety issues
in the
construction
process
Investor Coordinating with constructed contractors to establish labor safe regulations which force
workers to comply;
Assigning 01 staff to supervise labor safe issues of contractors;
Coordinating with contractors to solve on time the risks/accidents which happen during
construction.
Contractors The contractors are responsible for ensuring work safety for the whole engineers and workers
on the construction site as in details:
It is mandatory for workers to attend training courses on labor safety before they are
recruited to work for the project;
Supervise periodly on compliance to labour safe measures of workers at project sites;
Training courses on labor safety for workers are held periodically to improve their
knowledge and awareness in term of compliance with safety measures;
To provide necessary safety facilities for workers;
A person will be assigned to work as safety staff. He/she is responsible for supervising
and speeding up the compliance with regulations of labor safety of workers;
EMP - Bao Lam 1 Hydropower plant - Cao Bang Province
Page 58
Issues/Responsibilities Mitigation and Management Measures
To have timely measures in the event of happening accidents;
Do suspend all work absolutely during heavy rains or emergencies of any kind in
anticipation of landslide, accidents caused by open circuit that may lead damage for
worker’s health and lives.
To equip fully fire extinguishers in the worker camps and the construction sites.
20. Management
of sanitary and
safety and
prevention of
disease infection
in campsites.
Investor Assign 01 staff responsible for health care of workers in the project site;
Coordinating with constructed contractors to make plan of workers’ health care during
construction phase;
Coordinating with contractors to establish the precautionary program of sexual
transmitted diseases, especially HIV/AIDS precautionary program, among labors;
Supervising the implementation of mitigation measures in term of food safety,
environmental sanitation, disease transmitted precaution which must be done by
contractors.
Contractors 01 staff who is responsible for health care of workers in the project site will be assigned
by contractors;
A first aid kit will be provided at each construction site to ensure patients can receive
first aid timely before transporting them to the medical station/hospital;
Monitoring regularly to keep sanitary in campsite, construction sites in order to
precaution of pathogenesis/disease transmission relating to digestive and respiratory
system. To require workers using mosquito nets to prevent petechial/marsh fever;
To propagandize food safety and hygiene for workers;
EMP - Bao Lam 1 Hydropower plant - Cao Bang Province
Page 59
Issues/Responsibilities Mitigation and Management Measures
To build toilets in campsite which must meet environmental standards. To prohibit
discharging of domestic solid waste directly in to the environment. Domestic solid waste
must be hygienically collected, stored, transported and treated;
Carrying out the precautionary program of sexual transmitted diseases, especially
HIV/AIDS precautionary program, among labors;
Coordinating with Investor to make and implement plan of workers’ health care during
construction phase;
Provide communication/entertainment facilities for workers.
21.Worker
Regulation
Investor Coordinating with contractors to establish worker regulation and manage them during
construction phase;
If constructed contractors recruiting workers who come from the other regions, they
must be informed investor to register temporary residence with the Ly Bon, Vinh Quang
commune authorities;
Investor is responsible with the Ly Bon, Vinh Quang commune authorities for all issues
relating to worker management during they stay in locality for project construction.
Constructed
Contractors
Coordinating with investor to set up worker regulation;
Responsible for worker management during construction phase;
Informing to investor in case the workers coming from other regions to register
temporary residence with the Ly Bon, Vinh Quang commune authorities;
The following activities are prohibited on and near project site:
EMP - Bao Lam 1 Hydropower plant - Cao Bang Province
Page 60
Issues/Responsibilities Mitigation and Management Measures
- Cutting of trees for any reason outside the approved construction area;
- Hunting, fishing, wildlife capture, or plant harvest;
- Disturbance to anything with architectural or historical value;
- Building fires outside camp areas;
- Use of firearms (except authorized security guards);
- Use of alcohol by workers during working hours;
- Use of drugs and stimulants which are prohibited;
- Washing car, motorbikes or machinery in streams or creeks.
- Doing maintenance (change of oils and filters) of cars and equipment outside
authorized areas.
- Disposing trash in unauthorized places;
- Driving in an unsafe manner in local roads;
- Having caged wild animals (especially birds) in camps;
- Working without relevant safety equipment (including boots and helmets);
- Creating nuisances and disturbances in or near communities;
- Disrespecting local customs and traditions.
22.
Rehabilitation of
all Project sites
Investor Recover vegetation in all project components to prevent erosion in rainy season;
After construction phase, planting trees/grass in the surface of all borrow pits (disposal
sites, campsite, material temporary loadings etc);
EMP - Bao Lam 1 Hydropower plant - Cao Bang Province
Page 61
Issues/Responsibilities Mitigation and Management Measures
after construction
phase.
Planting in combination of 3 types of trees including long term trees, grass, and shrub
with priority of indigenous plants especially in re-vegetation areas;
Landscaping at project site after construction phase.
23. Affected
people
Investor Upgrading/Reparing water supply pipeline for affected households or irigation system
to ensure supplying fully water for agricultural activities of local communities incase if
is damaged by project;
Coordinating with local authorities to provide documents on compensation of land and
property on land, EMP to affected households within project area;
Upholding downstream’s flow to ensure development of aquatic life and do not affect to
fishing based on natural condition.
To ensure the pulpil could be safety to go to school, other replacement access road
(600m) which connect the schools and National highway No. 34 will be provided;
Preparing and implementing the awareness raising program in traffic safety for relevant
stakeholders to minimize the risks of traffic accidents.
OPERATION PHASE (Power Construction Joint Stock Company No. 1 is responsible to implement mitigation measures of
environmental affects in operation phase)
24. Noise (from the hydropower
plant)
Turbines and/or associated rotating equipment should be designed to meet international
standards of noise (85~90 db at 1 meter) comply with QCVN 26:2010/BTNMT;
Design and procurement of equipments should specify requirements to meet standards
of noise;
Monitoring periodically the noise level outside the fence of hydropower plant. To
EMP - Bao Lam 1 Hydropower plant - Cao Bang Province
Page 62
Issues/Responsibilities Mitigation and Management Measures
implement the measures of noise reduction in case it exceeds the standards.
25. Labor safety issues and worker
regulations
To arrange fire-extinguishers at necessary places;
To set up the procedures of safe operation;
To arrange the first aid cabinet so that it can carry out the first aid measures on site;
To assign a staff in each shift who is responsible for labor safety;
Labor regulation is defined similar to the construction phase.
26. Change in downstream flows For the reservoir: the flow is controlled strictly by developer following the regulations
on reservoir operation, discharging water. Developer is responsible for informing in
time on plan of water discharging to local authorities to prevent damage of health, life
or assets of downstream communities.
Investor is responsible for informing widely to local residents, organizations and
authorities on water level fluctuation of Bao Lam 1 flow in downstream to ensure safety
for health and asset as well as production and agricultural activities in the downstream
area.
Investor is responsible for compensating in case of damaging to asset of communities
due to discharging flood.
For the downstream distance after the power plant: developer commits to comply strictly
the approved operation procedures of reservoir. During operation phase, developer will
regularly coordinate to local authorities in monitoring water level and erosion to provide
suitable mitigation measures.
EMP - Bao Lam 1 Hydropower plant - Cao Bang Province
Page 63
Issues/Responsibilities Mitigation and Management Measures
27. Impairment of water quality To clear vegetation cover before flooding reservoir to prevent pollution of water;
Embankments are build at locations which are exposed to danger of landslide;
To built separated systems of domestic and industrial waste collection and treatment
which meet permitted standards prior to discharge into the environment;
Domestic solid waste is hygienically managed then transported to the dumpsite for
treatment;
Recovering vegetation at construction sites to mitigate erosion and water resource
protection.
28. Plant plankton residing in the
reservoir
In case of increasing too much planktons which leads to water pollution so it is
necessary to remove vegetation from the reservoir;
Pesticide is prohibited to use for planktons treatment.
29. Reservoir sedimentation Prohibition of cultivated activities in the semi flood area.
To coordinate to local authorities in supervising of prohibition of destroy forest in
reservoir surrounding area especially the semi flood area.
To monitor erosion of reservoir bank two times per year. To take the initiative in
implementing mitigation measures such as planting trees, building breakwaters at points
that expose to serious erosion.
Planting trees on the project component sites after construction phase to mitigate erosion
and sedimentation of reservoir;
Discharging sediment through bottom culvert and dredging the reservoir if necessary.
EMP - Bao Lam 1 Hydropower plant - Cao Bang Province
Page 64
Issues/Responsibilities Mitigation and Management Measures
To mitigate erosion of the river banks behind power house, the energy eliminated hole is
designed to reduce flow rate after discharging canal of power plant so that the flow
returning to original flow of river.
To monitor erosion of river banks in downstream and provide the appropriate mitigation
measures such as building breakwater, dealing to breakdowns that occur by erosion.
30. Monitoring and maintaining the
replanted vegetation cover
Monitoring and maintaining annually vegetation cover which is replanted after
construction phase
31. Management of hazardous
substances ( fuel, lubricant, etc)
The same to the measures presented in item No 11.
32. EMF To provide facilities of EMF protection and request staffs/workers who work directly in
the EMF arised areas comply strictly rules on labor safety.
As statistic data, in the safe distance of transmission line, the intensity of EMF is less
than 5kV/m that meets to WHO standards on EMF. The local resident who is living or
working in the safe distance of transmission line will not be affected by EMF.
To supervise periodly transmission line (lowest sag) to ensure meeting the standards on
EMF safety.
33.Emergency cases Storage of water and reservoir operation procedures must be complied to regulation of
reservoir.
Annualy, before flooding season, the director of Bao Lam 1 power plant make report
and organize the meeting with representatives from flood control sterring committes of
districts of Bao Lam, Bao Lac and Cao Bang province to approve the detail plan of flood
EMP - Bao Lam 1 Hydropower plant - Cao Bang Province
Page 65
Issues/Responsibilities Mitigation and Management Measures
control. The minute of meeting must be sent to each members of flood control sterring
committes of Bao Lam, Bao Lac districts for cordination in implementation. The detail
plan of flood control will be submitted to flood control sterring committes of Cao Bang
province for supervision.
Prepare the risk responding plans and strictly comply with regulations on dam safet and
safety operation, which include: i) Building up the communicate system with local
authorities and people to timely inform when risks occurs; ii) Compliance with design
standards on the dam stable monitoring equipment system; iii) Rapidly informing to
local authorities since the risks occur for appropriated responding action plans;
Dam breakdown risk responding plan:
An appropariate Dam breakdown risk responding plan need to be prepared and
updated every years to ensure rapidly responding actions;
Cooperating with local authorities to supervise when implementing the updrating and
maintain the dam;
Loss compensation for affected peoples and areas when the breakdown risk
occurring;
Training the detail responding activites and assistance to relocate and remove the
affected people and areas
Annualy before the rainy period, the director of Bao Lam 1 Power Plan need to
prepare the plan and work with Flooding Preventation and Responding Steering
Committees of Bao Lam, Bao Lac districts and Cao Bang province to approve the the
detail responding action plan.
EMP - Bao Lam 1 Hydropower plant - Cao Bang Province
Page 66
Issues/Responsibilities Mitigation and Management Measures
Annualy, from June, Bao Lam 1 power plant must check the whole equipments,
machines, hydrolic works such as generators, communication facilities, equipments to
monitoring water level, practising and checking of technology and procedures of flood
discharging.
To comply strictly rules on operation, maintaining, reparing of electrical equipment,
regulations of power plant, transmisison line and switchyard.
To train periodly on electrical safety, prevention of fire for staffs
To dissiminate electrical safe regulations at work places for staffs.
To monitor and provide regularly fire-extinguishers at neccesary places and provide
emergency aid for staffs in case of fire
EMP - Bao Lam 1 Hydropower plant - Cao Bang Province
Page 67
Chance finds procedures
If the Contractor discovers archeological/historical sites, monuments and objects,
including graveyards and / or individual graves unearthed during construction, the
contractor will be responsible for:
To stop the construction activities in the chance find area.
To delineate the location or found area.
To protect the area to prevent the object from being damage and lost. For
artifacts or remains, the night guard will be allocated directly until the local
government has the responsibility or the Department of Culture and Information
takeover.
Inform the Investor to notify for the local government or the nations
undertaking the cultural heritage of Viet Nam (within 24 hours)
Relevant local/central authorities will be responsible for the area protection and
conservation before providing the decision on the later appropriate procedures. Then
they will implement the preliminary evaluation on the excavated findings. The
significance and importance of these findings should be evaluated according to various
criteria relevant to cultural heritage, including aesthetic value, historical or scientific
research, economic and social values
The decision of findings treatment will be made by the responsible agency. This
decision covers the layout (such as in case of detecting the rest of the cultural or
archeological importance cannot be moved) conservation, preservation, restoration and
salvage.
If the cultural area and/or heritage evaluated by the experts and the Cultural Relics
Management agency’s regulation are valuable and should be preserved, the developer
have to change the design in accordance with the required conservation of the area
The decisions of findings management will be notified in writing by the related
agency.
EMP - Bao Lam 1 Hydropower plant - Cao Bang Province
Page 68
5. ENVIRONMENTAL MONITORING PLAN
Table 5-1 Parties involved in environmental monitoring
No. Agency Main Responsibility Content and form of
report
Frequency
1 Contractor To carry out the proposed mitigation
measures in EMP
To report to investor the implementation of
mitigation measures.
Refer to the table
5.3
Submitting report
to Investor
monthly
2 The Participate
Bank - BIDV - The PB review the EMP and ensure
that EMP commitments form part of the loan
agreement.
During subproject implementation, each PB will
supervise subproject implementation to ensure
that the responsibilities and protocols specified
in the EMP are being properly followed and
document their findings as part of their overall
reporting of subproject supervision.
PB will submit quarterly progress reports on
ESF compliance of REDP developers to the
Administrative Unit (AU).
Every 6 months,
submit report to
AU
3 Investor To join EMP into detail technology design
and construction bidding contractors.
Refer to the table
5.3
Submitting
quarterly reports
to BIDV
EMP - Bao Lam 1 Hydropower plant - Cao Bang Province
Page 69
To carry out the proposed mitigation
measures in EMP
To monitor construction activities and
ensure that the contractors comply to
environmental requirements in the
contracts and EMP (Terms of reference for
environmental staff in monitoring EMP is
presented in the Annex 2).
To report to BIDV Hanoi/GDoE PMB the
implementation of mitigation measures.
Hanoi/GDoE
PMB
4 Independent
Monitoring
Consultant
To monitor (by observation) and assess
environmental quality based on parameters
suggested by this EMP report.
To conduct public consultation to received
comment, assessment of local people on
environmental management of the Project.
Refer to the table
5.4
Submitting bi-
annual reports to
BIDV
Hanoi/GDoE
PMB
EMP - Bao Lam 1 Hydropower plant - Cao Bang Province
Page 70
Table 5-2 Environmental monitoring plan
Parameters Monitoring Measure Monitoring location
1. CONSTRUCTION PHASE
Selecting of campsites
and supplementary
areas
Visual observation the following issues:
Location of campsites:
How far from them to surface water and residential areas?
How investor arrange water supply?
Does investor build tanks to filter water?
Camp sites
Water supply
resources
Location of supplementary areas:
How far from them to surface water and residential areas?
Location of disposals/dumpsites:
How far from them to surface water/worker’s camps?
Concrete mixed
stations
Vehicles, machines
parking
Material yards
Equipment/machine
repaired workshops
EMP - Bao Lam 1 Hydropower plant - Cao Bang Province
Page 71
Parameters Monitoring Measure Monitoring location
Vegetation clearance
and topsoil stripping
Check and visual observation the following issues: The flora gathering
area after its cut-off;
Topsoil temporary
stored site
Work with investor
Vegetation clearance plan
Measures of vegetation clearance
Topsoil stored areas (disposal sites) are applied measures of protection
from erosion/run-off water?
Does project build holes/gutters/embankments?
Does project has landscape rehabilitation plan/Does it implement? Work with investor
Detect bombs and
mines
Checking bomb and mines disarming document proposed in the project Work with investor
Domestic and
constructed solid waste
management
Visual observation the following issues:
Does project generate discarded rock/soil?
Do discarded rock/soil affect on water quality or flow of water?
How to collect domestic solid waste?
How to treat domestic solid waste?
How to manage dump sites?
Disposal sites
Dump sites
Topsoil storage sites
Camp sites
Removal of discarded
vegetation out of
reservoir area
Visual observation the following issues:
Checking the plan of vegetation clearance
Work with investor
Check the reservoir bed.
EMP - Bao Lam 1 Hydropower plant - Cao Bang Province
Page 72
Parameters Monitoring Measure Monitoring location
Is it correct to cut off trees in the required areas?
Does collection of valuable wood out of the reservoir implement?
Is burning the remaining tree leaves/wood well done?
Erosion and
sedimentation
Visual observation the following issues: The construction sites
Do construction activities carry out in dry season?
Are measures to mitigate erosion/landslide applied at construction sites?
Are holes/ditchs/embankments built at danger sites of landslide in
construction areas?
The sites expose risk of
high erosion/landslide
Transportation and
traffic management
The following issues should be checked:
Certification of vehicles that serve for project meet
technological/emission standards
Attested document of vehicles/machine periodic maintenance
Do transportation cause traffic jam or damage the road?
Contracts signed with contractors supplying materials/equipments
Dam area
Powerhouse
Working with investor
Management of
hazardous substances
The following issues should be checked and assessed:
Hazardous substance storage:
Is it lined by anti-seeped ground?
Is it protected with protected roof?
Work with investor
Check the storage
EMP - Bao Lam 1 Hydropower plant - Cao Bang Province
Page 73
Parameters Monitoring Measure Monitoring location
Is it locked and isolated with surrounding area?
Check permission of Cao Bang Province’s Department of Industry
and Trade if explosives is stored;
Check dissemination and material supply about toxicity, safe manual
with hazardous substance;
Noise The following issues should be checked and assessed:
Does noise level at the construction sites impact on the nearest
residential area?
Interview local people and leaders living in the nearest area whether
the project makes noise in rest time, evening time?
Interview local people whether investor asks their permission to work
in evening time?
If there is any claim about the noise, request investor to measure the
noise level and give appropriate measures to mitigate its impact
Contracts signed with material supplied contractors.
Project area,
The nearest
residential area
Interview the local
people and
authorities
Working with
investor
Dust The following issues should be checked and assessed:
Is water sprayed fully in dry season at sensitive sites?
Does trucks used for transport material covering by tarpaulin?
Contracts signed with material/machine supplied contractors
Interview with local people about dust pollution
The construction site
Material transported
trucks
Working with investor
EMP - Bao Lam 1 Hydropower plant - Cao Bang Province
Page 74
Parameters Monitoring Measure Monitoring location
Water quality
management
The following issues should be checked and assessed:
How does sewage collection and treatment system implement at
campsites? Are there septic tanks?
Does sewage discharge directly into environment without treatment?
Do the septic tanks in campsites keep sanitary?
Are oil and grease from vehicles/machines maintenance collected?
Are ditchs/pits/embankments built at supplementary areas to collect
sand/soil/cement before discharging into environment?
Is water quality measured periodically as presented in EMP/EIA?
Campsites;
Crushing and mixing
concrete area
Vehicle maintenance
area;
Working with investor
on document of water
quality measurement
Safety Visual observation (combine with information collection on health protection
plan and safety issues):
Is health and safety plan prepared?
Are safe tools & equipments provided to and being used by workers?
Are labors trained and disseminated information on safety?
Are there any warming notice and boards guiding safety handling to
hazardous chemicals?
Construction sites
Storage area
Working with investor
EMP - Bao Lam 1 Hydropower plant - Cao Bang Province
Page 75
Parameters Monitoring Measure Monitoring location
Worker health care
Are first-aid kits for workers equipped?
Do they clean up well the drainage? Is there mosquito net for sleeping?
Are workers trained about food safety and prevent sexually infected
diseases?
Is there any disease for workers and did they treat by local health care
centre?
Camps
Working with investor
Interview workers
Worker regulation To assess implementation of regulations for workers as specified in item 19
of Table 4.1.
Finding of cultural
artifacts, and
areas/structures of local
cultural value
Observation, information collection, assessment of the below-mentioned
issues:
Excavation area of
soil/rock
Interview workers
Along transmission line
Let check whether contractors/ investor/ related persons be informed
the relevant organizations if accidental find of articles of cultural
value?
Do contractors and related persons have followed procedures?
Are there findings on cultural property and historical heritage in the
soil/rock excavation?
How are chance find procedures in place when accidental find of
articles of cultural value?
EMP - Bao Lam 1 Hydropower plant - Cao Bang Province
Page 76
Parameters Monitoring Measure Monitoring location
Location of tombs or valuable structures to local people
OPERATION PHASE
Noise Observation at site, interview people to assess the following issues:
Do noise from the powerhouse affect the local people?
The area out of the
fence of powerhouse
If there is any claim about the noise, request the investor to measure noise
at site.
The nearest residential
area
Safety and regulations to
workers
The following issues should be checked and assessed:
Are fire extinguishers equipped at site?
Check complying regulations for people as item 19 in Table 4.1
Powerhouse area
Operation house and
workers’ camps (if any)
Management of water
quality in reservoir
The following issues should be checked and assessed:
Is there any erosion at reservoir side? Are reinforcing measures
applied?
Is domestic waste water collected and treated prior discharging into
the environment?
Is there phenomenon of eutrophication in reservoir? Does investor
remove floating vegetation from the reservoir?
In the reservoir bed
Operation house and
powerhouse
Management of hazardous
materials (fuels,
lubricants, explosives etc.)
The following issues should be checked and assessed:
Are hazardous materials stored in safe conditions?
Does the investor equip facilities, provide information and guide safe
In the plant and fuel,
material and chemical
EMP - Bao Lam 1 Hydropower plant - Cao Bang Province
Page 77
Parameters Monitoring Measure Monitoring location
process to hazardous materials? storage areas.
EMP - Bao Lam 1 Hydropower plant - Cao Bang Province
Page 78
Table 5-3 Form of in-site environmental monitoring report
(Apply for contractor/investor)
Project name: Project location:
Name of Contractor:
Commencement of Project report or monthly report:
Date of report:
No. Issues Mitigation measures implemented Remark
Construction Phase
1 Selecting of construction camps and supported facilities
2 Vegetation clearance and topsoil stripping
3 Detect bomb and mines
4 Domestic and constructed solid waste management
5 Removal of discarded vegetation out of reservoir area
6 Soil erosion and sedimentation
7 Transportation and traffic management
8 Management of hazardous substances
9 Noise
EMP - Bao Lam 1 Hydropower plant - Cao Bang Province
Page 79
No. Issues Mitigation measures implemented Remark
10 Dust
11 Water quality management
12 Safety
13 Worker Health Care
14 Worker Regulation
15 Chance find of cultural artifacts, and areas/structures of
local cultural value
16 Vegetation cover including reforestation
Operation Phase
1 Noise
2 Surface water quality
3 Waste water
4 Solid waste
5 Vegetation cover maintenance
EMP - Bao Lam 1 Hydropower plant - Cao Bang Province
Page 80
No. Issues Mitigation measures implemented Remark
6 Environmental flow
7 Management of hazardous materials
8 Safety
9 Labour Health Care
10 Working regulation
Name of person prepared this Report:
Title:
Address:
Telephone:
EMP - Bao Lam 1 Hydropower plant - Cao Bang Province
Page 81
Table 5-4 Form of EMP implementation monitoring report
(Applying for environmental monitoring report of independent environmental consultant)
Project name:
Project location:
Date of report:
No Impacts Assessment of Consultant/ community
complaints
Comments/Recommendations
Construction phase
1 Selecting of construction camps and supported facilities
2 Vegetation clearance and topsoil stripping
3 Detect bomb and mines
4 Domestic and constructed solid waste management
5 Removal of discarded vegetation out of reservoir area
6 Soil erosion and sedimentation
7 Transportation and traffic management
8 Management of hazardous substances
EMP - Bao Lam 1 Hydropower plant - Cao Bang Province
Page 82
No Impacts Assessment of Consultant/ community
complaints
Comments/Recommendations
9 Noise
10 Dust
11 Water quality management
12 Safety
13 Worker health care
14 Worker regulation
15 Chance find of cultural artifacts, and areas/structures of local
cultural value
16 Vegetation cover including reforestation
Operation phase
1 Noise
2 Surface water quality
3 Waste water
4 Solid waste
EMP - Bao Lam 1 Hydropower plant - Cao Bang Province
Page 83
No Impacts Assessment of Consultant/ community
complaints
Comments/Recommendations
5 Vegetation cover remaining
6 Environmental flow
7 Management of hazardous materials
8 Safety
9 Labour health care
10 Worker regulation
Report prepared by:
Address and contact information:
EMP - Bao Lam 1 Hydropower plant - Cao Bang Province
Page 84
Table 5-5 Requirements on environmental management reporting system
No. Contents 1st reporting level 2
nd reporting level
3nd
reporting level
(A copy sent to the district’s
Environment Management
Department )
CONSTRUCTION PHASE
1 Implementation of
mitigation measures
and on- site
environmental
management
By: Contractor
Frequency: Monthly
To: Investor
By: Investor
Frequency: Quaterly
To: BIDV Hanoi/GDoE
By: BIDV Hanoi
Frequency: Semi-annual
To: GDoE
No. Contents 1st reporting level
2nd
reporting level
(A copy sent to the district’s
Environment Management
Department )
CONSTRUCTION PHASE
1 Environmental
monitoring
By: Independent Consultant
Frequency: Semi-annual
To: Investor/BIDV Hanoi
By: Independent Consultant
Frequency: Semi-annual
To: GDoE/WB
EMP - Bao Lam 1 Hydropower plant - Cao Bang Province
Page 85
OPERATION PHASE
1 Labor safety and
environmental
monitoring
By: Investor
Frequency: Yearly for first two years
To: BIDV Hanoi
By: BIDV Hanoi
Frequency: Yearly for first two
years
To: WB/GDoE
EMP - Bao Lam 1 Hydropower plant - Cao Bang Province
Page 86
6. COMPLAINATION ON ENVIRONMENT AND PENALTY
While monitoring the scene if supervising/monitoring environmental officers discover
that there is non-compliance with regulations on the implementation of measures to
minimize environmental impacts mentioned in EMP then monitoring construction
staff/ environmental supervisor shall make the records and report the investor .The
investor will stop paying that month expense for the contractor until the contractor
performed adequate measures to minimize environmental effects. The contractor will
be extended one time (due to the construction supervision consultant / supervisor of
environmental regulate) to correct this violation. If the contractor performs the repairs
within the time extension he will not be penalized. However, if the contractor does not
conduct the repairs needed in the extension period, the contractor will have to pay for a
third party to repair the damage (this cost will be taken from retained). Investors must
make provisions for compliance and sanctions for environmental violations in the
contract with the contractor.
In case supervision staff / monitoring environmental officers find non-compliance with
the environmental regulations of the contractor, the contractor shall have to pay the
cost to repair the violation.
The investor is responsible for monitoring and implementing the EMP effectively. If
he does not fulfill the implementation of the EMP, the slow disbursement from the
project to the investors will happen
Environmental offices of the contractor will be the place to receive complaints from
citizens against environmental influences such as dust, noise, traffic safety,... The
Contractor’s Chief Engineer and Personnel Assistant with the safety and environment
officers will be responsible for carrying out or giving solutions to handle the above
issues. Officer safety and environmental construction supervision consultant (or team
management environment of the investor) will be provided with copies of the
complaints of the people and must confirm that the problems are properly resolved by
the contractor in a similar incidents were discovered when examining at site.
EMP - Bao Lam 1 Hydropower plant - Cao Bang Province
Page 87
7. ENVIRONMENTAL MANAGEMENT CAPACITY
BUILDING PLAN
7.1. In the preparation phase
Investor will send staffs who are assigned to manage environmental protection of
project to partipate the WB/GDoE training courses on preparation of EMP and public
consultation.
7.2. In the construction and operation phase
The assigned staffs shall participate the training courses on WB’s safeguard policies
under REDP. The investor will appoint 1-2 environmental staffs to attend the short-
term training courses on environment which are held by the local authorities.
Additionally, book, papers and documents will be bought byInvestorso that they
could update the environmental protection information.
Table 7-1 Cost estimation for environmental management capacity building
No Activites Costs (VND)
CONSTRUCTION PHASE
1 To appoint staffs to participate training courses held by
WB: 2 persons x 5,000,000 VND/person/training
course x 2 times
20,000,000
2 To appoint staffs to attend training courses held by the
local environmental authorities.
2 persons x 1,000,000 VND/person/time x 2 time
4,000,000
3 Purchase of books, documents, papers to update
information
10,000,000
TOTAL 34,000,000
OPERATION PHASE
4 Cost for annual training in the project running phase
(10,000,000 VND/year x 20 year)
200,000,000
TOTAL 234,000,000
EMP - Bao Lam 1 Hydropower plant - Cao Bang Province
Page 88
8. ENVIRONMENTAL MANAGEMENT COST
ESTIMATION
Table 8-1 Estimated cost for EMP implementation
No. Items Construction phase During operation phase
(20 years of life cycle)
1 Mitigation
measures
The cost is covered in
investment cost
The cost is covered in
operation cost
2
Recover vegetation
at project sites
after construction
phase
40,000,000 VND
(The cost is covered in
investment cost)
3
Detect mine 30,000,000 VND
(The cost is covered in
investment cost)
4
Monitoring costs
for the Project.
(By staff of
environmental
management team’s
company)
The cost is covered in
investment cost
The cost is covered in
operation cost
5
Environmental
quality monitoring
as required in
Environment
Accessement
Report
Construction Phase
25,000,000 VND
(Cost estimated)
Operation Phase
400,000,000 VND
(Cost estimated)
6
Monitoring costs
for independent
environmental
monitoring
consultant*
Lump-sum
(2 times/year x 2 years x
20,000.000/time) =
80,000,000 VND
Sub-total 175,000,000 VND 400,000,000 VND
This cost is covered in
production cost
Total 575,000,000 VND
EMP - Bao Lam 1 Hydropower plant - Cao Bang Province
Page 89
* This cost is paid by Project Management Board under GdoE
9. PUBLIC CONSULTATION AND DISCLOSURE
9.1. Public consultation
In the preparation phase, Power Construction No.1 JSC carried out the following tasks:
1 The feasibility study report and investment report of Bao Lam project were
submitted to the People Committees of Ly Bon, Vinh Quang and Bao Toan Commune.
Based on the comments from above local authorities on locations of the main
components, the investor can revise promptly project documents to get effective
investment and mitigate compensation of relocation and impacts on environment and
communities.
2 Social survey by interview directly representatives of local authorities and
affected households was done by investor. Results from these investigations show that
almost households and local authorities support to construction of project since it
provides benifits for local residents. Project also facilitates for local traffic from
internal roads.
3 Survey and statistic of environmental impacts as well as affected households
were done.
4 Preparing EMP report.
5 Consultation meetings on EMP report and other related issues were held at the
offices of Peope Committes of affected communes Ly Bon, Vinh Quang and Bao Toan
from 08-11 July, 2014. Participants consist of representatives from Power
Construction No.1 JSC, local authorities of communes of Ly Bon, Vinh Quang, Bao
Toan, environmental and social consultants, affected households (Minute of meetings
and list of participants are presented in the Annex 3). The main content of consultation
meetings as below:
Investor presented the main information of project:
Bao Lam 1 hydropower project has with the capacity of 30 MW is categorized
of impoundment, regulated by reservoir, annual electricity production of 115.7
x 106 kWh. The headwork consists of gravity concrete dam with n x b x h = 6 x
15 x 13.5m, spillway with BxH = 15 x 13.5m. Volume of reservoir is 8.9x106
m3. Designed flow: 365 m
3/s; minimum flow 37.1 m
3/s. Bao Lam 1 hydropower
project is under small hydropower master plan that was approved by Cao Bang
Provincial People Committee.
Construction of Bao Lam No.1 hydropower project as the same other ones will
cause some negative/positive impacts to environment and social and these
negative impacts are unavoidable. EMP is prepared following to the World
Bank safeguard policies and commites to compling to mitigation measures so
that the negative impacts could limit. Investor also develops CDM for Bao Lam
1 hydropower project and hope to have support from local authorities as well as
residents for project.
EMP - Bao Lam 1 Hydropower plant - Cao Bang Province
Page 90
Environmental consultant presented generally the environmental negative/positive
impacts and mitigation measures which will be applied by investor/contractors during
project implementation as below:
Positive impacts:
When finishing, project will supply stable power with high quality for the local
people. It will support to development of industrial, handicraft and traditional
sectors in the locality.
During construction and operation phases, project creates jobs for local people.
After formation of reservoir, climate in the project area becomes cooler with
higher humidity that facilitates for development of vegetation cover, trees and
reservoir aquatic species such as fish, snail, shrimp etc. The reservoir could
allow to develop aquaculture in the future which provides new jobs and income
for local residents.
Income from tax of water resource usage which is provided from project will be
added to provincial budget.
Project has installed capacity of 30 MW with annual electricity production of
115.7 million kWh. Project also applied CDM and as estimated the certification
emission reduction is received around 80,000 ton of CO2 per year.
Negative impacts:
Construction and operation of project must block river, storage water, build the main
components such as dam, powerhouse, swichtyard, transmission line etc that cause
some unavoidable impacts as below:
103.91 ha land will be appropriated permanently for buiding components of
headwork and some more land will be acquired temporary for supported
facilities.
Construction activities of components of headwork such as dam, spillway,
intake, powerhouse and swichyard have to excavation of soil/rock that cause
landslide/erosion at these sites.
Process of blocking river, constructing dam bringing about increasing turbidity
and reduction of water quality of Gam and Nho Que rivers.
Activities such as blasting, excavation of foundation, quarry, levelling soil and
rock, material transportation, rock grind, concrete mixing, operation of
constructed machines, construction etc will impact to environment causing air
pollution in case the mitigation measures are not applies.
In the construction phase, the operation of constructed/transported facilities,
concrete mixing, rock grind, blasting, using driller etc will create noise that
disturb to local residents.
Constructed and domestic solid waste that discharged from workers will cause
pollution of air and water river if it is not well controlled.
EMP - Bao Lam 1 Hydropower plant - Cao Bang Province
Page 91
In the construction phase, the aquatic species may lose temporary living
condition due to reduction of surface water quality that cause by random
spilling or rain sweeping away concrete, petrol, oil, gear, soil, rock etc.
However, this is only temporary and negligible impacts. They may be mitigated
because project has small scale and the construction time takes only 2 years.
Storage of water in the reservoir as well as operation of Bao Lam 1 hydropower
plant will cause changing of Gam and Nho Que river flows regime from behind
dam to downstream of powerhouse. In the project site, rive flow regime will
replace by reservoir hydrography regime that performs by fluctuation of water
level. In the operation phase, the reservoir has negative impacts to aquatic
species and fishs which have habit of emigration. This affect is unavoidable
when construction and operation of hydropower projects.
Some key main mitigation measures:
Environmental consultant presented briefly draft EMP which will be complied by
investor to mitigate negative impacts with some key measures as below:
The permanent and temporary acquired land due to project construction will be
compensated following compensation plan which is approved by local
authorities. During construction phase, cultivative and public transportation
acquired land for campsites, transmission line and supported facilities will be
limited by contractors.
The contractors are responsible for informing to local authorities and residents
on blasting time so that they do not travel or release cattle in the blasting areas.
Disposals have to meet criteria: far from surface water at least 100m, do not
affect to surface water, cultivative land, do not locate on the risk of erosion,
should locate on the hollow sites to mitigate sweep away by runoff water.
To establise the worker regulation at construction site containing regulations
such as prohibiting workers to discard domestic/construction waste into
surrounding areas, river, stream or places which may sweep away to surface
water.
Do not allow to burn solid waste to mitigate risks of forest fire.
After construction phase, the mine, borrow pits or disposals etc must be
restored by levelling ground then planting trees to prevent erosion.
Planting trees and controlling vegetation cover at reservoir surrounding area
especially in the places of semi-flooding, main components for more stability of
ground.
To arrange storehouses of petrol, fuels etc at minimum safe distances of 300 m
from surface water, local communities.
Investor commits to comply with EMP with the main issues presented above.
Questions and answers are summarized as below:
Ly Bon commune, Bao Lam district:
EMP - Bao Lam 1 Hydropower plant - Cao Bang Province
Page 92
Questions from representatives of local authorities and affected households
Chairman and vice chairman of People Committee represent Ly Bon commune
is one of the New Rural Planning Region’s affairs of province, due to Bao Lam
1 Hydropower Project construction activities of New Rural Planning Region
temporarily stop and affect to the local people’ life. Beside that, representatives
of local authority request investor to provide related documents of designs and
compensation to affected households. They suggest investor should has
harmonized compensation level and support stable livelihood for affected
households.
Vice chairman of Commune People Committee raised an issue of constructed
company taking advantage of the hydropower project construction to mining
lake (sand, gravel) which cause erosion and depletion of natural resources.
Beside that, there are some companies ask permission of sand mining on Gam
riverbed but the primary purpose of gold mining, therefore investor is required
to recommend to Department of Natural Resources and Environmen of Cao
Bang Province not to permit them to exploit.
Almost affected households consent to Bao Lam 1 hydropower project
construction but some of them wonder about compensation such as land areas
and price of compensation.
Answers of developers and environmental consultants
Compensation will resolve in the other working days with Resettlement
Committee and local authorities. Investor will provide documents relating to
compensation to coummne authorities. The method to culculate acquired land
as well as compensative expenses will be based on the current regulations
setting by the government and annual updated regulation of Cao Bang province.
Measures of livelihood stability for affected households will be considered by
investor.
Vinh Quang commune, Bao Lam district:
Questions from representatives from local authority and affected households
Chairman of communal people committee supports to Bao Lam 1 hydropower
project construction however he requires investor to deal with complaints from
affected persons on compensative procedures and expenses, count of property
on land.
Affected people complained on compensative land and expenses, livelihood
after acquired land for reservoir. They are worry about their livelihood after
powerplant is put into operation.
Some of affected residents raised issue of widening their land last year with
high price (because of buying and renting machine for grading) whether
investor compenses satisfactory in expenses as well as procedures.
Answers from investor and consultant:
EMP - Bao Lam 1 Hydropower plant - Cao Bang Province
Page 93
Compensation of land areas, expenses as well as procedures will be done by
current regulations. Investor will coordinate to local authority to harmonize the
compensative requirements from affected households.
Regarding to supporting livelihood and providing new jobs for affected
residents, investor will try to deal with at the best effort.
Bao Toan commune, Bao Lac district
Questions from representatives from communal people committee and affected
households:
Vice chairman of Bao Toan Commune People Committee support to
construction project. Bao Toan commune the affected one at least, however, it
is difficult for households lose their cultivate land to get new cultivate land
(because of almost cultivate land belong to owner). Construction will also affect
to vegetation, however, within 2 years in constructing, it will be recovered
afterward.
Cultivative land in the commune is reclaimation of residents from surrounding
areas so vice chairman requestsInvestorcoordinate to local authorities
supporting them on land ownership during compensative implementation.
Investor is required to issue worthy compensation and to support livehood for
affected resident.
Answers fromInvestorand consultant:
Investor will coordinate to local authorities and affected household preparing
compensative plan based on current regulations.
Issue of vegetation (environmental condition) will be regulated in EMP it is
committed to implement by investor.
6 To revise EMP following to comments from local authorities and affected
people in the consultation meetings as well as in surveys.
7 To provide EMP to communal people committee of Ly Bon, Bao Toan and
Vinh Quang to get comments from them.
8 To revise EMP again based on comments.
9.2. Disclosure
As policy of WB’s disclosure, investor will implement steps as below:
To provide EMP in Vietnamese version which is approved by WB to DONRE
of Bao Lam, Bao Lac and Ly Bon, Vinh Quang, Bao Toan Commune People
Committees.
Approved EMP Vietnamese version will be disclosure at project site during the
project implementation.
Announcement of EMP which is approved by WB to public during project
preparation and implementation in working time at Ly Bon, Vinh Quang, Bao
Toan Commune People Committees.
EMP - Bao Lam 1 Hydropower plant - Cao Bang Province
Page 94
To provide EMP in both English and Vietnamese versions to Information
Development Centre, 63 Ly Thai To street, Hanoi so that they are accessed by
NGOs and communities. EMP in English version is sent to WB Infoshop for
disclosure.
EMP - Bao Lam 1 Hydropower plant - Cao Bang Province
Page 95
List of reference documents
1 The compensation and relocation Plan of the project- Power Construction No.1
JSC
2 Investment Report of Bao Lam hydropower project - Power Construction No.1
JSC
3 The World Bank’s Safeguard policies;
4 Environmental Impact Assessment of Bao Lam No.1 hydropower project
5 Environmental safeguard framework for Vietnam Renewable Energy
Development Project- MOIT 2008, revised 2014.
6 Statistical yearbook- statistic publishing house
EMP - Bao Lam 1 Hydropower plant - Cao Bang Province
Page 96
Annex 1. List of EMP preparers
No. Name Agency
1 Mr. Trinh Van Tuan Director of Power Construction No.1
JSCo.,
2 Mr. Vu Anh Duong Head of Hydropower projects
management board
3 Mrs. Lai Thi Nhu Environmental staff
4 Mrs. Le Thi Thanh Nhan Environmental expert
EMP - Bao Lam 1 Hydropower plant - Cao Bang Province
Page 97
Annex 2. Responsibility of safe and environmental supervising officer
The Target
The safe and environmental supervising officer supports the EMP efficiently during
the Bao Lam 1 hydropower construction
To achieve the target of diminishing the environmental negative impacts of the project,
the contractor needs to comply with this management plan. Therefore, implementing
him environmental management plan will relate to the following units:
The safe and environmental officers of the contractor are responsible for supervising
the EMP and problems about safety and environment of the construction
The safe and environmental supervising officers of the developer are responsible for
the construction inspection and guarantee that the contractor will comply with the
requests in the contract and EMP
Tasks:
Overall responsibilities of the safe and environmental supervising officers including
supervision and inspection of construction activities to ensure that the mitigation
measures are implemented as appropriate in the plan so that environmental
management and the negative impact of the project on the environment is diminished.
The contractor is responsible for ensuring compliance with the environmental
management plan of the project and the contract conditions during construction under
the supervision of safety and the environment officer. Therefore, safety and the
environment officer is an independent supervisory personnel to ensure compliance
with the environmental management plan and ensure the full implementation of the
contractor for environmental issues
Personnel monitoring and environmental safety will examine monitor and implement
the environmental review for tenders and contracts for road construction. Supervisors
on safety and the environment have much knowledge and experience in monitoring
and verification of environmental issues and advise investors on implementation issues
of the project environment project. Personnel monitoring and environmental safety
should be familiar with the project work through the review of relevant reports,
including the report on environmental impact assessment (DTM) Bao Lam 1
hydropower project, environmental Management plan as well as the relevant technical
standards and contract documents.
Being a part of the construction examiner group, safety and environmental staff is
obliged to the following tasks
Phase 1: Preparation
The objective of Phase I is taking foundation for successful implementation of the
project. During this period, supervisors, safety and environment must: (i) consider the
DTM, environmental management plan, project design and technical standards to
assert not to miss these mitigation measures ; (ii) prepare guidelines for contractors in
the implementation of Environmental Management Plan; and (iv) develop and
implement training programs for activities related to construction.
EMP - Bao Lam 1 Hydropower plant - Cao Bang Province
Page 98
Main tasks for this phase are:
Desk study: supervisors on safety and the environment will review the DTM,
environmental management plan, project design and technical standards and certify in
writing expressly not to omit any mitigation measures. If problems arise, safety and
environment officers propose to the investor for additional updates in the
environmental management plan, project design and technical standards of this issue.
When the Investors, Board of Management and the World Bank project GDoE ratify,
personnel monitoring and environmental safety will conduct additional updates
environmental management plan
Enviromental supervision directory: The safety and environment officers need to
create an examination directory during the construction for supervising the
implementation of the contractor. This includes the core issue of the project, the
requested mitigation measures and implementation plan
Diary: safety and environment supervising staff of the Contractor shall keep diaries to
record events or changes possibly implicate the assessment of environmental impact
and non-compliance attached to the proposals. Diaries must be always ready to serve
when the supervisory staff support as mentioned in the environmental management
plan and contract suggest. Safety and environment staff of the investor will verify this
diary.
Environmental training : Environmental safety staff of the investors are obliged to
design and implement a comprehensive training program for the Supervision Engineer,
Owner, environmental safety officers of the contractor (and workers as part of training
for supervisors, safety and environment), the environmental requirements of the
project and methods for monitoring and evaluation, especially should pay attention to:
Environmental management plan: the requirements of the Environmental Management
Plan, approved check list in supervising environmental, environmental sample
monitoring and processing methods for non-compliance with the management plan
environment and all the issues will be mentioned. Special attention should be paid to
the specific terms of the contract emphasized on compliance with the environmental
management plan
Health and safety: Health and safety requirements of the project must be apparently
verified and coordinated to the contractors and the investor (included in the technical
standard environment for the contractors
At the end of training, the contractor will sign a confirmation through training grasp of
environmental regulations, the environmental management plan and compliance
framework, on the health and safety obligations. Construction supervisors must sign
the certification through training understand the oversight responsibilities.
Phase 2 Construction activities supervision
Safety and environment officer of the investors will represent the Owner and
monitoring Chief Engineer:
Examining and monitoring independently the implementation of the
Environmental management plan
EMP - Bao Lam 1 Hydropower plant - Cao Bang Province
Page 99
Performing random checks and review the profiles of environmental safety staff
of the Contractor
Proceeding the inspection frequently in the building section
Reviewing the implementation of the mitigation measures is not right with the
environmental management plan and contract documents
Reviewing the effectiveness of the mitigation measures and the implementation
of environmental problems;
Reviewing the terms acceptable environmental construction methodology
(including temporary works and permanent works), designs and related
submissions. If necessary, staff safety and the environment have to research and
propose solutions to the environmental impacts discussed with the designers,
contractors and Investors
Verifying survey cases of non-compliance of environmental quality and
effectiveness of the remedial measures;
Providing feedback to the Owner and Chief Engineer under the supervision of
the process of non-compliance with the Environmental Management Plan;
Organizing training programs, including team environmental safety staff of the
contractors, evaluating issues identified an improve environmental compliance
method;
To conduct the contractors to repairs within the prescribed time, conducting
additional monitoring, if required, in accordance with the provisions of the
contract and procedures in case of non-compliance and complaints
To conduct the contractor to take measures to minimize the impact and comply
with the environmental management process required in the case of non-
compliance and inconsistency
To conduct the contractor to stop the construction activities which can cause
negative effects, and / or if the contractor fails to perform the requirements of
the Environmental Management Plan / not conduct operations as directed the
supervisor of environmental safety.
Review of the plan at site: To ensure the consistency throughout the project, safety
and the environment staff must consider the entire plan could affect the environment.
These plans include, but are not limited to: plan pits and dumps. Supervisors on safety
and the environment will be considered and approved the environmental management
of the project and plans to restore the landscape of the contractor. What parts of the
plan does not comply with the environmental management plan, environmental impact
assessment, personnel and environmental safety of the investors will work with the
Chief Engineer and the Contractor to take appropriate measures.
Health and Safety: To ensure consistency throughout the project, the environmental
safety officer must consider all of the safety plan of the contractor, and on the basis of
this plan, with the data of the investor's input, to create a comprehensive plan for
safety projects. Comprehensive Plan about project safety must include processes such
EMP - Bao Lam 1 Hydropower plant - Cao Bang Province
Page 100
as blast management and safety in the construction process, preventing landslides / soil
erosion during the rainy season, ... These plans must be reviewed on an annual basis
and must be updated as necessary.
The supervisors on safety and the environment must ensure compliance with the
provisions of health and safety in the contract documents. This Compliance includes,
but is not limited to: (i) the construction activities; (ii) dissemination of education on
HIV / AIDS; (iii) comply with the labor law of Vietnam; and (iv) traffic safety. For the
prevention of HIV / AIDS, not only focusing on the construction site, but also pay
attention to the nearby communities.
In case of violation in the requirements of technical standards, or contractual
conditions or non-compliance with the environmental management plan, safety and the
environment monitor immediately notify to the Chief Engineer of the Contractor ,
Chief Engineer supervision and investor. Safety and the environment supervisors must
also report violations to the Investor as part of the monthly report.
Diary of safety and the environment staff must always be ready to provide, upon
request by the support team of project management
Safety and the environment supervisors have to regularly review records of the
Contractor to ensure that all records are updated in accordance with reality and meet
the requirements of the Environmental Management Plan (eg the records of complaints
about environmental issues).
The unintended effect: In case of the incident which was not anticipated in the
environmental management plan and DTM, safety and the environment monitors must
be closely coordinated with the investor, the contractor and the project manager to
confirm that the problem has been resolved. Safety and the environment supervisors
must update Environmental Management Plan and implement guidelines, based on
that training for contractor personnel
Monthly Payment: safety and the environment monitoring officer must certify the
monthly payment for activities related to the environment as proposed by the
Monitoring Officer safety and the environment to the investor.
Roadwork’s and landscaping restore: safety and the environment monitoring
officer must closely monitor the operation to restore the site and landscaping in areas
such as land mines, quarries, wash stations vehicles, to ensure that activities are carried
out according to acceptable standards. Safety and the environment supervisors must be
consistent with the contractor about the recovery plan which should be implemented
before the end of construction activities.
Human Resource for the Project: safety and environmental supervisors and building
monitors group is expected to be mobilized 1 month prior to construction
commencement. In January, the safety and environmental monitor will be familiar
with the project, project design, specifications, contract documents, environment
protection commitment, environment management plan and other reports and
documents related to the project. Based on the review, monitoring officer safety and
the environment will report a summary of the issues that may arise in the process of
implementing the environmental management plan and the conditions of the contract
EMP - Bao Lam 1 Hydropower plant - Cao Bang Province
Page 101
the recommend the Manager the best option to improve the process of implementing
the environmental management plan.
Supervisors and safety are expected to be mobilized in the early stages of the contract
to prepare the guidelines, documentation, training,
Report: environmental safety officers must make a minimum of the following
documents: ...
Weekly reports on issues of non-compliance;
Monthly report summarizes the main issues and findings during surveillance
activities;
Quarterly report from the contractor's monthly report
Reports and data must be provided as required by the project manager.
At the end of the project, safety and environment monitoring staff set up a final report
summarizing the main findings, the non-compliance, the solutions ... as well as
guidance on implementing orientation this mission later.
EMP - Bao Lam 1 Hydropower plant - Cao Bang Province
Page 102
Annex 3. The approval documents on EIA of Bao Lam 1 HP
EMP - Bao Lam 1 Hydropower plant - Cao Bang Province
Page 103
EMP - Bao Lam 1 Hydropower plant - Cao Bang Province
Page 104
EMP - Bao Lam 1 Hydropower plant - Cao Bang Province
Page 105
EMP - Bao Lam 1 Hydropower plant - Cao Bang Province
Page 106
EMP - Bao Lam 1 Hydropower plant - Cao Bang Province
Page 107
EMP - Bao Lam 1 Hydropower plant - Cao Bang Province
Page 108
EMP - Bao Lam 1 Hydropower plant - Cao Bang Province
Page 109
Annex 4. Minute of Public Consultation Meetings
EMP - Bao Lam 1 Hydropower plant - Cao Bang Province
Page 110
EMP - Bao Lam 1 Hydropower plant - Cao Bang Province
Page 111
EMP - Bao Lam 1 Hydropower plant - Cao Bang Province
Page 112
EMP - Bao Lam 1 Hydropower plant - Cao Bang Province
Page 113
EMP - Bao Lam 1 Hydropower plant - Cao Bang Province
Page 114
EMP - Bao Lam 1 Hydropower plant - Cao Bang Province
Page 115
EMP - Bao Lam 1 Hydropower plant - Cao Bang Province
Page 116
EMP - Bao Lam 1 Hydropower plant - Cao Bang Province
Page 117
EMP - Bao Lam 1 Hydropower plant - Cao Bang Province
Page 118
EMP - Bao Lam 1 Hydropower plant - Cao Bang Province
Page 119
EMP - Bao Lam 1 Hydropower plant - Cao Bang Province
Page 120
EMP - Bao Lam 1 Hydropower plant - Cao Bang Province
Page 121
EMP - Bao Lam 1 Hydropower plant - Cao Bang Province
Page 122
EMP - Bao Lam 1 Hydropower plant - Cao Bang Province
Page 123
EMP - Bao Lam 1 Hydropower plant - Cao Bang Province
Page 124
EMP - Bao Lam 1 Hydropower plant - Cao Bang Province
Page 125
EMP - Bao Lam 1 Hydropower plant - Cao Bang Province
Page 126
EMP - Bao Lam 1 Hydropower plant - Cao Bang Province
Page 127
EMP - Bao Lam 1 Hydropower plant - Cao Bang Province
Page 128
EMP - Bao Lam 1 Hydropower plant - Cao Bang Province
Page 129
EMP - Bao Lam 1 Hydropower plant - Cao Bang Province
Page 130
EMP - Bao Lam 1 Hydropower plant - Cao Bang Province
Page 131
EMP - Bao Lam 1 Hydropower plant - Cao Bang Province
Page 132
EMP - Bao Lam 1 Hydropower plant - Cao Bang Province
Page 133
EMP - Bao Lam 1 Hydropower plant - Cao Bang Province
Page 134
EMP - Bao Lam 1 Hydropower plant - Cao Bang Province
Page 135
EMP - Bao Lam 1 Hydropower plant - Cao Bang Province
Page 136
Annex 5. Some pictures of consultation meetings
EMP - Bao Lam 1 Hydropower plant - Cao Bang Province
Page 137