Energiarbete i praktiken PICASSO. Agneta Ring Environmental Manager BT Products AB. Bild från Klas. Klas Gustafsson VD Mjölby Svartådalen Energi AB. Verksamheten i Mjölby. BT Flygfoto 2003. PROJECT PICASSO. Target Tact time:1,8 min Capacity70.000 forklifts/ year, 2-shift - PowerPoint PPT PresentationTRANSCRIPT
Energiarbete i praktikenPICASSO
Agneta RingEnvironmental ManagerBT Products AB
Klas GustafssonVDMjölby Svartådalen Energi AB
Bild från Klas
Verksamheten i Mjölby
BT Flygfoto 2003
PROJECT PICASSO
TargetTact time: 1,8 min
Capacity 70.000 forklifts/ year, 2-shift
SpecificationNew automated powder paint line.
For forklift parts from Riders sortiment.Total process time: ~3,5 h
Max weight: 1200 kgMax mess.: LxWxH 3200x1600x2300 mm
Colors: Black 2 automated booths (robots)Orange 1 automated booth (robots)
Special 1 booth (manual)