Engineering and Operations Committee Item 6a December 9, 2019

Upload: others

Post on 24-Jun-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Engineering Operations Committee Item 6a 9, 2019mwdh2o.com › DocSvcsPubs › rrwp › assets › boardupdate_dec2019.…Design Criteria Testing ISAP Meeting No. 2 (Dec. 4 and 5),

Engineering and Operations CommitteeItem 6aDecember 9, 2019

Page 2: Engineering Operations Committee Item 6a 9, 2019mwdh2o.com › DocSvcsPubs › rrwp › assets › boardupdate_dec2019.…Design Criteria Testing ISAP Meeting No. 2 (Dec. 4 and 5),

E&O Committee Item 6a, Slide 2 December 9, 2019

Demonstration Plant Activities

Grand Opening Operations and TestingSchedule

Panel and Regulatory ActivitiesProgram ActivitiesNext Steps

Demonstration  Plant

Page 3: Engineering Operations Committee Item 6a 9, 2019mwdh2o.com › DocSvcsPubs › rrwp › assets › boardupdate_dec2019.…Design Criteria Testing ISAP Meeting No. 2 (Dec. 4 and 5),

E&O Committee Item 6a Slide 3 December 9, 2019

October 10, 2019  ‐Approximately 250 attendees

Page 4: Engineering Operations Committee Item 6a 9, 2019mwdh2o.com › DocSvcsPubs › rrwp › assets › boardupdate_dec2019.…Design Criteria Testing ISAP Meeting No. 2 (Dec. 4 and 5),

E&O Committee Item 6a, Slide 4 December 9, 2019

MBR –Membrane Modules

Reverse Osmosis

Chemical Feed Systems UV Light/Advanced Oxidation Process

MBR – Aerobic and Anoxic 

Tanks

Page 5: Engineering Operations Committee Item 6a 9, 2019mwdh2o.com › DocSvcsPubs › rrwp › assets › boardupdate_dec2019.…Design Criteria Testing ISAP Meeting No. 2 (Dec. 4 and 5),

E&O Committee Item 6a Slide 5 December 9, 2019

Continued Weekly Coordination &Operational Meetings

MetropolitanLACSDProject Consultants

Monitoring & MaintenanceMicrobial MethodDevelopmentStart‐up Operations

Operations Partnering Kick‐off Meeting 

Page 6: Engineering Operations Committee Item 6a 9, 2019mwdh2o.com › DocSvcsPubs › rrwp › assets › boardupdate_dec2019.…Design Criteria Testing ISAP Meeting No. 2 (Dec. 4 and 5),

E&O Committee Item 6a, Slide 6 December 9, 2019

Field SamplingAnalyzer Maintenance

Chemical Tote Handling

Sample Analyses

Page 7: Engineering Operations Committee Item 6a 9, 2019mwdh2o.com › DocSvcsPubs › rrwp › assets › boardupdate_dec2019.…Design Criteria Testing ISAP Meeting No. 2 (Dec. 4 and 5),

E&O Committee Item 6a, Slide 7 December 9, 2019

Sanitation Districts’ Brine Test Platform

Pathogen Analyses Training

Bench‐Scale TestingDenitrification Reactor Test Setup

Page 8: Engineering Operations Committee Item 6a 9, 2019mwdh2o.com › DocSvcsPubs › rrwp › assets › boardupdate_dec2019.…Design Criteria Testing ISAP Meeting No. 2 (Dec. 4 and 5),

E&O Committee Item 6a, Slide 8 December 9, 2019

Biological Acclimation

Bioreactor Sampling

Equipment Troubleshooting        

Page 9: Engineering Operations Committee Item 6a 9, 2019mwdh2o.com › DocSvcsPubs › rrwp › assets › boardupdate_dec2019.…Design Criteria Testing ISAP Meeting No. 2 (Dec. 4 and 5),

E&O Committee Item 6a, Slide 9 December 9, 2019

Pre‐testing

Phase 1

Phase 2

Equipment Testing and Process Acclimation (3 months)

Baseline Performance Testing (4 months)

Challenge Testing and Evaluation (8 months)

Page 10: Engineering Operations Committee Item 6a 9, 2019mwdh2o.com › DocSvcsPubs › rrwp › assets › boardupdate_dec2019.…Design Criteria Testing ISAP Meeting No. 2 (Dec. 4 and 5),

E&O Committee Item 6a, Slide 10 December 9, 2019

Title 22 Regulations require independent panel of experts to review alternative approaches for meeting existing regulations (e.g., application of Membrane Bioreactor)

National Water Research Institute commissioned to secure panel for demonstration project

Panel will help guide demonstration project Testing and monitoring approachWater quality, operations data and reportingRegulatory engagement

Page 11: Engineering Operations Committee Item 6a 9, 2019mwdh2o.com › DocSvcsPubs › rrwp › assets › boardupdate_dec2019.…Design Criteria Testing ISAP Meeting No. 2 (Dec. 4 and 5),

E&O Committee Item 6a, Slide 11 December 9, 2019

Ed Means Adam OlivieriNancy Love 

Chuck Haas (Chair)Vernon Snoeyink Paul WesterhoffRichard Bull Joe Cotruvo

Thomas Harder 

FacilitationRegulations/PermittingWastewater Treatment

MicrobiologyPipeline Corrosion/Water ChemistryDrinking/Advanced Water Treatment

ToxicologyChemistry

Hydrogeology

Page 12: Engineering Operations Committee Item 6a 9, 2019mwdh2o.com › DocSvcsPubs › rrwp › assets › boardupdate_dec2019.…Design Criteria Testing ISAP Meeting No. 2 (Dec. 4 and 5),

E&O Committee Item 6a, Slide 12 December 9, 2019

Focus Areas covered on Dec. 4‐5, 2019 

Process Technology• Testing Approach• Operational Criteria 

Monitoring and Analysis• Microbial Sampling• Analytical Methodology

Raw Water Augmentation• Conceptual Approach• Technology Considerations

Page 13: Engineering Operations Committee Item 6a 9, 2019mwdh2o.com › DocSvcsPubs › rrwp › assets › boardupdate_dec2019.…Design Criteria Testing ISAP Meeting No. 2 (Dec. 4 and 5),

E&O Committee Item 6a, Slide 13 December 9, 2019

Final ISAP report available by early 2020

Page 14: Engineering Operations Committee Item 6a 9, 2019mwdh2o.com › DocSvcsPubs › rrwp › assets › boardupdate_dec2019.…Design Criteria Testing ISAP Meeting No. 2 (Dec. 4 and 5),

E&O Committee Item 6a, Slide 14 December 9, 2019

Joint support letter for RWA Expert Panel 

Metropolitan, LADWP & Santa Clara Valley Water District

Research to support and                inform regulation in progress

State Water Resources Control Board released a revised DPR Framework in August 2019

Staff provided verbal and written comments on framework

Page 15: Engineering Operations Committee Item 6a 9, 2019mwdh2o.com › DocSvcsPubs › rrwp › assets › boardupdate_dec2019.…Design Criteria Testing ISAP Meeting No. 2 (Dec. 4 and 5),

E&O Committee Item 6a Slide 15 December 9, 2019

ISAP/Regulator Engagement

2019 2020 2021 2022 2023

Raw Water Augmentation Development

Construction/Commissioning

Completion

MBR Regulatory TestingProcess Optimization & Design Criteria Testing

ISAP Meeting No. 2 (Dec. 4 and 5), Regulator Meeting No. 7 (Dec. 5)

Page 16: Engineering Operations Committee Item 6a 9, 2019mwdh2o.com › DocSvcsPubs › rrwp › assets › boardupdate_dec2019.…Design Criteria Testing ISAP Meeting No. 2 (Dec. 4 and 5),

E&O Committee Item 6a Slide 16 December 9, 2019

Full Tour Program Launched

Group ToursPublic Tours School Tours

Page 17: Engineering Operations Committee Item 6a 9, 2019mwdh2o.com › DocSvcsPubs › rrwp › assets › boardupdate_dec2019.…Design Criteria Testing ISAP Meeting No. 2 (Dec. 4 and 5),

E&O Committee Item 6a Slide 17 December 9, 2019

Workshop #1:Implementation and DPR Considerations

Workshop #1:Implementation and DPR Considerations

Workshop #2:Planning, Agreements 

and Financial Considerations

Workshop #2:Planning, Agreements 

and Financial Considerations

Board Action on Next Steps

Board Action on Next Steps

Mid 2020

Board Letter

Early 2020

Letters of Intent

2

July 23, 2019

White Papers

1

Page 18: Engineering Operations Committee Item 6a 9, 2019mwdh2o.com › DocSvcsPubs › rrwp › assets › boardupdate_dec2019.…Design Criteria Testing ISAP Meeting No. 2 (Dec. 4 and 5),

E&O Committee Item 6a Slide 18 December 9, 2019

Southern Nevada Water Authority Metropolitan and SNWA collaboration and partnership history

Colorado River water supplyWater quality, treatment technologies, and laboratory methods

SNWA assessing future long‐term supply needsExplore partnership opportunities in Program  development

Letter of IntentCoordination on 2026 Colorado River Operating Guidelines

Page 19: Engineering Operations Committee Item 6a 9, 2019mwdh2o.com › DocSvcsPubs › rrwp › assets › boardupdate_dec2019.…Design Criteria Testing ISAP Meeting No. 2 (Dec. 4 and 5),

E&O Committee Item 6a Slide 19 December 9, 2019

www.mwdh2o.com/RRWP