FINDINGS FOR THE BASIN SETTING

WHITE WOLF GSA PUBLIC WORKSHOP #1

4 JUNE 2019

1

Page 2: EKI TECHNICAL PRESENTATION: GSP DEVELOPMENT AND ...whitewolfgsa.org/wp-content/...Presentation_WWGSA... · 6/4/2019  · eki technical presentation: gsp development and preliminary

SUSTAINABLE GROUNDWATER MANAGEMENT ACT (SGMA)

Signed into CA Law on September 16, 2014 Contained in these bills: SB 1168 & SB 1319

(Pavley); AB 1739 (Dickinson)

“Requires governments and water agencies of high and medium priority basins to halt groundwater overdraft and bring groundwater basins into balanced levels of pumping and recharge”(1)

(1) DWR, 2018. https://water.ca.gov/Programs/Groundwater-Management/SGMA-Groundwater-Management 2

Page 3: EKI TECHNICAL PRESENTATION: GSP DEVELOPMENT AND ...whitewolfgsa.org/wp-content/...Presentation_WWGSA... · 6/4/2019  · eki technical presentation: gsp development and preliminary

Basin Boundary Modification July 2016 – DWR approved Basin Boundary Modification request forming the White Wolf Subbasin

GSA Formation May 2017 – AEWSD, Kern County, TCWD, and WRMWSD submitted GSA notification to DWR

CASGEM Compliance June 2017 –White Wolf GSA submitted CASGEM notification to DWR

GSP Development – Deadline: January 31, 2022 June 2018 – Initial Notification to prepare a GSP submitted to DWR June 2018 –White Wolf GSA adopts Stakeholder Communication and Engagement Plan December 2018 – Entered into a Prop 1 SGWP Grant Agreement with DWR June 2019 – Draft finding for the “Basin Setting” presented at Public Workshop

Demonstrate Groundwater Sustainability – January 31, 2042

SGMA COMPLIANCE TIMELINE20

19

201

8

2

017

2

016

3

Page 4: EKI TECHNICAL PRESENTATION: GSP DEVELOPMENT AND ...whitewolfgsa.org/wp-content/...Presentation_WWGSA... · 6/4/2019  · eki technical presentation: gsp development and preliminary

WHITE WOLF GSA AEWSD, Kern County, TCWD,

and WRMWSD coordinated to become the White Wolf GSA via a Joint Powers Agreement (JPA) on 9 May 2017

White Wolf GSA is the exclusive GSA for the White Wolf Subbasin

White Wolf GSA is producing one GSP

4

Page 5: EKI TECHNICAL PRESENTATION: GSP DEVELOPMENT AND ...whitewolfgsa.org/wp-content/...Presentation_WWGSA... · 6/4/2019  · eki technical presentation: gsp development and preliminary

BASIN BOUNDARY MODIFICATION

In 2016 the GSA entities petitioned DWR to revise Kern County Subbasin boundaries to create a separate White Wolf Subbasin (WWB)

Basin boundary modification request approved by DWR in July 2016 and the California Water commission in October 2016

5

Page 6: EKI TECHNICAL PRESENTATION: GSP DEVELOPMENT AND ...whitewolfgsa.org/wp-content/...Presentation_WWGSA... · 6/4/2019  · eki technical presentation: gsp development and preliminary

After the creation of the new WWB, the GSA entities petitioned DWR to downgrade the WWB from critical overdraft status

DWR released final prioritization on 4 January 2019 – WWB is Medium Priority

WWB now has two more years to comply with SGMA

GSP due January 31, 2022

DOWNGRADE FROM CRITICAL OVERDRAFT STATUS

Data Source: Statewide Map of SGMA 2019 Basin Prioritization Results (draft, subject to change)https://water.ca.gov/Programs/Groundwater-Management/Basin-Prioritization

Kern CountySubbasin

6

Page 7: EKI TECHNICAL PRESENTATION: GSP DEVELOPMENT AND ...whitewolfgsa.org/wp-content/...Presentation_WWGSA... · 6/4/2019  · eki technical presentation: gsp development and preliminary

KEY SGMA REQUIREMENTS – GSP DEVELOPMENT Notice and Communication

Data Management System (DMS)

Description of Plan Area

Hydrogeological Conceptual Model (HCM)

Groundwater Conditions Assessment

Water Budget

Sustainable Management Criteria (SMCs)

Monitoring Network

Projects & Management Actions (P&MAs)* 23-CCR Sections 352.6 , 354.8-20;www.water.ca.gov/groundwater/sgm/gsp.cfm

7

Page 8: EKI TECHNICAL PRESENTATION: GSP DEVELOPMENT AND ...whitewolfgsa.org/wp-content/...Presentation_WWGSA... · 6/4/2019  · eki technical presentation: gsp development and preliminary

White Wolf GSA adopted and is implementing a Stakeholder Communication & Engagement Plan (SCEP)

Venues for public engagement include: White Wolf GSA Board Meetings (first Tuesday

of every third month)

Public Workshops

White Wolf GSA actively coordinates with neighboring Kern Groundwater Authority (KGA) in the Kern Subbasin

8

STAKEHOLDER ENGAGEMENT & COORDINATION

http://whitewolfgsa.org/

Page 9: EKI TECHNICAL PRESENTATION: GSP DEVELOPMENT AND ...whitewolfgsa.org/wp-content/...Presentation_WWGSA... · 6/4/2019  · eki technical presentation: gsp development and preliminary

Surveys sent out to Basin stakeholders

20 surveys returned

Most stakeholders are familiar with SGMA and are currently engaged in groundwater management activities/discussions

11 stakeholders willing to share data

9

STAKEHOLDER SURVEY FEEDBACK

Yes90%

No10%

FAMILIARITY WITH SGMA

Yes55%

No20%

Occasionally20%

No answer5%

CURRENT ENGAGEMENT WITH GW MANAGEMENT

Page 10: EKI TECHNICAL PRESENTATION: GSP DEVELOPMENT AND ...whitewolfgsa.org/wp-content/...Presentation_WWGSA... · 6/4/2019  · eki technical presentation: gsp development and preliminary

Sent data requests to stakeholders willing to share data

Received 6 responses containing well location and construction information, pump test results, geophysical data, water level data, and water quality data for 34 wells

10

STAKEHOLDER DATA REQUESTS

Page 11: EKI TECHNICAL PRESENTATION: GSP DEVELOPMENT AND ...whitewolfgsa.org/wp-content/...Presentation_WWGSA... · 6/4/2019  · eki technical presentation: gsp development and preliminary

338 wells in the DMS

204 wells with water level data (1919-2018)

219 wells with water quality data

11

DATA MANAGEMENT SYSTEM (DMS)

Page 12: EKI TECHNICAL PRESENTATION: GSP DEVELOPMENT AND ...whitewolfgsa.org/wp-content/...Presentation_WWGSA... · 6/4/2019  · eki technical presentation: gsp development and preliminary

Land use maps show main basin floor as primarily irrigated agriculture and uplands area as undeveloped grazing and conservation lands

Identifies Grapevine Development as a major change in land use

12

DRAFT PLAN AREA KEY FINDINGS

Page 13: EKI TECHNICAL PRESENTATION: GSP DEVELOPMENT AND ...whitewolfgsa.org/wp-content/...Presentation_WWGSA... · 6/4/2019  · eki technical presentation: gsp development and preliminary

Defines one principal aquifer: Shallow Alluvium, Kern River Formation, and Chanac Formation

Santa Margarita Formation defined as the unpumped aquifer

Currently defines the “bottom of the Basin” as the depth of the deepest groundwater extractions (approximately 2,200 ft bgs)

Wells installed below that depth will have to demonstrate that they will not create impacts

13

DRAFT BASIN SETTING KEY FINDINGS - HCM

Page 14: EKI TECHNICAL PRESENTATION: GSP DEVELOPMENT AND ...whitewolfgsa.org/wp-content/...Presentation_WWGSA... · 6/4/2019  · eki technical presentation: gsp development and preliminary

Groundwater flow directions are generally to the northwest across the White Wolf Fault and into the Kern Subbasin

14

DRAFT BASIN SETTING KEY FINDINGS – WATER LEVELS

Page 15: EKI TECHNICAL PRESENTATION: GSP DEVELOPMENT AND ...whitewolfgsa.org/wp-content/...Presentation_WWGSA... · 6/4/2019  · eki technical presentation: gsp development and preliminary

Groundwater level trends: Lowest prior to the 1970s

Recovery starting around 1975 after surface water imports begin, by 2007 levels had recovered much of the decline

Decline again due to severe drought from 2012-2016

15

DRAFT BASIN SETTING KEY FINDINGS – WATER LEVELS

Page 16: EKI TECHNICAL PRESENTATION: GSP DEVELOPMENT AND ...whitewolfgsa.org/wp-content/...Presentation_WWGSA... · 6/4/2019  · eki technical presentation: gsp development and preliminary

DRAFT BASIN SETTING KEY FINDINGS – WATER LEVELS

16

Page 17: EKI TECHNICAL PRESENTATION: GSP DEVELOPMENT AND ...whitewolfgsa.org/wp-content/...Presentation_WWGSA... · 6/4/2019  · eki technical presentation: gsp development and preliminary

Water quality conditions based on data collected between 2012-2016 38% of well samples had constituents that

exceed MCLs / SMCLs: Nitrate

TDS

Arsenic

Selenium

Sulfate

Manganese

Iron

Boron was detected at levels that may restrict groundwater use for irrigation for common crops in 35% of wells

17

DRAFT BASIN SETTING KEY FINDINGS – WATER QUALITY

Nitrate

TDS

Page 18: EKI TECHNICAL PRESENTATION: GSP DEVELOPMENT AND ...whitewolfgsa.org/wp-content/...Presentation_WWGSA... · 6/4/2019  · eki technical presentation: gsp development and preliminary

Historical subsidence occurred in northern part of WWB and near Aqueduct

Recent subsidence mapping shows little deformation (within the range of error)

18

DRAFT BASIN SETTING KEY FINDINGS - SUBSIDENCE

Page 19: EKI TECHNICAL PRESENTATION: GSP DEVELOPMENT AND ...whitewolfgsa.org/wp-content/...Presentation_WWGSA... · 6/4/2019  · eki technical presentation: gsp development and preliminary

Groundwater storage in the Basin has increased by ~5,200 AFY between 1995-2014

19

DRAFT BASIN SETTING KEY FINDINGS – GW STORAGE

Page 20: EKI TECHNICAL PRESENTATION: GSP DEVELOPMENT AND ...whitewolfgsa.org/wp-content/...Presentation_WWGSA... · 6/4/2019  · eki technical presentation: gsp development and preliminary

Analytical spreadsheet model developed to quantify historical (WY 1994-2014) and current (WY 2015) conditions

Model-calculated water levels generally match the observed

20

DRAFT BASIN SETTING KEY FINDINGS – WATER BUDGETEXTERNAL WATER BUDGET DOMAIN

Page 21: EKI TECHNICAL PRESENTATION: GSP DEVELOPMENT AND ...whitewolfgsa.org/wp-content/...Presentation_WWGSA... · 6/4/2019  · eki technical presentation: gsp development and preliminary

HISTORICAL WATER BUDGET RESULTS – ANALYTICAL MODEL (WY 1994-2014)

21

Land Surface Agricultural LandUrban Land

Groundwater Basin

Change in Storage5,200

Atmosphere

Groundwater Inflow

0

Vadose Zone

Imported Water

Deliveries74,108

Agricultural Pumping22,305

Direct Precipitation

78,380

Evapo-transpiration

143,281

Consumptive Use

1,587

Deep Percolation:Effective Precipitation 3,463Surface Water Infiltration 8,197Applied Water Infiltration 23,061

Pumping:Private 17,636District 4,669

Water Budget Domain

Inflow to water budget zone

Outflow from water budget zone

Flow between subdomainUnits: AFY

Groundwater Outflow

7,104

Natural Surface

Water Flows8,416

Page 22: EKI TECHNICAL PRESENTATION: GSP DEVELOPMENT AND ...whitewolfgsa.org/wp-content/...Presentation_WWGSA... · 6/4/2019  · eki technical presentation: gsp development and preliminary

Basin is not in a condition of critical overdraft

Sustainable yield estimate = historical pumping + change in storage

Sustainable yield estimated to be about 27,500 AFY

22

DRAFT BASIN SETTING KEY FINDINGS – WATER BUDGET

1995-2014 Historical Water Budget

Pumping 22,300 AFY

Change in Storage 5,200 AFY

Sustainable Yield 27,500 AFY

Page 23: EKI TECHNICAL PRESENTATION: GSP DEVELOPMENT AND ...whitewolfgsa.org/wp-content/...Presentation_WWGSA... · 6/4/2019  · eki technical presentation: gsp development and preliminary

Assuming no interconnected surface water: Depth to groundwater in the principal

aquifer is well below land surface

Most streams in Basin are ephemeral (i.e., mostly dry with infrequent storm flows)

GDEs appear to be mapped in riparian areas

Springs Fault area may be an area we have to address GDEs

23

DRAFT BASIN SETTING KEY FINDINGS - GDEs

Page 24: EKI TECHNICAL PRESENTATION: GSP DEVELOPMENT AND ...whitewolfgsa.org/wp-content/...Presentation_WWGSA... · 6/4/2019  · eki technical presentation: gsp development and preliminary

WWB decided to participate in KGA’s groundwater model efforts for the Kern Subbasin

Model is not calibrated and results are not proving reliable for the WWB

White Wolf GSA considering doing its own model for GSP development and basin management

24

GROUNDWATER MODELING COORDINATION

Page 25: EKI TECHNICAL PRESENTATION: GSP DEVELOPMENT AND ...whitewolfgsa.org/wp-content/...Presentation_WWGSA... · 6/4/2019  · eki technical presentation: gsp development and preliminary

Uncertainty in distinguishing water transmitting and storage properties (hydraulic conductivity, specific yield, and specific storage) between geologic formations

Uncertainty in water transmitting and storage properties and groundwater flow across the White Wolf Fault

Uncertainty about well construction details, well use, and status for many wells

Uncertainty about well data received from stakeholders being correctly assigned to wells

Unknown well locations for the Tut Brothers public water system wells

Uncertainty in the reliability of groundwater flow model in its existing form

Limited available data associated with potential GDEs

25

PRELIMINARY DATA GAPS

§351. Defines “Data gap” as a lack of information that significantly affects the understanding of the basin setting or evaluation of the efficacy of Plan implementation, and could limit theability to assess whether a basin is being sustainably managed.

Page 26: EKI TECHNICAL PRESENTATION: GSP DEVELOPMENT AND ...whitewolfgsa.org/wp-content/...Presentation_WWGSA... · 6/4/2019  · eki technical presentation: gsp development and preliminary

POTENTIAL DATA GAP FILLING ACTIVITIES Conduct aquifer pumping tests to improve characterization of aquifer and fault

properties Consider applying for a Technical Support Services Grant to support well installation

and/or video logging Conduct additional outreach and field inspection to determine well construction

details of existing wells for potential use as monitoring wells Further attempts at stakeholder and public water systems outreach to accurately

locate well(s) Begin drafting coordination agreements with well owners for future monitoring Conduct additional model development / refinement Conduct field surveys for GDEs

26

Page 27: EKI TECHNICAL PRESENTATION: GSP DEVELOPMENT AND ...whitewolfgsa.org/wp-content/...Presentation_WWGSA... · 6/4/2019  · eki technical presentation: gsp development and preliminary

KEY TAKEAWAYS White Wolf GSA is preparing one GSP: Grapevine Development is a significant future land use change

One Principal Aquifer, extending to depths of approximately 2,200 feet bgs

Historically, groundwater level were lowest prior to the1970s, began to recover around 1975 after surface water imports begin, peak around 2007, and decline again due to severe drought from 2012-2016

Basin is not in critical overdraft: Average change in storage +5,200 AFY (WY1994-2014)

Irrigated areas of the Basin show high nitrate concentrations

Recent subsidence is minimal; historical subsidence has occurred near the Aqueduct

Limited reliability and data associated with groundwater flow modeling and potential GDEs requires future work

27

Page 28: EKI TECHNICAL PRESENTATION: GSP DEVELOPMENT AND ...whitewolfgsa.org/wp-content/...Presentation_WWGSA... · 6/4/2019  · eki technical presentation: gsp development and preliminary

SUSTAINABILITY CRITERIA(1)

Sustainability indicators (SIs) are the six effects that, when significant and unreasonable, become undesirable results

Minimum thresholds (MTs) are the quantitative values representing groundwater conditions at a representative monitoring site that, when exceeded, may cause an undesirable result(s)

Measurable Objectives (MOs) are quantitative goals that reflect the basin’s desired groundwater conditions and allow the GSA to achieve the sustainability goal within 20 years

Interim Milestone (IM) is a target value representing measurable groundwater conditions, in increments of five years, set by an Agency as part of a Plan

28

Margin of Operational Flexibility

(1) DWR, 2017. Draft Sustainable Management Criteria BMP; Union of Concerned Scientists, 2017.

Page 29: EKI TECHNICAL PRESENTATION: GSP DEVELOPMENT AND ...whitewolfgsa.org/wp-content/...Presentation_WWGSA... · 6/4/2019  · eki technical presentation: gsp development and preliminary

SUSTAINABILITY INDICATORS OF POTENTIAL CONCERN

29

Land Subsidence

Seawater Intrusion

DWR CWP 2013Winter et al 1998

Water Quality Degradation

Lowering of GW Levels

Reduction of GW Storage

Surface Water Depletion

Low Concern High Concern

Page 30: EKI TECHNICAL PRESENTATION: GSP DEVELOPMENT AND ...whitewolfgsa.org/wp-content/...Presentation_WWGSA... · 6/4/2019  · eki technical presentation: gsp development and preliminary

SIGNIFICANCE TO WHITE WOLF SUBBASIN

Sustainable Management Criteria (SMC) are the heart of the GSP

Development of SMC is a data-driven process (also guilty until proven innocent)

Scale and coordination are critical to defining Sustainability Indicators and Undesirable Results

SMCs can be iteratively adjusted in future years

State intervention can happen before 2042 if GSP is deemed inadequate or basin is underperforming relative to interim milestones

30

Page 31: EKI TECHNICAL PRESENTATION: GSP DEVELOPMENT AND ...whitewolfgsa.org/wp-content/...Presentation_WWGSA... · 6/4/2019  · eki technical presentation: gsp development and preliminary

NEXT STEPS

Assess monitoring network

Identify key data gaps and begin planning for data gaps filling efforts

Coordinate with KGA on projected future modeling

Begin Sustainability Planning

31

Page 32: EKI TECHNICAL PRESENTATION: GSP DEVELOPMENT AND ...whitewolfgsa.org/wp-content/...Presentation_WWGSA... · 6/4/2019  · eki technical presentation: gsp development and preliminary

White Wolf GSA Board Meetings First Tuesday of every third month

(Mar, Jun, Sep, & Dec) at 1 PM at the WRMWSD Headquarters

Public Workshops

White Wolf GSA Website: http://whitewolfgsa.org/

32

OPPORTUNITIES FOR ENGAGEMENT

Page 33: EKI TECHNICAL PRESENTATION: GSP DEVELOPMENT AND ...whitewolfgsa.org/wp-content/...Presentation_WWGSA... · 6/4/2019  · eki technical presentation: gsp development and preliminary

QUESTIONS?

Anona Dutton, P.G., C.Hg.

[email protected]

650-292-9100

33

www.ekiconsult.comBurlingame, CA | Los Angeles, CA

Oakland, CA | Centennial, CO

http://whitewolfgsa.org/