Engineering Economy• It deals with the concepts and techniques

of analysis useful in evaluating the worth of systems, products, and services in relation to their costs

Page 3: Engineering economics

3

Engineering Economy• It is used to answer many different

questions– Which engineering projects are worthwhile?

• Has the mining or petroleum engineer shown that the mineral or oil deposits is worth developing?

– Which engineering projects should have a higher priority?

• Has the industrial engineer shown which factory improvement projects should be funded with the available dollars?

– How should the engineering project be designed?

• Has civil or mechanical engineer chosen the best thickness for insulation?

Page 4: Engineering economics

4

Basic Concepts

• Cash flow

• Interest Rate and Time value of money

• Equivalence technique

Page 5: Engineering economics

5

Cash Flow• Engineering projects generally have economic

consequences that occur over an extended period of time– For example, if an expensive piece of machinery is

installed in a plant were brought on credit, the simple process of paying for it may take several years

– The resulting favorable consequences may last as long as the equipment performs its useful function

• Each project is described as cash receipts or disbursements (expenses) at different points in time

Page 6: Engineering economics

6

Categories of Cash Flows• The expenses and receipts due to

engineering projects usually fall into one of the following categories:– First cost: expense to build or to buy and install– Operations and maintenance (O&M): annual

expense, such as electricity, labor, and minor repairs

– Salvage value: receipt at project termination for sale or transfer of the equipment (can be a salvage cost)

– Revenues: annual receipts due to sale of products or services

– Overhaul: major capital expenditure that occurs during the asset’s life

Page 7: Engineering economics

7

Cash Flow diagrams

• The costs and benefits of engineering projects over time are summarized on a cash flow diagram (CFD). Specifically, CFD illustrates the size, sign, and timing of individual cash flows, and forms the basis for engineering economic analysis

• A CFD is created by first drawing a segmented time-based horizontal line, divided into appropriate time unit. Each time when there is a cash flow, a vertical arrow is added pointing down for costs and up for revenues or benefits. The cost flows are drawn to relative scale

Page 8: Engineering economics

8

Drawing a Cash Flow Diagram

• In a cash flow diagram (CFD) the end of period t is the same as the beginning of period (t+1)

• Beginning of period cash flows are: rent, lease, and insurance payments

• End-of-period cash flows are: O&M, salvages, revenues, overhauls

• The choice of time 0 is arbitrary. It can be when a project is analyzed, when funding is approved, or when construction begins

• One person’s cash outflow (represented as a negative value) is another person’s inflow (represented as a positive value)

• It is better to show two or more cash flows occurring in the same year individually so that there is a clear connection from the problem statement to each cash flow in the diagram

Page 9: Engineering economics

9

An Example of Cash Flow Diagram• A man borrowed $1,000 from a bank at 8%

interest. Two end-of-year payments: at the end of the first year, he will repay half of the $1000 principal plus the interest that is due. At the end of the second year, he will repay the remaining half plus the interest for the second year.

• Cash flow for this problem is:End of year Cash flow

0 +$1000

1 -$580 (-$500 - $80)

2 -$540 (-$500 - $40)

Page 10: Engineering economics

10

Cash Flow Diagram

$1,000

0

1 2

$580$540

Page 11: Engineering economics

11

Time Value of Money

• Money has value– Money can be leased or rented

– The payment is called interest

– If you put $100 in a bank at 9% interest for one time period you will receive back your original $100 plus $9

Original amount to be returned = $100Interest to be returned = $100 x .09 = $9

Page 12: Engineering economics

12

Compound Interest• Interest that is computed on the original

unpaid debt and the unpaid interest

• Compound interest is most commonly used in practice

• Total interest earned = In = P (1+i)n - P

– Where,• P – present sum of money• i – interest rate• n – number of periods (years)

I2 = $100 x (1+.09)2 - $100 = $18.81

Page 13: Engineering economics

13

Future Value of a Loan With Compound Interest

• Amount of money due at the end of a loan– F = P(1+i)1(1+i)2…..(1+i)n or F = P (1 + i)n

– Where,• F = future value and P = present value• Referring to slide #10, i = 9%, P = $100 and say n=

2. Determine the value of F.

F = $100 (1 + .09)2 = $118.81

Page 14: Engineering economics

14

Notation forCalculating a Future Value

• Formula:

F=P(1+i)n is the

single payment compound amount factor.

• Functional notation:

F=P(F/P,i,n) F=5000(F/P,6%,10)

• F =P(F/P) which is dimensionally correct.

Page 15: Engineering economics

15

Notation forCalculating a Present Value

• P=F(1/(1+i))n=F(1+i)-n is the

single payment present worth factor.

• Functional notation:

P=F(P/F,i,n) P=5000(P/F,6%,10)

Interpretation of (P/F, i, n): a present sum P, given a future sum, F, n interest periods hence at an interest rate i per interest period

Page 16: Engineering economics

16

Spreadsheet Function

P = PV(i,N,A,F,Type)F = FV(i,N,A,P,Type)i = RATE(N,A,P,F,Type,guess)Where, i = interest rate, N = number of interest

periods, A = uniform amount, P = present sum of money, F = future sum of money, Type = 0 means end-of-period cash payments, Type = 1 means beginning-of-period payments, guess is a guess value of the interest rate

Page 17: Engineering economics

17

Equivalence • Relative attractiveness of different

alternatives can be judged by using the technique of equivalence

• We use comparable equivalent values of alternatives to judge the relative attractiveness of the given alternatives

• Equivalence is dependent on interest rate• Compound Interest formulas can be

used to facilitate equivalence computations

Page 18: Engineering economics

18

Technique of Equivalence

• Determine a single equivalent value at a point in time for plan 1.

• Determine a single equivalent value at a point in time for plan 2.

Both at the same interest rate and at the same time point.

•Judge the relative attractiveness of the two alternatives from the comparable equivalent values.

Page 19: Engineering economics

19

Engineering Economic Analysis Calculation

• Generally involves compound interest formulas (factors)

• Compound interest formulas (factors) can be evaluated by using one of the three methods– Interest factor tables– Calculator– Spreadsheet

Page 20: Engineering economics

20

Given the choice of these two plans which would you choose?

Year Plan 1 Plan 2

0 $5,000

1 $1,000

2 $1,000

3 $1,000

4 $1,000

5 $1,000

Total $5,000 $5,000

To make a choice the cash flows must be altered so a comparison may be made.

Page 21: Engineering economics

21

Resolving Cash Flows to Equivalent Present Values

• P = $1,000(PA,10%,5) • P = $1,000(3.791) =

$3,791

• P = $5,000• Alternative 2 is better

than alternative 1 since alternative 2 has a greater present value

Page 22: Engineering economics

22

An Example of Future Value• Example: If $500 were deposited in a

bank savings account, how much would be in the account three years hence if the bank paid 6% interest compounded annually?

• Given P = 500, i = 6%, n = 3, use F = FV(6%,3,,500,0) = -595.91

• Note that the spreadsheet gives a negative number to find equivalent of P. If we find P using F = -$595.91, we get P = 500.

Page 23: Engineering economics

23

An Example of Present Value• Example 3-5: If you wished to have

$800 in a savings account at the end of four years, and 5% interest we paid annually, how much should you put into the savings account?

• n = 4, F = $800, i = 5%, P = ?

• P = PV(5%,4,,800,0) = -$658.16

• You should use P = $658.16

Page 24: Engineering economics

24

Economic Analysis Methods

• Three commonly used economic analysis methods are

• Present Worth Analysis

• Annual Worth Analysis

• Rate of Return Analysis

Page 25: Engineering economics

25

Present Worth Analysis

• Steps to do present worth analysis for a single alternative (investment)– Select a desired value of the return on

investment (i) – Using the compound interest formulas bring

all benefits and costs to present worth– Select the alternative if its net present worth

(Present worth of benefits – Present worth of costs) ≥ 0

Page 26: Engineering economics

26

Present Worth Analysis

• Steps to do present worth analysis for selecting a single alternative (investment) from among multiple alternatives– Step 1: Select a desired value of the return on

investment (i) – Step 2: Using the compound interest formulas

bring all benefits and costs to present worth for each alternative

– Step 3: Select the alternative with the largest net present worth (Present worth of benefits – Present worth of costs)

Page 27: Engineering economics

27

Present Worth Analysis• A construction enterprise is investigating the

purchase of a new dump truck. Interest rate is 9%. The cash flow for the dump truck are as follows:

• First cost = $50,000, annual operating cost = $2000, annual income = $9,000, salvage value is $10,000, life = 10 years. Is this investment worth undertaking?

• P = $50,000, A = annual net income = $9,000 - $2,000 = $7,000, S = 10,000, n = 10.

• Evaluate net present worth = present worth of benefits – present worth of costs

Page 28: Engineering economics

28

Present Worth Analysis

• Present worth of benefits = $9,000(PA,9%,10) = $9,000(6.418) = $57,762

• Present worth of costs = $50,000 + $2,000(PA,9%,10) - $10,000(PF,9%,10)= $50,000 + $2,000(6..418) - $10,000(.4224) = $58,612

• Net present worth = $57,762 - $58,612 < 0 do not invest

• What should be the minimum annual benefit for making it a worthy of investment at 9% rate of return?

Page 29: Engineering economics

29

Present Worth Analysis

• Present worth of benefits = A(PA,9%,10) = A(6.418)

• Present worth of costs = $50,000 + $2,000(PA,9%,10) - $10,000(PF,9%,10)= $50,000 + $2,000(6..418) - $10,000(.4224) = $58,612

• A(6.418) = $58,612 A = $58,612/6.418 = $9,312.44

Page 30: Engineering economics

30

Cost and Benefit Estimates

• Present and future benefits (income) and costs need to be estimated to determine the attractiveness (worthiness) of a new product investment alternative

Page 31: Engineering economics

31

Annual costs and Income for a Product

• Annual product total cost is the sum of annual material, labor, and overhead (salaries, taxes, marketing expenses, office costs, and related costs), annual operating costs (power, maintenance, repairs, space costs, and related expenses), and annual first cost minus the annual salvage value.

• Annual income generated through the sales of a product = number of units sold annuallyxunit price

Page 32: Engineering economics

32

Rate of Return Analysis

• Single alternative case

• In this method all revenues and costs of the alternative are reduced to a single percentage number

• This percentage number can be compared to other investment returns and interest rates inside and outside the organization

Page 33: Engineering economics

33

Rate of Return Analysis

• Steps to determine rate of return for a single stand-alone investment– Step 1: Take the dollar amounts to the same

point in time using the compound interest formulas

– Step 2: Equate the sum of the revenues to the sum of the costs at that point in time and solve for i

Page 34: Engineering economics

34

Rate of Return Analysis

• An initial investment of $500 is being considered. The revenues from this investment are $300 at the end of the first year, $300 at the end of the second, and $200 at the end of the third. If the desired return on investment is 15%, is the project acceptable?

• In this example we will take benefits and costs to the present time and their present values are then equated

Page 35: Engineering economics

35

Rate of Return Analysis• $500 = $300(PF, i, n=1) + 300(PF, i, n=2) +

$200(PF, i, n=3)• Now solve for i using trial and error method• Try 10%: $500 = ? $272 + $247 + $156 = $669

(not equal)• Try 20%: $500 = ? $250 + $208 + $116 = $574

(not equal) • Try 30%: $500 = ? $231 + $178 + $91 = $500

(equal) i = 30%• The desired return on investment is 15%, the

project returns 30%, so it should be implemented