enginnering final year project by

7
TRAIN SPEED CONTROL PRESENTED BY G.Chaitanya B.Neelima Ch.Prasanth kumar V.Srivani A.l.Raju DEPARTMENT OF ELECTRONICS & INSTRUMENTATION ENGINEERING ST.ANN’S ENGINEERING COLLEGE Under the guidance Of Mrs.J.kavitha M.tech.,

Upload: hyderabad-andhra-pradesh

Post on 15-Jan-2015

72 views

Category:

Business


0 download

DESCRIPTION

www.studentxclusive.com

TRANSCRIPT

Page 1: Enginnering final year project by

TRAIN SPEED CONTROL

PRESENTED BY

G.ChaitanyaB.Neelima Ch.Prasanth kumarV.SrivaniA.l.Raju

DEPARTMENT OF ELECTRONICS & INSTRUMENTATION ENGINEERING

ST.ANN’S ENGINEERING COLLEGE

Under the guidanceOf

Mrs.J.kavitha M.tech.,

Page 2: Enginnering final year project by

ABSTRACTNow a days there is a lot of problem with neglecting

railway signals by the driver in day today life. The driver may

neglect the train signals or it may not be clear due to fog etc

that reflects accidents of trains at different places. We have

taken the above problem for that we need one solution that

solution i.e. developed with automatic speed control of train

based on signals developed with microcontroller. Here we

have used an Infra Red (IR) transmitter at the signal terminal

We have established the receiver part in the train that

receives communication code.

Page 3: Enginnering final year project by

BLOCK DIAGRAM TRANSMITTER

Page 4: Enginnering final year project by

RECIEVER

Page 5: Enginnering final year project by

Advantages:

Small in size.

Easy to operate from a remote place.

Cost of manufacture is very less.

Flexibility of using in various applications.

Applications: After some small modifications made, the same kit can find many

applications.

Automation in industries ,house hold appliances etc

Also used in a remote areas where the facility of Cell network is

provided.

Page 6: Enginnering final year project by

Signal

Sysytem

Micro

Controller

At89c2051

20pins

FSK

TRANSMITTER

CRYSTAL

OSCILLATOR

RESET

LOGIC

Page 7: Enginnering final year project by