efi.uchicago.edu ci.uchicago.edu fax update rob gardner computation and enrico fermi institutes...
TRANSCRIPT
efi.uchicago.educi.uchicago.edu
FAX update
Rob Gardner
Computation and Enrico Fermi InstitutesUniversity of Chicago
Sep 9, 2013
efi.uchicago.educi.uchicago.edu2
FAX Activities Overview
• Start from https://twiki.cern.ch/twiki/bin/view/AtlasComputing/MonitoringFax – Several notable issues in the SSB requiring attention
• Xrootd 3.3.3 and N2N updates– https://twiki.cern.ch/twiki/bin/view/AtlasComputin
g/Xrootd333Upgrade
– The status table shows a long way to go before this is finished.
efi.uchicago.educi.uchicago.edu3
Functional testing notification
• Problems are now reported to ADC cloud support lists on a daily basis
• Need to change to HC-like offline-online notification– Necessary before going into production
efi.uchicago.educi.uchicago.edu4
Stress testing
• Jobs from Ilija submitted using the HC framework• Submitted jobs to US ANALY queues and CERN_PROD• Conditions at each queue:
– Batch of 10 jobs, each coping data from from 7 remote sites– Each job xrdcp’s 10 ~4.5 GB files, randomly chosen from SMWZ FDR data– Total ~ 2.2 TB data to transfer in 70 parallel transfers
• Time to finish, events/s, MB/s for each job & Panda IDs so jobs can be investigated
• All jobs submitted through FDR web interface– http://ivukotic.web.cern.ch/ivukotic/FDR/index.asp
• n.b. we cannot in practice “guarantee” simultaneous starts of jobs, but the workload should be indicative of what generally could be expected.
• Speeds presented are averages per file, aggregates per link are x10.
efi.uchicago.educi.uchicago.edu5
Stress testing US + CERN
AGLT2 BNL_ATLAS BU CERN-PROD MWT2 OU_OCHEP_SWT2 SWT2_CPB0
20
40
60
80
100
120XRDCP US + CERN AGLT2
BNL-ATLAS
BU
CERN-PROD
MWT2
OU_OCHEP_SWT2
WT2
SOURCES
MB/
s
XRDCP MB/s destinationAGLT2 BNL_ATLAS BU CERN-PROD MWT2 OU_OCHEP_SWT2 SWT2_CPB
source
AGLT2 28.54 51.26 1.53 0.57 16.21 64.65 20.27BNL-ATLAS 26.55 81.22 2.97 8.92 14.22 20.28 5.73
BU 15.06 75.92 58.12 2.91 1.44 36.95 10.06CERN-PROD 1.65 24.82 1.15 82.33 1.89 12.66 11.04
MWT2 8.17 57.08 1.44 1.4 87.87 37.64 4.21OU_OCHEP_SWT2 108.83 78.63 68.78 0 88.26 0 9.64
WT2 5.33 7.2 0.68 1.69 6.11 14.73 7.39
Observations & questions• BNL the best as
destination• OU_OCHEP_SWT2
shows great results but was unable to serve to CERN or itself
• AGLT2 was faster to read from OU than itself
• Even using CERN as source or destination is not unreasonable
efi.uchicago.educi.uchicago.edu6
Stress testing T1s
Observations:• Very nice
rates• The only
problematic connection INFN-T1 to FZK
BNL-ATLAS CERN-PROD FZK INFN-T1 RAL0
10
20
30
40
50
60
70
80
90 XDRCP between T1s BNL-ATLASCERN-PRODFZKIN2P3-CCINFN-T1PIC
Source
MB/
s