Page 1: Engineering Group Internationaleng-gi.com/uploads/3/2/1/9/3219048/company_profile.pdf · ENGINEERING GROUP INTERNATIONAL (EG INT [L) ... September 23, 1996 and plant startup was December

Engineering Group International- Falcon EDF Company Profile

All Rights Reserved

Engineering Group International

Page 2: Engineering Group Internationaleng-gi.com/uploads/3/2/1/9/3219048/company_profile.pdf · ENGINEERING GROUP INTERNATIONAL (EG INT [L) ... September 23, 1996 and plant startup was December

Introduction

ENGINEERING GROUP INTERNATIONAL (EG INT’L) – FALCON EDF is a global conglomerate group of

companies providing GLOBAL EPCM SERVICES to the Oil & Gas, Power and Allied Industries.

EG INT’L – FLACON EDF services cover Project Management, Engineering Management, Procurement

Management, Construction Management, Commissioning, QA/QC, HSE, Accounting and

Administration.

Our core policy is to offer and maintain the Best Applicable Engineering Practices and Friendly and

Harmonized Working Relationships with Clients, among the project personnel as well as with hosting

communities.

Our management and multi-discipline engineering staff have extensive working experience for more

than 30 years in Canada, USA, Middle East and West Africa in the Oil & Gas, Power, Water & Waste

Water processing facilities.

Corporate Philosophy

We operate as a project-driven company for EPCM services and contracts. Our philosophy is borne

out by our technical expertise, ethical standards and commitment to Clients/business associates. In

keeping with our desire to continue being recognized as ‘International Standard Company’, we

distinguish ourselves with our:

Value-added technical services

Innovative engineering solutions

Quality-certified systems and high engineering standards

Conformity to safety, health and environmental norms

Flexible, Client-oriented approach

Commitment to budgets and time schedules

Page 3: Engineering Group Internationaleng-gi.com/uploads/3/2/1/9/3219048/company_profile.pdf · ENGINEERING GROUP INTERNATIONAL (EG INT [L) ... September 23, 1996 and plant startup was December

Range Of Services

EG INT’L- FALCON EDF, and its group of affiliates, have proved capacity of providing wide range of engineering services and projects supporting activities such as but not limited to:

Pre-project Activities and Conceptual Development

FEED

Basic & Detailed Engineering

Project & Interface Management

Procurement Management

Construction Management

Commissioning and Start-up

Cost Control and Fund Management

HSEQ

Community Relations & Security

Training of Client personnel

Page 4: Engineering Group Internationaleng-gi.com/uploads/3/2/1/9/3219048/company_profile.pdf · ENGINEERING GROUP INTERNATIONAL (EG INT [L) ... September 23, 1996 and plant startup was December

Specialized Services

Basis of Design

Process Engineering

Piping & Pipeline Design & Route selection

Compressor Systems and Pumping stations

Static Equipment Engineering

Material and Equipment specifications

Civil / Structural Design

Electrical Power Systems

Quality Control (QA/QC)

Cathodic Protection Systems.

Instrumentation and Controls, SCADA & Tele-Communications Design

Pigging Facilities and Operating Procedures

Project development including feasibility studies ,process selection and optimization

Project capital and operating cost estimates

expediting

Shop inspection

FAT , SAT, & field inspection

As-Built works

Types of Contracts

Engineering, Procurement, Construction (EPC)

Lump sum Turnkey (LSTK)

Engineering, Procurement, Construction Management (EPCM)

Project Management Consultancy (PMC)

Page 5: Engineering Group Internationaleng-gi.com/uploads/3/2/1/9/3219048/company_profile.pdf · ENGINEERING GROUP INTERNATIONAL (EG INT [L) ... September 23, 1996 and plant startup was December

Types of Projects

EG INT’L – FALCON EDF staff, along with its group affiliate Companies, have proven executed projects

in Oil & Gas, Power & Industrial projects such as but not limited to:

Hydrocarbon Storage Facilities (both Fixed and Floating Roofs).

Oil & Gas Projects and Pipelines

Oil Products’ Loading and Offloading Facilities.

LPG plants.

Refinery units and Chemical Plants

Civil and Building Construction Projects.

Infrastructure & Civil Projects

Electrical power generation and cogeneration facilities,

Water & Industrial Waste Water Treatment Projects

Urban & Rural Development Projects

Environmental Projects

Petrochemical plants,

Enhanced oil recovery & mining plant upgrades.

Page 6: Engineering Group Internationaleng-gi.com/uploads/3/2/1/9/3219048/company_profile.pdf · ENGINEERING GROUP INTERNATIONAL (EG INT [L) ... September 23, 1996 and plant startup was December

LIST OF COMPLETED PROJECTS

EnCana Weyburn Facility

TERTIARY OIL RECOVERY (CO2 INJECTION /SEQUESTRATION)

ENCANA WEYBURN PRODUCED GAS RECYCLE COMPRESSORS (K701/702) DE-BOTTLENECKING Increased the capacity of the existing produced gas recycle compressors with minimal downtime and capital expense. The scope of work included changing the cylinder and staging configuration and adding two 400 HP Reda-Schlumberger multi stage horizontal pumps to boost the dense phase CO2 produced gas to injection pressure.

ENCANA WEYBURN CENTRAL PLANT ADDITION OF 25 MMSCFD OF GAS COMPRESSION CAPACITY TO THE RE-CYCLE GAS INJECTION SYSTEM This project included the front end engineering and compressor selection (Ariel JGU/6) of a new electrically driven 3-stage reciprocating compressor capable of 25 MMSCFD of recycle gas with a pressure differential from 1380 kPa-g to 15,960 kPa-g. Flare heater, piping modifications, electrical components and power generation unit was also included in the scope of work. The project is currently on hold due to recession.

Page 7: Engineering Group Internationaleng-gi.com/uploads/3/2/1/9/3219048/company_profile.pdf · ENGINEERING GROUP INTERNATIONAL (EG INT [L) ... September 23, 1996 and plant startup was December

EnCana Weyburn 600 HP Injection Pumps

ENCANA WEYBURN CO2 DENSE PHASE TWO NEW 600 HP MOTOR INSTALLATION

This project was designed to increase the capacity of the existing produced gas recycle Pumps with minimal downtime and capital expense. Two 600 HP electric motors were added to increase the capacity of the existing 400 HP CO2 REDA Multistage Injection pumps.

ENCANA WEYBURN CENTRAL PLANT ADDITION OF 100 MMSCFD HIGH PRESSURE CONTROL FLARE SYSTEM

This project comprised the installation of 1 X 100 MMSCFD John Zink Rimfire high pressure continuous flaring. The project included installing new high pressure flare piping (NPS-24”) capable of 224 MMSCFD of recycle gas (CO2) and fuel gas blending to enrich the recycle gas to 6-8 MJ/m3.

ENCANA WEYBURN CENTRAL PLANT LOW PRESSURE FLARE SYSTEM UPGRADE This project was initiated to de-bottleneck the existing low pressure water and oil storage tanks gas conservation and flaring capabilities. The gathering line to the VRU and emergency flare was upgraded from NPS-12” to NPS-16”. A John Zink high efficiency rim fire flare was installed to handle operating upsets. The previous flare gathering system was debottlenecked (Tank, PVRV’s relieving to atmosphere). The present new LP Flare is operating per design (all off gas handled by VRU). Upsets to flare through newly installed LP Pressure relieving valve operates without tank PRVR’s relieving. (Only in emergency situations when the VRU is inoperative)

Page 8: Engineering Group Internationaleng-gi.com/uploads/3/2/1/9/3219048/company_profile.pdf · ENGINEERING GROUP INTERNATIONAL (EG INT [L) ... September 23, 1996 and plant startup was December

ENCANA WEYBURN RECYLE GAS NGL LIQUIDS RECOVERY A process study and feasibility economic analysis was performed to recover NGL liquids from the recycle gas. Two alternatives were evaluated, crude spiking and fractionation. The design flows were 120 MMSCFD. Project payback was under 1 year.

Husky Etzicom Facility

TERTIARY OIL RECOVERY (POLYMER / CHEMICAL INJECTION)

CENOVUS SUFFIELD, Process/Project Management 1000 m3/d ASP Polymer Flood project. Completed Engineering, Design Mechanical, Civil, Electrical drawings, full Procurement, and Project Management. The project included gathering lines and facilities installation at Cenovus A2 / 16-15 on the Suffield weapons range block.

HYAK ENERGY, Process/Project Management of 5000 m3/d ASP Polymer Flood at LSD

15-13-18-17W3M (pennant) in Southern Saskatchewan. Project was fast tracked and completed in 8 months. Project capital cost was $28MM.

ENCANA PELICAN LAKE WATER CONDITIONING PROCESS REQUEST The objective of this project was to obtain process alternatives to treat Grosmont source water to reduce the TDS (total dissolved solids) to the same level as Grand Rapids source water. The proposal included all process equipment required, with chemical consumption and a material balance of treated water output, chemical addition, and wastewater.

Page 9: Engineering Group Internationaleng-gi.com/uploads/3/2/1/9/3219048/company_profile.pdf · ENGINEERING GROUP INTERNATIONAL (EG INT [L) ... September 23, 1996 and plant startup was December

HUSKY ASP WATERFLOOD 2-30-916 W4M CROWS NEST BATTERY To provide an ASP (Alkali, Surfactant, Polymer) injection Plant, for the purpose of enhanced oil recovery at the Crows Nest Battery. It was installed contiguous to the existing battery.

HUSKY POLYMER WATERFLOOD 06-13-06-17 W4M ETZIKOM AND 11-16-07-16 W4M

To upgrade the existing Etzikom polymer injection plant to handle ASP Process for the Warner sister battery to the north. The plant was totally revamped and debottlenecked. A new material balance was used to size existing and new equipment. The project comprised a new pipeline for produced water from the Warner Battery and an injection header/pipeline pump skid at Warner.

GAS WELL TIE-INS

GULF BRAZEAU 14-7 WELL TIE TI- IN

Fast tracked well tie-in, flow= 15MMSCFD (1. 5% H2S) Line heater, Separator, and 2 km pipeline. Project was completed in 2 months on budget. Falcon purchased all equipment and materials and paid invoices. Total job cost = $1 million.

GULF GROAT 5-15 SOUR GAS WELL TIE-IN Complete tie-in of a 5. 2 MMSCFD Sour Gas Well. Project included an 8600 m, NPS-4” insulated pipeline, line heater flare and methanol injection. The project cost was $1. 2 million

CANADIAN 88 9-20 CHEDDARVILLE SOUR GAS WELL TIE-IN Full Design and Procurement of a 6. 5% Sour Gas Well tied into the Gulf Strachan gathering system. Well with hot oil string, SSESDV, Separator/Dehy and incinerator. Well flow = 10 MMSCFD.

ANADARKO PETROLEUM SOUR GAS WELL TIE-IN FT. ST. JOHN BRITISH COLUMBIA Tied in 17% H2S Sour Gas Well at Stoddart, B. C. to Kerr McGee Sour Gas Plant. Down hole/Wellhead ESDV’s . Line heater, Flare and insulated pipeline. The project was completed in 4 months. Total cost was $340,000. (1995)

NOVA BALATER METERING STATION Performed tie-in of Petromet/Peace River gas to NOVA Metering station. Project included SCADA, piping, sampling and metering. Full EPCM project cost was $180K.

Page 10: Engineering Group Internationaleng-gi.com/uploads/3/2/1/9/3219048/company_profile.pdf · ENGINEERING GROUP INTERNATIONAL (EG INT [L) ... September 23, 1996 and plant startup was December

GAS PLANTS

CONFIDENTIAL LOCATION GAS PLANT/REFRIGERATION PLANT,

Process/ Mechanical design 15 MMSCFD , full fractionation plant (C3, C4, C5+) Engineering and Procurement only, PM by Client. Project capital projected cost was $47 MM.

PAN CANADIAN THOMPSON LAKE SOUR GAS PLANT

Debottlenecked an existing MDEA plant (25% acid gas, 5% H2S, 20% CO2). Performed HYSIM MDEA and refrigeration simulations to identify process bottlenecks. The bottlenecks were the lean/rich exchanger, inlet separator, and sales compression. Purchased and installed new plate exchangers and a separator. Throughput achieved after modifications

Probe Devon Refrigeration Plant

Page 11: Engineering Group Internationaleng-gi.com/uploads/3/2/1/9/3219048/company_profile.pdf · ENGINEERING GROUP INTERNATIONAL (EG INT [L) ... September 23, 1996 and plant startup was December

PROBE DEVON REFRIGERATION PLANT Full engineering, procurement and construction of a 25 MMSCFD sweet DP control plant at Devon, Alberta. The plant was fast tracked and was installed in 4-5 months.

CNRL CLEARHILLS ALBERTA SOUR GAS Debottlenecking of an existing 80 MMSCFD (2 trains of 40 MMSCFD) MDEA and refrigeration plant. Lower inlet pressures were causing problems to the contactor and exchangers. Models of the MDEA and DP control plants were developed. All equipment was rated as per HYSIM calibration run, maximum throughputs for the lower inlet pressures were run on the HYSIM model. All equipment bottlenecks were identified and plant maximum throughputs were established at the lower pressures.

CNRL GOLD CREEK SOUR GAS EXPANSION Debottlenecked the existing gold creek sour gas and sulphur plant. Three cases were simulated: The existing throughputs to obtain a base case (2450 103 m3/D) An additional 700 103 m3/D of new gas. Maximum case of 3718 103 m3/D throughput. The bottlenecks were identified (additional chiller and gas/gas exchange the sulphur plant simulations showed no bottleneck), the expansion was completed and the plant handled the additional gas.

PETROBANK ALDER FLATS GAS PLANT Relocated an existing 5MMSCFD Sweet Gas Plant from Saskatchewan to Alder Flats, Alberta. Turnkey project, de- bottlenecked plant, added refurbished 700 HP Compressor, and new de-ethanizer tower and reboiler. Falcon handled all Design (Process, Mechanical, Instrument, Electrical, PLC programming), Construction and Project Management. Project kick-off was September 23, 1996 and plant startup was December 21, 1996. Present plant throughput is 15 MMSCFD. Cost was $3.5 million.

CANADIAN 88 16-33 OLDS GAS PLANT Full EPCM of 20 MMSCFD Sweet Gas Plant. Plant was new and designed for 30 MMSCFD lean gas. Plant was installed in four months. The de-ethanizer reboiler was replaced by a kettle type (original was 250 MBTU/HR; new was 1. 8 MMBTU/HR). Falcon performed all detailed design, procurement and project management. Total cost was $4 million.

CANADIAN 88 THREE HILLS GAS PLANT CAPACITY REVIEW Built a HYSIM model of the existing plant. Matched existing operating conditions with model. Extrapolated model to predict bottlenecks and maximum throughputs. Issued report with recommendations. Increased refrigeration capacity with zero capital investment. Identified operating bottlenecks. Increased liquid recovery by 70 BBL/D.

Page 12: Engineering Group Internationaleng-gi.com/uploads/3/2/1/9/3219048/company_profile.pdf · ENGINEERING GROUP INTERNATIONAL (EG INT [L) ... September 23, 1996 and plant startup was December

CANADIAN 88 WILLOW CREEK GAS PLANT Complete EPCM of 35 MMSCFD/D Sweet Gas Plant. All Process, Mechanical, Instrumental and Electrical Skid Designs except for compressor performed by Falcon. Total project cost was $5.2 million. Project was Fast tracked and fully designed (Grassroots) by Falcon engineers and designers.

PETROMET BIGSTONE PLANT EXPANSION Carried out plant capacity process study to determine the maximum throughput of existing 60 MMSCFD plant. Determined plant capacity from process study (without any capital investment) to be 85 MMSCFD. Installed new 1400 HP EFX compressor and performed engineering of new Tony Creek gathering lines into plant. The plant handled added gas as predicted.

RIDER RESOURCES INC. PEMBINA SOUR GAS PLANT Designed and built sour gas plant to handle 5 MMSCFD with MDEA sweetening. The H2S gas was incinerated. The design was for a fully contained plant for zero H2S emissions.

Page 13: Engineering Group Internationaleng-gi.com/uploads/3/2/1/9/3219048/company_profile.pdf · ENGINEERING GROUP INTERNATIONAL (EG INT [L) ... September 23, 1996 and plant startup was December

OIL PRODUCTION AND BATTERIES

Petrovera Senlac Heavy Oil Battery

PETROVERA SENLAC HEAVY OIL BATTERY Debottlenecked the battery with two projects.

Conversion of KVAERNER treater to FWKO. Removal of 7000 m3/d of water from battery stream.

Installation of field water injection facilities. Removal of 5000 m3/d of produced water at a satellite.

The facilities included a FWKO, tanks, and pumps.

ENCANA WAYNE DALUM SWEET OIL BATTERY & SATELLITES PIPELINE CONSTRUCTION Design of a sweet oil battery for a total of 23 EnCana wells located in 27-19W4. The 23 producing wells have ashut-in pressure of approximately 9800 kPa (1420 psi), and a flowing pressure of about 1034 to 1380 kPa (150 to 200 psi). The battery was assembled from existing EnCana inventory and new facilities. Total production design: Sales oil: 350 m3/D Gas: 140 103 m3/D Water (Inj.): 300 m3/D

PETROVERA MARSHALL HEAVY OIL BATTERY REVAMP Upgraded facilities and pipelines of Petrovera’s heavy oil battery to meet new regulations. This included new tanks, a separator, flow lines, pumps and PLC control.

PROBE EXPLORATION INC. DEVON SATELLITES & OIL BATTERY Full EPCM for two satellites and the central treating, storage and sales facility. Facilities are

Page 14: Engineering Group Internationaleng-gi.com/uploads/3/2/1/9/3219048/company_profile.pdf · ENGINEERING GROUP INTERNATIONAL (EG INT [L) ... September 23, 1996 and plant startup was December

designed to handle 2,500 BBL/D of oil at a 5% cut and include vapor recovery at each site. These sites are located in a heavily populated area.

THUNDER ENERGY INC. ROSALIND BATTERY ADDITIONS Designed and installed two FWKOs and pumps to remove produced water at satellites to debottleneck water handling at the Thunder Energy main battery .

THUNDER ENERGY INC. SOUR OIL BATTERY Complete design, Project Management and Procurement of 2000 BBL/D 20 API Sour Crude Battery at Rosalind, Alberta. Total Project Cost = $3 million. Facility included a full vapour recovery system.

JORDAN PETROLEUM LTD. OIL FIELD UPGRADE Engineering evaluation and detailed design to upgrade oil facilities at Parkman, Saskatchewan. Additional oil flow= 2400 BBL/D produced fluid.

CANADIAN 88 CRUDE/CONDENSATE BLENDING FACILITY

Performed all Process and Design for a heavy crude/condensate blending facility including treating and water handling. Project postponed due to increase in condensate prices.

CANADIAN 88 OLDS PLANT VAPOUR HANDLING REVAMP

Designed and installed sour condensate vapour handling system to eliminate H2S odors in condensate storage tanks.

GULF BRAZEAU 12-29 OIL WELL TIE-IN TO PETROCANADA PLANT

Fast tracked 2000 BBL/D oil well tie –in to Petro Canada Brazeau plant. Project completed in less than one month. Falcon handled full EPCM including purchase orders, administration and payments. Cost was $0.75 million.

GULF PANNY-HOUSE CREEK BATTERY UPGARDE AND 60 KM PIPELINE Installed 60.3 km of 6 inch diameter pipeline north of Red Earth, Alberta. The project also included all pumping, treating, storage, and PLC instrumentation. A full EPCM project, fast tracked and completed in 6 months at a total cost of $9.5 million

Page 15: Engineering Group Internationaleng-gi.com/uploads/3/2/1/9/3219048/company_profile.pdf · ENGINEERING GROUP INTERNATIONAL (EG INT [L) ... September 23, 1996 and plant startup was December

GULF WESTEROSE BATTERY GATHERING SYSTEM BOTTLENECK STUDY

Performed PIPEFLO simulations to model multiphase flow of crude oil, gas and water to determine maximum capacity of gathering lines, satellites and manifolds. Pressure surveys were conducted to match well test data with PIPEFLO model. A good fit was obtained between the simulated and field data. Actual versus predicted increased production was within 5%.

Gulf Westerose Solution Gas Compressor Installation

GULF WESTEROSE SOLUTION GAS COMPRESSOR INSTALLATION

Installation of 4800 HP Solar centaur Turbine Driven Tandem C-160 Compressor (refurbished).The project included and inlet separator, a building to house the compressor, panel, scrubbers, instrument air compressor, PLC, MCC revamp, aerial cooler and all utilities and processing piping. The project was fast tracked and full EPCM. The total cost was $5 million; the compressor was on-line in 5 months; additional production of 4000 BBL/D was achieved.

CABRE EXPLORATION LTD. JORCAM FIELD UP-GRADE Installed two Corlac inclined FWKO at two locations to debottleneck field. First site 54” I/D/ FWKO with Solution Gas Compressor (1500 HP), local water injection (REDA pump) & oil pumping to central battery, Second site 36”D FWKO with local water injection (REDA pump) & oil pumping to central battery.

Page 16: Engineering Group Internationaleng-gi.com/uploads/3/2/1/9/3219048/company_profile.pdf · ENGINEERING GROUP INTERNATIONAL (EG INT [L) ... September 23, 1996 and plant startup was December

COMPRESSION FACILITIES

HUSKY DEBOLT (SEAL LAKE) COMPRESSOR 3-26-82-14W5M

The project consisted of engineering, design, procurement, PLC programming, and commissioning to install one electric screw 800 HP compressor and remove the existing 1745 HP compressor.

PARAMOUNT MAXHAMISH 2600HP COMPRESSOR Designed and installed compression and dehydrator to process Paramount’s gas in the Fort Liard area. Total throughput was 60 MMSCFD.

Samson Buick Creek Compressor Station

SAMSON BUICK CREEK COMPRESSOR REVAMP Replaced sour gas turbine driver (2000 hp) with and electric motor to drive an existing gathering system compressor. The installation included a 700 hp screw (booster) to draw down the gathering system pressure and increase production. Both electric motors were designed to start with a common VFD (start-up only) to reduce costs and minimize disruption to a weak BC Hydro power distribution grid.

SERENPET MCLEOD 9-30 NEW COMPRESSOR INSTALLATION

Full EPCM project to install refurbished 1200 HP Compressor IR-2HOSWA-7042GSI EFX Driver. Compressor was to de-bottleneck gas gathering system. Facility designed for 35 MMSCFD (150 psia suction to 1200 psia discharge)

Page 17: Engineering Group Internationaleng-gi.com/uploads/3/2/1/9/3219048/company_profile.pdf · ENGINEERING GROUP INTERNATIONAL (EG INT [L) ... September 23, 1996 and plant startup was December

PETROMET FOXCREEK GAS PLANT REVAMP AND 40 KM PIPELINE/GATHERING SYSTEM

Installed inlet separator/pump and compressor to process additional gas. Total cost for pipeline and facilities was approximately $6.5 million.

PETROMET PEACE RIVER COMPRESSOR INSTALLATION

Relocated 1000 HP – 4 throw – 2 stage compressor unit to handle 6-8 MMSCFD of sweet gas from Highvale to Peace River, Project comprised of: PLC, dehy unit, metering skids and office/MCC building. Total cost of project was $1.7 million.

PETROMET HIGHVALEE COMPRESSOR STATION New CAT. 3406 JA/Ariel JGA-2 215 BHP compressor installation. Project included replacing unit, foundation modifications, pipe rack extension and instruments/controls modifications. Total cost was $1 million

Page 18: Engineering Group Internationaleng-gi.com/uploads/3/2/1/9/3219048/company_profile.pdf · ENGINEERING GROUP INTERNATIONAL (EG INT [L) ... September 23, 1996 and plant startup was December

CABRE EXPLORATION LTD. SHALLOW GAS COMPRESSION Installed four Screw Booster Compressors at different locations. The booster were modularized to ease installation. They all included total spill containment and fire & gas detection shutdown & blowout.

CABRE EXPLORATION LTD. SHALLOW WELL GAS GATHERING SYSTEM & SALES FACILITY Installed a 12 MMSCFD reciprocating Compression/Dehydration system and low-pressure Gathering system C/W remote metering and a 600 HPS screw booster compressor. The central facility included a helipad, workshop, and residence. All facilities include state of the art environmental and safety containment, control and shutdown.

CABRE EXPLORATION LTD. – COMPRESSION TWO WELL TIE-IN Installed a 5 MMSCFD reciprocating Compression/Dehydration system to allow the wells to feed directly into the NOVA system. The facility was modularized to facilitate it’s relocation after the wells are depleted. As with other Falcon EDF Ltd. designed facilities, there is total spill containment and fully automated fire & gas detection and Shut down/blow down.

PIPELINES

FLINT ENERGY OIL GATHERING LINES FAILURE ANALYSIS, Multimillion Dollar Oil Gathering System study for Coral Hill Swan Hills Oil Battery line failures. Investigated and prepared a report presenting the cause of multiple gathering line NPS-8”/NPS-6” failures for Flint Energy. The owner and engineering firm blamed the installation for the failures. However the investigation and report identified the design as being the cause. Once the report was issued, the owner and engineering firm agreed with the findings and did not contest the results. An amicable settlement was reached.

AECE (ECUADOR) LAGO AGRIO NPS-16” CRUDE PIPELINE Designed a 100,000 BPD pipeline to deliver heavy crude from Lago Agrio tank farm to the “OCP” (pipeline utility transporting crude from the Amazon Ecuador region to the Pacific coast of Ecuador). Provided project management and design. Total cost = $6 million US.

Page 19: Engineering Group Internationaleng-gi.com/uploads/3/2/1/9/3219048/company_profile.pdf · ENGINEERING GROUP INTERNATIONAL (EG INT [L) ... September 23, 1996 and plant startup was December

19

OCP PIG SCRAPER STATION Performed design package for pig receiving at the OCP terminal for Oxy, AECE, Kerr McGee and Repsol YPF. The design included all civil, mechanical and instrumentation/electrical to handle safety situation (SCADA) and routine crude oil operation at the OCP terminal.

SAMSON BUICK CREEK GATHERING SYSTEM Two design tasks were performed;

1. Gathering system simulations to match and predict pressure drops through the main NPS- 10”/12” line. PIPEFLO was used for this. 2. Complete re-licensing of the gathering system for sour service. NDT was performed and a report was submitted to the OGC (BC regulatory agency for oil and gas) for the new conditions. Approval was obtained in two months.

COMODIN MEXICO COCHABAMBA PIPELINE (BOLIVIA) BASIC ENGINEERING Performed process design for a 247 km NPS-10” pipeline (Maximum elevation 3700 m). Sized lines and pumping stations Using HYSIM and PIPEFLO for simulations.

CONFIDENTIAL PIPELINE FEASIBILITY STUDIES Performed two process designs for large diameter 500-700 mile pipelines in Alberta and South America. Total cost of each was in the $600 million to $1 billion range.

MORRISON FENN COMPRESSOR STATION UPGRADE Retrofitted separation/compression/refrigeration facilities, to process different pressure inlet gas (30 MMSCFD). Total costs of retrofit = $2.5 million.

FOXCREEK GAS PLANT REVAMP AND 40 KM PIPELINE/GATHERING SYSTEM Installed pipeline/gathering lines to transport additional 20 MMSCFD of sweet gas.

PANCANADIAN LITTLE BOW GAS WELL TIE-IN Re-licensed existing Sweet Gas Line to Sour Service. Removed coupons on pipeline and performed testing to submit report to AEUB to justify service change. Project on-line in 4 months. Total cost= $420 k.

VARIOUS CLIENTS Design and Project Management for plowing in High Density Polyethylene (HDPE) pipeline for numerous low pressure gas gathering systems in North Alberta. Also steel pipe with HDPE liner to handle high pressure corrosive produced water injection

Page 20: Engineering Group Internationaleng-gi.com/uploads/3/2/1/9/3219048/company_profile.pdf · ENGINEERING GROUP INTERNATIONAL (EG INT [L) ... September 23, 1996 and plant startup was December

20

INTERNATIONAL

AECE Dorine-1 Injection Pumps

CONSULTANCY & DESIGN ENGINEERING SERVICES Provide Design, Engineering & Consultancy services for 400/ 132/33 T.L, EHV substation projects, EBOP of Thermal power plants and Industrial power distribution projects for large industries.

MANAGEMENT, TENDERING, CONSTRUCTION MANAGEMENT of (65 Km) 33Kv and

final Hand Over of the project Oil and Gas Government of Brunei.

COORDINATED ALL THE POWER PLANT USING NATURAL GAS TURBINES of (4x 50

MW) capacity needs of the complex are directly covered through a connection to the high voltage T.L grid 66/ 33 kV Barakas Power Company, W.Germany.

Page 21: Engineering Group Internationaleng-gi.com/uploads/3/2/1/9/3219048/company_profile.pdf · ENGINEERING GROUP INTERNATIONAL (EG INT [L) ... September 23, 1996 and plant startup was December

21

DEVELOPED FOR THE MINISTRY OF ENERGY- BRUNEI the design of the substations step-up/ step-down transformers, 33/66 kV and 66/13.8 kV (45Km) T.L ACSS double circuit end side to switchgears, and power main T& D distribution switchboard.

ABB – CANADA 38.0 KV (65KM) ACSS OR ACCC T.L Project upgrade, procurement

materials from local markets, submittals and get clients approval according to pre designed format and SOW.

ISSUED TENDERING DOCUMENTS OF 2X32 MW POWER COGENERATION PLANT

PROJECT OF $2.8 M, BRUNEI OIL AND GAS INDUSTRIAL BUILDINGS.

AECE LAGO AGRIO 4 X 1000 HP CENTRILIFT WATER INJECTION PUMPS The project comprised the following:

Debottleneck the water distribution of the injection underground pipelines. Addition of 6100 m of NPS-12” linepipe was installed.

Debottleneck the MPF and Dorine Battery surface water injection piping. Addition of 200 m of NPS- 16” B31.3 injection pump suction header.

Installation of 4 new water injection pump trains including 2 booster pumps and 4 centrilift high pressure injection pumps. This added 80,000 BBL/D of high pressure water injection capacity.

The cost of this project was 9.1 million dollars US.

AECE LAGO AGRIO TANK FARM & CRUDE PUMPING TRANSFER FACILITY (2002) Project Management of 2x100,000 BOPD Sales Tanks and Pumping Facilities. Included environmental and regulatory co-ordination. The cost of this project was 7 MM US Dollars.

CANADIAN OCCIDENTAL LIMITED HEAVY CRUDE FRACTIONATION AND PIPELINE Developed Process Design and Cost budget for Fractionation versus Emulsion for Transportation via pipeline of 10 API Crude through Andes Mountain in Ecuador (500 Mile Length). Performed Pipeline Process runs with PIPEFLO Computer software. Precursor of OCP (Oleoducto Crudos Pesados) pipeline installed subsequently to transport crude from Lago Agrio (Oriente) to Esmeraldas Port

Page 22: Engineering Group Internationaleng-gi.com/uploads/3/2/1/9/3219048/company_profile.pdf · ENGINEERING GROUP INTERNATIONAL (EG INT [L) ... September 23, 1996 and plant startup was December

22

CANADIAN OCCIDENTAL (INTERNATIONAL) OIL FACILITIES REVIEW AND UPGRADE

Evaluated existing facilities at Cabimas, Venezuela for 40,000 to 80,000 BBL/D of oil production and treating. FulL development plan and cost prepared for all facilities.

CAN OXY PETROLEUM

Venezuela 1994; Field trip, facilities evaluation and development plan for Colon/La Ceiba Field development (20k bbl/d).

Venezuela 1995-1996; full evaluation and development plan for Cabimas field (Scenario for 20 k to 100k bbl/d oil production).

Venezuela 1997; facilities review for bid round evaluation.

Ecuador 1997; ITTI-Tiputin to La Esmeralda fractionation facility and emulsion pipeline. Performed basic process design, cost estimate and development plan for

a 720 km pipeline and a 120k bbl/d production facility.

Colombia 1998; Facilities review for bid round evaluation.

Mexico 2005; Burgos study to bid PEMEX capital investment opportunity.

COMODIN Bolivia 1996; Process design and basic engineering for a NPS – 10”, 8”, and 6”, 260 km. pipeline system through the Andes mountains (Elevation max 3,700m). This system is in operation.

MALONEY/RIO SAN JUAN Mexico 1997; Basic engineering for the Jujo battery upgrade in Villa Hermosa, Tabasco state resulting in production increase of 20k bbl/d. Also added solution gas dew point control.

HALLIBURTON ENERGY SERVICES ORENBURG Russia; 1997-1998; initially under contract to Maloney Industries, Falcon EDF Ltd. Was commissioned to design the interconnecting piping design and skid installation for a 10, 000 bbl/d sour oil battery process skids included: compression, separation gas J/T plant, product storage. Following Maloney’s departure from the project, Halliburton Energy Services expanded Falcon’s scope of work to include the overall design, supply and construction assistance, as-built drawings and start up co- ordination. As a result, Falcon EDF Ltd. commissioned a number of its staff to the site during the construction phase and played a key role during commissioning and start-up of the battery during the

Page 23: Engineering Group Internationaleng-gi.com/uploads/3/2/1/9/3219048/company_profile.pdf · ENGINEERING GROUP INTERNATIONAL (EG INT [L) ... September 23, 1996 and plant startup was December

23

summer of 1999.

PEMEX JUJO BATTERY PRODUCED WATER HANDLING SKIDS Designed fully skidded produced water processing facilities to remove solids and oil from produced water for re- injection. Total water handled was 25,000 BBL/D. Skids were fully contained.

SANTOS LTD. (AUSTRALIA-2002) Preliminary design of injection facilities and budgetary cost estimates.

VARIOUS PROJECTS IN LATIN AMERICA Facilities evaluations of upstream projects in Venezuela, Colombia and Mexico. Process design and basic engineering for NPS-10”, 8”, and 6”, 160 mile pipeline system in Cochabamba, Bolivia (for Protexa Mexico).

Page 24: Engineering Group Internationaleng-gi.com/uploads/3/2/1/9/3219048/company_profile.pdf · ENGINEERING GROUP INTERNATIONAL (EG INT [L) ... September 23, 1996 and plant startup was December

24

IRAQ PROJECTS- INDIVIDUAL EXPERINCE

DEVELOPED AN OPERATIONAL TEAM FOR PROJECTS, and prepared it for future evolutions, based on ALSTOM Grid – Iraq branch processes, for maximum efficiency to animate project teams, and propose corrective/improvement actions. PROVIDED TECHNICAL REVIEW of RFQ/local contract specifications and tender preparation with ALSTOM-Grid design division, and contract management team. PREPARED TENDER DOCUMENT FOR DESIGN, TEST, SUPPLY AND SHIPMENT MATERIALS FOR 132KV DOUBLE CIRCUIT ACSR OVERHEAD T.L for Najiba Gas power station connection with Hartha 132 Kv Transmission lines (Total 45 Tangent Type YA, YB, YD, YL Tower complete with stub angles) PROCURED 132/33 KV SUBSTATION EQUIPMENT, supply steel structure towers materials for substations Qty 145 Tons ( MOE- Iraq) DEVELOPED AL- MANSURIYIA POWER PLANT PROJECT - IRAQ. Along with QA/ QC report, cost control and project procurements according to BOM, BOQ schedule Plan. PERFORMED PROPOSAL BID CONTRACT FOR MOE –IRAQ. Supply of Galvanized Steel Towers and Angles, Bars 400/132 Kv, including transformers , Circuit breakers Galvanized steel post, cables trays and lighting 12 Meters post tubular shape. (Supplier International Transmission Limited, India) DEVELOPED THE DESIGN AND SUPERVISION WITH US CORP OF ENGINEERS - BASRAH- IRAQ the 132Kv high voltage electrical construction including transmission and distribution line, substation erection, test & commissioning, underground power and communication cable, communication tower and fiber optics cable installations. PROVIDE DESIGN, PROCUREMENT , SUPERVISION AND ENGINEERING SERVICES for Salmnn Pak-Iraq project Number 705 GRD –US Crop of Engineers ( Police Training Centre) for 33 Kv (25Km) lattice steel structures of transmission line towers, substation gantry towers, beams, lightning masts, lighting towers and equipment support.

Page 25: Engineering Group Internationaleng-gi.com/uploads/3/2/1/9/3219048/company_profile.pdf · ENGINEERING GROUP INTERNATIONAL (EG INT [L) ... September 23, 1996 and plant startup was December

25

SHU’AIBA AND MUFTIYAH SITES’ DEVELOPMENT – BASRA/IRAQ, Project Summary: This project covered design and construction of new site at Shu’aiba which included a main administration building, two (2) maintenance workshops for vehicles (light and heavy vehicles), warehouse, washing and lubricating garage for vehicles, roads, waiting yards, car parks and fence. In Muftiyah, the works included adding an administration building and one maintenance workshop to an existing complex PROJECT # 1030 (UNDERGROUND OIL DEPOT AND FACILITIES), HABBANIYAH SITE/IRAQ, CONTRACT: INTERNATIONAL CONTRACTOR (CBC/CMP, FRENCH), TURN-KEY (FIXED PRICE) CONTRACT Project Summary: This project was a fully equipped underground oil depot which included one UEGCS (Underground Emergency Generators and Control Station), three (3) groups of oil products tanks each group comprised of four (4) tanks. Each tank is provided with a booster pump house and there is one main pump house for each group of tanks connected to several emergency loading/offloading points/arms for road tankers. The project also included one rail loading/offloading station and one road loading/offloading and filling (gas) station which included the main control room and main incoming 33kV overhead power line. The underground depot and the pipelines of this project were cathodically protected. The cathodic protection system was Impressed Current Type with Ferro-Silicon Anodes. HAMMAM AL-ALEEL OIL DEPOT, SOUTH OF MOSUL CITY, CONTRACT: EPCM BY SCOP. This is a regular above ground oil depot which included road and rail loading/unloading stations as well as cathodic protection system. CATHODIC PROTECTION SYSTEM (IMPRESSED CURRENT TYPE) OF 40 KM, 10” PIPELINE (SFAYAH – AIN-ZALAH), NORTH-WEST OF MOSUL CITY, IRAQ. CONTRACT: INTERNATIONAL CONTRACTOR (DODSAL, INDIAN), TURN-KEY CONTRACT

Page 26: Engineering Group Internationaleng-gi.com/uploads/3/2/1/9/3219048/company_profile.pdf · ENGINEERING GROUP INTERNATIONAL (EG INT [L) ... September 23, 1996 and plant startup was December

26

EXPANSION OF THE IRAQI/TURKISH 40” CRUDE OIL PIPELINE PROJECT, AIN-ZALAH PUMPING STATION (IT2-A), IRAQ. CONTRACT: INTERNATIONAL JOINT-VENTURE CONTRACTOR (TOYO-ENKA, JAPANESE-TURKISH), TURN-KEY CONTRACT Project Summary: The duties in this project covered 3 sites: Site 1 – Ain-Zalah site where a new pump station (IT2-A) was constructed with 4 main pump-motor sets (induction motors, direct on-line starting) 3.6MW, 11kV, 50Hz each. Site 2 – Expansion of an existing pump station (IT-2) by replacing 4 pump-motor sets with new higher efficiency sets. Site 3 – Metering station at the Iraqi/Turkish boarder line where a new meter run was added. LUBE OIL COMPLEX (LOC), BAIJI, IRAQ CONTRACT: INTERNATIONAL JOINT-VENTURE CONTRACTOR (TECHNIP (FRENCH) – TECHNIPETROL, ALSO NAMED AS TPL, (ITALIAN) – TECHNOEXPORT (CZECHOSLOVAKIAN), TURN-KEY CONTRACT Project Summary: This LOC included two (2) trains Lube Oil Refinery, each train is designed to produce 125,000 Ton/year of base oils. Common utilities were provided for the two trains (boiler house, cooling tower…etc) as well as a blending unit and can making and can filling, drum making and drum filling and loading arms. The off-site area (tank farm) included 128 tanks the civil works of which were directly constructed by SCOP NORTH REFINERY, BAIJI, IRAQ CONTRACT: INTERNATIONAL CONTRACTOR (CHEYODA, JAPANESE), TURN-KEY CONTRACT Project Summary: This oil refinery is located within the same complex of the North Refineries Company and was constructed between 1979 and 1983 with a design capacity of 150,000bpd. There were some technical problems involved in the hydrogen and hydrocracker units which resulted in a lot of delays in the commissioning of these 2 units. By 1988 the Contractor, Cheyoda, issued a technical study/report which included modifications to the furnace of the hydrogen unit. The modification works were to be done by the North Refineries Company. Technical evaluation was issued to finalize and settle the remaining pending items and issue the Final Acceptance Certificate (FAC) for the whole project in 1989, which was put On Hold since 1983

Page 27: Engineering Group Internationaleng-gi.com/uploads/3/2/1/9/3219048/company_profile.pdf · ENGINEERING GROUP INTERNATIONAL (EG INT [L) ... September 23, 1996 and plant startup was December

27

NATURAL GASOLINE 8” PIPELINE KIRKUK ~ BAIJI SECTION. CONTRACT: EPCM (DIRECT BY SCOP) Project Summary: This project covered the first 110km section of a 380km (overall length) of an 8” natural gasoline pipeline. This pipeline started from North LPG plant, located South-West of Kirkuk city, and included one main river crossing (Tigris River, near Baiji) and a lot of main and country road crossings and irrigation canals’ crossings. This pipeline project also included cathodic protection system, impressed current type. RECONSTRUCTION OF NORTH REFINERIES, BAIJI, IRAQ Construction of Raw Water Pipeline (24” Pipe) including Cathodic Protection System, Baiji, Natural Gasoline Pipeline (8” Pipe) including Cathodic Protection System. Part of Baiji –Tharthar Section - Partial involvement in up grading and reconditioning of package units of Kirkuk old stabilization plant Construction of Gasoil Pipeline (16” Pipe) including Cathodic Protection System, in Tharthar area. Oct. ‘94-April ’95 Final Completion stage of the Construction & Erection of Gas Pressure Vessel in Baiji gas plant, Apr. ‘95-Aug. ’95. Construction of Deep Well Anode Bed Type Cathodic protection System for Raw Water Pipeline in Mosul City, Aug. '95-Jan. '96. PARSONS E&C / WORLEY INTERNATIONAL (PIJV TEAM), JORDAN & IRAQ Project Summary: This PCO Oil North Project (Project and Contracting Office – Oil Sector) was awarded to a Joint Venture Contractor. Re-build the damaged Iraqi Oil Fields (due to war in 2003) in the Northern Region of Iraq and based in KRAB (Kirkuk Regional Air Base). The office works and field activities and projects’ assessments covered under this PCO Oil North Project were of a very special nature as they were conducted completely within War Zone areas KHAN BANI SA AD, BAGHDAD Construction, Start-up & Commissioning of pure ethanol alcohol plant (3000lit/day capacity NORTH AREA FERTILIZERS, BAIJI Rehabilitation & Major overall maintenance of High-pressure boiler feed water pumps (Centrifugal 12 Stages), Instrument air compressor (2 Stages Screw Compressor). Erection, precommissioning of Liquid Ammonia Pumping Unit (120 m3/hr liquid Ammonia) & stainless steel piping system related.

Page 28: Engineering Group Internationaleng-gi.com/uploads/3/2/1/9/3219048/company_profile.pdf · ENGINEERING GROUP INTERNATIONAL (EG INT [L) ... September 23, 1996 and plant startup was December

28

CASTABLES PLANT FALLUJAH, Erection & pre-commissioning of 200 ton Chilled water Units & piping system. COPPER SULPHATE PLANT, SAMMARAH Erection & pre-commissioning of 60- tone Chilled water unit & piping system KADARI CONTRACTING CO. BAGHDAD, IRAQ Erecting, pre commissioning and start of 45m3/hr Reverse Osmosis Plant Rehabilitation of 120m3/h Multimedia Water Filtration & 40m3/hr mixed Beds Water demineralization units. NORTH REFINERIES COMPLEX IN BAIJI, IRAQ Process Unit Operation Management .Engineers & Operators Supervision & Management. Maintenance & Scheduling of Refinery Utilities & Process Unit. Corrosion Monitoring & Treatment. SHELL MAJNOON FIELD, BASRA, IRAQ Provision of engineering, procurement & construction support services for Shell operation and maintenance at Majnoon field brown field. Prequalified Iraqi local construction contractors. Hiring, staffing, and training of Iraqi local staff. Management and supervision of local contractors and subcontractors BP ( RUMAILA OPERATIONS ORGANIZATION) RUMAILA FIELD, BASRA, IRAQ Residual Engineering, Detailed Engineering, for existing structure and as built for Tanks at degassing stations in Rumaila field.

HALFAYA OIL FIELD FACILITIES, MISSAN, IRAQ Detailed Engineering, procurement support, & field engineering for Temporary Storage & Filling stations

Page 29: Engineering Group Internationaleng-gi.com/uploads/3/2/1/9/3219048/company_profile.pdf · ENGINEERING GROUP INTERNATIONAL (EG INT [L) ... September 23, 1996 and plant startup was December

29

MENA POJECTS- INDIVIDUAL EXPERINCE

DIRECTED AND MANAGE MENA PROJECTS: 728 MW Power Plant-1 (400/132/33) Kv Substation , 1250 MW Power Plant-2 - Substation (132/33) Kv , 1250 Power Plant-3 , Substation-4 (400/ 132/33) Kv Gantry Substation under the authority of ALSTOM, the operations, design , procurement , QC plan, sale and marketing activities performed in support to ongoing operations in coordination with PMs, Erection team , QC/ EHS team, and Site Managers. DEVELOPED WITH OIL AND GAS, LIBYAN UTILITY A BUSINESS-TO-BUSINESS MARKETING PROGRAMS. This project drove a profit M$1.5. The project scope consist of the design, material procurement, installation and testing and commissioning complete package of 33 Kv transmission lines, double circuit (45 Km) ACSS T.L lattice type towers steel structure. REVIEWED RFQ 66/ 33 KV (55KM) T. LINE / NATIONAL GRID AND BUILT BOQ AND TECHNICAL SPECIFICATION, BRUNEI BARAKAS SUBSTATIONS. ZAKHEM-CONGO – POINTE NOIRE, REPUBLIC OF CONGO Project Summary: (Client is ENI-Italy – Congo Division), Contractor is ABB – SPA, PA Division, Milan. It is an electric power generating plant. It consists of two (2) Gas Turbine Generators. Each GTG set is rated @ 200MVA, 15.75kV, 50Hz, 0.8PF (Vendor is Ansaldo-Italy). The Black Start generator and other utilities are all provided including gas pressure reduction and handling station and flare. Other utilities consist of Air Compressors (for utility air and instrument air), Water filtration unit, Fire Fighting Systems, Industrial water System, Demi water unit, Potable Water System, Cooling Water System and Sewage Systems (Oily, Chemical, Rain Water and Closed Drain). The water is provided from 2 water wells for potable water (15m3/hr each) and 2 other water wells for fire water supply (150m3/hr) each. Buildings include 2 Technical Buildings, Main Electrical Building, Main Control Building, Office & Canteen Building, Fire Brigade and Infirmary Building, Security Building, Workshop and Warehouse Shelters and Chemical Store Shelter. • Mi-SWACO/SulfaTreat – Div. of Mi Drilling Fluids Dry Batch Sour Gas Sweetening Units • Gem Production Management . Sour gas and odour control treatment units detailed

design, Natural Gas Well site, and processing facilities, gathering systems, land fill and digest gas facilities and carbon dioxide processing facilities

Page 30: Engineering Group Internationaleng-gi.com/uploads/3/2/1/9/3219048/company_profile.pdf · ENGINEERING GROUP INTERNATIONAL (EG INT [L) ... September 23, 1996 and plant startup was December

30

Contact Details

For more Information visit our website:

www.eng-gi.com E-mail: [email protected]

ADDRESS:

#115, 1925-18th AV NE, Calgary, AB, CANADA T2E 7T8

T: +1 888 909-9976