engineering and operations committee item 6a march 9, 2020e&o committee item 6a slide 12 march...

15
Engineering and Operations Committee Item 6a March 9 , 2020

Upload: others

Post on 27-Jun-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Engineering and Operations Committee Item 6a March 9, 2020E&O Committee Item 6a Slide 12 March 9, 2020 Source Work Amount Status State Water Resources Control Board Groundwater Basin

Engineering and Operations CommitteeItem 6aMarch 9, 2020

Page 2: Engineering and Operations Committee Item 6a March 9, 2020E&O Committee Item 6a Slide 12 March 9, 2020 Source Work Amount Status State Water Resources Control Board Groundwater Basin

E&O Committee Item 6a Slide 2 March 9, 2020

Demo Plant Testing

Independent Scientific Advisory Panel

On-going Planning Activities

Agency Coordination

Public Outreach

Grant Funding

Next Steps

Page 3: Engineering and Operations Committee Item 6a March 9, 2020E&O Committee Item 6a Slide 12 March 9, 2020 Source Work Amount Status State Water Resources Control Board Groundwater Basin

E&O Committee Item 6a Slide 3 March 9, 2020

Demonstration Plant construction completed (2019)Secondary Effluent Testing (2020-2021)Primary Effluent Testing (2021-2022)Proposed DPR Testing (2023-2024)ISAP Oversight (ongoing)

MBR Reverse Osmosis

Demonstration Plant

Page 4: Engineering and Operations Committee Item 6a March 9, 2020E&O Committee Item 6a Slide 12 March 9, 2020 Source Work Amount Status State Water Resources Control Board Groundwater Basin

E&O Committee Item 6a Slide 4 March 9, 2020

Pre-testing

Phase 1

Phase 2

Process Acclimation (6 months)

Baseline Performance Testing (4 months)

Challenge Testing & Evaluation (8 months)

Page 5: Engineering and Operations Committee Item 6a March 9, 2020E&O Committee Item 6a Slide 12 March 9, 2020 Source Work Amount Status State Water Resources Control Board Groundwater Basin

E&O Committee Item 6a Slide 5 March 9, 2020

Continuing operation, monitoring & maintenance Biological process acclimation

Nitrogen removal from MBRDemo and Bench-scale testing

Bioreactor Monitoring Bench-Scale TestingNew Conduit Routing

Page 6: Engineering and Operations Committee Item 6a March 9, 2020E&O Committee Item 6a Slide 12 March 9, 2020 Source Work Amount Status State Water Resources Control Board Groundwater Basin

E&O Committee Item 6a Slide 6 March 9, 2020

Final report posted

Nitrogen control reviewed

Workshop #3 – Spring 2020

Page 7: Engineering and Operations Committee Item 6a March 9, 2020E&O Committee Item 6a Slide 12 March 9, 2020 Source Work Amount Status State Water Resources Control Board Groundwater Basin

E&O Committee Item 6a Slide 7 March 9, 2020

Planning for the potential next phaseProgrammatic Environmental Impact Report

Future DPR demonstration testing

Coordinating with other MWD effortsClimate Action Plan

2020 Integrated Resources Plan

Page 8: Engineering and Operations Committee Item 6a March 9, 2020E&O Committee Item 6a Slide 12 March 9, 2020 Source Work Amount Status State Water Resources Control Board Groundwater Basin

E&O Committee Item 6a Slide 8 March 9, 2020

Potential collaboration/ partnersLetters of Interest (LOI)Future Agreements

Collaboration/PartnersLACSD

LACDPWLADWP

City of TorranceCity of Long Beach

Upper San Gabriel Valley MWDThree Valleys MWDWest Basin MWD

MWDOCMain San Gabriel Basin

Watermaster Water Replenishment District

Southern Nevada Water Agency

8

Page 9: Engineering and Operations Committee Item 6a March 9, 2020E&O Committee Item 6a Slide 12 March 9, 2020 Source Work Amount Status State Water Resources Control Board Groundwater Basin

E&O Committee Item 6a Slide 9 March 9, 2020

Agreement signed in 2015 for the demonstration & full scale projects

Assisting on nitrification removal investigations for the demonstration plant

Proposals for investigating incorporation of secondary MBR treatment into the JWPCP

Future joint studies to provide information for the PEIR

Page 10: Engineering and Operations Committee Item 6a March 9, 2020E&O Committee Item 6a Slide 12 March 9, 2020 Source Work Amount Status State Water Resources Control Board Groundwater Basin

E&O Committee Item 6a Slide 10 March 9, 2020

Operation NEXT

Jensen WTP

Weymouth WTP

Refineries

RRWP

Pipeline

RRWP AWT

Page 11: Engineering and Operations Committee Item 6a March 9, 2020E&O Committee Item 6a Slide 12 March 9, 2020 Source Work Amount Status State Water Resources Control Board Groundwater Basin

E&O Committee Item 6a Slide 11 March 9, 2020

Executive Management committee

Upper San Gabriel Valley MWD

Three Valley MWD

LACSD

LACDPW

Main San Gabriel Basin Watermaster

Purpose to coordinate the agencies needs with the Program

11

Santa Fe Spreading Grounds

Page 12: Engineering and Operations Committee Item 6a March 9, 2020E&O Committee Item 6a Slide 12 March 9, 2020 Source Work Amount Status State Water Resources Control Board Groundwater Basin

E&O Committee Item 6a Slide 12 March 9, 2020

Source Work Amount Status

State Water Resources Control

Board

Groundwater Basin Planning

$300,000 Final Payment Pending

State Water Resources Control

BoardMBR Evaluation $1,000,000

Developing Draft Agreement

Bureau of Reclamation

Title XVIReuse Research $750,000

Developing Draft Agreement

Bureau of Reclamation

Title XVIConstruction Up to $20M Future

Page 13: Engineering and Operations Committee Item 6a March 9, 2020E&O Committee Item 6a Slide 12 March 9, 2020 Source Work Amount Status State Water Resources Control Board Groundwater Basin

E&O Committee Item 6a Slide 13 March 9, 2020

85+ Demonstration Plant Tours

Approximately 2,000 visitors

Member agencies, elected officials, industry groups, students & general public

Program has been well received

2020 PresentationsAWWA International Symposium on Potable Reuse

Singapore WaterWeek

WateReuse CA

Page 14: Engineering and Operations Committee Item 6a March 9, 2020E&O Committee Item 6a Slide 12 March 9, 2020 Source Work Amount Status State Water Resources Control Board Groundwater Basin

E&O Committee Item 6a Slide 14 March 9, 2020

14

Mid - Late 2020

Board Letter

Workshop #1:

Implementation and DPR

Considerations

Workshop #2:

Planning, Agreements and

Financial Considerations

Board Action on Next Steps

PEIR + DPR Demo Testing

July 23, 2019

White Paper #1 White Paper #2

2

Mid 2020

Page 15: Engineering and Operations Committee Item 6a March 9, 2020E&O Committee Item 6a Slide 12 March 9, 2020 Source Work Amount Status State Water Resources Control Board Groundwater Basin