ebrd's stakeholder engagement requirements for water sector … · 2011-05-05 · stakeholder...

10
EBRD's stakeholder EBRD's stakeholder engagement requirements engagement requirements for water sector projects for water sector projects Polina Pimenova, Principal Environmental Specialist, EBRD Polina Pimenova, Principal Environmental Specialist, EBRD Bucharest, 16 Bucharest, 16 th th June 2010 June 2010

Upload: others

Post on 22-Jul-2020

4 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: EBRD's stakeholder engagement requirements for water sector … · 2011-05-05 · stakeholder engagement Environmental and Social Policy and Performance Requirements, ... existing

EBRD's stakeholder EBRD's stakeholder engagement requirements engagement requirements for water sector projectsfor water sector projects

Polina Pimenova, Principal Environmental Specialist, EBRDPolina Pimenova, Principal Environmental Specialist, EBRDBucharest, 16Bucharest, 16thth June 2010June 2010

Page 2: EBRD's stakeholder engagement requirements for water sector … · 2011-05-05 · stakeholder engagement Environmental and Social Policy and Performance Requirements, ... existing

Background of the BankBackground of the Bank

� Regional multilateral financial institution investing in various sectors across 29 countries in Europe and central Asia, with prime focus on private sector clients

� Sustainability commitments by mandate

� Promoting corporate transparency, accountability and stakeholder engagement

� Environmental and Social Policy and Performance Requirements, Public Information Policy

Page 3: EBRD's stakeholder engagement requirements for water sector … · 2011-05-05 · stakeholder engagement Environmental and Social Policy and Performance Requirements, ... existing

Typical water sector projectsTypical water sector projects

� Aim to raise quality / efficiency of water services and improve public health

� Rehabilitation / modernisation and/or expansion of existing water & wastewater systems and facilities (e.g. water/wastewater mains, groundwater wells, pumping stations, treatment facilities etc.)

� Construction of new water treatment facilities, wastewater treatment plants, sludge biogas facilities etc.

Page 4: EBRD's stakeholder engagement requirements for water sector … · 2011-05-05 · stakeholder engagement Environmental and Social Policy and Performance Requirements, ... existing

ExamplesExamples

Page 5: EBRD's stakeholder engagement requirements for water sector … · 2011-05-05 · stakeholder engagement Environmental and Social Policy and Performance Requirements, ... existing

PR 10: Information Disclosure and PR 10: Information Disclosure and Stakeholder EngagementStakeholder Engagement

� Build and maintainconstructive relationships with stakeholders

� Identify people or communities affected by the project

� Information disclosure and meaningful consultation on the project

Page 6: EBRD's stakeholder engagement requirements for water sector … · 2011-05-05 · stakeholder engagement Environmental and Social Policy and Performance Requirements, ... existing

PR10 PR10 -- Key ConceptsKey Concepts

� During project preparation:

– Stakeholder identification and analysis

– Stakeholder Engagement Plan (SEP)

– Information disclosure

– Meaningful consultation

� During project implementation

– Reporting and community engagement

� Grievance mechanism

Page 7: EBRD's stakeholder engagement requirements for water sector … · 2011-05-05 · stakeholder engagement Environmental and Social Policy and Performance Requirements, ... existing

Stakeholder engagementStakeholder engagement

� a part of the E&S due diligence

� disclosure of relevant and adequate information

� consultations when need arises

� focused on E&S risks and adverse impacts

� outlines the proposed measures and actions to mitigate and monitor the impacts

� continues throughout project implementation

Page 8: EBRD's stakeholder engagement requirements for water sector … · 2011-05-05 · stakeholder engagement Environmental and Social Policy and Performance Requirements, ... existing

Key positive aspectsKey positive aspects

� Informing people prevents misconceptions and creates enabling environment

� Rigorous requirements:

– go beyond local/national requirements in many cases

– driven by EU requirements and best practice

– support Aarhus Convention approach even in areas where it has not been ratified

� Explicit requirements on disclosure of relevant information and meaningful consultation

Page 9: EBRD's stakeholder engagement requirements for water sector … · 2011-05-05 · stakeholder engagement Environmental and Social Policy and Performance Requirements, ... existing

Key challengesKey challenges

� General lack of awareness of Clients / Water Companies about the requirements / process / resources needed

� Weak corporate governance of water service providers in many cases

� Perception of high cost / time / complex logistics

� Lack of guidance for Water Companies on access to information and public participation

Page 10: EBRD's stakeholder engagement requirements for water sector … · 2011-05-05 · stakeholder engagement Environmental and Social Policy and Performance Requirements, ... existing

Need for Practical GuidanceNeed for Practical Guidance

� EBRD would strongly encourage the development of a Guidance note for companies in relation to access to information and public participation, to include:

� Obligations for companies (private or public) as opposed to authorities;

� Handling requests from stakeholders (e.g. letter templates);

� Providing info in advance of works (e.g. to affected people);

� Handling grievances/complaints;

� Good-practice record-keeping