Dynamic Mapping of ERCOT Interconnection Process
Gavin Dillingham, PhD
Satish Ravindran P.E, CEM, LEED Green Assoc.
HARC
![Page 2: Dynamic Mapping of ERCOT Interconnection Process · Dynamic Mapping of ERCOT Interconnection Process Gavin Dillingham, PhD Satish Ravindran P.E, CEM, LEED Green Assoc. HARC](https://reader036.vdocuments.site/reader036/viewer/2022062600/5b776fa97f8b9a4c438d2112/html5/thumbnails/2.jpg)
Agenda
• Interconnecting in Texas – Greater than 10 MW
• Process Requirements
• Introduce Interconnection Dynamic Mapping Tool
![Page 3: Dynamic Mapping of ERCOT Interconnection Process · Dynamic Mapping of ERCOT Interconnection Process Gavin Dillingham, PhD Satish Ravindran P.E, CEM, LEED Green Assoc. HARC](https://reader036.vdocuments.site/reader036/viewer/2022062600/5b776fa97f8b9a4c438d2112/html5/thumbnails/3.jpg)
SECO DOE Project
• Regulatory and Policy Barriers to CHP
– Department of Energy and State Energy Conservation Office – SEP
• Air Permitting
• Stand-by Rates
• Power Export
• Interconnection
![Page 4: Dynamic Mapping of ERCOT Interconnection Process · Dynamic Mapping of ERCOT Interconnection Process Gavin Dillingham, PhD Satish Ravindran P.E, CEM, LEED Green Assoc. HARC](https://reader036.vdocuments.site/reader036/viewer/2022062600/5b776fa97f8b9a4c438d2112/html5/thumbnails/4.jpg)
Interconnection > 10MW –Stakeholder interviews
• Interconnection process > 10 MW is DEMANDING
• Two thirds of projects in state > 10MW
• Process times average 270 days to 1020 days• Process times average 270 days to 1020 days
• ERCOT transmission infrastructure is strained-requires expensive upgrades
• Unclear understanding of modeling requirements
![Page 5: Dynamic Mapping of ERCOT Interconnection Process · Dynamic Mapping of ERCOT Interconnection Process Gavin Dillingham, PhD Satish Ravindran P.E, CEM, LEED Green Assoc. HARC](https://reader036.vdocuments.site/reader036/viewer/2022062600/5b776fa97f8b9a4c438d2112/html5/thumbnails/5.jpg)
Interconnection > 10MW – What we heard from ERCOT
• Developers may use incorrect equipment – does not match with study
• Uncertainty of modeling data required by developersdevelopers
• Incorrect understanding of process and documents
• Timelines are not followed
• Upgrades to infrastructure takes a long time
• Telemetry not set up properly
![Page 6: Dynamic Mapping of ERCOT Interconnection Process · Dynamic Mapping of ERCOT Interconnection Process Gavin Dillingham, PhD Satish Ravindran P.E, CEM, LEED Green Assoc. HARC](https://reader036.vdocuments.site/reader036/viewer/2022062600/5b776fa97f8b9a4c438d2112/html5/thumbnails/6.jpg)
Interconnection > 10 MW
• Affects Project Design and Economics
• Developers need deeper understanding of the technical requirements of processrequirements of process
• Solid understanding of market protocols and operating guides
• Closer communication between TSP, ERCOT and developers
![Page 7: Dynamic Mapping of ERCOT Interconnection Process · Dynamic Mapping of ERCOT Interconnection Process Gavin Dillingham, PhD Satish Ravindran P.E, CEM, LEED Green Assoc. HARC](https://reader036.vdocuments.site/reader036/viewer/2022062600/5b776fa97f8b9a4c438d2112/html5/thumbnails/7.jpg)
Process Requirements
• Stringent ERCOT Compliance Review
• Increasing Technical Data Requirements
• Complex Facility studies• Complex Facility studies
• Generator Modeling requirements differ for each project
• Testing and Telemetry requirements
![Page 8: Dynamic Mapping of ERCOT Interconnection Process · Dynamic Mapping of ERCOT Interconnection Process Gavin Dillingham, PhD Satish Ravindran P.E, CEM, LEED Green Assoc. HARC](https://reader036.vdocuments.site/reader036/viewer/2022062600/5b776fa97f8b9a4c438d2112/html5/thumbnails/8.jpg)
Process Flow Map
![Page 9: Dynamic Mapping of ERCOT Interconnection Process · Dynamic Mapping of ERCOT Interconnection Process Gavin Dillingham, PhD Satish Ravindran P.E, CEM, LEED Green Assoc. HARC](https://reader036.vdocuments.site/reader036/viewer/2022062600/5b776fa97f8b9a4c438d2112/html5/thumbnails/9.jpg)
Online Interconnection Wizard
• An interactive / simplified Users Guide
• Avoid paperwork delays and incorrect submissions
• A system to notify approaching deadlines
• Avoid communication delays
• Breaks complicated steps into simplified single task sub-steps
![Page 10: Dynamic Mapping of ERCOT Interconnection Process · Dynamic Mapping of ERCOT Interconnection Process Gavin Dillingham, PhD Satish Ravindran P.E, CEM, LEED Green Assoc. HARC](https://reader036.vdocuments.site/reader036/viewer/2022062600/5b776fa97f8b9a4c438d2112/html5/thumbnails/10.jpg)
Online Interconnection Wizard
• Keep track of timelines
• Tips and Tricks based of feedbacks from other stakeholders –common pitfalls, incorrect information etc.information etc.
• One place to manage multiple projects
![Page 11: Dynamic Mapping of ERCOT Interconnection Process · Dynamic Mapping of ERCOT Interconnection Process Gavin Dillingham, PhD Satish Ravindran P.E, CEM, LEED Green Assoc. HARC](https://reader036.vdocuments.site/reader036/viewer/2022062600/5b776fa97f8b9a4c438d2112/html5/thumbnails/11.jpg)
Online Interconnection Wizard
![Page 12: Dynamic Mapping of ERCOT Interconnection Process · Dynamic Mapping of ERCOT Interconnection Process Gavin Dillingham, PhD Satish Ravindran P.E, CEM, LEED Green Assoc. HARC](https://reader036.vdocuments.site/reader036/viewer/2022062600/5b776fa97f8b9a4c438d2112/html5/thumbnails/12.jpg)
Online Interconnection Wizard
![Page 13: Dynamic Mapping of ERCOT Interconnection Process · Dynamic Mapping of ERCOT Interconnection Process Gavin Dillingham, PhD Satish Ravindran P.E, CEM, LEED Green Assoc. HARC](https://reader036.vdocuments.site/reader036/viewer/2022062600/5b776fa97f8b9a4c438d2112/html5/thumbnails/13.jpg)
Online Interconnection Wizard
![Page 14: Dynamic Mapping of ERCOT Interconnection Process · Dynamic Mapping of ERCOT Interconnection Process Gavin Dillingham, PhD Satish Ravindran P.E, CEM, LEED Green Assoc. HARC](https://reader036.vdocuments.site/reader036/viewer/2022062600/5b776fa97f8b9a4c438d2112/html5/thumbnails/14.jpg)
Online Interconnection Wizard
![Page 15: Dynamic Mapping of ERCOT Interconnection Process · Dynamic Mapping of ERCOT Interconnection Process Gavin Dillingham, PhD Satish Ravindran P.E, CEM, LEED Green Assoc. HARC](https://reader036.vdocuments.site/reader036/viewer/2022062600/5b776fa97f8b9a4c438d2112/html5/thumbnails/15.jpg)
Online Interconnection Wizard
![Page 16: Dynamic Mapping of ERCOT Interconnection Process · Dynamic Mapping of ERCOT Interconnection Process Gavin Dillingham, PhD Satish Ravindran P.E, CEM, LEED Green Assoc. HARC](https://reader036.vdocuments.site/reader036/viewer/2022062600/5b776fa97f8b9a4c438d2112/html5/thumbnails/16.jpg)
Online Interconnection Wizard
![Page 17: Dynamic Mapping of ERCOT Interconnection Process · Dynamic Mapping of ERCOT Interconnection Process Gavin Dillingham, PhD Satish Ravindran P.E, CEM, LEED Green Assoc. HARC](https://reader036.vdocuments.site/reader036/viewer/2022062600/5b776fa97f8b9a4c438d2112/html5/thumbnails/17.jpg)
Online Interconnection Wizard
![Page 18: Dynamic Mapping of ERCOT Interconnection Process · Dynamic Mapping of ERCOT Interconnection Process Gavin Dillingham, PhD Satish Ravindran P.E, CEM, LEED Green Assoc. HARC](https://reader036.vdocuments.site/reader036/viewer/2022062600/5b776fa97f8b9a4c438d2112/html5/thumbnails/18.jpg)
Online Interconnection Wizard
![Page 19: Dynamic Mapping of ERCOT Interconnection Process · Dynamic Mapping of ERCOT Interconnection Process Gavin Dillingham, PhD Satish Ravindran P.E, CEM, LEED Green Assoc. HARC](https://reader036.vdocuments.site/reader036/viewer/2022062600/5b776fa97f8b9a4c438d2112/html5/thumbnails/19.jpg)
Online Interconnection Wizard
![Page 20: Dynamic Mapping of ERCOT Interconnection Process · Dynamic Mapping of ERCOT Interconnection Process Gavin Dillingham, PhD Satish Ravindran P.E, CEM, LEED Green Assoc. HARC](https://reader036.vdocuments.site/reader036/viewer/2022062600/5b776fa97f8b9a4c438d2112/html5/thumbnails/20.jpg)
Online Interconnection Wizard
![Page 21: Dynamic Mapping of ERCOT Interconnection Process · Dynamic Mapping of ERCOT Interconnection Process Gavin Dillingham, PhD Satish Ravindran P.E, CEM, LEED Green Assoc. HARC](https://reader036.vdocuments.site/reader036/viewer/2022062600/5b776fa97f8b9a4c438d2112/html5/thumbnails/21.jpg)
Online Interconnection Wizard
![Page 22: Dynamic Mapping of ERCOT Interconnection Process · Dynamic Mapping of ERCOT Interconnection Process Gavin Dillingham, PhD Satish Ravindran P.E, CEM, LEED Green Assoc. HARC](https://reader036.vdocuments.site/reader036/viewer/2022062600/5b776fa97f8b9a4c438d2112/html5/thumbnails/22.jpg)
Online Interconnection Wizard