ercot monthly operational overvie · ercot monthly operational overview (july 2018) revised...

53
ERCOT Monthly Operational Overview (July 2018) Revised 08.22.18 ERCOT Public August 15, 2018

Upload: others

Post on 17-May-2020

20 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: ERCOT Monthly Operational Overvie · ERCOT Monthly Operational Overview (July 2018) Revised 08.22.18. ERCOT Public. August 15, 2018

ERCOT Monthly Operational Overview(July 2018) Revised 082218

ERCOT PublicAugust 15 2018

Grid Planning amp Operations

PUBLIC

Summary ndash July 2018

Operationsbull The preliminary Settlements hourly peak demand of 73308 MW on July 19 was lower

than the day-ahead mid-term load forecast peak of 73518 MW for the same operatinghourndash The operational instantaneous peak demand was 73405 MW (telemetry)

bull Day-ahead load forecast error for July was 197bull ERCOT issued 12 notifications

ndash Four Advisories issued due to Physical Responsive Capability being below 3000 MWndash One Advisory issued for extreme hot weatherndash Five DC Tie-related Watchesndash One OCN issued for extreme hot weatherndash One OCN issued for projected reserve capacity shortage

Planning Activitiesbull 404 active generation interconnection requests totaling 79852 MW including 37697

MW of wind generation as of July 31 2018 Twenty five additional requests and anincrease of 2832 MW from June 30 2018

bull 21190 MW wind capacity in commercial operations as of August 1 2018

Per Demand and Energy Report as of 080718

3

PUBLIC

Daily Peak Demand Hourly Average Actual vs Forecast Wind Day-Ahead COPs amp On-Line Capacity at Peak ndash July 2018

4

PUBLIC

Actual Wind Output plus Curtailments vs Wind Day-Ahead COPs for All Hours ndash July 2018

5

PUBLIC

ERCOTrsquos CPS1 Monthly Performance ndash July 2018

CPS1 12 Month Rolling Average = 17641

6

PUBLIC

Monthly Peak Actual Demand ndash July 2018

Preliminary for latest two months of the current year

Monthly Peak Actual Demand = 73308 MW 071918 HE 1700

7

PUBLIC

Monthly Minimum Actual 15-Minute Demand ndash July 2018

Preliminary for latest two months of the current year

8

PUBLIC

Day-Ahead Load Forecast Performance ndash July 2018

Mean Absolute Percent Error (MAPE) for ERCOT Mid-Term Load Forecast (MTLF) Run at 1400 Day Ahead

2015MAPE

2016MAPE

2017MAPE

2018MAPE

July 2018MAPE

AverageAnnual MAPE

286 262 255 238 197

LowestMonthly MAPE

189 194 169 165LowestDailyMAPE

055Jul 16

HighestMonthly MAPE

381 386 407 366

Highest DailyMAPE

524Jul 4

9

PUBLIC

Reliability Unit Commitment (RUC) Capacity by Weather Zone ndashJuly 2018

10

PUBLIC

Generic Transmission Constraints (GTCs) ndash July 2018

GTC A transmission flow limit more constraining than a Transmission Elementrsquos normal limit established to constrain flow between geographic areas of the ERCOT Transmission System that is used to enforce stability and voltage constraints that cannot be modeled directly in ERCOTrsquos transmission security analysis applications

Note This table lists how many times a constraint has been activated to avoid exceeding a GTC limit it does not imply an exceedance of the GTC occurred

GTCsJul-17 May-18 Jun-18 Jul-18 Last 12 Months Total

DaysDays Days Days DaysGTCs GTCs GTCs GTCs (Aug 17 ndash Jul 18)

North ndash Houston 1 0 1 0 8

Valley Import 0 4 0 1 15

Panhandle 17 27 23 5 261

Red Tap 0 0 0 0 0North Edinburg ndash

Lobo 0 0 0 0 1Nelson Sharpe ndash

Rio Hondo - 0 2 0 65

East Texas - 0 0 0 16

11

PUBLIC

Advisories and Watches ndash July 2018 Corrected

bull Two OCNs issued for extreme hot weatherndash Issued 714 and 720

bull Four Advisories issued due to Physical Responsive Capability being below 3000 MWndash Issued 718 719 725 and 728

bull One OCN issued due to projected reserve capacity shortage for hours ending 1400 through 1900 ERCOT requested all QSEs to update their COPs

ndash Issued 726

bull One Watch issued due to the post-contingency loss of the Bevo to Asherton 138 kV (SBEVASH8) overloads the Big Wells to Cotulla Sub 69 kV and curtailment of Eagle Pass DC-Tie exports to CENACE

ndash Issued 717

bull Three Watches issued due to the post-contingency loss of Bentsen to Railroad 138 kV (SBENRAI8) overloads South Mission to Railroad 138 kV and curtailment of Railroad DC-Tie exports to CENACE

ndash Issued 723

bull One Watch issued for the de-rate of the Railroad DC-Tie and curtailment of the DC-Tie exports to CENACE

ndash Issued 731

12

PUBLIC

Lake Levels Update ndash August 1 2018

13

PUBLIC

Planning Summary ndash July 2018

bull ERCOT is currently tracking 404 active generation interconnection requests totaling 79852 MW This includes 37697 MW of wind generation

bull ERCOT is currently reviewing proposed transmission improvements with a total cost of $6035 million

bull Transmission Projects endorsed in 2018 total $3935 million

bull All projects (in engineering routing licensing and construction) total approximately $649 billion (as of June 1 2018)

bull Transmission Projects energized in 2018 total about $1120 billion (as of June 1 2018)

14

PUBLIC

Mapping of Counties to ERCOT Zones ndash July 2018

15

PUBLIC

Cumulative MW Capacity of Interconnection Requests by Zone ndashJuly 2018

16

PUBLIC

Cumulative MW Capacity of Interconnection Requests by Zone ndashJuly 2018

17

PUBLIC

Cumulative MW Capacity of Interconnection Requests by Zone ndashJuly 2018

18

PUBLIC

Wind Generation ndash July 2018

19

PUBLIC

Solar Generation ndash July 2018

20

PUBLIC

Generation Interconnection Activity by Fuel ndash July 2018

21

PUBLIC

Generation Interconnection Activity by Project Phase ndash July 2018

22

Market Operations

PUBLIC

Day-Ahead Schedule (Hourly Average) ndash July 2018

24

0

10000

20000

30000

40000

50000

60000

70000

80000

MW

Hour Ending

Scheduled Energy Only OfferScheduled Three-part OfferDAM Energy PurchaseRT System Load

Liquidity and activity are normal in the Day-Ahead Market

PUBLIC

Percentage of Real-Time Load Hedged in the DAM (Counter-Party Level) ndashJuly 2018

25

0

20

40

60

80

100

120Ja

nM

arM

ay Jul

Sep

Nov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May

July

2013 2014 2015 2016 2017 2018

The dotted lines represent the bounds for major outliers

PUBLIC

DAM and RTM Price Convergence ndash July 2018

26

-20

-10

0

10

20

30

40

50

60Ja

nM

arM

ay Jul

Sep

Nov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

l

2013 2014 2015 2016 2017 2018

Aver

age

DAM

-R

TM S

PP ($

MW

h)

The dotted lines represent the bounds for major outliers

PUBLIC

Day-Ahead Electricity and Ancillary Service Prices (Hourly Average) ndashJuly 2018

27

0

100

200

300

400

500

600

Pric

e ($

MW

h)

Hour Ending

Regulation Up

Regulation Down

Responsive Reserve

Non Spinning Reserve

DAM Power Balance Price(System Lambda)

Ancillary Service prices reflect the opportunity cost of energy

PUBLIC

Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash July 2018

28

0

100

200

300

400

500

600

Pric

e ($

MW

h)

Hour Ending

RTSPP - LZ West

RTSPP - LZ North

RTSPP - LZ South

RTSPP - LZ Houston

DASPP - LZ West

DASPP - LZ North

DASPP - LZ South

DASPP - LZ Houston

Prices reflect relative transmission congestion and system scarcity

PUBLIC

Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash July 2018

29

0

100

200

300

400

500

600

Pric

e ($

MW

h)

Hour Ending

RTSPP - Hub Average

DASPP - Hub Average

Energy prices reflect the risk premium between Day-Ahead amp Real-Time

PUBLIC

DRUC Monthly Summary (Hourly Average) ndash July 2018

30

0

15000

30000

45000

60000

75000

90000

MW

h

Hour Ending

Self Scheduled Capacity

Self Scheduled Ancillary Service Limit

Load Forecast

DRUC Recommended Capacity

31 executions (0 missed)0 published after 160011 minutes average execution time0 Resources committed

PUBLIC

HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash July 2018

31

0

02

04

06

08

1

0

20

40

60

80

100

RTO

RD

PA ($

MW

h)

MW

h

Hour Ending

744 executions (0 missed)8 minutes average execution time1 Resources committed through HRUC or by a Verbal Dispatch Instruction

The dotted line indicates the average RTORDPA

PUBLIC

NonndashSpinning Reserve Service Deployment ndash July 2018

32

Deployment Start Time

Deployment End Time

Deployment Duration (Hours)

Max Deployment(MW) Reason

NA

PUBLIC

CRR Price Convergence ndash July 2018

0

50

100

150

200

250

Mill

ions

$

Cost

Value

Congestion Revenue Right cost in auction convergence with payment in Day-Ahead Market and Real Time Market

33

PUBLIC

Daily Average System Lambda and ORDC Price Adders ndash July 2018

0

50

100

150

200

250

$M

Wh

Day of Month

RTOFFPA

RTORPA

SYSTEM_LAMBDA

34

PUBLIC

ERS Procurement for June 2018 ndash September 2018

TP1 TP2 TP3 TP4 TP5 TP6

Non Weather-Sensitive ERS-10 MW 160562 165996 143324 140708 156699 151138

Non Weather-Sensitive ERS-30 MW 736864 781559 702529 625067 755153 657394

Weather-Sensitive ERS-10 MW 0 0 0 0 0 0

Weather-Sensitive ERS-30 MW 0 0 11850 11850 0 0

Total MW Procured 897426 947555 857703 777625 911852 808532

Clearing Price $201 $185 $2108 $2177 $199 $225

Time Period Time Period Hours

Time Period 1 Hours Ending 0600 - 0800 (50000 am to 80000 am) Monday through Friday except ERCOT Holidays

Time Period 2 Hours Ending 0900 - 1300 (80000 am to 10000 pm) Monday through Friday except ERCOT Holidays

Time Period 3 Hours Ending 1400 - 1600 (10000 pm to 40000 pm) Monday through Friday except ERCOT Holidays

Time Period 4 Hours Ending 1700 - 1900 (40000 pm to 70000 pm) Monday through Friday except ERCOT Holidays

Time Period 5 Hours Ending 2000 - 2200 (70000 pm to 100000 pm) Monday through Friday except ERCOT Holidays Time Period 6 All other hours

35

PUBLIC

Reliability Services ndash July 2018

Reliability Unit Commitment (RUC) $ in Millions

RUC Make-Whole Payments $000

RUC Clawback Charges $000

RUC Commitment Settlement $000

RUC Capacity Short Charges $000

RUC Make-Whole Uplift $000

RUC Commitment Cost Allocation $000

RUC Decommitment Payments $000

Total RUC Allocation to Load $000

In July 2018 there was a credit of $000M allocated to load for RUC compared to bull A credit of $000M in June 2018bull A credit of $003M in July 2017

36

PUBLIC

Ancillary and Other Services ndash July 2018

Ancillary and Other Services $ in Millions

Regulation Up Service $1105

Regulation Down Service $072

Responsive Reserve Service $7177

Non-Spinning Reserve Service $1787

Black Start Service $059

Voltage Services - Reactive Power $000

Voltage Services - Lost Opportunity $000

Total Charges Allocated to Load $10200

In July 2018 Ancillary and Other Services was a charge of $10200M compared to bull A charge of $2001M in June 2018bull A charge of $2322M in July 2017

37

PUBLIC

Real-Time Ancillary Service Imbalance (ORDC) ndash July 2018

In July 2018 Real-Time Ancillary Service Imbalance was a charge to load of $2228K compared to bull A charge of $147K in June 2018bull A charge of $534K in July 2017

Real-Time Ancillary Service Imbalance $ in Thousands

Real-Time AS Imbalance ($2228)

Real-Time Reliability Deployment AS Imbalance $000

Total RTASI Amount Allocated to Load $2228

38

PUBLIC

Energy Settlement ndash July 2018

39

Day-Ahead Market Energy Settlement $ in Millions

Energy Purchases $215396

Point to Point Obligation Purchases $11726

Energy Sales ($212592)

Day-Ahead Congestion Rent $14531

Day-Ahead Market Make-Whole Payments ($001)

Real-Time Market Energy Settlement $ in Millions

Energy Imbalance at a Resource Node ($91963)

Energy Imbalance at a Load Zone $160737

Energy Imbalance at a Hub ($57497)

Net Real-Time Energy Imbalance $11276

Real Time Congestion from Self Schedules $013

Block Load Transfers and DC Ties ($2063)

Total Impact to Revenue Neutrality $9227

Load-Allocated Emergency Energy Payments ($016)

Load-Allocated Base Point Deviation Charges $026

Day-Ahead Market energy settlement activity increased from last month and increased from July 2017

Real-Time Market energy settlement activity increased from last month and increased from July 2017

PUBLIC

Congestion Revenue Rights (CRR) ndash July 2018

$ in Millions

Long-Term Auction ($4026)

Monthly Auction ($1773)

Total Auction Revenue ($5799)

Day-Ahead CRR Settlements ($15797)

Day-Ahead CRR Short-Charges $1885

Day-Ahead CRR Short-Charges Refunded ($899)

Day-Ahead CRR Short-Charges Net $986

Total CRR Funding ($14810)

Day-Ahead Point-to-Point Obligations $11726

Real-Time Point-to-Point Obligations ($10113)

Net Point-to-Point Obligations $1614

Congestion Revenue Rights settlement payments were not fully funded Partial funding to settle the CRR Short Charges was provided from the CRR Balancing Account Fund and the remaining $986M of CRR Short Charges were not refunded The CRR Fund Balance is now $0

Point to Point Obligations settled with a net charge of $1614M compared to a net credit of $1758M last month

40

PUBLIC

CRR Balancing Account Fund ndash July 2018

CRR Balancing Account $ in Millions

Monthly Day-Ahead Congestion Rent $14531

Monthly Day-Ahead CRR Settlements ($15797)

Monthly Day-Ahead CRR Short -Charges $1885

CRR Balancing Account Credit Total $619

Beginning Fund Balance for the Month $275

CRR Balancing Account Credit Total $619

Day-Ahead CRR Short-Charges Refunded ($899)

CRR PTP Option Award Charges $004

Load-Allocated CRR Amount $000

Total Fund Amount $000

41

PUBLIC

Revenue Neutrality ndash July 2018

Revenue Neutrality $ in Millions

Real-Time Energy Imbalance $11276

Real-Time Point to Point Obligation ($10113)

Real-Time Congestion from Self-Schedules $013

DC Tie amp Block Load Transfer ($2063)

Allocation to Load $886

In July 2018 the Revenue Neutrality charge to load was $886M compared to bull A charge of $3046M in June 2018bull A charge of $145M in July 2017

42

PUBLIC

Net Allocation to Load ndash July 2018

Market-Based Allocation $ in Millions

Reliability Unit Commitment $000

Ancillary and Other Services $10200

Real-Time Ancillary Service Imbalance $223

Emergency Energy $016

Base Point Deviation ($026)

CRR Auction Revenue ($5799)

CRR Balancing Account $000

Real-Time Revenue Neutrality $886

Reliability Must Run $000

Monthly Block Load Transfer $000

Total $5500

Fee AllocationERCOT Administrative Fee $2207

Net Allocated to Load $7707

In July 2018 the Net Allocation to load was a charge of $7707M compared to bull A charge of $2152M in June 2018bull A credit of $1363M in July 2017

43

PUBLIC

Advanced Meter Settlement Impacts ndash July 2018

July 2018 At month end settling 72M ESIIDs using Advanced Meter data

July 2018 990 of the load in ERCOT is settled with 15-min interval data (AMS Competitive IDR and NOIE IDR)

44

PUBLIC

ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndashJuly 2018

45

PUBLIC

Retail Transaction Volumes ndash Summary ndash July 2018

46

Transaction Type July 2018 July 2017 July 2018 July 2017

Switches 669909 617300 121926 84059

Acquisition 0 0 0 0

Move - Ins 1667037 1568153 270122 252360

Move - Outs 814580 802779 129820 127073

Continuous Service Agreements (CSA) 395944 283259 40217 55770

Mass Transitions 9033 0 0 0

Total 3556503 3271491 562085 519262

Year-To-Date Transactions Received

Board Presentation Input

Trans Volumes by Month_New

PUBLIC

Retail Transaction Volumes ndash Summary ndash July 2018

SwitchesAcquisitions Move-Ins

Move-Outs Mass Transition

47

Projects Report

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018

20000000$ 2018 Portfolio

Spending Estimate

Projects In FlightOn Hold (Count = 100) 24905011$

Projects Not Yet Started (Count = 10) 1320628$

Projects Completed (Count = 43) 795250$

(7020889)$

TOTAL 20000000$

Project Number Projects in Initiation Phase (Count = 4)

TBD IT Asset RecoveryNPRR842 Study Area Load Information

209-03 Study Network (STNET) Integration288-01 EDI Map and Translator Replacement

Impact Metric TolerancesUnfavorable variances are represented as negative numbers within the report - Green = No more than 49 unfavorable variance - Yellow = Unfavorable variance between 49 and 99 - Red = Unfavorable variance more than 99

Spending Reductions Required to Maintain Capital Budget

2018 Project Funding

Footnotes1 - One or more phases took longer than expected resulting in additional time required

2 - One or more phases required more labor than expected resulting in additional funding andor time required

3 - Project placed on holdNA - Metric not calculated because - it is reported at the parent project level or - it is an administrative project

Project Number Projects in Planning Phase (Count = 8) Phase Start Baseline

Phase FinishApproved

Phase FinishScheduled

Go-Live DateScheduled

Phase Finish

134-02 Privileged Account Management (PAM) Phase 2 882018 12192018 12192018 TBD 12192018 0 10

183-01 CMM-FT GUI Integration 12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs

242-01 Portfolio Reporting Assessment 1182017 12192018 12192018 TBD 12192018 0 21260-01 Information Governance Assessment 10182017 5302018 9192018 TBD 9192018 0 5286-01 Java Platform Assessment 6202018 11212018 11212018 TBD 11212018 0 6287-01 Security Constrained Unit Commitment (SCUC) 882018 2272019 2272019 TBD 2272019 0 -1

NPRR484Revisions to Congestion Revenue Rights Credit Calculations and Payments - Phase 1b 2

12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs

NPRR702Flexible Accounts Payment of Invoices and Disposition of Interest on Cash Collateral

12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs

Schedule Health Budget Health

49

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018Project Number Projects in Execution Phase (Count = 42) Phase Start Baseline Go-

Live DateApproved Go-

Live DateScheduled

Go-Live DateScheduled

Phase Finish

170-01 Enterprise Content Alignment Program 8262015 11152017 8312018 8312018 8312018 0 0170-06 ECAP - ECMS Implementation Phase 1 4252018 11302018 11302018 11302018 11302018 0 3173-02 ERCOT Flight Certification Website 11152017 2282019 2282019 2282019 5312019 0 2181-01 CRR Framework Upgrade 10262016 1022017 11192018 11192018 2272019 0 2

183-01 CMM Tech Refresh 3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

193-01 PMU Tool Evaluation and Implementation 12132017 892018 2152019 2152019 3202019 0 0196-01 GINR Project Status Application Replacement 12212016 9142017 2282019 2282019 3312019 0 1198-02 Reactive Power Coordination PoC 962017 6162018 8152018 8152018 8152018 0 54209-02 Weather Imaging and Line Observation (WILO) 5302018 212019 212019 212019 2272019 0 2210-01 REC Technology Refresh 8302017 3182018 12132018 12132018 1162019 0 3228-01 Enterprise Database Upgrade 882018 1292020 1292020 1292020 1292020 0 17229-01 IT Change and Configuration Management Phase 2 822017 6192018 12132018 12132018 3252019 0 2 -9238-01 Application Authentication Tech Refresh 962017 3192018 12132018 12132018 1302019 0 3239-01 Identity and Access Management 592018 3132019 3132019 3132019 3132019 0 2241-01 AREA - Generation 10112017 3302018 892018 892018 952018 0 -4244-01 Corporate Wireless 11292017 3282018 1252018 1252018 192019 0 9245-01 2017 EPS Metering Enhancements 6272018 892019 892019 892019 9252019 0 1246-01 iTest Data Refresh 12132017 1192018 11152018 11152018 122019 0 25249-01 Secondary Wind Forecasting Service 8302017 2282018 892018 892018 952018 0 0253-01 CIP Recovery Plan Project - Planning Phase 1 1312018 8292018 8292018 8292018 8292018 0 -2

257-01Security Constrained Optimal Powerflow in Study Network Analysis

1262017 10252018 10252018 10252018 1282018 0 19

261-01 Generic Transmission Constraint Calculation 372018 12132018 12132018 12132018 1232019 0 0263-01 Market Simulator 4112018 12132018 12132018 12132018 1302019 0 7265-01 Real-Time Assessment Continuity 1312018 12132018 12132018 12132018 1302019 0 0279-01 Cyber Security Project 24 6272018 10262018 10262018 10262018 11282018 0 0280-01 Quest Software Portfolio Transition 442018 6272018 9262018 9262018 9262018 0 13282-01 Synchronous Condenser Outage Modeling 662018 10252018 10252018 10252018 1252018 0 1Various 2015 CMM NPRRs 2 -18

NPRR519Exemption of ERS-Only QSEs from Collateral and Capitalization Requirements

3152017 5192018 12112018 12112018 12312018 0 See 2015 CMM NPRRs

NPRR620Collateral Requirements for Counter-Parties with No Load or Generation

3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

NPRR660 Remove CRR State Change Adder 3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

Budget HealthSchedule Health

50

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018Project Number Projects in Execution Phase (Count = 42) Phase Start Baseline Go-

Live DateApproved Go-

Live DateScheduled

Go-Live DateScheduled

Phase Finish

NPRR741 Clarifications to TPE and EAL Credit Exposure Calculations 3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

NPRR749 Option Cost for Outstanding CRRs 882018 12132018 12132018 12132018 TBD 0 NA See 2015 CMM NPRRs

NPRR755 Data Agent-Only QSE Registration 3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

NPRR819Modification of Non-Price Error Resettlement Thresholds and Resettlement Clean-Ups

592018 892018 892018 892018 952018 0 36

NPRR833 Modify PTP Obligation Bid Clearing Change 882018 12132018 12132018 12132018 TBD 0 1

NPRR843Short-Term System Adequacy and AS Offer Disclosure Reports Additions

7182018 10252018 10252018 10252018 11282018 0 0

NPRR864 RUC Modifications to Consider Market-Based Solutions 6202018 10252018 10252018 10252018 11282018 0 4SCR777 Bilateral CRR Interface Enhancement 10262016 1022017 11192018 11192018 2272019 0 NA See 181-01

SCR781 RARF Replacement 12202017 4252018 12192018 12192018 12192018 0 3SCR791 Correction of 60-day SCED GRD Disclosure Report 522018 892018 892018 892018 952018 0 39SCR795 Addition of Intra-Hour Wind Forecast to GTBD Calculation 882018 10252018 10252018 10252018 11142018 0 0

Project Number Expedited Projects in Execution (Count = 34)

Project Number Projects in Stabilization (Count = 10) Execution

Phase StartBaseline Go-Live Target

Approved Go-Live Target

ActualGo-Live Date

Scheduled Execution Phase

Finish

NPRR648 Remove References to Flowgate Rights 3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR683 Revision to Available Credit Limit Calculation 3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR743 Revision to MCE to Have a Floor For Load Exposure 3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR760 Calculation of Exposure Variables For Days With No Activity 3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR776 Voltage Set Point Communication 9202017 3192018 452018 452018 952018 0 1

NPRR800Revisions to Credit Exposure Calculations to Use Electricity Futures Market Prices

3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR815Revise the Limitation of Load Resources Providing Responsive Reserve (RRS) Service

3212018 5312018 5312018 5312018 8292018 0 2

209-01 Multi Station Breaker to Breaker One Lines 282017 392018 532018 532018 8222018 0 -1259-01 DC SCADA and Metering Upgrade 10252017 1172018 7252018 7252018 8292018 0 22266-01 Remote Email Access Enhancement 12132017 372018 662018 6192018 9262018 2 -7 2 -9

Schedule Health Budget Health

Budget HealthSchedule Health

51

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018

Project Number Projects On Hold (Count = 2) Forecast

Start DateBaseline

Phase FinishApproved Go-

Live TargetScheduled

Go-Live DateScheduled

Phase Finish

SCR789 Update NMMS Topology Processor to PSSE 34 Capability 0

269-01Document Repository Redesign and Governance Implementation - Phase 1

0

Project Number Projects Completed (Count = 20)

Baseline Execution

Phase Start

Baseline Go-Live Target

Approved Go-Live Target

Actual Go-Live Date

Actual Execution Phase Finish

185-01 Records Management and eDiscovery 12152016 5242017 8292017 8222017 12132017 2 0224-01 TelAlert Replacement 452017 6272017 842017 842017 592018 0 5230-01 SAS Technical Architecture Redesign 312017 12132017 12132017 12132017 6272018 0 2234-01 Reporting Solution Resiliency (RSR) 452017 8232017 11272017 11272017 1102018 0 8240-01 EDI Translator and Mapping Replacement Assessment 4192017 9272017 2282018 TBD 372018 -2 20254-01 Retail Windows Upgrade 10112017 12182017 12182017 1222018 272018 1 -51 65255-01 Settlements Architecture Enhancements 10252017 1112018 1112018 1192018 2142018 1 -10 53258-01 WD Kainos SMART Automation Testing Tool 4112018 642018 642018 662018 7182018 -3 33271-01 Issue Tracking and Resolution Tool Assessment 12132017 4252018 4252018 TBD 522018 1 -5 -1272-01 Operator Training Simulator Black Start GE Effort 1262017 4252018 4252018 4272018 5162018 -1 19274-01 Average Mid-Term Load Forecast 372018 5312018 5312018 5312018 6272018 0 50

NPRR768Revisions to Real-Time On-Line Reliability Deployment Price Adder Categories

372018 5312018 5312018 5312018 6272018 0 16

NPRR778 Modifications to Date Change and Cancellation Evaluation Window 7192017 10292017 12112017 12112017 1312018 0 23

NPRR782Settlement of Infeasible Ancillary Services Due to Transmission Constraints

5242017 8312017 1122017 1122017 1102018 0 20

NPRR808 Three Year CRR Auction 8232017 9182017 9182017 912017 1312018 65 68

NPRR810Applicability of RMR Incentive Factor on Reservation and Transportation Costs Associated with Firm Fuel Supplies

7172017 11122017 3312018 3312018 3312018 0 NA See 233-00

NPRR830 Revision of 4-Coincident Peak Methodology 12132017 262018 262018 262018 372018 0 85

NPRR831 Inclusion of Private Use Networks in Load Zone Price Calculations 822017 1122017 1122017 1122017 2212018 0 33

OBDRR002 ORDC OBD Revisions for PUCT Project 47199 372018 5312018 5312018 5312018 6272018 0 See NPRR768

SCR792 Enhance Communications of BAAL Exceedances 2142018 452018 452018 452018 4252018 0 69

Project Number Expedited Projects Completed (Count = 23)

Budget HealthSchedule Health

Budget HealthSchedule Health

52

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018

Project Number 2018 Projects Not Yet Started (Count = 10) Forecast

Start Date

NPRR858 Provide Complete Current Operating Plan (COP) Data Aug-2018TBD 2018 OS Enhancements Aug-2018TBD Additional Branch Limit for Relays Aug-2018

NPRR817 Create a Panhandle Hub Sep-2018NPRR821 Elimination of the CRR Deration Process Oct-2018NPRR865 Publish RTM Shift Factors for Hubs Load Zones and DC Ties Oct-2018

SCR793SSR Related Telemetry for Transmission Service Provider (TSP) Operators

Oct-2018

ECAP ECAP - ECMS Implementation Phase 2 Oct-2018TBD Job Scheduler Update in CSI Framework Oct-2018TBD Parameter Estimation Oct-2018

53

  • Slide Number 1
  • Slide Number 2
  • Summary ndash July 2018
  • Daily Peak Demand Hourly Average Actual vs Forecast Wind Day-Ahead COPs amp On-Line Capacity at Peak ndash July 2018
  • Actual Wind Output plus Curtailments vs Wind Day-Ahead COPs for All Hours ndash July 2018
  • ERCOTrsquos CPS1 Monthly Performance ndash July 2018
  • Monthly Peak Actual Demand ndash July 2018
  • Monthly Minimum Actual 15-Minute Demand ndash July 2018
  • Day-Ahead Load Forecast Performance ndash July 2018
  • Reliability Unit Commitment (RUC) Capacity by Weather Zone ndash July 2018
  • Generic Transmission Constraints (GTCs) ndash July 2018
  • Advisories and Watches ndash July 2018 Corrected
  • Lake Levels Update ndash August 1 2018
  • Planning Summary ndash July 2018
  • Mapping of Counties to ERCOT Zones ndash July 2018
  • Cumulative MW Capacity of Interconnection Requests by Zone ndashJuly 2018
  • Cumulative MW Capacity of Interconnection Requests by Zone ndashJuly 2018
  • Cumulative MW Capacity of Interconnection Requests by Zone ndashJuly 2018
  • Wind Generation ndash July 2018
  • Solar Generation ndash July 2018
  • Generation Interconnection Activity by Fuel ndash July 2018
  • Generation Interconnection Activity by Project Phase ndash July 2018
  • Slide Number 23
  • Day-Ahead Schedule (Hourly Average) ndash July 2018
  • Percentage of Real-Time Load Hedged in the DAM (Counter-Party Level) ndash July 2018
  • DAM and RTM Price Convergence ndash July 2018
  • Day-Ahead Electricity and Ancillary Service Prices (Hourly Average) ndash July 2018
  • Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash July 2018
  • Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash July 2018
  • DRUC Monthly Summary (Hourly Average) ndash July 2018
  • HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash July 2018
  • NonndashSpinning Reserve Service Deployment ndash July 2018
  • CRR Price Convergence ndash July 2018
  • Daily Average System Lambda and ORDC Price Adders ndash July 2018
  • ERS Procurement for June 2018 ndash September 2018
  • Reliability Services ndash July 2018
  • Ancillary and Other Services ndash July 2018
  • Real-Time Ancillary Service Imbalance (ORDC) ndash July 2018
  • Energy Settlement ndash July 2018
  • Congestion Revenue Rights (CRR) ndash July 2018
  • CRR Balancing Account Fund ndash July 2018
  • Revenue Neutrality ndash July 2018
  • Net Allocation to Load ndash July 2018
  • Advanced Meter Settlement Impacts ndash July 2018
  • ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndash July 2018
  • Retail Transaction Volumes ndash Summary ndash July 2018
  • Retail Transaction Volumes ndash Summary ndash July 2018
  • Slide Number 48
  • ERCOT Portfolio Stoplight Report ndash July 2018
  • ERCOT Portfolio Stoplight Report ndash July 2018
  • ERCOT Portfolio Stoplight Report ndash July 2018
  • ERCOT Portfolio Stoplight Report ndash July 2018
  • ERCOT Portfolio Stoplight Report ndash July 2018
Retail Transactions Summary
July 2018 June 2018 May 2018 April 2018 March 2018 February 2018 January 2018 December 2017 November 2017 October 2017 September 2017 August 2017 July 2017 June 2017 May 2017 April 2017 March 2017 February 2017 January 2017 December 2016 November 2016 October 2016 September 2016 August 2016 July 2016 June 2016 May 2016 April 2016 March 2016 February 2016 January 2016 December 2015 November 2015 October 2015 September 2015 August 2015 July 2015 June 2015 May 2015 April 2015 March 2015 February 2015 January 2015 December 2014 November 2014 October 2014 September 2014 August 2014 July 2014 June 2014 May 2014 April 2014 March 2014 February 2014 January 2014 December 2013 November 2013 October 2013 September 2013 August 2013 July 2013 June 2013 May 2013 April 2013 March 2013 February 2013 January 2013 Grand total
814_01 - Switch Received 121926 109653 96828 81291 95159 76119 88933 60560 77860 78096 79502 84134 84059 108784 130828 71769 67845 66875 87140 66556 56202 64452 67323 86656 82923 86376 75323 70300 76235 68057 63954 61486 52887 65276 70342 81674 91211 102661 86229 81255 79997 73394 72885 71072 67080 110465 175164 89677 99568 101490 111077 91983 93887 71130 86953 69691 55957 166882 82415 93194 102562 103756 116086 78919 68950 64329 67116 1321827
Difference from previous month 12273 12825 15537 (13868) 19040 (12814) 28373 (17300) (236) (1406) (4632) 75 (24725) (22044) 59059 3924 970 (20265) 20584 10354 (8250) (2871) (19333) 3733 (3453) 11053 5023 (5935) 8178 4103 2468 8599 (12389) (5066) (11332) (9537) (11450) 16432 4974 1258 6603 509 1813 3992 (43385) (64699) 85487 (9891) (1922) (9587) 19094 (1904) 22757 (15823) 17262 13734 (110925) 84467 (10779) (9368) (1194) (12330) 37167 9969 4621 (2787)
814_16 - Move - Ins Received 270122 257125 244431 225380 224289 215281 230409 238340 207921 236397 244511 258046 252360 257759 237611 197865 217962 201984 202612 196236 201714 220958 231999 268781 241844 247481 214383 199804 218245 212474 193716 189862 181098 215908 229405 248124 263233 247089 208166 207932 215950 197765 198025 193973 178624 226283 231418 243482 251957 233679 223201 258649 214724 208160 207059 172981 178671 233469 216550 255967 249114 220397 216982 204412 197200 191955 194507 3162148
Difference from previous month 12997 12694 19051 1091 9008 (15128) (7931) 30419 (28476) (8114) (13535) 5686 (5399) 20148 39746 (20097) 15978 (628) 6376 (5478) (19244) (11041) (36782) 26937 (5637) 33098 14579 (18441) 5771 18758 3854 8764 (34810) (13497) (18719) (15109) 16144 38923 234 (8018) 18185 (260) 4052 15349 (47659) (5135) (12064) (8475) 18278 10478 (35448) 43925 6564 1101 34078 (5690) (54798) 16919 (39417) 6853 28717 3415 12570 7212 5245 (2552)
814_24 - MVO and MVO to CSA Received 129820 125861 124403 113795 108753 100127 111821 144987 100830 116519 129103 128104 127073 133582 127218 102055 111459 100285 101107 96289 100578 109493 114094 133170 122932 129025 118022 103789 109278 103747 96628 99552 96214 109578 117949 123894 133905 133855 114675 108275 108859 94864 98233 97901 89578 111857 115918 121662 131607 126785 119107 107956 107266 99428 104273 93385 93977 115469 115524 129594 135196 121446 120049 111598 106467 102429 104399 1660500
814_10 - DTP Mass Acquisition Received - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0
814_10 - DTP Mass Transition Received - 0 - 0 9033 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 639 - 0 - 0 4975 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0
814_18 - CSA AdditionDeletes Received 40217 62083 99016 55581 46720 42587 49740 47725 31726 52888 41597 40616 55770 43745 52139 26702 21791 39082 44030 38884 39856 31786 33061 42622 48489 64178 50499 59475 59400 48536 42179 40351 34796 34420 54677 35078 49489 59611 39384 44247 44577 35386 40420 54831 43550 45039 44268 40405 57954 64408 65032 80184 70310 41156 34811 46680 50347 71847 48606 52585 50867 62747 59763 34925 40977 40389 41227 747237
Total 562085 554722 573711 476047 474921 434114 480903 491612 418337 483900 494713 510900 519262 543870 547796 398391 419057 408226 434889 397965 398350 426689 446477 531229 496188 527060 458227 433368 463158 432814 396477 391251 364995 425182 472373 488770 537838 543216 448454 441709 449383 401409 409563 417777 378832 493644 566768 495865 541086 526362 523392 538772 486187 419874 433096 382737 378952 587667 463095 531340 537739 508346 512880 429854 413594 399102 407249 6891712
Counts from Monthly Retail Transaction report
To do
Break Out 814_10s - AQ and MT
Break Out 814_18 Additions from Deletes
Year-To-Date Transactions Received
Transaction Type July 2018 July 2017 July 2018 July 2017
Switches 669909 617300 121926 84059
Acquisition 0 0 0 0
Move - Ins 1667037 1568153 270122 252360
Move - Outs 814580 802779 129820 127073
Continuous Service Agreements (CSA) 395944 283259 40217 55770
Mass Transitions 9033 0 0 0
Total 3556503 3271491 562085 519262
There has been a change since this was created
Mass Acquisition has been broken out of Mass Transition
Page 2: ERCOT Monthly Operational Overvie · ERCOT Monthly Operational Overview (July 2018) Revised 08.22.18. ERCOT Public. August 15, 2018

Grid Planning amp Operations

PUBLIC

Summary ndash July 2018

Operationsbull The preliminary Settlements hourly peak demand of 73308 MW on July 19 was lower

than the day-ahead mid-term load forecast peak of 73518 MW for the same operatinghourndash The operational instantaneous peak demand was 73405 MW (telemetry)

bull Day-ahead load forecast error for July was 197bull ERCOT issued 12 notifications

ndash Four Advisories issued due to Physical Responsive Capability being below 3000 MWndash One Advisory issued for extreme hot weatherndash Five DC Tie-related Watchesndash One OCN issued for extreme hot weatherndash One OCN issued for projected reserve capacity shortage

Planning Activitiesbull 404 active generation interconnection requests totaling 79852 MW including 37697

MW of wind generation as of July 31 2018 Twenty five additional requests and anincrease of 2832 MW from June 30 2018

bull 21190 MW wind capacity in commercial operations as of August 1 2018

Per Demand and Energy Report as of 080718

3

PUBLIC

Daily Peak Demand Hourly Average Actual vs Forecast Wind Day-Ahead COPs amp On-Line Capacity at Peak ndash July 2018

4

PUBLIC

Actual Wind Output plus Curtailments vs Wind Day-Ahead COPs for All Hours ndash July 2018

5

PUBLIC

ERCOTrsquos CPS1 Monthly Performance ndash July 2018

CPS1 12 Month Rolling Average = 17641

6

PUBLIC

Monthly Peak Actual Demand ndash July 2018

Preliminary for latest two months of the current year

Monthly Peak Actual Demand = 73308 MW 071918 HE 1700

7

PUBLIC

Monthly Minimum Actual 15-Minute Demand ndash July 2018

Preliminary for latest two months of the current year

8

PUBLIC

Day-Ahead Load Forecast Performance ndash July 2018

Mean Absolute Percent Error (MAPE) for ERCOT Mid-Term Load Forecast (MTLF) Run at 1400 Day Ahead

2015MAPE

2016MAPE

2017MAPE

2018MAPE

July 2018MAPE

AverageAnnual MAPE

286 262 255 238 197

LowestMonthly MAPE

189 194 169 165LowestDailyMAPE

055Jul 16

HighestMonthly MAPE

381 386 407 366

Highest DailyMAPE

524Jul 4

9

PUBLIC

Reliability Unit Commitment (RUC) Capacity by Weather Zone ndashJuly 2018

10

PUBLIC

Generic Transmission Constraints (GTCs) ndash July 2018

GTC A transmission flow limit more constraining than a Transmission Elementrsquos normal limit established to constrain flow between geographic areas of the ERCOT Transmission System that is used to enforce stability and voltage constraints that cannot be modeled directly in ERCOTrsquos transmission security analysis applications

Note This table lists how many times a constraint has been activated to avoid exceeding a GTC limit it does not imply an exceedance of the GTC occurred

GTCsJul-17 May-18 Jun-18 Jul-18 Last 12 Months Total

DaysDays Days Days DaysGTCs GTCs GTCs GTCs (Aug 17 ndash Jul 18)

North ndash Houston 1 0 1 0 8

Valley Import 0 4 0 1 15

Panhandle 17 27 23 5 261

Red Tap 0 0 0 0 0North Edinburg ndash

Lobo 0 0 0 0 1Nelson Sharpe ndash

Rio Hondo - 0 2 0 65

East Texas - 0 0 0 16

11

PUBLIC

Advisories and Watches ndash July 2018 Corrected

bull Two OCNs issued for extreme hot weatherndash Issued 714 and 720

bull Four Advisories issued due to Physical Responsive Capability being below 3000 MWndash Issued 718 719 725 and 728

bull One OCN issued due to projected reserve capacity shortage for hours ending 1400 through 1900 ERCOT requested all QSEs to update their COPs

ndash Issued 726

bull One Watch issued due to the post-contingency loss of the Bevo to Asherton 138 kV (SBEVASH8) overloads the Big Wells to Cotulla Sub 69 kV and curtailment of Eagle Pass DC-Tie exports to CENACE

ndash Issued 717

bull Three Watches issued due to the post-contingency loss of Bentsen to Railroad 138 kV (SBENRAI8) overloads South Mission to Railroad 138 kV and curtailment of Railroad DC-Tie exports to CENACE

ndash Issued 723

bull One Watch issued for the de-rate of the Railroad DC-Tie and curtailment of the DC-Tie exports to CENACE

ndash Issued 731

12

PUBLIC

Lake Levels Update ndash August 1 2018

13

PUBLIC

Planning Summary ndash July 2018

bull ERCOT is currently tracking 404 active generation interconnection requests totaling 79852 MW This includes 37697 MW of wind generation

bull ERCOT is currently reviewing proposed transmission improvements with a total cost of $6035 million

bull Transmission Projects endorsed in 2018 total $3935 million

bull All projects (in engineering routing licensing and construction) total approximately $649 billion (as of June 1 2018)

bull Transmission Projects energized in 2018 total about $1120 billion (as of June 1 2018)

14

PUBLIC

Mapping of Counties to ERCOT Zones ndash July 2018

15

PUBLIC

Cumulative MW Capacity of Interconnection Requests by Zone ndashJuly 2018

16

PUBLIC

Cumulative MW Capacity of Interconnection Requests by Zone ndashJuly 2018

17

PUBLIC

Cumulative MW Capacity of Interconnection Requests by Zone ndashJuly 2018

18

PUBLIC

Wind Generation ndash July 2018

19

PUBLIC

Solar Generation ndash July 2018

20

PUBLIC

Generation Interconnection Activity by Fuel ndash July 2018

21

PUBLIC

Generation Interconnection Activity by Project Phase ndash July 2018

22

Market Operations

PUBLIC

Day-Ahead Schedule (Hourly Average) ndash July 2018

24

0

10000

20000

30000

40000

50000

60000

70000

80000

MW

Hour Ending

Scheduled Energy Only OfferScheduled Three-part OfferDAM Energy PurchaseRT System Load

Liquidity and activity are normal in the Day-Ahead Market

PUBLIC

Percentage of Real-Time Load Hedged in the DAM (Counter-Party Level) ndashJuly 2018

25

0

20

40

60

80

100

120Ja

nM

arM

ay Jul

Sep

Nov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May

July

2013 2014 2015 2016 2017 2018

The dotted lines represent the bounds for major outliers

PUBLIC

DAM and RTM Price Convergence ndash July 2018

26

-20

-10

0

10

20

30

40

50

60Ja

nM

arM

ay Jul

Sep

Nov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

l

2013 2014 2015 2016 2017 2018

Aver

age

DAM

-R

TM S

PP ($

MW

h)

The dotted lines represent the bounds for major outliers

PUBLIC

Day-Ahead Electricity and Ancillary Service Prices (Hourly Average) ndashJuly 2018

27

0

100

200

300

400

500

600

Pric

e ($

MW

h)

Hour Ending

Regulation Up

Regulation Down

Responsive Reserve

Non Spinning Reserve

DAM Power Balance Price(System Lambda)

Ancillary Service prices reflect the opportunity cost of energy

PUBLIC

Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash July 2018

28

0

100

200

300

400

500

600

Pric

e ($

MW

h)

Hour Ending

RTSPP - LZ West

RTSPP - LZ North

RTSPP - LZ South

RTSPP - LZ Houston

DASPP - LZ West

DASPP - LZ North

DASPP - LZ South

DASPP - LZ Houston

Prices reflect relative transmission congestion and system scarcity

PUBLIC

Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash July 2018

29

0

100

200

300

400

500

600

Pric

e ($

MW

h)

Hour Ending

RTSPP - Hub Average

DASPP - Hub Average

Energy prices reflect the risk premium between Day-Ahead amp Real-Time

PUBLIC

DRUC Monthly Summary (Hourly Average) ndash July 2018

30

0

15000

30000

45000

60000

75000

90000

MW

h

Hour Ending

Self Scheduled Capacity

Self Scheduled Ancillary Service Limit

Load Forecast

DRUC Recommended Capacity

31 executions (0 missed)0 published after 160011 minutes average execution time0 Resources committed

PUBLIC

HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash July 2018

31

0

02

04

06

08

1

0

20

40

60

80

100

RTO

RD

PA ($

MW

h)

MW

h

Hour Ending

744 executions (0 missed)8 minutes average execution time1 Resources committed through HRUC or by a Verbal Dispatch Instruction

The dotted line indicates the average RTORDPA

PUBLIC

NonndashSpinning Reserve Service Deployment ndash July 2018

32

Deployment Start Time

Deployment End Time

Deployment Duration (Hours)

Max Deployment(MW) Reason

NA

PUBLIC

CRR Price Convergence ndash July 2018

0

50

100

150

200

250

Mill

ions

$

Cost

Value

Congestion Revenue Right cost in auction convergence with payment in Day-Ahead Market and Real Time Market

33

PUBLIC

Daily Average System Lambda and ORDC Price Adders ndash July 2018

0

50

100

150

200

250

$M

Wh

Day of Month

RTOFFPA

RTORPA

SYSTEM_LAMBDA

34

PUBLIC

ERS Procurement for June 2018 ndash September 2018

TP1 TP2 TP3 TP4 TP5 TP6

Non Weather-Sensitive ERS-10 MW 160562 165996 143324 140708 156699 151138

Non Weather-Sensitive ERS-30 MW 736864 781559 702529 625067 755153 657394

Weather-Sensitive ERS-10 MW 0 0 0 0 0 0

Weather-Sensitive ERS-30 MW 0 0 11850 11850 0 0

Total MW Procured 897426 947555 857703 777625 911852 808532

Clearing Price $201 $185 $2108 $2177 $199 $225

Time Period Time Period Hours

Time Period 1 Hours Ending 0600 - 0800 (50000 am to 80000 am) Monday through Friday except ERCOT Holidays

Time Period 2 Hours Ending 0900 - 1300 (80000 am to 10000 pm) Monday through Friday except ERCOT Holidays

Time Period 3 Hours Ending 1400 - 1600 (10000 pm to 40000 pm) Monday through Friday except ERCOT Holidays

Time Period 4 Hours Ending 1700 - 1900 (40000 pm to 70000 pm) Monday through Friday except ERCOT Holidays

Time Period 5 Hours Ending 2000 - 2200 (70000 pm to 100000 pm) Monday through Friday except ERCOT Holidays Time Period 6 All other hours

35

PUBLIC

Reliability Services ndash July 2018

Reliability Unit Commitment (RUC) $ in Millions

RUC Make-Whole Payments $000

RUC Clawback Charges $000

RUC Commitment Settlement $000

RUC Capacity Short Charges $000

RUC Make-Whole Uplift $000

RUC Commitment Cost Allocation $000

RUC Decommitment Payments $000

Total RUC Allocation to Load $000

In July 2018 there was a credit of $000M allocated to load for RUC compared to bull A credit of $000M in June 2018bull A credit of $003M in July 2017

36

PUBLIC

Ancillary and Other Services ndash July 2018

Ancillary and Other Services $ in Millions

Regulation Up Service $1105

Regulation Down Service $072

Responsive Reserve Service $7177

Non-Spinning Reserve Service $1787

Black Start Service $059

Voltage Services - Reactive Power $000

Voltage Services - Lost Opportunity $000

Total Charges Allocated to Load $10200

In July 2018 Ancillary and Other Services was a charge of $10200M compared to bull A charge of $2001M in June 2018bull A charge of $2322M in July 2017

37

PUBLIC

Real-Time Ancillary Service Imbalance (ORDC) ndash July 2018

In July 2018 Real-Time Ancillary Service Imbalance was a charge to load of $2228K compared to bull A charge of $147K in June 2018bull A charge of $534K in July 2017

Real-Time Ancillary Service Imbalance $ in Thousands

Real-Time AS Imbalance ($2228)

Real-Time Reliability Deployment AS Imbalance $000

Total RTASI Amount Allocated to Load $2228

38

PUBLIC

Energy Settlement ndash July 2018

39

Day-Ahead Market Energy Settlement $ in Millions

Energy Purchases $215396

Point to Point Obligation Purchases $11726

Energy Sales ($212592)

Day-Ahead Congestion Rent $14531

Day-Ahead Market Make-Whole Payments ($001)

Real-Time Market Energy Settlement $ in Millions

Energy Imbalance at a Resource Node ($91963)

Energy Imbalance at a Load Zone $160737

Energy Imbalance at a Hub ($57497)

Net Real-Time Energy Imbalance $11276

Real Time Congestion from Self Schedules $013

Block Load Transfers and DC Ties ($2063)

Total Impact to Revenue Neutrality $9227

Load-Allocated Emergency Energy Payments ($016)

Load-Allocated Base Point Deviation Charges $026

Day-Ahead Market energy settlement activity increased from last month and increased from July 2017

Real-Time Market energy settlement activity increased from last month and increased from July 2017

PUBLIC

Congestion Revenue Rights (CRR) ndash July 2018

$ in Millions

Long-Term Auction ($4026)

Monthly Auction ($1773)

Total Auction Revenue ($5799)

Day-Ahead CRR Settlements ($15797)

Day-Ahead CRR Short-Charges $1885

Day-Ahead CRR Short-Charges Refunded ($899)

Day-Ahead CRR Short-Charges Net $986

Total CRR Funding ($14810)

Day-Ahead Point-to-Point Obligations $11726

Real-Time Point-to-Point Obligations ($10113)

Net Point-to-Point Obligations $1614

Congestion Revenue Rights settlement payments were not fully funded Partial funding to settle the CRR Short Charges was provided from the CRR Balancing Account Fund and the remaining $986M of CRR Short Charges were not refunded The CRR Fund Balance is now $0

Point to Point Obligations settled with a net charge of $1614M compared to a net credit of $1758M last month

40

PUBLIC

CRR Balancing Account Fund ndash July 2018

CRR Balancing Account $ in Millions

Monthly Day-Ahead Congestion Rent $14531

Monthly Day-Ahead CRR Settlements ($15797)

Monthly Day-Ahead CRR Short -Charges $1885

CRR Balancing Account Credit Total $619

Beginning Fund Balance for the Month $275

CRR Balancing Account Credit Total $619

Day-Ahead CRR Short-Charges Refunded ($899)

CRR PTP Option Award Charges $004

Load-Allocated CRR Amount $000

Total Fund Amount $000

41

PUBLIC

Revenue Neutrality ndash July 2018

Revenue Neutrality $ in Millions

Real-Time Energy Imbalance $11276

Real-Time Point to Point Obligation ($10113)

Real-Time Congestion from Self-Schedules $013

DC Tie amp Block Load Transfer ($2063)

Allocation to Load $886

In July 2018 the Revenue Neutrality charge to load was $886M compared to bull A charge of $3046M in June 2018bull A charge of $145M in July 2017

42

PUBLIC

Net Allocation to Load ndash July 2018

Market-Based Allocation $ in Millions

Reliability Unit Commitment $000

Ancillary and Other Services $10200

Real-Time Ancillary Service Imbalance $223

Emergency Energy $016

Base Point Deviation ($026)

CRR Auction Revenue ($5799)

CRR Balancing Account $000

Real-Time Revenue Neutrality $886

Reliability Must Run $000

Monthly Block Load Transfer $000

Total $5500

Fee AllocationERCOT Administrative Fee $2207

Net Allocated to Load $7707

In July 2018 the Net Allocation to load was a charge of $7707M compared to bull A charge of $2152M in June 2018bull A credit of $1363M in July 2017

43

PUBLIC

Advanced Meter Settlement Impacts ndash July 2018

July 2018 At month end settling 72M ESIIDs using Advanced Meter data

July 2018 990 of the load in ERCOT is settled with 15-min interval data (AMS Competitive IDR and NOIE IDR)

44

PUBLIC

ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndashJuly 2018

45

PUBLIC

Retail Transaction Volumes ndash Summary ndash July 2018

46

Transaction Type July 2018 July 2017 July 2018 July 2017

Switches 669909 617300 121926 84059

Acquisition 0 0 0 0

Move - Ins 1667037 1568153 270122 252360

Move - Outs 814580 802779 129820 127073

Continuous Service Agreements (CSA) 395944 283259 40217 55770

Mass Transitions 9033 0 0 0

Total 3556503 3271491 562085 519262

Year-To-Date Transactions Received

Board Presentation Input

Trans Volumes by Month_New

PUBLIC

Retail Transaction Volumes ndash Summary ndash July 2018

SwitchesAcquisitions Move-Ins

Move-Outs Mass Transition

47

Projects Report

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018

20000000$ 2018 Portfolio

Spending Estimate

Projects In FlightOn Hold (Count = 100) 24905011$

Projects Not Yet Started (Count = 10) 1320628$

Projects Completed (Count = 43) 795250$

(7020889)$

TOTAL 20000000$

Project Number Projects in Initiation Phase (Count = 4)

TBD IT Asset RecoveryNPRR842 Study Area Load Information

209-03 Study Network (STNET) Integration288-01 EDI Map and Translator Replacement

Impact Metric TolerancesUnfavorable variances are represented as negative numbers within the report - Green = No more than 49 unfavorable variance - Yellow = Unfavorable variance between 49 and 99 - Red = Unfavorable variance more than 99

Spending Reductions Required to Maintain Capital Budget

2018 Project Funding

Footnotes1 - One or more phases took longer than expected resulting in additional time required

2 - One or more phases required more labor than expected resulting in additional funding andor time required

3 - Project placed on holdNA - Metric not calculated because - it is reported at the parent project level or - it is an administrative project

Project Number Projects in Planning Phase (Count = 8) Phase Start Baseline

Phase FinishApproved

Phase FinishScheduled

Go-Live DateScheduled

Phase Finish

134-02 Privileged Account Management (PAM) Phase 2 882018 12192018 12192018 TBD 12192018 0 10

183-01 CMM-FT GUI Integration 12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs

242-01 Portfolio Reporting Assessment 1182017 12192018 12192018 TBD 12192018 0 21260-01 Information Governance Assessment 10182017 5302018 9192018 TBD 9192018 0 5286-01 Java Platform Assessment 6202018 11212018 11212018 TBD 11212018 0 6287-01 Security Constrained Unit Commitment (SCUC) 882018 2272019 2272019 TBD 2272019 0 -1

NPRR484Revisions to Congestion Revenue Rights Credit Calculations and Payments - Phase 1b 2

12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs

NPRR702Flexible Accounts Payment of Invoices and Disposition of Interest on Cash Collateral

12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs

Schedule Health Budget Health

49

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018Project Number Projects in Execution Phase (Count = 42) Phase Start Baseline Go-

Live DateApproved Go-

Live DateScheduled

Go-Live DateScheduled

Phase Finish

170-01 Enterprise Content Alignment Program 8262015 11152017 8312018 8312018 8312018 0 0170-06 ECAP - ECMS Implementation Phase 1 4252018 11302018 11302018 11302018 11302018 0 3173-02 ERCOT Flight Certification Website 11152017 2282019 2282019 2282019 5312019 0 2181-01 CRR Framework Upgrade 10262016 1022017 11192018 11192018 2272019 0 2

183-01 CMM Tech Refresh 3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

193-01 PMU Tool Evaluation and Implementation 12132017 892018 2152019 2152019 3202019 0 0196-01 GINR Project Status Application Replacement 12212016 9142017 2282019 2282019 3312019 0 1198-02 Reactive Power Coordination PoC 962017 6162018 8152018 8152018 8152018 0 54209-02 Weather Imaging and Line Observation (WILO) 5302018 212019 212019 212019 2272019 0 2210-01 REC Technology Refresh 8302017 3182018 12132018 12132018 1162019 0 3228-01 Enterprise Database Upgrade 882018 1292020 1292020 1292020 1292020 0 17229-01 IT Change and Configuration Management Phase 2 822017 6192018 12132018 12132018 3252019 0 2 -9238-01 Application Authentication Tech Refresh 962017 3192018 12132018 12132018 1302019 0 3239-01 Identity and Access Management 592018 3132019 3132019 3132019 3132019 0 2241-01 AREA - Generation 10112017 3302018 892018 892018 952018 0 -4244-01 Corporate Wireless 11292017 3282018 1252018 1252018 192019 0 9245-01 2017 EPS Metering Enhancements 6272018 892019 892019 892019 9252019 0 1246-01 iTest Data Refresh 12132017 1192018 11152018 11152018 122019 0 25249-01 Secondary Wind Forecasting Service 8302017 2282018 892018 892018 952018 0 0253-01 CIP Recovery Plan Project - Planning Phase 1 1312018 8292018 8292018 8292018 8292018 0 -2

257-01Security Constrained Optimal Powerflow in Study Network Analysis

1262017 10252018 10252018 10252018 1282018 0 19

261-01 Generic Transmission Constraint Calculation 372018 12132018 12132018 12132018 1232019 0 0263-01 Market Simulator 4112018 12132018 12132018 12132018 1302019 0 7265-01 Real-Time Assessment Continuity 1312018 12132018 12132018 12132018 1302019 0 0279-01 Cyber Security Project 24 6272018 10262018 10262018 10262018 11282018 0 0280-01 Quest Software Portfolio Transition 442018 6272018 9262018 9262018 9262018 0 13282-01 Synchronous Condenser Outage Modeling 662018 10252018 10252018 10252018 1252018 0 1Various 2015 CMM NPRRs 2 -18

NPRR519Exemption of ERS-Only QSEs from Collateral and Capitalization Requirements

3152017 5192018 12112018 12112018 12312018 0 See 2015 CMM NPRRs

NPRR620Collateral Requirements for Counter-Parties with No Load or Generation

3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

NPRR660 Remove CRR State Change Adder 3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

Budget HealthSchedule Health

50

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018Project Number Projects in Execution Phase (Count = 42) Phase Start Baseline Go-

Live DateApproved Go-

Live DateScheduled

Go-Live DateScheduled

Phase Finish

NPRR741 Clarifications to TPE and EAL Credit Exposure Calculations 3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

NPRR749 Option Cost for Outstanding CRRs 882018 12132018 12132018 12132018 TBD 0 NA See 2015 CMM NPRRs

NPRR755 Data Agent-Only QSE Registration 3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

NPRR819Modification of Non-Price Error Resettlement Thresholds and Resettlement Clean-Ups

592018 892018 892018 892018 952018 0 36

NPRR833 Modify PTP Obligation Bid Clearing Change 882018 12132018 12132018 12132018 TBD 0 1

NPRR843Short-Term System Adequacy and AS Offer Disclosure Reports Additions

7182018 10252018 10252018 10252018 11282018 0 0

NPRR864 RUC Modifications to Consider Market-Based Solutions 6202018 10252018 10252018 10252018 11282018 0 4SCR777 Bilateral CRR Interface Enhancement 10262016 1022017 11192018 11192018 2272019 0 NA See 181-01

SCR781 RARF Replacement 12202017 4252018 12192018 12192018 12192018 0 3SCR791 Correction of 60-day SCED GRD Disclosure Report 522018 892018 892018 892018 952018 0 39SCR795 Addition of Intra-Hour Wind Forecast to GTBD Calculation 882018 10252018 10252018 10252018 11142018 0 0

Project Number Expedited Projects in Execution (Count = 34)

Project Number Projects in Stabilization (Count = 10) Execution

Phase StartBaseline Go-Live Target

Approved Go-Live Target

ActualGo-Live Date

Scheduled Execution Phase

Finish

NPRR648 Remove References to Flowgate Rights 3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR683 Revision to Available Credit Limit Calculation 3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR743 Revision to MCE to Have a Floor For Load Exposure 3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR760 Calculation of Exposure Variables For Days With No Activity 3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR776 Voltage Set Point Communication 9202017 3192018 452018 452018 952018 0 1

NPRR800Revisions to Credit Exposure Calculations to Use Electricity Futures Market Prices

3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR815Revise the Limitation of Load Resources Providing Responsive Reserve (RRS) Service

3212018 5312018 5312018 5312018 8292018 0 2

209-01 Multi Station Breaker to Breaker One Lines 282017 392018 532018 532018 8222018 0 -1259-01 DC SCADA and Metering Upgrade 10252017 1172018 7252018 7252018 8292018 0 22266-01 Remote Email Access Enhancement 12132017 372018 662018 6192018 9262018 2 -7 2 -9

Schedule Health Budget Health

Budget HealthSchedule Health

51

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018

Project Number Projects On Hold (Count = 2) Forecast

Start DateBaseline

Phase FinishApproved Go-

Live TargetScheduled

Go-Live DateScheduled

Phase Finish

SCR789 Update NMMS Topology Processor to PSSE 34 Capability 0

269-01Document Repository Redesign and Governance Implementation - Phase 1

0

Project Number Projects Completed (Count = 20)

Baseline Execution

Phase Start

Baseline Go-Live Target

Approved Go-Live Target

Actual Go-Live Date

Actual Execution Phase Finish

185-01 Records Management and eDiscovery 12152016 5242017 8292017 8222017 12132017 2 0224-01 TelAlert Replacement 452017 6272017 842017 842017 592018 0 5230-01 SAS Technical Architecture Redesign 312017 12132017 12132017 12132017 6272018 0 2234-01 Reporting Solution Resiliency (RSR) 452017 8232017 11272017 11272017 1102018 0 8240-01 EDI Translator and Mapping Replacement Assessment 4192017 9272017 2282018 TBD 372018 -2 20254-01 Retail Windows Upgrade 10112017 12182017 12182017 1222018 272018 1 -51 65255-01 Settlements Architecture Enhancements 10252017 1112018 1112018 1192018 2142018 1 -10 53258-01 WD Kainos SMART Automation Testing Tool 4112018 642018 642018 662018 7182018 -3 33271-01 Issue Tracking and Resolution Tool Assessment 12132017 4252018 4252018 TBD 522018 1 -5 -1272-01 Operator Training Simulator Black Start GE Effort 1262017 4252018 4252018 4272018 5162018 -1 19274-01 Average Mid-Term Load Forecast 372018 5312018 5312018 5312018 6272018 0 50

NPRR768Revisions to Real-Time On-Line Reliability Deployment Price Adder Categories

372018 5312018 5312018 5312018 6272018 0 16

NPRR778 Modifications to Date Change and Cancellation Evaluation Window 7192017 10292017 12112017 12112017 1312018 0 23

NPRR782Settlement of Infeasible Ancillary Services Due to Transmission Constraints

5242017 8312017 1122017 1122017 1102018 0 20

NPRR808 Three Year CRR Auction 8232017 9182017 9182017 912017 1312018 65 68

NPRR810Applicability of RMR Incentive Factor on Reservation and Transportation Costs Associated with Firm Fuel Supplies

7172017 11122017 3312018 3312018 3312018 0 NA See 233-00

NPRR830 Revision of 4-Coincident Peak Methodology 12132017 262018 262018 262018 372018 0 85

NPRR831 Inclusion of Private Use Networks in Load Zone Price Calculations 822017 1122017 1122017 1122017 2212018 0 33

OBDRR002 ORDC OBD Revisions for PUCT Project 47199 372018 5312018 5312018 5312018 6272018 0 See NPRR768

SCR792 Enhance Communications of BAAL Exceedances 2142018 452018 452018 452018 4252018 0 69

Project Number Expedited Projects Completed (Count = 23)

Budget HealthSchedule Health

Budget HealthSchedule Health

52

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018

Project Number 2018 Projects Not Yet Started (Count = 10) Forecast

Start Date

NPRR858 Provide Complete Current Operating Plan (COP) Data Aug-2018TBD 2018 OS Enhancements Aug-2018TBD Additional Branch Limit for Relays Aug-2018

NPRR817 Create a Panhandle Hub Sep-2018NPRR821 Elimination of the CRR Deration Process Oct-2018NPRR865 Publish RTM Shift Factors for Hubs Load Zones and DC Ties Oct-2018

SCR793SSR Related Telemetry for Transmission Service Provider (TSP) Operators

Oct-2018

ECAP ECAP - ECMS Implementation Phase 2 Oct-2018TBD Job Scheduler Update in CSI Framework Oct-2018TBD Parameter Estimation Oct-2018

53

  • Slide Number 1
  • Slide Number 2
  • Summary ndash July 2018
  • Daily Peak Demand Hourly Average Actual vs Forecast Wind Day-Ahead COPs amp On-Line Capacity at Peak ndash July 2018
  • Actual Wind Output plus Curtailments vs Wind Day-Ahead COPs for All Hours ndash July 2018
  • ERCOTrsquos CPS1 Monthly Performance ndash July 2018
  • Monthly Peak Actual Demand ndash July 2018
  • Monthly Minimum Actual 15-Minute Demand ndash July 2018
  • Day-Ahead Load Forecast Performance ndash July 2018
  • Reliability Unit Commitment (RUC) Capacity by Weather Zone ndash July 2018
  • Generic Transmission Constraints (GTCs) ndash July 2018
  • Advisories and Watches ndash July 2018 Corrected
  • Lake Levels Update ndash August 1 2018
  • Planning Summary ndash July 2018
  • Mapping of Counties to ERCOT Zones ndash July 2018
  • Cumulative MW Capacity of Interconnection Requests by Zone ndashJuly 2018
  • Cumulative MW Capacity of Interconnection Requests by Zone ndashJuly 2018
  • Cumulative MW Capacity of Interconnection Requests by Zone ndashJuly 2018
  • Wind Generation ndash July 2018
  • Solar Generation ndash July 2018
  • Generation Interconnection Activity by Fuel ndash July 2018
  • Generation Interconnection Activity by Project Phase ndash July 2018
  • Slide Number 23
  • Day-Ahead Schedule (Hourly Average) ndash July 2018
  • Percentage of Real-Time Load Hedged in the DAM (Counter-Party Level) ndash July 2018
  • DAM and RTM Price Convergence ndash July 2018
  • Day-Ahead Electricity and Ancillary Service Prices (Hourly Average) ndash July 2018
  • Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash July 2018
  • Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash July 2018
  • DRUC Monthly Summary (Hourly Average) ndash July 2018
  • HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash July 2018
  • NonndashSpinning Reserve Service Deployment ndash July 2018
  • CRR Price Convergence ndash July 2018
  • Daily Average System Lambda and ORDC Price Adders ndash July 2018
  • ERS Procurement for June 2018 ndash September 2018
  • Reliability Services ndash July 2018
  • Ancillary and Other Services ndash July 2018
  • Real-Time Ancillary Service Imbalance (ORDC) ndash July 2018
  • Energy Settlement ndash July 2018
  • Congestion Revenue Rights (CRR) ndash July 2018
  • CRR Balancing Account Fund ndash July 2018
  • Revenue Neutrality ndash July 2018
  • Net Allocation to Load ndash July 2018
  • Advanced Meter Settlement Impacts ndash July 2018
  • ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndash July 2018
  • Retail Transaction Volumes ndash Summary ndash July 2018
  • Retail Transaction Volumes ndash Summary ndash July 2018
  • Slide Number 48
  • ERCOT Portfolio Stoplight Report ndash July 2018
  • ERCOT Portfolio Stoplight Report ndash July 2018
  • ERCOT Portfolio Stoplight Report ndash July 2018
  • ERCOT Portfolio Stoplight Report ndash July 2018
  • ERCOT Portfolio Stoplight Report ndash July 2018
Retail Transactions Summary
July 2018 June 2018 May 2018 April 2018 March 2018 February 2018 January 2018 December 2017 November 2017 October 2017 September 2017 August 2017 July 2017 June 2017 May 2017 April 2017 March 2017 February 2017 January 2017 December 2016 November 2016 October 2016 September 2016 August 2016 July 2016 June 2016 May 2016 April 2016 March 2016 February 2016 January 2016 December 2015 November 2015 October 2015 September 2015 August 2015 July 2015 June 2015 May 2015 April 2015 March 2015 February 2015 January 2015 December 2014 November 2014 October 2014 September 2014 August 2014 July 2014 June 2014 May 2014 April 2014 March 2014 February 2014 January 2014 December 2013 November 2013 October 2013 September 2013 August 2013 July 2013 June 2013 May 2013 April 2013 March 2013 February 2013 January 2013 Grand total
814_01 - Switch Received 121926 109653 96828 81291 95159 76119 88933 60560 77860 78096 79502 84134 84059 108784 130828 71769 67845 66875 87140 66556 56202 64452 67323 86656 82923 86376 75323 70300 76235 68057 63954 61486 52887 65276 70342 81674 91211 102661 86229 81255 79997 73394 72885 71072 67080 110465 175164 89677 99568 101490 111077 91983 93887 71130 86953 69691 55957 166882 82415 93194 102562 103756 116086 78919 68950 64329 67116 1321827
Difference from previous month 12273 12825 15537 (13868) 19040 (12814) 28373 (17300) (236) (1406) (4632) 75 (24725) (22044) 59059 3924 970 (20265) 20584 10354 (8250) (2871) (19333) 3733 (3453) 11053 5023 (5935) 8178 4103 2468 8599 (12389) (5066) (11332) (9537) (11450) 16432 4974 1258 6603 509 1813 3992 (43385) (64699) 85487 (9891) (1922) (9587) 19094 (1904) 22757 (15823) 17262 13734 (110925) 84467 (10779) (9368) (1194) (12330) 37167 9969 4621 (2787)
814_16 - Move - Ins Received 270122 257125 244431 225380 224289 215281 230409 238340 207921 236397 244511 258046 252360 257759 237611 197865 217962 201984 202612 196236 201714 220958 231999 268781 241844 247481 214383 199804 218245 212474 193716 189862 181098 215908 229405 248124 263233 247089 208166 207932 215950 197765 198025 193973 178624 226283 231418 243482 251957 233679 223201 258649 214724 208160 207059 172981 178671 233469 216550 255967 249114 220397 216982 204412 197200 191955 194507 3162148
Difference from previous month 12997 12694 19051 1091 9008 (15128) (7931) 30419 (28476) (8114) (13535) 5686 (5399) 20148 39746 (20097) 15978 (628) 6376 (5478) (19244) (11041) (36782) 26937 (5637) 33098 14579 (18441) 5771 18758 3854 8764 (34810) (13497) (18719) (15109) 16144 38923 234 (8018) 18185 (260) 4052 15349 (47659) (5135) (12064) (8475) 18278 10478 (35448) 43925 6564 1101 34078 (5690) (54798) 16919 (39417) 6853 28717 3415 12570 7212 5245 (2552)
814_24 - MVO and MVO to CSA Received 129820 125861 124403 113795 108753 100127 111821 144987 100830 116519 129103 128104 127073 133582 127218 102055 111459 100285 101107 96289 100578 109493 114094 133170 122932 129025 118022 103789 109278 103747 96628 99552 96214 109578 117949 123894 133905 133855 114675 108275 108859 94864 98233 97901 89578 111857 115918 121662 131607 126785 119107 107956 107266 99428 104273 93385 93977 115469 115524 129594 135196 121446 120049 111598 106467 102429 104399 1660500
814_10 - DTP Mass Acquisition Received - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0
814_10 - DTP Mass Transition Received - 0 - 0 9033 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 639 - 0 - 0 4975 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0
814_18 - CSA AdditionDeletes Received 40217 62083 99016 55581 46720 42587 49740 47725 31726 52888 41597 40616 55770 43745 52139 26702 21791 39082 44030 38884 39856 31786 33061 42622 48489 64178 50499 59475 59400 48536 42179 40351 34796 34420 54677 35078 49489 59611 39384 44247 44577 35386 40420 54831 43550 45039 44268 40405 57954 64408 65032 80184 70310 41156 34811 46680 50347 71847 48606 52585 50867 62747 59763 34925 40977 40389 41227 747237
Total 562085 554722 573711 476047 474921 434114 480903 491612 418337 483900 494713 510900 519262 543870 547796 398391 419057 408226 434889 397965 398350 426689 446477 531229 496188 527060 458227 433368 463158 432814 396477 391251 364995 425182 472373 488770 537838 543216 448454 441709 449383 401409 409563 417777 378832 493644 566768 495865 541086 526362 523392 538772 486187 419874 433096 382737 378952 587667 463095 531340 537739 508346 512880 429854 413594 399102 407249 6891712
Counts from Monthly Retail Transaction report
To do
Break Out 814_10s - AQ and MT
Break Out 814_18 Additions from Deletes
Year-To-Date Transactions Received
Transaction Type July 2018 July 2017 July 2018 July 2017
Switches 669909 617300 121926 84059
Acquisition 0 0 0 0
Move - Ins 1667037 1568153 270122 252360
Move - Outs 814580 802779 129820 127073
Continuous Service Agreements (CSA) 395944 283259 40217 55770
Mass Transitions 9033 0 0 0
Total 3556503 3271491 562085 519262
There has been a change since this was created
Mass Acquisition has been broken out of Mass Transition
Page 3: ERCOT Monthly Operational Overvie · ERCOT Monthly Operational Overview (July 2018) Revised 08.22.18. ERCOT Public. August 15, 2018

PUBLIC

Summary ndash July 2018

Operationsbull The preliminary Settlements hourly peak demand of 73308 MW on July 19 was lower

than the day-ahead mid-term load forecast peak of 73518 MW for the same operatinghourndash The operational instantaneous peak demand was 73405 MW (telemetry)

bull Day-ahead load forecast error for July was 197bull ERCOT issued 12 notifications

ndash Four Advisories issued due to Physical Responsive Capability being below 3000 MWndash One Advisory issued for extreme hot weatherndash Five DC Tie-related Watchesndash One OCN issued for extreme hot weatherndash One OCN issued for projected reserve capacity shortage

Planning Activitiesbull 404 active generation interconnection requests totaling 79852 MW including 37697

MW of wind generation as of July 31 2018 Twenty five additional requests and anincrease of 2832 MW from June 30 2018

bull 21190 MW wind capacity in commercial operations as of August 1 2018

Per Demand and Energy Report as of 080718

3

PUBLIC

Daily Peak Demand Hourly Average Actual vs Forecast Wind Day-Ahead COPs amp On-Line Capacity at Peak ndash July 2018

4

PUBLIC

Actual Wind Output plus Curtailments vs Wind Day-Ahead COPs for All Hours ndash July 2018

5

PUBLIC

ERCOTrsquos CPS1 Monthly Performance ndash July 2018

CPS1 12 Month Rolling Average = 17641

6

PUBLIC

Monthly Peak Actual Demand ndash July 2018

Preliminary for latest two months of the current year

Monthly Peak Actual Demand = 73308 MW 071918 HE 1700

7

PUBLIC

Monthly Minimum Actual 15-Minute Demand ndash July 2018

Preliminary for latest two months of the current year

8

PUBLIC

Day-Ahead Load Forecast Performance ndash July 2018

Mean Absolute Percent Error (MAPE) for ERCOT Mid-Term Load Forecast (MTLF) Run at 1400 Day Ahead

2015MAPE

2016MAPE

2017MAPE

2018MAPE

July 2018MAPE

AverageAnnual MAPE

286 262 255 238 197

LowestMonthly MAPE

189 194 169 165LowestDailyMAPE

055Jul 16

HighestMonthly MAPE

381 386 407 366

Highest DailyMAPE

524Jul 4

9

PUBLIC

Reliability Unit Commitment (RUC) Capacity by Weather Zone ndashJuly 2018

10

PUBLIC

Generic Transmission Constraints (GTCs) ndash July 2018

GTC A transmission flow limit more constraining than a Transmission Elementrsquos normal limit established to constrain flow between geographic areas of the ERCOT Transmission System that is used to enforce stability and voltage constraints that cannot be modeled directly in ERCOTrsquos transmission security analysis applications

Note This table lists how many times a constraint has been activated to avoid exceeding a GTC limit it does not imply an exceedance of the GTC occurred

GTCsJul-17 May-18 Jun-18 Jul-18 Last 12 Months Total

DaysDays Days Days DaysGTCs GTCs GTCs GTCs (Aug 17 ndash Jul 18)

North ndash Houston 1 0 1 0 8

Valley Import 0 4 0 1 15

Panhandle 17 27 23 5 261

Red Tap 0 0 0 0 0North Edinburg ndash

Lobo 0 0 0 0 1Nelson Sharpe ndash

Rio Hondo - 0 2 0 65

East Texas - 0 0 0 16

11

PUBLIC

Advisories and Watches ndash July 2018 Corrected

bull Two OCNs issued for extreme hot weatherndash Issued 714 and 720

bull Four Advisories issued due to Physical Responsive Capability being below 3000 MWndash Issued 718 719 725 and 728

bull One OCN issued due to projected reserve capacity shortage for hours ending 1400 through 1900 ERCOT requested all QSEs to update their COPs

ndash Issued 726

bull One Watch issued due to the post-contingency loss of the Bevo to Asherton 138 kV (SBEVASH8) overloads the Big Wells to Cotulla Sub 69 kV and curtailment of Eagle Pass DC-Tie exports to CENACE

ndash Issued 717

bull Three Watches issued due to the post-contingency loss of Bentsen to Railroad 138 kV (SBENRAI8) overloads South Mission to Railroad 138 kV and curtailment of Railroad DC-Tie exports to CENACE

ndash Issued 723

bull One Watch issued for the de-rate of the Railroad DC-Tie and curtailment of the DC-Tie exports to CENACE

ndash Issued 731

12

PUBLIC

Lake Levels Update ndash August 1 2018

13

PUBLIC

Planning Summary ndash July 2018

bull ERCOT is currently tracking 404 active generation interconnection requests totaling 79852 MW This includes 37697 MW of wind generation

bull ERCOT is currently reviewing proposed transmission improvements with a total cost of $6035 million

bull Transmission Projects endorsed in 2018 total $3935 million

bull All projects (in engineering routing licensing and construction) total approximately $649 billion (as of June 1 2018)

bull Transmission Projects energized in 2018 total about $1120 billion (as of June 1 2018)

14

PUBLIC

Mapping of Counties to ERCOT Zones ndash July 2018

15

PUBLIC

Cumulative MW Capacity of Interconnection Requests by Zone ndashJuly 2018

16

PUBLIC

Cumulative MW Capacity of Interconnection Requests by Zone ndashJuly 2018

17

PUBLIC

Cumulative MW Capacity of Interconnection Requests by Zone ndashJuly 2018

18

PUBLIC

Wind Generation ndash July 2018

19

PUBLIC

Solar Generation ndash July 2018

20

PUBLIC

Generation Interconnection Activity by Fuel ndash July 2018

21

PUBLIC

Generation Interconnection Activity by Project Phase ndash July 2018

22

Market Operations

PUBLIC

Day-Ahead Schedule (Hourly Average) ndash July 2018

24

0

10000

20000

30000

40000

50000

60000

70000

80000

MW

Hour Ending

Scheduled Energy Only OfferScheduled Three-part OfferDAM Energy PurchaseRT System Load

Liquidity and activity are normal in the Day-Ahead Market

PUBLIC

Percentage of Real-Time Load Hedged in the DAM (Counter-Party Level) ndashJuly 2018

25

0

20

40

60

80

100

120Ja

nM

arM

ay Jul

Sep

Nov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May

July

2013 2014 2015 2016 2017 2018

The dotted lines represent the bounds for major outliers

PUBLIC

DAM and RTM Price Convergence ndash July 2018

26

-20

-10

0

10

20

30

40

50

60Ja

nM

arM

ay Jul

Sep

Nov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

l

2013 2014 2015 2016 2017 2018

Aver

age

DAM

-R

TM S

PP ($

MW

h)

The dotted lines represent the bounds for major outliers

PUBLIC

Day-Ahead Electricity and Ancillary Service Prices (Hourly Average) ndashJuly 2018

27

0

100

200

300

400

500

600

Pric

e ($

MW

h)

Hour Ending

Regulation Up

Regulation Down

Responsive Reserve

Non Spinning Reserve

DAM Power Balance Price(System Lambda)

Ancillary Service prices reflect the opportunity cost of energy

PUBLIC

Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash July 2018

28

0

100

200

300

400

500

600

Pric

e ($

MW

h)

Hour Ending

RTSPP - LZ West

RTSPP - LZ North

RTSPP - LZ South

RTSPP - LZ Houston

DASPP - LZ West

DASPP - LZ North

DASPP - LZ South

DASPP - LZ Houston

Prices reflect relative transmission congestion and system scarcity

PUBLIC

Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash July 2018

29

0

100

200

300

400

500

600

Pric

e ($

MW

h)

Hour Ending

RTSPP - Hub Average

DASPP - Hub Average

Energy prices reflect the risk premium between Day-Ahead amp Real-Time

PUBLIC

DRUC Monthly Summary (Hourly Average) ndash July 2018

30

0

15000

30000

45000

60000

75000

90000

MW

h

Hour Ending

Self Scheduled Capacity

Self Scheduled Ancillary Service Limit

Load Forecast

DRUC Recommended Capacity

31 executions (0 missed)0 published after 160011 minutes average execution time0 Resources committed

PUBLIC

HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash July 2018

31

0

02

04

06

08

1

0

20

40

60

80

100

RTO

RD

PA ($

MW

h)

MW

h

Hour Ending

744 executions (0 missed)8 minutes average execution time1 Resources committed through HRUC or by a Verbal Dispatch Instruction

The dotted line indicates the average RTORDPA

PUBLIC

NonndashSpinning Reserve Service Deployment ndash July 2018

32

Deployment Start Time

Deployment End Time

Deployment Duration (Hours)

Max Deployment(MW) Reason

NA

PUBLIC

CRR Price Convergence ndash July 2018

0

50

100

150

200

250

Mill

ions

$

Cost

Value

Congestion Revenue Right cost in auction convergence with payment in Day-Ahead Market and Real Time Market

33

PUBLIC

Daily Average System Lambda and ORDC Price Adders ndash July 2018

0

50

100

150

200

250

$M

Wh

Day of Month

RTOFFPA

RTORPA

SYSTEM_LAMBDA

34

PUBLIC

ERS Procurement for June 2018 ndash September 2018

TP1 TP2 TP3 TP4 TP5 TP6

Non Weather-Sensitive ERS-10 MW 160562 165996 143324 140708 156699 151138

Non Weather-Sensitive ERS-30 MW 736864 781559 702529 625067 755153 657394

Weather-Sensitive ERS-10 MW 0 0 0 0 0 0

Weather-Sensitive ERS-30 MW 0 0 11850 11850 0 0

Total MW Procured 897426 947555 857703 777625 911852 808532

Clearing Price $201 $185 $2108 $2177 $199 $225

Time Period Time Period Hours

Time Period 1 Hours Ending 0600 - 0800 (50000 am to 80000 am) Monday through Friday except ERCOT Holidays

Time Period 2 Hours Ending 0900 - 1300 (80000 am to 10000 pm) Monday through Friday except ERCOT Holidays

Time Period 3 Hours Ending 1400 - 1600 (10000 pm to 40000 pm) Monday through Friday except ERCOT Holidays

Time Period 4 Hours Ending 1700 - 1900 (40000 pm to 70000 pm) Monday through Friday except ERCOT Holidays

Time Period 5 Hours Ending 2000 - 2200 (70000 pm to 100000 pm) Monday through Friday except ERCOT Holidays Time Period 6 All other hours

35

PUBLIC

Reliability Services ndash July 2018

Reliability Unit Commitment (RUC) $ in Millions

RUC Make-Whole Payments $000

RUC Clawback Charges $000

RUC Commitment Settlement $000

RUC Capacity Short Charges $000

RUC Make-Whole Uplift $000

RUC Commitment Cost Allocation $000

RUC Decommitment Payments $000

Total RUC Allocation to Load $000

In July 2018 there was a credit of $000M allocated to load for RUC compared to bull A credit of $000M in June 2018bull A credit of $003M in July 2017

36

PUBLIC

Ancillary and Other Services ndash July 2018

Ancillary and Other Services $ in Millions

Regulation Up Service $1105

Regulation Down Service $072

Responsive Reserve Service $7177

Non-Spinning Reserve Service $1787

Black Start Service $059

Voltage Services - Reactive Power $000

Voltage Services - Lost Opportunity $000

Total Charges Allocated to Load $10200

In July 2018 Ancillary and Other Services was a charge of $10200M compared to bull A charge of $2001M in June 2018bull A charge of $2322M in July 2017

37

PUBLIC

Real-Time Ancillary Service Imbalance (ORDC) ndash July 2018

In July 2018 Real-Time Ancillary Service Imbalance was a charge to load of $2228K compared to bull A charge of $147K in June 2018bull A charge of $534K in July 2017

Real-Time Ancillary Service Imbalance $ in Thousands

Real-Time AS Imbalance ($2228)

Real-Time Reliability Deployment AS Imbalance $000

Total RTASI Amount Allocated to Load $2228

38

PUBLIC

Energy Settlement ndash July 2018

39

Day-Ahead Market Energy Settlement $ in Millions

Energy Purchases $215396

Point to Point Obligation Purchases $11726

Energy Sales ($212592)

Day-Ahead Congestion Rent $14531

Day-Ahead Market Make-Whole Payments ($001)

Real-Time Market Energy Settlement $ in Millions

Energy Imbalance at a Resource Node ($91963)

Energy Imbalance at a Load Zone $160737

Energy Imbalance at a Hub ($57497)

Net Real-Time Energy Imbalance $11276

Real Time Congestion from Self Schedules $013

Block Load Transfers and DC Ties ($2063)

Total Impact to Revenue Neutrality $9227

Load-Allocated Emergency Energy Payments ($016)

Load-Allocated Base Point Deviation Charges $026

Day-Ahead Market energy settlement activity increased from last month and increased from July 2017

Real-Time Market energy settlement activity increased from last month and increased from July 2017

PUBLIC

Congestion Revenue Rights (CRR) ndash July 2018

$ in Millions

Long-Term Auction ($4026)

Monthly Auction ($1773)

Total Auction Revenue ($5799)

Day-Ahead CRR Settlements ($15797)

Day-Ahead CRR Short-Charges $1885

Day-Ahead CRR Short-Charges Refunded ($899)

Day-Ahead CRR Short-Charges Net $986

Total CRR Funding ($14810)

Day-Ahead Point-to-Point Obligations $11726

Real-Time Point-to-Point Obligations ($10113)

Net Point-to-Point Obligations $1614

Congestion Revenue Rights settlement payments were not fully funded Partial funding to settle the CRR Short Charges was provided from the CRR Balancing Account Fund and the remaining $986M of CRR Short Charges were not refunded The CRR Fund Balance is now $0

Point to Point Obligations settled with a net charge of $1614M compared to a net credit of $1758M last month

40

PUBLIC

CRR Balancing Account Fund ndash July 2018

CRR Balancing Account $ in Millions

Monthly Day-Ahead Congestion Rent $14531

Monthly Day-Ahead CRR Settlements ($15797)

Monthly Day-Ahead CRR Short -Charges $1885

CRR Balancing Account Credit Total $619

Beginning Fund Balance for the Month $275

CRR Balancing Account Credit Total $619

Day-Ahead CRR Short-Charges Refunded ($899)

CRR PTP Option Award Charges $004

Load-Allocated CRR Amount $000

Total Fund Amount $000

41

PUBLIC

Revenue Neutrality ndash July 2018

Revenue Neutrality $ in Millions

Real-Time Energy Imbalance $11276

Real-Time Point to Point Obligation ($10113)

Real-Time Congestion from Self-Schedules $013

DC Tie amp Block Load Transfer ($2063)

Allocation to Load $886

In July 2018 the Revenue Neutrality charge to load was $886M compared to bull A charge of $3046M in June 2018bull A charge of $145M in July 2017

42

PUBLIC

Net Allocation to Load ndash July 2018

Market-Based Allocation $ in Millions

Reliability Unit Commitment $000

Ancillary and Other Services $10200

Real-Time Ancillary Service Imbalance $223

Emergency Energy $016

Base Point Deviation ($026)

CRR Auction Revenue ($5799)

CRR Balancing Account $000

Real-Time Revenue Neutrality $886

Reliability Must Run $000

Monthly Block Load Transfer $000

Total $5500

Fee AllocationERCOT Administrative Fee $2207

Net Allocated to Load $7707

In July 2018 the Net Allocation to load was a charge of $7707M compared to bull A charge of $2152M in June 2018bull A credit of $1363M in July 2017

43

PUBLIC

Advanced Meter Settlement Impacts ndash July 2018

July 2018 At month end settling 72M ESIIDs using Advanced Meter data

July 2018 990 of the load in ERCOT is settled with 15-min interval data (AMS Competitive IDR and NOIE IDR)

44

PUBLIC

ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndashJuly 2018

45

PUBLIC

Retail Transaction Volumes ndash Summary ndash July 2018

46

Transaction Type July 2018 July 2017 July 2018 July 2017

Switches 669909 617300 121926 84059

Acquisition 0 0 0 0

Move - Ins 1667037 1568153 270122 252360

Move - Outs 814580 802779 129820 127073

Continuous Service Agreements (CSA) 395944 283259 40217 55770

Mass Transitions 9033 0 0 0

Total 3556503 3271491 562085 519262

Year-To-Date Transactions Received

Board Presentation Input

Trans Volumes by Month_New

PUBLIC

Retail Transaction Volumes ndash Summary ndash July 2018

SwitchesAcquisitions Move-Ins

Move-Outs Mass Transition

47

Projects Report

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018

20000000$ 2018 Portfolio

Spending Estimate

Projects In FlightOn Hold (Count = 100) 24905011$

Projects Not Yet Started (Count = 10) 1320628$

Projects Completed (Count = 43) 795250$

(7020889)$

TOTAL 20000000$

Project Number Projects in Initiation Phase (Count = 4)

TBD IT Asset RecoveryNPRR842 Study Area Load Information

209-03 Study Network (STNET) Integration288-01 EDI Map and Translator Replacement

Impact Metric TolerancesUnfavorable variances are represented as negative numbers within the report - Green = No more than 49 unfavorable variance - Yellow = Unfavorable variance between 49 and 99 - Red = Unfavorable variance more than 99

Spending Reductions Required to Maintain Capital Budget

2018 Project Funding

Footnotes1 - One or more phases took longer than expected resulting in additional time required

2 - One or more phases required more labor than expected resulting in additional funding andor time required

3 - Project placed on holdNA - Metric not calculated because - it is reported at the parent project level or - it is an administrative project

Project Number Projects in Planning Phase (Count = 8) Phase Start Baseline

Phase FinishApproved

Phase FinishScheduled

Go-Live DateScheduled

Phase Finish

134-02 Privileged Account Management (PAM) Phase 2 882018 12192018 12192018 TBD 12192018 0 10

183-01 CMM-FT GUI Integration 12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs

242-01 Portfolio Reporting Assessment 1182017 12192018 12192018 TBD 12192018 0 21260-01 Information Governance Assessment 10182017 5302018 9192018 TBD 9192018 0 5286-01 Java Platform Assessment 6202018 11212018 11212018 TBD 11212018 0 6287-01 Security Constrained Unit Commitment (SCUC) 882018 2272019 2272019 TBD 2272019 0 -1

NPRR484Revisions to Congestion Revenue Rights Credit Calculations and Payments - Phase 1b 2

12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs

NPRR702Flexible Accounts Payment of Invoices and Disposition of Interest on Cash Collateral

12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs

Schedule Health Budget Health

49

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018Project Number Projects in Execution Phase (Count = 42) Phase Start Baseline Go-

Live DateApproved Go-

Live DateScheduled

Go-Live DateScheduled

Phase Finish

170-01 Enterprise Content Alignment Program 8262015 11152017 8312018 8312018 8312018 0 0170-06 ECAP - ECMS Implementation Phase 1 4252018 11302018 11302018 11302018 11302018 0 3173-02 ERCOT Flight Certification Website 11152017 2282019 2282019 2282019 5312019 0 2181-01 CRR Framework Upgrade 10262016 1022017 11192018 11192018 2272019 0 2

183-01 CMM Tech Refresh 3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

193-01 PMU Tool Evaluation and Implementation 12132017 892018 2152019 2152019 3202019 0 0196-01 GINR Project Status Application Replacement 12212016 9142017 2282019 2282019 3312019 0 1198-02 Reactive Power Coordination PoC 962017 6162018 8152018 8152018 8152018 0 54209-02 Weather Imaging and Line Observation (WILO) 5302018 212019 212019 212019 2272019 0 2210-01 REC Technology Refresh 8302017 3182018 12132018 12132018 1162019 0 3228-01 Enterprise Database Upgrade 882018 1292020 1292020 1292020 1292020 0 17229-01 IT Change and Configuration Management Phase 2 822017 6192018 12132018 12132018 3252019 0 2 -9238-01 Application Authentication Tech Refresh 962017 3192018 12132018 12132018 1302019 0 3239-01 Identity and Access Management 592018 3132019 3132019 3132019 3132019 0 2241-01 AREA - Generation 10112017 3302018 892018 892018 952018 0 -4244-01 Corporate Wireless 11292017 3282018 1252018 1252018 192019 0 9245-01 2017 EPS Metering Enhancements 6272018 892019 892019 892019 9252019 0 1246-01 iTest Data Refresh 12132017 1192018 11152018 11152018 122019 0 25249-01 Secondary Wind Forecasting Service 8302017 2282018 892018 892018 952018 0 0253-01 CIP Recovery Plan Project - Planning Phase 1 1312018 8292018 8292018 8292018 8292018 0 -2

257-01Security Constrained Optimal Powerflow in Study Network Analysis

1262017 10252018 10252018 10252018 1282018 0 19

261-01 Generic Transmission Constraint Calculation 372018 12132018 12132018 12132018 1232019 0 0263-01 Market Simulator 4112018 12132018 12132018 12132018 1302019 0 7265-01 Real-Time Assessment Continuity 1312018 12132018 12132018 12132018 1302019 0 0279-01 Cyber Security Project 24 6272018 10262018 10262018 10262018 11282018 0 0280-01 Quest Software Portfolio Transition 442018 6272018 9262018 9262018 9262018 0 13282-01 Synchronous Condenser Outage Modeling 662018 10252018 10252018 10252018 1252018 0 1Various 2015 CMM NPRRs 2 -18

NPRR519Exemption of ERS-Only QSEs from Collateral and Capitalization Requirements

3152017 5192018 12112018 12112018 12312018 0 See 2015 CMM NPRRs

NPRR620Collateral Requirements for Counter-Parties with No Load or Generation

3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

NPRR660 Remove CRR State Change Adder 3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

Budget HealthSchedule Health

50

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018Project Number Projects in Execution Phase (Count = 42) Phase Start Baseline Go-

Live DateApproved Go-

Live DateScheduled

Go-Live DateScheduled

Phase Finish

NPRR741 Clarifications to TPE and EAL Credit Exposure Calculations 3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

NPRR749 Option Cost for Outstanding CRRs 882018 12132018 12132018 12132018 TBD 0 NA See 2015 CMM NPRRs

NPRR755 Data Agent-Only QSE Registration 3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

NPRR819Modification of Non-Price Error Resettlement Thresholds and Resettlement Clean-Ups

592018 892018 892018 892018 952018 0 36

NPRR833 Modify PTP Obligation Bid Clearing Change 882018 12132018 12132018 12132018 TBD 0 1

NPRR843Short-Term System Adequacy and AS Offer Disclosure Reports Additions

7182018 10252018 10252018 10252018 11282018 0 0

NPRR864 RUC Modifications to Consider Market-Based Solutions 6202018 10252018 10252018 10252018 11282018 0 4SCR777 Bilateral CRR Interface Enhancement 10262016 1022017 11192018 11192018 2272019 0 NA See 181-01

SCR781 RARF Replacement 12202017 4252018 12192018 12192018 12192018 0 3SCR791 Correction of 60-day SCED GRD Disclosure Report 522018 892018 892018 892018 952018 0 39SCR795 Addition of Intra-Hour Wind Forecast to GTBD Calculation 882018 10252018 10252018 10252018 11142018 0 0

Project Number Expedited Projects in Execution (Count = 34)

Project Number Projects in Stabilization (Count = 10) Execution

Phase StartBaseline Go-Live Target

Approved Go-Live Target

ActualGo-Live Date

Scheduled Execution Phase

Finish

NPRR648 Remove References to Flowgate Rights 3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR683 Revision to Available Credit Limit Calculation 3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR743 Revision to MCE to Have a Floor For Load Exposure 3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR760 Calculation of Exposure Variables For Days With No Activity 3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR776 Voltage Set Point Communication 9202017 3192018 452018 452018 952018 0 1

NPRR800Revisions to Credit Exposure Calculations to Use Electricity Futures Market Prices

3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR815Revise the Limitation of Load Resources Providing Responsive Reserve (RRS) Service

3212018 5312018 5312018 5312018 8292018 0 2

209-01 Multi Station Breaker to Breaker One Lines 282017 392018 532018 532018 8222018 0 -1259-01 DC SCADA and Metering Upgrade 10252017 1172018 7252018 7252018 8292018 0 22266-01 Remote Email Access Enhancement 12132017 372018 662018 6192018 9262018 2 -7 2 -9

Schedule Health Budget Health

Budget HealthSchedule Health

51

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018

Project Number Projects On Hold (Count = 2) Forecast

Start DateBaseline

Phase FinishApproved Go-

Live TargetScheduled

Go-Live DateScheduled

Phase Finish

SCR789 Update NMMS Topology Processor to PSSE 34 Capability 0

269-01Document Repository Redesign and Governance Implementation - Phase 1

0

Project Number Projects Completed (Count = 20)

Baseline Execution

Phase Start

Baseline Go-Live Target

Approved Go-Live Target

Actual Go-Live Date

Actual Execution Phase Finish

185-01 Records Management and eDiscovery 12152016 5242017 8292017 8222017 12132017 2 0224-01 TelAlert Replacement 452017 6272017 842017 842017 592018 0 5230-01 SAS Technical Architecture Redesign 312017 12132017 12132017 12132017 6272018 0 2234-01 Reporting Solution Resiliency (RSR) 452017 8232017 11272017 11272017 1102018 0 8240-01 EDI Translator and Mapping Replacement Assessment 4192017 9272017 2282018 TBD 372018 -2 20254-01 Retail Windows Upgrade 10112017 12182017 12182017 1222018 272018 1 -51 65255-01 Settlements Architecture Enhancements 10252017 1112018 1112018 1192018 2142018 1 -10 53258-01 WD Kainos SMART Automation Testing Tool 4112018 642018 642018 662018 7182018 -3 33271-01 Issue Tracking and Resolution Tool Assessment 12132017 4252018 4252018 TBD 522018 1 -5 -1272-01 Operator Training Simulator Black Start GE Effort 1262017 4252018 4252018 4272018 5162018 -1 19274-01 Average Mid-Term Load Forecast 372018 5312018 5312018 5312018 6272018 0 50

NPRR768Revisions to Real-Time On-Line Reliability Deployment Price Adder Categories

372018 5312018 5312018 5312018 6272018 0 16

NPRR778 Modifications to Date Change and Cancellation Evaluation Window 7192017 10292017 12112017 12112017 1312018 0 23

NPRR782Settlement of Infeasible Ancillary Services Due to Transmission Constraints

5242017 8312017 1122017 1122017 1102018 0 20

NPRR808 Three Year CRR Auction 8232017 9182017 9182017 912017 1312018 65 68

NPRR810Applicability of RMR Incentive Factor on Reservation and Transportation Costs Associated with Firm Fuel Supplies

7172017 11122017 3312018 3312018 3312018 0 NA See 233-00

NPRR830 Revision of 4-Coincident Peak Methodology 12132017 262018 262018 262018 372018 0 85

NPRR831 Inclusion of Private Use Networks in Load Zone Price Calculations 822017 1122017 1122017 1122017 2212018 0 33

OBDRR002 ORDC OBD Revisions for PUCT Project 47199 372018 5312018 5312018 5312018 6272018 0 See NPRR768

SCR792 Enhance Communications of BAAL Exceedances 2142018 452018 452018 452018 4252018 0 69

Project Number Expedited Projects Completed (Count = 23)

Budget HealthSchedule Health

Budget HealthSchedule Health

52

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018

Project Number 2018 Projects Not Yet Started (Count = 10) Forecast

Start Date

NPRR858 Provide Complete Current Operating Plan (COP) Data Aug-2018TBD 2018 OS Enhancements Aug-2018TBD Additional Branch Limit for Relays Aug-2018

NPRR817 Create a Panhandle Hub Sep-2018NPRR821 Elimination of the CRR Deration Process Oct-2018NPRR865 Publish RTM Shift Factors for Hubs Load Zones and DC Ties Oct-2018

SCR793SSR Related Telemetry for Transmission Service Provider (TSP) Operators

Oct-2018

ECAP ECAP - ECMS Implementation Phase 2 Oct-2018TBD Job Scheduler Update in CSI Framework Oct-2018TBD Parameter Estimation Oct-2018

53

  • Slide Number 1
  • Slide Number 2
  • Summary ndash July 2018
  • Daily Peak Demand Hourly Average Actual vs Forecast Wind Day-Ahead COPs amp On-Line Capacity at Peak ndash July 2018
  • Actual Wind Output plus Curtailments vs Wind Day-Ahead COPs for All Hours ndash July 2018
  • ERCOTrsquos CPS1 Monthly Performance ndash July 2018
  • Monthly Peak Actual Demand ndash July 2018
  • Monthly Minimum Actual 15-Minute Demand ndash July 2018
  • Day-Ahead Load Forecast Performance ndash July 2018
  • Reliability Unit Commitment (RUC) Capacity by Weather Zone ndash July 2018
  • Generic Transmission Constraints (GTCs) ndash July 2018
  • Advisories and Watches ndash July 2018 Corrected
  • Lake Levels Update ndash August 1 2018
  • Planning Summary ndash July 2018
  • Mapping of Counties to ERCOT Zones ndash July 2018
  • Cumulative MW Capacity of Interconnection Requests by Zone ndashJuly 2018
  • Cumulative MW Capacity of Interconnection Requests by Zone ndashJuly 2018
  • Cumulative MW Capacity of Interconnection Requests by Zone ndashJuly 2018
  • Wind Generation ndash July 2018
  • Solar Generation ndash July 2018
  • Generation Interconnection Activity by Fuel ndash July 2018
  • Generation Interconnection Activity by Project Phase ndash July 2018
  • Slide Number 23
  • Day-Ahead Schedule (Hourly Average) ndash July 2018
  • Percentage of Real-Time Load Hedged in the DAM (Counter-Party Level) ndash July 2018
  • DAM and RTM Price Convergence ndash July 2018
  • Day-Ahead Electricity and Ancillary Service Prices (Hourly Average) ndash July 2018
  • Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash July 2018
  • Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash July 2018
  • DRUC Monthly Summary (Hourly Average) ndash July 2018
  • HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash July 2018
  • NonndashSpinning Reserve Service Deployment ndash July 2018
  • CRR Price Convergence ndash July 2018
  • Daily Average System Lambda and ORDC Price Adders ndash July 2018
  • ERS Procurement for June 2018 ndash September 2018
  • Reliability Services ndash July 2018
  • Ancillary and Other Services ndash July 2018
  • Real-Time Ancillary Service Imbalance (ORDC) ndash July 2018
  • Energy Settlement ndash July 2018
  • Congestion Revenue Rights (CRR) ndash July 2018
  • CRR Balancing Account Fund ndash July 2018
  • Revenue Neutrality ndash July 2018
  • Net Allocation to Load ndash July 2018
  • Advanced Meter Settlement Impacts ndash July 2018
  • ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndash July 2018
  • Retail Transaction Volumes ndash Summary ndash July 2018
  • Retail Transaction Volumes ndash Summary ndash July 2018
  • Slide Number 48
  • ERCOT Portfolio Stoplight Report ndash July 2018
  • ERCOT Portfolio Stoplight Report ndash July 2018
  • ERCOT Portfolio Stoplight Report ndash July 2018
  • ERCOT Portfolio Stoplight Report ndash July 2018
  • ERCOT Portfolio Stoplight Report ndash July 2018
Retail Transactions Summary
July 2018 June 2018 May 2018 April 2018 March 2018 February 2018 January 2018 December 2017 November 2017 October 2017 September 2017 August 2017 July 2017 June 2017 May 2017 April 2017 March 2017 February 2017 January 2017 December 2016 November 2016 October 2016 September 2016 August 2016 July 2016 June 2016 May 2016 April 2016 March 2016 February 2016 January 2016 December 2015 November 2015 October 2015 September 2015 August 2015 July 2015 June 2015 May 2015 April 2015 March 2015 February 2015 January 2015 December 2014 November 2014 October 2014 September 2014 August 2014 July 2014 June 2014 May 2014 April 2014 March 2014 February 2014 January 2014 December 2013 November 2013 October 2013 September 2013 August 2013 July 2013 June 2013 May 2013 April 2013 March 2013 February 2013 January 2013 Grand total
814_01 - Switch Received 121926 109653 96828 81291 95159 76119 88933 60560 77860 78096 79502 84134 84059 108784 130828 71769 67845 66875 87140 66556 56202 64452 67323 86656 82923 86376 75323 70300 76235 68057 63954 61486 52887 65276 70342 81674 91211 102661 86229 81255 79997 73394 72885 71072 67080 110465 175164 89677 99568 101490 111077 91983 93887 71130 86953 69691 55957 166882 82415 93194 102562 103756 116086 78919 68950 64329 67116 1321827
Difference from previous month 12273 12825 15537 (13868) 19040 (12814) 28373 (17300) (236) (1406) (4632) 75 (24725) (22044) 59059 3924 970 (20265) 20584 10354 (8250) (2871) (19333) 3733 (3453) 11053 5023 (5935) 8178 4103 2468 8599 (12389) (5066) (11332) (9537) (11450) 16432 4974 1258 6603 509 1813 3992 (43385) (64699) 85487 (9891) (1922) (9587) 19094 (1904) 22757 (15823) 17262 13734 (110925) 84467 (10779) (9368) (1194) (12330) 37167 9969 4621 (2787)
814_16 - Move - Ins Received 270122 257125 244431 225380 224289 215281 230409 238340 207921 236397 244511 258046 252360 257759 237611 197865 217962 201984 202612 196236 201714 220958 231999 268781 241844 247481 214383 199804 218245 212474 193716 189862 181098 215908 229405 248124 263233 247089 208166 207932 215950 197765 198025 193973 178624 226283 231418 243482 251957 233679 223201 258649 214724 208160 207059 172981 178671 233469 216550 255967 249114 220397 216982 204412 197200 191955 194507 3162148
Difference from previous month 12997 12694 19051 1091 9008 (15128) (7931) 30419 (28476) (8114) (13535) 5686 (5399) 20148 39746 (20097) 15978 (628) 6376 (5478) (19244) (11041) (36782) 26937 (5637) 33098 14579 (18441) 5771 18758 3854 8764 (34810) (13497) (18719) (15109) 16144 38923 234 (8018) 18185 (260) 4052 15349 (47659) (5135) (12064) (8475) 18278 10478 (35448) 43925 6564 1101 34078 (5690) (54798) 16919 (39417) 6853 28717 3415 12570 7212 5245 (2552)
814_24 - MVO and MVO to CSA Received 129820 125861 124403 113795 108753 100127 111821 144987 100830 116519 129103 128104 127073 133582 127218 102055 111459 100285 101107 96289 100578 109493 114094 133170 122932 129025 118022 103789 109278 103747 96628 99552 96214 109578 117949 123894 133905 133855 114675 108275 108859 94864 98233 97901 89578 111857 115918 121662 131607 126785 119107 107956 107266 99428 104273 93385 93977 115469 115524 129594 135196 121446 120049 111598 106467 102429 104399 1660500
814_10 - DTP Mass Acquisition Received - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0
814_10 - DTP Mass Transition Received - 0 - 0 9033 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 639 - 0 - 0 4975 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0
814_18 - CSA AdditionDeletes Received 40217 62083 99016 55581 46720 42587 49740 47725 31726 52888 41597 40616 55770 43745 52139 26702 21791 39082 44030 38884 39856 31786 33061 42622 48489 64178 50499 59475 59400 48536 42179 40351 34796 34420 54677 35078 49489 59611 39384 44247 44577 35386 40420 54831 43550 45039 44268 40405 57954 64408 65032 80184 70310 41156 34811 46680 50347 71847 48606 52585 50867 62747 59763 34925 40977 40389 41227 747237
Total 562085 554722 573711 476047 474921 434114 480903 491612 418337 483900 494713 510900 519262 543870 547796 398391 419057 408226 434889 397965 398350 426689 446477 531229 496188 527060 458227 433368 463158 432814 396477 391251 364995 425182 472373 488770 537838 543216 448454 441709 449383 401409 409563 417777 378832 493644 566768 495865 541086 526362 523392 538772 486187 419874 433096 382737 378952 587667 463095 531340 537739 508346 512880 429854 413594 399102 407249 6891712
Counts from Monthly Retail Transaction report
To do
Break Out 814_10s - AQ and MT
Break Out 814_18 Additions from Deletes
Year-To-Date Transactions Received
Transaction Type July 2018 July 2017 July 2018 July 2017
Switches 669909 617300 121926 84059
Acquisition 0 0 0 0
Move - Ins 1667037 1568153 270122 252360
Move - Outs 814580 802779 129820 127073
Continuous Service Agreements (CSA) 395944 283259 40217 55770
Mass Transitions 9033 0 0 0
Total 3556503 3271491 562085 519262
There has been a change since this was created
Mass Acquisition has been broken out of Mass Transition
Page 4: ERCOT Monthly Operational Overvie · ERCOT Monthly Operational Overview (July 2018) Revised 08.22.18. ERCOT Public. August 15, 2018

PUBLIC

Daily Peak Demand Hourly Average Actual vs Forecast Wind Day-Ahead COPs amp On-Line Capacity at Peak ndash July 2018

4

PUBLIC

Actual Wind Output plus Curtailments vs Wind Day-Ahead COPs for All Hours ndash July 2018

5

PUBLIC

ERCOTrsquos CPS1 Monthly Performance ndash July 2018

CPS1 12 Month Rolling Average = 17641

6

PUBLIC

Monthly Peak Actual Demand ndash July 2018

Preliminary for latest two months of the current year

Monthly Peak Actual Demand = 73308 MW 071918 HE 1700

7

PUBLIC

Monthly Minimum Actual 15-Minute Demand ndash July 2018

Preliminary for latest two months of the current year

8

PUBLIC

Day-Ahead Load Forecast Performance ndash July 2018

Mean Absolute Percent Error (MAPE) for ERCOT Mid-Term Load Forecast (MTLF) Run at 1400 Day Ahead

2015MAPE

2016MAPE

2017MAPE

2018MAPE

July 2018MAPE

AverageAnnual MAPE

286 262 255 238 197

LowestMonthly MAPE

189 194 169 165LowestDailyMAPE

055Jul 16

HighestMonthly MAPE

381 386 407 366

Highest DailyMAPE

524Jul 4

9

PUBLIC

Reliability Unit Commitment (RUC) Capacity by Weather Zone ndashJuly 2018

10

PUBLIC

Generic Transmission Constraints (GTCs) ndash July 2018

GTC A transmission flow limit more constraining than a Transmission Elementrsquos normal limit established to constrain flow between geographic areas of the ERCOT Transmission System that is used to enforce stability and voltage constraints that cannot be modeled directly in ERCOTrsquos transmission security analysis applications

Note This table lists how many times a constraint has been activated to avoid exceeding a GTC limit it does not imply an exceedance of the GTC occurred

GTCsJul-17 May-18 Jun-18 Jul-18 Last 12 Months Total

DaysDays Days Days DaysGTCs GTCs GTCs GTCs (Aug 17 ndash Jul 18)

North ndash Houston 1 0 1 0 8

Valley Import 0 4 0 1 15

Panhandle 17 27 23 5 261

Red Tap 0 0 0 0 0North Edinburg ndash

Lobo 0 0 0 0 1Nelson Sharpe ndash

Rio Hondo - 0 2 0 65

East Texas - 0 0 0 16

11

PUBLIC

Advisories and Watches ndash July 2018 Corrected

bull Two OCNs issued for extreme hot weatherndash Issued 714 and 720

bull Four Advisories issued due to Physical Responsive Capability being below 3000 MWndash Issued 718 719 725 and 728

bull One OCN issued due to projected reserve capacity shortage for hours ending 1400 through 1900 ERCOT requested all QSEs to update their COPs

ndash Issued 726

bull One Watch issued due to the post-contingency loss of the Bevo to Asherton 138 kV (SBEVASH8) overloads the Big Wells to Cotulla Sub 69 kV and curtailment of Eagle Pass DC-Tie exports to CENACE

ndash Issued 717

bull Three Watches issued due to the post-contingency loss of Bentsen to Railroad 138 kV (SBENRAI8) overloads South Mission to Railroad 138 kV and curtailment of Railroad DC-Tie exports to CENACE

ndash Issued 723

bull One Watch issued for the de-rate of the Railroad DC-Tie and curtailment of the DC-Tie exports to CENACE

ndash Issued 731

12

PUBLIC

Lake Levels Update ndash August 1 2018

13

PUBLIC

Planning Summary ndash July 2018

bull ERCOT is currently tracking 404 active generation interconnection requests totaling 79852 MW This includes 37697 MW of wind generation

bull ERCOT is currently reviewing proposed transmission improvements with a total cost of $6035 million

bull Transmission Projects endorsed in 2018 total $3935 million

bull All projects (in engineering routing licensing and construction) total approximately $649 billion (as of June 1 2018)

bull Transmission Projects energized in 2018 total about $1120 billion (as of June 1 2018)

14

PUBLIC

Mapping of Counties to ERCOT Zones ndash July 2018

15

PUBLIC

Cumulative MW Capacity of Interconnection Requests by Zone ndashJuly 2018

16

PUBLIC

Cumulative MW Capacity of Interconnection Requests by Zone ndashJuly 2018

17

PUBLIC

Cumulative MW Capacity of Interconnection Requests by Zone ndashJuly 2018

18

PUBLIC

Wind Generation ndash July 2018

19

PUBLIC

Solar Generation ndash July 2018

20

PUBLIC

Generation Interconnection Activity by Fuel ndash July 2018

21

PUBLIC

Generation Interconnection Activity by Project Phase ndash July 2018

22

Market Operations

PUBLIC

Day-Ahead Schedule (Hourly Average) ndash July 2018

24

0

10000

20000

30000

40000

50000

60000

70000

80000

MW

Hour Ending

Scheduled Energy Only OfferScheduled Three-part OfferDAM Energy PurchaseRT System Load

Liquidity and activity are normal in the Day-Ahead Market

PUBLIC

Percentage of Real-Time Load Hedged in the DAM (Counter-Party Level) ndashJuly 2018

25

0

20

40

60

80

100

120Ja

nM

arM

ay Jul

Sep

Nov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May

July

2013 2014 2015 2016 2017 2018

The dotted lines represent the bounds for major outliers

PUBLIC

DAM and RTM Price Convergence ndash July 2018

26

-20

-10

0

10

20

30

40

50

60Ja

nM

arM

ay Jul

Sep

Nov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

l

2013 2014 2015 2016 2017 2018

Aver

age

DAM

-R

TM S

PP ($

MW

h)

The dotted lines represent the bounds for major outliers

PUBLIC

Day-Ahead Electricity and Ancillary Service Prices (Hourly Average) ndashJuly 2018

27

0

100

200

300

400

500

600

Pric

e ($

MW

h)

Hour Ending

Regulation Up

Regulation Down

Responsive Reserve

Non Spinning Reserve

DAM Power Balance Price(System Lambda)

Ancillary Service prices reflect the opportunity cost of energy

PUBLIC

Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash July 2018

28

0

100

200

300

400

500

600

Pric

e ($

MW

h)

Hour Ending

RTSPP - LZ West

RTSPP - LZ North

RTSPP - LZ South

RTSPP - LZ Houston

DASPP - LZ West

DASPP - LZ North

DASPP - LZ South

DASPP - LZ Houston

Prices reflect relative transmission congestion and system scarcity

PUBLIC

Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash July 2018

29

0

100

200

300

400

500

600

Pric

e ($

MW

h)

Hour Ending

RTSPP - Hub Average

DASPP - Hub Average

Energy prices reflect the risk premium between Day-Ahead amp Real-Time

PUBLIC

DRUC Monthly Summary (Hourly Average) ndash July 2018

30

0

15000

30000

45000

60000

75000

90000

MW

h

Hour Ending

Self Scheduled Capacity

Self Scheduled Ancillary Service Limit

Load Forecast

DRUC Recommended Capacity

31 executions (0 missed)0 published after 160011 minutes average execution time0 Resources committed

PUBLIC

HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash July 2018

31

0

02

04

06

08

1

0

20

40

60

80

100

RTO

RD

PA ($

MW

h)

MW

h

Hour Ending

744 executions (0 missed)8 minutes average execution time1 Resources committed through HRUC or by a Verbal Dispatch Instruction

The dotted line indicates the average RTORDPA

PUBLIC

NonndashSpinning Reserve Service Deployment ndash July 2018

32

Deployment Start Time

Deployment End Time

Deployment Duration (Hours)

Max Deployment(MW) Reason

NA

PUBLIC

CRR Price Convergence ndash July 2018

0

50

100

150

200

250

Mill

ions

$

Cost

Value

Congestion Revenue Right cost in auction convergence with payment in Day-Ahead Market and Real Time Market

33

PUBLIC

Daily Average System Lambda and ORDC Price Adders ndash July 2018

0

50

100

150

200

250

$M

Wh

Day of Month

RTOFFPA

RTORPA

SYSTEM_LAMBDA

34

PUBLIC

ERS Procurement for June 2018 ndash September 2018

TP1 TP2 TP3 TP4 TP5 TP6

Non Weather-Sensitive ERS-10 MW 160562 165996 143324 140708 156699 151138

Non Weather-Sensitive ERS-30 MW 736864 781559 702529 625067 755153 657394

Weather-Sensitive ERS-10 MW 0 0 0 0 0 0

Weather-Sensitive ERS-30 MW 0 0 11850 11850 0 0

Total MW Procured 897426 947555 857703 777625 911852 808532

Clearing Price $201 $185 $2108 $2177 $199 $225

Time Period Time Period Hours

Time Period 1 Hours Ending 0600 - 0800 (50000 am to 80000 am) Monday through Friday except ERCOT Holidays

Time Period 2 Hours Ending 0900 - 1300 (80000 am to 10000 pm) Monday through Friday except ERCOT Holidays

Time Period 3 Hours Ending 1400 - 1600 (10000 pm to 40000 pm) Monday through Friday except ERCOT Holidays

Time Period 4 Hours Ending 1700 - 1900 (40000 pm to 70000 pm) Monday through Friday except ERCOT Holidays

Time Period 5 Hours Ending 2000 - 2200 (70000 pm to 100000 pm) Monday through Friday except ERCOT Holidays Time Period 6 All other hours

35

PUBLIC

Reliability Services ndash July 2018

Reliability Unit Commitment (RUC) $ in Millions

RUC Make-Whole Payments $000

RUC Clawback Charges $000

RUC Commitment Settlement $000

RUC Capacity Short Charges $000

RUC Make-Whole Uplift $000

RUC Commitment Cost Allocation $000

RUC Decommitment Payments $000

Total RUC Allocation to Load $000

In July 2018 there was a credit of $000M allocated to load for RUC compared to bull A credit of $000M in June 2018bull A credit of $003M in July 2017

36

PUBLIC

Ancillary and Other Services ndash July 2018

Ancillary and Other Services $ in Millions

Regulation Up Service $1105

Regulation Down Service $072

Responsive Reserve Service $7177

Non-Spinning Reserve Service $1787

Black Start Service $059

Voltage Services - Reactive Power $000

Voltage Services - Lost Opportunity $000

Total Charges Allocated to Load $10200

In July 2018 Ancillary and Other Services was a charge of $10200M compared to bull A charge of $2001M in June 2018bull A charge of $2322M in July 2017

37

PUBLIC

Real-Time Ancillary Service Imbalance (ORDC) ndash July 2018

In July 2018 Real-Time Ancillary Service Imbalance was a charge to load of $2228K compared to bull A charge of $147K in June 2018bull A charge of $534K in July 2017

Real-Time Ancillary Service Imbalance $ in Thousands

Real-Time AS Imbalance ($2228)

Real-Time Reliability Deployment AS Imbalance $000

Total RTASI Amount Allocated to Load $2228

38

PUBLIC

Energy Settlement ndash July 2018

39

Day-Ahead Market Energy Settlement $ in Millions

Energy Purchases $215396

Point to Point Obligation Purchases $11726

Energy Sales ($212592)

Day-Ahead Congestion Rent $14531

Day-Ahead Market Make-Whole Payments ($001)

Real-Time Market Energy Settlement $ in Millions

Energy Imbalance at a Resource Node ($91963)

Energy Imbalance at a Load Zone $160737

Energy Imbalance at a Hub ($57497)

Net Real-Time Energy Imbalance $11276

Real Time Congestion from Self Schedules $013

Block Load Transfers and DC Ties ($2063)

Total Impact to Revenue Neutrality $9227

Load-Allocated Emergency Energy Payments ($016)

Load-Allocated Base Point Deviation Charges $026

Day-Ahead Market energy settlement activity increased from last month and increased from July 2017

Real-Time Market energy settlement activity increased from last month and increased from July 2017

PUBLIC

Congestion Revenue Rights (CRR) ndash July 2018

$ in Millions

Long-Term Auction ($4026)

Monthly Auction ($1773)

Total Auction Revenue ($5799)

Day-Ahead CRR Settlements ($15797)

Day-Ahead CRR Short-Charges $1885

Day-Ahead CRR Short-Charges Refunded ($899)

Day-Ahead CRR Short-Charges Net $986

Total CRR Funding ($14810)

Day-Ahead Point-to-Point Obligations $11726

Real-Time Point-to-Point Obligations ($10113)

Net Point-to-Point Obligations $1614

Congestion Revenue Rights settlement payments were not fully funded Partial funding to settle the CRR Short Charges was provided from the CRR Balancing Account Fund and the remaining $986M of CRR Short Charges were not refunded The CRR Fund Balance is now $0

Point to Point Obligations settled with a net charge of $1614M compared to a net credit of $1758M last month

40

PUBLIC

CRR Balancing Account Fund ndash July 2018

CRR Balancing Account $ in Millions

Monthly Day-Ahead Congestion Rent $14531

Monthly Day-Ahead CRR Settlements ($15797)

Monthly Day-Ahead CRR Short -Charges $1885

CRR Balancing Account Credit Total $619

Beginning Fund Balance for the Month $275

CRR Balancing Account Credit Total $619

Day-Ahead CRR Short-Charges Refunded ($899)

CRR PTP Option Award Charges $004

Load-Allocated CRR Amount $000

Total Fund Amount $000

41

PUBLIC

Revenue Neutrality ndash July 2018

Revenue Neutrality $ in Millions

Real-Time Energy Imbalance $11276

Real-Time Point to Point Obligation ($10113)

Real-Time Congestion from Self-Schedules $013

DC Tie amp Block Load Transfer ($2063)

Allocation to Load $886

In July 2018 the Revenue Neutrality charge to load was $886M compared to bull A charge of $3046M in June 2018bull A charge of $145M in July 2017

42

PUBLIC

Net Allocation to Load ndash July 2018

Market-Based Allocation $ in Millions

Reliability Unit Commitment $000

Ancillary and Other Services $10200

Real-Time Ancillary Service Imbalance $223

Emergency Energy $016

Base Point Deviation ($026)

CRR Auction Revenue ($5799)

CRR Balancing Account $000

Real-Time Revenue Neutrality $886

Reliability Must Run $000

Monthly Block Load Transfer $000

Total $5500

Fee AllocationERCOT Administrative Fee $2207

Net Allocated to Load $7707

In July 2018 the Net Allocation to load was a charge of $7707M compared to bull A charge of $2152M in June 2018bull A credit of $1363M in July 2017

43

PUBLIC

Advanced Meter Settlement Impacts ndash July 2018

July 2018 At month end settling 72M ESIIDs using Advanced Meter data

July 2018 990 of the load in ERCOT is settled with 15-min interval data (AMS Competitive IDR and NOIE IDR)

44

PUBLIC

ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndashJuly 2018

45

PUBLIC

Retail Transaction Volumes ndash Summary ndash July 2018

46

Transaction Type July 2018 July 2017 July 2018 July 2017

Switches 669909 617300 121926 84059

Acquisition 0 0 0 0

Move - Ins 1667037 1568153 270122 252360

Move - Outs 814580 802779 129820 127073

Continuous Service Agreements (CSA) 395944 283259 40217 55770

Mass Transitions 9033 0 0 0

Total 3556503 3271491 562085 519262

Year-To-Date Transactions Received

Board Presentation Input

Trans Volumes by Month_New

PUBLIC

Retail Transaction Volumes ndash Summary ndash July 2018

SwitchesAcquisitions Move-Ins

Move-Outs Mass Transition

47

Projects Report

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018

20000000$ 2018 Portfolio

Spending Estimate

Projects In FlightOn Hold (Count = 100) 24905011$

Projects Not Yet Started (Count = 10) 1320628$

Projects Completed (Count = 43) 795250$

(7020889)$

TOTAL 20000000$

Project Number Projects in Initiation Phase (Count = 4)

TBD IT Asset RecoveryNPRR842 Study Area Load Information

209-03 Study Network (STNET) Integration288-01 EDI Map and Translator Replacement

Impact Metric TolerancesUnfavorable variances are represented as negative numbers within the report - Green = No more than 49 unfavorable variance - Yellow = Unfavorable variance between 49 and 99 - Red = Unfavorable variance more than 99

Spending Reductions Required to Maintain Capital Budget

2018 Project Funding

Footnotes1 - One or more phases took longer than expected resulting in additional time required

2 - One or more phases required more labor than expected resulting in additional funding andor time required

3 - Project placed on holdNA - Metric not calculated because - it is reported at the parent project level or - it is an administrative project

Project Number Projects in Planning Phase (Count = 8) Phase Start Baseline

Phase FinishApproved

Phase FinishScheduled

Go-Live DateScheduled

Phase Finish

134-02 Privileged Account Management (PAM) Phase 2 882018 12192018 12192018 TBD 12192018 0 10

183-01 CMM-FT GUI Integration 12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs

242-01 Portfolio Reporting Assessment 1182017 12192018 12192018 TBD 12192018 0 21260-01 Information Governance Assessment 10182017 5302018 9192018 TBD 9192018 0 5286-01 Java Platform Assessment 6202018 11212018 11212018 TBD 11212018 0 6287-01 Security Constrained Unit Commitment (SCUC) 882018 2272019 2272019 TBD 2272019 0 -1

NPRR484Revisions to Congestion Revenue Rights Credit Calculations and Payments - Phase 1b 2

12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs

NPRR702Flexible Accounts Payment of Invoices and Disposition of Interest on Cash Collateral

12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs

Schedule Health Budget Health

49

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018Project Number Projects in Execution Phase (Count = 42) Phase Start Baseline Go-

Live DateApproved Go-

Live DateScheduled

Go-Live DateScheduled

Phase Finish

170-01 Enterprise Content Alignment Program 8262015 11152017 8312018 8312018 8312018 0 0170-06 ECAP - ECMS Implementation Phase 1 4252018 11302018 11302018 11302018 11302018 0 3173-02 ERCOT Flight Certification Website 11152017 2282019 2282019 2282019 5312019 0 2181-01 CRR Framework Upgrade 10262016 1022017 11192018 11192018 2272019 0 2

183-01 CMM Tech Refresh 3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

193-01 PMU Tool Evaluation and Implementation 12132017 892018 2152019 2152019 3202019 0 0196-01 GINR Project Status Application Replacement 12212016 9142017 2282019 2282019 3312019 0 1198-02 Reactive Power Coordination PoC 962017 6162018 8152018 8152018 8152018 0 54209-02 Weather Imaging and Line Observation (WILO) 5302018 212019 212019 212019 2272019 0 2210-01 REC Technology Refresh 8302017 3182018 12132018 12132018 1162019 0 3228-01 Enterprise Database Upgrade 882018 1292020 1292020 1292020 1292020 0 17229-01 IT Change and Configuration Management Phase 2 822017 6192018 12132018 12132018 3252019 0 2 -9238-01 Application Authentication Tech Refresh 962017 3192018 12132018 12132018 1302019 0 3239-01 Identity and Access Management 592018 3132019 3132019 3132019 3132019 0 2241-01 AREA - Generation 10112017 3302018 892018 892018 952018 0 -4244-01 Corporate Wireless 11292017 3282018 1252018 1252018 192019 0 9245-01 2017 EPS Metering Enhancements 6272018 892019 892019 892019 9252019 0 1246-01 iTest Data Refresh 12132017 1192018 11152018 11152018 122019 0 25249-01 Secondary Wind Forecasting Service 8302017 2282018 892018 892018 952018 0 0253-01 CIP Recovery Plan Project - Planning Phase 1 1312018 8292018 8292018 8292018 8292018 0 -2

257-01Security Constrained Optimal Powerflow in Study Network Analysis

1262017 10252018 10252018 10252018 1282018 0 19

261-01 Generic Transmission Constraint Calculation 372018 12132018 12132018 12132018 1232019 0 0263-01 Market Simulator 4112018 12132018 12132018 12132018 1302019 0 7265-01 Real-Time Assessment Continuity 1312018 12132018 12132018 12132018 1302019 0 0279-01 Cyber Security Project 24 6272018 10262018 10262018 10262018 11282018 0 0280-01 Quest Software Portfolio Transition 442018 6272018 9262018 9262018 9262018 0 13282-01 Synchronous Condenser Outage Modeling 662018 10252018 10252018 10252018 1252018 0 1Various 2015 CMM NPRRs 2 -18

NPRR519Exemption of ERS-Only QSEs from Collateral and Capitalization Requirements

3152017 5192018 12112018 12112018 12312018 0 See 2015 CMM NPRRs

NPRR620Collateral Requirements for Counter-Parties with No Load or Generation

3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

NPRR660 Remove CRR State Change Adder 3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

Budget HealthSchedule Health

50

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018Project Number Projects in Execution Phase (Count = 42) Phase Start Baseline Go-

Live DateApproved Go-

Live DateScheduled

Go-Live DateScheduled

Phase Finish

NPRR741 Clarifications to TPE and EAL Credit Exposure Calculations 3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

NPRR749 Option Cost for Outstanding CRRs 882018 12132018 12132018 12132018 TBD 0 NA See 2015 CMM NPRRs

NPRR755 Data Agent-Only QSE Registration 3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

NPRR819Modification of Non-Price Error Resettlement Thresholds and Resettlement Clean-Ups

592018 892018 892018 892018 952018 0 36

NPRR833 Modify PTP Obligation Bid Clearing Change 882018 12132018 12132018 12132018 TBD 0 1

NPRR843Short-Term System Adequacy and AS Offer Disclosure Reports Additions

7182018 10252018 10252018 10252018 11282018 0 0

NPRR864 RUC Modifications to Consider Market-Based Solutions 6202018 10252018 10252018 10252018 11282018 0 4SCR777 Bilateral CRR Interface Enhancement 10262016 1022017 11192018 11192018 2272019 0 NA See 181-01

SCR781 RARF Replacement 12202017 4252018 12192018 12192018 12192018 0 3SCR791 Correction of 60-day SCED GRD Disclosure Report 522018 892018 892018 892018 952018 0 39SCR795 Addition of Intra-Hour Wind Forecast to GTBD Calculation 882018 10252018 10252018 10252018 11142018 0 0

Project Number Expedited Projects in Execution (Count = 34)

Project Number Projects in Stabilization (Count = 10) Execution

Phase StartBaseline Go-Live Target

Approved Go-Live Target

ActualGo-Live Date

Scheduled Execution Phase

Finish

NPRR648 Remove References to Flowgate Rights 3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR683 Revision to Available Credit Limit Calculation 3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR743 Revision to MCE to Have a Floor For Load Exposure 3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR760 Calculation of Exposure Variables For Days With No Activity 3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR776 Voltage Set Point Communication 9202017 3192018 452018 452018 952018 0 1

NPRR800Revisions to Credit Exposure Calculations to Use Electricity Futures Market Prices

3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR815Revise the Limitation of Load Resources Providing Responsive Reserve (RRS) Service

3212018 5312018 5312018 5312018 8292018 0 2

209-01 Multi Station Breaker to Breaker One Lines 282017 392018 532018 532018 8222018 0 -1259-01 DC SCADA and Metering Upgrade 10252017 1172018 7252018 7252018 8292018 0 22266-01 Remote Email Access Enhancement 12132017 372018 662018 6192018 9262018 2 -7 2 -9

Schedule Health Budget Health

Budget HealthSchedule Health

51

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018

Project Number Projects On Hold (Count = 2) Forecast

Start DateBaseline

Phase FinishApproved Go-

Live TargetScheduled

Go-Live DateScheduled

Phase Finish

SCR789 Update NMMS Topology Processor to PSSE 34 Capability 0

269-01Document Repository Redesign and Governance Implementation - Phase 1

0

Project Number Projects Completed (Count = 20)

Baseline Execution

Phase Start

Baseline Go-Live Target

Approved Go-Live Target

Actual Go-Live Date

Actual Execution Phase Finish

185-01 Records Management and eDiscovery 12152016 5242017 8292017 8222017 12132017 2 0224-01 TelAlert Replacement 452017 6272017 842017 842017 592018 0 5230-01 SAS Technical Architecture Redesign 312017 12132017 12132017 12132017 6272018 0 2234-01 Reporting Solution Resiliency (RSR) 452017 8232017 11272017 11272017 1102018 0 8240-01 EDI Translator and Mapping Replacement Assessment 4192017 9272017 2282018 TBD 372018 -2 20254-01 Retail Windows Upgrade 10112017 12182017 12182017 1222018 272018 1 -51 65255-01 Settlements Architecture Enhancements 10252017 1112018 1112018 1192018 2142018 1 -10 53258-01 WD Kainos SMART Automation Testing Tool 4112018 642018 642018 662018 7182018 -3 33271-01 Issue Tracking and Resolution Tool Assessment 12132017 4252018 4252018 TBD 522018 1 -5 -1272-01 Operator Training Simulator Black Start GE Effort 1262017 4252018 4252018 4272018 5162018 -1 19274-01 Average Mid-Term Load Forecast 372018 5312018 5312018 5312018 6272018 0 50

NPRR768Revisions to Real-Time On-Line Reliability Deployment Price Adder Categories

372018 5312018 5312018 5312018 6272018 0 16

NPRR778 Modifications to Date Change and Cancellation Evaluation Window 7192017 10292017 12112017 12112017 1312018 0 23

NPRR782Settlement of Infeasible Ancillary Services Due to Transmission Constraints

5242017 8312017 1122017 1122017 1102018 0 20

NPRR808 Three Year CRR Auction 8232017 9182017 9182017 912017 1312018 65 68

NPRR810Applicability of RMR Incentive Factor on Reservation and Transportation Costs Associated with Firm Fuel Supplies

7172017 11122017 3312018 3312018 3312018 0 NA See 233-00

NPRR830 Revision of 4-Coincident Peak Methodology 12132017 262018 262018 262018 372018 0 85

NPRR831 Inclusion of Private Use Networks in Load Zone Price Calculations 822017 1122017 1122017 1122017 2212018 0 33

OBDRR002 ORDC OBD Revisions for PUCT Project 47199 372018 5312018 5312018 5312018 6272018 0 See NPRR768

SCR792 Enhance Communications of BAAL Exceedances 2142018 452018 452018 452018 4252018 0 69

Project Number Expedited Projects Completed (Count = 23)

Budget HealthSchedule Health

Budget HealthSchedule Health

52

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018

Project Number 2018 Projects Not Yet Started (Count = 10) Forecast

Start Date

NPRR858 Provide Complete Current Operating Plan (COP) Data Aug-2018TBD 2018 OS Enhancements Aug-2018TBD Additional Branch Limit for Relays Aug-2018

NPRR817 Create a Panhandle Hub Sep-2018NPRR821 Elimination of the CRR Deration Process Oct-2018NPRR865 Publish RTM Shift Factors for Hubs Load Zones and DC Ties Oct-2018

SCR793SSR Related Telemetry for Transmission Service Provider (TSP) Operators

Oct-2018

ECAP ECAP - ECMS Implementation Phase 2 Oct-2018TBD Job Scheduler Update in CSI Framework Oct-2018TBD Parameter Estimation Oct-2018

53

  • Slide Number 1
  • Slide Number 2
  • Summary ndash July 2018
  • Daily Peak Demand Hourly Average Actual vs Forecast Wind Day-Ahead COPs amp On-Line Capacity at Peak ndash July 2018
  • Actual Wind Output plus Curtailments vs Wind Day-Ahead COPs for All Hours ndash July 2018
  • ERCOTrsquos CPS1 Monthly Performance ndash July 2018
  • Monthly Peak Actual Demand ndash July 2018
  • Monthly Minimum Actual 15-Minute Demand ndash July 2018
  • Day-Ahead Load Forecast Performance ndash July 2018
  • Reliability Unit Commitment (RUC) Capacity by Weather Zone ndash July 2018
  • Generic Transmission Constraints (GTCs) ndash July 2018
  • Advisories and Watches ndash July 2018 Corrected
  • Lake Levels Update ndash August 1 2018
  • Planning Summary ndash July 2018
  • Mapping of Counties to ERCOT Zones ndash July 2018
  • Cumulative MW Capacity of Interconnection Requests by Zone ndashJuly 2018
  • Cumulative MW Capacity of Interconnection Requests by Zone ndashJuly 2018
  • Cumulative MW Capacity of Interconnection Requests by Zone ndashJuly 2018
  • Wind Generation ndash July 2018
  • Solar Generation ndash July 2018
  • Generation Interconnection Activity by Fuel ndash July 2018
  • Generation Interconnection Activity by Project Phase ndash July 2018
  • Slide Number 23
  • Day-Ahead Schedule (Hourly Average) ndash July 2018
  • Percentage of Real-Time Load Hedged in the DAM (Counter-Party Level) ndash July 2018
  • DAM and RTM Price Convergence ndash July 2018
  • Day-Ahead Electricity and Ancillary Service Prices (Hourly Average) ndash July 2018
  • Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash July 2018
  • Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash July 2018
  • DRUC Monthly Summary (Hourly Average) ndash July 2018
  • HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash July 2018
  • NonndashSpinning Reserve Service Deployment ndash July 2018
  • CRR Price Convergence ndash July 2018
  • Daily Average System Lambda and ORDC Price Adders ndash July 2018
  • ERS Procurement for June 2018 ndash September 2018
  • Reliability Services ndash July 2018
  • Ancillary and Other Services ndash July 2018
  • Real-Time Ancillary Service Imbalance (ORDC) ndash July 2018
  • Energy Settlement ndash July 2018
  • Congestion Revenue Rights (CRR) ndash July 2018
  • CRR Balancing Account Fund ndash July 2018
  • Revenue Neutrality ndash July 2018
  • Net Allocation to Load ndash July 2018
  • Advanced Meter Settlement Impacts ndash July 2018
  • ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndash July 2018
  • Retail Transaction Volumes ndash Summary ndash July 2018
  • Retail Transaction Volumes ndash Summary ndash July 2018
  • Slide Number 48
  • ERCOT Portfolio Stoplight Report ndash July 2018
  • ERCOT Portfolio Stoplight Report ndash July 2018
  • ERCOT Portfolio Stoplight Report ndash July 2018
  • ERCOT Portfolio Stoplight Report ndash July 2018
  • ERCOT Portfolio Stoplight Report ndash July 2018
Retail Transactions Summary
July 2018 June 2018 May 2018 April 2018 March 2018 February 2018 January 2018 December 2017 November 2017 October 2017 September 2017 August 2017 July 2017 June 2017 May 2017 April 2017 March 2017 February 2017 January 2017 December 2016 November 2016 October 2016 September 2016 August 2016 July 2016 June 2016 May 2016 April 2016 March 2016 February 2016 January 2016 December 2015 November 2015 October 2015 September 2015 August 2015 July 2015 June 2015 May 2015 April 2015 March 2015 February 2015 January 2015 December 2014 November 2014 October 2014 September 2014 August 2014 July 2014 June 2014 May 2014 April 2014 March 2014 February 2014 January 2014 December 2013 November 2013 October 2013 September 2013 August 2013 July 2013 June 2013 May 2013 April 2013 March 2013 February 2013 January 2013 Grand total
814_01 - Switch Received 121926 109653 96828 81291 95159 76119 88933 60560 77860 78096 79502 84134 84059 108784 130828 71769 67845 66875 87140 66556 56202 64452 67323 86656 82923 86376 75323 70300 76235 68057 63954 61486 52887 65276 70342 81674 91211 102661 86229 81255 79997 73394 72885 71072 67080 110465 175164 89677 99568 101490 111077 91983 93887 71130 86953 69691 55957 166882 82415 93194 102562 103756 116086 78919 68950 64329 67116 1321827
Difference from previous month 12273 12825 15537 (13868) 19040 (12814) 28373 (17300) (236) (1406) (4632) 75 (24725) (22044) 59059 3924 970 (20265) 20584 10354 (8250) (2871) (19333) 3733 (3453) 11053 5023 (5935) 8178 4103 2468 8599 (12389) (5066) (11332) (9537) (11450) 16432 4974 1258 6603 509 1813 3992 (43385) (64699) 85487 (9891) (1922) (9587) 19094 (1904) 22757 (15823) 17262 13734 (110925) 84467 (10779) (9368) (1194) (12330) 37167 9969 4621 (2787)
814_16 - Move - Ins Received 270122 257125 244431 225380 224289 215281 230409 238340 207921 236397 244511 258046 252360 257759 237611 197865 217962 201984 202612 196236 201714 220958 231999 268781 241844 247481 214383 199804 218245 212474 193716 189862 181098 215908 229405 248124 263233 247089 208166 207932 215950 197765 198025 193973 178624 226283 231418 243482 251957 233679 223201 258649 214724 208160 207059 172981 178671 233469 216550 255967 249114 220397 216982 204412 197200 191955 194507 3162148
Difference from previous month 12997 12694 19051 1091 9008 (15128) (7931) 30419 (28476) (8114) (13535) 5686 (5399) 20148 39746 (20097) 15978 (628) 6376 (5478) (19244) (11041) (36782) 26937 (5637) 33098 14579 (18441) 5771 18758 3854 8764 (34810) (13497) (18719) (15109) 16144 38923 234 (8018) 18185 (260) 4052 15349 (47659) (5135) (12064) (8475) 18278 10478 (35448) 43925 6564 1101 34078 (5690) (54798) 16919 (39417) 6853 28717 3415 12570 7212 5245 (2552)
814_24 - MVO and MVO to CSA Received 129820 125861 124403 113795 108753 100127 111821 144987 100830 116519 129103 128104 127073 133582 127218 102055 111459 100285 101107 96289 100578 109493 114094 133170 122932 129025 118022 103789 109278 103747 96628 99552 96214 109578 117949 123894 133905 133855 114675 108275 108859 94864 98233 97901 89578 111857 115918 121662 131607 126785 119107 107956 107266 99428 104273 93385 93977 115469 115524 129594 135196 121446 120049 111598 106467 102429 104399 1660500
814_10 - DTP Mass Acquisition Received - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0
814_10 - DTP Mass Transition Received - 0 - 0 9033 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 639 - 0 - 0 4975 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0
814_18 - CSA AdditionDeletes Received 40217 62083 99016 55581 46720 42587 49740 47725 31726 52888 41597 40616 55770 43745 52139 26702 21791 39082 44030 38884 39856 31786 33061 42622 48489 64178 50499 59475 59400 48536 42179 40351 34796 34420 54677 35078 49489 59611 39384 44247 44577 35386 40420 54831 43550 45039 44268 40405 57954 64408 65032 80184 70310 41156 34811 46680 50347 71847 48606 52585 50867 62747 59763 34925 40977 40389 41227 747237
Total 562085 554722 573711 476047 474921 434114 480903 491612 418337 483900 494713 510900 519262 543870 547796 398391 419057 408226 434889 397965 398350 426689 446477 531229 496188 527060 458227 433368 463158 432814 396477 391251 364995 425182 472373 488770 537838 543216 448454 441709 449383 401409 409563 417777 378832 493644 566768 495865 541086 526362 523392 538772 486187 419874 433096 382737 378952 587667 463095 531340 537739 508346 512880 429854 413594 399102 407249 6891712
Counts from Monthly Retail Transaction report
To do
Break Out 814_10s - AQ and MT
Break Out 814_18 Additions from Deletes
Year-To-Date Transactions Received
Transaction Type July 2018 July 2017 July 2018 July 2017
Switches 669909 617300 121926 84059
Acquisition 0 0 0 0
Move - Ins 1667037 1568153 270122 252360
Move - Outs 814580 802779 129820 127073
Continuous Service Agreements (CSA) 395944 283259 40217 55770
Mass Transitions 9033 0 0 0
Total 3556503 3271491 562085 519262
There has been a change since this was created
Mass Acquisition has been broken out of Mass Transition
Page 5: ERCOT Monthly Operational Overvie · ERCOT Monthly Operational Overview (July 2018) Revised 08.22.18. ERCOT Public. August 15, 2018

PUBLIC

Actual Wind Output plus Curtailments vs Wind Day-Ahead COPs for All Hours ndash July 2018

5

PUBLIC

ERCOTrsquos CPS1 Monthly Performance ndash July 2018

CPS1 12 Month Rolling Average = 17641

6

PUBLIC

Monthly Peak Actual Demand ndash July 2018

Preliminary for latest two months of the current year

Monthly Peak Actual Demand = 73308 MW 071918 HE 1700

7

PUBLIC

Monthly Minimum Actual 15-Minute Demand ndash July 2018

Preliminary for latest two months of the current year

8

PUBLIC

Day-Ahead Load Forecast Performance ndash July 2018

Mean Absolute Percent Error (MAPE) for ERCOT Mid-Term Load Forecast (MTLF) Run at 1400 Day Ahead

2015MAPE

2016MAPE

2017MAPE

2018MAPE

July 2018MAPE

AverageAnnual MAPE

286 262 255 238 197

LowestMonthly MAPE

189 194 169 165LowestDailyMAPE

055Jul 16

HighestMonthly MAPE

381 386 407 366

Highest DailyMAPE

524Jul 4

9

PUBLIC

Reliability Unit Commitment (RUC) Capacity by Weather Zone ndashJuly 2018

10

PUBLIC

Generic Transmission Constraints (GTCs) ndash July 2018

GTC A transmission flow limit more constraining than a Transmission Elementrsquos normal limit established to constrain flow between geographic areas of the ERCOT Transmission System that is used to enforce stability and voltage constraints that cannot be modeled directly in ERCOTrsquos transmission security analysis applications

Note This table lists how many times a constraint has been activated to avoid exceeding a GTC limit it does not imply an exceedance of the GTC occurred

GTCsJul-17 May-18 Jun-18 Jul-18 Last 12 Months Total

DaysDays Days Days DaysGTCs GTCs GTCs GTCs (Aug 17 ndash Jul 18)

North ndash Houston 1 0 1 0 8

Valley Import 0 4 0 1 15

Panhandle 17 27 23 5 261

Red Tap 0 0 0 0 0North Edinburg ndash

Lobo 0 0 0 0 1Nelson Sharpe ndash

Rio Hondo - 0 2 0 65

East Texas - 0 0 0 16

11

PUBLIC

Advisories and Watches ndash July 2018 Corrected

bull Two OCNs issued for extreme hot weatherndash Issued 714 and 720

bull Four Advisories issued due to Physical Responsive Capability being below 3000 MWndash Issued 718 719 725 and 728

bull One OCN issued due to projected reserve capacity shortage for hours ending 1400 through 1900 ERCOT requested all QSEs to update their COPs

ndash Issued 726

bull One Watch issued due to the post-contingency loss of the Bevo to Asherton 138 kV (SBEVASH8) overloads the Big Wells to Cotulla Sub 69 kV and curtailment of Eagle Pass DC-Tie exports to CENACE

ndash Issued 717

bull Three Watches issued due to the post-contingency loss of Bentsen to Railroad 138 kV (SBENRAI8) overloads South Mission to Railroad 138 kV and curtailment of Railroad DC-Tie exports to CENACE

ndash Issued 723

bull One Watch issued for the de-rate of the Railroad DC-Tie and curtailment of the DC-Tie exports to CENACE

ndash Issued 731

12

PUBLIC

Lake Levels Update ndash August 1 2018

13

PUBLIC

Planning Summary ndash July 2018

bull ERCOT is currently tracking 404 active generation interconnection requests totaling 79852 MW This includes 37697 MW of wind generation

bull ERCOT is currently reviewing proposed transmission improvements with a total cost of $6035 million

bull Transmission Projects endorsed in 2018 total $3935 million

bull All projects (in engineering routing licensing and construction) total approximately $649 billion (as of June 1 2018)

bull Transmission Projects energized in 2018 total about $1120 billion (as of June 1 2018)

14

PUBLIC

Mapping of Counties to ERCOT Zones ndash July 2018

15

PUBLIC

Cumulative MW Capacity of Interconnection Requests by Zone ndashJuly 2018

16

PUBLIC

Cumulative MW Capacity of Interconnection Requests by Zone ndashJuly 2018

17

PUBLIC

Cumulative MW Capacity of Interconnection Requests by Zone ndashJuly 2018

18

PUBLIC

Wind Generation ndash July 2018

19

PUBLIC

Solar Generation ndash July 2018

20

PUBLIC

Generation Interconnection Activity by Fuel ndash July 2018

21

PUBLIC

Generation Interconnection Activity by Project Phase ndash July 2018

22

Market Operations

PUBLIC

Day-Ahead Schedule (Hourly Average) ndash July 2018

24

0

10000

20000

30000

40000

50000

60000

70000

80000

MW

Hour Ending

Scheduled Energy Only OfferScheduled Three-part OfferDAM Energy PurchaseRT System Load

Liquidity and activity are normal in the Day-Ahead Market

PUBLIC

Percentage of Real-Time Load Hedged in the DAM (Counter-Party Level) ndashJuly 2018

25

0

20

40

60

80

100

120Ja

nM

arM

ay Jul

Sep

Nov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May

July

2013 2014 2015 2016 2017 2018

The dotted lines represent the bounds for major outliers

PUBLIC

DAM and RTM Price Convergence ndash July 2018

26

-20

-10

0

10

20

30

40

50

60Ja

nM

arM

ay Jul

Sep

Nov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

l

2013 2014 2015 2016 2017 2018

Aver

age

DAM

-R

TM S

PP ($

MW

h)

The dotted lines represent the bounds for major outliers

PUBLIC

Day-Ahead Electricity and Ancillary Service Prices (Hourly Average) ndashJuly 2018

27

0

100

200

300

400

500

600

Pric

e ($

MW

h)

Hour Ending

Regulation Up

Regulation Down

Responsive Reserve

Non Spinning Reserve

DAM Power Balance Price(System Lambda)

Ancillary Service prices reflect the opportunity cost of energy

PUBLIC

Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash July 2018

28

0

100

200

300

400

500

600

Pric

e ($

MW

h)

Hour Ending

RTSPP - LZ West

RTSPP - LZ North

RTSPP - LZ South

RTSPP - LZ Houston

DASPP - LZ West

DASPP - LZ North

DASPP - LZ South

DASPP - LZ Houston

Prices reflect relative transmission congestion and system scarcity

PUBLIC

Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash July 2018

29

0

100

200

300

400

500

600

Pric

e ($

MW

h)

Hour Ending

RTSPP - Hub Average

DASPP - Hub Average

Energy prices reflect the risk premium between Day-Ahead amp Real-Time

PUBLIC

DRUC Monthly Summary (Hourly Average) ndash July 2018

30

0

15000

30000

45000

60000

75000

90000

MW

h

Hour Ending

Self Scheduled Capacity

Self Scheduled Ancillary Service Limit

Load Forecast

DRUC Recommended Capacity

31 executions (0 missed)0 published after 160011 minutes average execution time0 Resources committed

PUBLIC

HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash July 2018

31

0

02

04

06

08

1

0

20

40

60

80

100

RTO

RD

PA ($

MW

h)

MW

h

Hour Ending

744 executions (0 missed)8 minutes average execution time1 Resources committed through HRUC or by a Verbal Dispatch Instruction

The dotted line indicates the average RTORDPA

PUBLIC

NonndashSpinning Reserve Service Deployment ndash July 2018

32

Deployment Start Time

Deployment End Time

Deployment Duration (Hours)

Max Deployment(MW) Reason

NA

PUBLIC

CRR Price Convergence ndash July 2018

0

50

100

150

200

250

Mill

ions

$

Cost

Value

Congestion Revenue Right cost in auction convergence with payment in Day-Ahead Market and Real Time Market

33

PUBLIC

Daily Average System Lambda and ORDC Price Adders ndash July 2018

0

50

100

150

200

250

$M

Wh

Day of Month

RTOFFPA

RTORPA

SYSTEM_LAMBDA

34

PUBLIC

ERS Procurement for June 2018 ndash September 2018

TP1 TP2 TP3 TP4 TP5 TP6

Non Weather-Sensitive ERS-10 MW 160562 165996 143324 140708 156699 151138

Non Weather-Sensitive ERS-30 MW 736864 781559 702529 625067 755153 657394

Weather-Sensitive ERS-10 MW 0 0 0 0 0 0

Weather-Sensitive ERS-30 MW 0 0 11850 11850 0 0

Total MW Procured 897426 947555 857703 777625 911852 808532

Clearing Price $201 $185 $2108 $2177 $199 $225

Time Period Time Period Hours

Time Period 1 Hours Ending 0600 - 0800 (50000 am to 80000 am) Monday through Friday except ERCOT Holidays

Time Period 2 Hours Ending 0900 - 1300 (80000 am to 10000 pm) Monday through Friday except ERCOT Holidays

Time Period 3 Hours Ending 1400 - 1600 (10000 pm to 40000 pm) Monday through Friday except ERCOT Holidays

Time Period 4 Hours Ending 1700 - 1900 (40000 pm to 70000 pm) Monday through Friday except ERCOT Holidays

Time Period 5 Hours Ending 2000 - 2200 (70000 pm to 100000 pm) Monday through Friday except ERCOT Holidays Time Period 6 All other hours

35

PUBLIC

Reliability Services ndash July 2018

Reliability Unit Commitment (RUC) $ in Millions

RUC Make-Whole Payments $000

RUC Clawback Charges $000

RUC Commitment Settlement $000

RUC Capacity Short Charges $000

RUC Make-Whole Uplift $000

RUC Commitment Cost Allocation $000

RUC Decommitment Payments $000

Total RUC Allocation to Load $000

In July 2018 there was a credit of $000M allocated to load for RUC compared to bull A credit of $000M in June 2018bull A credit of $003M in July 2017

36

PUBLIC

Ancillary and Other Services ndash July 2018

Ancillary and Other Services $ in Millions

Regulation Up Service $1105

Regulation Down Service $072

Responsive Reserve Service $7177

Non-Spinning Reserve Service $1787

Black Start Service $059

Voltage Services - Reactive Power $000

Voltage Services - Lost Opportunity $000

Total Charges Allocated to Load $10200

In July 2018 Ancillary and Other Services was a charge of $10200M compared to bull A charge of $2001M in June 2018bull A charge of $2322M in July 2017

37

PUBLIC

Real-Time Ancillary Service Imbalance (ORDC) ndash July 2018

In July 2018 Real-Time Ancillary Service Imbalance was a charge to load of $2228K compared to bull A charge of $147K in June 2018bull A charge of $534K in July 2017

Real-Time Ancillary Service Imbalance $ in Thousands

Real-Time AS Imbalance ($2228)

Real-Time Reliability Deployment AS Imbalance $000

Total RTASI Amount Allocated to Load $2228

38

PUBLIC

Energy Settlement ndash July 2018

39

Day-Ahead Market Energy Settlement $ in Millions

Energy Purchases $215396

Point to Point Obligation Purchases $11726

Energy Sales ($212592)

Day-Ahead Congestion Rent $14531

Day-Ahead Market Make-Whole Payments ($001)

Real-Time Market Energy Settlement $ in Millions

Energy Imbalance at a Resource Node ($91963)

Energy Imbalance at a Load Zone $160737

Energy Imbalance at a Hub ($57497)

Net Real-Time Energy Imbalance $11276

Real Time Congestion from Self Schedules $013

Block Load Transfers and DC Ties ($2063)

Total Impact to Revenue Neutrality $9227

Load-Allocated Emergency Energy Payments ($016)

Load-Allocated Base Point Deviation Charges $026

Day-Ahead Market energy settlement activity increased from last month and increased from July 2017

Real-Time Market energy settlement activity increased from last month and increased from July 2017

PUBLIC

Congestion Revenue Rights (CRR) ndash July 2018

$ in Millions

Long-Term Auction ($4026)

Monthly Auction ($1773)

Total Auction Revenue ($5799)

Day-Ahead CRR Settlements ($15797)

Day-Ahead CRR Short-Charges $1885

Day-Ahead CRR Short-Charges Refunded ($899)

Day-Ahead CRR Short-Charges Net $986

Total CRR Funding ($14810)

Day-Ahead Point-to-Point Obligations $11726

Real-Time Point-to-Point Obligations ($10113)

Net Point-to-Point Obligations $1614

Congestion Revenue Rights settlement payments were not fully funded Partial funding to settle the CRR Short Charges was provided from the CRR Balancing Account Fund and the remaining $986M of CRR Short Charges were not refunded The CRR Fund Balance is now $0

Point to Point Obligations settled with a net charge of $1614M compared to a net credit of $1758M last month

40

PUBLIC

CRR Balancing Account Fund ndash July 2018

CRR Balancing Account $ in Millions

Monthly Day-Ahead Congestion Rent $14531

Monthly Day-Ahead CRR Settlements ($15797)

Monthly Day-Ahead CRR Short -Charges $1885

CRR Balancing Account Credit Total $619

Beginning Fund Balance for the Month $275

CRR Balancing Account Credit Total $619

Day-Ahead CRR Short-Charges Refunded ($899)

CRR PTP Option Award Charges $004

Load-Allocated CRR Amount $000

Total Fund Amount $000

41

PUBLIC

Revenue Neutrality ndash July 2018

Revenue Neutrality $ in Millions

Real-Time Energy Imbalance $11276

Real-Time Point to Point Obligation ($10113)

Real-Time Congestion from Self-Schedules $013

DC Tie amp Block Load Transfer ($2063)

Allocation to Load $886

In July 2018 the Revenue Neutrality charge to load was $886M compared to bull A charge of $3046M in June 2018bull A charge of $145M in July 2017

42

PUBLIC

Net Allocation to Load ndash July 2018

Market-Based Allocation $ in Millions

Reliability Unit Commitment $000

Ancillary and Other Services $10200

Real-Time Ancillary Service Imbalance $223

Emergency Energy $016

Base Point Deviation ($026)

CRR Auction Revenue ($5799)

CRR Balancing Account $000

Real-Time Revenue Neutrality $886

Reliability Must Run $000

Monthly Block Load Transfer $000

Total $5500

Fee AllocationERCOT Administrative Fee $2207

Net Allocated to Load $7707

In July 2018 the Net Allocation to load was a charge of $7707M compared to bull A charge of $2152M in June 2018bull A credit of $1363M in July 2017

43

PUBLIC

Advanced Meter Settlement Impacts ndash July 2018

July 2018 At month end settling 72M ESIIDs using Advanced Meter data

July 2018 990 of the load in ERCOT is settled with 15-min interval data (AMS Competitive IDR and NOIE IDR)

44

PUBLIC

ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndashJuly 2018

45

PUBLIC

Retail Transaction Volumes ndash Summary ndash July 2018

46

Transaction Type July 2018 July 2017 July 2018 July 2017

Switches 669909 617300 121926 84059

Acquisition 0 0 0 0

Move - Ins 1667037 1568153 270122 252360

Move - Outs 814580 802779 129820 127073

Continuous Service Agreements (CSA) 395944 283259 40217 55770

Mass Transitions 9033 0 0 0

Total 3556503 3271491 562085 519262

Year-To-Date Transactions Received

Board Presentation Input

Trans Volumes by Month_New

PUBLIC

Retail Transaction Volumes ndash Summary ndash July 2018

SwitchesAcquisitions Move-Ins

Move-Outs Mass Transition

47

Projects Report

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018

20000000$ 2018 Portfolio

Spending Estimate

Projects In FlightOn Hold (Count = 100) 24905011$

Projects Not Yet Started (Count = 10) 1320628$

Projects Completed (Count = 43) 795250$

(7020889)$

TOTAL 20000000$

Project Number Projects in Initiation Phase (Count = 4)

TBD IT Asset RecoveryNPRR842 Study Area Load Information

209-03 Study Network (STNET) Integration288-01 EDI Map and Translator Replacement

Impact Metric TolerancesUnfavorable variances are represented as negative numbers within the report - Green = No more than 49 unfavorable variance - Yellow = Unfavorable variance between 49 and 99 - Red = Unfavorable variance more than 99

Spending Reductions Required to Maintain Capital Budget

2018 Project Funding

Footnotes1 - One or more phases took longer than expected resulting in additional time required

2 - One or more phases required more labor than expected resulting in additional funding andor time required

3 - Project placed on holdNA - Metric not calculated because - it is reported at the parent project level or - it is an administrative project

Project Number Projects in Planning Phase (Count = 8) Phase Start Baseline

Phase FinishApproved

Phase FinishScheduled

Go-Live DateScheduled

Phase Finish

134-02 Privileged Account Management (PAM) Phase 2 882018 12192018 12192018 TBD 12192018 0 10

183-01 CMM-FT GUI Integration 12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs

242-01 Portfolio Reporting Assessment 1182017 12192018 12192018 TBD 12192018 0 21260-01 Information Governance Assessment 10182017 5302018 9192018 TBD 9192018 0 5286-01 Java Platform Assessment 6202018 11212018 11212018 TBD 11212018 0 6287-01 Security Constrained Unit Commitment (SCUC) 882018 2272019 2272019 TBD 2272019 0 -1

NPRR484Revisions to Congestion Revenue Rights Credit Calculations and Payments - Phase 1b 2

12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs

NPRR702Flexible Accounts Payment of Invoices and Disposition of Interest on Cash Collateral

12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs

Schedule Health Budget Health

49

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018Project Number Projects in Execution Phase (Count = 42) Phase Start Baseline Go-

Live DateApproved Go-

Live DateScheduled

Go-Live DateScheduled

Phase Finish

170-01 Enterprise Content Alignment Program 8262015 11152017 8312018 8312018 8312018 0 0170-06 ECAP - ECMS Implementation Phase 1 4252018 11302018 11302018 11302018 11302018 0 3173-02 ERCOT Flight Certification Website 11152017 2282019 2282019 2282019 5312019 0 2181-01 CRR Framework Upgrade 10262016 1022017 11192018 11192018 2272019 0 2

183-01 CMM Tech Refresh 3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

193-01 PMU Tool Evaluation and Implementation 12132017 892018 2152019 2152019 3202019 0 0196-01 GINR Project Status Application Replacement 12212016 9142017 2282019 2282019 3312019 0 1198-02 Reactive Power Coordination PoC 962017 6162018 8152018 8152018 8152018 0 54209-02 Weather Imaging and Line Observation (WILO) 5302018 212019 212019 212019 2272019 0 2210-01 REC Technology Refresh 8302017 3182018 12132018 12132018 1162019 0 3228-01 Enterprise Database Upgrade 882018 1292020 1292020 1292020 1292020 0 17229-01 IT Change and Configuration Management Phase 2 822017 6192018 12132018 12132018 3252019 0 2 -9238-01 Application Authentication Tech Refresh 962017 3192018 12132018 12132018 1302019 0 3239-01 Identity and Access Management 592018 3132019 3132019 3132019 3132019 0 2241-01 AREA - Generation 10112017 3302018 892018 892018 952018 0 -4244-01 Corporate Wireless 11292017 3282018 1252018 1252018 192019 0 9245-01 2017 EPS Metering Enhancements 6272018 892019 892019 892019 9252019 0 1246-01 iTest Data Refresh 12132017 1192018 11152018 11152018 122019 0 25249-01 Secondary Wind Forecasting Service 8302017 2282018 892018 892018 952018 0 0253-01 CIP Recovery Plan Project - Planning Phase 1 1312018 8292018 8292018 8292018 8292018 0 -2

257-01Security Constrained Optimal Powerflow in Study Network Analysis

1262017 10252018 10252018 10252018 1282018 0 19

261-01 Generic Transmission Constraint Calculation 372018 12132018 12132018 12132018 1232019 0 0263-01 Market Simulator 4112018 12132018 12132018 12132018 1302019 0 7265-01 Real-Time Assessment Continuity 1312018 12132018 12132018 12132018 1302019 0 0279-01 Cyber Security Project 24 6272018 10262018 10262018 10262018 11282018 0 0280-01 Quest Software Portfolio Transition 442018 6272018 9262018 9262018 9262018 0 13282-01 Synchronous Condenser Outage Modeling 662018 10252018 10252018 10252018 1252018 0 1Various 2015 CMM NPRRs 2 -18

NPRR519Exemption of ERS-Only QSEs from Collateral and Capitalization Requirements

3152017 5192018 12112018 12112018 12312018 0 See 2015 CMM NPRRs

NPRR620Collateral Requirements for Counter-Parties with No Load or Generation

3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

NPRR660 Remove CRR State Change Adder 3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

Budget HealthSchedule Health

50

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018Project Number Projects in Execution Phase (Count = 42) Phase Start Baseline Go-

Live DateApproved Go-

Live DateScheduled

Go-Live DateScheduled

Phase Finish

NPRR741 Clarifications to TPE and EAL Credit Exposure Calculations 3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

NPRR749 Option Cost for Outstanding CRRs 882018 12132018 12132018 12132018 TBD 0 NA See 2015 CMM NPRRs

NPRR755 Data Agent-Only QSE Registration 3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

NPRR819Modification of Non-Price Error Resettlement Thresholds and Resettlement Clean-Ups

592018 892018 892018 892018 952018 0 36

NPRR833 Modify PTP Obligation Bid Clearing Change 882018 12132018 12132018 12132018 TBD 0 1

NPRR843Short-Term System Adequacy and AS Offer Disclosure Reports Additions

7182018 10252018 10252018 10252018 11282018 0 0

NPRR864 RUC Modifications to Consider Market-Based Solutions 6202018 10252018 10252018 10252018 11282018 0 4SCR777 Bilateral CRR Interface Enhancement 10262016 1022017 11192018 11192018 2272019 0 NA See 181-01

SCR781 RARF Replacement 12202017 4252018 12192018 12192018 12192018 0 3SCR791 Correction of 60-day SCED GRD Disclosure Report 522018 892018 892018 892018 952018 0 39SCR795 Addition of Intra-Hour Wind Forecast to GTBD Calculation 882018 10252018 10252018 10252018 11142018 0 0

Project Number Expedited Projects in Execution (Count = 34)

Project Number Projects in Stabilization (Count = 10) Execution

Phase StartBaseline Go-Live Target

Approved Go-Live Target

ActualGo-Live Date

Scheduled Execution Phase

Finish

NPRR648 Remove References to Flowgate Rights 3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR683 Revision to Available Credit Limit Calculation 3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR743 Revision to MCE to Have a Floor For Load Exposure 3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR760 Calculation of Exposure Variables For Days With No Activity 3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR776 Voltage Set Point Communication 9202017 3192018 452018 452018 952018 0 1

NPRR800Revisions to Credit Exposure Calculations to Use Electricity Futures Market Prices

3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR815Revise the Limitation of Load Resources Providing Responsive Reserve (RRS) Service

3212018 5312018 5312018 5312018 8292018 0 2

209-01 Multi Station Breaker to Breaker One Lines 282017 392018 532018 532018 8222018 0 -1259-01 DC SCADA and Metering Upgrade 10252017 1172018 7252018 7252018 8292018 0 22266-01 Remote Email Access Enhancement 12132017 372018 662018 6192018 9262018 2 -7 2 -9

Schedule Health Budget Health

Budget HealthSchedule Health

51

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018

Project Number Projects On Hold (Count = 2) Forecast

Start DateBaseline

Phase FinishApproved Go-

Live TargetScheduled

Go-Live DateScheduled

Phase Finish

SCR789 Update NMMS Topology Processor to PSSE 34 Capability 0

269-01Document Repository Redesign and Governance Implementation - Phase 1

0

Project Number Projects Completed (Count = 20)

Baseline Execution

Phase Start

Baseline Go-Live Target

Approved Go-Live Target

Actual Go-Live Date

Actual Execution Phase Finish

185-01 Records Management and eDiscovery 12152016 5242017 8292017 8222017 12132017 2 0224-01 TelAlert Replacement 452017 6272017 842017 842017 592018 0 5230-01 SAS Technical Architecture Redesign 312017 12132017 12132017 12132017 6272018 0 2234-01 Reporting Solution Resiliency (RSR) 452017 8232017 11272017 11272017 1102018 0 8240-01 EDI Translator and Mapping Replacement Assessment 4192017 9272017 2282018 TBD 372018 -2 20254-01 Retail Windows Upgrade 10112017 12182017 12182017 1222018 272018 1 -51 65255-01 Settlements Architecture Enhancements 10252017 1112018 1112018 1192018 2142018 1 -10 53258-01 WD Kainos SMART Automation Testing Tool 4112018 642018 642018 662018 7182018 -3 33271-01 Issue Tracking and Resolution Tool Assessment 12132017 4252018 4252018 TBD 522018 1 -5 -1272-01 Operator Training Simulator Black Start GE Effort 1262017 4252018 4252018 4272018 5162018 -1 19274-01 Average Mid-Term Load Forecast 372018 5312018 5312018 5312018 6272018 0 50

NPRR768Revisions to Real-Time On-Line Reliability Deployment Price Adder Categories

372018 5312018 5312018 5312018 6272018 0 16

NPRR778 Modifications to Date Change and Cancellation Evaluation Window 7192017 10292017 12112017 12112017 1312018 0 23

NPRR782Settlement of Infeasible Ancillary Services Due to Transmission Constraints

5242017 8312017 1122017 1122017 1102018 0 20

NPRR808 Three Year CRR Auction 8232017 9182017 9182017 912017 1312018 65 68

NPRR810Applicability of RMR Incentive Factor on Reservation and Transportation Costs Associated with Firm Fuel Supplies

7172017 11122017 3312018 3312018 3312018 0 NA See 233-00

NPRR830 Revision of 4-Coincident Peak Methodology 12132017 262018 262018 262018 372018 0 85

NPRR831 Inclusion of Private Use Networks in Load Zone Price Calculations 822017 1122017 1122017 1122017 2212018 0 33

OBDRR002 ORDC OBD Revisions for PUCT Project 47199 372018 5312018 5312018 5312018 6272018 0 See NPRR768

SCR792 Enhance Communications of BAAL Exceedances 2142018 452018 452018 452018 4252018 0 69

Project Number Expedited Projects Completed (Count = 23)

Budget HealthSchedule Health

Budget HealthSchedule Health

52

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018

Project Number 2018 Projects Not Yet Started (Count = 10) Forecast

Start Date

NPRR858 Provide Complete Current Operating Plan (COP) Data Aug-2018TBD 2018 OS Enhancements Aug-2018TBD Additional Branch Limit for Relays Aug-2018

NPRR817 Create a Panhandle Hub Sep-2018NPRR821 Elimination of the CRR Deration Process Oct-2018NPRR865 Publish RTM Shift Factors for Hubs Load Zones and DC Ties Oct-2018

SCR793SSR Related Telemetry for Transmission Service Provider (TSP) Operators

Oct-2018

ECAP ECAP - ECMS Implementation Phase 2 Oct-2018TBD Job Scheduler Update in CSI Framework Oct-2018TBD Parameter Estimation Oct-2018

53

  • Slide Number 1
  • Slide Number 2
  • Summary ndash July 2018
  • Daily Peak Demand Hourly Average Actual vs Forecast Wind Day-Ahead COPs amp On-Line Capacity at Peak ndash July 2018
  • Actual Wind Output plus Curtailments vs Wind Day-Ahead COPs for All Hours ndash July 2018
  • ERCOTrsquos CPS1 Monthly Performance ndash July 2018
  • Monthly Peak Actual Demand ndash July 2018
  • Monthly Minimum Actual 15-Minute Demand ndash July 2018
  • Day-Ahead Load Forecast Performance ndash July 2018
  • Reliability Unit Commitment (RUC) Capacity by Weather Zone ndash July 2018
  • Generic Transmission Constraints (GTCs) ndash July 2018
  • Advisories and Watches ndash July 2018 Corrected
  • Lake Levels Update ndash August 1 2018
  • Planning Summary ndash July 2018
  • Mapping of Counties to ERCOT Zones ndash July 2018
  • Cumulative MW Capacity of Interconnection Requests by Zone ndashJuly 2018
  • Cumulative MW Capacity of Interconnection Requests by Zone ndashJuly 2018
  • Cumulative MW Capacity of Interconnection Requests by Zone ndashJuly 2018
  • Wind Generation ndash July 2018
  • Solar Generation ndash July 2018
  • Generation Interconnection Activity by Fuel ndash July 2018
  • Generation Interconnection Activity by Project Phase ndash July 2018
  • Slide Number 23
  • Day-Ahead Schedule (Hourly Average) ndash July 2018
  • Percentage of Real-Time Load Hedged in the DAM (Counter-Party Level) ndash July 2018
  • DAM and RTM Price Convergence ndash July 2018
  • Day-Ahead Electricity and Ancillary Service Prices (Hourly Average) ndash July 2018
  • Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash July 2018
  • Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash July 2018
  • DRUC Monthly Summary (Hourly Average) ndash July 2018
  • HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash July 2018
  • NonndashSpinning Reserve Service Deployment ndash July 2018
  • CRR Price Convergence ndash July 2018
  • Daily Average System Lambda and ORDC Price Adders ndash July 2018
  • ERS Procurement for June 2018 ndash September 2018
  • Reliability Services ndash July 2018
  • Ancillary and Other Services ndash July 2018
  • Real-Time Ancillary Service Imbalance (ORDC) ndash July 2018
  • Energy Settlement ndash July 2018
  • Congestion Revenue Rights (CRR) ndash July 2018
  • CRR Balancing Account Fund ndash July 2018
  • Revenue Neutrality ndash July 2018
  • Net Allocation to Load ndash July 2018
  • Advanced Meter Settlement Impacts ndash July 2018
  • ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndash July 2018
  • Retail Transaction Volumes ndash Summary ndash July 2018
  • Retail Transaction Volumes ndash Summary ndash July 2018
  • Slide Number 48
  • ERCOT Portfolio Stoplight Report ndash July 2018
  • ERCOT Portfolio Stoplight Report ndash July 2018
  • ERCOT Portfolio Stoplight Report ndash July 2018
  • ERCOT Portfolio Stoplight Report ndash July 2018
  • ERCOT Portfolio Stoplight Report ndash July 2018
Retail Transactions Summary
July 2018 June 2018 May 2018 April 2018 March 2018 February 2018 January 2018 December 2017 November 2017 October 2017 September 2017 August 2017 July 2017 June 2017 May 2017 April 2017 March 2017 February 2017 January 2017 December 2016 November 2016 October 2016 September 2016 August 2016 July 2016 June 2016 May 2016 April 2016 March 2016 February 2016 January 2016 December 2015 November 2015 October 2015 September 2015 August 2015 July 2015 June 2015 May 2015 April 2015 March 2015 February 2015 January 2015 December 2014 November 2014 October 2014 September 2014 August 2014 July 2014 June 2014 May 2014 April 2014 March 2014 February 2014 January 2014 December 2013 November 2013 October 2013 September 2013 August 2013 July 2013 June 2013 May 2013 April 2013 March 2013 February 2013 January 2013 Grand total
814_01 - Switch Received 121926 109653 96828 81291 95159 76119 88933 60560 77860 78096 79502 84134 84059 108784 130828 71769 67845 66875 87140 66556 56202 64452 67323 86656 82923 86376 75323 70300 76235 68057 63954 61486 52887 65276 70342 81674 91211 102661 86229 81255 79997 73394 72885 71072 67080 110465 175164 89677 99568 101490 111077 91983 93887 71130 86953 69691 55957 166882 82415 93194 102562 103756 116086 78919 68950 64329 67116 1321827
Difference from previous month 12273 12825 15537 (13868) 19040 (12814) 28373 (17300) (236) (1406) (4632) 75 (24725) (22044) 59059 3924 970 (20265) 20584 10354 (8250) (2871) (19333) 3733 (3453) 11053 5023 (5935) 8178 4103 2468 8599 (12389) (5066) (11332) (9537) (11450) 16432 4974 1258 6603 509 1813 3992 (43385) (64699) 85487 (9891) (1922) (9587) 19094 (1904) 22757 (15823) 17262 13734 (110925) 84467 (10779) (9368) (1194) (12330) 37167 9969 4621 (2787)
814_16 - Move - Ins Received 270122 257125 244431 225380 224289 215281 230409 238340 207921 236397 244511 258046 252360 257759 237611 197865 217962 201984 202612 196236 201714 220958 231999 268781 241844 247481 214383 199804 218245 212474 193716 189862 181098 215908 229405 248124 263233 247089 208166 207932 215950 197765 198025 193973 178624 226283 231418 243482 251957 233679 223201 258649 214724 208160 207059 172981 178671 233469 216550 255967 249114 220397 216982 204412 197200 191955 194507 3162148
Difference from previous month 12997 12694 19051 1091 9008 (15128) (7931) 30419 (28476) (8114) (13535) 5686 (5399) 20148 39746 (20097) 15978 (628) 6376 (5478) (19244) (11041) (36782) 26937 (5637) 33098 14579 (18441) 5771 18758 3854 8764 (34810) (13497) (18719) (15109) 16144 38923 234 (8018) 18185 (260) 4052 15349 (47659) (5135) (12064) (8475) 18278 10478 (35448) 43925 6564 1101 34078 (5690) (54798) 16919 (39417) 6853 28717 3415 12570 7212 5245 (2552)
814_24 - MVO and MVO to CSA Received 129820 125861 124403 113795 108753 100127 111821 144987 100830 116519 129103 128104 127073 133582 127218 102055 111459 100285 101107 96289 100578 109493 114094 133170 122932 129025 118022 103789 109278 103747 96628 99552 96214 109578 117949 123894 133905 133855 114675 108275 108859 94864 98233 97901 89578 111857 115918 121662 131607 126785 119107 107956 107266 99428 104273 93385 93977 115469 115524 129594 135196 121446 120049 111598 106467 102429 104399 1660500
814_10 - DTP Mass Acquisition Received - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0
814_10 - DTP Mass Transition Received - 0 - 0 9033 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 639 - 0 - 0 4975 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0
814_18 - CSA AdditionDeletes Received 40217 62083 99016 55581 46720 42587 49740 47725 31726 52888 41597 40616 55770 43745 52139 26702 21791 39082 44030 38884 39856 31786 33061 42622 48489 64178 50499 59475 59400 48536 42179 40351 34796 34420 54677 35078 49489 59611 39384 44247 44577 35386 40420 54831 43550 45039 44268 40405 57954 64408 65032 80184 70310 41156 34811 46680 50347 71847 48606 52585 50867 62747 59763 34925 40977 40389 41227 747237
Total 562085 554722 573711 476047 474921 434114 480903 491612 418337 483900 494713 510900 519262 543870 547796 398391 419057 408226 434889 397965 398350 426689 446477 531229 496188 527060 458227 433368 463158 432814 396477 391251 364995 425182 472373 488770 537838 543216 448454 441709 449383 401409 409563 417777 378832 493644 566768 495865 541086 526362 523392 538772 486187 419874 433096 382737 378952 587667 463095 531340 537739 508346 512880 429854 413594 399102 407249 6891712
Counts from Monthly Retail Transaction report
To do
Break Out 814_10s - AQ and MT
Break Out 814_18 Additions from Deletes
Year-To-Date Transactions Received
Transaction Type July 2018 July 2017 July 2018 July 2017
Switches 669909 617300 121926 84059
Acquisition 0 0 0 0
Move - Ins 1667037 1568153 270122 252360
Move - Outs 814580 802779 129820 127073
Continuous Service Agreements (CSA) 395944 283259 40217 55770
Mass Transitions 9033 0 0 0
Total 3556503 3271491 562085 519262
There has been a change since this was created
Mass Acquisition has been broken out of Mass Transition
Page 6: ERCOT Monthly Operational Overvie · ERCOT Monthly Operational Overview (July 2018) Revised 08.22.18. ERCOT Public. August 15, 2018

PUBLIC

ERCOTrsquos CPS1 Monthly Performance ndash July 2018

CPS1 12 Month Rolling Average = 17641

6

PUBLIC

Monthly Peak Actual Demand ndash July 2018

Preliminary for latest two months of the current year

Monthly Peak Actual Demand = 73308 MW 071918 HE 1700

7

PUBLIC

Monthly Minimum Actual 15-Minute Demand ndash July 2018

Preliminary for latest two months of the current year

8

PUBLIC

Day-Ahead Load Forecast Performance ndash July 2018

Mean Absolute Percent Error (MAPE) for ERCOT Mid-Term Load Forecast (MTLF) Run at 1400 Day Ahead

2015MAPE

2016MAPE

2017MAPE

2018MAPE

July 2018MAPE

AverageAnnual MAPE

286 262 255 238 197

LowestMonthly MAPE

189 194 169 165LowestDailyMAPE

055Jul 16

HighestMonthly MAPE

381 386 407 366

Highest DailyMAPE

524Jul 4

9

PUBLIC

Reliability Unit Commitment (RUC) Capacity by Weather Zone ndashJuly 2018

10

PUBLIC

Generic Transmission Constraints (GTCs) ndash July 2018

GTC A transmission flow limit more constraining than a Transmission Elementrsquos normal limit established to constrain flow between geographic areas of the ERCOT Transmission System that is used to enforce stability and voltage constraints that cannot be modeled directly in ERCOTrsquos transmission security analysis applications

Note This table lists how many times a constraint has been activated to avoid exceeding a GTC limit it does not imply an exceedance of the GTC occurred

GTCsJul-17 May-18 Jun-18 Jul-18 Last 12 Months Total

DaysDays Days Days DaysGTCs GTCs GTCs GTCs (Aug 17 ndash Jul 18)

North ndash Houston 1 0 1 0 8

Valley Import 0 4 0 1 15

Panhandle 17 27 23 5 261

Red Tap 0 0 0 0 0North Edinburg ndash

Lobo 0 0 0 0 1Nelson Sharpe ndash

Rio Hondo - 0 2 0 65

East Texas - 0 0 0 16

11

PUBLIC

Advisories and Watches ndash July 2018 Corrected

bull Two OCNs issued for extreme hot weatherndash Issued 714 and 720

bull Four Advisories issued due to Physical Responsive Capability being below 3000 MWndash Issued 718 719 725 and 728

bull One OCN issued due to projected reserve capacity shortage for hours ending 1400 through 1900 ERCOT requested all QSEs to update their COPs

ndash Issued 726

bull One Watch issued due to the post-contingency loss of the Bevo to Asherton 138 kV (SBEVASH8) overloads the Big Wells to Cotulla Sub 69 kV and curtailment of Eagle Pass DC-Tie exports to CENACE

ndash Issued 717

bull Three Watches issued due to the post-contingency loss of Bentsen to Railroad 138 kV (SBENRAI8) overloads South Mission to Railroad 138 kV and curtailment of Railroad DC-Tie exports to CENACE

ndash Issued 723

bull One Watch issued for the de-rate of the Railroad DC-Tie and curtailment of the DC-Tie exports to CENACE

ndash Issued 731

12

PUBLIC

Lake Levels Update ndash August 1 2018

13

PUBLIC

Planning Summary ndash July 2018

bull ERCOT is currently tracking 404 active generation interconnection requests totaling 79852 MW This includes 37697 MW of wind generation

bull ERCOT is currently reviewing proposed transmission improvements with a total cost of $6035 million

bull Transmission Projects endorsed in 2018 total $3935 million

bull All projects (in engineering routing licensing and construction) total approximately $649 billion (as of June 1 2018)

bull Transmission Projects energized in 2018 total about $1120 billion (as of June 1 2018)

14

PUBLIC

Mapping of Counties to ERCOT Zones ndash July 2018

15

PUBLIC

Cumulative MW Capacity of Interconnection Requests by Zone ndashJuly 2018

16

PUBLIC

Cumulative MW Capacity of Interconnection Requests by Zone ndashJuly 2018

17

PUBLIC

Cumulative MW Capacity of Interconnection Requests by Zone ndashJuly 2018

18

PUBLIC

Wind Generation ndash July 2018

19

PUBLIC

Solar Generation ndash July 2018

20

PUBLIC

Generation Interconnection Activity by Fuel ndash July 2018

21

PUBLIC

Generation Interconnection Activity by Project Phase ndash July 2018

22

Market Operations

PUBLIC

Day-Ahead Schedule (Hourly Average) ndash July 2018

24

0

10000

20000

30000

40000

50000

60000

70000

80000

MW

Hour Ending

Scheduled Energy Only OfferScheduled Three-part OfferDAM Energy PurchaseRT System Load

Liquidity and activity are normal in the Day-Ahead Market

PUBLIC

Percentage of Real-Time Load Hedged in the DAM (Counter-Party Level) ndashJuly 2018

25

0

20

40

60

80

100

120Ja

nM

arM

ay Jul

Sep

Nov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May

July

2013 2014 2015 2016 2017 2018

The dotted lines represent the bounds for major outliers

PUBLIC

DAM and RTM Price Convergence ndash July 2018

26

-20

-10

0

10

20

30

40

50

60Ja

nM

arM

ay Jul

Sep

Nov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

l

2013 2014 2015 2016 2017 2018

Aver

age

DAM

-R

TM S

PP ($

MW

h)

The dotted lines represent the bounds for major outliers

PUBLIC

Day-Ahead Electricity and Ancillary Service Prices (Hourly Average) ndashJuly 2018

27

0

100

200

300

400

500

600

Pric

e ($

MW

h)

Hour Ending

Regulation Up

Regulation Down

Responsive Reserve

Non Spinning Reserve

DAM Power Balance Price(System Lambda)

Ancillary Service prices reflect the opportunity cost of energy

PUBLIC

Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash July 2018

28

0

100

200

300

400

500

600

Pric

e ($

MW

h)

Hour Ending

RTSPP - LZ West

RTSPP - LZ North

RTSPP - LZ South

RTSPP - LZ Houston

DASPP - LZ West

DASPP - LZ North

DASPP - LZ South

DASPP - LZ Houston

Prices reflect relative transmission congestion and system scarcity

PUBLIC

Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash July 2018

29

0

100

200

300

400

500

600

Pric

e ($

MW

h)

Hour Ending

RTSPP - Hub Average

DASPP - Hub Average

Energy prices reflect the risk premium between Day-Ahead amp Real-Time

PUBLIC

DRUC Monthly Summary (Hourly Average) ndash July 2018

30

0

15000

30000

45000

60000

75000

90000

MW

h

Hour Ending

Self Scheduled Capacity

Self Scheduled Ancillary Service Limit

Load Forecast

DRUC Recommended Capacity

31 executions (0 missed)0 published after 160011 minutes average execution time0 Resources committed

PUBLIC

HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash July 2018

31

0

02

04

06

08

1

0

20

40

60

80

100

RTO

RD

PA ($

MW

h)

MW

h

Hour Ending

744 executions (0 missed)8 minutes average execution time1 Resources committed through HRUC or by a Verbal Dispatch Instruction

The dotted line indicates the average RTORDPA

PUBLIC

NonndashSpinning Reserve Service Deployment ndash July 2018

32

Deployment Start Time

Deployment End Time

Deployment Duration (Hours)

Max Deployment(MW) Reason

NA

PUBLIC

CRR Price Convergence ndash July 2018

0

50

100

150

200

250

Mill

ions

$

Cost

Value

Congestion Revenue Right cost in auction convergence with payment in Day-Ahead Market and Real Time Market

33

PUBLIC

Daily Average System Lambda and ORDC Price Adders ndash July 2018

0

50

100

150

200

250

$M

Wh

Day of Month

RTOFFPA

RTORPA

SYSTEM_LAMBDA

34

PUBLIC

ERS Procurement for June 2018 ndash September 2018

TP1 TP2 TP3 TP4 TP5 TP6

Non Weather-Sensitive ERS-10 MW 160562 165996 143324 140708 156699 151138

Non Weather-Sensitive ERS-30 MW 736864 781559 702529 625067 755153 657394

Weather-Sensitive ERS-10 MW 0 0 0 0 0 0

Weather-Sensitive ERS-30 MW 0 0 11850 11850 0 0

Total MW Procured 897426 947555 857703 777625 911852 808532

Clearing Price $201 $185 $2108 $2177 $199 $225

Time Period Time Period Hours

Time Period 1 Hours Ending 0600 - 0800 (50000 am to 80000 am) Monday through Friday except ERCOT Holidays

Time Period 2 Hours Ending 0900 - 1300 (80000 am to 10000 pm) Monday through Friday except ERCOT Holidays

Time Period 3 Hours Ending 1400 - 1600 (10000 pm to 40000 pm) Monday through Friday except ERCOT Holidays

Time Period 4 Hours Ending 1700 - 1900 (40000 pm to 70000 pm) Monday through Friday except ERCOT Holidays

Time Period 5 Hours Ending 2000 - 2200 (70000 pm to 100000 pm) Monday through Friday except ERCOT Holidays Time Period 6 All other hours

35

PUBLIC

Reliability Services ndash July 2018

Reliability Unit Commitment (RUC) $ in Millions

RUC Make-Whole Payments $000

RUC Clawback Charges $000

RUC Commitment Settlement $000

RUC Capacity Short Charges $000

RUC Make-Whole Uplift $000

RUC Commitment Cost Allocation $000

RUC Decommitment Payments $000

Total RUC Allocation to Load $000

In July 2018 there was a credit of $000M allocated to load for RUC compared to bull A credit of $000M in June 2018bull A credit of $003M in July 2017

36

PUBLIC

Ancillary and Other Services ndash July 2018

Ancillary and Other Services $ in Millions

Regulation Up Service $1105

Regulation Down Service $072

Responsive Reserve Service $7177

Non-Spinning Reserve Service $1787

Black Start Service $059

Voltage Services - Reactive Power $000

Voltage Services - Lost Opportunity $000

Total Charges Allocated to Load $10200

In July 2018 Ancillary and Other Services was a charge of $10200M compared to bull A charge of $2001M in June 2018bull A charge of $2322M in July 2017

37

PUBLIC

Real-Time Ancillary Service Imbalance (ORDC) ndash July 2018

In July 2018 Real-Time Ancillary Service Imbalance was a charge to load of $2228K compared to bull A charge of $147K in June 2018bull A charge of $534K in July 2017

Real-Time Ancillary Service Imbalance $ in Thousands

Real-Time AS Imbalance ($2228)

Real-Time Reliability Deployment AS Imbalance $000

Total RTASI Amount Allocated to Load $2228

38

PUBLIC

Energy Settlement ndash July 2018

39

Day-Ahead Market Energy Settlement $ in Millions

Energy Purchases $215396

Point to Point Obligation Purchases $11726

Energy Sales ($212592)

Day-Ahead Congestion Rent $14531

Day-Ahead Market Make-Whole Payments ($001)

Real-Time Market Energy Settlement $ in Millions

Energy Imbalance at a Resource Node ($91963)

Energy Imbalance at a Load Zone $160737

Energy Imbalance at a Hub ($57497)

Net Real-Time Energy Imbalance $11276

Real Time Congestion from Self Schedules $013

Block Load Transfers and DC Ties ($2063)

Total Impact to Revenue Neutrality $9227

Load-Allocated Emergency Energy Payments ($016)

Load-Allocated Base Point Deviation Charges $026

Day-Ahead Market energy settlement activity increased from last month and increased from July 2017

Real-Time Market energy settlement activity increased from last month and increased from July 2017

PUBLIC

Congestion Revenue Rights (CRR) ndash July 2018

$ in Millions

Long-Term Auction ($4026)

Monthly Auction ($1773)

Total Auction Revenue ($5799)

Day-Ahead CRR Settlements ($15797)

Day-Ahead CRR Short-Charges $1885

Day-Ahead CRR Short-Charges Refunded ($899)

Day-Ahead CRR Short-Charges Net $986

Total CRR Funding ($14810)

Day-Ahead Point-to-Point Obligations $11726

Real-Time Point-to-Point Obligations ($10113)

Net Point-to-Point Obligations $1614

Congestion Revenue Rights settlement payments were not fully funded Partial funding to settle the CRR Short Charges was provided from the CRR Balancing Account Fund and the remaining $986M of CRR Short Charges were not refunded The CRR Fund Balance is now $0

Point to Point Obligations settled with a net charge of $1614M compared to a net credit of $1758M last month

40

PUBLIC

CRR Balancing Account Fund ndash July 2018

CRR Balancing Account $ in Millions

Monthly Day-Ahead Congestion Rent $14531

Monthly Day-Ahead CRR Settlements ($15797)

Monthly Day-Ahead CRR Short -Charges $1885

CRR Balancing Account Credit Total $619

Beginning Fund Balance for the Month $275

CRR Balancing Account Credit Total $619

Day-Ahead CRR Short-Charges Refunded ($899)

CRR PTP Option Award Charges $004

Load-Allocated CRR Amount $000

Total Fund Amount $000

41

PUBLIC

Revenue Neutrality ndash July 2018

Revenue Neutrality $ in Millions

Real-Time Energy Imbalance $11276

Real-Time Point to Point Obligation ($10113)

Real-Time Congestion from Self-Schedules $013

DC Tie amp Block Load Transfer ($2063)

Allocation to Load $886

In July 2018 the Revenue Neutrality charge to load was $886M compared to bull A charge of $3046M in June 2018bull A charge of $145M in July 2017

42

PUBLIC

Net Allocation to Load ndash July 2018

Market-Based Allocation $ in Millions

Reliability Unit Commitment $000

Ancillary and Other Services $10200

Real-Time Ancillary Service Imbalance $223

Emergency Energy $016

Base Point Deviation ($026)

CRR Auction Revenue ($5799)

CRR Balancing Account $000

Real-Time Revenue Neutrality $886

Reliability Must Run $000

Monthly Block Load Transfer $000

Total $5500

Fee AllocationERCOT Administrative Fee $2207

Net Allocated to Load $7707

In July 2018 the Net Allocation to load was a charge of $7707M compared to bull A charge of $2152M in June 2018bull A credit of $1363M in July 2017

43

PUBLIC

Advanced Meter Settlement Impacts ndash July 2018

July 2018 At month end settling 72M ESIIDs using Advanced Meter data

July 2018 990 of the load in ERCOT is settled with 15-min interval data (AMS Competitive IDR and NOIE IDR)

44

PUBLIC

ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndashJuly 2018

45

PUBLIC

Retail Transaction Volumes ndash Summary ndash July 2018

46

Transaction Type July 2018 July 2017 July 2018 July 2017

Switches 669909 617300 121926 84059

Acquisition 0 0 0 0

Move - Ins 1667037 1568153 270122 252360

Move - Outs 814580 802779 129820 127073

Continuous Service Agreements (CSA) 395944 283259 40217 55770

Mass Transitions 9033 0 0 0

Total 3556503 3271491 562085 519262

Year-To-Date Transactions Received

Board Presentation Input

Trans Volumes by Month_New

PUBLIC

Retail Transaction Volumes ndash Summary ndash July 2018

SwitchesAcquisitions Move-Ins

Move-Outs Mass Transition

47

Projects Report

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018

20000000$ 2018 Portfolio

Spending Estimate

Projects In FlightOn Hold (Count = 100) 24905011$

Projects Not Yet Started (Count = 10) 1320628$

Projects Completed (Count = 43) 795250$

(7020889)$

TOTAL 20000000$

Project Number Projects in Initiation Phase (Count = 4)

TBD IT Asset RecoveryNPRR842 Study Area Load Information

209-03 Study Network (STNET) Integration288-01 EDI Map and Translator Replacement

Impact Metric TolerancesUnfavorable variances are represented as negative numbers within the report - Green = No more than 49 unfavorable variance - Yellow = Unfavorable variance between 49 and 99 - Red = Unfavorable variance more than 99

Spending Reductions Required to Maintain Capital Budget

2018 Project Funding

Footnotes1 - One or more phases took longer than expected resulting in additional time required

2 - One or more phases required more labor than expected resulting in additional funding andor time required

3 - Project placed on holdNA - Metric not calculated because - it is reported at the parent project level or - it is an administrative project

Project Number Projects in Planning Phase (Count = 8) Phase Start Baseline

Phase FinishApproved

Phase FinishScheduled

Go-Live DateScheduled

Phase Finish

134-02 Privileged Account Management (PAM) Phase 2 882018 12192018 12192018 TBD 12192018 0 10

183-01 CMM-FT GUI Integration 12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs

242-01 Portfolio Reporting Assessment 1182017 12192018 12192018 TBD 12192018 0 21260-01 Information Governance Assessment 10182017 5302018 9192018 TBD 9192018 0 5286-01 Java Platform Assessment 6202018 11212018 11212018 TBD 11212018 0 6287-01 Security Constrained Unit Commitment (SCUC) 882018 2272019 2272019 TBD 2272019 0 -1

NPRR484Revisions to Congestion Revenue Rights Credit Calculations and Payments - Phase 1b 2

12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs

NPRR702Flexible Accounts Payment of Invoices and Disposition of Interest on Cash Collateral

12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs

Schedule Health Budget Health

49

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018Project Number Projects in Execution Phase (Count = 42) Phase Start Baseline Go-

Live DateApproved Go-

Live DateScheduled

Go-Live DateScheduled

Phase Finish

170-01 Enterprise Content Alignment Program 8262015 11152017 8312018 8312018 8312018 0 0170-06 ECAP - ECMS Implementation Phase 1 4252018 11302018 11302018 11302018 11302018 0 3173-02 ERCOT Flight Certification Website 11152017 2282019 2282019 2282019 5312019 0 2181-01 CRR Framework Upgrade 10262016 1022017 11192018 11192018 2272019 0 2

183-01 CMM Tech Refresh 3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

193-01 PMU Tool Evaluation and Implementation 12132017 892018 2152019 2152019 3202019 0 0196-01 GINR Project Status Application Replacement 12212016 9142017 2282019 2282019 3312019 0 1198-02 Reactive Power Coordination PoC 962017 6162018 8152018 8152018 8152018 0 54209-02 Weather Imaging and Line Observation (WILO) 5302018 212019 212019 212019 2272019 0 2210-01 REC Technology Refresh 8302017 3182018 12132018 12132018 1162019 0 3228-01 Enterprise Database Upgrade 882018 1292020 1292020 1292020 1292020 0 17229-01 IT Change and Configuration Management Phase 2 822017 6192018 12132018 12132018 3252019 0 2 -9238-01 Application Authentication Tech Refresh 962017 3192018 12132018 12132018 1302019 0 3239-01 Identity and Access Management 592018 3132019 3132019 3132019 3132019 0 2241-01 AREA - Generation 10112017 3302018 892018 892018 952018 0 -4244-01 Corporate Wireless 11292017 3282018 1252018 1252018 192019 0 9245-01 2017 EPS Metering Enhancements 6272018 892019 892019 892019 9252019 0 1246-01 iTest Data Refresh 12132017 1192018 11152018 11152018 122019 0 25249-01 Secondary Wind Forecasting Service 8302017 2282018 892018 892018 952018 0 0253-01 CIP Recovery Plan Project - Planning Phase 1 1312018 8292018 8292018 8292018 8292018 0 -2

257-01Security Constrained Optimal Powerflow in Study Network Analysis

1262017 10252018 10252018 10252018 1282018 0 19

261-01 Generic Transmission Constraint Calculation 372018 12132018 12132018 12132018 1232019 0 0263-01 Market Simulator 4112018 12132018 12132018 12132018 1302019 0 7265-01 Real-Time Assessment Continuity 1312018 12132018 12132018 12132018 1302019 0 0279-01 Cyber Security Project 24 6272018 10262018 10262018 10262018 11282018 0 0280-01 Quest Software Portfolio Transition 442018 6272018 9262018 9262018 9262018 0 13282-01 Synchronous Condenser Outage Modeling 662018 10252018 10252018 10252018 1252018 0 1Various 2015 CMM NPRRs 2 -18

NPRR519Exemption of ERS-Only QSEs from Collateral and Capitalization Requirements

3152017 5192018 12112018 12112018 12312018 0 See 2015 CMM NPRRs

NPRR620Collateral Requirements for Counter-Parties with No Load or Generation

3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

NPRR660 Remove CRR State Change Adder 3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

Budget HealthSchedule Health

50

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018Project Number Projects in Execution Phase (Count = 42) Phase Start Baseline Go-

Live DateApproved Go-

Live DateScheduled

Go-Live DateScheduled

Phase Finish

NPRR741 Clarifications to TPE and EAL Credit Exposure Calculations 3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

NPRR749 Option Cost for Outstanding CRRs 882018 12132018 12132018 12132018 TBD 0 NA See 2015 CMM NPRRs

NPRR755 Data Agent-Only QSE Registration 3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

NPRR819Modification of Non-Price Error Resettlement Thresholds and Resettlement Clean-Ups

592018 892018 892018 892018 952018 0 36

NPRR833 Modify PTP Obligation Bid Clearing Change 882018 12132018 12132018 12132018 TBD 0 1

NPRR843Short-Term System Adequacy and AS Offer Disclosure Reports Additions

7182018 10252018 10252018 10252018 11282018 0 0

NPRR864 RUC Modifications to Consider Market-Based Solutions 6202018 10252018 10252018 10252018 11282018 0 4SCR777 Bilateral CRR Interface Enhancement 10262016 1022017 11192018 11192018 2272019 0 NA See 181-01

SCR781 RARF Replacement 12202017 4252018 12192018 12192018 12192018 0 3SCR791 Correction of 60-day SCED GRD Disclosure Report 522018 892018 892018 892018 952018 0 39SCR795 Addition of Intra-Hour Wind Forecast to GTBD Calculation 882018 10252018 10252018 10252018 11142018 0 0

Project Number Expedited Projects in Execution (Count = 34)

Project Number Projects in Stabilization (Count = 10) Execution

Phase StartBaseline Go-Live Target

Approved Go-Live Target

ActualGo-Live Date

Scheduled Execution Phase

Finish

NPRR648 Remove References to Flowgate Rights 3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR683 Revision to Available Credit Limit Calculation 3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR743 Revision to MCE to Have a Floor For Load Exposure 3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR760 Calculation of Exposure Variables For Days With No Activity 3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR776 Voltage Set Point Communication 9202017 3192018 452018 452018 952018 0 1

NPRR800Revisions to Credit Exposure Calculations to Use Electricity Futures Market Prices

3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR815Revise the Limitation of Load Resources Providing Responsive Reserve (RRS) Service

3212018 5312018 5312018 5312018 8292018 0 2

209-01 Multi Station Breaker to Breaker One Lines 282017 392018 532018 532018 8222018 0 -1259-01 DC SCADA and Metering Upgrade 10252017 1172018 7252018 7252018 8292018 0 22266-01 Remote Email Access Enhancement 12132017 372018 662018 6192018 9262018 2 -7 2 -9

Schedule Health Budget Health

Budget HealthSchedule Health

51

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018

Project Number Projects On Hold (Count = 2) Forecast

Start DateBaseline

Phase FinishApproved Go-

Live TargetScheduled

Go-Live DateScheduled

Phase Finish

SCR789 Update NMMS Topology Processor to PSSE 34 Capability 0

269-01Document Repository Redesign and Governance Implementation - Phase 1

0

Project Number Projects Completed (Count = 20)

Baseline Execution

Phase Start

Baseline Go-Live Target

Approved Go-Live Target

Actual Go-Live Date

Actual Execution Phase Finish

185-01 Records Management and eDiscovery 12152016 5242017 8292017 8222017 12132017 2 0224-01 TelAlert Replacement 452017 6272017 842017 842017 592018 0 5230-01 SAS Technical Architecture Redesign 312017 12132017 12132017 12132017 6272018 0 2234-01 Reporting Solution Resiliency (RSR) 452017 8232017 11272017 11272017 1102018 0 8240-01 EDI Translator and Mapping Replacement Assessment 4192017 9272017 2282018 TBD 372018 -2 20254-01 Retail Windows Upgrade 10112017 12182017 12182017 1222018 272018 1 -51 65255-01 Settlements Architecture Enhancements 10252017 1112018 1112018 1192018 2142018 1 -10 53258-01 WD Kainos SMART Automation Testing Tool 4112018 642018 642018 662018 7182018 -3 33271-01 Issue Tracking and Resolution Tool Assessment 12132017 4252018 4252018 TBD 522018 1 -5 -1272-01 Operator Training Simulator Black Start GE Effort 1262017 4252018 4252018 4272018 5162018 -1 19274-01 Average Mid-Term Load Forecast 372018 5312018 5312018 5312018 6272018 0 50

NPRR768Revisions to Real-Time On-Line Reliability Deployment Price Adder Categories

372018 5312018 5312018 5312018 6272018 0 16

NPRR778 Modifications to Date Change and Cancellation Evaluation Window 7192017 10292017 12112017 12112017 1312018 0 23

NPRR782Settlement of Infeasible Ancillary Services Due to Transmission Constraints

5242017 8312017 1122017 1122017 1102018 0 20

NPRR808 Three Year CRR Auction 8232017 9182017 9182017 912017 1312018 65 68

NPRR810Applicability of RMR Incentive Factor on Reservation and Transportation Costs Associated with Firm Fuel Supplies

7172017 11122017 3312018 3312018 3312018 0 NA See 233-00

NPRR830 Revision of 4-Coincident Peak Methodology 12132017 262018 262018 262018 372018 0 85

NPRR831 Inclusion of Private Use Networks in Load Zone Price Calculations 822017 1122017 1122017 1122017 2212018 0 33

OBDRR002 ORDC OBD Revisions for PUCT Project 47199 372018 5312018 5312018 5312018 6272018 0 See NPRR768

SCR792 Enhance Communications of BAAL Exceedances 2142018 452018 452018 452018 4252018 0 69

Project Number Expedited Projects Completed (Count = 23)

Budget HealthSchedule Health

Budget HealthSchedule Health

52

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018

Project Number 2018 Projects Not Yet Started (Count = 10) Forecast

Start Date

NPRR858 Provide Complete Current Operating Plan (COP) Data Aug-2018TBD 2018 OS Enhancements Aug-2018TBD Additional Branch Limit for Relays Aug-2018

NPRR817 Create a Panhandle Hub Sep-2018NPRR821 Elimination of the CRR Deration Process Oct-2018NPRR865 Publish RTM Shift Factors for Hubs Load Zones and DC Ties Oct-2018

SCR793SSR Related Telemetry for Transmission Service Provider (TSP) Operators

Oct-2018

ECAP ECAP - ECMS Implementation Phase 2 Oct-2018TBD Job Scheduler Update in CSI Framework Oct-2018TBD Parameter Estimation Oct-2018

53

  • Slide Number 1
  • Slide Number 2
  • Summary ndash July 2018
  • Daily Peak Demand Hourly Average Actual vs Forecast Wind Day-Ahead COPs amp On-Line Capacity at Peak ndash July 2018
  • Actual Wind Output plus Curtailments vs Wind Day-Ahead COPs for All Hours ndash July 2018
  • ERCOTrsquos CPS1 Monthly Performance ndash July 2018
  • Monthly Peak Actual Demand ndash July 2018
  • Monthly Minimum Actual 15-Minute Demand ndash July 2018
  • Day-Ahead Load Forecast Performance ndash July 2018
  • Reliability Unit Commitment (RUC) Capacity by Weather Zone ndash July 2018
  • Generic Transmission Constraints (GTCs) ndash July 2018
  • Advisories and Watches ndash July 2018 Corrected
  • Lake Levels Update ndash August 1 2018
  • Planning Summary ndash July 2018
  • Mapping of Counties to ERCOT Zones ndash July 2018
  • Cumulative MW Capacity of Interconnection Requests by Zone ndashJuly 2018
  • Cumulative MW Capacity of Interconnection Requests by Zone ndashJuly 2018
  • Cumulative MW Capacity of Interconnection Requests by Zone ndashJuly 2018
  • Wind Generation ndash July 2018
  • Solar Generation ndash July 2018
  • Generation Interconnection Activity by Fuel ndash July 2018
  • Generation Interconnection Activity by Project Phase ndash July 2018
  • Slide Number 23
  • Day-Ahead Schedule (Hourly Average) ndash July 2018
  • Percentage of Real-Time Load Hedged in the DAM (Counter-Party Level) ndash July 2018
  • DAM and RTM Price Convergence ndash July 2018
  • Day-Ahead Electricity and Ancillary Service Prices (Hourly Average) ndash July 2018
  • Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash July 2018
  • Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash July 2018
  • DRUC Monthly Summary (Hourly Average) ndash July 2018
  • HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash July 2018
  • NonndashSpinning Reserve Service Deployment ndash July 2018
  • CRR Price Convergence ndash July 2018
  • Daily Average System Lambda and ORDC Price Adders ndash July 2018
  • ERS Procurement for June 2018 ndash September 2018
  • Reliability Services ndash July 2018
  • Ancillary and Other Services ndash July 2018
  • Real-Time Ancillary Service Imbalance (ORDC) ndash July 2018
  • Energy Settlement ndash July 2018
  • Congestion Revenue Rights (CRR) ndash July 2018
  • CRR Balancing Account Fund ndash July 2018
  • Revenue Neutrality ndash July 2018
  • Net Allocation to Load ndash July 2018
  • Advanced Meter Settlement Impacts ndash July 2018
  • ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndash July 2018
  • Retail Transaction Volumes ndash Summary ndash July 2018
  • Retail Transaction Volumes ndash Summary ndash July 2018
  • Slide Number 48
  • ERCOT Portfolio Stoplight Report ndash July 2018
  • ERCOT Portfolio Stoplight Report ndash July 2018
  • ERCOT Portfolio Stoplight Report ndash July 2018
  • ERCOT Portfolio Stoplight Report ndash July 2018
  • ERCOT Portfolio Stoplight Report ndash July 2018
Retail Transactions Summary
July 2018 June 2018 May 2018 April 2018 March 2018 February 2018 January 2018 December 2017 November 2017 October 2017 September 2017 August 2017 July 2017 June 2017 May 2017 April 2017 March 2017 February 2017 January 2017 December 2016 November 2016 October 2016 September 2016 August 2016 July 2016 June 2016 May 2016 April 2016 March 2016 February 2016 January 2016 December 2015 November 2015 October 2015 September 2015 August 2015 July 2015 June 2015 May 2015 April 2015 March 2015 February 2015 January 2015 December 2014 November 2014 October 2014 September 2014 August 2014 July 2014 June 2014 May 2014 April 2014 March 2014 February 2014 January 2014 December 2013 November 2013 October 2013 September 2013 August 2013 July 2013 June 2013 May 2013 April 2013 March 2013 February 2013 January 2013 Grand total
814_01 - Switch Received 121926 109653 96828 81291 95159 76119 88933 60560 77860 78096 79502 84134 84059 108784 130828 71769 67845 66875 87140 66556 56202 64452 67323 86656 82923 86376 75323 70300 76235 68057 63954 61486 52887 65276 70342 81674 91211 102661 86229 81255 79997 73394 72885 71072 67080 110465 175164 89677 99568 101490 111077 91983 93887 71130 86953 69691 55957 166882 82415 93194 102562 103756 116086 78919 68950 64329 67116 1321827
Difference from previous month 12273 12825 15537 (13868) 19040 (12814) 28373 (17300) (236) (1406) (4632) 75 (24725) (22044) 59059 3924 970 (20265) 20584 10354 (8250) (2871) (19333) 3733 (3453) 11053 5023 (5935) 8178 4103 2468 8599 (12389) (5066) (11332) (9537) (11450) 16432 4974 1258 6603 509 1813 3992 (43385) (64699) 85487 (9891) (1922) (9587) 19094 (1904) 22757 (15823) 17262 13734 (110925) 84467 (10779) (9368) (1194) (12330) 37167 9969 4621 (2787)
814_16 - Move - Ins Received 270122 257125 244431 225380 224289 215281 230409 238340 207921 236397 244511 258046 252360 257759 237611 197865 217962 201984 202612 196236 201714 220958 231999 268781 241844 247481 214383 199804 218245 212474 193716 189862 181098 215908 229405 248124 263233 247089 208166 207932 215950 197765 198025 193973 178624 226283 231418 243482 251957 233679 223201 258649 214724 208160 207059 172981 178671 233469 216550 255967 249114 220397 216982 204412 197200 191955 194507 3162148
Difference from previous month 12997 12694 19051 1091 9008 (15128) (7931) 30419 (28476) (8114) (13535) 5686 (5399) 20148 39746 (20097) 15978 (628) 6376 (5478) (19244) (11041) (36782) 26937 (5637) 33098 14579 (18441) 5771 18758 3854 8764 (34810) (13497) (18719) (15109) 16144 38923 234 (8018) 18185 (260) 4052 15349 (47659) (5135) (12064) (8475) 18278 10478 (35448) 43925 6564 1101 34078 (5690) (54798) 16919 (39417) 6853 28717 3415 12570 7212 5245 (2552)
814_24 - MVO and MVO to CSA Received 129820 125861 124403 113795 108753 100127 111821 144987 100830 116519 129103 128104 127073 133582 127218 102055 111459 100285 101107 96289 100578 109493 114094 133170 122932 129025 118022 103789 109278 103747 96628 99552 96214 109578 117949 123894 133905 133855 114675 108275 108859 94864 98233 97901 89578 111857 115918 121662 131607 126785 119107 107956 107266 99428 104273 93385 93977 115469 115524 129594 135196 121446 120049 111598 106467 102429 104399 1660500
814_10 - DTP Mass Acquisition Received - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0
814_10 - DTP Mass Transition Received - 0 - 0 9033 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 639 - 0 - 0 4975 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0
814_18 - CSA AdditionDeletes Received 40217 62083 99016 55581 46720 42587 49740 47725 31726 52888 41597 40616 55770 43745 52139 26702 21791 39082 44030 38884 39856 31786 33061 42622 48489 64178 50499 59475 59400 48536 42179 40351 34796 34420 54677 35078 49489 59611 39384 44247 44577 35386 40420 54831 43550 45039 44268 40405 57954 64408 65032 80184 70310 41156 34811 46680 50347 71847 48606 52585 50867 62747 59763 34925 40977 40389 41227 747237
Total 562085 554722 573711 476047 474921 434114 480903 491612 418337 483900 494713 510900 519262 543870 547796 398391 419057 408226 434889 397965 398350 426689 446477 531229 496188 527060 458227 433368 463158 432814 396477 391251 364995 425182 472373 488770 537838 543216 448454 441709 449383 401409 409563 417777 378832 493644 566768 495865 541086 526362 523392 538772 486187 419874 433096 382737 378952 587667 463095 531340 537739 508346 512880 429854 413594 399102 407249 6891712
Counts from Monthly Retail Transaction report
To do
Break Out 814_10s - AQ and MT
Break Out 814_18 Additions from Deletes
Year-To-Date Transactions Received
Transaction Type July 2018 July 2017 July 2018 July 2017
Switches 669909 617300 121926 84059
Acquisition 0 0 0 0
Move - Ins 1667037 1568153 270122 252360
Move - Outs 814580 802779 129820 127073
Continuous Service Agreements (CSA) 395944 283259 40217 55770
Mass Transitions 9033 0 0 0
Total 3556503 3271491 562085 519262
There has been a change since this was created
Mass Acquisition has been broken out of Mass Transition
Page 7: ERCOT Monthly Operational Overvie · ERCOT Monthly Operational Overview (July 2018) Revised 08.22.18. ERCOT Public. August 15, 2018

PUBLIC

Monthly Peak Actual Demand ndash July 2018

Preliminary for latest two months of the current year

Monthly Peak Actual Demand = 73308 MW 071918 HE 1700

7

PUBLIC

Monthly Minimum Actual 15-Minute Demand ndash July 2018

Preliminary for latest two months of the current year

8

PUBLIC

Day-Ahead Load Forecast Performance ndash July 2018

Mean Absolute Percent Error (MAPE) for ERCOT Mid-Term Load Forecast (MTLF) Run at 1400 Day Ahead

2015MAPE

2016MAPE

2017MAPE

2018MAPE

July 2018MAPE

AverageAnnual MAPE

286 262 255 238 197

LowestMonthly MAPE

189 194 169 165LowestDailyMAPE

055Jul 16

HighestMonthly MAPE

381 386 407 366

Highest DailyMAPE

524Jul 4

9

PUBLIC

Reliability Unit Commitment (RUC) Capacity by Weather Zone ndashJuly 2018

10

PUBLIC

Generic Transmission Constraints (GTCs) ndash July 2018

GTC A transmission flow limit more constraining than a Transmission Elementrsquos normal limit established to constrain flow between geographic areas of the ERCOT Transmission System that is used to enforce stability and voltage constraints that cannot be modeled directly in ERCOTrsquos transmission security analysis applications

Note This table lists how many times a constraint has been activated to avoid exceeding a GTC limit it does not imply an exceedance of the GTC occurred

GTCsJul-17 May-18 Jun-18 Jul-18 Last 12 Months Total

DaysDays Days Days DaysGTCs GTCs GTCs GTCs (Aug 17 ndash Jul 18)

North ndash Houston 1 0 1 0 8

Valley Import 0 4 0 1 15

Panhandle 17 27 23 5 261

Red Tap 0 0 0 0 0North Edinburg ndash

Lobo 0 0 0 0 1Nelson Sharpe ndash

Rio Hondo - 0 2 0 65

East Texas - 0 0 0 16

11

PUBLIC

Advisories and Watches ndash July 2018 Corrected

bull Two OCNs issued for extreme hot weatherndash Issued 714 and 720

bull Four Advisories issued due to Physical Responsive Capability being below 3000 MWndash Issued 718 719 725 and 728

bull One OCN issued due to projected reserve capacity shortage for hours ending 1400 through 1900 ERCOT requested all QSEs to update their COPs

ndash Issued 726

bull One Watch issued due to the post-contingency loss of the Bevo to Asherton 138 kV (SBEVASH8) overloads the Big Wells to Cotulla Sub 69 kV and curtailment of Eagle Pass DC-Tie exports to CENACE

ndash Issued 717

bull Three Watches issued due to the post-contingency loss of Bentsen to Railroad 138 kV (SBENRAI8) overloads South Mission to Railroad 138 kV and curtailment of Railroad DC-Tie exports to CENACE

ndash Issued 723

bull One Watch issued for the de-rate of the Railroad DC-Tie and curtailment of the DC-Tie exports to CENACE

ndash Issued 731

12

PUBLIC

Lake Levels Update ndash August 1 2018

13

PUBLIC

Planning Summary ndash July 2018

bull ERCOT is currently tracking 404 active generation interconnection requests totaling 79852 MW This includes 37697 MW of wind generation

bull ERCOT is currently reviewing proposed transmission improvements with a total cost of $6035 million

bull Transmission Projects endorsed in 2018 total $3935 million

bull All projects (in engineering routing licensing and construction) total approximately $649 billion (as of June 1 2018)

bull Transmission Projects energized in 2018 total about $1120 billion (as of June 1 2018)

14

PUBLIC

Mapping of Counties to ERCOT Zones ndash July 2018

15

PUBLIC

Cumulative MW Capacity of Interconnection Requests by Zone ndashJuly 2018

16

PUBLIC

Cumulative MW Capacity of Interconnection Requests by Zone ndashJuly 2018

17

PUBLIC

Cumulative MW Capacity of Interconnection Requests by Zone ndashJuly 2018

18

PUBLIC

Wind Generation ndash July 2018

19

PUBLIC

Solar Generation ndash July 2018

20

PUBLIC

Generation Interconnection Activity by Fuel ndash July 2018

21

PUBLIC

Generation Interconnection Activity by Project Phase ndash July 2018

22

Market Operations

PUBLIC

Day-Ahead Schedule (Hourly Average) ndash July 2018

24

0

10000

20000

30000

40000

50000

60000

70000

80000

MW

Hour Ending

Scheduled Energy Only OfferScheduled Three-part OfferDAM Energy PurchaseRT System Load

Liquidity and activity are normal in the Day-Ahead Market

PUBLIC

Percentage of Real-Time Load Hedged in the DAM (Counter-Party Level) ndashJuly 2018

25

0

20

40

60

80

100

120Ja

nM

arM

ay Jul

Sep

Nov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May

July

2013 2014 2015 2016 2017 2018

The dotted lines represent the bounds for major outliers

PUBLIC

DAM and RTM Price Convergence ndash July 2018

26

-20

-10

0

10

20

30

40

50

60Ja

nM

arM

ay Jul

Sep

Nov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

l

2013 2014 2015 2016 2017 2018

Aver

age

DAM

-R

TM S

PP ($

MW

h)

The dotted lines represent the bounds for major outliers

PUBLIC

Day-Ahead Electricity and Ancillary Service Prices (Hourly Average) ndashJuly 2018

27

0

100

200

300

400

500

600

Pric

e ($

MW

h)

Hour Ending

Regulation Up

Regulation Down

Responsive Reserve

Non Spinning Reserve

DAM Power Balance Price(System Lambda)

Ancillary Service prices reflect the opportunity cost of energy

PUBLIC

Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash July 2018

28

0

100

200

300

400

500

600

Pric

e ($

MW

h)

Hour Ending

RTSPP - LZ West

RTSPP - LZ North

RTSPP - LZ South

RTSPP - LZ Houston

DASPP - LZ West

DASPP - LZ North

DASPP - LZ South

DASPP - LZ Houston

Prices reflect relative transmission congestion and system scarcity

PUBLIC

Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash July 2018

29

0

100

200

300

400

500

600

Pric

e ($

MW

h)

Hour Ending

RTSPP - Hub Average

DASPP - Hub Average

Energy prices reflect the risk premium between Day-Ahead amp Real-Time

PUBLIC

DRUC Monthly Summary (Hourly Average) ndash July 2018

30

0

15000

30000

45000

60000

75000

90000

MW

h

Hour Ending

Self Scheduled Capacity

Self Scheduled Ancillary Service Limit

Load Forecast

DRUC Recommended Capacity

31 executions (0 missed)0 published after 160011 minutes average execution time0 Resources committed

PUBLIC

HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash July 2018

31

0

02

04

06

08

1

0

20

40

60

80

100

RTO

RD

PA ($

MW

h)

MW

h

Hour Ending

744 executions (0 missed)8 minutes average execution time1 Resources committed through HRUC or by a Verbal Dispatch Instruction

The dotted line indicates the average RTORDPA

PUBLIC

NonndashSpinning Reserve Service Deployment ndash July 2018

32

Deployment Start Time

Deployment End Time

Deployment Duration (Hours)

Max Deployment(MW) Reason

NA

PUBLIC

CRR Price Convergence ndash July 2018

0

50

100

150

200

250

Mill

ions

$

Cost

Value

Congestion Revenue Right cost in auction convergence with payment in Day-Ahead Market and Real Time Market

33

PUBLIC

Daily Average System Lambda and ORDC Price Adders ndash July 2018

0

50

100

150

200

250

$M

Wh

Day of Month

RTOFFPA

RTORPA

SYSTEM_LAMBDA

34

PUBLIC

ERS Procurement for June 2018 ndash September 2018

TP1 TP2 TP3 TP4 TP5 TP6

Non Weather-Sensitive ERS-10 MW 160562 165996 143324 140708 156699 151138

Non Weather-Sensitive ERS-30 MW 736864 781559 702529 625067 755153 657394

Weather-Sensitive ERS-10 MW 0 0 0 0 0 0

Weather-Sensitive ERS-30 MW 0 0 11850 11850 0 0

Total MW Procured 897426 947555 857703 777625 911852 808532

Clearing Price $201 $185 $2108 $2177 $199 $225

Time Period Time Period Hours

Time Period 1 Hours Ending 0600 - 0800 (50000 am to 80000 am) Monday through Friday except ERCOT Holidays

Time Period 2 Hours Ending 0900 - 1300 (80000 am to 10000 pm) Monday through Friday except ERCOT Holidays

Time Period 3 Hours Ending 1400 - 1600 (10000 pm to 40000 pm) Monday through Friday except ERCOT Holidays

Time Period 4 Hours Ending 1700 - 1900 (40000 pm to 70000 pm) Monday through Friday except ERCOT Holidays

Time Period 5 Hours Ending 2000 - 2200 (70000 pm to 100000 pm) Monday through Friday except ERCOT Holidays Time Period 6 All other hours

35

PUBLIC

Reliability Services ndash July 2018

Reliability Unit Commitment (RUC) $ in Millions

RUC Make-Whole Payments $000

RUC Clawback Charges $000

RUC Commitment Settlement $000

RUC Capacity Short Charges $000

RUC Make-Whole Uplift $000

RUC Commitment Cost Allocation $000

RUC Decommitment Payments $000

Total RUC Allocation to Load $000

In July 2018 there was a credit of $000M allocated to load for RUC compared to bull A credit of $000M in June 2018bull A credit of $003M in July 2017

36

PUBLIC

Ancillary and Other Services ndash July 2018

Ancillary and Other Services $ in Millions

Regulation Up Service $1105

Regulation Down Service $072

Responsive Reserve Service $7177

Non-Spinning Reserve Service $1787

Black Start Service $059

Voltage Services - Reactive Power $000

Voltage Services - Lost Opportunity $000

Total Charges Allocated to Load $10200

In July 2018 Ancillary and Other Services was a charge of $10200M compared to bull A charge of $2001M in June 2018bull A charge of $2322M in July 2017

37

PUBLIC

Real-Time Ancillary Service Imbalance (ORDC) ndash July 2018

In July 2018 Real-Time Ancillary Service Imbalance was a charge to load of $2228K compared to bull A charge of $147K in June 2018bull A charge of $534K in July 2017

Real-Time Ancillary Service Imbalance $ in Thousands

Real-Time AS Imbalance ($2228)

Real-Time Reliability Deployment AS Imbalance $000

Total RTASI Amount Allocated to Load $2228

38

PUBLIC

Energy Settlement ndash July 2018

39

Day-Ahead Market Energy Settlement $ in Millions

Energy Purchases $215396

Point to Point Obligation Purchases $11726

Energy Sales ($212592)

Day-Ahead Congestion Rent $14531

Day-Ahead Market Make-Whole Payments ($001)

Real-Time Market Energy Settlement $ in Millions

Energy Imbalance at a Resource Node ($91963)

Energy Imbalance at a Load Zone $160737

Energy Imbalance at a Hub ($57497)

Net Real-Time Energy Imbalance $11276

Real Time Congestion from Self Schedules $013

Block Load Transfers and DC Ties ($2063)

Total Impact to Revenue Neutrality $9227

Load-Allocated Emergency Energy Payments ($016)

Load-Allocated Base Point Deviation Charges $026

Day-Ahead Market energy settlement activity increased from last month and increased from July 2017

Real-Time Market energy settlement activity increased from last month and increased from July 2017

PUBLIC

Congestion Revenue Rights (CRR) ndash July 2018

$ in Millions

Long-Term Auction ($4026)

Monthly Auction ($1773)

Total Auction Revenue ($5799)

Day-Ahead CRR Settlements ($15797)

Day-Ahead CRR Short-Charges $1885

Day-Ahead CRR Short-Charges Refunded ($899)

Day-Ahead CRR Short-Charges Net $986

Total CRR Funding ($14810)

Day-Ahead Point-to-Point Obligations $11726

Real-Time Point-to-Point Obligations ($10113)

Net Point-to-Point Obligations $1614

Congestion Revenue Rights settlement payments were not fully funded Partial funding to settle the CRR Short Charges was provided from the CRR Balancing Account Fund and the remaining $986M of CRR Short Charges were not refunded The CRR Fund Balance is now $0

Point to Point Obligations settled with a net charge of $1614M compared to a net credit of $1758M last month

40

PUBLIC

CRR Balancing Account Fund ndash July 2018

CRR Balancing Account $ in Millions

Monthly Day-Ahead Congestion Rent $14531

Monthly Day-Ahead CRR Settlements ($15797)

Monthly Day-Ahead CRR Short -Charges $1885

CRR Balancing Account Credit Total $619

Beginning Fund Balance for the Month $275

CRR Balancing Account Credit Total $619

Day-Ahead CRR Short-Charges Refunded ($899)

CRR PTP Option Award Charges $004

Load-Allocated CRR Amount $000

Total Fund Amount $000

41

PUBLIC

Revenue Neutrality ndash July 2018

Revenue Neutrality $ in Millions

Real-Time Energy Imbalance $11276

Real-Time Point to Point Obligation ($10113)

Real-Time Congestion from Self-Schedules $013

DC Tie amp Block Load Transfer ($2063)

Allocation to Load $886

In July 2018 the Revenue Neutrality charge to load was $886M compared to bull A charge of $3046M in June 2018bull A charge of $145M in July 2017

42

PUBLIC

Net Allocation to Load ndash July 2018

Market-Based Allocation $ in Millions

Reliability Unit Commitment $000

Ancillary and Other Services $10200

Real-Time Ancillary Service Imbalance $223

Emergency Energy $016

Base Point Deviation ($026)

CRR Auction Revenue ($5799)

CRR Balancing Account $000

Real-Time Revenue Neutrality $886

Reliability Must Run $000

Monthly Block Load Transfer $000

Total $5500

Fee AllocationERCOT Administrative Fee $2207

Net Allocated to Load $7707

In July 2018 the Net Allocation to load was a charge of $7707M compared to bull A charge of $2152M in June 2018bull A credit of $1363M in July 2017

43

PUBLIC

Advanced Meter Settlement Impacts ndash July 2018

July 2018 At month end settling 72M ESIIDs using Advanced Meter data

July 2018 990 of the load in ERCOT is settled with 15-min interval data (AMS Competitive IDR and NOIE IDR)

44

PUBLIC

ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndashJuly 2018

45

PUBLIC

Retail Transaction Volumes ndash Summary ndash July 2018

46

Transaction Type July 2018 July 2017 July 2018 July 2017

Switches 669909 617300 121926 84059

Acquisition 0 0 0 0

Move - Ins 1667037 1568153 270122 252360

Move - Outs 814580 802779 129820 127073

Continuous Service Agreements (CSA) 395944 283259 40217 55770

Mass Transitions 9033 0 0 0

Total 3556503 3271491 562085 519262

Year-To-Date Transactions Received

Board Presentation Input

Trans Volumes by Month_New

PUBLIC

Retail Transaction Volumes ndash Summary ndash July 2018

SwitchesAcquisitions Move-Ins

Move-Outs Mass Transition

47

Projects Report

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018

20000000$ 2018 Portfolio

Spending Estimate

Projects In FlightOn Hold (Count = 100) 24905011$

Projects Not Yet Started (Count = 10) 1320628$

Projects Completed (Count = 43) 795250$

(7020889)$

TOTAL 20000000$

Project Number Projects in Initiation Phase (Count = 4)

TBD IT Asset RecoveryNPRR842 Study Area Load Information

209-03 Study Network (STNET) Integration288-01 EDI Map and Translator Replacement

Impact Metric TolerancesUnfavorable variances are represented as negative numbers within the report - Green = No more than 49 unfavorable variance - Yellow = Unfavorable variance between 49 and 99 - Red = Unfavorable variance more than 99

Spending Reductions Required to Maintain Capital Budget

2018 Project Funding

Footnotes1 - One or more phases took longer than expected resulting in additional time required

2 - One or more phases required more labor than expected resulting in additional funding andor time required

3 - Project placed on holdNA - Metric not calculated because - it is reported at the parent project level or - it is an administrative project

Project Number Projects in Planning Phase (Count = 8) Phase Start Baseline

Phase FinishApproved

Phase FinishScheduled

Go-Live DateScheduled

Phase Finish

134-02 Privileged Account Management (PAM) Phase 2 882018 12192018 12192018 TBD 12192018 0 10

183-01 CMM-FT GUI Integration 12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs

242-01 Portfolio Reporting Assessment 1182017 12192018 12192018 TBD 12192018 0 21260-01 Information Governance Assessment 10182017 5302018 9192018 TBD 9192018 0 5286-01 Java Platform Assessment 6202018 11212018 11212018 TBD 11212018 0 6287-01 Security Constrained Unit Commitment (SCUC) 882018 2272019 2272019 TBD 2272019 0 -1

NPRR484Revisions to Congestion Revenue Rights Credit Calculations and Payments - Phase 1b 2

12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs

NPRR702Flexible Accounts Payment of Invoices and Disposition of Interest on Cash Collateral

12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs

Schedule Health Budget Health

49

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018Project Number Projects in Execution Phase (Count = 42) Phase Start Baseline Go-

Live DateApproved Go-

Live DateScheduled

Go-Live DateScheduled

Phase Finish

170-01 Enterprise Content Alignment Program 8262015 11152017 8312018 8312018 8312018 0 0170-06 ECAP - ECMS Implementation Phase 1 4252018 11302018 11302018 11302018 11302018 0 3173-02 ERCOT Flight Certification Website 11152017 2282019 2282019 2282019 5312019 0 2181-01 CRR Framework Upgrade 10262016 1022017 11192018 11192018 2272019 0 2

183-01 CMM Tech Refresh 3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

193-01 PMU Tool Evaluation and Implementation 12132017 892018 2152019 2152019 3202019 0 0196-01 GINR Project Status Application Replacement 12212016 9142017 2282019 2282019 3312019 0 1198-02 Reactive Power Coordination PoC 962017 6162018 8152018 8152018 8152018 0 54209-02 Weather Imaging and Line Observation (WILO) 5302018 212019 212019 212019 2272019 0 2210-01 REC Technology Refresh 8302017 3182018 12132018 12132018 1162019 0 3228-01 Enterprise Database Upgrade 882018 1292020 1292020 1292020 1292020 0 17229-01 IT Change and Configuration Management Phase 2 822017 6192018 12132018 12132018 3252019 0 2 -9238-01 Application Authentication Tech Refresh 962017 3192018 12132018 12132018 1302019 0 3239-01 Identity and Access Management 592018 3132019 3132019 3132019 3132019 0 2241-01 AREA - Generation 10112017 3302018 892018 892018 952018 0 -4244-01 Corporate Wireless 11292017 3282018 1252018 1252018 192019 0 9245-01 2017 EPS Metering Enhancements 6272018 892019 892019 892019 9252019 0 1246-01 iTest Data Refresh 12132017 1192018 11152018 11152018 122019 0 25249-01 Secondary Wind Forecasting Service 8302017 2282018 892018 892018 952018 0 0253-01 CIP Recovery Plan Project - Planning Phase 1 1312018 8292018 8292018 8292018 8292018 0 -2

257-01Security Constrained Optimal Powerflow in Study Network Analysis

1262017 10252018 10252018 10252018 1282018 0 19

261-01 Generic Transmission Constraint Calculation 372018 12132018 12132018 12132018 1232019 0 0263-01 Market Simulator 4112018 12132018 12132018 12132018 1302019 0 7265-01 Real-Time Assessment Continuity 1312018 12132018 12132018 12132018 1302019 0 0279-01 Cyber Security Project 24 6272018 10262018 10262018 10262018 11282018 0 0280-01 Quest Software Portfolio Transition 442018 6272018 9262018 9262018 9262018 0 13282-01 Synchronous Condenser Outage Modeling 662018 10252018 10252018 10252018 1252018 0 1Various 2015 CMM NPRRs 2 -18

NPRR519Exemption of ERS-Only QSEs from Collateral and Capitalization Requirements

3152017 5192018 12112018 12112018 12312018 0 See 2015 CMM NPRRs

NPRR620Collateral Requirements for Counter-Parties with No Load or Generation

3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

NPRR660 Remove CRR State Change Adder 3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

Budget HealthSchedule Health

50

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018Project Number Projects in Execution Phase (Count = 42) Phase Start Baseline Go-

Live DateApproved Go-

Live DateScheduled

Go-Live DateScheduled

Phase Finish

NPRR741 Clarifications to TPE and EAL Credit Exposure Calculations 3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

NPRR749 Option Cost for Outstanding CRRs 882018 12132018 12132018 12132018 TBD 0 NA See 2015 CMM NPRRs

NPRR755 Data Agent-Only QSE Registration 3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

NPRR819Modification of Non-Price Error Resettlement Thresholds and Resettlement Clean-Ups

592018 892018 892018 892018 952018 0 36

NPRR833 Modify PTP Obligation Bid Clearing Change 882018 12132018 12132018 12132018 TBD 0 1

NPRR843Short-Term System Adequacy and AS Offer Disclosure Reports Additions

7182018 10252018 10252018 10252018 11282018 0 0

NPRR864 RUC Modifications to Consider Market-Based Solutions 6202018 10252018 10252018 10252018 11282018 0 4SCR777 Bilateral CRR Interface Enhancement 10262016 1022017 11192018 11192018 2272019 0 NA See 181-01

SCR781 RARF Replacement 12202017 4252018 12192018 12192018 12192018 0 3SCR791 Correction of 60-day SCED GRD Disclosure Report 522018 892018 892018 892018 952018 0 39SCR795 Addition of Intra-Hour Wind Forecast to GTBD Calculation 882018 10252018 10252018 10252018 11142018 0 0

Project Number Expedited Projects in Execution (Count = 34)

Project Number Projects in Stabilization (Count = 10) Execution

Phase StartBaseline Go-Live Target

Approved Go-Live Target

ActualGo-Live Date

Scheduled Execution Phase

Finish

NPRR648 Remove References to Flowgate Rights 3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR683 Revision to Available Credit Limit Calculation 3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR743 Revision to MCE to Have a Floor For Load Exposure 3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR760 Calculation of Exposure Variables For Days With No Activity 3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR776 Voltage Set Point Communication 9202017 3192018 452018 452018 952018 0 1

NPRR800Revisions to Credit Exposure Calculations to Use Electricity Futures Market Prices

3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR815Revise the Limitation of Load Resources Providing Responsive Reserve (RRS) Service

3212018 5312018 5312018 5312018 8292018 0 2

209-01 Multi Station Breaker to Breaker One Lines 282017 392018 532018 532018 8222018 0 -1259-01 DC SCADA and Metering Upgrade 10252017 1172018 7252018 7252018 8292018 0 22266-01 Remote Email Access Enhancement 12132017 372018 662018 6192018 9262018 2 -7 2 -9

Schedule Health Budget Health

Budget HealthSchedule Health

51

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018

Project Number Projects On Hold (Count = 2) Forecast

Start DateBaseline

Phase FinishApproved Go-

Live TargetScheduled

Go-Live DateScheduled

Phase Finish

SCR789 Update NMMS Topology Processor to PSSE 34 Capability 0

269-01Document Repository Redesign and Governance Implementation - Phase 1

0

Project Number Projects Completed (Count = 20)

Baseline Execution

Phase Start

Baseline Go-Live Target

Approved Go-Live Target

Actual Go-Live Date

Actual Execution Phase Finish

185-01 Records Management and eDiscovery 12152016 5242017 8292017 8222017 12132017 2 0224-01 TelAlert Replacement 452017 6272017 842017 842017 592018 0 5230-01 SAS Technical Architecture Redesign 312017 12132017 12132017 12132017 6272018 0 2234-01 Reporting Solution Resiliency (RSR) 452017 8232017 11272017 11272017 1102018 0 8240-01 EDI Translator and Mapping Replacement Assessment 4192017 9272017 2282018 TBD 372018 -2 20254-01 Retail Windows Upgrade 10112017 12182017 12182017 1222018 272018 1 -51 65255-01 Settlements Architecture Enhancements 10252017 1112018 1112018 1192018 2142018 1 -10 53258-01 WD Kainos SMART Automation Testing Tool 4112018 642018 642018 662018 7182018 -3 33271-01 Issue Tracking and Resolution Tool Assessment 12132017 4252018 4252018 TBD 522018 1 -5 -1272-01 Operator Training Simulator Black Start GE Effort 1262017 4252018 4252018 4272018 5162018 -1 19274-01 Average Mid-Term Load Forecast 372018 5312018 5312018 5312018 6272018 0 50

NPRR768Revisions to Real-Time On-Line Reliability Deployment Price Adder Categories

372018 5312018 5312018 5312018 6272018 0 16

NPRR778 Modifications to Date Change and Cancellation Evaluation Window 7192017 10292017 12112017 12112017 1312018 0 23

NPRR782Settlement of Infeasible Ancillary Services Due to Transmission Constraints

5242017 8312017 1122017 1122017 1102018 0 20

NPRR808 Three Year CRR Auction 8232017 9182017 9182017 912017 1312018 65 68

NPRR810Applicability of RMR Incentive Factor on Reservation and Transportation Costs Associated with Firm Fuel Supplies

7172017 11122017 3312018 3312018 3312018 0 NA See 233-00

NPRR830 Revision of 4-Coincident Peak Methodology 12132017 262018 262018 262018 372018 0 85

NPRR831 Inclusion of Private Use Networks in Load Zone Price Calculations 822017 1122017 1122017 1122017 2212018 0 33

OBDRR002 ORDC OBD Revisions for PUCT Project 47199 372018 5312018 5312018 5312018 6272018 0 See NPRR768

SCR792 Enhance Communications of BAAL Exceedances 2142018 452018 452018 452018 4252018 0 69

Project Number Expedited Projects Completed (Count = 23)

Budget HealthSchedule Health

Budget HealthSchedule Health

52

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018

Project Number 2018 Projects Not Yet Started (Count = 10) Forecast

Start Date

NPRR858 Provide Complete Current Operating Plan (COP) Data Aug-2018TBD 2018 OS Enhancements Aug-2018TBD Additional Branch Limit for Relays Aug-2018

NPRR817 Create a Panhandle Hub Sep-2018NPRR821 Elimination of the CRR Deration Process Oct-2018NPRR865 Publish RTM Shift Factors for Hubs Load Zones and DC Ties Oct-2018

SCR793SSR Related Telemetry for Transmission Service Provider (TSP) Operators

Oct-2018

ECAP ECAP - ECMS Implementation Phase 2 Oct-2018TBD Job Scheduler Update in CSI Framework Oct-2018TBD Parameter Estimation Oct-2018

53

  • Slide Number 1
  • Slide Number 2
  • Summary ndash July 2018
  • Daily Peak Demand Hourly Average Actual vs Forecast Wind Day-Ahead COPs amp On-Line Capacity at Peak ndash July 2018
  • Actual Wind Output plus Curtailments vs Wind Day-Ahead COPs for All Hours ndash July 2018
  • ERCOTrsquos CPS1 Monthly Performance ndash July 2018
  • Monthly Peak Actual Demand ndash July 2018
  • Monthly Minimum Actual 15-Minute Demand ndash July 2018
  • Day-Ahead Load Forecast Performance ndash July 2018
  • Reliability Unit Commitment (RUC) Capacity by Weather Zone ndash July 2018
  • Generic Transmission Constraints (GTCs) ndash July 2018
  • Advisories and Watches ndash July 2018 Corrected
  • Lake Levels Update ndash August 1 2018
  • Planning Summary ndash July 2018
  • Mapping of Counties to ERCOT Zones ndash July 2018
  • Cumulative MW Capacity of Interconnection Requests by Zone ndashJuly 2018
  • Cumulative MW Capacity of Interconnection Requests by Zone ndashJuly 2018
  • Cumulative MW Capacity of Interconnection Requests by Zone ndashJuly 2018
  • Wind Generation ndash July 2018
  • Solar Generation ndash July 2018
  • Generation Interconnection Activity by Fuel ndash July 2018
  • Generation Interconnection Activity by Project Phase ndash July 2018
  • Slide Number 23
  • Day-Ahead Schedule (Hourly Average) ndash July 2018
  • Percentage of Real-Time Load Hedged in the DAM (Counter-Party Level) ndash July 2018
  • DAM and RTM Price Convergence ndash July 2018
  • Day-Ahead Electricity and Ancillary Service Prices (Hourly Average) ndash July 2018
  • Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash July 2018
  • Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash July 2018
  • DRUC Monthly Summary (Hourly Average) ndash July 2018
  • HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash July 2018
  • NonndashSpinning Reserve Service Deployment ndash July 2018
  • CRR Price Convergence ndash July 2018
  • Daily Average System Lambda and ORDC Price Adders ndash July 2018
  • ERS Procurement for June 2018 ndash September 2018
  • Reliability Services ndash July 2018
  • Ancillary and Other Services ndash July 2018
  • Real-Time Ancillary Service Imbalance (ORDC) ndash July 2018
  • Energy Settlement ndash July 2018
  • Congestion Revenue Rights (CRR) ndash July 2018
  • CRR Balancing Account Fund ndash July 2018
  • Revenue Neutrality ndash July 2018
  • Net Allocation to Load ndash July 2018
  • Advanced Meter Settlement Impacts ndash July 2018
  • ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndash July 2018
  • Retail Transaction Volumes ndash Summary ndash July 2018
  • Retail Transaction Volumes ndash Summary ndash July 2018
  • Slide Number 48
  • ERCOT Portfolio Stoplight Report ndash July 2018
  • ERCOT Portfolio Stoplight Report ndash July 2018
  • ERCOT Portfolio Stoplight Report ndash July 2018
  • ERCOT Portfolio Stoplight Report ndash July 2018
  • ERCOT Portfolio Stoplight Report ndash July 2018
Retail Transactions Summary
July 2018 June 2018 May 2018 April 2018 March 2018 February 2018 January 2018 December 2017 November 2017 October 2017 September 2017 August 2017 July 2017 June 2017 May 2017 April 2017 March 2017 February 2017 January 2017 December 2016 November 2016 October 2016 September 2016 August 2016 July 2016 June 2016 May 2016 April 2016 March 2016 February 2016 January 2016 December 2015 November 2015 October 2015 September 2015 August 2015 July 2015 June 2015 May 2015 April 2015 March 2015 February 2015 January 2015 December 2014 November 2014 October 2014 September 2014 August 2014 July 2014 June 2014 May 2014 April 2014 March 2014 February 2014 January 2014 December 2013 November 2013 October 2013 September 2013 August 2013 July 2013 June 2013 May 2013 April 2013 March 2013 February 2013 January 2013 Grand total
814_01 - Switch Received 121926 109653 96828 81291 95159 76119 88933 60560 77860 78096 79502 84134 84059 108784 130828 71769 67845 66875 87140 66556 56202 64452 67323 86656 82923 86376 75323 70300 76235 68057 63954 61486 52887 65276 70342 81674 91211 102661 86229 81255 79997 73394 72885 71072 67080 110465 175164 89677 99568 101490 111077 91983 93887 71130 86953 69691 55957 166882 82415 93194 102562 103756 116086 78919 68950 64329 67116 1321827
Difference from previous month 12273 12825 15537 (13868) 19040 (12814) 28373 (17300) (236) (1406) (4632) 75 (24725) (22044) 59059 3924 970 (20265) 20584 10354 (8250) (2871) (19333) 3733 (3453) 11053 5023 (5935) 8178 4103 2468 8599 (12389) (5066) (11332) (9537) (11450) 16432 4974 1258 6603 509 1813 3992 (43385) (64699) 85487 (9891) (1922) (9587) 19094 (1904) 22757 (15823) 17262 13734 (110925) 84467 (10779) (9368) (1194) (12330) 37167 9969 4621 (2787)
814_16 - Move - Ins Received 270122 257125 244431 225380 224289 215281 230409 238340 207921 236397 244511 258046 252360 257759 237611 197865 217962 201984 202612 196236 201714 220958 231999 268781 241844 247481 214383 199804 218245 212474 193716 189862 181098 215908 229405 248124 263233 247089 208166 207932 215950 197765 198025 193973 178624 226283 231418 243482 251957 233679 223201 258649 214724 208160 207059 172981 178671 233469 216550 255967 249114 220397 216982 204412 197200 191955 194507 3162148
Difference from previous month 12997 12694 19051 1091 9008 (15128) (7931) 30419 (28476) (8114) (13535) 5686 (5399) 20148 39746 (20097) 15978 (628) 6376 (5478) (19244) (11041) (36782) 26937 (5637) 33098 14579 (18441) 5771 18758 3854 8764 (34810) (13497) (18719) (15109) 16144 38923 234 (8018) 18185 (260) 4052 15349 (47659) (5135) (12064) (8475) 18278 10478 (35448) 43925 6564 1101 34078 (5690) (54798) 16919 (39417) 6853 28717 3415 12570 7212 5245 (2552)
814_24 - MVO and MVO to CSA Received 129820 125861 124403 113795 108753 100127 111821 144987 100830 116519 129103 128104 127073 133582 127218 102055 111459 100285 101107 96289 100578 109493 114094 133170 122932 129025 118022 103789 109278 103747 96628 99552 96214 109578 117949 123894 133905 133855 114675 108275 108859 94864 98233 97901 89578 111857 115918 121662 131607 126785 119107 107956 107266 99428 104273 93385 93977 115469 115524 129594 135196 121446 120049 111598 106467 102429 104399 1660500
814_10 - DTP Mass Acquisition Received - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0
814_10 - DTP Mass Transition Received - 0 - 0 9033 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 639 - 0 - 0 4975 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0
814_18 - CSA AdditionDeletes Received 40217 62083 99016 55581 46720 42587 49740 47725 31726 52888 41597 40616 55770 43745 52139 26702 21791 39082 44030 38884 39856 31786 33061 42622 48489 64178 50499 59475 59400 48536 42179 40351 34796 34420 54677 35078 49489 59611 39384 44247 44577 35386 40420 54831 43550 45039 44268 40405 57954 64408 65032 80184 70310 41156 34811 46680 50347 71847 48606 52585 50867 62747 59763 34925 40977 40389 41227 747237
Total 562085 554722 573711 476047 474921 434114 480903 491612 418337 483900 494713 510900 519262 543870 547796 398391 419057 408226 434889 397965 398350 426689 446477 531229 496188 527060 458227 433368 463158 432814 396477 391251 364995 425182 472373 488770 537838 543216 448454 441709 449383 401409 409563 417777 378832 493644 566768 495865 541086 526362 523392 538772 486187 419874 433096 382737 378952 587667 463095 531340 537739 508346 512880 429854 413594 399102 407249 6891712
Counts from Monthly Retail Transaction report
To do
Break Out 814_10s - AQ and MT
Break Out 814_18 Additions from Deletes
Year-To-Date Transactions Received
Transaction Type July 2018 July 2017 July 2018 July 2017
Switches 669909 617300 121926 84059
Acquisition 0 0 0 0
Move - Ins 1667037 1568153 270122 252360
Move - Outs 814580 802779 129820 127073
Continuous Service Agreements (CSA) 395944 283259 40217 55770
Mass Transitions 9033 0 0 0
Total 3556503 3271491 562085 519262
There has been a change since this was created
Mass Acquisition has been broken out of Mass Transition
Page 8: ERCOT Monthly Operational Overvie · ERCOT Monthly Operational Overview (July 2018) Revised 08.22.18. ERCOT Public. August 15, 2018

PUBLIC

Monthly Minimum Actual 15-Minute Demand ndash July 2018

Preliminary for latest two months of the current year

8

PUBLIC

Day-Ahead Load Forecast Performance ndash July 2018

Mean Absolute Percent Error (MAPE) for ERCOT Mid-Term Load Forecast (MTLF) Run at 1400 Day Ahead

2015MAPE

2016MAPE

2017MAPE

2018MAPE

July 2018MAPE

AverageAnnual MAPE

286 262 255 238 197

LowestMonthly MAPE

189 194 169 165LowestDailyMAPE

055Jul 16

HighestMonthly MAPE

381 386 407 366

Highest DailyMAPE

524Jul 4

9

PUBLIC

Reliability Unit Commitment (RUC) Capacity by Weather Zone ndashJuly 2018

10

PUBLIC

Generic Transmission Constraints (GTCs) ndash July 2018

GTC A transmission flow limit more constraining than a Transmission Elementrsquos normal limit established to constrain flow between geographic areas of the ERCOT Transmission System that is used to enforce stability and voltage constraints that cannot be modeled directly in ERCOTrsquos transmission security analysis applications

Note This table lists how many times a constraint has been activated to avoid exceeding a GTC limit it does not imply an exceedance of the GTC occurred

GTCsJul-17 May-18 Jun-18 Jul-18 Last 12 Months Total

DaysDays Days Days DaysGTCs GTCs GTCs GTCs (Aug 17 ndash Jul 18)

North ndash Houston 1 0 1 0 8

Valley Import 0 4 0 1 15

Panhandle 17 27 23 5 261

Red Tap 0 0 0 0 0North Edinburg ndash

Lobo 0 0 0 0 1Nelson Sharpe ndash

Rio Hondo - 0 2 0 65

East Texas - 0 0 0 16

11

PUBLIC

Advisories and Watches ndash July 2018 Corrected

bull Two OCNs issued for extreme hot weatherndash Issued 714 and 720

bull Four Advisories issued due to Physical Responsive Capability being below 3000 MWndash Issued 718 719 725 and 728

bull One OCN issued due to projected reserve capacity shortage for hours ending 1400 through 1900 ERCOT requested all QSEs to update their COPs

ndash Issued 726

bull One Watch issued due to the post-contingency loss of the Bevo to Asherton 138 kV (SBEVASH8) overloads the Big Wells to Cotulla Sub 69 kV and curtailment of Eagle Pass DC-Tie exports to CENACE

ndash Issued 717

bull Three Watches issued due to the post-contingency loss of Bentsen to Railroad 138 kV (SBENRAI8) overloads South Mission to Railroad 138 kV and curtailment of Railroad DC-Tie exports to CENACE

ndash Issued 723

bull One Watch issued for the de-rate of the Railroad DC-Tie and curtailment of the DC-Tie exports to CENACE

ndash Issued 731

12

PUBLIC

Lake Levels Update ndash August 1 2018

13

PUBLIC

Planning Summary ndash July 2018

bull ERCOT is currently tracking 404 active generation interconnection requests totaling 79852 MW This includes 37697 MW of wind generation

bull ERCOT is currently reviewing proposed transmission improvements with a total cost of $6035 million

bull Transmission Projects endorsed in 2018 total $3935 million

bull All projects (in engineering routing licensing and construction) total approximately $649 billion (as of June 1 2018)

bull Transmission Projects energized in 2018 total about $1120 billion (as of June 1 2018)

14

PUBLIC

Mapping of Counties to ERCOT Zones ndash July 2018

15

PUBLIC

Cumulative MW Capacity of Interconnection Requests by Zone ndashJuly 2018

16

PUBLIC

Cumulative MW Capacity of Interconnection Requests by Zone ndashJuly 2018

17

PUBLIC

Cumulative MW Capacity of Interconnection Requests by Zone ndashJuly 2018

18

PUBLIC

Wind Generation ndash July 2018

19

PUBLIC

Solar Generation ndash July 2018

20

PUBLIC

Generation Interconnection Activity by Fuel ndash July 2018

21

PUBLIC

Generation Interconnection Activity by Project Phase ndash July 2018

22

Market Operations

PUBLIC

Day-Ahead Schedule (Hourly Average) ndash July 2018

24

0

10000

20000

30000

40000

50000

60000

70000

80000

MW

Hour Ending

Scheduled Energy Only OfferScheduled Three-part OfferDAM Energy PurchaseRT System Load

Liquidity and activity are normal in the Day-Ahead Market

PUBLIC

Percentage of Real-Time Load Hedged in the DAM (Counter-Party Level) ndashJuly 2018

25

0

20

40

60

80

100

120Ja

nM

arM

ay Jul

Sep

Nov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May

July

2013 2014 2015 2016 2017 2018

The dotted lines represent the bounds for major outliers

PUBLIC

DAM and RTM Price Convergence ndash July 2018

26

-20

-10

0

10

20

30

40

50

60Ja

nM

arM

ay Jul

Sep

Nov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

l

2013 2014 2015 2016 2017 2018

Aver

age

DAM

-R

TM S

PP ($

MW

h)

The dotted lines represent the bounds for major outliers

PUBLIC

Day-Ahead Electricity and Ancillary Service Prices (Hourly Average) ndashJuly 2018

27

0

100

200

300

400

500

600

Pric

e ($

MW

h)

Hour Ending

Regulation Up

Regulation Down

Responsive Reserve

Non Spinning Reserve

DAM Power Balance Price(System Lambda)

Ancillary Service prices reflect the opportunity cost of energy

PUBLIC

Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash July 2018

28

0

100

200

300

400

500

600

Pric

e ($

MW

h)

Hour Ending

RTSPP - LZ West

RTSPP - LZ North

RTSPP - LZ South

RTSPP - LZ Houston

DASPP - LZ West

DASPP - LZ North

DASPP - LZ South

DASPP - LZ Houston

Prices reflect relative transmission congestion and system scarcity

PUBLIC

Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash July 2018

29

0

100

200

300

400

500

600

Pric

e ($

MW

h)

Hour Ending

RTSPP - Hub Average

DASPP - Hub Average

Energy prices reflect the risk premium between Day-Ahead amp Real-Time

PUBLIC

DRUC Monthly Summary (Hourly Average) ndash July 2018

30

0

15000

30000

45000

60000

75000

90000

MW

h

Hour Ending

Self Scheduled Capacity

Self Scheduled Ancillary Service Limit

Load Forecast

DRUC Recommended Capacity

31 executions (0 missed)0 published after 160011 minutes average execution time0 Resources committed

PUBLIC

HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash July 2018

31

0

02

04

06

08

1

0

20

40

60

80

100

RTO

RD

PA ($

MW

h)

MW

h

Hour Ending

744 executions (0 missed)8 minutes average execution time1 Resources committed through HRUC or by a Verbal Dispatch Instruction

The dotted line indicates the average RTORDPA

PUBLIC

NonndashSpinning Reserve Service Deployment ndash July 2018

32

Deployment Start Time

Deployment End Time

Deployment Duration (Hours)

Max Deployment(MW) Reason

NA

PUBLIC

CRR Price Convergence ndash July 2018

0

50

100

150

200

250

Mill

ions

$

Cost

Value

Congestion Revenue Right cost in auction convergence with payment in Day-Ahead Market and Real Time Market

33

PUBLIC

Daily Average System Lambda and ORDC Price Adders ndash July 2018

0

50

100

150

200

250

$M

Wh

Day of Month

RTOFFPA

RTORPA

SYSTEM_LAMBDA

34

PUBLIC

ERS Procurement for June 2018 ndash September 2018

TP1 TP2 TP3 TP4 TP5 TP6

Non Weather-Sensitive ERS-10 MW 160562 165996 143324 140708 156699 151138

Non Weather-Sensitive ERS-30 MW 736864 781559 702529 625067 755153 657394

Weather-Sensitive ERS-10 MW 0 0 0 0 0 0

Weather-Sensitive ERS-30 MW 0 0 11850 11850 0 0

Total MW Procured 897426 947555 857703 777625 911852 808532

Clearing Price $201 $185 $2108 $2177 $199 $225

Time Period Time Period Hours

Time Period 1 Hours Ending 0600 - 0800 (50000 am to 80000 am) Monday through Friday except ERCOT Holidays

Time Period 2 Hours Ending 0900 - 1300 (80000 am to 10000 pm) Monday through Friday except ERCOT Holidays

Time Period 3 Hours Ending 1400 - 1600 (10000 pm to 40000 pm) Monday through Friday except ERCOT Holidays

Time Period 4 Hours Ending 1700 - 1900 (40000 pm to 70000 pm) Monday through Friday except ERCOT Holidays

Time Period 5 Hours Ending 2000 - 2200 (70000 pm to 100000 pm) Monday through Friday except ERCOT Holidays Time Period 6 All other hours

35

PUBLIC

Reliability Services ndash July 2018

Reliability Unit Commitment (RUC) $ in Millions

RUC Make-Whole Payments $000

RUC Clawback Charges $000

RUC Commitment Settlement $000

RUC Capacity Short Charges $000

RUC Make-Whole Uplift $000

RUC Commitment Cost Allocation $000

RUC Decommitment Payments $000

Total RUC Allocation to Load $000

In July 2018 there was a credit of $000M allocated to load for RUC compared to bull A credit of $000M in June 2018bull A credit of $003M in July 2017

36

PUBLIC

Ancillary and Other Services ndash July 2018

Ancillary and Other Services $ in Millions

Regulation Up Service $1105

Regulation Down Service $072

Responsive Reserve Service $7177

Non-Spinning Reserve Service $1787

Black Start Service $059

Voltage Services - Reactive Power $000

Voltage Services - Lost Opportunity $000

Total Charges Allocated to Load $10200

In July 2018 Ancillary and Other Services was a charge of $10200M compared to bull A charge of $2001M in June 2018bull A charge of $2322M in July 2017

37

PUBLIC

Real-Time Ancillary Service Imbalance (ORDC) ndash July 2018

In July 2018 Real-Time Ancillary Service Imbalance was a charge to load of $2228K compared to bull A charge of $147K in June 2018bull A charge of $534K in July 2017

Real-Time Ancillary Service Imbalance $ in Thousands

Real-Time AS Imbalance ($2228)

Real-Time Reliability Deployment AS Imbalance $000

Total RTASI Amount Allocated to Load $2228

38

PUBLIC

Energy Settlement ndash July 2018

39

Day-Ahead Market Energy Settlement $ in Millions

Energy Purchases $215396

Point to Point Obligation Purchases $11726

Energy Sales ($212592)

Day-Ahead Congestion Rent $14531

Day-Ahead Market Make-Whole Payments ($001)

Real-Time Market Energy Settlement $ in Millions

Energy Imbalance at a Resource Node ($91963)

Energy Imbalance at a Load Zone $160737

Energy Imbalance at a Hub ($57497)

Net Real-Time Energy Imbalance $11276

Real Time Congestion from Self Schedules $013

Block Load Transfers and DC Ties ($2063)

Total Impact to Revenue Neutrality $9227

Load-Allocated Emergency Energy Payments ($016)

Load-Allocated Base Point Deviation Charges $026

Day-Ahead Market energy settlement activity increased from last month and increased from July 2017

Real-Time Market energy settlement activity increased from last month and increased from July 2017

PUBLIC

Congestion Revenue Rights (CRR) ndash July 2018

$ in Millions

Long-Term Auction ($4026)

Monthly Auction ($1773)

Total Auction Revenue ($5799)

Day-Ahead CRR Settlements ($15797)

Day-Ahead CRR Short-Charges $1885

Day-Ahead CRR Short-Charges Refunded ($899)

Day-Ahead CRR Short-Charges Net $986

Total CRR Funding ($14810)

Day-Ahead Point-to-Point Obligations $11726

Real-Time Point-to-Point Obligations ($10113)

Net Point-to-Point Obligations $1614

Congestion Revenue Rights settlement payments were not fully funded Partial funding to settle the CRR Short Charges was provided from the CRR Balancing Account Fund and the remaining $986M of CRR Short Charges were not refunded The CRR Fund Balance is now $0

Point to Point Obligations settled with a net charge of $1614M compared to a net credit of $1758M last month

40

PUBLIC

CRR Balancing Account Fund ndash July 2018

CRR Balancing Account $ in Millions

Monthly Day-Ahead Congestion Rent $14531

Monthly Day-Ahead CRR Settlements ($15797)

Monthly Day-Ahead CRR Short -Charges $1885

CRR Balancing Account Credit Total $619

Beginning Fund Balance for the Month $275

CRR Balancing Account Credit Total $619

Day-Ahead CRR Short-Charges Refunded ($899)

CRR PTP Option Award Charges $004

Load-Allocated CRR Amount $000

Total Fund Amount $000

41

PUBLIC

Revenue Neutrality ndash July 2018

Revenue Neutrality $ in Millions

Real-Time Energy Imbalance $11276

Real-Time Point to Point Obligation ($10113)

Real-Time Congestion from Self-Schedules $013

DC Tie amp Block Load Transfer ($2063)

Allocation to Load $886

In July 2018 the Revenue Neutrality charge to load was $886M compared to bull A charge of $3046M in June 2018bull A charge of $145M in July 2017

42

PUBLIC

Net Allocation to Load ndash July 2018

Market-Based Allocation $ in Millions

Reliability Unit Commitment $000

Ancillary and Other Services $10200

Real-Time Ancillary Service Imbalance $223

Emergency Energy $016

Base Point Deviation ($026)

CRR Auction Revenue ($5799)

CRR Balancing Account $000

Real-Time Revenue Neutrality $886

Reliability Must Run $000

Monthly Block Load Transfer $000

Total $5500

Fee AllocationERCOT Administrative Fee $2207

Net Allocated to Load $7707

In July 2018 the Net Allocation to load was a charge of $7707M compared to bull A charge of $2152M in June 2018bull A credit of $1363M in July 2017

43

PUBLIC

Advanced Meter Settlement Impacts ndash July 2018

July 2018 At month end settling 72M ESIIDs using Advanced Meter data

July 2018 990 of the load in ERCOT is settled with 15-min interval data (AMS Competitive IDR and NOIE IDR)

44

PUBLIC

ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndashJuly 2018

45

PUBLIC

Retail Transaction Volumes ndash Summary ndash July 2018

46

Transaction Type July 2018 July 2017 July 2018 July 2017

Switches 669909 617300 121926 84059

Acquisition 0 0 0 0

Move - Ins 1667037 1568153 270122 252360

Move - Outs 814580 802779 129820 127073

Continuous Service Agreements (CSA) 395944 283259 40217 55770

Mass Transitions 9033 0 0 0

Total 3556503 3271491 562085 519262

Year-To-Date Transactions Received

Board Presentation Input

Trans Volumes by Month_New

PUBLIC

Retail Transaction Volumes ndash Summary ndash July 2018

SwitchesAcquisitions Move-Ins

Move-Outs Mass Transition

47

Projects Report

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018

20000000$ 2018 Portfolio

Spending Estimate

Projects In FlightOn Hold (Count = 100) 24905011$

Projects Not Yet Started (Count = 10) 1320628$

Projects Completed (Count = 43) 795250$

(7020889)$

TOTAL 20000000$

Project Number Projects in Initiation Phase (Count = 4)

TBD IT Asset RecoveryNPRR842 Study Area Load Information

209-03 Study Network (STNET) Integration288-01 EDI Map and Translator Replacement

Impact Metric TolerancesUnfavorable variances are represented as negative numbers within the report - Green = No more than 49 unfavorable variance - Yellow = Unfavorable variance between 49 and 99 - Red = Unfavorable variance more than 99

Spending Reductions Required to Maintain Capital Budget

2018 Project Funding

Footnotes1 - One or more phases took longer than expected resulting in additional time required

2 - One or more phases required more labor than expected resulting in additional funding andor time required

3 - Project placed on holdNA - Metric not calculated because - it is reported at the parent project level or - it is an administrative project

Project Number Projects in Planning Phase (Count = 8) Phase Start Baseline

Phase FinishApproved

Phase FinishScheduled

Go-Live DateScheduled

Phase Finish

134-02 Privileged Account Management (PAM) Phase 2 882018 12192018 12192018 TBD 12192018 0 10

183-01 CMM-FT GUI Integration 12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs

242-01 Portfolio Reporting Assessment 1182017 12192018 12192018 TBD 12192018 0 21260-01 Information Governance Assessment 10182017 5302018 9192018 TBD 9192018 0 5286-01 Java Platform Assessment 6202018 11212018 11212018 TBD 11212018 0 6287-01 Security Constrained Unit Commitment (SCUC) 882018 2272019 2272019 TBD 2272019 0 -1

NPRR484Revisions to Congestion Revenue Rights Credit Calculations and Payments - Phase 1b 2

12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs

NPRR702Flexible Accounts Payment of Invoices and Disposition of Interest on Cash Collateral

12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs

Schedule Health Budget Health

49

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018Project Number Projects in Execution Phase (Count = 42) Phase Start Baseline Go-

Live DateApproved Go-

Live DateScheduled

Go-Live DateScheduled

Phase Finish

170-01 Enterprise Content Alignment Program 8262015 11152017 8312018 8312018 8312018 0 0170-06 ECAP - ECMS Implementation Phase 1 4252018 11302018 11302018 11302018 11302018 0 3173-02 ERCOT Flight Certification Website 11152017 2282019 2282019 2282019 5312019 0 2181-01 CRR Framework Upgrade 10262016 1022017 11192018 11192018 2272019 0 2

183-01 CMM Tech Refresh 3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

193-01 PMU Tool Evaluation and Implementation 12132017 892018 2152019 2152019 3202019 0 0196-01 GINR Project Status Application Replacement 12212016 9142017 2282019 2282019 3312019 0 1198-02 Reactive Power Coordination PoC 962017 6162018 8152018 8152018 8152018 0 54209-02 Weather Imaging and Line Observation (WILO) 5302018 212019 212019 212019 2272019 0 2210-01 REC Technology Refresh 8302017 3182018 12132018 12132018 1162019 0 3228-01 Enterprise Database Upgrade 882018 1292020 1292020 1292020 1292020 0 17229-01 IT Change and Configuration Management Phase 2 822017 6192018 12132018 12132018 3252019 0 2 -9238-01 Application Authentication Tech Refresh 962017 3192018 12132018 12132018 1302019 0 3239-01 Identity and Access Management 592018 3132019 3132019 3132019 3132019 0 2241-01 AREA - Generation 10112017 3302018 892018 892018 952018 0 -4244-01 Corporate Wireless 11292017 3282018 1252018 1252018 192019 0 9245-01 2017 EPS Metering Enhancements 6272018 892019 892019 892019 9252019 0 1246-01 iTest Data Refresh 12132017 1192018 11152018 11152018 122019 0 25249-01 Secondary Wind Forecasting Service 8302017 2282018 892018 892018 952018 0 0253-01 CIP Recovery Plan Project - Planning Phase 1 1312018 8292018 8292018 8292018 8292018 0 -2

257-01Security Constrained Optimal Powerflow in Study Network Analysis

1262017 10252018 10252018 10252018 1282018 0 19

261-01 Generic Transmission Constraint Calculation 372018 12132018 12132018 12132018 1232019 0 0263-01 Market Simulator 4112018 12132018 12132018 12132018 1302019 0 7265-01 Real-Time Assessment Continuity 1312018 12132018 12132018 12132018 1302019 0 0279-01 Cyber Security Project 24 6272018 10262018 10262018 10262018 11282018 0 0280-01 Quest Software Portfolio Transition 442018 6272018 9262018 9262018 9262018 0 13282-01 Synchronous Condenser Outage Modeling 662018 10252018 10252018 10252018 1252018 0 1Various 2015 CMM NPRRs 2 -18

NPRR519Exemption of ERS-Only QSEs from Collateral and Capitalization Requirements

3152017 5192018 12112018 12112018 12312018 0 See 2015 CMM NPRRs

NPRR620Collateral Requirements for Counter-Parties with No Load or Generation

3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

NPRR660 Remove CRR State Change Adder 3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

Budget HealthSchedule Health

50

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018Project Number Projects in Execution Phase (Count = 42) Phase Start Baseline Go-

Live DateApproved Go-

Live DateScheduled

Go-Live DateScheduled

Phase Finish

NPRR741 Clarifications to TPE and EAL Credit Exposure Calculations 3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

NPRR749 Option Cost for Outstanding CRRs 882018 12132018 12132018 12132018 TBD 0 NA See 2015 CMM NPRRs

NPRR755 Data Agent-Only QSE Registration 3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

NPRR819Modification of Non-Price Error Resettlement Thresholds and Resettlement Clean-Ups

592018 892018 892018 892018 952018 0 36

NPRR833 Modify PTP Obligation Bid Clearing Change 882018 12132018 12132018 12132018 TBD 0 1

NPRR843Short-Term System Adequacy and AS Offer Disclosure Reports Additions

7182018 10252018 10252018 10252018 11282018 0 0

NPRR864 RUC Modifications to Consider Market-Based Solutions 6202018 10252018 10252018 10252018 11282018 0 4SCR777 Bilateral CRR Interface Enhancement 10262016 1022017 11192018 11192018 2272019 0 NA See 181-01

SCR781 RARF Replacement 12202017 4252018 12192018 12192018 12192018 0 3SCR791 Correction of 60-day SCED GRD Disclosure Report 522018 892018 892018 892018 952018 0 39SCR795 Addition of Intra-Hour Wind Forecast to GTBD Calculation 882018 10252018 10252018 10252018 11142018 0 0

Project Number Expedited Projects in Execution (Count = 34)

Project Number Projects in Stabilization (Count = 10) Execution

Phase StartBaseline Go-Live Target

Approved Go-Live Target

ActualGo-Live Date

Scheduled Execution Phase

Finish

NPRR648 Remove References to Flowgate Rights 3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR683 Revision to Available Credit Limit Calculation 3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR743 Revision to MCE to Have a Floor For Load Exposure 3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR760 Calculation of Exposure Variables For Days With No Activity 3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR776 Voltage Set Point Communication 9202017 3192018 452018 452018 952018 0 1

NPRR800Revisions to Credit Exposure Calculations to Use Electricity Futures Market Prices

3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR815Revise the Limitation of Load Resources Providing Responsive Reserve (RRS) Service

3212018 5312018 5312018 5312018 8292018 0 2

209-01 Multi Station Breaker to Breaker One Lines 282017 392018 532018 532018 8222018 0 -1259-01 DC SCADA and Metering Upgrade 10252017 1172018 7252018 7252018 8292018 0 22266-01 Remote Email Access Enhancement 12132017 372018 662018 6192018 9262018 2 -7 2 -9

Schedule Health Budget Health

Budget HealthSchedule Health

51

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018

Project Number Projects On Hold (Count = 2) Forecast

Start DateBaseline

Phase FinishApproved Go-

Live TargetScheduled

Go-Live DateScheduled

Phase Finish

SCR789 Update NMMS Topology Processor to PSSE 34 Capability 0

269-01Document Repository Redesign and Governance Implementation - Phase 1

0

Project Number Projects Completed (Count = 20)

Baseline Execution

Phase Start

Baseline Go-Live Target

Approved Go-Live Target

Actual Go-Live Date

Actual Execution Phase Finish

185-01 Records Management and eDiscovery 12152016 5242017 8292017 8222017 12132017 2 0224-01 TelAlert Replacement 452017 6272017 842017 842017 592018 0 5230-01 SAS Technical Architecture Redesign 312017 12132017 12132017 12132017 6272018 0 2234-01 Reporting Solution Resiliency (RSR) 452017 8232017 11272017 11272017 1102018 0 8240-01 EDI Translator and Mapping Replacement Assessment 4192017 9272017 2282018 TBD 372018 -2 20254-01 Retail Windows Upgrade 10112017 12182017 12182017 1222018 272018 1 -51 65255-01 Settlements Architecture Enhancements 10252017 1112018 1112018 1192018 2142018 1 -10 53258-01 WD Kainos SMART Automation Testing Tool 4112018 642018 642018 662018 7182018 -3 33271-01 Issue Tracking and Resolution Tool Assessment 12132017 4252018 4252018 TBD 522018 1 -5 -1272-01 Operator Training Simulator Black Start GE Effort 1262017 4252018 4252018 4272018 5162018 -1 19274-01 Average Mid-Term Load Forecast 372018 5312018 5312018 5312018 6272018 0 50

NPRR768Revisions to Real-Time On-Line Reliability Deployment Price Adder Categories

372018 5312018 5312018 5312018 6272018 0 16

NPRR778 Modifications to Date Change and Cancellation Evaluation Window 7192017 10292017 12112017 12112017 1312018 0 23

NPRR782Settlement of Infeasible Ancillary Services Due to Transmission Constraints

5242017 8312017 1122017 1122017 1102018 0 20

NPRR808 Three Year CRR Auction 8232017 9182017 9182017 912017 1312018 65 68

NPRR810Applicability of RMR Incentive Factor on Reservation and Transportation Costs Associated with Firm Fuel Supplies

7172017 11122017 3312018 3312018 3312018 0 NA See 233-00

NPRR830 Revision of 4-Coincident Peak Methodology 12132017 262018 262018 262018 372018 0 85

NPRR831 Inclusion of Private Use Networks in Load Zone Price Calculations 822017 1122017 1122017 1122017 2212018 0 33

OBDRR002 ORDC OBD Revisions for PUCT Project 47199 372018 5312018 5312018 5312018 6272018 0 See NPRR768

SCR792 Enhance Communications of BAAL Exceedances 2142018 452018 452018 452018 4252018 0 69

Project Number Expedited Projects Completed (Count = 23)

Budget HealthSchedule Health

Budget HealthSchedule Health

52

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018

Project Number 2018 Projects Not Yet Started (Count = 10) Forecast

Start Date

NPRR858 Provide Complete Current Operating Plan (COP) Data Aug-2018TBD 2018 OS Enhancements Aug-2018TBD Additional Branch Limit for Relays Aug-2018

NPRR817 Create a Panhandle Hub Sep-2018NPRR821 Elimination of the CRR Deration Process Oct-2018NPRR865 Publish RTM Shift Factors for Hubs Load Zones and DC Ties Oct-2018

SCR793SSR Related Telemetry for Transmission Service Provider (TSP) Operators

Oct-2018

ECAP ECAP - ECMS Implementation Phase 2 Oct-2018TBD Job Scheduler Update in CSI Framework Oct-2018TBD Parameter Estimation Oct-2018

53

  • Slide Number 1
  • Slide Number 2
  • Summary ndash July 2018
  • Daily Peak Demand Hourly Average Actual vs Forecast Wind Day-Ahead COPs amp On-Line Capacity at Peak ndash July 2018
  • Actual Wind Output plus Curtailments vs Wind Day-Ahead COPs for All Hours ndash July 2018
  • ERCOTrsquos CPS1 Monthly Performance ndash July 2018
  • Monthly Peak Actual Demand ndash July 2018
  • Monthly Minimum Actual 15-Minute Demand ndash July 2018
  • Day-Ahead Load Forecast Performance ndash July 2018
  • Reliability Unit Commitment (RUC) Capacity by Weather Zone ndash July 2018
  • Generic Transmission Constraints (GTCs) ndash July 2018
  • Advisories and Watches ndash July 2018 Corrected
  • Lake Levels Update ndash August 1 2018
  • Planning Summary ndash July 2018
  • Mapping of Counties to ERCOT Zones ndash July 2018
  • Cumulative MW Capacity of Interconnection Requests by Zone ndashJuly 2018
  • Cumulative MW Capacity of Interconnection Requests by Zone ndashJuly 2018
  • Cumulative MW Capacity of Interconnection Requests by Zone ndashJuly 2018
  • Wind Generation ndash July 2018
  • Solar Generation ndash July 2018
  • Generation Interconnection Activity by Fuel ndash July 2018
  • Generation Interconnection Activity by Project Phase ndash July 2018
  • Slide Number 23
  • Day-Ahead Schedule (Hourly Average) ndash July 2018
  • Percentage of Real-Time Load Hedged in the DAM (Counter-Party Level) ndash July 2018
  • DAM and RTM Price Convergence ndash July 2018
  • Day-Ahead Electricity and Ancillary Service Prices (Hourly Average) ndash July 2018
  • Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash July 2018
  • Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash July 2018
  • DRUC Monthly Summary (Hourly Average) ndash July 2018
  • HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash July 2018
  • NonndashSpinning Reserve Service Deployment ndash July 2018
  • CRR Price Convergence ndash July 2018
  • Daily Average System Lambda and ORDC Price Adders ndash July 2018
  • ERS Procurement for June 2018 ndash September 2018
  • Reliability Services ndash July 2018
  • Ancillary and Other Services ndash July 2018
  • Real-Time Ancillary Service Imbalance (ORDC) ndash July 2018
  • Energy Settlement ndash July 2018
  • Congestion Revenue Rights (CRR) ndash July 2018
  • CRR Balancing Account Fund ndash July 2018
  • Revenue Neutrality ndash July 2018
  • Net Allocation to Load ndash July 2018
  • Advanced Meter Settlement Impacts ndash July 2018
  • ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndash July 2018
  • Retail Transaction Volumes ndash Summary ndash July 2018
  • Retail Transaction Volumes ndash Summary ndash July 2018
  • Slide Number 48
  • ERCOT Portfolio Stoplight Report ndash July 2018
  • ERCOT Portfolio Stoplight Report ndash July 2018
  • ERCOT Portfolio Stoplight Report ndash July 2018
  • ERCOT Portfolio Stoplight Report ndash July 2018
  • ERCOT Portfolio Stoplight Report ndash July 2018
Retail Transactions Summary
July 2018 June 2018 May 2018 April 2018 March 2018 February 2018 January 2018 December 2017 November 2017 October 2017 September 2017 August 2017 July 2017 June 2017 May 2017 April 2017 March 2017 February 2017 January 2017 December 2016 November 2016 October 2016 September 2016 August 2016 July 2016 June 2016 May 2016 April 2016 March 2016 February 2016 January 2016 December 2015 November 2015 October 2015 September 2015 August 2015 July 2015 June 2015 May 2015 April 2015 March 2015 February 2015 January 2015 December 2014 November 2014 October 2014 September 2014 August 2014 July 2014 June 2014 May 2014 April 2014 March 2014 February 2014 January 2014 December 2013 November 2013 October 2013 September 2013 August 2013 July 2013 June 2013 May 2013 April 2013 March 2013 February 2013 January 2013 Grand total
814_01 - Switch Received 121926 109653 96828 81291 95159 76119 88933 60560 77860 78096 79502 84134 84059 108784 130828 71769 67845 66875 87140 66556 56202 64452 67323 86656 82923 86376 75323 70300 76235 68057 63954 61486 52887 65276 70342 81674 91211 102661 86229 81255 79997 73394 72885 71072 67080 110465 175164 89677 99568 101490 111077 91983 93887 71130 86953 69691 55957 166882 82415 93194 102562 103756 116086 78919 68950 64329 67116 1321827
Difference from previous month 12273 12825 15537 (13868) 19040 (12814) 28373 (17300) (236) (1406) (4632) 75 (24725) (22044) 59059 3924 970 (20265) 20584 10354 (8250) (2871) (19333) 3733 (3453) 11053 5023 (5935) 8178 4103 2468 8599 (12389) (5066) (11332) (9537) (11450) 16432 4974 1258 6603 509 1813 3992 (43385) (64699) 85487 (9891) (1922) (9587) 19094 (1904) 22757 (15823) 17262 13734 (110925) 84467 (10779) (9368) (1194) (12330) 37167 9969 4621 (2787)
814_16 - Move - Ins Received 270122 257125 244431 225380 224289 215281 230409 238340 207921 236397 244511 258046 252360 257759 237611 197865 217962 201984 202612 196236 201714 220958 231999 268781 241844 247481 214383 199804 218245 212474 193716 189862 181098 215908 229405 248124 263233 247089 208166 207932 215950 197765 198025 193973 178624 226283 231418 243482 251957 233679 223201 258649 214724 208160 207059 172981 178671 233469 216550 255967 249114 220397 216982 204412 197200 191955 194507 3162148
Difference from previous month 12997 12694 19051 1091 9008 (15128) (7931) 30419 (28476) (8114) (13535) 5686 (5399) 20148 39746 (20097) 15978 (628) 6376 (5478) (19244) (11041) (36782) 26937 (5637) 33098 14579 (18441) 5771 18758 3854 8764 (34810) (13497) (18719) (15109) 16144 38923 234 (8018) 18185 (260) 4052 15349 (47659) (5135) (12064) (8475) 18278 10478 (35448) 43925 6564 1101 34078 (5690) (54798) 16919 (39417) 6853 28717 3415 12570 7212 5245 (2552)
814_24 - MVO and MVO to CSA Received 129820 125861 124403 113795 108753 100127 111821 144987 100830 116519 129103 128104 127073 133582 127218 102055 111459 100285 101107 96289 100578 109493 114094 133170 122932 129025 118022 103789 109278 103747 96628 99552 96214 109578 117949 123894 133905 133855 114675 108275 108859 94864 98233 97901 89578 111857 115918 121662 131607 126785 119107 107956 107266 99428 104273 93385 93977 115469 115524 129594 135196 121446 120049 111598 106467 102429 104399 1660500
814_10 - DTP Mass Acquisition Received - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0
814_10 - DTP Mass Transition Received - 0 - 0 9033 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 639 - 0 - 0 4975 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0
814_18 - CSA AdditionDeletes Received 40217 62083 99016 55581 46720 42587 49740 47725 31726 52888 41597 40616 55770 43745 52139 26702 21791 39082 44030 38884 39856 31786 33061 42622 48489 64178 50499 59475 59400 48536 42179 40351 34796 34420 54677 35078 49489 59611 39384 44247 44577 35386 40420 54831 43550 45039 44268 40405 57954 64408 65032 80184 70310 41156 34811 46680 50347 71847 48606 52585 50867 62747 59763 34925 40977 40389 41227 747237
Total 562085 554722 573711 476047 474921 434114 480903 491612 418337 483900 494713 510900 519262 543870 547796 398391 419057 408226 434889 397965 398350 426689 446477 531229 496188 527060 458227 433368 463158 432814 396477 391251 364995 425182 472373 488770 537838 543216 448454 441709 449383 401409 409563 417777 378832 493644 566768 495865 541086 526362 523392 538772 486187 419874 433096 382737 378952 587667 463095 531340 537739 508346 512880 429854 413594 399102 407249 6891712
Counts from Monthly Retail Transaction report
To do
Break Out 814_10s - AQ and MT
Break Out 814_18 Additions from Deletes
Year-To-Date Transactions Received
Transaction Type July 2018 July 2017 July 2018 July 2017
Switches 669909 617300 121926 84059
Acquisition 0 0 0 0
Move - Ins 1667037 1568153 270122 252360
Move - Outs 814580 802779 129820 127073
Continuous Service Agreements (CSA) 395944 283259 40217 55770
Mass Transitions 9033 0 0 0
Total 3556503 3271491 562085 519262
There has been a change since this was created
Mass Acquisition has been broken out of Mass Transition
Page 9: ERCOT Monthly Operational Overvie · ERCOT Monthly Operational Overview (July 2018) Revised 08.22.18. ERCOT Public. August 15, 2018

PUBLIC

Day-Ahead Load Forecast Performance ndash July 2018

Mean Absolute Percent Error (MAPE) for ERCOT Mid-Term Load Forecast (MTLF) Run at 1400 Day Ahead

2015MAPE

2016MAPE

2017MAPE

2018MAPE

July 2018MAPE

AverageAnnual MAPE

286 262 255 238 197

LowestMonthly MAPE

189 194 169 165LowestDailyMAPE

055Jul 16

HighestMonthly MAPE

381 386 407 366

Highest DailyMAPE

524Jul 4

9

PUBLIC

Reliability Unit Commitment (RUC) Capacity by Weather Zone ndashJuly 2018

10

PUBLIC

Generic Transmission Constraints (GTCs) ndash July 2018

GTC A transmission flow limit more constraining than a Transmission Elementrsquos normal limit established to constrain flow between geographic areas of the ERCOT Transmission System that is used to enforce stability and voltage constraints that cannot be modeled directly in ERCOTrsquos transmission security analysis applications

Note This table lists how many times a constraint has been activated to avoid exceeding a GTC limit it does not imply an exceedance of the GTC occurred

GTCsJul-17 May-18 Jun-18 Jul-18 Last 12 Months Total

DaysDays Days Days DaysGTCs GTCs GTCs GTCs (Aug 17 ndash Jul 18)

North ndash Houston 1 0 1 0 8

Valley Import 0 4 0 1 15

Panhandle 17 27 23 5 261

Red Tap 0 0 0 0 0North Edinburg ndash

Lobo 0 0 0 0 1Nelson Sharpe ndash

Rio Hondo - 0 2 0 65

East Texas - 0 0 0 16

11

PUBLIC

Advisories and Watches ndash July 2018 Corrected

bull Two OCNs issued for extreme hot weatherndash Issued 714 and 720

bull Four Advisories issued due to Physical Responsive Capability being below 3000 MWndash Issued 718 719 725 and 728

bull One OCN issued due to projected reserve capacity shortage for hours ending 1400 through 1900 ERCOT requested all QSEs to update their COPs

ndash Issued 726

bull One Watch issued due to the post-contingency loss of the Bevo to Asherton 138 kV (SBEVASH8) overloads the Big Wells to Cotulla Sub 69 kV and curtailment of Eagle Pass DC-Tie exports to CENACE

ndash Issued 717

bull Three Watches issued due to the post-contingency loss of Bentsen to Railroad 138 kV (SBENRAI8) overloads South Mission to Railroad 138 kV and curtailment of Railroad DC-Tie exports to CENACE

ndash Issued 723

bull One Watch issued for the de-rate of the Railroad DC-Tie and curtailment of the DC-Tie exports to CENACE

ndash Issued 731

12

PUBLIC

Lake Levels Update ndash August 1 2018

13

PUBLIC

Planning Summary ndash July 2018

bull ERCOT is currently tracking 404 active generation interconnection requests totaling 79852 MW This includes 37697 MW of wind generation

bull ERCOT is currently reviewing proposed transmission improvements with a total cost of $6035 million

bull Transmission Projects endorsed in 2018 total $3935 million

bull All projects (in engineering routing licensing and construction) total approximately $649 billion (as of June 1 2018)

bull Transmission Projects energized in 2018 total about $1120 billion (as of June 1 2018)

14

PUBLIC

Mapping of Counties to ERCOT Zones ndash July 2018

15

PUBLIC

Cumulative MW Capacity of Interconnection Requests by Zone ndashJuly 2018

16

PUBLIC

Cumulative MW Capacity of Interconnection Requests by Zone ndashJuly 2018

17

PUBLIC

Cumulative MW Capacity of Interconnection Requests by Zone ndashJuly 2018

18

PUBLIC

Wind Generation ndash July 2018

19

PUBLIC

Solar Generation ndash July 2018

20

PUBLIC

Generation Interconnection Activity by Fuel ndash July 2018

21

PUBLIC

Generation Interconnection Activity by Project Phase ndash July 2018

22

Market Operations

PUBLIC

Day-Ahead Schedule (Hourly Average) ndash July 2018

24

0

10000

20000

30000

40000

50000

60000

70000

80000

MW

Hour Ending

Scheduled Energy Only OfferScheduled Three-part OfferDAM Energy PurchaseRT System Load

Liquidity and activity are normal in the Day-Ahead Market

PUBLIC

Percentage of Real-Time Load Hedged in the DAM (Counter-Party Level) ndashJuly 2018

25

0

20

40

60

80

100

120Ja

nM

arM

ay Jul

Sep

Nov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May

July

2013 2014 2015 2016 2017 2018

The dotted lines represent the bounds for major outliers

PUBLIC

DAM and RTM Price Convergence ndash July 2018

26

-20

-10

0

10

20

30

40

50

60Ja

nM

arM

ay Jul

Sep

Nov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

l

2013 2014 2015 2016 2017 2018

Aver

age

DAM

-R

TM S

PP ($

MW

h)

The dotted lines represent the bounds for major outliers

PUBLIC

Day-Ahead Electricity and Ancillary Service Prices (Hourly Average) ndashJuly 2018

27

0

100

200

300

400

500

600

Pric

e ($

MW

h)

Hour Ending

Regulation Up

Regulation Down

Responsive Reserve

Non Spinning Reserve

DAM Power Balance Price(System Lambda)

Ancillary Service prices reflect the opportunity cost of energy

PUBLIC

Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash July 2018

28

0

100

200

300

400

500

600

Pric

e ($

MW

h)

Hour Ending

RTSPP - LZ West

RTSPP - LZ North

RTSPP - LZ South

RTSPP - LZ Houston

DASPP - LZ West

DASPP - LZ North

DASPP - LZ South

DASPP - LZ Houston

Prices reflect relative transmission congestion and system scarcity

PUBLIC

Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash July 2018

29

0

100

200

300

400

500

600

Pric

e ($

MW

h)

Hour Ending

RTSPP - Hub Average

DASPP - Hub Average

Energy prices reflect the risk premium between Day-Ahead amp Real-Time

PUBLIC

DRUC Monthly Summary (Hourly Average) ndash July 2018

30

0

15000

30000

45000

60000

75000

90000

MW

h

Hour Ending

Self Scheduled Capacity

Self Scheduled Ancillary Service Limit

Load Forecast

DRUC Recommended Capacity

31 executions (0 missed)0 published after 160011 minutes average execution time0 Resources committed

PUBLIC

HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash July 2018

31

0

02

04

06

08

1

0

20

40

60

80

100

RTO

RD

PA ($

MW

h)

MW

h

Hour Ending

744 executions (0 missed)8 minutes average execution time1 Resources committed through HRUC or by a Verbal Dispatch Instruction

The dotted line indicates the average RTORDPA

PUBLIC

NonndashSpinning Reserve Service Deployment ndash July 2018

32

Deployment Start Time

Deployment End Time

Deployment Duration (Hours)

Max Deployment(MW) Reason

NA

PUBLIC

CRR Price Convergence ndash July 2018

0

50

100

150

200

250

Mill

ions

$

Cost

Value

Congestion Revenue Right cost in auction convergence with payment in Day-Ahead Market and Real Time Market

33

PUBLIC

Daily Average System Lambda and ORDC Price Adders ndash July 2018

0

50

100

150

200

250

$M

Wh

Day of Month

RTOFFPA

RTORPA

SYSTEM_LAMBDA

34

PUBLIC

ERS Procurement for June 2018 ndash September 2018

TP1 TP2 TP3 TP4 TP5 TP6

Non Weather-Sensitive ERS-10 MW 160562 165996 143324 140708 156699 151138

Non Weather-Sensitive ERS-30 MW 736864 781559 702529 625067 755153 657394

Weather-Sensitive ERS-10 MW 0 0 0 0 0 0

Weather-Sensitive ERS-30 MW 0 0 11850 11850 0 0

Total MW Procured 897426 947555 857703 777625 911852 808532

Clearing Price $201 $185 $2108 $2177 $199 $225

Time Period Time Period Hours

Time Period 1 Hours Ending 0600 - 0800 (50000 am to 80000 am) Monday through Friday except ERCOT Holidays

Time Period 2 Hours Ending 0900 - 1300 (80000 am to 10000 pm) Monday through Friday except ERCOT Holidays

Time Period 3 Hours Ending 1400 - 1600 (10000 pm to 40000 pm) Monday through Friday except ERCOT Holidays

Time Period 4 Hours Ending 1700 - 1900 (40000 pm to 70000 pm) Monday through Friday except ERCOT Holidays

Time Period 5 Hours Ending 2000 - 2200 (70000 pm to 100000 pm) Monday through Friday except ERCOT Holidays Time Period 6 All other hours

35

PUBLIC

Reliability Services ndash July 2018

Reliability Unit Commitment (RUC) $ in Millions

RUC Make-Whole Payments $000

RUC Clawback Charges $000

RUC Commitment Settlement $000

RUC Capacity Short Charges $000

RUC Make-Whole Uplift $000

RUC Commitment Cost Allocation $000

RUC Decommitment Payments $000

Total RUC Allocation to Load $000

In July 2018 there was a credit of $000M allocated to load for RUC compared to bull A credit of $000M in June 2018bull A credit of $003M in July 2017

36

PUBLIC

Ancillary and Other Services ndash July 2018

Ancillary and Other Services $ in Millions

Regulation Up Service $1105

Regulation Down Service $072

Responsive Reserve Service $7177

Non-Spinning Reserve Service $1787

Black Start Service $059

Voltage Services - Reactive Power $000

Voltage Services - Lost Opportunity $000

Total Charges Allocated to Load $10200

In July 2018 Ancillary and Other Services was a charge of $10200M compared to bull A charge of $2001M in June 2018bull A charge of $2322M in July 2017

37

PUBLIC

Real-Time Ancillary Service Imbalance (ORDC) ndash July 2018

In July 2018 Real-Time Ancillary Service Imbalance was a charge to load of $2228K compared to bull A charge of $147K in June 2018bull A charge of $534K in July 2017

Real-Time Ancillary Service Imbalance $ in Thousands

Real-Time AS Imbalance ($2228)

Real-Time Reliability Deployment AS Imbalance $000

Total RTASI Amount Allocated to Load $2228

38

PUBLIC

Energy Settlement ndash July 2018

39

Day-Ahead Market Energy Settlement $ in Millions

Energy Purchases $215396

Point to Point Obligation Purchases $11726

Energy Sales ($212592)

Day-Ahead Congestion Rent $14531

Day-Ahead Market Make-Whole Payments ($001)

Real-Time Market Energy Settlement $ in Millions

Energy Imbalance at a Resource Node ($91963)

Energy Imbalance at a Load Zone $160737

Energy Imbalance at a Hub ($57497)

Net Real-Time Energy Imbalance $11276

Real Time Congestion from Self Schedules $013

Block Load Transfers and DC Ties ($2063)

Total Impact to Revenue Neutrality $9227

Load-Allocated Emergency Energy Payments ($016)

Load-Allocated Base Point Deviation Charges $026

Day-Ahead Market energy settlement activity increased from last month and increased from July 2017

Real-Time Market energy settlement activity increased from last month and increased from July 2017

PUBLIC

Congestion Revenue Rights (CRR) ndash July 2018

$ in Millions

Long-Term Auction ($4026)

Monthly Auction ($1773)

Total Auction Revenue ($5799)

Day-Ahead CRR Settlements ($15797)

Day-Ahead CRR Short-Charges $1885

Day-Ahead CRR Short-Charges Refunded ($899)

Day-Ahead CRR Short-Charges Net $986

Total CRR Funding ($14810)

Day-Ahead Point-to-Point Obligations $11726

Real-Time Point-to-Point Obligations ($10113)

Net Point-to-Point Obligations $1614

Congestion Revenue Rights settlement payments were not fully funded Partial funding to settle the CRR Short Charges was provided from the CRR Balancing Account Fund and the remaining $986M of CRR Short Charges were not refunded The CRR Fund Balance is now $0

Point to Point Obligations settled with a net charge of $1614M compared to a net credit of $1758M last month

40

PUBLIC

CRR Balancing Account Fund ndash July 2018

CRR Balancing Account $ in Millions

Monthly Day-Ahead Congestion Rent $14531

Monthly Day-Ahead CRR Settlements ($15797)

Monthly Day-Ahead CRR Short -Charges $1885

CRR Balancing Account Credit Total $619

Beginning Fund Balance for the Month $275

CRR Balancing Account Credit Total $619

Day-Ahead CRR Short-Charges Refunded ($899)

CRR PTP Option Award Charges $004

Load-Allocated CRR Amount $000

Total Fund Amount $000

41

PUBLIC

Revenue Neutrality ndash July 2018

Revenue Neutrality $ in Millions

Real-Time Energy Imbalance $11276

Real-Time Point to Point Obligation ($10113)

Real-Time Congestion from Self-Schedules $013

DC Tie amp Block Load Transfer ($2063)

Allocation to Load $886

In July 2018 the Revenue Neutrality charge to load was $886M compared to bull A charge of $3046M in June 2018bull A charge of $145M in July 2017

42

PUBLIC

Net Allocation to Load ndash July 2018

Market-Based Allocation $ in Millions

Reliability Unit Commitment $000

Ancillary and Other Services $10200

Real-Time Ancillary Service Imbalance $223

Emergency Energy $016

Base Point Deviation ($026)

CRR Auction Revenue ($5799)

CRR Balancing Account $000

Real-Time Revenue Neutrality $886

Reliability Must Run $000

Monthly Block Load Transfer $000

Total $5500

Fee AllocationERCOT Administrative Fee $2207

Net Allocated to Load $7707

In July 2018 the Net Allocation to load was a charge of $7707M compared to bull A charge of $2152M in June 2018bull A credit of $1363M in July 2017

43

PUBLIC

Advanced Meter Settlement Impacts ndash July 2018

July 2018 At month end settling 72M ESIIDs using Advanced Meter data

July 2018 990 of the load in ERCOT is settled with 15-min interval data (AMS Competitive IDR and NOIE IDR)

44

PUBLIC

ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndashJuly 2018

45

PUBLIC

Retail Transaction Volumes ndash Summary ndash July 2018

46

Transaction Type July 2018 July 2017 July 2018 July 2017

Switches 669909 617300 121926 84059

Acquisition 0 0 0 0

Move - Ins 1667037 1568153 270122 252360

Move - Outs 814580 802779 129820 127073

Continuous Service Agreements (CSA) 395944 283259 40217 55770

Mass Transitions 9033 0 0 0

Total 3556503 3271491 562085 519262

Year-To-Date Transactions Received

Board Presentation Input

Trans Volumes by Month_New

PUBLIC

Retail Transaction Volumes ndash Summary ndash July 2018

SwitchesAcquisitions Move-Ins

Move-Outs Mass Transition

47

Projects Report

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018

20000000$ 2018 Portfolio

Spending Estimate

Projects In FlightOn Hold (Count = 100) 24905011$

Projects Not Yet Started (Count = 10) 1320628$

Projects Completed (Count = 43) 795250$

(7020889)$

TOTAL 20000000$

Project Number Projects in Initiation Phase (Count = 4)

TBD IT Asset RecoveryNPRR842 Study Area Load Information

209-03 Study Network (STNET) Integration288-01 EDI Map and Translator Replacement

Impact Metric TolerancesUnfavorable variances are represented as negative numbers within the report - Green = No more than 49 unfavorable variance - Yellow = Unfavorable variance between 49 and 99 - Red = Unfavorable variance more than 99

Spending Reductions Required to Maintain Capital Budget

2018 Project Funding

Footnotes1 - One or more phases took longer than expected resulting in additional time required

2 - One or more phases required more labor than expected resulting in additional funding andor time required

3 - Project placed on holdNA - Metric not calculated because - it is reported at the parent project level or - it is an administrative project

Project Number Projects in Planning Phase (Count = 8) Phase Start Baseline

Phase FinishApproved

Phase FinishScheduled

Go-Live DateScheduled

Phase Finish

134-02 Privileged Account Management (PAM) Phase 2 882018 12192018 12192018 TBD 12192018 0 10

183-01 CMM-FT GUI Integration 12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs

242-01 Portfolio Reporting Assessment 1182017 12192018 12192018 TBD 12192018 0 21260-01 Information Governance Assessment 10182017 5302018 9192018 TBD 9192018 0 5286-01 Java Platform Assessment 6202018 11212018 11212018 TBD 11212018 0 6287-01 Security Constrained Unit Commitment (SCUC) 882018 2272019 2272019 TBD 2272019 0 -1

NPRR484Revisions to Congestion Revenue Rights Credit Calculations and Payments - Phase 1b 2

12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs

NPRR702Flexible Accounts Payment of Invoices and Disposition of Interest on Cash Collateral

12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs

Schedule Health Budget Health

49

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018Project Number Projects in Execution Phase (Count = 42) Phase Start Baseline Go-

Live DateApproved Go-

Live DateScheduled

Go-Live DateScheduled

Phase Finish

170-01 Enterprise Content Alignment Program 8262015 11152017 8312018 8312018 8312018 0 0170-06 ECAP - ECMS Implementation Phase 1 4252018 11302018 11302018 11302018 11302018 0 3173-02 ERCOT Flight Certification Website 11152017 2282019 2282019 2282019 5312019 0 2181-01 CRR Framework Upgrade 10262016 1022017 11192018 11192018 2272019 0 2

183-01 CMM Tech Refresh 3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

193-01 PMU Tool Evaluation and Implementation 12132017 892018 2152019 2152019 3202019 0 0196-01 GINR Project Status Application Replacement 12212016 9142017 2282019 2282019 3312019 0 1198-02 Reactive Power Coordination PoC 962017 6162018 8152018 8152018 8152018 0 54209-02 Weather Imaging and Line Observation (WILO) 5302018 212019 212019 212019 2272019 0 2210-01 REC Technology Refresh 8302017 3182018 12132018 12132018 1162019 0 3228-01 Enterprise Database Upgrade 882018 1292020 1292020 1292020 1292020 0 17229-01 IT Change and Configuration Management Phase 2 822017 6192018 12132018 12132018 3252019 0 2 -9238-01 Application Authentication Tech Refresh 962017 3192018 12132018 12132018 1302019 0 3239-01 Identity and Access Management 592018 3132019 3132019 3132019 3132019 0 2241-01 AREA - Generation 10112017 3302018 892018 892018 952018 0 -4244-01 Corporate Wireless 11292017 3282018 1252018 1252018 192019 0 9245-01 2017 EPS Metering Enhancements 6272018 892019 892019 892019 9252019 0 1246-01 iTest Data Refresh 12132017 1192018 11152018 11152018 122019 0 25249-01 Secondary Wind Forecasting Service 8302017 2282018 892018 892018 952018 0 0253-01 CIP Recovery Plan Project - Planning Phase 1 1312018 8292018 8292018 8292018 8292018 0 -2

257-01Security Constrained Optimal Powerflow in Study Network Analysis

1262017 10252018 10252018 10252018 1282018 0 19

261-01 Generic Transmission Constraint Calculation 372018 12132018 12132018 12132018 1232019 0 0263-01 Market Simulator 4112018 12132018 12132018 12132018 1302019 0 7265-01 Real-Time Assessment Continuity 1312018 12132018 12132018 12132018 1302019 0 0279-01 Cyber Security Project 24 6272018 10262018 10262018 10262018 11282018 0 0280-01 Quest Software Portfolio Transition 442018 6272018 9262018 9262018 9262018 0 13282-01 Synchronous Condenser Outage Modeling 662018 10252018 10252018 10252018 1252018 0 1Various 2015 CMM NPRRs 2 -18

NPRR519Exemption of ERS-Only QSEs from Collateral and Capitalization Requirements

3152017 5192018 12112018 12112018 12312018 0 See 2015 CMM NPRRs

NPRR620Collateral Requirements for Counter-Parties with No Load or Generation

3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

NPRR660 Remove CRR State Change Adder 3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

Budget HealthSchedule Health

50

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018Project Number Projects in Execution Phase (Count = 42) Phase Start Baseline Go-

Live DateApproved Go-

Live DateScheduled

Go-Live DateScheduled

Phase Finish

NPRR741 Clarifications to TPE and EAL Credit Exposure Calculations 3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

NPRR749 Option Cost for Outstanding CRRs 882018 12132018 12132018 12132018 TBD 0 NA See 2015 CMM NPRRs

NPRR755 Data Agent-Only QSE Registration 3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

NPRR819Modification of Non-Price Error Resettlement Thresholds and Resettlement Clean-Ups

592018 892018 892018 892018 952018 0 36

NPRR833 Modify PTP Obligation Bid Clearing Change 882018 12132018 12132018 12132018 TBD 0 1

NPRR843Short-Term System Adequacy and AS Offer Disclosure Reports Additions

7182018 10252018 10252018 10252018 11282018 0 0

NPRR864 RUC Modifications to Consider Market-Based Solutions 6202018 10252018 10252018 10252018 11282018 0 4SCR777 Bilateral CRR Interface Enhancement 10262016 1022017 11192018 11192018 2272019 0 NA See 181-01

SCR781 RARF Replacement 12202017 4252018 12192018 12192018 12192018 0 3SCR791 Correction of 60-day SCED GRD Disclosure Report 522018 892018 892018 892018 952018 0 39SCR795 Addition of Intra-Hour Wind Forecast to GTBD Calculation 882018 10252018 10252018 10252018 11142018 0 0

Project Number Expedited Projects in Execution (Count = 34)

Project Number Projects in Stabilization (Count = 10) Execution

Phase StartBaseline Go-Live Target

Approved Go-Live Target

ActualGo-Live Date

Scheduled Execution Phase

Finish

NPRR648 Remove References to Flowgate Rights 3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR683 Revision to Available Credit Limit Calculation 3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR743 Revision to MCE to Have a Floor For Load Exposure 3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR760 Calculation of Exposure Variables For Days With No Activity 3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR776 Voltage Set Point Communication 9202017 3192018 452018 452018 952018 0 1

NPRR800Revisions to Credit Exposure Calculations to Use Electricity Futures Market Prices

3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR815Revise the Limitation of Load Resources Providing Responsive Reserve (RRS) Service

3212018 5312018 5312018 5312018 8292018 0 2

209-01 Multi Station Breaker to Breaker One Lines 282017 392018 532018 532018 8222018 0 -1259-01 DC SCADA and Metering Upgrade 10252017 1172018 7252018 7252018 8292018 0 22266-01 Remote Email Access Enhancement 12132017 372018 662018 6192018 9262018 2 -7 2 -9

Schedule Health Budget Health

Budget HealthSchedule Health

51

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018

Project Number Projects On Hold (Count = 2) Forecast

Start DateBaseline

Phase FinishApproved Go-

Live TargetScheduled

Go-Live DateScheduled

Phase Finish

SCR789 Update NMMS Topology Processor to PSSE 34 Capability 0

269-01Document Repository Redesign and Governance Implementation - Phase 1

0

Project Number Projects Completed (Count = 20)

Baseline Execution

Phase Start

Baseline Go-Live Target

Approved Go-Live Target

Actual Go-Live Date

Actual Execution Phase Finish

185-01 Records Management and eDiscovery 12152016 5242017 8292017 8222017 12132017 2 0224-01 TelAlert Replacement 452017 6272017 842017 842017 592018 0 5230-01 SAS Technical Architecture Redesign 312017 12132017 12132017 12132017 6272018 0 2234-01 Reporting Solution Resiliency (RSR) 452017 8232017 11272017 11272017 1102018 0 8240-01 EDI Translator and Mapping Replacement Assessment 4192017 9272017 2282018 TBD 372018 -2 20254-01 Retail Windows Upgrade 10112017 12182017 12182017 1222018 272018 1 -51 65255-01 Settlements Architecture Enhancements 10252017 1112018 1112018 1192018 2142018 1 -10 53258-01 WD Kainos SMART Automation Testing Tool 4112018 642018 642018 662018 7182018 -3 33271-01 Issue Tracking and Resolution Tool Assessment 12132017 4252018 4252018 TBD 522018 1 -5 -1272-01 Operator Training Simulator Black Start GE Effort 1262017 4252018 4252018 4272018 5162018 -1 19274-01 Average Mid-Term Load Forecast 372018 5312018 5312018 5312018 6272018 0 50

NPRR768Revisions to Real-Time On-Line Reliability Deployment Price Adder Categories

372018 5312018 5312018 5312018 6272018 0 16

NPRR778 Modifications to Date Change and Cancellation Evaluation Window 7192017 10292017 12112017 12112017 1312018 0 23

NPRR782Settlement of Infeasible Ancillary Services Due to Transmission Constraints

5242017 8312017 1122017 1122017 1102018 0 20

NPRR808 Three Year CRR Auction 8232017 9182017 9182017 912017 1312018 65 68

NPRR810Applicability of RMR Incentive Factor on Reservation and Transportation Costs Associated with Firm Fuel Supplies

7172017 11122017 3312018 3312018 3312018 0 NA See 233-00

NPRR830 Revision of 4-Coincident Peak Methodology 12132017 262018 262018 262018 372018 0 85

NPRR831 Inclusion of Private Use Networks in Load Zone Price Calculations 822017 1122017 1122017 1122017 2212018 0 33

OBDRR002 ORDC OBD Revisions for PUCT Project 47199 372018 5312018 5312018 5312018 6272018 0 See NPRR768

SCR792 Enhance Communications of BAAL Exceedances 2142018 452018 452018 452018 4252018 0 69

Project Number Expedited Projects Completed (Count = 23)

Budget HealthSchedule Health

Budget HealthSchedule Health

52

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018

Project Number 2018 Projects Not Yet Started (Count = 10) Forecast

Start Date

NPRR858 Provide Complete Current Operating Plan (COP) Data Aug-2018TBD 2018 OS Enhancements Aug-2018TBD Additional Branch Limit for Relays Aug-2018

NPRR817 Create a Panhandle Hub Sep-2018NPRR821 Elimination of the CRR Deration Process Oct-2018NPRR865 Publish RTM Shift Factors for Hubs Load Zones and DC Ties Oct-2018

SCR793SSR Related Telemetry for Transmission Service Provider (TSP) Operators

Oct-2018

ECAP ECAP - ECMS Implementation Phase 2 Oct-2018TBD Job Scheduler Update in CSI Framework Oct-2018TBD Parameter Estimation Oct-2018

53

  • Slide Number 1
  • Slide Number 2
  • Summary ndash July 2018
  • Daily Peak Demand Hourly Average Actual vs Forecast Wind Day-Ahead COPs amp On-Line Capacity at Peak ndash July 2018
  • Actual Wind Output plus Curtailments vs Wind Day-Ahead COPs for All Hours ndash July 2018
  • ERCOTrsquos CPS1 Monthly Performance ndash July 2018
  • Monthly Peak Actual Demand ndash July 2018
  • Monthly Minimum Actual 15-Minute Demand ndash July 2018
  • Day-Ahead Load Forecast Performance ndash July 2018
  • Reliability Unit Commitment (RUC) Capacity by Weather Zone ndash July 2018
  • Generic Transmission Constraints (GTCs) ndash July 2018
  • Advisories and Watches ndash July 2018 Corrected
  • Lake Levels Update ndash August 1 2018
  • Planning Summary ndash July 2018
  • Mapping of Counties to ERCOT Zones ndash July 2018
  • Cumulative MW Capacity of Interconnection Requests by Zone ndashJuly 2018
  • Cumulative MW Capacity of Interconnection Requests by Zone ndashJuly 2018
  • Cumulative MW Capacity of Interconnection Requests by Zone ndashJuly 2018
  • Wind Generation ndash July 2018
  • Solar Generation ndash July 2018
  • Generation Interconnection Activity by Fuel ndash July 2018
  • Generation Interconnection Activity by Project Phase ndash July 2018
  • Slide Number 23
  • Day-Ahead Schedule (Hourly Average) ndash July 2018
  • Percentage of Real-Time Load Hedged in the DAM (Counter-Party Level) ndash July 2018
  • DAM and RTM Price Convergence ndash July 2018
  • Day-Ahead Electricity and Ancillary Service Prices (Hourly Average) ndash July 2018
  • Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash July 2018
  • Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash July 2018
  • DRUC Monthly Summary (Hourly Average) ndash July 2018
  • HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash July 2018
  • NonndashSpinning Reserve Service Deployment ndash July 2018
  • CRR Price Convergence ndash July 2018
  • Daily Average System Lambda and ORDC Price Adders ndash July 2018
  • ERS Procurement for June 2018 ndash September 2018
  • Reliability Services ndash July 2018
  • Ancillary and Other Services ndash July 2018
  • Real-Time Ancillary Service Imbalance (ORDC) ndash July 2018
  • Energy Settlement ndash July 2018
  • Congestion Revenue Rights (CRR) ndash July 2018
  • CRR Balancing Account Fund ndash July 2018
  • Revenue Neutrality ndash July 2018
  • Net Allocation to Load ndash July 2018
  • Advanced Meter Settlement Impacts ndash July 2018
  • ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndash July 2018
  • Retail Transaction Volumes ndash Summary ndash July 2018
  • Retail Transaction Volumes ndash Summary ndash July 2018
  • Slide Number 48
  • ERCOT Portfolio Stoplight Report ndash July 2018
  • ERCOT Portfolio Stoplight Report ndash July 2018
  • ERCOT Portfolio Stoplight Report ndash July 2018
  • ERCOT Portfolio Stoplight Report ndash July 2018
  • ERCOT Portfolio Stoplight Report ndash July 2018
Retail Transactions Summary
July 2018 June 2018 May 2018 April 2018 March 2018 February 2018 January 2018 December 2017 November 2017 October 2017 September 2017 August 2017 July 2017 June 2017 May 2017 April 2017 March 2017 February 2017 January 2017 December 2016 November 2016 October 2016 September 2016 August 2016 July 2016 June 2016 May 2016 April 2016 March 2016 February 2016 January 2016 December 2015 November 2015 October 2015 September 2015 August 2015 July 2015 June 2015 May 2015 April 2015 March 2015 February 2015 January 2015 December 2014 November 2014 October 2014 September 2014 August 2014 July 2014 June 2014 May 2014 April 2014 March 2014 February 2014 January 2014 December 2013 November 2013 October 2013 September 2013 August 2013 July 2013 June 2013 May 2013 April 2013 March 2013 February 2013 January 2013 Grand total
814_01 - Switch Received 121926 109653 96828 81291 95159 76119 88933 60560 77860 78096 79502 84134 84059 108784 130828 71769 67845 66875 87140 66556 56202 64452 67323 86656 82923 86376 75323 70300 76235 68057 63954 61486 52887 65276 70342 81674 91211 102661 86229 81255 79997 73394 72885 71072 67080 110465 175164 89677 99568 101490 111077 91983 93887 71130 86953 69691 55957 166882 82415 93194 102562 103756 116086 78919 68950 64329 67116 1321827
Difference from previous month 12273 12825 15537 (13868) 19040 (12814) 28373 (17300) (236) (1406) (4632) 75 (24725) (22044) 59059 3924 970 (20265) 20584 10354 (8250) (2871) (19333) 3733 (3453) 11053 5023 (5935) 8178 4103 2468 8599 (12389) (5066) (11332) (9537) (11450) 16432 4974 1258 6603 509 1813 3992 (43385) (64699) 85487 (9891) (1922) (9587) 19094 (1904) 22757 (15823) 17262 13734 (110925) 84467 (10779) (9368) (1194) (12330) 37167 9969 4621 (2787)
814_16 - Move - Ins Received 270122 257125 244431 225380 224289 215281 230409 238340 207921 236397 244511 258046 252360 257759 237611 197865 217962 201984 202612 196236 201714 220958 231999 268781 241844 247481 214383 199804 218245 212474 193716 189862 181098 215908 229405 248124 263233 247089 208166 207932 215950 197765 198025 193973 178624 226283 231418 243482 251957 233679 223201 258649 214724 208160 207059 172981 178671 233469 216550 255967 249114 220397 216982 204412 197200 191955 194507 3162148
Difference from previous month 12997 12694 19051 1091 9008 (15128) (7931) 30419 (28476) (8114) (13535) 5686 (5399) 20148 39746 (20097) 15978 (628) 6376 (5478) (19244) (11041) (36782) 26937 (5637) 33098 14579 (18441) 5771 18758 3854 8764 (34810) (13497) (18719) (15109) 16144 38923 234 (8018) 18185 (260) 4052 15349 (47659) (5135) (12064) (8475) 18278 10478 (35448) 43925 6564 1101 34078 (5690) (54798) 16919 (39417) 6853 28717 3415 12570 7212 5245 (2552)
814_24 - MVO and MVO to CSA Received 129820 125861 124403 113795 108753 100127 111821 144987 100830 116519 129103 128104 127073 133582 127218 102055 111459 100285 101107 96289 100578 109493 114094 133170 122932 129025 118022 103789 109278 103747 96628 99552 96214 109578 117949 123894 133905 133855 114675 108275 108859 94864 98233 97901 89578 111857 115918 121662 131607 126785 119107 107956 107266 99428 104273 93385 93977 115469 115524 129594 135196 121446 120049 111598 106467 102429 104399 1660500
814_10 - DTP Mass Acquisition Received - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0
814_10 - DTP Mass Transition Received - 0 - 0 9033 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 639 - 0 - 0 4975 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0
814_18 - CSA AdditionDeletes Received 40217 62083 99016 55581 46720 42587 49740 47725 31726 52888 41597 40616 55770 43745 52139 26702 21791 39082 44030 38884 39856 31786 33061 42622 48489 64178 50499 59475 59400 48536 42179 40351 34796 34420 54677 35078 49489 59611 39384 44247 44577 35386 40420 54831 43550 45039 44268 40405 57954 64408 65032 80184 70310 41156 34811 46680 50347 71847 48606 52585 50867 62747 59763 34925 40977 40389 41227 747237
Total 562085 554722 573711 476047 474921 434114 480903 491612 418337 483900 494713 510900 519262 543870 547796 398391 419057 408226 434889 397965 398350 426689 446477 531229 496188 527060 458227 433368 463158 432814 396477 391251 364995 425182 472373 488770 537838 543216 448454 441709 449383 401409 409563 417777 378832 493644 566768 495865 541086 526362 523392 538772 486187 419874 433096 382737 378952 587667 463095 531340 537739 508346 512880 429854 413594 399102 407249 6891712
Counts from Monthly Retail Transaction report
To do
Break Out 814_10s - AQ and MT
Break Out 814_18 Additions from Deletes
Year-To-Date Transactions Received
Transaction Type July 2018 July 2017 July 2018 July 2017
Switches 669909 617300 121926 84059
Acquisition 0 0 0 0
Move - Ins 1667037 1568153 270122 252360
Move - Outs 814580 802779 129820 127073
Continuous Service Agreements (CSA) 395944 283259 40217 55770
Mass Transitions 9033 0 0 0
Total 3556503 3271491 562085 519262
There has been a change since this was created
Mass Acquisition has been broken out of Mass Transition
Page 10: ERCOT Monthly Operational Overvie · ERCOT Monthly Operational Overview (July 2018) Revised 08.22.18. ERCOT Public. August 15, 2018

PUBLIC

Reliability Unit Commitment (RUC) Capacity by Weather Zone ndashJuly 2018

10

PUBLIC

Generic Transmission Constraints (GTCs) ndash July 2018

GTC A transmission flow limit more constraining than a Transmission Elementrsquos normal limit established to constrain flow between geographic areas of the ERCOT Transmission System that is used to enforce stability and voltage constraints that cannot be modeled directly in ERCOTrsquos transmission security analysis applications

Note This table lists how many times a constraint has been activated to avoid exceeding a GTC limit it does not imply an exceedance of the GTC occurred

GTCsJul-17 May-18 Jun-18 Jul-18 Last 12 Months Total

DaysDays Days Days DaysGTCs GTCs GTCs GTCs (Aug 17 ndash Jul 18)

North ndash Houston 1 0 1 0 8

Valley Import 0 4 0 1 15

Panhandle 17 27 23 5 261

Red Tap 0 0 0 0 0North Edinburg ndash

Lobo 0 0 0 0 1Nelson Sharpe ndash

Rio Hondo - 0 2 0 65

East Texas - 0 0 0 16

11

PUBLIC

Advisories and Watches ndash July 2018 Corrected

bull Two OCNs issued for extreme hot weatherndash Issued 714 and 720

bull Four Advisories issued due to Physical Responsive Capability being below 3000 MWndash Issued 718 719 725 and 728

bull One OCN issued due to projected reserve capacity shortage for hours ending 1400 through 1900 ERCOT requested all QSEs to update their COPs

ndash Issued 726

bull One Watch issued due to the post-contingency loss of the Bevo to Asherton 138 kV (SBEVASH8) overloads the Big Wells to Cotulla Sub 69 kV and curtailment of Eagle Pass DC-Tie exports to CENACE

ndash Issued 717

bull Three Watches issued due to the post-contingency loss of Bentsen to Railroad 138 kV (SBENRAI8) overloads South Mission to Railroad 138 kV and curtailment of Railroad DC-Tie exports to CENACE

ndash Issued 723

bull One Watch issued for the de-rate of the Railroad DC-Tie and curtailment of the DC-Tie exports to CENACE

ndash Issued 731

12

PUBLIC

Lake Levels Update ndash August 1 2018

13

PUBLIC

Planning Summary ndash July 2018

bull ERCOT is currently tracking 404 active generation interconnection requests totaling 79852 MW This includes 37697 MW of wind generation

bull ERCOT is currently reviewing proposed transmission improvements with a total cost of $6035 million

bull Transmission Projects endorsed in 2018 total $3935 million

bull All projects (in engineering routing licensing and construction) total approximately $649 billion (as of June 1 2018)

bull Transmission Projects energized in 2018 total about $1120 billion (as of June 1 2018)

14

PUBLIC

Mapping of Counties to ERCOT Zones ndash July 2018

15

PUBLIC

Cumulative MW Capacity of Interconnection Requests by Zone ndashJuly 2018

16

PUBLIC

Cumulative MW Capacity of Interconnection Requests by Zone ndashJuly 2018

17

PUBLIC

Cumulative MW Capacity of Interconnection Requests by Zone ndashJuly 2018

18

PUBLIC

Wind Generation ndash July 2018

19

PUBLIC

Solar Generation ndash July 2018

20

PUBLIC

Generation Interconnection Activity by Fuel ndash July 2018

21

PUBLIC

Generation Interconnection Activity by Project Phase ndash July 2018

22

Market Operations

PUBLIC

Day-Ahead Schedule (Hourly Average) ndash July 2018

24

0

10000

20000

30000

40000

50000

60000

70000

80000

MW

Hour Ending

Scheduled Energy Only OfferScheduled Three-part OfferDAM Energy PurchaseRT System Load

Liquidity and activity are normal in the Day-Ahead Market

PUBLIC

Percentage of Real-Time Load Hedged in the DAM (Counter-Party Level) ndashJuly 2018

25

0

20

40

60

80

100

120Ja

nM

arM

ay Jul

Sep

Nov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May

July

2013 2014 2015 2016 2017 2018

The dotted lines represent the bounds for major outliers

PUBLIC

DAM and RTM Price Convergence ndash July 2018

26

-20

-10

0

10

20

30

40

50

60Ja

nM

arM

ay Jul

Sep

Nov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

l

2013 2014 2015 2016 2017 2018

Aver

age

DAM

-R

TM S

PP ($

MW

h)

The dotted lines represent the bounds for major outliers

PUBLIC

Day-Ahead Electricity and Ancillary Service Prices (Hourly Average) ndashJuly 2018

27

0

100

200

300

400

500

600

Pric

e ($

MW

h)

Hour Ending

Regulation Up

Regulation Down

Responsive Reserve

Non Spinning Reserve

DAM Power Balance Price(System Lambda)

Ancillary Service prices reflect the opportunity cost of energy

PUBLIC

Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash July 2018

28

0

100

200

300

400

500

600

Pric

e ($

MW

h)

Hour Ending

RTSPP - LZ West

RTSPP - LZ North

RTSPP - LZ South

RTSPP - LZ Houston

DASPP - LZ West

DASPP - LZ North

DASPP - LZ South

DASPP - LZ Houston

Prices reflect relative transmission congestion and system scarcity

PUBLIC

Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash July 2018

29

0

100

200

300

400

500

600

Pric

e ($

MW

h)

Hour Ending

RTSPP - Hub Average

DASPP - Hub Average

Energy prices reflect the risk premium between Day-Ahead amp Real-Time

PUBLIC

DRUC Monthly Summary (Hourly Average) ndash July 2018

30

0

15000

30000

45000

60000

75000

90000

MW

h

Hour Ending

Self Scheduled Capacity

Self Scheduled Ancillary Service Limit

Load Forecast

DRUC Recommended Capacity

31 executions (0 missed)0 published after 160011 minutes average execution time0 Resources committed

PUBLIC

HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash July 2018

31

0

02

04

06

08

1

0

20

40

60

80

100

RTO

RD

PA ($

MW

h)

MW

h

Hour Ending

744 executions (0 missed)8 minutes average execution time1 Resources committed through HRUC or by a Verbal Dispatch Instruction

The dotted line indicates the average RTORDPA

PUBLIC

NonndashSpinning Reserve Service Deployment ndash July 2018

32

Deployment Start Time

Deployment End Time

Deployment Duration (Hours)

Max Deployment(MW) Reason

NA

PUBLIC

CRR Price Convergence ndash July 2018

0

50

100

150

200

250

Mill

ions

$

Cost

Value

Congestion Revenue Right cost in auction convergence with payment in Day-Ahead Market and Real Time Market

33

PUBLIC

Daily Average System Lambda and ORDC Price Adders ndash July 2018

0

50

100

150

200

250

$M

Wh

Day of Month

RTOFFPA

RTORPA

SYSTEM_LAMBDA

34

PUBLIC

ERS Procurement for June 2018 ndash September 2018

TP1 TP2 TP3 TP4 TP5 TP6

Non Weather-Sensitive ERS-10 MW 160562 165996 143324 140708 156699 151138

Non Weather-Sensitive ERS-30 MW 736864 781559 702529 625067 755153 657394

Weather-Sensitive ERS-10 MW 0 0 0 0 0 0

Weather-Sensitive ERS-30 MW 0 0 11850 11850 0 0

Total MW Procured 897426 947555 857703 777625 911852 808532

Clearing Price $201 $185 $2108 $2177 $199 $225

Time Period Time Period Hours

Time Period 1 Hours Ending 0600 - 0800 (50000 am to 80000 am) Monday through Friday except ERCOT Holidays

Time Period 2 Hours Ending 0900 - 1300 (80000 am to 10000 pm) Monday through Friday except ERCOT Holidays

Time Period 3 Hours Ending 1400 - 1600 (10000 pm to 40000 pm) Monday through Friday except ERCOT Holidays

Time Period 4 Hours Ending 1700 - 1900 (40000 pm to 70000 pm) Monday through Friday except ERCOT Holidays

Time Period 5 Hours Ending 2000 - 2200 (70000 pm to 100000 pm) Monday through Friday except ERCOT Holidays Time Period 6 All other hours

35

PUBLIC

Reliability Services ndash July 2018

Reliability Unit Commitment (RUC) $ in Millions

RUC Make-Whole Payments $000

RUC Clawback Charges $000

RUC Commitment Settlement $000

RUC Capacity Short Charges $000

RUC Make-Whole Uplift $000

RUC Commitment Cost Allocation $000

RUC Decommitment Payments $000

Total RUC Allocation to Load $000

In July 2018 there was a credit of $000M allocated to load for RUC compared to bull A credit of $000M in June 2018bull A credit of $003M in July 2017

36

PUBLIC

Ancillary and Other Services ndash July 2018

Ancillary and Other Services $ in Millions

Regulation Up Service $1105

Regulation Down Service $072

Responsive Reserve Service $7177

Non-Spinning Reserve Service $1787

Black Start Service $059

Voltage Services - Reactive Power $000

Voltage Services - Lost Opportunity $000

Total Charges Allocated to Load $10200

In July 2018 Ancillary and Other Services was a charge of $10200M compared to bull A charge of $2001M in June 2018bull A charge of $2322M in July 2017

37

PUBLIC

Real-Time Ancillary Service Imbalance (ORDC) ndash July 2018

In July 2018 Real-Time Ancillary Service Imbalance was a charge to load of $2228K compared to bull A charge of $147K in June 2018bull A charge of $534K in July 2017

Real-Time Ancillary Service Imbalance $ in Thousands

Real-Time AS Imbalance ($2228)

Real-Time Reliability Deployment AS Imbalance $000

Total RTASI Amount Allocated to Load $2228

38

PUBLIC

Energy Settlement ndash July 2018

39

Day-Ahead Market Energy Settlement $ in Millions

Energy Purchases $215396

Point to Point Obligation Purchases $11726

Energy Sales ($212592)

Day-Ahead Congestion Rent $14531

Day-Ahead Market Make-Whole Payments ($001)

Real-Time Market Energy Settlement $ in Millions

Energy Imbalance at a Resource Node ($91963)

Energy Imbalance at a Load Zone $160737

Energy Imbalance at a Hub ($57497)

Net Real-Time Energy Imbalance $11276

Real Time Congestion from Self Schedules $013

Block Load Transfers and DC Ties ($2063)

Total Impact to Revenue Neutrality $9227

Load-Allocated Emergency Energy Payments ($016)

Load-Allocated Base Point Deviation Charges $026

Day-Ahead Market energy settlement activity increased from last month and increased from July 2017

Real-Time Market energy settlement activity increased from last month and increased from July 2017

PUBLIC

Congestion Revenue Rights (CRR) ndash July 2018

$ in Millions

Long-Term Auction ($4026)

Monthly Auction ($1773)

Total Auction Revenue ($5799)

Day-Ahead CRR Settlements ($15797)

Day-Ahead CRR Short-Charges $1885

Day-Ahead CRR Short-Charges Refunded ($899)

Day-Ahead CRR Short-Charges Net $986

Total CRR Funding ($14810)

Day-Ahead Point-to-Point Obligations $11726

Real-Time Point-to-Point Obligations ($10113)

Net Point-to-Point Obligations $1614

Congestion Revenue Rights settlement payments were not fully funded Partial funding to settle the CRR Short Charges was provided from the CRR Balancing Account Fund and the remaining $986M of CRR Short Charges were not refunded The CRR Fund Balance is now $0

Point to Point Obligations settled with a net charge of $1614M compared to a net credit of $1758M last month

40

PUBLIC

CRR Balancing Account Fund ndash July 2018

CRR Balancing Account $ in Millions

Monthly Day-Ahead Congestion Rent $14531

Monthly Day-Ahead CRR Settlements ($15797)

Monthly Day-Ahead CRR Short -Charges $1885

CRR Balancing Account Credit Total $619

Beginning Fund Balance for the Month $275

CRR Balancing Account Credit Total $619

Day-Ahead CRR Short-Charges Refunded ($899)

CRR PTP Option Award Charges $004

Load-Allocated CRR Amount $000

Total Fund Amount $000

41

PUBLIC

Revenue Neutrality ndash July 2018

Revenue Neutrality $ in Millions

Real-Time Energy Imbalance $11276

Real-Time Point to Point Obligation ($10113)

Real-Time Congestion from Self-Schedules $013

DC Tie amp Block Load Transfer ($2063)

Allocation to Load $886

In July 2018 the Revenue Neutrality charge to load was $886M compared to bull A charge of $3046M in June 2018bull A charge of $145M in July 2017

42

PUBLIC

Net Allocation to Load ndash July 2018

Market-Based Allocation $ in Millions

Reliability Unit Commitment $000

Ancillary and Other Services $10200

Real-Time Ancillary Service Imbalance $223

Emergency Energy $016

Base Point Deviation ($026)

CRR Auction Revenue ($5799)

CRR Balancing Account $000

Real-Time Revenue Neutrality $886

Reliability Must Run $000

Monthly Block Load Transfer $000

Total $5500

Fee AllocationERCOT Administrative Fee $2207

Net Allocated to Load $7707

In July 2018 the Net Allocation to load was a charge of $7707M compared to bull A charge of $2152M in June 2018bull A credit of $1363M in July 2017

43

PUBLIC

Advanced Meter Settlement Impacts ndash July 2018

July 2018 At month end settling 72M ESIIDs using Advanced Meter data

July 2018 990 of the load in ERCOT is settled with 15-min interval data (AMS Competitive IDR and NOIE IDR)

44

PUBLIC

ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndashJuly 2018

45

PUBLIC

Retail Transaction Volumes ndash Summary ndash July 2018

46

Transaction Type July 2018 July 2017 July 2018 July 2017

Switches 669909 617300 121926 84059

Acquisition 0 0 0 0

Move - Ins 1667037 1568153 270122 252360

Move - Outs 814580 802779 129820 127073

Continuous Service Agreements (CSA) 395944 283259 40217 55770

Mass Transitions 9033 0 0 0

Total 3556503 3271491 562085 519262

Year-To-Date Transactions Received

Board Presentation Input

Trans Volumes by Month_New

PUBLIC

Retail Transaction Volumes ndash Summary ndash July 2018

SwitchesAcquisitions Move-Ins

Move-Outs Mass Transition

47

Projects Report

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018

20000000$ 2018 Portfolio

Spending Estimate

Projects In FlightOn Hold (Count = 100) 24905011$

Projects Not Yet Started (Count = 10) 1320628$

Projects Completed (Count = 43) 795250$

(7020889)$

TOTAL 20000000$

Project Number Projects in Initiation Phase (Count = 4)

TBD IT Asset RecoveryNPRR842 Study Area Load Information

209-03 Study Network (STNET) Integration288-01 EDI Map and Translator Replacement

Impact Metric TolerancesUnfavorable variances are represented as negative numbers within the report - Green = No more than 49 unfavorable variance - Yellow = Unfavorable variance between 49 and 99 - Red = Unfavorable variance more than 99

Spending Reductions Required to Maintain Capital Budget

2018 Project Funding

Footnotes1 - One or more phases took longer than expected resulting in additional time required

2 - One or more phases required more labor than expected resulting in additional funding andor time required

3 - Project placed on holdNA - Metric not calculated because - it is reported at the parent project level or - it is an administrative project

Project Number Projects in Planning Phase (Count = 8) Phase Start Baseline

Phase FinishApproved

Phase FinishScheduled

Go-Live DateScheduled

Phase Finish

134-02 Privileged Account Management (PAM) Phase 2 882018 12192018 12192018 TBD 12192018 0 10

183-01 CMM-FT GUI Integration 12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs

242-01 Portfolio Reporting Assessment 1182017 12192018 12192018 TBD 12192018 0 21260-01 Information Governance Assessment 10182017 5302018 9192018 TBD 9192018 0 5286-01 Java Platform Assessment 6202018 11212018 11212018 TBD 11212018 0 6287-01 Security Constrained Unit Commitment (SCUC) 882018 2272019 2272019 TBD 2272019 0 -1

NPRR484Revisions to Congestion Revenue Rights Credit Calculations and Payments - Phase 1b 2

12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs

NPRR702Flexible Accounts Payment of Invoices and Disposition of Interest on Cash Collateral

12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs

Schedule Health Budget Health

49

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018Project Number Projects in Execution Phase (Count = 42) Phase Start Baseline Go-

Live DateApproved Go-

Live DateScheduled

Go-Live DateScheduled

Phase Finish

170-01 Enterprise Content Alignment Program 8262015 11152017 8312018 8312018 8312018 0 0170-06 ECAP - ECMS Implementation Phase 1 4252018 11302018 11302018 11302018 11302018 0 3173-02 ERCOT Flight Certification Website 11152017 2282019 2282019 2282019 5312019 0 2181-01 CRR Framework Upgrade 10262016 1022017 11192018 11192018 2272019 0 2

183-01 CMM Tech Refresh 3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

193-01 PMU Tool Evaluation and Implementation 12132017 892018 2152019 2152019 3202019 0 0196-01 GINR Project Status Application Replacement 12212016 9142017 2282019 2282019 3312019 0 1198-02 Reactive Power Coordination PoC 962017 6162018 8152018 8152018 8152018 0 54209-02 Weather Imaging and Line Observation (WILO) 5302018 212019 212019 212019 2272019 0 2210-01 REC Technology Refresh 8302017 3182018 12132018 12132018 1162019 0 3228-01 Enterprise Database Upgrade 882018 1292020 1292020 1292020 1292020 0 17229-01 IT Change and Configuration Management Phase 2 822017 6192018 12132018 12132018 3252019 0 2 -9238-01 Application Authentication Tech Refresh 962017 3192018 12132018 12132018 1302019 0 3239-01 Identity and Access Management 592018 3132019 3132019 3132019 3132019 0 2241-01 AREA - Generation 10112017 3302018 892018 892018 952018 0 -4244-01 Corporate Wireless 11292017 3282018 1252018 1252018 192019 0 9245-01 2017 EPS Metering Enhancements 6272018 892019 892019 892019 9252019 0 1246-01 iTest Data Refresh 12132017 1192018 11152018 11152018 122019 0 25249-01 Secondary Wind Forecasting Service 8302017 2282018 892018 892018 952018 0 0253-01 CIP Recovery Plan Project - Planning Phase 1 1312018 8292018 8292018 8292018 8292018 0 -2

257-01Security Constrained Optimal Powerflow in Study Network Analysis

1262017 10252018 10252018 10252018 1282018 0 19

261-01 Generic Transmission Constraint Calculation 372018 12132018 12132018 12132018 1232019 0 0263-01 Market Simulator 4112018 12132018 12132018 12132018 1302019 0 7265-01 Real-Time Assessment Continuity 1312018 12132018 12132018 12132018 1302019 0 0279-01 Cyber Security Project 24 6272018 10262018 10262018 10262018 11282018 0 0280-01 Quest Software Portfolio Transition 442018 6272018 9262018 9262018 9262018 0 13282-01 Synchronous Condenser Outage Modeling 662018 10252018 10252018 10252018 1252018 0 1Various 2015 CMM NPRRs 2 -18

NPRR519Exemption of ERS-Only QSEs from Collateral and Capitalization Requirements

3152017 5192018 12112018 12112018 12312018 0 See 2015 CMM NPRRs

NPRR620Collateral Requirements for Counter-Parties with No Load or Generation

3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

NPRR660 Remove CRR State Change Adder 3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

Budget HealthSchedule Health

50

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018Project Number Projects in Execution Phase (Count = 42) Phase Start Baseline Go-

Live DateApproved Go-

Live DateScheduled

Go-Live DateScheduled

Phase Finish

NPRR741 Clarifications to TPE and EAL Credit Exposure Calculations 3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

NPRR749 Option Cost for Outstanding CRRs 882018 12132018 12132018 12132018 TBD 0 NA See 2015 CMM NPRRs

NPRR755 Data Agent-Only QSE Registration 3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

NPRR819Modification of Non-Price Error Resettlement Thresholds and Resettlement Clean-Ups

592018 892018 892018 892018 952018 0 36

NPRR833 Modify PTP Obligation Bid Clearing Change 882018 12132018 12132018 12132018 TBD 0 1

NPRR843Short-Term System Adequacy and AS Offer Disclosure Reports Additions

7182018 10252018 10252018 10252018 11282018 0 0

NPRR864 RUC Modifications to Consider Market-Based Solutions 6202018 10252018 10252018 10252018 11282018 0 4SCR777 Bilateral CRR Interface Enhancement 10262016 1022017 11192018 11192018 2272019 0 NA See 181-01

SCR781 RARF Replacement 12202017 4252018 12192018 12192018 12192018 0 3SCR791 Correction of 60-day SCED GRD Disclosure Report 522018 892018 892018 892018 952018 0 39SCR795 Addition of Intra-Hour Wind Forecast to GTBD Calculation 882018 10252018 10252018 10252018 11142018 0 0

Project Number Expedited Projects in Execution (Count = 34)

Project Number Projects in Stabilization (Count = 10) Execution

Phase StartBaseline Go-Live Target

Approved Go-Live Target

ActualGo-Live Date

Scheduled Execution Phase

Finish

NPRR648 Remove References to Flowgate Rights 3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR683 Revision to Available Credit Limit Calculation 3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR743 Revision to MCE to Have a Floor For Load Exposure 3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR760 Calculation of Exposure Variables For Days With No Activity 3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR776 Voltage Set Point Communication 9202017 3192018 452018 452018 952018 0 1

NPRR800Revisions to Credit Exposure Calculations to Use Electricity Futures Market Prices

3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR815Revise the Limitation of Load Resources Providing Responsive Reserve (RRS) Service

3212018 5312018 5312018 5312018 8292018 0 2

209-01 Multi Station Breaker to Breaker One Lines 282017 392018 532018 532018 8222018 0 -1259-01 DC SCADA and Metering Upgrade 10252017 1172018 7252018 7252018 8292018 0 22266-01 Remote Email Access Enhancement 12132017 372018 662018 6192018 9262018 2 -7 2 -9

Schedule Health Budget Health

Budget HealthSchedule Health

51

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018

Project Number Projects On Hold (Count = 2) Forecast

Start DateBaseline

Phase FinishApproved Go-

Live TargetScheduled

Go-Live DateScheduled

Phase Finish

SCR789 Update NMMS Topology Processor to PSSE 34 Capability 0

269-01Document Repository Redesign and Governance Implementation - Phase 1

0

Project Number Projects Completed (Count = 20)

Baseline Execution

Phase Start

Baseline Go-Live Target

Approved Go-Live Target

Actual Go-Live Date

Actual Execution Phase Finish

185-01 Records Management and eDiscovery 12152016 5242017 8292017 8222017 12132017 2 0224-01 TelAlert Replacement 452017 6272017 842017 842017 592018 0 5230-01 SAS Technical Architecture Redesign 312017 12132017 12132017 12132017 6272018 0 2234-01 Reporting Solution Resiliency (RSR) 452017 8232017 11272017 11272017 1102018 0 8240-01 EDI Translator and Mapping Replacement Assessment 4192017 9272017 2282018 TBD 372018 -2 20254-01 Retail Windows Upgrade 10112017 12182017 12182017 1222018 272018 1 -51 65255-01 Settlements Architecture Enhancements 10252017 1112018 1112018 1192018 2142018 1 -10 53258-01 WD Kainos SMART Automation Testing Tool 4112018 642018 642018 662018 7182018 -3 33271-01 Issue Tracking and Resolution Tool Assessment 12132017 4252018 4252018 TBD 522018 1 -5 -1272-01 Operator Training Simulator Black Start GE Effort 1262017 4252018 4252018 4272018 5162018 -1 19274-01 Average Mid-Term Load Forecast 372018 5312018 5312018 5312018 6272018 0 50

NPRR768Revisions to Real-Time On-Line Reliability Deployment Price Adder Categories

372018 5312018 5312018 5312018 6272018 0 16

NPRR778 Modifications to Date Change and Cancellation Evaluation Window 7192017 10292017 12112017 12112017 1312018 0 23

NPRR782Settlement of Infeasible Ancillary Services Due to Transmission Constraints

5242017 8312017 1122017 1122017 1102018 0 20

NPRR808 Three Year CRR Auction 8232017 9182017 9182017 912017 1312018 65 68

NPRR810Applicability of RMR Incentive Factor on Reservation and Transportation Costs Associated with Firm Fuel Supplies

7172017 11122017 3312018 3312018 3312018 0 NA See 233-00

NPRR830 Revision of 4-Coincident Peak Methodology 12132017 262018 262018 262018 372018 0 85

NPRR831 Inclusion of Private Use Networks in Load Zone Price Calculations 822017 1122017 1122017 1122017 2212018 0 33

OBDRR002 ORDC OBD Revisions for PUCT Project 47199 372018 5312018 5312018 5312018 6272018 0 See NPRR768

SCR792 Enhance Communications of BAAL Exceedances 2142018 452018 452018 452018 4252018 0 69

Project Number Expedited Projects Completed (Count = 23)

Budget HealthSchedule Health

Budget HealthSchedule Health

52

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018

Project Number 2018 Projects Not Yet Started (Count = 10) Forecast

Start Date

NPRR858 Provide Complete Current Operating Plan (COP) Data Aug-2018TBD 2018 OS Enhancements Aug-2018TBD Additional Branch Limit for Relays Aug-2018

NPRR817 Create a Panhandle Hub Sep-2018NPRR821 Elimination of the CRR Deration Process Oct-2018NPRR865 Publish RTM Shift Factors for Hubs Load Zones and DC Ties Oct-2018

SCR793SSR Related Telemetry for Transmission Service Provider (TSP) Operators

Oct-2018

ECAP ECAP - ECMS Implementation Phase 2 Oct-2018TBD Job Scheduler Update in CSI Framework Oct-2018TBD Parameter Estimation Oct-2018

53

  • Slide Number 1
  • Slide Number 2
  • Summary ndash July 2018
  • Daily Peak Demand Hourly Average Actual vs Forecast Wind Day-Ahead COPs amp On-Line Capacity at Peak ndash July 2018
  • Actual Wind Output plus Curtailments vs Wind Day-Ahead COPs for All Hours ndash July 2018
  • ERCOTrsquos CPS1 Monthly Performance ndash July 2018
  • Monthly Peak Actual Demand ndash July 2018
  • Monthly Minimum Actual 15-Minute Demand ndash July 2018
  • Day-Ahead Load Forecast Performance ndash July 2018
  • Reliability Unit Commitment (RUC) Capacity by Weather Zone ndash July 2018
  • Generic Transmission Constraints (GTCs) ndash July 2018
  • Advisories and Watches ndash July 2018 Corrected
  • Lake Levels Update ndash August 1 2018
  • Planning Summary ndash July 2018
  • Mapping of Counties to ERCOT Zones ndash July 2018
  • Cumulative MW Capacity of Interconnection Requests by Zone ndashJuly 2018
  • Cumulative MW Capacity of Interconnection Requests by Zone ndashJuly 2018
  • Cumulative MW Capacity of Interconnection Requests by Zone ndashJuly 2018
  • Wind Generation ndash July 2018
  • Solar Generation ndash July 2018
  • Generation Interconnection Activity by Fuel ndash July 2018
  • Generation Interconnection Activity by Project Phase ndash July 2018
  • Slide Number 23
  • Day-Ahead Schedule (Hourly Average) ndash July 2018
  • Percentage of Real-Time Load Hedged in the DAM (Counter-Party Level) ndash July 2018
  • DAM and RTM Price Convergence ndash July 2018
  • Day-Ahead Electricity and Ancillary Service Prices (Hourly Average) ndash July 2018
  • Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash July 2018
  • Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash July 2018
  • DRUC Monthly Summary (Hourly Average) ndash July 2018
  • HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash July 2018
  • NonndashSpinning Reserve Service Deployment ndash July 2018
  • CRR Price Convergence ndash July 2018
  • Daily Average System Lambda and ORDC Price Adders ndash July 2018
  • ERS Procurement for June 2018 ndash September 2018
  • Reliability Services ndash July 2018
  • Ancillary and Other Services ndash July 2018
  • Real-Time Ancillary Service Imbalance (ORDC) ndash July 2018
  • Energy Settlement ndash July 2018
  • Congestion Revenue Rights (CRR) ndash July 2018
  • CRR Balancing Account Fund ndash July 2018
  • Revenue Neutrality ndash July 2018
  • Net Allocation to Load ndash July 2018
  • Advanced Meter Settlement Impacts ndash July 2018
  • ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndash July 2018
  • Retail Transaction Volumes ndash Summary ndash July 2018
  • Retail Transaction Volumes ndash Summary ndash July 2018
  • Slide Number 48
  • ERCOT Portfolio Stoplight Report ndash July 2018
  • ERCOT Portfolio Stoplight Report ndash July 2018
  • ERCOT Portfolio Stoplight Report ndash July 2018
  • ERCOT Portfolio Stoplight Report ndash July 2018
  • ERCOT Portfolio Stoplight Report ndash July 2018
Retail Transactions Summary
July 2018 June 2018 May 2018 April 2018 March 2018 February 2018 January 2018 December 2017 November 2017 October 2017 September 2017 August 2017 July 2017 June 2017 May 2017 April 2017 March 2017 February 2017 January 2017 December 2016 November 2016 October 2016 September 2016 August 2016 July 2016 June 2016 May 2016 April 2016 March 2016 February 2016 January 2016 December 2015 November 2015 October 2015 September 2015 August 2015 July 2015 June 2015 May 2015 April 2015 March 2015 February 2015 January 2015 December 2014 November 2014 October 2014 September 2014 August 2014 July 2014 June 2014 May 2014 April 2014 March 2014 February 2014 January 2014 December 2013 November 2013 October 2013 September 2013 August 2013 July 2013 June 2013 May 2013 April 2013 March 2013 February 2013 January 2013 Grand total
814_01 - Switch Received 121926 109653 96828 81291 95159 76119 88933 60560 77860 78096 79502 84134 84059 108784 130828 71769 67845 66875 87140 66556 56202 64452 67323 86656 82923 86376 75323 70300 76235 68057 63954 61486 52887 65276 70342 81674 91211 102661 86229 81255 79997 73394 72885 71072 67080 110465 175164 89677 99568 101490 111077 91983 93887 71130 86953 69691 55957 166882 82415 93194 102562 103756 116086 78919 68950 64329 67116 1321827
Difference from previous month 12273 12825 15537 (13868) 19040 (12814) 28373 (17300) (236) (1406) (4632) 75 (24725) (22044) 59059 3924 970 (20265) 20584 10354 (8250) (2871) (19333) 3733 (3453) 11053 5023 (5935) 8178 4103 2468 8599 (12389) (5066) (11332) (9537) (11450) 16432 4974 1258 6603 509 1813 3992 (43385) (64699) 85487 (9891) (1922) (9587) 19094 (1904) 22757 (15823) 17262 13734 (110925) 84467 (10779) (9368) (1194) (12330) 37167 9969 4621 (2787)
814_16 - Move - Ins Received 270122 257125 244431 225380 224289 215281 230409 238340 207921 236397 244511 258046 252360 257759 237611 197865 217962 201984 202612 196236 201714 220958 231999 268781 241844 247481 214383 199804 218245 212474 193716 189862 181098 215908 229405 248124 263233 247089 208166 207932 215950 197765 198025 193973 178624 226283 231418 243482 251957 233679 223201 258649 214724 208160 207059 172981 178671 233469 216550 255967 249114 220397 216982 204412 197200 191955 194507 3162148
Difference from previous month 12997 12694 19051 1091 9008 (15128) (7931) 30419 (28476) (8114) (13535) 5686 (5399) 20148 39746 (20097) 15978 (628) 6376 (5478) (19244) (11041) (36782) 26937 (5637) 33098 14579 (18441) 5771 18758 3854 8764 (34810) (13497) (18719) (15109) 16144 38923 234 (8018) 18185 (260) 4052 15349 (47659) (5135) (12064) (8475) 18278 10478 (35448) 43925 6564 1101 34078 (5690) (54798) 16919 (39417) 6853 28717 3415 12570 7212 5245 (2552)
814_24 - MVO and MVO to CSA Received 129820 125861 124403 113795 108753 100127 111821 144987 100830 116519 129103 128104 127073 133582 127218 102055 111459 100285 101107 96289 100578 109493 114094 133170 122932 129025 118022 103789 109278 103747 96628 99552 96214 109578 117949 123894 133905 133855 114675 108275 108859 94864 98233 97901 89578 111857 115918 121662 131607 126785 119107 107956 107266 99428 104273 93385 93977 115469 115524 129594 135196 121446 120049 111598 106467 102429 104399 1660500
814_10 - DTP Mass Acquisition Received - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0
814_10 - DTP Mass Transition Received - 0 - 0 9033 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 639 - 0 - 0 4975 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0
814_18 - CSA AdditionDeletes Received 40217 62083 99016 55581 46720 42587 49740 47725 31726 52888 41597 40616 55770 43745 52139 26702 21791 39082 44030 38884 39856 31786 33061 42622 48489 64178 50499 59475 59400 48536 42179 40351 34796 34420 54677 35078 49489 59611 39384 44247 44577 35386 40420 54831 43550 45039 44268 40405 57954 64408 65032 80184 70310 41156 34811 46680 50347 71847 48606 52585 50867 62747 59763 34925 40977 40389 41227 747237
Total 562085 554722 573711 476047 474921 434114 480903 491612 418337 483900 494713 510900 519262 543870 547796 398391 419057 408226 434889 397965 398350 426689 446477 531229 496188 527060 458227 433368 463158 432814 396477 391251 364995 425182 472373 488770 537838 543216 448454 441709 449383 401409 409563 417777 378832 493644 566768 495865 541086 526362 523392 538772 486187 419874 433096 382737 378952 587667 463095 531340 537739 508346 512880 429854 413594 399102 407249 6891712
Counts from Monthly Retail Transaction report
To do
Break Out 814_10s - AQ and MT
Break Out 814_18 Additions from Deletes
Year-To-Date Transactions Received
Transaction Type July 2018 July 2017 July 2018 July 2017
Switches 669909 617300 121926 84059
Acquisition 0 0 0 0
Move - Ins 1667037 1568153 270122 252360
Move - Outs 814580 802779 129820 127073
Continuous Service Agreements (CSA) 395944 283259 40217 55770
Mass Transitions 9033 0 0 0
Total 3556503 3271491 562085 519262
There has been a change since this was created
Mass Acquisition has been broken out of Mass Transition
Page 11: ERCOT Monthly Operational Overvie · ERCOT Monthly Operational Overview (July 2018) Revised 08.22.18. ERCOT Public. August 15, 2018

PUBLIC

Generic Transmission Constraints (GTCs) ndash July 2018

GTC A transmission flow limit more constraining than a Transmission Elementrsquos normal limit established to constrain flow between geographic areas of the ERCOT Transmission System that is used to enforce stability and voltage constraints that cannot be modeled directly in ERCOTrsquos transmission security analysis applications

Note This table lists how many times a constraint has been activated to avoid exceeding a GTC limit it does not imply an exceedance of the GTC occurred

GTCsJul-17 May-18 Jun-18 Jul-18 Last 12 Months Total

DaysDays Days Days DaysGTCs GTCs GTCs GTCs (Aug 17 ndash Jul 18)

North ndash Houston 1 0 1 0 8

Valley Import 0 4 0 1 15

Panhandle 17 27 23 5 261

Red Tap 0 0 0 0 0North Edinburg ndash

Lobo 0 0 0 0 1Nelson Sharpe ndash

Rio Hondo - 0 2 0 65

East Texas - 0 0 0 16

11

PUBLIC

Advisories and Watches ndash July 2018 Corrected

bull Two OCNs issued for extreme hot weatherndash Issued 714 and 720

bull Four Advisories issued due to Physical Responsive Capability being below 3000 MWndash Issued 718 719 725 and 728

bull One OCN issued due to projected reserve capacity shortage for hours ending 1400 through 1900 ERCOT requested all QSEs to update their COPs

ndash Issued 726

bull One Watch issued due to the post-contingency loss of the Bevo to Asherton 138 kV (SBEVASH8) overloads the Big Wells to Cotulla Sub 69 kV and curtailment of Eagle Pass DC-Tie exports to CENACE

ndash Issued 717

bull Three Watches issued due to the post-contingency loss of Bentsen to Railroad 138 kV (SBENRAI8) overloads South Mission to Railroad 138 kV and curtailment of Railroad DC-Tie exports to CENACE

ndash Issued 723

bull One Watch issued for the de-rate of the Railroad DC-Tie and curtailment of the DC-Tie exports to CENACE

ndash Issued 731

12

PUBLIC

Lake Levels Update ndash August 1 2018

13

PUBLIC

Planning Summary ndash July 2018

bull ERCOT is currently tracking 404 active generation interconnection requests totaling 79852 MW This includes 37697 MW of wind generation

bull ERCOT is currently reviewing proposed transmission improvements with a total cost of $6035 million

bull Transmission Projects endorsed in 2018 total $3935 million

bull All projects (in engineering routing licensing and construction) total approximately $649 billion (as of June 1 2018)

bull Transmission Projects energized in 2018 total about $1120 billion (as of June 1 2018)

14

PUBLIC

Mapping of Counties to ERCOT Zones ndash July 2018

15

PUBLIC

Cumulative MW Capacity of Interconnection Requests by Zone ndashJuly 2018

16

PUBLIC

Cumulative MW Capacity of Interconnection Requests by Zone ndashJuly 2018

17

PUBLIC

Cumulative MW Capacity of Interconnection Requests by Zone ndashJuly 2018

18

PUBLIC

Wind Generation ndash July 2018

19

PUBLIC

Solar Generation ndash July 2018

20

PUBLIC

Generation Interconnection Activity by Fuel ndash July 2018

21

PUBLIC

Generation Interconnection Activity by Project Phase ndash July 2018

22

Market Operations

PUBLIC

Day-Ahead Schedule (Hourly Average) ndash July 2018

24

0

10000

20000

30000

40000

50000

60000

70000

80000

MW

Hour Ending

Scheduled Energy Only OfferScheduled Three-part OfferDAM Energy PurchaseRT System Load

Liquidity and activity are normal in the Day-Ahead Market

PUBLIC

Percentage of Real-Time Load Hedged in the DAM (Counter-Party Level) ndashJuly 2018

25

0

20

40

60

80

100

120Ja

nM

arM

ay Jul

Sep

Nov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May

July

2013 2014 2015 2016 2017 2018

The dotted lines represent the bounds for major outliers

PUBLIC

DAM and RTM Price Convergence ndash July 2018

26

-20

-10

0

10

20

30

40

50

60Ja

nM

arM

ay Jul

Sep

Nov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

l

2013 2014 2015 2016 2017 2018

Aver

age

DAM

-R

TM S

PP ($

MW

h)

The dotted lines represent the bounds for major outliers

PUBLIC

Day-Ahead Electricity and Ancillary Service Prices (Hourly Average) ndashJuly 2018

27

0

100

200

300

400

500

600

Pric

e ($

MW

h)

Hour Ending

Regulation Up

Regulation Down

Responsive Reserve

Non Spinning Reserve

DAM Power Balance Price(System Lambda)

Ancillary Service prices reflect the opportunity cost of energy

PUBLIC

Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash July 2018

28

0

100

200

300

400

500

600

Pric

e ($

MW

h)

Hour Ending

RTSPP - LZ West

RTSPP - LZ North

RTSPP - LZ South

RTSPP - LZ Houston

DASPP - LZ West

DASPP - LZ North

DASPP - LZ South

DASPP - LZ Houston

Prices reflect relative transmission congestion and system scarcity

PUBLIC

Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash July 2018

29

0

100

200

300

400

500

600

Pric

e ($

MW

h)

Hour Ending

RTSPP - Hub Average

DASPP - Hub Average

Energy prices reflect the risk premium between Day-Ahead amp Real-Time

PUBLIC

DRUC Monthly Summary (Hourly Average) ndash July 2018

30

0

15000

30000

45000

60000

75000

90000

MW

h

Hour Ending

Self Scheduled Capacity

Self Scheduled Ancillary Service Limit

Load Forecast

DRUC Recommended Capacity

31 executions (0 missed)0 published after 160011 minutes average execution time0 Resources committed

PUBLIC

HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash July 2018

31

0

02

04

06

08

1

0

20

40

60

80

100

RTO

RD

PA ($

MW

h)

MW

h

Hour Ending

744 executions (0 missed)8 minutes average execution time1 Resources committed through HRUC or by a Verbal Dispatch Instruction

The dotted line indicates the average RTORDPA

PUBLIC

NonndashSpinning Reserve Service Deployment ndash July 2018

32

Deployment Start Time

Deployment End Time

Deployment Duration (Hours)

Max Deployment(MW) Reason

NA

PUBLIC

CRR Price Convergence ndash July 2018

0

50

100

150

200

250

Mill

ions

$

Cost

Value

Congestion Revenue Right cost in auction convergence with payment in Day-Ahead Market and Real Time Market

33

PUBLIC

Daily Average System Lambda and ORDC Price Adders ndash July 2018

0

50

100

150

200

250

$M

Wh

Day of Month

RTOFFPA

RTORPA

SYSTEM_LAMBDA

34

PUBLIC

ERS Procurement for June 2018 ndash September 2018

TP1 TP2 TP3 TP4 TP5 TP6

Non Weather-Sensitive ERS-10 MW 160562 165996 143324 140708 156699 151138

Non Weather-Sensitive ERS-30 MW 736864 781559 702529 625067 755153 657394

Weather-Sensitive ERS-10 MW 0 0 0 0 0 0

Weather-Sensitive ERS-30 MW 0 0 11850 11850 0 0

Total MW Procured 897426 947555 857703 777625 911852 808532

Clearing Price $201 $185 $2108 $2177 $199 $225

Time Period Time Period Hours

Time Period 1 Hours Ending 0600 - 0800 (50000 am to 80000 am) Monday through Friday except ERCOT Holidays

Time Period 2 Hours Ending 0900 - 1300 (80000 am to 10000 pm) Monday through Friday except ERCOT Holidays

Time Period 3 Hours Ending 1400 - 1600 (10000 pm to 40000 pm) Monday through Friday except ERCOT Holidays

Time Period 4 Hours Ending 1700 - 1900 (40000 pm to 70000 pm) Monday through Friday except ERCOT Holidays

Time Period 5 Hours Ending 2000 - 2200 (70000 pm to 100000 pm) Monday through Friday except ERCOT Holidays Time Period 6 All other hours

35

PUBLIC

Reliability Services ndash July 2018

Reliability Unit Commitment (RUC) $ in Millions

RUC Make-Whole Payments $000

RUC Clawback Charges $000

RUC Commitment Settlement $000

RUC Capacity Short Charges $000

RUC Make-Whole Uplift $000

RUC Commitment Cost Allocation $000

RUC Decommitment Payments $000

Total RUC Allocation to Load $000

In July 2018 there was a credit of $000M allocated to load for RUC compared to bull A credit of $000M in June 2018bull A credit of $003M in July 2017

36

PUBLIC

Ancillary and Other Services ndash July 2018

Ancillary and Other Services $ in Millions

Regulation Up Service $1105

Regulation Down Service $072

Responsive Reserve Service $7177

Non-Spinning Reserve Service $1787

Black Start Service $059

Voltage Services - Reactive Power $000

Voltage Services - Lost Opportunity $000

Total Charges Allocated to Load $10200

In July 2018 Ancillary and Other Services was a charge of $10200M compared to bull A charge of $2001M in June 2018bull A charge of $2322M in July 2017

37

PUBLIC

Real-Time Ancillary Service Imbalance (ORDC) ndash July 2018

In July 2018 Real-Time Ancillary Service Imbalance was a charge to load of $2228K compared to bull A charge of $147K in June 2018bull A charge of $534K in July 2017

Real-Time Ancillary Service Imbalance $ in Thousands

Real-Time AS Imbalance ($2228)

Real-Time Reliability Deployment AS Imbalance $000

Total RTASI Amount Allocated to Load $2228

38

PUBLIC

Energy Settlement ndash July 2018

39

Day-Ahead Market Energy Settlement $ in Millions

Energy Purchases $215396

Point to Point Obligation Purchases $11726

Energy Sales ($212592)

Day-Ahead Congestion Rent $14531

Day-Ahead Market Make-Whole Payments ($001)

Real-Time Market Energy Settlement $ in Millions

Energy Imbalance at a Resource Node ($91963)

Energy Imbalance at a Load Zone $160737

Energy Imbalance at a Hub ($57497)

Net Real-Time Energy Imbalance $11276

Real Time Congestion from Self Schedules $013

Block Load Transfers and DC Ties ($2063)

Total Impact to Revenue Neutrality $9227

Load-Allocated Emergency Energy Payments ($016)

Load-Allocated Base Point Deviation Charges $026

Day-Ahead Market energy settlement activity increased from last month and increased from July 2017

Real-Time Market energy settlement activity increased from last month and increased from July 2017

PUBLIC

Congestion Revenue Rights (CRR) ndash July 2018

$ in Millions

Long-Term Auction ($4026)

Monthly Auction ($1773)

Total Auction Revenue ($5799)

Day-Ahead CRR Settlements ($15797)

Day-Ahead CRR Short-Charges $1885

Day-Ahead CRR Short-Charges Refunded ($899)

Day-Ahead CRR Short-Charges Net $986

Total CRR Funding ($14810)

Day-Ahead Point-to-Point Obligations $11726

Real-Time Point-to-Point Obligations ($10113)

Net Point-to-Point Obligations $1614

Congestion Revenue Rights settlement payments were not fully funded Partial funding to settle the CRR Short Charges was provided from the CRR Balancing Account Fund and the remaining $986M of CRR Short Charges were not refunded The CRR Fund Balance is now $0

Point to Point Obligations settled with a net charge of $1614M compared to a net credit of $1758M last month

40

PUBLIC

CRR Balancing Account Fund ndash July 2018

CRR Balancing Account $ in Millions

Monthly Day-Ahead Congestion Rent $14531

Monthly Day-Ahead CRR Settlements ($15797)

Monthly Day-Ahead CRR Short -Charges $1885

CRR Balancing Account Credit Total $619

Beginning Fund Balance for the Month $275

CRR Balancing Account Credit Total $619

Day-Ahead CRR Short-Charges Refunded ($899)

CRR PTP Option Award Charges $004

Load-Allocated CRR Amount $000

Total Fund Amount $000

41

PUBLIC

Revenue Neutrality ndash July 2018

Revenue Neutrality $ in Millions

Real-Time Energy Imbalance $11276

Real-Time Point to Point Obligation ($10113)

Real-Time Congestion from Self-Schedules $013

DC Tie amp Block Load Transfer ($2063)

Allocation to Load $886

In July 2018 the Revenue Neutrality charge to load was $886M compared to bull A charge of $3046M in June 2018bull A charge of $145M in July 2017

42

PUBLIC

Net Allocation to Load ndash July 2018

Market-Based Allocation $ in Millions

Reliability Unit Commitment $000

Ancillary and Other Services $10200

Real-Time Ancillary Service Imbalance $223

Emergency Energy $016

Base Point Deviation ($026)

CRR Auction Revenue ($5799)

CRR Balancing Account $000

Real-Time Revenue Neutrality $886

Reliability Must Run $000

Monthly Block Load Transfer $000

Total $5500

Fee AllocationERCOT Administrative Fee $2207

Net Allocated to Load $7707

In July 2018 the Net Allocation to load was a charge of $7707M compared to bull A charge of $2152M in June 2018bull A credit of $1363M in July 2017

43

PUBLIC

Advanced Meter Settlement Impacts ndash July 2018

July 2018 At month end settling 72M ESIIDs using Advanced Meter data

July 2018 990 of the load in ERCOT is settled with 15-min interval data (AMS Competitive IDR and NOIE IDR)

44

PUBLIC

ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndashJuly 2018

45

PUBLIC

Retail Transaction Volumes ndash Summary ndash July 2018

46

Transaction Type July 2018 July 2017 July 2018 July 2017

Switches 669909 617300 121926 84059

Acquisition 0 0 0 0

Move - Ins 1667037 1568153 270122 252360

Move - Outs 814580 802779 129820 127073

Continuous Service Agreements (CSA) 395944 283259 40217 55770

Mass Transitions 9033 0 0 0

Total 3556503 3271491 562085 519262

Year-To-Date Transactions Received

Board Presentation Input

Trans Volumes by Month_New

PUBLIC

Retail Transaction Volumes ndash Summary ndash July 2018

SwitchesAcquisitions Move-Ins

Move-Outs Mass Transition

47

Projects Report

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018

20000000$ 2018 Portfolio

Spending Estimate

Projects In FlightOn Hold (Count = 100) 24905011$

Projects Not Yet Started (Count = 10) 1320628$

Projects Completed (Count = 43) 795250$

(7020889)$

TOTAL 20000000$

Project Number Projects in Initiation Phase (Count = 4)

TBD IT Asset RecoveryNPRR842 Study Area Load Information

209-03 Study Network (STNET) Integration288-01 EDI Map and Translator Replacement

Impact Metric TolerancesUnfavorable variances are represented as negative numbers within the report - Green = No more than 49 unfavorable variance - Yellow = Unfavorable variance between 49 and 99 - Red = Unfavorable variance more than 99

Spending Reductions Required to Maintain Capital Budget

2018 Project Funding

Footnotes1 - One or more phases took longer than expected resulting in additional time required

2 - One or more phases required more labor than expected resulting in additional funding andor time required

3 - Project placed on holdNA - Metric not calculated because - it is reported at the parent project level or - it is an administrative project

Project Number Projects in Planning Phase (Count = 8) Phase Start Baseline

Phase FinishApproved

Phase FinishScheduled

Go-Live DateScheduled

Phase Finish

134-02 Privileged Account Management (PAM) Phase 2 882018 12192018 12192018 TBD 12192018 0 10

183-01 CMM-FT GUI Integration 12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs

242-01 Portfolio Reporting Assessment 1182017 12192018 12192018 TBD 12192018 0 21260-01 Information Governance Assessment 10182017 5302018 9192018 TBD 9192018 0 5286-01 Java Platform Assessment 6202018 11212018 11212018 TBD 11212018 0 6287-01 Security Constrained Unit Commitment (SCUC) 882018 2272019 2272019 TBD 2272019 0 -1

NPRR484Revisions to Congestion Revenue Rights Credit Calculations and Payments - Phase 1b 2

12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs

NPRR702Flexible Accounts Payment of Invoices and Disposition of Interest on Cash Collateral

12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs

Schedule Health Budget Health

49

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018Project Number Projects in Execution Phase (Count = 42) Phase Start Baseline Go-

Live DateApproved Go-

Live DateScheduled

Go-Live DateScheduled

Phase Finish

170-01 Enterprise Content Alignment Program 8262015 11152017 8312018 8312018 8312018 0 0170-06 ECAP - ECMS Implementation Phase 1 4252018 11302018 11302018 11302018 11302018 0 3173-02 ERCOT Flight Certification Website 11152017 2282019 2282019 2282019 5312019 0 2181-01 CRR Framework Upgrade 10262016 1022017 11192018 11192018 2272019 0 2

183-01 CMM Tech Refresh 3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

193-01 PMU Tool Evaluation and Implementation 12132017 892018 2152019 2152019 3202019 0 0196-01 GINR Project Status Application Replacement 12212016 9142017 2282019 2282019 3312019 0 1198-02 Reactive Power Coordination PoC 962017 6162018 8152018 8152018 8152018 0 54209-02 Weather Imaging and Line Observation (WILO) 5302018 212019 212019 212019 2272019 0 2210-01 REC Technology Refresh 8302017 3182018 12132018 12132018 1162019 0 3228-01 Enterprise Database Upgrade 882018 1292020 1292020 1292020 1292020 0 17229-01 IT Change and Configuration Management Phase 2 822017 6192018 12132018 12132018 3252019 0 2 -9238-01 Application Authentication Tech Refresh 962017 3192018 12132018 12132018 1302019 0 3239-01 Identity and Access Management 592018 3132019 3132019 3132019 3132019 0 2241-01 AREA - Generation 10112017 3302018 892018 892018 952018 0 -4244-01 Corporate Wireless 11292017 3282018 1252018 1252018 192019 0 9245-01 2017 EPS Metering Enhancements 6272018 892019 892019 892019 9252019 0 1246-01 iTest Data Refresh 12132017 1192018 11152018 11152018 122019 0 25249-01 Secondary Wind Forecasting Service 8302017 2282018 892018 892018 952018 0 0253-01 CIP Recovery Plan Project - Planning Phase 1 1312018 8292018 8292018 8292018 8292018 0 -2

257-01Security Constrained Optimal Powerflow in Study Network Analysis

1262017 10252018 10252018 10252018 1282018 0 19

261-01 Generic Transmission Constraint Calculation 372018 12132018 12132018 12132018 1232019 0 0263-01 Market Simulator 4112018 12132018 12132018 12132018 1302019 0 7265-01 Real-Time Assessment Continuity 1312018 12132018 12132018 12132018 1302019 0 0279-01 Cyber Security Project 24 6272018 10262018 10262018 10262018 11282018 0 0280-01 Quest Software Portfolio Transition 442018 6272018 9262018 9262018 9262018 0 13282-01 Synchronous Condenser Outage Modeling 662018 10252018 10252018 10252018 1252018 0 1Various 2015 CMM NPRRs 2 -18

NPRR519Exemption of ERS-Only QSEs from Collateral and Capitalization Requirements

3152017 5192018 12112018 12112018 12312018 0 See 2015 CMM NPRRs

NPRR620Collateral Requirements for Counter-Parties with No Load or Generation

3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

NPRR660 Remove CRR State Change Adder 3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

Budget HealthSchedule Health

50

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018Project Number Projects in Execution Phase (Count = 42) Phase Start Baseline Go-

Live DateApproved Go-

Live DateScheduled

Go-Live DateScheduled

Phase Finish

NPRR741 Clarifications to TPE and EAL Credit Exposure Calculations 3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

NPRR749 Option Cost for Outstanding CRRs 882018 12132018 12132018 12132018 TBD 0 NA See 2015 CMM NPRRs

NPRR755 Data Agent-Only QSE Registration 3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

NPRR819Modification of Non-Price Error Resettlement Thresholds and Resettlement Clean-Ups

592018 892018 892018 892018 952018 0 36

NPRR833 Modify PTP Obligation Bid Clearing Change 882018 12132018 12132018 12132018 TBD 0 1

NPRR843Short-Term System Adequacy and AS Offer Disclosure Reports Additions

7182018 10252018 10252018 10252018 11282018 0 0

NPRR864 RUC Modifications to Consider Market-Based Solutions 6202018 10252018 10252018 10252018 11282018 0 4SCR777 Bilateral CRR Interface Enhancement 10262016 1022017 11192018 11192018 2272019 0 NA See 181-01

SCR781 RARF Replacement 12202017 4252018 12192018 12192018 12192018 0 3SCR791 Correction of 60-day SCED GRD Disclosure Report 522018 892018 892018 892018 952018 0 39SCR795 Addition of Intra-Hour Wind Forecast to GTBD Calculation 882018 10252018 10252018 10252018 11142018 0 0

Project Number Expedited Projects in Execution (Count = 34)

Project Number Projects in Stabilization (Count = 10) Execution

Phase StartBaseline Go-Live Target

Approved Go-Live Target

ActualGo-Live Date

Scheduled Execution Phase

Finish

NPRR648 Remove References to Flowgate Rights 3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR683 Revision to Available Credit Limit Calculation 3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR743 Revision to MCE to Have a Floor For Load Exposure 3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR760 Calculation of Exposure Variables For Days With No Activity 3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR776 Voltage Set Point Communication 9202017 3192018 452018 452018 952018 0 1

NPRR800Revisions to Credit Exposure Calculations to Use Electricity Futures Market Prices

3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR815Revise the Limitation of Load Resources Providing Responsive Reserve (RRS) Service

3212018 5312018 5312018 5312018 8292018 0 2

209-01 Multi Station Breaker to Breaker One Lines 282017 392018 532018 532018 8222018 0 -1259-01 DC SCADA and Metering Upgrade 10252017 1172018 7252018 7252018 8292018 0 22266-01 Remote Email Access Enhancement 12132017 372018 662018 6192018 9262018 2 -7 2 -9

Schedule Health Budget Health

Budget HealthSchedule Health

51

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018

Project Number Projects On Hold (Count = 2) Forecast

Start DateBaseline

Phase FinishApproved Go-

Live TargetScheduled

Go-Live DateScheduled

Phase Finish

SCR789 Update NMMS Topology Processor to PSSE 34 Capability 0

269-01Document Repository Redesign and Governance Implementation - Phase 1

0

Project Number Projects Completed (Count = 20)

Baseline Execution

Phase Start

Baseline Go-Live Target

Approved Go-Live Target

Actual Go-Live Date

Actual Execution Phase Finish

185-01 Records Management and eDiscovery 12152016 5242017 8292017 8222017 12132017 2 0224-01 TelAlert Replacement 452017 6272017 842017 842017 592018 0 5230-01 SAS Technical Architecture Redesign 312017 12132017 12132017 12132017 6272018 0 2234-01 Reporting Solution Resiliency (RSR) 452017 8232017 11272017 11272017 1102018 0 8240-01 EDI Translator and Mapping Replacement Assessment 4192017 9272017 2282018 TBD 372018 -2 20254-01 Retail Windows Upgrade 10112017 12182017 12182017 1222018 272018 1 -51 65255-01 Settlements Architecture Enhancements 10252017 1112018 1112018 1192018 2142018 1 -10 53258-01 WD Kainos SMART Automation Testing Tool 4112018 642018 642018 662018 7182018 -3 33271-01 Issue Tracking and Resolution Tool Assessment 12132017 4252018 4252018 TBD 522018 1 -5 -1272-01 Operator Training Simulator Black Start GE Effort 1262017 4252018 4252018 4272018 5162018 -1 19274-01 Average Mid-Term Load Forecast 372018 5312018 5312018 5312018 6272018 0 50

NPRR768Revisions to Real-Time On-Line Reliability Deployment Price Adder Categories

372018 5312018 5312018 5312018 6272018 0 16

NPRR778 Modifications to Date Change and Cancellation Evaluation Window 7192017 10292017 12112017 12112017 1312018 0 23

NPRR782Settlement of Infeasible Ancillary Services Due to Transmission Constraints

5242017 8312017 1122017 1122017 1102018 0 20

NPRR808 Three Year CRR Auction 8232017 9182017 9182017 912017 1312018 65 68

NPRR810Applicability of RMR Incentive Factor on Reservation and Transportation Costs Associated with Firm Fuel Supplies

7172017 11122017 3312018 3312018 3312018 0 NA See 233-00

NPRR830 Revision of 4-Coincident Peak Methodology 12132017 262018 262018 262018 372018 0 85

NPRR831 Inclusion of Private Use Networks in Load Zone Price Calculations 822017 1122017 1122017 1122017 2212018 0 33

OBDRR002 ORDC OBD Revisions for PUCT Project 47199 372018 5312018 5312018 5312018 6272018 0 See NPRR768

SCR792 Enhance Communications of BAAL Exceedances 2142018 452018 452018 452018 4252018 0 69

Project Number Expedited Projects Completed (Count = 23)

Budget HealthSchedule Health

Budget HealthSchedule Health

52

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018

Project Number 2018 Projects Not Yet Started (Count = 10) Forecast

Start Date

NPRR858 Provide Complete Current Operating Plan (COP) Data Aug-2018TBD 2018 OS Enhancements Aug-2018TBD Additional Branch Limit for Relays Aug-2018

NPRR817 Create a Panhandle Hub Sep-2018NPRR821 Elimination of the CRR Deration Process Oct-2018NPRR865 Publish RTM Shift Factors for Hubs Load Zones and DC Ties Oct-2018

SCR793SSR Related Telemetry for Transmission Service Provider (TSP) Operators

Oct-2018

ECAP ECAP - ECMS Implementation Phase 2 Oct-2018TBD Job Scheduler Update in CSI Framework Oct-2018TBD Parameter Estimation Oct-2018

53

  • Slide Number 1
  • Slide Number 2
  • Summary ndash July 2018
  • Daily Peak Demand Hourly Average Actual vs Forecast Wind Day-Ahead COPs amp On-Line Capacity at Peak ndash July 2018
  • Actual Wind Output plus Curtailments vs Wind Day-Ahead COPs for All Hours ndash July 2018
  • ERCOTrsquos CPS1 Monthly Performance ndash July 2018
  • Monthly Peak Actual Demand ndash July 2018
  • Monthly Minimum Actual 15-Minute Demand ndash July 2018
  • Day-Ahead Load Forecast Performance ndash July 2018
  • Reliability Unit Commitment (RUC) Capacity by Weather Zone ndash July 2018
  • Generic Transmission Constraints (GTCs) ndash July 2018
  • Advisories and Watches ndash July 2018 Corrected
  • Lake Levels Update ndash August 1 2018
  • Planning Summary ndash July 2018
  • Mapping of Counties to ERCOT Zones ndash July 2018
  • Cumulative MW Capacity of Interconnection Requests by Zone ndashJuly 2018
  • Cumulative MW Capacity of Interconnection Requests by Zone ndashJuly 2018
  • Cumulative MW Capacity of Interconnection Requests by Zone ndashJuly 2018
  • Wind Generation ndash July 2018
  • Solar Generation ndash July 2018
  • Generation Interconnection Activity by Fuel ndash July 2018
  • Generation Interconnection Activity by Project Phase ndash July 2018
  • Slide Number 23
  • Day-Ahead Schedule (Hourly Average) ndash July 2018
  • Percentage of Real-Time Load Hedged in the DAM (Counter-Party Level) ndash July 2018
  • DAM and RTM Price Convergence ndash July 2018
  • Day-Ahead Electricity and Ancillary Service Prices (Hourly Average) ndash July 2018
  • Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash July 2018
  • Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash July 2018
  • DRUC Monthly Summary (Hourly Average) ndash July 2018
  • HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash July 2018
  • NonndashSpinning Reserve Service Deployment ndash July 2018
  • CRR Price Convergence ndash July 2018
  • Daily Average System Lambda and ORDC Price Adders ndash July 2018
  • ERS Procurement for June 2018 ndash September 2018
  • Reliability Services ndash July 2018
  • Ancillary and Other Services ndash July 2018
  • Real-Time Ancillary Service Imbalance (ORDC) ndash July 2018
  • Energy Settlement ndash July 2018
  • Congestion Revenue Rights (CRR) ndash July 2018
  • CRR Balancing Account Fund ndash July 2018
  • Revenue Neutrality ndash July 2018
  • Net Allocation to Load ndash July 2018
  • Advanced Meter Settlement Impacts ndash July 2018
  • ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndash July 2018
  • Retail Transaction Volumes ndash Summary ndash July 2018
  • Retail Transaction Volumes ndash Summary ndash July 2018
  • Slide Number 48
  • ERCOT Portfolio Stoplight Report ndash July 2018
  • ERCOT Portfolio Stoplight Report ndash July 2018
  • ERCOT Portfolio Stoplight Report ndash July 2018
  • ERCOT Portfolio Stoplight Report ndash July 2018
  • ERCOT Portfolio Stoplight Report ndash July 2018
Retail Transactions Summary
July 2018 June 2018 May 2018 April 2018 March 2018 February 2018 January 2018 December 2017 November 2017 October 2017 September 2017 August 2017 July 2017 June 2017 May 2017 April 2017 March 2017 February 2017 January 2017 December 2016 November 2016 October 2016 September 2016 August 2016 July 2016 June 2016 May 2016 April 2016 March 2016 February 2016 January 2016 December 2015 November 2015 October 2015 September 2015 August 2015 July 2015 June 2015 May 2015 April 2015 March 2015 February 2015 January 2015 December 2014 November 2014 October 2014 September 2014 August 2014 July 2014 June 2014 May 2014 April 2014 March 2014 February 2014 January 2014 December 2013 November 2013 October 2013 September 2013 August 2013 July 2013 June 2013 May 2013 April 2013 March 2013 February 2013 January 2013 Grand total
814_01 - Switch Received 121926 109653 96828 81291 95159 76119 88933 60560 77860 78096 79502 84134 84059 108784 130828 71769 67845 66875 87140 66556 56202 64452 67323 86656 82923 86376 75323 70300 76235 68057 63954 61486 52887 65276 70342 81674 91211 102661 86229 81255 79997 73394 72885 71072 67080 110465 175164 89677 99568 101490 111077 91983 93887 71130 86953 69691 55957 166882 82415 93194 102562 103756 116086 78919 68950 64329 67116 1321827
Difference from previous month 12273 12825 15537 (13868) 19040 (12814) 28373 (17300) (236) (1406) (4632) 75 (24725) (22044) 59059 3924 970 (20265) 20584 10354 (8250) (2871) (19333) 3733 (3453) 11053 5023 (5935) 8178 4103 2468 8599 (12389) (5066) (11332) (9537) (11450) 16432 4974 1258 6603 509 1813 3992 (43385) (64699) 85487 (9891) (1922) (9587) 19094 (1904) 22757 (15823) 17262 13734 (110925) 84467 (10779) (9368) (1194) (12330) 37167 9969 4621 (2787)
814_16 - Move - Ins Received 270122 257125 244431 225380 224289 215281 230409 238340 207921 236397 244511 258046 252360 257759 237611 197865 217962 201984 202612 196236 201714 220958 231999 268781 241844 247481 214383 199804 218245 212474 193716 189862 181098 215908 229405 248124 263233 247089 208166 207932 215950 197765 198025 193973 178624 226283 231418 243482 251957 233679 223201 258649 214724 208160 207059 172981 178671 233469 216550 255967 249114 220397 216982 204412 197200 191955 194507 3162148
Difference from previous month 12997 12694 19051 1091 9008 (15128) (7931) 30419 (28476) (8114) (13535) 5686 (5399) 20148 39746 (20097) 15978 (628) 6376 (5478) (19244) (11041) (36782) 26937 (5637) 33098 14579 (18441) 5771 18758 3854 8764 (34810) (13497) (18719) (15109) 16144 38923 234 (8018) 18185 (260) 4052 15349 (47659) (5135) (12064) (8475) 18278 10478 (35448) 43925 6564 1101 34078 (5690) (54798) 16919 (39417) 6853 28717 3415 12570 7212 5245 (2552)
814_24 - MVO and MVO to CSA Received 129820 125861 124403 113795 108753 100127 111821 144987 100830 116519 129103 128104 127073 133582 127218 102055 111459 100285 101107 96289 100578 109493 114094 133170 122932 129025 118022 103789 109278 103747 96628 99552 96214 109578 117949 123894 133905 133855 114675 108275 108859 94864 98233 97901 89578 111857 115918 121662 131607 126785 119107 107956 107266 99428 104273 93385 93977 115469 115524 129594 135196 121446 120049 111598 106467 102429 104399 1660500
814_10 - DTP Mass Acquisition Received - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0
814_10 - DTP Mass Transition Received - 0 - 0 9033 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 639 - 0 - 0 4975 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0
814_18 - CSA AdditionDeletes Received 40217 62083 99016 55581 46720 42587 49740 47725 31726 52888 41597 40616 55770 43745 52139 26702 21791 39082 44030 38884 39856 31786 33061 42622 48489 64178 50499 59475 59400 48536 42179 40351 34796 34420 54677 35078 49489 59611 39384 44247 44577 35386 40420 54831 43550 45039 44268 40405 57954 64408 65032 80184 70310 41156 34811 46680 50347 71847 48606 52585 50867 62747 59763 34925 40977 40389 41227 747237
Total 562085 554722 573711 476047 474921 434114 480903 491612 418337 483900 494713 510900 519262 543870 547796 398391 419057 408226 434889 397965 398350 426689 446477 531229 496188 527060 458227 433368 463158 432814 396477 391251 364995 425182 472373 488770 537838 543216 448454 441709 449383 401409 409563 417777 378832 493644 566768 495865 541086 526362 523392 538772 486187 419874 433096 382737 378952 587667 463095 531340 537739 508346 512880 429854 413594 399102 407249 6891712
Counts from Monthly Retail Transaction report
To do
Break Out 814_10s - AQ and MT
Break Out 814_18 Additions from Deletes
Year-To-Date Transactions Received
Transaction Type July 2018 July 2017 July 2018 July 2017
Switches 669909 617300 121926 84059
Acquisition 0 0 0 0
Move - Ins 1667037 1568153 270122 252360
Move - Outs 814580 802779 129820 127073
Continuous Service Agreements (CSA) 395944 283259 40217 55770
Mass Transitions 9033 0 0 0
Total 3556503 3271491 562085 519262
There has been a change since this was created
Mass Acquisition has been broken out of Mass Transition
Page 12: ERCOT Monthly Operational Overvie · ERCOT Monthly Operational Overview (July 2018) Revised 08.22.18. ERCOT Public. August 15, 2018

PUBLIC

Advisories and Watches ndash July 2018 Corrected

bull Two OCNs issued for extreme hot weatherndash Issued 714 and 720

bull Four Advisories issued due to Physical Responsive Capability being below 3000 MWndash Issued 718 719 725 and 728

bull One OCN issued due to projected reserve capacity shortage for hours ending 1400 through 1900 ERCOT requested all QSEs to update their COPs

ndash Issued 726

bull One Watch issued due to the post-contingency loss of the Bevo to Asherton 138 kV (SBEVASH8) overloads the Big Wells to Cotulla Sub 69 kV and curtailment of Eagle Pass DC-Tie exports to CENACE

ndash Issued 717

bull Three Watches issued due to the post-contingency loss of Bentsen to Railroad 138 kV (SBENRAI8) overloads South Mission to Railroad 138 kV and curtailment of Railroad DC-Tie exports to CENACE

ndash Issued 723

bull One Watch issued for the de-rate of the Railroad DC-Tie and curtailment of the DC-Tie exports to CENACE

ndash Issued 731

12

PUBLIC

Lake Levels Update ndash August 1 2018

13

PUBLIC

Planning Summary ndash July 2018

bull ERCOT is currently tracking 404 active generation interconnection requests totaling 79852 MW This includes 37697 MW of wind generation

bull ERCOT is currently reviewing proposed transmission improvements with a total cost of $6035 million

bull Transmission Projects endorsed in 2018 total $3935 million

bull All projects (in engineering routing licensing and construction) total approximately $649 billion (as of June 1 2018)

bull Transmission Projects energized in 2018 total about $1120 billion (as of June 1 2018)

14

PUBLIC

Mapping of Counties to ERCOT Zones ndash July 2018

15

PUBLIC

Cumulative MW Capacity of Interconnection Requests by Zone ndashJuly 2018

16

PUBLIC

Cumulative MW Capacity of Interconnection Requests by Zone ndashJuly 2018

17

PUBLIC

Cumulative MW Capacity of Interconnection Requests by Zone ndashJuly 2018

18

PUBLIC

Wind Generation ndash July 2018

19

PUBLIC

Solar Generation ndash July 2018

20

PUBLIC

Generation Interconnection Activity by Fuel ndash July 2018

21

PUBLIC

Generation Interconnection Activity by Project Phase ndash July 2018

22

Market Operations

PUBLIC

Day-Ahead Schedule (Hourly Average) ndash July 2018

24

0

10000

20000

30000

40000

50000

60000

70000

80000

MW

Hour Ending

Scheduled Energy Only OfferScheduled Three-part OfferDAM Energy PurchaseRT System Load

Liquidity and activity are normal in the Day-Ahead Market

PUBLIC

Percentage of Real-Time Load Hedged in the DAM (Counter-Party Level) ndashJuly 2018

25

0

20

40

60

80

100

120Ja

nM

arM

ay Jul

Sep

Nov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May

July

2013 2014 2015 2016 2017 2018

The dotted lines represent the bounds for major outliers

PUBLIC

DAM and RTM Price Convergence ndash July 2018

26

-20

-10

0

10

20

30

40

50

60Ja

nM

arM

ay Jul

Sep

Nov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

l

2013 2014 2015 2016 2017 2018

Aver

age

DAM

-R

TM S

PP ($

MW

h)

The dotted lines represent the bounds for major outliers

PUBLIC

Day-Ahead Electricity and Ancillary Service Prices (Hourly Average) ndashJuly 2018

27

0

100

200

300

400

500

600

Pric

e ($

MW

h)

Hour Ending

Regulation Up

Regulation Down

Responsive Reserve

Non Spinning Reserve

DAM Power Balance Price(System Lambda)

Ancillary Service prices reflect the opportunity cost of energy

PUBLIC

Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash July 2018

28

0

100

200

300

400

500

600

Pric

e ($

MW

h)

Hour Ending

RTSPP - LZ West

RTSPP - LZ North

RTSPP - LZ South

RTSPP - LZ Houston

DASPP - LZ West

DASPP - LZ North

DASPP - LZ South

DASPP - LZ Houston

Prices reflect relative transmission congestion and system scarcity

PUBLIC

Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash July 2018

29

0

100

200

300

400

500

600

Pric

e ($

MW

h)

Hour Ending

RTSPP - Hub Average

DASPP - Hub Average

Energy prices reflect the risk premium between Day-Ahead amp Real-Time

PUBLIC

DRUC Monthly Summary (Hourly Average) ndash July 2018

30

0

15000

30000

45000

60000

75000

90000

MW

h

Hour Ending

Self Scheduled Capacity

Self Scheduled Ancillary Service Limit

Load Forecast

DRUC Recommended Capacity

31 executions (0 missed)0 published after 160011 minutes average execution time0 Resources committed

PUBLIC

HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash July 2018

31

0

02

04

06

08

1

0

20

40

60

80

100

RTO

RD

PA ($

MW

h)

MW

h

Hour Ending

744 executions (0 missed)8 minutes average execution time1 Resources committed through HRUC or by a Verbal Dispatch Instruction

The dotted line indicates the average RTORDPA

PUBLIC

NonndashSpinning Reserve Service Deployment ndash July 2018

32

Deployment Start Time

Deployment End Time

Deployment Duration (Hours)

Max Deployment(MW) Reason

NA

PUBLIC

CRR Price Convergence ndash July 2018

0

50

100

150

200

250

Mill

ions

$

Cost

Value

Congestion Revenue Right cost in auction convergence with payment in Day-Ahead Market and Real Time Market

33

PUBLIC

Daily Average System Lambda and ORDC Price Adders ndash July 2018

0

50

100

150

200

250

$M

Wh

Day of Month

RTOFFPA

RTORPA

SYSTEM_LAMBDA

34

PUBLIC

ERS Procurement for June 2018 ndash September 2018

TP1 TP2 TP3 TP4 TP5 TP6

Non Weather-Sensitive ERS-10 MW 160562 165996 143324 140708 156699 151138

Non Weather-Sensitive ERS-30 MW 736864 781559 702529 625067 755153 657394

Weather-Sensitive ERS-10 MW 0 0 0 0 0 0

Weather-Sensitive ERS-30 MW 0 0 11850 11850 0 0

Total MW Procured 897426 947555 857703 777625 911852 808532

Clearing Price $201 $185 $2108 $2177 $199 $225

Time Period Time Period Hours

Time Period 1 Hours Ending 0600 - 0800 (50000 am to 80000 am) Monday through Friday except ERCOT Holidays

Time Period 2 Hours Ending 0900 - 1300 (80000 am to 10000 pm) Monday through Friday except ERCOT Holidays

Time Period 3 Hours Ending 1400 - 1600 (10000 pm to 40000 pm) Monday through Friday except ERCOT Holidays

Time Period 4 Hours Ending 1700 - 1900 (40000 pm to 70000 pm) Monday through Friday except ERCOT Holidays

Time Period 5 Hours Ending 2000 - 2200 (70000 pm to 100000 pm) Monday through Friday except ERCOT Holidays Time Period 6 All other hours

35

PUBLIC

Reliability Services ndash July 2018

Reliability Unit Commitment (RUC) $ in Millions

RUC Make-Whole Payments $000

RUC Clawback Charges $000

RUC Commitment Settlement $000

RUC Capacity Short Charges $000

RUC Make-Whole Uplift $000

RUC Commitment Cost Allocation $000

RUC Decommitment Payments $000

Total RUC Allocation to Load $000

In July 2018 there was a credit of $000M allocated to load for RUC compared to bull A credit of $000M in June 2018bull A credit of $003M in July 2017

36

PUBLIC

Ancillary and Other Services ndash July 2018

Ancillary and Other Services $ in Millions

Regulation Up Service $1105

Regulation Down Service $072

Responsive Reserve Service $7177

Non-Spinning Reserve Service $1787

Black Start Service $059

Voltage Services - Reactive Power $000

Voltage Services - Lost Opportunity $000

Total Charges Allocated to Load $10200

In July 2018 Ancillary and Other Services was a charge of $10200M compared to bull A charge of $2001M in June 2018bull A charge of $2322M in July 2017

37

PUBLIC

Real-Time Ancillary Service Imbalance (ORDC) ndash July 2018

In July 2018 Real-Time Ancillary Service Imbalance was a charge to load of $2228K compared to bull A charge of $147K in June 2018bull A charge of $534K in July 2017

Real-Time Ancillary Service Imbalance $ in Thousands

Real-Time AS Imbalance ($2228)

Real-Time Reliability Deployment AS Imbalance $000

Total RTASI Amount Allocated to Load $2228

38

PUBLIC

Energy Settlement ndash July 2018

39

Day-Ahead Market Energy Settlement $ in Millions

Energy Purchases $215396

Point to Point Obligation Purchases $11726

Energy Sales ($212592)

Day-Ahead Congestion Rent $14531

Day-Ahead Market Make-Whole Payments ($001)

Real-Time Market Energy Settlement $ in Millions

Energy Imbalance at a Resource Node ($91963)

Energy Imbalance at a Load Zone $160737

Energy Imbalance at a Hub ($57497)

Net Real-Time Energy Imbalance $11276

Real Time Congestion from Self Schedules $013

Block Load Transfers and DC Ties ($2063)

Total Impact to Revenue Neutrality $9227

Load-Allocated Emergency Energy Payments ($016)

Load-Allocated Base Point Deviation Charges $026

Day-Ahead Market energy settlement activity increased from last month and increased from July 2017

Real-Time Market energy settlement activity increased from last month and increased from July 2017

PUBLIC

Congestion Revenue Rights (CRR) ndash July 2018

$ in Millions

Long-Term Auction ($4026)

Monthly Auction ($1773)

Total Auction Revenue ($5799)

Day-Ahead CRR Settlements ($15797)

Day-Ahead CRR Short-Charges $1885

Day-Ahead CRR Short-Charges Refunded ($899)

Day-Ahead CRR Short-Charges Net $986

Total CRR Funding ($14810)

Day-Ahead Point-to-Point Obligations $11726

Real-Time Point-to-Point Obligations ($10113)

Net Point-to-Point Obligations $1614

Congestion Revenue Rights settlement payments were not fully funded Partial funding to settle the CRR Short Charges was provided from the CRR Balancing Account Fund and the remaining $986M of CRR Short Charges were not refunded The CRR Fund Balance is now $0

Point to Point Obligations settled with a net charge of $1614M compared to a net credit of $1758M last month

40

PUBLIC

CRR Balancing Account Fund ndash July 2018

CRR Balancing Account $ in Millions

Monthly Day-Ahead Congestion Rent $14531

Monthly Day-Ahead CRR Settlements ($15797)

Monthly Day-Ahead CRR Short -Charges $1885

CRR Balancing Account Credit Total $619

Beginning Fund Balance for the Month $275

CRR Balancing Account Credit Total $619

Day-Ahead CRR Short-Charges Refunded ($899)

CRR PTP Option Award Charges $004

Load-Allocated CRR Amount $000

Total Fund Amount $000

41

PUBLIC

Revenue Neutrality ndash July 2018

Revenue Neutrality $ in Millions

Real-Time Energy Imbalance $11276

Real-Time Point to Point Obligation ($10113)

Real-Time Congestion from Self-Schedules $013

DC Tie amp Block Load Transfer ($2063)

Allocation to Load $886

In July 2018 the Revenue Neutrality charge to load was $886M compared to bull A charge of $3046M in June 2018bull A charge of $145M in July 2017

42

PUBLIC

Net Allocation to Load ndash July 2018

Market-Based Allocation $ in Millions

Reliability Unit Commitment $000

Ancillary and Other Services $10200

Real-Time Ancillary Service Imbalance $223

Emergency Energy $016

Base Point Deviation ($026)

CRR Auction Revenue ($5799)

CRR Balancing Account $000

Real-Time Revenue Neutrality $886

Reliability Must Run $000

Monthly Block Load Transfer $000

Total $5500

Fee AllocationERCOT Administrative Fee $2207

Net Allocated to Load $7707

In July 2018 the Net Allocation to load was a charge of $7707M compared to bull A charge of $2152M in June 2018bull A credit of $1363M in July 2017

43

PUBLIC

Advanced Meter Settlement Impacts ndash July 2018

July 2018 At month end settling 72M ESIIDs using Advanced Meter data

July 2018 990 of the load in ERCOT is settled with 15-min interval data (AMS Competitive IDR and NOIE IDR)

44

PUBLIC

ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndashJuly 2018

45

PUBLIC

Retail Transaction Volumes ndash Summary ndash July 2018

46

Transaction Type July 2018 July 2017 July 2018 July 2017

Switches 669909 617300 121926 84059

Acquisition 0 0 0 0

Move - Ins 1667037 1568153 270122 252360

Move - Outs 814580 802779 129820 127073

Continuous Service Agreements (CSA) 395944 283259 40217 55770

Mass Transitions 9033 0 0 0

Total 3556503 3271491 562085 519262

Year-To-Date Transactions Received

Board Presentation Input

Trans Volumes by Month_New

PUBLIC

Retail Transaction Volumes ndash Summary ndash July 2018

SwitchesAcquisitions Move-Ins

Move-Outs Mass Transition

47

Projects Report

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018

20000000$ 2018 Portfolio

Spending Estimate

Projects In FlightOn Hold (Count = 100) 24905011$

Projects Not Yet Started (Count = 10) 1320628$

Projects Completed (Count = 43) 795250$

(7020889)$

TOTAL 20000000$

Project Number Projects in Initiation Phase (Count = 4)

TBD IT Asset RecoveryNPRR842 Study Area Load Information

209-03 Study Network (STNET) Integration288-01 EDI Map and Translator Replacement

Impact Metric TolerancesUnfavorable variances are represented as negative numbers within the report - Green = No more than 49 unfavorable variance - Yellow = Unfavorable variance between 49 and 99 - Red = Unfavorable variance more than 99

Spending Reductions Required to Maintain Capital Budget

2018 Project Funding

Footnotes1 - One or more phases took longer than expected resulting in additional time required

2 - One or more phases required more labor than expected resulting in additional funding andor time required

3 - Project placed on holdNA - Metric not calculated because - it is reported at the parent project level or - it is an administrative project

Project Number Projects in Planning Phase (Count = 8) Phase Start Baseline

Phase FinishApproved

Phase FinishScheduled

Go-Live DateScheduled

Phase Finish

134-02 Privileged Account Management (PAM) Phase 2 882018 12192018 12192018 TBD 12192018 0 10

183-01 CMM-FT GUI Integration 12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs

242-01 Portfolio Reporting Assessment 1182017 12192018 12192018 TBD 12192018 0 21260-01 Information Governance Assessment 10182017 5302018 9192018 TBD 9192018 0 5286-01 Java Platform Assessment 6202018 11212018 11212018 TBD 11212018 0 6287-01 Security Constrained Unit Commitment (SCUC) 882018 2272019 2272019 TBD 2272019 0 -1

NPRR484Revisions to Congestion Revenue Rights Credit Calculations and Payments - Phase 1b 2

12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs

NPRR702Flexible Accounts Payment of Invoices and Disposition of Interest on Cash Collateral

12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs

Schedule Health Budget Health

49

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018Project Number Projects in Execution Phase (Count = 42) Phase Start Baseline Go-

Live DateApproved Go-

Live DateScheduled

Go-Live DateScheduled

Phase Finish

170-01 Enterprise Content Alignment Program 8262015 11152017 8312018 8312018 8312018 0 0170-06 ECAP - ECMS Implementation Phase 1 4252018 11302018 11302018 11302018 11302018 0 3173-02 ERCOT Flight Certification Website 11152017 2282019 2282019 2282019 5312019 0 2181-01 CRR Framework Upgrade 10262016 1022017 11192018 11192018 2272019 0 2

183-01 CMM Tech Refresh 3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

193-01 PMU Tool Evaluation and Implementation 12132017 892018 2152019 2152019 3202019 0 0196-01 GINR Project Status Application Replacement 12212016 9142017 2282019 2282019 3312019 0 1198-02 Reactive Power Coordination PoC 962017 6162018 8152018 8152018 8152018 0 54209-02 Weather Imaging and Line Observation (WILO) 5302018 212019 212019 212019 2272019 0 2210-01 REC Technology Refresh 8302017 3182018 12132018 12132018 1162019 0 3228-01 Enterprise Database Upgrade 882018 1292020 1292020 1292020 1292020 0 17229-01 IT Change and Configuration Management Phase 2 822017 6192018 12132018 12132018 3252019 0 2 -9238-01 Application Authentication Tech Refresh 962017 3192018 12132018 12132018 1302019 0 3239-01 Identity and Access Management 592018 3132019 3132019 3132019 3132019 0 2241-01 AREA - Generation 10112017 3302018 892018 892018 952018 0 -4244-01 Corporate Wireless 11292017 3282018 1252018 1252018 192019 0 9245-01 2017 EPS Metering Enhancements 6272018 892019 892019 892019 9252019 0 1246-01 iTest Data Refresh 12132017 1192018 11152018 11152018 122019 0 25249-01 Secondary Wind Forecasting Service 8302017 2282018 892018 892018 952018 0 0253-01 CIP Recovery Plan Project - Planning Phase 1 1312018 8292018 8292018 8292018 8292018 0 -2

257-01Security Constrained Optimal Powerflow in Study Network Analysis

1262017 10252018 10252018 10252018 1282018 0 19

261-01 Generic Transmission Constraint Calculation 372018 12132018 12132018 12132018 1232019 0 0263-01 Market Simulator 4112018 12132018 12132018 12132018 1302019 0 7265-01 Real-Time Assessment Continuity 1312018 12132018 12132018 12132018 1302019 0 0279-01 Cyber Security Project 24 6272018 10262018 10262018 10262018 11282018 0 0280-01 Quest Software Portfolio Transition 442018 6272018 9262018 9262018 9262018 0 13282-01 Synchronous Condenser Outage Modeling 662018 10252018 10252018 10252018 1252018 0 1Various 2015 CMM NPRRs 2 -18

NPRR519Exemption of ERS-Only QSEs from Collateral and Capitalization Requirements

3152017 5192018 12112018 12112018 12312018 0 See 2015 CMM NPRRs

NPRR620Collateral Requirements for Counter-Parties with No Load or Generation

3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

NPRR660 Remove CRR State Change Adder 3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

Budget HealthSchedule Health

50

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018Project Number Projects in Execution Phase (Count = 42) Phase Start Baseline Go-

Live DateApproved Go-

Live DateScheduled

Go-Live DateScheduled

Phase Finish

NPRR741 Clarifications to TPE and EAL Credit Exposure Calculations 3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

NPRR749 Option Cost for Outstanding CRRs 882018 12132018 12132018 12132018 TBD 0 NA See 2015 CMM NPRRs

NPRR755 Data Agent-Only QSE Registration 3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

NPRR819Modification of Non-Price Error Resettlement Thresholds and Resettlement Clean-Ups

592018 892018 892018 892018 952018 0 36

NPRR833 Modify PTP Obligation Bid Clearing Change 882018 12132018 12132018 12132018 TBD 0 1

NPRR843Short-Term System Adequacy and AS Offer Disclosure Reports Additions

7182018 10252018 10252018 10252018 11282018 0 0

NPRR864 RUC Modifications to Consider Market-Based Solutions 6202018 10252018 10252018 10252018 11282018 0 4SCR777 Bilateral CRR Interface Enhancement 10262016 1022017 11192018 11192018 2272019 0 NA See 181-01

SCR781 RARF Replacement 12202017 4252018 12192018 12192018 12192018 0 3SCR791 Correction of 60-day SCED GRD Disclosure Report 522018 892018 892018 892018 952018 0 39SCR795 Addition of Intra-Hour Wind Forecast to GTBD Calculation 882018 10252018 10252018 10252018 11142018 0 0

Project Number Expedited Projects in Execution (Count = 34)

Project Number Projects in Stabilization (Count = 10) Execution

Phase StartBaseline Go-Live Target

Approved Go-Live Target

ActualGo-Live Date

Scheduled Execution Phase

Finish

NPRR648 Remove References to Flowgate Rights 3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR683 Revision to Available Credit Limit Calculation 3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR743 Revision to MCE to Have a Floor For Load Exposure 3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR760 Calculation of Exposure Variables For Days With No Activity 3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR776 Voltage Set Point Communication 9202017 3192018 452018 452018 952018 0 1

NPRR800Revisions to Credit Exposure Calculations to Use Electricity Futures Market Prices

3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR815Revise the Limitation of Load Resources Providing Responsive Reserve (RRS) Service

3212018 5312018 5312018 5312018 8292018 0 2

209-01 Multi Station Breaker to Breaker One Lines 282017 392018 532018 532018 8222018 0 -1259-01 DC SCADA and Metering Upgrade 10252017 1172018 7252018 7252018 8292018 0 22266-01 Remote Email Access Enhancement 12132017 372018 662018 6192018 9262018 2 -7 2 -9

Schedule Health Budget Health

Budget HealthSchedule Health

51

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018

Project Number Projects On Hold (Count = 2) Forecast

Start DateBaseline

Phase FinishApproved Go-

Live TargetScheduled

Go-Live DateScheduled

Phase Finish

SCR789 Update NMMS Topology Processor to PSSE 34 Capability 0

269-01Document Repository Redesign and Governance Implementation - Phase 1

0

Project Number Projects Completed (Count = 20)

Baseline Execution

Phase Start

Baseline Go-Live Target

Approved Go-Live Target

Actual Go-Live Date

Actual Execution Phase Finish

185-01 Records Management and eDiscovery 12152016 5242017 8292017 8222017 12132017 2 0224-01 TelAlert Replacement 452017 6272017 842017 842017 592018 0 5230-01 SAS Technical Architecture Redesign 312017 12132017 12132017 12132017 6272018 0 2234-01 Reporting Solution Resiliency (RSR) 452017 8232017 11272017 11272017 1102018 0 8240-01 EDI Translator and Mapping Replacement Assessment 4192017 9272017 2282018 TBD 372018 -2 20254-01 Retail Windows Upgrade 10112017 12182017 12182017 1222018 272018 1 -51 65255-01 Settlements Architecture Enhancements 10252017 1112018 1112018 1192018 2142018 1 -10 53258-01 WD Kainos SMART Automation Testing Tool 4112018 642018 642018 662018 7182018 -3 33271-01 Issue Tracking and Resolution Tool Assessment 12132017 4252018 4252018 TBD 522018 1 -5 -1272-01 Operator Training Simulator Black Start GE Effort 1262017 4252018 4252018 4272018 5162018 -1 19274-01 Average Mid-Term Load Forecast 372018 5312018 5312018 5312018 6272018 0 50

NPRR768Revisions to Real-Time On-Line Reliability Deployment Price Adder Categories

372018 5312018 5312018 5312018 6272018 0 16

NPRR778 Modifications to Date Change and Cancellation Evaluation Window 7192017 10292017 12112017 12112017 1312018 0 23

NPRR782Settlement of Infeasible Ancillary Services Due to Transmission Constraints

5242017 8312017 1122017 1122017 1102018 0 20

NPRR808 Three Year CRR Auction 8232017 9182017 9182017 912017 1312018 65 68

NPRR810Applicability of RMR Incentive Factor on Reservation and Transportation Costs Associated with Firm Fuel Supplies

7172017 11122017 3312018 3312018 3312018 0 NA See 233-00

NPRR830 Revision of 4-Coincident Peak Methodology 12132017 262018 262018 262018 372018 0 85

NPRR831 Inclusion of Private Use Networks in Load Zone Price Calculations 822017 1122017 1122017 1122017 2212018 0 33

OBDRR002 ORDC OBD Revisions for PUCT Project 47199 372018 5312018 5312018 5312018 6272018 0 See NPRR768

SCR792 Enhance Communications of BAAL Exceedances 2142018 452018 452018 452018 4252018 0 69

Project Number Expedited Projects Completed (Count = 23)

Budget HealthSchedule Health

Budget HealthSchedule Health

52

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018

Project Number 2018 Projects Not Yet Started (Count = 10) Forecast

Start Date

NPRR858 Provide Complete Current Operating Plan (COP) Data Aug-2018TBD 2018 OS Enhancements Aug-2018TBD Additional Branch Limit for Relays Aug-2018

NPRR817 Create a Panhandle Hub Sep-2018NPRR821 Elimination of the CRR Deration Process Oct-2018NPRR865 Publish RTM Shift Factors for Hubs Load Zones and DC Ties Oct-2018

SCR793SSR Related Telemetry for Transmission Service Provider (TSP) Operators

Oct-2018

ECAP ECAP - ECMS Implementation Phase 2 Oct-2018TBD Job Scheduler Update in CSI Framework Oct-2018TBD Parameter Estimation Oct-2018

53

  • Slide Number 1
  • Slide Number 2
  • Summary ndash July 2018
  • Daily Peak Demand Hourly Average Actual vs Forecast Wind Day-Ahead COPs amp On-Line Capacity at Peak ndash July 2018
  • Actual Wind Output plus Curtailments vs Wind Day-Ahead COPs for All Hours ndash July 2018
  • ERCOTrsquos CPS1 Monthly Performance ndash July 2018
  • Monthly Peak Actual Demand ndash July 2018
  • Monthly Minimum Actual 15-Minute Demand ndash July 2018
  • Day-Ahead Load Forecast Performance ndash July 2018
  • Reliability Unit Commitment (RUC) Capacity by Weather Zone ndash July 2018
  • Generic Transmission Constraints (GTCs) ndash July 2018
  • Advisories and Watches ndash July 2018 Corrected
  • Lake Levels Update ndash August 1 2018
  • Planning Summary ndash July 2018
  • Mapping of Counties to ERCOT Zones ndash July 2018
  • Cumulative MW Capacity of Interconnection Requests by Zone ndashJuly 2018
  • Cumulative MW Capacity of Interconnection Requests by Zone ndashJuly 2018
  • Cumulative MW Capacity of Interconnection Requests by Zone ndashJuly 2018
  • Wind Generation ndash July 2018
  • Solar Generation ndash July 2018
  • Generation Interconnection Activity by Fuel ndash July 2018
  • Generation Interconnection Activity by Project Phase ndash July 2018
  • Slide Number 23
  • Day-Ahead Schedule (Hourly Average) ndash July 2018
  • Percentage of Real-Time Load Hedged in the DAM (Counter-Party Level) ndash July 2018
  • DAM and RTM Price Convergence ndash July 2018
  • Day-Ahead Electricity and Ancillary Service Prices (Hourly Average) ndash July 2018
  • Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash July 2018
  • Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash July 2018
  • DRUC Monthly Summary (Hourly Average) ndash July 2018
  • HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash July 2018
  • NonndashSpinning Reserve Service Deployment ndash July 2018
  • CRR Price Convergence ndash July 2018
  • Daily Average System Lambda and ORDC Price Adders ndash July 2018
  • ERS Procurement for June 2018 ndash September 2018
  • Reliability Services ndash July 2018
  • Ancillary and Other Services ndash July 2018
  • Real-Time Ancillary Service Imbalance (ORDC) ndash July 2018
  • Energy Settlement ndash July 2018
  • Congestion Revenue Rights (CRR) ndash July 2018
  • CRR Balancing Account Fund ndash July 2018
  • Revenue Neutrality ndash July 2018
  • Net Allocation to Load ndash July 2018
  • Advanced Meter Settlement Impacts ndash July 2018
  • ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndash July 2018
  • Retail Transaction Volumes ndash Summary ndash July 2018
  • Retail Transaction Volumes ndash Summary ndash July 2018
  • Slide Number 48
  • ERCOT Portfolio Stoplight Report ndash July 2018
  • ERCOT Portfolio Stoplight Report ndash July 2018
  • ERCOT Portfolio Stoplight Report ndash July 2018
  • ERCOT Portfolio Stoplight Report ndash July 2018
  • ERCOT Portfolio Stoplight Report ndash July 2018
Retail Transactions Summary
July 2018 June 2018 May 2018 April 2018 March 2018 February 2018 January 2018 December 2017 November 2017 October 2017 September 2017 August 2017 July 2017 June 2017 May 2017 April 2017 March 2017 February 2017 January 2017 December 2016 November 2016 October 2016 September 2016 August 2016 July 2016 June 2016 May 2016 April 2016 March 2016 February 2016 January 2016 December 2015 November 2015 October 2015 September 2015 August 2015 July 2015 June 2015 May 2015 April 2015 March 2015 February 2015 January 2015 December 2014 November 2014 October 2014 September 2014 August 2014 July 2014 June 2014 May 2014 April 2014 March 2014 February 2014 January 2014 December 2013 November 2013 October 2013 September 2013 August 2013 July 2013 June 2013 May 2013 April 2013 March 2013 February 2013 January 2013 Grand total
814_01 - Switch Received 121926 109653 96828 81291 95159 76119 88933 60560 77860 78096 79502 84134 84059 108784 130828 71769 67845 66875 87140 66556 56202 64452 67323 86656 82923 86376 75323 70300 76235 68057 63954 61486 52887 65276 70342 81674 91211 102661 86229 81255 79997 73394 72885 71072 67080 110465 175164 89677 99568 101490 111077 91983 93887 71130 86953 69691 55957 166882 82415 93194 102562 103756 116086 78919 68950 64329 67116 1321827
Difference from previous month 12273 12825 15537 (13868) 19040 (12814) 28373 (17300) (236) (1406) (4632) 75 (24725) (22044) 59059 3924 970 (20265) 20584 10354 (8250) (2871) (19333) 3733 (3453) 11053 5023 (5935) 8178 4103 2468 8599 (12389) (5066) (11332) (9537) (11450) 16432 4974 1258 6603 509 1813 3992 (43385) (64699) 85487 (9891) (1922) (9587) 19094 (1904) 22757 (15823) 17262 13734 (110925) 84467 (10779) (9368) (1194) (12330) 37167 9969 4621 (2787)
814_16 - Move - Ins Received 270122 257125 244431 225380 224289 215281 230409 238340 207921 236397 244511 258046 252360 257759 237611 197865 217962 201984 202612 196236 201714 220958 231999 268781 241844 247481 214383 199804 218245 212474 193716 189862 181098 215908 229405 248124 263233 247089 208166 207932 215950 197765 198025 193973 178624 226283 231418 243482 251957 233679 223201 258649 214724 208160 207059 172981 178671 233469 216550 255967 249114 220397 216982 204412 197200 191955 194507 3162148
Difference from previous month 12997 12694 19051 1091 9008 (15128) (7931) 30419 (28476) (8114) (13535) 5686 (5399) 20148 39746 (20097) 15978 (628) 6376 (5478) (19244) (11041) (36782) 26937 (5637) 33098 14579 (18441) 5771 18758 3854 8764 (34810) (13497) (18719) (15109) 16144 38923 234 (8018) 18185 (260) 4052 15349 (47659) (5135) (12064) (8475) 18278 10478 (35448) 43925 6564 1101 34078 (5690) (54798) 16919 (39417) 6853 28717 3415 12570 7212 5245 (2552)
814_24 - MVO and MVO to CSA Received 129820 125861 124403 113795 108753 100127 111821 144987 100830 116519 129103 128104 127073 133582 127218 102055 111459 100285 101107 96289 100578 109493 114094 133170 122932 129025 118022 103789 109278 103747 96628 99552 96214 109578 117949 123894 133905 133855 114675 108275 108859 94864 98233 97901 89578 111857 115918 121662 131607 126785 119107 107956 107266 99428 104273 93385 93977 115469 115524 129594 135196 121446 120049 111598 106467 102429 104399 1660500
814_10 - DTP Mass Acquisition Received - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0
814_10 - DTP Mass Transition Received - 0 - 0 9033 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 639 - 0 - 0 4975 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0
814_18 - CSA AdditionDeletes Received 40217 62083 99016 55581 46720 42587 49740 47725 31726 52888 41597 40616 55770 43745 52139 26702 21791 39082 44030 38884 39856 31786 33061 42622 48489 64178 50499 59475 59400 48536 42179 40351 34796 34420 54677 35078 49489 59611 39384 44247 44577 35386 40420 54831 43550 45039 44268 40405 57954 64408 65032 80184 70310 41156 34811 46680 50347 71847 48606 52585 50867 62747 59763 34925 40977 40389 41227 747237
Total 562085 554722 573711 476047 474921 434114 480903 491612 418337 483900 494713 510900 519262 543870 547796 398391 419057 408226 434889 397965 398350 426689 446477 531229 496188 527060 458227 433368 463158 432814 396477 391251 364995 425182 472373 488770 537838 543216 448454 441709 449383 401409 409563 417777 378832 493644 566768 495865 541086 526362 523392 538772 486187 419874 433096 382737 378952 587667 463095 531340 537739 508346 512880 429854 413594 399102 407249 6891712
Counts from Monthly Retail Transaction report
To do
Break Out 814_10s - AQ and MT
Break Out 814_18 Additions from Deletes
Year-To-Date Transactions Received
Transaction Type July 2018 July 2017 July 2018 July 2017
Switches 669909 617300 121926 84059
Acquisition 0 0 0 0
Move - Ins 1667037 1568153 270122 252360
Move - Outs 814580 802779 129820 127073
Continuous Service Agreements (CSA) 395944 283259 40217 55770
Mass Transitions 9033 0 0 0
Total 3556503 3271491 562085 519262
There has been a change since this was created
Mass Acquisition has been broken out of Mass Transition
Page 13: ERCOT Monthly Operational Overvie · ERCOT Monthly Operational Overview (July 2018) Revised 08.22.18. ERCOT Public. August 15, 2018

PUBLIC

Lake Levels Update ndash August 1 2018

13

PUBLIC

Planning Summary ndash July 2018

bull ERCOT is currently tracking 404 active generation interconnection requests totaling 79852 MW This includes 37697 MW of wind generation

bull ERCOT is currently reviewing proposed transmission improvements with a total cost of $6035 million

bull Transmission Projects endorsed in 2018 total $3935 million

bull All projects (in engineering routing licensing and construction) total approximately $649 billion (as of June 1 2018)

bull Transmission Projects energized in 2018 total about $1120 billion (as of June 1 2018)

14

PUBLIC

Mapping of Counties to ERCOT Zones ndash July 2018

15

PUBLIC

Cumulative MW Capacity of Interconnection Requests by Zone ndashJuly 2018

16

PUBLIC

Cumulative MW Capacity of Interconnection Requests by Zone ndashJuly 2018

17

PUBLIC

Cumulative MW Capacity of Interconnection Requests by Zone ndashJuly 2018

18

PUBLIC

Wind Generation ndash July 2018

19

PUBLIC

Solar Generation ndash July 2018

20

PUBLIC

Generation Interconnection Activity by Fuel ndash July 2018

21

PUBLIC

Generation Interconnection Activity by Project Phase ndash July 2018

22

Market Operations

PUBLIC

Day-Ahead Schedule (Hourly Average) ndash July 2018

24

0

10000

20000

30000

40000

50000

60000

70000

80000

MW

Hour Ending

Scheduled Energy Only OfferScheduled Three-part OfferDAM Energy PurchaseRT System Load

Liquidity and activity are normal in the Day-Ahead Market

PUBLIC

Percentage of Real-Time Load Hedged in the DAM (Counter-Party Level) ndashJuly 2018

25

0

20

40

60

80

100

120Ja

nM

arM

ay Jul

Sep

Nov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May

July

2013 2014 2015 2016 2017 2018

The dotted lines represent the bounds for major outliers

PUBLIC

DAM and RTM Price Convergence ndash July 2018

26

-20

-10

0

10

20

30

40

50

60Ja

nM

arM

ay Jul

Sep

Nov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

l

2013 2014 2015 2016 2017 2018

Aver

age

DAM

-R

TM S

PP ($

MW

h)

The dotted lines represent the bounds for major outliers

PUBLIC

Day-Ahead Electricity and Ancillary Service Prices (Hourly Average) ndashJuly 2018

27

0

100

200

300

400

500

600

Pric

e ($

MW

h)

Hour Ending

Regulation Up

Regulation Down

Responsive Reserve

Non Spinning Reserve

DAM Power Balance Price(System Lambda)

Ancillary Service prices reflect the opportunity cost of energy

PUBLIC

Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash July 2018

28

0

100

200

300

400

500

600

Pric

e ($

MW

h)

Hour Ending

RTSPP - LZ West

RTSPP - LZ North

RTSPP - LZ South

RTSPP - LZ Houston

DASPP - LZ West

DASPP - LZ North

DASPP - LZ South

DASPP - LZ Houston

Prices reflect relative transmission congestion and system scarcity

PUBLIC

Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash July 2018

29

0

100

200

300

400

500

600

Pric

e ($

MW

h)

Hour Ending

RTSPP - Hub Average

DASPP - Hub Average

Energy prices reflect the risk premium between Day-Ahead amp Real-Time

PUBLIC

DRUC Monthly Summary (Hourly Average) ndash July 2018

30

0

15000

30000

45000

60000

75000

90000

MW

h

Hour Ending

Self Scheduled Capacity

Self Scheduled Ancillary Service Limit

Load Forecast

DRUC Recommended Capacity

31 executions (0 missed)0 published after 160011 minutes average execution time0 Resources committed

PUBLIC

HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash July 2018

31

0

02

04

06

08

1

0

20

40

60

80

100

RTO

RD

PA ($

MW

h)

MW

h

Hour Ending

744 executions (0 missed)8 minutes average execution time1 Resources committed through HRUC or by a Verbal Dispatch Instruction

The dotted line indicates the average RTORDPA

PUBLIC

NonndashSpinning Reserve Service Deployment ndash July 2018

32

Deployment Start Time

Deployment End Time

Deployment Duration (Hours)

Max Deployment(MW) Reason

NA

PUBLIC

CRR Price Convergence ndash July 2018

0

50

100

150

200

250

Mill

ions

$

Cost

Value

Congestion Revenue Right cost in auction convergence with payment in Day-Ahead Market and Real Time Market

33

PUBLIC

Daily Average System Lambda and ORDC Price Adders ndash July 2018

0

50

100

150

200

250

$M

Wh

Day of Month

RTOFFPA

RTORPA

SYSTEM_LAMBDA

34

PUBLIC

ERS Procurement for June 2018 ndash September 2018

TP1 TP2 TP3 TP4 TP5 TP6

Non Weather-Sensitive ERS-10 MW 160562 165996 143324 140708 156699 151138

Non Weather-Sensitive ERS-30 MW 736864 781559 702529 625067 755153 657394

Weather-Sensitive ERS-10 MW 0 0 0 0 0 0

Weather-Sensitive ERS-30 MW 0 0 11850 11850 0 0

Total MW Procured 897426 947555 857703 777625 911852 808532

Clearing Price $201 $185 $2108 $2177 $199 $225

Time Period Time Period Hours

Time Period 1 Hours Ending 0600 - 0800 (50000 am to 80000 am) Monday through Friday except ERCOT Holidays

Time Period 2 Hours Ending 0900 - 1300 (80000 am to 10000 pm) Monday through Friday except ERCOT Holidays

Time Period 3 Hours Ending 1400 - 1600 (10000 pm to 40000 pm) Monday through Friday except ERCOT Holidays

Time Period 4 Hours Ending 1700 - 1900 (40000 pm to 70000 pm) Monday through Friday except ERCOT Holidays

Time Period 5 Hours Ending 2000 - 2200 (70000 pm to 100000 pm) Monday through Friday except ERCOT Holidays Time Period 6 All other hours

35

PUBLIC

Reliability Services ndash July 2018

Reliability Unit Commitment (RUC) $ in Millions

RUC Make-Whole Payments $000

RUC Clawback Charges $000

RUC Commitment Settlement $000

RUC Capacity Short Charges $000

RUC Make-Whole Uplift $000

RUC Commitment Cost Allocation $000

RUC Decommitment Payments $000

Total RUC Allocation to Load $000

In July 2018 there was a credit of $000M allocated to load for RUC compared to bull A credit of $000M in June 2018bull A credit of $003M in July 2017

36

PUBLIC

Ancillary and Other Services ndash July 2018

Ancillary and Other Services $ in Millions

Regulation Up Service $1105

Regulation Down Service $072

Responsive Reserve Service $7177

Non-Spinning Reserve Service $1787

Black Start Service $059

Voltage Services - Reactive Power $000

Voltage Services - Lost Opportunity $000

Total Charges Allocated to Load $10200

In July 2018 Ancillary and Other Services was a charge of $10200M compared to bull A charge of $2001M in June 2018bull A charge of $2322M in July 2017

37

PUBLIC

Real-Time Ancillary Service Imbalance (ORDC) ndash July 2018

In July 2018 Real-Time Ancillary Service Imbalance was a charge to load of $2228K compared to bull A charge of $147K in June 2018bull A charge of $534K in July 2017

Real-Time Ancillary Service Imbalance $ in Thousands

Real-Time AS Imbalance ($2228)

Real-Time Reliability Deployment AS Imbalance $000

Total RTASI Amount Allocated to Load $2228

38

PUBLIC

Energy Settlement ndash July 2018

39

Day-Ahead Market Energy Settlement $ in Millions

Energy Purchases $215396

Point to Point Obligation Purchases $11726

Energy Sales ($212592)

Day-Ahead Congestion Rent $14531

Day-Ahead Market Make-Whole Payments ($001)

Real-Time Market Energy Settlement $ in Millions

Energy Imbalance at a Resource Node ($91963)

Energy Imbalance at a Load Zone $160737

Energy Imbalance at a Hub ($57497)

Net Real-Time Energy Imbalance $11276

Real Time Congestion from Self Schedules $013

Block Load Transfers and DC Ties ($2063)

Total Impact to Revenue Neutrality $9227

Load-Allocated Emergency Energy Payments ($016)

Load-Allocated Base Point Deviation Charges $026

Day-Ahead Market energy settlement activity increased from last month and increased from July 2017

Real-Time Market energy settlement activity increased from last month and increased from July 2017

PUBLIC

Congestion Revenue Rights (CRR) ndash July 2018

$ in Millions

Long-Term Auction ($4026)

Monthly Auction ($1773)

Total Auction Revenue ($5799)

Day-Ahead CRR Settlements ($15797)

Day-Ahead CRR Short-Charges $1885

Day-Ahead CRR Short-Charges Refunded ($899)

Day-Ahead CRR Short-Charges Net $986

Total CRR Funding ($14810)

Day-Ahead Point-to-Point Obligations $11726

Real-Time Point-to-Point Obligations ($10113)

Net Point-to-Point Obligations $1614

Congestion Revenue Rights settlement payments were not fully funded Partial funding to settle the CRR Short Charges was provided from the CRR Balancing Account Fund and the remaining $986M of CRR Short Charges were not refunded The CRR Fund Balance is now $0

Point to Point Obligations settled with a net charge of $1614M compared to a net credit of $1758M last month

40

PUBLIC

CRR Balancing Account Fund ndash July 2018

CRR Balancing Account $ in Millions

Monthly Day-Ahead Congestion Rent $14531

Monthly Day-Ahead CRR Settlements ($15797)

Monthly Day-Ahead CRR Short -Charges $1885

CRR Balancing Account Credit Total $619

Beginning Fund Balance for the Month $275

CRR Balancing Account Credit Total $619

Day-Ahead CRR Short-Charges Refunded ($899)

CRR PTP Option Award Charges $004

Load-Allocated CRR Amount $000

Total Fund Amount $000

41

PUBLIC

Revenue Neutrality ndash July 2018

Revenue Neutrality $ in Millions

Real-Time Energy Imbalance $11276

Real-Time Point to Point Obligation ($10113)

Real-Time Congestion from Self-Schedules $013

DC Tie amp Block Load Transfer ($2063)

Allocation to Load $886

In July 2018 the Revenue Neutrality charge to load was $886M compared to bull A charge of $3046M in June 2018bull A charge of $145M in July 2017

42

PUBLIC

Net Allocation to Load ndash July 2018

Market-Based Allocation $ in Millions

Reliability Unit Commitment $000

Ancillary and Other Services $10200

Real-Time Ancillary Service Imbalance $223

Emergency Energy $016

Base Point Deviation ($026)

CRR Auction Revenue ($5799)

CRR Balancing Account $000

Real-Time Revenue Neutrality $886

Reliability Must Run $000

Monthly Block Load Transfer $000

Total $5500

Fee AllocationERCOT Administrative Fee $2207

Net Allocated to Load $7707

In July 2018 the Net Allocation to load was a charge of $7707M compared to bull A charge of $2152M in June 2018bull A credit of $1363M in July 2017

43

PUBLIC

Advanced Meter Settlement Impacts ndash July 2018

July 2018 At month end settling 72M ESIIDs using Advanced Meter data

July 2018 990 of the load in ERCOT is settled with 15-min interval data (AMS Competitive IDR and NOIE IDR)

44

PUBLIC

ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndashJuly 2018

45

PUBLIC

Retail Transaction Volumes ndash Summary ndash July 2018

46

Transaction Type July 2018 July 2017 July 2018 July 2017

Switches 669909 617300 121926 84059

Acquisition 0 0 0 0

Move - Ins 1667037 1568153 270122 252360

Move - Outs 814580 802779 129820 127073

Continuous Service Agreements (CSA) 395944 283259 40217 55770

Mass Transitions 9033 0 0 0

Total 3556503 3271491 562085 519262

Year-To-Date Transactions Received

Board Presentation Input

Trans Volumes by Month_New

PUBLIC

Retail Transaction Volumes ndash Summary ndash July 2018

SwitchesAcquisitions Move-Ins

Move-Outs Mass Transition

47

Projects Report

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018

20000000$ 2018 Portfolio

Spending Estimate

Projects In FlightOn Hold (Count = 100) 24905011$

Projects Not Yet Started (Count = 10) 1320628$

Projects Completed (Count = 43) 795250$

(7020889)$

TOTAL 20000000$

Project Number Projects in Initiation Phase (Count = 4)

TBD IT Asset RecoveryNPRR842 Study Area Load Information

209-03 Study Network (STNET) Integration288-01 EDI Map and Translator Replacement

Impact Metric TolerancesUnfavorable variances are represented as negative numbers within the report - Green = No more than 49 unfavorable variance - Yellow = Unfavorable variance between 49 and 99 - Red = Unfavorable variance more than 99

Spending Reductions Required to Maintain Capital Budget

2018 Project Funding

Footnotes1 - One or more phases took longer than expected resulting in additional time required

2 - One or more phases required more labor than expected resulting in additional funding andor time required

3 - Project placed on holdNA - Metric not calculated because - it is reported at the parent project level or - it is an administrative project

Project Number Projects in Planning Phase (Count = 8) Phase Start Baseline

Phase FinishApproved

Phase FinishScheduled

Go-Live DateScheduled

Phase Finish

134-02 Privileged Account Management (PAM) Phase 2 882018 12192018 12192018 TBD 12192018 0 10

183-01 CMM-FT GUI Integration 12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs

242-01 Portfolio Reporting Assessment 1182017 12192018 12192018 TBD 12192018 0 21260-01 Information Governance Assessment 10182017 5302018 9192018 TBD 9192018 0 5286-01 Java Platform Assessment 6202018 11212018 11212018 TBD 11212018 0 6287-01 Security Constrained Unit Commitment (SCUC) 882018 2272019 2272019 TBD 2272019 0 -1

NPRR484Revisions to Congestion Revenue Rights Credit Calculations and Payments - Phase 1b 2

12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs

NPRR702Flexible Accounts Payment of Invoices and Disposition of Interest on Cash Collateral

12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs

Schedule Health Budget Health

49

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018Project Number Projects in Execution Phase (Count = 42) Phase Start Baseline Go-

Live DateApproved Go-

Live DateScheduled

Go-Live DateScheduled

Phase Finish

170-01 Enterprise Content Alignment Program 8262015 11152017 8312018 8312018 8312018 0 0170-06 ECAP - ECMS Implementation Phase 1 4252018 11302018 11302018 11302018 11302018 0 3173-02 ERCOT Flight Certification Website 11152017 2282019 2282019 2282019 5312019 0 2181-01 CRR Framework Upgrade 10262016 1022017 11192018 11192018 2272019 0 2

183-01 CMM Tech Refresh 3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

193-01 PMU Tool Evaluation and Implementation 12132017 892018 2152019 2152019 3202019 0 0196-01 GINR Project Status Application Replacement 12212016 9142017 2282019 2282019 3312019 0 1198-02 Reactive Power Coordination PoC 962017 6162018 8152018 8152018 8152018 0 54209-02 Weather Imaging and Line Observation (WILO) 5302018 212019 212019 212019 2272019 0 2210-01 REC Technology Refresh 8302017 3182018 12132018 12132018 1162019 0 3228-01 Enterprise Database Upgrade 882018 1292020 1292020 1292020 1292020 0 17229-01 IT Change and Configuration Management Phase 2 822017 6192018 12132018 12132018 3252019 0 2 -9238-01 Application Authentication Tech Refresh 962017 3192018 12132018 12132018 1302019 0 3239-01 Identity and Access Management 592018 3132019 3132019 3132019 3132019 0 2241-01 AREA - Generation 10112017 3302018 892018 892018 952018 0 -4244-01 Corporate Wireless 11292017 3282018 1252018 1252018 192019 0 9245-01 2017 EPS Metering Enhancements 6272018 892019 892019 892019 9252019 0 1246-01 iTest Data Refresh 12132017 1192018 11152018 11152018 122019 0 25249-01 Secondary Wind Forecasting Service 8302017 2282018 892018 892018 952018 0 0253-01 CIP Recovery Plan Project - Planning Phase 1 1312018 8292018 8292018 8292018 8292018 0 -2

257-01Security Constrained Optimal Powerflow in Study Network Analysis

1262017 10252018 10252018 10252018 1282018 0 19

261-01 Generic Transmission Constraint Calculation 372018 12132018 12132018 12132018 1232019 0 0263-01 Market Simulator 4112018 12132018 12132018 12132018 1302019 0 7265-01 Real-Time Assessment Continuity 1312018 12132018 12132018 12132018 1302019 0 0279-01 Cyber Security Project 24 6272018 10262018 10262018 10262018 11282018 0 0280-01 Quest Software Portfolio Transition 442018 6272018 9262018 9262018 9262018 0 13282-01 Synchronous Condenser Outage Modeling 662018 10252018 10252018 10252018 1252018 0 1Various 2015 CMM NPRRs 2 -18

NPRR519Exemption of ERS-Only QSEs from Collateral and Capitalization Requirements

3152017 5192018 12112018 12112018 12312018 0 See 2015 CMM NPRRs

NPRR620Collateral Requirements for Counter-Parties with No Load or Generation

3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

NPRR660 Remove CRR State Change Adder 3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

Budget HealthSchedule Health

50

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018Project Number Projects in Execution Phase (Count = 42) Phase Start Baseline Go-

Live DateApproved Go-

Live DateScheduled

Go-Live DateScheduled

Phase Finish

NPRR741 Clarifications to TPE and EAL Credit Exposure Calculations 3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

NPRR749 Option Cost for Outstanding CRRs 882018 12132018 12132018 12132018 TBD 0 NA See 2015 CMM NPRRs

NPRR755 Data Agent-Only QSE Registration 3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

NPRR819Modification of Non-Price Error Resettlement Thresholds and Resettlement Clean-Ups

592018 892018 892018 892018 952018 0 36

NPRR833 Modify PTP Obligation Bid Clearing Change 882018 12132018 12132018 12132018 TBD 0 1

NPRR843Short-Term System Adequacy and AS Offer Disclosure Reports Additions

7182018 10252018 10252018 10252018 11282018 0 0

NPRR864 RUC Modifications to Consider Market-Based Solutions 6202018 10252018 10252018 10252018 11282018 0 4SCR777 Bilateral CRR Interface Enhancement 10262016 1022017 11192018 11192018 2272019 0 NA See 181-01

SCR781 RARF Replacement 12202017 4252018 12192018 12192018 12192018 0 3SCR791 Correction of 60-day SCED GRD Disclosure Report 522018 892018 892018 892018 952018 0 39SCR795 Addition of Intra-Hour Wind Forecast to GTBD Calculation 882018 10252018 10252018 10252018 11142018 0 0

Project Number Expedited Projects in Execution (Count = 34)

Project Number Projects in Stabilization (Count = 10) Execution

Phase StartBaseline Go-Live Target

Approved Go-Live Target

ActualGo-Live Date

Scheduled Execution Phase

Finish

NPRR648 Remove References to Flowgate Rights 3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR683 Revision to Available Credit Limit Calculation 3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR743 Revision to MCE to Have a Floor For Load Exposure 3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR760 Calculation of Exposure Variables For Days With No Activity 3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR776 Voltage Set Point Communication 9202017 3192018 452018 452018 952018 0 1

NPRR800Revisions to Credit Exposure Calculations to Use Electricity Futures Market Prices

3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR815Revise the Limitation of Load Resources Providing Responsive Reserve (RRS) Service

3212018 5312018 5312018 5312018 8292018 0 2

209-01 Multi Station Breaker to Breaker One Lines 282017 392018 532018 532018 8222018 0 -1259-01 DC SCADA and Metering Upgrade 10252017 1172018 7252018 7252018 8292018 0 22266-01 Remote Email Access Enhancement 12132017 372018 662018 6192018 9262018 2 -7 2 -9

Schedule Health Budget Health

Budget HealthSchedule Health

51

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018

Project Number Projects On Hold (Count = 2) Forecast

Start DateBaseline

Phase FinishApproved Go-

Live TargetScheduled

Go-Live DateScheduled

Phase Finish

SCR789 Update NMMS Topology Processor to PSSE 34 Capability 0

269-01Document Repository Redesign and Governance Implementation - Phase 1

0

Project Number Projects Completed (Count = 20)

Baseline Execution

Phase Start

Baseline Go-Live Target

Approved Go-Live Target

Actual Go-Live Date

Actual Execution Phase Finish

185-01 Records Management and eDiscovery 12152016 5242017 8292017 8222017 12132017 2 0224-01 TelAlert Replacement 452017 6272017 842017 842017 592018 0 5230-01 SAS Technical Architecture Redesign 312017 12132017 12132017 12132017 6272018 0 2234-01 Reporting Solution Resiliency (RSR) 452017 8232017 11272017 11272017 1102018 0 8240-01 EDI Translator and Mapping Replacement Assessment 4192017 9272017 2282018 TBD 372018 -2 20254-01 Retail Windows Upgrade 10112017 12182017 12182017 1222018 272018 1 -51 65255-01 Settlements Architecture Enhancements 10252017 1112018 1112018 1192018 2142018 1 -10 53258-01 WD Kainos SMART Automation Testing Tool 4112018 642018 642018 662018 7182018 -3 33271-01 Issue Tracking and Resolution Tool Assessment 12132017 4252018 4252018 TBD 522018 1 -5 -1272-01 Operator Training Simulator Black Start GE Effort 1262017 4252018 4252018 4272018 5162018 -1 19274-01 Average Mid-Term Load Forecast 372018 5312018 5312018 5312018 6272018 0 50

NPRR768Revisions to Real-Time On-Line Reliability Deployment Price Adder Categories

372018 5312018 5312018 5312018 6272018 0 16

NPRR778 Modifications to Date Change and Cancellation Evaluation Window 7192017 10292017 12112017 12112017 1312018 0 23

NPRR782Settlement of Infeasible Ancillary Services Due to Transmission Constraints

5242017 8312017 1122017 1122017 1102018 0 20

NPRR808 Three Year CRR Auction 8232017 9182017 9182017 912017 1312018 65 68

NPRR810Applicability of RMR Incentive Factor on Reservation and Transportation Costs Associated with Firm Fuel Supplies

7172017 11122017 3312018 3312018 3312018 0 NA See 233-00

NPRR830 Revision of 4-Coincident Peak Methodology 12132017 262018 262018 262018 372018 0 85

NPRR831 Inclusion of Private Use Networks in Load Zone Price Calculations 822017 1122017 1122017 1122017 2212018 0 33

OBDRR002 ORDC OBD Revisions for PUCT Project 47199 372018 5312018 5312018 5312018 6272018 0 See NPRR768

SCR792 Enhance Communications of BAAL Exceedances 2142018 452018 452018 452018 4252018 0 69

Project Number Expedited Projects Completed (Count = 23)

Budget HealthSchedule Health

Budget HealthSchedule Health

52

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018

Project Number 2018 Projects Not Yet Started (Count = 10) Forecast

Start Date

NPRR858 Provide Complete Current Operating Plan (COP) Data Aug-2018TBD 2018 OS Enhancements Aug-2018TBD Additional Branch Limit for Relays Aug-2018

NPRR817 Create a Panhandle Hub Sep-2018NPRR821 Elimination of the CRR Deration Process Oct-2018NPRR865 Publish RTM Shift Factors for Hubs Load Zones and DC Ties Oct-2018

SCR793SSR Related Telemetry for Transmission Service Provider (TSP) Operators

Oct-2018

ECAP ECAP - ECMS Implementation Phase 2 Oct-2018TBD Job Scheduler Update in CSI Framework Oct-2018TBD Parameter Estimation Oct-2018

53

  • Slide Number 1
  • Slide Number 2
  • Summary ndash July 2018
  • Daily Peak Demand Hourly Average Actual vs Forecast Wind Day-Ahead COPs amp On-Line Capacity at Peak ndash July 2018
  • Actual Wind Output plus Curtailments vs Wind Day-Ahead COPs for All Hours ndash July 2018
  • ERCOTrsquos CPS1 Monthly Performance ndash July 2018
  • Monthly Peak Actual Demand ndash July 2018
  • Monthly Minimum Actual 15-Minute Demand ndash July 2018
  • Day-Ahead Load Forecast Performance ndash July 2018
  • Reliability Unit Commitment (RUC) Capacity by Weather Zone ndash July 2018
  • Generic Transmission Constraints (GTCs) ndash July 2018
  • Advisories and Watches ndash July 2018 Corrected
  • Lake Levels Update ndash August 1 2018
  • Planning Summary ndash July 2018
  • Mapping of Counties to ERCOT Zones ndash July 2018
  • Cumulative MW Capacity of Interconnection Requests by Zone ndashJuly 2018
  • Cumulative MW Capacity of Interconnection Requests by Zone ndashJuly 2018
  • Cumulative MW Capacity of Interconnection Requests by Zone ndashJuly 2018
  • Wind Generation ndash July 2018
  • Solar Generation ndash July 2018
  • Generation Interconnection Activity by Fuel ndash July 2018
  • Generation Interconnection Activity by Project Phase ndash July 2018
  • Slide Number 23
  • Day-Ahead Schedule (Hourly Average) ndash July 2018
  • Percentage of Real-Time Load Hedged in the DAM (Counter-Party Level) ndash July 2018
  • DAM and RTM Price Convergence ndash July 2018
  • Day-Ahead Electricity and Ancillary Service Prices (Hourly Average) ndash July 2018
  • Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash July 2018
  • Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash July 2018
  • DRUC Monthly Summary (Hourly Average) ndash July 2018
  • HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash July 2018
  • NonndashSpinning Reserve Service Deployment ndash July 2018
  • CRR Price Convergence ndash July 2018
  • Daily Average System Lambda and ORDC Price Adders ndash July 2018
  • ERS Procurement for June 2018 ndash September 2018
  • Reliability Services ndash July 2018
  • Ancillary and Other Services ndash July 2018
  • Real-Time Ancillary Service Imbalance (ORDC) ndash July 2018
  • Energy Settlement ndash July 2018
  • Congestion Revenue Rights (CRR) ndash July 2018
  • CRR Balancing Account Fund ndash July 2018
  • Revenue Neutrality ndash July 2018
  • Net Allocation to Load ndash July 2018
  • Advanced Meter Settlement Impacts ndash July 2018
  • ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndash July 2018
  • Retail Transaction Volumes ndash Summary ndash July 2018
  • Retail Transaction Volumes ndash Summary ndash July 2018
  • Slide Number 48
  • ERCOT Portfolio Stoplight Report ndash July 2018
  • ERCOT Portfolio Stoplight Report ndash July 2018
  • ERCOT Portfolio Stoplight Report ndash July 2018
  • ERCOT Portfolio Stoplight Report ndash July 2018
  • ERCOT Portfolio Stoplight Report ndash July 2018
Retail Transactions Summary
July 2018 June 2018 May 2018 April 2018 March 2018 February 2018 January 2018 December 2017 November 2017 October 2017 September 2017 August 2017 July 2017 June 2017 May 2017 April 2017 March 2017 February 2017 January 2017 December 2016 November 2016 October 2016 September 2016 August 2016 July 2016 June 2016 May 2016 April 2016 March 2016 February 2016 January 2016 December 2015 November 2015 October 2015 September 2015 August 2015 July 2015 June 2015 May 2015 April 2015 March 2015 February 2015 January 2015 December 2014 November 2014 October 2014 September 2014 August 2014 July 2014 June 2014 May 2014 April 2014 March 2014 February 2014 January 2014 December 2013 November 2013 October 2013 September 2013 August 2013 July 2013 June 2013 May 2013 April 2013 March 2013 February 2013 January 2013 Grand total
814_01 - Switch Received 121926 109653 96828 81291 95159 76119 88933 60560 77860 78096 79502 84134 84059 108784 130828 71769 67845 66875 87140 66556 56202 64452 67323 86656 82923 86376 75323 70300 76235 68057 63954 61486 52887 65276 70342 81674 91211 102661 86229 81255 79997 73394 72885 71072 67080 110465 175164 89677 99568 101490 111077 91983 93887 71130 86953 69691 55957 166882 82415 93194 102562 103756 116086 78919 68950 64329 67116 1321827
Difference from previous month 12273 12825 15537 (13868) 19040 (12814) 28373 (17300) (236) (1406) (4632) 75 (24725) (22044) 59059 3924 970 (20265) 20584 10354 (8250) (2871) (19333) 3733 (3453) 11053 5023 (5935) 8178 4103 2468 8599 (12389) (5066) (11332) (9537) (11450) 16432 4974 1258 6603 509 1813 3992 (43385) (64699) 85487 (9891) (1922) (9587) 19094 (1904) 22757 (15823) 17262 13734 (110925) 84467 (10779) (9368) (1194) (12330) 37167 9969 4621 (2787)
814_16 - Move - Ins Received 270122 257125 244431 225380 224289 215281 230409 238340 207921 236397 244511 258046 252360 257759 237611 197865 217962 201984 202612 196236 201714 220958 231999 268781 241844 247481 214383 199804 218245 212474 193716 189862 181098 215908 229405 248124 263233 247089 208166 207932 215950 197765 198025 193973 178624 226283 231418 243482 251957 233679 223201 258649 214724 208160 207059 172981 178671 233469 216550 255967 249114 220397 216982 204412 197200 191955 194507 3162148
Difference from previous month 12997 12694 19051 1091 9008 (15128) (7931) 30419 (28476) (8114) (13535) 5686 (5399) 20148 39746 (20097) 15978 (628) 6376 (5478) (19244) (11041) (36782) 26937 (5637) 33098 14579 (18441) 5771 18758 3854 8764 (34810) (13497) (18719) (15109) 16144 38923 234 (8018) 18185 (260) 4052 15349 (47659) (5135) (12064) (8475) 18278 10478 (35448) 43925 6564 1101 34078 (5690) (54798) 16919 (39417) 6853 28717 3415 12570 7212 5245 (2552)
814_24 - MVO and MVO to CSA Received 129820 125861 124403 113795 108753 100127 111821 144987 100830 116519 129103 128104 127073 133582 127218 102055 111459 100285 101107 96289 100578 109493 114094 133170 122932 129025 118022 103789 109278 103747 96628 99552 96214 109578 117949 123894 133905 133855 114675 108275 108859 94864 98233 97901 89578 111857 115918 121662 131607 126785 119107 107956 107266 99428 104273 93385 93977 115469 115524 129594 135196 121446 120049 111598 106467 102429 104399 1660500
814_10 - DTP Mass Acquisition Received - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0
814_10 - DTP Mass Transition Received - 0 - 0 9033 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 639 - 0 - 0 4975 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0
814_18 - CSA AdditionDeletes Received 40217 62083 99016 55581 46720 42587 49740 47725 31726 52888 41597 40616 55770 43745 52139 26702 21791 39082 44030 38884 39856 31786 33061 42622 48489 64178 50499 59475 59400 48536 42179 40351 34796 34420 54677 35078 49489 59611 39384 44247 44577 35386 40420 54831 43550 45039 44268 40405 57954 64408 65032 80184 70310 41156 34811 46680 50347 71847 48606 52585 50867 62747 59763 34925 40977 40389 41227 747237
Total 562085 554722 573711 476047 474921 434114 480903 491612 418337 483900 494713 510900 519262 543870 547796 398391 419057 408226 434889 397965 398350 426689 446477 531229 496188 527060 458227 433368 463158 432814 396477 391251 364995 425182 472373 488770 537838 543216 448454 441709 449383 401409 409563 417777 378832 493644 566768 495865 541086 526362 523392 538772 486187 419874 433096 382737 378952 587667 463095 531340 537739 508346 512880 429854 413594 399102 407249 6891712
Counts from Monthly Retail Transaction report
To do
Break Out 814_10s - AQ and MT
Break Out 814_18 Additions from Deletes
Year-To-Date Transactions Received
Transaction Type July 2018 July 2017 July 2018 July 2017
Switches 669909 617300 121926 84059
Acquisition 0 0 0 0
Move - Ins 1667037 1568153 270122 252360
Move - Outs 814580 802779 129820 127073
Continuous Service Agreements (CSA) 395944 283259 40217 55770
Mass Transitions 9033 0 0 0
Total 3556503 3271491 562085 519262
There has been a change since this was created
Mass Acquisition has been broken out of Mass Transition
Page 14: ERCOT Monthly Operational Overvie · ERCOT Monthly Operational Overview (July 2018) Revised 08.22.18. ERCOT Public. August 15, 2018

PUBLIC

Planning Summary ndash July 2018

bull ERCOT is currently tracking 404 active generation interconnection requests totaling 79852 MW This includes 37697 MW of wind generation

bull ERCOT is currently reviewing proposed transmission improvements with a total cost of $6035 million

bull Transmission Projects endorsed in 2018 total $3935 million

bull All projects (in engineering routing licensing and construction) total approximately $649 billion (as of June 1 2018)

bull Transmission Projects energized in 2018 total about $1120 billion (as of June 1 2018)

14

PUBLIC

Mapping of Counties to ERCOT Zones ndash July 2018

15

PUBLIC

Cumulative MW Capacity of Interconnection Requests by Zone ndashJuly 2018

16

PUBLIC

Cumulative MW Capacity of Interconnection Requests by Zone ndashJuly 2018

17

PUBLIC

Cumulative MW Capacity of Interconnection Requests by Zone ndashJuly 2018

18

PUBLIC

Wind Generation ndash July 2018

19

PUBLIC

Solar Generation ndash July 2018

20

PUBLIC

Generation Interconnection Activity by Fuel ndash July 2018

21

PUBLIC

Generation Interconnection Activity by Project Phase ndash July 2018

22

Market Operations

PUBLIC

Day-Ahead Schedule (Hourly Average) ndash July 2018

24

0

10000

20000

30000

40000

50000

60000

70000

80000

MW

Hour Ending

Scheduled Energy Only OfferScheduled Three-part OfferDAM Energy PurchaseRT System Load

Liquidity and activity are normal in the Day-Ahead Market

PUBLIC

Percentage of Real-Time Load Hedged in the DAM (Counter-Party Level) ndashJuly 2018

25

0

20

40

60

80

100

120Ja

nM

arM

ay Jul

Sep

Nov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May

July

2013 2014 2015 2016 2017 2018

The dotted lines represent the bounds for major outliers

PUBLIC

DAM and RTM Price Convergence ndash July 2018

26

-20

-10

0

10

20

30

40

50

60Ja

nM

arM

ay Jul

Sep

Nov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

l

2013 2014 2015 2016 2017 2018

Aver

age

DAM

-R

TM S

PP ($

MW

h)

The dotted lines represent the bounds for major outliers

PUBLIC

Day-Ahead Electricity and Ancillary Service Prices (Hourly Average) ndashJuly 2018

27

0

100

200

300

400

500

600

Pric

e ($

MW

h)

Hour Ending

Regulation Up

Regulation Down

Responsive Reserve

Non Spinning Reserve

DAM Power Balance Price(System Lambda)

Ancillary Service prices reflect the opportunity cost of energy

PUBLIC

Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash July 2018

28

0

100

200

300

400

500

600

Pric

e ($

MW

h)

Hour Ending

RTSPP - LZ West

RTSPP - LZ North

RTSPP - LZ South

RTSPP - LZ Houston

DASPP - LZ West

DASPP - LZ North

DASPP - LZ South

DASPP - LZ Houston

Prices reflect relative transmission congestion and system scarcity

PUBLIC

Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash July 2018

29

0

100

200

300

400

500

600

Pric

e ($

MW

h)

Hour Ending

RTSPP - Hub Average

DASPP - Hub Average

Energy prices reflect the risk premium between Day-Ahead amp Real-Time

PUBLIC

DRUC Monthly Summary (Hourly Average) ndash July 2018

30

0

15000

30000

45000

60000

75000

90000

MW

h

Hour Ending

Self Scheduled Capacity

Self Scheduled Ancillary Service Limit

Load Forecast

DRUC Recommended Capacity

31 executions (0 missed)0 published after 160011 minutes average execution time0 Resources committed

PUBLIC

HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash July 2018

31

0

02

04

06

08

1

0

20

40

60

80

100

RTO

RD

PA ($

MW

h)

MW

h

Hour Ending

744 executions (0 missed)8 minutes average execution time1 Resources committed through HRUC or by a Verbal Dispatch Instruction

The dotted line indicates the average RTORDPA

PUBLIC

NonndashSpinning Reserve Service Deployment ndash July 2018

32

Deployment Start Time

Deployment End Time

Deployment Duration (Hours)

Max Deployment(MW) Reason

NA

PUBLIC

CRR Price Convergence ndash July 2018

0

50

100

150

200

250

Mill

ions

$

Cost

Value

Congestion Revenue Right cost in auction convergence with payment in Day-Ahead Market and Real Time Market

33

PUBLIC

Daily Average System Lambda and ORDC Price Adders ndash July 2018

0

50

100

150

200

250

$M

Wh

Day of Month

RTOFFPA

RTORPA

SYSTEM_LAMBDA

34

PUBLIC

ERS Procurement for June 2018 ndash September 2018

TP1 TP2 TP3 TP4 TP5 TP6

Non Weather-Sensitive ERS-10 MW 160562 165996 143324 140708 156699 151138

Non Weather-Sensitive ERS-30 MW 736864 781559 702529 625067 755153 657394

Weather-Sensitive ERS-10 MW 0 0 0 0 0 0

Weather-Sensitive ERS-30 MW 0 0 11850 11850 0 0

Total MW Procured 897426 947555 857703 777625 911852 808532

Clearing Price $201 $185 $2108 $2177 $199 $225

Time Period Time Period Hours

Time Period 1 Hours Ending 0600 - 0800 (50000 am to 80000 am) Monday through Friday except ERCOT Holidays

Time Period 2 Hours Ending 0900 - 1300 (80000 am to 10000 pm) Monday through Friday except ERCOT Holidays

Time Period 3 Hours Ending 1400 - 1600 (10000 pm to 40000 pm) Monday through Friday except ERCOT Holidays

Time Period 4 Hours Ending 1700 - 1900 (40000 pm to 70000 pm) Monday through Friday except ERCOT Holidays

Time Period 5 Hours Ending 2000 - 2200 (70000 pm to 100000 pm) Monday through Friday except ERCOT Holidays Time Period 6 All other hours

35

PUBLIC

Reliability Services ndash July 2018

Reliability Unit Commitment (RUC) $ in Millions

RUC Make-Whole Payments $000

RUC Clawback Charges $000

RUC Commitment Settlement $000

RUC Capacity Short Charges $000

RUC Make-Whole Uplift $000

RUC Commitment Cost Allocation $000

RUC Decommitment Payments $000

Total RUC Allocation to Load $000

In July 2018 there was a credit of $000M allocated to load for RUC compared to bull A credit of $000M in June 2018bull A credit of $003M in July 2017

36

PUBLIC

Ancillary and Other Services ndash July 2018

Ancillary and Other Services $ in Millions

Regulation Up Service $1105

Regulation Down Service $072

Responsive Reserve Service $7177

Non-Spinning Reserve Service $1787

Black Start Service $059

Voltage Services - Reactive Power $000

Voltage Services - Lost Opportunity $000

Total Charges Allocated to Load $10200

In July 2018 Ancillary and Other Services was a charge of $10200M compared to bull A charge of $2001M in June 2018bull A charge of $2322M in July 2017

37

PUBLIC

Real-Time Ancillary Service Imbalance (ORDC) ndash July 2018

In July 2018 Real-Time Ancillary Service Imbalance was a charge to load of $2228K compared to bull A charge of $147K in June 2018bull A charge of $534K in July 2017

Real-Time Ancillary Service Imbalance $ in Thousands

Real-Time AS Imbalance ($2228)

Real-Time Reliability Deployment AS Imbalance $000

Total RTASI Amount Allocated to Load $2228

38

PUBLIC

Energy Settlement ndash July 2018

39

Day-Ahead Market Energy Settlement $ in Millions

Energy Purchases $215396

Point to Point Obligation Purchases $11726

Energy Sales ($212592)

Day-Ahead Congestion Rent $14531

Day-Ahead Market Make-Whole Payments ($001)

Real-Time Market Energy Settlement $ in Millions

Energy Imbalance at a Resource Node ($91963)

Energy Imbalance at a Load Zone $160737

Energy Imbalance at a Hub ($57497)

Net Real-Time Energy Imbalance $11276

Real Time Congestion from Self Schedules $013

Block Load Transfers and DC Ties ($2063)

Total Impact to Revenue Neutrality $9227

Load-Allocated Emergency Energy Payments ($016)

Load-Allocated Base Point Deviation Charges $026

Day-Ahead Market energy settlement activity increased from last month and increased from July 2017

Real-Time Market energy settlement activity increased from last month and increased from July 2017

PUBLIC

Congestion Revenue Rights (CRR) ndash July 2018

$ in Millions

Long-Term Auction ($4026)

Monthly Auction ($1773)

Total Auction Revenue ($5799)

Day-Ahead CRR Settlements ($15797)

Day-Ahead CRR Short-Charges $1885

Day-Ahead CRR Short-Charges Refunded ($899)

Day-Ahead CRR Short-Charges Net $986

Total CRR Funding ($14810)

Day-Ahead Point-to-Point Obligations $11726

Real-Time Point-to-Point Obligations ($10113)

Net Point-to-Point Obligations $1614

Congestion Revenue Rights settlement payments were not fully funded Partial funding to settle the CRR Short Charges was provided from the CRR Balancing Account Fund and the remaining $986M of CRR Short Charges were not refunded The CRR Fund Balance is now $0

Point to Point Obligations settled with a net charge of $1614M compared to a net credit of $1758M last month

40

PUBLIC

CRR Balancing Account Fund ndash July 2018

CRR Balancing Account $ in Millions

Monthly Day-Ahead Congestion Rent $14531

Monthly Day-Ahead CRR Settlements ($15797)

Monthly Day-Ahead CRR Short -Charges $1885

CRR Balancing Account Credit Total $619

Beginning Fund Balance for the Month $275

CRR Balancing Account Credit Total $619

Day-Ahead CRR Short-Charges Refunded ($899)

CRR PTP Option Award Charges $004

Load-Allocated CRR Amount $000

Total Fund Amount $000

41

PUBLIC

Revenue Neutrality ndash July 2018

Revenue Neutrality $ in Millions

Real-Time Energy Imbalance $11276

Real-Time Point to Point Obligation ($10113)

Real-Time Congestion from Self-Schedules $013

DC Tie amp Block Load Transfer ($2063)

Allocation to Load $886

In July 2018 the Revenue Neutrality charge to load was $886M compared to bull A charge of $3046M in June 2018bull A charge of $145M in July 2017

42

PUBLIC

Net Allocation to Load ndash July 2018

Market-Based Allocation $ in Millions

Reliability Unit Commitment $000

Ancillary and Other Services $10200

Real-Time Ancillary Service Imbalance $223

Emergency Energy $016

Base Point Deviation ($026)

CRR Auction Revenue ($5799)

CRR Balancing Account $000

Real-Time Revenue Neutrality $886

Reliability Must Run $000

Monthly Block Load Transfer $000

Total $5500

Fee AllocationERCOT Administrative Fee $2207

Net Allocated to Load $7707

In July 2018 the Net Allocation to load was a charge of $7707M compared to bull A charge of $2152M in June 2018bull A credit of $1363M in July 2017

43

PUBLIC

Advanced Meter Settlement Impacts ndash July 2018

July 2018 At month end settling 72M ESIIDs using Advanced Meter data

July 2018 990 of the load in ERCOT is settled with 15-min interval data (AMS Competitive IDR and NOIE IDR)

44

PUBLIC

ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndashJuly 2018

45

PUBLIC

Retail Transaction Volumes ndash Summary ndash July 2018

46

Transaction Type July 2018 July 2017 July 2018 July 2017

Switches 669909 617300 121926 84059

Acquisition 0 0 0 0

Move - Ins 1667037 1568153 270122 252360

Move - Outs 814580 802779 129820 127073

Continuous Service Agreements (CSA) 395944 283259 40217 55770

Mass Transitions 9033 0 0 0

Total 3556503 3271491 562085 519262

Year-To-Date Transactions Received

Board Presentation Input

Trans Volumes by Month_New

PUBLIC

Retail Transaction Volumes ndash Summary ndash July 2018

SwitchesAcquisitions Move-Ins

Move-Outs Mass Transition

47

Projects Report

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018

20000000$ 2018 Portfolio

Spending Estimate

Projects In FlightOn Hold (Count = 100) 24905011$

Projects Not Yet Started (Count = 10) 1320628$

Projects Completed (Count = 43) 795250$

(7020889)$

TOTAL 20000000$

Project Number Projects in Initiation Phase (Count = 4)

TBD IT Asset RecoveryNPRR842 Study Area Load Information

209-03 Study Network (STNET) Integration288-01 EDI Map and Translator Replacement

Impact Metric TolerancesUnfavorable variances are represented as negative numbers within the report - Green = No more than 49 unfavorable variance - Yellow = Unfavorable variance between 49 and 99 - Red = Unfavorable variance more than 99

Spending Reductions Required to Maintain Capital Budget

2018 Project Funding

Footnotes1 - One or more phases took longer than expected resulting in additional time required

2 - One or more phases required more labor than expected resulting in additional funding andor time required

3 - Project placed on holdNA - Metric not calculated because - it is reported at the parent project level or - it is an administrative project

Project Number Projects in Planning Phase (Count = 8) Phase Start Baseline

Phase FinishApproved

Phase FinishScheduled

Go-Live DateScheduled

Phase Finish

134-02 Privileged Account Management (PAM) Phase 2 882018 12192018 12192018 TBD 12192018 0 10

183-01 CMM-FT GUI Integration 12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs

242-01 Portfolio Reporting Assessment 1182017 12192018 12192018 TBD 12192018 0 21260-01 Information Governance Assessment 10182017 5302018 9192018 TBD 9192018 0 5286-01 Java Platform Assessment 6202018 11212018 11212018 TBD 11212018 0 6287-01 Security Constrained Unit Commitment (SCUC) 882018 2272019 2272019 TBD 2272019 0 -1

NPRR484Revisions to Congestion Revenue Rights Credit Calculations and Payments - Phase 1b 2

12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs

NPRR702Flexible Accounts Payment of Invoices and Disposition of Interest on Cash Collateral

12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs

Schedule Health Budget Health

49

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018Project Number Projects in Execution Phase (Count = 42) Phase Start Baseline Go-

Live DateApproved Go-

Live DateScheduled

Go-Live DateScheduled

Phase Finish

170-01 Enterprise Content Alignment Program 8262015 11152017 8312018 8312018 8312018 0 0170-06 ECAP - ECMS Implementation Phase 1 4252018 11302018 11302018 11302018 11302018 0 3173-02 ERCOT Flight Certification Website 11152017 2282019 2282019 2282019 5312019 0 2181-01 CRR Framework Upgrade 10262016 1022017 11192018 11192018 2272019 0 2

183-01 CMM Tech Refresh 3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

193-01 PMU Tool Evaluation and Implementation 12132017 892018 2152019 2152019 3202019 0 0196-01 GINR Project Status Application Replacement 12212016 9142017 2282019 2282019 3312019 0 1198-02 Reactive Power Coordination PoC 962017 6162018 8152018 8152018 8152018 0 54209-02 Weather Imaging and Line Observation (WILO) 5302018 212019 212019 212019 2272019 0 2210-01 REC Technology Refresh 8302017 3182018 12132018 12132018 1162019 0 3228-01 Enterprise Database Upgrade 882018 1292020 1292020 1292020 1292020 0 17229-01 IT Change and Configuration Management Phase 2 822017 6192018 12132018 12132018 3252019 0 2 -9238-01 Application Authentication Tech Refresh 962017 3192018 12132018 12132018 1302019 0 3239-01 Identity and Access Management 592018 3132019 3132019 3132019 3132019 0 2241-01 AREA - Generation 10112017 3302018 892018 892018 952018 0 -4244-01 Corporate Wireless 11292017 3282018 1252018 1252018 192019 0 9245-01 2017 EPS Metering Enhancements 6272018 892019 892019 892019 9252019 0 1246-01 iTest Data Refresh 12132017 1192018 11152018 11152018 122019 0 25249-01 Secondary Wind Forecasting Service 8302017 2282018 892018 892018 952018 0 0253-01 CIP Recovery Plan Project - Planning Phase 1 1312018 8292018 8292018 8292018 8292018 0 -2

257-01Security Constrained Optimal Powerflow in Study Network Analysis

1262017 10252018 10252018 10252018 1282018 0 19

261-01 Generic Transmission Constraint Calculation 372018 12132018 12132018 12132018 1232019 0 0263-01 Market Simulator 4112018 12132018 12132018 12132018 1302019 0 7265-01 Real-Time Assessment Continuity 1312018 12132018 12132018 12132018 1302019 0 0279-01 Cyber Security Project 24 6272018 10262018 10262018 10262018 11282018 0 0280-01 Quest Software Portfolio Transition 442018 6272018 9262018 9262018 9262018 0 13282-01 Synchronous Condenser Outage Modeling 662018 10252018 10252018 10252018 1252018 0 1Various 2015 CMM NPRRs 2 -18

NPRR519Exemption of ERS-Only QSEs from Collateral and Capitalization Requirements

3152017 5192018 12112018 12112018 12312018 0 See 2015 CMM NPRRs

NPRR620Collateral Requirements for Counter-Parties with No Load or Generation

3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

NPRR660 Remove CRR State Change Adder 3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

Budget HealthSchedule Health

50

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018Project Number Projects in Execution Phase (Count = 42) Phase Start Baseline Go-

Live DateApproved Go-

Live DateScheduled

Go-Live DateScheduled

Phase Finish

NPRR741 Clarifications to TPE and EAL Credit Exposure Calculations 3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

NPRR749 Option Cost for Outstanding CRRs 882018 12132018 12132018 12132018 TBD 0 NA See 2015 CMM NPRRs

NPRR755 Data Agent-Only QSE Registration 3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

NPRR819Modification of Non-Price Error Resettlement Thresholds and Resettlement Clean-Ups

592018 892018 892018 892018 952018 0 36

NPRR833 Modify PTP Obligation Bid Clearing Change 882018 12132018 12132018 12132018 TBD 0 1

NPRR843Short-Term System Adequacy and AS Offer Disclosure Reports Additions

7182018 10252018 10252018 10252018 11282018 0 0

NPRR864 RUC Modifications to Consider Market-Based Solutions 6202018 10252018 10252018 10252018 11282018 0 4SCR777 Bilateral CRR Interface Enhancement 10262016 1022017 11192018 11192018 2272019 0 NA See 181-01

SCR781 RARF Replacement 12202017 4252018 12192018 12192018 12192018 0 3SCR791 Correction of 60-day SCED GRD Disclosure Report 522018 892018 892018 892018 952018 0 39SCR795 Addition of Intra-Hour Wind Forecast to GTBD Calculation 882018 10252018 10252018 10252018 11142018 0 0

Project Number Expedited Projects in Execution (Count = 34)

Project Number Projects in Stabilization (Count = 10) Execution

Phase StartBaseline Go-Live Target

Approved Go-Live Target

ActualGo-Live Date

Scheduled Execution Phase

Finish

NPRR648 Remove References to Flowgate Rights 3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR683 Revision to Available Credit Limit Calculation 3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR743 Revision to MCE to Have a Floor For Load Exposure 3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR760 Calculation of Exposure Variables For Days With No Activity 3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR776 Voltage Set Point Communication 9202017 3192018 452018 452018 952018 0 1

NPRR800Revisions to Credit Exposure Calculations to Use Electricity Futures Market Prices

3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR815Revise the Limitation of Load Resources Providing Responsive Reserve (RRS) Service

3212018 5312018 5312018 5312018 8292018 0 2

209-01 Multi Station Breaker to Breaker One Lines 282017 392018 532018 532018 8222018 0 -1259-01 DC SCADA and Metering Upgrade 10252017 1172018 7252018 7252018 8292018 0 22266-01 Remote Email Access Enhancement 12132017 372018 662018 6192018 9262018 2 -7 2 -9

Schedule Health Budget Health

Budget HealthSchedule Health

51

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018

Project Number Projects On Hold (Count = 2) Forecast

Start DateBaseline

Phase FinishApproved Go-

Live TargetScheduled

Go-Live DateScheduled

Phase Finish

SCR789 Update NMMS Topology Processor to PSSE 34 Capability 0

269-01Document Repository Redesign and Governance Implementation - Phase 1

0

Project Number Projects Completed (Count = 20)

Baseline Execution

Phase Start

Baseline Go-Live Target

Approved Go-Live Target

Actual Go-Live Date

Actual Execution Phase Finish

185-01 Records Management and eDiscovery 12152016 5242017 8292017 8222017 12132017 2 0224-01 TelAlert Replacement 452017 6272017 842017 842017 592018 0 5230-01 SAS Technical Architecture Redesign 312017 12132017 12132017 12132017 6272018 0 2234-01 Reporting Solution Resiliency (RSR) 452017 8232017 11272017 11272017 1102018 0 8240-01 EDI Translator and Mapping Replacement Assessment 4192017 9272017 2282018 TBD 372018 -2 20254-01 Retail Windows Upgrade 10112017 12182017 12182017 1222018 272018 1 -51 65255-01 Settlements Architecture Enhancements 10252017 1112018 1112018 1192018 2142018 1 -10 53258-01 WD Kainos SMART Automation Testing Tool 4112018 642018 642018 662018 7182018 -3 33271-01 Issue Tracking and Resolution Tool Assessment 12132017 4252018 4252018 TBD 522018 1 -5 -1272-01 Operator Training Simulator Black Start GE Effort 1262017 4252018 4252018 4272018 5162018 -1 19274-01 Average Mid-Term Load Forecast 372018 5312018 5312018 5312018 6272018 0 50

NPRR768Revisions to Real-Time On-Line Reliability Deployment Price Adder Categories

372018 5312018 5312018 5312018 6272018 0 16

NPRR778 Modifications to Date Change and Cancellation Evaluation Window 7192017 10292017 12112017 12112017 1312018 0 23

NPRR782Settlement of Infeasible Ancillary Services Due to Transmission Constraints

5242017 8312017 1122017 1122017 1102018 0 20

NPRR808 Three Year CRR Auction 8232017 9182017 9182017 912017 1312018 65 68

NPRR810Applicability of RMR Incentive Factor on Reservation and Transportation Costs Associated with Firm Fuel Supplies

7172017 11122017 3312018 3312018 3312018 0 NA See 233-00

NPRR830 Revision of 4-Coincident Peak Methodology 12132017 262018 262018 262018 372018 0 85

NPRR831 Inclusion of Private Use Networks in Load Zone Price Calculations 822017 1122017 1122017 1122017 2212018 0 33

OBDRR002 ORDC OBD Revisions for PUCT Project 47199 372018 5312018 5312018 5312018 6272018 0 See NPRR768

SCR792 Enhance Communications of BAAL Exceedances 2142018 452018 452018 452018 4252018 0 69

Project Number Expedited Projects Completed (Count = 23)

Budget HealthSchedule Health

Budget HealthSchedule Health

52

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018

Project Number 2018 Projects Not Yet Started (Count = 10) Forecast

Start Date

NPRR858 Provide Complete Current Operating Plan (COP) Data Aug-2018TBD 2018 OS Enhancements Aug-2018TBD Additional Branch Limit for Relays Aug-2018

NPRR817 Create a Panhandle Hub Sep-2018NPRR821 Elimination of the CRR Deration Process Oct-2018NPRR865 Publish RTM Shift Factors for Hubs Load Zones and DC Ties Oct-2018

SCR793SSR Related Telemetry for Transmission Service Provider (TSP) Operators

Oct-2018

ECAP ECAP - ECMS Implementation Phase 2 Oct-2018TBD Job Scheduler Update in CSI Framework Oct-2018TBD Parameter Estimation Oct-2018

53

  • Slide Number 1
  • Slide Number 2
  • Summary ndash July 2018
  • Daily Peak Demand Hourly Average Actual vs Forecast Wind Day-Ahead COPs amp On-Line Capacity at Peak ndash July 2018
  • Actual Wind Output plus Curtailments vs Wind Day-Ahead COPs for All Hours ndash July 2018
  • ERCOTrsquos CPS1 Monthly Performance ndash July 2018
  • Monthly Peak Actual Demand ndash July 2018
  • Monthly Minimum Actual 15-Minute Demand ndash July 2018
  • Day-Ahead Load Forecast Performance ndash July 2018
  • Reliability Unit Commitment (RUC) Capacity by Weather Zone ndash July 2018
  • Generic Transmission Constraints (GTCs) ndash July 2018
  • Advisories and Watches ndash July 2018 Corrected
  • Lake Levels Update ndash August 1 2018
  • Planning Summary ndash July 2018
  • Mapping of Counties to ERCOT Zones ndash July 2018
  • Cumulative MW Capacity of Interconnection Requests by Zone ndashJuly 2018
  • Cumulative MW Capacity of Interconnection Requests by Zone ndashJuly 2018
  • Cumulative MW Capacity of Interconnection Requests by Zone ndashJuly 2018
  • Wind Generation ndash July 2018
  • Solar Generation ndash July 2018
  • Generation Interconnection Activity by Fuel ndash July 2018
  • Generation Interconnection Activity by Project Phase ndash July 2018
  • Slide Number 23
  • Day-Ahead Schedule (Hourly Average) ndash July 2018
  • Percentage of Real-Time Load Hedged in the DAM (Counter-Party Level) ndash July 2018
  • DAM and RTM Price Convergence ndash July 2018
  • Day-Ahead Electricity and Ancillary Service Prices (Hourly Average) ndash July 2018
  • Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash July 2018
  • Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash July 2018
  • DRUC Monthly Summary (Hourly Average) ndash July 2018
  • HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash July 2018
  • NonndashSpinning Reserve Service Deployment ndash July 2018
  • CRR Price Convergence ndash July 2018
  • Daily Average System Lambda and ORDC Price Adders ndash July 2018
  • ERS Procurement for June 2018 ndash September 2018
  • Reliability Services ndash July 2018
  • Ancillary and Other Services ndash July 2018
  • Real-Time Ancillary Service Imbalance (ORDC) ndash July 2018
  • Energy Settlement ndash July 2018
  • Congestion Revenue Rights (CRR) ndash July 2018
  • CRR Balancing Account Fund ndash July 2018
  • Revenue Neutrality ndash July 2018
  • Net Allocation to Load ndash July 2018
  • Advanced Meter Settlement Impacts ndash July 2018
  • ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndash July 2018
  • Retail Transaction Volumes ndash Summary ndash July 2018
  • Retail Transaction Volumes ndash Summary ndash July 2018
  • Slide Number 48
  • ERCOT Portfolio Stoplight Report ndash July 2018
  • ERCOT Portfolio Stoplight Report ndash July 2018
  • ERCOT Portfolio Stoplight Report ndash July 2018
  • ERCOT Portfolio Stoplight Report ndash July 2018
  • ERCOT Portfolio Stoplight Report ndash July 2018
Retail Transactions Summary
July 2018 June 2018 May 2018 April 2018 March 2018 February 2018 January 2018 December 2017 November 2017 October 2017 September 2017 August 2017 July 2017 June 2017 May 2017 April 2017 March 2017 February 2017 January 2017 December 2016 November 2016 October 2016 September 2016 August 2016 July 2016 June 2016 May 2016 April 2016 March 2016 February 2016 January 2016 December 2015 November 2015 October 2015 September 2015 August 2015 July 2015 June 2015 May 2015 April 2015 March 2015 February 2015 January 2015 December 2014 November 2014 October 2014 September 2014 August 2014 July 2014 June 2014 May 2014 April 2014 March 2014 February 2014 January 2014 December 2013 November 2013 October 2013 September 2013 August 2013 July 2013 June 2013 May 2013 April 2013 March 2013 February 2013 January 2013 Grand total
814_01 - Switch Received 121926 109653 96828 81291 95159 76119 88933 60560 77860 78096 79502 84134 84059 108784 130828 71769 67845 66875 87140 66556 56202 64452 67323 86656 82923 86376 75323 70300 76235 68057 63954 61486 52887 65276 70342 81674 91211 102661 86229 81255 79997 73394 72885 71072 67080 110465 175164 89677 99568 101490 111077 91983 93887 71130 86953 69691 55957 166882 82415 93194 102562 103756 116086 78919 68950 64329 67116 1321827
Difference from previous month 12273 12825 15537 (13868) 19040 (12814) 28373 (17300) (236) (1406) (4632) 75 (24725) (22044) 59059 3924 970 (20265) 20584 10354 (8250) (2871) (19333) 3733 (3453) 11053 5023 (5935) 8178 4103 2468 8599 (12389) (5066) (11332) (9537) (11450) 16432 4974 1258 6603 509 1813 3992 (43385) (64699) 85487 (9891) (1922) (9587) 19094 (1904) 22757 (15823) 17262 13734 (110925) 84467 (10779) (9368) (1194) (12330) 37167 9969 4621 (2787)
814_16 - Move - Ins Received 270122 257125 244431 225380 224289 215281 230409 238340 207921 236397 244511 258046 252360 257759 237611 197865 217962 201984 202612 196236 201714 220958 231999 268781 241844 247481 214383 199804 218245 212474 193716 189862 181098 215908 229405 248124 263233 247089 208166 207932 215950 197765 198025 193973 178624 226283 231418 243482 251957 233679 223201 258649 214724 208160 207059 172981 178671 233469 216550 255967 249114 220397 216982 204412 197200 191955 194507 3162148
Difference from previous month 12997 12694 19051 1091 9008 (15128) (7931) 30419 (28476) (8114) (13535) 5686 (5399) 20148 39746 (20097) 15978 (628) 6376 (5478) (19244) (11041) (36782) 26937 (5637) 33098 14579 (18441) 5771 18758 3854 8764 (34810) (13497) (18719) (15109) 16144 38923 234 (8018) 18185 (260) 4052 15349 (47659) (5135) (12064) (8475) 18278 10478 (35448) 43925 6564 1101 34078 (5690) (54798) 16919 (39417) 6853 28717 3415 12570 7212 5245 (2552)
814_24 - MVO and MVO to CSA Received 129820 125861 124403 113795 108753 100127 111821 144987 100830 116519 129103 128104 127073 133582 127218 102055 111459 100285 101107 96289 100578 109493 114094 133170 122932 129025 118022 103789 109278 103747 96628 99552 96214 109578 117949 123894 133905 133855 114675 108275 108859 94864 98233 97901 89578 111857 115918 121662 131607 126785 119107 107956 107266 99428 104273 93385 93977 115469 115524 129594 135196 121446 120049 111598 106467 102429 104399 1660500
814_10 - DTP Mass Acquisition Received - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0
814_10 - DTP Mass Transition Received - 0 - 0 9033 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 639 - 0 - 0 4975 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0
814_18 - CSA AdditionDeletes Received 40217 62083 99016 55581 46720 42587 49740 47725 31726 52888 41597 40616 55770 43745 52139 26702 21791 39082 44030 38884 39856 31786 33061 42622 48489 64178 50499 59475 59400 48536 42179 40351 34796 34420 54677 35078 49489 59611 39384 44247 44577 35386 40420 54831 43550 45039 44268 40405 57954 64408 65032 80184 70310 41156 34811 46680 50347 71847 48606 52585 50867 62747 59763 34925 40977 40389 41227 747237
Total 562085 554722 573711 476047 474921 434114 480903 491612 418337 483900 494713 510900 519262 543870 547796 398391 419057 408226 434889 397965 398350 426689 446477 531229 496188 527060 458227 433368 463158 432814 396477 391251 364995 425182 472373 488770 537838 543216 448454 441709 449383 401409 409563 417777 378832 493644 566768 495865 541086 526362 523392 538772 486187 419874 433096 382737 378952 587667 463095 531340 537739 508346 512880 429854 413594 399102 407249 6891712
Counts from Monthly Retail Transaction report
To do
Break Out 814_10s - AQ and MT
Break Out 814_18 Additions from Deletes
Year-To-Date Transactions Received
Transaction Type July 2018 July 2017 July 2018 July 2017
Switches 669909 617300 121926 84059
Acquisition 0 0 0 0
Move - Ins 1667037 1568153 270122 252360
Move - Outs 814580 802779 129820 127073
Continuous Service Agreements (CSA) 395944 283259 40217 55770
Mass Transitions 9033 0 0 0
Total 3556503 3271491 562085 519262
There has been a change since this was created
Mass Acquisition has been broken out of Mass Transition
Page 15: ERCOT Monthly Operational Overvie · ERCOT Monthly Operational Overview (July 2018) Revised 08.22.18. ERCOT Public. August 15, 2018

PUBLIC

Mapping of Counties to ERCOT Zones ndash July 2018

15

PUBLIC

Cumulative MW Capacity of Interconnection Requests by Zone ndashJuly 2018

16

PUBLIC

Cumulative MW Capacity of Interconnection Requests by Zone ndashJuly 2018

17

PUBLIC

Cumulative MW Capacity of Interconnection Requests by Zone ndashJuly 2018

18

PUBLIC

Wind Generation ndash July 2018

19

PUBLIC

Solar Generation ndash July 2018

20

PUBLIC

Generation Interconnection Activity by Fuel ndash July 2018

21

PUBLIC

Generation Interconnection Activity by Project Phase ndash July 2018

22

Market Operations

PUBLIC

Day-Ahead Schedule (Hourly Average) ndash July 2018

24

0

10000

20000

30000

40000

50000

60000

70000

80000

MW

Hour Ending

Scheduled Energy Only OfferScheduled Three-part OfferDAM Energy PurchaseRT System Load

Liquidity and activity are normal in the Day-Ahead Market

PUBLIC

Percentage of Real-Time Load Hedged in the DAM (Counter-Party Level) ndashJuly 2018

25

0

20

40

60

80

100

120Ja

nM

arM

ay Jul

Sep

Nov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May

July

2013 2014 2015 2016 2017 2018

The dotted lines represent the bounds for major outliers

PUBLIC

DAM and RTM Price Convergence ndash July 2018

26

-20

-10

0

10

20

30

40

50

60Ja

nM

arM

ay Jul

Sep

Nov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

l

2013 2014 2015 2016 2017 2018

Aver

age

DAM

-R

TM S

PP ($

MW

h)

The dotted lines represent the bounds for major outliers

PUBLIC

Day-Ahead Electricity and Ancillary Service Prices (Hourly Average) ndashJuly 2018

27

0

100

200

300

400

500

600

Pric

e ($

MW

h)

Hour Ending

Regulation Up

Regulation Down

Responsive Reserve

Non Spinning Reserve

DAM Power Balance Price(System Lambda)

Ancillary Service prices reflect the opportunity cost of energy

PUBLIC

Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash July 2018

28

0

100

200

300

400

500

600

Pric

e ($

MW

h)

Hour Ending

RTSPP - LZ West

RTSPP - LZ North

RTSPP - LZ South

RTSPP - LZ Houston

DASPP - LZ West

DASPP - LZ North

DASPP - LZ South

DASPP - LZ Houston

Prices reflect relative transmission congestion and system scarcity

PUBLIC

Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash July 2018

29

0

100

200

300

400

500

600

Pric

e ($

MW

h)

Hour Ending

RTSPP - Hub Average

DASPP - Hub Average

Energy prices reflect the risk premium between Day-Ahead amp Real-Time

PUBLIC

DRUC Monthly Summary (Hourly Average) ndash July 2018

30

0

15000

30000

45000

60000

75000

90000

MW

h

Hour Ending

Self Scheduled Capacity

Self Scheduled Ancillary Service Limit

Load Forecast

DRUC Recommended Capacity

31 executions (0 missed)0 published after 160011 minutes average execution time0 Resources committed

PUBLIC

HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash July 2018

31

0

02

04

06

08

1

0

20

40

60

80

100

RTO

RD

PA ($

MW

h)

MW

h

Hour Ending

744 executions (0 missed)8 minutes average execution time1 Resources committed through HRUC or by a Verbal Dispatch Instruction

The dotted line indicates the average RTORDPA

PUBLIC

NonndashSpinning Reserve Service Deployment ndash July 2018

32

Deployment Start Time

Deployment End Time

Deployment Duration (Hours)

Max Deployment(MW) Reason

NA

PUBLIC

CRR Price Convergence ndash July 2018

0

50

100

150

200

250

Mill

ions

$

Cost

Value

Congestion Revenue Right cost in auction convergence with payment in Day-Ahead Market and Real Time Market

33

PUBLIC

Daily Average System Lambda and ORDC Price Adders ndash July 2018

0

50

100

150

200

250

$M

Wh

Day of Month

RTOFFPA

RTORPA

SYSTEM_LAMBDA

34

PUBLIC

ERS Procurement for June 2018 ndash September 2018

TP1 TP2 TP3 TP4 TP5 TP6

Non Weather-Sensitive ERS-10 MW 160562 165996 143324 140708 156699 151138

Non Weather-Sensitive ERS-30 MW 736864 781559 702529 625067 755153 657394

Weather-Sensitive ERS-10 MW 0 0 0 0 0 0

Weather-Sensitive ERS-30 MW 0 0 11850 11850 0 0

Total MW Procured 897426 947555 857703 777625 911852 808532

Clearing Price $201 $185 $2108 $2177 $199 $225

Time Period Time Period Hours

Time Period 1 Hours Ending 0600 - 0800 (50000 am to 80000 am) Monday through Friday except ERCOT Holidays

Time Period 2 Hours Ending 0900 - 1300 (80000 am to 10000 pm) Monday through Friday except ERCOT Holidays

Time Period 3 Hours Ending 1400 - 1600 (10000 pm to 40000 pm) Monday through Friday except ERCOT Holidays

Time Period 4 Hours Ending 1700 - 1900 (40000 pm to 70000 pm) Monday through Friday except ERCOT Holidays

Time Period 5 Hours Ending 2000 - 2200 (70000 pm to 100000 pm) Monday through Friday except ERCOT Holidays Time Period 6 All other hours

35

PUBLIC

Reliability Services ndash July 2018

Reliability Unit Commitment (RUC) $ in Millions

RUC Make-Whole Payments $000

RUC Clawback Charges $000

RUC Commitment Settlement $000

RUC Capacity Short Charges $000

RUC Make-Whole Uplift $000

RUC Commitment Cost Allocation $000

RUC Decommitment Payments $000

Total RUC Allocation to Load $000

In July 2018 there was a credit of $000M allocated to load for RUC compared to bull A credit of $000M in June 2018bull A credit of $003M in July 2017

36

PUBLIC

Ancillary and Other Services ndash July 2018

Ancillary and Other Services $ in Millions

Regulation Up Service $1105

Regulation Down Service $072

Responsive Reserve Service $7177

Non-Spinning Reserve Service $1787

Black Start Service $059

Voltage Services - Reactive Power $000

Voltage Services - Lost Opportunity $000

Total Charges Allocated to Load $10200

In July 2018 Ancillary and Other Services was a charge of $10200M compared to bull A charge of $2001M in June 2018bull A charge of $2322M in July 2017

37

PUBLIC

Real-Time Ancillary Service Imbalance (ORDC) ndash July 2018

In July 2018 Real-Time Ancillary Service Imbalance was a charge to load of $2228K compared to bull A charge of $147K in June 2018bull A charge of $534K in July 2017

Real-Time Ancillary Service Imbalance $ in Thousands

Real-Time AS Imbalance ($2228)

Real-Time Reliability Deployment AS Imbalance $000

Total RTASI Amount Allocated to Load $2228

38

PUBLIC

Energy Settlement ndash July 2018

39

Day-Ahead Market Energy Settlement $ in Millions

Energy Purchases $215396

Point to Point Obligation Purchases $11726

Energy Sales ($212592)

Day-Ahead Congestion Rent $14531

Day-Ahead Market Make-Whole Payments ($001)

Real-Time Market Energy Settlement $ in Millions

Energy Imbalance at a Resource Node ($91963)

Energy Imbalance at a Load Zone $160737

Energy Imbalance at a Hub ($57497)

Net Real-Time Energy Imbalance $11276

Real Time Congestion from Self Schedules $013

Block Load Transfers and DC Ties ($2063)

Total Impact to Revenue Neutrality $9227

Load-Allocated Emergency Energy Payments ($016)

Load-Allocated Base Point Deviation Charges $026

Day-Ahead Market energy settlement activity increased from last month and increased from July 2017

Real-Time Market energy settlement activity increased from last month and increased from July 2017

PUBLIC

Congestion Revenue Rights (CRR) ndash July 2018

$ in Millions

Long-Term Auction ($4026)

Monthly Auction ($1773)

Total Auction Revenue ($5799)

Day-Ahead CRR Settlements ($15797)

Day-Ahead CRR Short-Charges $1885

Day-Ahead CRR Short-Charges Refunded ($899)

Day-Ahead CRR Short-Charges Net $986

Total CRR Funding ($14810)

Day-Ahead Point-to-Point Obligations $11726

Real-Time Point-to-Point Obligations ($10113)

Net Point-to-Point Obligations $1614

Congestion Revenue Rights settlement payments were not fully funded Partial funding to settle the CRR Short Charges was provided from the CRR Balancing Account Fund and the remaining $986M of CRR Short Charges were not refunded The CRR Fund Balance is now $0

Point to Point Obligations settled with a net charge of $1614M compared to a net credit of $1758M last month

40

PUBLIC

CRR Balancing Account Fund ndash July 2018

CRR Balancing Account $ in Millions

Monthly Day-Ahead Congestion Rent $14531

Monthly Day-Ahead CRR Settlements ($15797)

Monthly Day-Ahead CRR Short -Charges $1885

CRR Balancing Account Credit Total $619

Beginning Fund Balance for the Month $275

CRR Balancing Account Credit Total $619

Day-Ahead CRR Short-Charges Refunded ($899)

CRR PTP Option Award Charges $004

Load-Allocated CRR Amount $000

Total Fund Amount $000

41

PUBLIC

Revenue Neutrality ndash July 2018

Revenue Neutrality $ in Millions

Real-Time Energy Imbalance $11276

Real-Time Point to Point Obligation ($10113)

Real-Time Congestion from Self-Schedules $013

DC Tie amp Block Load Transfer ($2063)

Allocation to Load $886

In July 2018 the Revenue Neutrality charge to load was $886M compared to bull A charge of $3046M in June 2018bull A charge of $145M in July 2017

42

PUBLIC

Net Allocation to Load ndash July 2018

Market-Based Allocation $ in Millions

Reliability Unit Commitment $000

Ancillary and Other Services $10200

Real-Time Ancillary Service Imbalance $223

Emergency Energy $016

Base Point Deviation ($026)

CRR Auction Revenue ($5799)

CRR Balancing Account $000

Real-Time Revenue Neutrality $886

Reliability Must Run $000

Monthly Block Load Transfer $000

Total $5500

Fee AllocationERCOT Administrative Fee $2207

Net Allocated to Load $7707

In July 2018 the Net Allocation to load was a charge of $7707M compared to bull A charge of $2152M in June 2018bull A credit of $1363M in July 2017

43

PUBLIC

Advanced Meter Settlement Impacts ndash July 2018

July 2018 At month end settling 72M ESIIDs using Advanced Meter data

July 2018 990 of the load in ERCOT is settled with 15-min interval data (AMS Competitive IDR and NOIE IDR)

44

PUBLIC

ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndashJuly 2018

45

PUBLIC

Retail Transaction Volumes ndash Summary ndash July 2018

46

Transaction Type July 2018 July 2017 July 2018 July 2017

Switches 669909 617300 121926 84059

Acquisition 0 0 0 0

Move - Ins 1667037 1568153 270122 252360

Move - Outs 814580 802779 129820 127073

Continuous Service Agreements (CSA) 395944 283259 40217 55770

Mass Transitions 9033 0 0 0

Total 3556503 3271491 562085 519262

Year-To-Date Transactions Received

Board Presentation Input

Trans Volumes by Month_New

PUBLIC

Retail Transaction Volumes ndash Summary ndash July 2018

SwitchesAcquisitions Move-Ins

Move-Outs Mass Transition

47

Projects Report

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018

20000000$ 2018 Portfolio

Spending Estimate

Projects In FlightOn Hold (Count = 100) 24905011$

Projects Not Yet Started (Count = 10) 1320628$

Projects Completed (Count = 43) 795250$

(7020889)$

TOTAL 20000000$

Project Number Projects in Initiation Phase (Count = 4)

TBD IT Asset RecoveryNPRR842 Study Area Load Information

209-03 Study Network (STNET) Integration288-01 EDI Map and Translator Replacement

Impact Metric TolerancesUnfavorable variances are represented as negative numbers within the report - Green = No more than 49 unfavorable variance - Yellow = Unfavorable variance between 49 and 99 - Red = Unfavorable variance more than 99

Spending Reductions Required to Maintain Capital Budget

2018 Project Funding

Footnotes1 - One or more phases took longer than expected resulting in additional time required

2 - One or more phases required more labor than expected resulting in additional funding andor time required

3 - Project placed on holdNA - Metric not calculated because - it is reported at the parent project level or - it is an administrative project

Project Number Projects in Planning Phase (Count = 8) Phase Start Baseline

Phase FinishApproved

Phase FinishScheduled

Go-Live DateScheduled

Phase Finish

134-02 Privileged Account Management (PAM) Phase 2 882018 12192018 12192018 TBD 12192018 0 10

183-01 CMM-FT GUI Integration 12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs

242-01 Portfolio Reporting Assessment 1182017 12192018 12192018 TBD 12192018 0 21260-01 Information Governance Assessment 10182017 5302018 9192018 TBD 9192018 0 5286-01 Java Platform Assessment 6202018 11212018 11212018 TBD 11212018 0 6287-01 Security Constrained Unit Commitment (SCUC) 882018 2272019 2272019 TBD 2272019 0 -1

NPRR484Revisions to Congestion Revenue Rights Credit Calculations and Payments - Phase 1b 2

12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs

NPRR702Flexible Accounts Payment of Invoices and Disposition of Interest on Cash Collateral

12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs

Schedule Health Budget Health

49

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018Project Number Projects in Execution Phase (Count = 42) Phase Start Baseline Go-

Live DateApproved Go-

Live DateScheduled

Go-Live DateScheduled

Phase Finish

170-01 Enterprise Content Alignment Program 8262015 11152017 8312018 8312018 8312018 0 0170-06 ECAP - ECMS Implementation Phase 1 4252018 11302018 11302018 11302018 11302018 0 3173-02 ERCOT Flight Certification Website 11152017 2282019 2282019 2282019 5312019 0 2181-01 CRR Framework Upgrade 10262016 1022017 11192018 11192018 2272019 0 2

183-01 CMM Tech Refresh 3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

193-01 PMU Tool Evaluation and Implementation 12132017 892018 2152019 2152019 3202019 0 0196-01 GINR Project Status Application Replacement 12212016 9142017 2282019 2282019 3312019 0 1198-02 Reactive Power Coordination PoC 962017 6162018 8152018 8152018 8152018 0 54209-02 Weather Imaging and Line Observation (WILO) 5302018 212019 212019 212019 2272019 0 2210-01 REC Technology Refresh 8302017 3182018 12132018 12132018 1162019 0 3228-01 Enterprise Database Upgrade 882018 1292020 1292020 1292020 1292020 0 17229-01 IT Change and Configuration Management Phase 2 822017 6192018 12132018 12132018 3252019 0 2 -9238-01 Application Authentication Tech Refresh 962017 3192018 12132018 12132018 1302019 0 3239-01 Identity and Access Management 592018 3132019 3132019 3132019 3132019 0 2241-01 AREA - Generation 10112017 3302018 892018 892018 952018 0 -4244-01 Corporate Wireless 11292017 3282018 1252018 1252018 192019 0 9245-01 2017 EPS Metering Enhancements 6272018 892019 892019 892019 9252019 0 1246-01 iTest Data Refresh 12132017 1192018 11152018 11152018 122019 0 25249-01 Secondary Wind Forecasting Service 8302017 2282018 892018 892018 952018 0 0253-01 CIP Recovery Plan Project - Planning Phase 1 1312018 8292018 8292018 8292018 8292018 0 -2

257-01Security Constrained Optimal Powerflow in Study Network Analysis

1262017 10252018 10252018 10252018 1282018 0 19

261-01 Generic Transmission Constraint Calculation 372018 12132018 12132018 12132018 1232019 0 0263-01 Market Simulator 4112018 12132018 12132018 12132018 1302019 0 7265-01 Real-Time Assessment Continuity 1312018 12132018 12132018 12132018 1302019 0 0279-01 Cyber Security Project 24 6272018 10262018 10262018 10262018 11282018 0 0280-01 Quest Software Portfolio Transition 442018 6272018 9262018 9262018 9262018 0 13282-01 Synchronous Condenser Outage Modeling 662018 10252018 10252018 10252018 1252018 0 1Various 2015 CMM NPRRs 2 -18

NPRR519Exemption of ERS-Only QSEs from Collateral and Capitalization Requirements

3152017 5192018 12112018 12112018 12312018 0 See 2015 CMM NPRRs

NPRR620Collateral Requirements for Counter-Parties with No Load or Generation

3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

NPRR660 Remove CRR State Change Adder 3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

Budget HealthSchedule Health

50

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018Project Number Projects in Execution Phase (Count = 42) Phase Start Baseline Go-

Live DateApproved Go-

Live DateScheduled

Go-Live DateScheduled

Phase Finish

NPRR741 Clarifications to TPE and EAL Credit Exposure Calculations 3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

NPRR749 Option Cost for Outstanding CRRs 882018 12132018 12132018 12132018 TBD 0 NA See 2015 CMM NPRRs

NPRR755 Data Agent-Only QSE Registration 3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

NPRR819Modification of Non-Price Error Resettlement Thresholds and Resettlement Clean-Ups

592018 892018 892018 892018 952018 0 36

NPRR833 Modify PTP Obligation Bid Clearing Change 882018 12132018 12132018 12132018 TBD 0 1

NPRR843Short-Term System Adequacy and AS Offer Disclosure Reports Additions

7182018 10252018 10252018 10252018 11282018 0 0

NPRR864 RUC Modifications to Consider Market-Based Solutions 6202018 10252018 10252018 10252018 11282018 0 4SCR777 Bilateral CRR Interface Enhancement 10262016 1022017 11192018 11192018 2272019 0 NA See 181-01

SCR781 RARF Replacement 12202017 4252018 12192018 12192018 12192018 0 3SCR791 Correction of 60-day SCED GRD Disclosure Report 522018 892018 892018 892018 952018 0 39SCR795 Addition of Intra-Hour Wind Forecast to GTBD Calculation 882018 10252018 10252018 10252018 11142018 0 0

Project Number Expedited Projects in Execution (Count = 34)

Project Number Projects in Stabilization (Count = 10) Execution

Phase StartBaseline Go-Live Target

Approved Go-Live Target

ActualGo-Live Date

Scheduled Execution Phase

Finish

NPRR648 Remove References to Flowgate Rights 3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR683 Revision to Available Credit Limit Calculation 3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR743 Revision to MCE to Have a Floor For Load Exposure 3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR760 Calculation of Exposure Variables For Days With No Activity 3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR776 Voltage Set Point Communication 9202017 3192018 452018 452018 952018 0 1

NPRR800Revisions to Credit Exposure Calculations to Use Electricity Futures Market Prices

3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR815Revise the Limitation of Load Resources Providing Responsive Reserve (RRS) Service

3212018 5312018 5312018 5312018 8292018 0 2

209-01 Multi Station Breaker to Breaker One Lines 282017 392018 532018 532018 8222018 0 -1259-01 DC SCADA and Metering Upgrade 10252017 1172018 7252018 7252018 8292018 0 22266-01 Remote Email Access Enhancement 12132017 372018 662018 6192018 9262018 2 -7 2 -9

Schedule Health Budget Health

Budget HealthSchedule Health

51

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018

Project Number Projects On Hold (Count = 2) Forecast

Start DateBaseline

Phase FinishApproved Go-

Live TargetScheduled

Go-Live DateScheduled

Phase Finish

SCR789 Update NMMS Topology Processor to PSSE 34 Capability 0

269-01Document Repository Redesign and Governance Implementation - Phase 1

0

Project Number Projects Completed (Count = 20)

Baseline Execution

Phase Start

Baseline Go-Live Target

Approved Go-Live Target

Actual Go-Live Date

Actual Execution Phase Finish

185-01 Records Management and eDiscovery 12152016 5242017 8292017 8222017 12132017 2 0224-01 TelAlert Replacement 452017 6272017 842017 842017 592018 0 5230-01 SAS Technical Architecture Redesign 312017 12132017 12132017 12132017 6272018 0 2234-01 Reporting Solution Resiliency (RSR) 452017 8232017 11272017 11272017 1102018 0 8240-01 EDI Translator and Mapping Replacement Assessment 4192017 9272017 2282018 TBD 372018 -2 20254-01 Retail Windows Upgrade 10112017 12182017 12182017 1222018 272018 1 -51 65255-01 Settlements Architecture Enhancements 10252017 1112018 1112018 1192018 2142018 1 -10 53258-01 WD Kainos SMART Automation Testing Tool 4112018 642018 642018 662018 7182018 -3 33271-01 Issue Tracking and Resolution Tool Assessment 12132017 4252018 4252018 TBD 522018 1 -5 -1272-01 Operator Training Simulator Black Start GE Effort 1262017 4252018 4252018 4272018 5162018 -1 19274-01 Average Mid-Term Load Forecast 372018 5312018 5312018 5312018 6272018 0 50

NPRR768Revisions to Real-Time On-Line Reliability Deployment Price Adder Categories

372018 5312018 5312018 5312018 6272018 0 16

NPRR778 Modifications to Date Change and Cancellation Evaluation Window 7192017 10292017 12112017 12112017 1312018 0 23

NPRR782Settlement of Infeasible Ancillary Services Due to Transmission Constraints

5242017 8312017 1122017 1122017 1102018 0 20

NPRR808 Three Year CRR Auction 8232017 9182017 9182017 912017 1312018 65 68

NPRR810Applicability of RMR Incentive Factor on Reservation and Transportation Costs Associated with Firm Fuel Supplies

7172017 11122017 3312018 3312018 3312018 0 NA See 233-00

NPRR830 Revision of 4-Coincident Peak Methodology 12132017 262018 262018 262018 372018 0 85

NPRR831 Inclusion of Private Use Networks in Load Zone Price Calculations 822017 1122017 1122017 1122017 2212018 0 33

OBDRR002 ORDC OBD Revisions for PUCT Project 47199 372018 5312018 5312018 5312018 6272018 0 See NPRR768

SCR792 Enhance Communications of BAAL Exceedances 2142018 452018 452018 452018 4252018 0 69

Project Number Expedited Projects Completed (Count = 23)

Budget HealthSchedule Health

Budget HealthSchedule Health

52

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018

Project Number 2018 Projects Not Yet Started (Count = 10) Forecast

Start Date

NPRR858 Provide Complete Current Operating Plan (COP) Data Aug-2018TBD 2018 OS Enhancements Aug-2018TBD Additional Branch Limit for Relays Aug-2018

NPRR817 Create a Panhandle Hub Sep-2018NPRR821 Elimination of the CRR Deration Process Oct-2018NPRR865 Publish RTM Shift Factors for Hubs Load Zones and DC Ties Oct-2018

SCR793SSR Related Telemetry for Transmission Service Provider (TSP) Operators

Oct-2018

ECAP ECAP - ECMS Implementation Phase 2 Oct-2018TBD Job Scheduler Update in CSI Framework Oct-2018TBD Parameter Estimation Oct-2018

53

  • Slide Number 1
  • Slide Number 2
  • Summary ndash July 2018
  • Daily Peak Demand Hourly Average Actual vs Forecast Wind Day-Ahead COPs amp On-Line Capacity at Peak ndash July 2018
  • Actual Wind Output plus Curtailments vs Wind Day-Ahead COPs for All Hours ndash July 2018
  • ERCOTrsquos CPS1 Monthly Performance ndash July 2018
  • Monthly Peak Actual Demand ndash July 2018
  • Monthly Minimum Actual 15-Minute Demand ndash July 2018
  • Day-Ahead Load Forecast Performance ndash July 2018
  • Reliability Unit Commitment (RUC) Capacity by Weather Zone ndash July 2018
  • Generic Transmission Constraints (GTCs) ndash July 2018
  • Advisories and Watches ndash July 2018 Corrected
  • Lake Levels Update ndash August 1 2018
  • Planning Summary ndash July 2018
  • Mapping of Counties to ERCOT Zones ndash July 2018
  • Cumulative MW Capacity of Interconnection Requests by Zone ndashJuly 2018
  • Cumulative MW Capacity of Interconnection Requests by Zone ndashJuly 2018
  • Cumulative MW Capacity of Interconnection Requests by Zone ndashJuly 2018
  • Wind Generation ndash July 2018
  • Solar Generation ndash July 2018
  • Generation Interconnection Activity by Fuel ndash July 2018
  • Generation Interconnection Activity by Project Phase ndash July 2018
  • Slide Number 23
  • Day-Ahead Schedule (Hourly Average) ndash July 2018
  • Percentage of Real-Time Load Hedged in the DAM (Counter-Party Level) ndash July 2018
  • DAM and RTM Price Convergence ndash July 2018
  • Day-Ahead Electricity and Ancillary Service Prices (Hourly Average) ndash July 2018
  • Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash July 2018
  • Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash July 2018
  • DRUC Monthly Summary (Hourly Average) ndash July 2018
  • HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash July 2018
  • NonndashSpinning Reserve Service Deployment ndash July 2018
  • CRR Price Convergence ndash July 2018
  • Daily Average System Lambda and ORDC Price Adders ndash July 2018
  • ERS Procurement for June 2018 ndash September 2018
  • Reliability Services ndash July 2018
  • Ancillary and Other Services ndash July 2018
  • Real-Time Ancillary Service Imbalance (ORDC) ndash July 2018
  • Energy Settlement ndash July 2018
  • Congestion Revenue Rights (CRR) ndash July 2018
  • CRR Balancing Account Fund ndash July 2018
  • Revenue Neutrality ndash July 2018
  • Net Allocation to Load ndash July 2018
  • Advanced Meter Settlement Impacts ndash July 2018
  • ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndash July 2018
  • Retail Transaction Volumes ndash Summary ndash July 2018
  • Retail Transaction Volumes ndash Summary ndash July 2018
  • Slide Number 48
  • ERCOT Portfolio Stoplight Report ndash July 2018
  • ERCOT Portfolio Stoplight Report ndash July 2018
  • ERCOT Portfolio Stoplight Report ndash July 2018
  • ERCOT Portfolio Stoplight Report ndash July 2018
  • ERCOT Portfolio Stoplight Report ndash July 2018
Retail Transactions Summary
July 2018 June 2018 May 2018 April 2018 March 2018 February 2018 January 2018 December 2017 November 2017 October 2017 September 2017 August 2017 July 2017 June 2017 May 2017 April 2017 March 2017 February 2017 January 2017 December 2016 November 2016 October 2016 September 2016 August 2016 July 2016 June 2016 May 2016 April 2016 March 2016 February 2016 January 2016 December 2015 November 2015 October 2015 September 2015 August 2015 July 2015 June 2015 May 2015 April 2015 March 2015 February 2015 January 2015 December 2014 November 2014 October 2014 September 2014 August 2014 July 2014 June 2014 May 2014 April 2014 March 2014 February 2014 January 2014 December 2013 November 2013 October 2013 September 2013 August 2013 July 2013 June 2013 May 2013 April 2013 March 2013 February 2013 January 2013 Grand total
814_01 - Switch Received 121926 109653 96828 81291 95159 76119 88933 60560 77860 78096 79502 84134 84059 108784 130828 71769 67845 66875 87140 66556 56202 64452 67323 86656 82923 86376 75323 70300 76235 68057 63954 61486 52887 65276 70342 81674 91211 102661 86229 81255 79997 73394 72885 71072 67080 110465 175164 89677 99568 101490 111077 91983 93887 71130 86953 69691 55957 166882 82415 93194 102562 103756 116086 78919 68950 64329 67116 1321827
Difference from previous month 12273 12825 15537 (13868) 19040 (12814) 28373 (17300) (236) (1406) (4632) 75 (24725) (22044) 59059 3924 970 (20265) 20584 10354 (8250) (2871) (19333) 3733 (3453) 11053 5023 (5935) 8178 4103 2468 8599 (12389) (5066) (11332) (9537) (11450) 16432 4974 1258 6603 509 1813 3992 (43385) (64699) 85487 (9891) (1922) (9587) 19094 (1904) 22757 (15823) 17262 13734 (110925) 84467 (10779) (9368) (1194) (12330) 37167 9969 4621 (2787)
814_16 - Move - Ins Received 270122 257125 244431 225380 224289 215281 230409 238340 207921 236397 244511 258046 252360 257759 237611 197865 217962 201984 202612 196236 201714 220958 231999 268781 241844 247481 214383 199804 218245 212474 193716 189862 181098 215908 229405 248124 263233 247089 208166 207932 215950 197765 198025 193973 178624 226283 231418 243482 251957 233679 223201 258649 214724 208160 207059 172981 178671 233469 216550 255967 249114 220397 216982 204412 197200 191955 194507 3162148
Difference from previous month 12997 12694 19051 1091 9008 (15128) (7931) 30419 (28476) (8114) (13535) 5686 (5399) 20148 39746 (20097) 15978 (628) 6376 (5478) (19244) (11041) (36782) 26937 (5637) 33098 14579 (18441) 5771 18758 3854 8764 (34810) (13497) (18719) (15109) 16144 38923 234 (8018) 18185 (260) 4052 15349 (47659) (5135) (12064) (8475) 18278 10478 (35448) 43925 6564 1101 34078 (5690) (54798) 16919 (39417) 6853 28717 3415 12570 7212 5245 (2552)
814_24 - MVO and MVO to CSA Received 129820 125861 124403 113795 108753 100127 111821 144987 100830 116519 129103 128104 127073 133582 127218 102055 111459 100285 101107 96289 100578 109493 114094 133170 122932 129025 118022 103789 109278 103747 96628 99552 96214 109578 117949 123894 133905 133855 114675 108275 108859 94864 98233 97901 89578 111857 115918 121662 131607 126785 119107 107956 107266 99428 104273 93385 93977 115469 115524 129594 135196 121446 120049 111598 106467 102429 104399 1660500
814_10 - DTP Mass Acquisition Received - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0
814_10 - DTP Mass Transition Received - 0 - 0 9033 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 639 - 0 - 0 4975 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0
814_18 - CSA AdditionDeletes Received 40217 62083 99016 55581 46720 42587 49740 47725 31726 52888 41597 40616 55770 43745 52139 26702 21791 39082 44030 38884 39856 31786 33061 42622 48489 64178 50499 59475 59400 48536 42179 40351 34796 34420 54677 35078 49489 59611 39384 44247 44577 35386 40420 54831 43550 45039 44268 40405 57954 64408 65032 80184 70310 41156 34811 46680 50347 71847 48606 52585 50867 62747 59763 34925 40977 40389 41227 747237
Total 562085 554722 573711 476047 474921 434114 480903 491612 418337 483900 494713 510900 519262 543870 547796 398391 419057 408226 434889 397965 398350 426689 446477 531229 496188 527060 458227 433368 463158 432814 396477 391251 364995 425182 472373 488770 537838 543216 448454 441709 449383 401409 409563 417777 378832 493644 566768 495865 541086 526362 523392 538772 486187 419874 433096 382737 378952 587667 463095 531340 537739 508346 512880 429854 413594 399102 407249 6891712
Counts from Monthly Retail Transaction report
To do
Break Out 814_10s - AQ and MT
Break Out 814_18 Additions from Deletes
Year-To-Date Transactions Received
Transaction Type July 2018 July 2017 July 2018 July 2017
Switches 669909 617300 121926 84059
Acquisition 0 0 0 0
Move - Ins 1667037 1568153 270122 252360
Move - Outs 814580 802779 129820 127073
Continuous Service Agreements (CSA) 395944 283259 40217 55770
Mass Transitions 9033 0 0 0
Total 3556503 3271491 562085 519262
There has been a change since this was created
Mass Acquisition has been broken out of Mass Transition
Page 16: ERCOT Monthly Operational Overvie · ERCOT Monthly Operational Overview (July 2018) Revised 08.22.18. ERCOT Public. August 15, 2018

PUBLIC

Cumulative MW Capacity of Interconnection Requests by Zone ndashJuly 2018

16

PUBLIC

Cumulative MW Capacity of Interconnection Requests by Zone ndashJuly 2018

17

PUBLIC

Cumulative MW Capacity of Interconnection Requests by Zone ndashJuly 2018

18

PUBLIC

Wind Generation ndash July 2018

19

PUBLIC

Solar Generation ndash July 2018

20

PUBLIC

Generation Interconnection Activity by Fuel ndash July 2018

21

PUBLIC

Generation Interconnection Activity by Project Phase ndash July 2018

22

Market Operations

PUBLIC

Day-Ahead Schedule (Hourly Average) ndash July 2018

24

0

10000

20000

30000

40000

50000

60000

70000

80000

MW

Hour Ending

Scheduled Energy Only OfferScheduled Three-part OfferDAM Energy PurchaseRT System Load

Liquidity and activity are normal in the Day-Ahead Market

PUBLIC

Percentage of Real-Time Load Hedged in the DAM (Counter-Party Level) ndashJuly 2018

25

0

20

40

60

80

100

120Ja

nM

arM

ay Jul

Sep

Nov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May

July

2013 2014 2015 2016 2017 2018

The dotted lines represent the bounds for major outliers

PUBLIC

DAM and RTM Price Convergence ndash July 2018

26

-20

-10

0

10

20

30

40

50

60Ja

nM

arM

ay Jul

Sep

Nov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

l

2013 2014 2015 2016 2017 2018

Aver

age

DAM

-R

TM S

PP ($

MW

h)

The dotted lines represent the bounds for major outliers

PUBLIC

Day-Ahead Electricity and Ancillary Service Prices (Hourly Average) ndashJuly 2018

27

0

100

200

300

400

500

600

Pric

e ($

MW

h)

Hour Ending

Regulation Up

Regulation Down

Responsive Reserve

Non Spinning Reserve

DAM Power Balance Price(System Lambda)

Ancillary Service prices reflect the opportunity cost of energy

PUBLIC

Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash July 2018

28

0

100

200

300

400

500

600

Pric

e ($

MW

h)

Hour Ending

RTSPP - LZ West

RTSPP - LZ North

RTSPP - LZ South

RTSPP - LZ Houston

DASPP - LZ West

DASPP - LZ North

DASPP - LZ South

DASPP - LZ Houston

Prices reflect relative transmission congestion and system scarcity

PUBLIC

Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash July 2018

29

0

100

200

300

400

500

600

Pric

e ($

MW

h)

Hour Ending

RTSPP - Hub Average

DASPP - Hub Average

Energy prices reflect the risk premium between Day-Ahead amp Real-Time

PUBLIC

DRUC Monthly Summary (Hourly Average) ndash July 2018

30

0

15000

30000

45000

60000

75000

90000

MW

h

Hour Ending

Self Scheduled Capacity

Self Scheduled Ancillary Service Limit

Load Forecast

DRUC Recommended Capacity

31 executions (0 missed)0 published after 160011 minutes average execution time0 Resources committed

PUBLIC

HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash July 2018

31

0

02

04

06

08

1

0

20

40

60

80

100

RTO

RD

PA ($

MW

h)

MW

h

Hour Ending

744 executions (0 missed)8 minutes average execution time1 Resources committed through HRUC or by a Verbal Dispatch Instruction

The dotted line indicates the average RTORDPA

PUBLIC

NonndashSpinning Reserve Service Deployment ndash July 2018

32

Deployment Start Time

Deployment End Time

Deployment Duration (Hours)

Max Deployment(MW) Reason

NA

PUBLIC

CRR Price Convergence ndash July 2018

0

50

100

150

200

250

Mill

ions

$

Cost

Value

Congestion Revenue Right cost in auction convergence with payment in Day-Ahead Market and Real Time Market

33

PUBLIC

Daily Average System Lambda and ORDC Price Adders ndash July 2018

0

50

100

150

200

250

$M

Wh

Day of Month

RTOFFPA

RTORPA

SYSTEM_LAMBDA

34

PUBLIC

ERS Procurement for June 2018 ndash September 2018

TP1 TP2 TP3 TP4 TP5 TP6

Non Weather-Sensitive ERS-10 MW 160562 165996 143324 140708 156699 151138

Non Weather-Sensitive ERS-30 MW 736864 781559 702529 625067 755153 657394

Weather-Sensitive ERS-10 MW 0 0 0 0 0 0

Weather-Sensitive ERS-30 MW 0 0 11850 11850 0 0

Total MW Procured 897426 947555 857703 777625 911852 808532

Clearing Price $201 $185 $2108 $2177 $199 $225

Time Period Time Period Hours

Time Period 1 Hours Ending 0600 - 0800 (50000 am to 80000 am) Monday through Friday except ERCOT Holidays

Time Period 2 Hours Ending 0900 - 1300 (80000 am to 10000 pm) Monday through Friday except ERCOT Holidays

Time Period 3 Hours Ending 1400 - 1600 (10000 pm to 40000 pm) Monday through Friday except ERCOT Holidays

Time Period 4 Hours Ending 1700 - 1900 (40000 pm to 70000 pm) Monday through Friday except ERCOT Holidays

Time Period 5 Hours Ending 2000 - 2200 (70000 pm to 100000 pm) Monday through Friday except ERCOT Holidays Time Period 6 All other hours

35

PUBLIC

Reliability Services ndash July 2018

Reliability Unit Commitment (RUC) $ in Millions

RUC Make-Whole Payments $000

RUC Clawback Charges $000

RUC Commitment Settlement $000

RUC Capacity Short Charges $000

RUC Make-Whole Uplift $000

RUC Commitment Cost Allocation $000

RUC Decommitment Payments $000

Total RUC Allocation to Load $000

In July 2018 there was a credit of $000M allocated to load for RUC compared to bull A credit of $000M in June 2018bull A credit of $003M in July 2017

36

PUBLIC

Ancillary and Other Services ndash July 2018

Ancillary and Other Services $ in Millions

Regulation Up Service $1105

Regulation Down Service $072

Responsive Reserve Service $7177

Non-Spinning Reserve Service $1787

Black Start Service $059

Voltage Services - Reactive Power $000

Voltage Services - Lost Opportunity $000

Total Charges Allocated to Load $10200

In July 2018 Ancillary and Other Services was a charge of $10200M compared to bull A charge of $2001M in June 2018bull A charge of $2322M in July 2017

37

PUBLIC

Real-Time Ancillary Service Imbalance (ORDC) ndash July 2018

In July 2018 Real-Time Ancillary Service Imbalance was a charge to load of $2228K compared to bull A charge of $147K in June 2018bull A charge of $534K in July 2017

Real-Time Ancillary Service Imbalance $ in Thousands

Real-Time AS Imbalance ($2228)

Real-Time Reliability Deployment AS Imbalance $000

Total RTASI Amount Allocated to Load $2228

38

PUBLIC

Energy Settlement ndash July 2018

39

Day-Ahead Market Energy Settlement $ in Millions

Energy Purchases $215396

Point to Point Obligation Purchases $11726

Energy Sales ($212592)

Day-Ahead Congestion Rent $14531

Day-Ahead Market Make-Whole Payments ($001)

Real-Time Market Energy Settlement $ in Millions

Energy Imbalance at a Resource Node ($91963)

Energy Imbalance at a Load Zone $160737

Energy Imbalance at a Hub ($57497)

Net Real-Time Energy Imbalance $11276

Real Time Congestion from Self Schedules $013

Block Load Transfers and DC Ties ($2063)

Total Impact to Revenue Neutrality $9227

Load-Allocated Emergency Energy Payments ($016)

Load-Allocated Base Point Deviation Charges $026

Day-Ahead Market energy settlement activity increased from last month and increased from July 2017

Real-Time Market energy settlement activity increased from last month and increased from July 2017

PUBLIC

Congestion Revenue Rights (CRR) ndash July 2018

$ in Millions

Long-Term Auction ($4026)

Monthly Auction ($1773)

Total Auction Revenue ($5799)

Day-Ahead CRR Settlements ($15797)

Day-Ahead CRR Short-Charges $1885

Day-Ahead CRR Short-Charges Refunded ($899)

Day-Ahead CRR Short-Charges Net $986

Total CRR Funding ($14810)

Day-Ahead Point-to-Point Obligations $11726

Real-Time Point-to-Point Obligations ($10113)

Net Point-to-Point Obligations $1614

Congestion Revenue Rights settlement payments were not fully funded Partial funding to settle the CRR Short Charges was provided from the CRR Balancing Account Fund and the remaining $986M of CRR Short Charges were not refunded The CRR Fund Balance is now $0

Point to Point Obligations settled with a net charge of $1614M compared to a net credit of $1758M last month

40

PUBLIC

CRR Balancing Account Fund ndash July 2018

CRR Balancing Account $ in Millions

Monthly Day-Ahead Congestion Rent $14531

Monthly Day-Ahead CRR Settlements ($15797)

Monthly Day-Ahead CRR Short -Charges $1885

CRR Balancing Account Credit Total $619

Beginning Fund Balance for the Month $275

CRR Balancing Account Credit Total $619

Day-Ahead CRR Short-Charges Refunded ($899)

CRR PTP Option Award Charges $004

Load-Allocated CRR Amount $000

Total Fund Amount $000

41

PUBLIC

Revenue Neutrality ndash July 2018

Revenue Neutrality $ in Millions

Real-Time Energy Imbalance $11276

Real-Time Point to Point Obligation ($10113)

Real-Time Congestion from Self-Schedules $013

DC Tie amp Block Load Transfer ($2063)

Allocation to Load $886

In July 2018 the Revenue Neutrality charge to load was $886M compared to bull A charge of $3046M in June 2018bull A charge of $145M in July 2017

42

PUBLIC

Net Allocation to Load ndash July 2018

Market-Based Allocation $ in Millions

Reliability Unit Commitment $000

Ancillary and Other Services $10200

Real-Time Ancillary Service Imbalance $223

Emergency Energy $016

Base Point Deviation ($026)

CRR Auction Revenue ($5799)

CRR Balancing Account $000

Real-Time Revenue Neutrality $886

Reliability Must Run $000

Monthly Block Load Transfer $000

Total $5500

Fee AllocationERCOT Administrative Fee $2207

Net Allocated to Load $7707

In July 2018 the Net Allocation to load was a charge of $7707M compared to bull A charge of $2152M in June 2018bull A credit of $1363M in July 2017

43

PUBLIC

Advanced Meter Settlement Impacts ndash July 2018

July 2018 At month end settling 72M ESIIDs using Advanced Meter data

July 2018 990 of the load in ERCOT is settled with 15-min interval data (AMS Competitive IDR and NOIE IDR)

44

PUBLIC

ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndashJuly 2018

45

PUBLIC

Retail Transaction Volumes ndash Summary ndash July 2018

46

Transaction Type July 2018 July 2017 July 2018 July 2017

Switches 669909 617300 121926 84059

Acquisition 0 0 0 0

Move - Ins 1667037 1568153 270122 252360

Move - Outs 814580 802779 129820 127073

Continuous Service Agreements (CSA) 395944 283259 40217 55770

Mass Transitions 9033 0 0 0

Total 3556503 3271491 562085 519262

Year-To-Date Transactions Received

Board Presentation Input

Trans Volumes by Month_New

PUBLIC

Retail Transaction Volumes ndash Summary ndash July 2018

SwitchesAcquisitions Move-Ins

Move-Outs Mass Transition

47

Projects Report

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018

20000000$ 2018 Portfolio

Spending Estimate

Projects In FlightOn Hold (Count = 100) 24905011$

Projects Not Yet Started (Count = 10) 1320628$

Projects Completed (Count = 43) 795250$

(7020889)$

TOTAL 20000000$

Project Number Projects in Initiation Phase (Count = 4)

TBD IT Asset RecoveryNPRR842 Study Area Load Information

209-03 Study Network (STNET) Integration288-01 EDI Map and Translator Replacement

Impact Metric TolerancesUnfavorable variances are represented as negative numbers within the report - Green = No more than 49 unfavorable variance - Yellow = Unfavorable variance between 49 and 99 - Red = Unfavorable variance more than 99

Spending Reductions Required to Maintain Capital Budget

2018 Project Funding

Footnotes1 - One or more phases took longer than expected resulting in additional time required

2 - One or more phases required more labor than expected resulting in additional funding andor time required

3 - Project placed on holdNA - Metric not calculated because - it is reported at the parent project level or - it is an administrative project

Project Number Projects in Planning Phase (Count = 8) Phase Start Baseline

Phase FinishApproved

Phase FinishScheduled

Go-Live DateScheduled

Phase Finish

134-02 Privileged Account Management (PAM) Phase 2 882018 12192018 12192018 TBD 12192018 0 10

183-01 CMM-FT GUI Integration 12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs

242-01 Portfolio Reporting Assessment 1182017 12192018 12192018 TBD 12192018 0 21260-01 Information Governance Assessment 10182017 5302018 9192018 TBD 9192018 0 5286-01 Java Platform Assessment 6202018 11212018 11212018 TBD 11212018 0 6287-01 Security Constrained Unit Commitment (SCUC) 882018 2272019 2272019 TBD 2272019 0 -1

NPRR484Revisions to Congestion Revenue Rights Credit Calculations and Payments - Phase 1b 2

12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs

NPRR702Flexible Accounts Payment of Invoices and Disposition of Interest on Cash Collateral

12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs

Schedule Health Budget Health

49

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018Project Number Projects in Execution Phase (Count = 42) Phase Start Baseline Go-

Live DateApproved Go-

Live DateScheduled

Go-Live DateScheduled

Phase Finish

170-01 Enterprise Content Alignment Program 8262015 11152017 8312018 8312018 8312018 0 0170-06 ECAP - ECMS Implementation Phase 1 4252018 11302018 11302018 11302018 11302018 0 3173-02 ERCOT Flight Certification Website 11152017 2282019 2282019 2282019 5312019 0 2181-01 CRR Framework Upgrade 10262016 1022017 11192018 11192018 2272019 0 2

183-01 CMM Tech Refresh 3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

193-01 PMU Tool Evaluation and Implementation 12132017 892018 2152019 2152019 3202019 0 0196-01 GINR Project Status Application Replacement 12212016 9142017 2282019 2282019 3312019 0 1198-02 Reactive Power Coordination PoC 962017 6162018 8152018 8152018 8152018 0 54209-02 Weather Imaging and Line Observation (WILO) 5302018 212019 212019 212019 2272019 0 2210-01 REC Technology Refresh 8302017 3182018 12132018 12132018 1162019 0 3228-01 Enterprise Database Upgrade 882018 1292020 1292020 1292020 1292020 0 17229-01 IT Change and Configuration Management Phase 2 822017 6192018 12132018 12132018 3252019 0 2 -9238-01 Application Authentication Tech Refresh 962017 3192018 12132018 12132018 1302019 0 3239-01 Identity and Access Management 592018 3132019 3132019 3132019 3132019 0 2241-01 AREA - Generation 10112017 3302018 892018 892018 952018 0 -4244-01 Corporate Wireless 11292017 3282018 1252018 1252018 192019 0 9245-01 2017 EPS Metering Enhancements 6272018 892019 892019 892019 9252019 0 1246-01 iTest Data Refresh 12132017 1192018 11152018 11152018 122019 0 25249-01 Secondary Wind Forecasting Service 8302017 2282018 892018 892018 952018 0 0253-01 CIP Recovery Plan Project - Planning Phase 1 1312018 8292018 8292018 8292018 8292018 0 -2

257-01Security Constrained Optimal Powerflow in Study Network Analysis

1262017 10252018 10252018 10252018 1282018 0 19

261-01 Generic Transmission Constraint Calculation 372018 12132018 12132018 12132018 1232019 0 0263-01 Market Simulator 4112018 12132018 12132018 12132018 1302019 0 7265-01 Real-Time Assessment Continuity 1312018 12132018 12132018 12132018 1302019 0 0279-01 Cyber Security Project 24 6272018 10262018 10262018 10262018 11282018 0 0280-01 Quest Software Portfolio Transition 442018 6272018 9262018 9262018 9262018 0 13282-01 Synchronous Condenser Outage Modeling 662018 10252018 10252018 10252018 1252018 0 1Various 2015 CMM NPRRs 2 -18

NPRR519Exemption of ERS-Only QSEs from Collateral and Capitalization Requirements

3152017 5192018 12112018 12112018 12312018 0 See 2015 CMM NPRRs

NPRR620Collateral Requirements for Counter-Parties with No Load or Generation

3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

NPRR660 Remove CRR State Change Adder 3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

Budget HealthSchedule Health

50

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018Project Number Projects in Execution Phase (Count = 42) Phase Start Baseline Go-

Live DateApproved Go-

Live DateScheduled

Go-Live DateScheduled

Phase Finish

NPRR741 Clarifications to TPE and EAL Credit Exposure Calculations 3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

NPRR749 Option Cost for Outstanding CRRs 882018 12132018 12132018 12132018 TBD 0 NA See 2015 CMM NPRRs

NPRR755 Data Agent-Only QSE Registration 3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

NPRR819Modification of Non-Price Error Resettlement Thresholds and Resettlement Clean-Ups

592018 892018 892018 892018 952018 0 36

NPRR833 Modify PTP Obligation Bid Clearing Change 882018 12132018 12132018 12132018 TBD 0 1

NPRR843Short-Term System Adequacy and AS Offer Disclosure Reports Additions

7182018 10252018 10252018 10252018 11282018 0 0

NPRR864 RUC Modifications to Consider Market-Based Solutions 6202018 10252018 10252018 10252018 11282018 0 4SCR777 Bilateral CRR Interface Enhancement 10262016 1022017 11192018 11192018 2272019 0 NA See 181-01

SCR781 RARF Replacement 12202017 4252018 12192018 12192018 12192018 0 3SCR791 Correction of 60-day SCED GRD Disclosure Report 522018 892018 892018 892018 952018 0 39SCR795 Addition of Intra-Hour Wind Forecast to GTBD Calculation 882018 10252018 10252018 10252018 11142018 0 0

Project Number Expedited Projects in Execution (Count = 34)

Project Number Projects in Stabilization (Count = 10) Execution

Phase StartBaseline Go-Live Target

Approved Go-Live Target

ActualGo-Live Date

Scheduled Execution Phase

Finish

NPRR648 Remove References to Flowgate Rights 3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR683 Revision to Available Credit Limit Calculation 3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR743 Revision to MCE to Have a Floor For Load Exposure 3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR760 Calculation of Exposure Variables For Days With No Activity 3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR776 Voltage Set Point Communication 9202017 3192018 452018 452018 952018 0 1

NPRR800Revisions to Credit Exposure Calculations to Use Electricity Futures Market Prices

3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR815Revise the Limitation of Load Resources Providing Responsive Reserve (RRS) Service

3212018 5312018 5312018 5312018 8292018 0 2

209-01 Multi Station Breaker to Breaker One Lines 282017 392018 532018 532018 8222018 0 -1259-01 DC SCADA and Metering Upgrade 10252017 1172018 7252018 7252018 8292018 0 22266-01 Remote Email Access Enhancement 12132017 372018 662018 6192018 9262018 2 -7 2 -9

Schedule Health Budget Health

Budget HealthSchedule Health

51

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018

Project Number Projects On Hold (Count = 2) Forecast

Start DateBaseline

Phase FinishApproved Go-

Live TargetScheduled

Go-Live DateScheduled

Phase Finish

SCR789 Update NMMS Topology Processor to PSSE 34 Capability 0

269-01Document Repository Redesign and Governance Implementation - Phase 1

0

Project Number Projects Completed (Count = 20)

Baseline Execution

Phase Start

Baseline Go-Live Target

Approved Go-Live Target

Actual Go-Live Date

Actual Execution Phase Finish

185-01 Records Management and eDiscovery 12152016 5242017 8292017 8222017 12132017 2 0224-01 TelAlert Replacement 452017 6272017 842017 842017 592018 0 5230-01 SAS Technical Architecture Redesign 312017 12132017 12132017 12132017 6272018 0 2234-01 Reporting Solution Resiliency (RSR) 452017 8232017 11272017 11272017 1102018 0 8240-01 EDI Translator and Mapping Replacement Assessment 4192017 9272017 2282018 TBD 372018 -2 20254-01 Retail Windows Upgrade 10112017 12182017 12182017 1222018 272018 1 -51 65255-01 Settlements Architecture Enhancements 10252017 1112018 1112018 1192018 2142018 1 -10 53258-01 WD Kainos SMART Automation Testing Tool 4112018 642018 642018 662018 7182018 -3 33271-01 Issue Tracking and Resolution Tool Assessment 12132017 4252018 4252018 TBD 522018 1 -5 -1272-01 Operator Training Simulator Black Start GE Effort 1262017 4252018 4252018 4272018 5162018 -1 19274-01 Average Mid-Term Load Forecast 372018 5312018 5312018 5312018 6272018 0 50

NPRR768Revisions to Real-Time On-Line Reliability Deployment Price Adder Categories

372018 5312018 5312018 5312018 6272018 0 16

NPRR778 Modifications to Date Change and Cancellation Evaluation Window 7192017 10292017 12112017 12112017 1312018 0 23

NPRR782Settlement of Infeasible Ancillary Services Due to Transmission Constraints

5242017 8312017 1122017 1122017 1102018 0 20

NPRR808 Three Year CRR Auction 8232017 9182017 9182017 912017 1312018 65 68

NPRR810Applicability of RMR Incentive Factor on Reservation and Transportation Costs Associated with Firm Fuel Supplies

7172017 11122017 3312018 3312018 3312018 0 NA See 233-00

NPRR830 Revision of 4-Coincident Peak Methodology 12132017 262018 262018 262018 372018 0 85

NPRR831 Inclusion of Private Use Networks in Load Zone Price Calculations 822017 1122017 1122017 1122017 2212018 0 33

OBDRR002 ORDC OBD Revisions for PUCT Project 47199 372018 5312018 5312018 5312018 6272018 0 See NPRR768

SCR792 Enhance Communications of BAAL Exceedances 2142018 452018 452018 452018 4252018 0 69

Project Number Expedited Projects Completed (Count = 23)

Budget HealthSchedule Health

Budget HealthSchedule Health

52

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018

Project Number 2018 Projects Not Yet Started (Count = 10) Forecast

Start Date

NPRR858 Provide Complete Current Operating Plan (COP) Data Aug-2018TBD 2018 OS Enhancements Aug-2018TBD Additional Branch Limit for Relays Aug-2018

NPRR817 Create a Panhandle Hub Sep-2018NPRR821 Elimination of the CRR Deration Process Oct-2018NPRR865 Publish RTM Shift Factors for Hubs Load Zones and DC Ties Oct-2018

SCR793SSR Related Telemetry for Transmission Service Provider (TSP) Operators

Oct-2018

ECAP ECAP - ECMS Implementation Phase 2 Oct-2018TBD Job Scheduler Update in CSI Framework Oct-2018TBD Parameter Estimation Oct-2018

53

  • Slide Number 1
  • Slide Number 2
  • Summary ndash July 2018
  • Daily Peak Demand Hourly Average Actual vs Forecast Wind Day-Ahead COPs amp On-Line Capacity at Peak ndash July 2018
  • Actual Wind Output plus Curtailments vs Wind Day-Ahead COPs for All Hours ndash July 2018
  • ERCOTrsquos CPS1 Monthly Performance ndash July 2018
  • Monthly Peak Actual Demand ndash July 2018
  • Monthly Minimum Actual 15-Minute Demand ndash July 2018
  • Day-Ahead Load Forecast Performance ndash July 2018
  • Reliability Unit Commitment (RUC) Capacity by Weather Zone ndash July 2018
  • Generic Transmission Constraints (GTCs) ndash July 2018
  • Advisories and Watches ndash July 2018 Corrected
  • Lake Levels Update ndash August 1 2018
  • Planning Summary ndash July 2018
  • Mapping of Counties to ERCOT Zones ndash July 2018
  • Cumulative MW Capacity of Interconnection Requests by Zone ndashJuly 2018
  • Cumulative MW Capacity of Interconnection Requests by Zone ndashJuly 2018
  • Cumulative MW Capacity of Interconnection Requests by Zone ndashJuly 2018
  • Wind Generation ndash July 2018
  • Solar Generation ndash July 2018
  • Generation Interconnection Activity by Fuel ndash July 2018
  • Generation Interconnection Activity by Project Phase ndash July 2018
  • Slide Number 23
  • Day-Ahead Schedule (Hourly Average) ndash July 2018
  • Percentage of Real-Time Load Hedged in the DAM (Counter-Party Level) ndash July 2018
  • DAM and RTM Price Convergence ndash July 2018
  • Day-Ahead Electricity and Ancillary Service Prices (Hourly Average) ndash July 2018
  • Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash July 2018
  • Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash July 2018
  • DRUC Monthly Summary (Hourly Average) ndash July 2018
  • HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash July 2018
  • NonndashSpinning Reserve Service Deployment ndash July 2018
  • CRR Price Convergence ndash July 2018
  • Daily Average System Lambda and ORDC Price Adders ndash July 2018
  • ERS Procurement for June 2018 ndash September 2018
  • Reliability Services ndash July 2018
  • Ancillary and Other Services ndash July 2018
  • Real-Time Ancillary Service Imbalance (ORDC) ndash July 2018
  • Energy Settlement ndash July 2018
  • Congestion Revenue Rights (CRR) ndash July 2018
  • CRR Balancing Account Fund ndash July 2018
  • Revenue Neutrality ndash July 2018
  • Net Allocation to Load ndash July 2018
  • Advanced Meter Settlement Impacts ndash July 2018
  • ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndash July 2018
  • Retail Transaction Volumes ndash Summary ndash July 2018
  • Retail Transaction Volumes ndash Summary ndash July 2018
  • Slide Number 48
  • ERCOT Portfolio Stoplight Report ndash July 2018
  • ERCOT Portfolio Stoplight Report ndash July 2018
  • ERCOT Portfolio Stoplight Report ndash July 2018
  • ERCOT Portfolio Stoplight Report ndash July 2018
  • ERCOT Portfolio Stoplight Report ndash July 2018
Retail Transactions Summary
July 2018 June 2018 May 2018 April 2018 March 2018 February 2018 January 2018 December 2017 November 2017 October 2017 September 2017 August 2017 July 2017 June 2017 May 2017 April 2017 March 2017 February 2017 January 2017 December 2016 November 2016 October 2016 September 2016 August 2016 July 2016 June 2016 May 2016 April 2016 March 2016 February 2016 January 2016 December 2015 November 2015 October 2015 September 2015 August 2015 July 2015 June 2015 May 2015 April 2015 March 2015 February 2015 January 2015 December 2014 November 2014 October 2014 September 2014 August 2014 July 2014 June 2014 May 2014 April 2014 March 2014 February 2014 January 2014 December 2013 November 2013 October 2013 September 2013 August 2013 July 2013 June 2013 May 2013 April 2013 March 2013 February 2013 January 2013 Grand total
814_01 - Switch Received 121926 109653 96828 81291 95159 76119 88933 60560 77860 78096 79502 84134 84059 108784 130828 71769 67845 66875 87140 66556 56202 64452 67323 86656 82923 86376 75323 70300 76235 68057 63954 61486 52887 65276 70342 81674 91211 102661 86229 81255 79997 73394 72885 71072 67080 110465 175164 89677 99568 101490 111077 91983 93887 71130 86953 69691 55957 166882 82415 93194 102562 103756 116086 78919 68950 64329 67116 1321827
Difference from previous month 12273 12825 15537 (13868) 19040 (12814) 28373 (17300) (236) (1406) (4632) 75 (24725) (22044) 59059 3924 970 (20265) 20584 10354 (8250) (2871) (19333) 3733 (3453) 11053 5023 (5935) 8178 4103 2468 8599 (12389) (5066) (11332) (9537) (11450) 16432 4974 1258 6603 509 1813 3992 (43385) (64699) 85487 (9891) (1922) (9587) 19094 (1904) 22757 (15823) 17262 13734 (110925) 84467 (10779) (9368) (1194) (12330) 37167 9969 4621 (2787)
814_16 - Move - Ins Received 270122 257125 244431 225380 224289 215281 230409 238340 207921 236397 244511 258046 252360 257759 237611 197865 217962 201984 202612 196236 201714 220958 231999 268781 241844 247481 214383 199804 218245 212474 193716 189862 181098 215908 229405 248124 263233 247089 208166 207932 215950 197765 198025 193973 178624 226283 231418 243482 251957 233679 223201 258649 214724 208160 207059 172981 178671 233469 216550 255967 249114 220397 216982 204412 197200 191955 194507 3162148
Difference from previous month 12997 12694 19051 1091 9008 (15128) (7931) 30419 (28476) (8114) (13535) 5686 (5399) 20148 39746 (20097) 15978 (628) 6376 (5478) (19244) (11041) (36782) 26937 (5637) 33098 14579 (18441) 5771 18758 3854 8764 (34810) (13497) (18719) (15109) 16144 38923 234 (8018) 18185 (260) 4052 15349 (47659) (5135) (12064) (8475) 18278 10478 (35448) 43925 6564 1101 34078 (5690) (54798) 16919 (39417) 6853 28717 3415 12570 7212 5245 (2552)
814_24 - MVO and MVO to CSA Received 129820 125861 124403 113795 108753 100127 111821 144987 100830 116519 129103 128104 127073 133582 127218 102055 111459 100285 101107 96289 100578 109493 114094 133170 122932 129025 118022 103789 109278 103747 96628 99552 96214 109578 117949 123894 133905 133855 114675 108275 108859 94864 98233 97901 89578 111857 115918 121662 131607 126785 119107 107956 107266 99428 104273 93385 93977 115469 115524 129594 135196 121446 120049 111598 106467 102429 104399 1660500
814_10 - DTP Mass Acquisition Received - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0
814_10 - DTP Mass Transition Received - 0 - 0 9033 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 639 - 0 - 0 4975 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0
814_18 - CSA AdditionDeletes Received 40217 62083 99016 55581 46720 42587 49740 47725 31726 52888 41597 40616 55770 43745 52139 26702 21791 39082 44030 38884 39856 31786 33061 42622 48489 64178 50499 59475 59400 48536 42179 40351 34796 34420 54677 35078 49489 59611 39384 44247 44577 35386 40420 54831 43550 45039 44268 40405 57954 64408 65032 80184 70310 41156 34811 46680 50347 71847 48606 52585 50867 62747 59763 34925 40977 40389 41227 747237
Total 562085 554722 573711 476047 474921 434114 480903 491612 418337 483900 494713 510900 519262 543870 547796 398391 419057 408226 434889 397965 398350 426689 446477 531229 496188 527060 458227 433368 463158 432814 396477 391251 364995 425182 472373 488770 537838 543216 448454 441709 449383 401409 409563 417777 378832 493644 566768 495865 541086 526362 523392 538772 486187 419874 433096 382737 378952 587667 463095 531340 537739 508346 512880 429854 413594 399102 407249 6891712
Counts from Monthly Retail Transaction report
To do
Break Out 814_10s - AQ and MT
Break Out 814_18 Additions from Deletes
Year-To-Date Transactions Received
Transaction Type July 2018 July 2017 July 2018 July 2017
Switches 669909 617300 121926 84059
Acquisition 0 0 0 0
Move - Ins 1667037 1568153 270122 252360
Move - Outs 814580 802779 129820 127073
Continuous Service Agreements (CSA) 395944 283259 40217 55770
Mass Transitions 9033 0 0 0
Total 3556503 3271491 562085 519262
There has been a change since this was created
Mass Acquisition has been broken out of Mass Transition
Page 17: ERCOT Monthly Operational Overvie · ERCOT Monthly Operational Overview (July 2018) Revised 08.22.18. ERCOT Public. August 15, 2018

PUBLIC

Cumulative MW Capacity of Interconnection Requests by Zone ndashJuly 2018

17

PUBLIC

Cumulative MW Capacity of Interconnection Requests by Zone ndashJuly 2018

18

PUBLIC

Wind Generation ndash July 2018

19

PUBLIC

Solar Generation ndash July 2018

20

PUBLIC

Generation Interconnection Activity by Fuel ndash July 2018

21

PUBLIC

Generation Interconnection Activity by Project Phase ndash July 2018

22

Market Operations

PUBLIC

Day-Ahead Schedule (Hourly Average) ndash July 2018

24

0

10000

20000

30000

40000

50000

60000

70000

80000

MW

Hour Ending

Scheduled Energy Only OfferScheduled Three-part OfferDAM Energy PurchaseRT System Load

Liquidity and activity are normal in the Day-Ahead Market

PUBLIC

Percentage of Real-Time Load Hedged in the DAM (Counter-Party Level) ndashJuly 2018

25

0

20

40

60

80

100

120Ja

nM

arM

ay Jul

Sep

Nov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May

July

2013 2014 2015 2016 2017 2018

The dotted lines represent the bounds for major outliers

PUBLIC

DAM and RTM Price Convergence ndash July 2018

26

-20

-10

0

10

20

30

40

50

60Ja

nM

arM

ay Jul

Sep

Nov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

l

2013 2014 2015 2016 2017 2018

Aver

age

DAM

-R

TM S

PP ($

MW

h)

The dotted lines represent the bounds for major outliers

PUBLIC

Day-Ahead Electricity and Ancillary Service Prices (Hourly Average) ndashJuly 2018

27

0

100

200

300

400

500

600

Pric

e ($

MW

h)

Hour Ending

Regulation Up

Regulation Down

Responsive Reserve

Non Spinning Reserve

DAM Power Balance Price(System Lambda)

Ancillary Service prices reflect the opportunity cost of energy

PUBLIC

Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash July 2018

28

0

100

200

300

400

500

600

Pric

e ($

MW

h)

Hour Ending

RTSPP - LZ West

RTSPP - LZ North

RTSPP - LZ South

RTSPP - LZ Houston

DASPP - LZ West

DASPP - LZ North

DASPP - LZ South

DASPP - LZ Houston

Prices reflect relative transmission congestion and system scarcity

PUBLIC

Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash July 2018

29

0

100

200

300

400

500

600

Pric

e ($

MW

h)

Hour Ending

RTSPP - Hub Average

DASPP - Hub Average

Energy prices reflect the risk premium between Day-Ahead amp Real-Time

PUBLIC

DRUC Monthly Summary (Hourly Average) ndash July 2018

30

0

15000

30000

45000

60000

75000

90000

MW

h

Hour Ending

Self Scheduled Capacity

Self Scheduled Ancillary Service Limit

Load Forecast

DRUC Recommended Capacity

31 executions (0 missed)0 published after 160011 minutes average execution time0 Resources committed

PUBLIC

HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash July 2018

31

0

02

04

06

08

1

0

20

40

60

80

100

RTO

RD

PA ($

MW

h)

MW

h

Hour Ending

744 executions (0 missed)8 minutes average execution time1 Resources committed through HRUC or by a Verbal Dispatch Instruction

The dotted line indicates the average RTORDPA

PUBLIC

NonndashSpinning Reserve Service Deployment ndash July 2018

32

Deployment Start Time

Deployment End Time

Deployment Duration (Hours)

Max Deployment(MW) Reason

NA

PUBLIC

CRR Price Convergence ndash July 2018

0

50

100

150

200

250

Mill

ions

$

Cost

Value

Congestion Revenue Right cost in auction convergence with payment in Day-Ahead Market and Real Time Market

33

PUBLIC

Daily Average System Lambda and ORDC Price Adders ndash July 2018

0

50

100

150

200

250

$M

Wh

Day of Month

RTOFFPA

RTORPA

SYSTEM_LAMBDA

34

PUBLIC

ERS Procurement for June 2018 ndash September 2018

TP1 TP2 TP3 TP4 TP5 TP6

Non Weather-Sensitive ERS-10 MW 160562 165996 143324 140708 156699 151138

Non Weather-Sensitive ERS-30 MW 736864 781559 702529 625067 755153 657394

Weather-Sensitive ERS-10 MW 0 0 0 0 0 0

Weather-Sensitive ERS-30 MW 0 0 11850 11850 0 0

Total MW Procured 897426 947555 857703 777625 911852 808532

Clearing Price $201 $185 $2108 $2177 $199 $225

Time Period Time Period Hours

Time Period 1 Hours Ending 0600 - 0800 (50000 am to 80000 am) Monday through Friday except ERCOT Holidays

Time Period 2 Hours Ending 0900 - 1300 (80000 am to 10000 pm) Monday through Friday except ERCOT Holidays

Time Period 3 Hours Ending 1400 - 1600 (10000 pm to 40000 pm) Monday through Friday except ERCOT Holidays

Time Period 4 Hours Ending 1700 - 1900 (40000 pm to 70000 pm) Monday through Friday except ERCOT Holidays

Time Period 5 Hours Ending 2000 - 2200 (70000 pm to 100000 pm) Monday through Friday except ERCOT Holidays Time Period 6 All other hours

35

PUBLIC

Reliability Services ndash July 2018

Reliability Unit Commitment (RUC) $ in Millions

RUC Make-Whole Payments $000

RUC Clawback Charges $000

RUC Commitment Settlement $000

RUC Capacity Short Charges $000

RUC Make-Whole Uplift $000

RUC Commitment Cost Allocation $000

RUC Decommitment Payments $000

Total RUC Allocation to Load $000

In July 2018 there was a credit of $000M allocated to load for RUC compared to bull A credit of $000M in June 2018bull A credit of $003M in July 2017

36

PUBLIC

Ancillary and Other Services ndash July 2018

Ancillary and Other Services $ in Millions

Regulation Up Service $1105

Regulation Down Service $072

Responsive Reserve Service $7177

Non-Spinning Reserve Service $1787

Black Start Service $059

Voltage Services - Reactive Power $000

Voltage Services - Lost Opportunity $000

Total Charges Allocated to Load $10200

In July 2018 Ancillary and Other Services was a charge of $10200M compared to bull A charge of $2001M in June 2018bull A charge of $2322M in July 2017

37

PUBLIC

Real-Time Ancillary Service Imbalance (ORDC) ndash July 2018

In July 2018 Real-Time Ancillary Service Imbalance was a charge to load of $2228K compared to bull A charge of $147K in June 2018bull A charge of $534K in July 2017

Real-Time Ancillary Service Imbalance $ in Thousands

Real-Time AS Imbalance ($2228)

Real-Time Reliability Deployment AS Imbalance $000

Total RTASI Amount Allocated to Load $2228

38

PUBLIC

Energy Settlement ndash July 2018

39

Day-Ahead Market Energy Settlement $ in Millions

Energy Purchases $215396

Point to Point Obligation Purchases $11726

Energy Sales ($212592)

Day-Ahead Congestion Rent $14531

Day-Ahead Market Make-Whole Payments ($001)

Real-Time Market Energy Settlement $ in Millions

Energy Imbalance at a Resource Node ($91963)

Energy Imbalance at a Load Zone $160737

Energy Imbalance at a Hub ($57497)

Net Real-Time Energy Imbalance $11276

Real Time Congestion from Self Schedules $013

Block Load Transfers and DC Ties ($2063)

Total Impact to Revenue Neutrality $9227

Load-Allocated Emergency Energy Payments ($016)

Load-Allocated Base Point Deviation Charges $026

Day-Ahead Market energy settlement activity increased from last month and increased from July 2017

Real-Time Market energy settlement activity increased from last month and increased from July 2017

PUBLIC

Congestion Revenue Rights (CRR) ndash July 2018

$ in Millions

Long-Term Auction ($4026)

Monthly Auction ($1773)

Total Auction Revenue ($5799)

Day-Ahead CRR Settlements ($15797)

Day-Ahead CRR Short-Charges $1885

Day-Ahead CRR Short-Charges Refunded ($899)

Day-Ahead CRR Short-Charges Net $986

Total CRR Funding ($14810)

Day-Ahead Point-to-Point Obligations $11726

Real-Time Point-to-Point Obligations ($10113)

Net Point-to-Point Obligations $1614

Congestion Revenue Rights settlement payments were not fully funded Partial funding to settle the CRR Short Charges was provided from the CRR Balancing Account Fund and the remaining $986M of CRR Short Charges were not refunded The CRR Fund Balance is now $0

Point to Point Obligations settled with a net charge of $1614M compared to a net credit of $1758M last month

40

PUBLIC

CRR Balancing Account Fund ndash July 2018

CRR Balancing Account $ in Millions

Monthly Day-Ahead Congestion Rent $14531

Monthly Day-Ahead CRR Settlements ($15797)

Monthly Day-Ahead CRR Short -Charges $1885

CRR Balancing Account Credit Total $619

Beginning Fund Balance for the Month $275

CRR Balancing Account Credit Total $619

Day-Ahead CRR Short-Charges Refunded ($899)

CRR PTP Option Award Charges $004

Load-Allocated CRR Amount $000

Total Fund Amount $000

41

PUBLIC

Revenue Neutrality ndash July 2018

Revenue Neutrality $ in Millions

Real-Time Energy Imbalance $11276

Real-Time Point to Point Obligation ($10113)

Real-Time Congestion from Self-Schedules $013

DC Tie amp Block Load Transfer ($2063)

Allocation to Load $886

In July 2018 the Revenue Neutrality charge to load was $886M compared to bull A charge of $3046M in June 2018bull A charge of $145M in July 2017

42

PUBLIC

Net Allocation to Load ndash July 2018

Market-Based Allocation $ in Millions

Reliability Unit Commitment $000

Ancillary and Other Services $10200

Real-Time Ancillary Service Imbalance $223

Emergency Energy $016

Base Point Deviation ($026)

CRR Auction Revenue ($5799)

CRR Balancing Account $000

Real-Time Revenue Neutrality $886

Reliability Must Run $000

Monthly Block Load Transfer $000

Total $5500

Fee AllocationERCOT Administrative Fee $2207

Net Allocated to Load $7707

In July 2018 the Net Allocation to load was a charge of $7707M compared to bull A charge of $2152M in June 2018bull A credit of $1363M in July 2017

43

PUBLIC

Advanced Meter Settlement Impacts ndash July 2018

July 2018 At month end settling 72M ESIIDs using Advanced Meter data

July 2018 990 of the load in ERCOT is settled with 15-min interval data (AMS Competitive IDR and NOIE IDR)

44

PUBLIC

ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndashJuly 2018

45

PUBLIC

Retail Transaction Volumes ndash Summary ndash July 2018

46

Transaction Type July 2018 July 2017 July 2018 July 2017

Switches 669909 617300 121926 84059

Acquisition 0 0 0 0

Move - Ins 1667037 1568153 270122 252360

Move - Outs 814580 802779 129820 127073

Continuous Service Agreements (CSA) 395944 283259 40217 55770

Mass Transitions 9033 0 0 0

Total 3556503 3271491 562085 519262

Year-To-Date Transactions Received

Board Presentation Input

Trans Volumes by Month_New

PUBLIC

Retail Transaction Volumes ndash Summary ndash July 2018

SwitchesAcquisitions Move-Ins

Move-Outs Mass Transition

47

Projects Report

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018

20000000$ 2018 Portfolio

Spending Estimate

Projects In FlightOn Hold (Count = 100) 24905011$

Projects Not Yet Started (Count = 10) 1320628$

Projects Completed (Count = 43) 795250$

(7020889)$

TOTAL 20000000$

Project Number Projects in Initiation Phase (Count = 4)

TBD IT Asset RecoveryNPRR842 Study Area Load Information

209-03 Study Network (STNET) Integration288-01 EDI Map and Translator Replacement

Impact Metric TolerancesUnfavorable variances are represented as negative numbers within the report - Green = No more than 49 unfavorable variance - Yellow = Unfavorable variance between 49 and 99 - Red = Unfavorable variance more than 99

Spending Reductions Required to Maintain Capital Budget

2018 Project Funding

Footnotes1 - One or more phases took longer than expected resulting in additional time required

2 - One or more phases required more labor than expected resulting in additional funding andor time required

3 - Project placed on holdNA - Metric not calculated because - it is reported at the parent project level or - it is an administrative project

Project Number Projects in Planning Phase (Count = 8) Phase Start Baseline

Phase FinishApproved

Phase FinishScheduled

Go-Live DateScheduled

Phase Finish

134-02 Privileged Account Management (PAM) Phase 2 882018 12192018 12192018 TBD 12192018 0 10

183-01 CMM-FT GUI Integration 12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs

242-01 Portfolio Reporting Assessment 1182017 12192018 12192018 TBD 12192018 0 21260-01 Information Governance Assessment 10182017 5302018 9192018 TBD 9192018 0 5286-01 Java Platform Assessment 6202018 11212018 11212018 TBD 11212018 0 6287-01 Security Constrained Unit Commitment (SCUC) 882018 2272019 2272019 TBD 2272019 0 -1

NPRR484Revisions to Congestion Revenue Rights Credit Calculations and Payments - Phase 1b 2

12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs

NPRR702Flexible Accounts Payment of Invoices and Disposition of Interest on Cash Collateral

12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs

Schedule Health Budget Health

49

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018Project Number Projects in Execution Phase (Count = 42) Phase Start Baseline Go-

Live DateApproved Go-

Live DateScheduled

Go-Live DateScheduled

Phase Finish

170-01 Enterprise Content Alignment Program 8262015 11152017 8312018 8312018 8312018 0 0170-06 ECAP - ECMS Implementation Phase 1 4252018 11302018 11302018 11302018 11302018 0 3173-02 ERCOT Flight Certification Website 11152017 2282019 2282019 2282019 5312019 0 2181-01 CRR Framework Upgrade 10262016 1022017 11192018 11192018 2272019 0 2

183-01 CMM Tech Refresh 3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

193-01 PMU Tool Evaluation and Implementation 12132017 892018 2152019 2152019 3202019 0 0196-01 GINR Project Status Application Replacement 12212016 9142017 2282019 2282019 3312019 0 1198-02 Reactive Power Coordination PoC 962017 6162018 8152018 8152018 8152018 0 54209-02 Weather Imaging and Line Observation (WILO) 5302018 212019 212019 212019 2272019 0 2210-01 REC Technology Refresh 8302017 3182018 12132018 12132018 1162019 0 3228-01 Enterprise Database Upgrade 882018 1292020 1292020 1292020 1292020 0 17229-01 IT Change and Configuration Management Phase 2 822017 6192018 12132018 12132018 3252019 0 2 -9238-01 Application Authentication Tech Refresh 962017 3192018 12132018 12132018 1302019 0 3239-01 Identity and Access Management 592018 3132019 3132019 3132019 3132019 0 2241-01 AREA - Generation 10112017 3302018 892018 892018 952018 0 -4244-01 Corporate Wireless 11292017 3282018 1252018 1252018 192019 0 9245-01 2017 EPS Metering Enhancements 6272018 892019 892019 892019 9252019 0 1246-01 iTest Data Refresh 12132017 1192018 11152018 11152018 122019 0 25249-01 Secondary Wind Forecasting Service 8302017 2282018 892018 892018 952018 0 0253-01 CIP Recovery Plan Project - Planning Phase 1 1312018 8292018 8292018 8292018 8292018 0 -2

257-01Security Constrained Optimal Powerflow in Study Network Analysis

1262017 10252018 10252018 10252018 1282018 0 19

261-01 Generic Transmission Constraint Calculation 372018 12132018 12132018 12132018 1232019 0 0263-01 Market Simulator 4112018 12132018 12132018 12132018 1302019 0 7265-01 Real-Time Assessment Continuity 1312018 12132018 12132018 12132018 1302019 0 0279-01 Cyber Security Project 24 6272018 10262018 10262018 10262018 11282018 0 0280-01 Quest Software Portfolio Transition 442018 6272018 9262018 9262018 9262018 0 13282-01 Synchronous Condenser Outage Modeling 662018 10252018 10252018 10252018 1252018 0 1Various 2015 CMM NPRRs 2 -18

NPRR519Exemption of ERS-Only QSEs from Collateral and Capitalization Requirements

3152017 5192018 12112018 12112018 12312018 0 See 2015 CMM NPRRs

NPRR620Collateral Requirements for Counter-Parties with No Load or Generation

3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

NPRR660 Remove CRR State Change Adder 3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

Budget HealthSchedule Health

50

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018Project Number Projects in Execution Phase (Count = 42) Phase Start Baseline Go-

Live DateApproved Go-

Live DateScheduled

Go-Live DateScheduled

Phase Finish

NPRR741 Clarifications to TPE and EAL Credit Exposure Calculations 3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

NPRR749 Option Cost for Outstanding CRRs 882018 12132018 12132018 12132018 TBD 0 NA See 2015 CMM NPRRs

NPRR755 Data Agent-Only QSE Registration 3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

NPRR819Modification of Non-Price Error Resettlement Thresholds and Resettlement Clean-Ups

592018 892018 892018 892018 952018 0 36

NPRR833 Modify PTP Obligation Bid Clearing Change 882018 12132018 12132018 12132018 TBD 0 1

NPRR843Short-Term System Adequacy and AS Offer Disclosure Reports Additions

7182018 10252018 10252018 10252018 11282018 0 0

NPRR864 RUC Modifications to Consider Market-Based Solutions 6202018 10252018 10252018 10252018 11282018 0 4SCR777 Bilateral CRR Interface Enhancement 10262016 1022017 11192018 11192018 2272019 0 NA See 181-01

SCR781 RARF Replacement 12202017 4252018 12192018 12192018 12192018 0 3SCR791 Correction of 60-day SCED GRD Disclosure Report 522018 892018 892018 892018 952018 0 39SCR795 Addition of Intra-Hour Wind Forecast to GTBD Calculation 882018 10252018 10252018 10252018 11142018 0 0

Project Number Expedited Projects in Execution (Count = 34)

Project Number Projects in Stabilization (Count = 10) Execution

Phase StartBaseline Go-Live Target

Approved Go-Live Target

ActualGo-Live Date

Scheduled Execution Phase

Finish

NPRR648 Remove References to Flowgate Rights 3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR683 Revision to Available Credit Limit Calculation 3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR743 Revision to MCE to Have a Floor For Load Exposure 3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR760 Calculation of Exposure Variables For Days With No Activity 3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR776 Voltage Set Point Communication 9202017 3192018 452018 452018 952018 0 1

NPRR800Revisions to Credit Exposure Calculations to Use Electricity Futures Market Prices

3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR815Revise the Limitation of Load Resources Providing Responsive Reserve (RRS) Service

3212018 5312018 5312018 5312018 8292018 0 2

209-01 Multi Station Breaker to Breaker One Lines 282017 392018 532018 532018 8222018 0 -1259-01 DC SCADA and Metering Upgrade 10252017 1172018 7252018 7252018 8292018 0 22266-01 Remote Email Access Enhancement 12132017 372018 662018 6192018 9262018 2 -7 2 -9

Schedule Health Budget Health

Budget HealthSchedule Health

51

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018

Project Number Projects On Hold (Count = 2) Forecast

Start DateBaseline

Phase FinishApproved Go-

Live TargetScheduled

Go-Live DateScheduled

Phase Finish

SCR789 Update NMMS Topology Processor to PSSE 34 Capability 0

269-01Document Repository Redesign and Governance Implementation - Phase 1

0

Project Number Projects Completed (Count = 20)

Baseline Execution

Phase Start

Baseline Go-Live Target

Approved Go-Live Target

Actual Go-Live Date

Actual Execution Phase Finish

185-01 Records Management and eDiscovery 12152016 5242017 8292017 8222017 12132017 2 0224-01 TelAlert Replacement 452017 6272017 842017 842017 592018 0 5230-01 SAS Technical Architecture Redesign 312017 12132017 12132017 12132017 6272018 0 2234-01 Reporting Solution Resiliency (RSR) 452017 8232017 11272017 11272017 1102018 0 8240-01 EDI Translator and Mapping Replacement Assessment 4192017 9272017 2282018 TBD 372018 -2 20254-01 Retail Windows Upgrade 10112017 12182017 12182017 1222018 272018 1 -51 65255-01 Settlements Architecture Enhancements 10252017 1112018 1112018 1192018 2142018 1 -10 53258-01 WD Kainos SMART Automation Testing Tool 4112018 642018 642018 662018 7182018 -3 33271-01 Issue Tracking and Resolution Tool Assessment 12132017 4252018 4252018 TBD 522018 1 -5 -1272-01 Operator Training Simulator Black Start GE Effort 1262017 4252018 4252018 4272018 5162018 -1 19274-01 Average Mid-Term Load Forecast 372018 5312018 5312018 5312018 6272018 0 50

NPRR768Revisions to Real-Time On-Line Reliability Deployment Price Adder Categories

372018 5312018 5312018 5312018 6272018 0 16

NPRR778 Modifications to Date Change and Cancellation Evaluation Window 7192017 10292017 12112017 12112017 1312018 0 23

NPRR782Settlement of Infeasible Ancillary Services Due to Transmission Constraints

5242017 8312017 1122017 1122017 1102018 0 20

NPRR808 Three Year CRR Auction 8232017 9182017 9182017 912017 1312018 65 68

NPRR810Applicability of RMR Incentive Factor on Reservation and Transportation Costs Associated with Firm Fuel Supplies

7172017 11122017 3312018 3312018 3312018 0 NA See 233-00

NPRR830 Revision of 4-Coincident Peak Methodology 12132017 262018 262018 262018 372018 0 85

NPRR831 Inclusion of Private Use Networks in Load Zone Price Calculations 822017 1122017 1122017 1122017 2212018 0 33

OBDRR002 ORDC OBD Revisions for PUCT Project 47199 372018 5312018 5312018 5312018 6272018 0 See NPRR768

SCR792 Enhance Communications of BAAL Exceedances 2142018 452018 452018 452018 4252018 0 69

Project Number Expedited Projects Completed (Count = 23)

Budget HealthSchedule Health

Budget HealthSchedule Health

52

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018

Project Number 2018 Projects Not Yet Started (Count = 10) Forecast

Start Date

NPRR858 Provide Complete Current Operating Plan (COP) Data Aug-2018TBD 2018 OS Enhancements Aug-2018TBD Additional Branch Limit for Relays Aug-2018

NPRR817 Create a Panhandle Hub Sep-2018NPRR821 Elimination of the CRR Deration Process Oct-2018NPRR865 Publish RTM Shift Factors for Hubs Load Zones and DC Ties Oct-2018

SCR793SSR Related Telemetry for Transmission Service Provider (TSP) Operators

Oct-2018

ECAP ECAP - ECMS Implementation Phase 2 Oct-2018TBD Job Scheduler Update in CSI Framework Oct-2018TBD Parameter Estimation Oct-2018

53

  • Slide Number 1
  • Slide Number 2
  • Summary ndash July 2018
  • Daily Peak Demand Hourly Average Actual vs Forecast Wind Day-Ahead COPs amp On-Line Capacity at Peak ndash July 2018
  • Actual Wind Output plus Curtailments vs Wind Day-Ahead COPs for All Hours ndash July 2018
  • ERCOTrsquos CPS1 Monthly Performance ndash July 2018
  • Monthly Peak Actual Demand ndash July 2018
  • Monthly Minimum Actual 15-Minute Demand ndash July 2018
  • Day-Ahead Load Forecast Performance ndash July 2018
  • Reliability Unit Commitment (RUC) Capacity by Weather Zone ndash July 2018
  • Generic Transmission Constraints (GTCs) ndash July 2018
  • Advisories and Watches ndash July 2018 Corrected
  • Lake Levels Update ndash August 1 2018
  • Planning Summary ndash July 2018
  • Mapping of Counties to ERCOT Zones ndash July 2018
  • Cumulative MW Capacity of Interconnection Requests by Zone ndashJuly 2018
  • Cumulative MW Capacity of Interconnection Requests by Zone ndashJuly 2018
  • Cumulative MW Capacity of Interconnection Requests by Zone ndashJuly 2018
  • Wind Generation ndash July 2018
  • Solar Generation ndash July 2018
  • Generation Interconnection Activity by Fuel ndash July 2018
  • Generation Interconnection Activity by Project Phase ndash July 2018
  • Slide Number 23
  • Day-Ahead Schedule (Hourly Average) ndash July 2018
  • Percentage of Real-Time Load Hedged in the DAM (Counter-Party Level) ndash July 2018
  • DAM and RTM Price Convergence ndash July 2018
  • Day-Ahead Electricity and Ancillary Service Prices (Hourly Average) ndash July 2018
  • Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash July 2018
  • Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash July 2018
  • DRUC Monthly Summary (Hourly Average) ndash July 2018
  • HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash July 2018
  • NonndashSpinning Reserve Service Deployment ndash July 2018
  • CRR Price Convergence ndash July 2018
  • Daily Average System Lambda and ORDC Price Adders ndash July 2018
  • ERS Procurement for June 2018 ndash September 2018
  • Reliability Services ndash July 2018
  • Ancillary and Other Services ndash July 2018
  • Real-Time Ancillary Service Imbalance (ORDC) ndash July 2018
  • Energy Settlement ndash July 2018
  • Congestion Revenue Rights (CRR) ndash July 2018
  • CRR Balancing Account Fund ndash July 2018
  • Revenue Neutrality ndash July 2018
  • Net Allocation to Load ndash July 2018
  • Advanced Meter Settlement Impacts ndash July 2018
  • ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndash July 2018
  • Retail Transaction Volumes ndash Summary ndash July 2018
  • Retail Transaction Volumes ndash Summary ndash July 2018
  • Slide Number 48
  • ERCOT Portfolio Stoplight Report ndash July 2018
  • ERCOT Portfolio Stoplight Report ndash July 2018
  • ERCOT Portfolio Stoplight Report ndash July 2018
  • ERCOT Portfolio Stoplight Report ndash July 2018
  • ERCOT Portfolio Stoplight Report ndash July 2018
Retail Transactions Summary
July 2018 June 2018 May 2018 April 2018 March 2018 February 2018 January 2018 December 2017 November 2017 October 2017 September 2017 August 2017 July 2017 June 2017 May 2017 April 2017 March 2017 February 2017 January 2017 December 2016 November 2016 October 2016 September 2016 August 2016 July 2016 June 2016 May 2016 April 2016 March 2016 February 2016 January 2016 December 2015 November 2015 October 2015 September 2015 August 2015 July 2015 June 2015 May 2015 April 2015 March 2015 February 2015 January 2015 December 2014 November 2014 October 2014 September 2014 August 2014 July 2014 June 2014 May 2014 April 2014 March 2014 February 2014 January 2014 December 2013 November 2013 October 2013 September 2013 August 2013 July 2013 June 2013 May 2013 April 2013 March 2013 February 2013 January 2013 Grand total
814_01 - Switch Received 121926 109653 96828 81291 95159 76119 88933 60560 77860 78096 79502 84134 84059 108784 130828 71769 67845 66875 87140 66556 56202 64452 67323 86656 82923 86376 75323 70300 76235 68057 63954 61486 52887 65276 70342 81674 91211 102661 86229 81255 79997 73394 72885 71072 67080 110465 175164 89677 99568 101490 111077 91983 93887 71130 86953 69691 55957 166882 82415 93194 102562 103756 116086 78919 68950 64329 67116 1321827
Difference from previous month 12273 12825 15537 (13868) 19040 (12814) 28373 (17300) (236) (1406) (4632) 75 (24725) (22044) 59059 3924 970 (20265) 20584 10354 (8250) (2871) (19333) 3733 (3453) 11053 5023 (5935) 8178 4103 2468 8599 (12389) (5066) (11332) (9537) (11450) 16432 4974 1258 6603 509 1813 3992 (43385) (64699) 85487 (9891) (1922) (9587) 19094 (1904) 22757 (15823) 17262 13734 (110925) 84467 (10779) (9368) (1194) (12330) 37167 9969 4621 (2787)
814_16 - Move - Ins Received 270122 257125 244431 225380 224289 215281 230409 238340 207921 236397 244511 258046 252360 257759 237611 197865 217962 201984 202612 196236 201714 220958 231999 268781 241844 247481 214383 199804 218245 212474 193716 189862 181098 215908 229405 248124 263233 247089 208166 207932 215950 197765 198025 193973 178624 226283 231418 243482 251957 233679 223201 258649 214724 208160 207059 172981 178671 233469 216550 255967 249114 220397 216982 204412 197200 191955 194507 3162148
Difference from previous month 12997 12694 19051 1091 9008 (15128) (7931) 30419 (28476) (8114) (13535) 5686 (5399) 20148 39746 (20097) 15978 (628) 6376 (5478) (19244) (11041) (36782) 26937 (5637) 33098 14579 (18441) 5771 18758 3854 8764 (34810) (13497) (18719) (15109) 16144 38923 234 (8018) 18185 (260) 4052 15349 (47659) (5135) (12064) (8475) 18278 10478 (35448) 43925 6564 1101 34078 (5690) (54798) 16919 (39417) 6853 28717 3415 12570 7212 5245 (2552)
814_24 - MVO and MVO to CSA Received 129820 125861 124403 113795 108753 100127 111821 144987 100830 116519 129103 128104 127073 133582 127218 102055 111459 100285 101107 96289 100578 109493 114094 133170 122932 129025 118022 103789 109278 103747 96628 99552 96214 109578 117949 123894 133905 133855 114675 108275 108859 94864 98233 97901 89578 111857 115918 121662 131607 126785 119107 107956 107266 99428 104273 93385 93977 115469 115524 129594 135196 121446 120049 111598 106467 102429 104399 1660500
814_10 - DTP Mass Acquisition Received - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0
814_10 - DTP Mass Transition Received - 0 - 0 9033 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 639 - 0 - 0 4975 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0
814_18 - CSA AdditionDeletes Received 40217 62083 99016 55581 46720 42587 49740 47725 31726 52888 41597 40616 55770 43745 52139 26702 21791 39082 44030 38884 39856 31786 33061 42622 48489 64178 50499 59475 59400 48536 42179 40351 34796 34420 54677 35078 49489 59611 39384 44247 44577 35386 40420 54831 43550 45039 44268 40405 57954 64408 65032 80184 70310 41156 34811 46680 50347 71847 48606 52585 50867 62747 59763 34925 40977 40389 41227 747237
Total 562085 554722 573711 476047 474921 434114 480903 491612 418337 483900 494713 510900 519262 543870 547796 398391 419057 408226 434889 397965 398350 426689 446477 531229 496188 527060 458227 433368 463158 432814 396477 391251 364995 425182 472373 488770 537838 543216 448454 441709 449383 401409 409563 417777 378832 493644 566768 495865 541086 526362 523392 538772 486187 419874 433096 382737 378952 587667 463095 531340 537739 508346 512880 429854 413594 399102 407249 6891712
Counts from Monthly Retail Transaction report
To do
Break Out 814_10s - AQ and MT
Break Out 814_18 Additions from Deletes
Year-To-Date Transactions Received
Transaction Type July 2018 July 2017 July 2018 July 2017
Switches 669909 617300 121926 84059
Acquisition 0 0 0 0
Move - Ins 1667037 1568153 270122 252360
Move - Outs 814580 802779 129820 127073
Continuous Service Agreements (CSA) 395944 283259 40217 55770
Mass Transitions 9033 0 0 0
Total 3556503 3271491 562085 519262
There has been a change since this was created
Mass Acquisition has been broken out of Mass Transition
Page 18: ERCOT Monthly Operational Overvie · ERCOT Monthly Operational Overview (July 2018) Revised 08.22.18. ERCOT Public. August 15, 2018

PUBLIC

Cumulative MW Capacity of Interconnection Requests by Zone ndashJuly 2018

18

PUBLIC

Wind Generation ndash July 2018

19

PUBLIC

Solar Generation ndash July 2018

20

PUBLIC

Generation Interconnection Activity by Fuel ndash July 2018

21

PUBLIC

Generation Interconnection Activity by Project Phase ndash July 2018

22

Market Operations

PUBLIC

Day-Ahead Schedule (Hourly Average) ndash July 2018

24

0

10000

20000

30000

40000

50000

60000

70000

80000

MW

Hour Ending

Scheduled Energy Only OfferScheduled Three-part OfferDAM Energy PurchaseRT System Load

Liquidity and activity are normal in the Day-Ahead Market

PUBLIC

Percentage of Real-Time Load Hedged in the DAM (Counter-Party Level) ndashJuly 2018

25

0

20

40

60

80

100

120Ja

nM

arM

ay Jul

Sep

Nov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May

July

2013 2014 2015 2016 2017 2018

The dotted lines represent the bounds for major outliers

PUBLIC

DAM and RTM Price Convergence ndash July 2018

26

-20

-10

0

10

20

30

40

50

60Ja

nM

arM

ay Jul

Sep

Nov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

l

2013 2014 2015 2016 2017 2018

Aver

age

DAM

-R

TM S

PP ($

MW

h)

The dotted lines represent the bounds for major outliers

PUBLIC

Day-Ahead Electricity and Ancillary Service Prices (Hourly Average) ndashJuly 2018

27

0

100

200

300

400

500

600

Pric

e ($

MW

h)

Hour Ending

Regulation Up

Regulation Down

Responsive Reserve

Non Spinning Reserve

DAM Power Balance Price(System Lambda)

Ancillary Service prices reflect the opportunity cost of energy

PUBLIC

Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash July 2018

28

0

100

200

300

400

500

600

Pric

e ($

MW

h)

Hour Ending

RTSPP - LZ West

RTSPP - LZ North

RTSPP - LZ South

RTSPP - LZ Houston

DASPP - LZ West

DASPP - LZ North

DASPP - LZ South

DASPP - LZ Houston

Prices reflect relative transmission congestion and system scarcity

PUBLIC

Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash July 2018

29

0

100

200

300

400

500

600

Pric

e ($

MW

h)

Hour Ending

RTSPP - Hub Average

DASPP - Hub Average

Energy prices reflect the risk premium between Day-Ahead amp Real-Time

PUBLIC

DRUC Monthly Summary (Hourly Average) ndash July 2018

30

0

15000

30000

45000

60000

75000

90000

MW

h

Hour Ending

Self Scheduled Capacity

Self Scheduled Ancillary Service Limit

Load Forecast

DRUC Recommended Capacity

31 executions (0 missed)0 published after 160011 minutes average execution time0 Resources committed

PUBLIC

HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash July 2018

31

0

02

04

06

08

1

0

20

40

60

80

100

RTO

RD

PA ($

MW

h)

MW

h

Hour Ending

744 executions (0 missed)8 minutes average execution time1 Resources committed through HRUC or by a Verbal Dispatch Instruction

The dotted line indicates the average RTORDPA

PUBLIC

NonndashSpinning Reserve Service Deployment ndash July 2018

32

Deployment Start Time

Deployment End Time

Deployment Duration (Hours)

Max Deployment(MW) Reason

NA

PUBLIC

CRR Price Convergence ndash July 2018

0

50

100

150

200

250

Mill

ions

$

Cost

Value

Congestion Revenue Right cost in auction convergence with payment in Day-Ahead Market and Real Time Market

33

PUBLIC

Daily Average System Lambda and ORDC Price Adders ndash July 2018

0

50

100

150

200

250

$M

Wh

Day of Month

RTOFFPA

RTORPA

SYSTEM_LAMBDA

34

PUBLIC

ERS Procurement for June 2018 ndash September 2018

TP1 TP2 TP3 TP4 TP5 TP6

Non Weather-Sensitive ERS-10 MW 160562 165996 143324 140708 156699 151138

Non Weather-Sensitive ERS-30 MW 736864 781559 702529 625067 755153 657394

Weather-Sensitive ERS-10 MW 0 0 0 0 0 0

Weather-Sensitive ERS-30 MW 0 0 11850 11850 0 0

Total MW Procured 897426 947555 857703 777625 911852 808532

Clearing Price $201 $185 $2108 $2177 $199 $225

Time Period Time Period Hours

Time Period 1 Hours Ending 0600 - 0800 (50000 am to 80000 am) Monday through Friday except ERCOT Holidays

Time Period 2 Hours Ending 0900 - 1300 (80000 am to 10000 pm) Monday through Friday except ERCOT Holidays

Time Period 3 Hours Ending 1400 - 1600 (10000 pm to 40000 pm) Monday through Friday except ERCOT Holidays

Time Period 4 Hours Ending 1700 - 1900 (40000 pm to 70000 pm) Monday through Friday except ERCOT Holidays

Time Period 5 Hours Ending 2000 - 2200 (70000 pm to 100000 pm) Monday through Friday except ERCOT Holidays Time Period 6 All other hours

35

PUBLIC

Reliability Services ndash July 2018

Reliability Unit Commitment (RUC) $ in Millions

RUC Make-Whole Payments $000

RUC Clawback Charges $000

RUC Commitment Settlement $000

RUC Capacity Short Charges $000

RUC Make-Whole Uplift $000

RUC Commitment Cost Allocation $000

RUC Decommitment Payments $000

Total RUC Allocation to Load $000

In July 2018 there was a credit of $000M allocated to load for RUC compared to bull A credit of $000M in June 2018bull A credit of $003M in July 2017

36

PUBLIC

Ancillary and Other Services ndash July 2018

Ancillary and Other Services $ in Millions

Regulation Up Service $1105

Regulation Down Service $072

Responsive Reserve Service $7177

Non-Spinning Reserve Service $1787

Black Start Service $059

Voltage Services - Reactive Power $000

Voltage Services - Lost Opportunity $000

Total Charges Allocated to Load $10200

In July 2018 Ancillary and Other Services was a charge of $10200M compared to bull A charge of $2001M in June 2018bull A charge of $2322M in July 2017

37

PUBLIC

Real-Time Ancillary Service Imbalance (ORDC) ndash July 2018

In July 2018 Real-Time Ancillary Service Imbalance was a charge to load of $2228K compared to bull A charge of $147K in June 2018bull A charge of $534K in July 2017

Real-Time Ancillary Service Imbalance $ in Thousands

Real-Time AS Imbalance ($2228)

Real-Time Reliability Deployment AS Imbalance $000

Total RTASI Amount Allocated to Load $2228

38

PUBLIC

Energy Settlement ndash July 2018

39

Day-Ahead Market Energy Settlement $ in Millions

Energy Purchases $215396

Point to Point Obligation Purchases $11726

Energy Sales ($212592)

Day-Ahead Congestion Rent $14531

Day-Ahead Market Make-Whole Payments ($001)

Real-Time Market Energy Settlement $ in Millions

Energy Imbalance at a Resource Node ($91963)

Energy Imbalance at a Load Zone $160737

Energy Imbalance at a Hub ($57497)

Net Real-Time Energy Imbalance $11276

Real Time Congestion from Self Schedules $013

Block Load Transfers and DC Ties ($2063)

Total Impact to Revenue Neutrality $9227

Load-Allocated Emergency Energy Payments ($016)

Load-Allocated Base Point Deviation Charges $026

Day-Ahead Market energy settlement activity increased from last month and increased from July 2017

Real-Time Market energy settlement activity increased from last month and increased from July 2017

PUBLIC

Congestion Revenue Rights (CRR) ndash July 2018

$ in Millions

Long-Term Auction ($4026)

Monthly Auction ($1773)

Total Auction Revenue ($5799)

Day-Ahead CRR Settlements ($15797)

Day-Ahead CRR Short-Charges $1885

Day-Ahead CRR Short-Charges Refunded ($899)

Day-Ahead CRR Short-Charges Net $986

Total CRR Funding ($14810)

Day-Ahead Point-to-Point Obligations $11726

Real-Time Point-to-Point Obligations ($10113)

Net Point-to-Point Obligations $1614

Congestion Revenue Rights settlement payments were not fully funded Partial funding to settle the CRR Short Charges was provided from the CRR Balancing Account Fund and the remaining $986M of CRR Short Charges were not refunded The CRR Fund Balance is now $0

Point to Point Obligations settled with a net charge of $1614M compared to a net credit of $1758M last month

40

PUBLIC

CRR Balancing Account Fund ndash July 2018

CRR Balancing Account $ in Millions

Monthly Day-Ahead Congestion Rent $14531

Monthly Day-Ahead CRR Settlements ($15797)

Monthly Day-Ahead CRR Short -Charges $1885

CRR Balancing Account Credit Total $619

Beginning Fund Balance for the Month $275

CRR Balancing Account Credit Total $619

Day-Ahead CRR Short-Charges Refunded ($899)

CRR PTP Option Award Charges $004

Load-Allocated CRR Amount $000

Total Fund Amount $000

41

PUBLIC

Revenue Neutrality ndash July 2018

Revenue Neutrality $ in Millions

Real-Time Energy Imbalance $11276

Real-Time Point to Point Obligation ($10113)

Real-Time Congestion from Self-Schedules $013

DC Tie amp Block Load Transfer ($2063)

Allocation to Load $886

In July 2018 the Revenue Neutrality charge to load was $886M compared to bull A charge of $3046M in June 2018bull A charge of $145M in July 2017

42

PUBLIC

Net Allocation to Load ndash July 2018

Market-Based Allocation $ in Millions

Reliability Unit Commitment $000

Ancillary and Other Services $10200

Real-Time Ancillary Service Imbalance $223

Emergency Energy $016

Base Point Deviation ($026)

CRR Auction Revenue ($5799)

CRR Balancing Account $000

Real-Time Revenue Neutrality $886

Reliability Must Run $000

Monthly Block Load Transfer $000

Total $5500

Fee AllocationERCOT Administrative Fee $2207

Net Allocated to Load $7707

In July 2018 the Net Allocation to load was a charge of $7707M compared to bull A charge of $2152M in June 2018bull A credit of $1363M in July 2017

43

PUBLIC

Advanced Meter Settlement Impacts ndash July 2018

July 2018 At month end settling 72M ESIIDs using Advanced Meter data

July 2018 990 of the load in ERCOT is settled with 15-min interval data (AMS Competitive IDR and NOIE IDR)

44

PUBLIC

ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndashJuly 2018

45

PUBLIC

Retail Transaction Volumes ndash Summary ndash July 2018

46

Transaction Type July 2018 July 2017 July 2018 July 2017

Switches 669909 617300 121926 84059

Acquisition 0 0 0 0

Move - Ins 1667037 1568153 270122 252360

Move - Outs 814580 802779 129820 127073

Continuous Service Agreements (CSA) 395944 283259 40217 55770

Mass Transitions 9033 0 0 0

Total 3556503 3271491 562085 519262

Year-To-Date Transactions Received

Board Presentation Input

Trans Volumes by Month_New

PUBLIC

Retail Transaction Volumes ndash Summary ndash July 2018

SwitchesAcquisitions Move-Ins

Move-Outs Mass Transition

47

Projects Report

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018

20000000$ 2018 Portfolio

Spending Estimate

Projects In FlightOn Hold (Count = 100) 24905011$

Projects Not Yet Started (Count = 10) 1320628$

Projects Completed (Count = 43) 795250$

(7020889)$

TOTAL 20000000$

Project Number Projects in Initiation Phase (Count = 4)

TBD IT Asset RecoveryNPRR842 Study Area Load Information

209-03 Study Network (STNET) Integration288-01 EDI Map and Translator Replacement

Impact Metric TolerancesUnfavorable variances are represented as negative numbers within the report - Green = No more than 49 unfavorable variance - Yellow = Unfavorable variance between 49 and 99 - Red = Unfavorable variance more than 99

Spending Reductions Required to Maintain Capital Budget

2018 Project Funding

Footnotes1 - One or more phases took longer than expected resulting in additional time required

2 - One or more phases required more labor than expected resulting in additional funding andor time required

3 - Project placed on holdNA - Metric not calculated because - it is reported at the parent project level or - it is an administrative project

Project Number Projects in Planning Phase (Count = 8) Phase Start Baseline

Phase FinishApproved

Phase FinishScheduled

Go-Live DateScheduled

Phase Finish

134-02 Privileged Account Management (PAM) Phase 2 882018 12192018 12192018 TBD 12192018 0 10

183-01 CMM-FT GUI Integration 12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs

242-01 Portfolio Reporting Assessment 1182017 12192018 12192018 TBD 12192018 0 21260-01 Information Governance Assessment 10182017 5302018 9192018 TBD 9192018 0 5286-01 Java Platform Assessment 6202018 11212018 11212018 TBD 11212018 0 6287-01 Security Constrained Unit Commitment (SCUC) 882018 2272019 2272019 TBD 2272019 0 -1

NPRR484Revisions to Congestion Revenue Rights Credit Calculations and Payments - Phase 1b 2

12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs

NPRR702Flexible Accounts Payment of Invoices and Disposition of Interest on Cash Collateral

12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs

Schedule Health Budget Health

49

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018Project Number Projects in Execution Phase (Count = 42) Phase Start Baseline Go-

Live DateApproved Go-

Live DateScheduled

Go-Live DateScheduled

Phase Finish

170-01 Enterprise Content Alignment Program 8262015 11152017 8312018 8312018 8312018 0 0170-06 ECAP - ECMS Implementation Phase 1 4252018 11302018 11302018 11302018 11302018 0 3173-02 ERCOT Flight Certification Website 11152017 2282019 2282019 2282019 5312019 0 2181-01 CRR Framework Upgrade 10262016 1022017 11192018 11192018 2272019 0 2

183-01 CMM Tech Refresh 3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

193-01 PMU Tool Evaluation and Implementation 12132017 892018 2152019 2152019 3202019 0 0196-01 GINR Project Status Application Replacement 12212016 9142017 2282019 2282019 3312019 0 1198-02 Reactive Power Coordination PoC 962017 6162018 8152018 8152018 8152018 0 54209-02 Weather Imaging and Line Observation (WILO) 5302018 212019 212019 212019 2272019 0 2210-01 REC Technology Refresh 8302017 3182018 12132018 12132018 1162019 0 3228-01 Enterprise Database Upgrade 882018 1292020 1292020 1292020 1292020 0 17229-01 IT Change and Configuration Management Phase 2 822017 6192018 12132018 12132018 3252019 0 2 -9238-01 Application Authentication Tech Refresh 962017 3192018 12132018 12132018 1302019 0 3239-01 Identity and Access Management 592018 3132019 3132019 3132019 3132019 0 2241-01 AREA - Generation 10112017 3302018 892018 892018 952018 0 -4244-01 Corporate Wireless 11292017 3282018 1252018 1252018 192019 0 9245-01 2017 EPS Metering Enhancements 6272018 892019 892019 892019 9252019 0 1246-01 iTest Data Refresh 12132017 1192018 11152018 11152018 122019 0 25249-01 Secondary Wind Forecasting Service 8302017 2282018 892018 892018 952018 0 0253-01 CIP Recovery Plan Project - Planning Phase 1 1312018 8292018 8292018 8292018 8292018 0 -2

257-01Security Constrained Optimal Powerflow in Study Network Analysis

1262017 10252018 10252018 10252018 1282018 0 19

261-01 Generic Transmission Constraint Calculation 372018 12132018 12132018 12132018 1232019 0 0263-01 Market Simulator 4112018 12132018 12132018 12132018 1302019 0 7265-01 Real-Time Assessment Continuity 1312018 12132018 12132018 12132018 1302019 0 0279-01 Cyber Security Project 24 6272018 10262018 10262018 10262018 11282018 0 0280-01 Quest Software Portfolio Transition 442018 6272018 9262018 9262018 9262018 0 13282-01 Synchronous Condenser Outage Modeling 662018 10252018 10252018 10252018 1252018 0 1Various 2015 CMM NPRRs 2 -18

NPRR519Exemption of ERS-Only QSEs from Collateral and Capitalization Requirements

3152017 5192018 12112018 12112018 12312018 0 See 2015 CMM NPRRs

NPRR620Collateral Requirements for Counter-Parties with No Load or Generation

3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

NPRR660 Remove CRR State Change Adder 3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

Budget HealthSchedule Health

50

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018Project Number Projects in Execution Phase (Count = 42) Phase Start Baseline Go-

Live DateApproved Go-

Live DateScheduled

Go-Live DateScheduled

Phase Finish

NPRR741 Clarifications to TPE and EAL Credit Exposure Calculations 3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

NPRR749 Option Cost for Outstanding CRRs 882018 12132018 12132018 12132018 TBD 0 NA See 2015 CMM NPRRs

NPRR755 Data Agent-Only QSE Registration 3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

NPRR819Modification of Non-Price Error Resettlement Thresholds and Resettlement Clean-Ups

592018 892018 892018 892018 952018 0 36

NPRR833 Modify PTP Obligation Bid Clearing Change 882018 12132018 12132018 12132018 TBD 0 1

NPRR843Short-Term System Adequacy and AS Offer Disclosure Reports Additions

7182018 10252018 10252018 10252018 11282018 0 0

NPRR864 RUC Modifications to Consider Market-Based Solutions 6202018 10252018 10252018 10252018 11282018 0 4SCR777 Bilateral CRR Interface Enhancement 10262016 1022017 11192018 11192018 2272019 0 NA See 181-01

SCR781 RARF Replacement 12202017 4252018 12192018 12192018 12192018 0 3SCR791 Correction of 60-day SCED GRD Disclosure Report 522018 892018 892018 892018 952018 0 39SCR795 Addition of Intra-Hour Wind Forecast to GTBD Calculation 882018 10252018 10252018 10252018 11142018 0 0

Project Number Expedited Projects in Execution (Count = 34)

Project Number Projects in Stabilization (Count = 10) Execution

Phase StartBaseline Go-Live Target

Approved Go-Live Target

ActualGo-Live Date

Scheduled Execution Phase

Finish

NPRR648 Remove References to Flowgate Rights 3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR683 Revision to Available Credit Limit Calculation 3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR743 Revision to MCE to Have a Floor For Load Exposure 3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR760 Calculation of Exposure Variables For Days With No Activity 3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR776 Voltage Set Point Communication 9202017 3192018 452018 452018 952018 0 1

NPRR800Revisions to Credit Exposure Calculations to Use Electricity Futures Market Prices

3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR815Revise the Limitation of Load Resources Providing Responsive Reserve (RRS) Service

3212018 5312018 5312018 5312018 8292018 0 2

209-01 Multi Station Breaker to Breaker One Lines 282017 392018 532018 532018 8222018 0 -1259-01 DC SCADA and Metering Upgrade 10252017 1172018 7252018 7252018 8292018 0 22266-01 Remote Email Access Enhancement 12132017 372018 662018 6192018 9262018 2 -7 2 -9

Schedule Health Budget Health

Budget HealthSchedule Health

51

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018

Project Number Projects On Hold (Count = 2) Forecast

Start DateBaseline

Phase FinishApproved Go-

Live TargetScheduled

Go-Live DateScheduled

Phase Finish

SCR789 Update NMMS Topology Processor to PSSE 34 Capability 0

269-01Document Repository Redesign and Governance Implementation - Phase 1

0

Project Number Projects Completed (Count = 20)

Baseline Execution

Phase Start

Baseline Go-Live Target

Approved Go-Live Target

Actual Go-Live Date

Actual Execution Phase Finish

185-01 Records Management and eDiscovery 12152016 5242017 8292017 8222017 12132017 2 0224-01 TelAlert Replacement 452017 6272017 842017 842017 592018 0 5230-01 SAS Technical Architecture Redesign 312017 12132017 12132017 12132017 6272018 0 2234-01 Reporting Solution Resiliency (RSR) 452017 8232017 11272017 11272017 1102018 0 8240-01 EDI Translator and Mapping Replacement Assessment 4192017 9272017 2282018 TBD 372018 -2 20254-01 Retail Windows Upgrade 10112017 12182017 12182017 1222018 272018 1 -51 65255-01 Settlements Architecture Enhancements 10252017 1112018 1112018 1192018 2142018 1 -10 53258-01 WD Kainos SMART Automation Testing Tool 4112018 642018 642018 662018 7182018 -3 33271-01 Issue Tracking and Resolution Tool Assessment 12132017 4252018 4252018 TBD 522018 1 -5 -1272-01 Operator Training Simulator Black Start GE Effort 1262017 4252018 4252018 4272018 5162018 -1 19274-01 Average Mid-Term Load Forecast 372018 5312018 5312018 5312018 6272018 0 50

NPRR768Revisions to Real-Time On-Line Reliability Deployment Price Adder Categories

372018 5312018 5312018 5312018 6272018 0 16

NPRR778 Modifications to Date Change and Cancellation Evaluation Window 7192017 10292017 12112017 12112017 1312018 0 23

NPRR782Settlement of Infeasible Ancillary Services Due to Transmission Constraints

5242017 8312017 1122017 1122017 1102018 0 20

NPRR808 Three Year CRR Auction 8232017 9182017 9182017 912017 1312018 65 68

NPRR810Applicability of RMR Incentive Factor on Reservation and Transportation Costs Associated with Firm Fuel Supplies

7172017 11122017 3312018 3312018 3312018 0 NA See 233-00

NPRR830 Revision of 4-Coincident Peak Methodology 12132017 262018 262018 262018 372018 0 85

NPRR831 Inclusion of Private Use Networks in Load Zone Price Calculations 822017 1122017 1122017 1122017 2212018 0 33

OBDRR002 ORDC OBD Revisions for PUCT Project 47199 372018 5312018 5312018 5312018 6272018 0 See NPRR768

SCR792 Enhance Communications of BAAL Exceedances 2142018 452018 452018 452018 4252018 0 69

Project Number Expedited Projects Completed (Count = 23)

Budget HealthSchedule Health

Budget HealthSchedule Health

52

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018

Project Number 2018 Projects Not Yet Started (Count = 10) Forecast

Start Date

NPRR858 Provide Complete Current Operating Plan (COP) Data Aug-2018TBD 2018 OS Enhancements Aug-2018TBD Additional Branch Limit for Relays Aug-2018

NPRR817 Create a Panhandle Hub Sep-2018NPRR821 Elimination of the CRR Deration Process Oct-2018NPRR865 Publish RTM Shift Factors for Hubs Load Zones and DC Ties Oct-2018

SCR793SSR Related Telemetry for Transmission Service Provider (TSP) Operators

Oct-2018

ECAP ECAP - ECMS Implementation Phase 2 Oct-2018TBD Job Scheduler Update in CSI Framework Oct-2018TBD Parameter Estimation Oct-2018

53

  • Slide Number 1
  • Slide Number 2
  • Summary ndash July 2018
  • Daily Peak Demand Hourly Average Actual vs Forecast Wind Day-Ahead COPs amp On-Line Capacity at Peak ndash July 2018
  • Actual Wind Output plus Curtailments vs Wind Day-Ahead COPs for All Hours ndash July 2018
  • ERCOTrsquos CPS1 Monthly Performance ndash July 2018
  • Monthly Peak Actual Demand ndash July 2018
  • Monthly Minimum Actual 15-Minute Demand ndash July 2018
  • Day-Ahead Load Forecast Performance ndash July 2018
  • Reliability Unit Commitment (RUC) Capacity by Weather Zone ndash July 2018
  • Generic Transmission Constraints (GTCs) ndash July 2018
  • Advisories and Watches ndash July 2018 Corrected
  • Lake Levels Update ndash August 1 2018
  • Planning Summary ndash July 2018
  • Mapping of Counties to ERCOT Zones ndash July 2018
  • Cumulative MW Capacity of Interconnection Requests by Zone ndashJuly 2018
  • Cumulative MW Capacity of Interconnection Requests by Zone ndashJuly 2018
  • Cumulative MW Capacity of Interconnection Requests by Zone ndashJuly 2018
  • Wind Generation ndash July 2018
  • Solar Generation ndash July 2018
  • Generation Interconnection Activity by Fuel ndash July 2018
  • Generation Interconnection Activity by Project Phase ndash July 2018
  • Slide Number 23
  • Day-Ahead Schedule (Hourly Average) ndash July 2018
  • Percentage of Real-Time Load Hedged in the DAM (Counter-Party Level) ndash July 2018
  • DAM and RTM Price Convergence ndash July 2018
  • Day-Ahead Electricity and Ancillary Service Prices (Hourly Average) ndash July 2018
  • Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash July 2018
  • Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash July 2018
  • DRUC Monthly Summary (Hourly Average) ndash July 2018
  • HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash July 2018
  • NonndashSpinning Reserve Service Deployment ndash July 2018
  • CRR Price Convergence ndash July 2018
  • Daily Average System Lambda and ORDC Price Adders ndash July 2018
  • ERS Procurement for June 2018 ndash September 2018
  • Reliability Services ndash July 2018
  • Ancillary and Other Services ndash July 2018
  • Real-Time Ancillary Service Imbalance (ORDC) ndash July 2018
  • Energy Settlement ndash July 2018
  • Congestion Revenue Rights (CRR) ndash July 2018
  • CRR Balancing Account Fund ndash July 2018
  • Revenue Neutrality ndash July 2018
  • Net Allocation to Load ndash July 2018
  • Advanced Meter Settlement Impacts ndash July 2018
  • ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndash July 2018
  • Retail Transaction Volumes ndash Summary ndash July 2018
  • Retail Transaction Volumes ndash Summary ndash July 2018
  • Slide Number 48
  • ERCOT Portfolio Stoplight Report ndash July 2018
  • ERCOT Portfolio Stoplight Report ndash July 2018
  • ERCOT Portfolio Stoplight Report ndash July 2018
  • ERCOT Portfolio Stoplight Report ndash July 2018
  • ERCOT Portfolio Stoplight Report ndash July 2018
Retail Transactions Summary
July 2018 June 2018 May 2018 April 2018 March 2018 February 2018 January 2018 December 2017 November 2017 October 2017 September 2017 August 2017 July 2017 June 2017 May 2017 April 2017 March 2017 February 2017 January 2017 December 2016 November 2016 October 2016 September 2016 August 2016 July 2016 June 2016 May 2016 April 2016 March 2016 February 2016 January 2016 December 2015 November 2015 October 2015 September 2015 August 2015 July 2015 June 2015 May 2015 April 2015 March 2015 February 2015 January 2015 December 2014 November 2014 October 2014 September 2014 August 2014 July 2014 June 2014 May 2014 April 2014 March 2014 February 2014 January 2014 December 2013 November 2013 October 2013 September 2013 August 2013 July 2013 June 2013 May 2013 April 2013 March 2013 February 2013 January 2013 Grand total
814_01 - Switch Received 121926 109653 96828 81291 95159 76119 88933 60560 77860 78096 79502 84134 84059 108784 130828 71769 67845 66875 87140 66556 56202 64452 67323 86656 82923 86376 75323 70300 76235 68057 63954 61486 52887 65276 70342 81674 91211 102661 86229 81255 79997 73394 72885 71072 67080 110465 175164 89677 99568 101490 111077 91983 93887 71130 86953 69691 55957 166882 82415 93194 102562 103756 116086 78919 68950 64329 67116 1321827
Difference from previous month 12273 12825 15537 (13868) 19040 (12814) 28373 (17300) (236) (1406) (4632) 75 (24725) (22044) 59059 3924 970 (20265) 20584 10354 (8250) (2871) (19333) 3733 (3453) 11053 5023 (5935) 8178 4103 2468 8599 (12389) (5066) (11332) (9537) (11450) 16432 4974 1258 6603 509 1813 3992 (43385) (64699) 85487 (9891) (1922) (9587) 19094 (1904) 22757 (15823) 17262 13734 (110925) 84467 (10779) (9368) (1194) (12330) 37167 9969 4621 (2787)
814_16 - Move - Ins Received 270122 257125 244431 225380 224289 215281 230409 238340 207921 236397 244511 258046 252360 257759 237611 197865 217962 201984 202612 196236 201714 220958 231999 268781 241844 247481 214383 199804 218245 212474 193716 189862 181098 215908 229405 248124 263233 247089 208166 207932 215950 197765 198025 193973 178624 226283 231418 243482 251957 233679 223201 258649 214724 208160 207059 172981 178671 233469 216550 255967 249114 220397 216982 204412 197200 191955 194507 3162148
Difference from previous month 12997 12694 19051 1091 9008 (15128) (7931) 30419 (28476) (8114) (13535) 5686 (5399) 20148 39746 (20097) 15978 (628) 6376 (5478) (19244) (11041) (36782) 26937 (5637) 33098 14579 (18441) 5771 18758 3854 8764 (34810) (13497) (18719) (15109) 16144 38923 234 (8018) 18185 (260) 4052 15349 (47659) (5135) (12064) (8475) 18278 10478 (35448) 43925 6564 1101 34078 (5690) (54798) 16919 (39417) 6853 28717 3415 12570 7212 5245 (2552)
814_24 - MVO and MVO to CSA Received 129820 125861 124403 113795 108753 100127 111821 144987 100830 116519 129103 128104 127073 133582 127218 102055 111459 100285 101107 96289 100578 109493 114094 133170 122932 129025 118022 103789 109278 103747 96628 99552 96214 109578 117949 123894 133905 133855 114675 108275 108859 94864 98233 97901 89578 111857 115918 121662 131607 126785 119107 107956 107266 99428 104273 93385 93977 115469 115524 129594 135196 121446 120049 111598 106467 102429 104399 1660500
814_10 - DTP Mass Acquisition Received - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0
814_10 - DTP Mass Transition Received - 0 - 0 9033 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 639 - 0 - 0 4975 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0
814_18 - CSA AdditionDeletes Received 40217 62083 99016 55581 46720 42587 49740 47725 31726 52888 41597 40616 55770 43745 52139 26702 21791 39082 44030 38884 39856 31786 33061 42622 48489 64178 50499 59475 59400 48536 42179 40351 34796 34420 54677 35078 49489 59611 39384 44247 44577 35386 40420 54831 43550 45039 44268 40405 57954 64408 65032 80184 70310 41156 34811 46680 50347 71847 48606 52585 50867 62747 59763 34925 40977 40389 41227 747237
Total 562085 554722 573711 476047 474921 434114 480903 491612 418337 483900 494713 510900 519262 543870 547796 398391 419057 408226 434889 397965 398350 426689 446477 531229 496188 527060 458227 433368 463158 432814 396477 391251 364995 425182 472373 488770 537838 543216 448454 441709 449383 401409 409563 417777 378832 493644 566768 495865 541086 526362 523392 538772 486187 419874 433096 382737 378952 587667 463095 531340 537739 508346 512880 429854 413594 399102 407249 6891712
Counts from Monthly Retail Transaction report
To do
Break Out 814_10s - AQ and MT
Break Out 814_18 Additions from Deletes
Year-To-Date Transactions Received
Transaction Type July 2018 July 2017 July 2018 July 2017
Switches 669909 617300 121926 84059
Acquisition 0 0 0 0
Move - Ins 1667037 1568153 270122 252360
Move - Outs 814580 802779 129820 127073
Continuous Service Agreements (CSA) 395944 283259 40217 55770
Mass Transitions 9033 0 0 0
Total 3556503 3271491 562085 519262
There has been a change since this was created
Mass Acquisition has been broken out of Mass Transition
Page 19: ERCOT Monthly Operational Overvie · ERCOT Monthly Operational Overview (July 2018) Revised 08.22.18. ERCOT Public. August 15, 2018

PUBLIC

Wind Generation ndash July 2018

19

PUBLIC

Solar Generation ndash July 2018

20

PUBLIC

Generation Interconnection Activity by Fuel ndash July 2018

21

PUBLIC

Generation Interconnection Activity by Project Phase ndash July 2018

22

Market Operations

PUBLIC

Day-Ahead Schedule (Hourly Average) ndash July 2018

24

0

10000

20000

30000

40000

50000

60000

70000

80000

MW

Hour Ending

Scheduled Energy Only OfferScheduled Three-part OfferDAM Energy PurchaseRT System Load

Liquidity and activity are normal in the Day-Ahead Market

PUBLIC

Percentage of Real-Time Load Hedged in the DAM (Counter-Party Level) ndashJuly 2018

25

0

20

40

60

80

100

120Ja

nM

arM

ay Jul

Sep

Nov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May

July

2013 2014 2015 2016 2017 2018

The dotted lines represent the bounds for major outliers

PUBLIC

DAM and RTM Price Convergence ndash July 2018

26

-20

-10

0

10

20

30

40

50

60Ja

nM

arM

ay Jul

Sep

Nov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

l

2013 2014 2015 2016 2017 2018

Aver

age

DAM

-R

TM S

PP ($

MW

h)

The dotted lines represent the bounds for major outliers

PUBLIC

Day-Ahead Electricity and Ancillary Service Prices (Hourly Average) ndashJuly 2018

27

0

100

200

300

400

500

600

Pric

e ($

MW

h)

Hour Ending

Regulation Up

Regulation Down

Responsive Reserve

Non Spinning Reserve

DAM Power Balance Price(System Lambda)

Ancillary Service prices reflect the opportunity cost of energy

PUBLIC

Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash July 2018

28

0

100

200

300

400

500

600

Pric

e ($

MW

h)

Hour Ending

RTSPP - LZ West

RTSPP - LZ North

RTSPP - LZ South

RTSPP - LZ Houston

DASPP - LZ West

DASPP - LZ North

DASPP - LZ South

DASPP - LZ Houston

Prices reflect relative transmission congestion and system scarcity

PUBLIC

Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash July 2018

29

0

100

200

300

400

500

600

Pric

e ($

MW

h)

Hour Ending

RTSPP - Hub Average

DASPP - Hub Average

Energy prices reflect the risk premium between Day-Ahead amp Real-Time

PUBLIC

DRUC Monthly Summary (Hourly Average) ndash July 2018

30

0

15000

30000

45000

60000

75000

90000

MW

h

Hour Ending

Self Scheduled Capacity

Self Scheduled Ancillary Service Limit

Load Forecast

DRUC Recommended Capacity

31 executions (0 missed)0 published after 160011 minutes average execution time0 Resources committed

PUBLIC

HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash July 2018

31

0

02

04

06

08

1

0

20

40

60

80

100

RTO

RD

PA ($

MW

h)

MW

h

Hour Ending

744 executions (0 missed)8 minutes average execution time1 Resources committed through HRUC or by a Verbal Dispatch Instruction

The dotted line indicates the average RTORDPA

PUBLIC

NonndashSpinning Reserve Service Deployment ndash July 2018

32

Deployment Start Time

Deployment End Time

Deployment Duration (Hours)

Max Deployment(MW) Reason

NA

PUBLIC

CRR Price Convergence ndash July 2018

0

50

100

150

200

250

Mill

ions

$

Cost

Value

Congestion Revenue Right cost in auction convergence with payment in Day-Ahead Market and Real Time Market

33

PUBLIC

Daily Average System Lambda and ORDC Price Adders ndash July 2018

0

50

100

150

200

250

$M

Wh

Day of Month

RTOFFPA

RTORPA

SYSTEM_LAMBDA

34

PUBLIC

ERS Procurement for June 2018 ndash September 2018

TP1 TP2 TP3 TP4 TP5 TP6

Non Weather-Sensitive ERS-10 MW 160562 165996 143324 140708 156699 151138

Non Weather-Sensitive ERS-30 MW 736864 781559 702529 625067 755153 657394

Weather-Sensitive ERS-10 MW 0 0 0 0 0 0

Weather-Sensitive ERS-30 MW 0 0 11850 11850 0 0

Total MW Procured 897426 947555 857703 777625 911852 808532

Clearing Price $201 $185 $2108 $2177 $199 $225

Time Period Time Period Hours

Time Period 1 Hours Ending 0600 - 0800 (50000 am to 80000 am) Monday through Friday except ERCOT Holidays

Time Period 2 Hours Ending 0900 - 1300 (80000 am to 10000 pm) Monday through Friday except ERCOT Holidays

Time Period 3 Hours Ending 1400 - 1600 (10000 pm to 40000 pm) Monday through Friday except ERCOT Holidays

Time Period 4 Hours Ending 1700 - 1900 (40000 pm to 70000 pm) Monday through Friday except ERCOT Holidays

Time Period 5 Hours Ending 2000 - 2200 (70000 pm to 100000 pm) Monday through Friday except ERCOT Holidays Time Period 6 All other hours

35

PUBLIC

Reliability Services ndash July 2018

Reliability Unit Commitment (RUC) $ in Millions

RUC Make-Whole Payments $000

RUC Clawback Charges $000

RUC Commitment Settlement $000

RUC Capacity Short Charges $000

RUC Make-Whole Uplift $000

RUC Commitment Cost Allocation $000

RUC Decommitment Payments $000

Total RUC Allocation to Load $000

In July 2018 there was a credit of $000M allocated to load for RUC compared to bull A credit of $000M in June 2018bull A credit of $003M in July 2017

36

PUBLIC

Ancillary and Other Services ndash July 2018

Ancillary and Other Services $ in Millions

Regulation Up Service $1105

Regulation Down Service $072

Responsive Reserve Service $7177

Non-Spinning Reserve Service $1787

Black Start Service $059

Voltage Services - Reactive Power $000

Voltage Services - Lost Opportunity $000

Total Charges Allocated to Load $10200

In July 2018 Ancillary and Other Services was a charge of $10200M compared to bull A charge of $2001M in June 2018bull A charge of $2322M in July 2017

37

PUBLIC

Real-Time Ancillary Service Imbalance (ORDC) ndash July 2018

In July 2018 Real-Time Ancillary Service Imbalance was a charge to load of $2228K compared to bull A charge of $147K in June 2018bull A charge of $534K in July 2017

Real-Time Ancillary Service Imbalance $ in Thousands

Real-Time AS Imbalance ($2228)

Real-Time Reliability Deployment AS Imbalance $000

Total RTASI Amount Allocated to Load $2228

38

PUBLIC

Energy Settlement ndash July 2018

39

Day-Ahead Market Energy Settlement $ in Millions

Energy Purchases $215396

Point to Point Obligation Purchases $11726

Energy Sales ($212592)

Day-Ahead Congestion Rent $14531

Day-Ahead Market Make-Whole Payments ($001)

Real-Time Market Energy Settlement $ in Millions

Energy Imbalance at a Resource Node ($91963)

Energy Imbalance at a Load Zone $160737

Energy Imbalance at a Hub ($57497)

Net Real-Time Energy Imbalance $11276

Real Time Congestion from Self Schedules $013

Block Load Transfers and DC Ties ($2063)

Total Impact to Revenue Neutrality $9227

Load-Allocated Emergency Energy Payments ($016)

Load-Allocated Base Point Deviation Charges $026

Day-Ahead Market energy settlement activity increased from last month and increased from July 2017

Real-Time Market energy settlement activity increased from last month and increased from July 2017

PUBLIC

Congestion Revenue Rights (CRR) ndash July 2018

$ in Millions

Long-Term Auction ($4026)

Monthly Auction ($1773)

Total Auction Revenue ($5799)

Day-Ahead CRR Settlements ($15797)

Day-Ahead CRR Short-Charges $1885

Day-Ahead CRR Short-Charges Refunded ($899)

Day-Ahead CRR Short-Charges Net $986

Total CRR Funding ($14810)

Day-Ahead Point-to-Point Obligations $11726

Real-Time Point-to-Point Obligations ($10113)

Net Point-to-Point Obligations $1614

Congestion Revenue Rights settlement payments were not fully funded Partial funding to settle the CRR Short Charges was provided from the CRR Balancing Account Fund and the remaining $986M of CRR Short Charges were not refunded The CRR Fund Balance is now $0

Point to Point Obligations settled with a net charge of $1614M compared to a net credit of $1758M last month

40

PUBLIC

CRR Balancing Account Fund ndash July 2018

CRR Balancing Account $ in Millions

Monthly Day-Ahead Congestion Rent $14531

Monthly Day-Ahead CRR Settlements ($15797)

Monthly Day-Ahead CRR Short -Charges $1885

CRR Balancing Account Credit Total $619

Beginning Fund Balance for the Month $275

CRR Balancing Account Credit Total $619

Day-Ahead CRR Short-Charges Refunded ($899)

CRR PTP Option Award Charges $004

Load-Allocated CRR Amount $000

Total Fund Amount $000

41

PUBLIC

Revenue Neutrality ndash July 2018

Revenue Neutrality $ in Millions

Real-Time Energy Imbalance $11276

Real-Time Point to Point Obligation ($10113)

Real-Time Congestion from Self-Schedules $013

DC Tie amp Block Load Transfer ($2063)

Allocation to Load $886

In July 2018 the Revenue Neutrality charge to load was $886M compared to bull A charge of $3046M in June 2018bull A charge of $145M in July 2017

42

PUBLIC

Net Allocation to Load ndash July 2018

Market-Based Allocation $ in Millions

Reliability Unit Commitment $000

Ancillary and Other Services $10200

Real-Time Ancillary Service Imbalance $223

Emergency Energy $016

Base Point Deviation ($026)

CRR Auction Revenue ($5799)

CRR Balancing Account $000

Real-Time Revenue Neutrality $886

Reliability Must Run $000

Monthly Block Load Transfer $000

Total $5500

Fee AllocationERCOT Administrative Fee $2207

Net Allocated to Load $7707

In July 2018 the Net Allocation to load was a charge of $7707M compared to bull A charge of $2152M in June 2018bull A credit of $1363M in July 2017

43

PUBLIC

Advanced Meter Settlement Impacts ndash July 2018

July 2018 At month end settling 72M ESIIDs using Advanced Meter data

July 2018 990 of the load in ERCOT is settled with 15-min interval data (AMS Competitive IDR and NOIE IDR)

44

PUBLIC

ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndashJuly 2018

45

PUBLIC

Retail Transaction Volumes ndash Summary ndash July 2018

46

Transaction Type July 2018 July 2017 July 2018 July 2017

Switches 669909 617300 121926 84059

Acquisition 0 0 0 0

Move - Ins 1667037 1568153 270122 252360

Move - Outs 814580 802779 129820 127073

Continuous Service Agreements (CSA) 395944 283259 40217 55770

Mass Transitions 9033 0 0 0

Total 3556503 3271491 562085 519262

Year-To-Date Transactions Received

Board Presentation Input

Trans Volumes by Month_New

PUBLIC

Retail Transaction Volumes ndash Summary ndash July 2018

SwitchesAcquisitions Move-Ins

Move-Outs Mass Transition

47

Projects Report

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018

20000000$ 2018 Portfolio

Spending Estimate

Projects In FlightOn Hold (Count = 100) 24905011$

Projects Not Yet Started (Count = 10) 1320628$

Projects Completed (Count = 43) 795250$

(7020889)$

TOTAL 20000000$

Project Number Projects in Initiation Phase (Count = 4)

TBD IT Asset RecoveryNPRR842 Study Area Load Information

209-03 Study Network (STNET) Integration288-01 EDI Map and Translator Replacement

Impact Metric TolerancesUnfavorable variances are represented as negative numbers within the report - Green = No more than 49 unfavorable variance - Yellow = Unfavorable variance between 49 and 99 - Red = Unfavorable variance more than 99

Spending Reductions Required to Maintain Capital Budget

2018 Project Funding

Footnotes1 - One or more phases took longer than expected resulting in additional time required

2 - One or more phases required more labor than expected resulting in additional funding andor time required

3 - Project placed on holdNA - Metric not calculated because - it is reported at the parent project level or - it is an administrative project

Project Number Projects in Planning Phase (Count = 8) Phase Start Baseline

Phase FinishApproved

Phase FinishScheduled

Go-Live DateScheduled

Phase Finish

134-02 Privileged Account Management (PAM) Phase 2 882018 12192018 12192018 TBD 12192018 0 10

183-01 CMM-FT GUI Integration 12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs

242-01 Portfolio Reporting Assessment 1182017 12192018 12192018 TBD 12192018 0 21260-01 Information Governance Assessment 10182017 5302018 9192018 TBD 9192018 0 5286-01 Java Platform Assessment 6202018 11212018 11212018 TBD 11212018 0 6287-01 Security Constrained Unit Commitment (SCUC) 882018 2272019 2272019 TBD 2272019 0 -1

NPRR484Revisions to Congestion Revenue Rights Credit Calculations and Payments - Phase 1b 2

12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs

NPRR702Flexible Accounts Payment of Invoices and Disposition of Interest on Cash Collateral

12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs

Schedule Health Budget Health

49

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018Project Number Projects in Execution Phase (Count = 42) Phase Start Baseline Go-

Live DateApproved Go-

Live DateScheduled

Go-Live DateScheduled

Phase Finish

170-01 Enterprise Content Alignment Program 8262015 11152017 8312018 8312018 8312018 0 0170-06 ECAP - ECMS Implementation Phase 1 4252018 11302018 11302018 11302018 11302018 0 3173-02 ERCOT Flight Certification Website 11152017 2282019 2282019 2282019 5312019 0 2181-01 CRR Framework Upgrade 10262016 1022017 11192018 11192018 2272019 0 2

183-01 CMM Tech Refresh 3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

193-01 PMU Tool Evaluation and Implementation 12132017 892018 2152019 2152019 3202019 0 0196-01 GINR Project Status Application Replacement 12212016 9142017 2282019 2282019 3312019 0 1198-02 Reactive Power Coordination PoC 962017 6162018 8152018 8152018 8152018 0 54209-02 Weather Imaging and Line Observation (WILO) 5302018 212019 212019 212019 2272019 0 2210-01 REC Technology Refresh 8302017 3182018 12132018 12132018 1162019 0 3228-01 Enterprise Database Upgrade 882018 1292020 1292020 1292020 1292020 0 17229-01 IT Change and Configuration Management Phase 2 822017 6192018 12132018 12132018 3252019 0 2 -9238-01 Application Authentication Tech Refresh 962017 3192018 12132018 12132018 1302019 0 3239-01 Identity and Access Management 592018 3132019 3132019 3132019 3132019 0 2241-01 AREA - Generation 10112017 3302018 892018 892018 952018 0 -4244-01 Corporate Wireless 11292017 3282018 1252018 1252018 192019 0 9245-01 2017 EPS Metering Enhancements 6272018 892019 892019 892019 9252019 0 1246-01 iTest Data Refresh 12132017 1192018 11152018 11152018 122019 0 25249-01 Secondary Wind Forecasting Service 8302017 2282018 892018 892018 952018 0 0253-01 CIP Recovery Plan Project - Planning Phase 1 1312018 8292018 8292018 8292018 8292018 0 -2

257-01Security Constrained Optimal Powerflow in Study Network Analysis

1262017 10252018 10252018 10252018 1282018 0 19

261-01 Generic Transmission Constraint Calculation 372018 12132018 12132018 12132018 1232019 0 0263-01 Market Simulator 4112018 12132018 12132018 12132018 1302019 0 7265-01 Real-Time Assessment Continuity 1312018 12132018 12132018 12132018 1302019 0 0279-01 Cyber Security Project 24 6272018 10262018 10262018 10262018 11282018 0 0280-01 Quest Software Portfolio Transition 442018 6272018 9262018 9262018 9262018 0 13282-01 Synchronous Condenser Outage Modeling 662018 10252018 10252018 10252018 1252018 0 1Various 2015 CMM NPRRs 2 -18

NPRR519Exemption of ERS-Only QSEs from Collateral and Capitalization Requirements

3152017 5192018 12112018 12112018 12312018 0 See 2015 CMM NPRRs

NPRR620Collateral Requirements for Counter-Parties with No Load or Generation

3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

NPRR660 Remove CRR State Change Adder 3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

Budget HealthSchedule Health

50

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018Project Number Projects in Execution Phase (Count = 42) Phase Start Baseline Go-

Live DateApproved Go-

Live DateScheduled

Go-Live DateScheduled

Phase Finish

NPRR741 Clarifications to TPE and EAL Credit Exposure Calculations 3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

NPRR749 Option Cost for Outstanding CRRs 882018 12132018 12132018 12132018 TBD 0 NA See 2015 CMM NPRRs

NPRR755 Data Agent-Only QSE Registration 3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

NPRR819Modification of Non-Price Error Resettlement Thresholds and Resettlement Clean-Ups

592018 892018 892018 892018 952018 0 36

NPRR833 Modify PTP Obligation Bid Clearing Change 882018 12132018 12132018 12132018 TBD 0 1

NPRR843Short-Term System Adequacy and AS Offer Disclosure Reports Additions

7182018 10252018 10252018 10252018 11282018 0 0

NPRR864 RUC Modifications to Consider Market-Based Solutions 6202018 10252018 10252018 10252018 11282018 0 4SCR777 Bilateral CRR Interface Enhancement 10262016 1022017 11192018 11192018 2272019 0 NA See 181-01

SCR781 RARF Replacement 12202017 4252018 12192018 12192018 12192018 0 3SCR791 Correction of 60-day SCED GRD Disclosure Report 522018 892018 892018 892018 952018 0 39SCR795 Addition of Intra-Hour Wind Forecast to GTBD Calculation 882018 10252018 10252018 10252018 11142018 0 0

Project Number Expedited Projects in Execution (Count = 34)

Project Number Projects in Stabilization (Count = 10) Execution

Phase StartBaseline Go-Live Target

Approved Go-Live Target

ActualGo-Live Date

Scheduled Execution Phase

Finish

NPRR648 Remove References to Flowgate Rights 3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR683 Revision to Available Credit Limit Calculation 3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR743 Revision to MCE to Have a Floor For Load Exposure 3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR760 Calculation of Exposure Variables For Days With No Activity 3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR776 Voltage Set Point Communication 9202017 3192018 452018 452018 952018 0 1

NPRR800Revisions to Credit Exposure Calculations to Use Electricity Futures Market Prices

3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR815Revise the Limitation of Load Resources Providing Responsive Reserve (RRS) Service

3212018 5312018 5312018 5312018 8292018 0 2

209-01 Multi Station Breaker to Breaker One Lines 282017 392018 532018 532018 8222018 0 -1259-01 DC SCADA and Metering Upgrade 10252017 1172018 7252018 7252018 8292018 0 22266-01 Remote Email Access Enhancement 12132017 372018 662018 6192018 9262018 2 -7 2 -9

Schedule Health Budget Health

Budget HealthSchedule Health

51

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018

Project Number Projects On Hold (Count = 2) Forecast

Start DateBaseline

Phase FinishApproved Go-

Live TargetScheduled

Go-Live DateScheduled

Phase Finish

SCR789 Update NMMS Topology Processor to PSSE 34 Capability 0

269-01Document Repository Redesign and Governance Implementation - Phase 1

0

Project Number Projects Completed (Count = 20)

Baseline Execution

Phase Start

Baseline Go-Live Target

Approved Go-Live Target

Actual Go-Live Date

Actual Execution Phase Finish

185-01 Records Management and eDiscovery 12152016 5242017 8292017 8222017 12132017 2 0224-01 TelAlert Replacement 452017 6272017 842017 842017 592018 0 5230-01 SAS Technical Architecture Redesign 312017 12132017 12132017 12132017 6272018 0 2234-01 Reporting Solution Resiliency (RSR) 452017 8232017 11272017 11272017 1102018 0 8240-01 EDI Translator and Mapping Replacement Assessment 4192017 9272017 2282018 TBD 372018 -2 20254-01 Retail Windows Upgrade 10112017 12182017 12182017 1222018 272018 1 -51 65255-01 Settlements Architecture Enhancements 10252017 1112018 1112018 1192018 2142018 1 -10 53258-01 WD Kainos SMART Automation Testing Tool 4112018 642018 642018 662018 7182018 -3 33271-01 Issue Tracking and Resolution Tool Assessment 12132017 4252018 4252018 TBD 522018 1 -5 -1272-01 Operator Training Simulator Black Start GE Effort 1262017 4252018 4252018 4272018 5162018 -1 19274-01 Average Mid-Term Load Forecast 372018 5312018 5312018 5312018 6272018 0 50

NPRR768Revisions to Real-Time On-Line Reliability Deployment Price Adder Categories

372018 5312018 5312018 5312018 6272018 0 16

NPRR778 Modifications to Date Change and Cancellation Evaluation Window 7192017 10292017 12112017 12112017 1312018 0 23

NPRR782Settlement of Infeasible Ancillary Services Due to Transmission Constraints

5242017 8312017 1122017 1122017 1102018 0 20

NPRR808 Three Year CRR Auction 8232017 9182017 9182017 912017 1312018 65 68

NPRR810Applicability of RMR Incentive Factor on Reservation and Transportation Costs Associated with Firm Fuel Supplies

7172017 11122017 3312018 3312018 3312018 0 NA See 233-00

NPRR830 Revision of 4-Coincident Peak Methodology 12132017 262018 262018 262018 372018 0 85

NPRR831 Inclusion of Private Use Networks in Load Zone Price Calculations 822017 1122017 1122017 1122017 2212018 0 33

OBDRR002 ORDC OBD Revisions for PUCT Project 47199 372018 5312018 5312018 5312018 6272018 0 See NPRR768

SCR792 Enhance Communications of BAAL Exceedances 2142018 452018 452018 452018 4252018 0 69

Project Number Expedited Projects Completed (Count = 23)

Budget HealthSchedule Health

Budget HealthSchedule Health

52

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018

Project Number 2018 Projects Not Yet Started (Count = 10) Forecast

Start Date

NPRR858 Provide Complete Current Operating Plan (COP) Data Aug-2018TBD 2018 OS Enhancements Aug-2018TBD Additional Branch Limit for Relays Aug-2018

NPRR817 Create a Panhandle Hub Sep-2018NPRR821 Elimination of the CRR Deration Process Oct-2018NPRR865 Publish RTM Shift Factors for Hubs Load Zones and DC Ties Oct-2018

SCR793SSR Related Telemetry for Transmission Service Provider (TSP) Operators

Oct-2018

ECAP ECAP - ECMS Implementation Phase 2 Oct-2018TBD Job Scheduler Update in CSI Framework Oct-2018TBD Parameter Estimation Oct-2018

53

  • Slide Number 1
  • Slide Number 2
  • Summary ndash July 2018
  • Daily Peak Demand Hourly Average Actual vs Forecast Wind Day-Ahead COPs amp On-Line Capacity at Peak ndash July 2018
  • Actual Wind Output plus Curtailments vs Wind Day-Ahead COPs for All Hours ndash July 2018
  • ERCOTrsquos CPS1 Monthly Performance ndash July 2018
  • Monthly Peak Actual Demand ndash July 2018
  • Monthly Minimum Actual 15-Minute Demand ndash July 2018
  • Day-Ahead Load Forecast Performance ndash July 2018
  • Reliability Unit Commitment (RUC) Capacity by Weather Zone ndash July 2018
  • Generic Transmission Constraints (GTCs) ndash July 2018
  • Advisories and Watches ndash July 2018 Corrected
  • Lake Levels Update ndash August 1 2018
  • Planning Summary ndash July 2018
  • Mapping of Counties to ERCOT Zones ndash July 2018
  • Cumulative MW Capacity of Interconnection Requests by Zone ndashJuly 2018
  • Cumulative MW Capacity of Interconnection Requests by Zone ndashJuly 2018
  • Cumulative MW Capacity of Interconnection Requests by Zone ndashJuly 2018
  • Wind Generation ndash July 2018
  • Solar Generation ndash July 2018
  • Generation Interconnection Activity by Fuel ndash July 2018
  • Generation Interconnection Activity by Project Phase ndash July 2018
  • Slide Number 23
  • Day-Ahead Schedule (Hourly Average) ndash July 2018
  • Percentage of Real-Time Load Hedged in the DAM (Counter-Party Level) ndash July 2018
  • DAM and RTM Price Convergence ndash July 2018
  • Day-Ahead Electricity and Ancillary Service Prices (Hourly Average) ndash July 2018
  • Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash July 2018
  • Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash July 2018
  • DRUC Monthly Summary (Hourly Average) ndash July 2018
  • HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash July 2018
  • NonndashSpinning Reserve Service Deployment ndash July 2018
  • CRR Price Convergence ndash July 2018
  • Daily Average System Lambda and ORDC Price Adders ndash July 2018
  • ERS Procurement for June 2018 ndash September 2018
  • Reliability Services ndash July 2018
  • Ancillary and Other Services ndash July 2018
  • Real-Time Ancillary Service Imbalance (ORDC) ndash July 2018
  • Energy Settlement ndash July 2018
  • Congestion Revenue Rights (CRR) ndash July 2018
  • CRR Balancing Account Fund ndash July 2018
  • Revenue Neutrality ndash July 2018
  • Net Allocation to Load ndash July 2018
  • Advanced Meter Settlement Impacts ndash July 2018
  • ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndash July 2018
  • Retail Transaction Volumes ndash Summary ndash July 2018
  • Retail Transaction Volumes ndash Summary ndash July 2018
  • Slide Number 48
  • ERCOT Portfolio Stoplight Report ndash July 2018
  • ERCOT Portfolio Stoplight Report ndash July 2018
  • ERCOT Portfolio Stoplight Report ndash July 2018
  • ERCOT Portfolio Stoplight Report ndash July 2018
  • ERCOT Portfolio Stoplight Report ndash July 2018
Retail Transactions Summary
July 2018 June 2018 May 2018 April 2018 March 2018 February 2018 January 2018 December 2017 November 2017 October 2017 September 2017 August 2017 July 2017 June 2017 May 2017 April 2017 March 2017 February 2017 January 2017 December 2016 November 2016 October 2016 September 2016 August 2016 July 2016 June 2016 May 2016 April 2016 March 2016 February 2016 January 2016 December 2015 November 2015 October 2015 September 2015 August 2015 July 2015 June 2015 May 2015 April 2015 March 2015 February 2015 January 2015 December 2014 November 2014 October 2014 September 2014 August 2014 July 2014 June 2014 May 2014 April 2014 March 2014 February 2014 January 2014 December 2013 November 2013 October 2013 September 2013 August 2013 July 2013 June 2013 May 2013 April 2013 March 2013 February 2013 January 2013 Grand total
814_01 - Switch Received 121926 109653 96828 81291 95159 76119 88933 60560 77860 78096 79502 84134 84059 108784 130828 71769 67845 66875 87140 66556 56202 64452 67323 86656 82923 86376 75323 70300 76235 68057 63954 61486 52887 65276 70342 81674 91211 102661 86229 81255 79997 73394 72885 71072 67080 110465 175164 89677 99568 101490 111077 91983 93887 71130 86953 69691 55957 166882 82415 93194 102562 103756 116086 78919 68950 64329 67116 1321827
Difference from previous month 12273 12825 15537 (13868) 19040 (12814) 28373 (17300) (236) (1406) (4632) 75 (24725) (22044) 59059 3924 970 (20265) 20584 10354 (8250) (2871) (19333) 3733 (3453) 11053 5023 (5935) 8178 4103 2468 8599 (12389) (5066) (11332) (9537) (11450) 16432 4974 1258 6603 509 1813 3992 (43385) (64699) 85487 (9891) (1922) (9587) 19094 (1904) 22757 (15823) 17262 13734 (110925) 84467 (10779) (9368) (1194) (12330) 37167 9969 4621 (2787)
814_16 - Move - Ins Received 270122 257125 244431 225380 224289 215281 230409 238340 207921 236397 244511 258046 252360 257759 237611 197865 217962 201984 202612 196236 201714 220958 231999 268781 241844 247481 214383 199804 218245 212474 193716 189862 181098 215908 229405 248124 263233 247089 208166 207932 215950 197765 198025 193973 178624 226283 231418 243482 251957 233679 223201 258649 214724 208160 207059 172981 178671 233469 216550 255967 249114 220397 216982 204412 197200 191955 194507 3162148
Difference from previous month 12997 12694 19051 1091 9008 (15128) (7931) 30419 (28476) (8114) (13535) 5686 (5399) 20148 39746 (20097) 15978 (628) 6376 (5478) (19244) (11041) (36782) 26937 (5637) 33098 14579 (18441) 5771 18758 3854 8764 (34810) (13497) (18719) (15109) 16144 38923 234 (8018) 18185 (260) 4052 15349 (47659) (5135) (12064) (8475) 18278 10478 (35448) 43925 6564 1101 34078 (5690) (54798) 16919 (39417) 6853 28717 3415 12570 7212 5245 (2552)
814_24 - MVO and MVO to CSA Received 129820 125861 124403 113795 108753 100127 111821 144987 100830 116519 129103 128104 127073 133582 127218 102055 111459 100285 101107 96289 100578 109493 114094 133170 122932 129025 118022 103789 109278 103747 96628 99552 96214 109578 117949 123894 133905 133855 114675 108275 108859 94864 98233 97901 89578 111857 115918 121662 131607 126785 119107 107956 107266 99428 104273 93385 93977 115469 115524 129594 135196 121446 120049 111598 106467 102429 104399 1660500
814_10 - DTP Mass Acquisition Received - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0
814_10 - DTP Mass Transition Received - 0 - 0 9033 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 639 - 0 - 0 4975 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0
814_18 - CSA AdditionDeletes Received 40217 62083 99016 55581 46720 42587 49740 47725 31726 52888 41597 40616 55770 43745 52139 26702 21791 39082 44030 38884 39856 31786 33061 42622 48489 64178 50499 59475 59400 48536 42179 40351 34796 34420 54677 35078 49489 59611 39384 44247 44577 35386 40420 54831 43550 45039 44268 40405 57954 64408 65032 80184 70310 41156 34811 46680 50347 71847 48606 52585 50867 62747 59763 34925 40977 40389 41227 747237
Total 562085 554722 573711 476047 474921 434114 480903 491612 418337 483900 494713 510900 519262 543870 547796 398391 419057 408226 434889 397965 398350 426689 446477 531229 496188 527060 458227 433368 463158 432814 396477 391251 364995 425182 472373 488770 537838 543216 448454 441709 449383 401409 409563 417777 378832 493644 566768 495865 541086 526362 523392 538772 486187 419874 433096 382737 378952 587667 463095 531340 537739 508346 512880 429854 413594 399102 407249 6891712
Counts from Monthly Retail Transaction report
To do
Break Out 814_10s - AQ and MT
Break Out 814_18 Additions from Deletes
Year-To-Date Transactions Received
Transaction Type July 2018 July 2017 July 2018 July 2017
Switches 669909 617300 121926 84059
Acquisition 0 0 0 0
Move - Ins 1667037 1568153 270122 252360
Move - Outs 814580 802779 129820 127073
Continuous Service Agreements (CSA) 395944 283259 40217 55770
Mass Transitions 9033 0 0 0
Total 3556503 3271491 562085 519262
There has been a change since this was created
Mass Acquisition has been broken out of Mass Transition
Page 20: ERCOT Monthly Operational Overvie · ERCOT Monthly Operational Overview (July 2018) Revised 08.22.18. ERCOT Public. August 15, 2018

PUBLIC

Solar Generation ndash July 2018

20

PUBLIC

Generation Interconnection Activity by Fuel ndash July 2018

21

PUBLIC

Generation Interconnection Activity by Project Phase ndash July 2018

22

Market Operations

PUBLIC

Day-Ahead Schedule (Hourly Average) ndash July 2018

24

0

10000

20000

30000

40000

50000

60000

70000

80000

MW

Hour Ending

Scheduled Energy Only OfferScheduled Three-part OfferDAM Energy PurchaseRT System Load

Liquidity and activity are normal in the Day-Ahead Market

PUBLIC

Percentage of Real-Time Load Hedged in the DAM (Counter-Party Level) ndashJuly 2018

25

0

20

40

60

80

100

120Ja

nM

arM

ay Jul

Sep

Nov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May

July

2013 2014 2015 2016 2017 2018

The dotted lines represent the bounds for major outliers

PUBLIC

DAM and RTM Price Convergence ndash July 2018

26

-20

-10

0

10

20

30

40

50

60Ja

nM

arM

ay Jul

Sep

Nov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

l

2013 2014 2015 2016 2017 2018

Aver

age

DAM

-R

TM S

PP ($

MW

h)

The dotted lines represent the bounds for major outliers

PUBLIC

Day-Ahead Electricity and Ancillary Service Prices (Hourly Average) ndashJuly 2018

27

0

100

200

300

400

500

600

Pric

e ($

MW

h)

Hour Ending

Regulation Up

Regulation Down

Responsive Reserve

Non Spinning Reserve

DAM Power Balance Price(System Lambda)

Ancillary Service prices reflect the opportunity cost of energy

PUBLIC

Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash July 2018

28

0

100

200

300

400

500

600

Pric

e ($

MW

h)

Hour Ending

RTSPP - LZ West

RTSPP - LZ North

RTSPP - LZ South

RTSPP - LZ Houston

DASPP - LZ West

DASPP - LZ North

DASPP - LZ South

DASPP - LZ Houston

Prices reflect relative transmission congestion and system scarcity

PUBLIC

Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash July 2018

29

0

100

200

300

400

500

600

Pric

e ($

MW

h)

Hour Ending

RTSPP - Hub Average

DASPP - Hub Average

Energy prices reflect the risk premium between Day-Ahead amp Real-Time

PUBLIC

DRUC Monthly Summary (Hourly Average) ndash July 2018

30

0

15000

30000

45000

60000

75000

90000

MW

h

Hour Ending

Self Scheduled Capacity

Self Scheduled Ancillary Service Limit

Load Forecast

DRUC Recommended Capacity

31 executions (0 missed)0 published after 160011 minutes average execution time0 Resources committed

PUBLIC

HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash July 2018

31

0

02

04

06

08

1

0

20

40

60

80

100

RTO

RD

PA ($

MW

h)

MW

h

Hour Ending

744 executions (0 missed)8 minutes average execution time1 Resources committed through HRUC or by a Verbal Dispatch Instruction

The dotted line indicates the average RTORDPA

PUBLIC

NonndashSpinning Reserve Service Deployment ndash July 2018

32

Deployment Start Time

Deployment End Time

Deployment Duration (Hours)

Max Deployment(MW) Reason

NA

PUBLIC

CRR Price Convergence ndash July 2018

0

50

100

150

200

250

Mill

ions

$

Cost

Value

Congestion Revenue Right cost in auction convergence with payment in Day-Ahead Market and Real Time Market

33

PUBLIC

Daily Average System Lambda and ORDC Price Adders ndash July 2018

0

50

100

150

200

250

$M

Wh

Day of Month

RTOFFPA

RTORPA

SYSTEM_LAMBDA

34

PUBLIC

ERS Procurement for June 2018 ndash September 2018

TP1 TP2 TP3 TP4 TP5 TP6

Non Weather-Sensitive ERS-10 MW 160562 165996 143324 140708 156699 151138

Non Weather-Sensitive ERS-30 MW 736864 781559 702529 625067 755153 657394

Weather-Sensitive ERS-10 MW 0 0 0 0 0 0

Weather-Sensitive ERS-30 MW 0 0 11850 11850 0 0

Total MW Procured 897426 947555 857703 777625 911852 808532

Clearing Price $201 $185 $2108 $2177 $199 $225

Time Period Time Period Hours

Time Period 1 Hours Ending 0600 - 0800 (50000 am to 80000 am) Monday through Friday except ERCOT Holidays

Time Period 2 Hours Ending 0900 - 1300 (80000 am to 10000 pm) Monday through Friday except ERCOT Holidays

Time Period 3 Hours Ending 1400 - 1600 (10000 pm to 40000 pm) Monday through Friday except ERCOT Holidays

Time Period 4 Hours Ending 1700 - 1900 (40000 pm to 70000 pm) Monday through Friday except ERCOT Holidays

Time Period 5 Hours Ending 2000 - 2200 (70000 pm to 100000 pm) Monday through Friday except ERCOT Holidays Time Period 6 All other hours

35

PUBLIC

Reliability Services ndash July 2018

Reliability Unit Commitment (RUC) $ in Millions

RUC Make-Whole Payments $000

RUC Clawback Charges $000

RUC Commitment Settlement $000

RUC Capacity Short Charges $000

RUC Make-Whole Uplift $000

RUC Commitment Cost Allocation $000

RUC Decommitment Payments $000

Total RUC Allocation to Load $000

In July 2018 there was a credit of $000M allocated to load for RUC compared to bull A credit of $000M in June 2018bull A credit of $003M in July 2017

36

PUBLIC

Ancillary and Other Services ndash July 2018

Ancillary and Other Services $ in Millions

Regulation Up Service $1105

Regulation Down Service $072

Responsive Reserve Service $7177

Non-Spinning Reserve Service $1787

Black Start Service $059

Voltage Services - Reactive Power $000

Voltage Services - Lost Opportunity $000

Total Charges Allocated to Load $10200

In July 2018 Ancillary and Other Services was a charge of $10200M compared to bull A charge of $2001M in June 2018bull A charge of $2322M in July 2017

37

PUBLIC

Real-Time Ancillary Service Imbalance (ORDC) ndash July 2018

In July 2018 Real-Time Ancillary Service Imbalance was a charge to load of $2228K compared to bull A charge of $147K in June 2018bull A charge of $534K in July 2017

Real-Time Ancillary Service Imbalance $ in Thousands

Real-Time AS Imbalance ($2228)

Real-Time Reliability Deployment AS Imbalance $000

Total RTASI Amount Allocated to Load $2228

38

PUBLIC

Energy Settlement ndash July 2018

39

Day-Ahead Market Energy Settlement $ in Millions

Energy Purchases $215396

Point to Point Obligation Purchases $11726

Energy Sales ($212592)

Day-Ahead Congestion Rent $14531

Day-Ahead Market Make-Whole Payments ($001)

Real-Time Market Energy Settlement $ in Millions

Energy Imbalance at a Resource Node ($91963)

Energy Imbalance at a Load Zone $160737

Energy Imbalance at a Hub ($57497)

Net Real-Time Energy Imbalance $11276

Real Time Congestion from Self Schedules $013

Block Load Transfers and DC Ties ($2063)

Total Impact to Revenue Neutrality $9227

Load-Allocated Emergency Energy Payments ($016)

Load-Allocated Base Point Deviation Charges $026

Day-Ahead Market energy settlement activity increased from last month and increased from July 2017

Real-Time Market energy settlement activity increased from last month and increased from July 2017

PUBLIC

Congestion Revenue Rights (CRR) ndash July 2018

$ in Millions

Long-Term Auction ($4026)

Monthly Auction ($1773)

Total Auction Revenue ($5799)

Day-Ahead CRR Settlements ($15797)

Day-Ahead CRR Short-Charges $1885

Day-Ahead CRR Short-Charges Refunded ($899)

Day-Ahead CRR Short-Charges Net $986

Total CRR Funding ($14810)

Day-Ahead Point-to-Point Obligations $11726

Real-Time Point-to-Point Obligations ($10113)

Net Point-to-Point Obligations $1614

Congestion Revenue Rights settlement payments were not fully funded Partial funding to settle the CRR Short Charges was provided from the CRR Balancing Account Fund and the remaining $986M of CRR Short Charges were not refunded The CRR Fund Balance is now $0

Point to Point Obligations settled with a net charge of $1614M compared to a net credit of $1758M last month

40

PUBLIC

CRR Balancing Account Fund ndash July 2018

CRR Balancing Account $ in Millions

Monthly Day-Ahead Congestion Rent $14531

Monthly Day-Ahead CRR Settlements ($15797)

Monthly Day-Ahead CRR Short -Charges $1885

CRR Balancing Account Credit Total $619

Beginning Fund Balance for the Month $275

CRR Balancing Account Credit Total $619

Day-Ahead CRR Short-Charges Refunded ($899)

CRR PTP Option Award Charges $004

Load-Allocated CRR Amount $000

Total Fund Amount $000

41

PUBLIC

Revenue Neutrality ndash July 2018

Revenue Neutrality $ in Millions

Real-Time Energy Imbalance $11276

Real-Time Point to Point Obligation ($10113)

Real-Time Congestion from Self-Schedules $013

DC Tie amp Block Load Transfer ($2063)

Allocation to Load $886

In July 2018 the Revenue Neutrality charge to load was $886M compared to bull A charge of $3046M in June 2018bull A charge of $145M in July 2017

42

PUBLIC

Net Allocation to Load ndash July 2018

Market-Based Allocation $ in Millions

Reliability Unit Commitment $000

Ancillary and Other Services $10200

Real-Time Ancillary Service Imbalance $223

Emergency Energy $016

Base Point Deviation ($026)

CRR Auction Revenue ($5799)

CRR Balancing Account $000

Real-Time Revenue Neutrality $886

Reliability Must Run $000

Monthly Block Load Transfer $000

Total $5500

Fee AllocationERCOT Administrative Fee $2207

Net Allocated to Load $7707

In July 2018 the Net Allocation to load was a charge of $7707M compared to bull A charge of $2152M in June 2018bull A credit of $1363M in July 2017

43

PUBLIC

Advanced Meter Settlement Impacts ndash July 2018

July 2018 At month end settling 72M ESIIDs using Advanced Meter data

July 2018 990 of the load in ERCOT is settled with 15-min interval data (AMS Competitive IDR and NOIE IDR)

44

PUBLIC

ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndashJuly 2018

45

PUBLIC

Retail Transaction Volumes ndash Summary ndash July 2018

46

Transaction Type July 2018 July 2017 July 2018 July 2017

Switches 669909 617300 121926 84059

Acquisition 0 0 0 0

Move - Ins 1667037 1568153 270122 252360

Move - Outs 814580 802779 129820 127073

Continuous Service Agreements (CSA) 395944 283259 40217 55770

Mass Transitions 9033 0 0 0

Total 3556503 3271491 562085 519262

Year-To-Date Transactions Received

Board Presentation Input

Trans Volumes by Month_New

PUBLIC

Retail Transaction Volumes ndash Summary ndash July 2018

SwitchesAcquisitions Move-Ins

Move-Outs Mass Transition

47

Projects Report

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018

20000000$ 2018 Portfolio

Spending Estimate

Projects In FlightOn Hold (Count = 100) 24905011$

Projects Not Yet Started (Count = 10) 1320628$

Projects Completed (Count = 43) 795250$

(7020889)$

TOTAL 20000000$

Project Number Projects in Initiation Phase (Count = 4)

TBD IT Asset RecoveryNPRR842 Study Area Load Information

209-03 Study Network (STNET) Integration288-01 EDI Map and Translator Replacement

Impact Metric TolerancesUnfavorable variances are represented as negative numbers within the report - Green = No more than 49 unfavorable variance - Yellow = Unfavorable variance between 49 and 99 - Red = Unfavorable variance more than 99

Spending Reductions Required to Maintain Capital Budget

2018 Project Funding

Footnotes1 - One or more phases took longer than expected resulting in additional time required

2 - One or more phases required more labor than expected resulting in additional funding andor time required

3 - Project placed on holdNA - Metric not calculated because - it is reported at the parent project level or - it is an administrative project

Project Number Projects in Planning Phase (Count = 8) Phase Start Baseline

Phase FinishApproved

Phase FinishScheduled

Go-Live DateScheduled

Phase Finish

134-02 Privileged Account Management (PAM) Phase 2 882018 12192018 12192018 TBD 12192018 0 10

183-01 CMM-FT GUI Integration 12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs

242-01 Portfolio Reporting Assessment 1182017 12192018 12192018 TBD 12192018 0 21260-01 Information Governance Assessment 10182017 5302018 9192018 TBD 9192018 0 5286-01 Java Platform Assessment 6202018 11212018 11212018 TBD 11212018 0 6287-01 Security Constrained Unit Commitment (SCUC) 882018 2272019 2272019 TBD 2272019 0 -1

NPRR484Revisions to Congestion Revenue Rights Credit Calculations and Payments - Phase 1b 2

12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs

NPRR702Flexible Accounts Payment of Invoices and Disposition of Interest on Cash Collateral

12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs

Schedule Health Budget Health

49

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018Project Number Projects in Execution Phase (Count = 42) Phase Start Baseline Go-

Live DateApproved Go-

Live DateScheduled

Go-Live DateScheduled

Phase Finish

170-01 Enterprise Content Alignment Program 8262015 11152017 8312018 8312018 8312018 0 0170-06 ECAP - ECMS Implementation Phase 1 4252018 11302018 11302018 11302018 11302018 0 3173-02 ERCOT Flight Certification Website 11152017 2282019 2282019 2282019 5312019 0 2181-01 CRR Framework Upgrade 10262016 1022017 11192018 11192018 2272019 0 2

183-01 CMM Tech Refresh 3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

193-01 PMU Tool Evaluation and Implementation 12132017 892018 2152019 2152019 3202019 0 0196-01 GINR Project Status Application Replacement 12212016 9142017 2282019 2282019 3312019 0 1198-02 Reactive Power Coordination PoC 962017 6162018 8152018 8152018 8152018 0 54209-02 Weather Imaging and Line Observation (WILO) 5302018 212019 212019 212019 2272019 0 2210-01 REC Technology Refresh 8302017 3182018 12132018 12132018 1162019 0 3228-01 Enterprise Database Upgrade 882018 1292020 1292020 1292020 1292020 0 17229-01 IT Change and Configuration Management Phase 2 822017 6192018 12132018 12132018 3252019 0 2 -9238-01 Application Authentication Tech Refresh 962017 3192018 12132018 12132018 1302019 0 3239-01 Identity and Access Management 592018 3132019 3132019 3132019 3132019 0 2241-01 AREA - Generation 10112017 3302018 892018 892018 952018 0 -4244-01 Corporate Wireless 11292017 3282018 1252018 1252018 192019 0 9245-01 2017 EPS Metering Enhancements 6272018 892019 892019 892019 9252019 0 1246-01 iTest Data Refresh 12132017 1192018 11152018 11152018 122019 0 25249-01 Secondary Wind Forecasting Service 8302017 2282018 892018 892018 952018 0 0253-01 CIP Recovery Plan Project - Planning Phase 1 1312018 8292018 8292018 8292018 8292018 0 -2

257-01Security Constrained Optimal Powerflow in Study Network Analysis

1262017 10252018 10252018 10252018 1282018 0 19

261-01 Generic Transmission Constraint Calculation 372018 12132018 12132018 12132018 1232019 0 0263-01 Market Simulator 4112018 12132018 12132018 12132018 1302019 0 7265-01 Real-Time Assessment Continuity 1312018 12132018 12132018 12132018 1302019 0 0279-01 Cyber Security Project 24 6272018 10262018 10262018 10262018 11282018 0 0280-01 Quest Software Portfolio Transition 442018 6272018 9262018 9262018 9262018 0 13282-01 Synchronous Condenser Outage Modeling 662018 10252018 10252018 10252018 1252018 0 1Various 2015 CMM NPRRs 2 -18

NPRR519Exemption of ERS-Only QSEs from Collateral and Capitalization Requirements

3152017 5192018 12112018 12112018 12312018 0 See 2015 CMM NPRRs

NPRR620Collateral Requirements for Counter-Parties with No Load or Generation

3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

NPRR660 Remove CRR State Change Adder 3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

Budget HealthSchedule Health

50

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018Project Number Projects in Execution Phase (Count = 42) Phase Start Baseline Go-

Live DateApproved Go-

Live DateScheduled

Go-Live DateScheduled

Phase Finish

NPRR741 Clarifications to TPE and EAL Credit Exposure Calculations 3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

NPRR749 Option Cost for Outstanding CRRs 882018 12132018 12132018 12132018 TBD 0 NA See 2015 CMM NPRRs

NPRR755 Data Agent-Only QSE Registration 3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

NPRR819Modification of Non-Price Error Resettlement Thresholds and Resettlement Clean-Ups

592018 892018 892018 892018 952018 0 36

NPRR833 Modify PTP Obligation Bid Clearing Change 882018 12132018 12132018 12132018 TBD 0 1

NPRR843Short-Term System Adequacy and AS Offer Disclosure Reports Additions

7182018 10252018 10252018 10252018 11282018 0 0

NPRR864 RUC Modifications to Consider Market-Based Solutions 6202018 10252018 10252018 10252018 11282018 0 4SCR777 Bilateral CRR Interface Enhancement 10262016 1022017 11192018 11192018 2272019 0 NA See 181-01

SCR781 RARF Replacement 12202017 4252018 12192018 12192018 12192018 0 3SCR791 Correction of 60-day SCED GRD Disclosure Report 522018 892018 892018 892018 952018 0 39SCR795 Addition of Intra-Hour Wind Forecast to GTBD Calculation 882018 10252018 10252018 10252018 11142018 0 0

Project Number Expedited Projects in Execution (Count = 34)

Project Number Projects in Stabilization (Count = 10) Execution

Phase StartBaseline Go-Live Target

Approved Go-Live Target

ActualGo-Live Date

Scheduled Execution Phase

Finish

NPRR648 Remove References to Flowgate Rights 3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR683 Revision to Available Credit Limit Calculation 3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR743 Revision to MCE to Have a Floor For Load Exposure 3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR760 Calculation of Exposure Variables For Days With No Activity 3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR776 Voltage Set Point Communication 9202017 3192018 452018 452018 952018 0 1

NPRR800Revisions to Credit Exposure Calculations to Use Electricity Futures Market Prices

3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR815Revise the Limitation of Load Resources Providing Responsive Reserve (RRS) Service

3212018 5312018 5312018 5312018 8292018 0 2

209-01 Multi Station Breaker to Breaker One Lines 282017 392018 532018 532018 8222018 0 -1259-01 DC SCADA and Metering Upgrade 10252017 1172018 7252018 7252018 8292018 0 22266-01 Remote Email Access Enhancement 12132017 372018 662018 6192018 9262018 2 -7 2 -9

Schedule Health Budget Health

Budget HealthSchedule Health

51

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018

Project Number Projects On Hold (Count = 2) Forecast

Start DateBaseline

Phase FinishApproved Go-

Live TargetScheduled

Go-Live DateScheduled

Phase Finish

SCR789 Update NMMS Topology Processor to PSSE 34 Capability 0

269-01Document Repository Redesign and Governance Implementation - Phase 1

0

Project Number Projects Completed (Count = 20)

Baseline Execution

Phase Start

Baseline Go-Live Target

Approved Go-Live Target

Actual Go-Live Date

Actual Execution Phase Finish

185-01 Records Management and eDiscovery 12152016 5242017 8292017 8222017 12132017 2 0224-01 TelAlert Replacement 452017 6272017 842017 842017 592018 0 5230-01 SAS Technical Architecture Redesign 312017 12132017 12132017 12132017 6272018 0 2234-01 Reporting Solution Resiliency (RSR) 452017 8232017 11272017 11272017 1102018 0 8240-01 EDI Translator and Mapping Replacement Assessment 4192017 9272017 2282018 TBD 372018 -2 20254-01 Retail Windows Upgrade 10112017 12182017 12182017 1222018 272018 1 -51 65255-01 Settlements Architecture Enhancements 10252017 1112018 1112018 1192018 2142018 1 -10 53258-01 WD Kainos SMART Automation Testing Tool 4112018 642018 642018 662018 7182018 -3 33271-01 Issue Tracking and Resolution Tool Assessment 12132017 4252018 4252018 TBD 522018 1 -5 -1272-01 Operator Training Simulator Black Start GE Effort 1262017 4252018 4252018 4272018 5162018 -1 19274-01 Average Mid-Term Load Forecast 372018 5312018 5312018 5312018 6272018 0 50

NPRR768Revisions to Real-Time On-Line Reliability Deployment Price Adder Categories

372018 5312018 5312018 5312018 6272018 0 16

NPRR778 Modifications to Date Change and Cancellation Evaluation Window 7192017 10292017 12112017 12112017 1312018 0 23

NPRR782Settlement of Infeasible Ancillary Services Due to Transmission Constraints

5242017 8312017 1122017 1122017 1102018 0 20

NPRR808 Three Year CRR Auction 8232017 9182017 9182017 912017 1312018 65 68

NPRR810Applicability of RMR Incentive Factor on Reservation and Transportation Costs Associated with Firm Fuel Supplies

7172017 11122017 3312018 3312018 3312018 0 NA See 233-00

NPRR830 Revision of 4-Coincident Peak Methodology 12132017 262018 262018 262018 372018 0 85

NPRR831 Inclusion of Private Use Networks in Load Zone Price Calculations 822017 1122017 1122017 1122017 2212018 0 33

OBDRR002 ORDC OBD Revisions for PUCT Project 47199 372018 5312018 5312018 5312018 6272018 0 See NPRR768

SCR792 Enhance Communications of BAAL Exceedances 2142018 452018 452018 452018 4252018 0 69

Project Number Expedited Projects Completed (Count = 23)

Budget HealthSchedule Health

Budget HealthSchedule Health

52

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018

Project Number 2018 Projects Not Yet Started (Count = 10) Forecast

Start Date

NPRR858 Provide Complete Current Operating Plan (COP) Data Aug-2018TBD 2018 OS Enhancements Aug-2018TBD Additional Branch Limit for Relays Aug-2018

NPRR817 Create a Panhandle Hub Sep-2018NPRR821 Elimination of the CRR Deration Process Oct-2018NPRR865 Publish RTM Shift Factors for Hubs Load Zones and DC Ties Oct-2018

SCR793SSR Related Telemetry for Transmission Service Provider (TSP) Operators

Oct-2018

ECAP ECAP - ECMS Implementation Phase 2 Oct-2018TBD Job Scheduler Update in CSI Framework Oct-2018TBD Parameter Estimation Oct-2018

53

  • Slide Number 1
  • Slide Number 2
  • Summary ndash July 2018
  • Daily Peak Demand Hourly Average Actual vs Forecast Wind Day-Ahead COPs amp On-Line Capacity at Peak ndash July 2018
  • Actual Wind Output plus Curtailments vs Wind Day-Ahead COPs for All Hours ndash July 2018
  • ERCOTrsquos CPS1 Monthly Performance ndash July 2018
  • Monthly Peak Actual Demand ndash July 2018
  • Monthly Minimum Actual 15-Minute Demand ndash July 2018
  • Day-Ahead Load Forecast Performance ndash July 2018
  • Reliability Unit Commitment (RUC) Capacity by Weather Zone ndash July 2018
  • Generic Transmission Constraints (GTCs) ndash July 2018
  • Advisories and Watches ndash July 2018 Corrected
  • Lake Levels Update ndash August 1 2018
  • Planning Summary ndash July 2018
  • Mapping of Counties to ERCOT Zones ndash July 2018
  • Cumulative MW Capacity of Interconnection Requests by Zone ndashJuly 2018
  • Cumulative MW Capacity of Interconnection Requests by Zone ndashJuly 2018
  • Cumulative MW Capacity of Interconnection Requests by Zone ndashJuly 2018
  • Wind Generation ndash July 2018
  • Solar Generation ndash July 2018
  • Generation Interconnection Activity by Fuel ndash July 2018
  • Generation Interconnection Activity by Project Phase ndash July 2018
  • Slide Number 23
  • Day-Ahead Schedule (Hourly Average) ndash July 2018
  • Percentage of Real-Time Load Hedged in the DAM (Counter-Party Level) ndash July 2018
  • DAM and RTM Price Convergence ndash July 2018
  • Day-Ahead Electricity and Ancillary Service Prices (Hourly Average) ndash July 2018
  • Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash July 2018
  • Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash July 2018
  • DRUC Monthly Summary (Hourly Average) ndash July 2018
  • HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash July 2018
  • NonndashSpinning Reserve Service Deployment ndash July 2018
  • CRR Price Convergence ndash July 2018
  • Daily Average System Lambda and ORDC Price Adders ndash July 2018
  • ERS Procurement for June 2018 ndash September 2018
  • Reliability Services ndash July 2018
  • Ancillary and Other Services ndash July 2018
  • Real-Time Ancillary Service Imbalance (ORDC) ndash July 2018
  • Energy Settlement ndash July 2018
  • Congestion Revenue Rights (CRR) ndash July 2018
  • CRR Balancing Account Fund ndash July 2018
  • Revenue Neutrality ndash July 2018
  • Net Allocation to Load ndash July 2018
  • Advanced Meter Settlement Impacts ndash July 2018
  • ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndash July 2018
  • Retail Transaction Volumes ndash Summary ndash July 2018
  • Retail Transaction Volumes ndash Summary ndash July 2018
  • Slide Number 48
  • ERCOT Portfolio Stoplight Report ndash July 2018
  • ERCOT Portfolio Stoplight Report ndash July 2018
  • ERCOT Portfolio Stoplight Report ndash July 2018
  • ERCOT Portfolio Stoplight Report ndash July 2018
  • ERCOT Portfolio Stoplight Report ndash July 2018
Retail Transactions Summary
July 2018 June 2018 May 2018 April 2018 March 2018 February 2018 January 2018 December 2017 November 2017 October 2017 September 2017 August 2017 July 2017 June 2017 May 2017 April 2017 March 2017 February 2017 January 2017 December 2016 November 2016 October 2016 September 2016 August 2016 July 2016 June 2016 May 2016 April 2016 March 2016 February 2016 January 2016 December 2015 November 2015 October 2015 September 2015 August 2015 July 2015 June 2015 May 2015 April 2015 March 2015 February 2015 January 2015 December 2014 November 2014 October 2014 September 2014 August 2014 July 2014 June 2014 May 2014 April 2014 March 2014 February 2014 January 2014 December 2013 November 2013 October 2013 September 2013 August 2013 July 2013 June 2013 May 2013 April 2013 March 2013 February 2013 January 2013 Grand total
814_01 - Switch Received 121926 109653 96828 81291 95159 76119 88933 60560 77860 78096 79502 84134 84059 108784 130828 71769 67845 66875 87140 66556 56202 64452 67323 86656 82923 86376 75323 70300 76235 68057 63954 61486 52887 65276 70342 81674 91211 102661 86229 81255 79997 73394 72885 71072 67080 110465 175164 89677 99568 101490 111077 91983 93887 71130 86953 69691 55957 166882 82415 93194 102562 103756 116086 78919 68950 64329 67116 1321827
Difference from previous month 12273 12825 15537 (13868) 19040 (12814) 28373 (17300) (236) (1406) (4632) 75 (24725) (22044) 59059 3924 970 (20265) 20584 10354 (8250) (2871) (19333) 3733 (3453) 11053 5023 (5935) 8178 4103 2468 8599 (12389) (5066) (11332) (9537) (11450) 16432 4974 1258 6603 509 1813 3992 (43385) (64699) 85487 (9891) (1922) (9587) 19094 (1904) 22757 (15823) 17262 13734 (110925) 84467 (10779) (9368) (1194) (12330) 37167 9969 4621 (2787)
814_16 - Move - Ins Received 270122 257125 244431 225380 224289 215281 230409 238340 207921 236397 244511 258046 252360 257759 237611 197865 217962 201984 202612 196236 201714 220958 231999 268781 241844 247481 214383 199804 218245 212474 193716 189862 181098 215908 229405 248124 263233 247089 208166 207932 215950 197765 198025 193973 178624 226283 231418 243482 251957 233679 223201 258649 214724 208160 207059 172981 178671 233469 216550 255967 249114 220397 216982 204412 197200 191955 194507 3162148
Difference from previous month 12997 12694 19051 1091 9008 (15128) (7931) 30419 (28476) (8114) (13535) 5686 (5399) 20148 39746 (20097) 15978 (628) 6376 (5478) (19244) (11041) (36782) 26937 (5637) 33098 14579 (18441) 5771 18758 3854 8764 (34810) (13497) (18719) (15109) 16144 38923 234 (8018) 18185 (260) 4052 15349 (47659) (5135) (12064) (8475) 18278 10478 (35448) 43925 6564 1101 34078 (5690) (54798) 16919 (39417) 6853 28717 3415 12570 7212 5245 (2552)
814_24 - MVO and MVO to CSA Received 129820 125861 124403 113795 108753 100127 111821 144987 100830 116519 129103 128104 127073 133582 127218 102055 111459 100285 101107 96289 100578 109493 114094 133170 122932 129025 118022 103789 109278 103747 96628 99552 96214 109578 117949 123894 133905 133855 114675 108275 108859 94864 98233 97901 89578 111857 115918 121662 131607 126785 119107 107956 107266 99428 104273 93385 93977 115469 115524 129594 135196 121446 120049 111598 106467 102429 104399 1660500
814_10 - DTP Mass Acquisition Received - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0
814_10 - DTP Mass Transition Received - 0 - 0 9033 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 639 - 0 - 0 4975 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0
814_18 - CSA AdditionDeletes Received 40217 62083 99016 55581 46720 42587 49740 47725 31726 52888 41597 40616 55770 43745 52139 26702 21791 39082 44030 38884 39856 31786 33061 42622 48489 64178 50499 59475 59400 48536 42179 40351 34796 34420 54677 35078 49489 59611 39384 44247 44577 35386 40420 54831 43550 45039 44268 40405 57954 64408 65032 80184 70310 41156 34811 46680 50347 71847 48606 52585 50867 62747 59763 34925 40977 40389 41227 747237
Total 562085 554722 573711 476047 474921 434114 480903 491612 418337 483900 494713 510900 519262 543870 547796 398391 419057 408226 434889 397965 398350 426689 446477 531229 496188 527060 458227 433368 463158 432814 396477 391251 364995 425182 472373 488770 537838 543216 448454 441709 449383 401409 409563 417777 378832 493644 566768 495865 541086 526362 523392 538772 486187 419874 433096 382737 378952 587667 463095 531340 537739 508346 512880 429854 413594 399102 407249 6891712
Counts from Monthly Retail Transaction report
To do
Break Out 814_10s - AQ and MT
Break Out 814_18 Additions from Deletes
Year-To-Date Transactions Received
Transaction Type July 2018 July 2017 July 2018 July 2017
Switches 669909 617300 121926 84059
Acquisition 0 0 0 0
Move - Ins 1667037 1568153 270122 252360
Move - Outs 814580 802779 129820 127073
Continuous Service Agreements (CSA) 395944 283259 40217 55770
Mass Transitions 9033 0 0 0
Total 3556503 3271491 562085 519262
There has been a change since this was created
Mass Acquisition has been broken out of Mass Transition
Page 21: ERCOT Monthly Operational Overvie · ERCOT Monthly Operational Overview (July 2018) Revised 08.22.18. ERCOT Public. August 15, 2018

PUBLIC

Generation Interconnection Activity by Fuel ndash July 2018

21

PUBLIC

Generation Interconnection Activity by Project Phase ndash July 2018

22

Market Operations

PUBLIC

Day-Ahead Schedule (Hourly Average) ndash July 2018

24

0

10000

20000

30000

40000

50000

60000

70000

80000

MW

Hour Ending

Scheduled Energy Only OfferScheduled Three-part OfferDAM Energy PurchaseRT System Load

Liquidity and activity are normal in the Day-Ahead Market

PUBLIC

Percentage of Real-Time Load Hedged in the DAM (Counter-Party Level) ndashJuly 2018

25

0

20

40

60

80

100

120Ja

nM

arM

ay Jul

Sep

Nov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May

July

2013 2014 2015 2016 2017 2018

The dotted lines represent the bounds for major outliers

PUBLIC

DAM and RTM Price Convergence ndash July 2018

26

-20

-10

0

10

20

30

40

50

60Ja

nM

arM

ay Jul

Sep

Nov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

l

2013 2014 2015 2016 2017 2018

Aver

age

DAM

-R

TM S

PP ($

MW

h)

The dotted lines represent the bounds for major outliers

PUBLIC

Day-Ahead Electricity and Ancillary Service Prices (Hourly Average) ndashJuly 2018

27

0

100

200

300

400

500

600

Pric

e ($

MW

h)

Hour Ending

Regulation Up

Regulation Down

Responsive Reserve

Non Spinning Reserve

DAM Power Balance Price(System Lambda)

Ancillary Service prices reflect the opportunity cost of energy

PUBLIC

Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash July 2018

28

0

100

200

300

400

500

600

Pric

e ($

MW

h)

Hour Ending

RTSPP - LZ West

RTSPP - LZ North

RTSPP - LZ South

RTSPP - LZ Houston

DASPP - LZ West

DASPP - LZ North

DASPP - LZ South

DASPP - LZ Houston

Prices reflect relative transmission congestion and system scarcity

PUBLIC

Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash July 2018

29

0

100

200

300

400

500

600

Pric

e ($

MW

h)

Hour Ending

RTSPP - Hub Average

DASPP - Hub Average

Energy prices reflect the risk premium between Day-Ahead amp Real-Time

PUBLIC

DRUC Monthly Summary (Hourly Average) ndash July 2018

30

0

15000

30000

45000

60000

75000

90000

MW

h

Hour Ending

Self Scheduled Capacity

Self Scheduled Ancillary Service Limit

Load Forecast

DRUC Recommended Capacity

31 executions (0 missed)0 published after 160011 minutes average execution time0 Resources committed

PUBLIC

HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash July 2018

31

0

02

04

06

08

1

0

20

40

60

80

100

RTO

RD

PA ($

MW

h)

MW

h

Hour Ending

744 executions (0 missed)8 minutes average execution time1 Resources committed through HRUC or by a Verbal Dispatch Instruction

The dotted line indicates the average RTORDPA

PUBLIC

NonndashSpinning Reserve Service Deployment ndash July 2018

32

Deployment Start Time

Deployment End Time

Deployment Duration (Hours)

Max Deployment(MW) Reason

NA

PUBLIC

CRR Price Convergence ndash July 2018

0

50

100

150

200

250

Mill

ions

$

Cost

Value

Congestion Revenue Right cost in auction convergence with payment in Day-Ahead Market and Real Time Market

33

PUBLIC

Daily Average System Lambda and ORDC Price Adders ndash July 2018

0

50

100

150

200

250

$M

Wh

Day of Month

RTOFFPA

RTORPA

SYSTEM_LAMBDA

34

PUBLIC

ERS Procurement for June 2018 ndash September 2018

TP1 TP2 TP3 TP4 TP5 TP6

Non Weather-Sensitive ERS-10 MW 160562 165996 143324 140708 156699 151138

Non Weather-Sensitive ERS-30 MW 736864 781559 702529 625067 755153 657394

Weather-Sensitive ERS-10 MW 0 0 0 0 0 0

Weather-Sensitive ERS-30 MW 0 0 11850 11850 0 0

Total MW Procured 897426 947555 857703 777625 911852 808532

Clearing Price $201 $185 $2108 $2177 $199 $225

Time Period Time Period Hours

Time Period 1 Hours Ending 0600 - 0800 (50000 am to 80000 am) Monday through Friday except ERCOT Holidays

Time Period 2 Hours Ending 0900 - 1300 (80000 am to 10000 pm) Monday through Friday except ERCOT Holidays

Time Period 3 Hours Ending 1400 - 1600 (10000 pm to 40000 pm) Monday through Friday except ERCOT Holidays

Time Period 4 Hours Ending 1700 - 1900 (40000 pm to 70000 pm) Monday through Friday except ERCOT Holidays

Time Period 5 Hours Ending 2000 - 2200 (70000 pm to 100000 pm) Monday through Friday except ERCOT Holidays Time Period 6 All other hours

35

PUBLIC

Reliability Services ndash July 2018

Reliability Unit Commitment (RUC) $ in Millions

RUC Make-Whole Payments $000

RUC Clawback Charges $000

RUC Commitment Settlement $000

RUC Capacity Short Charges $000

RUC Make-Whole Uplift $000

RUC Commitment Cost Allocation $000

RUC Decommitment Payments $000

Total RUC Allocation to Load $000

In July 2018 there was a credit of $000M allocated to load for RUC compared to bull A credit of $000M in June 2018bull A credit of $003M in July 2017

36

PUBLIC

Ancillary and Other Services ndash July 2018

Ancillary and Other Services $ in Millions

Regulation Up Service $1105

Regulation Down Service $072

Responsive Reserve Service $7177

Non-Spinning Reserve Service $1787

Black Start Service $059

Voltage Services - Reactive Power $000

Voltage Services - Lost Opportunity $000

Total Charges Allocated to Load $10200

In July 2018 Ancillary and Other Services was a charge of $10200M compared to bull A charge of $2001M in June 2018bull A charge of $2322M in July 2017

37

PUBLIC

Real-Time Ancillary Service Imbalance (ORDC) ndash July 2018

In July 2018 Real-Time Ancillary Service Imbalance was a charge to load of $2228K compared to bull A charge of $147K in June 2018bull A charge of $534K in July 2017

Real-Time Ancillary Service Imbalance $ in Thousands

Real-Time AS Imbalance ($2228)

Real-Time Reliability Deployment AS Imbalance $000

Total RTASI Amount Allocated to Load $2228

38

PUBLIC

Energy Settlement ndash July 2018

39

Day-Ahead Market Energy Settlement $ in Millions

Energy Purchases $215396

Point to Point Obligation Purchases $11726

Energy Sales ($212592)

Day-Ahead Congestion Rent $14531

Day-Ahead Market Make-Whole Payments ($001)

Real-Time Market Energy Settlement $ in Millions

Energy Imbalance at a Resource Node ($91963)

Energy Imbalance at a Load Zone $160737

Energy Imbalance at a Hub ($57497)

Net Real-Time Energy Imbalance $11276

Real Time Congestion from Self Schedules $013

Block Load Transfers and DC Ties ($2063)

Total Impact to Revenue Neutrality $9227

Load-Allocated Emergency Energy Payments ($016)

Load-Allocated Base Point Deviation Charges $026

Day-Ahead Market energy settlement activity increased from last month and increased from July 2017

Real-Time Market energy settlement activity increased from last month and increased from July 2017

PUBLIC

Congestion Revenue Rights (CRR) ndash July 2018

$ in Millions

Long-Term Auction ($4026)

Monthly Auction ($1773)

Total Auction Revenue ($5799)

Day-Ahead CRR Settlements ($15797)

Day-Ahead CRR Short-Charges $1885

Day-Ahead CRR Short-Charges Refunded ($899)

Day-Ahead CRR Short-Charges Net $986

Total CRR Funding ($14810)

Day-Ahead Point-to-Point Obligations $11726

Real-Time Point-to-Point Obligations ($10113)

Net Point-to-Point Obligations $1614

Congestion Revenue Rights settlement payments were not fully funded Partial funding to settle the CRR Short Charges was provided from the CRR Balancing Account Fund and the remaining $986M of CRR Short Charges were not refunded The CRR Fund Balance is now $0

Point to Point Obligations settled with a net charge of $1614M compared to a net credit of $1758M last month

40

PUBLIC

CRR Balancing Account Fund ndash July 2018

CRR Balancing Account $ in Millions

Monthly Day-Ahead Congestion Rent $14531

Monthly Day-Ahead CRR Settlements ($15797)

Monthly Day-Ahead CRR Short -Charges $1885

CRR Balancing Account Credit Total $619

Beginning Fund Balance for the Month $275

CRR Balancing Account Credit Total $619

Day-Ahead CRR Short-Charges Refunded ($899)

CRR PTP Option Award Charges $004

Load-Allocated CRR Amount $000

Total Fund Amount $000

41

PUBLIC

Revenue Neutrality ndash July 2018

Revenue Neutrality $ in Millions

Real-Time Energy Imbalance $11276

Real-Time Point to Point Obligation ($10113)

Real-Time Congestion from Self-Schedules $013

DC Tie amp Block Load Transfer ($2063)

Allocation to Load $886

In July 2018 the Revenue Neutrality charge to load was $886M compared to bull A charge of $3046M in June 2018bull A charge of $145M in July 2017

42

PUBLIC

Net Allocation to Load ndash July 2018

Market-Based Allocation $ in Millions

Reliability Unit Commitment $000

Ancillary and Other Services $10200

Real-Time Ancillary Service Imbalance $223

Emergency Energy $016

Base Point Deviation ($026)

CRR Auction Revenue ($5799)

CRR Balancing Account $000

Real-Time Revenue Neutrality $886

Reliability Must Run $000

Monthly Block Load Transfer $000

Total $5500

Fee AllocationERCOT Administrative Fee $2207

Net Allocated to Load $7707

In July 2018 the Net Allocation to load was a charge of $7707M compared to bull A charge of $2152M in June 2018bull A credit of $1363M in July 2017

43

PUBLIC

Advanced Meter Settlement Impacts ndash July 2018

July 2018 At month end settling 72M ESIIDs using Advanced Meter data

July 2018 990 of the load in ERCOT is settled with 15-min interval data (AMS Competitive IDR and NOIE IDR)

44

PUBLIC

ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndashJuly 2018

45

PUBLIC

Retail Transaction Volumes ndash Summary ndash July 2018

46

Transaction Type July 2018 July 2017 July 2018 July 2017

Switches 669909 617300 121926 84059

Acquisition 0 0 0 0

Move - Ins 1667037 1568153 270122 252360

Move - Outs 814580 802779 129820 127073

Continuous Service Agreements (CSA) 395944 283259 40217 55770

Mass Transitions 9033 0 0 0

Total 3556503 3271491 562085 519262

Year-To-Date Transactions Received

Board Presentation Input

Trans Volumes by Month_New

PUBLIC

Retail Transaction Volumes ndash Summary ndash July 2018

SwitchesAcquisitions Move-Ins

Move-Outs Mass Transition

47

Projects Report

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018

20000000$ 2018 Portfolio

Spending Estimate

Projects In FlightOn Hold (Count = 100) 24905011$

Projects Not Yet Started (Count = 10) 1320628$

Projects Completed (Count = 43) 795250$

(7020889)$

TOTAL 20000000$

Project Number Projects in Initiation Phase (Count = 4)

TBD IT Asset RecoveryNPRR842 Study Area Load Information

209-03 Study Network (STNET) Integration288-01 EDI Map and Translator Replacement

Impact Metric TolerancesUnfavorable variances are represented as negative numbers within the report - Green = No more than 49 unfavorable variance - Yellow = Unfavorable variance between 49 and 99 - Red = Unfavorable variance more than 99

Spending Reductions Required to Maintain Capital Budget

2018 Project Funding

Footnotes1 - One or more phases took longer than expected resulting in additional time required

2 - One or more phases required more labor than expected resulting in additional funding andor time required

3 - Project placed on holdNA - Metric not calculated because - it is reported at the parent project level or - it is an administrative project

Project Number Projects in Planning Phase (Count = 8) Phase Start Baseline

Phase FinishApproved

Phase FinishScheduled

Go-Live DateScheduled

Phase Finish

134-02 Privileged Account Management (PAM) Phase 2 882018 12192018 12192018 TBD 12192018 0 10

183-01 CMM-FT GUI Integration 12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs

242-01 Portfolio Reporting Assessment 1182017 12192018 12192018 TBD 12192018 0 21260-01 Information Governance Assessment 10182017 5302018 9192018 TBD 9192018 0 5286-01 Java Platform Assessment 6202018 11212018 11212018 TBD 11212018 0 6287-01 Security Constrained Unit Commitment (SCUC) 882018 2272019 2272019 TBD 2272019 0 -1

NPRR484Revisions to Congestion Revenue Rights Credit Calculations and Payments - Phase 1b 2

12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs

NPRR702Flexible Accounts Payment of Invoices and Disposition of Interest on Cash Collateral

12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs

Schedule Health Budget Health

49

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018Project Number Projects in Execution Phase (Count = 42) Phase Start Baseline Go-

Live DateApproved Go-

Live DateScheduled

Go-Live DateScheduled

Phase Finish

170-01 Enterprise Content Alignment Program 8262015 11152017 8312018 8312018 8312018 0 0170-06 ECAP - ECMS Implementation Phase 1 4252018 11302018 11302018 11302018 11302018 0 3173-02 ERCOT Flight Certification Website 11152017 2282019 2282019 2282019 5312019 0 2181-01 CRR Framework Upgrade 10262016 1022017 11192018 11192018 2272019 0 2

183-01 CMM Tech Refresh 3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

193-01 PMU Tool Evaluation and Implementation 12132017 892018 2152019 2152019 3202019 0 0196-01 GINR Project Status Application Replacement 12212016 9142017 2282019 2282019 3312019 0 1198-02 Reactive Power Coordination PoC 962017 6162018 8152018 8152018 8152018 0 54209-02 Weather Imaging and Line Observation (WILO) 5302018 212019 212019 212019 2272019 0 2210-01 REC Technology Refresh 8302017 3182018 12132018 12132018 1162019 0 3228-01 Enterprise Database Upgrade 882018 1292020 1292020 1292020 1292020 0 17229-01 IT Change and Configuration Management Phase 2 822017 6192018 12132018 12132018 3252019 0 2 -9238-01 Application Authentication Tech Refresh 962017 3192018 12132018 12132018 1302019 0 3239-01 Identity and Access Management 592018 3132019 3132019 3132019 3132019 0 2241-01 AREA - Generation 10112017 3302018 892018 892018 952018 0 -4244-01 Corporate Wireless 11292017 3282018 1252018 1252018 192019 0 9245-01 2017 EPS Metering Enhancements 6272018 892019 892019 892019 9252019 0 1246-01 iTest Data Refresh 12132017 1192018 11152018 11152018 122019 0 25249-01 Secondary Wind Forecasting Service 8302017 2282018 892018 892018 952018 0 0253-01 CIP Recovery Plan Project - Planning Phase 1 1312018 8292018 8292018 8292018 8292018 0 -2

257-01Security Constrained Optimal Powerflow in Study Network Analysis

1262017 10252018 10252018 10252018 1282018 0 19

261-01 Generic Transmission Constraint Calculation 372018 12132018 12132018 12132018 1232019 0 0263-01 Market Simulator 4112018 12132018 12132018 12132018 1302019 0 7265-01 Real-Time Assessment Continuity 1312018 12132018 12132018 12132018 1302019 0 0279-01 Cyber Security Project 24 6272018 10262018 10262018 10262018 11282018 0 0280-01 Quest Software Portfolio Transition 442018 6272018 9262018 9262018 9262018 0 13282-01 Synchronous Condenser Outage Modeling 662018 10252018 10252018 10252018 1252018 0 1Various 2015 CMM NPRRs 2 -18

NPRR519Exemption of ERS-Only QSEs from Collateral and Capitalization Requirements

3152017 5192018 12112018 12112018 12312018 0 See 2015 CMM NPRRs

NPRR620Collateral Requirements for Counter-Parties with No Load or Generation

3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

NPRR660 Remove CRR State Change Adder 3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

Budget HealthSchedule Health

50

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018Project Number Projects in Execution Phase (Count = 42) Phase Start Baseline Go-

Live DateApproved Go-

Live DateScheduled

Go-Live DateScheduled

Phase Finish

NPRR741 Clarifications to TPE and EAL Credit Exposure Calculations 3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

NPRR749 Option Cost for Outstanding CRRs 882018 12132018 12132018 12132018 TBD 0 NA See 2015 CMM NPRRs

NPRR755 Data Agent-Only QSE Registration 3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

NPRR819Modification of Non-Price Error Resettlement Thresholds and Resettlement Clean-Ups

592018 892018 892018 892018 952018 0 36

NPRR833 Modify PTP Obligation Bid Clearing Change 882018 12132018 12132018 12132018 TBD 0 1

NPRR843Short-Term System Adequacy and AS Offer Disclosure Reports Additions

7182018 10252018 10252018 10252018 11282018 0 0

NPRR864 RUC Modifications to Consider Market-Based Solutions 6202018 10252018 10252018 10252018 11282018 0 4SCR777 Bilateral CRR Interface Enhancement 10262016 1022017 11192018 11192018 2272019 0 NA See 181-01

SCR781 RARF Replacement 12202017 4252018 12192018 12192018 12192018 0 3SCR791 Correction of 60-day SCED GRD Disclosure Report 522018 892018 892018 892018 952018 0 39SCR795 Addition of Intra-Hour Wind Forecast to GTBD Calculation 882018 10252018 10252018 10252018 11142018 0 0

Project Number Expedited Projects in Execution (Count = 34)

Project Number Projects in Stabilization (Count = 10) Execution

Phase StartBaseline Go-Live Target

Approved Go-Live Target

ActualGo-Live Date

Scheduled Execution Phase

Finish

NPRR648 Remove References to Flowgate Rights 3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR683 Revision to Available Credit Limit Calculation 3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR743 Revision to MCE to Have a Floor For Load Exposure 3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR760 Calculation of Exposure Variables For Days With No Activity 3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR776 Voltage Set Point Communication 9202017 3192018 452018 452018 952018 0 1

NPRR800Revisions to Credit Exposure Calculations to Use Electricity Futures Market Prices

3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR815Revise the Limitation of Load Resources Providing Responsive Reserve (RRS) Service

3212018 5312018 5312018 5312018 8292018 0 2

209-01 Multi Station Breaker to Breaker One Lines 282017 392018 532018 532018 8222018 0 -1259-01 DC SCADA and Metering Upgrade 10252017 1172018 7252018 7252018 8292018 0 22266-01 Remote Email Access Enhancement 12132017 372018 662018 6192018 9262018 2 -7 2 -9

Schedule Health Budget Health

Budget HealthSchedule Health

51

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018

Project Number Projects On Hold (Count = 2) Forecast

Start DateBaseline

Phase FinishApproved Go-

Live TargetScheduled

Go-Live DateScheduled

Phase Finish

SCR789 Update NMMS Topology Processor to PSSE 34 Capability 0

269-01Document Repository Redesign and Governance Implementation - Phase 1

0

Project Number Projects Completed (Count = 20)

Baseline Execution

Phase Start

Baseline Go-Live Target

Approved Go-Live Target

Actual Go-Live Date

Actual Execution Phase Finish

185-01 Records Management and eDiscovery 12152016 5242017 8292017 8222017 12132017 2 0224-01 TelAlert Replacement 452017 6272017 842017 842017 592018 0 5230-01 SAS Technical Architecture Redesign 312017 12132017 12132017 12132017 6272018 0 2234-01 Reporting Solution Resiliency (RSR) 452017 8232017 11272017 11272017 1102018 0 8240-01 EDI Translator and Mapping Replacement Assessment 4192017 9272017 2282018 TBD 372018 -2 20254-01 Retail Windows Upgrade 10112017 12182017 12182017 1222018 272018 1 -51 65255-01 Settlements Architecture Enhancements 10252017 1112018 1112018 1192018 2142018 1 -10 53258-01 WD Kainos SMART Automation Testing Tool 4112018 642018 642018 662018 7182018 -3 33271-01 Issue Tracking and Resolution Tool Assessment 12132017 4252018 4252018 TBD 522018 1 -5 -1272-01 Operator Training Simulator Black Start GE Effort 1262017 4252018 4252018 4272018 5162018 -1 19274-01 Average Mid-Term Load Forecast 372018 5312018 5312018 5312018 6272018 0 50

NPRR768Revisions to Real-Time On-Line Reliability Deployment Price Adder Categories

372018 5312018 5312018 5312018 6272018 0 16

NPRR778 Modifications to Date Change and Cancellation Evaluation Window 7192017 10292017 12112017 12112017 1312018 0 23

NPRR782Settlement of Infeasible Ancillary Services Due to Transmission Constraints

5242017 8312017 1122017 1122017 1102018 0 20

NPRR808 Three Year CRR Auction 8232017 9182017 9182017 912017 1312018 65 68

NPRR810Applicability of RMR Incentive Factor on Reservation and Transportation Costs Associated with Firm Fuel Supplies

7172017 11122017 3312018 3312018 3312018 0 NA See 233-00

NPRR830 Revision of 4-Coincident Peak Methodology 12132017 262018 262018 262018 372018 0 85

NPRR831 Inclusion of Private Use Networks in Load Zone Price Calculations 822017 1122017 1122017 1122017 2212018 0 33

OBDRR002 ORDC OBD Revisions for PUCT Project 47199 372018 5312018 5312018 5312018 6272018 0 See NPRR768

SCR792 Enhance Communications of BAAL Exceedances 2142018 452018 452018 452018 4252018 0 69

Project Number Expedited Projects Completed (Count = 23)

Budget HealthSchedule Health

Budget HealthSchedule Health

52

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018

Project Number 2018 Projects Not Yet Started (Count = 10) Forecast

Start Date

NPRR858 Provide Complete Current Operating Plan (COP) Data Aug-2018TBD 2018 OS Enhancements Aug-2018TBD Additional Branch Limit for Relays Aug-2018

NPRR817 Create a Panhandle Hub Sep-2018NPRR821 Elimination of the CRR Deration Process Oct-2018NPRR865 Publish RTM Shift Factors for Hubs Load Zones and DC Ties Oct-2018

SCR793SSR Related Telemetry for Transmission Service Provider (TSP) Operators

Oct-2018

ECAP ECAP - ECMS Implementation Phase 2 Oct-2018TBD Job Scheduler Update in CSI Framework Oct-2018TBD Parameter Estimation Oct-2018

53

  • Slide Number 1
  • Slide Number 2
  • Summary ndash July 2018
  • Daily Peak Demand Hourly Average Actual vs Forecast Wind Day-Ahead COPs amp On-Line Capacity at Peak ndash July 2018
  • Actual Wind Output plus Curtailments vs Wind Day-Ahead COPs for All Hours ndash July 2018
  • ERCOTrsquos CPS1 Monthly Performance ndash July 2018
  • Monthly Peak Actual Demand ndash July 2018
  • Monthly Minimum Actual 15-Minute Demand ndash July 2018
  • Day-Ahead Load Forecast Performance ndash July 2018
  • Reliability Unit Commitment (RUC) Capacity by Weather Zone ndash July 2018
  • Generic Transmission Constraints (GTCs) ndash July 2018
  • Advisories and Watches ndash July 2018 Corrected
  • Lake Levels Update ndash August 1 2018
  • Planning Summary ndash July 2018
  • Mapping of Counties to ERCOT Zones ndash July 2018
  • Cumulative MW Capacity of Interconnection Requests by Zone ndashJuly 2018
  • Cumulative MW Capacity of Interconnection Requests by Zone ndashJuly 2018
  • Cumulative MW Capacity of Interconnection Requests by Zone ndashJuly 2018
  • Wind Generation ndash July 2018
  • Solar Generation ndash July 2018
  • Generation Interconnection Activity by Fuel ndash July 2018
  • Generation Interconnection Activity by Project Phase ndash July 2018
  • Slide Number 23
  • Day-Ahead Schedule (Hourly Average) ndash July 2018
  • Percentage of Real-Time Load Hedged in the DAM (Counter-Party Level) ndash July 2018
  • DAM and RTM Price Convergence ndash July 2018
  • Day-Ahead Electricity and Ancillary Service Prices (Hourly Average) ndash July 2018
  • Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash July 2018
  • Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash July 2018
  • DRUC Monthly Summary (Hourly Average) ndash July 2018
  • HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash July 2018
  • NonndashSpinning Reserve Service Deployment ndash July 2018
  • CRR Price Convergence ndash July 2018
  • Daily Average System Lambda and ORDC Price Adders ndash July 2018
  • ERS Procurement for June 2018 ndash September 2018
  • Reliability Services ndash July 2018
  • Ancillary and Other Services ndash July 2018
  • Real-Time Ancillary Service Imbalance (ORDC) ndash July 2018
  • Energy Settlement ndash July 2018
  • Congestion Revenue Rights (CRR) ndash July 2018
  • CRR Balancing Account Fund ndash July 2018
  • Revenue Neutrality ndash July 2018
  • Net Allocation to Load ndash July 2018
  • Advanced Meter Settlement Impacts ndash July 2018
  • ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndash July 2018
  • Retail Transaction Volumes ndash Summary ndash July 2018
  • Retail Transaction Volumes ndash Summary ndash July 2018
  • Slide Number 48
  • ERCOT Portfolio Stoplight Report ndash July 2018
  • ERCOT Portfolio Stoplight Report ndash July 2018
  • ERCOT Portfolio Stoplight Report ndash July 2018
  • ERCOT Portfolio Stoplight Report ndash July 2018
  • ERCOT Portfolio Stoplight Report ndash July 2018
Retail Transactions Summary
July 2018 June 2018 May 2018 April 2018 March 2018 February 2018 January 2018 December 2017 November 2017 October 2017 September 2017 August 2017 July 2017 June 2017 May 2017 April 2017 March 2017 February 2017 January 2017 December 2016 November 2016 October 2016 September 2016 August 2016 July 2016 June 2016 May 2016 April 2016 March 2016 February 2016 January 2016 December 2015 November 2015 October 2015 September 2015 August 2015 July 2015 June 2015 May 2015 April 2015 March 2015 February 2015 January 2015 December 2014 November 2014 October 2014 September 2014 August 2014 July 2014 June 2014 May 2014 April 2014 March 2014 February 2014 January 2014 December 2013 November 2013 October 2013 September 2013 August 2013 July 2013 June 2013 May 2013 April 2013 March 2013 February 2013 January 2013 Grand total
814_01 - Switch Received 121926 109653 96828 81291 95159 76119 88933 60560 77860 78096 79502 84134 84059 108784 130828 71769 67845 66875 87140 66556 56202 64452 67323 86656 82923 86376 75323 70300 76235 68057 63954 61486 52887 65276 70342 81674 91211 102661 86229 81255 79997 73394 72885 71072 67080 110465 175164 89677 99568 101490 111077 91983 93887 71130 86953 69691 55957 166882 82415 93194 102562 103756 116086 78919 68950 64329 67116 1321827
Difference from previous month 12273 12825 15537 (13868) 19040 (12814) 28373 (17300) (236) (1406) (4632) 75 (24725) (22044) 59059 3924 970 (20265) 20584 10354 (8250) (2871) (19333) 3733 (3453) 11053 5023 (5935) 8178 4103 2468 8599 (12389) (5066) (11332) (9537) (11450) 16432 4974 1258 6603 509 1813 3992 (43385) (64699) 85487 (9891) (1922) (9587) 19094 (1904) 22757 (15823) 17262 13734 (110925) 84467 (10779) (9368) (1194) (12330) 37167 9969 4621 (2787)
814_16 - Move - Ins Received 270122 257125 244431 225380 224289 215281 230409 238340 207921 236397 244511 258046 252360 257759 237611 197865 217962 201984 202612 196236 201714 220958 231999 268781 241844 247481 214383 199804 218245 212474 193716 189862 181098 215908 229405 248124 263233 247089 208166 207932 215950 197765 198025 193973 178624 226283 231418 243482 251957 233679 223201 258649 214724 208160 207059 172981 178671 233469 216550 255967 249114 220397 216982 204412 197200 191955 194507 3162148
Difference from previous month 12997 12694 19051 1091 9008 (15128) (7931) 30419 (28476) (8114) (13535) 5686 (5399) 20148 39746 (20097) 15978 (628) 6376 (5478) (19244) (11041) (36782) 26937 (5637) 33098 14579 (18441) 5771 18758 3854 8764 (34810) (13497) (18719) (15109) 16144 38923 234 (8018) 18185 (260) 4052 15349 (47659) (5135) (12064) (8475) 18278 10478 (35448) 43925 6564 1101 34078 (5690) (54798) 16919 (39417) 6853 28717 3415 12570 7212 5245 (2552)
814_24 - MVO and MVO to CSA Received 129820 125861 124403 113795 108753 100127 111821 144987 100830 116519 129103 128104 127073 133582 127218 102055 111459 100285 101107 96289 100578 109493 114094 133170 122932 129025 118022 103789 109278 103747 96628 99552 96214 109578 117949 123894 133905 133855 114675 108275 108859 94864 98233 97901 89578 111857 115918 121662 131607 126785 119107 107956 107266 99428 104273 93385 93977 115469 115524 129594 135196 121446 120049 111598 106467 102429 104399 1660500
814_10 - DTP Mass Acquisition Received - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0
814_10 - DTP Mass Transition Received - 0 - 0 9033 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 639 - 0 - 0 4975 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0
814_18 - CSA AdditionDeletes Received 40217 62083 99016 55581 46720 42587 49740 47725 31726 52888 41597 40616 55770 43745 52139 26702 21791 39082 44030 38884 39856 31786 33061 42622 48489 64178 50499 59475 59400 48536 42179 40351 34796 34420 54677 35078 49489 59611 39384 44247 44577 35386 40420 54831 43550 45039 44268 40405 57954 64408 65032 80184 70310 41156 34811 46680 50347 71847 48606 52585 50867 62747 59763 34925 40977 40389 41227 747237
Total 562085 554722 573711 476047 474921 434114 480903 491612 418337 483900 494713 510900 519262 543870 547796 398391 419057 408226 434889 397965 398350 426689 446477 531229 496188 527060 458227 433368 463158 432814 396477 391251 364995 425182 472373 488770 537838 543216 448454 441709 449383 401409 409563 417777 378832 493644 566768 495865 541086 526362 523392 538772 486187 419874 433096 382737 378952 587667 463095 531340 537739 508346 512880 429854 413594 399102 407249 6891712
Counts from Monthly Retail Transaction report
To do
Break Out 814_10s - AQ and MT
Break Out 814_18 Additions from Deletes
Year-To-Date Transactions Received
Transaction Type July 2018 July 2017 July 2018 July 2017
Switches 669909 617300 121926 84059
Acquisition 0 0 0 0
Move - Ins 1667037 1568153 270122 252360
Move - Outs 814580 802779 129820 127073
Continuous Service Agreements (CSA) 395944 283259 40217 55770
Mass Transitions 9033 0 0 0
Total 3556503 3271491 562085 519262
There has been a change since this was created
Mass Acquisition has been broken out of Mass Transition
Page 22: ERCOT Monthly Operational Overvie · ERCOT Monthly Operational Overview (July 2018) Revised 08.22.18. ERCOT Public. August 15, 2018

PUBLIC

Generation Interconnection Activity by Project Phase ndash July 2018

22

Market Operations

PUBLIC

Day-Ahead Schedule (Hourly Average) ndash July 2018

24

0

10000

20000

30000

40000

50000

60000

70000

80000

MW

Hour Ending

Scheduled Energy Only OfferScheduled Three-part OfferDAM Energy PurchaseRT System Load

Liquidity and activity are normal in the Day-Ahead Market

PUBLIC

Percentage of Real-Time Load Hedged in the DAM (Counter-Party Level) ndashJuly 2018

25

0

20

40

60

80

100

120Ja

nM

arM

ay Jul

Sep

Nov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May

July

2013 2014 2015 2016 2017 2018

The dotted lines represent the bounds for major outliers

PUBLIC

DAM and RTM Price Convergence ndash July 2018

26

-20

-10

0

10

20

30

40

50

60Ja

nM

arM

ay Jul

Sep

Nov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

l

2013 2014 2015 2016 2017 2018

Aver

age

DAM

-R

TM S

PP ($

MW

h)

The dotted lines represent the bounds for major outliers

PUBLIC

Day-Ahead Electricity and Ancillary Service Prices (Hourly Average) ndashJuly 2018

27

0

100

200

300

400

500

600

Pric

e ($

MW

h)

Hour Ending

Regulation Up

Regulation Down

Responsive Reserve

Non Spinning Reserve

DAM Power Balance Price(System Lambda)

Ancillary Service prices reflect the opportunity cost of energy

PUBLIC

Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash July 2018

28

0

100

200

300

400

500

600

Pric

e ($

MW

h)

Hour Ending

RTSPP - LZ West

RTSPP - LZ North

RTSPP - LZ South

RTSPP - LZ Houston

DASPP - LZ West

DASPP - LZ North

DASPP - LZ South

DASPP - LZ Houston

Prices reflect relative transmission congestion and system scarcity

PUBLIC

Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash July 2018

29

0

100

200

300

400

500

600

Pric

e ($

MW

h)

Hour Ending

RTSPP - Hub Average

DASPP - Hub Average

Energy prices reflect the risk premium between Day-Ahead amp Real-Time

PUBLIC

DRUC Monthly Summary (Hourly Average) ndash July 2018

30

0

15000

30000

45000

60000

75000

90000

MW

h

Hour Ending

Self Scheduled Capacity

Self Scheduled Ancillary Service Limit

Load Forecast

DRUC Recommended Capacity

31 executions (0 missed)0 published after 160011 minutes average execution time0 Resources committed

PUBLIC

HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash July 2018

31

0

02

04

06

08

1

0

20

40

60

80

100

RTO

RD

PA ($

MW

h)

MW

h

Hour Ending

744 executions (0 missed)8 minutes average execution time1 Resources committed through HRUC or by a Verbal Dispatch Instruction

The dotted line indicates the average RTORDPA

PUBLIC

NonndashSpinning Reserve Service Deployment ndash July 2018

32

Deployment Start Time

Deployment End Time

Deployment Duration (Hours)

Max Deployment(MW) Reason

NA

PUBLIC

CRR Price Convergence ndash July 2018

0

50

100

150

200

250

Mill

ions

$

Cost

Value

Congestion Revenue Right cost in auction convergence with payment in Day-Ahead Market and Real Time Market

33

PUBLIC

Daily Average System Lambda and ORDC Price Adders ndash July 2018

0

50

100

150

200

250

$M

Wh

Day of Month

RTOFFPA

RTORPA

SYSTEM_LAMBDA

34

PUBLIC

ERS Procurement for June 2018 ndash September 2018

TP1 TP2 TP3 TP4 TP5 TP6

Non Weather-Sensitive ERS-10 MW 160562 165996 143324 140708 156699 151138

Non Weather-Sensitive ERS-30 MW 736864 781559 702529 625067 755153 657394

Weather-Sensitive ERS-10 MW 0 0 0 0 0 0

Weather-Sensitive ERS-30 MW 0 0 11850 11850 0 0

Total MW Procured 897426 947555 857703 777625 911852 808532

Clearing Price $201 $185 $2108 $2177 $199 $225

Time Period Time Period Hours

Time Period 1 Hours Ending 0600 - 0800 (50000 am to 80000 am) Monday through Friday except ERCOT Holidays

Time Period 2 Hours Ending 0900 - 1300 (80000 am to 10000 pm) Monday through Friday except ERCOT Holidays

Time Period 3 Hours Ending 1400 - 1600 (10000 pm to 40000 pm) Monday through Friday except ERCOT Holidays

Time Period 4 Hours Ending 1700 - 1900 (40000 pm to 70000 pm) Monday through Friday except ERCOT Holidays

Time Period 5 Hours Ending 2000 - 2200 (70000 pm to 100000 pm) Monday through Friday except ERCOT Holidays Time Period 6 All other hours

35

PUBLIC

Reliability Services ndash July 2018

Reliability Unit Commitment (RUC) $ in Millions

RUC Make-Whole Payments $000

RUC Clawback Charges $000

RUC Commitment Settlement $000

RUC Capacity Short Charges $000

RUC Make-Whole Uplift $000

RUC Commitment Cost Allocation $000

RUC Decommitment Payments $000

Total RUC Allocation to Load $000

In July 2018 there was a credit of $000M allocated to load for RUC compared to bull A credit of $000M in June 2018bull A credit of $003M in July 2017

36

PUBLIC

Ancillary and Other Services ndash July 2018

Ancillary and Other Services $ in Millions

Regulation Up Service $1105

Regulation Down Service $072

Responsive Reserve Service $7177

Non-Spinning Reserve Service $1787

Black Start Service $059

Voltage Services - Reactive Power $000

Voltage Services - Lost Opportunity $000

Total Charges Allocated to Load $10200

In July 2018 Ancillary and Other Services was a charge of $10200M compared to bull A charge of $2001M in June 2018bull A charge of $2322M in July 2017

37

PUBLIC

Real-Time Ancillary Service Imbalance (ORDC) ndash July 2018

In July 2018 Real-Time Ancillary Service Imbalance was a charge to load of $2228K compared to bull A charge of $147K in June 2018bull A charge of $534K in July 2017

Real-Time Ancillary Service Imbalance $ in Thousands

Real-Time AS Imbalance ($2228)

Real-Time Reliability Deployment AS Imbalance $000

Total RTASI Amount Allocated to Load $2228

38

PUBLIC

Energy Settlement ndash July 2018

39

Day-Ahead Market Energy Settlement $ in Millions

Energy Purchases $215396

Point to Point Obligation Purchases $11726

Energy Sales ($212592)

Day-Ahead Congestion Rent $14531

Day-Ahead Market Make-Whole Payments ($001)

Real-Time Market Energy Settlement $ in Millions

Energy Imbalance at a Resource Node ($91963)

Energy Imbalance at a Load Zone $160737

Energy Imbalance at a Hub ($57497)

Net Real-Time Energy Imbalance $11276

Real Time Congestion from Self Schedules $013

Block Load Transfers and DC Ties ($2063)

Total Impact to Revenue Neutrality $9227

Load-Allocated Emergency Energy Payments ($016)

Load-Allocated Base Point Deviation Charges $026

Day-Ahead Market energy settlement activity increased from last month and increased from July 2017

Real-Time Market energy settlement activity increased from last month and increased from July 2017

PUBLIC

Congestion Revenue Rights (CRR) ndash July 2018

$ in Millions

Long-Term Auction ($4026)

Monthly Auction ($1773)

Total Auction Revenue ($5799)

Day-Ahead CRR Settlements ($15797)

Day-Ahead CRR Short-Charges $1885

Day-Ahead CRR Short-Charges Refunded ($899)

Day-Ahead CRR Short-Charges Net $986

Total CRR Funding ($14810)

Day-Ahead Point-to-Point Obligations $11726

Real-Time Point-to-Point Obligations ($10113)

Net Point-to-Point Obligations $1614

Congestion Revenue Rights settlement payments were not fully funded Partial funding to settle the CRR Short Charges was provided from the CRR Balancing Account Fund and the remaining $986M of CRR Short Charges were not refunded The CRR Fund Balance is now $0

Point to Point Obligations settled with a net charge of $1614M compared to a net credit of $1758M last month

40

PUBLIC

CRR Balancing Account Fund ndash July 2018

CRR Balancing Account $ in Millions

Monthly Day-Ahead Congestion Rent $14531

Monthly Day-Ahead CRR Settlements ($15797)

Monthly Day-Ahead CRR Short -Charges $1885

CRR Balancing Account Credit Total $619

Beginning Fund Balance for the Month $275

CRR Balancing Account Credit Total $619

Day-Ahead CRR Short-Charges Refunded ($899)

CRR PTP Option Award Charges $004

Load-Allocated CRR Amount $000

Total Fund Amount $000

41

PUBLIC

Revenue Neutrality ndash July 2018

Revenue Neutrality $ in Millions

Real-Time Energy Imbalance $11276

Real-Time Point to Point Obligation ($10113)

Real-Time Congestion from Self-Schedules $013

DC Tie amp Block Load Transfer ($2063)

Allocation to Load $886

In July 2018 the Revenue Neutrality charge to load was $886M compared to bull A charge of $3046M in June 2018bull A charge of $145M in July 2017

42

PUBLIC

Net Allocation to Load ndash July 2018

Market-Based Allocation $ in Millions

Reliability Unit Commitment $000

Ancillary and Other Services $10200

Real-Time Ancillary Service Imbalance $223

Emergency Energy $016

Base Point Deviation ($026)

CRR Auction Revenue ($5799)

CRR Balancing Account $000

Real-Time Revenue Neutrality $886

Reliability Must Run $000

Monthly Block Load Transfer $000

Total $5500

Fee AllocationERCOT Administrative Fee $2207

Net Allocated to Load $7707

In July 2018 the Net Allocation to load was a charge of $7707M compared to bull A charge of $2152M in June 2018bull A credit of $1363M in July 2017

43

PUBLIC

Advanced Meter Settlement Impacts ndash July 2018

July 2018 At month end settling 72M ESIIDs using Advanced Meter data

July 2018 990 of the load in ERCOT is settled with 15-min interval data (AMS Competitive IDR and NOIE IDR)

44

PUBLIC

ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndashJuly 2018

45

PUBLIC

Retail Transaction Volumes ndash Summary ndash July 2018

46

Transaction Type July 2018 July 2017 July 2018 July 2017

Switches 669909 617300 121926 84059

Acquisition 0 0 0 0

Move - Ins 1667037 1568153 270122 252360

Move - Outs 814580 802779 129820 127073

Continuous Service Agreements (CSA) 395944 283259 40217 55770

Mass Transitions 9033 0 0 0

Total 3556503 3271491 562085 519262

Year-To-Date Transactions Received

Board Presentation Input

Trans Volumes by Month_New

PUBLIC

Retail Transaction Volumes ndash Summary ndash July 2018

SwitchesAcquisitions Move-Ins

Move-Outs Mass Transition

47

Projects Report

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018

20000000$ 2018 Portfolio

Spending Estimate

Projects In FlightOn Hold (Count = 100) 24905011$

Projects Not Yet Started (Count = 10) 1320628$

Projects Completed (Count = 43) 795250$

(7020889)$

TOTAL 20000000$

Project Number Projects in Initiation Phase (Count = 4)

TBD IT Asset RecoveryNPRR842 Study Area Load Information

209-03 Study Network (STNET) Integration288-01 EDI Map and Translator Replacement

Impact Metric TolerancesUnfavorable variances are represented as negative numbers within the report - Green = No more than 49 unfavorable variance - Yellow = Unfavorable variance between 49 and 99 - Red = Unfavorable variance more than 99

Spending Reductions Required to Maintain Capital Budget

2018 Project Funding

Footnotes1 - One or more phases took longer than expected resulting in additional time required

2 - One or more phases required more labor than expected resulting in additional funding andor time required

3 - Project placed on holdNA - Metric not calculated because - it is reported at the parent project level or - it is an administrative project

Project Number Projects in Planning Phase (Count = 8) Phase Start Baseline

Phase FinishApproved

Phase FinishScheduled

Go-Live DateScheduled

Phase Finish

134-02 Privileged Account Management (PAM) Phase 2 882018 12192018 12192018 TBD 12192018 0 10

183-01 CMM-FT GUI Integration 12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs

242-01 Portfolio Reporting Assessment 1182017 12192018 12192018 TBD 12192018 0 21260-01 Information Governance Assessment 10182017 5302018 9192018 TBD 9192018 0 5286-01 Java Platform Assessment 6202018 11212018 11212018 TBD 11212018 0 6287-01 Security Constrained Unit Commitment (SCUC) 882018 2272019 2272019 TBD 2272019 0 -1

NPRR484Revisions to Congestion Revenue Rights Credit Calculations and Payments - Phase 1b 2

12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs

NPRR702Flexible Accounts Payment of Invoices and Disposition of Interest on Cash Collateral

12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs

Schedule Health Budget Health

49

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018Project Number Projects in Execution Phase (Count = 42) Phase Start Baseline Go-

Live DateApproved Go-

Live DateScheduled

Go-Live DateScheduled

Phase Finish

170-01 Enterprise Content Alignment Program 8262015 11152017 8312018 8312018 8312018 0 0170-06 ECAP - ECMS Implementation Phase 1 4252018 11302018 11302018 11302018 11302018 0 3173-02 ERCOT Flight Certification Website 11152017 2282019 2282019 2282019 5312019 0 2181-01 CRR Framework Upgrade 10262016 1022017 11192018 11192018 2272019 0 2

183-01 CMM Tech Refresh 3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

193-01 PMU Tool Evaluation and Implementation 12132017 892018 2152019 2152019 3202019 0 0196-01 GINR Project Status Application Replacement 12212016 9142017 2282019 2282019 3312019 0 1198-02 Reactive Power Coordination PoC 962017 6162018 8152018 8152018 8152018 0 54209-02 Weather Imaging and Line Observation (WILO) 5302018 212019 212019 212019 2272019 0 2210-01 REC Technology Refresh 8302017 3182018 12132018 12132018 1162019 0 3228-01 Enterprise Database Upgrade 882018 1292020 1292020 1292020 1292020 0 17229-01 IT Change and Configuration Management Phase 2 822017 6192018 12132018 12132018 3252019 0 2 -9238-01 Application Authentication Tech Refresh 962017 3192018 12132018 12132018 1302019 0 3239-01 Identity and Access Management 592018 3132019 3132019 3132019 3132019 0 2241-01 AREA - Generation 10112017 3302018 892018 892018 952018 0 -4244-01 Corporate Wireless 11292017 3282018 1252018 1252018 192019 0 9245-01 2017 EPS Metering Enhancements 6272018 892019 892019 892019 9252019 0 1246-01 iTest Data Refresh 12132017 1192018 11152018 11152018 122019 0 25249-01 Secondary Wind Forecasting Service 8302017 2282018 892018 892018 952018 0 0253-01 CIP Recovery Plan Project - Planning Phase 1 1312018 8292018 8292018 8292018 8292018 0 -2

257-01Security Constrained Optimal Powerflow in Study Network Analysis

1262017 10252018 10252018 10252018 1282018 0 19

261-01 Generic Transmission Constraint Calculation 372018 12132018 12132018 12132018 1232019 0 0263-01 Market Simulator 4112018 12132018 12132018 12132018 1302019 0 7265-01 Real-Time Assessment Continuity 1312018 12132018 12132018 12132018 1302019 0 0279-01 Cyber Security Project 24 6272018 10262018 10262018 10262018 11282018 0 0280-01 Quest Software Portfolio Transition 442018 6272018 9262018 9262018 9262018 0 13282-01 Synchronous Condenser Outage Modeling 662018 10252018 10252018 10252018 1252018 0 1Various 2015 CMM NPRRs 2 -18

NPRR519Exemption of ERS-Only QSEs from Collateral and Capitalization Requirements

3152017 5192018 12112018 12112018 12312018 0 See 2015 CMM NPRRs

NPRR620Collateral Requirements for Counter-Parties with No Load or Generation

3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

NPRR660 Remove CRR State Change Adder 3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

Budget HealthSchedule Health

50

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018Project Number Projects in Execution Phase (Count = 42) Phase Start Baseline Go-

Live DateApproved Go-

Live DateScheduled

Go-Live DateScheduled

Phase Finish

NPRR741 Clarifications to TPE and EAL Credit Exposure Calculations 3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

NPRR749 Option Cost for Outstanding CRRs 882018 12132018 12132018 12132018 TBD 0 NA See 2015 CMM NPRRs

NPRR755 Data Agent-Only QSE Registration 3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

NPRR819Modification of Non-Price Error Resettlement Thresholds and Resettlement Clean-Ups

592018 892018 892018 892018 952018 0 36

NPRR833 Modify PTP Obligation Bid Clearing Change 882018 12132018 12132018 12132018 TBD 0 1

NPRR843Short-Term System Adequacy and AS Offer Disclosure Reports Additions

7182018 10252018 10252018 10252018 11282018 0 0

NPRR864 RUC Modifications to Consider Market-Based Solutions 6202018 10252018 10252018 10252018 11282018 0 4SCR777 Bilateral CRR Interface Enhancement 10262016 1022017 11192018 11192018 2272019 0 NA See 181-01

SCR781 RARF Replacement 12202017 4252018 12192018 12192018 12192018 0 3SCR791 Correction of 60-day SCED GRD Disclosure Report 522018 892018 892018 892018 952018 0 39SCR795 Addition of Intra-Hour Wind Forecast to GTBD Calculation 882018 10252018 10252018 10252018 11142018 0 0

Project Number Expedited Projects in Execution (Count = 34)

Project Number Projects in Stabilization (Count = 10) Execution

Phase StartBaseline Go-Live Target

Approved Go-Live Target

ActualGo-Live Date

Scheduled Execution Phase

Finish

NPRR648 Remove References to Flowgate Rights 3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR683 Revision to Available Credit Limit Calculation 3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR743 Revision to MCE to Have a Floor For Load Exposure 3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR760 Calculation of Exposure Variables For Days With No Activity 3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR776 Voltage Set Point Communication 9202017 3192018 452018 452018 952018 0 1

NPRR800Revisions to Credit Exposure Calculations to Use Electricity Futures Market Prices

3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR815Revise the Limitation of Load Resources Providing Responsive Reserve (RRS) Service

3212018 5312018 5312018 5312018 8292018 0 2

209-01 Multi Station Breaker to Breaker One Lines 282017 392018 532018 532018 8222018 0 -1259-01 DC SCADA and Metering Upgrade 10252017 1172018 7252018 7252018 8292018 0 22266-01 Remote Email Access Enhancement 12132017 372018 662018 6192018 9262018 2 -7 2 -9

Schedule Health Budget Health

Budget HealthSchedule Health

51

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018

Project Number Projects On Hold (Count = 2) Forecast

Start DateBaseline

Phase FinishApproved Go-

Live TargetScheduled

Go-Live DateScheduled

Phase Finish

SCR789 Update NMMS Topology Processor to PSSE 34 Capability 0

269-01Document Repository Redesign and Governance Implementation - Phase 1

0

Project Number Projects Completed (Count = 20)

Baseline Execution

Phase Start

Baseline Go-Live Target

Approved Go-Live Target

Actual Go-Live Date

Actual Execution Phase Finish

185-01 Records Management and eDiscovery 12152016 5242017 8292017 8222017 12132017 2 0224-01 TelAlert Replacement 452017 6272017 842017 842017 592018 0 5230-01 SAS Technical Architecture Redesign 312017 12132017 12132017 12132017 6272018 0 2234-01 Reporting Solution Resiliency (RSR) 452017 8232017 11272017 11272017 1102018 0 8240-01 EDI Translator and Mapping Replacement Assessment 4192017 9272017 2282018 TBD 372018 -2 20254-01 Retail Windows Upgrade 10112017 12182017 12182017 1222018 272018 1 -51 65255-01 Settlements Architecture Enhancements 10252017 1112018 1112018 1192018 2142018 1 -10 53258-01 WD Kainos SMART Automation Testing Tool 4112018 642018 642018 662018 7182018 -3 33271-01 Issue Tracking and Resolution Tool Assessment 12132017 4252018 4252018 TBD 522018 1 -5 -1272-01 Operator Training Simulator Black Start GE Effort 1262017 4252018 4252018 4272018 5162018 -1 19274-01 Average Mid-Term Load Forecast 372018 5312018 5312018 5312018 6272018 0 50

NPRR768Revisions to Real-Time On-Line Reliability Deployment Price Adder Categories

372018 5312018 5312018 5312018 6272018 0 16

NPRR778 Modifications to Date Change and Cancellation Evaluation Window 7192017 10292017 12112017 12112017 1312018 0 23

NPRR782Settlement of Infeasible Ancillary Services Due to Transmission Constraints

5242017 8312017 1122017 1122017 1102018 0 20

NPRR808 Three Year CRR Auction 8232017 9182017 9182017 912017 1312018 65 68

NPRR810Applicability of RMR Incentive Factor on Reservation and Transportation Costs Associated with Firm Fuel Supplies

7172017 11122017 3312018 3312018 3312018 0 NA See 233-00

NPRR830 Revision of 4-Coincident Peak Methodology 12132017 262018 262018 262018 372018 0 85

NPRR831 Inclusion of Private Use Networks in Load Zone Price Calculations 822017 1122017 1122017 1122017 2212018 0 33

OBDRR002 ORDC OBD Revisions for PUCT Project 47199 372018 5312018 5312018 5312018 6272018 0 See NPRR768

SCR792 Enhance Communications of BAAL Exceedances 2142018 452018 452018 452018 4252018 0 69

Project Number Expedited Projects Completed (Count = 23)

Budget HealthSchedule Health

Budget HealthSchedule Health

52

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018

Project Number 2018 Projects Not Yet Started (Count = 10) Forecast

Start Date

NPRR858 Provide Complete Current Operating Plan (COP) Data Aug-2018TBD 2018 OS Enhancements Aug-2018TBD Additional Branch Limit for Relays Aug-2018

NPRR817 Create a Panhandle Hub Sep-2018NPRR821 Elimination of the CRR Deration Process Oct-2018NPRR865 Publish RTM Shift Factors for Hubs Load Zones and DC Ties Oct-2018

SCR793SSR Related Telemetry for Transmission Service Provider (TSP) Operators

Oct-2018

ECAP ECAP - ECMS Implementation Phase 2 Oct-2018TBD Job Scheduler Update in CSI Framework Oct-2018TBD Parameter Estimation Oct-2018

53

  • Slide Number 1
  • Slide Number 2
  • Summary ndash July 2018
  • Daily Peak Demand Hourly Average Actual vs Forecast Wind Day-Ahead COPs amp On-Line Capacity at Peak ndash July 2018
  • Actual Wind Output plus Curtailments vs Wind Day-Ahead COPs for All Hours ndash July 2018
  • ERCOTrsquos CPS1 Monthly Performance ndash July 2018
  • Monthly Peak Actual Demand ndash July 2018
  • Monthly Minimum Actual 15-Minute Demand ndash July 2018
  • Day-Ahead Load Forecast Performance ndash July 2018
  • Reliability Unit Commitment (RUC) Capacity by Weather Zone ndash July 2018
  • Generic Transmission Constraints (GTCs) ndash July 2018
  • Advisories and Watches ndash July 2018 Corrected
  • Lake Levels Update ndash August 1 2018
  • Planning Summary ndash July 2018
  • Mapping of Counties to ERCOT Zones ndash July 2018
  • Cumulative MW Capacity of Interconnection Requests by Zone ndashJuly 2018
  • Cumulative MW Capacity of Interconnection Requests by Zone ndashJuly 2018
  • Cumulative MW Capacity of Interconnection Requests by Zone ndashJuly 2018
  • Wind Generation ndash July 2018
  • Solar Generation ndash July 2018
  • Generation Interconnection Activity by Fuel ndash July 2018
  • Generation Interconnection Activity by Project Phase ndash July 2018
  • Slide Number 23
  • Day-Ahead Schedule (Hourly Average) ndash July 2018
  • Percentage of Real-Time Load Hedged in the DAM (Counter-Party Level) ndash July 2018
  • DAM and RTM Price Convergence ndash July 2018
  • Day-Ahead Electricity and Ancillary Service Prices (Hourly Average) ndash July 2018
  • Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash July 2018
  • Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash July 2018
  • DRUC Monthly Summary (Hourly Average) ndash July 2018
  • HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash July 2018
  • NonndashSpinning Reserve Service Deployment ndash July 2018
  • CRR Price Convergence ndash July 2018
  • Daily Average System Lambda and ORDC Price Adders ndash July 2018
  • ERS Procurement for June 2018 ndash September 2018
  • Reliability Services ndash July 2018
  • Ancillary and Other Services ndash July 2018
  • Real-Time Ancillary Service Imbalance (ORDC) ndash July 2018
  • Energy Settlement ndash July 2018
  • Congestion Revenue Rights (CRR) ndash July 2018
  • CRR Balancing Account Fund ndash July 2018
  • Revenue Neutrality ndash July 2018
  • Net Allocation to Load ndash July 2018
  • Advanced Meter Settlement Impacts ndash July 2018
  • ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndash July 2018
  • Retail Transaction Volumes ndash Summary ndash July 2018
  • Retail Transaction Volumes ndash Summary ndash July 2018
  • Slide Number 48
  • ERCOT Portfolio Stoplight Report ndash July 2018
  • ERCOT Portfolio Stoplight Report ndash July 2018
  • ERCOT Portfolio Stoplight Report ndash July 2018
  • ERCOT Portfolio Stoplight Report ndash July 2018
  • ERCOT Portfolio Stoplight Report ndash July 2018
Retail Transactions Summary
July 2018 June 2018 May 2018 April 2018 March 2018 February 2018 January 2018 December 2017 November 2017 October 2017 September 2017 August 2017 July 2017 June 2017 May 2017 April 2017 March 2017 February 2017 January 2017 December 2016 November 2016 October 2016 September 2016 August 2016 July 2016 June 2016 May 2016 April 2016 March 2016 February 2016 January 2016 December 2015 November 2015 October 2015 September 2015 August 2015 July 2015 June 2015 May 2015 April 2015 March 2015 February 2015 January 2015 December 2014 November 2014 October 2014 September 2014 August 2014 July 2014 June 2014 May 2014 April 2014 March 2014 February 2014 January 2014 December 2013 November 2013 October 2013 September 2013 August 2013 July 2013 June 2013 May 2013 April 2013 March 2013 February 2013 January 2013 Grand total
814_01 - Switch Received 121926 109653 96828 81291 95159 76119 88933 60560 77860 78096 79502 84134 84059 108784 130828 71769 67845 66875 87140 66556 56202 64452 67323 86656 82923 86376 75323 70300 76235 68057 63954 61486 52887 65276 70342 81674 91211 102661 86229 81255 79997 73394 72885 71072 67080 110465 175164 89677 99568 101490 111077 91983 93887 71130 86953 69691 55957 166882 82415 93194 102562 103756 116086 78919 68950 64329 67116 1321827
Difference from previous month 12273 12825 15537 (13868) 19040 (12814) 28373 (17300) (236) (1406) (4632) 75 (24725) (22044) 59059 3924 970 (20265) 20584 10354 (8250) (2871) (19333) 3733 (3453) 11053 5023 (5935) 8178 4103 2468 8599 (12389) (5066) (11332) (9537) (11450) 16432 4974 1258 6603 509 1813 3992 (43385) (64699) 85487 (9891) (1922) (9587) 19094 (1904) 22757 (15823) 17262 13734 (110925) 84467 (10779) (9368) (1194) (12330) 37167 9969 4621 (2787)
814_16 - Move - Ins Received 270122 257125 244431 225380 224289 215281 230409 238340 207921 236397 244511 258046 252360 257759 237611 197865 217962 201984 202612 196236 201714 220958 231999 268781 241844 247481 214383 199804 218245 212474 193716 189862 181098 215908 229405 248124 263233 247089 208166 207932 215950 197765 198025 193973 178624 226283 231418 243482 251957 233679 223201 258649 214724 208160 207059 172981 178671 233469 216550 255967 249114 220397 216982 204412 197200 191955 194507 3162148
Difference from previous month 12997 12694 19051 1091 9008 (15128) (7931) 30419 (28476) (8114) (13535) 5686 (5399) 20148 39746 (20097) 15978 (628) 6376 (5478) (19244) (11041) (36782) 26937 (5637) 33098 14579 (18441) 5771 18758 3854 8764 (34810) (13497) (18719) (15109) 16144 38923 234 (8018) 18185 (260) 4052 15349 (47659) (5135) (12064) (8475) 18278 10478 (35448) 43925 6564 1101 34078 (5690) (54798) 16919 (39417) 6853 28717 3415 12570 7212 5245 (2552)
814_24 - MVO and MVO to CSA Received 129820 125861 124403 113795 108753 100127 111821 144987 100830 116519 129103 128104 127073 133582 127218 102055 111459 100285 101107 96289 100578 109493 114094 133170 122932 129025 118022 103789 109278 103747 96628 99552 96214 109578 117949 123894 133905 133855 114675 108275 108859 94864 98233 97901 89578 111857 115918 121662 131607 126785 119107 107956 107266 99428 104273 93385 93977 115469 115524 129594 135196 121446 120049 111598 106467 102429 104399 1660500
814_10 - DTP Mass Acquisition Received - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0
814_10 - DTP Mass Transition Received - 0 - 0 9033 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 639 - 0 - 0 4975 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0
814_18 - CSA AdditionDeletes Received 40217 62083 99016 55581 46720 42587 49740 47725 31726 52888 41597 40616 55770 43745 52139 26702 21791 39082 44030 38884 39856 31786 33061 42622 48489 64178 50499 59475 59400 48536 42179 40351 34796 34420 54677 35078 49489 59611 39384 44247 44577 35386 40420 54831 43550 45039 44268 40405 57954 64408 65032 80184 70310 41156 34811 46680 50347 71847 48606 52585 50867 62747 59763 34925 40977 40389 41227 747237
Total 562085 554722 573711 476047 474921 434114 480903 491612 418337 483900 494713 510900 519262 543870 547796 398391 419057 408226 434889 397965 398350 426689 446477 531229 496188 527060 458227 433368 463158 432814 396477 391251 364995 425182 472373 488770 537838 543216 448454 441709 449383 401409 409563 417777 378832 493644 566768 495865 541086 526362 523392 538772 486187 419874 433096 382737 378952 587667 463095 531340 537739 508346 512880 429854 413594 399102 407249 6891712
Counts from Monthly Retail Transaction report
To do
Break Out 814_10s - AQ and MT
Break Out 814_18 Additions from Deletes
Year-To-Date Transactions Received
Transaction Type July 2018 July 2017 July 2018 July 2017
Switches 669909 617300 121926 84059
Acquisition 0 0 0 0
Move - Ins 1667037 1568153 270122 252360
Move - Outs 814580 802779 129820 127073
Continuous Service Agreements (CSA) 395944 283259 40217 55770
Mass Transitions 9033 0 0 0
Total 3556503 3271491 562085 519262
There has been a change since this was created
Mass Acquisition has been broken out of Mass Transition
Page 23: ERCOT Monthly Operational Overvie · ERCOT Monthly Operational Overview (July 2018) Revised 08.22.18. ERCOT Public. August 15, 2018

Market Operations

PUBLIC

Day-Ahead Schedule (Hourly Average) ndash July 2018

24

0

10000

20000

30000

40000

50000

60000

70000

80000

MW

Hour Ending

Scheduled Energy Only OfferScheduled Three-part OfferDAM Energy PurchaseRT System Load

Liquidity and activity are normal in the Day-Ahead Market

PUBLIC

Percentage of Real-Time Load Hedged in the DAM (Counter-Party Level) ndashJuly 2018

25

0

20

40

60

80

100

120Ja

nM

arM

ay Jul

Sep

Nov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May

July

2013 2014 2015 2016 2017 2018

The dotted lines represent the bounds for major outliers

PUBLIC

DAM and RTM Price Convergence ndash July 2018

26

-20

-10

0

10

20

30

40

50

60Ja

nM

arM

ay Jul

Sep

Nov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

l

2013 2014 2015 2016 2017 2018

Aver

age

DAM

-R

TM S

PP ($

MW

h)

The dotted lines represent the bounds for major outliers

PUBLIC

Day-Ahead Electricity and Ancillary Service Prices (Hourly Average) ndashJuly 2018

27

0

100

200

300

400

500

600

Pric

e ($

MW

h)

Hour Ending

Regulation Up

Regulation Down

Responsive Reserve

Non Spinning Reserve

DAM Power Balance Price(System Lambda)

Ancillary Service prices reflect the opportunity cost of energy

PUBLIC

Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash July 2018

28

0

100

200

300

400

500

600

Pric

e ($

MW

h)

Hour Ending

RTSPP - LZ West

RTSPP - LZ North

RTSPP - LZ South

RTSPP - LZ Houston

DASPP - LZ West

DASPP - LZ North

DASPP - LZ South

DASPP - LZ Houston

Prices reflect relative transmission congestion and system scarcity

PUBLIC

Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash July 2018

29

0

100

200

300

400

500

600

Pric

e ($

MW

h)

Hour Ending

RTSPP - Hub Average

DASPP - Hub Average

Energy prices reflect the risk premium between Day-Ahead amp Real-Time

PUBLIC

DRUC Monthly Summary (Hourly Average) ndash July 2018

30

0

15000

30000

45000

60000

75000

90000

MW

h

Hour Ending

Self Scheduled Capacity

Self Scheduled Ancillary Service Limit

Load Forecast

DRUC Recommended Capacity

31 executions (0 missed)0 published after 160011 minutes average execution time0 Resources committed

PUBLIC

HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash July 2018

31

0

02

04

06

08

1

0

20

40

60

80

100

RTO

RD

PA ($

MW

h)

MW

h

Hour Ending

744 executions (0 missed)8 minutes average execution time1 Resources committed through HRUC or by a Verbal Dispatch Instruction

The dotted line indicates the average RTORDPA

PUBLIC

NonndashSpinning Reserve Service Deployment ndash July 2018

32

Deployment Start Time

Deployment End Time

Deployment Duration (Hours)

Max Deployment(MW) Reason

NA

PUBLIC

CRR Price Convergence ndash July 2018

0

50

100

150

200

250

Mill

ions

$

Cost

Value

Congestion Revenue Right cost in auction convergence with payment in Day-Ahead Market and Real Time Market

33

PUBLIC

Daily Average System Lambda and ORDC Price Adders ndash July 2018

0

50

100

150

200

250

$M

Wh

Day of Month

RTOFFPA

RTORPA

SYSTEM_LAMBDA

34

PUBLIC

ERS Procurement for June 2018 ndash September 2018

TP1 TP2 TP3 TP4 TP5 TP6

Non Weather-Sensitive ERS-10 MW 160562 165996 143324 140708 156699 151138

Non Weather-Sensitive ERS-30 MW 736864 781559 702529 625067 755153 657394

Weather-Sensitive ERS-10 MW 0 0 0 0 0 0

Weather-Sensitive ERS-30 MW 0 0 11850 11850 0 0

Total MW Procured 897426 947555 857703 777625 911852 808532

Clearing Price $201 $185 $2108 $2177 $199 $225

Time Period Time Period Hours

Time Period 1 Hours Ending 0600 - 0800 (50000 am to 80000 am) Monday through Friday except ERCOT Holidays

Time Period 2 Hours Ending 0900 - 1300 (80000 am to 10000 pm) Monday through Friday except ERCOT Holidays

Time Period 3 Hours Ending 1400 - 1600 (10000 pm to 40000 pm) Monday through Friday except ERCOT Holidays

Time Period 4 Hours Ending 1700 - 1900 (40000 pm to 70000 pm) Monday through Friday except ERCOT Holidays

Time Period 5 Hours Ending 2000 - 2200 (70000 pm to 100000 pm) Monday through Friday except ERCOT Holidays Time Period 6 All other hours

35

PUBLIC

Reliability Services ndash July 2018

Reliability Unit Commitment (RUC) $ in Millions

RUC Make-Whole Payments $000

RUC Clawback Charges $000

RUC Commitment Settlement $000

RUC Capacity Short Charges $000

RUC Make-Whole Uplift $000

RUC Commitment Cost Allocation $000

RUC Decommitment Payments $000

Total RUC Allocation to Load $000

In July 2018 there was a credit of $000M allocated to load for RUC compared to bull A credit of $000M in June 2018bull A credit of $003M in July 2017

36

PUBLIC

Ancillary and Other Services ndash July 2018

Ancillary and Other Services $ in Millions

Regulation Up Service $1105

Regulation Down Service $072

Responsive Reserve Service $7177

Non-Spinning Reserve Service $1787

Black Start Service $059

Voltage Services - Reactive Power $000

Voltage Services - Lost Opportunity $000

Total Charges Allocated to Load $10200

In July 2018 Ancillary and Other Services was a charge of $10200M compared to bull A charge of $2001M in June 2018bull A charge of $2322M in July 2017

37

PUBLIC

Real-Time Ancillary Service Imbalance (ORDC) ndash July 2018

In July 2018 Real-Time Ancillary Service Imbalance was a charge to load of $2228K compared to bull A charge of $147K in June 2018bull A charge of $534K in July 2017

Real-Time Ancillary Service Imbalance $ in Thousands

Real-Time AS Imbalance ($2228)

Real-Time Reliability Deployment AS Imbalance $000

Total RTASI Amount Allocated to Load $2228

38

PUBLIC

Energy Settlement ndash July 2018

39

Day-Ahead Market Energy Settlement $ in Millions

Energy Purchases $215396

Point to Point Obligation Purchases $11726

Energy Sales ($212592)

Day-Ahead Congestion Rent $14531

Day-Ahead Market Make-Whole Payments ($001)

Real-Time Market Energy Settlement $ in Millions

Energy Imbalance at a Resource Node ($91963)

Energy Imbalance at a Load Zone $160737

Energy Imbalance at a Hub ($57497)

Net Real-Time Energy Imbalance $11276

Real Time Congestion from Self Schedules $013

Block Load Transfers and DC Ties ($2063)

Total Impact to Revenue Neutrality $9227

Load-Allocated Emergency Energy Payments ($016)

Load-Allocated Base Point Deviation Charges $026

Day-Ahead Market energy settlement activity increased from last month and increased from July 2017

Real-Time Market energy settlement activity increased from last month and increased from July 2017

PUBLIC

Congestion Revenue Rights (CRR) ndash July 2018

$ in Millions

Long-Term Auction ($4026)

Monthly Auction ($1773)

Total Auction Revenue ($5799)

Day-Ahead CRR Settlements ($15797)

Day-Ahead CRR Short-Charges $1885

Day-Ahead CRR Short-Charges Refunded ($899)

Day-Ahead CRR Short-Charges Net $986

Total CRR Funding ($14810)

Day-Ahead Point-to-Point Obligations $11726

Real-Time Point-to-Point Obligations ($10113)

Net Point-to-Point Obligations $1614

Congestion Revenue Rights settlement payments were not fully funded Partial funding to settle the CRR Short Charges was provided from the CRR Balancing Account Fund and the remaining $986M of CRR Short Charges were not refunded The CRR Fund Balance is now $0

Point to Point Obligations settled with a net charge of $1614M compared to a net credit of $1758M last month

40

PUBLIC

CRR Balancing Account Fund ndash July 2018

CRR Balancing Account $ in Millions

Monthly Day-Ahead Congestion Rent $14531

Monthly Day-Ahead CRR Settlements ($15797)

Monthly Day-Ahead CRR Short -Charges $1885

CRR Balancing Account Credit Total $619

Beginning Fund Balance for the Month $275

CRR Balancing Account Credit Total $619

Day-Ahead CRR Short-Charges Refunded ($899)

CRR PTP Option Award Charges $004

Load-Allocated CRR Amount $000

Total Fund Amount $000

41

PUBLIC

Revenue Neutrality ndash July 2018

Revenue Neutrality $ in Millions

Real-Time Energy Imbalance $11276

Real-Time Point to Point Obligation ($10113)

Real-Time Congestion from Self-Schedules $013

DC Tie amp Block Load Transfer ($2063)

Allocation to Load $886

In July 2018 the Revenue Neutrality charge to load was $886M compared to bull A charge of $3046M in June 2018bull A charge of $145M in July 2017

42

PUBLIC

Net Allocation to Load ndash July 2018

Market-Based Allocation $ in Millions

Reliability Unit Commitment $000

Ancillary and Other Services $10200

Real-Time Ancillary Service Imbalance $223

Emergency Energy $016

Base Point Deviation ($026)

CRR Auction Revenue ($5799)

CRR Balancing Account $000

Real-Time Revenue Neutrality $886

Reliability Must Run $000

Monthly Block Load Transfer $000

Total $5500

Fee AllocationERCOT Administrative Fee $2207

Net Allocated to Load $7707

In July 2018 the Net Allocation to load was a charge of $7707M compared to bull A charge of $2152M in June 2018bull A credit of $1363M in July 2017

43

PUBLIC

Advanced Meter Settlement Impacts ndash July 2018

July 2018 At month end settling 72M ESIIDs using Advanced Meter data

July 2018 990 of the load in ERCOT is settled with 15-min interval data (AMS Competitive IDR and NOIE IDR)

44

PUBLIC

ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndashJuly 2018

45

PUBLIC

Retail Transaction Volumes ndash Summary ndash July 2018

46

Transaction Type July 2018 July 2017 July 2018 July 2017

Switches 669909 617300 121926 84059

Acquisition 0 0 0 0

Move - Ins 1667037 1568153 270122 252360

Move - Outs 814580 802779 129820 127073

Continuous Service Agreements (CSA) 395944 283259 40217 55770

Mass Transitions 9033 0 0 0

Total 3556503 3271491 562085 519262

Year-To-Date Transactions Received

Board Presentation Input

Trans Volumes by Month_New

PUBLIC

Retail Transaction Volumes ndash Summary ndash July 2018

SwitchesAcquisitions Move-Ins

Move-Outs Mass Transition

47

Projects Report

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018

20000000$ 2018 Portfolio

Spending Estimate

Projects In FlightOn Hold (Count = 100) 24905011$

Projects Not Yet Started (Count = 10) 1320628$

Projects Completed (Count = 43) 795250$

(7020889)$

TOTAL 20000000$

Project Number Projects in Initiation Phase (Count = 4)

TBD IT Asset RecoveryNPRR842 Study Area Load Information

209-03 Study Network (STNET) Integration288-01 EDI Map and Translator Replacement

Impact Metric TolerancesUnfavorable variances are represented as negative numbers within the report - Green = No more than 49 unfavorable variance - Yellow = Unfavorable variance between 49 and 99 - Red = Unfavorable variance more than 99

Spending Reductions Required to Maintain Capital Budget

2018 Project Funding

Footnotes1 - One or more phases took longer than expected resulting in additional time required

2 - One or more phases required more labor than expected resulting in additional funding andor time required

3 - Project placed on holdNA - Metric not calculated because - it is reported at the parent project level or - it is an administrative project

Project Number Projects in Planning Phase (Count = 8) Phase Start Baseline

Phase FinishApproved

Phase FinishScheduled

Go-Live DateScheduled

Phase Finish

134-02 Privileged Account Management (PAM) Phase 2 882018 12192018 12192018 TBD 12192018 0 10

183-01 CMM-FT GUI Integration 12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs

242-01 Portfolio Reporting Assessment 1182017 12192018 12192018 TBD 12192018 0 21260-01 Information Governance Assessment 10182017 5302018 9192018 TBD 9192018 0 5286-01 Java Platform Assessment 6202018 11212018 11212018 TBD 11212018 0 6287-01 Security Constrained Unit Commitment (SCUC) 882018 2272019 2272019 TBD 2272019 0 -1

NPRR484Revisions to Congestion Revenue Rights Credit Calculations and Payments - Phase 1b 2

12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs

NPRR702Flexible Accounts Payment of Invoices and Disposition of Interest on Cash Collateral

12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs

Schedule Health Budget Health

49

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018Project Number Projects in Execution Phase (Count = 42) Phase Start Baseline Go-

Live DateApproved Go-

Live DateScheduled

Go-Live DateScheduled

Phase Finish

170-01 Enterprise Content Alignment Program 8262015 11152017 8312018 8312018 8312018 0 0170-06 ECAP - ECMS Implementation Phase 1 4252018 11302018 11302018 11302018 11302018 0 3173-02 ERCOT Flight Certification Website 11152017 2282019 2282019 2282019 5312019 0 2181-01 CRR Framework Upgrade 10262016 1022017 11192018 11192018 2272019 0 2

183-01 CMM Tech Refresh 3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

193-01 PMU Tool Evaluation and Implementation 12132017 892018 2152019 2152019 3202019 0 0196-01 GINR Project Status Application Replacement 12212016 9142017 2282019 2282019 3312019 0 1198-02 Reactive Power Coordination PoC 962017 6162018 8152018 8152018 8152018 0 54209-02 Weather Imaging and Line Observation (WILO) 5302018 212019 212019 212019 2272019 0 2210-01 REC Technology Refresh 8302017 3182018 12132018 12132018 1162019 0 3228-01 Enterprise Database Upgrade 882018 1292020 1292020 1292020 1292020 0 17229-01 IT Change and Configuration Management Phase 2 822017 6192018 12132018 12132018 3252019 0 2 -9238-01 Application Authentication Tech Refresh 962017 3192018 12132018 12132018 1302019 0 3239-01 Identity and Access Management 592018 3132019 3132019 3132019 3132019 0 2241-01 AREA - Generation 10112017 3302018 892018 892018 952018 0 -4244-01 Corporate Wireless 11292017 3282018 1252018 1252018 192019 0 9245-01 2017 EPS Metering Enhancements 6272018 892019 892019 892019 9252019 0 1246-01 iTest Data Refresh 12132017 1192018 11152018 11152018 122019 0 25249-01 Secondary Wind Forecasting Service 8302017 2282018 892018 892018 952018 0 0253-01 CIP Recovery Plan Project - Planning Phase 1 1312018 8292018 8292018 8292018 8292018 0 -2

257-01Security Constrained Optimal Powerflow in Study Network Analysis

1262017 10252018 10252018 10252018 1282018 0 19

261-01 Generic Transmission Constraint Calculation 372018 12132018 12132018 12132018 1232019 0 0263-01 Market Simulator 4112018 12132018 12132018 12132018 1302019 0 7265-01 Real-Time Assessment Continuity 1312018 12132018 12132018 12132018 1302019 0 0279-01 Cyber Security Project 24 6272018 10262018 10262018 10262018 11282018 0 0280-01 Quest Software Portfolio Transition 442018 6272018 9262018 9262018 9262018 0 13282-01 Synchronous Condenser Outage Modeling 662018 10252018 10252018 10252018 1252018 0 1Various 2015 CMM NPRRs 2 -18

NPRR519Exemption of ERS-Only QSEs from Collateral and Capitalization Requirements

3152017 5192018 12112018 12112018 12312018 0 See 2015 CMM NPRRs

NPRR620Collateral Requirements for Counter-Parties with No Load or Generation

3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

NPRR660 Remove CRR State Change Adder 3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

Budget HealthSchedule Health

50

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018Project Number Projects in Execution Phase (Count = 42) Phase Start Baseline Go-

Live DateApproved Go-

Live DateScheduled

Go-Live DateScheduled

Phase Finish

NPRR741 Clarifications to TPE and EAL Credit Exposure Calculations 3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

NPRR749 Option Cost for Outstanding CRRs 882018 12132018 12132018 12132018 TBD 0 NA See 2015 CMM NPRRs

NPRR755 Data Agent-Only QSE Registration 3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

NPRR819Modification of Non-Price Error Resettlement Thresholds and Resettlement Clean-Ups

592018 892018 892018 892018 952018 0 36

NPRR833 Modify PTP Obligation Bid Clearing Change 882018 12132018 12132018 12132018 TBD 0 1

NPRR843Short-Term System Adequacy and AS Offer Disclosure Reports Additions

7182018 10252018 10252018 10252018 11282018 0 0

NPRR864 RUC Modifications to Consider Market-Based Solutions 6202018 10252018 10252018 10252018 11282018 0 4SCR777 Bilateral CRR Interface Enhancement 10262016 1022017 11192018 11192018 2272019 0 NA See 181-01

SCR781 RARF Replacement 12202017 4252018 12192018 12192018 12192018 0 3SCR791 Correction of 60-day SCED GRD Disclosure Report 522018 892018 892018 892018 952018 0 39SCR795 Addition of Intra-Hour Wind Forecast to GTBD Calculation 882018 10252018 10252018 10252018 11142018 0 0

Project Number Expedited Projects in Execution (Count = 34)

Project Number Projects in Stabilization (Count = 10) Execution

Phase StartBaseline Go-Live Target

Approved Go-Live Target

ActualGo-Live Date

Scheduled Execution Phase

Finish

NPRR648 Remove References to Flowgate Rights 3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR683 Revision to Available Credit Limit Calculation 3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR743 Revision to MCE to Have a Floor For Load Exposure 3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR760 Calculation of Exposure Variables For Days With No Activity 3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR776 Voltage Set Point Communication 9202017 3192018 452018 452018 952018 0 1

NPRR800Revisions to Credit Exposure Calculations to Use Electricity Futures Market Prices

3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR815Revise the Limitation of Load Resources Providing Responsive Reserve (RRS) Service

3212018 5312018 5312018 5312018 8292018 0 2

209-01 Multi Station Breaker to Breaker One Lines 282017 392018 532018 532018 8222018 0 -1259-01 DC SCADA and Metering Upgrade 10252017 1172018 7252018 7252018 8292018 0 22266-01 Remote Email Access Enhancement 12132017 372018 662018 6192018 9262018 2 -7 2 -9

Schedule Health Budget Health

Budget HealthSchedule Health

51

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018

Project Number Projects On Hold (Count = 2) Forecast

Start DateBaseline

Phase FinishApproved Go-

Live TargetScheduled

Go-Live DateScheduled

Phase Finish

SCR789 Update NMMS Topology Processor to PSSE 34 Capability 0

269-01Document Repository Redesign and Governance Implementation - Phase 1

0

Project Number Projects Completed (Count = 20)

Baseline Execution

Phase Start

Baseline Go-Live Target

Approved Go-Live Target

Actual Go-Live Date

Actual Execution Phase Finish

185-01 Records Management and eDiscovery 12152016 5242017 8292017 8222017 12132017 2 0224-01 TelAlert Replacement 452017 6272017 842017 842017 592018 0 5230-01 SAS Technical Architecture Redesign 312017 12132017 12132017 12132017 6272018 0 2234-01 Reporting Solution Resiliency (RSR) 452017 8232017 11272017 11272017 1102018 0 8240-01 EDI Translator and Mapping Replacement Assessment 4192017 9272017 2282018 TBD 372018 -2 20254-01 Retail Windows Upgrade 10112017 12182017 12182017 1222018 272018 1 -51 65255-01 Settlements Architecture Enhancements 10252017 1112018 1112018 1192018 2142018 1 -10 53258-01 WD Kainos SMART Automation Testing Tool 4112018 642018 642018 662018 7182018 -3 33271-01 Issue Tracking and Resolution Tool Assessment 12132017 4252018 4252018 TBD 522018 1 -5 -1272-01 Operator Training Simulator Black Start GE Effort 1262017 4252018 4252018 4272018 5162018 -1 19274-01 Average Mid-Term Load Forecast 372018 5312018 5312018 5312018 6272018 0 50

NPRR768Revisions to Real-Time On-Line Reliability Deployment Price Adder Categories

372018 5312018 5312018 5312018 6272018 0 16

NPRR778 Modifications to Date Change and Cancellation Evaluation Window 7192017 10292017 12112017 12112017 1312018 0 23

NPRR782Settlement of Infeasible Ancillary Services Due to Transmission Constraints

5242017 8312017 1122017 1122017 1102018 0 20

NPRR808 Three Year CRR Auction 8232017 9182017 9182017 912017 1312018 65 68

NPRR810Applicability of RMR Incentive Factor on Reservation and Transportation Costs Associated with Firm Fuel Supplies

7172017 11122017 3312018 3312018 3312018 0 NA See 233-00

NPRR830 Revision of 4-Coincident Peak Methodology 12132017 262018 262018 262018 372018 0 85

NPRR831 Inclusion of Private Use Networks in Load Zone Price Calculations 822017 1122017 1122017 1122017 2212018 0 33

OBDRR002 ORDC OBD Revisions for PUCT Project 47199 372018 5312018 5312018 5312018 6272018 0 See NPRR768

SCR792 Enhance Communications of BAAL Exceedances 2142018 452018 452018 452018 4252018 0 69

Project Number Expedited Projects Completed (Count = 23)

Budget HealthSchedule Health

Budget HealthSchedule Health

52

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018

Project Number 2018 Projects Not Yet Started (Count = 10) Forecast

Start Date

NPRR858 Provide Complete Current Operating Plan (COP) Data Aug-2018TBD 2018 OS Enhancements Aug-2018TBD Additional Branch Limit for Relays Aug-2018

NPRR817 Create a Panhandle Hub Sep-2018NPRR821 Elimination of the CRR Deration Process Oct-2018NPRR865 Publish RTM Shift Factors for Hubs Load Zones and DC Ties Oct-2018

SCR793SSR Related Telemetry for Transmission Service Provider (TSP) Operators

Oct-2018

ECAP ECAP - ECMS Implementation Phase 2 Oct-2018TBD Job Scheduler Update in CSI Framework Oct-2018TBD Parameter Estimation Oct-2018

53

  • Slide Number 1
  • Slide Number 2
  • Summary ndash July 2018
  • Daily Peak Demand Hourly Average Actual vs Forecast Wind Day-Ahead COPs amp On-Line Capacity at Peak ndash July 2018
  • Actual Wind Output plus Curtailments vs Wind Day-Ahead COPs for All Hours ndash July 2018
  • ERCOTrsquos CPS1 Monthly Performance ndash July 2018
  • Monthly Peak Actual Demand ndash July 2018
  • Monthly Minimum Actual 15-Minute Demand ndash July 2018
  • Day-Ahead Load Forecast Performance ndash July 2018
  • Reliability Unit Commitment (RUC) Capacity by Weather Zone ndash July 2018
  • Generic Transmission Constraints (GTCs) ndash July 2018
  • Advisories and Watches ndash July 2018 Corrected
  • Lake Levels Update ndash August 1 2018
  • Planning Summary ndash July 2018
  • Mapping of Counties to ERCOT Zones ndash July 2018
  • Cumulative MW Capacity of Interconnection Requests by Zone ndashJuly 2018
  • Cumulative MW Capacity of Interconnection Requests by Zone ndashJuly 2018
  • Cumulative MW Capacity of Interconnection Requests by Zone ndashJuly 2018
  • Wind Generation ndash July 2018
  • Solar Generation ndash July 2018
  • Generation Interconnection Activity by Fuel ndash July 2018
  • Generation Interconnection Activity by Project Phase ndash July 2018
  • Slide Number 23
  • Day-Ahead Schedule (Hourly Average) ndash July 2018
  • Percentage of Real-Time Load Hedged in the DAM (Counter-Party Level) ndash July 2018
  • DAM and RTM Price Convergence ndash July 2018
  • Day-Ahead Electricity and Ancillary Service Prices (Hourly Average) ndash July 2018
  • Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash July 2018
  • Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash July 2018
  • DRUC Monthly Summary (Hourly Average) ndash July 2018
  • HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash July 2018
  • NonndashSpinning Reserve Service Deployment ndash July 2018
  • CRR Price Convergence ndash July 2018
  • Daily Average System Lambda and ORDC Price Adders ndash July 2018
  • ERS Procurement for June 2018 ndash September 2018
  • Reliability Services ndash July 2018
  • Ancillary and Other Services ndash July 2018
  • Real-Time Ancillary Service Imbalance (ORDC) ndash July 2018
  • Energy Settlement ndash July 2018
  • Congestion Revenue Rights (CRR) ndash July 2018
  • CRR Balancing Account Fund ndash July 2018
  • Revenue Neutrality ndash July 2018
  • Net Allocation to Load ndash July 2018
  • Advanced Meter Settlement Impacts ndash July 2018
  • ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndash July 2018
  • Retail Transaction Volumes ndash Summary ndash July 2018
  • Retail Transaction Volumes ndash Summary ndash July 2018
  • Slide Number 48
  • ERCOT Portfolio Stoplight Report ndash July 2018
  • ERCOT Portfolio Stoplight Report ndash July 2018
  • ERCOT Portfolio Stoplight Report ndash July 2018
  • ERCOT Portfolio Stoplight Report ndash July 2018
  • ERCOT Portfolio Stoplight Report ndash July 2018
Retail Transactions Summary
July 2018 June 2018 May 2018 April 2018 March 2018 February 2018 January 2018 December 2017 November 2017 October 2017 September 2017 August 2017 July 2017 June 2017 May 2017 April 2017 March 2017 February 2017 January 2017 December 2016 November 2016 October 2016 September 2016 August 2016 July 2016 June 2016 May 2016 April 2016 March 2016 February 2016 January 2016 December 2015 November 2015 October 2015 September 2015 August 2015 July 2015 June 2015 May 2015 April 2015 March 2015 February 2015 January 2015 December 2014 November 2014 October 2014 September 2014 August 2014 July 2014 June 2014 May 2014 April 2014 March 2014 February 2014 January 2014 December 2013 November 2013 October 2013 September 2013 August 2013 July 2013 June 2013 May 2013 April 2013 March 2013 February 2013 January 2013 Grand total
814_01 - Switch Received 121926 109653 96828 81291 95159 76119 88933 60560 77860 78096 79502 84134 84059 108784 130828 71769 67845 66875 87140 66556 56202 64452 67323 86656 82923 86376 75323 70300 76235 68057 63954 61486 52887 65276 70342 81674 91211 102661 86229 81255 79997 73394 72885 71072 67080 110465 175164 89677 99568 101490 111077 91983 93887 71130 86953 69691 55957 166882 82415 93194 102562 103756 116086 78919 68950 64329 67116 1321827
Difference from previous month 12273 12825 15537 (13868) 19040 (12814) 28373 (17300) (236) (1406) (4632) 75 (24725) (22044) 59059 3924 970 (20265) 20584 10354 (8250) (2871) (19333) 3733 (3453) 11053 5023 (5935) 8178 4103 2468 8599 (12389) (5066) (11332) (9537) (11450) 16432 4974 1258 6603 509 1813 3992 (43385) (64699) 85487 (9891) (1922) (9587) 19094 (1904) 22757 (15823) 17262 13734 (110925) 84467 (10779) (9368) (1194) (12330) 37167 9969 4621 (2787)
814_16 - Move - Ins Received 270122 257125 244431 225380 224289 215281 230409 238340 207921 236397 244511 258046 252360 257759 237611 197865 217962 201984 202612 196236 201714 220958 231999 268781 241844 247481 214383 199804 218245 212474 193716 189862 181098 215908 229405 248124 263233 247089 208166 207932 215950 197765 198025 193973 178624 226283 231418 243482 251957 233679 223201 258649 214724 208160 207059 172981 178671 233469 216550 255967 249114 220397 216982 204412 197200 191955 194507 3162148
Difference from previous month 12997 12694 19051 1091 9008 (15128) (7931) 30419 (28476) (8114) (13535) 5686 (5399) 20148 39746 (20097) 15978 (628) 6376 (5478) (19244) (11041) (36782) 26937 (5637) 33098 14579 (18441) 5771 18758 3854 8764 (34810) (13497) (18719) (15109) 16144 38923 234 (8018) 18185 (260) 4052 15349 (47659) (5135) (12064) (8475) 18278 10478 (35448) 43925 6564 1101 34078 (5690) (54798) 16919 (39417) 6853 28717 3415 12570 7212 5245 (2552)
814_24 - MVO and MVO to CSA Received 129820 125861 124403 113795 108753 100127 111821 144987 100830 116519 129103 128104 127073 133582 127218 102055 111459 100285 101107 96289 100578 109493 114094 133170 122932 129025 118022 103789 109278 103747 96628 99552 96214 109578 117949 123894 133905 133855 114675 108275 108859 94864 98233 97901 89578 111857 115918 121662 131607 126785 119107 107956 107266 99428 104273 93385 93977 115469 115524 129594 135196 121446 120049 111598 106467 102429 104399 1660500
814_10 - DTP Mass Acquisition Received - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0
814_10 - DTP Mass Transition Received - 0 - 0 9033 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 639 - 0 - 0 4975 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0
814_18 - CSA AdditionDeletes Received 40217 62083 99016 55581 46720 42587 49740 47725 31726 52888 41597 40616 55770 43745 52139 26702 21791 39082 44030 38884 39856 31786 33061 42622 48489 64178 50499 59475 59400 48536 42179 40351 34796 34420 54677 35078 49489 59611 39384 44247 44577 35386 40420 54831 43550 45039 44268 40405 57954 64408 65032 80184 70310 41156 34811 46680 50347 71847 48606 52585 50867 62747 59763 34925 40977 40389 41227 747237
Total 562085 554722 573711 476047 474921 434114 480903 491612 418337 483900 494713 510900 519262 543870 547796 398391 419057 408226 434889 397965 398350 426689 446477 531229 496188 527060 458227 433368 463158 432814 396477 391251 364995 425182 472373 488770 537838 543216 448454 441709 449383 401409 409563 417777 378832 493644 566768 495865 541086 526362 523392 538772 486187 419874 433096 382737 378952 587667 463095 531340 537739 508346 512880 429854 413594 399102 407249 6891712
Counts from Monthly Retail Transaction report
To do
Break Out 814_10s - AQ and MT
Break Out 814_18 Additions from Deletes
Year-To-Date Transactions Received
Transaction Type July 2018 July 2017 July 2018 July 2017
Switches 669909 617300 121926 84059
Acquisition 0 0 0 0
Move - Ins 1667037 1568153 270122 252360
Move - Outs 814580 802779 129820 127073
Continuous Service Agreements (CSA) 395944 283259 40217 55770
Mass Transitions 9033 0 0 0
Total 3556503 3271491 562085 519262
There has been a change since this was created
Mass Acquisition has been broken out of Mass Transition
Page 24: ERCOT Monthly Operational Overvie · ERCOT Monthly Operational Overview (July 2018) Revised 08.22.18. ERCOT Public. August 15, 2018

PUBLIC

Day-Ahead Schedule (Hourly Average) ndash July 2018

24

0

10000

20000

30000

40000

50000

60000

70000

80000

MW

Hour Ending

Scheduled Energy Only OfferScheduled Three-part OfferDAM Energy PurchaseRT System Load

Liquidity and activity are normal in the Day-Ahead Market

PUBLIC

Percentage of Real-Time Load Hedged in the DAM (Counter-Party Level) ndashJuly 2018

25

0

20

40

60

80

100

120Ja

nM

arM

ay Jul

Sep

Nov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May

July

2013 2014 2015 2016 2017 2018

The dotted lines represent the bounds for major outliers

PUBLIC

DAM and RTM Price Convergence ndash July 2018

26

-20

-10

0

10

20

30

40

50

60Ja

nM

arM

ay Jul

Sep

Nov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

l

2013 2014 2015 2016 2017 2018

Aver

age

DAM

-R

TM S

PP ($

MW

h)

The dotted lines represent the bounds for major outliers

PUBLIC

Day-Ahead Electricity and Ancillary Service Prices (Hourly Average) ndashJuly 2018

27

0

100

200

300

400

500

600

Pric

e ($

MW

h)

Hour Ending

Regulation Up

Regulation Down

Responsive Reserve

Non Spinning Reserve

DAM Power Balance Price(System Lambda)

Ancillary Service prices reflect the opportunity cost of energy

PUBLIC

Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash July 2018

28

0

100

200

300

400

500

600

Pric

e ($

MW

h)

Hour Ending

RTSPP - LZ West

RTSPP - LZ North

RTSPP - LZ South

RTSPP - LZ Houston

DASPP - LZ West

DASPP - LZ North

DASPP - LZ South

DASPP - LZ Houston

Prices reflect relative transmission congestion and system scarcity

PUBLIC

Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash July 2018

29

0

100

200

300

400

500

600

Pric

e ($

MW

h)

Hour Ending

RTSPP - Hub Average

DASPP - Hub Average

Energy prices reflect the risk premium between Day-Ahead amp Real-Time

PUBLIC

DRUC Monthly Summary (Hourly Average) ndash July 2018

30

0

15000

30000

45000

60000

75000

90000

MW

h

Hour Ending

Self Scheduled Capacity

Self Scheduled Ancillary Service Limit

Load Forecast

DRUC Recommended Capacity

31 executions (0 missed)0 published after 160011 minutes average execution time0 Resources committed

PUBLIC

HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash July 2018

31

0

02

04

06

08

1

0

20

40

60

80

100

RTO

RD

PA ($

MW

h)

MW

h

Hour Ending

744 executions (0 missed)8 minutes average execution time1 Resources committed through HRUC or by a Verbal Dispatch Instruction

The dotted line indicates the average RTORDPA

PUBLIC

NonndashSpinning Reserve Service Deployment ndash July 2018

32

Deployment Start Time

Deployment End Time

Deployment Duration (Hours)

Max Deployment(MW) Reason

NA

PUBLIC

CRR Price Convergence ndash July 2018

0

50

100

150

200

250

Mill

ions

$

Cost

Value

Congestion Revenue Right cost in auction convergence with payment in Day-Ahead Market and Real Time Market

33

PUBLIC

Daily Average System Lambda and ORDC Price Adders ndash July 2018

0

50

100

150

200

250

$M

Wh

Day of Month

RTOFFPA

RTORPA

SYSTEM_LAMBDA

34

PUBLIC

ERS Procurement for June 2018 ndash September 2018

TP1 TP2 TP3 TP4 TP5 TP6

Non Weather-Sensitive ERS-10 MW 160562 165996 143324 140708 156699 151138

Non Weather-Sensitive ERS-30 MW 736864 781559 702529 625067 755153 657394

Weather-Sensitive ERS-10 MW 0 0 0 0 0 0

Weather-Sensitive ERS-30 MW 0 0 11850 11850 0 0

Total MW Procured 897426 947555 857703 777625 911852 808532

Clearing Price $201 $185 $2108 $2177 $199 $225

Time Period Time Period Hours

Time Period 1 Hours Ending 0600 - 0800 (50000 am to 80000 am) Monday through Friday except ERCOT Holidays

Time Period 2 Hours Ending 0900 - 1300 (80000 am to 10000 pm) Monday through Friday except ERCOT Holidays

Time Period 3 Hours Ending 1400 - 1600 (10000 pm to 40000 pm) Monday through Friday except ERCOT Holidays

Time Period 4 Hours Ending 1700 - 1900 (40000 pm to 70000 pm) Monday through Friday except ERCOT Holidays

Time Period 5 Hours Ending 2000 - 2200 (70000 pm to 100000 pm) Monday through Friday except ERCOT Holidays Time Period 6 All other hours

35

PUBLIC

Reliability Services ndash July 2018

Reliability Unit Commitment (RUC) $ in Millions

RUC Make-Whole Payments $000

RUC Clawback Charges $000

RUC Commitment Settlement $000

RUC Capacity Short Charges $000

RUC Make-Whole Uplift $000

RUC Commitment Cost Allocation $000

RUC Decommitment Payments $000

Total RUC Allocation to Load $000

In July 2018 there was a credit of $000M allocated to load for RUC compared to bull A credit of $000M in June 2018bull A credit of $003M in July 2017

36

PUBLIC

Ancillary and Other Services ndash July 2018

Ancillary and Other Services $ in Millions

Regulation Up Service $1105

Regulation Down Service $072

Responsive Reserve Service $7177

Non-Spinning Reserve Service $1787

Black Start Service $059

Voltage Services - Reactive Power $000

Voltage Services - Lost Opportunity $000

Total Charges Allocated to Load $10200

In July 2018 Ancillary and Other Services was a charge of $10200M compared to bull A charge of $2001M in June 2018bull A charge of $2322M in July 2017

37

PUBLIC

Real-Time Ancillary Service Imbalance (ORDC) ndash July 2018

In July 2018 Real-Time Ancillary Service Imbalance was a charge to load of $2228K compared to bull A charge of $147K in June 2018bull A charge of $534K in July 2017

Real-Time Ancillary Service Imbalance $ in Thousands

Real-Time AS Imbalance ($2228)

Real-Time Reliability Deployment AS Imbalance $000

Total RTASI Amount Allocated to Load $2228

38

PUBLIC

Energy Settlement ndash July 2018

39

Day-Ahead Market Energy Settlement $ in Millions

Energy Purchases $215396

Point to Point Obligation Purchases $11726

Energy Sales ($212592)

Day-Ahead Congestion Rent $14531

Day-Ahead Market Make-Whole Payments ($001)

Real-Time Market Energy Settlement $ in Millions

Energy Imbalance at a Resource Node ($91963)

Energy Imbalance at a Load Zone $160737

Energy Imbalance at a Hub ($57497)

Net Real-Time Energy Imbalance $11276

Real Time Congestion from Self Schedules $013

Block Load Transfers and DC Ties ($2063)

Total Impact to Revenue Neutrality $9227

Load-Allocated Emergency Energy Payments ($016)

Load-Allocated Base Point Deviation Charges $026

Day-Ahead Market energy settlement activity increased from last month and increased from July 2017

Real-Time Market energy settlement activity increased from last month and increased from July 2017

PUBLIC

Congestion Revenue Rights (CRR) ndash July 2018

$ in Millions

Long-Term Auction ($4026)

Monthly Auction ($1773)

Total Auction Revenue ($5799)

Day-Ahead CRR Settlements ($15797)

Day-Ahead CRR Short-Charges $1885

Day-Ahead CRR Short-Charges Refunded ($899)

Day-Ahead CRR Short-Charges Net $986

Total CRR Funding ($14810)

Day-Ahead Point-to-Point Obligations $11726

Real-Time Point-to-Point Obligations ($10113)

Net Point-to-Point Obligations $1614

Congestion Revenue Rights settlement payments were not fully funded Partial funding to settle the CRR Short Charges was provided from the CRR Balancing Account Fund and the remaining $986M of CRR Short Charges were not refunded The CRR Fund Balance is now $0

Point to Point Obligations settled with a net charge of $1614M compared to a net credit of $1758M last month

40

PUBLIC

CRR Balancing Account Fund ndash July 2018

CRR Balancing Account $ in Millions

Monthly Day-Ahead Congestion Rent $14531

Monthly Day-Ahead CRR Settlements ($15797)

Monthly Day-Ahead CRR Short -Charges $1885

CRR Balancing Account Credit Total $619

Beginning Fund Balance for the Month $275

CRR Balancing Account Credit Total $619

Day-Ahead CRR Short-Charges Refunded ($899)

CRR PTP Option Award Charges $004

Load-Allocated CRR Amount $000

Total Fund Amount $000

41

PUBLIC

Revenue Neutrality ndash July 2018

Revenue Neutrality $ in Millions

Real-Time Energy Imbalance $11276

Real-Time Point to Point Obligation ($10113)

Real-Time Congestion from Self-Schedules $013

DC Tie amp Block Load Transfer ($2063)

Allocation to Load $886

In July 2018 the Revenue Neutrality charge to load was $886M compared to bull A charge of $3046M in June 2018bull A charge of $145M in July 2017

42

PUBLIC

Net Allocation to Load ndash July 2018

Market-Based Allocation $ in Millions

Reliability Unit Commitment $000

Ancillary and Other Services $10200

Real-Time Ancillary Service Imbalance $223

Emergency Energy $016

Base Point Deviation ($026)

CRR Auction Revenue ($5799)

CRR Balancing Account $000

Real-Time Revenue Neutrality $886

Reliability Must Run $000

Monthly Block Load Transfer $000

Total $5500

Fee AllocationERCOT Administrative Fee $2207

Net Allocated to Load $7707

In July 2018 the Net Allocation to load was a charge of $7707M compared to bull A charge of $2152M in June 2018bull A credit of $1363M in July 2017

43

PUBLIC

Advanced Meter Settlement Impacts ndash July 2018

July 2018 At month end settling 72M ESIIDs using Advanced Meter data

July 2018 990 of the load in ERCOT is settled with 15-min interval data (AMS Competitive IDR and NOIE IDR)

44

PUBLIC

ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndashJuly 2018

45

PUBLIC

Retail Transaction Volumes ndash Summary ndash July 2018

46

Transaction Type July 2018 July 2017 July 2018 July 2017

Switches 669909 617300 121926 84059

Acquisition 0 0 0 0

Move - Ins 1667037 1568153 270122 252360

Move - Outs 814580 802779 129820 127073

Continuous Service Agreements (CSA) 395944 283259 40217 55770

Mass Transitions 9033 0 0 0

Total 3556503 3271491 562085 519262

Year-To-Date Transactions Received

Board Presentation Input

Trans Volumes by Month_New

PUBLIC

Retail Transaction Volumes ndash Summary ndash July 2018

SwitchesAcquisitions Move-Ins

Move-Outs Mass Transition

47

Projects Report

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018

20000000$ 2018 Portfolio

Spending Estimate

Projects In FlightOn Hold (Count = 100) 24905011$

Projects Not Yet Started (Count = 10) 1320628$

Projects Completed (Count = 43) 795250$

(7020889)$

TOTAL 20000000$

Project Number Projects in Initiation Phase (Count = 4)

TBD IT Asset RecoveryNPRR842 Study Area Load Information

209-03 Study Network (STNET) Integration288-01 EDI Map and Translator Replacement

Impact Metric TolerancesUnfavorable variances are represented as negative numbers within the report - Green = No more than 49 unfavorable variance - Yellow = Unfavorable variance between 49 and 99 - Red = Unfavorable variance more than 99

Spending Reductions Required to Maintain Capital Budget

2018 Project Funding

Footnotes1 - One or more phases took longer than expected resulting in additional time required

2 - One or more phases required more labor than expected resulting in additional funding andor time required

3 - Project placed on holdNA - Metric not calculated because - it is reported at the parent project level or - it is an administrative project

Project Number Projects in Planning Phase (Count = 8) Phase Start Baseline

Phase FinishApproved

Phase FinishScheduled

Go-Live DateScheduled

Phase Finish

134-02 Privileged Account Management (PAM) Phase 2 882018 12192018 12192018 TBD 12192018 0 10

183-01 CMM-FT GUI Integration 12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs

242-01 Portfolio Reporting Assessment 1182017 12192018 12192018 TBD 12192018 0 21260-01 Information Governance Assessment 10182017 5302018 9192018 TBD 9192018 0 5286-01 Java Platform Assessment 6202018 11212018 11212018 TBD 11212018 0 6287-01 Security Constrained Unit Commitment (SCUC) 882018 2272019 2272019 TBD 2272019 0 -1

NPRR484Revisions to Congestion Revenue Rights Credit Calculations and Payments - Phase 1b 2

12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs

NPRR702Flexible Accounts Payment of Invoices and Disposition of Interest on Cash Collateral

12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs

Schedule Health Budget Health

49

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018Project Number Projects in Execution Phase (Count = 42) Phase Start Baseline Go-

Live DateApproved Go-

Live DateScheduled

Go-Live DateScheduled

Phase Finish

170-01 Enterprise Content Alignment Program 8262015 11152017 8312018 8312018 8312018 0 0170-06 ECAP - ECMS Implementation Phase 1 4252018 11302018 11302018 11302018 11302018 0 3173-02 ERCOT Flight Certification Website 11152017 2282019 2282019 2282019 5312019 0 2181-01 CRR Framework Upgrade 10262016 1022017 11192018 11192018 2272019 0 2

183-01 CMM Tech Refresh 3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

193-01 PMU Tool Evaluation and Implementation 12132017 892018 2152019 2152019 3202019 0 0196-01 GINR Project Status Application Replacement 12212016 9142017 2282019 2282019 3312019 0 1198-02 Reactive Power Coordination PoC 962017 6162018 8152018 8152018 8152018 0 54209-02 Weather Imaging and Line Observation (WILO) 5302018 212019 212019 212019 2272019 0 2210-01 REC Technology Refresh 8302017 3182018 12132018 12132018 1162019 0 3228-01 Enterprise Database Upgrade 882018 1292020 1292020 1292020 1292020 0 17229-01 IT Change and Configuration Management Phase 2 822017 6192018 12132018 12132018 3252019 0 2 -9238-01 Application Authentication Tech Refresh 962017 3192018 12132018 12132018 1302019 0 3239-01 Identity and Access Management 592018 3132019 3132019 3132019 3132019 0 2241-01 AREA - Generation 10112017 3302018 892018 892018 952018 0 -4244-01 Corporate Wireless 11292017 3282018 1252018 1252018 192019 0 9245-01 2017 EPS Metering Enhancements 6272018 892019 892019 892019 9252019 0 1246-01 iTest Data Refresh 12132017 1192018 11152018 11152018 122019 0 25249-01 Secondary Wind Forecasting Service 8302017 2282018 892018 892018 952018 0 0253-01 CIP Recovery Plan Project - Planning Phase 1 1312018 8292018 8292018 8292018 8292018 0 -2

257-01Security Constrained Optimal Powerflow in Study Network Analysis

1262017 10252018 10252018 10252018 1282018 0 19

261-01 Generic Transmission Constraint Calculation 372018 12132018 12132018 12132018 1232019 0 0263-01 Market Simulator 4112018 12132018 12132018 12132018 1302019 0 7265-01 Real-Time Assessment Continuity 1312018 12132018 12132018 12132018 1302019 0 0279-01 Cyber Security Project 24 6272018 10262018 10262018 10262018 11282018 0 0280-01 Quest Software Portfolio Transition 442018 6272018 9262018 9262018 9262018 0 13282-01 Synchronous Condenser Outage Modeling 662018 10252018 10252018 10252018 1252018 0 1Various 2015 CMM NPRRs 2 -18

NPRR519Exemption of ERS-Only QSEs from Collateral and Capitalization Requirements

3152017 5192018 12112018 12112018 12312018 0 See 2015 CMM NPRRs

NPRR620Collateral Requirements for Counter-Parties with No Load or Generation

3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

NPRR660 Remove CRR State Change Adder 3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

Budget HealthSchedule Health

50

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018Project Number Projects in Execution Phase (Count = 42) Phase Start Baseline Go-

Live DateApproved Go-

Live DateScheduled

Go-Live DateScheduled

Phase Finish

NPRR741 Clarifications to TPE and EAL Credit Exposure Calculations 3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

NPRR749 Option Cost for Outstanding CRRs 882018 12132018 12132018 12132018 TBD 0 NA See 2015 CMM NPRRs

NPRR755 Data Agent-Only QSE Registration 3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

NPRR819Modification of Non-Price Error Resettlement Thresholds and Resettlement Clean-Ups

592018 892018 892018 892018 952018 0 36

NPRR833 Modify PTP Obligation Bid Clearing Change 882018 12132018 12132018 12132018 TBD 0 1

NPRR843Short-Term System Adequacy and AS Offer Disclosure Reports Additions

7182018 10252018 10252018 10252018 11282018 0 0

NPRR864 RUC Modifications to Consider Market-Based Solutions 6202018 10252018 10252018 10252018 11282018 0 4SCR777 Bilateral CRR Interface Enhancement 10262016 1022017 11192018 11192018 2272019 0 NA See 181-01

SCR781 RARF Replacement 12202017 4252018 12192018 12192018 12192018 0 3SCR791 Correction of 60-day SCED GRD Disclosure Report 522018 892018 892018 892018 952018 0 39SCR795 Addition of Intra-Hour Wind Forecast to GTBD Calculation 882018 10252018 10252018 10252018 11142018 0 0

Project Number Expedited Projects in Execution (Count = 34)

Project Number Projects in Stabilization (Count = 10) Execution

Phase StartBaseline Go-Live Target

Approved Go-Live Target

ActualGo-Live Date

Scheduled Execution Phase

Finish

NPRR648 Remove References to Flowgate Rights 3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR683 Revision to Available Credit Limit Calculation 3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR743 Revision to MCE to Have a Floor For Load Exposure 3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR760 Calculation of Exposure Variables For Days With No Activity 3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR776 Voltage Set Point Communication 9202017 3192018 452018 452018 952018 0 1

NPRR800Revisions to Credit Exposure Calculations to Use Electricity Futures Market Prices

3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR815Revise the Limitation of Load Resources Providing Responsive Reserve (RRS) Service

3212018 5312018 5312018 5312018 8292018 0 2

209-01 Multi Station Breaker to Breaker One Lines 282017 392018 532018 532018 8222018 0 -1259-01 DC SCADA and Metering Upgrade 10252017 1172018 7252018 7252018 8292018 0 22266-01 Remote Email Access Enhancement 12132017 372018 662018 6192018 9262018 2 -7 2 -9

Schedule Health Budget Health

Budget HealthSchedule Health

51

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018

Project Number Projects On Hold (Count = 2) Forecast

Start DateBaseline

Phase FinishApproved Go-

Live TargetScheduled

Go-Live DateScheduled

Phase Finish

SCR789 Update NMMS Topology Processor to PSSE 34 Capability 0

269-01Document Repository Redesign and Governance Implementation - Phase 1

0

Project Number Projects Completed (Count = 20)

Baseline Execution

Phase Start

Baseline Go-Live Target

Approved Go-Live Target

Actual Go-Live Date

Actual Execution Phase Finish

185-01 Records Management and eDiscovery 12152016 5242017 8292017 8222017 12132017 2 0224-01 TelAlert Replacement 452017 6272017 842017 842017 592018 0 5230-01 SAS Technical Architecture Redesign 312017 12132017 12132017 12132017 6272018 0 2234-01 Reporting Solution Resiliency (RSR) 452017 8232017 11272017 11272017 1102018 0 8240-01 EDI Translator and Mapping Replacement Assessment 4192017 9272017 2282018 TBD 372018 -2 20254-01 Retail Windows Upgrade 10112017 12182017 12182017 1222018 272018 1 -51 65255-01 Settlements Architecture Enhancements 10252017 1112018 1112018 1192018 2142018 1 -10 53258-01 WD Kainos SMART Automation Testing Tool 4112018 642018 642018 662018 7182018 -3 33271-01 Issue Tracking and Resolution Tool Assessment 12132017 4252018 4252018 TBD 522018 1 -5 -1272-01 Operator Training Simulator Black Start GE Effort 1262017 4252018 4252018 4272018 5162018 -1 19274-01 Average Mid-Term Load Forecast 372018 5312018 5312018 5312018 6272018 0 50

NPRR768Revisions to Real-Time On-Line Reliability Deployment Price Adder Categories

372018 5312018 5312018 5312018 6272018 0 16

NPRR778 Modifications to Date Change and Cancellation Evaluation Window 7192017 10292017 12112017 12112017 1312018 0 23

NPRR782Settlement of Infeasible Ancillary Services Due to Transmission Constraints

5242017 8312017 1122017 1122017 1102018 0 20

NPRR808 Three Year CRR Auction 8232017 9182017 9182017 912017 1312018 65 68

NPRR810Applicability of RMR Incentive Factor on Reservation and Transportation Costs Associated with Firm Fuel Supplies

7172017 11122017 3312018 3312018 3312018 0 NA See 233-00

NPRR830 Revision of 4-Coincident Peak Methodology 12132017 262018 262018 262018 372018 0 85

NPRR831 Inclusion of Private Use Networks in Load Zone Price Calculations 822017 1122017 1122017 1122017 2212018 0 33

OBDRR002 ORDC OBD Revisions for PUCT Project 47199 372018 5312018 5312018 5312018 6272018 0 See NPRR768

SCR792 Enhance Communications of BAAL Exceedances 2142018 452018 452018 452018 4252018 0 69

Project Number Expedited Projects Completed (Count = 23)

Budget HealthSchedule Health

Budget HealthSchedule Health

52

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018

Project Number 2018 Projects Not Yet Started (Count = 10) Forecast

Start Date

NPRR858 Provide Complete Current Operating Plan (COP) Data Aug-2018TBD 2018 OS Enhancements Aug-2018TBD Additional Branch Limit for Relays Aug-2018

NPRR817 Create a Panhandle Hub Sep-2018NPRR821 Elimination of the CRR Deration Process Oct-2018NPRR865 Publish RTM Shift Factors for Hubs Load Zones and DC Ties Oct-2018

SCR793SSR Related Telemetry for Transmission Service Provider (TSP) Operators

Oct-2018

ECAP ECAP - ECMS Implementation Phase 2 Oct-2018TBD Job Scheduler Update in CSI Framework Oct-2018TBD Parameter Estimation Oct-2018

53

  • Slide Number 1
  • Slide Number 2
  • Summary ndash July 2018
  • Daily Peak Demand Hourly Average Actual vs Forecast Wind Day-Ahead COPs amp On-Line Capacity at Peak ndash July 2018
  • Actual Wind Output plus Curtailments vs Wind Day-Ahead COPs for All Hours ndash July 2018
  • ERCOTrsquos CPS1 Monthly Performance ndash July 2018
  • Monthly Peak Actual Demand ndash July 2018
  • Monthly Minimum Actual 15-Minute Demand ndash July 2018
  • Day-Ahead Load Forecast Performance ndash July 2018
  • Reliability Unit Commitment (RUC) Capacity by Weather Zone ndash July 2018
  • Generic Transmission Constraints (GTCs) ndash July 2018
  • Advisories and Watches ndash July 2018 Corrected
  • Lake Levels Update ndash August 1 2018
  • Planning Summary ndash July 2018
  • Mapping of Counties to ERCOT Zones ndash July 2018
  • Cumulative MW Capacity of Interconnection Requests by Zone ndashJuly 2018
  • Cumulative MW Capacity of Interconnection Requests by Zone ndashJuly 2018
  • Cumulative MW Capacity of Interconnection Requests by Zone ndashJuly 2018
  • Wind Generation ndash July 2018
  • Solar Generation ndash July 2018
  • Generation Interconnection Activity by Fuel ndash July 2018
  • Generation Interconnection Activity by Project Phase ndash July 2018
  • Slide Number 23
  • Day-Ahead Schedule (Hourly Average) ndash July 2018
  • Percentage of Real-Time Load Hedged in the DAM (Counter-Party Level) ndash July 2018
  • DAM and RTM Price Convergence ndash July 2018
  • Day-Ahead Electricity and Ancillary Service Prices (Hourly Average) ndash July 2018
  • Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash July 2018
  • Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash July 2018
  • DRUC Monthly Summary (Hourly Average) ndash July 2018
  • HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash July 2018
  • NonndashSpinning Reserve Service Deployment ndash July 2018
  • CRR Price Convergence ndash July 2018
  • Daily Average System Lambda and ORDC Price Adders ndash July 2018
  • ERS Procurement for June 2018 ndash September 2018
  • Reliability Services ndash July 2018
  • Ancillary and Other Services ndash July 2018
  • Real-Time Ancillary Service Imbalance (ORDC) ndash July 2018
  • Energy Settlement ndash July 2018
  • Congestion Revenue Rights (CRR) ndash July 2018
  • CRR Balancing Account Fund ndash July 2018
  • Revenue Neutrality ndash July 2018
  • Net Allocation to Load ndash July 2018
  • Advanced Meter Settlement Impacts ndash July 2018
  • ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndash July 2018
  • Retail Transaction Volumes ndash Summary ndash July 2018
  • Retail Transaction Volumes ndash Summary ndash July 2018
  • Slide Number 48
  • ERCOT Portfolio Stoplight Report ndash July 2018
  • ERCOT Portfolio Stoplight Report ndash July 2018
  • ERCOT Portfolio Stoplight Report ndash July 2018
  • ERCOT Portfolio Stoplight Report ndash July 2018
  • ERCOT Portfolio Stoplight Report ndash July 2018
Retail Transactions Summary
July 2018 June 2018 May 2018 April 2018 March 2018 February 2018 January 2018 December 2017 November 2017 October 2017 September 2017 August 2017 July 2017 June 2017 May 2017 April 2017 March 2017 February 2017 January 2017 December 2016 November 2016 October 2016 September 2016 August 2016 July 2016 June 2016 May 2016 April 2016 March 2016 February 2016 January 2016 December 2015 November 2015 October 2015 September 2015 August 2015 July 2015 June 2015 May 2015 April 2015 March 2015 February 2015 January 2015 December 2014 November 2014 October 2014 September 2014 August 2014 July 2014 June 2014 May 2014 April 2014 March 2014 February 2014 January 2014 December 2013 November 2013 October 2013 September 2013 August 2013 July 2013 June 2013 May 2013 April 2013 March 2013 February 2013 January 2013 Grand total
814_01 - Switch Received 121926 109653 96828 81291 95159 76119 88933 60560 77860 78096 79502 84134 84059 108784 130828 71769 67845 66875 87140 66556 56202 64452 67323 86656 82923 86376 75323 70300 76235 68057 63954 61486 52887 65276 70342 81674 91211 102661 86229 81255 79997 73394 72885 71072 67080 110465 175164 89677 99568 101490 111077 91983 93887 71130 86953 69691 55957 166882 82415 93194 102562 103756 116086 78919 68950 64329 67116 1321827
Difference from previous month 12273 12825 15537 (13868) 19040 (12814) 28373 (17300) (236) (1406) (4632) 75 (24725) (22044) 59059 3924 970 (20265) 20584 10354 (8250) (2871) (19333) 3733 (3453) 11053 5023 (5935) 8178 4103 2468 8599 (12389) (5066) (11332) (9537) (11450) 16432 4974 1258 6603 509 1813 3992 (43385) (64699) 85487 (9891) (1922) (9587) 19094 (1904) 22757 (15823) 17262 13734 (110925) 84467 (10779) (9368) (1194) (12330) 37167 9969 4621 (2787)
814_16 - Move - Ins Received 270122 257125 244431 225380 224289 215281 230409 238340 207921 236397 244511 258046 252360 257759 237611 197865 217962 201984 202612 196236 201714 220958 231999 268781 241844 247481 214383 199804 218245 212474 193716 189862 181098 215908 229405 248124 263233 247089 208166 207932 215950 197765 198025 193973 178624 226283 231418 243482 251957 233679 223201 258649 214724 208160 207059 172981 178671 233469 216550 255967 249114 220397 216982 204412 197200 191955 194507 3162148
Difference from previous month 12997 12694 19051 1091 9008 (15128) (7931) 30419 (28476) (8114) (13535) 5686 (5399) 20148 39746 (20097) 15978 (628) 6376 (5478) (19244) (11041) (36782) 26937 (5637) 33098 14579 (18441) 5771 18758 3854 8764 (34810) (13497) (18719) (15109) 16144 38923 234 (8018) 18185 (260) 4052 15349 (47659) (5135) (12064) (8475) 18278 10478 (35448) 43925 6564 1101 34078 (5690) (54798) 16919 (39417) 6853 28717 3415 12570 7212 5245 (2552)
814_24 - MVO and MVO to CSA Received 129820 125861 124403 113795 108753 100127 111821 144987 100830 116519 129103 128104 127073 133582 127218 102055 111459 100285 101107 96289 100578 109493 114094 133170 122932 129025 118022 103789 109278 103747 96628 99552 96214 109578 117949 123894 133905 133855 114675 108275 108859 94864 98233 97901 89578 111857 115918 121662 131607 126785 119107 107956 107266 99428 104273 93385 93977 115469 115524 129594 135196 121446 120049 111598 106467 102429 104399 1660500
814_10 - DTP Mass Acquisition Received - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0
814_10 - DTP Mass Transition Received - 0 - 0 9033 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 639 - 0 - 0 4975 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0
814_18 - CSA AdditionDeletes Received 40217 62083 99016 55581 46720 42587 49740 47725 31726 52888 41597 40616 55770 43745 52139 26702 21791 39082 44030 38884 39856 31786 33061 42622 48489 64178 50499 59475 59400 48536 42179 40351 34796 34420 54677 35078 49489 59611 39384 44247 44577 35386 40420 54831 43550 45039 44268 40405 57954 64408 65032 80184 70310 41156 34811 46680 50347 71847 48606 52585 50867 62747 59763 34925 40977 40389 41227 747237
Total 562085 554722 573711 476047 474921 434114 480903 491612 418337 483900 494713 510900 519262 543870 547796 398391 419057 408226 434889 397965 398350 426689 446477 531229 496188 527060 458227 433368 463158 432814 396477 391251 364995 425182 472373 488770 537838 543216 448454 441709 449383 401409 409563 417777 378832 493644 566768 495865 541086 526362 523392 538772 486187 419874 433096 382737 378952 587667 463095 531340 537739 508346 512880 429854 413594 399102 407249 6891712
Counts from Monthly Retail Transaction report
To do
Break Out 814_10s - AQ and MT
Break Out 814_18 Additions from Deletes
Year-To-Date Transactions Received
Transaction Type July 2018 July 2017 July 2018 July 2017
Switches 669909 617300 121926 84059
Acquisition 0 0 0 0
Move - Ins 1667037 1568153 270122 252360
Move - Outs 814580 802779 129820 127073
Continuous Service Agreements (CSA) 395944 283259 40217 55770
Mass Transitions 9033 0 0 0
Total 3556503 3271491 562085 519262
There has been a change since this was created
Mass Acquisition has been broken out of Mass Transition
Page 25: ERCOT Monthly Operational Overvie · ERCOT Monthly Operational Overview (July 2018) Revised 08.22.18. ERCOT Public. August 15, 2018

PUBLIC

Percentage of Real-Time Load Hedged in the DAM (Counter-Party Level) ndashJuly 2018

25

0

20

40

60

80

100

120Ja

nM

arM

ay Jul

Sep

Nov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May

July

2013 2014 2015 2016 2017 2018

The dotted lines represent the bounds for major outliers

PUBLIC

DAM and RTM Price Convergence ndash July 2018

26

-20

-10

0

10

20

30

40

50

60Ja

nM

arM

ay Jul

Sep

Nov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

l

2013 2014 2015 2016 2017 2018

Aver

age

DAM

-R

TM S

PP ($

MW

h)

The dotted lines represent the bounds for major outliers

PUBLIC

Day-Ahead Electricity and Ancillary Service Prices (Hourly Average) ndashJuly 2018

27

0

100

200

300

400

500

600

Pric

e ($

MW

h)

Hour Ending

Regulation Up

Regulation Down

Responsive Reserve

Non Spinning Reserve

DAM Power Balance Price(System Lambda)

Ancillary Service prices reflect the opportunity cost of energy

PUBLIC

Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash July 2018

28

0

100

200

300

400

500

600

Pric

e ($

MW

h)

Hour Ending

RTSPP - LZ West

RTSPP - LZ North

RTSPP - LZ South

RTSPP - LZ Houston

DASPP - LZ West

DASPP - LZ North

DASPP - LZ South

DASPP - LZ Houston

Prices reflect relative transmission congestion and system scarcity

PUBLIC

Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash July 2018

29

0

100

200

300

400

500

600

Pric

e ($

MW

h)

Hour Ending

RTSPP - Hub Average

DASPP - Hub Average

Energy prices reflect the risk premium between Day-Ahead amp Real-Time

PUBLIC

DRUC Monthly Summary (Hourly Average) ndash July 2018

30

0

15000

30000

45000

60000

75000

90000

MW

h

Hour Ending

Self Scheduled Capacity

Self Scheduled Ancillary Service Limit

Load Forecast

DRUC Recommended Capacity

31 executions (0 missed)0 published after 160011 minutes average execution time0 Resources committed

PUBLIC

HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash July 2018

31

0

02

04

06

08

1

0

20

40

60

80

100

RTO

RD

PA ($

MW

h)

MW

h

Hour Ending

744 executions (0 missed)8 minutes average execution time1 Resources committed through HRUC or by a Verbal Dispatch Instruction

The dotted line indicates the average RTORDPA

PUBLIC

NonndashSpinning Reserve Service Deployment ndash July 2018

32

Deployment Start Time

Deployment End Time

Deployment Duration (Hours)

Max Deployment(MW) Reason

NA

PUBLIC

CRR Price Convergence ndash July 2018

0

50

100

150

200

250

Mill

ions

$

Cost

Value

Congestion Revenue Right cost in auction convergence with payment in Day-Ahead Market and Real Time Market

33

PUBLIC

Daily Average System Lambda and ORDC Price Adders ndash July 2018

0

50

100

150

200

250

$M

Wh

Day of Month

RTOFFPA

RTORPA

SYSTEM_LAMBDA

34

PUBLIC

ERS Procurement for June 2018 ndash September 2018

TP1 TP2 TP3 TP4 TP5 TP6

Non Weather-Sensitive ERS-10 MW 160562 165996 143324 140708 156699 151138

Non Weather-Sensitive ERS-30 MW 736864 781559 702529 625067 755153 657394

Weather-Sensitive ERS-10 MW 0 0 0 0 0 0

Weather-Sensitive ERS-30 MW 0 0 11850 11850 0 0

Total MW Procured 897426 947555 857703 777625 911852 808532

Clearing Price $201 $185 $2108 $2177 $199 $225

Time Period Time Period Hours

Time Period 1 Hours Ending 0600 - 0800 (50000 am to 80000 am) Monday through Friday except ERCOT Holidays

Time Period 2 Hours Ending 0900 - 1300 (80000 am to 10000 pm) Monday through Friday except ERCOT Holidays

Time Period 3 Hours Ending 1400 - 1600 (10000 pm to 40000 pm) Monday through Friday except ERCOT Holidays

Time Period 4 Hours Ending 1700 - 1900 (40000 pm to 70000 pm) Monday through Friday except ERCOT Holidays

Time Period 5 Hours Ending 2000 - 2200 (70000 pm to 100000 pm) Monday through Friday except ERCOT Holidays Time Period 6 All other hours

35

PUBLIC

Reliability Services ndash July 2018

Reliability Unit Commitment (RUC) $ in Millions

RUC Make-Whole Payments $000

RUC Clawback Charges $000

RUC Commitment Settlement $000

RUC Capacity Short Charges $000

RUC Make-Whole Uplift $000

RUC Commitment Cost Allocation $000

RUC Decommitment Payments $000

Total RUC Allocation to Load $000

In July 2018 there was a credit of $000M allocated to load for RUC compared to bull A credit of $000M in June 2018bull A credit of $003M in July 2017

36

PUBLIC

Ancillary and Other Services ndash July 2018

Ancillary and Other Services $ in Millions

Regulation Up Service $1105

Regulation Down Service $072

Responsive Reserve Service $7177

Non-Spinning Reserve Service $1787

Black Start Service $059

Voltage Services - Reactive Power $000

Voltage Services - Lost Opportunity $000

Total Charges Allocated to Load $10200

In July 2018 Ancillary and Other Services was a charge of $10200M compared to bull A charge of $2001M in June 2018bull A charge of $2322M in July 2017

37

PUBLIC

Real-Time Ancillary Service Imbalance (ORDC) ndash July 2018

In July 2018 Real-Time Ancillary Service Imbalance was a charge to load of $2228K compared to bull A charge of $147K in June 2018bull A charge of $534K in July 2017

Real-Time Ancillary Service Imbalance $ in Thousands

Real-Time AS Imbalance ($2228)

Real-Time Reliability Deployment AS Imbalance $000

Total RTASI Amount Allocated to Load $2228

38

PUBLIC

Energy Settlement ndash July 2018

39

Day-Ahead Market Energy Settlement $ in Millions

Energy Purchases $215396

Point to Point Obligation Purchases $11726

Energy Sales ($212592)

Day-Ahead Congestion Rent $14531

Day-Ahead Market Make-Whole Payments ($001)

Real-Time Market Energy Settlement $ in Millions

Energy Imbalance at a Resource Node ($91963)

Energy Imbalance at a Load Zone $160737

Energy Imbalance at a Hub ($57497)

Net Real-Time Energy Imbalance $11276

Real Time Congestion from Self Schedules $013

Block Load Transfers and DC Ties ($2063)

Total Impact to Revenue Neutrality $9227

Load-Allocated Emergency Energy Payments ($016)

Load-Allocated Base Point Deviation Charges $026

Day-Ahead Market energy settlement activity increased from last month and increased from July 2017

Real-Time Market energy settlement activity increased from last month and increased from July 2017

PUBLIC

Congestion Revenue Rights (CRR) ndash July 2018

$ in Millions

Long-Term Auction ($4026)

Monthly Auction ($1773)

Total Auction Revenue ($5799)

Day-Ahead CRR Settlements ($15797)

Day-Ahead CRR Short-Charges $1885

Day-Ahead CRR Short-Charges Refunded ($899)

Day-Ahead CRR Short-Charges Net $986

Total CRR Funding ($14810)

Day-Ahead Point-to-Point Obligations $11726

Real-Time Point-to-Point Obligations ($10113)

Net Point-to-Point Obligations $1614

Congestion Revenue Rights settlement payments were not fully funded Partial funding to settle the CRR Short Charges was provided from the CRR Balancing Account Fund and the remaining $986M of CRR Short Charges were not refunded The CRR Fund Balance is now $0

Point to Point Obligations settled with a net charge of $1614M compared to a net credit of $1758M last month

40

PUBLIC

CRR Balancing Account Fund ndash July 2018

CRR Balancing Account $ in Millions

Monthly Day-Ahead Congestion Rent $14531

Monthly Day-Ahead CRR Settlements ($15797)

Monthly Day-Ahead CRR Short -Charges $1885

CRR Balancing Account Credit Total $619

Beginning Fund Balance for the Month $275

CRR Balancing Account Credit Total $619

Day-Ahead CRR Short-Charges Refunded ($899)

CRR PTP Option Award Charges $004

Load-Allocated CRR Amount $000

Total Fund Amount $000

41

PUBLIC

Revenue Neutrality ndash July 2018

Revenue Neutrality $ in Millions

Real-Time Energy Imbalance $11276

Real-Time Point to Point Obligation ($10113)

Real-Time Congestion from Self-Schedules $013

DC Tie amp Block Load Transfer ($2063)

Allocation to Load $886

In July 2018 the Revenue Neutrality charge to load was $886M compared to bull A charge of $3046M in June 2018bull A charge of $145M in July 2017

42

PUBLIC

Net Allocation to Load ndash July 2018

Market-Based Allocation $ in Millions

Reliability Unit Commitment $000

Ancillary and Other Services $10200

Real-Time Ancillary Service Imbalance $223

Emergency Energy $016

Base Point Deviation ($026)

CRR Auction Revenue ($5799)

CRR Balancing Account $000

Real-Time Revenue Neutrality $886

Reliability Must Run $000

Monthly Block Load Transfer $000

Total $5500

Fee AllocationERCOT Administrative Fee $2207

Net Allocated to Load $7707

In July 2018 the Net Allocation to load was a charge of $7707M compared to bull A charge of $2152M in June 2018bull A credit of $1363M in July 2017

43

PUBLIC

Advanced Meter Settlement Impacts ndash July 2018

July 2018 At month end settling 72M ESIIDs using Advanced Meter data

July 2018 990 of the load in ERCOT is settled with 15-min interval data (AMS Competitive IDR and NOIE IDR)

44

PUBLIC

ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndashJuly 2018

45

PUBLIC

Retail Transaction Volumes ndash Summary ndash July 2018

46

Transaction Type July 2018 July 2017 July 2018 July 2017

Switches 669909 617300 121926 84059

Acquisition 0 0 0 0

Move - Ins 1667037 1568153 270122 252360

Move - Outs 814580 802779 129820 127073

Continuous Service Agreements (CSA) 395944 283259 40217 55770

Mass Transitions 9033 0 0 0

Total 3556503 3271491 562085 519262

Year-To-Date Transactions Received

Board Presentation Input

Trans Volumes by Month_New

PUBLIC

Retail Transaction Volumes ndash Summary ndash July 2018

SwitchesAcquisitions Move-Ins

Move-Outs Mass Transition

47

Projects Report

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018

20000000$ 2018 Portfolio

Spending Estimate

Projects In FlightOn Hold (Count = 100) 24905011$

Projects Not Yet Started (Count = 10) 1320628$

Projects Completed (Count = 43) 795250$

(7020889)$

TOTAL 20000000$

Project Number Projects in Initiation Phase (Count = 4)

TBD IT Asset RecoveryNPRR842 Study Area Load Information

209-03 Study Network (STNET) Integration288-01 EDI Map and Translator Replacement

Impact Metric TolerancesUnfavorable variances are represented as negative numbers within the report - Green = No more than 49 unfavorable variance - Yellow = Unfavorable variance between 49 and 99 - Red = Unfavorable variance more than 99

Spending Reductions Required to Maintain Capital Budget

2018 Project Funding

Footnotes1 - One or more phases took longer than expected resulting in additional time required

2 - One or more phases required more labor than expected resulting in additional funding andor time required

3 - Project placed on holdNA - Metric not calculated because - it is reported at the parent project level or - it is an administrative project

Project Number Projects in Planning Phase (Count = 8) Phase Start Baseline

Phase FinishApproved

Phase FinishScheduled

Go-Live DateScheduled

Phase Finish

134-02 Privileged Account Management (PAM) Phase 2 882018 12192018 12192018 TBD 12192018 0 10

183-01 CMM-FT GUI Integration 12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs

242-01 Portfolio Reporting Assessment 1182017 12192018 12192018 TBD 12192018 0 21260-01 Information Governance Assessment 10182017 5302018 9192018 TBD 9192018 0 5286-01 Java Platform Assessment 6202018 11212018 11212018 TBD 11212018 0 6287-01 Security Constrained Unit Commitment (SCUC) 882018 2272019 2272019 TBD 2272019 0 -1

NPRR484Revisions to Congestion Revenue Rights Credit Calculations and Payments - Phase 1b 2

12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs

NPRR702Flexible Accounts Payment of Invoices and Disposition of Interest on Cash Collateral

12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs

Schedule Health Budget Health

49

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018Project Number Projects in Execution Phase (Count = 42) Phase Start Baseline Go-

Live DateApproved Go-

Live DateScheduled

Go-Live DateScheduled

Phase Finish

170-01 Enterprise Content Alignment Program 8262015 11152017 8312018 8312018 8312018 0 0170-06 ECAP - ECMS Implementation Phase 1 4252018 11302018 11302018 11302018 11302018 0 3173-02 ERCOT Flight Certification Website 11152017 2282019 2282019 2282019 5312019 0 2181-01 CRR Framework Upgrade 10262016 1022017 11192018 11192018 2272019 0 2

183-01 CMM Tech Refresh 3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

193-01 PMU Tool Evaluation and Implementation 12132017 892018 2152019 2152019 3202019 0 0196-01 GINR Project Status Application Replacement 12212016 9142017 2282019 2282019 3312019 0 1198-02 Reactive Power Coordination PoC 962017 6162018 8152018 8152018 8152018 0 54209-02 Weather Imaging and Line Observation (WILO) 5302018 212019 212019 212019 2272019 0 2210-01 REC Technology Refresh 8302017 3182018 12132018 12132018 1162019 0 3228-01 Enterprise Database Upgrade 882018 1292020 1292020 1292020 1292020 0 17229-01 IT Change and Configuration Management Phase 2 822017 6192018 12132018 12132018 3252019 0 2 -9238-01 Application Authentication Tech Refresh 962017 3192018 12132018 12132018 1302019 0 3239-01 Identity and Access Management 592018 3132019 3132019 3132019 3132019 0 2241-01 AREA - Generation 10112017 3302018 892018 892018 952018 0 -4244-01 Corporate Wireless 11292017 3282018 1252018 1252018 192019 0 9245-01 2017 EPS Metering Enhancements 6272018 892019 892019 892019 9252019 0 1246-01 iTest Data Refresh 12132017 1192018 11152018 11152018 122019 0 25249-01 Secondary Wind Forecasting Service 8302017 2282018 892018 892018 952018 0 0253-01 CIP Recovery Plan Project - Planning Phase 1 1312018 8292018 8292018 8292018 8292018 0 -2

257-01Security Constrained Optimal Powerflow in Study Network Analysis

1262017 10252018 10252018 10252018 1282018 0 19

261-01 Generic Transmission Constraint Calculation 372018 12132018 12132018 12132018 1232019 0 0263-01 Market Simulator 4112018 12132018 12132018 12132018 1302019 0 7265-01 Real-Time Assessment Continuity 1312018 12132018 12132018 12132018 1302019 0 0279-01 Cyber Security Project 24 6272018 10262018 10262018 10262018 11282018 0 0280-01 Quest Software Portfolio Transition 442018 6272018 9262018 9262018 9262018 0 13282-01 Synchronous Condenser Outage Modeling 662018 10252018 10252018 10252018 1252018 0 1Various 2015 CMM NPRRs 2 -18

NPRR519Exemption of ERS-Only QSEs from Collateral and Capitalization Requirements

3152017 5192018 12112018 12112018 12312018 0 See 2015 CMM NPRRs

NPRR620Collateral Requirements for Counter-Parties with No Load or Generation

3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

NPRR660 Remove CRR State Change Adder 3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

Budget HealthSchedule Health

50

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018Project Number Projects in Execution Phase (Count = 42) Phase Start Baseline Go-

Live DateApproved Go-

Live DateScheduled

Go-Live DateScheduled

Phase Finish

NPRR741 Clarifications to TPE and EAL Credit Exposure Calculations 3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

NPRR749 Option Cost for Outstanding CRRs 882018 12132018 12132018 12132018 TBD 0 NA See 2015 CMM NPRRs

NPRR755 Data Agent-Only QSE Registration 3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

NPRR819Modification of Non-Price Error Resettlement Thresholds and Resettlement Clean-Ups

592018 892018 892018 892018 952018 0 36

NPRR833 Modify PTP Obligation Bid Clearing Change 882018 12132018 12132018 12132018 TBD 0 1

NPRR843Short-Term System Adequacy and AS Offer Disclosure Reports Additions

7182018 10252018 10252018 10252018 11282018 0 0

NPRR864 RUC Modifications to Consider Market-Based Solutions 6202018 10252018 10252018 10252018 11282018 0 4SCR777 Bilateral CRR Interface Enhancement 10262016 1022017 11192018 11192018 2272019 0 NA See 181-01

SCR781 RARF Replacement 12202017 4252018 12192018 12192018 12192018 0 3SCR791 Correction of 60-day SCED GRD Disclosure Report 522018 892018 892018 892018 952018 0 39SCR795 Addition of Intra-Hour Wind Forecast to GTBD Calculation 882018 10252018 10252018 10252018 11142018 0 0

Project Number Expedited Projects in Execution (Count = 34)

Project Number Projects in Stabilization (Count = 10) Execution

Phase StartBaseline Go-Live Target

Approved Go-Live Target

ActualGo-Live Date

Scheduled Execution Phase

Finish

NPRR648 Remove References to Flowgate Rights 3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR683 Revision to Available Credit Limit Calculation 3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR743 Revision to MCE to Have a Floor For Load Exposure 3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR760 Calculation of Exposure Variables For Days With No Activity 3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR776 Voltage Set Point Communication 9202017 3192018 452018 452018 952018 0 1

NPRR800Revisions to Credit Exposure Calculations to Use Electricity Futures Market Prices

3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR815Revise the Limitation of Load Resources Providing Responsive Reserve (RRS) Service

3212018 5312018 5312018 5312018 8292018 0 2

209-01 Multi Station Breaker to Breaker One Lines 282017 392018 532018 532018 8222018 0 -1259-01 DC SCADA and Metering Upgrade 10252017 1172018 7252018 7252018 8292018 0 22266-01 Remote Email Access Enhancement 12132017 372018 662018 6192018 9262018 2 -7 2 -9

Schedule Health Budget Health

Budget HealthSchedule Health

51

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018

Project Number Projects On Hold (Count = 2) Forecast

Start DateBaseline

Phase FinishApproved Go-

Live TargetScheduled

Go-Live DateScheduled

Phase Finish

SCR789 Update NMMS Topology Processor to PSSE 34 Capability 0

269-01Document Repository Redesign and Governance Implementation - Phase 1

0

Project Number Projects Completed (Count = 20)

Baseline Execution

Phase Start

Baseline Go-Live Target

Approved Go-Live Target

Actual Go-Live Date

Actual Execution Phase Finish

185-01 Records Management and eDiscovery 12152016 5242017 8292017 8222017 12132017 2 0224-01 TelAlert Replacement 452017 6272017 842017 842017 592018 0 5230-01 SAS Technical Architecture Redesign 312017 12132017 12132017 12132017 6272018 0 2234-01 Reporting Solution Resiliency (RSR) 452017 8232017 11272017 11272017 1102018 0 8240-01 EDI Translator and Mapping Replacement Assessment 4192017 9272017 2282018 TBD 372018 -2 20254-01 Retail Windows Upgrade 10112017 12182017 12182017 1222018 272018 1 -51 65255-01 Settlements Architecture Enhancements 10252017 1112018 1112018 1192018 2142018 1 -10 53258-01 WD Kainos SMART Automation Testing Tool 4112018 642018 642018 662018 7182018 -3 33271-01 Issue Tracking and Resolution Tool Assessment 12132017 4252018 4252018 TBD 522018 1 -5 -1272-01 Operator Training Simulator Black Start GE Effort 1262017 4252018 4252018 4272018 5162018 -1 19274-01 Average Mid-Term Load Forecast 372018 5312018 5312018 5312018 6272018 0 50

NPRR768Revisions to Real-Time On-Line Reliability Deployment Price Adder Categories

372018 5312018 5312018 5312018 6272018 0 16

NPRR778 Modifications to Date Change and Cancellation Evaluation Window 7192017 10292017 12112017 12112017 1312018 0 23

NPRR782Settlement of Infeasible Ancillary Services Due to Transmission Constraints

5242017 8312017 1122017 1122017 1102018 0 20

NPRR808 Three Year CRR Auction 8232017 9182017 9182017 912017 1312018 65 68

NPRR810Applicability of RMR Incentive Factor on Reservation and Transportation Costs Associated with Firm Fuel Supplies

7172017 11122017 3312018 3312018 3312018 0 NA See 233-00

NPRR830 Revision of 4-Coincident Peak Methodology 12132017 262018 262018 262018 372018 0 85

NPRR831 Inclusion of Private Use Networks in Load Zone Price Calculations 822017 1122017 1122017 1122017 2212018 0 33

OBDRR002 ORDC OBD Revisions for PUCT Project 47199 372018 5312018 5312018 5312018 6272018 0 See NPRR768

SCR792 Enhance Communications of BAAL Exceedances 2142018 452018 452018 452018 4252018 0 69

Project Number Expedited Projects Completed (Count = 23)

Budget HealthSchedule Health

Budget HealthSchedule Health

52

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018

Project Number 2018 Projects Not Yet Started (Count = 10) Forecast

Start Date

NPRR858 Provide Complete Current Operating Plan (COP) Data Aug-2018TBD 2018 OS Enhancements Aug-2018TBD Additional Branch Limit for Relays Aug-2018

NPRR817 Create a Panhandle Hub Sep-2018NPRR821 Elimination of the CRR Deration Process Oct-2018NPRR865 Publish RTM Shift Factors for Hubs Load Zones and DC Ties Oct-2018

SCR793SSR Related Telemetry for Transmission Service Provider (TSP) Operators

Oct-2018

ECAP ECAP - ECMS Implementation Phase 2 Oct-2018TBD Job Scheduler Update in CSI Framework Oct-2018TBD Parameter Estimation Oct-2018

53

  • Slide Number 1
  • Slide Number 2
  • Summary ndash July 2018
  • Daily Peak Demand Hourly Average Actual vs Forecast Wind Day-Ahead COPs amp On-Line Capacity at Peak ndash July 2018
  • Actual Wind Output plus Curtailments vs Wind Day-Ahead COPs for All Hours ndash July 2018
  • ERCOTrsquos CPS1 Monthly Performance ndash July 2018
  • Monthly Peak Actual Demand ndash July 2018
  • Monthly Minimum Actual 15-Minute Demand ndash July 2018
  • Day-Ahead Load Forecast Performance ndash July 2018
  • Reliability Unit Commitment (RUC) Capacity by Weather Zone ndash July 2018
  • Generic Transmission Constraints (GTCs) ndash July 2018
  • Advisories and Watches ndash July 2018 Corrected
  • Lake Levels Update ndash August 1 2018
  • Planning Summary ndash July 2018
  • Mapping of Counties to ERCOT Zones ndash July 2018
  • Cumulative MW Capacity of Interconnection Requests by Zone ndashJuly 2018
  • Cumulative MW Capacity of Interconnection Requests by Zone ndashJuly 2018
  • Cumulative MW Capacity of Interconnection Requests by Zone ndashJuly 2018
  • Wind Generation ndash July 2018
  • Solar Generation ndash July 2018
  • Generation Interconnection Activity by Fuel ndash July 2018
  • Generation Interconnection Activity by Project Phase ndash July 2018
  • Slide Number 23
  • Day-Ahead Schedule (Hourly Average) ndash July 2018
  • Percentage of Real-Time Load Hedged in the DAM (Counter-Party Level) ndash July 2018
  • DAM and RTM Price Convergence ndash July 2018
  • Day-Ahead Electricity and Ancillary Service Prices (Hourly Average) ndash July 2018
  • Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash July 2018
  • Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash July 2018
  • DRUC Monthly Summary (Hourly Average) ndash July 2018
  • HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash July 2018
  • NonndashSpinning Reserve Service Deployment ndash July 2018
  • CRR Price Convergence ndash July 2018
  • Daily Average System Lambda and ORDC Price Adders ndash July 2018
  • ERS Procurement for June 2018 ndash September 2018
  • Reliability Services ndash July 2018
  • Ancillary and Other Services ndash July 2018
  • Real-Time Ancillary Service Imbalance (ORDC) ndash July 2018
  • Energy Settlement ndash July 2018
  • Congestion Revenue Rights (CRR) ndash July 2018
  • CRR Balancing Account Fund ndash July 2018
  • Revenue Neutrality ndash July 2018
  • Net Allocation to Load ndash July 2018
  • Advanced Meter Settlement Impacts ndash July 2018
  • ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndash July 2018
  • Retail Transaction Volumes ndash Summary ndash July 2018
  • Retail Transaction Volumes ndash Summary ndash July 2018
  • Slide Number 48
  • ERCOT Portfolio Stoplight Report ndash July 2018
  • ERCOT Portfolio Stoplight Report ndash July 2018
  • ERCOT Portfolio Stoplight Report ndash July 2018
  • ERCOT Portfolio Stoplight Report ndash July 2018
  • ERCOT Portfolio Stoplight Report ndash July 2018
Retail Transactions Summary
July 2018 June 2018 May 2018 April 2018 March 2018 February 2018 January 2018 December 2017 November 2017 October 2017 September 2017 August 2017 July 2017 June 2017 May 2017 April 2017 March 2017 February 2017 January 2017 December 2016 November 2016 October 2016 September 2016 August 2016 July 2016 June 2016 May 2016 April 2016 March 2016 February 2016 January 2016 December 2015 November 2015 October 2015 September 2015 August 2015 July 2015 June 2015 May 2015 April 2015 March 2015 February 2015 January 2015 December 2014 November 2014 October 2014 September 2014 August 2014 July 2014 June 2014 May 2014 April 2014 March 2014 February 2014 January 2014 December 2013 November 2013 October 2013 September 2013 August 2013 July 2013 June 2013 May 2013 April 2013 March 2013 February 2013 January 2013 Grand total
814_01 - Switch Received 121926 109653 96828 81291 95159 76119 88933 60560 77860 78096 79502 84134 84059 108784 130828 71769 67845 66875 87140 66556 56202 64452 67323 86656 82923 86376 75323 70300 76235 68057 63954 61486 52887 65276 70342 81674 91211 102661 86229 81255 79997 73394 72885 71072 67080 110465 175164 89677 99568 101490 111077 91983 93887 71130 86953 69691 55957 166882 82415 93194 102562 103756 116086 78919 68950 64329 67116 1321827
Difference from previous month 12273 12825 15537 (13868) 19040 (12814) 28373 (17300) (236) (1406) (4632) 75 (24725) (22044) 59059 3924 970 (20265) 20584 10354 (8250) (2871) (19333) 3733 (3453) 11053 5023 (5935) 8178 4103 2468 8599 (12389) (5066) (11332) (9537) (11450) 16432 4974 1258 6603 509 1813 3992 (43385) (64699) 85487 (9891) (1922) (9587) 19094 (1904) 22757 (15823) 17262 13734 (110925) 84467 (10779) (9368) (1194) (12330) 37167 9969 4621 (2787)
814_16 - Move - Ins Received 270122 257125 244431 225380 224289 215281 230409 238340 207921 236397 244511 258046 252360 257759 237611 197865 217962 201984 202612 196236 201714 220958 231999 268781 241844 247481 214383 199804 218245 212474 193716 189862 181098 215908 229405 248124 263233 247089 208166 207932 215950 197765 198025 193973 178624 226283 231418 243482 251957 233679 223201 258649 214724 208160 207059 172981 178671 233469 216550 255967 249114 220397 216982 204412 197200 191955 194507 3162148
Difference from previous month 12997 12694 19051 1091 9008 (15128) (7931) 30419 (28476) (8114) (13535) 5686 (5399) 20148 39746 (20097) 15978 (628) 6376 (5478) (19244) (11041) (36782) 26937 (5637) 33098 14579 (18441) 5771 18758 3854 8764 (34810) (13497) (18719) (15109) 16144 38923 234 (8018) 18185 (260) 4052 15349 (47659) (5135) (12064) (8475) 18278 10478 (35448) 43925 6564 1101 34078 (5690) (54798) 16919 (39417) 6853 28717 3415 12570 7212 5245 (2552)
814_24 - MVO and MVO to CSA Received 129820 125861 124403 113795 108753 100127 111821 144987 100830 116519 129103 128104 127073 133582 127218 102055 111459 100285 101107 96289 100578 109493 114094 133170 122932 129025 118022 103789 109278 103747 96628 99552 96214 109578 117949 123894 133905 133855 114675 108275 108859 94864 98233 97901 89578 111857 115918 121662 131607 126785 119107 107956 107266 99428 104273 93385 93977 115469 115524 129594 135196 121446 120049 111598 106467 102429 104399 1660500
814_10 - DTP Mass Acquisition Received - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0
814_10 - DTP Mass Transition Received - 0 - 0 9033 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 639 - 0 - 0 4975 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0
814_18 - CSA AdditionDeletes Received 40217 62083 99016 55581 46720 42587 49740 47725 31726 52888 41597 40616 55770 43745 52139 26702 21791 39082 44030 38884 39856 31786 33061 42622 48489 64178 50499 59475 59400 48536 42179 40351 34796 34420 54677 35078 49489 59611 39384 44247 44577 35386 40420 54831 43550 45039 44268 40405 57954 64408 65032 80184 70310 41156 34811 46680 50347 71847 48606 52585 50867 62747 59763 34925 40977 40389 41227 747237
Total 562085 554722 573711 476047 474921 434114 480903 491612 418337 483900 494713 510900 519262 543870 547796 398391 419057 408226 434889 397965 398350 426689 446477 531229 496188 527060 458227 433368 463158 432814 396477 391251 364995 425182 472373 488770 537838 543216 448454 441709 449383 401409 409563 417777 378832 493644 566768 495865 541086 526362 523392 538772 486187 419874 433096 382737 378952 587667 463095 531340 537739 508346 512880 429854 413594 399102 407249 6891712
Counts from Monthly Retail Transaction report
To do
Break Out 814_10s - AQ and MT
Break Out 814_18 Additions from Deletes
Year-To-Date Transactions Received
Transaction Type July 2018 July 2017 July 2018 July 2017
Switches 669909 617300 121926 84059
Acquisition 0 0 0 0
Move - Ins 1667037 1568153 270122 252360
Move - Outs 814580 802779 129820 127073
Continuous Service Agreements (CSA) 395944 283259 40217 55770
Mass Transitions 9033 0 0 0
Total 3556503 3271491 562085 519262
There has been a change since this was created
Mass Acquisition has been broken out of Mass Transition
Page 26: ERCOT Monthly Operational Overvie · ERCOT Monthly Operational Overview (July 2018) Revised 08.22.18. ERCOT Public. August 15, 2018

PUBLIC

DAM and RTM Price Convergence ndash July 2018

26

-20

-10

0

10

20

30

40

50

60Ja

nM

arM

ay Jul

Sep

Nov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

l

2013 2014 2015 2016 2017 2018

Aver

age

DAM

-R

TM S

PP ($

MW

h)

The dotted lines represent the bounds for major outliers

PUBLIC

Day-Ahead Electricity and Ancillary Service Prices (Hourly Average) ndashJuly 2018

27

0

100

200

300

400

500

600

Pric

e ($

MW

h)

Hour Ending

Regulation Up

Regulation Down

Responsive Reserve

Non Spinning Reserve

DAM Power Balance Price(System Lambda)

Ancillary Service prices reflect the opportunity cost of energy

PUBLIC

Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash July 2018

28

0

100

200

300

400

500

600

Pric

e ($

MW

h)

Hour Ending

RTSPP - LZ West

RTSPP - LZ North

RTSPP - LZ South

RTSPP - LZ Houston

DASPP - LZ West

DASPP - LZ North

DASPP - LZ South

DASPP - LZ Houston

Prices reflect relative transmission congestion and system scarcity

PUBLIC

Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash July 2018

29

0

100

200

300

400

500

600

Pric

e ($

MW

h)

Hour Ending

RTSPP - Hub Average

DASPP - Hub Average

Energy prices reflect the risk premium between Day-Ahead amp Real-Time

PUBLIC

DRUC Monthly Summary (Hourly Average) ndash July 2018

30

0

15000

30000

45000

60000

75000

90000

MW

h

Hour Ending

Self Scheduled Capacity

Self Scheduled Ancillary Service Limit

Load Forecast

DRUC Recommended Capacity

31 executions (0 missed)0 published after 160011 minutes average execution time0 Resources committed

PUBLIC

HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash July 2018

31

0

02

04

06

08

1

0

20

40

60

80

100

RTO

RD

PA ($

MW

h)

MW

h

Hour Ending

744 executions (0 missed)8 minutes average execution time1 Resources committed through HRUC or by a Verbal Dispatch Instruction

The dotted line indicates the average RTORDPA

PUBLIC

NonndashSpinning Reserve Service Deployment ndash July 2018

32

Deployment Start Time

Deployment End Time

Deployment Duration (Hours)

Max Deployment(MW) Reason

NA

PUBLIC

CRR Price Convergence ndash July 2018

0

50

100

150

200

250

Mill

ions

$

Cost

Value

Congestion Revenue Right cost in auction convergence with payment in Day-Ahead Market and Real Time Market

33

PUBLIC

Daily Average System Lambda and ORDC Price Adders ndash July 2018

0

50

100

150

200

250

$M

Wh

Day of Month

RTOFFPA

RTORPA

SYSTEM_LAMBDA

34

PUBLIC

ERS Procurement for June 2018 ndash September 2018

TP1 TP2 TP3 TP4 TP5 TP6

Non Weather-Sensitive ERS-10 MW 160562 165996 143324 140708 156699 151138

Non Weather-Sensitive ERS-30 MW 736864 781559 702529 625067 755153 657394

Weather-Sensitive ERS-10 MW 0 0 0 0 0 0

Weather-Sensitive ERS-30 MW 0 0 11850 11850 0 0

Total MW Procured 897426 947555 857703 777625 911852 808532

Clearing Price $201 $185 $2108 $2177 $199 $225

Time Period Time Period Hours

Time Period 1 Hours Ending 0600 - 0800 (50000 am to 80000 am) Monday through Friday except ERCOT Holidays

Time Period 2 Hours Ending 0900 - 1300 (80000 am to 10000 pm) Monday through Friday except ERCOT Holidays

Time Period 3 Hours Ending 1400 - 1600 (10000 pm to 40000 pm) Monday through Friday except ERCOT Holidays

Time Period 4 Hours Ending 1700 - 1900 (40000 pm to 70000 pm) Monday through Friday except ERCOT Holidays

Time Period 5 Hours Ending 2000 - 2200 (70000 pm to 100000 pm) Monday through Friday except ERCOT Holidays Time Period 6 All other hours

35

PUBLIC

Reliability Services ndash July 2018

Reliability Unit Commitment (RUC) $ in Millions

RUC Make-Whole Payments $000

RUC Clawback Charges $000

RUC Commitment Settlement $000

RUC Capacity Short Charges $000

RUC Make-Whole Uplift $000

RUC Commitment Cost Allocation $000

RUC Decommitment Payments $000

Total RUC Allocation to Load $000

In July 2018 there was a credit of $000M allocated to load for RUC compared to bull A credit of $000M in June 2018bull A credit of $003M in July 2017

36

PUBLIC

Ancillary and Other Services ndash July 2018

Ancillary and Other Services $ in Millions

Regulation Up Service $1105

Regulation Down Service $072

Responsive Reserve Service $7177

Non-Spinning Reserve Service $1787

Black Start Service $059

Voltage Services - Reactive Power $000

Voltage Services - Lost Opportunity $000

Total Charges Allocated to Load $10200

In July 2018 Ancillary and Other Services was a charge of $10200M compared to bull A charge of $2001M in June 2018bull A charge of $2322M in July 2017

37

PUBLIC

Real-Time Ancillary Service Imbalance (ORDC) ndash July 2018

In July 2018 Real-Time Ancillary Service Imbalance was a charge to load of $2228K compared to bull A charge of $147K in June 2018bull A charge of $534K in July 2017

Real-Time Ancillary Service Imbalance $ in Thousands

Real-Time AS Imbalance ($2228)

Real-Time Reliability Deployment AS Imbalance $000

Total RTASI Amount Allocated to Load $2228

38

PUBLIC

Energy Settlement ndash July 2018

39

Day-Ahead Market Energy Settlement $ in Millions

Energy Purchases $215396

Point to Point Obligation Purchases $11726

Energy Sales ($212592)

Day-Ahead Congestion Rent $14531

Day-Ahead Market Make-Whole Payments ($001)

Real-Time Market Energy Settlement $ in Millions

Energy Imbalance at a Resource Node ($91963)

Energy Imbalance at a Load Zone $160737

Energy Imbalance at a Hub ($57497)

Net Real-Time Energy Imbalance $11276

Real Time Congestion from Self Schedules $013

Block Load Transfers and DC Ties ($2063)

Total Impact to Revenue Neutrality $9227

Load-Allocated Emergency Energy Payments ($016)

Load-Allocated Base Point Deviation Charges $026

Day-Ahead Market energy settlement activity increased from last month and increased from July 2017

Real-Time Market energy settlement activity increased from last month and increased from July 2017

PUBLIC

Congestion Revenue Rights (CRR) ndash July 2018

$ in Millions

Long-Term Auction ($4026)

Monthly Auction ($1773)

Total Auction Revenue ($5799)

Day-Ahead CRR Settlements ($15797)

Day-Ahead CRR Short-Charges $1885

Day-Ahead CRR Short-Charges Refunded ($899)

Day-Ahead CRR Short-Charges Net $986

Total CRR Funding ($14810)

Day-Ahead Point-to-Point Obligations $11726

Real-Time Point-to-Point Obligations ($10113)

Net Point-to-Point Obligations $1614

Congestion Revenue Rights settlement payments were not fully funded Partial funding to settle the CRR Short Charges was provided from the CRR Balancing Account Fund and the remaining $986M of CRR Short Charges were not refunded The CRR Fund Balance is now $0

Point to Point Obligations settled with a net charge of $1614M compared to a net credit of $1758M last month

40

PUBLIC

CRR Balancing Account Fund ndash July 2018

CRR Balancing Account $ in Millions

Monthly Day-Ahead Congestion Rent $14531

Monthly Day-Ahead CRR Settlements ($15797)

Monthly Day-Ahead CRR Short -Charges $1885

CRR Balancing Account Credit Total $619

Beginning Fund Balance for the Month $275

CRR Balancing Account Credit Total $619

Day-Ahead CRR Short-Charges Refunded ($899)

CRR PTP Option Award Charges $004

Load-Allocated CRR Amount $000

Total Fund Amount $000

41

PUBLIC

Revenue Neutrality ndash July 2018

Revenue Neutrality $ in Millions

Real-Time Energy Imbalance $11276

Real-Time Point to Point Obligation ($10113)

Real-Time Congestion from Self-Schedules $013

DC Tie amp Block Load Transfer ($2063)

Allocation to Load $886

In July 2018 the Revenue Neutrality charge to load was $886M compared to bull A charge of $3046M in June 2018bull A charge of $145M in July 2017

42

PUBLIC

Net Allocation to Load ndash July 2018

Market-Based Allocation $ in Millions

Reliability Unit Commitment $000

Ancillary and Other Services $10200

Real-Time Ancillary Service Imbalance $223

Emergency Energy $016

Base Point Deviation ($026)

CRR Auction Revenue ($5799)

CRR Balancing Account $000

Real-Time Revenue Neutrality $886

Reliability Must Run $000

Monthly Block Load Transfer $000

Total $5500

Fee AllocationERCOT Administrative Fee $2207

Net Allocated to Load $7707

In July 2018 the Net Allocation to load was a charge of $7707M compared to bull A charge of $2152M in June 2018bull A credit of $1363M in July 2017

43

PUBLIC

Advanced Meter Settlement Impacts ndash July 2018

July 2018 At month end settling 72M ESIIDs using Advanced Meter data

July 2018 990 of the load in ERCOT is settled with 15-min interval data (AMS Competitive IDR and NOIE IDR)

44

PUBLIC

ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndashJuly 2018

45

PUBLIC

Retail Transaction Volumes ndash Summary ndash July 2018

46

Transaction Type July 2018 July 2017 July 2018 July 2017

Switches 669909 617300 121926 84059

Acquisition 0 0 0 0

Move - Ins 1667037 1568153 270122 252360

Move - Outs 814580 802779 129820 127073

Continuous Service Agreements (CSA) 395944 283259 40217 55770

Mass Transitions 9033 0 0 0

Total 3556503 3271491 562085 519262

Year-To-Date Transactions Received

Board Presentation Input

Trans Volumes by Month_New

PUBLIC

Retail Transaction Volumes ndash Summary ndash July 2018

SwitchesAcquisitions Move-Ins

Move-Outs Mass Transition

47

Projects Report

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018

20000000$ 2018 Portfolio

Spending Estimate

Projects In FlightOn Hold (Count = 100) 24905011$

Projects Not Yet Started (Count = 10) 1320628$

Projects Completed (Count = 43) 795250$

(7020889)$

TOTAL 20000000$

Project Number Projects in Initiation Phase (Count = 4)

TBD IT Asset RecoveryNPRR842 Study Area Load Information

209-03 Study Network (STNET) Integration288-01 EDI Map and Translator Replacement

Impact Metric TolerancesUnfavorable variances are represented as negative numbers within the report - Green = No more than 49 unfavorable variance - Yellow = Unfavorable variance between 49 and 99 - Red = Unfavorable variance more than 99

Spending Reductions Required to Maintain Capital Budget

2018 Project Funding

Footnotes1 - One or more phases took longer than expected resulting in additional time required

2 - One or more phases required more labor than expected resulting in additional funding andor time required

3 - Project placed on holdNA - Metric not calculated because - it is reported at the parent project level or - it is an administrative project

Project Number Projects in Planning Phase (Count = 8) Phase Start Baseline

Phase FinishApproved

Phase FinishScheduled

Go-Live DateScheduled

Phase Finish

134-02 Privileged Account Management (PAM) Phase 2 882018 12192018 12192018 TBD 12192018 0 10

183-01 CMM-FT GUI Integration 12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs

242-01 Portfolio Reporting Assessment 1182017 12192018 12192018 TBD 12192018 0 21260-01 Information Governance Assessment 10182017 5302018 9192018 TBD 9192018 0 5286-01 Java Platform Assessment 6202018 11212018 11212018 TBD 11212018 0 6287-01 Security Constrained Unit Commitment (SCUC) 882018 2272019 2272019 TBD 2272019 0 -1

NPRR484Revisions to Congestion Revenue Rights Credit Calculations and Payments - Phase 1b 2

12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs

NPRR702Flexible Accounts Payment of Invoices and Disposition of Interest on Cash Collateral

12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs

Schedule Health Budget Health

49

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018Project Number Projects in Execution Phase (Count = 42) Phase Start Baseline Go-

Live DateApproved Go-

Live DateScheduled

Go-Live DateScheduled

Phase Finish

170-01 Enterprise Content Alignment Program 8262015 11152017 8312018 8312018 8312018 0 0170-06 ECAP - ECMS Implementation Phase 1 4252018 11302018 11302018 11302018 11302018 0 3173-02 ERCOT Flight Certification Website 11152017 2282019 2282019 2282019 5312019 0 2181-01 CRR Framework Upgrade 10262016 1022017 11192018 11192018 2272019 0 2

183-01 CMM Tech Refresh 3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

193-01 PMU Tool Evaluation and Implementation 12132017 892018 2152019 2152019 3202019 0 0196-01 GINR Project Status Application Replacement 12212016 9142017 2282019 2282019 3312019 0 1198-02 Reactive Power Coordination PoC 962017 6162018 8152018 8152018 8152018 0 54209-02 Weather Imaging and Line Observation (WILO) 5302018 212019 212019 212019 2272019 0 2210-01 REC Technology Refresh 8302017 3182018 12132018 12132018 1162019 0 3228-01 Enterprise Database Upgrade 882018 1292020 1292020 1292020 1292020 0 17229-01 IT Change and Configuration Management Phase 2 822017 6192018 12132018 12132018 3252019 0 2 -9238-01 Application Authentication Tech Refresh 962017 3192018 12132018 12132018 1302019 0 3239-01 Identity and Access Management 592018 3132019 3132019 3132019 3132019 0 2241-01 AREA - Generation 10112017 3302018 892018 892018 952018 0 -4244-01 Corporate Wireless 11292017 3282018 1252018 1252018 192019 0 9245-01 2017 EPS Metering Enhancements 6272018 892019 892019 892019 9252019 0 1246-01 iTest Data Refresh 12132017 1192018 11152018 11152018 122019 0 25249-01 Secondary Wind Forecasting Service 8302017 2282018 892018 892018 952018 0 0253-01 CIP Recovery Plan Project - Planning Phase 1 1312018 8292018 8292018 8292018 8292018 0 -2

257-01Security Constrained Optimal Powerflow in Study Network Analysis

1262017 10252018 10252018 10252018 1282018 0 19

261-01 Generic Transmission Constraint Calculation 372018 12132018 12132018 12132018 1232019 0 0263-01 Market Simulator 4112018 12132018 12132018 12132018 1302019 0 7265-01 Real-Time Assessment Continuity 1312018 12132018 12132018 12132018 1302019 0 0279-01 Cyber Security Project 24 6272018 10262018 10262018 10262018 11282018 0 0280-01 Quest Software Portfolio Transition 442018 6272018 9262018 9262018 9262018 0 13282-01 Synchronous Condenser Outage Modeling 662018 10252018 10252018 10252018 1252018 0 1Various 2015 CMM NPRRs 2 -18

NPRR519Exemption of ERS-Only QSEs from Collateral and Capitalization Requirements

3152017 5192018 12112018 12112018 12312018 0 See 2015 CMM NPRRs

NPRR620Collateral Requirements for Counter-Parties with No Load or Generation

3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

NPRR660 Remove CRR State Change Adder 3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

Budget HealthSchedule Health

50

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018Project Number Projects in Execution Phase (Count = 42) Phase Start Baseline Go-

Live DateApproved Go-

Live DateScheduled

Go-Live DateScheduled

Phase Finish

NPRR741 Clarifications to TPE and EAL Credit Exposure Calculations 3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

NPRR749 Option Cost for Outstanding CRRs 882018 12132018 12132018 12132018 TBD 0 NA See 2015 CMM NPRRs

NPRR755 Data Agent-Only QSE Registration 3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

NPRR819Modification of Non-Price Error Resettlement Thresholds and Resettlement Clean-Ups

592018 892018 892018 892018 952018 0 36

NPRR833 Modify PTP Obligation Bid Clearing Change 882018 12132018 12132018 12132018 TBD 0 1

NPRR843Short-Term System Adequacy and AS Offer Disclosure Reports Additions

7182018 10252018 10252018 10252018 11282018 0 0

NPRR864 RUC Modifications to Consider Market-Based Solutions 6202018 10252018 10252018 10252018 11282018 0 4SCR777 Bilateral CRR Interface Enhancement 10262016 1022017 11192018 11192018 2272019 0 NA See 181-01

SCR781 RARF Replacement 12202017 4252018 12192018 12192018 12192018 0 3SCR791 Correction of 60-day SCED GRD Disclosure Report 522018 892018 892018 892018 952018 0 39SCR795 Addition of Intra-Hour Wind Forecast to GTBD Calculation 882018 10252018 10252018 10252018 11142018 0 0

Project Number Expedited Projects in Execution (Count = 34)

Project Number Projects in Stabilization (Count = 10) Execution

Phase StartBaseline Go-Live Target

Approved Go-Live Target

ActualGo-Live Date

Scheduled Execution Phase

Finish

NPRR648 Remove References to Flowgate Rights 3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR683 Revision to Available Credit Limit Calculation 3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR743 Revision to MCE to Have a Floor For Load Exposure 3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR760 Calculation of Exposure Variables For Days With No Activity 3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR776 Voltage Set Point Communication 9202017 3192018 452018 452018 952018 0 1

NPRR800Revisions to Credit Exposure Calculations to Use Electricity Futures Market Prices

3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR815Revise the Limitation of Load Resources Providing Responsive Reserve (RRS) Service

3212018 5312018 5312018 5312018 8292018 0 2

209-01 Multi Station Breaker to Breaker One Lines 282017 392018 532018 532018 8222018 0 -1259-01 DC SCADA and Metering Upgrade 10252017 1172018 7252018 7252018 8292018 0 22266-01 Remote Email Access Enhancement 12132017 372018 662018 6192018 9262018 2 -7 2 -9

Schedule Health Budget Health

Budget HealthSchedule Health

51

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018

Project Number Projects On Hold (Count = 2) Forecast

Start DateBaseline

Phase FinishApproved Go-

Live TargetScheduled

Go-Live DateScheduled

Phase Finish

SCR789 Update NMMS Topology Processor to PSSE 34 Capability 0

269-01Document Repository Redesign and Governance Implementation - Phase 1

0

Project Number Projects Completed (Count = 20)

Baseline Execution

Phase Start

Baseline Go-Live Target

Approved Go-Live Target

Actual Go-Live Date

Actual Execution Phase Finish

185-01 Records Management and eDiscovery 12152016 5242017 8292017 8222017 12132017 2 0224-01 TelAlert Replacement 452017 6272017 842017 842017 592018 0 5230-01 SAS Technical Architecture Redesign 312017 12132017 12132017 12132017 6272018 0 2234-01 Reporting Solution Resiliency (RSR) 452017 8232017 11272017 11272017 1102018 0 8240-01 EDI Translator and Mapping Replacement Assessment 4192017 9272017 2282018 TBD 372018 -2 20254-01 Retail Windows Upgrade 10112017 12182017 12182017 1222018 272018 1 -51 65255-01 Settlements Architecture Enhancements 10252017 1112018 1112018 1192018 2142018 1 -10 53258-01 WD Kainos SMART Automation Testing Tool 4112018 642018 642018 662018 7182018 -3 33271-01 Issue Tracking and Resolution Tool Assessment 12132017 4252018 4252018 TBD 522018 1 -5 -1272-01 Operator Training Simulator Black Start GE Effort 1262017 4252018 4252018 4272018 5162018 -1 19274-01 Average Mid-Term Load Forecast 372018 5312018 5312018 5312018 6272018 0 50

NPRR768Revisions to Real-Time On-Line Reliability Deployment Price Adder Categories

372018 5312018 5312018 5312018 6272018 0 16

NPRR778 Modifications to Date Change and Cancellation Evaluation Window 7192017 10292017 12112017 12112017 1312018 0 23

NPRR782Settlement of Infeasible Ancillary Services Due to Transmission Constraints

5242017 8312017 1122017 1122017 1102018 0 20

NPRR808 Three Year CRR Auction 8232017 9182017 9182017 912017 1312018 65 68

NPRR810Applicability of RMR Incentive Factor on Reservation and Transportation Costs Associated with Firm Fuel Supplies

7172017 11122017 3312018 3312018 3312018 0 NA See 233-00

NPRR830 Revision of 4-Coincident Peak Methodology 12132017 262018 262018 262018 372018 0 85

NPRR831 Inclusion of Private Use Networks in Load Zone Price Calculations 822017 1122017 1122017 1122017 2212018 0 33

OBDRR002 ORDC OBD Revisions for PUCT Project 47199 372018 5312018 5312018 5312018 6272018 0 See NPRR768

SCR792 Enhance Communications of BAAL Exceedances 2142018 452018 452018 452018 4252018 0 69

Project Number Expedited Projects Completed (Count = 23)

Budget HealthSchedule Health

Budget HealthSchedule Health

52

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018

Project Number 2018 Projects Not Yet Started (Count = 10) Forecast

Start Date

NPRR858 Provide Complete Current Operating Plan (COP) Data Aug-2018TBD 2018 OS Enhancements Aug-2018TBD Additional Branch Limit for Relays Aug-2018

NPRR817 Create a Panhandle Hub Sep-2018NPRR821 Elimination of the CRR Deration Process Oct-2018NPRR865 Publish RTM Shift Factors for Hubs Load Zones and DC Ties Oct-2018

SCR793SSR Related Telemetry for Transmission Service Provider (TSP) Operators

Oct-2018

ECAP ECAP - ECMS Implementation Phase 2 Oct-2018TBD Job Scheduler Update in CSI Framework Oct-2018TBD Parameter Estimation Oct-2018

53

  • Slide Number 1
  • Slide Number 2
  • Summary ndash July 2018
  • Daily Peak Demand Hourly Average Actual vs Forecast Wind Day-Ahead COPs amp On-Line Capacity at Peak ndash July 2018
  • Actual Wind Output plus Curtailments vs Wind Day-Ahead COPs for All Hours ndash July 2018
  • ERCOTrsquos CPS1 Monthly Performance ndash July 2018
  • Monthly Peak Actual Demand ndash July 2018
  • Monthly Minimum Actual 15-Minute Demand ndash July 2018
  • Day-Ahead Load Forecast Performance ndash July 2018
  • Reliability Unit Commitment (RUC) Capacity by Weather Zone ndash July 2018
  • Generic Transmission Constraints (GTCs) ndash July 2018
  • Advisories and Watches ndash July 2018 Corrected
  • Lake Levels Update ndash August 1 2018
  • Planning Summary ndash July 2018
  • Mapping of Counties to ERCOT Zones ndash July 2018
  • Cumulative MW Capacity of Interconnection Requests by Zone ndashJuly 2018
  • Cumulative MW Capacity of Interconnection Requests by Zone ndashJuly 2018
  • Cumulative MW Capacity of Interconnection Requests by Zone ndashJuly 2018
  • Wind Generation ndash July 2018
  • Solar Generation ndash July 2018
  • Generation Interconnection Activity by Fuel ndash July 2018
  • Generation Interconnection Activity by Project Phase ndash July 2018
  • Slide Number 23
  • Day-Ahead Schedule (Hourly Average) ndash July 2018
  • Percentage of Real-Time Load Hedged in the DAM (Counter-Party Level) ndash July 2018
  • DAM and RTM Price Convergence ndash July 2018
  • Day-Ahead Electricity and Ancillary Service Prices (Hourly Average) ndash July 2018
  • Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash July 2018
  • Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash July 2018
  • DRUC Monthly Summary (Hourly Average) ndash July 2018
  • HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash July 2018
  • NonndashSpinning Reserve Service Deployment ndash July 2018
  • CRR Price Convergence ndash July 2018
  • Daily Average System Lambda and ORDC Price Adders ndash July 2018
  • ERS Procurement for June 2018 ndash September 2018
  • Reliability Services ndash July 2018
  • Ancillary and Other Services ndash July 2018
  • Real-Time Ancillary Service Imbalance (ORDC) ndash July 2018
  • Energy Settlement ndash July 2018
  • Congestion Revenue Rights (CRR) ndash July 2018
  • CRR Balancing Account Fund ndash July 2018
  • Revenue Neutrality ndash July 2018
  • Net Allocation to Load ndash July 2018
  • Advanced Meter Settlement Impacts ndash July 2018
  • ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndash July 2018
  • Retail Transaction Volumes ndash Summary ndash July 2018
  • Retail Transaction Volumes ndash Summary ndash July 2018
  • Slide Number 48
  • ERCOT Portfolio Stoplight Report ndash July 2018
  • ERCOT Portfolio Stoplight Report ndash July 2018
  • ERCOT Portfolio Stoplight Report ndash July 2018
  • ERCOT Portfolio Stoplight Report ndash July 2018
  • ERCOT Portfolio Stoplight Report ndash July 2018
Retail Transactions Summary
July 2018 June 2018 May 2018 April 2018 March 2018 February 2018 January 2018 December 2017 November 2017 October 2017 September 2017 August 2017 July 2017 June 2017 May 2017 April 2017 March 2017 February 2017 January 2017 December 2016 November 2016 October 2016 September 2016 August 2016 July 2016 June 2016 May 2016 April 2016 March 2016 February 2016 January 2016 December 2015 November 2015 October 2015 September 2015 August 2015 July 2015 June 2015 May 2015 April 2015 March 2015 February 2015 January 2015 December 2014 November 2014 October 2014 September 2014 August 2014 July 2014 June 2014 May 2014 April 2014 March 2014 February 2014 January 2014 December 2013 November 2013 October 2013 September 2013 August 2013 July 2013 June 2013 May 2013 April 2013 March 2013 February 2013 January 2013 Grand total
814_01 - Switch Received 121926 109653 96828 81291 95159 76119 88933 60560 77860 78096 79502 84134 84059 108784 130828 71769 67845 66875 87140 66556 56202 64452 67323 86656 82923 86376 75323 70300 76235 68057 63954 61486 52887 65276 70342 81674 91211 102661 86229 81255 79997 73394 72885 71072 67080 110465 175164 89677 99568 101490 111077 91983 93887 71130 86953 69691 55957 166882 82415 93194 102562 103756 116086 78919 68950 64329 67116 1321827
Difference from previous month 12273 12825 15537 (13868) 19040 (12814) 28373 (17300) (236) (1406) (4632) 75 (24725) (22044) 59059 3924 970 (20265) 20584 10354 (8250) (2871) (19333) 3733 (3453) 11053 5023 (5935) 8178 4103 2468 8599 (12389) (5066) (11332) (9537) (11450) 16432 4974 1258 6603 509 1813 3992 (43385) (64699) 85487 (9891) (1922) (9587) 19094 (1904) 22757 (15823) 17262 13734 (110925) 84467 (10779) (9368) (1194) (12330) 37167 9969 4621 (2787)
814_16 - Move - Ins Received 270122 257125 244431 225380 224289 215281 230409 238340 207921 236397 244511 258046 252360 257759 237611 197865 217962 201984 202612 196236 201714 220958 231999 268781 241844 247481 214383 199804 218245 212474 193716 189862 181098 215908 229405 248124 263233 247089 208166 207932 215950 197765 198025 193973 178624 226283 231418 243482 251957 233679 223201 258649 214724 208160 207059 172981 178671 233469 216550 255967 249114 220397 216982 204412 197200 191955 194507 3162148
Difference from previous month 12997 12694 19051 1091 9008 (15128) (7931) 30419 (28476) (8114) (13535) 5686 (5399) 20148 39746 (20097) 15978 (628) 6376 (5478) (19244) (11041) (36782) 26937 (5637) 33098 14579 (18441) 5771 18758 3854 8764 (34810) (13497) (18719) (15109) 16144 38923 234 (8018) 18185 (260) 4052 15349 (47659) (5135) (12064) (8475) 18278 10478 (35448) 43925 6564 1101 34078 (5690) (54798) 16919 (39417) 6853 28717 3415 12570 7212 5245 (2552)
814_24 - MVO and MVO to CSA Received 129820 125861 124403 113795 108753 100127 111821 144987 100830 116519 129103 128104 127073 133582 127218 102055 111459 100285 101107 96289 100578 109493 114094 133170 122932 129025 118022 103789 109278 103747 96628 99552 96214 109578 117949 123894 133905 133855 114675 108275 108859 94864 98233 97901 89578 111857 115918 121662 131607 126785 119107 107956 107266 99428 104273 93385 93977 115469 115524 129594 135196 121446 120049 111598 106467 102429 104399 1660500
814_10 - DTP Mass Acquisition Received - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0
814_10 - DTP Mass Transition Received - 0 - 0 9033 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 639 - 0 - 0 4975 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0
814_18 - CSA AdditionDeletes Received 40217 62083 99016 55581 46720 42587 49740 47725 31726 52888 41597 40616 55770 43745 52139 26702 21791 39082 44030 38884 39856 31786 33061 42622 48489 64178 50499 59475 59400 48536 42179 40351 34796 34420 54677 35078 49489 59611 39384 44247 44577 35386 40420 54831 43550 45039 44268 40405 57954 64408 65032 80184 70310 41156 34811 46680 50347 71847 48606 52585 50867 62747 59763 34925 40977 40389 41227 747237
Total 562085 554722 573711 476047 474921 434114 480903 491612 418337 483900 494713 510900 519262 543870 547796 398391 419057 408226 434889 397965 398350 426689 446477 531229 496188 527060 458227 433368 463158 432814 396477 391251 364995 425182 472373 488770 537838 543216 448454 441709 449383 401409 409563 417777 378832 493644 566768 495865 541086 526362 523392 538772 486187 419874 433096 382737 378952 587667 463095 531340 537739 508346 512880 429854 413594 399102 407249 6891712
Counts from Monthly Retail Transaction report
To do
Break Out 814_10s - AQ and MT
Break Out 814_18 Additions from Deletes
Year-To-Date Transactions Received
Transaction Type July 2018 July 2017 July 2018 July 2017
Switches 669909 617300 121926 84059
Acquisition 0 0 0 0
Move - Ins 1667037 1568153 270122 252360
Move - Outs 814580 802779 129820 127073
Continuous Service Agreements (CSA) 395944 283259 40217 55770
Mass Transitions 9033 0 0 0
Total 3556503 3271491 562085 519262
There has been a change since this was created
Mass Acquisition has been broken out of Mass Transition
Page 27: ERCOT Monthly Operational Overvie · ERCOT Monthly Operational Overview (July 2018) Revised 08.22.18. ERCOT Public. August 15, 2018

PUBLIC

Day-Ahead Electricity and Ancillary Service Prices (Hourly Average) ndashJuly 2018

27

0

100

200

300

400

500

600

Pric

e ($

MW

h)

Hour Ending

Regulation Up

Regulation Down

Responsive Reserve

Non Spinning Reserve

DAM Power Balance Price(System Lambda)

Ancillary Service prices reflect the opportunity cost of energy

PUBLIC

Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash July 2018

28

0

100

200

300

400

500

600

Pric

e ($

MW

h)

Hour Ending

RTSPP - LZ West

RTSPP - LZ North

RTSPP - LZ South

RTSPP - LZ Houston

DASPP - LZ West

DASPP - LZ North

DASPP - LZ South

DASPP - LZ Houston

Prices reflect relative transmission congestion and system scarcity

PUBLIC

Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash July 2018

29

0

100

200

300

400

500

600

Pric

e ($

MW

h)

Hour Ending

RTSPP - Hub Average

DASPP - Hub Average

Energy prices reflect the risk premium between Day-Ahead amp Real-Time

PUBLIC

DRUC Monthly Summary (Hourly Average) ndash July 2018

30

0

15000

30000

45000

60000

75000

90000

MW

h

Hour Ending

Self Scheduled Capacity

Self Scheduled Ancillary Service Limit

Load Forecast

DRUC Recommended Capacity

31 executions (0 missed)0 published after 160011 minutes average execution time0 Resources committed

PUBLIC

HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash July 2018

31

0

02

04

06

08

1

0

20

40

60

80

100

RTO

RD

PA ($

MW

h)

MW

h

Hour Ending

744 executions (0 missed)8 minutes average execution time1 Resources committed through HRUC or by a Verbal Dispatch Instruction

The dotted line indicates the average RTORDPA

PUBLIC

NonndashSpinning Reserve Service Deployment ndash July 2018

32

Deployment Start Time

Deployment End Time

Deployment Duration (Hours)

Max Deployment(MW) Reason

NA

PUBLIC

CRR Price Convergence ndash July 2018

0

50

100

150

200

250

Mill

ions

$

Cost

Value

Congestion Revenue Right cost in auction convergence with payment in Day-Ahead Market and Real Time Market

33

PUBLIC

Daily Average System Lambda and ORDC Price Adders ndash July 2018

0

50

100

150

200

250

$M

Wh

Day of Month

RTOFFPA

RTORPA

SYSTEM_LAMBDA

34

PUBLIC

ERS Procurement for June 2018 ndash September 2018

TP1 TP2 TP3 TP4 TP5 TP6

Non Weather-Sensitive ERS-10 MW 160562 165996 143324 140708 156699 151138

Non Weather-Sensitive ERS-30 MW 736864 781559 702529 625067 755153 657394

Weather-Sensitive ERS-10 MW 0 0 0 0 0 0

Weather-Sensitive ERS-30 MW 0 0 11850 11850 0 0

Total MW Procured 897426 947555 857703 777625 911852 808532

Clearing Price $201 $185 $2108 $2177 $199 $225

Time Period Time Period Hours

Time Period 1 Hours Ending 0600 - 0800 (50000 am to 80000 am) Monday through Friday except ERCOT Holidays

Time Period 2 Hours Ending 0900 - 1300 (80000 am to 10000 pm) Monday through Friday except ERCOT Holidays

Time Period 3 Hours Ending 1400 - 1600 (10000 pm to 40000 pm) Monday through Friday except ERCOT Holidays

Time Period 4 Hours Ending 1700 - 1900 (40000 pm to 70000 pm) Monday through Friday except ERCOT Holidays

Time Period 5 Hours Ending 2000 - 2200 (70000 pm to 100000 pm) Monday through Friday except ERCOT Holidays Time Period 6 All other hours

35

PUBLIC

Reliability Services ndash July 2018

Reliability Unit Commitment (RUC) $ in Millions

RUC Make-Whole Payments $000

RUC Clawback Charges $000

RUC Commitment Settlement $000

RUC Capacity Short Charges $000

RUC Make-Whole Uplift $000

RUC Commitment Cost Allocation $000

RUC Decommitment Payments $000

Total RUC Allocation to Load $000

In July 2018 there was a credit of $000M allocated to load for RUC compared to bull A credit of $000M in June 2018bull A credit of $003M in July 2017

36

PUBLIC

Ancillary and Other Services ndash July 2018

Ancillary and Other Services $ in Millions

Regulation Up Service $1105

Regulation Down Service $072

Responsive Reserve Service $7177

Non-Spinning Reserve Service $1787

Black Start Service $059

Voltage Services - Reactive Power $000

Voltage Services - Lost Opportunity $000

Total Charges Allocated to Load $10200

In July 2018 Ancillary and Other Services was a charge of $10200M compared to bull A charge of $2001M in June 2018bull A charge of $2322M in July 2017

37

PUBLIC

Real-Time Ancillary Service Imbalance (ORDC) ndash July 2018

In July 2018 Real-Time Ancillary Service Imbalance was a charge to load of $2228K compared to bull A charge of $147K in June 2018bull A charge of $534K in July 2017

Real-Time Ancillary Service Imbalance $ in Thousands

Real-Time AS Imbalance ($2228)

Real-Time Reliability Deployment AS Imbalance $000

Total RTASI Amount Allocated to Load $2228

38

PUBLIC

Energy Settlement ndash July 2018

39

Day-Ahead Market Energy Settlement $ in Millions

Energy Purchases $215396

Point to Point Obligation Purchases $11726

Energy Sales ($212592)

Day-Ahead Congestion Rent $14531

Day-Ahead Market Make-Whole Payments ($001)

Real-Time Market Energy Settlement $ in Millions

Energy Imbalance at a Resource Node ($91963)

Energy Imbalance at a Load Zone $160737

Energy Imbalance at a Hub ($57497)

Net Real-Time Energy Imbalance $11276

Real Time Congestion from Self Schedules $013

Block Load Transfers and DC Ties ($2063)

Total Impact to Revenue Neutrality $9227

Load-Allocated Emergency Energy Payments ($016)

Load-Allocated Base Point Deviation Charges $026

Day-Ahead Market energy settlement activity increased from last month and increased from July 2017

Real-Time Market energy settlement activity increased from last month and increased from July 2017

PUBLIC

Congestion Revenue Rights (CRR) ndash July 2018

$ in Millions

Long-Term Auction ($4026)

Monthly Auction ($1773)

Total Auction Revenue ($5799)

Day-Ahead CRR Settlements ($15797)

Day-Ahead CRR Short-Charges $1885

Day-Ahead CRR Short-Charges Refunded ($899)

Day-Ahead CRR Short-Charges Net $986

Total CRR Funding ($14810)

Day-Ahead Point-to-Point Obligations $11726

Real-Time Point-to-Point Obligations ($10113)

Net Point-to-Point Obligations $1614

Congestion Revenue Rights settlement payments were not fully funded Partial funding to settle the CRR Short Charges was provided from the CRR Balancing Account Fund and the remaining $986M of CRR Short Charges were not refunded The CRR Fund Balance is now $0

Point to Point Obligations settled with a net charge of $1614M compared to a net credit of $1758M last month

40

PUBLIC

CRR Balancing Account Fund ndash July 2018

CRR Balancing Account $ in Millions

Monthly Day-Ahead Congestion Rent $14531

Monthly Day-Ahead CRR Settlements ($15797)

Monthly Day-Ahead CRR Short -Charges $1885

CRR Balancing Account Credit Total $619

Beginning Fund Balance for the Month $275

CRR Balancing Account Credit Total $619

Day-Ahead CRR Short-Charges Refunded ($899)

CRR PTP Option Award Charges $004

Load-Allocated CRR Amount $000

Total Fund Amount $000

41

PUBLIC

Revenue Neutrality ndash July 2018

Revenue Neutrality $ in Millions

Real-Time Energy Imbalance $11276

Real-Time Point to Point Obligation ($10113)

Real-Time Congestion from Self-Schedules $013

DC Tie amp Block Load Transfer ($2063)

Allocation to Load $886

In July 2018 the Revenue Neutrality charge to load was $886M compared to bull A charge of $3046M in June 2018bull A charge of $145M in July 2017

42

PUBLIC

Net Allocation to Load ndash July 2018

Market-Based Allocation $ in Millions

Reliability Unit Commitment $000

Ancillary and Other Services $10200

Real-Time Ancillary Service Imbalance $223

Emergency Energy $016

Base Point Deviation ($026)

CRR Auction Revenue ($5799)

CRR Balancing Account $000

Real-Time Revenue Neutrality $886

Reliability Must Run $000

Monthly Block Load Transfer $000

Total $5500

Fee AllocationERCOT Administrative Fee $2207

Net Allocated to Load $7707

In July 2018 the Net Allocation to load was a charge of $7707M compared to bull A charge of $2152M in June 2018bull A credit of $1363M in July 2017

43

PUBLIC

Advanced Meter Settlement Impacts ndash July 2018

July 2018 At month end settling 72M ESIIDs using Advanced Meter data

July 2018 990 of the load in ERCOT is settled with 15-min interval data (AMS Competitive IDR and NOIE IDR)

44

PUBLIC

ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndashJuly 2018

45

PUBLIC

Retail Transaction Volumes ndash Summary ndash July 2018

46

Transaction Type July 2018 July 2017 July 2018 July 2017

Switches 669909 617300 121926 84059

Acquisition 0 0 0 0

Move - Ins 1667037 1568153 270122 252360

Move - Outs 814580 802779 129820 127073

Continuous Service Agreements (CSA) 395944 283259 40217 55770

Mass Transitions 9033 0 0 0

Total 3556503 3271491 562085 519262

Year-To-Date Transactions Received

Board Presentation Input

Trans Volumes by Month_New

PUBLIC

Retail Transaction Volumes ndash Summary ndash July 2018

SwitchesAcquisitions Move-Ins

Move-Outs Mass Transition

47

Projects Report

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018

20000000$ 2018 Portfolio

Spending Estimate

Projects In FlightOn Hold (Count = 100) 24905011$

Projects Not Yet Started (Count = 10) 1320628$

Projects Completed (Count = 43) 795250$

(7020889)$

TOTAL 20000000$

Project Number Projects in Initiation Phase (Count = 4)

TBD IT Asset RecoveryNPRR842 Study Area Load Information

209-03 Study Network (STNET) Integration288-01 EDI Map and Translator Replacement

Impact Metric TolerancesUnfavorable variances are represented as negative numbers within the report - Green = No more than 49 unfavorable variance - Yellow = Unfavorable variance between 49 and 99 - Red = Unfavorable variance more than 99

Spending Reductions Required to Maintain Capital Budget

2018 Project Funding

Footnotes1 - One or more phases took longer than expected resulting in additional time required

2 - One or more phases required more labor than expected resulting in additional funding andor time required

3 - Project placed on holdNA - Metric not calculated because - it is reported at the parent project level or - it is an administrative project

Project Number Projects in Planning Phase (Count = 8) Phase Start Baseline

Phase FinishApproved

Phase FinishScheduled

Go-Live DateScheduled

Phase Finish

134-02 Privileged Account Management (PAM) Phase 2 882018 12192018 12192018 TBD 12192018 0 10

183-01 CMM-FT GUI Integration 12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs

242-01 Portfolio Reporting Assessment 1182017 12192018 12192018 TBD 12192018 0 21260-01 Information Governance Assessment 10182017 5302018 9192018 TBD 9192018 0 5286-01 Java Platform Assessment 6202018 11212018 11212018 TBD 11212018 0 6287-01 Security Constrained Unit Commitment (SCUC) 882018 2272019 2272019 TBD 2272019 0 -1

NPRR484Revisions to Congestion Revenue Rights Credit Calculations and Payments - Phase 1b 2

12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs

NPRR702Flexible Accounts Payment of Invoices and Disposition of Interest on Cash Collateral

12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs

Schedule Health Budget Health

49

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018Project Number Projects in Execution Phase (Count = 42) Phase Start Baseline Go-

Live DateApproved Go-

Live DateScheduled

Go-Live DateScheduled

Phase Finish

170-01 Enterprise Content Alignment Program 8262015 11152017 8312018 8312018 8312018 0 0170-06 ECAP - ECMS Implementation Phase 1 4252018 11302018 11302018 11302018 11302018 0 3173-02 ERCOT Flight Certification Website 11152017 2282019 2282019 2282019 5312019 0 2181-01 CRR Framework Upgrade 10262016 1022017 11192018 11192018 2272019 0 2

183-01 CMM Tech Refresh 3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

193-01 PMU Tool Evaluation and Implementation 12132017 892018 2152019 2152019 3202019 0 0196-01 GINR Project Status Application Replacement 12212016 9142017 2282019 2282019 3312019 0 1198-02 Reactive Power Coordination PoC 962017 6162018 8152018 8152018 8152018 0 54209-02 Weather Imaging and Line Observation (WILO) 5302018 212019 212019 212019 2272019 0 2210-01 REC Technology Refresh 8302017 3182018 12132018 12132018 1162019 0 3228-01 Enterprise Database Upgrade 882018 1292020 1292020 1292020 1292020 0 17229-01 IT Change and Configuration Management Phase 2 822017 6192018 12132018 12132018 3252019 0 2 -9238-01 Application Authentication Tech Refresh 962017 3192018 12132018 12132018 1302019 0 3239-01 Identity and Access Management 592018 3132019 3132019 3132019 3132019 0 2241-01 AREA - Generation 10112017 3302018 892018 892018 952018 0 -4244-01 Corporate Wireless 11292017 3282018 1252018 1252018 192019 0 9245-01 2017 EPS Metering Enhancements 6272018 892019 892019 892019 9252019 0 1246-01 iTest Data Refresh 12132017 1192018 11152018 11152018 122019 0 25249-01 Secondary Wind Forecasting Service 8302017 2282018 892018 892018 952018 0 0253-01 CIP Recovery Plan Project - Planning Phase 1 1312018 8292018 8292018 8292018 8292018 0 -2

257-01Security Constrained Optimal Powerflow in Study Network Analysis

1262017 10252018 10252018 10252018 1282018 0 19

261-01 Generic Transmission Constraint Calculation 372018 12132018 12132018 12132018 1232019 0 0263-01 Market Simulator 4112018 12132018 12132018 12132018 1302019 0 7265-01 Real-Time Assessment Continuity 1312018 12132018 12132018 12132018 1302019 0 0279-01 Cyber Security Project 24 6272018 10262018 10262018 10262018 11282018 0 0280-01 Quest Software Portfolio Transition 442018 6272018 9262018 9262018 9262018 0 13282-01 Synchronous Condenser Outage Modeling 662018 10252018 10252018 10252018 1252018 0 1Various 2015 CMM NPRRs 2 -18

NPRR519Exemption of ERS-Only QSEs from Collateral and Capitalization Requirements

3152017 5192018 12112018 12112018 12312018 0 See 2015 CMM NPRRs

NPRR620Collateral Requirements for Counter-Parties with No Load or Generation

3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

NPRR660 Remove CRR State Change Adder 3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

Budget HealthSchedule Health

50

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018Project Number Projects in Execution Phase (Count = 42) Phase Start Baseline Go-

Live DateApproved Go-

Live DateScheduled

Go-Live DateScheduled

Phase Finish

NPRR741 Clarifications to TPE and EAL Credit Exposure Calculations 3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

NPRR749 Option Cost for Outstanding CRRs 882018 12132018 12132018 12132018 TBD 0 NA See 2015 CMM NPRRs

NPRR755 Data Agent-Only QSE Registration 3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

NPRR819Modification of Non-Price Error Resettlement Thresholds and Resettlement Clean-Ups

592018 892018 892018 892018 952018 0 36

NPRR833 Modify PTP Obligation Bid Clearing Change 882018 12132018 12132018 12132018 TBD 0 1

NPRR843Short-Term System Adequacy and AS Offer Disclosure Reports Additions

7182018 10252018 10252018 10252018 11282018 0 0

NPRR864 RUC Modifications to Consider Market-Based Solutions 6202018 10252018 10252018 10252018 11282018 0 4SCR777 Bilateral CRR Interface Enhancement 10262016 1022017 11192018 11192018 2272019 0 NA See 181-01

SCR781 RARF Replacement 12202017 4252018 12192018 12192018 12192018 0 3SCR791 Correction of 60-day SCED GRD Disclosure Report 522018 892018 892018 892018 952018 0 39SCR795 Addition of Intra-Hour Wind Forecast to GTBD Calculation 882018 10252018 10252018 10252018 11142018 0 0

Project Number Expedited Projects in Execution (Count = 34)

Project Number Projects in Stabilization (Count = 10) Execution

Phase StartBaseline Go-Live Target

Approved Go-Live Target

ActualGo-Live Date

Scheduled Execution Phase

Finish

NPRR648 Remove References to Flowgate Rights 3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR683 Revision to Available Credit Limit Calculation 3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR743 Revision to MCE to Have a Floor For Load Exposure 3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR760 Calculation of Exposure Variables For Days With No Activity 3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR776 Voltage Set Point Communication 9202017 3192018 452018 452018 952018 0 1

NPRR800Revisions to Credit Exposure Calculations to Use Electricity Futures Market Prices

3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR815Revise the Limitation of Load Resources Providing Responsive Reserve (RRS) Service

3212018 5312018 5312018 5312018 8292018 0 2

209-01 Multi Station Breaker to Breaker One Lines 282017 392018 532018 532018 8222018 0 -1259-01 DC SCADA and Metering Upgrade 10252017 1172018 7252018 7252018 8292018 0 22266-01 Remote Email Access Enhancement 12132017 372018 662018 6192018 9262018 2 -7 2 -9

Schedule Health Budget Health

Budget HealthSchedule Health

51

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018

Project Number Projects On Hold (Count = 2) Forecast

Start DateBaseline

Phase FinishApproved Go-

Live TargetScheduled

Go-Live DateScheduled

Phase Finish

SCR789 Update NMMS Topology Processor to PSSE 34 Capability 0

269-01Document Repository Redesign and Governance Implementation - Phase 1

0

Project Number Projects Completed (Count = 20)

Baseline Execution

Phase Start

Baseline Go-Live Target

Approved Go-Live Target

Actual Go-Live Date

Actual Execution Phase Finish

185-01 Records Management and eDiscovery 12152016 5242017 8292017 8222017 12132017 2 0224-01 TelAlert Replacement 452017 6272017 842017 842017 592018 0 5230-01 SAS Technical Architecture Redesign 312017 12132017 12132017 12132017 6272018 0 2234-01 Reporting Solution Resiliency (RSR) 452017 8232017 11272017 11272017 1102018 0 8240-01 EDI Translator and Mapping Replacement Assessment 4192017 9272017 2282018 TBD 372018 -2 20254-01 Retail Windows Upgrade 10112017 12182017 12182017 1222018 272018 1 -51 65255-01 Settlements Architecture Enhancements 10252017 1112018 1112018 1192018 2142018 1 -10 53258-01 WD Kainos SMART Automation Testing Tool 4112018 642018 642018 662018 7182018 -3 33271-01 Issue Tracking and Resolution Tool Assessment 12132017 4252018 4252018 TBD 522018 1 -5 -1272-01 Operator Training Simulator Black Start GE Effort 1262017 4252018 4252018 4272018 5162018 -1 19274-01 Average Mid-Term Load Forecast 372018 5312018 5312018 5312018 6272018 0 50

NPRR768Revisions to Real-Time On-Line Reliability Deployment Price Adder Categories

372018 5312018 5312018 5312018 6272018 0 16

NPRR778 Modifications to Date Change and Cancellation Evaluation Window 7192017 10292017 12112017 12112017 1312018 0 23

NPRR782Settlement of Infeasible Ancillary Services Due to Transmission Constraints

5242017 8312017 1122017 1122017 1102018 0 20

NPRR808 Three Year CRR Auction 8232017 9182017 9182017 912017 1312018 65 68

NPRR810Applicability of RMR Incentive Factor on Reservation and Transportation Costs Associated with Firm Fuel Supplies

7172017 11122017 3312018 3312018 3312018 0 NA See 233-00

NPRR830 Revision of 4-Coincident Peak Methodology 12132017 262018 262018 262018 372018 0 85

NPRR831 Inclusion of Private Use Networks in Load Zone Price Calculations 822017 1122017 1122017 1122017 2212018 0 33

OBDRR002 ORDC OBD Revisions for PUCT Project 47199 372018 5312018 5312018 5312018 6272018 0 See NPRR768

SCR792 Enhance Communications of BAAL Exceedances 2142018 452018 452018 452018 4252018 0 69

Project Number Expedited Projects Completed (Count = 23)

Budget HealthSchedule Health

Budget HealthSchedule Health

52

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018

Project Number 2018 Projects Not Yet Started (Count = 10) Forecast

Start Date

NPRR858 Provide Complete Current Operating Plan (COP) Data Aug-2018TBD 2018 OS Enhancements Aug-2018TBD Additional Branch Limit for Relays Aug-2018

NPRR817 Create a Panhandle Hub Sep-2018NPRR821 Elimination of the CRR Deration Process Oct-2018NPRR865 Publish RTM Shift Factors for Hubs Load Zones and DC Ties Oct-2018

SCR793SSR Related Telemetry for Transmission Service Provider (TSP) Operators

Oct-2018

ECAP ECAP - ECMS Implementation Phase 2 Oct-2018TBD Job Scheduler Update in CSI Framework Oct-2018TBD Parameter Estimation Oct-2018

53

  • Slide Number 1
  • Slide Number 2
  • Summary ndash July 2018
  • Daily Peak Demand Hourly Average Actual vs Forecast Wind Day-Ahead COPs amp On-Line Capacity at Peak ndash July 2018
  • Actual Wind Output plus Curtailments vs Wind Day-Ahead COPs for All Hours ndash July 2018
  • ERCOTrsquos CPS1 Monthly Performance ndash July 2018
  • Monthly Peak Actual Demand ndash July 2018
  • Monthly Minimum Actual 15-Minute Demand ndash July 2018
  • Day-Ahead Load Forecast Performance ndash July 2018
  • Reliability Unit Commitment (RUC) Capacity by Weather Zone ndash July 2018
  • Generic Transmission Constraints (GTCs) ndash July 2018
  • Advisories and Watches ndash July 2018 Corrected
  • Lake Levels Update ndash August 1 2018
  • Planning Summary ndash July 2018
  • Mapping of Counties to ERCOT Zones ndash July 2018
  • Cumulative MW Capacity of Interconnection Requests by Zone ndashJuly 2018
  • Cumulative MW Capacity of Interconnection Requests by Zone ndashJuly 2018
  • Cumulative MW Capacity of Interconnection Requests by Zone ndashJuly 2018
  • Wind Generation ndash July 2018
  • Solar Generation ndash July 2018
  • Generation Interconnection Activity by Fuel ndash July 2018
  • Generation Interconnection Activity by Project Phase ndash July 2018
  • Slide Number 23
  • Day-Ahead Schedule (Hourly Average) ndash July 2018
  • Percentage of Real-Time Load Hedged in the DAM (Counter-Party Level) ndash July 2018
  • DAM and RTM Price Convergence ndash July 2018
  • Day-Ahead Electricity and Ancillary Service Prices (Hourly Average) ndash July 2018
  • Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash July 2018
  • Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash July 2018
  • DRUC Monthly Summary (Hourly Average) ndash July 2018
  • HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash July 2018
  • NonndashSpinning Reserve Service Deployment ndash July 2018
  • CRR Price Convergence ndash July 2018
  • Daily Average System Lambda and ORDC Price Adders ndash July 2018
  • ERS Procurement for June 2018 ndash September 2018
  • Reliability Services ndash July 2018
  • Ancillary and Other Services ndash July 2018
  • Real-Time Ancillary Service Imbalance (ORDC) ndash July 2018
  • Energy Settlement ndash July 2018
  • Congestion Revenue Rights (CRR) ndash July 2018
  • CRR Balancing Account Fund ndash July 2018
  • Revenue Neutrality ndash July 2018
  • Net Allocation to Load ndash July 2018
  • Advanced Meter Settlement Impacts ndash July 2018
  • ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndash July 2018
  • Retail Transaction Volumes ndash Summary ndash July 2018
  • Retail Transaction Volumes ndash Summary ndash July 2018
  • Slide Number 48
  • ERCOT Portfolio Stoplight Report ndash July 2018
  • ERCOT Portfolio Stoplight Report ndash July 2018
  • ERCOT Portfolio Stoplight Report ndash July 2018
  • ERCOT Portfolio Stoplight Report ndash July 2018
  • ERCOT Portfolio Stoplight Report ndash July 2018
Retail Transactions Summary
July 2018 June 2018 May 2018 April 2018 March 2018 February 2018 January 2018 December 2017 November 2017 October 2017 September 2017 August 2017 July 2017 June 2017 May 2017 April 2017 March 2017 February 2017 January 2017 December 2016 November 2016 October 2016 September 2016 August 2016 July 2016 June 2016 May 2016 April 2016 March 2016 February 2016 January 2016 December 2015 November 2015 October 2015 September 2015 August 2015 July 2015 June 2015 May 2015 April 2015 March 2015 February 2015 January 2015 December 2014 November 2014 October 2014 September 2014 August 2014 July 2014 June 2014 May 2014 April 2014 March 2014 February 2014 January 2014 December 2013 November 2013 October 2013 September 2013 August 2013 July 2013 June 2013 May 2013 April 2013 March 2013 February 2013 January 2013 Grand total
814_01 - Switch Received 121926 109653 96828 81291 95159 76119 88933 60560 77860 78096 79502 84134 84059 108784 130828 71769 67845 66875 87140 66556 56202 64452 67323 86656 82923 86376 75323 70300 76235 68057 63954 61486 52887 65276 70342 81674 91211 102661 86229 81255 79997 73394 72885 71072 67080 110465 175164 89677 99568 101490 111077 91983 93887 71130 86953 69691 55957 166882 82415 93194 102562 103756 116086 78919 68950 64329 67116 1321827
Difference from previous month 12273 12825 15537 (13868) 19040 (12814) 28373 (17300) (236) (1406) (4632) 75 (24725) (22044) 59059 3924 970 (20265) 20584 10354 (8250) (2871) (19333) 3733 (3453) 11053 5023 (5935) 8178 4103 2468 8599 (12389) (5066) (11332) (9537) (11450) 16432 4974 1258 6603 509 1813 3992 (43385) (64699) 85487 (9891) (1922) (9587) 19094 (1904) 22757 (15823) 17262 13734 (110925) 84467 (10779) (9368) (1194) (12330) 37167 9969 4621 (2787)
814_16 - Move - Ins Received 270122 257125 244431 225380 224289 215281 230409 238340 207921 236397 244511 258046 252360 257759 237611 197865 217962 201984 202612 196236 201714 220958 231999 268781 241844 247481 214383 199804 218245 212474 193716 189862 181098 215908 229405 248124 263233 247089 208166 207932 215950 197765 198025 193973 178624 226283 231418 243482 251957 233679 223201 258649 214724 208160 207059 172981 178671 233469 216550 255967 249114 220397 216982 204412 197200 191955 194507 3162148
Difference from previous month 12997 12694 19051 1091 9008 (15128) (7931) 30419 (28476) (8114) (13535) 5686 (5399) 20148 39746 (20097) 15978 (628) 6376 (5478) (19244) (11041) (36782) 26937 (5637) 33098 14579 (18441) 5771 18758 3854 8764 (34810) (13497) (18719) (15109) 16144 38923 234 (8018) 18185 (260) 4052 15349 (47659) (5135) (12064) (8475) 18278 10478 (35448) 43925 6564 1101 34078 (5690) (54798) 16919 (39417) 6853 28717 3415 12570 7212 5245 (2552)
814_24 - MVO and MVO to CSA Received 129820 125861 124403 113795 108753 100127 111821 144987 100830 116519 129103 128104 127073 133582 127218 102055 111459 100285 101107 96289 100578 109493 114094 133170 122932 129025 118022 103789 109278 103747 96628 99552 96214 109578 117949 123894 133905 133855 114675 108275 108859 94864 98233 97901 89578 111857 115918 121662 131607 126785 119107 107956 107266 99428 104273 93385 93977 115469 115524 129594 135196 121446 120049 111598 106467 102429 104399 1660500
814_10 - DTP Mass Acquisition Received - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0
814_10 - DTP Mass Transition Received - 0 - 0 9033 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 639 - 0 - 0 4975 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0
814_18 - CSA AdditionDeletes Received 40217 62083 99016 55581 46720 42587 49740 47725 31726 52888 41597 40616 55770 43745 52139 26702 21791 39082 44030 38884 39856 31786 33061 42622 48489 64178 50499 59475 59400 48536 42179 40351 34796 34420 54677 35078 49489 59611 39384 44247 44577 35386 40420 54831 43550 45039 44268 40405 57954 64408 65032 80184 70310 41156 34811 46680 50347 71847 48606 52585 50867 62747 59763 34925 40977 40389 41227 747237
Total 562085 554722 573711 476047 474921 434114 480903 491612 418337 483900 494713 510900 519262 543870 547796 398391 419057 408226 434889 397965 398350 426689 446477 531229 496188 527060 458227 433368 463158 432814 396477 391251 364995 425182 472373 488770 537838 543216 448454 441709 449383 401409 409563 417777 378832 493644 566768 495865 541086 526362 523392 538772 486187 419874 433096 382737 378952 587667 463095 531340 537739 508346 512880 429854 413594 399102 407249 6891712
Counts from Monthly Retail Transaction report
To do
Break Out 814_10s - AQ and MT
Break Out 814_18 Additions from Deletes
Year-To-Date Transactions Received
Transaction Type July 2018 July 2017 July 2018 July 2017
Switches 669909 617300 121926 84059
Acquisition 0 0 0 0
Move - Ins 1667037 1568153 270122 252360
Move - Outs 814580 802779 129820 127073
Continuous Service Agreements (CSA) 395944 283259 40217 55770
Mass Transitions 9033 0 0 0
Total 3556503 3271491 562085 519262
There has been a change since this was created
Mass Acquisition has been broken out of Mass Transition
Page 28: ERCOT Monthly Operational Overvie · ERCOT Monthly Operational Overview (July 2018) Revised 08.22.18. ERCOT Public. August 15, 2018

PUBLIC

Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash July 2018

28

0

100

200

300

400

500

600

Pric

e ($

MW

h)

Hour Ending

RTSPP - LZ West

RTSPP - LZ North

RTSPP - LZ South

RTSPP - LZ Houston

DASPP - LZ West

DASPP - LZ North

DASPP - LZ South

DASPP - LZ Houston

Prices reflect relative transmission congestion and system scarcity

PUBLIC

Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash July 2018

29

0

100

200

300

400

500

600

Pric

e ($

MW

h)

Hour Ending

RTSPP - Hub Average

DASPP - Hub Average

Energy prices reflect the risk premium between Day-Ahead amp Real-Time

PUBLIC

DRUC Monthly Summary (Hourly Average) ndash July 2018

30

0

15000

30000

45000

60000

75000

90000

MW

h

Hour Ending

Self Scheduled Capacity

Self Scheduled Ancillary Service Limit

Load Forecast

DRUC Recommended Capacity

31 executions (0 missed)0 published after 160011 minutes average execution time0 Resources committed

PUBLIC

HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash July 2018

31

0

02

04

06

08

1

0

20

40

60

80

100

RTO

RD

PA ($

MW

h)

MW

h

Hour Ending

744 executions (0 missed)8 minutes average execution time1 Resources committed through HRUC or by a Verbal Dispatch Instruction

The dotted line indicates the average RTORDPA

PUBLIC

NonndashSpinning Reserve Service Deployment ndash July 2018

32

Deployment Start Time

Deployment End Time

Deployment Duration (Hours)

Max Deployment(MW) Reason

NA

PUBLIC

CRR Price Convergence ndash July 2018

0

50

100

150

200

250

Mill

ions

$

Cost

Value

Congestion Revenue Right cost in auction convergence with payment in Day-Ahead Market and Real Time Market

33

PUBLIC

Daily Average System Lambda and ORDC Price Adders ndash July 2018

0

50

100

150

200

250

$M

Wh

Day of Month

RTOFFPA

RTORPA

SYSTEM_LAMBDA

34

PUBLIC

ERS Procurement for June 2018 ndash September 2018

TP1 TP2 TP3 TP4 TP5 TP6

Non Weather-Sensitive ERS-10 MW 160562 165996 143324 140708 156699 151138

Non Weather-Sensitive ERS-30 MW 736864 781559 702529 625067 755153 657394

Weather-Sensitive ERS-10 MW 0 0 0 0 0 0

Weather-Sensitive ERS-30 MW 0 0 11850 11850 0 0

Total MW Procured 897426 947555 857703 777625 911852 808532

Clearing Price $201 $185 $2108 $2177 $199 $225

Time Period Time Period Hours

Time Period 1 Hours Ending 0600 - 0800 (50000 am to 80000 am) Monday through Friday except ERCOT Holidays

Time Period 2 Hours Ending 0900 - 1300 (80000 am to 10000 pm) Monday through Friday except ERCOT Holidays

Time Period 3 Hours Ending 1400 - 1600 (10000 pm to 40000 pm) Monday through Friday except ERCOT Holidays

Time Period 4 Hours Ending 1700 - 1900 (40000 pm to 70000 pm) Monday through Friday except ERCOT Holidays

Time Period 5 Hours Ending 2000 - 2200 (70000 pm to 100000 pm) Monday through Friday except ERCOT Holidays Time Period 6 All other hours

35

PUBLIC

Reliability Services ndash July 2018

Reliability Unit Commitment (RUC) $ in Millions

RUC Make-Whole Payments $000

RUC Clawback Charges $000

RUC Commitment Settlement $000

RUC Capacity Short Charges $000

RUC Make-Whole Uplift $000

RUC Commitment Cost Allocation $000

RUC Decommitment Payments $000

Total RUC Allocation to Load $000

In July 2018 there was a credit of $000M allocated to load for RUC compared to bull A credit of $000M in June 2018bull A credit of $003M in July 2017

36

PUBLIC

Ancillary and Other Services ndash July 2018

Ancillary and Other Services $ in Millions

Regulation Up Service $1105

Regulation Down Service $072

Responsive Reserve Service $7177

Non-Spinning Reserve Service $1787

Black Start Service $059

Voltage Services - Reactive Power $000

Voltage Services - Lost Opportunity $000

Total Charges Allocated to Load $10200

In July 2018 Ancillary and Other Services was a charge of $10200M compared to bull A charge of $2001M in June 2018bull A charge of $2322M in July 2017

37

PUBLIC

Real-Time Ancillary Service Imbalance (ORDC) ndash July 2018

In July 2018 Real-Time Ancillary Service Imbalance was a charge to load of $2228K compared to bull A charge of $147K in June 2018bull A charge of $534K in July 2017

Real-Time Ancillary Service Imbalance $ in Thousands

Real-Time AS Imbalance ($2228)

Real-Time Reliability Deployment AS Imbalance $000

Total RTASI Amount Allocated to Load $2228

38

PUBLIC

Energy Settlement ndash July 2018

39

Day-Ahead Market Energy Settlement $ in Millions

Energy Purchases $215396

Point to Point Obligation Purchases $11726

Energy Sales ($212592)

Day-Ahead Congestion Rent $14531

Day-Ahead Market Make-Whole Payments ($001)

Real-Time Market Energy Settlement $ in Millions

Energy Imbalance at a Resource Node ($91963)

Energy Imbalance at a Load Zone $160737

Energy Imbalance at a Hub ($57497)

Net Real-Time Energy Imbalance $11276

Real Time Congestion from Self Schedules $013

Block Load Transfers and DC Ties ($2063)

Total Impact to Revenue Neutrality $9227

Load-Allocated Emergency Energy Payments ($016)

Load-Allocated Base Point Deviation Charges $026

Day-Ahead Market energy settlement activity increased from last month and increased from July 2017

Real-Time Market energy settlement activity increased from last month and increased from July 2017

PUBLIC

Congestion Revenue Rights (CRR) ndash July 2018

$ in Millions

Long-Term Auction ($4026)

Monthly Auction ($1773)

Total Auction Revenue ($5799)

Day-Ahead CRR Settlements ($15797)

Day-Ahead CRR Short-Charges $1885

Day-Ahead CRR Short-Charges Refunded ($899)

Day-Ahead CRR Short-Charges Net $986

Total CRR Funding ($14810)

Day-Ahead Point-to-Point Obligations $11726

Real-Time Point-to-Point Obligations ($10113)

Net Point-to-Point Obligations $1614

Congestion Revenue Rights settlement payments were not fully funded Partial funding to settle the CRR Short Charges was provided from the CRR Balancing Account Fund and the remaining $986M of CRR Short Charges were not refunded The CRR Fund Balance is now $0

Point to Point Obligations settled with a net charge of $1614M compared to a net credit of $1758M last month

40

PUBLIC

CRR Balancing Account Fund ndash July 2018

CRR Balancing Account $ in Millions

Monthly Day-Ahead Congestion Rent $14531

Monthly Day-Ahead CRR Settlements ($15797)

Monthly Day-Ahead CRR Short -Charges $1885

CRR Balancing Account Credit Total $619

Beginning Fund Balance for the Month $275

CRR Balancing Account Credit Total $619

Day-Ahead CRR Short-Charges Refunded ($899)

CRR PTP Option Award Charges $004

Load-Allocated CRR Amount $000

Total Fund Amount $000

41

PUBLIC

Revenue Neutrality ndash July 2018

Revenue Neutrality $ in Millions

Real-Time Energy Imbalance $11276

Real-Time Point to Point Obligation ($10113)

Real-Time Congestion from Self-Schedules $013

DC Tie amp Block Load Transfer ($2063)

Allocation to Load $886

In July 2018 the Revenue Neutrality charge to load was $886M compared to bull A charge of $3046M in June 2018bull A charge of $145M in July 2017

42

PUBLIC

Net Allocation to Load ndash July 2018

Market-Based Allocation $ in Millions

Reliability Unit Commitment $000

Ancillary and Other Services $10200

Real-Time Ancillary Service Imbalance $223

Emergency Energy $016

Base Point Deviation ($026)

CRR Auction Revenue ($5799)

CRR Balancing Account $000

Real-Time Revenue Neutrality $886

Reliability Must Run $000

Monthly Block Load Transfer $000

Total $5500

Fee AllocationERCOT Administrative Fee $2207

Net Allocated to Load $7707

In July 2018 the Net Allocation to load was a charge of $7707M compared to bull A charge of $2152M in June 2018bull A credit of $1363M in July 2017

43

PUBLIC

Advanced Meter Settlement Impacts ndash July 2018

July 2018 At month end settling 72M ESIIDs using Advanced Meter data

July 2018 990 of the load in ERCOT is settled with 15-min interval data (AMS Competitive IDR and NOIE IDR)

44

PUBLIC

ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndashJuly 2018

45

PUBLIC

Retail Transaction Volumes ndash Summary ndash July 2018

46

Transaction Type July 2018 July 2017 July 2018 July 2017

Switches 669909 617300 121926 84059

Acquisition 0 0 0 0

Move - Ins 1667037 1568153 270122 252360

Move - Outs 814580 802779 129820 127073

Continuous Service Agreements (CSA) 395944 283259 40217 55770

Mass Transitions 9033 0 0 0

Total 3556503 3271491 562085 519262

Year-To-Date Transactions Received

Board Presentation Input

Trans Volumes by Month_New

PUBLIC

Retail Transaction Volumes ndash Summary ndash July 2018

SwitchesAcquisitions Move-Ins

Move-Outs Mass Transition

47

Projects Report

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018

20000000$ 2018 Portfolio

Spending Estimate

Projects In FlightOn Hold (Count = 100) 24905011$

Projects Not Yet Started (Count = 10) 1320628$

Projects Completed (Count = 43) 795250$

(7020889)$

TOTAL 20000000$

Project Number Projects in Initiation Phase (Count = 4)

TBD IT Asset RecoveryNPRR842 Study Area Load Information

209-03 Study Network (STNET) Integration288-01 EDI Map and Translator Replacement

Impact Metric TolerancesUnfavorable variances are represented as negative numbers within the report - Green = No more than 49 unfavorable variance - Yellow = Unfavorable variance between 49 and 99 - Red = Unfavorable variance more than 99

Spending Reductions Required to Maintain Capital Budget

2018 Project Funding

Footnotes1 - One or more phases took longer than expected resulting in additional time required

2 - One or more phases required more labor than expected resulting in additional funding andor time required

3 - Project placed on holdNA - Metric not calculated because - it is reported at the parent project level or - it is an administrative project

Project Number Projects in Planning Phase (Count = 8) Phase Start Baseline

Phase FinishApproved

Phase FinishScheduled

Go-Live DateScheduled

Phase Finish

134-02 Privileged Account Management (PAM) Phase 2 882018 12192018 12192018 TBD 12192018 0 10

183-01 CMM-FT GUI Integration 12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs

242-01 Portfolio Reporting Assessment 1182017 12192018 12192018 TBD 12192018 0 21260-01 Information Governance Assessment 10182017 5302018 9192018 TBD 9192018 0 5286-01 Java Platform Assessment 6202018 11212018 11212018 TBD 11212018 0 6287-01 Security Constrained Unit Commitment (SCUC) 882018 2272019 2272019 TBD 2272019 0 -1

NPRR484Revisions to Congestion Revenue Rights Credit Calculations and Payments - Phase 1b 2

12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs

NPRR702Flexible Accounts Payment of Invoices and Disposition of Interest on Cash Collateral

12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs

Schedule Health Budget Health

49

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018Project Number Projects in Execution Phase (Count = 42) Phase Start Baseline Go-

Live DateApproved Go-

Live DateScheduled

Go-Live DateScheduled

Phase Finish

170-01 Enterprise Content Alignment Program 8262015 11152017 8312018 8312018 8312018 0 0170-06 ECAP - ECMS Implementation Phase 1 4252018 11302018 11302018 11302018 11302018 0 3173-02 ERCOT Flight Certification Website 11152017 2282019 2282019 2282019 5312019 0 2181-01 CRR Framework Upgrade 10262016 1022017 11192018 11192018 2272019 0 2

183-01 CMM Tech Refresh 3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

193-01 PMU Tool Evaluation and Implementation 12132017 892018 2152019 2152019 3202019 0 0196-01 GINR Project Status Application Replacement 12212016 9142017 2282019 2282019 3312019 0 1198-02 Reactive Power Coordination PoC 962017 6162018 8152018 8152018 8152018 0 54209-02 Weather Imaging and Line Observation (WILO) 5302018 212019 212019 212019 2272019 0 2210-01 REC Technology Refresh 8302017 3182018 12132018 12132018 1162019 0 3228-01 Enterprise Database Upgrade 882018 1292020 1292020 1292020 1292020 0 17229-01 IT Change and Configuration Management Phase 2 822017 6192018 12132018 12132018 3252019 0 2 -9238-01 Application Authentication Tech Refresh 962017 3192018 12132018 12132018 1302019 0 3239-01 Identity and Access Management 592018 3132019 3132019 3132019 3132019 0 2241-01 AREA - Generation 10112017 3302018 892018 892018 952018 0 -4244-01 Corporate Wireless 11292017 3282018 1252018 1252018 192019 0 9245-01 2017 EPS Metering Enhancements 6272018 892019 892019 892019 9252019 0 1246-01 iTest Data Refresh 12132017 1192018 11152018 11152018 122019 0 25249-01 Secondary Wind Forecasting Service 8302017 2282018 892018 892018 952018 0 0253-01 CIP Recovery Plan Project - Planning Phase 1 1312018 8292018 8292018 8292018 8292018 0 -2

257-01Security Constrained Optimal Powerflow in Study Network Analysis

1262017 10252018 10252018 10252018 1282018 0 19

261-01 Generic Transmission Constraint Calculation 372018 12132018 12132018 12132018 1232019 0 0263-01 Market Simulator 4112018 12132018 12132018 12132018 1302019 0 7265-01 Real-Time Assessment Continuity 1312018 12132018 12132018 12132018 1302019 0 0279-01 Cyber Security Project 24 6272018 10262018 10262018 10262018 11282018 0 0280-01 Quest Software Portfolio Transition 442018 6272018 9262018 9262018 9262018 0 13282-01 Synchronous Condenser Outage Modeling 662018 10252018 10252018 10252018 1252018 0 1Various 2015 CMM NPRRs 2 -18

NPRR519Exemption of ERS-Only QSEs from Collateral and Capitalization Requirements

3152017 5192018 12112018 12112018 12312018 0 See 2015 CMM NPRRs

NPRR620Collateral Requirements for Counter-Parties with No Load or Generation

3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

NPRR660 Remove CRR State Change Adder 3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

Budget HealthSchedule Health

50

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018Project Number Projects in Execution Phase (Count = 42) Phase Start Baseline Go-

Live DateApproved Go-

Live DateScheduled

Go-Live DateScheduled

Phase Finish

NPRR741 Clarifications to TPE and EAL Credit Exposure Calculations 3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

NPRR749 Option Cost for Outstanding CRRs 882018 12132018 12132018 12132018 TBD 0 NA See 2015 CMM NPRRs

NPRR755 Data Agent-Only QSE Registration 3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

NPRR819Modification of Non-Price Error Resettlement Thresholds and Resettlement Clean-Ups

592018 892018 892018 892018 952018 0 36

NPRR833 Modify PTP Obligation Bid Clearing Change 882018 12132018 12132018 12132018 TBD 0 1

NPRR843Short-Term System Adequacy and AS Offer Disclosure Reports Additions

7182018 10252018 10252018 10252018 11282018 0 0

NPRR864 RUC Modifications to Consider Market-Based Solutions 6202018 10252018 10252018 10252018 11282018 0 4SCR777 Bilateral CRR Interface Enhancement 10262016 1022017 11192018 11192018 2272019 0 NA See 181-01

SCR781 RARF Replacement 12202017 4252018 12192018 12192018 12192018 0 3SCR791 Correction of 60-day SCED GRD Disclosure Report 522018 892018 892018 892018 952018 0 39SCR795 Addition of Intra-Hour Wind Forecast to GTBD Calculation 882018 10252018 10252018 10252018 11142018 0 0

Project Number Expedited Projects in Execution (Count = 34)

Project Number Projects in Stabilization (Count = 10) Execution

Phase StartBaseline Go-Live Target

Approved Go-Live Target

ActualGo-Live Date

Scheduled Execution Phase

Finish

NPRR648 Remove References to Flowgate Rights 3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR683 Revision to Available Credit Limit Calculation 3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR743 Revision to MCE to Have a Floor For Load Exposure 3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR760 Calculation of Exposure Variables For Days With No Activity 3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR776 Voltage Set Point Communication 9202017 3192018 452018 452018 952018 0 1

NPRR800Revisions to Credit Exposure Calculations to Use Electricity Futures Market Prices

3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR815Revise the Limitation of Load Resources Providing Responsive Reserve (RRS) Service

3212018 5312018 5312018 5312018 8292018 0 2

209-01 Multi Station Breaker to Breaker One Lines 282017 392018 532018 532018 8222018 0 -1259-01 DC SCADA and Metering Upgrade 10252017 1172018 7252018 7252018 8292018 0 22266-01 Remote Email Access Enhancement 12132017 372018 662018 6192018 9262018 2 -7 2 -9

Schedule Health Budget Health

Budget HealthSchedule Health

51

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018

Project Number Projects On Hold (Count = 2) Forecast

Start DateBaseline

Phase FinishApproved Go-

Live TargetScheduled

Go-Live DateScheduled

Phase Finish

SCR789 Update NMMS Topology Processor to PSSE 34 Capability 0

269-01Document Repository Redesign and Governance Implementation - Phase 1

0

Project Number Projects Completed (Count = 20)

Baseline Execution

Phase Start

Baseline Go-Live Target

Approved Go-Live Target

Actual Go-Live Date

Actual Execution Phase Finish

185-01 Records Management and eDiscovery 12152016 5242017 8292017 8222017 12132017 2 0224-01 TelAlert Replacement 452017 6272017 842017 842017 592018 0 5230-01 SAS Technical Architecture Redesign 312017 12132017 12132017 12132017 6272018 0 2234-01 Reporting Solution Resiliency (RSR) 452017 8232017 11272017 11272017 1102018 0 8240-01 EDI Translator and Mapping Replacement Assessment 4192017 9272017 2282018 TBD 372018 -2 20254-01 Retail Windows Upgrade 10112017 12182017 12182017 1222018 272018 1 -51 65255-01 Settlements Architecture Enhancements 10252017 1112018 1112018 1192018 2142018 1 -10 53258-01 WD Kainos SMART Automation Testing Tool 4112018 642018 642018 662018 7182018 -3 33271-01 Issue Tracking and Resolution Tool Assessment 12132017 4252018 4252018 TBD 522018 1 -5 -1272-01 Operator Training Simulator Black Start GE Effort 1262017 4252018 4252018 4272018 5162018 -1 19274-01 Average Mid-Term Load Forecast 372018 5312018 5312018 5312018 6272018 0 50

NPRR768Revisions to Real-Time On-Line Reliability Deployment Price Adder Categories

372018 5312018 5312018 5312018 6272018 0 16

NPRR778 Modifications to Date Change and Cancellation Evaluation Window 7192017 10292017 12112017 12112017 1312018 0 23

NPRR782Settlement of Infeasible Ancillary Services Due to Transmission Constraints

5242017 8312017 1122017 1122017 1102018 0 20

NPRR808 Three Year CRR Auction 8232017 9182017 9182017 912017 1312018 65 68

NPRR810Applicability of RMR Incentive Factor on Reservation and Transportation Costs Associated with Firm Fuel Supplies

7172017 11122017 3312018 3312018 3312018 0 NA See 233-00

NPRR830 Revision of 4-Coincident Peak Methodology 12132017 262018 262018 262018 372018 0 85

NPRR831 Inclusion of Private Use Networks in Load Zone Price Calculations 822017 1122017 1122017 1122017 2212018 0 33

OBDRR002 ORDC OBD Revisions for PUCT Project 47199 372018 5312018 5312018 5312018 6272018 0 See NPRR768

SCR792 Enhance Communications of BAAL Exceedances 2142018 452018 452018 452018 4252018 0 69

Project Number Expedited Projects Completed (Count = 23)

Budget HealthSchedule Health

Budget HealthSchedule Health

52

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018

Project Number 2018 Projects Not Yet Started (Count = 10) Forecast

Start Date

NPRR858 Provide Complete Current Operating Plan (COP) Data Aug-2018TBD 2018 OS Enhancements Aug-2018TBD Additional Branch Limit for Relays Aug-2018

NPRR817 Create a Panhandle Hub Sep-2018NPRR821 Elimination of the CRR Deration Process Oct-2018NPRR865 Publish RTM Shift Factors for Hubs Load Zones and DC Ties Oct-2018

SCR793SSR Related Telemetry for Transmission Service Provider (TSP) Operators

Oct-2018

ECAP ECAP - ECMS Implementation Phase 2 Oct-2018TBD Job Scheduler Update in CSI Framework Oct-2018TBD Parameter Estimation Oct-2018

53

  • Slide Number 1
  • Slide Number 2
  • Summary ndash July 2018
  • Daily Peak Demand Hourly Average Actual vs Forecast Wind Day-Ahead COPs amp On-Line Capacity at Peak ndash July 2018
  • Actual Wind Output plus Curtailments vs Wind Day-Ahead COPs for All Hours ndash July 2018
  • ERCOTrsquos CPS1 Monthly Performance ndash July 2018
  • Monthly Peak Actual Demand ndash July 2018
  • Monthly Minimum Actual 15-Minute Demand ndash July 2018
  • Day-Ahead Load Forecast Performance ndash July 2018
  • Reliability Unit Commitment (RUC) Capacity by Weather Zone ndash July 2018
  • Generic Transmission Constraints (GTCs) ndash July 2018
  • Advisories and Watches ndash July 2018 Corrected
  • Lake Levels Update ndash August 1 2018
  • Planning Summary ndash July 2018
  • Mapping of Counties to ERCOT Zones ndash July 2018
  • Cumulative MW Capacity of Interconnection Requests by Zone ndashJuly 2018
  • Cumulative MW Capacity of Interconnection Requests by Zone ndashJuly 2018
  • Cumulative MW Capacity of Interconnection Requests by Zone ndashJuly 2018
  • Wind Generation ndash July 2018
  • Solar Generation ndash July 2018
  • Generation Interconnection Activity by Fuel ndash July 2018
  • Generation Interconnection Activity by Project Phase ndash July 2018
  • Slide Number 23
  • Day-Ahead Schedule (Hourly Average) ndash July 2018
  • Percentage of Real-Time Load Hedged in the DAM (Counter-Party Level) ndash July 2018
  • DAM and RTM Price Convergence ndash July 2018
  • Day-Ahead Electricity and Ancillary Service Prices (Hourly Average) ndash July 2018
  • Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash July 2018
  • Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash July 2018
  • DRUC Monthly Summary (Hourly Average) ndash July 2018
  • HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash July 2018
  • NonndashSpinning Reserve Service Deployment ndash July 2018
  • CRR Price Convergence ndash July 2018
  • Daily Average System Lambda and ORDC Price Adders ndash July 2018
  • ERS Procurement for June 2018 ndash September 2018
  • Reliability Services ndash July 2018
  • Ancillary and Other Services ndash July 2018
  • Real-Time Ancillary Service Imbalance (ORDC) ndash July 2018
  • Energy Settlement ndash July 2018
  • Congestion Revenue Rights (CRR) ndash July 2018
  • CRR Balancing Account Fund ndash July 2018
  • Revenue Neutrality ndash July 2018
  • Net Allocation to Load ndash July 2018
  • Advanced Meter Settlement Impacts ndash July 2018
  • ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndash July 2018
  • Retail Transaction Volumes ndash Summary ndash July 2018
  • Retail Transaction Volumes ndash Summary ndash July 2018
  • Slide Number 48
  • ERCOT Portfolio Stoplight Report ndash July 2018
  • ERCOT Portfolio Stoplight Report ndash July 2018
  • ERCOT Portfolio Stoplight Report ndash July 2018
  • ERCOT Portfolio Stoplight Report ndash July 2018
  • ERCOT Portfolio Stoplight Report ndash July 2018
Retail Transactions Summary
July 2018 June 2018 May 2018 April 2018 March 2018 February 2018 January 2018 December 2017 November 2017 October 2017 September 2017 August 2017 July 2017 June 2017 May 2017 April 2017 March 2017 February 2017 January 2017 December 2016 November 2016 October 2016 September 2016 August 2016 July 2016 June 2016 May 2016 April 2016 March 2016 February 2016 January 2016 December 2015 November 2015 October 2015 September 2015 August 2015 July 2015 June 2015 May 2015 April 2015 March 2015 February 2015 January 2015 December 2014 November 2014 October 2014 September 2014 August 2014 July 2014 June 2014 May 2014 April 2014 March 2014 February 2014 January 2014 December 2013 November 2013 October 2013 September 2013 August 2013 July 2013 June 2013 May 2013 April 2013 March 2013 February 2013 January 2013 Grand total
814_01 - Switch Received 121926 109653 96828 81291 95159 76119 88933 60560 77860 78096 79502 84134 84059 108784 130828 71769 67845 66875 87140 66556 56202 64452 67323 86656 82923 86376 75323 70300 76235 68057 63954 61486 52887 65276 70342 81674 91211 102661 86229 81255 79997 73394 72885 71072 67080 110465 175164 89677 99568 101490 111077 91983 93887 71130 86953 69691 55957 166882 82415 93194 102562 103756 116086 78919 68950 64329 67116 1321827
Difference from previous month 12273 12825 15537 (13868) 19040 (12814) 28373 (17300) (236) (1406) (4632) 75 (24725) (22044) 59059 3924 970 (20265) 20584 10354 (8250) (2871) (19333) 3733 (3453) 11053 5023 (5935) 8178 4103 2468 8599 (12389) (5066) (11332) (9537) (11450) 16432 4974 1258 6603 509 1813 3992 (43385) (64699) 85487 (9891) (1922) (9587) 19094 (1904) 22757 (15823) 17262 13734 (110925) 84467 (10779) (9368) (1194) (12330) 37167 9969 4621 (2787)
814_16 - Move - Ins Received 270122 257125 244431 225380 224289 215281 230409 238340 207921 236397 244511 258046 252360 257759 237611 197865 217962 201984 202612 196236 201714 220958 231999 268781 241844 247481 214383 199804 218245 212474 193716 189862 181098 215908 229405 248124 263233 247089 208166 207932 215950 197765 198025 193973 178624 226283 231418 243482 251957 233679 223201 258649 214724 208160 207059 172981 178671 233469 216550 255967 249114 220397 216982 204412 197200 191955 194507 3162148
Difference from previous month 12997 12694 19051 1091 9008 (15128) (7931) 30419 (28476) (8114) (13535) 5686 (5399) 20148 39746 (20097) 15978 (628) 6376 (5478) (19244) (11041) (36782) 26937 (5637) 33098 14579 (18441) 5771 18758 3854 8764 (34810) (13497) (18719) (15109) 16144 38923 234 (8018) 18185 (260) 4052 15349 (47659) (5135) (12064) (8475) 18278 10478 (35448) 43925 6564 1101 34078 (5690) (54798) 16919 (39417) 6853 28717 3415 12570 7212 5245 (2552)
814_24 - MVO and MVO to CSA Received 129820 125861 124403 113795 108753 100127 111821 144987 100830 116519 129103 128104 127073 133582 127218 102055 111459 100285 101107 96289 100578 109493 114094 133170 122932 129025 118022 103789 109278 103747 96628 99552 96214 109578 117949 123894 133905 133855 114675 108275 108859 94864 98233 97901 89578 111857 115918 121662 131607 126785 119107 107956 107266 99428 104273 93385 93977 115469 115524 129594 135196 121446 120049 111598 106467 102429 104399 1660500
814_10 - DTP Mass Acquisition Received - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0
814_10 - DTP Mass Transition Received - 0 - 0 9033 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 639 - 0 - 0 4975 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0
814_18 - CSA AdditionDeletes Received 40217 62083 99016 55581 46720 42587 49740 47725 31726 52888 41597 40616 55770 43745 52139 26702 21791 39082 44030 38884 39856 31786 33061 42622 48489 64178 50499 59475 59400 48536 42179 40351 34796 34420 54677 35078 49489 59611 39384 44247 44577 35386 40420 54831 43550 45039 44268 40405 57954 64408 65032 80184 70310 41156 34811 46680 50347 71847 48606 52585 50867 62747 59763 34925 40977 40389 41227 747237
Total 562085 554722 573711 476047 474921 434114 480903 491612 418337 483900 494713 510900 519262 543870 547796 398391 419057 408226 434889 397965 398350 426689 446477 531229 496188 527060 458227 433368 463158 432814 396477 391251 364995 425182 472373 488770 537838 543216 448454 441709 449383 401409 409563 417777 378832 493644 566768 495865 541086 526362 523392 538772 486187 419874 433096 382737 378952 587667 463095 531340 537739 508346 512880 429854 413594 399102 407249 6891712
Counts from Monthly Retail Transaction report
To do
Break Out 814_10s - AQ and MT
Break Out 814_18 Additions from Deletes
Year-To-Date Transactions Received
Transaction Type July 2018 July 2017 July 2018 July 2017
Switches 669909 617300 121926 84059
Acquisition 0 0 0 0
Move - Ins 1667037 1568153 270122 252360
Move - Outs 814580 802779 129820 127073
Continuous Service Agreements (CSA) 395944 283259 40217 55770
Mass Transitions 9033 0 0 0
Total 3556503 3271491 562085 519262
There has been a change since this was created
Mass Acquisition has been broken out of Mass Transition
Page 29: ERCOT Monthly Operational Overvie · ERCOT Monthly Operational Overview (July 2018) Revised 08.22.18. ERCOT Public. August 15, 2018

PUBLIC

Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash July 2018

29

0

100

200

300

400

500

600

Pric

e ($

MW

h)

Hour Ending

RTSPP - Hub Average

DASPP - Hub Average

Energy prices reflect the risk premium between Day-Ahead amp Real-Time

PUBLIC

DRUC Monthly Summary (Hourly Average) ndash July 2018

30

0

15000

30000

45000

60000

75000

90000

MW

h

Hour Ending

Self Scheduled Capacity

Self Scheduled Ancillary Service Limit

Load Forecast

DRUC Recommended Capacity

31 executions (0 missed)0 published after 160011 minutes average execution time0 Resources committed

PUBLIC

HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash July 2018

31

0

02

04

06

08

1

0

20

40

60

80

100

RTO

RD

PA ($

MW

h)

MW

h

Hour Ending

744 executions (0 missed)8 minutes average execution time1 Resources committed through HRUC or by a Verbal Dispatch Instruction

The dotted line indicates the average RTORDPA

PUBLIC

NonndashSpinning Reserve Service Deployment ndash July 2018

32

Deployment Start Time

Deployment End Time

Deployment Duration (Hours)

Max Deployment(MW) Reason

NA

PUBLIC

CRR Price Convergence ndash July 2018

0

50

100

150

200

250

Mill

ions

$

Cost

Value

Congestion Revenue Right cost in auction convergence with payment in Day-Ahead Market and Real Time Market

33

PUBLIC

Daily Average System Lambda and ORDC Price Adders ndash July 2018

0

50

100

150

200

250

$M

Wh

Day of Month

RTOFFPA

RTORPA

SYSTEM_LAMBDA

34

PUBLIC

ERS Procurement for June 2018 ndash September 2018

TP1 TP2 TP3 TP4 TP5 TP6

Non Weather-Sensitive ERS-10 MW 160562 165996 143324 140708 156699 151138

Non Weather-Sensitive ERS-30 MW 736864 781559 702529 625067 755153 657394

Weather-Sensitive ERS-10 MW 0 0 0 0 0 0

Weather-Sensitive ERS-30 MW 0 0 11850 11850 0 0

Total MW Procured 897426 947555 857703 777625 911852 808532

Clearing Price $201 $185 $2108 $2177 $199 $225

Time Period Time Period Hours

Time Period 1 Hours Ending 0600 - 0800 (50000 am to 80000 am) Monday through Friday except ERCOT Holidays

Time Period 2 Hours Ending 0900 - 1300 (80000 am to 10000 pm) Monday through Friday except ERCOT Holidays

Time Period 3 Hours Ending 1400 - 1600 (10000 pm to 40000 pm) Monday through Friday except ERCOT Holidays

Time Period 4 Hours Ending 1700 - 1900 (40000 pm to 70000 pm) Monday through Friday except ERCOT Holidays

Time Period 5 Hours Ending 2000 - 2200 (70000 pm to 100000 pm) Monday through Friday except ERCOT Holidays Time Period 6 All other hours

35

PUBLIC

Reliability Services ndash July 2018

Reliability Unit Commitment (RUC) $ in Millions

RUC Make-Whole Payments $000

RUC Clawback Charges $000

RUC Commitment Settlement $000

RUC Capacity Short Charges $000

RUC Make-Whole Uplift $000

RUC Commitment Cost Allocation $000

RUC Decommitment Payments $000

Total RUC Allocation to Load $000

In July 2018 there was a credit of $000M allocated to load for RUC compared to bull A credit of $000M in June 2018bull A credit of $003M in July 2017

36

PUBLIC

Ancillary and Other Services ndash July 2018

Ancillary and Other Services $ in Millions

Regulation Up Service $1105

Regulation Down Service $072

Responsive Reserve Service $7177

Non-Spinning Reserve Service $1787

Black Start Service $059

Voltage Services - Reactive Power $000

Voltage Services - Lost Opportunity $000

Total Charges Allocated to Load $10200

In July 2018 Ancillary and Other Services was a charge of $10200M compared to bull A charge of $2001M in June 2018bull A charge of $2322M in July 2017

37

PUBLIC

Real-Time Ancillary Service Imbalance (ORDC) ndash July 2018

In July 2018 Real-Time Ancillary Service Imbalance was a charge to load of $2228K compared to bull A charge of $147K in June 2018bull A charge of $534K in July 2017

Real-Time Ancillary Service Imbalance $ in Thousands

Real-Time AS Imbalance ($2228)

Real-Time Reliability Deployment AS Imbalance $000

Total RTASI Amount Allocated to Load $2228

38

PUBLIC

Energy Settlement ndash July 2018

39

Day-Ahead Market Energy Settlement $ in Millions

Energy Purchases $215396

Point to Point Obligation Purchases $11726

Energy Sales ($212592)

Day-Ahead Congestion Rent $14531

Day-Ahead Market Make-Whole Payments ($001)

Real-Time Market Energy Settlement $ in Millions

Energy Imbalance at a Resource Node ($91963)

Energy Imbalance at a Load Zone $160737

Energy Imbalance at a Hub ($57497)

Net Real-Time Energy Imbalance $11276

Real Time Congestion from Self Schedules $013

Block Load Transfers and DC Ties ($2063)

Total Impact to Revenue Neutrality $9227

Load-Allocated Emergency Energy Payments ($016)

Load-Allocated Base Point Deviation Charges $026

Day-Ahead Market energy settlement activity increased from last month and increased from July 2017

Real-Time Market energy settlement activity increased from last month and increased from July 2017

PUBLIC

Congestion Revenue Rights (CRR) ndash July 2018

$ in Millions

Long-Term Auction ($4026)

Monthly Auction ($1773)

Total Auction Revenue ($5799)

Day-Ahead CRR Settlements ($15797)

Day-Ahead CRR Short-Charges $1885

Day-Ahead CRR Short-Charges Refunded ($899)

Day-Ahead CRR Short-Charges Net $986

Total CRR Funding ($14810)

Day-Ahead Point-to-Point Obligations $11726

Real-Time Point-to-Point Obligations ($10113)

Net Point-to-Point Obligations $1614

Congestion Revenue Rights settlement payments were not fully funded Partial funding to settle the CRR Short Charges was provided from the CRR Balancing Account Fund and the remaining $986M of CRR Short Charges were not refunded The CRR Fund Balance is now $0

Point to Point Obligations settled with a net charge of $1614M compared to a net credit of $1758M last month

40

PUBLIC

CRR Balancing Account Fund ndash July 2018

CRR Balancing Account $ in Millions

Monthly Day-Ahead Congestion Rent $14531

Monthly Day-Ahead CRR Settlements ($15797)

Monthly Day-Ahead CRR Short -Charges $1885

CRR Balancing Account Credit Total $619

Beginning Fund Balance for the Month $275

CRR Balancing Account Credit Total $619

Day-Ahead CRR Short-Charges Refunded ($899)

CRR PTP Option Award Charges $004

Load-Allocated CRR Amount $000

Total Fund Amount $000

41

PUBLIC

Revenue Neutrality ndash July 2018

Revenue Neutrality $ in Millions

Real-Time Energy Imbalance $11276

Real-Time Point to Point Obligation ($10113)

Real-Time Congestion from Self-Schedules $013

DC Tie amp Block Load Transfer ($2063)

Allocation to Load $886

In July 2018 the Revenue Neutrality charge to load was $886M compared to bull A charge of $3046M in June 2018bull A charge of $145M in July 2017

42

PUBLIC

Net Allocation to Load ndash July 2018

Market-Based Allocation $ in Millions

Reliability Unit Commitment $000

Ancillary and Other Services $10200

Real-Time Ancillary Service Imbalance $223

Emergency Energy $016

Base Point Deviation ($026)

CRR Auction Revenue ($5799)

CRR Balancing Account $000

Real-Time Revenue Neutrality $886

Reliability Must Run $000

Monthly Block Load Transfer $000

Total $5500

Fee AllocationERCOT Administrative Fee $2207

Net Allocated to Load $7707

In July 2018 the Net Allocation to load was a charge of $7707M compared to bull A charge of $2152M in June 2018bull A credit of $1363M in July 2017

43

PUBLIC

Advanced Meter Settlement Impacts ndash July 2018

July 2018 At month end settling 72M ESIIDs using Advanced Meter data

July 2018 990 of the load in ERCOT is settled with 15-min interval data (AMS Competitive IDR and NOIE IDR)

44

PUBLIC

ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndashJuly 2018

45

PUBLIC

Retail Transaction Volumes ndash Summary ndash July 2018

46

Transaction Type July 2018 July 2017 July 2018 July 2017

Switches 669909 617300 121926 84059

Acquisition 0 0 0 0

Move - Ins 1667037 1568153 270122 252360

Move - Outs 814580 802779 129820 127073

Continuous Service Agreements (CSA) 395944 283259 40217 55770

Mass Transitions 9033 0 0 0

Total 3556503 3271491 562085 519262

Year-To-Date Transactions Received

Board Presentation Input

Trans Volumes by Month_New

PUBLIC

Retail Transaction Volumes ndash Summary ndash July 2018

SwitchesAcquisitions Move-Ins

Move-Outs Mass Transition

47

Projects Report

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018

20000000$ 2018 Portfolio

Spending Estimate

Projects In FlightOn Hold (Count = 100) 24905011$

Projects Not Yet Started (Count = 10) 1320628$

Projects Completed (Count = 43) 795250$

(7020889)$

TOTAL 20000000$

Project Number Projects in Initiation Phase (Count = 4)

TBD IT Asset RecoveryNPRR842 Study Area Load Information

209-03 Study Network (STNET) Integration288-01 EDI Map and Translator Replacement

Impact Metric TolerancesUnfavorable variances are represented as negative numbers within the report - Green = No more than 49 unfavorable variance - Yellow = Unfavorable variance between 49 and 99 - Red = Unfavorable variance more than 99

Spending Reductions Required to Maintain Capital Budget

2018 Project Funding

Footnotes1 - One or more phases took longer than expected resulting in additional time required

2 - One or more phases required more labor than expected resulting in additional funding andor time required

3 - Project placed on holdNA - Metric not calculated because - it is reported at the parent project level or - it is an administrative project

Project Number Projects in Planning Phase (Count = 8) Phase Start Baseline

Phase FinishApproved

Phase FinishScheduled

Go-Live DateScheduled

Phase Finish

134-02 Privileged Account Management (PAM) Phase 2 882018 12192018 12192018 TBD 12192018 0 10

183-01 CMM-FT GUI Integration 12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs

242-01 Portfolio Reporting Assessment 1182017 12192018 12192018 TBD 12192018 0 21260-01 Information Governance Assessment 10182017 5302018 9192018 TBD 9192018 0 5286-01 Java Platform Assessment 6202018 11212018 11212018 TBD 11212018 0 6287-01 Security Constrained Unit Commitment (SCUC) 882018 2272019 2272019 TBD 2272019 0 -1

NPRR484Revisions to Congestion Revenue Rights Credit Calculations and Payments - Phase 1b 2

12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs

NPRR702Flexible Accounts Payment of Invoices and Disposition of Interest on Cash Collateral

12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs

Schedule Health Budget Health

49

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018Project Number Projects in Execution Phase (Count = 42) Phase Start Baseline Go-

Live DateApproved Go-

Live DateScheduled

Go-Live DateScheduled

Phase Finish

170-01 Enterprise Content Alignment Program 8262015 11152017 8312018 8312018 8312018 0 0170-06 ECAP - ECMS Implementation Phase 1 4252018 11302018 11302018 11302018 11302018 0 3173-02 ERCOT Flight Certification Website 11152017 2282019 2282019 2282019 5312019 0 2181-01 CRR Framework Upgrade 10262016 1022017 11192018 11192018 2272019 0 2

183-01 CMM Tech Refresh 3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

193-01 PMU Tool Evaluation and Implementation 12132017 892018 2152019 2152019 3202019 0 0196-01 GINR Project Status Application Replacement 12212016 9142017 2282019 2282019 3312019 0 1198-02 Reactive Power Coordination PoC 962017 6162018 8152018 8152018 8152018 0 54209-02 Weather Imaging and Line Observation (WILO) 5302018 212019 212019 212019 2272019 0 2210-01 REC Technology Refresh 8302017 3182018 12132018 12132018 1162019 0 3228-01 Enterprise Database Upgrade 882018 1292020 1292020 1292020 1292020 0 17229-01 IT Change and Configuration Management Phase 2 822017 6192018 12132018 12132018 3252019 0 2 -9238-01 Application Authentication Tech Refresh 962017 3192018 12132018 12132018 1302019 0 3239-01 Identity and Access Management 592018 3132019 3132019 3132019 3132019 0 2241-01 AREA - Generation 10112017 3302018 892018 892018 952018 0 -4244-01 Corporate Wireless 11292017 3282018 1252018 1252018 192019 0 9245-01 2017 EPS Metering Enhancements 6272018 892019 892019 892019 9252019 0 1246-01 iTest Data Refresh 12132017 1192018 11152018 11152018 122019 0 25249-01 Secondary Wind Forecasting Service 8302017 2282018 892018 892018 952018 0 0253-01 CIP Recovery Plan Project - Planning Phase 1 1312018 8292018 8292018 8292018 8292018 0 -2

257-01Security Constrained Optimal Powerflow in Study Network Analysis

1262017 10252018 10252018 10252018 1282018 0 19

261-01 Generic Transmission Constraint Calculation 372018 12132018 12132018 12132018 1232019 0 0263-01 Market Simulator 4112018 12132018 12132018 12132018 1302019 0 7265-01 Real-Time Assessment Continuity 1312018 12132018 12132018 12132018 1302019 0 0279-01 Cyber Security Project 24 6272018 10262018 10262018 10262018 11282018 0 0280-01 Quest Software Portfolio Transition 442018 6272018 9262018 9262018 9262018 0 13282-01 Synchronous Condenser Outage Modeling 662018 10252018 10252018 10252018 1252018 0 1Various 2015 CMM NPRRs 2 -18

NPRR519Exemption of ERS-Only QSEs from Collateral and Capitalization Requirements

3152017 5192018 12112018 12112018 12312018 0 See 2015 CMM NPRRs

NPRR620Collateral Requirements for Counter-Parties with No Load or Generation

3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

NPRR660 Remove CRR State Change Adder 3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

Budget HealthSchedule Health

50

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018Project Number Projects in Execution Phase (Count = 42) Phase Start Baseline Go-

Live DateApproved Go-

Live DateScheduled

Go-Live DateScheduled

Phase Finish

NPRR741 Clarifications to TPE and EAL Credit Exposure Calculations 3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

NPRR749 Option Cost for Outstanding CRRs 882018 12132018 12132018 12132018 TBD 0 NA See 2015 CMM NPRRs

NPRR755 Data Agent-Only QSE Registration 3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

NPRR819Modification of Non-Price Error Resettlement Thresholds and Resettlement Clean-Ups

592018 892018 892018 892018 952018 0 36

NPRR833 Modify PTP Obligation Bid Clearing Change 882018 12132018 12132018 12132018 TBD 0 1

NPRR843Short-Term System Adequacy and AS Offer Disclosure Reports Additions

7182018 10252018 10252018 10252018 11282018 0 0

NPRR864 RUC Modifications to Consider Market-Based Solutions 6202018 10252018 10252018 10252018 11282018 0 4SCR777 Bilateral CRR Interface Enhancement 10262016 1022017 11192018 11192018 2272019 0 NA See 181-01

SCR781 RARF Replacement 12202017 4252018 12192018 12192018 12192018 0 3SCR791 Correction of 60-day SCED GRD Disclosure Report 522018 892018 892018 892018 952018 0 39SCR795 Addition of Intra-Hour Wind Forecast to GTBD Calculation 882018 10252018 10252018 10252018 11142018 0 0

Project Number Expedited Projects in Execution (Count = 34)

Project Number Projects in Stabilization (Count = 10) Execution

Phase StartBaseline Go-Live Target

Approved Go-Live Target

ActualGo-Live Date

Scheduled Execution Phase

Finish

NPRR648 Remove References to Flowgate Rights 3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR683 Revision to Available Credit Limit Calculation 3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR743 Revision to MCE to Have a Floor For Load Exposure 3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR760 Calculation of Exposure Variables For Days With No Activity 3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR776 Voltage Set Point Communication 9202017 3192018 452018 452018 952018 0 1

NPRR800Revisions to Credit Exposure Calculations to Use Electricity Futures Market Prices

3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR815Revise the Limitation of Load Resources Providing Responsive Reserve (RRS) Service

3212018 5312018 5312018 5312018 8292018 0 2

209-01 Multi Station Breaker to Breaker One Lines 282017 392018 532018 532018 8222018 0 -1259-01 DC SCADA and Metering Upgrade 10252017 1172018 7252018 7252018 8292018 0 22266-01 Remote Email Access Enhancement 12132017 372018 662018 6192018 9262018 2 -7 2 -9

Schedule Health Budget Health

Budget HealthSchedule Health

51

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018

Project Number Projects On Hold (Count = 2) Forecast

Start DateBaseline

Phase FinishApproved Go-

Live TargetScheduled

Go-Live DateScheduled

Phase Finish

SCR789 Update NMMS Topology Processor to PSSE 34 Capability 0

269-01Document Repository Redesign and Governance Implementation - Phase 1

0

Project Number Projects Completed (Count = 20)

Baseline Execution

Phase Start

Baseline Go-Live Target

Approved Go-Live Target

Actual Go-Live Date

Actual Execution Phase Finish

185-01 Records Management and eDiscovery 12152016 5242017 8292017 8222017 12132017 2 0224-01 TelAlert Replacement 452017 6272017 842017 842017 592018 0 5230-01 SAS Technical Architecture Redesign 312017 12132017 12132017 12132017 6272018 0 2234-01 Reporting Solution Resiliency (RSR) 452017 8232017 11272017 11272017 1102018 0 8240-01 EDI Translator and Mapping Replacement Assessment 4192017 9272017 2282018 TBD 372018 -2 20254-01 Retail Windows Upgrade 10112017 12182017 12182017 1222018 272018 1 -51 65255-01 Settlements Architecture Enhancements 10252017 1112018 1112018 1192018 2142018 1 -10 53258-01 WD Kainos SMART Automation Testing Tool 4112018 642018 642018 662018 7182018 -3 33271-01 Issue Tracking and Resolution Tool Assessment 12132017 4252018 4252018 TBD 522018 1 -5 -1272-01 Operator Training Simulator Black Start GE Effort 1262017 4252018 4252018 4272018 5162018 -1 19274-01 Average Mid-Term Load Forecast 372018 5312018 5312018 5312018 6272018 0 50

NPRR768Revisions to Real-Time On-Line Reliability Deployment Price Adder Categories

372018 5312018 5312018 5312018 6272018 0 16

NPRR778 Modifications to Date Change and Cancellation Evaluation Window 7192017 10292017 12112017 12112017 1312018 0 23

NPRR782Settlement of Infeasible Ancillary Services Due to Transmission Constraints

5242017 8312017 1122017 1122017 1102018 0 20

NPRR808 Three Year CRR Auction 8232017 9182017 9182017 912017 1312018 65 68

NPRR810Applicability of RMR Incentive Factor on Reservation and Transportation Costs Associated with Firm Fuel Supplies

7172017 11122017 3312018 3312018 3312018 0 NA See 233-00

NPRR830 Revision of 4-Coincident Peak Methodology 12132017 262018 262018 262018 372018 0 85

NPRR831 Inclusion of Private Use Networks in Load Zone Price Calculations 822017 1122017 1122017 1122017 2212018 0 33

OBDRR002 ORDC OBD Revisions for PUCT Project 47199 372018 5312018 5312018 5312018 6272018 0 See NPRR768

SCR792 Enhance Communications of BAAL Exceedances 2142018 452018 452018 452018 4252018 0 69

Project Number Expedited Projects Completed (Count = 23)

Budget HealthSchedule Health

Budget HealthSchedule Health

52

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018

Project Number 2018 Projects Not Yet Started (Count = 10) Forecast

Start Date

NPRR858 Provide Complete Current Operating Plan (COP) Data Aug-2018TBD 2018 OS Enhancements Aug-2018TBD Additional Branch Limit for Relays Aug-2018

NPRR817 Create a Panhandle Hub Sep-2018NPRR821 Elimination of the CRR Deration Process Oct-2018NPRR865 Publish RTM Shift Factors for Hubs Load Zones and DC Ties Oct-2018

SCR793SSR Related Telemetry for Transmission Service Provider (TSP) Operators

Oct-2018

ECAP ECAP - ECMS Implementation Phase 2 Oct-2018TBD Job Scheduler Update in CSI Framework Oct-2018TBD Parameter Estimation Oct-2018

53

  • Slide Number 1
  • Slide Number 2
  • Summary ndash July 2018
  • Daily Peak Demand Hourly Average Actual vs Forecast Wind Day-Ahead COPs amp On-Line Capacity at Peak ndash July 2018
  • Actual Wind Output plus Curtailments vs Wind Day-Ahead COPs for All Hours ndash July 2018
  • ERCOTrsquos CPS1 Monthly Performance ndash July 2018
  • Monthly Peak Actual Demand ndash July 2018
  • Monthly Minimum Actual 15-Minute Demand ndash July 2018
  • Day-Ahead Load Forecast Performance ndash July 2018
  • Reliability Unit Commitment (RUC) Capacity by Weather Zone ndash July 2018
  • Generic Transmission Constraints (GTCs) ndash July 2018
  • Advisories and Watches ndash July 2018 Corrected
  • Lake Levels Update ndash August 1 2018
  • Planning Summary ndash July 2018
  • Mapping of Counties to ERCOT Zones ndash July 2018
  • Cumulative MW Capacity of Interconnection Requests by Zone ndashJuly 2018
  • Cumulative MW Capacity of Interconnection Requests by Zone ndashJuly 2018
  • Cumulative MW Capacity of Interconnection Requests by Zone ndashJuly 2018
  • Wind Generation ndash July 2018
  • Solar Generation ndash July 2018
  • Generation Interconnection Activity by Fuel ndash July 2018
  • Generation Interconnection Activity by Project Phase ndash July 2018
  • Slide Number 23
  • Day-Ahead Schedule (Hourly Average) ndash July 2018
  • Percentage of Real-Time Load Hedged in the DAM (Counter-Party Level) ndash July 2018
  • DAM and RTM Price Convergence ndash July 2018
  • Day-Ahead Electricity and Ancillary Service Prices (Hourly Average) ndash July 2018
  • Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash July 2018
  • Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash July 2018
  • DRUC Monthly Summary (Hourly Average) ndash July 2018
  • HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash July 2018
  • NonndashSpinning Reserve Service Deployment ndash July 2018
  • CRR Price Convergence ndash July 2018
  • Daily Average System Lambda and ORDC Price Adders ndash July 2018
  • ERS Procurement for June 2018 ndash September 2018
  • Reliability Services ndash July 2018
  • Ancillary and Other Services ndash July 2018
  • Real-Time Ancillary Service Imbalance (ORDC) ndash July 2018
  • Energy Settlement ndash July 2018
  • Congestion Revenue Rights (CRR) ndash July 2018
  • CRR Balancing Account Fund ndash July 2018
  • Revenue Neutrality ndash July 2018
  • Net Allocation to Load ndash July 2018
  • Advanced Meter Settlement Impacts ndash July 2018
  • ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndash July 2018
  • Retail Transaction Volumes ndash Summary ndash July 2018
  • Retail Transaction Volumes ndash Summary ndash July 2018
  • Slide Number 48
  • ERCOT Portfolio Stoplight Report ndash July 2018
  • ERCOT Portfolio Stoplight Report ndash July 2018
  • ERCOT Portfolio Stoplight Report ndash July 2018
  • ERCOT Portfolio Stoplight Report ndash July 2018
  • ERCOT Portfolio Stoplight Report ndash July 2018
Retail Transactions Summary
July 2018 June 2018 May 2018 April 2018 March 2018 February 2018 January 2018 December 2017 November 2017 October 2017 September 2017 August 2017 July 2017 June 2017 May 2017 April 2017 March 2017 February 2017 January 2017 December 2016 November 2016 October 2016 September 2016 August 2016 July 2016 June 2016 May 2016 April 2016 March 2016 February 2016 January 2016 December 2015 November 2015 October 2015 September 2015 August 2015 July 2015 June 2015 May 2015 April 2015 March 2015 February 2015 January 2015 December 2014 November 2014 October 2014 September 2014 August 2014 July 2014 June 2014 May 2014 April 2014 March 2014 February 2014 January 2014 December 2013 November 2013 October 2013 September 2013 August 2013 July 2013 June 2013 May 2013 April 2013 March 2013 February 2013 January 2013 Grand total
814_01 - Switch Received 121926 109653 96828 81291 95159 76119 88933 60560 77860 78096 79502 84134 84059 108784 130828 71769 67845 66875 87140 66556 56202 64452 67323 86656 82923 86376 75323 70300 76235 68057 63954 61486 52887 65276 70342 81674 91211 102661 86229 81255 79997 73394 72885 71072 67080 110465 175164 89677 99568 101490 111077 91983 93887 71130 86953 69691 55957 166882 82415 93194 102562 103756 116086 78919 68950 64329 67116 1321827
Difference from previous month 12273 12825 15537 (13868) 19040 (12814) 28373 (17300) (236) (1406) (4632) 75 (24725) (22044) 59059 3924 970 (20265) 20584 10354 (8250) (2871) (19333) 3733 (3453) 11053 5023 (5935) 8178 4103 2468 8599 (12389) (5066) (11332) (9537) (11450) 16432 4974 1258 6603 509 1813 3992 (43385) (64699) 85487 (9891) (1922) (9587) 19094 (1904) 22757 (15823) 17262 13734 (110925) 84467 (10779) (9368) (1194) (12330) 37167 9969 4621 (2787)
814_16 - Move - Ins Received 270122 257125 244431 225380 224289 215281 230409 238340 207921 236397 244511 258046 252360 257759 237611 197865 217962 201984 202612 196236 201714 220958 231999 268781 241844 247481 214383 199804 218245 212474 193716 189862 181098 215908 229405 248124 263233 247089 208166 207932 215950 197765 198025 193973 178624 226283 231418 243482 251957 233679 223201 258649 214724 208160 207059 172981 178671 233469 216550 255967 249114 220397 216982 204412 197200 191955 194507 3162148
Difference from previous month 12997 12694 19051 1091 9008 (15128) (7931) 30419 (28476) (8114) (13535) 5686 (5399) 20148 39746 (20097) 15978 (628) 6376 (5478) (19244) (11041) (36782) 26937 (5637) 33098 14579 (18441) 5771 18758 3854 8764 (34810) (13497) (18719) (15109) 16144 38923 234 (8018) 18185 (260) 4052 15349 (47659) (5135) (12064) (8475) 18278 10478 (35448) 43925 6564 1101 34078 (5690) (54798) 16919 (39417) 6853 28717 3415 12570 7212 5245 (2552)
814_24 - MVO and MVO to CSA Received 129820 125861 124403 113795 108753 100127 111821 144987 100830 116519 129103 128104 127073 133582 127218 102055 111459 100285 101107 96289 100578 109493 114094 133170 122932 129025 118022 103789 109278 103747 96628 99552 96214 109578 117949 123894 133905 133855 114675 108275 108859 94864 98233 97901 89578 111857 115918 121662 131607 126785 119107 107956 107266 99428 104273 93385 93977 115469 115524 129594 135196 121446 120049 111598 106467 102429 104399 1660500
814_10 - DTP Mass Acquisition Received - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0
814_10 - DTP Mass Transition Received - 0 - 0 9033 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 639 - 0 - 0 4975 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0
814_18 - CSA AdditionDeletes Received 40217 62083 99016 55581 46720 42587 49740 47725 31726 52888 41597 40616 55770 43745 52139 26702 21791 39082 44030 38884 39856 31786 33061 42622 48489 64178 50499 59475 59400 48536 42179 40351 34796 34420 54677 35078 49489 59611 39384 44247 44577 35386 40420 54831 43550 45039 44268 40405 57954 64408 65032 80184 70310 41156 34811 46680 50347 71847 48606 52585 50867 62747 59763 34925 40977 40389 41227 747237
Total 562085 554722 573711 476047 474921 434114 480903 491612 418337 483900 494713 510900 519262 543870 547796 398391 419057 408226 434889 397965 398350 426689 446477 531229 496188 527060 458227 433368 463158 432814 396477 391251 364995 425182 472373 488770 537838 543216 448454 441709 449383 401409 409563 417777 378832 493644 566768 495865 541086 526362 523392 538772 486187 419874 433096 382737 378952 587667 463095 531340 537739 508346 512880 429854 413594 399102 407249 6891712
Counts from Monthly Retail Transaction report
To do
Break Out 814_10s - AQ and MT
Break Out 814_18 Additions from Deletes
Year-To-Date Transactions Received
Transaction Type July 2018 July 2017 July 2018 July 2017
Switches 669909 617300 121926 84059
Acquisition 0 0 0 0
Move - Ins 1667037 1568153 270122 252360
Move - Outs 814580 802779 129820 127073
Continuous Service Agreements (CSA) 395944 283259 40217 55770
Mass Transitions 9033 0 0 0
Total 3556503 3271491 562085 519262
There has been a change since this was created
Mass Acquisition has been broken out of Mass Transition
Page 30: ERCOT Monthly Operational Overvie · ERCOT Monthly Operational Overview (July 2018) Revised 08.22.18. ERCOT Public. August 15, 2018

PUBLIC

DRUC Monthly Summary (Hourly Average) ndash July 2018

30

0

15000

30000

45000

60000

75000

90000

MW

h

Hour Ending

Self Scheduled Capacity

Self Scheduled Ancillary Service Limit

Load Forecast

DRUC Recommended Capacity

31 executions (0 missed)0 published after 160011 minutes average execution time0 Resources committed

PUBLIC

HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash July 2018

31

0

02

04

06

08

1

0

20

40

60

80

100

RTO

RD

PA ($

MW

h)

MW

h

Hour Ending

744 executions (0 missed)8 minutes average execution time1 Resources committed through HRUC or by a Verbal Dispatch Instruction

The dotted line indicates the average RTORDPA

PUBLIC

NonndashSpinning Reserve Service Deployment ndash July 2018

32

Deployment Start Time

Deployment End Time

Deployment Duration (Hours)

Max Deployment(MW) Reason

NA

PUBLIC

CRR Price Convergence ndash July 2018

0

50

100

150

200

250

Mill

ions

$

Cost

Value

Congestion Revenue Right cost in auction convergence with payment in Day-Ahead Market and Real Time Market

33

PUBLIC

Daily Average System Lambda and ORDC Price Adders ndash July 2018

0

50

100

150

200

250

$M

Wh

Day of Month

RTOFFPA

RTORPA

SYSTEM_LAMBDA

34

PUBLIC

ERS Procurement for June 2018 ndash September 2018

TP1 TP2 TP3 TP4 TP5 TP6

Non Weather-Sensitive ERS-10 MW 160562 165996 143324 140708 156699 151138

Non Weather-Sensitive ERS-30 MW 736864 781559 702529 625067 755153 657394

Weather-Sensitive ERS-10 MW 0 0 0 0 0 0

Weather-Sensitive ERS-30 MW 0 0 11850 11850 0 0

Total MW Procured 897426 947555 857703 777625 911852 808532

Clearing Price $201 $185 $2108 $2177 $199 $225

Time Period Time Period Hours

Time Period 1 Hours Ending 0600 - 0800 (50000 am to 80000 am) Monday through Friday except ERCOT Holidays

Time Period 2 Hours Ending 0900 - 1300 (80000 am to 10000 pm) Monday through Friday except ERCOT Holidays

Time Period 3 Hours Ending 1400 - 1600 (10000 pm to 40000 pm) Monday through Friday except ERCOT Holidays

Time Period 4 Hours Ending 1700 - 1900 (40000 pm to 70000 pm) Monday through Friday except ERCOT Holidays

Time Period 5 Hours Ending 2000 - 2200 (70000 pm to 100000 pm) Monday through Friday except ERCOT Holidays Time Period 6 All other hours

35

PUBLIC

Reliability Services ndash July 2018

Reliability Unit Commitment (RUC) $ in Millions

RUC Make-Whole Payments $000

RUC Clawback Charges $000

RUC Commitment Settlement $000

RUC Capacity Short Charges $000

RUC Make-Whole Uplift $000

RUC Commitment Cost Allocation $000

RUC Decommitment Payments $000

Total RUC Allocation to Load $000

In July 2018 there was a credit of $000M allocated to load for RUC compared to bull A credit of $000M in June 2018bull A credit of $003M in July 2017

36

PUBLIC

Ancillary and Other Services ndash July 2018

Ancillary and Other Services $ in Millions

Regulation Up Service $1105

Regulation Down Service $072

Responsive Reserve Service $7177

Non-Spinning Reserve Service $1787

Black Start Service $059

Voltage Services - Reactive Power $000

Voltage Services - Lost Opportunity $000

Total Charges Allocated to Load $10200

In July 2018 Ancillary and Other Services was a charge of $10200M compared to bull A charge of $2001M in June 2018bull A charge of $2322M in July 2017

37

PUBLIC

Real-Time Ancillary Service Imbalance (ORDC) ndash July 2018

In July 2018 Real-Time Ancillary Service Imbalance was a charge to load of $2228K compared to bull A charge of $147K in June 2018bull A charge of $534K in July 2017

Real-Time Ancillary Service Imbalance $ in Thousands

Real-Time AS Imbalance ($2228)

Real-Time Reliability Deployment AS Imbalance $000

Total RTASI Amount Allocated to Load $2228

38

PUBLIC

Energy Settlement ndash July 2018

39

Day-Ahead Market Energy Settlement $ in Millions

Energy Purchases $215396

Point to Point Obligation Purchases $11726

Energy Sales ($212592)

Day-Ahead Congestion Rent $14531

Day-Ahead Market Make-Whole Payments ($001)

Real-Time Market Energy Settlement $ in Millions

Energy Imbalance at a Resource Node ($91963)

Energy Imbalance at a Load Zone $160737

Energy Imbalance at a Hub ($57497)

Net Real-Time Energy Imbalance $11276

Real Time Congestion from Self Schedules $013

Block Load Transfers and DC Ties ($2063)

Total Impact to Revenue Neutrality $9227

Load-Allocated Emergency Energy Payments ($016)

Load-Allocated Base Point Deviation Charges $026

Day-Ahead Market energy settlement activity increased from last month and increased from July 2017

Real-Time Market energy settlement activity increased from last month and increased from July 2017

PUBLIC

Congestion Revenue Rights (CRR) ndash July 2018

$ in Millions

Long-Term Auction ($4026)

Monthly Auction ($1773)

Total Auction Revenue ($5799)

Day-Ahead CRR Settlements ($15797)

Day-Ahead CRR Short-Charges $1885

Day-Ahead CRR Short-Charges Refunded ($899)

Day-Ahead CRR Short-Charges Net $986

Total CRR Funding ($14810)

Day-Ahead Point-to-Point Obligations $11726

Real-Time Point-to-Point Obligations ($10113)

Net Point-to-Point Obligations $1614

Congestion Revenue Rights settlement payments were not fully funded Partial funding to settle the CRR Short Charges was provided from the CRR Balancing Account Fund and the remaining $986M of CRR Short Charges were not refunded The CRR Fund Balance is now $0

Point to Point Obligations settled with a net charge of $1614M compared to a net credit of $1758M last month

40

PUBLIC

CRR Balancing Account Fund ndash July 2018

CRR Balancing Account $ in Millions

Monthly Day-Ahead Congestion Rent $14531

Monthly Day-Ahead CRR Settlements ($15797)

Monthly Day-Ahead CRR Short -Charges $1885

CRR Balancing Account Credit Total $619

Beginning Fund Balance for the Month $275

CRR Balancing Account Credit Total $619

Day-Ahead CRR Short-Charges Refunded ($899)

CRR PTP Option Award Charges $004

Load-Allocated CRR Amount $000

Total Fund Amount $000

41

PUBLIC

Revenue Neutrality ndash July 2018

Revenue Neutrality $ in Millions

Real-Time Energy Imbalance $11276

Real-Time Point to Point Obligation ($10113)

Real-Time Congestion from Self-Schedules $013

DC Tie amp Block Load Transfer ($2063)

Allocation to Load $886

In July 2018 the Revenue Neutrality charge to load was $886M compared to bull A charge of $3046M in June 2018bull A charge of $145M in July 2017

42

PUBLIC

Net Allocation to Load ndash July 2018

Market-Based Allocation $ in Millions

Reliability Unit Commitment $000

Ancillary and Other Services $10200

Real-Time Ancillary Service Imbalance $223

Emergency Energy $016

Base Point Deviation ($026)

CRR Auction Revenue ($5799)

CRR Balancing Account $000

Real-Time Revenue Neutrality $886

Reliability Must Run $000

Monthly Block Load Transfer $000

Total $5500

Fee AllocationERCOT Administrative Fee $2207

Net Allocated to Load $7707

In July 2018 the Net Allocation to load was a charge of $7707M compared to bull A charge of $2152M in June 2018bull A credit of $1363M in July 2017

43

PUBLIC

Advanced Meter Settlement Impacts ndash July 2018

July 2018 At month end settling 72M ESIIDs using Advanced Meter data

July 2018 990 of the load in ERCOT is settled with 15-min interval data (AMS Competitive IDR and NOIE IDR)

44

PUBLIC

ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndashJuly 2018

45

PUBLIC

Retail Transaction Volumes ndash Summary ndash July 2018

46

Transaction Type July 2018 July 2017 July 2018 July 2017

Switches 669909 617300 121926 84059

Acquisition 0 0 0 0

Move - Ins 1667037 1568153 270122 252360

Move - Outs 814580 802779 129820 127073

Continuous Service Agreements (CSA) 395944 283259 40217 55770

Mass Transitions 9033 0 0 0

Total 3556503 3271491 562085 519262

Year-To-Date Transactions Received

Board Presentation Input

Trans Volumes by Month_New

PUBLIC

Retail Transaction Volumes ndash Summary ndash July 2018

SwitchesAcquisitions Move-Ins

Move-Outs Mass Transition

47

Projects Report

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018

20000000$ 2018 Portfolio

Spending Estimate

Projects In FlightOn Hold (Count = 100) 24905011$

Projects Not Yet Started (Count = 10) 1320628$

Projects Completed (Count = 43) 795250$

(7020889)$

TOTAL 20000000$

Project Number Projects in Initiation Phase (Count = 4)

TBD IT Asset RecoveryNPRR842 Study Area Load Information

209-03 Study Network (STNET) Integration288-01 EDI Map and Translator Replacement

Impact Metric TolerancesUnfavorable variances are represented as negative numbers within the report - Green = No more than 49 unfavorable variance - Yellow = Unfavorable variance between 49 and 99 - Red = Unfavorable variance more than 99

Spending Reductions Required to Maintain Capital Budget

2018 Project Funding

Footnotes1 - One or more phases took longer than expected resulting in additional time required

2 - One or more phases required more labor than expected resulting in additional funding andor time required

3 - Project placed on holdNA - Metric not calculated because - it is reported at the parent project level or - it is an administrative project

Project Number Projects in Planning Phase (Count = 8) Phase Start Baseline

Phase FinishApproved

Phase FinishScheduled

Go-Live DateScheduled

Phase Finish

134-02 Privileged Account Management (PAM) Phase 2 882018 12192018 12192018 TBD 12192018 0 10

183-01 CMM-FT GUI Integration 12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs

242-01 Portfolio Reporting Assessment 1182017 12192018 12192018 TBD 12192018 0 21260-01 Information Governance Assessment 10182017 5302018 9192018 TBD 9192018 0 5286-01 Java Platform Assessment 6202018 11212018 11212018 TBD 11212018 0 6287-01 Security Constrained Unit Commitment (SCUC) 882018 2272019 2272019 TBD 2272019 0 -1

NPRR484Revisions to Congestion Revenue Rights Credit Calculations and Payments - Phase 1b 2

12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs

NPRR702Flexible Accounts Payment of Invoices and Disposition of Interest on Cash Collateral

12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs

Schedule Health Budget Health

49

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018Project Number Projects in Execution Phase (Count = 42) Phase Start Baseline Go-

Live DateApproved Go-

Live DateScheduled

Go-Live DateScheduled

Phase Finish

170-01 Enterprise Content Alignment Program 8262015 11152017 8312018 8312018 8312018 0 0170-06 ECAP - ECMS Implementation Phase 1 4252018 11302018 11302018 11302018 11302018 0 3173-02 ERCOT Flight Certification Website 11152017 2282019 2282019 2282019 5312019 0 2181-01 CRR Framework Upgrade 10262016 1022017 11192018 11192018 2272019 0 2

183-01 CMM Tech Refresh 3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

193-01 PMU Tool Evaluation and Implementation 12132017 892018 2152019 2152019 3202019 0 0196-01 GINR Project Status Application Replacement 12212016 9142017 2282019 2282019 3312019 0 1198-02 Reactive Power Coordination PoC 962017 6162018 8152018 8152018 8152018 0 54209-02 Weather Imaging and Line Observation (WILO) 5302018 212019 212019 212019 2272019 0 2210-01 REC Technology Refresh 8302017 3182018 12132018 12132018 1162019 0 3228-01 Enterprise Database Upgrade 882018 1292020 1292020 1292020 1292020 0 17229-01 IT Change and Configuration Management Phase 2 822017 6192018 12132018 12132018 3252019 0 2 -9238-01 Application Authentication Tech Refresh 962017 3192018 12132018 12132018 1302019 0 3239-01 Identity and Access Management 592018 3132019 3132019 3132019 3132019 0 2241-01 AREA - Generation 10112017 3302018 892018 892018 952018 0 -4244-01 Corporate Wireless 11292017 3282018 1252018 1252018 192019 0 9245-01 2017 EPS Metering Enhancements 6272018 892019 892019 892019 9252019 0 1246-01 iTest Data Refresh 12132017 1192018 11152018 11152018 122019 0 25249-01 Secondary Wind Forecasting Service 8302017 2282018 892018 892018 952018 0 0253-01 CIP Recovery Plan Project - Planning Phase 1 1312018 8292018 8292018 8292018 8292018 0 -2

257-01Security Constrained Optimal Powerflow in Study Network Analysis

1262017 10252018 10252018 10252018 1282018 0 19

261-01 Generic Transmission Constraint Calculation 372018 12132018 12132018 12132018 1232019 0 0263-01 Market Simulator 4112018 12132018 12132018 12132018 1302019 0 7265-01 Real-Time Assessment Continuity 1312018 12132018 12132018 12132018 1302019 0 0279-01 Cyber Security Project 24 6272018 10262018 10262018 10262018 11282018 0 0280-01 Quest Software Portfolio Transition 442018 6272018 9262018 9262018 9262018 0 13282-01 Synchronous Condenser Outage Modeling 662018 10252018 10252018 10252018 1252018 0 1Various 2015 CMM NPRRs 2 -18

NPRR519Exemption of ERS-Only QSEs from Collateral and Capitalization Requirements

3152017 5192018 12112018 12112018 12312018 0 See 2015 CMM NPRRs

NPRR620Collateral Requirements for Counter-Parties with No Load or Generation

3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

NPRR660 Remove CRR State Change Adder 3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

Budget HealthSchedule Health

50

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018Project Number Projects in Execution Phase (Count = 42) Phase Start Baseline Go-

Live DateApproved Go-

Live DateScheduled

Go-Live DateScheduled

Phase Finish

NPRR741 Clarifications to TPE and EAL Credit Exposure Calculations 3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

NPRR749 Option Cost for Outstanding CRRs 882018 12132018 12132018 12132018 TBD 0 NA See 2015 CMM NPRRs

NPRR755 Data Agent-Only QSE Registration 3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

NPRR819Modification of Non-Price Error Resettlement Thresholds and Resettlement Clean-Ups

592018 892018 892018 892018 952018 0 36

NPRR833 Modify PTP Obligation Bid Clearing Change 882018 12132018 12132018 12132018 TBD 0 1

NPRR843Short-Term System Adequacy and AS Offer Disclosure Reports Additions

7182018 10252018 10252018 10252018 11282018 0 0

NPRR864 RUC Modifications to Consider Market-Based Solutions 6202018 10252018 10252018 10252018 11282018 0 4SCR777 Bilateral CRR Interface Enhancement 10262016 1022017 11192018 11192018 2272019 0 NA See 181-01

SCR781 RARF Replacement 12202017 4252018 12192018 12192018 12192018 0 3SCR791 Correction of 60-day SCED GRD Disclosure Report 522018 892018 892018 892018 952018 0 39SCR795 Addition of Intra-Hour Wind Forecast to GTBD Calculation 882018 10252018 10252018 10252018 11142018 0 0

Project Number Expedited Projects in Execution (Count = 34)

Project Number Projects in Stabilization (Count = 10) Execution

Phase StartBaseline Go-Live Target

Approved Go-Live Target

ActualGo-Live Date

Scheduled Execution Phase

Finish

NPRR648 Remove References to Flowgate Rights 3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR683 Revision to Available Credit Limit Calculation 3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR743 Revision to MCE to Have a Floor For Load Exposure 3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR760 Calculation of Exposure Variables For Days With No Activity 3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR776 Voltage Set Point Communication 9202017 3192018 452018 452018 952018 0 1

NPRR800Revisions to Credit Exposure Calculations to Use Electricity Futures Market Prices

3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR815Revise the Limitation of Load Resources Providing Responsive Reserve (RRS) Service

3212018 5312018 5312018 5312018 8292018 0 2

209-01 Multi Station Breaker to Breaker One Lines 282017 392018 532018 532018 8222018 0 -1259-01 DC SCADA and Metering Upgrade 10252017 1172018 7252018 7252018 8292018 0 22266-01 Remote Email Access Enhancement 12132017 372018 662018 6192018 9262018 2 -7 2 -9

Schedule Health Budget Health

Budget HealthSchedule Health

51

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018

Project Number Projects On Hold (Count = 2) Forecast

Start DateBaseline

Phase FinishApproved Go-

Live TargetScheduled

Go-Live DateScheduled

Phase Finish

SCR789 Update NMMS Topology Processor to PSSE 34 Capability 0

269-01Document Repository Redesign and Governance Implementation - Phase 1

0

Project Number Projects Completed (Count = 20)

Baseline Execution

Phase Start

Baseline Go-Live Target

Approved Go-Live Target

Actual Go-Live Date

Actual Execution Phase Finish

185-01 Records Management and eDiscovery 12152016 5242017 8292017 8222017 12132017 2 0224-01 TelAlert Replacement 452017 6272017 842017 842017 592018 0 5230-01 SAS Technical Architecture Redesign 312017 12132017 12132017 12132017 6272018 0 2234-01 Reporting Solution Resiliency (RSR) 452017 8232017 11272017 11272017 1102018 0 8240-01 EDI Translator and Mapping Replacement Assessment 4192017 9272017 2282018 TBD 372018 -2 20254-01 Retail Windows Upgrade 10112017 12182017 12182017 1222018 272018 1 -51 65255-01 Settlements Architecture Enhancements 10252017 1112018 1112018 1192018 2142018 1 -10 53258-01 WD Kainos SMART Automation Testing Tool 4112018 642018 642018 662018 7182018 -3 33271-01 Issue Tracking and Resolution Tool Assessment 12132017 4252018 4252018 TBD 522018 1 -5 -1272-01 Operator Training Simulator Black Start GE Effort 1262017 4252018 4252018 4272018 5162018 -1 19274-01 Average Mid-Term Load Forecast 372018 5312018 5312018 5312018 6272018 0 50

NPRR768Revisions to Real-Time On-Line Reliability Deployment Price Adder Categories

372018 5312018 5312018 5312018 6272018 0 16

NPRR778 Modifications to Date Change and Cancellation Evaluation Window 7192017 10292017 12112017 12112017 1312018 0 23

NPRR782Settlement of Infeasible Ancillary Services Due to Transmission Constraints

5242017 8312017 1122017 1122017 1102018 0 20

NPRR808 Three Year CRR Auction 8232017 9182017 9182017 912017 1312018 65 68

NPRR810Applicability of RMR Incentive Factor on Reservation and Transportation Costs Associated with Firm Fuel Supplies

7172017 11122017 3312018 3312018 3312018 0 NA See 233-00

NPRR830 Revision of 4-Coincident Peak Methodology 12132017 262018 262018 262018 372018 0 85

NPRR831 Inclusion of Private Use Networks in Load Zone Price Calculations 822017 1122017 1122017 1122017 2212018 0 33

OBDRR002 ORDC OBD Revisions for PUCT Project 47199 372018 5312018 5312018 5312018 6272018 0 See NPRR768

SCR792 Enhance Communications of BAAL Exceedances 2142018 452018 452018 452018 4252018 0 69

Project Number Expedited Projects Completed (Count = 23)

Budget HealthSchedule Health

Budget HealthSchedule Health

52

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018

Project Number 2018 Projects Not Yet Started (Count = 10) Forecast

Start Date

NPRR858 Provide Complete Current Operating Plan (COP) Data Aug-2018TBD 2018 OS Enhancements Aug-2018TBD Additional Branch Limit for Relays Aug-2018

NPRR817 Create a Panhandle Hub Sep-2018NPRR821 Elimination of the CRR Deration Process Oct-2018NPRR865 Publish RTM Shift Factors for Hubs Load Zones and DC Ties Oct-2018

SCR793SSR Related Telemetry for Transmission Service Provider (TSP) Operators

Oct-2018

ECAP ECAP - ECMS Implementation Phase 2 Oct-2018TBD Job Scheduler Update in CSI Framework Oct-2018TBD Parameter Estimation Oct-2018

53

  • Slide Number 1
  • Slide Number 2
  • Summary ndash July 2018
  • Daily Peak Demand Hourly Average Actual vs Forecast Wind Day-Ahead COPs amp On-Line Capacity at Peak ndash July 2018
  • Actual Wind Output plus Curtailments vs Wind Day-Ahead COPs for All Hours ndash July 2018
  • ERCOTrsquos CPS1 Monthly Performance ndash July 2018
  • Monthly Peak Actual Demand ndash July 2018
  • Monthly Minimum Actual 15-Minute Demand ndash July 2018
  • Day-Ahead Load Forecast Performance ndash July 2018
  • Reliability Unit Commitment (RUC) Capacity by Weather Zone ndash July 2018
  • Generic Transmission Constraints (GTCs) ndash July 2018
  • Advisories and Watches ndash July 2018 Corrected
  • Lake Levels Update ndash August 1 2018
  • Planning Summary ndash July 2018
  • Mapping of Counties to ERCOT Zones ndash July 2018
  • Cumulative MW Capacity of Interconnection Requests by Zone ndashJuly 2018
  • Cumulative MW Capacity of Interconnection Requests by Zone ndashJuly 2018
  • Cumulative MW Capacity of Interconnection Requests by Zone ndashJuly 2018
  • Wind Generation ndash July 2018
  • Solar Generation ndash July 2018
  • Generation Interconnection Activity by Fuel ndash July 2018
  • Generation Interconnection Activity by Project Phase ndash July 2018
  • Slide Number 23
  • Day-Ahead Schedule (Hourly Average) ndash July 2018
  • Percentage of Real-Time Load Hedged in the DAM (Counter-Party Level) ndash July 2018
  • DAM and RTM Price Convergence ndash July 2018
  • Day-Ahead Electricity and Ancillary Service Prices (Hourly Average) ndash July 2018
  • Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash July 2018
  • Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash July 2018
  • DRUC Monthly Summary (Hourly Average) ndash July 2018
  • HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash July 2018
  • NonndashSpinning Reserve Service Deployment ndash July 2018
  • CRR Price Convergence ndash July 2018
  • Daily Average System Lambda and ORDC Price Adders ndash July 2018
  • ERS Procurement for June 2018 ndash September 2018
  • Reliability Services ndash July 2018
  • Ancillary and Other Services ndash July 2018
  • Real-Time Ancillary Service Imbalance (ORDC) ndash July 2018
  • Energy Settlement ndash July 2018
  • Congestion Revenue Rights (CRR) ndash July 2018
  • CRR Balancing Account Fund ndash July 2018
  • Revenue Neutrality ndash July 2018
  • Net Allocation to Load ndash July 2018
  • Advanced Meter Settlement Impacts ndash July 2018
  • ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndash July 2018
  • Retail Transaction Volumes ndash Summary ndash July 2018
  • Retail Transaction Volumes ndash Summary ndash July 2018
  • Slide Number 48
  • ERCOT Portfolio Stoplight Report ndash July 2018
  • ERCOT Portfolio Stoplight Report ndash July 2018
  • ERCOT Portfolio Stoplight Report ndash July 2018
  • ERCOT Portfolio Stoplight Report ndash July 2018
  • ERCOT Portfolio Stoplight Report ndash July 2018
Retail Transactions Summary
July 2018 June 2018 May 2018 April 2018 March 2018 February 2018 January 2018 December 2017 November 2017 October 2017 September 2017 August 2017 July 2017 June 2017 May 2017 April 2017 March 2017 February 2017 January 2017 December 2016 November 2016 October 2016 September 2016 August 2016 July 2016 June 2016 May 2016 April 2016 March 2016 February 2016 January 2016 December 2015 November 2015 October 2015 September 2015 August 2015 July 2015 June 2015 May 2015 April 2015 March 2015 February 2015 January 2015 December 2014 November 2014 October 2014 September 2014 August 2014 July 2014 June 2014 May 2014 April 2014 March 2014 February 2014 January 2014 December 2013 November 2013 October 2013 September 2013 August 2013 July 2013 June 2013 May 2013 April 2013 March 2013 February 2013 January 2013 Grand total
814_01 - Switch Received 121926 109653 96828 81291 95159 76119 88933 60560 77860 78096 79502 84134 84059 108784 130828 71769 67845 66875 87140 66556 56202 64452 67323 86656 82923 86376 75323 70300 76235 68057 63954 61486 52887 65276 70342 81674 91211 102661 86229 81255 79997 73394 72885 71072 67080 110465 175164 89677 99568 101490 111077 91983 93887 71130 86953 69691 55957 166882 82415 93194 102562 103756 116086 78919 68950 64329 67116 1321827
Difference from previous month 12273 12825 15537 (13868) 19040 (12814) 28373 (17300) (236) (1406) (4632) 75 (24725) (22044) 59059 3924 970 (20265) 20584 10354 (8250) (2871) (19333) 3733 (3453) 11053 5023 (5935) 8178 4103 2468 8599 (12389) (5066) (11332) (9537) (11450) 16432 4974 1258 6603 509 1813 3992 (43385) (64699) 85487 (9891) (1922) (9587) 19094 (1904) 22757 (15823) 17262 13734 (110925) 84467 (10779) (9368) (1194) (12330) 37167 9969 4621 (2787)
814_16 - Move - Ins Received 270122 257125 244431 225380 224289 215281 230409 238340 207921 236397 244511 258046 252360 257759 237611 197865 217962 201984 202612 196236 201714 220958 231999 268781 241844 247481 214383 199804 218245 212474 193716 189862 181098 215908 229405 248124 263233 247089 208166 207932 215950 197765 198025 193973 178624 226283 231418 243482 251957 233679 223201 258649 214724 208160 207059 172981 178671 233469 216550 255967 249114 220397 216982 204412 197200 191955 194507 3162148
Difference from previous month 12997 12694 19051 1091 9008 (15128) (7931) 30419 (28476) (8114) (13535) 5686 (5399) 20148 39746 (20097) 15978 (628) 6376 (5478) (19244) (11041) (36782) 26937 (5637) 33098 14579 (18441) 5771 18758 3854 8764 (34810) (13497) (18719) (15109) 16144 38923 234 (8018) 18185 (260) 4052 15349 (47659) (5135) (12064) (8475) 18278 10478 (35448) 43925 6564 1101 34078 (5690) (54798) 16919 (39417) 6853 28717 3415 12570 7212 5245 (2552)
814_24 - MVO and MVO to CSA Received 129820 125861 124403 113795 108753 100127 111821 144987 100830 116519 129103 128104 127073 133582 127218 102055 111459 100285 101107 96289 100578 109493 114094 133170 122932 129025 118022 103789 109278 103747 96628 99552 96214 109578 117949 123894 133905 133855 114675 108275 108859 94864 98233 97901 89578 111857 115918 121662 131607 126785 119107 107956 107266 99428 104273 93385 93977 115469 115524 129594 135196 121446 120049 111598 106467 102429 104399 1660500
814_10 - DTP Mass Acquisition Received - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0
814_10 - DTP Mass Transition Received - 0 - 0 9033 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 639 - 0 - 0 4975 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0
814_18 - CSA AdditionDeletes Received 40217 62083 99016 55581 46720 42587 49740 47725 31726 52888 41597 40616 55770 43745 52139 26702 21791 39082 44030 38884 39856 31786 33061 42622 48489 64178 50499 59475 59400 48536 42179 40351 34796 34420 54677 35078 49489 59611 39384 44247 44577 35386 40420 54831 43550 45039 44268 40405 57954 64408 65032 80184 70310 41156 34811 46680 50347 71847 48606 52585 50867 62747 59763 34925 40977 40389 41227 747237
Total 562085 554722 573711 476047 474921 434114 480903 491612 418337 483900 494713 510900 519262 543870 547796 398391 419057 408226 434889 397965 398350 426689 446477 531229 496188 527060 458227 433368 463158 432814 396477 391251 364995 425182 472373 488770 537838 543216 448454 441709 449383 401409 409563 417777 378832 493644 566768 495865 541086 526362 523392 538772 486187 419874 433096 382737 378952 587667 463095 531340 537739 508346 512880 429854 413594 399102 407249 6891712
Counts from Monthly Retail Transaction report
To do
Break Out 814_10s - AQ and MT
Break Out 814_18 Additions from Deletes
Year-To-Date Transactions Received
Transaction Type July 2018 July 2017 July 2018 July 2017
Switches 669909 617300 121926 84059
Acquisition 0 0 0 0
Move - Ins 1667037 1568153 270122 252360
Move - Outs 814580 802779 129820 127073
Continuous Service Agreements (CSA) 395944 283259 40217 55770
Mass Transitions 9033 0 0 0
Total 3556503 3271491 562085 519262
There has been a change since this was created
Mass Acquisition has been broken out of Mass Transition
Page 31: ERCOT Monthly Operational Overvie · ERCOT Monthly Operational Overview (July 2018) Revised 08.22.18. ERCOT Public. August 15, 2018

PUBLIC

HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash July 2018

31

0

02

04

06

08

1

0

20

40

60

80

100

RTO

RD

PA ($

MW

h)

MW

h

Hour Ending

744 executions (0 missed)8 minutes average execution time1 Resources committed through HRUC or by a Verbal Dispatch Instruction

The dotted line indicates the average RTORDPA

PUBLIC

NonndashSpinning Reserve Service Deployment ndash July 2018

32

Deployment Start Time

Deployment End Time

Deployment Duration (Hours)

Max Deployment(MW) Reason

NA

PUBLIC

CRR Price Convergence ndash July 2018

0

50

100

150

200

250

Mill

ions

$

Cost

Value

Congestion Revenue Right cost in auction convergence with payment in Day-Ahead Market and Real Time Market

33

PUBLIC

Daily Average System Lambda and ORDC Price Adders ndash July 2018

0

50

100

150

200

250

$M

Wh

Day of Month

RTOFFPA

RTORPA

SYSTEM_LAMBDA

34

PUBLIC

ERS Procurement for June 2018 ndash September 2018

TP1 TP2 TP3 TP4 TP5 TP6

Non Weather-Sensitive ERS-10 MW 160562 165996 143324 140708 156699 151138

Non Weather-Sensitive ERS-30 MW 736864 781559 702529 625067 755153 657394

Weather-Sensitive ERS-10 MW 0 0 0 0 0 0

Weather-Sensitive ERS-30 MW 0 0 11850 11850 0 0

Total MW Procured 897426 947555 857703 777625 911852 808532

Clearing Price $201 $185 $2108 $2177 $199 $225

Time Period Time Period Hours

Time Period 1 Hours Ending 0600 - 0800 (50000 am to 80000 am) Monday through Friday except ERCOT Holidays

Time Period 2 Hours Ending 0900 - 1300 (80000 am to 10000 pm) Monday through Friday except ERCOT Holidays

Time Period 3 Hours Ending 1400 - 1600 (10000 pm to 40000 pm) Monday through Friday except ERCOT Holidays

Time Period 4 Hours Ending 1700 - 1900 (40000 pm to 70000 pm) Monday through Friday except ERCOT Holidays

Time Period 5 Hours Ending 2000 - 2200 (70000 pm to 100000 pm) Monday through Friday except ERCOT Holidays Time Period 6 All other hours

35

PUBLIC

Reliability Services ndash July 2018

Reliability Unit Commitment (RUC) $ in Millions

RUC Make-Whole Payments $000

RUC Clawback Charges $000

RUC Commitment Settlement $000

RUC Capacity Short Charges $000

RUC Make-Whole Uplift $000

RUC Commitment Cost Allocation $000

RUC Decommitment Payments $000

Total RUC Allocation to Load $000

In July 2018 there was a credit of $000M allocated to load for RUC compared to bull A credit of $000M in June 2018bull A credit of $003M in July 2017

36

PUBLIC

Ancillary and Other Services ndash July 2018

Ancillary and Other Services $ in Millions

Regulation Up Service $1105

Regulation Down Service $072

Responsive Reserve Service $7177

Non-Spinning Reserve Service $1787

Black Start Service $059

Voltage Services - Reactive Power $000

Voltage Services - Lost Opportunity $000

Total Charges Allocated to Load $10200

In July 2018 Ancillary and Other Services was a charge of $10200M compared to bull A charge of $2001M in June 2018bull A charge of $2322M in July 2017

37

PUBLIC

Real-Time Ancillary Service Imbalance (ORDC) ndash July 2018

In July 2018 Real-Time Ancillary Service Imbalance was a charge to load of $2228K compared to bull A charge of $147K in June 2018bull A charge of $534K in July 2017

Real-Time Ancillary Service Imbalance $ in Thousands

Real-Time AS Imbalance ($2228)

Real-Time Reliability Deployment AS Imbalance $000

Total RTASI Amount Allocated to Load $2228

38

PUBLIC

Energy Settlement ndash July 2018

39

Day-Ahead Market Energy Settlement $ in Millions

Energy Purchases $215396

Point to Point Obligation Purchases $11726

Energy Sales ($212592)

Day-Ahead Congestion Rent $14531

Day-Ahead Market Make-Whole Payments ($001)

Real-Time Market Energy Settlement $ in Millions

Energy Imbalance at a Resource Node ($91963)

Energy Imbalance at a Load Zone $160737

Energy Imbalance at a Hub ($57497)

Net Real-Time Energy Imbalance $11276

Real Time Congestion from Self Schedules $013

Block Load Transfers and DC Ties ($2063)

Total Impact to Revenue Neutrality $9227

Load-Allocated Emergency Energy Payments ($016)

Load-Allocated Base Point Deviation Charges $026

Day-Ahead Market energy settlement activity increased from last month and increased from July 2017

Real-Time Market energy settlement activity increased from last month and increased from July 2017

PUBLIC

Congestion Revenue Rights (CRR) ndash July 2018

$ in Millions

Long-Term Auction ($4026)

Monthly Auction ($1773)

Total Auction Revenue ($5799)

Day-Ahead CRR Settlements ($15797)

Day-Ahead CRR Short-Charges $1885

Day-Ahead CRR Short-Charges Refunded ($899)

Day-Ahead CRR Short-Charges Net $986

Total CRR Funding ($14810)

Day-Ahead Point-to-Point Obligations $11726

Real-Time Point-to-Point Obligations ($10113)

Net Point-to-Point Obligations $1614

Congestion Revenue Rights settlement payments were not fully funded Partial funding to settle the CRR Short Charges was provided from the CRR Balancing Account Fund and the remaining $986M of CRR Short Charges were not refunded The CRR Fund Balance is now $0

Point to Point Obligations settled with a net charge of $1614M compared to a net credit of $1758M last month

40

PUBLIC

CRR Balancing Account Fund ndash July 2018

CRR Balancing Account $ in Millions

Monthly Day-Ahead Congestion Rent $14531

Monthly Day-Ahead CRR Settlements ($15797)

Monthly Day-Ahead CRR Short -Charges $1885

CRR Balancing Account Credit Total $619

Beginning Fund Balance for the Month $275

CRR Balancing Account Credit Total $619

Day-Ahead CRR Short-Charges Refunded ($899)

CRR PTP Option Award Charges $004

Load-Allocated CRR Amount $000

Total Fund Amount $000

41

PUBLIC

Revenue Neutrality ndash July 2018

Revenue Neutrality $ in Millions

Real-Time Energy Imbalance $11276

Real-Time Point to Point Obligation ($10113)

Real-Time Congestion from Self-Schedules $013

DC Tie amp Block Load Transfer ($2063)

Allocation to Load $886

In July 2018 the Revenue Neutrality charge to load was $886M compared to bull A charge of $3046M in June 2018bull A charge of $145M in July 2017

42

PUBLIC

Net Allocation to Load ndash July 2018

Market-Based Allocation $ in Millions

Reliability Unit Commitment $000

Ancillary and Other Services $10200

Real-Time Ancillary Service Imbalance $223

Emergency Energy $016

Base Point Deviation ($026)

CRR Auction Revenue ($5799)

CRR Balancing Account $000

Real-Time Revenue Neutrality $886

Reliability Must Run $000

Monthly Block Load Transfer $000

Total $5500

Fee AllocationERCOT Administrative Fee $2207

Net Allocated to Load $7707

In July 2018 the Net Allocation to load was a charge of $7707M compared to bull A charge of $2152M in June 2018bull A credit of $1363M in July 2017

43

PUBLIC

Advanced Meter Settlement Impacts ndash July 2018

July 2018 At month end settling 72M ESIIDs using Advanced Meter data

July 2018 990 of the load in ERCOT is settled with 15-min interval data (AMS Competitive IDR and NOIE IDR)

44

PUBLIC

ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndashJuly 2018

45

PUBLIC

Retail Transaction Volumes ndash Summary ndash July 2018

46

Transaction Type July 2018 July 2017 July 2018 July 2017

Switches 669909 617300 121926 84059

Acquisition 0 0 0 0

Move - Ins 1667037 1568153 270122 252360

Move - Outs 814580 802779 129820 127073

Continuous Service Agreements (CSA) 395944 283259 40217 55770

Mass Transitions 9033 0 0 0

Total 3556503 3271491 562085 519262

Year-To-Date Transactions Received

Board Presentation Input

Trans Volumes by Month_New

PUBLIC

Retail Transaction Volumes ndash Summary ndash July 2018

SwitchesAcquisitions Move-Ins

Move-Outs Mass Transition

47

Projects Report

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018

20000000$ 2018 Portfolio

Spending Estimate

Projects In FlightOn Hold (Count = 100) 24905011$

Projects Not Yet Started (Count = 10) 1320628$

Projects Completed (Count = 43) 795250$

(7020889)$

TOTAL 20000000$

Project Number Projects in Initiation Phase (Count = 4)

TBD IT Asset RecoveryNPRR842 Study Area Load Information

209-03 Study Network (STNET) Integration288-01 EDI Map and Translator Replacement

Impact Metric TolerancesUnfavorable variances are represented as negative numbers within the report - Green = No more than 49 unfavorable variance - Yellow = Unfavorable variance between 49 and 99 - Red = Unfavorable variance more than 99

Spending Reductions Required to Maintain Capital Budget

2018 Project Funding

Footnotes1 - One or more phases took longer than expected resulting in additional time required

2 - One or more phases required more labor than expected resulting in additional funding andor time required

3 - Project placed on holdNA - Metric not calculated because - it is reported at the parent project level or - it is an administrative project

Project Number Projects in Planning Phase (Count = 8) Phase Start Baseline

Phase FinishApproved

Phase FinishScheduled

Go-Live DateScheduled

Phase Finish

134-02 Privileged Account Management (PAM) Phase 2 882018 12192018 12192018 TBD 12192018 0 10

183-01 CMM-FT GUI Integration 12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs

242-01 Portfolio Reporting Assessment 1182017 12192018 12192018 TBD 12192018 0 21260-01 Information Governance Assessment 10182017 5302018 9192018 TBD 9192018 0 5286-01 Java Platform Assessment 6202018 11212018 11212018 TBD 11212018 0 6287-01 Security Constrained Unit Commitment (SCUC) 882018 2272019 2272019 TBD 2272019 0 -1

NPRR484Revisions to Congestion Revenue Rights Credit Calculations and Payments - Phase 1b 2

12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs

NPRR702Flexible Accounts Payment of Invoices and Disposition of Interest on Cash Collateral

12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs

Schedule Health Budget Health

49

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018Project Number Projects in Execution Phase (Count = 42) Phase Start Baseline Go-

Live DateApproved Go-

Live DateScheduled

Go-Live DateScheduled

Phase Finish

170-01 Enterprise Content Alignment Program 8262015 11152017 8312018 8312018 8312018 0 0170-06 ECAP - ECMS Implementation Phase 1 4252018 11302018 11302018 11302018 11302018 0 3173-02 ERCOT Flight Certification Website 11152017 2282019 2282019 2282019 5312019 0 2181-01 CRR Framework Upgrade 10262016 1022017 11192018 11192018 2272019 0 2

183-01 CMM Tech Refresh 3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

193-01 PMU Tool Evaluation and Implementation 12132017 892018 2152019 2152019 3202019 0 0196-01 GINR Project Status Application Replacement 12212016 9142017 2282019 2282019 3312019 0 1198-02 Reactive Power Coordination PoC 962017 6162018 8152018 8152018 8152018 0 54209-02 Weather Imaging and Line Observation (WILO) 5302018 212019 212019 212019 2272019 0 2210-01 REC Technology Refresh 8302017 3182018 12132018 12132018 1162019 0 3228-01 Enterprise Database Upgrade 882018 1292020 1292020 1292020 1292020 0 17229-01 IT Change and Configuration Management Phase 2 822017 6192018 12132018 12132018 3252019 0 2 -9238-01 Application Authentication Tech Refresh 962017 3192018 12132018 12132018 1302019 0 3239-01 Identity and Access Management 592018 3132019 3132019 3132019 3132019 0 2241-01 AREA - Generation 10112017 3302018 892018 892018 952018 0 -4244-01 Corporate Wireless 11292017 3282018 1252018 1252018 192019 0 9245-01 2017 EPS Metering Enhancements 6272018 892019 892019 892019 9252019 0 1246-01 iTest Data Refresh 12132017 1192018 11152018 11152018 122019 0 25249-01 Secondary Wind Forecasting Service 8302017 2282018 892018 892018 952018 0 0253-01 CIP Recovery Plan Project - Planning Phase 1 1312018 8292018 8292018 8292018 8292018 0 -2

257-01Security Constrained Optimal Powerflow in Study Network Analysis

1262017 10252018 10252018 10252018 1282018 0 19

261-01 Generic Transmission Constraint Calculation 372018 12132018 12132018 12132018 1232019 0 0263-01 Market Simulator 4112018 12132018 12132018 12132018 1302019 0 7265-01 Real-Time Assessment Continuity 1312018 12132018 12132018 12132018 1302019 0 0279-01 Cyber Security Project 24 6272018 10262018 10262018 10262018 11282018 0 0280-01 Quest Software Portfolio Transition 442018 6272018 9262018 9262018 9262018 0 13282-01 Synchronous Condenser Outage Modeling 662018 10252018 10252018 10252018 1252018 0 1Various 2015 CMM NPRRs 2 -18

NPRR519Exemption of ERS-Only QSEs from Collateral and Capitalization Requirements

3152017 5192018 12112018 12112018 12312018 0 See 2015 CMM NPRRs

NPRR620Collateral Requirements for Counter-Parties with No Load or Generation

3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

NPRR660 Remove CRR State Change Adder 3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

Budget HealthSchedule Health

50

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018Project Number Projects in Execution Phase (Count = 42) Phase Start Baseline Go-

Live DateApproved Go-

Live DateScheduled

Go-Live DateScheduled

Phase Finish

NPRR741 Clarifications to TPE and EAL Credit Exposure Calculations 3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

NPRR749 Option Cost for Outstanding CRRs 882018 12132018 12132018 12132018 TBD 0 NA See 2015 CMM NPRRs

NPRR755 Data Agent-Only QSE Registration 3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

NPRR819Modification of Non-Price Error Resettlement Thresholds and Resettlement Clean-Ups

592018 892018 892018 892018 952018 0 36

NPRR833 Modify PTP Obligation Bid Clearing Change 882018 12132018 12132018 12132018 TBD 0 1

NPRR843Short-Term System Adequacy and AS Offer Disclosure Reports Additions

7182018 10252018 10252018 10252018 11282018 0 0

NPRR864 RUC Modifications to Consider Market-Based Solutions 6202018 10252018 10252018 10252018 11282018 0 4SCR777 Bilateral CRR Interface Enhancement 10262016 1022017 11192018 11192018 2272019 0 NA See 181-01

SCR781 RARF Replacement 12202017 4252018 12192018 12192018 12192018 0 3SCR791 Correction of 60-day SCED GRD Disclosure Report 522018 892018 892018 892018 952018 0 39SCR795 Addition of Intra-Hour Wind Forecast to GTBD Calculation 882018 10252018 10252018 10252018 11142018 0 0

Project Number Expedited Projects in Execution (Count = 34)

Project Number Projects in Stabilization (Count = 10) Execution

Phase StartBaseline Go-Live Target

Approved Go-Live Target

ActualGo-Live Date

Scheduled Execution Phase

Finish

NPRR648 Remove References to Flowgate Rights 3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR683 Revision to Available Credit Limit Calculation 3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR743 Revision to MCE to Have a Floor For Load Exposure 3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR760 Calculation of Exposure Variables For Days With No Activity 3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR776 Voltage Set Point Communication 9202017 3192018 452018 452018 952018 0 1

NPRR800Revisions to Credit Exposure Calculations to Use Electricity Futures Market Prices

3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR815Revise the Limitation of Load Resources Providing Responsive Reserve (RRS) Service

3212018 5312018 5312018 5312018 8292018 0 2

209-01 Multi Station Breaker to Breaker One Lines 282017 392018 532018 532018 8222018 0 -1259-01 DC SCADA and Metering Upgrade 10252017 1172018 7252018 7252018 8292018 0 22266-01 Remote Email Access Enhancement 12132017 372018 662018 6192018 9262018 2 -7 2 -9

Schedule Health Budget Health

Budget HealthSchedule Health

51

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018

Project Number Projects On Hold (Count = 2) Forecast

Start DateBaseline

Phase FinishApproved Go-

Live TargetScheduled

Go-Live DateScheduled

Phase Finish

SCR789 Update NMMS Topology Processor to PSSE 34 Capability 0

269-01Document Repository Redesign and Governance Implementation - Phase 1

0

Project Number Projects Completed (Count = 20)

Baseline Execution

Phase Start

Baseline Go-Live Target

Approved Go-Live Target

Actual Go-Live Date

Actual Execution Phase Finish

185-01 Records Management and eDiscovery 12152016 5242017 8292017 8222017 12132017 2 0224-01 TelAlert Replacement 452017 6272017 842017 842017 592018 0 5230-01 SAS Technical Architecture Redesign 312017 12132017 12132017 12132017 6272018 0 2234-01 Reporting Solution Resiliency (RSR) 452017 8232017 11272017 11272017 1102018 0 8240-01 EDI Translator and Mapping Replacement Assessment 4192017 9272017 2282018 TBD 372018 -2 20254-01 Retail Windows Upgrade 10112017 12182017 12182017 1222018 272018 1 -51 65255-01 Settlements Architecture Enhancements 10252017 1112018 1112018 1192018 2142018 1 -10 53258-01 WD Kainos SMART Automation Testing Tool 4112018 642018 642018 662018 7182018 -3 33271-01 Issue Tracking and Resolution Tool Assessment 12132017 4252018 4252018 TBD 522018 1 -5 -1272-01 Operator Training Simulator Black Start GE Effort 1262017 4252018 4252018 4272018 5162018 -1 19274-01 Average Mid-Term Load Forecast 372018 5312018 5312018 5312018 6272018 0 50

NPRR768Revisions to Real-Time On-Line Reliability Deployment Price Adder Categories

372018 5312018 5312018 5312018 6272018 0 16

NPRR778 Modifications to Date Change and Cancellation Evaluation Window 7192017 10292017 12112017 12112017 1312018 0 23

NPRR782Settlement of Infeasible Ancillary Services Due to Transmission Constraints

5242017 8312017 1122017 1122017 1102018 0 20

NPRR808 Three Year CRR Auction 8232017 9182017 9182017 912017 1312018 65 68

NPRR810Applicability of RMR Incentive Factor on Reservation and Transportation Costs Associated with Firm Fuel Supplies

7172017 11122017 3312018 3312018 3312018 0 NA See 233-00

NPRR830 Revision of 4-Coincident Peak Methodology 12132017 262018 262018 262018 372018 0 85

NPRR831 Inclusion of Private Use Networks in Load Zone Price Calculations 822017 1122017 1122017 1122017 2212018 0 33

OBDRR002 ORDC OBD Revisions for PUCT Project 47199 372018 5312018 5312018 5312018 6272018 0 See NPRR768

SCR792 Enhance Communications of BAAL Exceedances 2142018 452018 452018 452018 4252018 0 69

Project Number Expedited Projects Completed (Count = 23)

Budget HealthSchedule Health

Budget HealthSchedule Health

52

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018

Project Number 2018 Projects Not Yet Started (Count = 10) Forecast

Start Date

NPRR858 Provide Complete Current Operating Plan (COP) Data Aug-2018TBD 2018 OS Enhancements Aug-2018TBD Additional Branch Limit for Relays Aug-2018

NPRR817 Create a Panhandle Hub Sep-2018NPRR821 Elimination of the CRR Deration Process Oct-2018NPRR865 Publish RTM Shift Factors for Hubs Load Zones and DC Ties Oct-2018

SCR793SSR Related Telemetry for Transmission Service Provider (TSP) Operators

Oct-2018

ECAP ECAP - ECMS Implementation Phase 2 Oct-2018TBD Job Scheduler Update in CSI Framework Oct-2018TBD Parameter Estimation Oct-2018

53

  • Slide Number 1
  • Slide Number 2
  • Summary ndash July 2018
  • Daily Peak Demand Hourly Average Actual vs Forecast Wind Day-Ahead COPs amp On-Line Capacity at Peak ndash July 2018
  • Actual Wind Output plus Curtailments vs Wind Day-Ahead COPs for All Hours ndash July 2018
  • ERCOTrsquos CPS1 Monthly Performance ndash July 2018
  • Monthly Peak Actual Demand ndash July 2018
  • Monthly Minimum Actual 15-Minute Demand ndash July 2018
  • Day-Ahead Load Forecast Performance ndash July 2018
  • Reliability Unit Commitment (RUC) Capacity by Weather Zone ndash July 2018
  • Generic Transmission Constraints (GTCs) ndash July 2018
  • Advisories and Watches ndash July 2018 Corrected
  • Lake Levels Update ndash August 1 2018
  • Planning Summary ndash July 2018
  • Mapping of Counties to ERCOT Zones ndash July 2018
  • Cumulative MW Capacity of Interconnection Requests by Zone ndashJuly 2018
  • Cumulative MW Capacity of Interconnection Requests by Zone ndashJuly 2018
  • Cumulative MW Capacity of Interconnection Requests by Zone ndashJuly 2018
  • Wind Generation ndash July 2018
  • Solar Generation ndash July 2018
  • Generation Interconnection Activity by Fuel ndash July 2018
  • Generation Interconnection Activity by Project Phase ndash July 2018
  • Slide Number 23
  • Day-Ahead Schedule (Hourly Average) ndash July 2018
  • Percentage of Real-Time Load Hedged in the DAM (Counter-Party Level) ndash July 2018
  • DAM and RTM Price Convergence ndash July 2018
  • Day-Ahead Electricity and Ancillary Service Prices (Hourly Average) ndash July 2018
  • Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash July 2018
  • Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash July 2018
  • DRUC Monthly Summary (Hourly Average) ndash July 2018
  • HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash July 2018
  • NonndashSpinning Reserve Service Deployment ndash July 2018
  • CRR Price Convergence ndash July 2018
  • Daily Average System Lambda and ORDC Price Adders ndash July 2018
  • ERS Procurement for June 2018 ndash September 2018
  • Reliability Services ndash July 2018
  • Ancillary and Other Services ndash July 2018
  • Real-Time Ancillary Service Imbalance (ORDC) ndash July 2018
  • Energy Settlement ndash July 2018
  • Congestion Revenue Rights (CRR) ndash July 2018
  • CRR Balancing Account Fund ndash July 2018
  • Revenue Neutrality ndash July 2018
  • Net Allocation to Load ndash July 2018
  • Advanced Meter Settlement Impacts ndash July 2018
  • ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndash July 2018
  • Retail Transaction Volumes ndash Summary ndash July 2018
  • Retail Transaction Volumes ndash Summary ndash July 2018
  • Slide Number 48
  • ERCOT Portfolio Stoplight Report ndash July 2018
  • ERCOT Portfolio Stoplight Report ndash July 2018
  • ERCOT Portfolio Stoplight Report ndash July 2018
  • ERCOT Portfolio Stoplight Report ndash July 2018
  • ERCOT Portfolio Stoplight Report ndash July 2018
Retail Transactions Summary
July 2018 June 2018 May 2018 April 2018 March 2018 February 2018 January 2018 December 2017 November 2017 October 2017 September 2017 August 2017 July 2017 June 2017 May 2017 April 2017 March 2017 February 2017 January 2017 December 2016 November 2016 October 2016 September 2016 August 2016 July 2016 June 2016 May 2016 April 2016 March 2016 February 2016 January 2016 December 2015 November 2015 October 2015 September 2015 August 2015 July 2015 June 2015 May 2015 April 2015 March 2015 February 2015 January 2015 December 2014 November 2014 October 2014 September 2014 August 2014 July 2014 June 2014 May 2014 April 2014 March 2014 February 2014 January 2014 December 2013 November 2013 October 2013 September 2013 August 2013 July 2013 June 2013 May 2013 April 2013 March 2013 February 2013 January 2013 Grand total
814_01 - Switch Received 121926 109653 96828 81291 95159 76119 88933 60560 77860 78096 79502 84134 84059 108784 130828 71769 67845 66875 87140 66556 56202 64452 67323 86656 82923 86376 75323 70300 76235 68057 63954 61486 52887 65276 70342 81674 91211 102661 86229 81255 79997 73394 72885 71072 67080 110465 175164 89677 99568 101490 111077 91983 93887 71130 86953 69691 55957 166882 82415 93194 102562 103756 116086 78919 68950 64329 67116 1321827
Difference from previous month 12273 12825 15537 (13868) 19040 (12814) 28373 (17300) (236) (1406) (4632) 75 (24725) (22044) 59059 3924 970 (20265) 20584 10354 (8250) (2871) (19333) 3733 (3453) 11053 5023 (5935) 8178 4103 2468 8599 (12389) (5066) (11332) (9537) (11450) 16432 4974 1258 6603 509 1813 3992 (43385) (64699) 85487 (9891) (1922) (9587) 19094 (1904) 22757 (15823) 17262 13734 (110925) 84467 (10779) (9368) (1194) (12330) 37167 9969 4621 (2787)
814_16 - Move - Ins Received 270122 257125 244431 225380 224289 215281 230409 238340 207921 236397 244511 258046 252360 257759 237611 197865 217962 201984 202612 196236 201714 220958 231999 268781 241844 247481 214383 199804 218245 212474 193716 189862 181098 215908 229405 248124 263233 247089 208166 207932 215950 197765 198025 193973 178624 226283 231418 243482 251957 233679 223201 258649 214724 208160 207059 172981 178671 233469 216550 255967 249114 220397 216982 204412 197200 191955 194507 3162148
Difference from previous month 12997 12694 19051 1091 9008 (15128) (7931) 30419 (28476) (8114) (13535) 5686 (5399) 20148 39746 (20097) 15978 (628) 6376 (5478) (19244) (11041) (36782) 26937 (5637) 33098 14579 (18441) 5771 18758 3854 8764 (34810) (13497) (18719) (15109) 16144 38923 234 (8018) 18185 (260) 4052 15349 (47659) (5135) (12064) (8475) 18278 10478 (35448) 43925 6564 1101 34078 (5690) (54798) 16919 (39417) 6853 28717 3415 12570 7212 5245 (2552)
814_24 - MVO and MVO to CSA Received 129820 125861 124403 113795 108753 100127 111821 144987 100830 116519 129103 128104 127073 133582 127218 102055 111459 100285 101107 96289 100578 109493 114094 133170 122932 129025 118022 103789 109278 103747 96628 99552 96214 109578 117949 123894 133905 133855 114675 108275 108859 94864 98233 97901 89578 111857 115918 121662 131607 126785 119107 107956 107266 99428 104273 93385 93977 115469 115524 129594 135196 121446 120049 111598 106467 102429 104399 1660500
814_10 - DTP Mass Acquisition Received - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0
814_10 - DTP Mass Transition Received - 0 - 0 9033 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 639 - 0 - 0 4975 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0
814_18 - CSA AdditionDeletes Received 40217 62083 99016 55581 46720 42587 49740 47725 31726 52888 41597 40616 55770 43745 52139 26702 21791 39082 44030 38884 39856 31786 33061 42622 48489 64178 50499 59475 59400 48536 42179 40351 34796 34420 54677 35078 49489 59611 39384 44247 44577 35386 40420 54831 43550 45039 44268 40405 57954 64408 65032 80184 70310 41156 34811 46680 50347 71847 48606 52585 50867 62747 59763 34925 40977 40389 41227 747237
Total 562085 554722 573711 476047 474921 434114 480903 491612 418337 483900 494713 510900 519262 543870 547796 398391 419057 408226 434889 397965 398350 426689 446477 531229 496188 527060 458227 433368 463158 432814 396477 391251 364995 425182 472373 488770 537838 543216 448454 441709 449383 401409 409563 417777 378832 493644 566768 495865 541086 526362 523392 538772 486187 419874 433096 382737 378952 587667 463095 531340 537739 508346 512880 429854 413594 399102 407249 6891712
Counts from Monthly Retail Transaction report
To do
Break Out 814_10s - AQ and MT
Break Out 814_18 Additions from Deletes
Year-To-Date Transactions Received
Transaction Type July 2018 July 2017 July 2018 July 2017
Switches 669909 617300 121926 84059
Acquisition 0 0 0 0
Move - Ins 1667037 1568153 270122 252360
Move - Outs 814580 802779 129820 127073
Continuous Service Agreements (CSA) 395944 283259 40217 55770
Mass Transitions 9033 0 0 0
Total 3556503 3271491 562085 519262
There has been a change since this was created
Mass Acquisition has been broken out of Mass Transition
Page 32: ERCOT Monthly Operational Overvie · ERCOT Monthly Operational Overview (July 2018) Revised 08.22.18. ERCOT Public. August 15, 2018

PUBLIC

NonndashSpinning Reserve Service Deployment ndash July 2018

32

Deployment Start Time

Deployment End Time

Deployment Duration (Hours)

Max Deployment(MW) Reason

NA

PUBLIC

CRR Price Convergence ndash July 2018

0

50

100

150

200

250

Mill

ions

$

Cost

Value

Congestion Revenue Right cost in auction convergence with payment in Day-Ahead Market and Real Time Market

33

PUBLIC

Daily Average System Lambda and ORDC Price Adders ndash July 2018

0

50

100

150

200

250

$M

Wh

Day of Month

RTOFFPA

RTORPA

SYSTEM_LAMBDA

34

PUBLIC

ERS Procurement for June 2018 ndash September 2018

TP1 TP2 TP3 TP4 TP5 TP6

Non Weather-Sensitive ERS-10 MW 160562 165996 143324 140708 156699 151138

Non Weather-Sensitive ERS-30 MW 736864 781559 702529 625067 755153 657394

Weather-Sensitive ERS-10 MW 0 0 0 0 0 0

Weather-Sensitive ERS-30 MW 0 0 11850 11850 0 0

Total MW Procured 897426 947555 857703 777625 911852 808532

Clearing Price $201 $185 $2108 $2177 $199 $225

Time Period Time Period Hours

Time Period 1 Hours Ending 0600 - 0800 (50000 am to 80000 am) Monday through Friday except ERCOT Holidays

Time Period 2 Hours Ending 0900 - 1300 (80000 am to 10000 pm) Monday through Friday except ERCOT Holidays

Time Period 3 Hours Ending 1400 - 1600 (10000 pm to 40000 pm) Monday through Friday except ERCOT Holidays

Time Period 4 Hours Ending 1700 - 1900 (40000 pm to 70000 pm) Monday through Friday except ERCOT Holidays

Time Period 5 Hours Ending 2000 - 2200 (70000 pm to 100000 pm) Monday through Friday except ERCOT Holidays Time Period 6 All other hours

35

PUBLIC

Reliability Services ndash July 2018

Reliability Unit Commitment (RUC) $ in Millions

RUC Make-Whole Payments $000

RUC Clawback Charges $000

RUC Commitment Settlement $000

RUC Capacity Short Charges $000

RUC Make-Whole Uplift $000

RUC Commitment Cost Allocation $000

RUC Decommitment Payments $000

Total RUC Allocation to Load $000

In July 2018 there was a credit of $000M allocated to load for RUC compared to bull A credit of $000M in June 2018bull A credit of $003M in July 2017

36

PUBLIC

Ancillary and Other Services ndash July 2018

Ancillary and Other Services $ in Millions

Regulation Up Service $1105

Regulation Down Service $072

Responsive Reserve Service $7177

Non-Spinning Reserve Service $1787

Black Start Service $059

Voltage Services - Reactive Power $000

Voltage Services - Lost Opportunity $000

Total Charges Allocated to Load $10200

In July 2018 Ancillary and Other Services was a charge of $10200M compared to bull A charge of $2001M in June 2018bull A charge of $2322M in July 2017

37

PUBLIC

Real-Time Ancillary Service Imbalance (ORDC) ndash July 2018

In July 2018 Real-Time Ancillary Service Imbalance was a charge to load of $2228K compared to bull A charge of $147K in June 2018bull A charge of $534K in July 2017

Real-Time Ancillary Service Imbalance $ in Thousands

Real-Time AS Imbalance ($2228)

Real-Time Reliability Deployment AS Imbalance $000

Total RTASI Amount Allocated to Load $2228

38

PUBLIC

Energy Settlement ndash July 2018

39

Day-Ahead Market Energy Settlement $ in Millions

Energy Purchases $215396

Point to Point Obligation Purchases $11726

Energy Sales ($212592)

Day-Ahead Congestion Rent $14531

Day-Ahead Market Make-Whole Payments ($001)

Real-Time Market Energy Settlement $ in Millions

Energy Imbalance at a Resource Node ($91963)

Energy Imbalance at a Load Zone $160737

Energy Imbalance at a Hub ($57497)

Net Real-Time Energy Imbalance $11276

Real Time Congestion from Self Schedules $013

Block Load Transfers and DC Ties ($2063)

Total Impact to Revenue Neutrality $9227

Load-Allocated Emergency Energy Payments ($016)

Load-Allocated Base Point Deviation Charges $026

Day-Ahead Market energy settlement activity increased from last month and increased from July 2017

Real-Time Market energy settlement activity increased from last month and increased from July 2017

PUBLIC

Congestion Revenue Rights (CRR) ndash July 2018

$ in Millions

Long-Term Auction ($4026)

Monthly Auction ($1773)

Total Auction Revenue ($5799)

Day-Ahead CRR Settlements ($15797)

Day-Ahead CRR Short-Charges $1885

Day-Ahead CRR Short-Charges Refunded ($899)

Day-Ahead CRR Short-Charges Net $986

Total CRR Funding ($14810)

Day-Ahead Point-to-Point Obligations $11726

Real-Time Point-to-Point Obligations ($10113)

Net Point-to-Point Obligations $1614

Congestion Revenue Rights settlement payments were not fully funded Partial funding to settle the CRR Short Charges was provided from the CRR Balancing Account Fund and the remaining $986M of CRR Short Charges were not refunded The CRR Fund Balance is now $0

Point to Point Obligations settled with a net charge of $1614M compared to a net credit of $1758M last month

40

PUBLIC

CRR Balancing Account Fund ndash July 2018

CRR Balancing Account $ in Millions

Monthly Day-Ahead Congestion Rent $14531

Monthly Day-Ahead CRR Settlements ($15797)

Monthly Day-Ahead CRR Short -Charges $1885

CRR Balancing Account Credit Total $619

Beginning Fund Balance for the Month $275

CRR Balancing Account Credit Total $619

Day-Ahead CRR Short-Charges Refunded ($899)

CRR PTP Option Award Charges $004

Load-Allocated CRR Amount $000

Total Fund Amount $000

41

PUBLIC

Revenue Neutrality ndash July 2018

Revenue Neutrality $ in Millions

Real-Time Energy Imbalance $11276

Real-Time Point to Point Obligation ($10113)

Real-Time Congestion from Self-Schedules $013

DC Tie amp Block Load Transfer ($2063)

Allocation to Load $886

In July 2018 the Revenue Neutrality charge to load was $886M compared to bull A charge of $3046M in June 2018bull A charge of $145M in July 2017

42

PUBLIC

Net Allocation to Load ndash July 2018

Market-Based Allocation $ in Millions

Reliability Unit Commitment $000

Ancillary and Other Services $10200

Real-Time Ancillary Service Imbalance $223

Emergency Energy $016

Base Point Deviation ($026)

CRR Auction Revenue ($5799)

CRR Balancing Account $000

Real-Time Revenue Neutrality $886

Reliability Must Run $000

Monthly Block Load Transfer $000

Total $5500

Fee AllocationERCOT Administrative Fee $2207

Net Allocated to Load $7707

In July 2018 the Net Allocation to load was a charge of $7707M compared to bull A charge of $2152M in June 2018bull A credit of $1363M in July 2017

43

PUBLIC

Advanced Meter Settlement Impacts ndash July 2018

July 2018 At month end settling 72M ESIIDs using Advanced Meter data

July 2018 990 of the load in ERCOT is settled with 15-min interval data (AMS Competitive IDR and NOIE IDR)

44

PUBLIC

ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndashJuly 2018

45

PUBLIC

Retail Transaction Volumes ndash Summary ndash July 2018

46

Transaction Type July 2018 July 2017 July 2018 July 2017

Switches 669909 617300 121926 84059

Acquisition 0 0 0 0

Move - Ins 1667037 1568153 270122 252360

Move - Outs 814580 802779 129820 127073

Continuous Service Agreements (CSA) 395944 283259 40217 55770

Mass Transitions 9033 0 0 0

Total 3556503 3271491 562085 519262

Year-To-Date Transactions Received

Board Presentation Input

Trans Volumes by Month_New

PUBLIC

Retail Transaction Volumes ndash Summary ndash July 2018

SwitchesAcquisitions Move-Ins

Move-Outs Mass Transition

47

Projects Report

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018

20000000$ 2018 Portfolio

Spending Estimate

Projects In FlightOn Hold (Count = 100) 24905011$

Projects Not Yet Started (Count = 10) 1320628$

Projects Completed (Count = 43) 795250$

(7020889)$

TOTAL 20000000$

Project Number Projects in Initiation Phase (Count = 4)

TBD IT Asset RecoveryNPRR842 Study Area Load Information

209-03 Study Network (STNET) Integration288-01 EDI Map and Translator Replacement

Impact Metric TolerancesUnfavorable variances are represented as negative numbers within the report - Green = No more than 49 unfavorable variance - Yellow = Unfavorable variance between 49 and 99 - Red = Unfavorable variance more than 99

Spending Reductions Required to Maintain Capital Budget

2018 Project Funding

Footnotes1 - One or more phases took longer than expected resulting in additional time required

2 - One or more phases required more labor than expected resulting in additional funding andor time required

3 - Project placed on holdNA - Metric not calculated because - it is reported at the parent project level or - it is an administrative project

Project Number Projects in Planning Phase (Count = 8) Phase Start Baseline

Phase FinishApproved

Phase FinishScheduled

Go-Live DateScheduled

Phase Finish

134-02 Privileged Account Management (PAM) Phase 2 882018 12192018 12192018 TBD 12192018 0 10

183-01 CMM-FT GUI Integration 12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs

242-01 Portfolio Reporting Assessment 1182017 12192018 12192018 TBD 12192018 0 21260-01 Information Governance Assessment 10182017 5302018 9192018 TBD 9192018 0 5286-01 Java Platform Assessment 6202018 11212018 11212018 TBD 11212018 0 6287-01 Security Constrained Unit Commitment (SCUC) 882018 2272019 2272019 TBD 2272019 0 -1

NPRR484Revisions to Congestion Revenue Rights Credit Calculations and Payments - Phase 1b 2

12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs

NPRR702Flexible Accounts Payment of Invoices and Disposition of Interest on Cash Collateral

12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs

Schedule Health Budget Health

49

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018Project Number Projects in Execution Phase (Count = 42) Phase Start Baseline Go-

Live DateApproved Go-

Live DateScheduled

Go-Live DateScheduled

Phase Finish

170-01 Enterprise Content Alignment Program 8262015 11152017 8312018 8312018 8312018 0 0170-06 ECAP - ECMS Implementation Phase 1 4252018 11302018 11302018 11302018 11302018 0 3173-02 ERCOT Flight Certification Website 11152017 2282019 2282019 2282019 5312019 0 2181-01 CRR Framework Upgrade 10262016 1022017 11192018 11192018 2272019 0 2

183-01 CMM Tech Refresh 3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

193-01 PMU Tool Evaluation and Implementation 12132017 892018 2152019 2152019 3202019 0 0196-01 GINR Project Status Application Replacement 12212016 9142017 2282019 2282019 3312019 0 1198-02 Reactive Power Coordination PoC 962017 6162018 8152018 8152018 8152018 0 54209-02 Weather Imaging and Line Observation (WILO) 5302018 212019 212019 212019 2272019 0 2210-01 REC Technology Refresh 8302017 3182018 12132018 12132018 1162019 0 3228-01 Enterprise Database Upgrade 882018 1292020 1292020 1292020 1292020 0 17229-01 IT Change and Configuration Management Phase 2 822017 6192018 12132018 12132018 3252019 0 2 -9238-01 Application Authentication Tech Refresh 962017 3192018 12132018 12132018 1302019 0 3239-01 Identity and Access Management 592018 3132019 3132019 3132019 3132019 0 2241-01 AREA - Generation 10112017 3302018 892018 892018 952018 0 -4244-01 Corporate Wireless 11292017 3282018 1252018 1252018 192019 0 9245-01 2017 EPS Metering Enhancements 6272018 892019 892019 892019 9252019 0 1246-01 iTest Data Refresh 12132017 1192018 11152018 11152018 122019 0 25249-01 Secondary Wind Forecasting Service 8302017 2282018 892018 892018 952018 0 0253-01 CIP Recovery Plan Project - Planning Phase 1 1312018 8292018 8292018 8292018 8292018 0 -2

257-01Security Constrained Optimal Powerflow in Study Network Analysis

1262017 10252018 10252018 10252018 1282018 0 19

261-01 Generic Transmission Constraint Calculation 372018 12132018 12132018 12132018 1232019 0 0263-01 Market Simulator 4112018 12132018 12132018 12132018 1302019 0 7265-01 Real-Time Assessment Continuity 1312018 12132018 12132018 12132018 1302019 0 0279-01 Cyber Security Project 24 6272018 10262018 10262018 10262018 11282018 0 0280-01 Quest Software Portfolio Transition 442018 6272018 9262018 9262018 9262018 0 13282-01 Synchronous Condenser Outage Modeling 662018 10252018 10252018 10252018 1252018 0 1Various 2015 CMM NPRRs 2 -18

NPRR519Exemption of ERS-Only QSEs from Collateral and Capitalization Requirements

3152017 5192018 12112018 12112018 12312018 0 See 2015 CMM NPRRs

NPRR620Collateral Requirements for Counter-Parties with No Load or Generation

3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

NPRR660 Remove CRR State Change Adder 3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

Budget HealthSchedule Health

50

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018Project Number Projects in Execution Phase (Count = 42) Phase Start Baseline Go-

Live DateApproved Go-

Live DateScheduled

Go-Live DateScheduled

Phase Finish

NPRR741 Clarifications to TPE and EAL Credit Exposure Calculations 3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

NPRR749 Option Cost for Outstanding CRRs 882018 12132018 12132018 12132018 TBD 0 NA See 2015 CMM NPRRs

NPRR755 Data Agent-Only QSE Registration 3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

NPRR819Modification of Non-Price Error Resettlement Thresholds and Resettlement Clean-Ups

592018 892018 892018 892018 952018 0 36

NPRR833 Modify PTP Obligation Bid Clearing Change 882018 12132018 12132018 12132018 TBD 0 1

NPRR843Short-Term System Adequacy and AS Offer Disclosure Reports Additions

7182018 10252018 10252018 10252018 11282018 0 0

NPRR864 RUC Modifications to Consider Market-Based Solutions 6202018 10252018 10252018 10252018 11282018 0 4SCR777 Bilateral CRR Interface Enhancement 10262016 1022017 11192018 11192018 2272019 0 NA See 181-01

SCR781 RARF Replacement 12202017 4252018 12192018 12192018 12192018 0 3SCR791 Correction of 60-day SCED GRD Disclosure Report 522018 892018 892018 892018 952018 0 39SCR795 Addition of Intra-Hour Wind Forecast to GTBD Calculation 882018 10252018 10252018 10252018 11142018 0 0

Project Number Expedited Projects in Execution (Count = 34)

Project Number Projects in Stabilization (Count = 10) Execution

Phase StartBaseline Go-Live Target

Approved Go-Live Target

ActualGo-Live Date

Scheduled Execution Phase

Finish

NPRR648 Remove References to Flowgate Rights 3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR683 Revision to Available Credit Limit Calculation 3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR743 Revision to MCE to Have a Floor For Load Exposure 3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR760 Calculation of Exposure Variables For Days With No Activity 3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR776 Voltage Set Point Communication 9202017 3192018 452018 452018 952018 0 1

NPRR800Revisions to Credit Exposure Calculations to Use Electricity Futures Market Prices

3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR815Revise the Limitation of Load Resources Providing Responsive Reserve (RRS) Service

3212018 5312018 5312018 5312018 8292018 0 2

209-01 Multi Station Breaker to Breaker One Lines 282017 392018 532018 532018 8222018 0 -1259-01 DC SCADA and Metering Upgrade 10252017 1172018 7252018 7252018 8292018 0 22266-01 Remote Email Access Enhancement 12132017 372018 662018 6192018 9262018 2 -7 2 -9

Schedule Health Budget Health

Budget HealthSchedule Health

51

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018

Project Number Projects On Hold (Count = 2) Forecast

Start DateBaseline

Phase FinishApproved Go-

Live TargetScheduled

Go-Live DateScheduled

Phase Finish

SCR789 Update NMMS Topology Processor to PSSE 34 Capability 0

269-01Document Repository Redesign and Governance Implementation - Phase 1

0

Project Number Projects Completed (Count = 20)

Baseline Execution

Phase Start

Baseline Go-Live Target

Approved Go-Live Target

Actual Go-Live Date

Actual Execution Phase Finish

185-01 Records Management and eDiscovery 12152016 5242017 8292017 8222017 12132017 2 0224-01 TelAlert Replacement 452017 6272017 842017 842017 592018 0 5230-01 SAS Technical Architecture Redesign 312017 12132017 12132017 12132017 6272018 0 2234-01 Reporting Solution Resiliency (RSR) 452017 8232017 11272017 11272017 1102018 0 8240-01 EDI Translator and Mapping Replacement Assessment 4192017 9272017 2282018 TBD 372018 -2 20254-01 Retail Windows Upgrade 10112017 12182017 12182017 1222018 272018 1 -51 65255-01 Settlements Architecture Enhancements 10252017 1112018 1112018 1192018 2142018 1 -10 53258-01 WD Kainos SMART Automation Testing Tool 4112018 642018 642018 662018 7182018 -3 33271-01 Issue Tracking and Resolution Tool Assessment 12132017 4252018 4252018 TBD 522018 1 -5 -1272-01 Operator Training Simulator Black Start GE Effort 1262017 4252018 4252018 4272018 5162018 -1 19274-01 Average Mid-Term Load Forecast 372018 5312018 5312018 5312018 6272018 0 50

NPRR768Revisions to Real-Time On-Line Reliability Deployment Price Adder Categories

372018 5312018 5312018 5312018 6272018 0 16

NPRR778 Modifications to Date Change and Cancellation Evaluation Window 7192017 10292017 12112017 12112017 1312018 0 23

NPRR782Settlement of Infeasible Ancillary Services Due to Transmission Constraints

5242017 8312017 1122017 1122017 1102018 0 20

NPRR808 Three Year CRR Auction 8232017 9182017 9182017 912017 1312018 65 68

NPRR810Applicability of RMR Incentive Factor on Reservation and Transportation Costs Associated with Firm Fuel Supplies

7172017 11122017 3312018 3312018 3312018 0 NA See 233-00

NPRR830 Revision of 4-Coincident Peak Methodology 12132017 262018 262018 262018 372018 0 85

NPRR831 Inclusion of Private Use Networks in Load Zone Price Calculations 822017 1122017 1122017 1122017 2212018 0 33

OBDRR002 ORDC OBD Revisions for PUCT Project 47199 372018 5312018 5312018 5312018 6272018 0 See NPRR768

SCR792 Enhance Communications of BAAL Exceedances 2142018 452018 452018 452018 4252018 0 69

Project Number Expedited Projects Completed (Count = 23)

Budget HealthSchedule Health

Budget HealthSchedule Health

52

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018

Project Number 2018 Projects Not Yet Started (Count = 10) Forecast

Start Date

NPRR858 Provide Complete Current Operating Plan (COP) Data Aug-2018TBD 2018 OS Enhancements Aug-2018TBD Additional Branch Limit for Relays Aug-2018

NPRR817 Create a Panhandle Hub Sep-2018NPRR821 Elimination of the CRR Deration Process Oct-2018NPRR865 Publish RTM Shift Factors for Hubs Load Zones and DC Ties Oct-2018

SCR793SSR Related Telemetry for Transmission Service Provider (TSP) Operators

Oct-2018

ECAP ECAP - ECMS Implementation Phase 2 Oct-2018TBD Job Scheduler Update in CSI Framework Oct-2018TBD Parameter Estimation Oct-2018

53

  • Slide Number 1
  • Slide Number 2
  • Summary ndash July 2018
  • Daily Peak Demand Hourly Average Actual vs Forecast Wind Day-Ahead COPs amp On-Line Capacity at Peak ndash July 2018
  • Actual Wind Output plus Curtailments vs Wind Day-Ahead COPs for All Hours ndash July 2018
  • ERCOTrsquos CPS1 Monthly Performance ndash July 2018
  • Monthly Peak Actual Demand ndash July 2018
  • Monthly Minimum Actual 15-Minute Demand ndash July 2018
  • Day-Ahead Load Forecast Performance ndash July 2018
  • Reliability Unit Commitment (RUC) Capacity by Weather Zone ndash July 2018
  • Generic Transmission Constraints (GTCs) ndash July 2018
  • Advisories and Watches ndash July 2018 Corrected
  • Lake Levels Update ndash August 1 2018
  • Planning Summary ndash July 2018
  • Mapping of Counties to ERCOT Zones ndash July 2018
  • Cumulative MW Capacity of Interconnection Requests by Zone ndashJuly 2018
  • Cumulative MW Capacity of Interconnection Requests by Zone ndashJuly 2018
  • Cumulative MW Capacity of Interconnection Requests by Zone ndashJuly 2018
  • Wind Generation ndash July 2018
  • Solar Generation ndash July 2018
  • Generation Interconnection Activity by Fuel ndash July 2018
  • Generation Interconnection Activity by Project Phase ndash July 2018
  • Slide Number 23
  • Day-Ahead Schedule (Hourly Average) ndash July 2018
  • Percentage of Real-Time Load Hedged in the DAM (Counter-Party Level) ndash July 2018
  • DAM and RTM Price Convergence ndash July 2018
  • Day-Ahead Electricity and Ancillary Service Prices (Hourly Average) ndash July 2018
  • Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash July 2018
  • Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash July 2018
  • DRUC Monthly Summary (Hourly Average) ndash July 2018
  • HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash July 2018
  • NonndashSpinning Reserve Service Deployment ndash July 2018
  • CRR Price Convergence ndash July 2018
  • Daily Average System Lambda and ORDC Price Adders ndash July 2018
  • ERS Procurement for June 2018 ndash September 2018
  • Reliability Services ndash July 2018
  • Ancillary and Other Services ndash July 2018
  • Real-Time Ancillary Service Imbalance (ORDC) ndash July 2018
  • Energy Settlement ndash July 2018
  • Congestion Revenue Rights (CRR) ndash July 2018
  • CRR Balancing Account Fund ndash July 2018
  • Revenue Neutrality ndash July 2018
  • Net Allocation to Load ndash July 2018
  • Advanced Meter Settlement Impacts ndash July 2018
  • ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndash July 2018
  • Retail Transaction Volumes ndash Summary ndash July 2018
  • Retail Transaction Volumes ndash Summary ndash July 2018
  • Slide Number 48
  • ERCOT Portfolio Stoplight Report ndash July 2018
  • ERCOT Portfolio Stoplight Report ndash July 2018
  • ERCOT Portfolio Stoplight Report ndash July 2018
  • ERCOT Portfolio Stoplight Report ndash July 2018
  • ERCOT Portfolio Stoplight Report ndash July 2018
Retail Transactions Summary
July 2018 June 2018 May 2018 April 2018 March 2018 February 2018 January 2018 December 2017 November 2017 October 2017 September 2017 August 2017 July 2017 June 2017 May 2017 April 2017 March 2017 February 2017 January 2017 December 2016 November 2016 October 2016 September 2016 August 2016 July 2016 June 2016 May 2016 April 2016 March 2016 February 2016 January 2016 December 2015 November 2015 October 2015 September 2015 August 2015 July 2015 June 2015 May 2015 April 2015 March 2015 February 2015 January 2015 December 2014 November 2014 October 2014 September 2014 August 2014 July 2014 June 2014 May 2014 April 2014 March 2014 February 2014 January 2014 December 2013 November 2013 October 2013 September 2013 August 2013 July 2013 June 2013 May 2013 April 2013 March 2013 February 2013 January 2013 Grand total
814_01 - Switch Received 121926 109653 96828 81291 95159 76119 88933 60560 77860 78096 79502 84134 84059 108784 130828 71769 67845 66875 87140 66556 56202 64452 67323 86656 82923 86376 75323 70300 76235 68057 63954 61486 52887 65276 70342 81674 91211 102661 86229 81255 79997 73394 72885 71072 67080 110465 175164 89677 99568 101490 111077 91983 93887 71130 86953 69691 55957 166882 82415 93194 102562 103756 116086 78919 68950 64329 67116 1321827
Difference from previous month 12273 12825 15537 (13868) 19040 (12814) 28373 (17300) (236) (1406) (4632) 75 (24725) (22044) 59059 3924 970 (20265) 20584 10354 (8250) (2871) (19333) 3733 (3453) 11053 5023 (5935) 8178 4103 2468 8599 (12389) (5066) (11332) (9537) (11450) 16432 4974 1258 6603 509 1813 3992 (43385) (64699) 85487 (9891) (1922) (9587) 19094 (1904) 22757 (15823) 17262 13734 (110925) 84467 (10779) (9368) (1194) (12330) 37167 9969 4621 (2787)
814_16 - Move - Ins Received 270122 257125 244431 225380 224289 215281 230409 238340 207921 236397 244511 258046 252360 257759 237611 197865 217962 201984 202612 196236 201714 220958 231999 268781 241844 247481 214383 199804 218245 212474 193716 189862 181098 215908 229405 248124 263233 247089 208166 207932 215950 197765 198025 193973 178624 226283 231418 243482 251957 233679 223201 258649 214724 208160 207059 172981 178671 233469 216550 255967 249114 220397 216982 204412 197200 191955 194507 3162148
Difference from previous month 12997 12694 19051 1091 9008 (15128) (7931) 30419 (28476) (8114) (13535) 5686 (5399) 20148 39746 (20097) 15978 (628) 6376 (5478) (19244) (11041) (36782) 26937 (5637) 33098 14579 (18441) 5771 18758 3854 8764 (34810) (13497) (18719) (15109) 16144 38923 234 (8018) 18185 (260) 4052 15349 (47659) (5135) (12064) (8475) 18278 10478 (35448) 43925 6564 1101 34078 (5690) (54798) 16919 (39417) 6853 28717 3415 12570 7212 5245 (2552)
814_24 - MVO and MVO to CSA Received 129820 125861 124403 113795 108753 100127 111821 144987 100830 116519 129103 128104 127073 133582 127218 102055 111459 100285 101107 96289 100578 109493 114094 133170 122932 129025 118022 103789 109278 103747 96628 99552 96214 109578 117949 123894 133905 133855 114675 108275 108859 94864 98233 97901 89578 111857 115918 121662 131607 126785 119107 107956 107266 99428 104273 93385 93977 115469 115524 129594 135196 121446 120049 111598 106467 102429 104399 1660500
814_10 - DTP Mass Acquisition Received - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0
814_10 - DTP Mass Transition Received - 0 - 0 9033 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 639 - 0 - 0 4975 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0
814_18 - CSA AdditionDeletes Received 40217 62083 99016 55581 46720 42587 49740 47725 31726 52888 41597 40616 55770 43745 52139 26702 21791 39082 44030 38884 39856 31786 33061 42622 48489 64178 50499 59475 59400 48536 42179 40351 34796 34420 54677 35078 49489 59611 39384 44247 44577 35386 40420 54831 43550 45039 44268 40405 57954 64408 65032 80184 70310 41156 34811 46680 50347 71847 48606 52585 50867 62747 59763 34925 40977 40389 41227 747237
Total 562085 554722 573711 476047 474921 434114 480903 491612 418337 483900 494713 510900 519262 543870 547796 398391 419057 408226 434889 397965 398350 426689 446477 531229 496188 527060 458227 433368 463158 432814 396477 391251 364995 425182 472373 488770 537838 543216 448454 441709 449383 401409 409563 417777 378832 493644 566768 495865 541086 526362 523392 538772 486187 419874 433096 382737 378952 587667 463095 531340 537739 508346 512880 429854 413594 399102 407249 6891712
Counts from Monthly Retail Transaction report
To do
Break Out 814_10s - AQ and MT
Break Out 814_18 Additions from Deletes
Year-To-Date Transactions Received
Transaction Type July 2018 July 2017 July 2018 July 2017
Switches 669909 617300 121926 84059
Acquisition 0 0 0 0
Move - Ins 1667037 1568153 270122 252360
Move - Outs 814580 802779 129820 127073
Continuous Service Agreements (CSA) 395944 283259 40217 55770
Mass Transitions 9033 0 0 0
Total 3556503 3271491 562085 519262
There has been a change since this was created
Mass Acquisition has been broken out of Mass Transition
Page 33: ERCOT Monthly Operational Overvie · ERCOT Monthly Operational Overview (July 2018) Revised 08.22.18. ERCOT Public. August 15, 2018

PUBLIC

CRR Price Convergence ndash July 2018

0

50

100

150

200

250

Mill

ions

$

Cost

Value

Congestion Revenue Right cost in auction convergence with payment in Day-Ahead Market and Real Time Market

33

PUBLIC

Daily Average System Lambda and ORDC Price Adders ndash July 2018

0

50

100

150

200

250

$M

Wh

Day of Month

RTOFFPA

RTORPA

SYSTEM_LAMBDA

34

PUBLIC

ERS Procurement for June 2018 ndash September 2018

TP1 TP2 TP3 TP4 TP5 TP6

Non Weather-Sensitive ERS-10 MW 160562 165996 143324 140708 156699 151138

Non Weather-Sensitive ERS-30 MW 736864 781559 702529 625067 755153 657394

Weather-Sensitive ERS-10 MW 0 0 0 0 0 0

Weather-Sensitive ERS-30 MW 0 0 11850 11850 0 0

Total MW Procured 897426 947555 857703 777625 911852 808532

Clearing Price $201 $185 $2108 $2177 $199 $225

Time Period Time Period Hours

Time Period 1 Hours Ending 0600 - 0800 (50000 am to 80000 am) Monday through Friday except ERCOT Holidays

Time Period 2 Hours Ending 0900 - 1300 (80000 am to 10000 pm) Monday through Friday except ERCOT Holidays

Time Period 3 Hours Ending 1400 - 1600 (10000 pm to 40000 pm) Monday through Friday except ERCOT Holidays

Time Period 4 Hours Ending 1700 - 1900 (40000 pm to 70000 pm) Monday through Friday except ERCOT Holidays

Time Period 5 Hours Ending 2000 - 2200 (70000 pm to 100000 pm) Monday through Friday except ERCOT Holidays Time Period 6 All other hours

35

PUBLIC

Reliability Services ndash July 2018

Reliability Unit Commitment (RUC) $ in Millions

RUC Make-Whole Payments $000

RUC Clawback Charges $000

RUC Commitment Settlement $000

RUC Capacity Short Charges $000

RUC Make-Whole Uplift $000

RUC Commitment Cost Allocation $000

RUC Decommitment Payments $000

Total RUC Allocation to Load $000

In July 2018 there was a credit of $000M allocated to load for RUC compared to bull A credit of $000M in June 2018bull A credit of $003M in July 2017

36

PUBLIC

Ancillary and Other Services ndash July 2018

Ancillary and Other Services $ in Millions

Regulation Up Service $1105

Regulation Down Service $072

Responsive Reserve Service $7177

Non-Spinning Reserve Service $1787

Black Start Service $059

Voltage Services - Reactive Power $000

Voltage Services - Lost Opportunity $000

Total Charges Allocated to Load $10200

In July 2018 Ancillary and Other Services was a charge of $10200M compared to bull A charge of $2001M in June 2018bull A charge of $2322M in July 2017

37

PUBLIC

Real-Time Ancillary Service Imbalance (ORDC) ndash July 2018

In July 2018 Real-Time Ancillary Service Imbalance was a charge to load of $2228K compared to bull A charge of $147K in June 2018bull A charge of $534K in July 2017

Real-Time Ancillary Service Imbalance $ in Thousands

Real-Time AS Imbalance ($2228)

Real-Time Reliability Deployment AS Imbalance $000

Total RTASI Amount Allocated to Load $2228

38

PUBLIC

Energy Settlement ndash July 2018

39

Day-Ahead Market Energy Settlement $ in Millions

Energy Purchases $215396

Point to Point Obligation Purchases $11726

Energy Sales ($212592)

Day-Ahead Congestion Rent $14531

Day-Ahead Market Make-Whole Payments ($001)

Real-Time Market Energy Settlement $ in Millions

Energy Imbalance at a Resource Node ($91963)

Energy Imbalance at a Load Zone $160737

Energy Imbalance at a Hub ($57497)

Net Real-Time Energy Imbalance $11276

Real Time Congestion from Self Schedules $013

Block Load Transfers and DC Ties ($2063)

Total Impact to Revenue Neutrality $9227

Load-Allocated Emergency Energy Payments ($016)

Load-Allocated Base Point Deviation Charges $026

Day-Ahead Market energy settlement activity increased from last month and increased from July 2017

Real-Time Market energy settlement activity increased from last month and increased from July 2017

PUBLIC

Congestion Revenue Rights (CRR) ndash July 2018

$ in Millions

Long-Term Auction ($4026)

Monthly Auction ($1773)

Total Auction Revenue ($5799)

Day-Ahead CRR Settlements ($15797)

Day-Ahead CRR Short-Charges $1885

Day-Ahead CRR Short-Charges Refunded ($899)

Day-Ahead CRR Short-Charges Net $986

Total CRR Funding ($14810)

Day-Ahead Point-to-Point Obligations $11726

Real-Time Point-to-Point Obligations ($10113)

Net Point-to-Point Obligations $1614

Congestion Revenue Rights settlement payments were not fully funded Partial funding to settle the CRR Short Charges was provided from the CRR Balancing Account Fund and the remaining $986M of CRR Short Charges were not refunded The CRR Fund Balance is now $0

Point to Point Obligations settled with a net charge of $1614M compared to a net credit of $1758M last month

40

PUBLIC

CRR Balancing Account Fund ndash July 2018

CRR Balancing Account $ in Millions

Monthly Day-Ahead Congestion Rent $14531

Monthly Day-Ahead CRR Settlements ($15797)

Monthly Day-Ahead CRR Short -Charges $1885

CRR Balancing Account Credit Total $619

Beginning Fund Balance for the Month $275

CRR Balancing Account Credit Total $619

Day-Ahead CRR Short-Charges Refunded ($899)

CRR PTP Option Award Charges $004

Load-Allocated CRR Amount $000

Total Fund Amount $000

41

PUBLIC

Revenue Neutrality ndash July 2018

Revenue Neutrality $ in Millions

Real-Time Energy Imbalance $11276

Real-Time Point to Point Obligation ($10113)

Real-Time Congestion from Self-Schedules $013

DC Tie amp Block Load Transfer ($2063)

Allocation to Load $886

In July 2018 the Revenue Neutrality charge to load was $886M compared to bull A charge of $3046M in June 2018bull A charge of $145M in July 2017

42

PUBLIC

Net Allocation to Load ndash July 2018

Market-Based Allocation $ in Millions

Reliability Unit Commitment $000

Ancillary and Other Services $10200

Real-Time Ancillary Service Imbalance $223

Emergency Energy $016

Base Point Deviation ($026)

CRR Auction Revenue ($5799)

CRR Balancing Account $000

Real-Time Revenue Neutrality $886

Reliability Must Run $000

Monthly Block Load Transfer $000

Total $5500

Fee AllocationERCOT Administrative Fee $2207

Net Allocated to Load $7707

In July 2018 the Net Allocation to load was a charge of $7707M compared to bull A charge of $2152M in June 2018bull A credit of $1363M in July 2017

43

PUBLIC

Advanced Meter Settlement Impacts ndash July 2018

July 2018 At month end settling 72M ESIIDs using Advanced Meter data

July 2018 990 of the load in ERCOT is settled with 15-min interval data (AMS Competitive IDR and NOIE IDR)

44

PUBLIC

ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndashJuly 2018

45

PUBLIC

Retail Transaction Volumes ndash Summary ndash July 2018

46

Transaction Type July 2018 July 2017 July 2018 July 2017

Switches 669909 617300 121926 84059

Acquisition 0 0 0 0

Move - Ins 1667037 1568153 270122 252360

Move - Outs 814580 802779 129820 127073

Continuous Service Agreements (CSA) 395944 283259 40217 55770

Mass Transitions 9033 0 0 0

Total 3556503 3271491 562085 519262

Year-To-Date Transactions Received

Board Presentation Input

Trans Volumes by Month_New

PUBLIC

Retail Transaction Volumes ndash Summary ndash July 2018

SwitchesAcquisitions Move-Ins

Move-Outs Mass Transition

47

Projects Report

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018

20000000$ 2018 Portfolio

Spending Estimate

Projects In FlightOn Hold (Count = 100) 24905011$

Projects Not Yet Started (Count = 10) 1320628$

Projects Completed (Count = 43) 795250$

(7020889)$

TOTAL 20000000$

Project Number Projects in Initiation Phase (Count = 4)

TBD IT Asset RecoveryNPRR842 Study Area Load Information

209-03 Study Network (STNET) Integration288-01 EDI Map and Translator Replacement

Impact Metric TolerancesUnfavorable variances are represented as negative numbers within the report - Green = No more than 49 unfavorable variance - Yellow = Unfavorable variance between 49 and 99 - Red = Unfavorable variance more than 99

Spending Reductions Required to Maintain Capital Budget

2018 Project Funding

Footnotes1 - One or more phases took longer than expected resulting in additional time required

2 - One or more phases required more labor than expected resulting in additional funding andor time required

3 - Project placed on holdNA - Metric not calculated because - it is reported at the parent project level or - it is an administrative project

Project Number Projects in Planning Phase (Count = 8) Phase Start Baseline

Phase FinishApproved

Phase FinishScheduled

Go-Live DateScheduled

Phase Finish

134-02 Privileged Account Management (PAM) Phase 2 882018 12192018 12192018 TBD 12192018 0 10

183-01 CMM-FT GUI Integration 12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs

242-01 Portfolio Reporting Assessment 1182017 12192018 12192018 TBD 12192018 0 21260-01 Information Governance Assessment 10182017 5302018 9192018 TBD 9192018 0 5286-01 Java Platform Assessment 6202018 11212018 11212018 TBD 11212018 0 6287-01 Security Constrained Unit Commitment (SCUC) 882018 2272019 2272019 TBD 2272019 0 -1

NPRR484Revisions to Congestion Revenue Rights Credit Calculations and Payments - Phase 1b 2

12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs

NPRR702Flexible Accounts Payment of Invoices and Disposition of Interest on Cash Collateral

12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs

Schedule Health Budget Health

49

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018Project Number Projects in Execution Phase (Count = 42) Phase Start Baseline Go-

Live DateApproved Go-

Live DateScheduled

Go-Live DateScheduled

Phase Finish

170-01 Enterprise Content Alignment Program 8262015 11152017 8312018 8312018 8312018 0 0170-06 ECAP - ECMS Implementation Phase 1 4252018 11302018 11302018 11302018 11302018 0 3173-02 ERCOT Flight Certification Website 11152017 2282019 2282019 2282019 5312019 0 2181-01 CRR Framework Upgrade 10262016 1022017 11192018 11192018 2272019 0 2

183-01 CMM Tech Refresh 3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

193-01 PMU Tool Evaluation and Implementation 12132017 892018 2152019 2152019 3202019 0 0196-01 GINR Project Status Application Replacement 12212016 9142017 2282019 2282019 3312019 0 1198-02 Reactive Power Coordination PoC 962017 6162018 8152018 8152018 8152018 0 54209-02 Weather Imaging and Line Observation (WILO) 5302018 212019 212019 212019 2272019 0 2210-01 REC Technology Refresh 8302017 3182018 12132018 12132018 1162019 0 3228-01 Enterprise Database Upgrade 882018 1292020 1292020 1292020 1292020 0 17229-01 IT Change and Configuration Management Phase 2 822017 6192018 12132018 12132018 3252019 0 2 -9238-01 Application Authentication Tech Refresh 962017 3192018 12132018 12132018 1302019 0 3239-01 Identity and Access Management 592018 3132019 3132019 3132019 3132019 0 2241-01 AREA - Generation 10112017 3302018 892018 892018 952018 0 -4244-01 Corporate Wireless 11292017 3282018 1252018 1252018 192019 0 9245-01 2017 EPS Metering Enhancements 6272018 892019 892019 892019 9252019 0 1246-01 iTest Data Refresh 12132017 1192018 11152018 11152018 122019 0 25249-01 Secondary Wind Forecasting Service 8302017 2282018 892018 892018 952018 0 0253-01 CIP Recovery Plan Project - Planning Phase 1 1312018 8292018 8292018 8292018 8292018 0 -2

257-01Security Constrained Optimal Powerflow in Study Network Analysis

1262017 10252018 10252018 10252018 1282018 0 19

261-01 Generic Transmission Constraint Calculation 372018 12132018 12132018 12132018 1232019 0 0263-01 Market Simulator 4112018 12132018 12132018 12132018 1302019 0 7265-01 Real-Time Assessment Continuity 1312018 12132018 12132018 12132018 1302019 0 0279-01 Cyber Security Project 24 6272018 10262018 10262018 10262018 11282018 0 0280-01 Quest Software Portfolio Transition 442018 6272018 9262018 9262018 9262018 0 13282-01 Synchronous Condenser Outage Modeling 662018 10252018 10252018 10252018 1252018 0 1Various 2015 CMM NPRRs 2 -18

NPRR519Exemption of ERS-Only QSEs from Collateral and Capitalization Requirements

3152017 5192018 12112018 12112018 12312018 0 See 2015 CMM NPRRs

NPRR620Collateral Requirements for Counter-Parties with No Load or Generation

3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

NPRR660 Remove CRR State Change Adder 3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

Budget HealthSchedule Health

50

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018Project Number Projects in Execution Phase (Count = 42) Phase Start Baseline Go-

Live DateApproved Go-

Live DateScheduled

Go-Live DateScheduled

Phase Finish

NPRR741 Clarifications to TPE and EAL Credit Exposure Calculations 3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

NPRR749 Option Cost for Outstanding CRRs 882018 12132018 12132018 12132018 TBD 0 NA See 2015 CMM NPRRs

NPRR755 Data Agent-Only QSE Registration 3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

NPRR819Modification of Non-Price Error Resettlement Thresholds and Resettlement Clean-Ups

592018 892018 892018 892018 952018 0 36

NPRR833 Modify PTP Obligation Bid Clearing Change 882018 12132018 12132018 12132018 TBD 0 1

NPRR843Short-Term System Adequacy and AS Offer Disclosure Reports Additions

7182018 10252018 10252018 10252018 11282018 0 0

NPRR864 RUC Modifications to Consider Market-Based Solutions 6202018 10252018 10252018 10252018 11282018 0 4SCR777 Bilateral CRR Interface Enhancement 10262016 1022017 11192018 11192018 2272019 0 NA See 181-01

SCR781 RARF Replacement 12202017 4252018 12192018 12192018 12192018 0 3SCR791 Correction of 60-day SCED GRD Disclosure Report 522018 892018 892018 892018 952018 0 39SCR795 Addition of Intra-Hour Wind Forecast to GTBD Calculation 882018 10252018 10252018 10252018 11142018 0 0

Project Number Expedited Projects in Execution (Count = 34)

Project Number Projects in Stabilization (Count = 10) Execution

Phase StartBaseline Go-Live Target

Approved Go-Live Target

ActualGo-Live Date

Scheduled Execution Phase

Finish

NPRR648 Remove References to Flowgate Rights 3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR683 Revision to Available Credit Limit Calculation 3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR743 Revision to MCE to Have a Floor For Load Exposure 3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR760 Calculation of Exposure Variables For Days With No Activity 3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR776 Voltage Set Point Communication 9202017 3192018 452018 452018 952018 0 1

NPRR800Revisions to Credit Exposure Calculations to Use Electricity Futures Market Prices

3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR815Revise the Limitation of Load Resources Providing Responsive Reserve (RRS) Service

3212018 5312018 5312018 5312018 8292018 0 2

209-01 Multi Station Breaker to Breaker One Lines 282017 392018 532018 532018 8222018 0 -1259-01 DC SCADA and Metering Upgrade 10252017 1172018 7252018 7252018 8292018 0 22266-01 Remote Email Access Enhancement 12132017 372018 662018 6192018 9262018 2 -7 2 -9

Schedule Health Budget Health

Budget HealthSchedule Health

51

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018

Project Number Projects On Hold (Count = 2) Forecast

Start DateBaseline

Phase FinishApproved Go-

Live TargetScheduled

Go-Live DateScheduled

Phase Finish

SCR789 Update NMMS Topology Processor to PSSE 34 Capability 0

269-01Document Repository Redesign and Governance Implementation - Phase 1

0

Project Number Projects Completed (Count = 20)

Baseline Execution

Phase Start

Baseline Go-Live Target

Approved Go-Live Target

Actual Go-Live Date

Actual Execution Phase Finish

185-01 Records Management and eDiscovery 12152016 5242017 8292017 8222017 12132017 2 0224-01 TelAlert Replacement 452017 6272017 842017 842017 592018 0 5230-01 SAS Technical Architecture Redesign 312017 12132017 12132017 12132017 6272018 0 2234-01 Reporting Solution Resiliency (RSR) 452017 8232017 11272017 11272017 1102018 0 8240-01 EDI Translator and Mapping Replacement Assessment 4192017 9272017 2282018 TBD 372018 -2 20254-01 Retail Windows Upgrade 10112017 12182017 12182017 1222018 272018 1 -51 65255-01 Settlements Architecture Enhancements 10252017 1112018 1112018 1192018 2142018 1 -10 53258-01 WD Kainos SMART Automation Testing Tool 4112018 642018 642018 662018 7182018 -3 33271-01 Issue Tracking and Resolution Tool Assessment 12132017 4252018 4252018 TBD 522018 1 -5 -1272-01 Operator Training Simulator Black Start GE Effort 1262017 4252018 4252018 4272018 5162018 -1 19274-01 Average Mid-Term Load Forecast 372018 5312018 5312018 5312018 6272018 0 50

NPRR768Revisions to Real-Time On-Line Reliability Deployment Price Adder Categories

372018 5312018 5312018 5312018 6272018 0 16

NPRR778 Modifications to Date Change and Cancellation Evaluation Window 7192017 10292017 12112017 12112017 1312018 0 23

NPRR782Settlement of Infeasible Ancillary Services Due to Transmission Constraints

5242017 8312017 1122017 1122017 1102018 0 20

NPRR808 Three Year CRR Auction 8232017 9182017 9182017 912017 1312018 65 68

NPRR810Applicability of RMR Incentive Factor on Reservation and Transportation Costs Associated with Firm Fuel Supplies

7172017 11122017 3312018 3312018 3312018 0 NA See 233-00

NPRR830 Revision of 4-Coincident Peak Methodology 12132017 262018 262018 262018 372018 0 85

NPRR831 Inclusion of Private Use Networks in Load Zone Price Calculations 822017 1122017 1122017 1122017 2212018 0 33

OBDRR002 ORDC OBD Revisions for PUCT Project 47199 372018 5312018 5312018 5312018 6272018 0 See NPRR768

SCR792 Enhance Communications of BAAL Exceedances 2142018 452018 452018 452018 4252018 0 69

Project Number Expedited Projects Completed (Count = 23)

Budget HealthSchedule Health

Budget HealthSchedule Health

52

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018

Project Number 2018 Projects Not Yet Started (Count = 10) Forecast

Start Date

NPRR858 Provide Complete Current Operating Plan (COP) Data Aug-2018TBD 2018 OS Enhancements Aug-2018TBD Additional Branch Limit for Relays Aug-2018

NPRR817 Create a Panhandle Hub Sep-2018NPRR821 Elimination of the CRR Deration Process Oct-2018NPRR865 Publish RTM Shift Factors for Hubs Load Zones and DC Ties Oct-2018

SCR793SSR Related Telemetry for Transmission Service Provider (TSP) Operators

Oct-2018

ECAP ECAP - ECMS Implementation Phase 2 Oct-2018TBD Job Scheduler Update in CSI Framework Oct-2018TBD Parameter Estimation Oct-2018

53

  • Slide Number 1
  • Slide Number 2
  • Summary ndash July 2018
  • Daily Peak Demand Hourly Average Actual vs Forecast Wind Day-Ahead COPs amp On-Line Capacity at Peak ndash July 2018
  • Actual Wind Output plus Curtailments vs Wind Day-Ahead COPs for All Hours ndash July 2018
  • ERCOTrsquos CPS1 Monthly Performance ndash July 2018
  • Monthly Peak Actual Demand ndash July 2018
  • Monthly Minimum Actual 15-Minute Demand ndash July 2018
  • Day-Ahead Load Forecast Performance ndash July 2018
  • Reliability Unit Commitment (RUC) Capacity by Weather Zone ndash July 2018
  • Generic Transmission Constraints (GTCs) ndash July 2018
  • Advisories and Watches ndash July 2018 Corrected
  • Lake Levels Update ndash August 1 2018
  • Planning Summary ndash July 2018
  • Mapping of Counties to ERCOT Zones ndash July 2018
  • Cumulative MW Capacity of Interconnection Requests by Zone ndashJuly 2018
  • Cumulative MW Capacity of Interconnection Requests by Zone ndashJuly 2018
  • Cumulative MW Capacity of Interconnection Requests by Zone ndashJuly 2018
  • Wind Generation ndash July 2018
  • Solar Generation ndash July 2018
  • Generation Interconnection Activity by Fuel ndash July 2018
  • Generation Interconnection Activity by Project Phase ndash July 2018
  • Slide Number 23
  • Day-Ahead Schedule (Hourly Average) ndash July 2018
  • Percentage of Real-Time Load Hedged in the DAM (Counter-Party Level) ndash July 2018
  • DAM and RTM Price Convergence ndash July 2018
  • Day-Ahead Electricity and Ancillary Service Prices (Hourly Average) ndash July 2018
  • Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash July 2018
  • Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash July 2018
  • DRUC Monthly Summary (Hourly Average) ndash July 2018
  • HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash July 2018
  • NonndashSpinning Reserve Service Deployment ndash July 2018
  • CRR Price Convergence ndash July 2018
  • Daily Average System Lambda and ORDC Price Adders ndash July 2018
  • ERS Procurement for June 2018 ndash September 2018
  • Reliability Services ndash July 2018
  • Ancillary and Other Services ndash July 2018
  • Real-Time Ancillary Service Imbalance (ORDC) ndash July 2018
  • Energy Settlement ndash July 2018
  • Congestion Revenue Rights (CRR) ndash July 2018
  • CRR Balancing Account Fund ndash July 2018
  • Revenue Neutrality ndash July 2018
  • Net Allocation to Load ndash July 2018
  • Advanced Meter Settlement Impacts ndash July 2018
  • ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndash July 2018
  • Retail Transaction Volumes ndash Summary ndash July 2018
  • Retail Transaction Volumes ndash Summary ndash July 2018
  • Slide Number 48
  • ERCOT Portfolio Stoplight Report ndash July 2018
  • ERCOT Portfolio Stoplight Report ndash July 2018
  • ERCOT Portfolio Stoplight Report ndash July 2018
  • ERCOT Portfolio Stoplight Report ndash July 2018
  • ERCOT Portfolio Stoplight Report ndash July 2018
Retail Transactions Summary
July 2018 June 2018 May 2018 April 2018 March 2018 February 2018 January 2018 December 2017 November 2017 October 2017 September 2017 August 2017 July 2017 June 2017 May 2017 April 2017 March 2017 February 2017 January 2017 December 2016 November 2016 October 2016 September 2016 August 2016 July 2016 June 2016 May 2016 April 2016 March 2016 February 2016 January 2016 December 2015 November 2015 October 2015 September 2015 August 2015 July 2015 June 2015 May 2015 April 2015 March 2015 February 2015 January 2015 December 2014 November 2014 October 2014 September 2014 August 2014 July 2014 June 2014 May 2014 April 2014 March 2014 February 2014 January 2014 December 2013 November 2013 October 2013 September 2013 August 2013 July 2013 June 2013 May 2013 April 2013 March 2013 February 2013 January 2013 Grand total
814_01 - Switch Received 121926 109653 96828 81291 95159 76119 88933 60560 77860 78096 79502 84134 84059 108784 130828 71769 67845 66875 87140 66556 56202 64452 67323 86656 82923 86376 75323 70300 76235 68057 63954 61486 52887 65276 70342 81674 91211 102661 86229 81255 79997 73394 72885 71072 67080 110465 175164 89677 99568 101490 111077 91983 93887 71130 86953 69691 55957 166882 82415 93194 102562 103756 116086 78919 68950 64329 67116 1321827
Difference from previous month 12273 12825 15537 (13868) 19040 (12814) 28373 (17300) (236) (1406) (4632) 75 (24725) (22044) 59059 3924 970 (20265) 20584 10354 (8250) (2871) (19333) 3733 (3453) 11053 5023 (5935) 8178 4103 2468 8599 (12389) (5066) (11332) (9537) (11450) 16432 4974 1258 6603 509 1813 3992 (43385) (64699) 85487 (9891) (1922) (9587) 19094 (1904) 22757 (15823) 17262 13734 (110925) 84467 (10779) (9368) (1194) (12330) 37167 9969 4621 (2787)
814_16 - Move - Ins Received 270122 257125 244431 225380 224289 215281 230409 238340 207921 236397 244511 258046 252360 257759 237611 197865 217962 201984 202612 196236 201714 220958 231999 268781 241844 247481 214383 199804 218245 212474 193716 189862 181098 215908 229405 248124 263233 247089 208166 207932 215950 197765 198025 193973 178624 226283 231418 243482 251957 233679 223201 258649 214724 208160 207059 172981 178671 233469 216550 255967 249114 220397 216982 204412 197200 191955 194507 3162148
Difference from previous month 12997 12694 19051 1091 9008 (15128) (7931) 30419 (28476) (8114) (13535) 5686 (5399) 20148 39746 (20097) 15978 (628) 6376 (5478) (19244) (11041) (36782) 26937 (5637) 33098 14579 (18441) 5771 18758 3854 8764 (34810) (13497) (18719) (15109) 16144 38923 234 (8018) 18185 (260) 4052 15349 (47659) (5135) (12064) (8475) 18278 10478 (35448) 43925 6564 1101 34078 (5690) (54798) 16919 (39417) 6853 28717 3415 12570 7212 5245 (2552)
814_24 - MVO and MVO to CSA Received 129820 125861 124403 113795 108753 100127 111821 144987 100830 116519 129103 128104 127073 133582 127218 102055 111459 100285 101107 96289 100578 109493 114094 133170 122932 129025 118022 103789 109278 103747 96628 99552 96214 109578 117949 123894 133905 133855 114675 108275 108859 94864 98233 97901 89578 111857 115918 121662 131607 126785 119107 107956 107266 99428 104273 93385 93977 115469 115524 129594 135196 121446 120049 111598 106467 102429 104399 1660500
814_10 - DTP Mass Acquisition Received - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0
814_10 - DTP Mass Transition Received - 0 - 0 9033 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 639 - 0 - 0 4975 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0
814_18 - CSA AdditionDeletes Received 40217 62083 99016 55581 46720 42587 49740 47725 31726 52888 41597 40616 55770 43745 52139 26702 21791 39082 44030 38884 39856 31786 33061 42622 48489 64178 50499 59475 59400 48536 42179 40351 34796 34420 54677 35078 49489 59611 39384 44247 44577 35386 40420 54831 43550 45039 44268 40405 57954 64408 65032 80184 70310 41156 34811 46680 50347 71847 48606 52585 50867 62747 59763 34925 40977 40389 41227 747237
Total 562085 554722 573711 476047 474921 434114 480903 491612 418337 483900 494713 510900 519262 543870 547796 398391 419057 408226 434889 397965 398350 426689 446477 531229 496188 527060 458227 433368 463158 432814 396477 391251 364995 425182 472373 488770 537838 543216 448454 441709 449383 401409 409563 417777 378832 493644 566768 495865 541086 526362 523392 538772 486187 419874 433096 382737 378952 587667 463095 531340 537739 508346 512880 429854 413594 399102 407249 6891712
Counts from Monthly Retail Transaction report
To do
Break Out 814_10s - AQ and MT
Break Out 814_18 Additions from Deletes
Year-To-Date Transactions Received
Transaction Type July 2018 July 2017 July 2018 July 2017
Switches 669909 617300 121926 84059
Acquisition 0 0 0 0
Move - Ins 1667037 1568153 270122 252360
Move - Outs 814580 802779 129820 127073
Continuous Service Agreements (CSA) 395944 283259 40217 55770
Mass Transitions 9033 0 0 0
Total 3556503 3271491 562085 519262
There has been a change since this was created
Mass Acquisition has been broken out of Mass Transition
Page 34: ERCOT Monthly Operational Overvie · ERCOT Monthly Operational Overview (July 2018) Revised 08.22.18. ERCOT Public. August 15, 2018

PUBLIC

Daily Average System Lambda and ORDC Price Adders ndash July 2018

0

50

100

150

200

250

$M

Wh

Day of Month

RTOFFPA

RTORPA

SYSTEM_LAMBDA

34

PUBLIC

ERS Procurement for June 2018 ndash September 2018

TP1 TP2 TP3 TP4 TP5 TP6

Non Weather-Sensitive ERS-10 MW 160562 165996 143324 140708 156699 151138

Non Weather-Sensitive ERS-30 MW 736864 781559 702529 625067 755153 657394

Weather-Sensitive ERS-10 MW 0 0 0 0 0 0

Weather-Sensitive ERS-30 MW 0 0 11850 11850 0 0

Total MW Procured 897426 947555 857703 777625 911852 808532

Clearing Price $201 $185 $2108 $2177 $199 $225

Time Period Time Period Hours

Time Period 1 Hours Ending 0600 - 0800 (50000 am to 80000 am) Monday through Friday except ERCOT Holidays

Time Period 2 Hours Ending 0900 - 1300 (80000 am to 10000 pm) Monday through Friday except ERCOT Holidays

Time Period 3 Hours Ending 1400 - 1600 (10000 pm to 40000 pm) Monday through Friday except ERCOT Holidays

Time Period 4 Hours Ending 1700 - 1900 (40000 pm to 70000 pm) Monday through Friday except ERCOT Holidays

Time Period 5 Hours Ending 2000 - 2200 (70000 pm to 100000 pm) Monday through Friday except ERCOT Holidays Time Period 6 All other hours

35

PUBLIC

Reliability Services ndash July 2018

Reliability Unit Commitment (RUC) $ in Millions

RUC Make-Whole Payments $000

RUC Clawback Charges $000

RUC Commitment Settlement $000

RUC Capacity Short Charges $000

RUC Make-Whole Uplift $000

RUC Commitment Cost Allocation $000

RUC Decommitment Payments $000

Total RUC Allocation to Load $000

In July 2018 there was a credit of $000M allocated to load for RUC compared to bull A credit of $000M in June 2018bull A credit of $003M in July 2017

36

PUBLIC

Ancillary and Other Services ndash July 2018

Ancillary and Other Services $ in Millions

Regulation Up Service $1105

Regulation Down Service $072

Responsive Reserve Service $7177

Non-Spinning Reserve Service $1787

Black Start Service $059

Voltage Services - Reactive Power $000

Voltage Services - Lost Opportunity $000

Total Charges Allocated to Load $10200

In July 2018 Ancillary and Other Services was a charge of $10200M compared to bull A charge of $2001M in June 2018bull A charge of $2322M in July 2017

37

PUBLIC

Real-Time Ancillary Service Imbalance (ORDC) ndash July 2018

In July 2018 Real-Time Ancillary Service Imbalance was a charge to load of $2228K compared to bull A charge of $147K in June 2018bull A charge of $534K in July 2017

Real-Time Ancillary Service Imbalance $ in Thousands

Real-Time AS Imbalance ($2228)

Real-Time Reliability Deployment AS Imbalance $000

Total RTASI Amount Allocated to Load $2228

38

PUBLIC

Energy Settlement ndash July 2018

39

Day-Ahead Market Energy Settlement $ in Millions

Energy Purchases $215396

Point to Point Obligation Purchases $11726

Energy Sales ($212592)

Day-Ahead Congestion Rent $14531

Day-Ahead Market Make-Whole Payments ($001)

Real-Time Market Energy Settlement $ in Millions

Energy Imbalance at a Resource Node ($91963)

Energy Imbalance at a Load Zone $160737

Energy Imbalance at a Hub ($57497)

Net Real-Time Energy Imbalance $11276

Real Time Congestion from Self Schedules $013

Block Load Transfers and DC Ties ($2063)

Total Impact to Revenue Neutrality $9227

Load-Allocated Emergency Energy Payments ($016)

Load-Allocated Base Point Deviation Charges $026

Day-Ahead Market energy settlement activity increased from last month and increased from July 2017

Real-Time Market energy settlement activity increased from last month and increased from July 2017

PUBLIC

Congestion Revenue Rights (CRR) ndash July 2018

$ in Millions

Long-Term Auction ($4026)

Monthly Auction ($1773)

Total Auction Revenue ($5799)

Day-Ahead CRR Settlements ($15797)

Day-Ahead CRR Short-Charges $1885

Day-Ahead CRR Short-Charges Refunded ($899)

Day-Ahead CRR Short-Charges Net $986

Total CRR Funding ($14810)

Day-Ahead Point-to-Point Obligations $11726

Real-Time Point-to-Point Obligations ($10113)

Net Point-to-Point Obligations $1614

Congestion Revenue Rights settlement payments were not fully funded Partial funding to settle the CRR Short Charges was provided from the CRR Balancing Account Fund and the remaining $986M of CRR Short Charges were not refunded The CRR Fund Balance is now $0

Point to Point Obligations settled with a net charge of $1614M compared to a net credit of $1758M last month

40

PUBLIC

CRR Balancing Account Fund ndash July 2018

CRR Balancing Account $ in Millions

Monthly Day-Ahead Congestion Rent $14531

Monthly Day-Ahead CRR Settlements ($15797)

Monthly Day-Ahead CRR Short -Charges $1885

CRR Balancing Account Credit Total $619

Beginning Fund Balance for the Month $275

CRR Balancing Account Credit Total $619

Day-Ahead CRR Short-Charges Refunded ($899)

CRR PTP Option Award Charges $004

Load-Allocated CRR Amount $000

Total Fund Amount $000

41

PUBLIC

Revenue Neutrality ndash July 2018

Revenue Neutrality $ in Millions

Real-Time Energy Imbalance $11276

Real-Time Point to Point Obligation ($10113)

Real-Time Congestion from Self-Schedules $013

DC Tie amp Block Load Transfer ($2063)

Allocation to Load $886

In July 2018 the Revenue Neutrality charge to load was $886M compared to bull A charge of $3046M in June 2018bull A charge of $145M in July 2017

42

PUBLIC

Net Allocation to Load ndash July 2018

Market-Based Allocation $ in Millions

Reliability Unit Commitment $000

Ancillary and Other Services $10200

Real-Time Ancillary Service Imbalance $223

Emergency Energy $016

Base Point Deviation ($026)

CRR Auction Revenue ($5799)

CRR Balancing Account $000

Real-Time Revenue Neutrality $886

Reliability Must Run $000

Monthly Block Load Transfer $000

Total $5500

Fee AllocationERCOT Administrative Fee $2207

Net Allocated to Load $7707

In July 2018 the Net Allocation to load was a charge of $7707M compared to bull A charge of $2152M in June 2018bull A credit of $1363M in July 2017

43

PUBLIC

Advanced Meter Settlement Impacts ndash July 2018

July 2018 At month end settling 72M ESIIDs using Advanced Meter data

July 2018 990 of the load in ERCOT is settled with 15-min interval data (AMS Competitive IDR and NOIE IDR)

44

PUBLIC

ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndashJuly 2018

45

PUBLIC

Retail Transaction Volumes ndash Summary ndash July 2018

46

Transaction Type July 2018 July 2017 July 2018 July 2017

Switches 669909 617300 121926 84059

Acquisition 0 0 0 0

Move - Ins 1667037 1568153 270122 252360

Move - Outs 814580 802779 129820 127073

Continuous Service Agreements (CSA) 395944 283259 40217 55770

Mass Transitions 9033 0 0 0

Total 3556503 3271491 562085 519262

Year-To-Date Transactions Received

Board Presentation Input

Trans Volumes by Month_New

PUBLIC

Retail Transaction Volumes ndash Summary ndash July 2018

SwitchesAcquisitions Move-Ins

Move-Outs Mass Transition

47

Projects Report

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018

20000000$ 2018 Portfolio

Spending Estimate

Projects In FlightOn Hold (Count = 100) 24905011$

Projects Not Yet Started (Count = 10) 1320628$

Projects Completed (Count = 43) 795250$

(7020889)$

TOTAL 20000000$

Project Number Projects in Initiation Phase (Count = 4)

TBD IT Asset RecoveryNPRR842 Study Area Load Information

209-03 Study Network (STNET) Integration288-01 EDI Map and Translator Replacement

Impact Metric TolerancesUnfavorable variances are represented as negative numbers within the report - Green = No more than 49 unfavorable variance - Yellow = Unfavorable variance between 49 and 99 - Red = Unfavorable variance more than 99

Spending Reductions Required to Maintain Capital Budget

2018 Project Funding

Footnotes1 - One or more phases took longer than expected resulting in additional time required

2 - One or more phases required more labor than expected resulting in additional funding andor time required

3 - Project placed on holdNA - Metric not calculated because - it is reported at the parent project level or - it is an administrative project

Project Number Projects in Planning Phase (Count = 8) Phase Start Baseline

Phase FinishApproved

Phase FinishScheduled

Go-Live DateScheduled

Phase Finish

134-02 Privileged Account Management (PAM) Phase 2 882018 12192018 12192018 TBD 12192018 0 10

183-01 CMM-FT GUI Integration 12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs

242-01 Portfolio Reporting Assessment 1182017 12192018 12192018 TBD 12192018 0 21260-01 Information Governance Assessment 10182017 5302018 9192018 TBD 9192018 0 5286-01 Java Platform Assessment 6202018 11212018 11212018 TBD 11212018 0 6287-01 Security Constrained Unit Commitment (SCUC) 882018 2272019 2272019 TBD 2272019 0 -1

NPRR484Revisions to Congestion Revenue Rights Credit Calculations and Payments - Phase 1b 2

12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs

NPRR702Flexible Accounts Payment of Invoices and Disposition of Interest on Cash Collateral

12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs

Schedule Health Budget Health

49

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018Project Number Projects in Execution Phase (Count = 42) Phase Start Baseline Go-

Live DateApproved Go-

Live DateScheduled

Go-Live DateScheduled

Phase Finish

170-01 Enterprise Content Alignment Program 8262015 11152017 8312018 8312018 8312018 0 0170-06 ECAP - ECMS Implementation Phase 1 4252018 11302018 11302018 11302018 11302018 0 3173-02 ERCOT Flight Certification Website 11152017 2282019 2282019 2282019 5312019 0 2181-01 CRR Framework Upgrade 10262016 1022017 11192018 11192018 2272019 0 2

183-01 CMM Tech Refresh 3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

193-01 PMU Tool Evaluation and Implementation 12132017 892018 2152019 2152019 3202019 0 0196-01 GINR Project Status Application Replacement 12212016 9142017 2282019 2282019 3312019 0 1198-02 Reactive Power Coordination PoC 962017 6162018 8152018 8152018 8152018 0 54209-02 Weather Imaging and Line Observation (WILO) 5302018 212019 212019 212019 2272019 0 2210-01 REC Technology Refresh 8302017 3182018 12132018 12132018 1162019 0 3228-01 Enterprise Database Upgrade 882018 1292020 1292020 1292020 1292020 0 17229-01 IT Change and Configuration Management Phase 2 822017 6192018 12132018 12132018 3252019 0 2 -9238-01 Application Authentication Tech Refresh 962017 3192018 12132018 12132018 1302019 0 3239-01 Identity and Access Management 592018 3132019 3132019 3132019 3132019 0 2241-01 AREA - Generation 10112017 3302018 892018 892018 952018 0 -4244-01 Corporate Wireless 11292017 3282018 1252018 1252018 192019 0 9245-01 2017 EPS Metering Enhancements 6272018 892019 892019 892019 9252019 0 1246-01 iTest Data Refresh 12132017 1192018 11152018 11152018 122019 0 25249-01 Secondary Wind Forecasting Service 8302017 2282018 892018 892018 952018 0 0253-01 CIP Recovery Plan Project - Planning Phase 1 1312018 8292018 8292018 8292018 8292018 0 -2

257-01Security Constrained Optimal Powerflow in Study Network Analysis

1262017 10252018 10252018 10252018 1282018 0 19

261-01 Generic Transmission Constraint Calculation 372018 12132018 12132018 12132018 1232019 0 0263-01 Market Simulator 4112018 12132018 12132018 12132018 1302019 0 7265-01 Real-Time Assessment Continuity 1312018 12132018 12132018 12132018 1302019 0 0279-01 Cyber Security Project 24 6272018 10262018 10262018 10262018 11282018 0 0280-01 Quest Software Portfolio Transition 442018 6272018 9262018 9262018 9262018 0 13282-01 Synchronous Condenser Outage Modeling 662018 10252018 10252018 10252018 1252018 0 1Various 2015 CMM NPRRs 2 -18

NPRR519Exemption of ERS-Only QSEs from Collateral and Capitalization Requirements

3152017 5192018 12112018 12112018 12312018 0 See 2015 CMM NPRRs

NPRR620Collateral Requirements for Counter-Parties with No Load or Generation

3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

NPRR660 Remove CRR State Change Adder 3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

Budget HealthSchedule Health

50

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018Project Number Projects in Execution Phase (Count = 42) Phase Start Baseline Go-

Live DateApproved Go-

Live DateScheduled

Go-Live DateScheduled

Phase Finish

NPRR741 Clarifications to TPE and EAL Credit Exposure Calculations 3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

NPRR749 Option Cost for Outstanding CRRs 882018 12132018 12132018 12132018 TBD 0 NA See 2015 CMM NPRRs

NPRR755 Data Agent-Only QSE Registration 3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

NPRR819Modification of Non-Price Error Resettlement Thresholds and Resettlement Clean-Ups

592018 892018 892018 892018 952018 0 36

NPRR833 Modify PTP Obligation Bid Clearing Change 882018 12132018 12132018 12132018 TBD 0 1

NPRR843Short-Term System Adequacy and AS Offer Disclosure Reports Additions

7182018 10252018 10252018 10252018 11282018 0 0

NPRR864 RUC Modifications to Consider Market-Based Solutions 6202018 10252018 10252018 10252018 11282018 0 4SCR777 Bilateral CRR Interface Enhancement 10262016 1022017 11192018 11192018 2272019 0 NA See 181-01

SCR781 RARF Replacement 12202017 4252018 12192018 12192018 12192018 0 3SCR791 Correction of 60-day SCED GRD Disclosure Report 522018 892018 892018 892018 952018 0 39SCR795 Addition of Intra-Hour Wind Forecast to GTBD Calculation 882018 10252018 10252018 10252018 11142018 0 0

Project Number Expedited Projects in Execution (Count = 34)

Project Number Projects in Stabilization (Count = 10) Execution

Phase StartBaseline Go-Live Target

Approved Go-Live Target

ActualGo-Live Date

Scheduled Execution Phase

Finish

NPRR648 Remove References to Flowgate Rights 3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR683 Revision to Available Credit Limit Calculation 3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR743 Revision to MCE to Have a Floor For Load Exposure 3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR760 Calculation of Exposure Variables For Days With No Activity 3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR776 Voltage Set Point Communication 9202017 3192018 452018 452018 952018 0 1

NPRR800Revisions to Credit Exposure Calculations to Use Electricity Futures Market Prices

3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR815Revise the Limitation of Load Resources Providing Responsive Reserve (RRS) Service

3212018 5312018 5312018 5312018 8292018 0 2

209-01 Multi Station Breaker to Breaker One Lines 282017 392018 532018 532018 8222018 0 -1259-01 DC SCADA and Metering Upgrade 10252017 1172018 7252018 7252018 8292018 0 22266-01 Remote Email Access Enhancement 12132017 372018 662018 6192018 9262018 2 -7 2 -9

Schedule Health Budget Health

Budget HealthSchedule Health

51

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018

Project Number Projects On Hold (Count = 2) Forecast

Start DateBaseline

Phase FinishApproved Go-

Live TargetScheduled

Go-Live DateScheduled

Phase Finish

SCR789 Update NMMS Topology Processor to PSSE 34 Capability 0

269-01Document Repository Redesign and Governance Implementation - Phase 1

0

Project Number Projects Completed (Count = 20)

Baseline Execution

Phase Start

Baseline Go-Live Target

Approved Go-Live Target

Actual Go-Live Date

Actual Execution Phase Finish

185-01 Records Management and eDiscovery 12152016 5242017 8292017 8222017 12132017 2 0224-01 TelAlert Replacement 452017 6272017 842017 842017 592018 0 5230-01 SAS Technical Architecture Redesign 312017 12132017 12132017 12132017 6272018 0 2234-01 Reporting Solution Resiliency (RSR) 452017 8232017 11272017 11272017 1102018 0 8240-01 EDI Translator and Mapping Replacement Assessment 4192017 9272017 2282018 TBD 372018 -2 20254-01 Retail Windows Upgrade 10112017 12182017 12182017 1222018 272018 1 -51 65255-01 Settlements Architecture Enhancements 10252017 1112018 1112018 1192018 2142018 1 -10 53258-01 WD Kainos SMART Automation Testing Tool 4112018 642018 642018 662018 7182018 -3 33271-01 Issue Tracking and Resolution Tool Assessment 12132017 4252018 4252018 TBD 522018 1 -5 -1272-01 Operator Training Simulator Black Start GE Effort 1262017 4252018 4252018 4272018 5162018 -1 19274-01 Average Mid-Term Load Forecast 372018 5312018 5312018 5312018 6272018 0 50

NPRR768Revisions to Real-Time On-Line Reliability Deployment Price Adder Categories

372018 5312018 5312018 5312018 6272018 0 16

NPRR778 Modifications to Date Change and Cancellation Evaluation Window 7192017 10292017 12112017 12112017 1312018 0 23

NPRR782Settlement of Infeasible Ancillary Services Due to Transmission Constraints

5242017 8312017 1122017 1122017 1102018 0 20

NPRR808 Three Year CRR Auction 8232017 9182017 9182017 912017 1312018 65 68

NPRR810Applicability of RMR Incentive Factor on Reservation and Transportation Costs Associated with Firm Fuel Supplies

7172017 11122017 3312018 3312018 3312018 0 NA See 233-00

NPRR830 Revision of 4-Coincident Peak Methodology 12132017 262018 262018 262018 372018 0 85

NPRR831 Inclusion of Private Use Networks in Load Zone Price Calculations 822017 1122017 1122017 1122017 2212018 0 33

OBDRR002 ORDC OBD Revisions for PUCT Project 47199 372018 5312018 5312018 5312018 6272018 0 See NPRR768

SCR792 Enhance Communications of BAAL Exceedances 2142018 452018 452018 452018 4252018 0 69

Project Number Expedited Projects Completed (Count = 23)

Budget HealthSchedule Health

Budget HealthSchedule Health

52

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018

Project Number 2018 Projects Not Yet Started (Count = 10) Forecast

Start Date

NPRR858 Provide Complete Current Operating Plan (COP) Data Aug-2018TBD 2018 OS Enhancements Aug-2018TBD Additional Branch Limit for Relays Aug-2018

NPRR817 Create a Panhandle Hub Sep-2018NPRR821 Elimination of the CRR Deration Process Oct-2018NPRR865 Publish RTM Shift Factors for Hubs Load Zones and DC Ties Oct-2018

SCR793SSR Related Telemetry for Transmission Service Provider (TSP) Operators

Oct-2018

ECAP ECAP - ECMS Implementation Phase 2 Oct-2018TBD Job Scheduler Update in CSI Framework Oct-2018TBD Parameter Estimation Oct-2018

53

  • Slide Number 1
  • Slide Number 2
  • Summary ndash July 2018
  • Daily Peak Demand Hourly Average Actual vs Forecast Wind Day-Ahead COPs amp On-Line Capacity at Peak ndash July 2018
  • Actual Wind Output plus Curtailments vs Wind Day-Ahead COPs for All Hours ndash July 2018
  • ERCOTrsquos CPS1 Monthly Performance ndash July 2018
  • Monthly Peak Actual Demand ndash July 2018
  • Monthly Minimum Actual 15-Minute Demand ndash July 2018
  • Day-Ahead Load Forecast Performance ndash July 2018
  • Reliability Unit Commitment (RUC) Capacity by Weather Zone ndash July 2018
  • Generic Transmission Constraints (GTCs) ndash July 2018
  • Advisories and Watches ndash July 2018 Corrected
  • Lake Levels Update ndash August 1 2018
  • Planning Summary ndash July 2018
  • Mapping of Counties to ERCOT Zones ndash July 2018
  • Cumulative MW Capacity of Interconnection Requests by Zone ndashJuly 2018
  • Cumulative MW Capacity of Interconnection Requests by Zone ndashJuly 2018
  • Cumulative MW Capacity of Interconnection Requests by Zone ndashJuly 2018
  • Wind Generation ndash July 2018
  • Solar Generation ndash July 2018
  • Generation Interconnection Activity by Fuel ndash July 2018
  • Generation Interconnection Activity by Project Phase ndash July 2018
  • Slide Number 23
  • Day-Ahead Schedule (Hourly Average) ndash July 2018
  • Percentage of Real-Time Load Hedged in the DAM (Counter-Party Level) ndash July 2018
  • DAM and RTM Price Convergence ndash July 2018
  • Day-Ahead Electricity and Ancillary Service Prices (Hourly Average) ndash July 2018
  • Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash July 2018
  • Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash July 2018
  • DRUC Monthly Summary (Hourly Average) ndash July 2018
  • HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash July 2018
  • NonndashSpinning Reserve Service Deployment ndash July 2018
  • CRR Price Convergence ndash July 2018
  • Daily Average System Lambda and ORDC Price Adders ndash July 2018
  • ERS Procurement for June 2018 ndash September 2018
  • Reliability Services ndash July 2018
  • Ancillary and Other Services ndash July 2018
  • Real-Time Ancillary Service Imbalance (ORDC) ndash July 2018
  • Energy Settlement ndash July 2018
  • Congestion Revenue Rights (CRR) ndash July 2018
  • CRR Balancing Account Fund ndash July 2018
  • Revenue Neutrality ndash July 2018
  • Net Allocation to Load ndash July 2018
  • Advanced Meter Settlement Impacts ndash July 2018
  • ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndash July 2018
  • Retail Transaction Volumes ndash Summary ndash July 2018
  • Retail Transaction Volumes ndash Summary ndash July 2018
  • Slide Number 48
  • ERCOT Portfolio Stoplight Report ndash July 2018
  • ERCOT Portfolio Stoplight Report ndash July 2018
  • ERCOT Portfolio Stoplight Report ndash July 2018
  • ERCOT Portfolio Stoplight Report ndash July 2018
  • ERCOT Portfolio Stoplight Report ndash July 2018
Retail Transactions Summary
July 2018 June 2018 May 2018 April 2018 March 2018 February 2018 January 2018 December 2017 November 2017 October 2017 September 2017 August 2017 July 2017 June 2017 May 2017 April 2017 March 2017 February 2017 January 2017 December 2016 November 2016 October 2016 September 2016 August 2016 July 2016 June 2016 May 2016 April 2016 March 2016 February 2016 January 2016 December 2015 November 2015 October 2015 September 2015 August 2015 July 2015 June 2015 May 2015 April 2015 March 2015 February 2015 January 2015 December 2014 November 2014 October 2014 September 2014 August 2014 July 2014 June 2014 May 2014 April 2014 March 2014 February 2014 January 2014 December 2013 November 2013 October 2013 September 2013 August 2013 July 2013 June 2013 May 2013 April 2013 March 2013 February 2013 January 2013 Grand total
814_01 - Switch Received 121926 109653 96828 81291 95159 76119 88933 60560 77860 78096 79502 84134 84059 108784 130828 71769 67845 66875 87140 66556 56202 64452 67323 86656 82923 86376 75323 70300 76235 68057 63954 61486 52887 65276 70342 81674 91211 102661 86229 81255 79997 73394 72885 71072 67080 110465 175164 89677 99568 101490 111077 91983 93887 71130 86953 69691 55957 166882 82415 93194 102562 103756 116086 78919 68950 64329 67116 1321827
Difference from previous month 12273 12825 15537 (13868) 19040 (12814) 28373 (17300) (236) (1406) (4632) 75 (24725) (22044) 59059 3924 970 (20265) 20584 10354 (8250) (2871) (19333) 3733 (3453) 11053 5023 (5935) 8178 4103 2468 8599 (12389) (5066) (11332) (9537) (11450) 16432 4974 1258 6603 509 1813 3992 (43385) (64699) 85487 (9891) (1922) (9587) 19094 (1904) 22757 (15823) 17262 13734 (110925) 84467 (10779) (9368) (1194) (12330) 37167 9969 4621 (2787)
814_16 - Move - Ins Received 270122 257125 244431 225380 224289 215281 230409 238340 207921 236397 244511 258046 252360 257759 237611 197865 217962 201984 202612 196236 201714 220958 231999 268781 241844 247481 214383 199804 218245 212474 193716 189862 181098 215908 229405 248124 263233 247089 208166 207932 215950 197765 198025 193973 178624 226283 231418 243482 251957 233679 223201 258649 214724 208160 207059 172981 178671 233469 216550 255967 249114 220397 216982 204412 197200 191955 194507 3162148
Difference from previous month 12997 12694 19051 1091 9008 (15128) (7931) 30419 (28476) (8114) (13535) 5686 (5399) 20148 39746 (20097) 15978 (628) 6376 (5478) (19244) (11041) (36782) 26937 (5637) 33098 14579 (18441) 5771 18758 3854 8764 (34810) (13497) (18719) (15109) 16144 38923 234 (8018) 18185 (260) 4052 15349 (47659) (5135) (12064) (8475) 18278 10478 (35448) 43925 6564 1101 34078 (5690) (54798) 16919 (39417) 6853 28717 3415 12570 7212 5245 (2552)
814_24 - MVO and MVO to CSA Received 129820 125861 124403 113795 108753 100127 111821 144987 100830 116519 129103 128104 127073 133582 127218 102055 111459 100285 101107 96289 100578 109493 114094 133170 122932 129025 118022 103789 109278 103747 96628 99552 96214 109578 117949 123894 133905 133855 114675 108275 108859 94864 98233 97901 89578 111857 115918 121662 131607 126785 119107 107956 107266 99428 104273 93385 93977 115469 115524 129594 135196 121446 120049 111598 106467 102429 104399 1660500
814_10 - DTP Mass Acquisition Received - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0
814_10 - DTP Mass Transition Received - 0 - 0 9033 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 639 - 0 - 0 4975 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0
814_18 - CSA AdditionDeletes Received 40217 62083 99016 55581 46720 42587 49740 47725 31726 52888 41597 40616 55770 43745 52139 26702 21791 39082 44030 38884 39856 31786 33061 42622 48489 64178 50499 59475 59400 48536 42179 40351 34796 34420 54677 35078 49489 59611 39384 44247 44577 35386 40420 54831 43550 45039 44268 40405 57954 64408 65032 80184 70310 41156 34811 46680 50347 71847 48606 52585 50867 62747 59763 34925 40977 40389 41227 747237
Total 562085 554722 573711 476047 474921 434114 480903 491612 418337 483900 494713 510900 519262 543870 547796 398391 419057 408226 434889 397965 398350 426689 446477 531229 496188 527060 458227 433368 463158 432814 396477 391251 364995 425182 472373 488770 537838 543216 448454 441709 449383 401409 409563 417777 378832 493644 566768 495865 541086 526362 523392 538772 486187 419874 433096 382737 378952 587667 463095 531340 537739 508346 512880 429854 413594 399102 407249 6891712
Counts from Monthly Retail Transaction report
To do
Break Out 814_10s - AQ and MT
Break Out 814_18 Additions from Deletes
Year-To-Date Transactions Received
Transaction Type July 2018 July 2017 July 2018 July 2017
Switches 669909 617300 121926 84059
Acquisition 0 0 0 0
Move - Ins 1667037 1568153 270122 252360
Move - Outs 814580 802779 129820 127073
Continuous Service Agreements (CSA) 395944 283259 40217 55770
Mass Transitions 9033 0 0 0
Total 3556503 3271491 562085 519262
There has been a change since this was created
Mass Acquisition has been broken out of Mass Transition
Page 35: ERCOT Monthly Operational Overvie · ERCOT Monthly Operational Overview (July 2018) Revised 08.22.18. ERCOT Public. August 15, 2018

PUBLIC

ERS Procurement for June 2018 ndash September 2018

TP1 TP2 TP3 TP4 TP5 TP6

Non Weather-Sensitive ERS-10 MW 160562 165996 143324 140708 156699 151138

Non Weather-Sensitive ERS-30 MW 736864 781559 702529 625067 755153 657394

Weather-Sensitive ERS-10 MW 0 0 0 0 0 0

Weather-Sensitive ERS-30 MW 0 0 11850 11850 0 0

Total MW Procured 897426 947555 857703 777625 911852 808532

Clearing Price $201 $185 $2108 $2177 $199 $225

Time Period Time Period Hours

Time Period 1 Hours Ending 0600 - 0800 (50000 am to 80000 am) Monday through Friday except ERCOT Holidays

Time Period 2 Hours Ending 0900 - 1300 (80000 am to 10000 pm) Monday through Friday except ERCOT Holidays

Time Period 3 Hours Ending 1400 - 1600 (10000 pm to 40000 pm) Monday through Friday except ERCOT Holidays

Time Period 4 Hours Ending 1700 - 1900 (40000 pm to 70000 pm) Monday through Friday except ERCOT Holidays

Time Period 5 Hours Ending 2000 - 2200 (70000 pm to 100000 pm) Monday through Friday except ERCOT Holidays Time Period 6 All other hours

35

PUBLIC

Reliability Services ndash July 2018

Reliability Unit Commitment (RUC) $ in Millions

RUC Make-Whole Payments $000

RUC Clawback Charges $000

RUC Commitment Settlement $000

RUC Capacity Short Charges $000

RUC Make-Whole Uplift $000

RUC Commitment Cost Allocation $000

RUC Decommitment Payments $000

Total RUC Allocation to Load $000

In July 2018 there was a credit of $000M allocated to load for RUC compared to bull A credit of $000M in June 2018bull A credit of $003M in July 2017

36

PUBLIC

Ancillary and Other Services ndash July 2018

Ancillary and Other Services $ in Millions

Regulation Up Service $1105

Regulation Down Service $072

Responsive Reserve Service $7177

Non-Spinning Reserve Service $1787

Black Start Service $059

Voltage Services - Reactive Power $000

Voltage Services - Lost Opportunity $000

Total Charges Allocated to Load $10200

In July 2018 Ancillary and Other Services was a charge of $10200M compared to bull A charge of $2001M in June 2018bull A charge of $2322M in July 2017

37

PUBLIC

Real-Time Ancillary Service Imbalance (ORDC) ndash July 2018

In July 2018 Real-Time Ancillary Service Imbalance was a charge to load of $2228K compared to bull A charge of $147K in June 2018bull A charge of $534K in July 2017

Real-Time Ancillary Service Imbalance $ in Thousands

Real-Time AS Imbalance ($2228)

Real-Time Reliability Deployment AS Imbalance $000

Total RTASI Amount Allocated to Load $2228

38

PUBLIC

Energy Settlement ndash July 2018

39

Day-Ahead Market Energy Settlement $ in Millions

Energy Purchases $215396

Point to Point Obligation Purchases $11726

Energy Sales ($212592)

Day-Ahead Congestion Rent $14531

Day-Ahead Market Make-Whole Payments ($001)

Real-Time Market Energy Settlement $ in Millions

Energy Imbalance at a Resource Node ($91963)

Energy Imbalance at a Load Zone $160737

Energy Imbalance at a Hub ($57497)

Net Real-Time Energy Imbalance $11276

Real Time Congestion from Self Schedules $013

Block Load Transfers and DC Ties ($2063)

Total Impact to Revenue Neutrality $9227

Load-Allocated Emergency Energy Payments ($016)

Load-Allocated Base Point Deviation Charges $026

Day-Ahead Market energy settlement activity increased from last month and increased from July 2017

Real-Time Market energy settlement activity increased from last month and increased from July 2017

PUBLIC

Congestion Revenue Rights (CRR) ndash July 2018

$ in Millions

Long-Term Auction ($4026)

Monthly Auction ($1773)

Total Auction Revenue ($5799)

Day-Ahead CRR Settlements ($15797)

Day-Ahead CRR Short-Charges $1885

Day-Ahead CRR Short-Charges Refunded ($899)

Day-Ahead CRR Short-Charges Net $986

Total CRR Funding ($14810)

Day-Ahead Point-to-Point Obligations $11726

Real-Time Point-to-Point Obligations ($10113)

Net Point-to-Point Obligations $1614

Congestion Revenue Rights settlement payments were not fully funded Partial funding to settle the CRR Short Charges was provided from the CRR Balancing Account Fund and the remaining $986M of CRR Short Charges were not refunded The CRR Fund Balance is now $0

Point to Point Obligations settled with a net charge of $1614M compared to a net credit of $1758M last month

40

PUBLIC

CRR Balancing Account Fund ndash July 2018

CRR Balancing Account $ in Millions

Monthly Day-Ahead Congestion Rent $14531

Monthly Day-Ahead CRR Settlements ($15797)

Monthly Day-Ahead CRR Short -Charges $1885

CRR Balancing Account Credit Total $619

Beginning Fund Balance for the Month $275

CRR Balancing Account Credit Total $619

Day-Ahead CRR Short-Charges Refunded ($899)

CRR PTP Option Award Charges $004

Load-Allocated CRR Amount $000

Total Fund Amount $000

41

PUBLIC

Revenue Neutrality ndash July 2018

Revenue Neutrality $ in Millions

Real-Time Energy Imbalance $11276

Real-Time Point to Point Obligation ($10113)

Real-Time Congestion from Self-Schedules $013

DC Tie amp Block Load Transfer ($2063)

Allocation to Load $886

In July 2018 the Revenue Neutrality charge to load was $886M compared to bull A charge of $3046M in June 2018bull A charge of $145M in July 2017

42

PUBLIC

Net Allocation to Load ndash July 2018

Market-Based Allocation $ in Millions

Reliability Unit Commitment $000

Ancillary and Other Services $10200

Real-Time Ancillary Service Imbalance $223

Emergency Energy $016

Base Point Deviation ($026)

CRR Auction Revenue ($5799)

CRR Balancing Account $000

Real-Time Revenue Neutrality $886

Reliability Must Run $000

Monthly Block Load Transfer $000

Total $5500

Fee AllocationERCOT Administrative Fee $2207

Net Allocated to Load $7707

In July 2018 the Net Allocation to load was a charge of $7707M compared to bull A charge of $2152M in June 2018bull A credit of $1363M in July 2017

43

PUBLIC

Advanced Meter Settlement Impacts ndash July 2018

July 2018 At month end settling 72M ESIIDs using Advanced Meter data

July 2018 990 of the load in ERCOT is settled with 15-min interval data (AMS Competitive IDR and NOIE IDR)

44

PUBLIC

ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndashJuly 2018

45

PUBLIC

Retail Transaction Volumes ndash Summary ndash July 2018

46

Transaction Type July 2018 July 2017 July 2018 July 2017

Switches 669909 617300 121926 84059

Acquisition 0 0 0 0

Move - Ins 1667037 1568153 270122 252360

Move - Outs 814580 802779 129820 127073

Continuous Service Agreements (CSA) 395944 283259 40217 55770

Mass Transitions 9033 0 0 0

Total 3556503 3271491 562085 519262

Year-To-Date Transactions Received

Board Presentation Input

Trans Volumes by Month_New

PUBLIC

Retail Transaction Volumes ndash Summary ndash July 2018

SwitchesAcquisitions Move-Ins

Move-Outs Mass Transition

47

Projects Report

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018

20000000$ 2018 Portfolio

Spending Estimate

Projects In FlightOn Hold (Count = 100) 24905011$

Projects Not Yet Started (Count = 10) 1320628$

Projects Completed (Count = 43) 795250$

(7020889)$

TOTAL 20000000$

Project Number Projects in Initiation Phase (Count = 4)

TBD IT Asset RecoveryNPRR842 Study Area Load Information

209-03 Study Network (STNET) Integration288-01 EDI Map and Translator Replacement

Impact Metric TolerancesUnfavorable variances are represented as negative numbers within the report - Green = No more than 49 unfavorable variance - Yellow = Unfavorable variance between 49 and 99 - Red = Unfavorable variance more than 99

Spending Reductions Required to Maintain Capital Budget

2018 Project Funding

Footnotes1 - One or more phases took longer than expected resulting in additional time required

2 - One or more phases required more labor than expected resulting in additional funding andor time required

3 - Project placed on holdNA - Metric not calculated because - it is reported at the parent project level or - it is an administrative project

Project Number Projects in Planning Phase (Count = 8) Phase Start Baseline

Phase FinishApproved

Phase FinishScheduled

Go-Live DateScheduled

Phase Finish

134-02 Privileged Account Management (PAM) Phase 2 882018 12192018 12192018 TBD 12192018 0 10

183-01 CMM-FT GUI Integration 12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs

242-01 Portfolio Reporting Assessment 1182017 12192018 12192018 TBD 12192018 0 21260-01 Information Governance Assessment 10182017 5302018 9192018 TBD 9192018 0 5286-01 Java Platform Assessment 6202018 11212018 11212018 TBD 11212018 0 6287-01 Security Constrained Unit Commitment (SCUC) 882018 2272019 2272019 TBD 2272019 0 -1

NPRR484Revisions to Congestion Revenue Rights Credit Calculations and Payments - Phase 1b 2

12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs

NPRR702Flexible Accounts Payment of Invoices and Disposition of Interest on Cash Collateral

12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs

Schedule Health Budget Health

49

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018Project Number Projects in Execution Phase (Count = 42) Phase Start Baseline Go-

Live DateApproved Go-

Live DateScheduled

Go-Live DateScheduled

Phase Finish

170-01 Enterprise Content Alignment Program 8262015 11152017 8312018 8312018 8312018 0 0170-06 ECAP - ECMS Implementation Phase 1 4252018 11302018 11302018 11302018 11302018 0 3173-02 ERCOT Flight Certification Website 11152017 2282019 2282019 2282019 5312019 0 2181-01 CRR Framework Upgrade 10262016 1022017 11192018 11192018 2272019 0 2

183-01 CMM Tech Refresh 3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

193-01 PMU Tool Evaluation and Implementation 12132017 892018 2152019 2152019 3202019 0 0196-01 GINR Project Status Application Replacement 12212016 9142017 2282019 2282019 3312019 0 1198-02 Reactive Power Coordination PoC 962017 6162018 8152018 8152018 8152018 0 54209-02 Weather Imaging and Line Observation (WILO) 5302018 212019 212019 212019 2272019 0 2210-01 REC Technology Refresh 8302017 3182018 12132018 12132018 1162019 0 3228-01 Enterprise Database Upgrade 882018 1292020 1292020 1292020 1292020 0 17229-01 IT Change and Configuration Management Phase 2 822017 6192018 12132018 12132018 3252019 0 2 -9238-01 Application Authentication Tech Refresh 962017 3192018 12132018 12132018 1302019 0 3239-01 Identity and Access Management 592018 3132019 3132019 3132019 3132019 0 2241-01 AREA - Generation 10112017 3302018 892018 892018 952018 0 -4244-01 Corporate Wireless 11292017 3282018 1252018 1252018 192019 0 9245-01 2017 EPS Metering Enhancements 6272018 892019 892019 892019 9252019 0 1246-01 iTest Data Refresh 12132017 1192018 11152018 11152018 122019 0 25249-01 Secondary Wind Forecasting Service 8302017 2282018 892018 892018 952018 0 0253-01 CIP Recovery Plan Project - Planning Phase 1 1312018 8292018 8292018 8292018 8292018 0 -2

257-01Security Constrained Optimal Powerflow in Study Network Analysis

1262017 10252018 10252018 10252018 1282018 0 19

261-01 Generic Transmission Constraint Calculation 372018 12132018 12132018 12132018 1232019 0 0263-01 Market Simulator 4112018 12132018 12132018 12132018 1302019 0 7265-01 Real-Time Assessment Continuity 1312018 12132018 12132018 12132018 1302019 0 0279-01 Cyber Security Project 24 6272018 10262018 10262018 10262018 11282018 0 0280-01 Quest Software Portfolio Transition 442018 6272018 9262018 9262018 9262018 0 13282-01 Synchronous Condenser Outage Modeling 662018 10252018 10252018 10252018 1252018 0 1Various 2015 CMM NPRRs 2 -18

NPRR519Exemption of ERS-Only QSEs from Collateral and Capitalization Requirements

3152017 5192018 12112018 12112018 12312018 0 See 2015 CMM NPRRs

NPRR620Collateral Requirements for Counter-Parties with No Load or Generation

3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

NPRR660 Remove CRR State Change Adder 3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

Budget HealthSchedule Health

50

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018Project Number Projects in Execution Phase (Count = 42) Phase Start Baseline Go-

Live DateApproved Go-

Live DateScheduled

Go-Live DateScheduled

Phase Finish

NPRR741 Clarifications to TPE and EAL Credit Exposure Calculations 3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

NPRR749 Option Cost for Outstanding CRRs 882018 12132018 12132018 12132018 TBD 0 NA See 2015 CMM NPRRs

NPRR755 Data Agent-Only QSE Registration 3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

NPRR819Modification of Non-Price Error Resettlement Thresholds and Resettlement Clean-Ups

592018 892018 892018 892018 952018 0 36

NPRR833 Modify PTP Obligation Bid Clearing Change 882018 12132018 12132018 12132018 TBD 0 1

NPRR843Short-Term System Adequacy and AS Offer Disclosure Reports Additions

7182018 10252018 10252018 10252018 11282018 0 0

NPRR864 RUC Modifications to Consider Market-Based Solutions 6202018 10252018 10252018 10252018 11282018 0 4SCR777 Bilateral CRR Interface Enhancement 10262016 1022017 11192018 11192018 2272019 0 NA See 181-01

SCR781 RARF Replacement 12202017 4252018 12192018 12192018 12192018 0 3SCR791 Correction of 60-day SCED GRD Disclosure Report 522018 892018 892018 892018 952018 0 39SCR795 Addition of Intra-Hour Wind Forecast to GTBD Calculation 882018 10252018 10252018 10252018 11142018 0 0

Project Number Expedited Projects in Execution (Count = 34)

Project Number Projects in Stabilization (Count = 10) Execution

Phase StartBaseline Go-Live Target

Approved Go-Live Target

ActualGo-Live Date

Scheduled Execution Phase

Finish

NPRR648 Remove References to Flowgate Rights 3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR683 Revision to Available Credit Limit Calculation 3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR743 Revision to MCE to Have a Floor For Load Exposure 3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR760 Calculation of Exposure Variables For Days With No Activity 3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR776 Voltage Set Point Communication 9202017 3192018 452018 452018 952018 0 1

NPRR800Revisions to Credit Exposure Calculations to Use Electricity Futures Market Prices

3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR815Revise the Limitation of Load Resources Providing Responsive Reserve (RRS) Service

3212018 5312018 5312018 5312018 8292018 0 2

209-01 Multi Station Breaker to Breaker One Lines 282017 392018 532018 532018 8222018 0 -1259-01 DC SCADA and Metering Upgrade 10252017 1172018 7252018 7252018 8292018 0 22266-01 Remote Email Access Enhancement 12132017 372018 662018 6192018 9262018 2 -7 2 -9

Schedule Health Budget Health

Budget HealthSchedule Health

51

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018

Project Number Projects On Hold (Count = 2) Forecast

Start DateBaseline

Phase FinishApproved Go-

Live TargetScheduled

Go-Live DateScheduled

Phase Finish

SCR789 Update NMMS Topology Processor to PSSE 34 Capability 0

269-01Document Repository Redesign and Governance Implementation - Phase 1

0

Project Number Projects Completed (Count = 20)

Baseline Execution

Phase Start

Baseline Go-Live Target

Approved Go-Live Target

Actual Go-Live Date

Actual Execution Phase Finish

185-01 Records Management and eDiscovery 12152016 5242017 8292017 8222017 12132017 2 0224-01 TelAlert Replacement 452017 6272017 842017 842017 592018 0 5230-01 SAS Technical Architecture Redesign 312017 12132017 12132017 12132017 6272018 0 2234-01 Reporting Solution Resiliency (RSR) 452017 8232017 11272017 11272017 1102018 0 8240-01 EDI Translator and Mapping Replacement Assessment 4192017 9272017 2282018 TBD 372018 -2 20254-01 Retail Windows Upgrade 10112017 12182017 12182017 1222018 272018 1 -51 65255-01 Settlements Architecture Enhancements 10252017 1112018 1112018 1192018 2142018 1 -10 53258-01 WD Kainos SMART Automation Testing Tool 4112018 642018 642018 662018 7182018 -3 33271-01 Issue Tracking and Resolution Tool Assessment 12132017 4252018 4252018 TBD 522018 1 -5 -1272-01 Operator Training Simulator Black Start GE Effort 1262017 4252018 4252018 4272018 5162018 -1 19274-01 Average Mid-Term Load Forecast 372018 5312018 5312018 5312018 6272018 0 50

NPRR768Revisions to Real-Time On-Line Reliability Deployment Price Adder Categories

372018 5312018 5312018 5312018 6272018 0 16

NPRR778 Modifications to Date Change and Cancellation Evaluation Window 7192017 10292017 12112017 12112017 1312018 0 23

NPRR782Settlement of Infeasible Ancillary Services Due to Transmission Constraints

5242017 8312017 1122017 1122017 1102018 0 20

NPRR808 Three Year CRR Auction 8232017 9182017 9182017 912017 1312018 65 68

NPRR810Applicability of RMR Incentive Factor on Reservation and Transportation Costs Associated with Firm Fuel Supplies

7172017 11122017 3312018 3312018 3312018 0 NA See 233-00

NPRR830 Revision of 4-Coincident Peak Methodology 12132017 262018 262018 262018 372018 0 85

NPRR831 Inclusion of Private Use Networks in Load Zone Price Calculations 822017 1122017 1122017 1122017 2212018 0 33

OBDRR002 ORDC OBD Revisions for PUCT Project 47199 372018 5312018 5312018 5312018 6272018 0 See NPRR768

SCR792 Enhance Communications of BAAL Exceedances 2142018 452018 452018 452018 4252018 0 69

Project Number Expedited Projects Completed (Count = 23)

Budget HealthSchedule Health

Budget HealthSchedule Health

52

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018

Project Number 2018 Projects Not Yet Started (Count = 10) Forecast

Start Date

NPRR858 Provide Complete Current Operating Plan (COP) Data Aug-2018TBD 2018 OS Enhancements Aug-2018TBD Additional Branch Limit for Relays Aug-2018

NPRR817 Create a Panhandle Hub Sep-2018NPRR821 Elimination of the CRR Deration Process Oct-2018NPRR865 Publish RTM Shift Factors for Hubs Load Zones and DC Ties Oct-2018

SCR793SSR Related Telemetry for Transmission Service Provider (TSP) Operators

Oct-2018

ECAP ECAP - ECMS Implementation Phase 2 Oct-2018TBD Job Scheduler Update in CSI Framework Oct-2018TBD Parameter Estimation Oct-2018

53

  • Slide Number 1
  • Slide Number 2
  • Summary ndash July 2018
  • Daily Peak Demand Hourly Average Actual vs Forecast Wind Day-Ahead COPs amp On-Line Capacity at Peak ndash July 2018
  • Actual Wind Output plus Curtailments vs Wind Day-Ahead COPs for All Hours ndash July 2018
  • ERCOTrsquos CPS1 Monthly Performance ndash July 2018
  • Monthly Peak Actual Demand ndash July 2018
  • Monthly Minimum Actual 15-Minute Demand ndash July 2018
  • Day-Ahead Load Forecast Performance ndash July 2018
  • Reliability Unit Commitment (RUC) Capacity by Weather Zone ndash July 2018
  • Generic Transmission Constraints (GTCs) ndash July 2018
  • Advisories and Watches ndash July 2018 Corrected
  • Lake Levels Update ndash August 1 2018
  • Planning Summary ndash July 2018
  • Mapping of Counties to ERCOT Zones ndash July 2018
  • Cumulative MW Capacity of Interconnection Requests by Zone ndashJuly 2018
  • Cumulative MW Capacity of Interconnection Requests by Zone ndashJuly 2018
  • Cumulative MW Capacity of Interconnection Requests by Zone ndashJuly 2018
  • Wind Generation ndash July 2018
  • Solar Generation ndash July 2018
  • Generation Interconnection Activity by Fuel ndash July 2018
  • Generation Interconnection Activity by Project Phase ndash July 2018
  • Slide Number 23
  • Day-Ahead Schedule (Hourly Average) ndash July 2018
  • Percentage of Real-Time Load Hedged in the DAM (Counter-Party Level) ndash July 2018
  • DAM and RTM Price Convergence ndash July 2018
  • Day-Ahead Electricity and Ancillary Service Prices (Hourly Average) ndash July 2018
  • Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash July 2018
  • Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash July 2018
  • DRUC Monthly Summary (Hourly Average) ndash July 2018
  • HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash July 2018
  • NonndashSpinning Reserve Service Deployment ndash July 2018
  • CRR Price Convergence ndash July 2018
  • Daily Average System Lambda and ORDC Price Adders ndash July 2018
  • ERS Procurement for June 2018 ndash September 2018
  • Reliability Services ndash July 2018
  • Ancillary and Other Services ndash July 2018
  • Real-Time Ancillary Service Imbalance (ORDC) ndash July 2018
  • Energy Settlement ndash July 2018
  • Congestion Revenue Rights (CRR) ndash July 2018
  • CRR Balancing Account Fund ndash July 2018
  • Revenue Neutrality ndash July 2018
  • Net Allocation to Load ndash July 2018
  • Advanced Meter Settlement Impacts ndash July 2018
  • ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndash July 2018
  • Retail Transaction Volumes ndash Summary ndash July 2018
  • Retail Transaction Volumes ndash Summary ndash July 2018
  • Slide Number 48
  • ERCOT Portfolio Stoplight Report ndash July 2018
  • ERCOT Portfolio Stoplight Report ndash July 2018
  • ERCOT Portfolio Stoplight Report ndash July 2018
  • ERCOT Portfolio Stoplight Report ndash July 2018
  • ERCOT Portfolio Stoplight Report ndash July 2018
Retail Transactions Summary
July 2018 June 2018 May 2018 April 2018 March 2018 February 2018 January 2018 December 2017 November 2017 October 2017 September 2017 August 2017 July 2017 June 2017 May 2017 April 2017 March 2017 February 2017 January 2017 December 2016 November 2016 October 2016 September 2016 August 2016 July 2016 June 2016 May 2016 April 2016 March 2016 February 2016 January 2016 December 2015 November 2015 October 2015 September 2015 August 2015 July 2015 June 2015 May 2015 April 2015 March 2015 February 2015 January 2015 December 2014 November 2014 October 2014 September 2014 August 2014 July 2014 June 2014 May 2014 April 2014 March 2014 February 2014 January 2014 December 2013 November 2013 October 2013 September 2013 August 2013 July 2013 June 2013 May 2013 April 2013 March 2013 February 2013 January 2013 Grand total
814_01 - Switch Received 121926 109653 96828 81291 95159 76119 88933 60560 77860 78096 79502 84134 84059 108784 130828 71769 67845 66875 87140 66556 56202 64452 67323 86656 82923 86376 75323 70300 76235 68057 63954 61486 52887 65276 70342 81674 91211 102661 86229 81255 79997 73394 72885 71072 67080 110465 175164 89677 99568 101490 111077 91983 93887 71130 86953 69691 55957 166882 82415 93194 102562 103756 116086 78919 68950 64329 67116 1321827
Difference from previous month 12273 12825 15537 (13868) 19040 (12814) 28373 (17300) (236) (1406) (4632) 75 (24725) (22044) 59059 3924 970 (20265) 20584 10354 (8250) (2871) (19333) 3733 (3453) 11053 5023 (5935) 8178 4103 2468 8599 (12389) (5066) (11332) (9537) (11450) 16432 4974 1258 6603 509 1813 3992 (43385) (64699) 85487 (9891) (1922) (9587) 19094 (1904) 22757 (15823) 17262 13734 (110925) 84467 (10779) (9368) (1194) (12330) 37167 9969 4621 (2787)
814_16 - Move - Ins Received 270122 257125 244431 225380 224289 215281 230409 238340 207921 236397 244511 258046 252360 257759 237611 197865 217962 201984 202612 196236 201714 220958 231999 268781 241844 247481 214383 199804 218245 212474 193716 189862 181098 215908 229405 248124 263233 247089 208166 207932 215950 197765 198025 193973 178624 226283 231418 243482 251957 233679 223201 258649 214724 208160 207059 172981 178671 233469 216550 255967 249114 220397 216982 204412 197200 191955 194507 3162148
Difference from previous month 12997 12694 19051 1091 9008 (15128) (7931) 30419 (28476) (8114) (13535) 5686 (5399) 20148 39746 (20097) 15978 (628) 6376 (5478) (19244) (11041) (36782) 26937 (5637) 33098 14579 (18441) 5771 18758 3854 8764 (34810) (13497) (18719) (15109) 16144 38923 234 (8018) 18185 (260) 4052 15349 (47659) (5135) (12064) (8475) 18278 10478 (35448) 43925 6564 1101 34078 (5690) (54798) 16919 (39417) 6853 28717 3415 12570 7212 5245 (2552)
814_24 - MVO and MVO to CSA Received 129820 125861 124403 113795 108753 100127 111821 144987 100830 116519 129103 128104 127073 133582 127218 102055 111459 100285 101107 96289 100578 109493 114094 133170 122932 129025 118022 103789 109278 103747 96628 99552 96214 109578 117949 123894 133905 133855 114675 108275 108859 94864 98233 97901 89578 111857 115918 121662 131607 126785 119107 107956 107266 99428 104273 93385 93977 115469 115524 129594 135196 121446 120049 111598 106467 102429 104399 1660500
814_10 - DTP Mass Acquisition Received - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0
814_10 - DTP Mass Transition Received - 0 - 0 9033 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 639 - 0 - 0 4975 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0
814_18 - CSA AdditionDeletes Received 40217 62083 99016 55581 46720 42587 49740 47725 31726 52888 41597 40616 55770 43745 52139 26702 21791 39082 44030 38884 39856 31786 33061 42622 48489 64178 50499 59475 59400 48536 42179 40351 34796 34420 54677 35078 49489 59611 39384 44247 44577 35386 40420 54831 43550 45039 44268 40405 57954 64408 65032 80184 70310 41156 34811 46680 50347 71847 48606 52585 50867 62747 59763 34925 40977 40389 41227 747237
Total 562085 554722 573711 476047 474921 434114 480903 491612 418337 483900 494713 510900 519262 543870 547796 398391 419057 408226 434889 397965 398350 426689 446477 531229 496188 527060 458227 433368 463158 432814 396477 391251 364995 425182 472373 488770 537838 543216 448454 441709 449383 401409 409563 417777 378832 493644 566768 495865 541086 526362 523392 538772 486187 419874 433096 382737 378952 587667 463095 531340 537739 508346 512880 429854 413594 399102 407249 6891712
Counts from Monthly Retail Transaction report
To do
Break Out 814_10s - AQ and MT
Break Out 814_18 Additions from Deletes
Year-To-Date Transactions Received
Transaction Type July 2018 July 2017 July 2018 July 2017
Switches 669909 617300 121926 84059
Acquisition 0 0 0 0
Move - Ins 1667037 1568153 270122 252360
Move - Outs 814580 802779 129820 127073
Continuous Service Agreements (CSA) 395944 283259 40217 55770
Mass Transitions 9033 0 0 0
Total 3556503 3271491 562085 519262
There has been a change since this was created
Mass Acquisition has been broken out of Mass Transition
Page 36: ERCOT Monthly Operational Overvie · ERCOT Monthly Operational Overview (July 2018) Revised 08.22.18. ERCOT Public. August 15, 2018

PUBLIC

Reliability Services ndash July 2018

Reliability Unit Commitment (RUC) $ in Millions

RUC Make-Whole Payments $000

RUC Clawback Charges $000

RUC Commitment Settlement $000

RUC Capacity Short Charges $000

RUC Make-Whole Uplift $000

RUC Commitment Cost Allocation $000

RUC Decommitment Payments $000

Total RUC Allocation to Load $000

In July 2018 there was a credit of $000M allocated to load for RUC compared to bull A credit of $000M in June 2018bull A credit of $003M in July 2017

36

PUBLIC

Ancillary and Other Services ndash July 2018

Ancillary and Other Services $ in Millions

Regulation Up Service $1105

Regulation Down Service $072

Responsive Reserve Service $7177

Non-Spinning Reserve Service $1787

Black Start Service $059

Voltage Services - Reactive Power $000

Voltage Services - Lost Opportunity $000

Total Charges Allocated to Load $10200

In July 2018 Ancillary and Other Services was a charge of $10200M compared to bull A charge of $2001M in June 2018bull A charge of $2322M in July 2017

37

PUBLIC

Real-Time Ancillary Service Imbalance (ORDC) ndash July 2018

In July 2018 Real-Time Ancillary Service Imbalance was a charge to load of $2228K compared to bull A charge of $147K in June 2018bull A charge of $534K in July 2017

Real-Time Ancillary Service Imbalance $ in Thousands

Real-Time AS Imbalance ($2228)

Real-Time Reliability Deployment AS Imbalance $000

Total RTASI Amount Allocated to Load $2228

38

PUBLIC

Energy Settlement ndash July 2018

39

Day-Ahead Market Energy Settlement $ in Millions

Energy Purchases $215396

Point to Point Obligation Purchases $11726

Energy Sales ($212592)

Day-Ahead Congestion Rent $14531

Day-Ahead Market Make-Whole Payments ($001)

Real-Time Market Energy Settlement $ in Millions

Energy Imbalance at a Resource Node ($91963)

Energy Imbalance at a Load Zone $160737

Energy Imbalance at a Hub ($57497)

Net Real-Time Energy Imbalance $11276

Real Time Congestion from Self Schedules $013

Block Load Transfers and DC Ties ($2063)

Total Impact to Revenue Neutrality $9227

Load-Allocated Emergency Energy Payments ($016)

Load-Allocated Base Point Deviation Charges $026

Day-Ahead Market energy settlement activity increased from last month and increased from July 2017

Real-Time Market energy settlement activity increased from last month and increased from July 2017

PUBLIC

Congestion Revenue Rights (CRR) ndash July 2018

$ in Millions

Long-Term Auction ($4026)

Monthly Auction ($1773)

Total Auction Revenue ($5799)

Day-Ahead CRR Settlements ($15797)

Day-Ahead CRR Short-Charges $1885

Day-Ahead CRR Short-Charges Refunded ($899)

Day-Ahead CRR Short-Charges Net $986

Total CRR Funding ($14810)

Day-Ahead Point-to-Point Obligations $11726

Real-Time Point-to-Point Obligations ($10113)

Net Point-to-Point Obligations $1614

Congestion Revenue Rights settlement payments were not fully funded Partial funding to settle the CRR Short Charges was provided from the CRR Balancing Account Fund and the remaining $986M of CRR Short Charges were not refunded The CRR Fund Balance is now $0

Point to Point Obligations settled with a net charge of $1614M compared to a net credit of $1758M last month

40

PUBLIC

CRR Balancing Account Fund ndash July 2018

CRR Balancing Account $ in Millions

Monthly Day-Ahead Congestion Rent $14531

Monthly Day-Ahead CRR Settlements ($15797)

Monthly Day-Ahead CRR Short -Charges $1885

CRR Balancing Account Credit Total $619

Beginning Fund Balance for the Month $275

CRR Balancing Account Credit Total $619

Day-Ahead CRR Short-Charges Refunded ($899)

CRR PTP Option Award Charges $004

Load-Allocated CRR Amount $000

Total Fund Amount $000

41

PUBLIC

Revenue Neutrality ndash July 2018

Revenue Neutrality $ in Millions

Real-Time Energy Imbalance $11276

Real-Time Point to Point Obligation ($10113)

Real-Time Congestion from Self-Schedules $013

DC Tie amp Block Load Transfer ($2063)

Allocation to Load $886

In July 2018 the Revenue Neutrality charge to load was $886M compared to bull A charge of $3046M in June 2018bull A charge of $145M in July 2017

42

PUBLIC

Net Allocation to Load ndash July 2018

Market-Based Allocation $ in Millions

Reliability Unit Commitment $000

Ancillary and Other Services $10200

Real-Time Ancillary Service Imbalance $223

Emergency Energy $016

Base Point Deviation ($026)

CRR Auction Revenue ($5799)

CRR Balancing Account $000

Real-Time Revenue Neutrality $886

Reliability Must Run $000

Monthly Block Load Transfer $000

Total $5500

Fee AllocationERCOT Administrative Fee $2207

Net Allocated to Load $7707

In July 2018 the Net Allocation to load was a charge of $7707M compared to bull A charge of $2152M in June 2018bull A credit of $1363M in July 2017

43

PUBLIC

Advanced Meter Settlement Impacts ndash July 2018

July 2018 At month end settling 72M ESIIDs using Advanced Meter data

July 2018 990 of the load in ERCOT is settled with 15-min interval data (AMS Competitive IDR and NOIE IDR)

44

PUBLIC

ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndashJuly 2018

45

PUBLIC

Retail Transaction Volumes ndash Summary ndash July 2018

46

Transaction Type July 2018 July 2017 July 2018 July 2017

Switches 669909 617300 121926 84059

Acquisition 0 0 0 0

Move - Ins 1667037 1568153 270122 252360

Move - Outs 814580 802779 129820 127073

Continuous Service Agreements (CSA) 395944 283259 40217 55770

Mass Transitions 9033 0 0 0

Total 3556503 3271491 562085 519262

Year-To-Date Transactions Received

Board Presentation Input

Trans Volumes by Month_New

PUBLIC

Retail Transaction Volumes ndash Summary ndash July 2018

SwitchesAcquisitions Move-Ins

Move-Outs Mass Transition

47

Projects Report

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018

20000000$ 2018 Portfolio

Spending Estimate

Projects In FlightOn Hold (Count = 100) 24905011$

Projects Not Yet Started (Count = 10) 1320628$

Projects Completed (Count = 43) 795250$

(7020889)$

TOTAL 20000000$

Project Number Projects in Initiation Phase (Count = 4)

TBD IT Asset RecoveryNPRR842 Study Area Load Information

209-03 Study Network (STNET) Integration288-01 EDI Map and Translator Replacement

Impact Metric TolerancesUnfavorable variances are represented as negative numbers within the report - Green = No more than 49 unfavorable variance - Yellow = Unfavorable variance between 49 and 99 - Red = Unfavorable variance more than 99

Spending Reductions Required to Maintain Capital Budget

2018 Project Funding

Footnotes1 - One or more phases took longer than expected resulting in additional time required

2 - One or more phases required more labor than expected resulting in additional funding andor time required

3 - Project placed on holdNA - Metric not calculated because - it is reported at the parent project level or - it is an administrative project

Project Number Projects in Planning Phase (Count = 8) Phase Start Baseline

Phase FinishApproved

Phase FinishScheduled

Go-Live DateScheduled

Phase Finish

134-02 Privileged Account Management (PAM) Phase 2 882018 12192018 12192018 TBD 12192018 0 10

183-01 CMM-FT GUI Integration 12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs

242-01 Portfolio Reporting Assessment 1182017 12192018 12192018 TBD 12192018 0 21260-01 Information Governance Assessment 10182017 5302018 9192018 TBD 9192018 0 5286-01 Java Platform Assessment 6202018 11212018 11212018 TBD 11212018 0 6287-01 Security Constrained Unit Commitment (SCUC) 882018 2272019 2272019 TBD 2272019 0 -1

NPRR484Revisions to Congestion Revenue Rights Credit Calculations and Payments - Phase 1b 2

12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs

NPRR702Flexible Accounts Payment of Invoices and Disposition of Interest on Cash Collateral

12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs

Schedule Health Budget Health

49

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018Project Number Projects in Execution Phase (Count = 42) Phase Start Baseline Go-

Live DateApproved Go-

Live DateScheduled

Go-Live DateScheduled

Phase Finish

170-01 Enterprise Content Alignment Program 8262015 11152017 8312018 8312018 8312018 0 0170-06 ECAP - ECMS Implementation Phase 1 4252018 11302018 11302018 11302018 11302018 0 3173-02 ERCOT Flight Certification Website 11152017 2282019 2282019 2282019 5312019 0 2181-01 CRR Framework Upgrade 10262016 1022017 11192018 11192018 2272019 0 2

183-01 CMM Tech Refresh 3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

193-01 PMU Tool Evaluation and Implementation 12132017 892018 2152019 2152019 3202019 0 0196-01 GINR Project Status Application Replacement 12212016 9142017 2282019 2282019 3312019 0 1198-02 Reactive Power Coordination PoC 962017 6162018 8152018 8152018 8152018 0 54209-02 Weather Imaging and Line Observation (WILO) 5302018 212019 212019 212019 2272019 0 2210-01 REC Technology Refresh 8302017 3182018 12132018 12132018 1162019 0 3228-01 Enterprise Database Upgrade 882018 1292020 1292020 1292020 1292020 0 17229-01 IT Change and Configuration Management Phase 2 822017 6192018 12132018 12132018 3252019 0 2 -9238-01 Application Authentication Tech Refresh 962017 3192018 12132018 12132018 1302019 0 3239-01 Identity and Access Management 592018 3132019 3132019 3132019 3132019 0 2241-01 AREA - Generation 10112017 3302018 892018 892018 952018 0 -4244-01 Corporate Wireless 11292017 3282018 1252018 1252018 192019 0 9245-01 2017 EPS Metering Enhancements 6272018 892019 892019 892019 9252019 0 1246-01 iTest Data Refresh 12132017 1192018 11152018 11152018 122019 0 25249-01 Secondary Wind Forecasting Service 8302017 2282018 892018 892018 952018 0 0253-01 CIP Recovery Plan Project - Planning Phase 1 1312018 8292018 8292018 8292018 8292018 0 -2

257-01Security Constrained Optimal Powerflow in Study Network Analysis

1262017 10252018 10252018 10252018 1282018 0 19

261-01 Generic Transmission Constraint Calculation 372018 12132018 12132018 12132018 1232019 0 0263-01 Market Simulator 4112018 12132018 12132018 12132018 1302019 0 7265-01 Real-Time Assessment Continuity 1312018 12132018 12132018 12132018 1302019 0 0279-01 Cyber Security Project 24 6272018 10262018 10262018 10262018 11282018 0 0280-01 Quest Software Portfolio Transition 442018 6272018 9262018 9262018 9262018 0 13282-01 Synchronous Condenser Outage Modeling 662018 10252018 10252018 10252018 1252018 0 1Various 2015 CMM NPRRs 2 -18

NPRR519Exemption of ERS-Only QSEs from Collateral and Capitalization Requirements

3152017 5192018 12112018 12112018 12312018 0 See 2015 CMM NPRRs

NPRR620Collateral Requirements for Counter-Parties with No Load or Generation

3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

NPRR660 Remove CRR State Change Adder 3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

Budget HealthSchedule Health

50

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018Project Number Projects in Execution Phase (Count = 42) Phase Start Baseline Go-

Live DateApproved Go-

Live DateScheduled

Go-Live DateScheduled

Phase Finish

NPRR741 Clarifications to TPE and EAL Credit Exposure Calculations 3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

NPRR749 Option Cost for Outstanding CRRs 882018 12132018 12132018 12132018 TBD 0 NA See 2015 CMM NPRRs

NPRR755 Data Agent-Only QSE Registration 3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

NPRR819Modification of Non-Price Error Resettlement Thresholds and Resettlement Clean-Ups

592018 892018 892018 892018 952018 0 36

NPRR833 Modify PTP Obligation Bid Clearing Change 882018 12132018 12132018 12132018 TBD 0 1

NPRR843Short-Term System Adequacy and AS Offer Disclosure Reports Additions

7182018 10252018 10252018 10252018 11282018 0 0

NPRR864 RUC Modifications to Consider Market-Based Solutions 6202018 10252018 10252018 10252018 11282018 0 4SCR777 Bilateral CRR Interface Enhancement 10262016 1022017 11192018 11192018 2272019 0 NA See 181-01

SCR781 RARF Replacement 12202017 4252018 12192018 12192018 12192018 0 3SCR791 Correction of 60-day SCED GRD Disclosure Report 522018 892018 892018 892018 952018 0 39SCR795 Addition of Intra-Hour Wind Forecast to GTBD Calculation 882018 10252018 10252018 10252018 11142018 0 0

Project Number Expedited Projects in Execution (Count = 34)

Project Number Projects in Stabilization (Count = 10) Execution

Phase StartBaseline Go-Live Target

Approved Go-Live Target

ActualGo-Live Date

Scheduled Execution Phase

Finish

NPRR648 Remove References to Flowgate Rights 3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR683 Revision to Available Credit Limit Calculation 3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR743 Revision to MCE to Have a Floor For Load Exposure 3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR760 Calculation of Exposure Variables For Days With No Activity 3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR776 Voltage Set Point Communication 9202017 3192018 452018 452018 952018 0 1

NPRR800Revisions to Credit Exposure Calculations to Use Electricity Futures Market Prices

3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR815Revise the Limitation of Load Resources Providing Responsive Reserve (RRS) Service

3212018 5312018 5312018 5312018 8292018 0 2

209-01 Multi Station Breaker to Breaker One Lines 282017 392018 532018 532018 8222018 0 -1259-01 DC SCADA and Metering Upgrade 10252017 1172018 7252018 7252018 8292018 0 22266-01 Remote Email Access Enhancement 12132017 372018 662018 6192018 9262018 2 -7 2 -9

Schedule Health Budget Health

Budget HealthSchedule Health

51

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018

Project Number Projects On Hold (Count = 2) Forecast

Start DateBaseline

Phase FinishApproved Go-

Live TargetScheduled

Go-Live DateScheduled

Phase Finish

SCR789 Update NMMS Topology Processor to PSSE 34 Capability 0

269-01Document Repository Redesign and Governance Implementation - Phase 1

0

Project Number Projects Completed (Count = 20)

Baseline Execution

Phase Start

Baseline Go-Live Target

Approved Go-Live Target

Actual Go-Live Date

Actual Execution Phase Finish

185-01 Records Management and eDiscovery 12152016 5242017 8292017 8222017 12132017 2 0224-01 TelAlert Replacement 452017 6272017 842017 842017 592018 0 5230-01 SAS Technical Architecture Redesign 312017 12132017 12132017 12132017 6272018 0 2234-01 Reporting Solution Resiliency (RSR) 452017 8232017 11272017 11272017 1102018 0 8240-01 EDI Translator and Mapping Replacement Assessment 4192017 9272017 2282018 TBD 372018 -2 20254-01 Retail Windows Upgrade 10112017 12182017 12182017 1222018 272018 1 -51 65255-01 Settlements Architecture Enhancements 10252017 1112018 1112018 1192018 2142018 1 -10 53258-01 WD Kainos SMART Automation Testing Tool 4112018 642018 642018 662018 7182018 -3 33271-01 Issue Tracking and Resolution Tool Assessment 12132017 4252018 4252018 TBD 522018 1 -5 -1272-01 Operator Training Simulator Black Start GE Effort 1262017 4252018 4252018 4272018 5162018 -1 19274-01 Average Mid-Term Load Forecast 372018 5312018 5312018 5312018 6272018 0 50

NPRR768Revisions to Real-Time On-Line Reliability Deployment Price Adder Categories

372018 5312018 5312018 5312018 6272018 0 16

NPRR778 Modifications to Date Change and Cancellation Evaluation Window 7192017 10292017 12112017 12112017 1312018 0 23

NPRR782Settlement of Infeasible Ancillary Services Due to Transmission Constraints

5242017 8312017 1122017 1122017 1102018 0 20

NPRR808 Three Year CRR Auction 8232017 9182017 9182017 912017 1312018 65 68

NPRR810Applicability of RMR Incentive Factor on Reservation and Transportation Costs Associated with Firm Fuel Supplies

7172017 11122017 3312018 3312018 3312018 0 NA See 233-00

NPRR830 Revision of 4-Coincident Peak Methodology 12132017 262018 262018 262018 372018 0 85

NPRR831 Inclusion of Private Use Networks in Load Zone Price Calculations 822017 1122017 1122017 1122017 2212018 0 33

OBDRR002 ORDC OBD Revisions for PUCT Project 47199 372018 5312018 5312018 5312018 6272018 0 See NPRR768

SCR792 Enhance Communications of BAAL Exceedances 2142018 452018 452018 452018 4252018 0 69

Project Number Expedited Projects Completed (Count = 23)

Budget HealthSchedule Health

Budget HealthSchedule Health

52

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018

Project Number 2018 Projects Not Yet Started (Count = 10) Forecast

Start Date

NPRR858 Provide Complete Current Operating Plan (COP) Data Aug-2018TBD 2018 OS Enhancements Aug-2018TBD Additional Branch Limit for Relays Aug-2018

NPRR817 Create a Panhandle Hub Sep-2018NPRR821 Elimination of the CRR Deration Process Oct-2018NPRR865 Publish RTM Shift Factors for Hubs Load Zones and DC Ties Oct-2018

SCR793SSR Related Telemetry for Transmission Service Provider (TSP) Operators

Oct-2018

ECAP ECAP - ECMS Implementation Phase 2 Oct-2018TBD Job Scheduler Update in CSI Framework Oct-2018TBD Parameter Estimation Oct-2018

53

  • Slide Number 1
  • Slide Number 2
  • Summary ndash July 2018
  • Daily Peak Demand Hourly Average Actual vs Forecast Wind Day-Ahead COPs amp On-Line Capacity at Peak ndash July 2018
  • Actual Wind Output plus Curtailments vs Wind Day-Ahead COPs for All Hours ndash July 2018
  • ERCOTrsquos CPS1 Monthly Performance ndash July 2018
  • Monthly Peak Actual Demand ndash July 2018
  • Monthly Minimum Actual 15-Minute Demand ndash July 2018
  • Day-Ahead Load Forecast Performance ndash July 2018
  • Reliability Unit Commitment (RUC) Capacity by Weather Zone ndash July 2018
  • Generic Transmission Constraints (GTCs) ndash July 2018
  • Advisories and Watches ndash July 2018 Corrected
  • Lake Levels Update ndash August 1 2018
  • Planning Summary ndash July 2018
  • Mapping of Counties to ERCOT Zones ndash July 2018
  • Cumulative MW Capacity of Interconnection Requests by Zone ndashJuly 2018
  • Cumulative MW Capacity of Interconnection Requests by Zone ndashJuly 2018
  • Cumulative MW Capacity of Interconnection Requests by Zone ndashJuly 2018
  • Wind Generation ndash July 2018
  • Solar Generation ndash July 2018
  • Generation Interconnection Activity by Fuel ndash July 2018
  • Generation Interconnection Activity by Project Phase ndash July 2018
  • Slide Number 23
  • Day-Ahead Schedule (Hourly Average) ndash July 2018
  • Percentage of Real-Time Load Hedged in the DAM (Counter-Party Level) ndash July 2018
  • DAM and RTM Price Convergence ndash July 2018
  • Day-Ahead Electricity and Ancillary Service Prices (Hourly Average) ndash July 2018
  • Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash July 2018
  • Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash July 2018
  • DRUC Monthly Summary (Hourly Average) ndash July 2018
  • HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash July 2018
  • NonndashSpinning Reserve Service Deployment ndash July 2018
  • CRR Price Convergence ndash July 2018
  • Daily Average System Lambda and ORDC Price Adders ndash July 2018
  • ERS Procurement for June 2018 ndash September 2018
  • Reliability Services ndash July 2018
  • Ancillary and Other Services ndash July 2018
  • Real-Time Ancillary Service Imbalance (ORDC) ndash July 2018
  • Energy Settlement ndash July 2018
  • Congestion Revenue Rights (CRR) ndash July 2018
  • CRR Balancing Account Fund ndash July 2018
  • Revenue Neutrality ndash July 2018
  • Net Allocation to Load ndash July 2018
  • Advanced Meter Settlement Impacts ndash July 2018
  • ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndash July 2018
  • Retail Transaction Volumes ndash Summary ndash July 2018
  • Retail Transaction Volumes ndash Summary ndash July 2018
  • Slide Number 48
  • ERCOT Portfolio Stoplight Report ndash July 2018
  • ERCOT Portfolio Stoplight Report ndash July 2018
  • ERCOT Portfolio Stoplight Report ndash July 2018
  • ERCOT Portfolio Stoplight Report ndash July 2018
  • ERCOT Portfolio Stoplight Report ndash July 2018
Retail Transactions Summary
July 2018 June 2018 May 2018 April 2018 March 2018 February 2018 January 2018 December 2017 November 2017 October 2017 September 2017 August 2017 July 2017 June 2017 May 2017 April 2017 March 2017 February 2017 January 2017 December 2016 November 2016 October 2016 September 2016 August 2016 July 2016 June 2016 May 2016 April 2016 March 2016 February 2016 January 2016 December 2015 November 2015 October 2015 September 2015 August 2015 July 2015 June 2015 May 2015 April 2015 March 2015 February 2015 January 2015 December 2014 November 2014 October 2014 September 2014 August 2014 July 2014 June 2014 May 2014 April 2014 March 2014 February 2014 January 2014 December 2013 November 2013 October 2013 September 2013 August 2013 July 2013 June 2013 May 2013 April 2013 March 2013 February 2013 January 2013 Grand total
814_01 - Switch Received 121926 109653 96828 81291 95159 76119 88933 60560 77860 78096 79502 84134 84059 108784 130828 71769 67845 66875 87140 66556 56202 64452 67323 86656 82923 86376 75323 70300 76235 68057 63954 61486 52887 65276 70342 81674 91211 102661 86229 81255 79997 73394 72885 71072 67080 110465 175164 89677 99568 101490 111077 91983 93887 71130 86953 69691 55957 166882 82415 93194 102562 103756 116086 78919 68950 64329 67116 1321827
Difference from previous month 12273 12825 15537 (13868) 19040 (12814) 28373 (17300) (236) (1406) (4632) 75 (24725) (22044) 59059 3924 970 (20265) 20584 10354 (8250) (2871) (19333) 3733 (3453) 11053 5023 (5935) 8178 4103 2468 8599 (12389) (5066) (11332) (9537) (11450) 16432 4974 1258 6603 509 1813 3992 (43385) (64699) 85487 (9891) (1922) (9587) 19094 (1904) 22757 (15823) 17262 13734 (110925) 84467 (10779) (9368) (1194) (12330) 37167 9969 4621 (2787)
814_16 - Move - Ins Received 270122 257125 244431 225380 224289 215281 230409 238340 207921 236397 244511 258046 252360 257759 237611 197865 217962 201984 202612 196236 201714 220958 231999 268781 241844 247481 214383 199804 218245 212474 193716 189862 181098 215908 229405 248124 263233 247089 208166 207932 215950 197765 198025 193973 178624 226283 231418 243482 251957 233679 223201 258649 214724 208160 207059 172981 178671 233469 216550 255967 249114 220397 216982 204412 197200 191955 194507 3162148
Difference from previous month 12997 12694 19051 1091 9008 (15128) (7931) 30419 (28476) (8114) (13535) 5686 (5399) 20148 39746 (20097) 15978 (628) 6376 (5478) (19244) (11041) (36782) 26937 (5637) 33098 14579 (18441) 5771 18758 3854 8764 (34810) (13497) (18719) (15109) 16144 38923 234 (8018) 18185 (260) 4052 15349 (47659) (5135) (12064) (8475) 18278 10478 (35448) 43925 6564 1101 34078 (5690) (54798) 16919 (39417) 6853 28717 3415 12570 7212 5245 (2552)
814_24 - MVO and MVO to CSA Received 129820 125861 124403 113795 108753 100127 111821 144987 100830 116519 129103 128104 127073 133582 127218 102055 111459 100285 101107 96289 100578 109493 114094 133170 122932 129025 118022 103789 109278 103747 96628 99552 96214 109578 117949 123894 133905 133855 114675 108275 108859 94864 98233 97901 89578 111857 115918 121662 131607 126785 119107 107956 107266 99428 104273 93385 93977 115469 115524 129594 135196 121446 120049 111598 106467 102429 104399 1660500
814_10 - DTP Mass Acquisition Received - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0
814_10 - DTP Mass Transition Received - 0 - 0 9033 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 639 - 0 - 0 4975 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0
814_18 - CSA AdditionDeletes Received 40217 62083 99016 55581 46720 42587 49740 47725 31726 52888 41597 40616 55770 43745 52139 26702 21791 39082 44030 38884 39856 31786 33061 42622 48489 64178 50499 59475 59400 48536 42179 40351 34796 34420 54677 35078 49489 59611 39384 44247 44577 35386 40420 54831 43550 45039 44268 40405 57954 64408 65032 80184 70310 41156 34811 46680 50347 71847 48606 52585 50867 62747 59763 34925 40977 40389 41227 747237
Total 562085 554722 573711 476047 474921 434114 480903 491612 418337 483900 494713 510900 519262 543870 547796 398391 419057 408226 434889 397965 398350 426689 446477 531229 496188 527060 458227 433368 463158 432814 396477 391251 364995 425182 472373 488770 537838 543216 448454 441709 449383 401409 409563 417777 378832 493644 566768 495865 541086 526362 523392 538772 486187 419874 433096 382737 378952 587667 463095 531340 537739 508346 512880 429854 413594 399102 407249 6891712
Counts from Monthly Retail Transaction report
To do
Break Out 814_10s - AQ and MT
Break Out 814_18 Additions from Deletes
Year-To-Date Transactions Received
Transaction Type July 2018 July 2017 July 2018 July 2017
Switches 669909 617300 121926 84059
Acquisition 0 0 0 0
Move - Ins 1667037 1568153 270122 252360
Move - Outs 814580 802779 129820 127073
Continuous Service Agreements (CSA) 395944 283259 40217 55770
Mass Transitions 9033 0 0 0
Total 3556503 3271491 562085 519262
There has been a change since this was created
Mass Acquisition has been broken out of Mass Transition
Page 37: ERCOT Monthly Operational Overvie · ERCOT Monthly Operational Overview (July 2018) Revised 08.22.18. ERCOT Public. August 15, 2018

PUBLIC

Ancillary and Other Services ndash July 2018

Ancillary and Other Services $ in Millions

Regulation Up Service $1105

Regulation Down Service $072

Responsive Reserve Service $7177

Non-Spinning Reserve Service $1787

Black Start Service $059

Voltage Services - Reactive Power $000

Voltage Services - Lost Opportunity $000

Total Charges Allocated to Load $10200

In July 2018 Ancillary and Other Services was a charge of $10200M compared to bull A charge of $2001M in June 2018bull A charge of $2322M in July 2017

37

PUBLIC

Real-Time Ancillary Service Imbalance (ORDC) ndash July 2018

In July 2018 Real-Time Ancillary Service Imbalance was a charge to load of $2228K compared to bull A charge of $147K in June 2018bull A charge of $534K in July 2017

Real-Time Ancillary Service Imbalance $ in Thousands

Real-Time AS Imbalance ($2228)

Real-Time Reliability Deployment AS Imbalance $000

Total RTASI Amount Allocated to Load $2228

38

PUBLIC

Energy Settlement ndash July 2018

39

Day-Ahead Market Energy Settlement $ in Millions

Energy Purchases $215396

Point to Point Obligation Purchases $11726

Energy Sales ($212592)

Day-Ahead Congestion Rent $14531

Day-Ahead Market Make-Whole Payments ($001)

Real-Time Market Energy Settlement $ in Millions

Energy Imbalance at a Resource Node ($91963)

Energy Imbalance at a Load Zone $160737

Energy Imbalance at a Hub ($57497)

Net Real-Time Energy Imbalance $11276

Real Time Congestion from Self Schedules $013

Block Load Transfers and DC Ties ($2063)

Total Impact to Revenue Neutrality $9227

Load-Allocated Emergency Energy Payments ($016)

Load-Allocated Base Point Deviation Charges $026

Day-Ahead Market energy settlement activity increased from last month and increased from July 2017

Real-Time Market energy settlement activity increased from last month and increased from July 2017

PUBLIC

Congestion Revenue Rights (CRR) ndash July 2018

$ in Millions

Long-Term Auction ($4026)

Monthly Auction ($1773)

Total Auction Revenue ($5799)

Day-Ahead CRR Settlements ($15797)

Day-Ahead CRR Short-Charges $1885

Day-Ahead CRR Short-Charges Refunded ($899)

Day-Ahead CRR Short-Charges Net $986

Total CRR Funding ($14810)

Day-Ahead Point-to-Point Obligations $11726

Real-Time Point-to-Point Obligations ($10113)

Net Point-to-Point Obligations $1614

Congestion Revenue Rights settlement payments were not fully funded Partial funding to settle the CRR Short Charges was provided from the CRR Balancing Account Fund and the remaining $986M of CRR Short Charges were not refunded The CRR Fund Balance is now $0

Point to Point Obligations settled with a net charge of $1614M compared to a net credit of $1758M last month

40

PUBLIC

CRR Balancing Account Fund ndash July 2018

CRR Balancing Account $ in Millions

Monthly Day-Ahead Congestion Rent $14531

Monthly Day-Ahead CRR Settlements ($15797)

Monthly Day-Ahead CRR Short -Charges $1885

CRR Balancing Account Credit Total $619

Beginning Fund Balance for the Month $275

CRR Balancing Account Credit Total $619

Day-Ahead CRR Short-Charges Refunded ($899)

CRR PTP Option Award Charges $004

Load-Allocated CRR Amount $000

Total Fund Amount $000

41

PUBLIC

Revenue Neutrality ndash July 2018

Revenue Neutrality $ in Millions

Real-Time Energy Imbalance $11276

Real-Time Point to Point Obligation ($10113)

Real-Time Congestion from Self-Schedules $013

DC Tie amp Block Load Transfer ($2063)

Allocation to Load $886

In July 2018 the Revenue Neutrality charge to load was $886M compared to bull A charge of $3046M in June 2018bull A charge of $145M in July 2017

42

PUBLIC

Net Allocation to Load ndash July 2018

Market-Based Allocation $ in Millions

Reliability Unit Commitment $000

Ancillary and Other Services $10200

Real-Time Ancillary Service Imbalance $223

Emergency Energy $016

Base Point Deviation ($026)

CRR Auction Revenue ($5799)

CRR Balancing Account $000

Real-Time Revenue Neutrality $886

Reliability Must Run $000

Monthly Block Load Transfer $000

Total $5500

Fee AllocationERCOT Administrative Fee $2207

Net Allocated to Load $7707

In July 2018 the Net Allocation to load was a charge of $7707M compared to bull A charge of $2152M in June 2018bull A credit of $1363M in July 2017

43

PUBLIC

Advanced Meter Settlement Impacts ndash July 2018

July 2018 At month end settling 72M ESIIDs using Advanced Meter data

July 2018 990 of the load in ERCOT is settled with 15-min interval data (AMS Competitive IDR and NOIE IDR)

44

PUBLIC

ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndashJuly 2018

45

PUBLIC

Retail Transaction Volumes ndash Summary ndash July 2018

46

Transaction Type July 2018 July 2017 July 2018 July 2017

Switches 669909 617300 121926 84059

Acquisition 0 0 0 0

Move - Ins 1667037 1568153 270122 252360

Move - Outs 814580 802779 129820 127073

Continuous Service Agreements (CSA) 395944 283259 40217 55770

Mass Transitions 9033 0 0 0

Total 3556503 3271491 562085 519262

Year-To-Date Transactions Received

Board Presentation Input

Trans Volumes by Month_New

PUBLIC

Retail Transaction Volumes ndash Summary ndash July 2018

SwitchesAcquisitions Move-Ins

Move-Outs Mass Transition

47

Projects Report

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018

20000000$ 2018 Portfolio

Spending Estimate

Projects In FlightOn Hold (Count = 100) 24905011$

Projects Not Yet Started (Count = 10) 1320628$

Projects Completed (Count = 43) 795250$

(7020889)$

TOTAL 20000000$

Project Number Projects in Initiation Phase (Count = 4)

TBD IT Asset RecoveryNPRR842 Study Area Load Information

209-03 Study Network (STNET) Integration288-01 EDI Map and Translator Replacement

Impact Metric TolerancesUnfavorable variances are represented as negative numbers within the report - Green = No more than 49 unfavorable variance - Yellow = Unfavorable variance between 49 and 99 - Red = Unfavorable variance more than 99

Spending Reductions Required to Maintain Capital Budget

2018 Project Funding

Footnotes1 - One or more phases took longer than expected resulting in additional time required

2 - One or more phases required more labor than expected resulting in additional funding andor time required

3 - Project placed on holdNA - Metric not calculated because - it is reported at the parent project level or - it is an administrative project

Project Number Projects in Planning Phase (Count = 8) Phase Start Baseline

Phase FinishApproved

Phase FinishScheduled

Go-Live DateScheduled

Phase Finish

134-02 Privileged Account Management (PAM) Phase 2 882018 12192018 12192018 TBD 12192018 0 10

183-01 CMM-FT GUI Integration 12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs

242-01 Portfolio Reporting Assessment 1182017 12192018 12192018 TBD 12192018 0 21260-01 Information Governance Assessment 10182017 5302018 9192018 TBD 9192018 0 5286-01 Java Platform Assessment 6202018 11212018 11212018 TBD 11212018 0 6287-01 Security Constrained Unit Commitment (SCUC) 882018 2272019 2272019 TBD 2272019 0 -1

NPRR484Revisions to Congestion Revenue Rights Credit Calculations and Payments - Phase 1b 2

12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs

NPRR702Flexible Accounts Payment of Invoices and Disposition of Interest on Cash Collateral

12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs

Schedule Health Budget Health

49

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018Project Number Projects in Execution Phase (Count = 42) Phase Start Baseline Go-

Live DateApproved Go-

Live DateScheduled

Go-Live DateScheduled

Phase Finish

170-01 Enterprise Content Alignment Program 8262015 11152017 8312018 8312018 8312018 0 0170-06 ECAP - ECMS Implementation Phase 1 4252018 11302018 11302018 11302018 11302018 0 3173-02 ERCOT Flight Certification Website 11152017 2282019 2282019 2282019 5312019 0 2181-01 CRR Framework Upgrade 10262016 1022017 11192018 11192018 2272019 0 2

183-01 CMM Tech Refresh 3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

193-01 PMU Tool Evaluation and Implementation 12132017 892018 2152019 2152019 3202019 0 0196-01 GINR Project Status Application Replacement 12212016 9142017 2282019 2282019 3312019 0 1198-02 Reactive Power Coordination PoC 962017 6162018 8152018 8152018 8152018 0 54209-02 Weather Imaging and Line Observation (WILO) 5302018 212019 212019 212019 2272019 0 2210-01 REC Technology Refresh 8302017 3182018 12132018 12132018 1162019 0 3228-01 Enterprise Database Upgrade 882018 1292020 1292020 1292020 1292020 0 17229-01 IT Change and Configuration Management Phase 2 822017 6192018 12132018 12132018 3252019 0 2 -9238-01 Application Authentication Tech Refresh 962017 3192018 12132018 12132018 1302019 0 3239-01 Identity and Access Management 592018 3132019 3132019 3132019 3132019 0 2241-01 AREA - Generation 10112017 3302018 892018 892018 952018 0 -4244-01 Corporate Wireless 11292017 3282018 1252018 1252018 192019 0 9245-01 2017 EPS Metering Enhancements 6272018 892019 892019 892019 9252019 0 1246-01 iTest Data Refresh 12132017 1192018 11152018 11152018 122019 0 25249-01 Secondary Wind Forecasting Service 8302017 2282018 892018 892018 952018 0 0253-01 CIP Recovery Plan Project - Planning Phase 1 1312018 8292018 8292018 8292018 8292018 0 -2

257-01Security Constrained Optimal Powerflow in Study Network Analysis

1262017 10252018 10252018 10252018 1282018 0 19

261-01 Generic Transmission Constraint Calculation 372018 12132018 12132018 12132018 1232019 0 0263-01 Market Simulator 4112018 12132018 12132018 12132018 1302019 0 7265-01 Real-Time Assessment Continuity 1312018 12132018 12132018 12132018 1302019 0 0279-01 Cyber Security Project 24 6272018 10262018 10262018 10262018 11282018 0 0280-01 Quest Software Portfolio Transition 442018 6272018 9262018 9262018 9262018 0 13282-01 Synchronous Condenser Outage Modeling 662018 10252018 10252018 10252018 1252018 0 1Various 2015 CMM NPRRs 2 -18

NPRR519Exemption of ERS-Only QSEs from Collateral and Capitalization Requirements

3152017 5192018 12112018 12112018 12312018 0 See 2015 CMM NPRRs

NPRR620Collateral Requirements for Counter-Parties with No Load or Generation

3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

NPRR660 Remove CRR State Change Adder 3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

Budget HealthSchedule Health

50

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018Project Number Projects in Execution Phase (Count = 42) Phase Start Baseline Go-

Live DateApproved Go-

Live DateScheduled

Go-Live DateScheduled

Phase Finish

NPRR741 Clarifications to TPE and EAL Credit Exposure Calculations 3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

NPRR749 Option Cost for Outstanding CRRs 882018 12132018 12132018 12132018 TBD 0 NA See 2015 CMM NPRRs

NPRR755 Data Agent-Only QSE Registration 3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

NPRR819Modification of Non-Price Error Resettlement Thresholds and Resettlement Clean-Ups

592018 892018 892018 892018 952018 0 36

NPRR833 Modify PTP Obligation Bid Clearing Change 882018 12132018 12132018 12132018 TBD 0 1

NPRR843Short-Term System Adequacy and AS Offer Disclosure Reports Additions

7182018 10252018 10252018 10252018 11282018 0 0

NPRR864 RUC Modifications to Consider Market-Based Solutions 6202018 10252018 10252018 10252018 11282018 0 4SCR777 Bilateral CRR Interface Enhancement 10262016 1022017 11192018 11192018 2272019 0 NA See 181-01

SCR781 RARF Replacement 12202017 4252018 12192018 12192018 12192018 0 3SCR791 Correction of 60-day SCED GRD Disclosure Report 522018 892018 892018 892018 952018 0 39SCR795 Addition of Intra-Hour Wind Forecast to GTBD Calculation 882018 10252018 10252018 10252018 11142018 0 0

Project Number Expedited Projects in Execution (Count = 34)

Project Number Projects in Stabilization (Count = 10) Execution

Phase StartBaseline Go-Live Target

Approved Go-Live Target

ActualGo-Live Date

Scheduled Execution Phase

Finish

NPRR648 Remove References to Flowgate Rights 3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR683 Revision to Available Credit Limit Calculation 3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR743 Revision to MCE to Have a Floor For Load Exposure 3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR760 Calculation of Exposure Variables For Days With No Activity 3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR776 Voltage Set Point Communication 9202017 3192018 452018 452018 952018 0 1

NPRR800Revisions to Credit Exposure Calculations to Use Electricity Futures Market Prices

3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR815Revise the Limitation of Load Resources Providing Responsive Reserve (RRS) Service

3212018 5312018 5312018 5312018 8292018 0 2

209-01 Multi Station Breaker to Breaker One Lines 282017 392018 532018 532018 8222018 0 -1259-01 DC SCADA and Metering Upgrade 10252017 1172018 7252018 7252018 8292018 0 22266-01 Remote Email Access Enhancement 12132017 372018 662018 6192018 9262018 2 -7 2 -9

Schedule Health Budget Health

Budget HealthSchedule Health

51

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018

Project Number Projects On Hold (Count = 2) Forecast

Start DateBaseline

Phase FinishApproved Go-

Live TargetScheduled

Go-Live DateScheduled

Phase Finish

SCR789 Update NMMS Topology Processor to PSSE 34 Capability 0

269-01Document Repository Redesign and Governance Implementation - Phase 1

0

Project Number Projects Completed (Count = 20)

Baseline Execution

Phase Start

Baseline Go-Live Target

Approved Go-Live Target

Actual Go-Live Date

Actual Execution Phase Finish

185-01 Records Management and eDiscovery 12152016 5242017 8292017 8222017 12132017 2 0224-01 TelAlert Replacement 452017 6272017 842017 842017 592018 0 5230-01 SAS Technical Architecture Redesign 312017 12132017 12132017 12132017 6272018 0 2234-01 Reporting Solution Resiliency (RSR) 452017 8232017 11272017 11272017 1102018 0 8240-01 EDI Translator and Mapping Replacement Assessment 4192017 9272017 2282018 TBD 372018 -2 20254-01 Retail Windows Upgrade 10112017 12182017 12182017 1222018 272018 1 -51 65255-01 Settlements Architecture Enhancements 10252017 1112018 1112018 1192018 2142018 1 -10 53258-01 WD Kainos SMART Automation Testing Tool 4112018 642018 642018 662018 7182018 -3 33271-01 Issue Tracking and Resolution Tool Assessment 12132017 4252018 4252018 TBD 522018 1 -5 -1272-01 Operator Training Simulator Black Start GE Effort 1262017 4252018 4252018 4272018 5162018 -1 19274-01 Average Mid-Term Load Forecast 372018 5312018 5312018 5312018 6272018 0 50

NPRR768Revisions to Real-Time On-Line Reliability Deployment Price Adder Categories

372018 5312018 5312018 5312018 6272018 0 16

NPRR778 Modifications to Date Change and Cancellation Evaluation Window 7192017 10292017 12112017 12112017 1312018 0 23

NPRR782Settlement of Infeasible Ancillary Services Due to Transmission Constraints

5242017 8312017 1122017 1122017 1102018 0 20

NPRR808 Three Year CRR Auction 8232017 9182017 9182017 912017 1312018 65 68

NPRR810Applicability of RMR Incentive Factor on Reservation and Transportation Costs Associated with Firm Fuel Supplies

7172017 11122017 3312018 3312018 3312018 0 NA See 233-00

NPRR830 Revision of 4-Coincident Peak Methodology 12132017 262018 262018 262018 372018 0 85

NPRR831 Inclusion of Private Use Networks in Load Zone Price Calculations 822017 1122017 1122017 1122017 2212018 0 33

OBDRR002 ORDC OBD Revisions for PUCT Project 47199 372018 5312018 5312018 5312018 6272018 0 See NPRR768

SCR792 Enhance Communications of BAAL Exceedances 2142018 452018 452018 452018 4252018 0 69

Project Number Expedited Projects Completed (Count = 23)

Budget HealthSchedule Health

Budget HealthSchedule Health

52

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018

Project Number 2018 Projects Not Yet Started (Count = 10) Forecast

Start Date

NPRR858 Provide Complete Current Operating Plan (COP) Data Aug-2018TBD 2018 OS Enhancements Aug-2018TBD Additional Branch Limit for Relays Aug-2018

NPRR817 Create a Panhandle Hub Sep-2018NPRR821 Elimination of the CRR Deration Process Oct-2018NPRR865 Publish RTM Shift Factors for Hubs Load Zones and DC Ties Oct-2018

SCR793SSR Related Telemetry for Transmission Service Provider (TSP) Operators

Oct-2018

ECAP ECAP - ECMS Implementation Phase 2 Oct-2018TBD Job Scheduler Update in CSI Framework Oct-2018TBD Parameter Estimation Oct-2018

53

  • Slide Number 1
  • Slide Number 2
  • Summary ndash July 2018
  • Daily Peak Demand Hourly Average Actual vs Forecast Wind Day-Ahead COPs amp On-Line Capacity at Peak ndash July 2018
  • Actual Wind Output plus Curtailments vs Wind Day-Ahead COPs for All Hours ndash July 2018
  • ERCOTrsquos CPS1 Monthly Performance ndash July 2018
  • Monthly Peak Actual Demand ndash July 2018
  • Monthly Minimum Actual 15-Minute Demand ndash July 2018
  • Day-Ahead Load Forecast Performance ndash July 2018
  • Reliability Unit Commitment (RUC) Capacity by Weather Zone ndash July 2018
  • Generic Transmission Constraints (GTCs) ndash July 2018
  • Advisories and Watches ndash July 2018 Corrected
  • Lake Levels Update ndash August 1 2018
  • Planning Summary ndash July 2018
  • Mapping of Counties to ERCOT Zones ndash July 2018
  • Cumulative MW Capacity of Interconnection Requests by Zone ndashJuly 2018
  • Cumulative MW Capacity of Interconnection Requests by Zone ndashJuly 2018
  • Cumulative MW Capacity of Interconnection Requests by Zone ndashJuly 2018
  • Wind Generation ndash July 2018
  • Solar Generation ndash July 2018
  • Generation Interconnection Activity by Fuel ndash July 2018
  • Generation Interconnection Activity by Project Phase ndash July 2018
  • Slide Number 23
  • Day-Ahead Schedule (Hourly Average) ndash July 2018
  • Percentage of Real-Time Load Hedged in the DAM (Counter-Party Level) ndash July 2018
  • DAM and RTM Price Convergence ndash July 2018
  • Day-Ahead Electricity and Ancillary Service Prices (Hourly Average) ndash July 2018
  • Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash July 2018
  • Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash July 2018
  • DRUC Monthly Summary (Hourly Average) ndash July 2018
  • HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash July 2018
  • NonndashSpinning Reserve Service Deployment ndash July 2018
  • CRR Price Convergence ndash July 2018
  • Daily Average System Lambda and ORDC Price Adders ndash July 2018
  • ERS Procurement for June 2018 ndash September 2018
  • Reliability Services ndash July 2018
  • Ancillary and Other Services ndash July 2018
  • Real-Time Ancillary Service Imbalance (ORDC) ndash July 2018
  • Energy Settlement ndash July 2018
  • Congestion Revenue Rights (CRR) ndash July 2018
  • CRR Balancing Account Fund ndash July 2018
  • Revenue Neutrality ndash July 2018
  • Net Allocation to Load ndash July 2018
  • Advanced Meter Settlement Impacts ndash July 2018
  • ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndash July 2018
  • Retail Transaction Volumes ndash Summary ndash July 2018
  • Retail Transaction Volumes ndash Summary ndash July 2018
  • Slide Number 48
  • ERCOT Portfolio Stoplight Report ndash July 2018
  • ERCOT Portfolio Stoplight Report ndash July 2018
  • ERCOT Portfolio Stoplight Report ndash July 2018
  • ERCOT Portfolio Stoplight Report ndash July 2018
  • ERCOT Portfolio Stoplight Report ndash July 2018
Retail Transactions Summary
July 2018 June 2018 May 2018 April 2018 March 2018 February 2018 January 2018 December 2017 November 2017 October 2017 September 2017 August 2017 July 2017 June 2017 May 2017 April 2017 March 2017 February 2017 January 2017 December 2016 November 2016 October 2016 September 2016 August 2016 July 2016 June 2016 May 2016 April 2016 March 2016 February 2016 January 2016 December 2015 November 2015 October 2015 September 2015 August 2015 July 2015 June 2015 May 2015 April 2015 March 2015 February 2015 January 2015 December 2014 November 2014 October 2014 September 2014 August 2014 July 2014 June 2014 May 2014 April 2014 March 2014 February 2014 January 2014 December 2013 November 2013 October 2013 September 2013 August 2013 July 2013 June 2013 May 2013 April 2013 March 2013 February 2013 January 2013 Grand total
814_01 - Switch Received 121926 109653 96828 81291 95159 76119 88933 60560 77860 78096 79502 84134 84059 108784 130828 71769 67845 66875 87140 66556 56202 64452 67323 86656 82923 86376 75323 70300 76235 68057 63954 61486 52887 65276 70342 81674 91211 102661 86229 81255 79997 73394 72885 71072 67080 110465 175164 89677 99568 101490 111077 91983 93887 71130 86953 69691 55957 166882 82415 93194 102562 103756 116086 78919 68950 64329 67116 1321827
Difference from previous month 12273 12825 15537 (13868) 19040 (12814) 28373 (17300) (236) (1406) (4632) 75 (24725) (22044) 59059 3924 970 (20265) 20584 10354 (8250) (2871) (19333) 3733 (3453) 11053 5023 (5935) 8178 4103 2468 8599 (12389) (5066) (11332) (9537) (11450) 16432 4974 1258 6603 509 1813 3992 (43385) (64699) 85487 (9891) (1922) (9587) 19094 (1904) 22757 (15823) 17262 13734 (110925) 84467 (10779) (9368) (1194) (12330) 37167 9969 4621 (2787)
814_16 - Move - Ins Received 270122 257125 244431 225380 224289 215281 230409 238340 207921 236397 244511 258046 252360 257759 237611 197865 217962 201984 202612 196236 201714 220958 231999 268781 241844 247481 214383 199804 218245 212474 193716 189862 181098 215908 229405 248124 263233 247089 208166 207932 215950 197765 198025 193973 178624 226283 231418 243482 251957 233679 223201 258649 214724 208160 207059 172981 178671 233469 216550 255967 249114 220397 216982 204412 197200 191955 194507 3162148
Difference from previous month 12997 12694 19051 1091 9008 (15128) (7931) 30419 (28476) (8114) (13535) 5686 (5399) 20148 39746 (20097) 15978 (628) 6376 (5478) (19244) (11041) (36782) 26937 (5637) 33098 14579 (18441) 5771 18758 3854 8764 (34810) (13497) (18719) (15109) 16144 38923 234 (8018) 18185 (260) 4052 15349 (47659) (5135) (12064) (8475) 18278 10478 (35448) 43925 6564 1101 34078 (5690) (54798) 16919 (39417) 6853 28717 3415 12570 7212 5245 (2552)
814_24 - MVO and MVO to CSA Received 129820 125861 124403 113795 108753 100127 111821 144987 100830 116519 129103 128104 127073 133582 127218 102055 111459 100285 101107 96289 100578 109493 114094 133170 122932 129025 118022 103789 109278 103747 96628 99552 96214 109578 117949 123894 133905 133855 114675 108275 108859 94864 98233 97901 89578 111857 115918 121662 131607 126785 119107 107956 107266 99428 104273 93385 93977 115469 115524 129594 135196 121446 120049 111598 106467 102429 104399 1660500
814_10 - DTP Mass Acquisition Received - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0
814_10 - DTP Mass Transition Received - 0 - 0 9033 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 639 - 0 - 0 4975 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0
814_18 - CSA AdditionDeletes Received 40217 62083 99016 55581 46720 42587 49740 47725 31726 52888 41597 40616 55770 43745 52139 26702 21791 39082 44030 38884 39856 31786 33061 42622 48489 64178 50499 59475 59400 48536 42179 40351 34796 34420 54677 35078 49489 59611 39384 44247 44577 35386 40420 54831 43550 45039 44268 40405 57954 64408 65032 80184 70310 41156 34811 46680 50347 71847 48606 52585 50867 62747 59763 34925 40977 40389 41227 747237
Total 562085 554722 573711 476047 474921 434114 480903 491612 418337 483900 494713 510900 519262 543870 547796 398391 419057 408226 434889 397965 398350 426689 446477 531229 496188 527060 458227 433368 463158 432814 396477 391251 364995 425182 472373 488770 537838 543216 448454 441709 449383 401409 409563 417777 378832 493644 566768 495865 541086 526362 523392 538772 486187 419874 433096 382737 378952 587667 463095 531340 537739 508346 512880 429854 413594 399102 407249 6891712
Counts from Monthly Retail Transaction report
To do
Break Out 814_10s - AQ and MT
Break Out 814_18 Additions from Deletes
Year-To-Date Transactions Received
Transaction Type July 2018 July 2017 July 2018 July 2017
Switches 669909 617300 121926 84059
Acquisition 0 0 0 0
Move - Ins 1667037 1568153 270122 252360
Move - Outs 814580 802779 129820 127073
Continuous Service Agreements (CSA) 395944 283259 40217 55770
Mass Transitions 9033 0 0 0
Total 3556503 3271491 562085 519262
There has been a change since this was created
Mass Acquisition has been broken out of Mass Transition
Page 38: ERCOT Monthly Operational Overvie · ERCOT Monthly Operational Overview (July 2018) Revised 08.22.18. ERCOT Public. August 15, 2018

PUBLIC

Real-Time Ancillary Service Imbalance (ORDC) ndash July 2018

In July 2018 Real-Time Ancillary Service Imbalance was a charge to load of $2228K compared to bull A charge of $147K in June 2018bull A charge of $534K in July 2017

Real-Time Ancillary Service Imbalance $ in Thousands

Real-Time AS Imbalance ($2228)

Real-Time Reliability Deployment AS Imbalance $000

Total RTASI Amount Allocated to Load $2228

38

PUBLIC

Energy Settlement ndash July 2018

39

Day-Ahead Market Energy Settlement $ in Millions

Energy Purchases $215396

Point to Point Obligation Purchases $11726

Energy Sales ($212592)

Day-Ahead Congestion Rent $14531

Day-Ahead Market Make-Whole Payments ($001)

Real-Time Market Energy Settlement $ in Millions

Energy Imbalance at a Resource Node ($91963)

Energy Imbalance at a Load Zone $160737

Energy Imbalance at a Hub ($57497)

Net Real-Time Energy Imbalance $11276

Real Time Congestion from Self Schedules $013

Block Load Transfers and DC Ties ($2063)

Total Impact to Revenue Neutrality $9227

Load-Allocated Emergency Energy Payments ($016)

Load-Allocated Base Point Deviation Charges $026

Day-Ahead Market energy settlement activity increased from last month and increased from July 2017

Real-Time Market energy settlement activity increased from last month and increased from July 2017

PUBLIC

Congestion Revenue Rights (CRR) ndash July 2018

$ in Millions

Long-Term Auction ($4026)

Monthly Auction ($1773)

Total Auction Revenue ($5799)

Day-Ahead CRR Settlements ($15797)

Day-Ahead CRR Short-Charges $1885

Day-Ahead CRR Short-Charges Refunded ($899)

Day-Ahead CRR Short-Charges Net $986

Total CRR Funding ($14810)

Day-Ahead Point-to-Point Obligations $11726

Real-Time Point-to-Point Obligations ($10113)

Net Point-to-Point Obligations $1614

Congestion Revenue Rights settlement payments were not fully funded Partial funding to settle the CRR Short Charges was provided from the CRR Balancing Account Fund and the remaining $986M of CRR Short Charges were not refunded The CRR Fund Balance is now $0

Point to Point Obligations settled with a net charge of $1614M compared to a net credit of $1758M last month

40

PUBLIC

CRR Balancing Account Fund ndash July 2018

CRR Balancing Account $ in Millions

Monthly Day-Ahead Congestion Rent $14531

Monthly Day-Ahead CRR Settlements ($15797)

Monthly Day-Ahead CRR Short -Charges $1885

CRR Balancing Account Credit Total $619

Beginning Fund Balance for the Month $275

CRR Balancing Account Credit Total $619

Day-Ahead CRR Short-Charges Refunded ($899)

CRR PTP Option Award Charges $004

Load-Allocated CRR Amount $000

Total Fund Amount $000

41

PUBLIC

Revenue Neutrality ndash July 2018

Revenue Neutrality $ in Millions

Real-Time Energy Imbalance $11276

Real-Time Point to Point Obligation ($10113)

Real-Time Congestion from Self-Schedules $013

DC Tie amp Block Load Transfer ($2063)

Allocation to Load $886

In July 2018 the Revenue Neutrality charge to load was $886M compared to bull A charge of $3046M in June 2018bull A charge of $145M in July 2017

42

PUBLIC

Net Allocation to Load ndash July 2018

Market-Based Allocation $ in Millions

Reliability Unit Commitment $000

Ancillary and Other Services $10200

Real-Time Ancillary Service Imbalance $223

Emergency Energy $016

Base Point Deviation ($026)

CRR Auction Revenue ($5799)

CRR Balancing Account $000

Real-Time Revenue Neutrality $886

Reliability Must Run $000

Monthly Block Load Transfer $000

Total $5500

Fee AllocationERCOT Administrative Fee $2207

Net Allocated to Load $7707

In July 2018 the Net Allocation to load was a charge of $7707M compared to bull A charge of $2152M in June 2018bull A credit of $1363M in July 2017

43

PUBLIC

Advanced Meter Settlement Impacts ndash July 2018

July 2018 At month end settling 72M ESIIDs using Advanced Meter data

July 2018 990 of the load in ERCOT is settled with 15-min interval data (AMS Competitive IDR and NOIE IDR)

44

PUBLIC

ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndashJuly 2018

45

PUBLIC

Retail Transaction Volumes ndash Summary ndash July 2018

46

Transaction Type July 2018 July 2017 July 2018 July 2017

Switches 669909 617300 121926 84059

Acquisition 0 0 0 0

Move - Ins 1667037 1568153 270122 252360

Move - Outs 814580 802779 129820 127073

Continuous Service Agreements (CSA) 395944 283259 40217 55770

Mass Transitions 9033 0 0 0

Total 3556503 3271491 562085 519262

Year-To-Date Transactions Received

Board Presentation Input

Trans Volumes by Month_New

PUBLIC

Retail Transaction Volumes ndash Summary ndash July 2018

SwitchesAcquisitions Move-Ins

Move-Outs Mass Transition

47

Projects Report

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018

20000000$ 2018 Portfolio

Spending Estimate

Projects In FlightOn Hold (Count = 100) 24905011$

Projects Not Yet Started (Count = 10) 1320628$

Projects Completed (Count = 43) 795250$

(7020889)$

TOTAL 20000000$

Project Number Projects in Initiation Phase (Count = 4)

TBD IT Asset RecoveryNPRR842 Study Area Load Information

209-03 Study Network (STNET) Integration288-01 EDI Map and Translator Replacement

Impact Metric TolerancesUnfavorable variances are represented as negative numbers within the report - Green = No more than 49 unfavorable variance - Yellow = Unfavorable variance between 49 and 99 - Red = Unfavorable variance more than 99

Spending Reductions Required to Maintain Capital Budget

2018 Project Funding

Footnotes1 - One or more phases took longer than expected resulting in additional time required

2 - One or more phases required more labor than expected resulting in additional funding andor time required

3 - Project placed on holdNA - Metric not calculated because - it is reported at the parent project level or - it is an administrative project

Project Number Projects in Planning Phase (Count = 8) Phase Start Baseline

Phase FinishApproved

Phase FinishScheduled

Go-Live DateScheduled

Phase Finish

134-02 Privileged Account Management (PAM) Phase 2 882018 12192018 12192018 TBD 12192018 0 10

183-01 CMM-FT GUI Integration 12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs

242-01 Portfolio Reporting Assessment 1182017 12192018 12192018 TBD 12192018 0 21260-01 Information Governance Assessment 10182017 5302018 9192018 TBD 9192018 0 5286-01 Java Platform Assessment 6202018 11212018 11212018 TBD 11212018 0 6287-01 Security Constrained Unit Commitment (SCUC) 882018 2272019 2272019 TBD 2272019 0 -1

NPRR484Revisions to Congestion Revenue Rights Credit Calculations and Payments - Phase 1b 2

12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs

NPRR702Flexible Accounts Payment of Invoices and Disposition of Interest on Cash Collateral

12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs

Schedule Health Budget Health

49

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018Project Number Projects in Execution Phase (Count = 42) Phase Start Baseline Go-

Live DateApproved Go-

Live DateScheduled

Go-Live DateScheduled

Phase Finish

170-01 Enterprise Content Alignment Program 8262015 11152017 8312018 8312018 8312018 0 0170-06 ECAP - ECMS Implementation Phase 1 4252018 11302018 11302018 11302018 11302018 0 3173-02 ERCOT Flight Certification Website 11152017 2282019 2282019 2282019 5312019 0 2181-01 CRR Framework Upgrade 10262016 1022017 11192018 11192018 2272019 0 2

183-01 CMM Tech Refresh 3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

193-01 PMU Tool Evaluation and Implementation 12132017 892018 2152019 2152019 3202019 0 0196-01 GINR Project Status Application Replacement 12212016 9142017 2282019 2282019 3312019 0 1198-02 Reactive Power Coordination PoC 962017 6162018 8152018 8152018 8152018 0 54209-02 Weather Imaging and Line Observation (WILO) 5302018 212019 212019 212019 2272019 0 2210-01 REC Technology Refresh 8302017 3182018 12132018 12132018 1162019 0 3228-01 Enterprise Database Upgrade 882018 1292020 1292020 1292020 1292020 0 17229-01 IT Change and Configuration Management Phase 2 822017 6192018 12132018 12132018 3252019 0 2 -9238-01 Application Authentication Tech Refresh 962017 3192018 12132018 12132018 1302019 0 3239-01 Identity and Access Management 592018 3132019 3132019 3132019 3132019 0 2241-01 AREA - Generation 10112017 3302018 892018 892018 952018 0 -4244-01 Corporate Wireless 11292017 3282018 1252018 1252018 192019 0 9245-01 2017 EPS Metering Enhancements 6272018 892019 892019 892019 9252019 0 1246-01 iTest Data Refresh 12132017 1192018 11152018 11152018 122019 0 25249-01 Secondary Wind Forecasting Service 8302017 2282018 892018 892018 952018 0 0253-01 CIP Recovery Plan Project - Planning Phase 1 1312018 8292018 8292018 8292018 8292018 0 -2

257-01Security Constrained Optimal Powerflow in Study Network Analysis

1262017 10252018 10252018 10252018 1282018 0 19

261-01 Generic Transmission Constraint Calculation 372018 12132018 12132018 12132018 1232019 0 0263-01 Market Simulator 4112018 12132018 12132018 12132018 1302019 0 7265-01 Real-Time Assessment Continuity 1312018 12132018 12132018 12132018 1302019 0 0279-01 Cyber Security Project 24 6272018 10262018 10262018 10262018 11282018 0 0280-01 Quest Software Portfolio Transition 442018 6272018 9262018 9262018 9262018 0 13282-01 Synchronous Condenser Outage Modeling 662018 10252018 10252018 10252018 1252018 0 1Various 2015 CMM NPRRs 2 -18

NPRR519Exemption of ERS-Only QSEs from Collateral and Capitalization Requirements

3152017 5192018 12112018 12112018 12312018 0 See 2015 CMM NPRRs

NPRR620Collateral Requirements for Counter-Parties with No Load or Generation

3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

NPRR660 Remove CRR State Change Adder 3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

Budget HealthSchedule Health

50

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018Project Number Projects in Execution Phase (Count = 42) Phase Start Baseline Go-

Live DateApproved Go-

Live DateScheduled

Go-Live DateScheduled

Phase Finish

NPRR741 Clarifications to TPE and EAL Credit Exposure Calculations 3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

NPRR749 Option Cost for Outstanding CRRs 882018 12132018 12132018 12132018 TBD 0 NA See 2015 CMM NPRRs

NPRR755 Data Agent-Only QSE Registration 3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

NPRR819Modification of Non-Price Error Resettlement Thresholds and Resettlement Clean-Ups

592018 892018 892018 892018 952018 0 36

NPRR833 Modify PTP Obligation Bid Clearing Change 882018 12132018 12132018 12132018 TBD 0 1

NPRR843Short-Term System Adequacy and AS Offer Disclosure Reports Additions

7182018 10252018 10252018 10252018 11282018 0 0

NPRR864 RUC Modifications to Consider Market-Based Solutions 6202018 10252018 10252018 10252018 11282018 0 4SCR777 Bilateral CRR Interface Enhancement 10262016 1022017 11192018 11192018 2272019 0 NA See 181-01

SCR781 RARF Replacement 12202017 4252018 12192018 12192018 12192018 0 3SCR791 Correction of 60-day SCED GRD Disclosure Report 522018 892018 892018 892018 952018 0 39SCR795 Addition of Intra-Hour Wind Forecast to GTBD Calculation 882018 10252018 10252018 10252018 11142018 0 0

Project Number Expedited Projects in Execution (Count = 34)

Project Number Projects in Stabilization (Count = 10) Execution

Phase StartBaseline Go-Live Target

Approved Go-Live Target

ActualGo-Live Date

Scheduled Execution Phase

Finish

NPRR648 Remove References to Flowgate Rights 3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR683 Revision to Available Credit Limit Calculation 3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR743 Revision to MCE to Have a Floor For Load Exposure 3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR760 Calculation of Exposure Variables For Days With No Activity 3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR776 Voltage Set Point Communication 9202017 3192018 452018 452018 952018 0 1

NPRR800Revisions to Credit Exposure Calculations to Use Electricity Futures Market Prices

3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR815Revise the Limitation of Load Resources Providing Responsive Reserve (RRS) Service

3212018 5312018 5312018 5312018 8292018 0 2

209-01 Multi Station Breaker to Breaker One Lines 282017 392018 532018 532018 8222018 0 -1259-01 DC SCADA and Metering Upgrade 10252017 1172018 7252018 7252018 8292018 0 22266-01 Remote Email Access Enhancement 12132017 372018 662018 6192018 9262018 2 -7 2 -9

Schedule Health Budget Health

Budget HealthSchedule Health

51

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018

Project Number Projects On Hold (Count = 2) Forecast

Start DateBaseline

Phase FinishApproved Go-

Live TargetScheduled

Go-Live DateScheduled

Phase Finish

SCR789 Update NMMS Topology Processor to PSSE 34 Capability 0

269-01Document Repository Redesign and Governance Implementation - Phase 1

0

Project Number Projects Completed (Count = 20)

Baseline Execution

Phase Start

Baseline Go-Live Target

Approved Go-Live Target

Actual Go-Live Date

Actual Execution Phase Finish

185-01 Records Management and eDiscovery 12152016 5242017 8292017 8222017 12132017 2 0224-01 TelAlert Replacement 452017 6272017 842017 842017 592018 0 5230-01 SAS Technical Architecture Redesign 312017 12132017 12132017 12132017 6272018 0 2234-01 Reporting Solution Resiliency (RSR) 452017 8232017 11272017 11272017 1102018 0 8240-01 EDI Translator and Mapping Replacement Assessment 4192017 9272017 2282018 TBD 372018 -2 20254-01 Retail Windows Upgrade 10112017 12182017 12182017 1222018 272018 1 -51 65255-01 Settlements Architecture Enhancements 10252017 1112018 1112018 1192018 2142018 1 -10 53258-01 WD Kainos SMART Automation Testing Tool 4112018 642018 642018 662018 7182018 -3 33271-01 Issue Tracking and Resolution Tool Assessment 12132017 4252018 4252018 TBD 522018 1 -5 -1272-01 Operator Training Simulator Black Start GE Effort 1262017 4252018 4252018 4272018 5162018 -1 19274-01 Average Mid-Term Load Forecast 372018 5312018 5312018 5312018 6272018 0 50

NPRR768Revisions to Real-Time On-Line Reliability Deployment Price Adder Categories

372018 5312018 5312018 5312018 6272018 0 16

NPRR778 Modifications to Date Change and Cancellation Evaluation Window 7192017 10292017 12112017 12112017 1312018 0 23

NPRR782Settlement of Infeasible Ancillary Services Due to Transmission Constraints

5242017 8312017 1122017 1122017 1102018 0 20

NPRR808 Three Year CRR Auction 8232017 9182017 9182017 912017 1312018 65 68

NPRR810Applicability of RMR Incentive Factor on Reservation and Transportation Costs Associated with Firm Fuel Supplies

7172017 11122017 3312018 3312018 3312018 0 NA See 233-00

NPRR830 Revision of 4-Coincident Peak Methodology 12132017 262018 262018 262018 372018 0 85

NPRR831 Inclusion of Private Use Networks in Load Zone Price Calculations 822017 1122017 1122017 1122017 2212018 0 33

OBDRR002 ORDC OBD Revisions for PUCT Project 47199 372018 5312018 5312018 5312018 6272018 0 See NPRR768

SCR792 Enhance Communications of BAAL Exceedances 2142018 452018 452018 452018 4252018 0 69

Project Number Expedited Projects Completed (Count = 23)

Budget HealthSchedule Health

Budget HealthSchedule Health

52

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018

Project Number 2018 Projects Not Yet Started (Count = 10) Forecast

Start Date

NPRR858 Provide Complete Current Operating Plan (COP) Data Aug-2018TBD 2018 OS Enhancements Aug-2018TBD Additional Branch Limit for Relays Aug-2018

NPRR817 Create a Panhandle Hub Sep-2018NPRR821 Elimination of the CRR Deration Process Oct-2018NPRR865 Publish RTM Shift Factors for Hubs Load Zones and DC Ties Oct-2018

SCR793SSR Related Telemetry for Transmission Service Provider (TSP) Operators

Oct-2018

ECAP ECAP - ECMS Implementation Phase 2 Oct-2018TBD Job Scheduler Update in CSI Framework Oct-2018TBD Parameter Estimation Oct-2018

53

  • Slide Number 1
  • Slide Number 2
  • Summary ndash July 2018
  • Daily Peak Demand Hourly Average Actual vs Forecast Wind Day-Ahead COPs amp On-Line Capacity at Peak ndash July 2018
  • Actual Wind Output plus Curtailments vs Wind Day-Ahead COPs for All Hours ndash July 2018
  • ERCOTrsquos CPS1 Monthly Performance ndash July 2018
  • Monthly Peak Actual Demand ndash July 2018
  • Monthly Minimum Actual 15-Minute Demand ndash July 2018
  • Day-Ahead Load Forecast Performance ndash July 2018
  • Reliability Unit Commitment (RUC) Capacity by Weather Zone ndash July 2018
  • Generic Transmission Constraints (GTCs) ndash July 2018
  • Advisories and Watches ndash July 2018 Corrected
  • Lake Levels Update ndash August 1 2018
  • Planning Summary ndash July 2018
  • Mapping of Counties to ERCOT Zones ndash July 2018
  • Cumulative MW Capacity of Interconnection Requests by Zone ndashJuly 2018
  • Cumulative MW Capacity of Interconnection Requests by Zone ndashJuly 2018
  • Cumulative MW Capacity of Interconnection Requests by Zone ndashJuly 2018
  • Wind Generation ndash July 2018
  • Solar Generation ndash July 2018
  • Generation Interconnection Activity by Fuel ndash July 2018
  • Generation Interconnection Activity by Project Phase ndash July 2018
  • Slide Number 23
  • Day-Ahead Schedule (Hourly Average) ndash July 2018
  • Percentage of Real-Time Load Hedged in the DAM (Counter-Party Level) ndash July 2018
  • DAM and RTM Price Convergence ndash July 2018
  • Day-Ahead Electricity and Ancillary Service Prices (Hourly Average) ndash July 2018
  • Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash July 2018
  • Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash July 2018
  • DRUC Monthly Summary (Hourly Average) ndash July 2018
  • HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash July 2018
  • NonndashSpinning Reserve Service Deployment ndash July 2018
  • CRR Price Convergence ndash July 2018
  • Daily Average System Lambda and ORDC Price Adders ndash July 2018
  • ERS Procurement for June 2018 ndash September 2018
  • Reliability Services ndash July 2018
  • Ancillary and Other Services ndash July 2018
  • Real-Time Ancillary Service Imbalance (ORDC) ndash July 2018
  • Energy Settlement ndash July 2018
  • Congestion Revenue Rights (CRR) ndash July 2018
  • CRR Balancing Account Fund ndash July 2018
  • Revenue Neutrality ndash July 2018
  • Net Allocation to Load ndash July 2018
  • Advanced Meter Settlement Impacts ndash July 2018
  • ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndash July 2018
  • Retail Transaction Volumes ndash Summary ndash July 2018
  • Retail Transaction Volumes ndash Summary ndash July 2018
  • Slide Number 48
  • ERCOT Portfolio Stoplight Report ndash July 2018
  • ERCOT Portfolio Stoplight Report ndash July 2018
  • ERCOT Portfolio Stoplight Report ndash July 2018
  • ERCOT Portfolio Stoplight Report ndash July 2018
  • ERCOT Portfolio Stoplight Report ndash July 2018
Retail Transactions Summary
July 2018 June 2018 May 2018 April 2018 March 2018 February 2018 January 2018 December 2017 November 2017 October 2017 September 2017 August 2017 July 2017 June 2017 May 2017 April 2017 March 2017 February 2017 January 2017 December 2016 November 2016 October 2016 September 2016 August 2016 July 2016 June 2016 May 2016 April 2016 March 2016 February 2016 January 2016 December 2015 November 2015 October 2015 September 2015 August 2015 July 2015 June 2015 May 2015 April 2015 March 2015 February 2015 January 2015 December 2014 November 2014 October 2014 September 2014 August 2014 July 2014 June 2014 May 2014 April 2014 March 2014 February 2014 January 2014 December 2013 November 2013 October 2013 September 2013 August 2013 July 2013 June 2013 May 2013 April 2013 March 2013 February 2013 January 2013 Grand total
814_01 - Switch Received 121926 109653 96828 81291 95159 76119 88933 60560 77860 78096 79502 84134 84059 108784 130828 71769 67845 66875 87140 66556 56202 64452 67323 86656 82923 86376 75323 70300 76235 68057 63954 61486 52887 65276 70342 81674 91211 102661 86229 81255 79997 73394 72885 71072 67080 110465 175164 89677 99568 101490 111077 91983 93887 71130 86953 69691 55957 166882 82415 93194 102562 103756 116086 78919 68950 64329 67116 1321827
Difference from previous month 12273 12825 15537 (13868) 19040 (12814) 28373 (17300) (236) (1406) (4632) 75 (24725) (22044) 59059 3924 970 (20265) 20584 10354 (8250) (2871) (19333) 3733 (3453) 11053 5023 (5935) 8178 4103 2468 8599 (12389) (5066) (11332) (9537) (11450) 16432 4974 1258 6603 509 1813 3992 (43385) (64699) 85487 (9891) (1922) (9587) 19094 (1904) 22757 (15823) 17262 13734 (110925) 84467 (10779) (9368) (1194) (12330) 37167 9969 4621 (2787)
814_16 - Move - Ins Received 270122 257125 244431 225380 224289 215281 230409 238340 207921 236397 244511 258046 252360 257759 237611 197865 217962 201984 202612 196236 201714 220958 231999 268781 241844 247481 214383 199804 218245 212474 193716 189862 181098 215908 229405 248124 263233 247089 208166 207932 215950 197765 198025 193973 178624 226283 231418 243482 251957 233679 223201 258649 214724 208160 207059 172981 178671 233469 216550 255967 249114 220397 216982 204412 197200 191955 194507 3162148
Difference from previous month 12997 12694 19051 1091 9008 (15128) (7931) 30419 (28476) (8114) (13535) 5686 (5399) 20148 39746 (20097) 15978 (628) 6376 (5478) (19244) (11041) (36782) 26937 (5637) 33098 14579 (18441) 5771 18758 3854 8764 (34810) (13497) (18719) (15109) 16144 38923 234 (8018) 18185 (260) 4052 15349 (47659) (5135) (12064) (8475) 18278 10478 (35448) 43925 6564 1101 34078 (5690) (54798) 16919 (39417) 6853 28717 3415 12570 7212 5245 (2552)
814_24 - MVO and MVO to CSA Received 129820 125861 124403 113795 108753 100127 111821 144987 100830 116519 129103 128104 127073 133582 127218 102055 111459 100285 101107 96289 100578 109493 114094 133170 122932 129025 118022 103789 109278 103747 96628 99552 96214 109578 117949 123894 133905 133855 114675 108275 108859 94864 98233 97901 89578 111857 115918 121662 131607 126785 119107 107956 107266 99428 104273 93385 93977 115469 115524 129594 135196 121446 120049 111598 106467 102429 104399 1660500
814_10 - DTP Mass Acquisition Received - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0
814_10 - DTP Mass Transition Received - 0 - 0 9033 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 639 - 0 - 0 4975 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0
814_18 - CSA AdditionDeletes Received 40217 62083 99016 55581 46720 42587 49740 47725 31726 52888 41597 40616 55770 43745 52139 26702 21791 39082 44030 38884 39856 31786 33061 42622 48489 64178 50499 59475 59400 48536 42179 40351 34796 34420 54677 35078 49489 59611 39384 44247 44577 35386 40420 54831 43550 45039 44268 40405 57954 64408 65032 80184 70310 41156 34811 46680 50347 71847 48606 52585 50867 62747 59763 34925 40977 40389 41227 747237
Total 562085 554722 573711 476047 474921 434114 480903 491612 418337 483900 494713 510900 519262 543870 547796 398391 419057 408226 434889 397965 398350 426689 446477 531229 496188 527060 458227 433368 463158 432814 396477 391251 364995 425182 472373 488770 537838 543216 448454 441709 449383 401409 409563 417777 378832 493644 566768 495865 541086 526362 523392 538772 486187 419874 433096 382737 378952 587667 463095 531340 537739 508346 512880 429854 413594 399102 407249 6891712
Counts from Monthly Retail Transaction report
To do
Break Out 814_10s - AQ and MT
Break Out 814_18 Additions from Deletes
Year-To-Date Transactions Received
Transaction Type July 2018 July 2017 July 2018 July 2017
Switches 669909 617300 121926 84059
Acquisition 0 0 0 0
Move - Ins 1667037 1568153 270122 252360
Move - Outs 814580 802779 129820 127073
Continuous Service Agreements (CSA) 395944 283259 40217 55770
Mass Transitions 9033 0 0 0
Total 3556503 3271491 562085 519262
There has been a change since this was created
Mass Acquisition has been broken out of Mass Transition
Page 39: ERCOT Monthly Operational Overvie · ERCOT Monthly Operational Overview (July 2018) Revised 08.22.18. ERCOT Public. August 15, 2018

PUBLIC

Energy Settlement ndash July 2018

39

Day-Ahead Market Energy Settlement $ in Millions

Energy Purchases $215396

Point to Point Obligation Purchases $11726

Energy Sales ($212592)

Day-Ahead Congestion Rent $14531

Day-Ahead Market Make-Whole Payments ($001)

Real-Time Market Energy Settlement $ in Millions

Energy Imbalance at a Resource Node ($91963)

Energy Imbalance at a Load Zone $160737

Energy Imbalance at a Hub ($57497)

Net Real-Time Energy Imbalance $11276

Real Time Congestion from Self Schedules $013

Block Load Transfers and DC Ties ($2063)

Total Impact to Revenue Neutrality $9227

Load-Allocated Emergency Energy Payments ($016)

Load-Allocated Base Point Deviation Charges $026

Day-Ahead Market energy settlement activity increased from last month and increased from July 2017

Real-Time Market energy settlement activity increased from last month and increased from July 2017

PUBLIC

Congestion Revenue Rights (CRR) ndash July 2018

$ in Millions

Long-Term Auction ($4026)

Monthly Auction ($1773)

Total Auction Revenue ($5799)

Day-Ahead CRR Settlements ($15797)

Day-Ahead CRR Short-Charges $1885

Day-Ahead CRR Short-Charges Refunded ($899)

Day-Ahead CRR Short-Charges Net $986

Total CRR Funding ($14810)

Day-Ahead Point-to-Point Obligations $11726

Real-Time Point-to-Point Obligations ($10113)

Net Point-to-Point Obligations $1614

Congestion Revenue Rights settlement payments were not fully funded Partial funding to settle the CRR Short Charges was provided from the CRR Balancing Account Fund and the remaining $986M of CRR Short Charges were not refunded The CRR Fund Balance is now $0

Point to Point Obligations settled with a net charge of $1614M compared to a net credit of $1758M last month

40

PUBLIC

CRR Balancing Account Fund ndash July 2018

CRR Balancing Account $ in Millions

Monthly Day-Ahead Congestion Rent $14531

Monthly Day-Ahead CRR Settlements ($15797)

Monthly Day-Ahead CRR Short -Charges $1885

CRR Balancing Account Credit Total $619

Beginning Fund Balance for the Month $275

CRR Balancing Account Credit Total $619

Day-Ahead CRR Short-Charges Refunded ($899)

CRR PTP Option Award Charges $004

Load-Allocated CRR Amount $000

Total Fund Amount $000

41

PUBLIC

Revenue Neutrality ndash July 2018

Revenue Neutrality $ in Millions

Real-Time Energy Imbalance $11276

Real-Time Point to Point Obligation ($10113)

Real-Time Congestion from Self-Schedules $013

DC Tie amp Block Load Transfer ($2063)

Allocation to Load $886

In July 2018 the Revenue Neutrality charge to load was $886M compared to bull A charge of $3046M in June 2018bull A charge of $145M in July 2017

42

PUBLIC

Net Allocation to Load ndash July 2018

Market-Based Allocation $ in Millions

Reliability Unit Commitment $000

Ancillary and Other Services $10200

Real-Time Ancillary Service Imbalance $223

Emergency Energy $016

Base Point Deviation ($026)

CRR Auction Revenue ($5799)

CRR Balancing Account $000

Real-Time Revenue Neutrality $886

Reliability Must Run $000

Monthly Block Load Transfer $000

Total $5500

Fee AllocationERCOT Administrative Fee $2207

Net Allocated to Load $7707

In July 2018 the Net Allocation to load was a charge of $7707M compared to bull A charge of $2152M in June 2018bull A credit of $1363M in July 2017

43

PUBLIC

Advanced Meter Settlement Impacts ndash July 2018

July 2018 At month end settling 72M ESIIDs using Advanced Meter data

July 2018 990 of the load in ERCOT is settled with 15-min interval data (AMS Competitive IDR and NOIE IDR)

44

PUBLIC

ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndashJuly 2018

45

PUBLIC

Retail Transaction Volumes ndash Summary ndash July 2018

46

Transaction Type July 2018 July 2017 July 2018 July 2017

Switches 669909 617300 121926 84059

Acquisition 0 0 0 0

Move - Ins 1667037 1568153 270122 252360

Move - Outs 814580 802779 129820 127073

Continuous Service Agreements (CSA) 395944 283259 40217 55770

Mass Transitions 9033 0 0 0

Total 3556503 3271491 562085 519262

Year-To-Date Transactions Received

Board Presentation Input

Trans Volumes by Month_New

PUBLIC

Retail Transaction Volumes ndash Summary ndash July 2018

SwitchesAcquisitions Move-Ins

Move-Outs Mass Transition

47

Projects Report

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018

20000000$ 2018 Portfolio

Spending Estimate

Projects In FlightOn Hold (Count = 100) 24905011$

Projects Not Yet Started (Count = 10) 1320628$

Projects Completed (Count = 43) 795250$

(7020889)$

TOTAL 20000000$

Project Number Projects in Initiation Phase (Count = 4)

TBD IT Asset RecoveryNPRR842 Study Area Load Information

209-03 Study Network (STNET) Integration288-01 EDI Map and Translator Replacement

Impact Metric TolerancesUnfavorable variances are represented as negative numbers within the report - Green = No more than 49 unfavorable variance - Yellow = Unfavorable variance between 49 and 99 - Red = Unfavorable variance more than 99

Spending Reductions Required to Maintain Capital Budget

2018 Project Funding

Footnotes1 - One or more phases took longer than expected resulting in additional time required

2 - One or more phases required more labor than expected resulting in additional funding andor time required

3 - Project placed on holdNA - Metric not calculated because - it is reported at the parent project level or - it is an administrative project

Project Number Projects in Planning Phase (Count = 8) Phase Start Baseline

Phase FinishApproved

Phase FinishScheduled

Go-Live DateScheduled

Phase Finish

134-02 Privileged Account Management (PAM) Phase 2 882018 12192018 12192018 TBD 12192018 0 10

183-01 CMM-FT GUI Integration 12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs

242-01 Portfolio Reporting Assessment 1182017 12192018 12192018 TBD 12192018 0 21260-01 Information Governance Assessment 10182017 5302018 9192018 TBD 9192018 0 5286-01 Java Platform Assessment 6202018 11212018 11212018 TBD 11212018 0 6287-01 Security Constrained Unit Commitment (SCUC) 882018 2272019 2272019 TBD 2272019 0 -1

NPRR484Revisions to Congestion Revenue Rights Credit Calculations and Payments - Phase 1b 2

12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs

NPRR702Flexible Accounts Payment of Invoices and Disposition of Interest on Cash Collateral

12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs

Schedule Health Budget Health

49

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018Project Number Projects in Execution Phase (Count = 42) Phase Start Baseline Go-

Live DateApproved Go-

Live DateScheduled

Go-Live DateScheduled

Phase Finish

170-01 Enterprise Content Alignment Program 8262015 11152017 8312018 8312018 8312018 0 0170-06 ECAP - ECMS Implementation Phase 1 4252018 11302018 11302018 11302018 11302018 0 3173-02 ERCOT Flight Certification Website 11152017 2282019 2282019 2282019 5312019 0 2181-01 CRR Framework Upgrade 10262016 1022017 11192018 11192018 2272019 0 2

183-01 CMM Tech Refresh 3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

193-01 PMU Tool Evaluation and Implementation 12132017 892018 2152019 2152019 3202019 0 0196-01 GINR Project Status Application Replacement 12212016 9142017 2282019 2282019 3312019 0 1198-02 Reactive Power Coordination PoC 962017 6162018 8152018 8152018 8152018 0 54209-02 Weather Imaging and Line Observation (WILO) 5302018 212019 212019 212019 2272019 0 2210-01 REC Technology Refresh 8302017 3182018 12132018 12132018 1162019 0 3228-01 Enterprise Database Upgrade 882018 1292020 1292020 1292020 1292020 0 17229-01 IT Change and Configuration Management Phase 2 822017 6192018 12132018 12132018 3252019 0 2 -9238-01 Application Authentication Tech Refresh 962017 3192018 12132018 12132018 1302019 0 3239-01 Identity and Access Management 592018 3132019 3132019 3132019 3132019 0 2241-01 AREA - Generation 10112017 3302018 892018 892018 952018 0 -4244-01 Corporate Wireless 11292017 3282018 1252018 1252018 192019 0 9245-01 2017 EPS Metering Enhancements 6272018 892019 892019 892019 9252019 0 1246-01 iTest Data Refresh 12132017 1192018 11152018 11152018 122019 0 25249-01 Secondary Wind Forecasting Service 8302017 2282018 892018 892018 952018 0 0253-01 CIP Recovery Plan Project - Planning Phase 1 1312018 8292018 8292018 8292018 8292018 0 -2

257-01Security Constrained Optimal Powerflow in Study Network Analysis

1262017 10252018 10252018 10252018 1282018 0 19

261-01 Generic Transmission Constraint Calculation 372018 12132018 12132018 12132018 1232019 0 0263-01 Market Simulator 4112018 12132018 12132018 12132018 1302019 0 7265-01 Real-Time Assessment Continuity 1312018 12132018 12132018 12132018 1302019 0 0279-01 Cyber Security Project 24 6272018 10262018 10262018 10262018 11282018 0 0280-01 Quest Software Portfolio Transition 442018 6272018 9262018 9262018 9262018 0 13282-01 Synchronous Condenser Outage Modeling 662018 10252018 10252018 10252018 1252018 0 1Various 2015 CMM NPRRs 2 -18

NPRR519Exemption of ERS-Only QSEs from Collateral and Capitalization Requirements

3152017 5192018 12112018 12112018 12312018 0 See 2015 CMM NPRRs

NPRR620Collateral Requirements for Counter-Parties with No Load or Generation

3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

NPRR660 Remove CRR State Change Adder 3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

Budget HealthSchedule Health

50

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018Project Number Projects in Execution Phase (Count = 42) Phase Start Baseline Go-

Live DateApproved Go-

Live DateScheduled

Go-Live DateScheduled

Phase Finish

NPRR741 Clarifications to TPE and EAL Credit Exposure Calculations 3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

NPRR749 Option Cost for Outstanding CRRs 882018 12132018 12132018 12132018 TBD 0 NA See 2015 CMM NPRRs

NPRR755 Data Agent-Only QSE Registration 3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

NPRR819Modification of Non-Price Error Resettlement Thresholds and Resettlement Clean-Ups

592018 892018 892018 892018 952018 0 36

NPRR833 Modify PTP Obligation Bid Clearing Change 882018 12132018 12132018 12132018 TBD 0 1

NPRR843Short-Term System Adequacy and AS Offer Disclosure Reports Additions

7182018 10252018 10252018 10252018 11282018 0 0

NPRR864 RUC Modifications to Consider Market-Based Solutions 6202018 10252018 10252018 10252018 11282018 0 4SCR777 Bilateral CRR Interface Enhancement 10262016 1022017 11192018 11192018 2272019 0 NA See 181-01

SCR781 RARF Replacement 12202017 4252018 12192018 12192018 12192018 0 3SCR791 Correction of 60-day SCED GRD Disclosure Report 522018 892018 892018 892018 952018 0 39SCR795 Addition of Intra-Hour Wind Forecast to GTBD Calculation 882018 10252018 10252018 10252018 11142018 0 0

Project Number Expedited Projects in Execution (Count = 34)

Project Number Projects in Stabilization (Count = 10) Execution

Phase StartBaseline Go-Live Target

Approved Go-Live Target

ActualGo-Live Date

Scheduled Execution Phase

Finish

NPRR648 Remove References to Flowgate Rights 3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR683 Revision to Available Credit Limit Calculation 3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR743 Revision to MCE to Have a Floor For Load Exposure 3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR760 Calculation of Exposure Variables For Days With No Activity 3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR776 Voltage Set Point Communication 9202017 3192018 452018 452018 952018 0 1

NPRR800Revisions to Credit Exposure Calculations to Use Electricity Futures Market Prices

3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR815Revise the Limitation of Load Resources Providing Responsive Reserve (RRS) Service

3212018 5312018 5312018 5312018 8292018 0 2

209-01 Multi Station Breaker to Breaker One Lines 282017 392018 532018 532018 8222018 0 -1259-01 DC SCADA and Metering Upgrade 10252017 1172018 7252018 7252018 8292018 0 22266-01 Remote Email Access Enhancement 12132017 372018 662018 6192018 9262018 2 -7 2 -9

Schedule Health Budget Health

Budget HealthSchedule Health

51

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018

Project Number Projects On Hold (Count = 2) Forecast

Start DateBaseline

Phase FinishApproved Go-

Live TargetScheduled

Go-Live DateScheduled

Phase Finish

SCR789 Update NMMS Topology Processor to PSSE 34 Capability 0

269-01Document Repository Redesign and Governance Implementation - Phase 1

0

Project Number Projects Completed (Count = 20)

Baseline Execution

Phase Start

Baseline Go-Live Target

Approved Go-Live Target

Actual Go-Live Date

Actual Execution Phase Finish

185-01 Records Management and eDiscovery 12152016 5242017 8292017 8222017 12132017 2 0224-01 TelAlert Replacement 452017 6272017 842017 842017 592018 0 5230-01 SAS Technical Architecture Redesign 312017 12132017 12132017 12132017 6272018 0 2234-01 Reporting Solution Resiliency (RSR) 452017 8232017 11272017 11272017 1102018 0 8240-01 EDI Translator and Mapping Replacement Assessment 4192017 9272017 2282018 TBD 372018 -2 20254-01 Retail Windows Upgrade 10112017 12182017 12182017 1222018 272018 1 -51 65255-01 Settlements Architecture Enhancements 10252017 1112018 1112018 1192018 2142018 1 -10 53258-01 WD Kainos SMART Automation Testing Tool 4112018 642018 642018 662018 7182018 -3 33271-01 Issue Tracking and Resolution Tool Assessment 12132017 4252018 4252018 TBD 522018 1 -5 -1272-01 Operator Training Simulator Black Start GE Effort 1262017 4252018 4252018 4272018 5162018 -1 19274-01 Average Mid-Term Load Forecast 372018 5312018 5312018 5312018 6272018 0 50

NPRR768Revisions to Real-Time On-Line Reliability Deployment Price Adder Categories

372018 5312018 5312018 5312018 6272018 0 16

NPRR778 Modifications to Date Change and Cancellation Evaluation Window 7192017 10292017 12112017 12112017 1312018 0 23

NPRR782Settlement of Infeasible Ancillary Services Due to Transmission Constraints

5242017 8312017 1122017 1122017 1102018 0 20

NPRR808 Three Year CRR Auction 8232017 9182017 9182017 912017 1312018 65 68

NPRR810Applicability of RMR Incentive Factor on Reservation and Transportation Costs Associated with Firm Fuel Supplies

7172017 11122017 3312018 3312018 3312018 0 NA See 233-00

NPRR830 Revision of 4-Coincident Peak Methodology 12132017 262018 262018 262018 372018 0 85

NPRR831 Inclusion of Private Use Networks in Load Zone Price Calculations 822017 1122017 1122017 1122017 2212018 0 33

OBDRR002 ORDC OBD Revisions for PUCT Project 47199 372018 5312018 5312018 5312018 6272018 0 See NPRR768

SCR792 Enhance Communications of BAAL Exceedances 2142018 452018 452018 452018 4252018 0 69

Project Number Expedited Projects Completed (Count = 23)

Budget HealthSchedule Health

Budget HealthSchedule Health

52

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018

Project Number 2018 Projects Not Yet Started (Count = 10) Forecast

Start Date

NPRR858 Provide Complete Current Operating Plan (COP) Data Aug-2018TBD 2018 OS Enhancements Aug-2018TBD Additional Branch Limit for Relays Aug-2018

NPRR817 Create a Panhandle Hub Sep-2018NPRR821 Elimination of the CRR Deration Process Oct-2018NPRR865 Publish RTM Shift Factors for Hubs Load Zones and DC Ties Oct-2018

SCR793SSR Related Telemetry for Transmission Service Provider (TSP) Operators

Oct-2018

ECAP ECAP - ECMS Implementation Phase 2 Oct-2018TBD Job Scheduler Update in CSI Framework Oct-2018TBD Parameter Estimation Oct-2018

53

  • Slide Number 1
  • Slide Number 2
  • Summary ndash July 2018
  • Daily Peak Demand Hourly Average Actual vs Forecast Wind Day-Ahead COPs amp On-Line Capacity at Peak ndash July 2018
  • Actual Wind Output plus Curtailments vs Wind Day-Ahead COPs for All Hours ndash July 2018
  • ERCOTrsquos CPS1 Monthly Performance ndash July 2018
  • Monthly Peak Actual Demand ndash July 2018
  • Monthly Minimum Actual 15-Minute Demand ndash July 2018
  • Day-Ahead Load Forecast Performance ndash July 2018
  • Reliability Unit Commitment (RUC) Capacity by Weather Zone ndash July 2018
  • Generic Transmission Constraints (GTCs) ndash July 2018
  • Advisories and Watches ndash July 2018 Corrected
  • Lake Levels Update ndash August 1 2018
  • Planning Summary ndash July 2018
  • Mapping of Counties to ERCOT Zones ndash July 2018
  • Cumulative MW Capacity of Interconnection Requests by Zone ndashJuly 2018
  • Cumulative MW Capacity of Interconnection Requests by Zone ndashJuly 2018
  • Cumulative MW Capacity of Interconnection Requests by Zone ndashJuly 2018
  • Wind Generation ndash July 2018
  • Solar Generation ndash July 2018
  • Generation Interconnection Activity by Fuel ndash July 2018
  • Generation Interconnection Activity by Project Phase ndash July 2018
  • Slide Number 23
  • Day-Ahead Schedule (Hourly Average) ndash July 2018
  • Percentage of Real-Time Load Hedged in the DAM (Counter-Party Level) ndash July 2018
  • DAM and RTM Price Convergence ndash July 2018
  • Day-Ahead Electricity and Ancillary Service Prices (Hourly Average) ndash July 2018
  • Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash July 2018
  • Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash July 2018
  • DRUC Monthly Summary (Hourly Average) ndash July 2018
  • HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash July 2018
  • NonndashSpinning Reserve Service Deployment ndash July 2018
  • CRR Price Convergence ndash July 2018
  • Daily Average System Lambda and ORDC Price Adders ndash July 2018
  • ERS Procurement for June 2018 ndash September 2018
  • Reliability Services ndash July 2018
  • Ancillary and Other Services ndash July 2018
  • Real-Time Ancillary Service Imbalance (ORDC) ndash July 2018
  • Energy Settlement ndash July 2018
  • Congestion Revenue Rights (CRR) ndash July 2018
  • CRR Balancing Account Fund ndash July 2018
  • Revenue Neutrality ndash July 2018
  • Net Allocation to Load ndash July 2018
  • Advanced Meter Settlement Impacts ndash July 2018
  • ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndash July 2018
  • Retail Transaction Volumes ndash Summary ndash July 2018
  • Retail Transaction Volumes ndash Summary ndash July 2018
  • Slide Number 48
  • ERCOT Portfolio Stoplight Report ndash July 2018
  • ERCOT Portfolio Stoplight Report ndash July 2018
  • ERCOT Portfolio Stoplight Report ndash July 2018
  • ERCOT Portfolio Stoplight Report ndash July 2018
  • ERCOT Portfolio Stoplight Report ndash July 2018
Retail Transactions Summary
July 2018 June 2018 May 2018 April 2018 March 2018 February 2018 January 2018 December 2017 November 2017 October 2017 September 2017 August 2017 July 2017 June 2017 May 2017 April 2017 March 2017 February 2017 January 2017 December 2016 November 2016 October 2016 September 2016 August 2016 July 2016 June 2016 May 2016 April 2016 March 2016 February 2016 January 2016 December 2015 November 2015 October 2015 September 2015 August 2015 July 2015 June 2015 May 2015 April 2015 March 2015 February 2015 January 2015 December 2014 November 2014 October 2014 September 2014 August 2014 July 2014 June 2014 May 2014 April 2014 March 2014 February 2014 January 2014 December 2013 November 2013 October 2013 September 2013 August 2013 July 2013 June 2013 May 2013 April 2013 March 2013 February 2013 January 2013 Grand total
814_01 - Switch Received 121926 109653 96828 81291 95159 76119 88933 60560 77860 78096 79502 84134 84059 108784 130828 71769 67845 66875 87140 66556 56202 64452 67323 86656 82923 86376 75323 70300 76235 68057 63954 61486 52887 65276 70342 81674 91211 102661 86229 81255 79997 73394 72885 71072 67080 110465 175164 89677 99568 101490 111077 91983 93887 71130 86953 69691 55957 166882 82415 93194 102562 103756 116086 78919 68950 64329 67116 1321827
Difference from previous month 12273 12825 15537 (13868) 19040 (12814) 28373 (17300) (236) (1406) (4632) 75 (24725) (22044) 59059 3924 970 (20265) 20584 10354 (8250) (2871) (19333) 3733 (3453) 11053 5023 (5935) 8178 4103 2468 8599 (12389) (5066) (11332) (9537) (11450) 16432 4974 1258 6603 509 1813 3992 (43385) (64699) 85487 (9891) (1922) (9587) 19094 (1904) 22757 (15823) 17262 13734 (110925) 84467 (10779) (9368) (1194) (12330) 37167 9969 4621 (2787)
814_16 - Move - Ins Received 270122 257125 244431 225380 224289 215281 230409 238340 207921 236397 244511 258046 252360 257759 237611 197865 217962 201984 202612 196236 201714 220958 231999 268781 241844 247481 214383 199804 218245 212474 193716 189862 181098 215908 229405 248124 263233 247089 208166 207932 215950 197765 198025 193973 178624 226283 231418 243482 251957 233679 223201 258649 214724 208160 207059 172981 178671 233469 216550 255967 249114 220397 216982 204412 197200 191955 194507 3162148
Difference from previous month 12997 12694 19051 1091 9008 (15128) (7931) 30419 (28476) (8114) (13535) 5686 (5399) 20148 39746 (20097) 15978 (628) 6376 (5478) (19244) (11041) (36782) 26937 (5637) 33098 14579 (18441) 5771 18758 3854 8764 (34810) (13497) (18719) (15109) 16144 38923 234 (8018) 18185 (260) 4052 15349 (47659) (5135) (12064) (8475) 18278 10478 (35448) 43925 6564 1101 34078 (5690) (54798) 16919 (39417) 6853 28717 3415 12570 7212 5245 (2552)
814_24 - MVO and MVO to CSA Received 129820 125861 124403 113795 108753 100127 111821 144987 100830 116519 129103 128104 127073 133582 127218 102055 111459 100285 101107 96289 100578 109493 114094 133170 122932 129025 118022 103789 109278 103747 96628 99552 96214 109578 117949 123894 133905 133855 114675 108275 108859 94864 98233 97901 89578 111857 115918 121662 131607 126785 119107 107956 107266 99428 104273 93385 93977 115469 115524 129594 135196 121446 120049 111598 106467 102429 104399 1660500
814_10 - DTP Mass Acquisition Received - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0
814_10 - DTP Mass Transition Received - 0 - 0 9033 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 639 - 0 - 0 4975 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0
814_18 - CSA AdditionDeletes Received 40217 62083 99016 55581 46720 42587 49740 47725 31726 52888 41597 40616 55770 43745 52139 26702 21791 39082 44030 38884 39856 31786 33061 42622 48489 64178 50499 59475 59400 48536 42179 40351 34796 34420 54677 35078 49489 59611 39384 44247 44577 35386 40420 54831 43550 45039 44268 40405 57954 64408 65032 80184 70310 41156 34811 46680 50347 71847 48606 52585 50867 62747 59763 34925 40977 40389 41227 747237
Total 562085 554722 573711 476047 474921 434114 480903 491612 418337 483900 494713 510900 519262 543870 547796 398391 419057 408226 434889 397965 398350 426689 446477 531229 496188 527060 458227 433368 463158 432814 396477 391251 364995 425182 472373 488770 537838 543216 448454 441709 449383 401409 409563 417777 378832 493644 566768 495865 541086 526362 523392 538772 486187 419874 433096 382737 378952 587667 463095 531340 537739 508346 512880 429854 413594 399102 407249 6891712
Counts from Monthly Retail Transaction report
To do
Break Out 814_10s - AQ and MT
Break Out 814_18 Additions from Deletes
Year-To-Date Transactions Received
Transaction Type July 2018 July 2017 July 2018 July 2017
Switches 669909 617300 121926 84059
Acquisition 0 0 0 0
Move - Ins 1667037 1568153 270122 252360
Move - Outs 814580 802779 129820 127073
Continuous Service Agreements (CSA) 395944 283259 40217 55770
Mass Transitions 9033 0 0 0
Total 3556503 3271491 562085 519262
There has been a change since this was created
Mass Acquisition has been broken out of Mass Transition
Page 40: ERCOT Monthly Operational Overvie · ERCOT Monthly Operational Overview (July 2018) Revised 08.22.18. ERCOT Public. August 15, 2018

PUBLIC

Congestion Revenue Rights (CRR) ndash July 2018

$ in Millions

Long-Term Auction ($4026)

Monthly Auction ($1773)

Total Auction Revenue ($5799)

Day-Ahead CRR Settlements ($15797)

Day-Ahead CRR Short-Charges $1885

Day-Ahead CRR Short-Charges Refunded ($899)

Day-Ahead CRR Short-Charges Net $986

Total CRR Funding ($14810)

Day-Ahead Point-to-Point Obligations $11726

Real-Time Point-to-Point Obligations ($10113)

Net Point-to-Point Obligations $1614

Congestion Revenue Rights settlement payments were not fully funded Partial funding to settle the CRR Short Charges was provided from the CRR Balancing Account Fund and the remaining $986M of CRR Short Charges were not refunded The CRR Fund Balance is now $0

Point to Point Obligations settled with a net charge of $1614M compared to a net credit of $1758M last month

40

PUBLIC

CRR Balancing Account Fund ndash July 2018

CRR Balancing Account $ in Millions

Monthly Day-Ahead Congestion Rent $14531

Monthly Day-Ahead CRR Settlements ($15797)

Monthly Day-Ahead CRR Short -Charges $1885

CRR Balancing Account Credit Total $619

Beginning Fund Balance for the Month $275

CRR Balancing Account Credit Total $619

Day-Ahead CRR Short-Charges Refunded ($899)

CRR PTP Option Award Charges $004

Load-Allocated CRR Amount $000

Total Fund Amount $000

41

PUBLIC

Revenue Neutrality ndash July 2018

Revenue Neutrality $ in Millions

Real-Time Energy Imbalance $11276

Real-Time Point to Point Obligation ($10113)

Real-Time Congestion from Self-Schedules $013

DC Tie amp Block Load Transfer ($2063)

Allocation to Load $886

In July 2018 the Revenue Neutrality charge to load was $886M compared to bull A charge of $3046M in June 2018bull A charge of $145M in July 2017

42

PUBLIC

Net Allocation to Load ndash July 2018

Market-Based Allocation $ in Millions

Reliability Unit Commitment $000

Ancillary and Other Services $10200

Real-Time Ancillary Service Imbalance $223

Emergency Energy $016

Base Point Deviation ($026)

CRR Auction Revenue ($5799)

CRR Balancing Account $000

Real-Time Revenue Neutrality $886

Reliability Must Run $000

Monthly Block Load Transfer $000

Total $5500

Fee AllocationERCOT Administrative Fee $2207

Net Allocated to Load $7707

In July 2018 the Net Allocation to load was a charge of $7707M compared to bull A charge of $2152M in June 2018bull A credit of $1363M in July 2017

43

PUBLIC

Advanced Meter Settlement Impacts ndash July 2018

July 2018 At month end settling 72M ESIIDs using Advanced Meter data

July 2018 990 of the load in ERCOT is settled with 15-min interval data (AMS Competitive IDR and NOIE IDR)

44

PUBLIC

ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndashJuly 2018

45

PUBLIC

Retail Transaction Volumes ndash Summary ndash July 2018

46

Transaction Type July 2018 July 2017 July 2018 July 2017

Switches 669909 617300 121926 84059

Acquisition 0 0 0 0

Move - Ins 1667037 1568153 270122 252360

Move - Outs 814580 802779 129820 127073

Continuous Service Agreements (CSA) 395944 283259 40217 55770

Mass Transitions 9033 0 0 0

Total 3556503 3271491 562085 519262

Year-To-Date Transactions Received

Board Presentation Input

Trans Volumes by Month_New

PUBLIC

Retail Transaction Volumes ndash Summary ndash July 2018

SwitchesAcquisitions Move-Ins

Move-Outs Mass Transition

47

Projects Report

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018

20000000$ 2018 Portfolio

Spending Estimate

Projects In FlightOn Hold (Count = 100) 24905011$

Projects Not Yet Started (Count = 10) 1320628$

Projects Completed (Count = 43) 795250$

(7020889)$

TOTAL 20000000$

Project Number Projects in Initiation Phase (Count = 4)

TBD IT Asset RecoveryNPRR842 Study Area Load Information

209-03 Study Network (STNET) Integration288-01 EDI Map and Translator Replacement

Impact Metric TolerancesUnfavorable variances are represented as negative numbers within the report - Green = No more than 49 unfavorable variance - Yellow = Unfavorable variance between 49 and 99 - Red = Unfavorable variance more than 99

Spending Reductions Required to Maintain Capital Budget

2018 Project Funding

Footnotes1 - One or more phases took longer than expected resulting in additional time required

2 - One or more phases required more labor than expected resulting in additional funding andor time required

3 - Project placed on holdNA - Metric not calculated because - it is reported at the parent project level or - it is an administrative project

Project Number Projects in Planning Phase (Count = 8) Phase Start Baseline

Phase FinishApproved

Phase FinishScheduled

Go-Live DateScheduled

Phase Finish

134-02 Privileged Account Management (PAM) Phase 2 882018 12192018 12192018 TBD 12192018 0 10

183-01 CMM-FT GUI Integration 12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs

242-01 Portfolio Reporting Assessment 1182017 12192018 12192018 TBD 12192018 0 21260-01 Information Governance Assessment 10182017 5302018 9192018 TBD 9192018 0 5286-01 Java Platform Assessment 6202018 11212018 11212018 TBD 11212018 0 6287-01 Security Constrained Unit Commitment (SCUC) 882018 2272019 2272019 TBD 2272019 0 -1

NPRR484Revisions to Congestion Revenue Rights Credit Calculations and Payments - Phase 1b 2

12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs

NPRR702Flexible Accounts Payment of Invoices and Disposition of Interest on Cash Collateral

12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs

Schedule Health Budget Health

49

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018Project Number Projects in Execution Phase (Count = 42) Phase Start Baseline Go-

Live DateApproved Go-

Live DateScheduled

Go-Live DateScheduled

Phase Finish

170-01 Enterprise Content Alignment Program 8262015 11152017 8312018 8312018 8312018 0 0170-06 ECAP - ECMS Implementation Phase 1 4252018 11302018 11302018 11302018 11302018 0 3173-02 ERCOT Flight Certification Website 11152017 2282019 2282019 2282019 5312019 0 2181-01 CRR Framework Upgrade 10262016 1022017 11192018 11192018 2272019 0 2

183-01 CMM Tech Refresh 3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

193-01 PMU Tool Evaluation and Implementation 12132017 892018 2152019 2152019 3202019 0 0196-01 GINR Project Status Application Replacement 12212016 9142017 2282019 2282019 3312019 0 1198-02 Reactive Power Coordination PoC 962017 6162018 8152018 8152018 8152018 0 54209-02 Weather Imaging and Line Observation (WILO) 5302018 212019 212019 212019 2272019 0 2210-01 REC Technology Refresh 8302017 3182018 12132018 12132018 1162019 0 3228-01 Enterprise Database Upgrade 882018 1292020 1292020 1292020 1292020 0 17229-01 IT Change and Configuration Management Phase 2 822017 6192018 12132018 12132018 3252019 0 2 -9238-01 Application Authentication Tech Refresh 962017 3192018 12132018 12132018 1302019 0 3239-01 Identity and Access Management 592018 3132019 3132019 3132019 3132019 0 2241-01 AREA - Generation 10112017 3302018 892018 892018 952018 0 -4244-01 Corporate Wireless 11292017 3282018 1252018 1252018 192019 0 9245-01 2017 EPS Metering Enhancements 6272018 892019 892019 892019 9252019 0 1246-01 iTest Data Refresh 12132017 1192018 11152018 11152018 122019 0 25249-01 Secondary Wind Forecasting Service 8302017 2282018 892018 892018 952018 0 0253-01 CIP Recovery Plan Project - Planning Phase 1 1312018 8292018 8292018 8292018 8292018 0 -2

257-01Security Constrained Optimal Powerflow in Study Network Analysis

1262017 10252018 10252018 10252018 1282018 0 19

261-01 Generic Transmission Constraint Calculation 372018 12132018 12132018 12132018 1232019 0 0263-01 Market Simulator 4112018 12132018 12132018 12132018 1302019 0 7265-01 Real-Time Assessment Continuity 1312018 12132018 12132018 12132018 1302019 0 0279-01 Cyber Security Project 24 6272018 10262018 10262018 10262018 11282018 0 0280-01 Quest Software Portfolio Transition 442018 6272018 9262018 9262018 9262018 0 13282-01 Synchronous Condenser Outage Modeling 662018 10252018 10252018 10252018 1252018 0 1Various 2015 CMM NPRRs 2 -18

NPRR519Exemption of ERS-Only QSEs from Collateral and Capitalization Requirements

3152017 5192018 12112018 12112018 12312018 0 See 2015 CMM NPRRs

NPRR620Collateral Requirements for Counter-Parties with No Load or Generation

3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

NPRR660 Remove CRR State Change Adder 3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

Budget HealthSchedule Health

50

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018Project Number Projects in Execution Phase (Count = 42) Phase Start Baseline Go-

Live DateApproved Go-

Live DateScheduled

Go-Live DateScheduled

Phase Finish

NPRR741 Clarifications to TPE and EAL Credit Exposure Calculations 3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

NPRR749 Option Cost for Outstanding CRRs 882018 12132018 12132018 12132018 TBD 0 NA See 2015 CMM NPRRs

NPRR755 Data Agent-Only QSE Registration 3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

NPRR819Modification of Non-Price Error Resettlement Thresholds and Resettlement Clean-Ups

592018 892018 892018 892018 952018 0 36

NPRR833 Modify PTP Obligation Bid Clearing Change 882018 12132018 12132018 12132018 TBD 0 1

NPRR843Short-Term System Adequacy and AS Offer Disclosure Reports Additions

7182018 10252018 10252018 10252018 11282018 0 0

NPRR864 RUC Modifications to Consider Market-Based Solutions 6202018 10252018 10252018 10252018 11282018 0 4SCR777 Bilateral CRR Interface Enhancement 10262016 1022017 11192018 11192018 2272019 0 NA See 181-01

SCR781 RARF Replacement 12202017 4252018 12192018 12192018 12192018 0 3SCR791 Correction of 60-day SCED GRD Disclosure Report 522018 892018 892018 892018 952018 0 39SCR795 Addition of Intra-Hour Wind Forecast to GTBD Calculation 882018 10252018 10252018 10252018 11142018 0 0

Project Number Expedited Projects in Execution (Count = 34)

Project Number Projects in Stabilization (Count = 10) Execution

Phase StartBaseline Go-Live Target

Approved Go-Live Target

ActualGo-Live Date

Scheduled Execution Phase

Finish

NPRR648 Remove References to Flowgate Rights 3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR683 Revision to Available Credit Limit Calculation 3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR743 Revision to MCE to Have a Floor For Load Exposure 3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR760 Calculation of Exposure Variables For Days With No Activity 3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR776 Voltage Set Point Communication 9202017 3192018 452018 452018 952018 0 1

NPRR800Revisions to Credit Exposure Calculations to Use Electricity Futures Market Prices

3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR815Revise the Limitation of Load Resources Providing Responsive Reserve (RRS) Service

3212018 5312018 5312018 5312018 8292018 0 2

209-01 Multi Station Breaker to Breaker One Lines 282017 392018 532018 532018 8222018 0 -1259-01 DC SCADA and Metering Upgrade 10252017 1172018 7252018 7252018 8292018 0 22266-01 Remote Email Access Enhancement 12132017 372018 662018 6192018 9262018 2 -7 2 -9

Schedule Health Budget Health

Budget HealthSchedule Health

51

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018

Project Number Projects On Hold (Count = 2) Forecast

Start DateBaseline

Phase FinishApproved Go-

Live TargetScheduled

Go-Live DateScheduled

Phase Finish

SCR789 Update NMMS Topology Processor to PSSE 34 Capability 0

269-01Document Repository Redesign and Governance Implementation - Phase 1

0

Project Number Projects Completed (Count = 20)

Baseline Execution

Phase Start

Baseline Go-Live Target

Approved Go-Live Target

Actual Go-Live Date

Actual Execution Phase Finish

185-01 Records Management and eDiscovery 12152016 5242017 8292017 8222017 12132017 2 0224-01 TelAlert Replacement 452017 6272017 842017 842017 592018 0 5230-01 SAS Technical Architecture Redesign 312017 12132017 12132017 12132017 6272018 0 2234-01 Reporting Solution Resiliency (RSR) 452017 8232017 11272017 11272017 1102018 0 8240-01 EDI Translator and Mapping Replacement Assessment 4192017 9272017 2282018 TBD 372018 -2 20254-01 Retail Windows Upgrade 10112017 12182017 12182017 1222018 272018 1 -51 65255-01 Settlements Architecture Enhancements 10252017 1112018 1112018 1192018 2142018 1 -10 53258-01 WD Kainos SMART Automation Testing Tool 4112018 642018 642018 662018 7182018 -3 33271-01 Issue Tracking and Resolution Tool Assessment 12132017 4252018 4252018 TBD 522018 1 -5 -1272-01 Operator Training Simulator Black Start GE Effort 1262017 4252018 4252018 4272018 5162018 -1 19274-01 Average Mid-Term Load Forecast 372018 5312018 5312018 5312018 6272018 0 50

NPRR768Revisions to Real-Time On-Line Reliability Deployment Price Adder Categories

372018 5312018 5312018 5312018 6272018 0 16

NPRR778 Modifications to Date Change and Cancellation Evaluation Window 7192017 10292017 12112017 12112017 1312018 0 23

NPRR782Settlement of Infeasible Ancillary Services Due to Transmission Constraints

5242017 8312017 1122017 1122017 1102018 0 20

NPRR808 Three Year CRR Auction 8232017 9182017 9182017 912017 1312018 65 68

NPRR810Applicability of RMR Incentive Factor on Reservation and Transportation Costs Associated with Firm Fuel Supplies

7172017 11122017 3312018 3312018 3312018 0 NA See 233-00

NPRR830 Revision of 4-Coincident Peak Methodology 12132017 262018 262018 262018 372018 0 85

NPRR831 Inclusion of Private Use Networks in Load Zone Price Calculations 822017 1122017 1122017 1122017 2212018 0 33

OBDRR002 ORDC OBD Revisions for PUCT Project 47199 372018 5312018 5312018 5312018 6272018 0 See NPRR768

SCR792 Enhance Communications of BAAL Exceedances 2142018 452018 452018 452018 4252018 0 69

Project Number Expedited Projects Completed (Count = 23)

Budget HealthSchedule Health

Budget HealthSchedule Health

52

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018

Project Number 2018 Projects Not Yet Started (Count = 10) Forecast

Start Date

NPRR858 Provide Complete Current Operating Plan (COP) Data Aug-2018TBD 2018 OS Enhancements Aug-2018TBD Additional Branch Limit for Relays Aug-2018

NPRR817 Create a Panhandle Hub Sep-2018NPRR821 Elimination of the CRR Deration Process Oct-2018NPRR865 Publish RTM Shift Factors for Hubs Load Zones and DC Ties Oct-2018

SCR793SSR Related Telemetry for Transmission Service Provider (TSP) Operators

Oct-2018

ECAP ECAP - ECMS Implementation Phase 2 Oct-2018TBD Job Scheduler Update in CSI Framework Oct-2018TBD Parameter Estimation Oct-2018

53

  • Slide Number 1
  • Slide Number 2
  • Summary ndash July 2018
  • Daily Peak Demand Hourly Average Actual vs Forecast Wind Day-Ahead COPs amp On-Line Capacity at Peak ndash July 2018
  • Actual Wind Output plus Curtailments vs Wind Day-Ahead COPs for All Hours ndash July 2018
  • ERCOTrsquos CPS1 Monthly Performance ndash July 2018
  • Monthly Peak Actual Demand ndash July 2018
  • Monthly Minimum Actual 15-Minute Demand ndash July 2018
  • Day-Ahead Load Forecast Performance ndash July 2018
  • Reliability Unit Commitment (RUC) Capacity by Weather Zone ndash July 2018
  • Generic Transmission Constraints (GTCs) ndash July 2018
  • Advisories and Watches ndash July 2018 Corrected
  • Lake Levels Update ndash August 1 2018
  • Planning Summary ndash July 2018
  • Mapping of Counties to ERCOT Zones ndash July 2018
  • Cumulative MW Capacity of Interconnection Requests by Zone ndashJuly 2018
  • Cumulative MW Capacity of Interconnection Requests by Zone ndashJuly 2018
  • Cumulative MW Capacity of Interconnection Requests by Zone ndashJuly 2018
  • Wind Generation ndash July 2018
  • Solar Generation ndash July 2018
  • Generation Interconnection Activity by Fuel ndash July 2018
  • Generation Interconnection Activity by Project Phase ndash July 2018
  • Slide Number 23
  • Day-Ahead Schedule (Hourly Average) ndash July 2018
  • Percentage of Real-Time Load Hedged in the DAM (Counter-Party Level) ndash July 2018
  • DAM and RTM Price Convergence ndash July 2018
  • Day-Ahead Electricity and Ancillary Service Prices (Hourly Average) ndash July 2018
  • Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash July 2018
  • Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash July 2018
  • DRUC Monthly Summary (Hourly Average) ndash July 2018
  • HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash July 2018
  • NonndashSpinning Reserve Service Deployment ndash July 2018
  • CRR Price Convergence ndash July 2018
  • Daily Average System Lambda and ORDC Price Adders ndash July 2018
  • ERS Procurement for June 2018 ndash September 2018
  • Reliability Services ndash July 2018
  • Ancillary and Other Services ndash July 2018
  • Real-Time Ancillary Service Imbalance (ORDC) ndash July 2018
  • Energy Settlement ndash July 2018
  • Congestion Revenue Rights (CRR) ndash July 2018
  • CRR Balancing Account Fund ndash July 2018
  • Revenue Neutrality ndash July 2018
  • Net Allocation to Load ndash July 2018
  • Advanced Meter Settlement Impacts ndash July 2018
  • ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndash July 2018
  • Retail Transaction Volumes ndash Summary ndash July 2018
  • Retail Transaction Volumes ndash Summary ndash July 2018
  • Slide Number 48
  • ERCOT Portfolio Stoplight Report ndash July 2018
  • ERCOT Portfolio Stoplight Report ndash July 2018
  • ERCOT Portfolio Stoplight Report ndash July 2018
  • ERCOT Portfolio Stoplight Report ndash July 2018
  • ERCOT Portfolio Stoplight Report ndash July 2018
Retail Transactions Summary
July 2018 June 2018 May 2018 April 2018 March 2018 February 2018 January 2018 December 2017 November 2017 October 2017 September 2017 August 2017 July 2017 June 2017 May 2017 April 2017 March 2017 February 2017 January 2017 December 2016 November 2016 October 2016 September 2016 August 2016 July 2016 June 2016 May 2016 April 2016 March 2016 February 2016 January 2016 December 2015 November 2015 October 2015 September 2015 August 2015 July 2015 June 2015 May 2015 April 2015 March 2015 February 2015 January 2015 December 2014 November 2014 October 2014 September 2014 August 2014 July 2014 June 2014 May 2014 April 2014 March 2014 February 2014 January 2014 December 2013 November 2013 October 2013 September 2013 August 2013 July 2013 June 2013 May 2013 April 2013 March 2013 February 2013 January 2013 Grand total
814_01 - Switch Received 121926 109653 96828 81291 95159 76119 88933 60560 77860 78096 79502 84134 84059 108784 130828 71769 67845 66875 87140 66556 56202 64452 67323 86656 82923 86376 75323 70300 76235 68057 63954 61486 52887 65276 70342 81674 91211 102661 86229 81255 79997 73394 72885 71072 67080 110465 175164 89677 99568 101490 111077 91983 93887 71130 86953 69691 55957 166882 82415 93194 102562 103756 116086 78919 68950 64329 67116 1321827
Difference from previous month 12273 12825 15537 (13868) 19040 (12814) 28373 (17300) (236) (1406) (4632) 75 (24725) (22044) 59059 3924 970 (20265) 20584 10354 (8250) (2871) (19333) 3733 (3453) 11053 5023 (5935) 8178 4103 2468 8599 (12389) (5066) (11332) (9537) (11450) 16432 4974 1258 6603 509 1813 3992 (43385) (64699) 85487 (9891) (1922) (9587) 19094 (1904) 22757 (15823) 17262 13734 (110925) 84467 (10779) (9368) (1194) (12330) 37167 9969 4621 (2787)
814_16 - Move - Ins Received 270122 257125 244431 225380 224289 215281 230409 238340 207921 236397 244511 258046 252360 257759 237611 197865 217962 201984 202612 196236 201714 220958 231999 268781 241844 247481 214383 199804 218245 212474 193716 189862 181098 215908 229405 248124 263233 247089 208166 207932 215950 197765 198025 193973 178624 226283 231418 243482 251957 233679 223201 258649 214724 208160 207059 172981 178671 233469 216550 255967 249114 220397 216982 204412 197200 191955 194507 3162148
Difference from previous month 12997 12694 19051 1091 9008 (15128) (7931) 30419 (28476) (8114) (13535) 5686 (5399) 20148 39746 (20097) 15978 (628) 6376 (5478) (19244) (11041) (36782) 26937 (5637) 33098 14579 (18441) 5771 18758 3854 8764 (34810) (13497) (18719) (15109) 16144 38923 234 (8018) 18185 (260) 4052 15349 (47659) (5135) (12064) (8475) 18278 10478 (35448) 43925 6564 1101 34078 (5690) (54798) 16919 (39417) 6853 28717 3415 12570 7212 5245 (2552)
814_24 - MVO and MVO to CSA Received 129820 125861 124403 113795 108753 100127 111821 144987 100830 116519 129103 128104 127073 133582 127218 102055 111459 100285 101107 96289 100578 109493 114094 133170 122932 129025 118022 103789 109278 103747 96628 99552 96214 109578 117949 123894 133905 133855 114675 108275 108859 94864 98233 97901 89578 111857 115918 121662 131607 126785 119107 107956 107266 99428 104273 93385 93977 115469 115524 129594 135196 121446 120049 111598 106467 102429 104399 1660500
814_10 - DTP Mass Acquisition Received - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0
814_10 - DTP Mass Transition Received - 0 - 0 9033 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 639 - 0 - 0 4975 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0
814_18 - CSA AdditionDeletes Received 40217 62083 99016 55581 46720 42587 49740 47725 31726 52888 41597 40616 55770 43745 52139 26702 21791 39082 44030 38884 39856 31786 33061 42622 48489 64178 50499 59475 59400 48536 42179 40351 34796 34420 54677 35078 49489 59611 39384 44247 44577 35386 40420 54831 43550 45039 44268 40405 57954 64408 65032 80184 70310 41156 34811 46680 50347 71847 48606 52585 50867 62747 59763 34925 40977 40389 41227 747237
Total 562085 554722 573711 476047 474921 434114 480903 491612 418337 483900 494713 510900 519262 543870 547796 398391 419057 408226 434889 397965 398350 426689 446477 531229 496188 527060 458227 433368 463158 432814 396477 391251 364995 425182 472373 488770 537838 543216 448454 441709 449383 401409 409563 417777 378832 493644 566768 495865 541086 526362 523392 538772 486187 419874 433096 382737 378952 587667 463095 531340 537739 508346 512880 429854 413594 399102 407249 6891712
Counts from Monthly Retail Transaction report
To do
Break Out 814_10s - AQ and MT
Break Out 814_18 Additions from Deletes
Year-To-Date Transactions Received
Transaction Type July 2018 July 2017 July 2018 July 2017
Switches 669909 617300 121926 84059
Acquisition 0 0 0 0
Move - Ins 1667037 1568153 270122 252360
Move - Outs 814580 802779 129820 127073
Continuous Service Agreements (CSA) 395944 283259 40217 55770
Mass Transitions 9033 0 0 0
Total 3556503 3271491 562085 519262
There has been a change since this was created
Mass Acquisition has been broken out of Mass Transition
Page 41: ERCOT Monthly Operational Overvie · ERCOT Monthly Operational Overview (July 2018) Revised 08.22.18. ERCOT Public. August 15, 2018

PUBLIC

CRR Balancing Account Fund ndash July 2018

CRR Balancing Account $ in Millions

Monthly Day-Ahead Congestion Rent $14531

Monthly Day-Ahead CRR Settlements ($15797)

Monthly Day-Ahead CRR Short -Charges $1885

CRR Balancing Account Credit Total $619

Beginning Fund Balance for the Month $275

CRR Balancing Account Credit Total $619

Day-Ahead CRR Short-Charges Refunded ($899)

CRR PTP Option Award Charges $004

Load-Allocated CRR Amount $000

Total Fund Amount $000

41

PUBLIC

Revenue Neutrality ndash July 2018

Revenue Neutrality $ in Millions

Real-Time Energy Imbalance $11276

Real-Time Point to Point Obligation ($10113)

Real-Time Congestion from Self-Schedules $013

DC Tie amp Block Load Transfer ($2063)

Allocation to Load $886

In July 2018 the Revenue Neutrality charge to load was $886M compared to bull A charge of $3046M in June 2018bull A charge of $145M in July 2017

42

PUBLIC

Net Allocation to Load ndash July 2018

Market-Based Allocation $ in Millions

Reliability Unit Commitment $000

Ancillary and Other Services $10200

Real-Time Ancillary Service Imbalance $223

Emergency Energy $016

Base Point Deviation ($026)

CRR Auction Revenue ($5799)

CRR Balancing Account $000

Real-Time Revenue Neutrality $886

Reliability Must Run $000

Monthly Block Load Transfer $000

Total $5500

Fee AllocationERCOT Administrative Fee $2207

Net Allocated to Load $7707

In July 2018 the Net Allocation to load was a charge of $7707M compared to bull A charge of $2152M in June 2018bull A credit of $1363M in July 2017

43

PUBLIC

Advanced Meter Settlement Impacts ndash July 2018

July 2018 At month end settling 72M ESIIDs using Advanced Meter data

July 2018 990 of the load in ERCOT is settled with 15-min interval data (AMS Competitive IDR and NOIE IDR)

44

PUBLIC

ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndashJuly 2018

45

PUBLIC

Retail Transaction Volumes ndash Summary ndash July 2018

46

Transaction Type July 2018 July 2017 July 2018 July 2017

Switches 669909 617300 121926 84059

Acquisition 0 0 0 0

Move - Ins 1667037 1568153 270122 252360

Move - Outs 814580 802779 129820 127073

Continuous Service Agreements (CSA) 395944 283259 40217 55770

Mass Transitions 9033 0 0 0

Total 3556503 3271491 562085 519262

Year-To-Date Transactions Received

Board Presentation Input

Trans Volumes by Month_New

PUBLIC

Retail Transaction Volumes ndash Summary ndash July 2018

SwitchesAcquisitions Move-Ins

Move-Outs Mass Transition

47

Projects Report

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018

20000000$ 2018 Portfolio

Spending Estimate

Projects In FlightOn Hold (Count = 100) 24905011$

Projects Not Yet Started (Count = 10) 1320628$

Projects Completed (Count = 43) 795250$

(7020889)$

TOTAL 20000000$

Project Number Projects in Initiation Phase (Count = 4)

TBD IT Asset RecoveryNPRR842 Study Area Load Information

209-03 Study Network (STNET) Integration288-01 EDI Map and Translator Replacement

Impact Metric TolerancesUnfavorable variances are represented as negative numbers within the report - Green = No more than 49 unfavorable variance - Yellow = Unfavorable variance between 49 and 99 - Red = Unfavorable variance more than 99

Spending Reductions Required to Maintain Capital Budget

2018 Project Funding

Footnotes1 - One or more phases took longer than expected resulting in additional time required

2 - One or more phases required more labor than expected resulting in additional funding andor time required

3 - Project placed on holdNA - Metric not calculated because - it is reported at the parent project level or - it is an administrative project

Project Number Projects in Planning Phase (Count = 8) Phase Start Baseline

Phase FinishApproved

Phase FinishScheduled

Go-Live DateScheduled

Phase Finish

134-02 Privileged Account Management (PAM) Phase 2 882018 12192018 12192018 TBD 12192018 0 10

183-01 CMM-FT GUI Integration 12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs

242-01 Portfolio Reporting Assessment 1182017 12192018 12192018 TBD 12192018 0 21260-01 Information Governance Assessment 10182017 5302018 9192018 TBD 9192018 0 5286-01 Java Platform Assessment 6202018 11212018 11212018 TBD 11212018 0 6287-01 Security Constrained Unit Commitment (SCUC) 882018 2272019 2272019 TBD 2272019 0 -1

NPRR484Revisions to Congestion Revenue Rights Credit Calculations and Payments - Phase 1b 2

12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs

NPRR702Flexible Accounts Payment of Invoices and Disposition of Interest on Cash Collateral

12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs

Schedule Health Budget Health

49

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018Project Number Projects in Execution Phase (Count = 42) Phase Start Baseline Go-

Live DateApproved Go-

Live DateScheduled

Go-Live DateScheduled

Phase Finish

170-01 Enterprise Content Alignment Program 8262015 11152017 8312018 8312018 8312018 0 0170-06 ECAP - ECMS Implementation Phase 1 4252018 11302018 11302018 11302018 11302018 0 3173-02 ERCOT Flight Certification Website 11152017 2282019 2282019 2282019 5312019 0 2181-01 CRR Framework Upgrade 10262016 1022017 11192018 11192018 2272019 0 2

183-01 CMM Tech Refresh 3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

193-01 PMU Tool Evaluation and Implementation 12132017 892018 2152019 2152019 3202019 0 0196-01 GINR Project Status Application Replacement 12212016 9142017 2282019 2282019 3312019 0 1198-02 Reactive Power Coordination PoC 962017 6162018 8152018 8152018 8152018 0 54209-02 Weather Imaging and Line Observation (WILO) 5302018 212019 212019 212019 2272019 0 2210-01 REC Technology Refresh 8302017 3182018 12132018 12132018 1162019 0 3228-01 Enterprise Database Upgrade 882018 1292020 1292020 1292020 1292020 0 17229-01 IT Change and Configuration Management Phase 2 822017 6192018 12132018 12132018 3252019 0 2 -9238-01 Application Authentication Tech Refresh 962017 3192018 12132018 12132018 1302019 0 3239-01 Identity and Access Management 592018 3132019 3132019 3132019 3132019 0 2241-01 AREA - Generation 10112017 3302018 892018 892018 952018 0 -4244-01 Corporate Wireless 11292017 3282018 1252018 1252018 192019 0 9245-01 2017 EPS Metering Enhancements 6272018 892019 892019 892019 9252019 0 1246-01 iTest Data Refresh 12132017 1192018 11152018 11152018 122019 0 25249-01 Secondary Wind Forecasting Service 8302017 2282018 892018 892018 952018 0 0253-01 CIP Recovery Plan Project - Planning Phase 1 1312018 8292018 8292018 8292018 8292018 0 -2

257-01Security Constrained Optimal Powerflow in Study Network Analysis

1262017 10252018 10252018 10252018 1282018 0 19

261-01 Generic Transmission Constraint Calculation 372018 12132018 12132018 12132018 1232019 0 0263-01 Market Simulator 4112018 12132018 12132018 12132018 1302019 0 7265-01 Real-Time Assessment Continuity 1312018 12132018 12132018 12132018 1302019 0 0279-01 Cyber Security Project 24 6272018 10262018 10262018 10262018 11282018 0 0280-01 Quest Software Portfolio Transition 442018 6272018 9262018 9262018 9262018 0 13282-01 Synchronous Condenser Outage Modeling 662018 10252018 10252018 10252018 1252018 0 1Various 2015 CMM NPRRs 2 -18

NPRR519Exemption of ERS-Only QSEs from Collateral and Capitalization Requirements

3152017 5192018 12112018 12112018 12312018 0 See 2015 CMM NPRRs

NPRR620Collateral Requirements for Counter-Parties with No Load or Generation

3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

NPRR660 Remove CRR State Change Adder 3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

Budget HealthSchedule Health

50

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018Project Number Projects in Execution Phase (Count = 42) Phase Start Baseline Go-

Live DateApproved Go-

Live DateScheduled

Go-Live DateScheduled

Phase Finish

NPRR741 Clarifications to TPE and EAL Credit Exposure Calculations 3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

NPRR749 Option Cost for Outstanding CRRs 882018 12132018 12132018 12132018 TBD 0 NA See 2015 CMM NPRRs

NPRR755 Data Agent-Only QSE Registration 3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

NPRR819Modification of Non-Price Error Resettlement Thresholds and Resettlement Clean-Ups

592018 892018 892018 892018 952018 0 36

NPRR833 Modify PTP Obligation Bid Clearing Change 882018 12132018 12132018 12132018 TBD 0 1

NPRR843Short-Term System Adequacy and AS Offer Disclosure Reports Additions

7182018 10252018 10252018 10252018 11282018 0 0

NPRR864 RUC Modifications to Consider Market-Based Solutions 6202018 10252018 10252018 10252018 11282018 0 4SCR777 Bilateral CRR Interface Enhancement 10262016 1022017 11192018 11192018 2272019 0 NA See 181-01

SCR781 RARF Replacement 12202017 4252018 12192018 12192018 12192018 0 3SCR791 Correction of 60-day SCED GRD Disclosure Report 522018 892018 892018 892018 952018 0 39SCR795 Addition of Intra-Hour Wind Forecast to GTBD Calculation 882018 10252018 10252018 10252018 11142018 0 0

Project Number Expedited Projects in Execution (Count = 34)

Project Number Projects in Stabilization (Count = 10) Execution

Phase StartBaseline Go-Live Target

Approved Go-Live Target

ActualGo-Live Date

Scheduled Execution Phase

Finish

NPRR648 Remove References to Flowgate Rights 3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR683 Revision to Available Credit Limit Calculation 3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR743 Revision to MCE to Have a Floor For Load Exposure 3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR760 Calculation of Exposure Variables For Days With No Activity 3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR776 Voltage Set Point Communication 9202017 3192018 452018 452018 952018 0 1

NPRR800Revisions to Credit Exposure Calculations to Use Electricity Futures Market Prices

3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR815Revise the Limitation of Load Resources Providing Responsive Reserve (RRS) Service

3212018 5312018 5312018 5312018 8292018 0 2

209-01 Multi Station Breaker to Breaker One Lines 282017 392018 532018 532018 8222018 0 -1259-01 DC SCADA and Metering Upgrade 10252017 1172018 7252018 7252018 8292018 0 22266-01 Remote Email Access Enhancement 12132017 372018 662018 6192018 9262018 2 -7 2 -9

Schedule Health Budget Health

Budget HealthSchedule Health

51

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018

Project Number Projects On Hold (Count = 2) Forecast

Start DateBaseline

Phase FinishApproved Go-

Live TargetScheduled

Go-Live DateScheduled

Phase Finish

SCR789 Update NMMS Topology Processor to PSSE 34 Capability 0

269-01Document Repository Redesign and Governance Implementation - Phase 1

0

Project Number Projects Completed (Count = 20)

Baseline Execution

Phase Start

Baseline Go-Live Target

Approved Go-Live Target

Actual Go-Live Date

Actual Execution Phase Finish

185-01 Records Management and eDiscovery 12152016 5242017 8292017 8222017 12132017 2 0224-01 TelAlert Replacement 452017 6272017 842017 842017 592018 0 5230-01 SAS Technical Architecture Redesign 312017 12132017 12132017 12132017 6272018 0 2234-01 Reporting Solution Resiliency (RSR) 452017 8232017 11272017 11272017 1102018 0 8240-01 EDI Translator and Mapping Replacement Assessment 4192017 9272017 2282018 TBD 372018 -2 20254-01 Retail Windows Upgrade 10112017 12182017 12182017 1222018 272018 1 -51 65255-01 Settlements Architecture Enhancements 10252017 1112018 1112018 1192018 2142018 1 -10 53258-01 WD Kainos SMART Automation Testing Tool 4112018 642018 642018 662018 7182018 -3 33271-01 Issue Tracking and Resolution Tool Assessment 12132017 4252018 4252018 TBD 522018 1 -5 -1272-01 Operator Training Simulator Black Start GE Effort 1262017 4252018 4252018 4272018 5162018 -1 19274-01 Average Mid-Term Load Forecast 372018 5312018 5312018 5312018 6272018 0 50

NPRR768Revisions to Real-Time On-Line Reliability Deployment Price Adder Categories

372018 5312018 5312018 5312018 6272018 0 16

NPRR778 Modifications to Date Change and Cancellation Evaluation Window 7192017 10292017 12112017 12112017 1312018 0 23

NPRR782Settlement of Infeasible Ancillary Services Due to Transmission Constraints

5242017 8312017 1122017 1122017 1102018 0 20

NPRR808 Three Year CRR Auction 8232017 9182017 9182017 912017 1312018 65 68

NPRR810Applicability of RMR Incentive Factor on Reservation and Transportation Costs Associated with Firm Fuel Supplies

7172017 11122017 3312018 3312018 3312018 0 NA See 233-00

NPRR830 Revision of 4-Coincident Peak Methodology 12132017 262018 262018 262018 372018 0 85

NPRR831 Inclusion of Private Use Networks in Load Zone Price Calculations 822017 1122017 1122017 1122017 2212018 0 33

OBDRR002 ORDC OBD Revisions for PUCT Project 47199 372018 5312018 5312018 5312018 6272018 0 See NPRR768

SCR792 Enhance Communications of BAAL Exceedances 2142018 452018 452018 452018 4252018 0 69

Project Number Expedited Projects Completed (Count = 23)

Budget HealthSchedule Health

Budget HealthSchedule Health

52

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018

Project Number 2018 Projects Not Yet Started (Count = 10) Forecast

Start Date

NPRR858 Provide Complete Current Operating Plan (COP) Data Aug-2018TBD 2018 OS Enhancements Aug-2018TBD Additional Branch Limit for Relays Aug-2018

NPRR817 Create a Panhandle Hub Sep-2018NPRR821 Elimination of the CRR Deration Process Oct-2018NPRR865 Publish RTM Shift Factors for Hubs Load Zones and DC Ties Oct-2018

SCR793SSR Related Telemetry for Transmission Service Provider (TSP) Operators

Oct-2018

ECAP ECAP - ECMS Implementation Phase 2 Oct-2018TBD Job Scheduler Update in CSI Framework Oct-2018TBD Parameter Estimation Oct-2018

53

  • Slide Number 1
  • Slide Number 2
  • Summary ndash July 2018
  • Daily Peak Demand Hourly Average Actual vs Forecast Wind Day-Ahead COPs amp On-Line Capacity at Peak ndash July 2018
  • Actual Wind Output plus Curtailments vs Wind Day-Ahead COPs for All Hours ndash July 2018
  • ERCOTrsquos CPS1 Monthly Performance ndash July 2018
  • Monthly Peak Actual Demand ndash July 2018
  • Monthly Minimum Actual 15-Minute Demand ndash July 2018
  • Day-Ahead Load Forecast Performance ndash July 2018
  • Reliability Unit Commitment (RUC) Capacity by Weather Zone ndash July 2018
  • Generic Transmission Constraints (GTCs) ndash July 2018
  • Advisories and Watches ndash July 2018 Corrected
  • Lake Levels Update ndash August 1 2018
  • Planning Summary ndash July 2018
  • Mapping of Counties to ERCOT Zones ndash July 2018
  • Cumulative MW Capacity of Interconnection Requests by Zone ndashJuly 2018
  • Cumulative MW Capacity of Interconnection Requests by Zone ndashJuly 2018
  • Cumulative MW Capacity of Interconnection Requests by Zone ndashJuly 2018
  • Wind Generation ndash July 2018
  • Solar Generation ndash July 2018
  • Generation Interconnection Activity by Fuel ndash July 2018
  • Generation Interconnection Activity by Project Phase ndash July 2018
  • Slide Number 23
  • Day-Ahead Schedule (Hourly Average) ndash July 2018
  • Percentage of Real-Time Load Hedged in the DAM (Counter-Party Level) ndash July 2018
  • DAM and RTM Price Convergence ndash July 2018
  • Day-Ahead Electricity and Ancillary Service Prices (Hourly Average) ndash July 2018
  • Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash July 2018
  • Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash July 2018
  • DRUC Monthly Summary (Hourly Average) ndash July 2018
  • HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash July 2018
  • NonndashSpinning Reserve Service Deployment ndash July 2018
  • CRR Price Convergence ndash July 2018
  • Daily Average System Lambda and ORDC Price Adders ndash July 2018
  • ERS Procurement for June 2018 ndash September 2018
  • Reliability Services ndash July 2018
  • Ancillary and Other Services ndash July 2018
  • Real-Time Ancillary Service Imbalance (ORDC) ndash July 2018
  • Energy Settlement ndash July 2018
  • Congestion Revenue Rights (CRR) ndash July 2018
  • CRR Balancing Account Fund ndash July 2018
  • Revenue Neutrality ndash July 2018
  • Net Allocation to Load ndash July 2018
  • Advanced Meter Settlement Impacts ndash July 2018
  • ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndash July 2018
  • Retail Transaction Volumes ndash Summary ndash July 2018
  • Retail Transaction Volumes ndash Summary ndash July 2018
  • Slide Number 48
  • ERCOT Portfolio Stoplight Report ndash July 2018
  • ERCOT Portfolio Stoplight Report ndash July 2018
  • ERCOT Portfolio Stoplight Report ndash July 2018
  • ERCOT Portfolio Stoplight Report ndash July 2018
  • ERCOT Portfolio Stoplight Report ndash July 2018
Retail Transactions Summary
July 2018 June 2018 May 2018 April 2018 March 2018 February 2018 January 2018 December 2017 November 2017 October 2017 September 2017 August 2017 July 2017 June 2017 May 2017 April 2017 March 2017 February 2017 January 2017 December 2016 November 2016 October 2016 September 2016 August 2016 July 2016 June 2016 May 2016 April 2016 March 2016 February 2016 January 2016 December 2015 November 2015 October 2015 September 2015 August 2015 July 2015 June 2015 May 2015 April 2015 March 2015 February 2015 January 2015 December 2014 November 2014 October 2014 September 2014 August 2014 July 2014 June 2014 May 2014 April 2014 March 2014 February 2014 January 2014 December 2013 November 2013 October 2013 September 2013 August 2013 July 2013 June 2013 May 2013 April 2013 March 2013 February 2013 January 2013 Grand total
814_01 - Switch Received 121926 109653 96828 81291 95159 76119 88933 60560 77860 78096 79502 84134 84059 108784 130828 71769 67845 66875 87140 66556 56202 64452 67323 86656 82923 86376 75323 70300 76235 68057 63954 61486 52887 65276 70342 81674 91211 102661 86229 81255 79997 73394 72885 71072 67080 110465 175164 89677 99568 101490 111077 91983 93887 71130 86953 69691 55957 166882 82415 93194 102562 103756 116086 78919 68950 64329 67116 1321827
Difference from previous month 12273 12825 15537 (13868) 19040 (12814) 28373 (17300) (236) (1406) (4632) 75 (24725) (22044) 59059 3924 970 (20265) 20584 10354 (8250) (2871) (19333) 3733 (3453) 11053 5023 (5935) 8178 4103 2468 8599 (12389) (5066) (11332) (9537) (11450) 16432 4974 1258 6603 509 1813 3992 (43385) (64699) 85487 (9891) (1922) (9587) 19094 (1904) 22757 (15823) 17262 13734 (110925) 84467 (10779) (9368) (1194) (12330) 37167 9969 4621 (2787)
814_16 - Move - Ins Received 270122 257125 244431 225380 224289 215281 230409 238340 207921 236397 244511 258046 252360 257759 237611 197865 217962 201984 202612 196236 201714 220958 231999 268781 241844 247481 214383 199804 218245 212474 193716 189862 181098 215908 229405 248124 263233 247089 208166 207932 215950 197765 198025 193973 178624 226283 231418 243482 251957 233679 223201 258649 214724 208160 207059 172981 178671 233469 216550 255967 249114 220397 216982 204412 197200 191955 194507 3162148
Difference from previous month 12997 12694 19051 1091 9008 (15128) (7931) 30419 (28476) (8114) (13535) 5686 (5399) 20148 39746 (20097) 15978 (628) 6376 (5478) (19244) (11041) (36782) 26937 (5637) 33098 14579 (18441) 5771 18758 3854 8764 (34810) (13497) (18719) (15109) 16144 38923 234 (8018) 18185 (260) 4052 15349 (47659) (5135) (12064) (8475) 18278 10478 (35448) 43925 6564 1101 34078 (5690) (54798) 16919 (39417) 6853 28717 3415 12570 7212 5245 (2552)
814_24 - MVO and MVO to CSA Received 129820 125861 124403 113795 108753 100127 111821 144987 100830 116519 129103 128104 127073 133582 127218 102055 111459 100285 101107 96289 100578 109493 114094 133170 122932 129025 118022 103789 109278 103747 96628 99552 96214 109578 117949 123894 133905 133855 114675 108275 108859 94864 98233 97901 89578 111857 115918 121662 131607 126785 119107 107956 107266 99428 104273 93385 93977 115469 115524 129594 135196 121446 120049 111598 106467 102429 104399 1660500
814_10 - DTP Mass Acquisition Received - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0
814_10 - DTP Mass Transition Received - 0 - 0 9033 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 639 - 0 - 0 4975 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0
814_18 - CSA AdditionDeletes Received 40217 62083 99016 55581 46720 42587 49740 47725 31726 52888 41597 40616 55770 43745 52139 26702 21791 39082 44030 38884 39856 31786 33061 42622 48489 64178 50499 59475 59400 48536 42179 40351 34796 34420 54677 35078 49489 59611 39384 44247 44577 35386 40420 54831 43550 45039 44268 40405 57954 64408 65032 80184 70310 41156 34811 46680 50347 71847 48606 52585 50867 62747 59763 34925 40977 40389 41227 747237
Total 562085 554722 573711 476047 474921 434114 480903 491612 418337 483900 494713 510900 519262 543870 547796 398391 419057 408226 434889 397965 398350 426689 446477 531229 496188 527060 458227 433368 463158 432814 396477 391251 364995 425182 472373 488770 537838 543216 448454 441709 449383 401409 409563 417777 378832 493644 566768 495865 541086 526362 523392 538772 486187 419874 433096 382737 378952 587667 463095 531340 537739 508346 512880 429854 413594 399102 407249 6891712
Counts from Monthly Retail Transaction report
To do
Break Out 814_10s - AQ and MT
Break Out 814_18 Additions from Deletes
Year-To-Date Transactions Received
Transaction Type July 2018 July 2017 July 2018 July 2017
Switches 669909 617300 121926 84059
Acquisition 0 0 0 0
Move - Ins 1667037 1568153 270122 252360
Move - Outs 814580 802779 129820 127073
Continuous Service Agreements (CSA) 395944 283259 40217 55770
Mass Transitions 9033 0 0 0
Total 3556503 3271491 562085 519262
There has been a change since this was created
Mass Acquisition has been broken out of Mass Transition
Page 42: ERCOT Monthly Operational Overvie · ERCOT Monthly Operational Overview (July 2018) Revised 08.22.18. ERCOT Public. August 15, 2018

PUBLIC

Revenue Neutrality ndash July 2018

Revenue Neutrality $ in Millions

Real-Time Energy Imbalance $11276

Real-Time Point to Point Obligation ($10113)

Real-Time Congestion from Self-Schedules $013

DC Tie amp Block Load Transfer ($2063)

Allocation to Load $886

In July 2018 the Revenue Neutrality charge to load was $886M compared to bull A charge of $3046M in June 2018bull A charge of $145M in July 2017

42

PUBLIC

Net Allocation to Load ndash July 2018

Market-Based Allocation $ in Millions

Reliability Unit Commitment $000

Ancillary and Other Services $10200

Real-Time Ancillary Service Imbalance $223

Emergency Energy $016

Base Point Deviation ($026)

CRR Auction Revenue ($5799)

CRR Balancing Account $000

Real-Time Revenue Neutrality $886

Reliability Must Run $000

Monthly Block Load Transfer $000

Total $5500

Fee AllocationERCOT Administrative Fee $2207

Net Allocated to Load $7707

In July 2018 the Net Allocation to load was a charge of $7707M compared to bull A charge of $2152M in June 2018bull A credit of $1363M in July 2017

43

PUBLIC

Advanced Meter Settlement Impacts ndash July 2018

July 2018 At month end settling 72M ESIIDs using Advanced Meter data

July 2018 990 of the load in ERCOT is settled with 15-min interval data (AMS Competitive IDR and NOIE IDR)

44

PUBLIC

ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndashJuly 2018

45

PUBLIC

Retail Transaction Volumes ndash Summary ndash July 2018

46

Transaction Type July 2018 July 2017 July 2018 July 2017

Switches 669909 617300 121926 84059

Acquisition 0 0 0 0

Move - Ins 1667037 1568153 270122 252360

Move - Outs 814580 802779 129820 127073

Continuous Service Agreements (CSA) 395944 283259 40217 55770

Mass Transitions 9033 0 0 0

Total 3556503 3271491 562085 519262

Year-To-Date Transactions Received

Board Presentation Input

Trans Volumes by Month_New

PUBLIC

Retail Transaction Volumes ndash Summary ndash July 2018

SwitchesAcquisitions Move-Ins

Move-Outs Mass Transition

47

Projects Report

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018

20000000$ 2018 Portfolio

Spending Estimate

Projects In FlightOn Hold (Count = 100) 24905011$

Projects Not Yet Started (Count = 10) 1320628$

Projects Completed (Count = 43) 795250$

(7020889)$

TOTAL 20000000$

Project Number Projects in Initiation Phase (Count = 4)

TBD IT Asset RecoveryNPRR842 Study Area Load Information

209-03 Study Network (STNET) Integration288-01 EDI Map and Translator Replacement

Impact Metric TolerancesUnfavorable variances are represented as negative numbers within the report - Green = No more than 49 unfavorable variance - Yellow = Unfavorable variance between 49 and 99 - Red = Unfavorable variance more than 99

Spending Reductions Required to Maintain Capital Budget

2018 Project Funding

Footnotes1 - One or more phases took longer than expected resulting in additional time required

2 - One or more phases required more labor than expected resulting in additional funding andor time required

3 - Project placed on holdNA - Metric not calculated because - it is reported at the parent project level or - it is an administrative project

Project Number Projects in Planning Phase (Count = 8) Phase Start Baseline

Phase FinishApproved

Phase FinishScheduled

Go-Live DateScheduled

Phase Finish

134-02 Privileged Account Management (PAM) Phase 2 882018 12192018 12192018 TBD 12192018 0 10

183-01 CMM-FT GUI Integration 12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs

242-01 Portfolio Reporting Assessment 1182017 12192018 12192018 TBD 12192018 0 21260-01 Information Governance Assessment 10182017 5302018 9192018 TBD 9192018 0 5286-01 Java Platform Assessment 6202018 11212018 11212018 TBD 11212018 0 6287-01 Security Constrained Unit Commitment (SCUC) 882018 2272019 2272019 TBD 2272019 0 -1

NPRR484Revisions to Congestion Revenue Rights Credit Calculations and Payments - Phase 1b 2

12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs

NPRR702Flexible Accounts Payment of Invoices and Disposition of Interest on Cash Collateral

12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs

Schedule Health Budget Health

49

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018Project Number Projects in Execution Phase (Count = 42) Phase Start Baseline Go-

Live DateApproved Go-

Live DateScheduled

Go-Live DateScheduled

Phase Finish

170-01 Enterprise Content Alignment Program 8262015 11152017 8312018 8312018 8312018 0 0170-06 ECAP - ECMS Implementation Phase 1 4252018 11302018 11302018 11302018 11302018 0 3173-02 ERCOT Flight Certification Website 11152017 2282019 2282019 2282019 5312019 0 2181-01 CRR Framework Upgrade 10262016 1022017 11192018 11192018 2272019 0 2

183-01 CMM Tech Refresh 3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

193-01 PMU Tool Evaluation and Implementation 12132017 892018 2152019 2152019 3202019 0 0196-01 GINR Project Status Application Replacement 12212016 9142017 2282019 2282019 3312019 0 1198-02 Reactive Power Coordination PoC 962017 6162018 8152018 8152018 8152018 0 54209-02 Weather Imaging and Line Observation (WILO) 5302018 212019 212019 212019 2272019 0 2210-01 REC Technology Refresh 8302017 3182018 12132018 12132018 1162019 0 3228-01 Enterprise Database Upgrade 882018 1292020 1292020 1292020 1292020 0 17229-01 IT Change and Configuration Management Phase 2 822017 6192018 12132018 12132018 3252019 0 2 -9238-01 Application Authentication Tech Refresh 962017 3192018 12132018 12132018 1302019 0 3239-01 Identity and Access Management 592018 3132019 3132019 3132019 3132019 0 2241-01 AREA - Generation 10112017 3302018 892018 892018 952018 0 -4244-01 Corporate Wireless 11292017 3282018 1252018 1252018 192019 0 9245-01 2017 EPS Metering Enhancements 6272018 892019 892019 892019 9252019 0 1246-01 iTest Data Refresh 12132017 1192018 11152018 11152018 122019 0 25249-01 Secondary Wind Forecasting Service 8302017 2282018 892018 892018 952018 0 0253-01 CIP Recovery Plan Project - Planning Phase 1 1312018 8292018 8292018 8292018 8292018 0 -2

257-01Security Constrained Optimal Powerflow in Study Network Analysis

1262017 10252018 10252018 10252018 1282018 0 19

261-01 Generic Transmission Constraint Calculation 372018 12132018 12132018 12132018 1232019 0 0263-01 Market Simulator 4112018 12132018 12132018 12132018 1302019 0 7265-01 Real-Time Assessment Continuity 1312018 12132018 12132018 12132018 1302019 0 0279-01 Cyber Security Project 24 6272018 10262018 10262018 10262018 11282018 0 0280-01 Quest Software Portfolio Transition 442018 6272018 9262018 9262018 9262018 0 13282-01 Synchronous Condenser Outage Modeling 662018 10252018 10252018 10252018 1252018 0 1Various 2015 CMM NPRRs 2 -18

NPRR519Exemption of ERS-Only QSEs from Collateral and Capitalization Requirements

3152017 5192018 12112018 12112018 12312018 0 See 2015 CMM NPRRs

NPRR620Collateral Requirements for Counter-Parties with No Load or Generation

3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

NPRR660 Remove CRR State Change Adder 3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

Budget HealthSchedule Health

50

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018Project Number Projects in Execution Phase (Count = 42) Phase Start Baseline Go-

Live DateApproved Go-

Live DateScheduled

Go-Live DateScheduled

Phase Finish

NPRR741 Clarifications to TPE and EAL Credit Exposure Calculations 3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

NPRR749 Option Cost for Outstanding CRRs 882018 12132018 12132018 12132018 TBD 0 NA See 2015 CMM NPRRs

NPRR755 Data Agent-Only QSE Registration 3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

NPRR819Modification of Non-Price Error Resettlement Thresholds and Resettlement Clean-Ups

592018 892018 892018 892018 952018 0 36

NPRR833 Modify PTP Obligation Bid Clearing Change 882018 12132018 12132018 12132018 TBD 0 1

NPRR843Short-Term System Adequacy and AS Offer Disclosure Reports Additions

7182018 10252018 10252018 10252018 11282018 0 0

NPRR864 RUC Modifications to Consider Market-Based Solutions 6202018 10252018 10252018 10252018 11282018 0 4SCR777 Bilateral CRR Interface Enhancement 10262016 1022017 11192018 11192018 2272019 0 NA See 181-01

SCR781 RARF Replacement 12202017 4252018 12192018 12192018 12192018 0 3SCR791 Correction of 60-day SCED GRD Disclosure Report 522018 892018 892018 892018 952018 0 39SCR795 Addition of Intra-Hour Wind Forecast to GTBD Calculation 882018 10252018 10252018 10252018 11142018 0 0

Project Number Expedited Projects in Execution (Count = 34)

Project Number Projects in Stabilization (Count = 10) Execution

Phase StartBaseline Go-Live Target

Approved Go-Live Target

ActualGo-Live Date

Scheduled Execution Phase

Finish

NPRR648 Remove References to Flowgate Rights 3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR683 Revision to Available Credit Limit Calculation 3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR743 Revision to MCE to Have a Floor For Load Exposure 3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR760 Calculation of Exposure Variables For Days With No Activity 3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR776 Voltage Set Point Communication 9202017 3192018 452018 452018 952018 0 1

NPRR800Revisions to Credit Exposure Calculations to Use Electricity Futures Market Prices

3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR815Revise the Limitation of Load Resources Providing Responsive Reserve (RRS) Service

3212018 5312018 5312018 5312018 8292018 0 2

209-01 Multi Station Breaker to Breaker One Lines 282017 392018 532018 532018 8222018 0 -1259-01 DC SCADA and Metering Upgrade 10252017 1172018 7252018 7252018 8292018 0 22266-01 Remote Email Access Enhancement 12132017 372018 662018 6192018 9262018 2 -7 2 -9

Schedule Health Budget Health

Budget HealthSchedule Health

51

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018

Project Number Projects On Hold (Count = 2) Forecast

Start DateBaseline

Phase FinishApproved Go-

Live TargetScheduled

Go-Live DateScheduled

Phase Finish

SCR789 Update NMMS Topology Processor to PSSE 34 Capability 0

269-01Document Repository Redesign and Governance Implementation - Phase 1

0

Project Number Projects Completed (Count = 20)

Baseline Execution

Phase Start

Baseline Go-Live Target

Approved Go-Live Target

Actual Go-Live Date

Actual Execution Phase Finish

185-01 Records Management and eDiscovery 12152016 5242017 8292017 8222017 12132017 2 0224-01 TelAlert Replacement 452017 6272017 842017 842017 592018 0 5230-01 SAS Technical Architecture Redesign 312017 12132017 12132017 12132017 6272018 0 2234-01 Reporting Solution Resiliency (RSR) 452017 8232017 11272017 11272017 1102018 0 8240-01 EDI Translator and Mapping Replacement Assessment 4192017 9272017 2282018 TBD 372018 -2 20254-01 Retail Windows Upgrade 10112017 12182017 12182017 1222018 272018 1 -51 65255-01 Settlements Architecture Enhancements 10252017 1112018 1112018 1192018 2142018 1 -10 53258-01 WD Kainos SMART Automation Testing Tool 4112018 642018 642018 662018 7182018 -3 33271-01 Issue Tracking and Resolution Tool Assessment 12132017 4252018 4252018 TBD 522018 1 -5 -1272-01 Operator Training Simulator Black Start GE Effort 1262017 4252018 4252018 4272018 5162018 -1 19274-01 Average Mid-Term Load Forecast 372018 5312018 5312018 5312018 6272018 0 50

NPRR768Revisions to Real-Time On-Line Reliability Deployment Price Adder Categories

372018 5312018 5312018 5312018 6272018 0 16

NPRR778 Modifications to Date Change and Cancellation Evaluation Window 7192017 10292017 12112017 12112017 1312018 0 23

NPRR782Settlement of Infeasible Ancillary Services Due to Transmission Constraints

5242017 8312017 1122017 1122017 1102018 0 20

NPRR808 Three Year CRR Auction 8232017 9182017 9182017 912017 1312018 65 68

NPRR810Applicability of RMR Incentive Factor on Reservation and Transportation Costs Associated with Firm Fuel Supplies

7172017 11122017 3312018 3312018 3312018 0 NA See 233-00

NPRR830 Revision of 4-Coincident Peak Methodology 12132017 262018 262018 262018 372018 0 85

NPRR831 Inclusion of Private Use Networks in Load Zone Price Calculations 822017 1122017 1122017 1122017 2212018 0 33

OBDRR002 ORDC OBD Revisions for PUCT Project 47199 372018 5312018 5312018 5312018 6272018 0 See NPRR768

SCR792 Enhance Communications of BAAL Exceedances 2142018 452018 452018 452018 4252018 0 69

Project Number Expedited Projects Completed (Count = 23)

Budget HealthSchedule Health

Budget HealthSchedule Health

52

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018

Project Number 2018 Projects Not Yet Started (Count = 10) Forecast

Start Date

NPRR858 Provide Complete Current Operating Plan (COP) Data Aug-2018TBD 2018 OS Enhancements Aug-2018TBD Additional Branch Limit for Relays Aug-2018

NPRR817 Create a Panhandle Hub Sep-2018NPRR821 Elimination of the CRR Deration Process Oct-2018NPRR865 Publish RTM Shift Factors for Hubs Load Zones and DC Ties Oct-2018

SCR793SSR Related Telemetry for Transmission Service Provider (TSP) Operators

Oct-2018

ECAP ECAP - ECMS Implementation Phase 2 Oct-2018TBD Job Scheduler Update in CSI Framework Oct-2018TBD Parameter Estimation Oct-2018

53

  • Slide Number 1
  • Slide Number 2
  • Summary ndash July 2018
  • Daily Peak Demand Hourly Average Actual vs Forecast Wind Day-Ahead COPs amp On-Line Capacity at Peak ndash July 2018
  • Actual Wind Output plus Curtailments vs Wind Day-Ahead COPs for All Hours ndash July 2018
  • ERCOTrsquos CPS1 Monthly Performance ndash July 2018
  • Monthly Peak Actual Demand ndash July 2018
  • Monthly Minimum Actual 15-Minute Demand ndash July 2018
  • Day-Ahead Load Forecast Performance ndash July 2018
  • Reliability Unit Commitment (RUC) Capacity by Weather Zone ndash July 2018
  • Generic Transmission Constraints (GTCs) ndash July 2018
  • Advisories and Watches ndash July 2018 Corrected
  • Lake Levels Update ndash August 1 2018
  • Planning Summary ndash July 2018
  • Mapping of Counties to ERCOT Zones ndash July 2018
  • Cumulative MW Capacity of Interconnection Requests by Zone ndashJuly 2018
  • Cumulative MW Capacity of Interconnection Requests by Zone ndashJuly 2018
  • Cumulative MW Capacity of Interconnection Requests by Zone ndashJuly 2018
  • Wind Generation ndash July 2018
  • Solar Generation ndash July 2018
  • Generation Interconnection Activity by Fuel ndash July 2018
  • Generation Interconnection Activity by Project Phase ndash July 2018
  • Slide Number 23
  • Day-Ahead Schedule (Hourly Average) ndash July 2018
  • Percentage of Real-Time Load Hedged in the DAM (Counter-Party Level) ndash July 2018
  • DAM and RTM Price Convergence ndash July 2018
  • Day-Ahead Electricity and Ancillary Service Prices (Hourly Average) ndash July 2018
  • Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash July 2018
  • Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash July 2018
  • DRUC Monthly Summary (Hourly Average) ndash July 2018
  • HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash July 2018
  • NonndashSpinning Reserve Service Deployment ndash July 2018
  • CRR Price Convergence ndash July 2018
  • Daily Average System Lambda and ORDC Price Adders ndash July 2018
  • ERS Procurement for June 2018 ndash September 2018
  • Reliability Services ndash July 2018
  • Ancillary and Other Services ndash July 2018
  • Real-Time Ancillary Service Imbalance (ORDC) ndash July 2018
  • Energy Settlement ndash July 2018
  • Congestion Revenue Rights (CRR) ndash July 2018
  • CRR Balancing Account Fund ndash July 2018
  • Revenue Neutrality ndash July 2018
  • Net Allocation to Load ndash July 2018
  • Advanced Meter Settlement Impacts ndash July 2018
  • ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndash July 2018
  • Retail Transaction Volumes ndash Summary ndash July 2018
  • Retail Transaction Volumes ndash Summary ndash July 2018
  • Slide Number 48
  • ERCOT Portfolio Stoplight Report ndash July 2018
  • ERCOT Portfolio Stoplight Report ndash July 2018
  • ERCOT Portfolio Stoplight Report ndash July 2018
  • ERCOT Portfolio Stoplight Report ndash July 2018
  • ERCOT Portfolio Stoplight Report ndash July 2018
Retail Transactions Summary
July 2018 June 2018 May 2018 April 2018 March 2018 February 2018 January 2018 December 2017 November 2017 October 2017 September 2017 August 2017 July 2017 June 2017 May 2017 April 2017 March 2017 February 2017 January 2017 December 2016 November 2016 October 2016 September 2016 August 2016 July 2016 June 2016 May 2016 April 2016 March 2016 February 2016 January 2016 December 2015 November 2015 October 2015 September 2015 August 2015 July 2015 June 2015 May 2015 April 2015 March 2015 February 2015 January 2015 December 2014 November 2014 October 2014 September 2014 August 2014 July 2014 June 2014 May 2014 April 2014 March 2014 February 2014 January 2014 December 2013 November 2013 October 2013 September 2013 August 2013 July 2013 June 2013 May 2013 April 2013 March 2013 February 2013 January 2013 Grand total
814_01 - Switch Received 121926 109653 96828 81291 95159 76119 88933 60560 77860 78096 79502 84134 84059 108784 130828 71769 67845 66875 87140 66556 56202 64452 67323 86656 82923 86376 75323 70300 76235 68057 63954 61486 52887 65276 70342 81674 91211 102661 86229 81255 79997 73394 72885 71072 67080 110465 175164 89677 99568 101490 111077 91983 93887 71130 86953 69691 55957 166882 82415 93194 102562 103756 116086 78919 68950 64329 67116 1321827
Difference from previous month 12273 12825 15537 (13868) 19040 (12814) 28373 (17300) (236) (1406) (4632) 75 (24725) (22044) 59059 3924 970 (20265) 20584 10354 (8250) (2871) (19333) 3733 (3453) 11053 5023 (5935) 8178 4103 2468 8599 (12389) (5066) (11332) (9537) (11450) 16432 4974 1258 6603 509 1813 3992 (43385) (64699) 85487 (9891) (1922) (9587) 19094 (1904) 22757 (15823) 17262 13734 (110925) 84467 (10779) (9368) (1194) (12330) 37167 9969 4621 (2787)
814_16 - Move - Ins Received 270122 257125 244431 225380 224289 215281 230409 238340 207921 236397 244511 258046 252360 257759 237611 197865 217962 201984 202612 196236 201714 220958 231999 268781 241844 247481 214383 199804 218245 212474 193716 189862 181098 215908 229405 248124 263233 247089 208166 207932 215950 197765 198025 193973 178624 226283 231418 243482 251957 233679 223201 258649 214724 208160 207059 172981 178671 233469 216550 255967 249114 220397 216982 204412 197200 191955 194507 3162148
Difference from previous month 12997 12694 19051 1091 9008 (15128) (7931) 30419 (28476) (8114) (13535) 5686 (5399) 20148 39746 (20097) 15978 (628) 6376 (5478) (19244) (11041) (36782) 26937 (5637) 33098 14579 (18441) 5771 18758 3854 8764 (34810) (13497) (18719) (15109) 16144 38923 234 (8018) 18185 (260) 4052 15349 (47659) (5135) (12064) (8475) 18278 10478 (35448) 43925 6564 1101 34078 (5690) (54798) 16919 (39417) 6853 28717 3415 12570 7212 5245 (2552)
814_24 - MVO and MVO to CSA Received 129820 125861 124403 113795 108753 100127 111821 144987 100830 116519 129103 128104 127073 133582 127218 102055 111459 100285 101107 96289 100578 109493 114094 133170 122932 129025 118022 103789 109278 103747 96628 99552 96214 109578 117949 123894 133905 133855 114675 108275 108859 94864 98233 97901 89578 111857 115918 121662 131607 126785 119107 107956 107266 99428 104273 93385 93977 115469 115524 129594 135196 121446 120049 111598 106467 102429 104399 1660500
814_10 - DTP Mass Acquisition Received - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0
814_10 - DTP Mass Transition Received - 0 - 0 9033 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 639 - 0 - 0 4975 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0
814_18 - CSA AdditionDeletes Received 40217 62083 99016 55581 46720 42587 49740 47725 31726 52888 41597 40616 55770 43745 52139 26702 21791 39082 44030 38884 39856 31786 33061 42622 48489 64178 50499 59475 59400 48536 42179 40351 34796 34420 54677 35078 49489 59611 39384 44247 44577 35386 40420 54831 43550 45039 44268 40405 57954 64408 65032 80184 70310 41156 34811 46680 50347 71847 48606 52585 50867 62747 59763 34925 40977 40389 41227 747237
Total 562085 554722 573711 476047 474921 434114 480903 491612 418337 483900 494713 510900 519262 543870 547796 398391 419057 408226 434889 397965 398350 426689 446477 531229 496188 527060 458227 433368 463158 432814 396477 391251 364995 425182 472373 488770 537838 543216 448454 441709 449383 401409 409563 417777 378832 493644 566768 495865 541086 526362 523392 538772 486187 419874 433096 382737 378952 587667 463095 531340 537739 508346 512880 429854 413594 399102 407249 6891712
Counts from Monthly Retail Transaction report
To do
Break Out 814_10s - AQ and MT
Break Out 814_18 Additions from Deletes
Year-To-Date Transactions Received
Transaction Type July 2018 July 2017 July 2018 July 2017
Switches 669909 617300 121926 84059
Acquisition 0 0 0 0
Move - Ins 1667037 1568153 270122 252360
Move - Outs 814580 802779 129820 127073
Continuous Service Agreements (CSA) 395944 283259 40217 55770
Mass Transitions 9033 0 0 0
Total 3556503 3271491 562085 519262
There has been a change since this was created
Mass Acquisition has been broken out of Mass Transition
Page 43: ERCOT Monthly Operational Overvie · ERCOT Monthly Operational Overview (July 2018) Revised 08.22.18. ERCOT Public. August 15, 2018

PUBLIC

Net Allocation to Load ndash July 2018

Market-Based Allocation $ in Millions

Reliability Unit Commitment $000

Ancillary and Other Services $10200

Real-Time Ancillary Service Imbalance $223

Emergency Energy $016

Base Point Deviation ($026)

CRR Auction Revenue ($5799)

CRR Balancing Account $000

Real-Time Revenue Neutrality $886

Reliability Must Run $000

Monthly Block Load Transfer $000

Total $5500

Fee AllocationERCOT Administrative Fee $2207

Net Allocated to Load $7707

In July 2018 the Net Allocation to load was a charge of $7707M compared to bull A charge of $2152M in June 2018bull A credit of $1363M in July 2017

43

PUBLIC

Advanced Meter Settlement Impacts ndash July 2018

July 2018 At month end settling 72M ESIIDs using Advanced Meter data

July 2018 990 of the load in ERCOT is settled with 15-min interval data (AMS Competitive IDR and NOIE IDR)

44

PUBLIC

ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndashJuly 2018

45

PUBLIC

Retail Transaction Volumes ndash Summary ndash July 2018

46

Transaction Type July 2018 July 2017 July 2018 July 2017

Switches 669909 617300 121926 84059

Acquisition 0 0 0 0

Move - Ins 1667037 1568153 270122 252360

Move - Outs 814580 802779 129820 127073

Continuous Service Agreements (CSA) 395944 283259 40217 55770

Mass Transitions 9033 0 0 0

Total 3556503 3271491 562085 519262

Year-To-Date Transactions Received

Board Presentation Input

Trans Volumes by Month_New

PUBLIC

Retail Transaction Volumes ndash Summary ndash July 2018

SwitchesAcquisitions Move-Ins

Move-Outs Mass Transition

47

Projects Report

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018

20000000$ 2018 Portfolio

Spending Estimate

Projects In FlightOn Hold (Count = 100) 24905011$

Projects Not Yet Started (Count = 10) 1320628$

Projects Completed (Count = 43) 795250$

(7020889)$

TOTAL 20000000$

Project Number Projects in Initiation Phase (Count = 4)

TBD IT Asset RecoveryNPRR842 Study Area Load Information

209-03 Study Network (STNET) Integration288-01 EDI Map and Translator Replacement

Impact Metric TolerancesUnfavorable variances are represented as negative numbers within the report - Green = No more than 49 unfavorable variance - Yellow = Unfavorable variance between 49 and 99 - Red = Unfavorable variance more than 99

Spending Reductions Required to Maintain Capital Budget

2018 Project Funding

Footnotes1 - One or more phases took longer than expected resulting in additional time required

2 - One or more phases required more labor than expected resulting in additional funding andor time required

3 - Project placed on holdNA - Metric not calculated because - it is reported at the parent project level or - it is an administrative project

Project Number Projects in Planning Phase (Count = 8) Phase Start Baseline

Phase FinishApproved

Phase FinishScheduled

Go-Live DateScheduled

Phase Finish

134-02 Privileged Account Management (PAM) Phase 2 882018 12192018 12192018 TBD 12192018 0 10

183-01 CMM-FT GUI Integration 12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs

242-01 Portfolio Reporting Assessment 1182017 12192018 12192018 TBD 12192018 0 21260-01 Information Governance Assessment 10182017 5302018 9192018 TBD 9192018 0 5286-01 Java Platform Assessment 6202018 11212018 11212018 TBD 11212018 0 6287-01 Security Constrained Unit Commitment (SCUC) 882018 2272019 2272019 TBD 2272019 0 -1

NPRR484Revisions to Congestion Revenue Rights Credit Calculations and Payments - Phase 1b 2

12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs

NPRR702Flexible Accounts Payment of Invoices and Disposition of Interest on Cash Collateral

12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs

Schedule Health Budget Health

49

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018Project Number Projects in Execution Phase (Count = 42) Phase Start Baseline Go-

Live DateApproved Go-

Live DateScheduled

Go-Live DateScheduled

Phase Finish

170-01 Enterprise Content Alignment Program 8262015 11152017 8312018 8312018 8312018 0 0170-06 ECAP - ECMS Implementation Phase 1 4252018 11302018 11302018 11302018 11302018 0 3173-02 ERCOT Flight Certification Website 11152017 2282019 2282019 2282019 5312019 0 2181-01 CRR Framework Upgrade 10262016 1022017 11192018 11192018 2272019 0 2

183-01 CMM Tech Refresh 3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

193-01 PMU Tool Evaluation and Implementation 12132017 892018 2152019 2152019 3202019 0 0196-01 GINR Project Status Application Replacement 12212016 9142017 2282019 2282019 3312019 0 1198-02 Reactive Power Coordination PoC 962017 6162018 8152018 8152018 8152018 0 54209-02 Weather Imaging and Line Observation (WILO) 5302018 212019 212019 212019 2272019 0 2210-01 REC Technology Refresh 8302017 3182018 12132018 12132018 1162019 0 3228-01 Enterprise Database Upgrade 882018 1292020 1292020 1292020 1292020 0 17229-01 IT Change and Configuration Management Phase 2 822017 6192018 12132018 12132018 3252019 0 2 -9238-01 Application Authentication Tech Refresh 962017 3192018 12132018 12132018 1302019 0 3239-01 Identity and Access Management 592018 3132019 3132019 3132019 3132019 0 2241-01 AREA - Generation 10112017 3302018 892018 892018 952018 0 -4244-01 Corporate Wireless 11292017 3282018 1252018 1252018 192019 0 9245-01 2017 EPS Metering Enhancements 6272018 892019 892019 892019 9252019 0 1246-01 iTest Data Refresh 12132017 1192018 11152018 11152018 122019 0 25249-01 Secondary Wind Forecasting Service 8302017 2282018 892018 892018 952018 0 0253-01 CIP Recovery Plan Project - Planning Phase 1 1312018 8292018 8292018 8292018 8292018 0 -2

257-01Security Constrained Optimal Powerflow in Study Network Analysis

1262017 10252018 10252018 10252018 1282018 0 19

261-01 Generic Transmission Constraint Calculation 372018 12132018 12132018 12132018 1232019 0 0263-01 Market Simulator 4112018 12132018 12132018 12132018 1302019 0 7265-01 Real-Time Assessment Continuity 1312018 12132018 12132018 12132018 1302019 0 0279-01 Cyber Security Project 24 6272018 10262018 10262018 10262018 11282018 0 0280-01 Quest Software Portfolio Transition 442018 6272018 9262018 9262018 9262018 0 13282-01 Synchronous Condenser Outage Modeling 662018 10252018 10252018 10252018 1252018 0 1Various 2015 CMM NPRRs 2 -18

NPRR519Exemption of ERS-Only QSEs from Collateral and Capitalization Requirements

3152017 5192018 12112018 12112018 12312018 0 See 2015 CMM NPRRs

NPRR620Collateral Requirements for Counter-Parties with No Load or Generation

3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

NPRR660 Remove CRR State Change Adder 3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

Budget HealthSchedule Health

50

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018Project Number Projects in Execution Phase (Count = 42) Phase Start Baseline Go-

Live DateApproved Go-

Live DateScheduled

Go-Live DateScheduled

Phase Finish

NPRR741 Clarifications to TPE and EAL Credit Exposure Calculations 3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

NPRR749 Option Cost for Outstanding CRRs 882018 12132018 12132018 12132018 TBD 0 NA See 2015 CMM NPRRs

NPRR755 Data Agent-Only QSE Registration 3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

NPRR819Modification of Non-Price Error Resettlement Thresholds and Resettlement Clean-Ups

592018 892018 892018 892018 952018 0 36

NPRR833 Modify PTP Obligation Bid Clearing Change 882018 12132018 12132018 12132018 TBD 0 1

NPRR843Short-Term System Adequacy and AS Offer Disclosure Reports Additions

7182018 10252018 10252018 10252018 11282018 0 0

NPRR864 RUC Modifications to Consider Market-Based Solutions 6202018 10252018 10252018 10252018 11282018 0 4SCR777 Bilateral CRR Interface Enhancement 10262016 1022017 11192018 11192018 2272019 0 NA See 181-01

SCR781 RARF Replacement 12202017 4252018 12192018 12192018 12192018 0 3SCR791 Correction of 60-day SCED GRD Disclosure Report 522018 892018 892018 892018 952018 0 39SCR795 Addition of Intra-Hour Wind Forecast to GTBD Calculation 882018 10252018 10252018 10252018 11142018 0 0

Project Number Expedited Projects in Execution (Count = 34)

Project Number Projects in Stabilization (Count = 10) Execution

Phase StartBaseline Go-Live Target

Approved Go-Live Target

ActualGo-Live Date

Scheduled Execution Phase

Finish

NPRR648 Remove References to Flowgate Rights 3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR683 Revision to Available Credit Limit Calculation 3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR743 Revision to MCE to Have a Floor For Load Exposure 3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR760 Calculation of Exposure Variables For Days With No Activity 3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR776 Voltage Set Point Communication 9202017 3192018 452018 452018 952018 0 1

NPRR800Revisions to Credit Exposure Calculations to Use Electricity Futures Market Prices

3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR815Revise the Limitation of Load Resources Providing Responsive Reserve (RRS) Service

3212018 5312018 5312018 5312018 8292018 0 2

209-01 Multi Station Breaker to Breaker One Lines 282017 392018 532018 532018 8222018 0 -1259-01 DC SCADA and Metering Upgrade 10252017 1172018 7252018 7252018 8292018 0 22266-01 Remote Email Access Enhancement 12132017 372018 662018 6192018 9262018 2 -7 2 -9

Schedule Health Budget Health

Budget HealthSchedule Health

51

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018

Project Number Projects On Hold (Count = 2) Forecast

Start DateBaseline

Phase FinishApproved Go-

Live TargetScheduled

Go-Live DateScheduled

Phase Finish

SCR789 Update NMMS Topology Processor to PSSE 34 Capability 0

269-01Document Repository Redesign and Governance Implementation - Phase 1

0

Project Number Projects Completed (Count = 20)

Baseline Execution

Phase Start

Baseline Go-Live Target

Approved Go-Live Target

Actual Go-Live Date

Actual Execution Phase Finish

185-01 Records Management and eDiscovery 12152016 5242017 8292017 8222017 12132017 2 0224-01 TelAlert Replacement 452017 6272017 842017 842017 592018 0 5230-01 SAS Technical Architecture Redesign 312017 12132017 12132017 12132017 6272018 0 2234-01 Reporting Solution Resiliency (RSR) 452017 8232017 11272017 11272017 1102018 0 8240-01 EDI Translator and Mapping Replacement Assessment 4192017 9272017 2282018 TBD 372018 -2 20254-01 Retail Windows Upgrade 10112017 12182017 12182017 1222018 272018 1 -51 65255-01 Settlements Architecture Enhancements 10252017 1112018 1112018 1192018 2142018 1 -10 53258-01 WD Kainos SMART Automation Testing Tool 4112018 642018 642018 662018 7182018 -3 33271-01 Issue Tracking and Resolution Tool Assessment 12132017 4252018 4252018 TBD 522018 1 -5 -1272-01 Operator Training Simulator Black Start GE Effort 1262017 4252018 4252018 4272018 5162018 -1 19274-01 Average Mid-Term Load Forecast 372018 5312018 5312018 5312018 6272018 0 50

NPRR768Revisions to Real-Time On-Line Reliability Deployment Price Adder Categories

372018 5312018 5312018 5312018 6272018 0 16

NPRR778 Modifications to Date Change and Cancellation Evaluation Window 7192017 10292017 12112017 12112017 1312018 0 23

NPRR782Settlement of Infeasible Ancillary Services Due to Transmission Constraints

5242017 8312017 1122017 1122017 1102018 0 20

NPRR808 Three Year CRR Auction 8232017 9182017 9182017 912017 1312018 65 68

NPRR810Applicability of RMR Incentive Factor on Reservation and Transportation Costs Associated with Firm Fuel Supplies

7172017 11122017 3312018 3312018 3312018 0 NA See 233-00

NPRR830 Revision of 4-Coincident Peak Methodology 12132017 262018 262018 262018 372018 0 85

NPRR831 Inclusion of Private Use Networks in Load Zone Price Calculations 822017 1122017 1122017 1122017 2212018 0 33

OBDRR002 ORDC OBD Revisions for PUCT Project 47199 372018 5312018 5312018 5312018 6272018 0 See NPRR768

SCR792 Enhance Communications of BAAL Exceedances 2142018 452018 452018 452018 4252018 0 69

Project Number Expedited Projects Completed (Count = 23)

Budget HealthSchedule Health

Budget HealthSchedule Health

52

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018

Project Number 2018 Projects Not Yet Started (Count = 10) Forecast

Start Date

NPRR858 Provide Complete Current Operating Plan (COP) Data Aug-2018TBD 2018 OS Enhancements Aug-2018TBD Additional Branch Limit for Relays Aug-2018

NPRR817 Create a Panhandle Hub Sep-2018NPRR821 Elimination of the CRR Deration Process Oct-2018NPRR865 Publish RTM Shift Factors for Hubs Load Zones and DC Ties Oct-2018

SCR793SSR Related Telemetry for Transmission Service Provider (TSP) Operators

Oct-2018

ECAP ECAP - ECMS Implementation Phase 2 Oct-2018TBD Job Scheduler Update in CSI Framework Oct-2018TBD Parameter Estimation Oct-2018

53

  • Slide Number 1
  • Slide Number 2
  • Summary ndash July 2018
  • Daily Peak Demand Hourly Average Actual vs Forecast Wind Day-Ahead COPs amp On-Line Capacity at Peak ndash July 2018
  • Actual Wind Output plus Curtailments vs Wind Day-Ahead COPs for All Hours ndash July 2018
  • ERCOTrsquos CPS1 Monthly Performance ndash July 2018
  • Monthly Peak Actual Demand ndash July 2018
  • Monthly Minimum Actual 15-Minute Demand ndash July 2018
  • Day-Ahead Load Forecast Performance ndash July 2018
  • Reliability Unit Commitment (RUC) Capacity by Weather Zone ndash July 2018
  • Generic Transmission Constraints (GTCs) ndash July 2018
  • Advisories and Watches ndash July 2018 Corrected
  • Lake Levels Update ndash August 1 2018
  • Planning Summary ndash July 2018
  • Mapping of Counties to ERCOT Zones ndash July 2018
  • Cumulative MW Capacity of Interconnection Requests by Zone ndashJuly 2018
  • Cumulative MW Capacity of Interconnection Requests by Zone ndashJuly 2018
  • Cumulative MW Capacity of Interconnection Requests by Zone ndashJuly 2018
  • Wind Generation ndash July 2018
  • Solar Generation ndash July 2018
  • Generation Interconnection Activity by Fuel ndash July 2018
  • Generation Interconnection Activity by Project Phase ndash July 2018
  • Slide Number 23
  • Day-Ahead Schedule (Hourly Average) ndash July 2018
  • Percentage of Real-Time Load Hedged in the DAM (Counter-Party Level) ndash July 2018
  • DAM and RTM Price Convergence ndash July 2018
  • Day-Ahead Electricity and Ancillary Service Prices (Hourly Average) ndash July 2018
  • Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash July 2018
  • Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash July 2018
  • DRUC Monthly Summary (Hourly Average) ndash July 2018
  • HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash July 2018
  • NonndashSpinning Reserve Service Deployment ndash July 2018
  • CRR Price Convergence ndash July 2018
  • Daily Average System Lambda and ORDC Price Adders ndash July 2018
  • ERS Procurement for June 2018 ndash September 2018
  • Reliability Services ndash July 2018
  • Ancillary and Other Services ndash July 2018
  • Real-Time Ancillary Service Imbalance (ORDC) ndash July 2018
  • Energy Settlement ndash July 2018
  • Congestion Revenue Rights (CRR) ndash July 2018
  • CRR Balancing Account Fund ndash July 2018
  • Revenue Neutrality ndash July 2018
  • Net Allocation to Load ndash July 2018
  • Advanced Meter Settlement Impacts ndash July 2018
  • ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndash July 2018
  • Retail Transaction Volumes ndash Summary ndash July 2018
  • Retail Transaction Volumes ndash Summary ndash July 2018
  • Slide Number 48
  • ERCOT Portfolio Stoplight Report ndash July 2018
  • ERCOT Portfolio Stoplight Report ndash July 2018
  • ERCOT Portfolio Stoplight Report ndash July 2018
  • ERCOT Portfolio Stoplight Report ndash July 2018
  • ERCOT Portfolio Stoplight Report ndash July 2018
Retail Transactions Summary
July 2018 June 2018 May 2018 April 2018 March 2018 February 2018 January 2018 December 2017 November 2017 October 2017 September 2017 August 2017 July 2017 June 2017 May 2017 April 2017 March 2017 February 2017 January 2017 December 2016 November 2016 October 2016 September 2016 August 2016 July 2016 June 2016 May 2016 April 2016 March 2016 February 2016 January 2016 December 2015 November 2015 October 2015 September 2015 August 2015 July 2015 June 2015 May 2015 April 2015 March 2015 February 2015 January 2015 December 2014 November 2014 October 2014 September 2014 August 2014 July 2014 June 2014 May 2014 April 2014 March 2014 February 2014 January 2014 December 2013 November 2013 October 2013 September 2013 August 2013 July 2013 June 2013 May 2013 April 2013 March 2013 February 2013 January 2013 Grand total
814_01 - Switch Received 121926 109653 96828 81291 95159 76119 88933 60560 77860 78096 79502 84134 84059 108784 130828 71769 67845 66875 87140 66556 56202 64452 67323 86656 82923 86376 75323 70300 76235 68057 63954 61486 52887 65276 70342 81674 91211 102661 86229 81255 79997 73394 72885 71072 67080 110465 175164 89677 99568 101490 111077 91983 93887 71130 86953 69691 55957 166882 82415 93194 102562 103756 116086 78919 68950 64329 67116 1321827
Difference from previous month 12273 12825 15537 (13868) 19040 (12814) 28373 (17300) (236) (1406) (4632) 75 (24725) (22044) 59059 3924 970 (20265) 20584 10354 (8250) (2871) (19333) 3733 (3453) 11053 5023 (5935) 8178 4103 2468 8599 (12389) (5066) (11332) (9537) (11450) 16432 4974 1258 6603 509 1813 3992 (43385) (64699) 85487 (9891) (1922) (9587) 19094 (1904) 22757 (15823) 17262 13734 (110925) 84467 (10779) (9368) (1194) (12330) 37167 9969 4621 (2787)
814_16 - Move - Ins Received 270122 257125 244431 225380 224289 215281 230409 238340 207921 236397 244511 258046 252360 257759 237611 197865 217962 201984 202612 196236 201714 220958 231999 268781 241844 247481 214383 199804 218245 212474 193716 189862 181098 215908 229405 248124 263233 247089 208166 207932 215950 197765 198025 193973 178624 226283 231418 243482 251957 233679 223201 258649 214724 208160 207059 172981 178671 233469 216550 255967 249114 220397 216982 204412 197200 191955 194507 3162148
Difference from previous month 12997 12694 19051 1091 9008 (15128) (7931) 30419 (28476) (8114) (13535) 5686 (5399) 20148 39746 (20097) 15978 (628) 6376 (5478) (19244) (11041) (36782) 26937 (5637) 33098 14579 (18441) 5771 18758 3854 8764 (34810) (13497) (18719) (15109) 16144 38923 234 (8018) 18185 (260) 4052 15349 (47659) (5135) (12064) (8475) 18278 10478 (35448) 43925 6564 1101 34078 (5690) (54798) 16919 (39417) 6853 28717 3415 12570 7212 5245 (2552)
814_24 - MVO and MVO to CSA Received 129820 125861 124403 113795 108753 100127 111821 144987 100830 116519 129103 128104 127073 133582 127218 102055 111459 100285 101107 96289 100578 109493 114094 133170 122932 129025 118022 103789 109278 103747 96628 99552 96214 109578 117949 123894 133905 133855 114675 108275 108859 94864 98233 97901 89578 111857 115918 121662 131607 126785 119107 107956 107266 99428 104273 93385 93977 115469 115524 129594 135196 121446 120049 111598 106467 102429 104399 1660500
814_10 - DTP Mass Acquisition Received - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0
814_10 - DTP Mass Transition Received - 0 - 0 9033 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 639 - 0 - 0 4975 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0
814_18 - CSA AdditionDeletes Received 40217 62083 99016 55581 46720 42587 49740 47725 31726 52888 41597 40616 55770 43745 52139 26702 21791 39082 44030 38884 39856 31786 33061 42622 48489 64178 50499 59475 59400 48536 42179 40351 34796 34420 54677 35078 49489 59611 39384 44247 44577 35386 40420 54831 43550 45039 44268 40405 57954 64408 65032 80184 70310 41156 34811 46680 50347 71847 48606 52585 50867 62747 59763 34925 40977 40389 41227 747237
Total 562085 554722 573711 476047 474921 434114 480903 491612 418337 483900 494713 510900 519262 543870 547796 398391 419057 408226 434889 397965 398350 426689 446477 531229 496188 527060 458227 433368 463158 432814 396477 391251 364995 425182 472373 488770 537838 543216 448454 441709 449383 401409 409563 417777 378832 493644 566768 495865 541086 526362 523392 538772 486187 419874 433096 382737 378952 587667 463095 531340 537739 508346 512880 429854 413594 399102 407249 6891712
Counts from Monthly Retail Transaction report
To do
Break Out 814_10s - AQ and MT
Break Out 814_18 Additions from Deletes
Year-To-Date Transactions Received
Transaction Type July 2018 July 2017 July 2018 July 2017
Switches 669909 617300 121926 84059
Acquisition 0 0 0 0
Move - Ins 1667037 1568153 270122 252360
Move - Outs 814580 802779 129820 127073
Continuous Service Agreements (CSA) 395944 283259 40217 55770
Mass Transitions 9033 0 0 0
Total 3556503 3271491 562085 519262
There has been a change since this was created
Mass Acquisition has been broken out of Mass Transition
Page 44: ERCOT Monthly Operational Overvie · ERCOT Monthly Operational Overview (July 2018) Revised 08.22.18. ERCOT Public. August 15, 2018

PUBLIC

Advanced Meter Settlement Impacts ndash July 2018

July 2018 At month end settling 72M ESIIDs using Advanced Meter data

July 2018 990 of the load in ERCOT is settled with 15-min interval data (AMS Competitive IDR and NOIE IDR)

44

PUBLIC

ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndashJuly 2018

45

PUBLIC

Retail Transaction Volumes ndash Summary ndash July 2018

46

Transaction Type July 2018 July 2017 July 2018 July 2017

Switches 669909 617300 121926 84059

Acquisition 0 0 0 0

Move - Ins 1667037 1568153 270122 252360

Move - Outs 814580 802779 129820 127073

Continuous Service Agreements (CSA) 395944 283259 40217 55770

Mass Transitions 9033 0 0 0

Total 3556503 3271491 562085 519262

Year-To-Date Transactions Received

Board Presentation Input

Trans Volumes by Month_New

PUBLIC

Retail Transaction Volumes ndash Summary ndash July 2018

SwitchesAcquisitions Move-Ins

Move-Outs Mass Transition

47

Projects Report

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018

20000000$ 2018 Portfolio

Spending Estimate

Projects In FlightOn Hold (Count = 100) 24905011$

Projects Not Yet Started (Count = 10) 1320628$

Projects Completed (Count = 43) 795250$

(7020889)$

TOTAL 20000000$

Project Number Projects in Initiation Phase (Count = 4)

TBD IT Asset RecoveryNPRR842 Study Area Load Information

209-03 Study Network (STNET) Integration288-01 EDI Map and Translator Replacement

Impact Metric TolerancesUnfavorable variances are represented as negative numbers within the report - Green = No more than 49 unfavorable variance - Yellow = Unfavorable variance between 49 and 99 - Red = Unfavorable variance more than 99

Spending Reductions Required to Maintain Capital Budget

2018 Project Funding

Footnotes1 - One or more phases took longer than expected resulting in additional time required

2 - One or more phases required more labor than expected resulting in additional funding andor time required

3 - Project placed on holdNA - Metric not calculated because - it is reported at the parent project level or - it is an administrative project

Project Number Projects in Planning Phase (Count = 8) Phase Start Baseline

Phase FinishApproved

Phase FinishScheduled

Go-Live DateScheduled

Phase Finish

134-02 Privileged Account Management (PAM) Phase 2 882018 12192018 12192018 TBD 12192018 0 10

183-01 CMM-FT GUI Integration 12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs

242-01 Portfolio Reporting Assessment 1182017 12192018 12192018 TBD 12192018 0 21260-01 Information Governance Assessment 10182017 5302018 9192018 TBD 9192018 0 5286-01 Java Platform Assessment 6202018 11212018 11212018 TBD 11212018 0 6287-01 Security Constrained Unit Commitment (SCUC) 882018 2272019 2272019 TBD 2272019 0 -1

NPRR484Revisions to Congestion Revenue Rights Credit Calculations and Payments - Phase 1b 2

12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs

NPRR702Flexible Accounts Payment of Invoices and Disposition of Interest on Cash Collateral

12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs

Schedule Health Budget Health

49

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018Project Number Projects in Execution Phase (Count = 42) Phase Start Baseline Go-

Live DateApproved Go-

Live DateScheduled

Go-Live DateScheduled

Phase Finish

170-01 Enterprise Content Alignment Program 8262015 11152017 8312018 8312018 8312018 0 0170-06 ECAP - ECMS Implementation Phase 1 4252018 11302018 11302018 11302018 11302018 0 3173-02 ERCOT Flight Certification Website 11152017 2282019 2282019 2282019 5312019 0 2181-01 CRR Framework Upgrade 10262016 1022017 11192018 11192018 2272019 0 2

183-01 CMM Tech Refresh 3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

193-01 PMU Tool Evaluation and Implementation 12132017 892018 2152019 2152019 3202019 0 0196-01 GINR Project Status Application Replacement 12212016 9142017 2282019 2282019 3312019 0 1198-02 Reactive Power Coordination PoC 962017 6162018 8152018 8152018 8152018 0 54209-02 Weather Imaging and Line Observation (WILO) 5302018 212019 212019 212019 2272019 0 2210-01 REC Technology Refresh 8302017 3182018 12132018 12132018 1162019 0 3228-01 Enterprise Database Upgrade 882018 1292020 1292020 1292020 1292020 0 17229-01 IT Change and Configuration Management Phase 2 822017 6192018 12132018 12132018 3252019 0 2 -9238-01 Application Authentication Tech Refresh 962017 3192018 12132018 12132018 1302019 0 3239-01 Identity and Access Management 592018 3132019 3132019 3132019 3132019 0 2241-01 AREA - Generation 10112017 3302018 892018 892018 952018 0 -4244-01 Corporate Wireless 11292017 3282018 1252018 1252018 192019 0 9245-01 2017 EPS Metering Enhancements 6272018 892019 892019 892019 9252019 0 1246-01 iTest Data Refresh 12132017 1192018 11152018 11152018 122019 0 25249-01 Secondary Wind Forecasting Service 8302017 2282018 892018 892018 952018 0 0253-01 CIP Recovery Plan Project - Planning Phase 1 1312018 8292018 8292018 8292018 8292018 0 -2

257-01Security Constrained Optimal Powerflow in Study Network Analysis

1262017 10252018 10252018 10252018 1282018 0 19

261-01 Generic Transmission Constraint Calculation 372018 12132018 12132018 12132018 1232019 0 0263-01 Market Simulator 4112018 12132018 12132018 12132018 1302019 0 7265-01 Real-Time Assessment Continuity 1312018 12132018 12132018 12132018 1302019 0 0279-01 Cyber Security Project 24 6272018 10262018 10262018 10262018 11282018 0 0280-01 Quest Software Portfolio Transition 442018 6272018 9262018 9262018 9262018 0 13282-01 Synchronous Condenser Outage Modeling 662018 10252018 10252018 10252018 1252018 0 1Various 2015 CMM NPRRs 2 -18

NPRR519Exemption of ERS-Only QSEs from Collateral and Capitalization Requirements

3152017 5192018 12112018 12112018 12312018 0 See 2015 CMM NPRRs

NPRR620Collateral Requirements for Counter-Parties with No Load or Generation

3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

NPRR660 Remove CRR State Change Adder 3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

Budget HealthSchedule Health

50

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018Project Number Projects in Execution Phase (Count = 42) Phase Start Baseline Go-

Live DateApproved Go-

Live DateScheduled

Go-Live DateScheduled

Phase Finish

NPRR741 Clarifications to TPE and EAL Credit Exposure Calculations 3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

NPRR749 Option Cost for Outstanding CRRs 882018 12132018 12132018 12132018 TBD 0 NA See 2015 CMM NPRRs

NPRR755 Data Agent-Only QSE Registration 3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

NPRR819Modification of Non-Price Error Resettlement Thresholds and Resettlement Clean-Ups

592018 892018 892018 892018 952018 0 36

NPRR833 Modify PTP Obligation Bid Clearing Change 882018 12132018 12132018 12132018 TBD 0 1

NPRR843Short-Term System Adequacy and AS Offer Disclosure Reports Additions

7182018 10252018 10252018 10252018 11282018 0 0

NPRR864 RUC Modifications to Consider Market-Based Solutions 6202018 10252018 10252018 10252018 11282018 0 4SCR777 Bilateral CRR Interface Enhancement 10262016 1022017 11192018 11192018 2272019 0 NA See 181-01

SCR781 RARF Replacement 12202017 4252018 12192018 12192018 12192018 0 3SCR791 Correction of 60-day SCED GRD Disclosure Report 522018 892018 892018 892018 952018 0 39SCR795 Addition of Intra-Hour Wind Forecast to GTBD Calculation 882018 10252018 10252018 10252018 11142018 0 0

Project Number Expedited Projects in Execution (Count = 34)

Project Number Projects in Stabilization (Count = 10) Execution

Phase StartBaseline Go-Live Target

Approved Go-Live Target

ActualGo-Live Date

Scheduled Execution Phase

Finish

NPRR648 Remove References to Flowgate Rights 3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR683 Revision to Available Credit Limit Calculation 3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR743 Revision to MCE to Have a Floor For Load Exposure 3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR760 Calculation of Exposure Variables For Days With No Activity 3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR776 Voltage Set Point Communication 9202017 3192018 452018 452018 952018 0 1

NPRR800Revisions to Credit Exposure Calculations to Use Electricity Futures Market Prices

3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR815Revise the Limitation of Load Resources Providing Responsive Reserve (RRS) Service

3212018 5312018 5312018 5312018 8292018 0 2

209-01 Multi Station Breaker to Breaker One Lines 282017 392018 532018 532018 8222018 0 -1259-01 DC SCADA and Metering Upgrade 10252017 1172018 7252018 7252018 8292018 0 22266-01 Remote Email Access Enhancement 12132017 372018 662018 6192018 9262018 2 -7 2 -9

Schedule Health Budget Health

Budget HealthSchedule Health

51

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018

Project Number Projects On Hold (Count = 2) Forecast

Start DateBaseline

Phase FinishApproved Go-

Live TargetScheduled

Go-Live DateScheduled

Phase Finish

SCR789 Update NMMS Topology Processor to PSSE 34 Capability 0

269-01Document Repository Redesign and Governance Implementation - Phase 1

0

Project Number Projects Completed (Count = 20)

Baseline Execution

Phase Start

Baseline Go-Live Target

Approved Go-Live Target

Actual Go-Live Date

Actual Execution Phase Finish

185-01 Records Management and eDiscovery 12152016 5242017 8292017 8222017 12132017 2 0224-01 TelAlert Replacement 452017 6272017 842017 842017 592018 0 5230-01 SAS Technical Architecture Redesign 312017 12132017 12132017 12132017 6272018 0 2234-01 Reporting Solution Resiliency (RSR) 452017 8232017 11272017 11272017 1102018 0 8240-01 EDI Translator and Mapping Replacement Assessment 4192017 9272017 2282018 TBD 372018 -2 20254-01 Retail Windows Upgrade 10112017 12182017 12182017 1222018 272018 1 -51 65255-01 Settlements Architecture Enhancements 10252017 1112018 1112018 1192018 2142018 1 -10 53258-01 WD Kainos SMART Automation Testing Tool 4112018 642018 642018 662018 7182018 -3 33271-01 Issue Tracking and Resolution Tool Assessment 12132017 4252018 4252018 TBD 522018 1 -5 -1272-01 Operator Training Simulator Black Start GE Effort 1262017 4252018 4252018 4272018 5162018 -1 19274-01 Average Mid-Term Load Forecast 372018 5312018 5312018 5312018 6272018 0 50

NPRR768Revisions to Real-Time On-Line Reliability Deployment Price Adder Categories

372018 5312018 5312018 5312018 6272018 0 16

NPRR778 Modifications to Date Change and Cancellation Evaluation Window 7192017 10292017 12112017 12112017 1312018 0 23

NPRR782Settlement of Infeasible Ancillary Services Due to Transmission Constraints

5242017 8312017 1122017 1122017 1102018 0 20

NPRR808 Three Year CRR Auction 8232017 9182017 9182017 912017 1312018 65 68

NPRR810Applicability of RMR Incentive Factor on Reservation and Transportation Costs Associated with Firm Fuel Supplies

7172017 11122017 3312018 3312018 3312018 0 NA See 233-00

NPRR830 Revision of 4-Coincident Peak Methodology 12132017 262018 262018 262018 372018 0 85

NPRR831 Inclusion of Private Use Networks in Load Zone Price Calculations 822017 1122017 1122017 1122017 2212018 0 33

OBDRR002 ORDC OBD Revisions for PUCT Project 47199 372018 5312018 5312018 5312018 6272018 0 See NPRR768

SCR792 Enhance Communications of BAAL Exceedances 2142018 452018 452018 452018 4252018 0 69

Project Number Expedited Projects Completed (Count = 23)

Budget HealthSchedule Health

Budget HealthSchedule Health

52

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018

Project Number 2018 Projects Not Yet Started (Count = 10) Forecast

Start Date

NPRR858 Provide Complete Current Operating Plan (COP) Data Aug-2018TBD 2018 OS Enhancements Aug-2018TBD Additional Branch Limit for Relays Aug-2018

NPRR817 Create a Panhandle Hub Sep-2018NPRR821 Elimination of the CRR Deration Process Oct-2018NPRR865 Publish RTM Shift Factors for Hubs Load Zones and DC Ties Oct-2018

SCR793SSR Related Telemetry for Transmission Service Provider (TSP) Operators

Oct-2018

ECAP ECAP - ECMS Implementation Phase 2 Oct-2018TBD Job Scheduler Update in CSI Framework Oct-2018TBD Parameter Estimation Oct-2018

53

  • Slide Number 1
  • Slide Number 2
  • Summary ndash July 2018
  • Daily Peak Demand Hourly Average Actual vs Forecast Wind Day-Ahead COPs amp On-Line Capacity at Peak ndash July 2018
  • Actual Wind Output plus Curtailments vs Wind Day-Ahead COPs for All Hours ndash July 2018
  • ERCOTrsquos CPS1 Monthly Performance ndash July 2018
  • Monthly Peak Actual Demand ndash July 2018
  • Monthly Minimum Actual 15-Minute Demand ndash July 2018
  • Day-Ahead Load Forecast Performance ndash July 2018
  • Reliability Unit Commitment (RUC) Capacity by Weather Zone ndash July 2018
  • Generic Transmission Constraints (GTCs) ndash July 2018
  • Advisories and Watches ndash July 2018 Corrected
  • Lake Levels Update ndash August 1 2018
  • Planning Summary ndash July 2018
  • Mapping of Counties to ERCOT Zones ndash July 2018
  • Cumulative MW Capacity of Interconnection Requests by Zone ndashJuly 2018
  • Cumulative MW Capacity of Interconnection Requests by Zone ndashJuly 2018
  • Cumulative MW Capacity of Interconnection Requests by Zone ndashJuly 2018
  • Wind Generation ndash July 2018
  • Solar Generation ndash July 2018
  • Generation Interconnection Activity by Fuel ndash July 2018
  • Generation Interconnection Activity by Project Phase ndash July 2018
  • Slide Number 23
  • Day-Ahead Schedule (Hourly Average) ndash July 2018
  • Percentage of Real-Time Load Hedged in the DAM (Counter-Party Level) ndash July 2018
  • DAM and RTM Price Convergence ndash July 2018
  • Day-Ahead Electricity and Ancillary Service Prices (Hourly Average) ndash July 2018
  • Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash July 2018
  • Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash July 2018
  • DRUC Monthly Summary (Hourly Average) ndash July 2018
  • HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash July 2018
  • NonndashSpinning Reserve Service Deployment ndash July 2018
  • CRR Price Convergence ndash July 2018
  • Daily Average System Lambda and ORDC Price Adders ndash July 2018
  • ERS Procurement for June 2018 ndash September 2018
  • Reliability Services ndash July 2018
  • Ancillary and Other Services ndash July 2018
  • Real-Time Ancillary Service Imbalance (ORDC) ndash July 2018
  • Energy Settlement ndash July 2018
  • Congestion Revenue Rights (CRR) ndash July 2018
  • CRR Balancing Account Fund ndash July 2018
  • Revenue Neutrality ndash July 2018
  • Net Allocation to Load ndash July 2018
  • Advanced Meter Settlement Impacts ndash July 2018
  • ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndash July 2018
  • Retail Transaction Volumes ndash Summary ndash July 2018
  • Retail Transaction Volumes ndash Summary ndash July 2018
  • Slide Number 48
  • ERCOT Portfolio Stoplight Report ndash July 2018
  • ERCOT Portfolio Stoplight Report ndash July 2018
  • ERCOT Portfolio Stoplight Report ndash July 2018
  • ERCOT Portfolio Stoplight Report ndash July 2018
  • ERCOT Portfolio Stoplight Report ndash July 2018
Retail Transactions Summary
July 2018 June 2018 May 2018 April 2018 March 2018 February 2018 January 2018 December 2017 November 2017 October 2017 September 2017 August 2017 July 2017 June 2017 May 2017 April 2017 March 2017 February 2017 January 2017 December 2016 November 2016 October 2016 September 2016 August 2016 July 2016 June 2016 May 2016 April 2016 March 2016 February 2016 January 2016 December 2015 November 2015 October 2015 September 2015 August 2015 July 2015 June 2015 May 2015 April 2015 March 2015 February 2015 January 2015 December 2014 November 2014 October 2014 September 2014 August 2014 July 2014 June 2014 May 2014 April 2014 March 2014 February 2014 January 2014 December 2013 November 2013 October 2013 September 2013 August 2013 July 2013 June 2013 May 2013 April 2013 March 2013 February 2013 January 2013 Grand total
814_01 - Switch Received 121926 109653 96828 81291 95159 76119 88933 60560 77860 78096 79502 84134 84059 108784 130828 71769 67845 66875 87140 66556 56202 64452 67323 86656 82923 86376 75323 70300 76235 68057 63954 61486 52887 65276 70342 81674 91211 102661 86229 81255 79997 73394 72885 71072 67080 110465 175164 89677 99568 101490 111077 91983 93887 71130 86953 69691 55957 166882 82415 93194 102562 103756 116086 78919 68950 64329 67116 1321827
Difference from previous month 12273 12825 15537 (13868) 19040 (12814) 28373 (17300) (236) (1406) (4632) 75 (24725) (22044) 59059 3924 970 (20265) 20584 10354 (8250) (2871) (19333) 3733 (3453) 11053 5023 (5935) 8178 4103 2468 8599 (12389) (5066) (11332) (9537) (11450) 16432 4974 1258 6603 509 1813 3992 (43385) (64699) 85487 (9891) (1922) (9587) 19094 (1904) 22757 (15823) 17262 13734 (110925) 84467 (10779) (9368) (1194) (12330) 37167 9969 4621 (2787)
814_16 - Move - Ins Received 270122 257125 244431 225380 224289 215281 230409 238340 207921 236397 244511 258046 252360 257759 237611 197865 217962 201984 202612 196236 201714 220958 231999 268781 241844 247481 214383 199804 218245 212474 193716 189862 181098 215908 229405 248124 263233 247089 208166 207932 215950 197765 198025 193973 178624 226283 231418 243482 251957 233679 223201 258649 214724 208160 207059 172981 178671 233469 216550 255967 249114 220397 216982 204412 197200 191955 194507 3162148
Difference from previous month 12997 12694 19051 1091 9008 (15128) (7931) 30419 (28476) (8114) (13535) 5686 (5399) 20148 39746 (20097) 15978 (628) 6376 (5478) (19244) (11041) (36782) 26937 (5637) 33098 14579 (18441) 5771 18758 3854 8764 (34810) (13497) (18719) (15109) 16144 38923 234 (8018) 18185 (260) 4052 15349 (47659) (5135) (12064) (8475) 18278 10478 (35448) 43925 6564 1101 34078 (5690) (54798) 16919 (39417) 6853 28717 3415 12570 7212 5245 (2552)
814_24 - MVO and MVO to CSA Received 129820 125861 124403 113795 108753 100127 111821 144987 100830 116519 129103 128104 127073 133582 127218 102055 111459 100285 101107 96289 100578 109493 114094 133170 122932 129025 118022 103789 109278 103747 96628 99552 96214 109578 117949 123894 133905 133855 114675 108275 108859 94864 98233 97901 89578 111857 115918 121662 131607 126785 119107 107956 107266 99428 104273 93385 93977 115469 115524 129594 135196 121446 120049 111598 106467 102429 104399 1660500
814_10 - DTP Mass Acquisition Received - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0
814_10 - DTP Mass Transition Received - 0 - 0 9033 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 639 - 0 - 0 4975 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0
814_18 - CSA AdditionDeletes Received 40217 62083 99016 55581 46720 42587 49740 47725 31726 52888 41597 40616 55770 43745 52139 26702 21791 39082 44030 38884 39856 31786 33061 42622 48489 64178 50499 59475 59400 48536 42179 40351 34796 34420 54677 35078 49489 59611 39384 44247 44577 35386 40420 54831 43550 45039 44268 40405 57954 64408 65032 80184 70310 41156 34811 46680 50347 71847 48606 52585 50867 62747 59763 34925 40977 40389 41227 747237
Total 562085 554722 573711 476047 474921 434114 480903 491612 418337 483900 494713 510900 519262 543870 547796 398391 419057 408226 434889 397965 398350 426689 446477 531229 496188 527060 458227 433368 463158 432814 396477 391251 364995 425182 472373 488770 537838 543216 448454 441709 449383 401409 409563 417777 378832 493644 566768 495865 541086 526362 523392 538772 486187 419874 433096 382737 378952 587667 463095 531340 537739 508346 512880 429854 413594 399102 407249 6891712
Counts from Monthly Retail Transaction report
To do
Break Out 814_10s - AQ and MT
Break Out 814_18 Additions from Deletes
Year-To-Date Transactions Received
Transaction Type July 2018 July 2017 July 2018 July 2017
Switches 669909 617300 121926 84059
Acquisition 0 0 0 0
Move - Ins 1667037 1568153 270122 252360
Move - Outs 814580 802779 129820 127073
Continuous Service Agreements (CSA) 395944 283259 40217 55770
Mass Transitions 9033 0 0 0
Total 3556503 3271491 562085 519262
There has been a change since this was created
Mass Acquisition has been broken out of Mass Transition
Page 45: ERCOT Monthly Operational Overvie · ERCOT Monthly Operational Overview (July 2018) Revised 08.22.18. ERCOT Public. August 15, 2018

PUBLIC

ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndashJuly 2018

45

PUBLIC

Retail Transaction Volumes ndash Summary ndash July 2018

46

Transaction Type July 2018 July 2017 July 2018 July 2017

Switches 669909 617300 121926 84059

Acquisition 0 0 0 0

Move - Ins 1667037 1568153 270122 252360

Move - Outs 814580 802779 129820 127073

Continuous Service Agreements (CSA) 395944 283259 40217 55770

Mass Transitions 9033 0 0 0

Total 3556503 3271491 562085 519262

Year-To-Date Transactions Received

Board Presentation Input

Trans Volumes by Month_New

PUBLIC

Retail Transaction Volumes ndash Summary ndash July 2018

SwitchesAcquisitions Move-Ins

Move-Outs Mass Transition

47

Projects Report

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018

20000000$ 2018 Portfolio

Spending Estimate

Projects In FlightOn Hold (Count = 100) 24905011$

Projects Not Yet Started (Count = 10) 1320628$

Projects Completed (Count = 43) 795250$

(7020889)$

TOTAL 20000000$

Project Number Projects in Initiation Phase (Count = 4)

TBD IT Asset RecoveryNPRR842 Study Area Load Information

209-03 Study Network (STNET) Integration288-01 EDI Map and Translator Replacement

Impact Metric TolerancesUnfavorable variances are represented as negative numbers within the report - Green = No more than 49 unfavorable variance - Yellow = Unfavorable variance between 49 and 99 - Red = Unfavorable variance more than 99

Spending Reductions Required to Maintain Capital Budget

2018 Project Funding

Footnotes1 - One or more phases took longer than expected resulting in additional time required

2 - One or more phases required more labor than expected resulting in additional funding andor time required

3 - Project placed on holdNA - Metric not calculated because - it is reported at the parent project level or - it is an administrative project

Project Number Projects in Planning Phase (Count = 8) Phase Start Baseline

Phase FinishApproved

Phase FinishScheduled

Go-Live DateScheduled

Phase Finish

134-02 Privileged Account Management (PAM) Phase 2 882018 12192018 12192018 TBD 12192018 0 10

183-01 CMM-FT GUI Integration 12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs

242-01 Portfolio Reporting Assessment 1182017 12192018 12192018 TBD 12192018 0 21260-01 Information Governance Assessment 10182017 5302018 9192018 TBD 9192018 0 5286-01 Java Platform Assessment 6202018 11212018 11212018 TBD 11212018 0 6287-01 Security Constrained Unit Commitment (SCUC) 882018 2272019 2272019 TBD 2272019 0 -1

NPRR484Revisions to Congestion Revenue Rights Credit Calculations and Payments - Phase 1b 2

12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs

NPRR702Flexible Accounts Payment of Invoices and Disposition of Interest on Cash Collateral

12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs

Schedule Health Budget Health

49

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018Project Number Projects in Execution Phase (Count = 42) Phase Start Baseline Go-

Live DateApproved Go-

Live DateScheduled

Go-Live DateScheduled

Phase Finish

170-01 Enterprise Content Alignment Program 8262015 11152017 8312018 8312018 8312018 0 0170-06 ECAP - ECMS Implementation Phase 1 4252018 11302018 11302018 11302018 11302018 0 3173-02 ERCOT Flight Certification Website 11152017 2282019 2282019 2282019 5312019 0 2181-01 CRR Framework Upgrade 10262016 1022017 11192018 11192018 2272019 0 2

183-01 CMM Tech Refresh 3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

193-01 PMU Tool Evaluation and Implementation 12132017 892018 2152019 2152019 3202019 0 0196-01 GINR Project Status Application Replacement 12212016 9142017 2282019 2282019 3312019 0 1198-02 Reactive Power Coordination PoC 962017 6162018 8152018 8152018 8152018 0 54209-02 Weather Imaging and Line Observation (WILO) 5302018 212019 212019 212019 2272019 0 2210-01 REC Technology Refresh 8302017 3182018 12132018 12132018 1162019 0 3228-01 Enterprise Database Upgrade 882018 1292020 1292020 1292020 1292020 0 17229-01 IT Change and Configuration Management Phase 2 822017 6192018 12132018 12132018 3252019 0 2 -9238-01 Application Authentication Tech Refresh 962017 3192018 12132018 12132018 1302019 0 3239-01 Identity and Access Management 592018 3132019 3132019 3132019 3132019 0 2241-01 AREA - Generation 10112017 3302018 892018 892018 952018 0 -4244-01 Corporate Wireless 11292017 3282018 1252018 1252018 192019 0 9245-01 2017 EPS Metering Enhancements 6272018 892019 892019 892019 9252019 0 1246-01 iTest Data Refresh 12132017 1192018 11152018 11152018 122019 0 25249-01 Secondary Wind Forecasting Service 8302017 2282018 892018 892018 952018 0 0253-01 CIP Recovery Plan Project - Planning Phase 1 1312018 8292018 8292018 8292018 8292018 0 -2

257-01Security Constrained Optimal Powerflow in Study Network Analysis

1262017 10252018 10252018 10252018 1282018 0 19

261-01 Generic Transmission Constraint Calculation 372018 12132018 12132018 12132018 1232019 0 0263-01 Market Simulator 4112018 12132018 12132018 12132018 1302019 0 7265-01 Real-Time Assessment Continuity 1312018 12132018 12132018 12132018 1302019 0 0279-01 Cyber Security Project 24 6272018 10262018 10262018 10262018 11282018 0 0280-01 Quest Software Portfolio Transition 442018 6272018 9262018 9262018 9262018 0 13282-01 Synchronous Condenser Outage Modeling 662018 10252018 10252018 10252018 1252018 0 1Various 2015 CMM NPRRs 2 -18

NPRR519Exemption of ERS-Only QSEs from Collateral and Capitalization Requirements

3152017 5192018 12112018 12112018 12312018 0 See 2015 CMM NPRRs

NPRR620Collateral Requirements for Counter-Parties with No Load or Generation

3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

NPRR660 Remove CRR State Change Adder 3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

Budget HealthSchedule Health

50

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018Project Number Projects in Execution Phase (Count = 42) Phase Start Baseline Go-

Live DateApproved Go-

Live DateScheduled

Go-Live DateScheduled

Phase Finish

NPRR741 Clarifications to TPE and EAL Credit Exposure Calculations 3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

NPRR749 Option Cost for Outstanding CRRs 882018 12132018 12132018 12132018 TBD 0 NA See 2015 CMM NPRRs

NPRR755 Data Agent-Only QSE Registration 3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

NPRR819Modification of Non-Price Error Resettlement Thresholds and Resettlement Clean-Ups

592018 892018 892018 892018 952018 0 36

NPRR833 Modify PTP Obligation Bid Clearing Change 882018 12132018 12132018 12132018 TBD 0 1

NPRR843Short-Term System Adequacy and AS Offer Disclosure Reports Additions

7182018 10252018 10252018 10252018 11282018 0 0

NPRR864 RUC Modifications to Consider Market-Based Solutions 6202018 10252018 10252018 10252018 11282018 0 4SCR777 Bilateral CRR Interface Enhancement 10262016 1022017 11192018 11192018 2272019 0 NA See 181-01

SCR781 RARF Replacement 12202017 4252018 12192018 12192018 12192018 0 3SCR791 Correction of 60-day SCED GRD Disclosure Report 522018 892018 892018 892018 952018 0 39SCR795 Addition of Intra-Hour Wind Forecast to GTBD Calculation 882018 10252018 10252018 10252018 11142018 0 0

Project Number Expedited Projects in Execution (Count = 34)

Project Number Projects in Stabilization (Count = 10) Execution

Phase StartBaseline Go-Live Target

Approved Go-Live Target

ActualGo-Live Date

Scheduled Execution Phase

Finish

NPRR648 Remove References to Flowgate Rights 3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR683 Revision to Available Credit Limit Calculation 3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR743 Revision to MCE to Have a Floor For Load Exposure 3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR760 Calculation of Exposure Variables For Days With No Activity 3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR776 Voltage Set Point Communication 9202017 3192018 452018 452018 952018 0 1

NPRR800Revisions to Credit Exposure Calculations to Use Electricity Futures Market Prices

3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR815Revise the Limitation of Load Resources Providing Responsive Reserve (RRS) Service

3212018 5312018 5312018 5312018 8292018 0 2

209-01 Multi Station Breaker to Breaker One Lines 282017 392018 532018 532018 8222018 0 -1259-01 DC SCADA and Metering Upgrade 10252017 1172018 7252018 7252018 8292018 0 22266-01 Remote Email Access Enhancement 12132017 372018 662018 6192018 9262018 2 -7 2 -9

Schedule Health Budget Health

Budget HealthSchedule Health

51

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018

Project Number Projects On Hold (Count = 2) Forecast

Start DateBaseline

Phase FinishApproved Go-

Live TargetScheduled

Go-Live DateScheduled

Phase Finish

SCR789 Update NMMS Topology Processor to PSSE 34 Capability 0

269-01Document Repository Redesign and Governance Implementation - Phase 1

0

Project Number Projects Completed (Count = 20)

Baseline Execution

Phase Start

Baseline Go-Live Target

Approved Go-Live Target

Actual Go-Live Date

Actual Execution Phase Finish

185-01 Records Management and eDiscovery 12152016 5242017 8292017 8222017 12132017 2 0224-01 TelAlert Replacement 452017 6272017 842017 842017 592018 0 5230-01 SAS Technical Architecture Redesign 312017 12132017 12132017 12132017 6272018 0 2234-01 Reporting Solution Resiliency (RSR) 452017 8232017 11272017 11272017 1102018 0 8240-01 EDI Translator and Mapping Replacement Assessment 4192017 9272017 2282018 TBD 372018 -2 20254-01 Retail Windows Upgrade 10112017 12182017 12182017 1222018 272018 1 -51 65255-01 Settlements Architecture Enhancements 10252017 1112018 1112018 1192018 2142018 1 -10 53258-01 WD Kainos SMART Automation Testing Tool 4112018 642018 642018 662018 7182018 -3 33271-01 Issue Tracking and Resolution Tool Assessment 12132017 4252018 4252018 TBD 522018 1 -5 -1272-01 Operator Training Simulator Black Start GE Effort 1262017 4252018 4252018 4272018 5162018 -1 19274-01 Average Mid-Term Load Forecast 372018 5312018 5312018 5312018 6272018 0 50

NPRR768Revisions to Real-Time On-Line Reliability Deployment Price Adder Categories

372018 5312018 5312018 5312018 6272018 0 16

NPRR778 Modifications to Date Change and Cancellation Evaluation Window 7192017 10292017 12112017 12112017 1312018 0 23

NPRR782Settlement of Infeasible Ancillary Services Due to Transmission Constraints

5242017 8312017 1122017 1122017 1102018 0 20

NPRR808 Three Year CRR Auction 8232017 9182017 9182017 912017 1312018 65 68

NPRR810Applicability of RMR Incentive Factor on Reservation and Transportation Costs Associated with Firm Fuel Supplies

7172017 11122017 3312018 3312018 3312018 0 NA See 233-00

NPRR830 Revision of 4-Coincident Peak Methodology 12132017 262018 262018 262018 372018 0 85

NPRR831 Inclusion of Private Use Networks in Load Zone Price Calculations 822017 1122017 1122017 1122017 2212018 0 33

OBDRR002 ORDC OBD Revisions for PUCT Project 47199 372018 5312018 5312018 5312018 6272018 0 See NPRR768

SCR792 Enhance Communications of BAAL Exceedances 2142018 452018 452018 452018 4252018 0 69

Project Number Expedited Projects Completed (Count = 23)

Budget HealthSchedule Health

Budget HealthSchedule Health

52

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018

Project Number 2018 Projects Not Yet Started (Count = 10) Forecast

Start Date

NPRR858 Provide Complete Current Operating Plan (COP) Data Aug-2018TBD 2018 OS Enhancements Aug-2018TBD Additional Branch Limit for Relays Aug-2018

NPRR817 Create a Panhandle Hub Sep-2018NPRR821 Elimination of the CRR Deration Process Oct-2018NPRR865 Publish RTM Shift Factors for Hubs Load Zones and DC Ties Oct-2018

SCR793SSR Related Telemetry for Transmission Service Provider (TSP) Operators

Oct-2018

ECAP ECAP - ECMS Implementation Phase 2 Oct-2018TBD Job Scheduler Update in CSI Framework Oct-2018TBD Parameter Estimation Oct-2018

53

  • Slide Number 1
  • Slide Number 2
  • Summary ndash July 2018
  • Daily Peak Demand Hourly Average Actual vs Forecast Wind Day-Ahead COPs amp On-Line Capacity at Peak ndash July 2018
  • Actual Wind Output plus Curtailments vs Wind Day-Ahead COPs for All Hours ndash July 2018
  • ERCOTrsquos CPS1 Monthly Performance ndash July 2018
  • Monthly Peak Actual Demand ndash July 2018
  • Monthly Minimum Actual 15-Minute Demand ndash July 2018
  • Day-Ahead Load Forecast Performance ndash July 2018
  • Reliability Unit Commitment (RUC) Capacity by Weather Zone ndash July 2018
  • Generic Transmission Constraints (GTCs) ndash July 2018
  • Advisories and Watches ndash July 2018 Corrected
  • Lake Levels Update ndash August 1 2018
  • Planning Summary ndash July 2018
  • Mapping of Counties to ERCOT Zones ndash July 2018
  • Cumulative MW Capacity of Interconnection Requests by Zone ndashJuly 2018
  • Cumulative MW Capacity of Interconnection Requests by Zone ndashJuly 2018
  • Cumulative MW Capacity of Interconnection Requests by Zone ndashJuly 2018
  • Wind Generation ndash July 2018
  • Solar Generation ndash July 2018
  • Generation Interconnection Activity by Fuel ndash July 2018
  • Generation Interconnection Activity by Project Phase ndash July 2018
  • Slide Number 23
  • Day-Ahead Schedule (Hourly Average) ndash July 2018
  • Percentage of Real-Time Load Hedged in the DAM (Counter-Party Level) ndash July 2018
  • DAM and RTM Price Convergence ndash July 2018
  • Day-Ahead Electricity and Ancillary Service Prices (Hourly Average) ndash July 2018
  • Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash July 2018
  • Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash July 2018
  • DRUC Monthly Summary (Hourly Average) ndash July 2018
  • HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash July 2018
  • NonndashSpinning Reserve Service Deployment ndash July 2018
  • CRR Price Convergence ndash July 2018
  • Daily Average System Lambda and ORDC Price Adders ndash July 2018
  • ERS Procurement for June 2018 ndash September 2018
  • Reliability Services ndash July 2018
  • Ancillary and Other Services ndash July 2018
  • Real-Time Ancillary Service Imbalance (ORDC) ndash July 2018
  • Energy Settlement ndash July 2018
  • Congestion Revenue Rights (CRR) ndash July 2018
  • CRR Balancing Account Fund ndash July 2018
  • Revenue Neutrality ndash July 2018
  • Net Allocation to Load ndash July 2018
  • Advanced Meter Settlement Impacts ndash July 2018
  • ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndash July 2018
  • Retail Transaction Volumes ndash Summary ndash July 2018
  • Retail Transaction Volumes ndash Summary ndash July 2018
  • Slide Number 48
  • ERCOT Portfolio Stoplight Report ndash July 2018
  • ERCOT Portfolio Stoplight Report ndash July 2018
  • ERCOT Portfolio Stoplight Report ndash July 2018
  • ERCOT Portfolio Stoplight Report ndash July 2018
  • ERCOT Portfolio Stoplight Report ndash July 2018
Retail Transactions Summary
July 2018 June 2018 May 2018 April 2018 March 2018 February 2018 January 2018 December 2017 November 2017 October 2017 September 2017 August 2017 July 2017 June 2017 May 2017 April 2017 March 2017 February 2017 January 2017 December 2016 November 2016 October 2016 September 2016 August 2016 July 2016 June 2016 May 2016 April 2016 March 2016 February 2016 January 2016 December 2015 November 2015 October 2015 September 2015 August 2015 July 2015 June 2015 May 2015 April 2015 March 2015 February 2015 January 2015 December 2014 November 2014 October 2014 September 2014 August 2014 July 2014 June 2014 May 2014 April 2014 March 2014 February 2014 January 2014 December 2013 November 2013 October 2013 September 2013 August 2013 July 2013 June 2013 May 2013 April 2013 March 2013 February 2013 January 2013 Grand total
814_01 - Switch Received 121926 109653 96828 81291 95159 76119 88933 60560 77860 78096 79502 84134 84059 108784 130828 71769 67845 66875 87140 66556 56202 64452 67323 86656 82923 86376 75323 70300 76235 68057 63954 61486 52887 65276 70342 81674 91211 102661 86229 81255 79997 73394 72885 71072 67080 110465 175164 89677 99568 101490 111077 91983 93887 71130 86953 69691 55957 166882 82415 93194 102562 103756 116086 78919 68950 64329 67116 1321827
Difference from previous month 12273 12825 15537 (13868) 19040 (12814) 28373 (17300) (236) (1406) (4632) 75 (24725) (22044) 59059 3924 970 (20265) 20584 10354 (8250) (2871) (19333) 3733 (3453) 11053 5023 (5935) 8178 4103 2468 8599 (12389) (5066) (11332) (9537) (11450) 16432 4974 1258 6603 509 1813 3992 (43385) (64699) 85487 (9891) (1922) (9587) 19094 (1904) 22757 (15823) 17262 13734 (110925) 84467 (10779) (9368) (1194) (12330) 37167 9969 4621 (2787)
814_16 - Move - Ins Received 270122 257125 244431 225380 224289 215281 230409 238340 207921 236397 244511 258046 252360 257759 237611 197865 217962 201984 202612 196236 201714 220958 231999 268781 241844 247481 214383 199804 218245 212474 193716 189862 181098 215908 229405 248124 263233 247089 208166 207932 215950 197765 198025 193973 178624 226283 231418 243482 251957 233679 223201 258649 214724 208160 207059 172981 178671 233469 216550 255967 249114 220397 216982 204412 197200 191955 194507 3162148
Difference from previous month 12997 12694 19051 1091 9008 (15128) (7931) 30419 (28476) (8114) (13535) 5686 (5399) 20148 39746 (20097) 15978 (628) 6376 (5478) (19244) (11041) (36782) 26937 (5637) 33098 14579 (18441) 5771 18758 3854 8764 (34810) (13497) (18719) (15109) 16144 38923 234 (8018) 18185 (260) 4052 15349 (47659) (5135) (12064) (8475) 18278 10478 (35448) 43925 6564 1101 34078 (5690) (54798) 16919 (39417) 6853 28717 3415 12570 7212 5245 (2552)
814_24 - MVO and MVO to CSA Received 129820 125861 124403 113795 108753 100127 111821 144987 100830 116519 129103 128104 127073 133582 127218 102055 111459 100285 101107 96289 100578 109493 114094 133170 122932 129025 118022 103789 109278 103747 96628 99552 96214 109578 117949 123894 133905 133855 114675 108275 108859 94864 98233 97901 89578 111857 115918 121662 131607 126785 119107 107956 107266 99428 104273 93385 93977 115469 115524 129594 135196 121446 120049 111598 106467 102429 104399 1660500
814_10 - DTP Mass Acquisition Received - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0
814_10 - DTP Mass Transition Received - 0 - 0 9033 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 639 - 0 - 0 4975 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0
814_18 - CSA AdditionDeletes Received 40217 62083 99016 55581 46720 42587 49740 47725 31726 52888 41597 40616 55770 43745 52139 26702 21791 39082 44030 38884 39856 31786 33061 42622 48489 64178 50499 59475 59400 48536 42179 40351 34796 34420 54677 35078 49489 59611 39384 44247 44577 35386 40420 54831 43550 45039 44268 40405 57954 64408 65032 80184 70310 41156 34811 46680 50347 71847 48606 52585 50867 62747 59763 34925 40977 40389 41227 747237
Total 562085 554722 573711 476047 474921 434114 480903 491612 418337 483900 494713 510900 519262 543870 547796 398391 419057 408226 434889 397965 398350 426689 446477 531229 496188 527060 458227 433368 463158 432814 396477 391251 364995 425182 472373 488770 537838 543216 448454 441709 449383 401409 409563 417777 378832 493644 566768 495865 541086 526362 523392 538772 486187 419874 433096 382737 378952 587667 463095 531340 537739 508346 512880 429854 413594 399102 407249 6891712
Counts from Monthly Retail Transaction report
To do
Break Out 814_10s - AQ and MT
Break Out 814_18 Additions from Deletes
Year-To-Date Transactions Received
Transaction Type July 2018 July 2017 July 2018 July 2017
Switches 669909 617300 121926 84059
Acquisition 0 0 0 0
Move - Ins 1667037 1568153 270122 252360
Move - Outs 814580 802779 129820 127073
Continuous Service Agreements (CSA) 395944 283259 40217 55770
Mass Transitions 9033 0 0 0
Total 3556503 3271491 562085 519262
There has been a change since this was created
Mass Acquisition has been broken out of Mass Transition
Page 46: ERCOT Monthly Operational Overvie · ERCOT Monthly Operational Overview (July 2018) Revised 08.22.18. ERCOT Public. August 15, 2018

PUBLIC

Retail Transaction Volumes ndash Summary ndash July 2018

46

Transaction Type July 2018 July 2017 July 2018 July 2017

Switches 669909 617300 121926 84059

Acquisition 0 0 0 0

Move - Ins 1667037 1568153 270122 252360

Move - Outs 814580 802779 129820 127073

Continuous Service Agreements (CSA) 395944 283259 40217 55770

Mass Transitions 9033 0 0 0

Total 3556503 3271491 562085 519262

Year-To-Date Transactions Received

Board Presentation Input

Trans Volumes by Month_New

PUBLIC

Retail Transaction Volumes ndash Summary ndash July 2018

SwitchesAcquisitions Move-Ins

Move-Outs Mass Transition

47

Projects Report

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018

20000000$ 2018 Portfolio

Spending Estimate

Projects In FlightOn Hold (Count = 100) 24905011$

Projects Not Yet Started (Count = 10) 1320628$

Projects Completed (Count = 43) 795250$

(7020889)$

TOTAL 20000000$

Project Number Projects in Initiation Phase (Count = 4)

TBD IT Asset RecoveryNPRR842 Study Area Load Information

209-03 Study Network (STNET) Integration288-01 EDI Map and Translator Replacement

Impact Metric TolerancesUnfavorable variances are represented as negative numbers within the report - Green = No more than 49 unfavorable variance - Yellow = Unfavorable variance between 49 and 99 - Red = Unfavorable variance more than 99

Spending Reductions Required to Maintain Capital Budget

2018 Project Funding

Footnotes1 - One or more phases took longer than expected resulting in additional time required

2 - One or more phases required more labor than expected resulting in additional funding andor time required

3 - Project placed on holdNA - Metric not calculated because - it is reported at the parent project level or - it is an administrative project

Project Number Projects in Planning Phase (Count = 8) Phase Start Baseline

Phase FinishApproved

Phase FinishScheduled

Go-Live DateScheduled

Phase Finish

134-02 Privileged Account Management (PAM) Phase 2 882018 12192018 12192018 TBD 12192018 0 10

183-01 CMM-FT GUI Integration 12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs

242-01 Portfolio Reporting Assessment 1182017 12192018 12192018 TBD 12192018 0 21260-01 Information Governance Assessment 10182017 5302018 9192018 TBD 9192018 0 5286-01 Java Platform Assessment 6202018 11212018 11212018 TBD 11212018 0 6287-01 Security Constrained Unit Commitment (SCUC) 882018 2272019 2272019 TBD 2272019 0 -1

NPRR484Revisions to Congestion Revenue Rights Credit Calculations and Payments - Phase 1b 2

12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs

NPRR702Flexible Accounts Payment of Invoices and Disposition of Interest on Cash Collateral

12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs

Schedule Health Budget Health

49

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018Project Number Projects in Execution Phase (Count = 42) Phase Start Baseline Go-

Live DateApproved Go-

Live DateScheduled

Go-Live DateScheduled

Phase Finish

170-01 Enterprise Content Alignment Program 8262015 11152017 8312018 8312018 8312018 0 0170-06 ECAP - ECMS Implementation Phase 1 4252018 11302018 11302018 11302018 11302018 0 3173-02 ERCOT Flight Certification Website 11152017 2282019 2282019 2282019 5312019 0 2181-01 CRR Framework Upgrade 10262016 1022017 11192018 11192018 2272019 0 2

183-01 CMM Tech Refresh 3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

193-01 PMU Tool Evaluation and Implementation 12132017 892018 2152019 2152019 3202019 0 0196-01 GINR Project Status Application Replacement 12212016 9142017 2282019 2282019 3312019 0 1198-02 Reactive Power Coordination PoC 962017 6162018 8152018 8152018 8152018 0 54209-02 Weather Imaging and Line Observation (WILO) 5302018 212019 212019 212019 2272019 0 2210-01 REC Technology Refresh 8302017 3182018 12132018 12132018 1162019 0 3228-01 Enterprise Database Upgrade 882018 1292020 1292020 1292020 1292020 0 17229-01 IT Change and Configuration Management Phase 2 822017 6192018 12132018 12132018 3252019 0 2 -9238-01 Application Authentication Tech Refresh 962017 3192018 12132018 12132018 1302019 0 3239-01 Identity and Access Management 592018 3132019 3132019 3132019 3132019 0 2241-01 AREA - Generation 10112017 3302018 892018 892018 952018 0 -4244-01 Corporate Wireless 11292017 3282018 1252018 1252018 192019 0 9245-01 2017 EPS Metering Enhancements 6272018 892019 892019 892019 9252019 0 1246-01 iTest Data Refresh 12132017 1192018 11152018 11152018 122019 0 25249-01 Secondary Wind Forecasting Service 8302017 2282018 892018 892018 952018 0 0253-01 CIP Recovery Plan Project - Planning Phase 1 1312018 8292018 8292018 8292018 8292018 0 -2

257-01Security Constrained Optimal Powerflow in Study Network Analysis

1262017 10252018 10252018 10252018 1282018 0 19

261-01 Generic Transmission Constraint Calculation 372018 12132018 12132018 12132018 1232019 0 0263-01 Market Simulator 4112018 12132018 12132018 12132018 1302019 0 7265-01 Real-Time Assessment Continuity 1312018 12132018 12132018 12132018 1302019 0 0279-01 Cyber Security Project 24 6272018 10262018 10262018 10262018 11282018 0 0280-01 Quest Software Portfolio Transition 442018 6272018 9262018 9262018 9262018 0 13282-01 Synchronous Condenser Outage Modeling 662018 10252018 10252018 10252018 1252018 0 1Various 2015 CMM NPRRs 2 -18

NPRR519Exemption of ERS-Only QSEs from Collateral and Capitalization Requirements

3152017 5192018 12112018 12112018 12312018 0 See 2015 CMM NPRRs

NPRR620Collateral Requirements for Counter-Parties with No Load or Generation

3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

NPRR660 Remove CRR State Change Adder 3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

Budget HealthSchedule Health

50

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018Project Number Projects in Execution Phase (Count = 42) Phase Start Baseline Go-

Live DateApproved Go-

Live DateScheduled

Go-Live DateScheduled

Phase Finish

NPRR741 Clarifications to TPE and EAL Credit Exposure Calculations 3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

NPRR749 Option Cost for Outstanding CRRs 882018 12132018 12132018 12132018 TBD 0 NA See 2015 CMM NPRRs

NPRR755 Data Agent-Only QSE Registration 3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

NPRR819Modification of Non-Price Error Resettlement Thresholds and Resettlement Clean-Ups

592018 892018 892018 892018 952018 0 36

NPRR833 Modify PTP Obligation Bid Clearing Change 882018 12132018 12132018 12132018 TBD 0 1

NPRR843Short-Term System Adequacy and AS Offer Disclosure Reports Additions

7182018 10252018 10252018 10252018 11282018 0 0

NPRR864 RUC Modifications to Consider Market-Based Solutions 6202018 10252018 10252018 10252018 11282018 0 4SCR777 Bilateral CRR Interface Enhancement 10262016 1022017 11192018 11192018 2272019 0 NA See 181-01

SCR781 RARF Replacement 12202017 4252018 12192018 12192018 12192018 0 3SCR791 Correction of 60-day SCED GRD Disclosure Report 522018 892018 892018 892018 952018 0 39SCR795 Addition of Intra-Hour Wind Forecast to GTBD Calculation 882018 10252018 10252018 10252018 11142018 0 0

Project Number Expedited Projects in Execution (Count = 34)

Project Number Projects in Stabilization (Count = 10) Execution

Phase StartBaseline Go-Live Target

Approved Go-Live Target

ActualGo-Live Date

Scheduled Execution Phase

Finish

NPRR648 Remove References to Flowgate Rights 3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR683 Revision to Available Credit Limit Calculation 3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR743 Revision to MCE to Have a Floor For Load Exposure 3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR760 Calculation of Exposure Variables For Days With No Activity 3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR776 Voltage Set Point Communication 9202017 3192018 452018 452018 952018 0 1

NPRR800Revisions to Credit Exposure Calculations to Use Electricity Futures Market Prices

3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR815Revise the Limitation of Load Resources Providing Responsive Reserve (RRS) Service

3212018 5312018 5312018 5312018 8292018 0 2

209-01 Multi Station Breaker to Breaker One Lines 282017 392018 532018 532018 8222018 0 -1259-01 DC SCADA and Metering Upgrade 10252017 1172018 7252018 7252018 8292018 0 22266-01 Remote Email Access Enhancement 12132017 372018 662018 6192018 9262018 2 -7 2 -9

Schedule Health Budget Health

Budget HealthSchedule Health

51

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018

Project Number Projects On Hold (Count = 2) Forecast

Start DateBaseline

Phase FinishApproved Go-

Live TargetScheduled

Go-Live DateScheduled

Phase Finish

SCR789 Update NMMS Topology Processor to PSSE 34 Capability 0

269-01Document Repository Redesign and Governance Implementation - Phase 1

0

Project Number Projects Completed (Count = 20)

Baseline Execution

Phase Start

Baseline Go-Live Target

Approved Go-Live Target

Actual Go-Live Date

Actual Execution Phase Finish

185-01 Records Management and eDiscovery 12152016 5242017 8292017 8222017 12132017 2 0224-01 TelAlert Replacement 452017 6272017 842017 842017 592018 0 5230-01 SAS Technical Architecture Redesign 312017 12132017 12132017 12132017 6272018 0 2234-01 Reporting Solution Resiliency (RSR) 452017 8232017 11272017 11272017 1102018 0 8240-01 EDI Translator and Mapping Replacement Assessment 4192017 9272017 2282018 TBD 372018 -2 20254-01 Retail Windows Upgrade 10112017 12182017 12182017 1222018 272018 1 -51 65255-01 Settlements Architecture Enhancements 10252017 1112018 1112018 1192018 2142018 1 -10 53258-01 WD Kainos SMART Automation Testing Tool 4112018 642018 642018 662018 7182018 -3 33271-01 Issue Tracking and Resolution Tool Assessment 12132017 4252018 4252018 TBD 522018 1 -5 -1272-01 Operator Training Simulator Black Start GE Effort 1262017 4252018 4252018 4272018 5162018 -1 19274-01 Average Mid-Term Load Forecast 372018 5312018 5312018 5312018 6272018 0 50

NPRR768Revisions to Real-Time On-Line Reliability Deployment Price Adder Categories

372018 5312018 5312018 5312018 6272018 0 16

NPRR778 Modifications to Date Change and Cancellation Evaluation Window 7192017 10292017 12112017 12112017 1312018 0 23

NPRR782Settlement of Infeasible Ancillary Services Due to Transmission Constraints

5242017 8312017 1122017 1122017 1102018 0 20

NPRR808 Three Year CRR Auction 8232017 9182017 9182017 912017 1312018 65 68

NPRR810Applicability of RMR Incentive Factor on Reservation and Transportation Costs Associated with Firm Fuel Supplies

7172017 11122017 3312018 3312018 3312018 0 NA See 233-00

NPRR830 Revision of 4-Coincident Peak Methodology 12132017 262018 262018 262018 372018 0 85

NPRR831 Inclusion of Private Use Networks in Load Zone Price Calculations 822017 1122017 1122017 1122017 2212018 0 33

OBDRR002 ORDC OBD Revisions for PUCT Project 47199 372018 5312018 5312018 5312018 6272018 0 See NPRR768

SCR792 Enhance Communications of BAAL Exceedances 2142018 452018 452018 452018 4252018 0 69

Project Number Expedited Projects Completed (Count = 23)

Budget HealthSchedule Health

Budget HealthSchedule Health

52

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018

Project Number 2018 Projects Not Yet Started (Count = 10) Forecast

Start Date

NPRR858 Provide Complete Current Operating Plan (COP) Data Aug-2018TBD 2018 OS Enhancements Aug-2018TBD Additional Branch Limit for Relays Aug-2018

NPRR817 Create a Panhandle Hub Sep-2018NPRR821 Elimination of the CRR Deration Process Oct-2018NPRR865 Publish RTM Shift Factors for Hubs Load Zones and DC Ties Oct-2018

SCR793SSR Related Telemetry for Transmission Service Provider (TSP) Operators

Oct-2018

ECAP ECAP - ECMS Implementation Phase 2 Oct-2018TBD Job Scheduler Update in CSI Framework Oct-2018TBD Parameter Estimation Oct-2018

53

  • Slide Number 1
  • Slide Number 2
  • Summary ndash July 2018
  • Daily Peak Demand Hourly Average Actual vs Forecast Wind Day-Ahead COPs amp On-Line Capacity at Peak ndash July 2018
  • Actual Wind Output plus Curtailments vs Wind Day-Ahead COPs for All Hours ndash July 2018
  • ERCOTrsquos CPS1 Monthly Performance ndash July 2018
  • Monthly Peak Actual Demand ndash July 2018
  • Monthly Minimum Actual 15-Minute Demand ndash July 2018
  • Day-Ahead Load Forecast Performance ndash July 2018
  • Reliability Unit Commitment (RUC) Capacity by Weather Zone ndash July 2018
  • Generic Transmission Constraints (GTCs) ndash July 2018
  • Advisories and Watches ndash July 2018 Corrected
  • Lake Levels Update ndash August 1 2018
  • Planning Summary ndash July 2018
  • Mapping of Counties to ERCOT Zones ndash July 2018
  • Cumulative MW Capacity of Interconnection Requests by Zone ndashJuly 2018
  • Cumulative MW Capacity of Interconnection Requests by Zone ndashJuly 2018
  • Cumulative MW Capacity of Interconnection Requests by Zone ndashJuly 2018
  • Wind Generation ndash July 2018
  • Solar Generation ndash July 2018
  • Generation Interconnection Activity by Fuel ndash July 2018
  • Generation Interconnection Activity by Project Phase ndash July 2018
  • Slide Number 23
  • Day-Ahead Schedule (Hourly Average) ndash July 2018
  • Percentage of Real-Time Load Hedged in the DAM (Counter-Party Level) ndash July 2018
  • DAM and RTM Price Convergence ndash July 2018
  • Day-Ahead Electricity and Ancillary Service Prices (Hourly Average) ndash July 2018
  • Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash July 2018
  • Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash July 2018
  • DRUC Monthly Summary (Hourly Average) ndash July 2018
  • HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash July 2018
  • NonndashSpinning Reserve Service Deployment ndash July 2018
  • CRR Price Convergence ndash July 2018
  • Daily Average System Lambda and ORDC Price Adders ndash July 2018
  • ERS Procurement for June 2018 ndash September 2018
  • Reliability Services ndash July 2018
  • Ancillary and Other Services ndash July 2018
  • Real-Time Ancillary Service Imbalance (ORDC) ndash July 2018
  • Energy Settlement ndash July 2018
  • Congestion Revenue Rights (CRR) ndash July 2018
  • CRR Balancing Account Fund ndash July 2018
  • Revenue Neutrality ndash July 2018
  • Net Allocation to Load ndash July 2018
  • Advanced Meter Settlement Impacts ndash July 2018
  • ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndash July 2018
  • Retail Transaction Volumes ndash Summary ndash July 2018
  • Retail Transaction Volumes ndash Summary ndash July 2018
  • Slide Number 48
  • ERCOT Portfolio Stoplight Report ndash July 2018
  • ERCOT Portfolio Stoplight Report ndash July 2018
  • ERCOT Portfolio Stoplight Report ndash July 2018
  • ERCOT Portfolio Stoplight Report ndash July 2018
  • ERCOT Portfolio Stoplight Report ndash July 2018
Retail Transactions Summary
July 2018 June 2018 May 2018 April 2018 March 2018 February 2018 January 2018 December 2017 November 2017 October 2017 September 2017 August 2017 July 2017 June 2017 May 2017 April 2017 March 2017 February 2017 January 2017 December 2016 November 2016 October 2016 September 2016 August 2016 July 2016 June 2016 May 2016 April 2016 March 2016 February 2016 January 2016 December 2015 November 2015 October 2015 September 2015 August 2015 July 2015 June 2015 May 2015 April 2015 March 2015 February 2015 January 2015 December 2014 November 2014 October 2014 September 2014 August 2014 July 2014 June 2014 May 2014 April 2014 March 2014 February 2014 January 2014 December 2013 November 2013 October 2013 September 2013 August 2013 July 2013 June 2013 May 2013 April 2013 March 2013 February 2013 January 2013 Grand total
814_01 - Switch Received 121926 109653 96828 81291 95159 76119 88933 60560 77860 78096 79502 84134 84059 108784 130828 71769 67845 66875 87140 66556 56202 64452 67323 86656 82923 86376 75323 70300 76235 68057 63954 61486 52887 65276 70342 81674 91211 102661 86229 81255 79997 73394 72885 71072 67080 110465 175164 89677 99568 101490 111077 91983 93887 71130 86953 69691 55957 166882 82415 93194 102562 103756 116086 78919 68950 64329 67116 1321827
Difference from previous month 12273 12825 15537 (13868) 19040 (12814) 28373 (17300) (236) (1406) (4632) 75 (24725) (22044) 59059 3924 970 (20265) 20584 10354 (8250) (2871) (19333) 3733 (3453) 11053 5023 (5935) 8178 4103 2468 8599 (12389) (5066) (11332) (9537) (11450) 16432 4974 1258 6603 509 1813 3992 (43385) (64699) 85487 (9891) (1922) (9587) 19094 (1904) 22757 (15823) 17262 13734 (110925) 84467 (10779) (9368) (1194) (12330) 37167 9969 4621 (2787)
814_16 - Move - Ins Received 270122 257125 244431 225380 224289 215281 230409 238340 207921 236397 244511 258046 252360 257759 237611 197865 217962 201984 202612 196236 201714 220958 231999 268781 241844 247481 214383 199804 218245 212474 193716 189862 181098 215908 229405 248124 263233 247089 208166 207932 215950 197765 198025 193973 178624 226283 231418 243482 251957 233679 223201 258649 214724 208160 207059 172981 178671 233469 216550 255967 249114 220397 216982 204412 197200 191955 194507 3162148
Difference from previous month 12997 12694 19051 1091 9008 (15128) (7931) 30419 (28476) (8114) (13535) 5686 (5399) 20148 39746 (20097) 15978 (628) 6376 (5478) (19244) (11041) (36782) 26937 (5637) 33098 14579 (18441) 5771 18758 3854 8764 (34810) (13497) (18719) (15109) 16144 38923 234 (8018) 18185 (260) 4052 15349 (47659) (5135) (12064) (8475) 18278 10478 (35448) 43925 6564 1101 34078 (5690) (54798) 16919 (39417) 6853 28717 3415 12570 7212 5245 (2552)
814_24 - MVO and MVO to CSA Received 129820 125861 124403 113795 108753 100127 111821 144987 100830 116519 129103 128104 127073 133582 127218 102055 111459 100285 101107 96289 100578 109493 114094 133170 122932 129025 118022 103789 109278 103747 96628 99552 96214 109578 117949 123894 133905 133855 114675 108275 108859 94864 98233 97901 89578 111857 115918 121662 131607 126785 119107 107956 107266 99428 104273 93385 93977 115469 115524 129594 135196 121446 120049 111598 106467 102429 104399 1660500
814_10 - DTP Mass Acquisition Received - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0
814_10 - DTP Mass Transition Received - 0 - 0 9033 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 639 - 0 - 0 4975 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0
814_18 - CSA AdditionDeletes Received 40217 62083 99016 55581 46720 42587 49740 47725 31726 52888 41597 40616 55770 43745 52139 26702 21791 39082 44030 38884 39856 31786 33061 42622 48489 64178 50499 59475 59400 48536 42179 40351 34796 34420 54677 35078 49489 59611 39384 44247 44577 35386 40420 54831 43550 45039 44268 40405 57954 64408 65032 80184 70310 41156 34811 46680 50347 71847 48606 52585 50867 62747 59763 34925 40977 40389 41227 747237
Total 562085 554722 573711 476047 474921 434114 480903 491612 418337 483900 494713 510900 519262 543870 547796 398391 419057 408226 434889 397965 398350 426689 446477 531229 496188 527060 458227 433368 463158 432814 396477 391251 364995 425182 472373 488770 537838 543216 448454 441709 449383 401409 409563 417777 378832 493644 566768 495865 541086 526362 523392 538772 486187 419874 433096 382737 378952 587667 463095 531340 537739 508346 512880 429854 413594 399102 407249 6891712
Counts from Monthly Retail Transaction report
To do
Break Out 814_10s - AQ and MT
Break Out 814_18 Additions from Deletes
Year-To-Date Transactions Received
Transaction Type July 2018 July 2017 July 2018 July 2017
Switches 669909 617300 121926 84059
Acquisition 0 0 0 0
Move - Ins 1667037 1568153 270122 252360
Move - Outs 814580 802779 129820 127073
Continuous Service Agreements (CSA) 395944 283259 40217 55770
Mass Transitions 9033 0 0 0
Total 3556503 3271491 562085 519262
There has been a change since this was created
Mass Acquisition has been broken out of Mass Transition
Page 47: ERCOT Monthly Operational Overvie · ERCOT Monthly Operational Overview (July 2018) Revised 08.22.18. ERCOT Public. August 15, 2018

PUBLIC

Retail Transaction Volumes ndash Summary ndash July 2018

SwitchesAcquisitions Move-Ins

Move-Outs Mass Transition

47

Projects Report

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018

20000000$ 2018 Portfolio

Spending Estimate

Projects In FlightOn Hold (Count = 100) 24905011$

Projects Not Yet Started (Count = 10) 1320628$

Projects Completed (Count = 43) 795250$

(7020889)$

TOTAL 20000000$

Project Number Projects in Initiation Phase (Count = 4)

TBD IT Asset RecoveryNPRR842 Study Area Load Information

209-03 Study Network (STNET) Integration288-01 EDI Map and Translator Replacement

Impact Metric TolerancesUnfavorable variances are represented as negative numbers within the report - Green = No more than 49 unfavorable variance - Yellow = Unfavorable variance between 49 and 99 - Red = Unfavorable variance more than 99

Spending Reductions Required to Maintain Capital Budget

2018 Project Funding

Footnotes1 - One or more phases took longer than expected resulting in additional time required

2 - One or more phases required more labor than expected resulting in additional funding andor time required

3 - Project placed on holdNA - Metric not calculated because - it is reported at the parent project level or - it is an administrative project

Project Number Projects in Planning Phase (Count = 8) Phase Start Baseline

Phase FinishApproved

Phase FinishScheduled

Go-Live DateScheduled

Phase Finish

134-02 Privileged Account Management (PAM) Phase 2 882018 12192018 12192018 TBD 12192018 0 10

183-01 CMM-FT GUI Integration 12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs

242-01 Portfolio Reporting Assessment 1182017 12192018 12192018 TBD 12192018 0 21260-01 Information Governance Assessment 10182017 5302018 9192018 TBD 9192018 0 5286-01 Java Platform Assessment 6202018 11212018 11212018 TBD 11212018 0 6287-01 Security Constrained Unit Commitment (SCUC) 882018 2272019 2272019 TBD 2272019 0 -1

NPRR484Revisions to Congestion Revenue Rights Credit Calculations and Payments - Phase 1b 2

12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs

NPRR702Flexible Accounts Payment of Invoices and Disposition of Interest on Cash Collateral

12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs

Schedule Health Budget Health

49

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018Project Number Projects in Execution Phase (Count = 42) Phase Start Baseline Go-

Live DateApproved Go-

Live DateScheduled

Go-Live DateScheduled

Phase Finish

170-01 Enterprise Content Alignment Program 8262015 11152017 8312018 8312018 8312018 0 0170-06 ECAP - ECMS Implementation Phase 1 4252018 11302018 11302018 11302018 11302018 0 3173-02 ERCOT Flight Certification Website 11152017 2282019 2282019 2282019 5312019 0 2181-01 CRR Framework Upgrade 10262016 1022017 11192018 11192018 2272019 0 2

183-01 CMM Tech Refresh 3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

193-01 PMU Tool Evaluation and Implementation 12132017 892018 2152019 2152019 3202019 0 0196-01 GINR Project Status Application Replacement 12212016 9142017 2282019 2282019 3312019 0 1198-02 Reactive Power Coordination PoC 962017 6162018 8152018 8152018 8152018 0 54209-02 Weather Imaging and Line Observation (WILO) 5302018 212019 212019 212019 2272019 0 2210-01 REC Technology Refresh 8302017 3182018 12132018 12132018 1162019 0 3228-01 Enterprise Database Upgrade 882018 1292020 1292020 1292020 1292020 0 17229-01 IT Change and Configuration Management Phase 2 822017 6192018 12132018 12132018 3252019 0 2 -9238-01 Application Authentication Tech Refresh 962017 3192018 12132018 12132018 1302019 0 3239-01 Identity and Access Management 592018 3132019 3132019 3132019 3132019 0 2241-01 AREA - Generation 10112017 3302018 892018 892018 952018 0 -4244-01 Corporate Wireless 11292017 3282018 1252018 1252018 192019 0 9245-01 2017 EPS Metering Enhancements 6272018 892019 892019 892019 9252019 0 1246-01 iTest Data Refresh 12132017 1192018 11152018 11152018 122019 0 25249-01 Secondary Wind Forecasting Service 8302017 2282018 892018 892018 952018 0 0253-01 CIP Recovery Plan Project - Planning Phase 1 1312018 8292018 8292018 8292018 8292018 0 -2

257-01Security Constrained Optimal Powerflow in Study Network Analysis

1262017 10252018 10252018 10252018 1282018 0 19

261-01 Generic Transmission Constraint Calculation 372018 12132018 12132018 12132018 1232019 0 0263-01 Market Simulator 4112018 12132018 12132018 12132018 1302019 0 7265-01 Real-Time Assessment Continuity 1312018 12132018 12132018 12132018 1302019 0 0279-01 Cyber Security Project 24 6272018 10262018 10262018 10262018 11282018 0 0280-01 Quest Software Portfolio Transition 442018 6272018 9262018 9262018 9262018 0 13282-01 Synchronous Condenser Outage Modeling 662018 10252018 10252018 10252018 1252018 0 1Various 2015 CMM NPRRs 2 -18

NPRR519Exemption of ERS-Only QSEs from Collateral and Capitalization Requirements

3152017 5192018 12112018 12112018 12312018 0 See 2015 CMM NPRRs

NPRR620Collateral Requirements for Counter-Parties with No Load or Generation

3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

NPRR660 Remove CRR State Change Adder 3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

Budget HealthSchedule Health

50

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018Project Number Projects in Execution Phase (Count = 42) Phase Start Baseline Go-

Live DateApproved Go-

Live DateScheduled

Go-Live DateScheduled

Phase Finish

NPRR741 Clarifications to TPE and EAL Credit Exposure Calculations 3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

NPRR749 Option Cost for Outstanding CRRs 882018 12132018 12132018 12132018 TBD 0 NA See 2015 CMM NPRRs

NPRR755 Data Agent-Only QSE Registration 3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

NPRR819Modification of Non-Price Error Resettlement Thresholds and Resettlement Clean-Ups

592018 892018 892018 892018 952018 0 36

NPRR833 Modify PTP Obligation Bid Clearing Change 882018 12132018 12132018 12132018 TBD 0 1

NPRR843Short-Term System Adequacy and AS Offer Disclosure Reports Additions

7182018 10252018 10252018 10252018 11282018 0 0

NPRR864 RUC Modifications to Consider Market-Based Solutions 6202018 10252018 10252018 10252018 11282018 0 4SCR777 Bilateral CRR Interface Enhancement 10262016 1022017 11192018 11192018 2272019 0 NA See 181-01

SCR781 RARF Replacement 12202017 4252018 12192018 12192018 12192018 0 3SCR791 Correction of 60-day SCED GRD Disclosure Report 522018 892018 892018 892018 952018 0 39SCR795 Addition of Intra-Hour Wind Forecast to GTBD Calculation 882018 10252018 10252018 10252018 11142018 0 0

Project Number Expedited Projects in Execution (Count = 34)

Project Number Projects in Stabilization (Count = 10) Execution

Phase StartBaseline Go-Live Target

Approved Go-Live Target

ActualGo-Live Date

Scheduled Execution Phase

Finish

NPRR648 Remove References to Flowgate Rights 3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR683 Revision to Available Credit Limit Calculation 3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR743 Revision to MCE to Have a Floor For Load Exposure 3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR760 Calculation of Exposure Variables For Days With No Activity 3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR776 Voltage Set Point Communication 9202017 3192018 452018 452018 952018 0 1

NPRR800Revisions to Credit Exposure Calculations to Use Electricity Futures Market Prices

3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR815Revise the Limitation of Load Resources Providing Responsive Reserve (RRS) Service

3212018 5312018 5312018 5312018 8292018 0 2

209-01 Multi Station Breaker to Breaker One Lines 282017 392018 532018 532018 8222018 0 -1259-01 DC SCADA and Metering Upgrade 10252017 1172018 7252018 7252018 8292018 0 22266-01 Remote Email Access Enhancement 12132017 372018 662018 6192018 9262018 2 -7 2 -9

Schedule Health Budget Health

Budget HealthSchedule Health

51

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018

Project Number Projects On Hold (Count = 2) Forecast

Start DateBaseline

Phase FinishApproved Go-

Live TargetScheduled

Go-Live DateScheduled

Phase Finish

SCR789 Update NMMS Topology Processor to PSSE 34 Capability 0

269-01Document Repository Redesign and Governance Implementation - Phase 1

0

Project Number Projects Completed (Count = 20)

Baseline Execution

Phase Start

Baseline Go-Live Target

Approved Go-Live Target

Actual Go-Live Date

Actual Execution Phase Finish

185-01 Records Management and eDiscovery 12152016 5242017 8292017 8222017 12132017 2 0224-01 TelAlert Replacement 452017 6272017 842017 842017 592018 0 5230-01 SAS Technical Architecture Redesign 312017 12132017 12132017 12132017 6272018 0 2234-01 Reporting Solution Resiliency (RSR) 452017 8232017 11272017 11272017 1102018 0 8240-01 EDI Translator and Mapping Replacement Assessment 4192017 9272017 2282018 TBD 372018 -2 20254-01 Retail Windows Upgrade 10112017 12182017 12182017 1222018 272018 1 -51 65255-01 Settlements Architecture Enhancements 10252017 1112018 1112018 1192018 2142018 1 -10 53258-01 WD Kainos SMART Automation Testing Tool 4112018 642018 642018 662018 7182018 -3 33271-01 Issue Tracking and Resolution Tool Assessment 12132017 4252018 4252018 TBD 522018 1 -5 -1272-01 Operator Training Simulator Black Start GE Effort 1262017 4252018 4252018 4272018 5162018 -1 19274-01 Average Mid-Term Load Forecast 372018 5312018 5312018 5312018 6272018 0 50

NPRR768Revisions to Real-Time On-Line Reliability Deployment Price Adder Categories

372018 5312018 5312018 5312018 6272018 0 16

NPRR778 Modifications to Date Change and Cancellation Evaluation Window 7192017 10292017 12112017 12112017 1312018 0 23

NPRR782Settlement of Infeasible Ancillary Services Due to Transmission Constraints

5242017 8312017 1122017 1122017 1102018 0 20

NPRR808 Three Year CRR Auction 8232017 9182017 9182017 912017 1312018 65 68

NPRR810Applicability of RMR Incentive Factor on Reservation and Transportation Costs Associated with Firm Fuel Supplies

7172017 11122017 3312018 3312018 3312018 0 NA See 233-00

NPRR830 Revision of 4-Coincident Peak Methodology 12132017 262018 262018 262018 372018 0 85

NPRR831 Inclusion of Private Use Networks in Load Zone Price Calculations 822017 1122017 1122017 1122017 2212018 0 33

OBDRR002 ORDC OBD Revisions for PUCT Project 47199 372018 5312018 5312018 5312018 6272018 0 See NPRR768

SCR792 Enhance Communications of BAAL Exceedances 2142018 452018 452018 452018 4252018 0 69

Project Number Expedited Projects Completed (Count = 23)

Budget HealthSchedule Health

Budget HealthSchedule Health

52

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018

Project Number 2018 Projects Not Yet Started (Count = 10) Forecast

Start Date

NPRR858 Provide Complete Current Operating Plan (COP) Data Aug-2018TBD 2018 OS Enhancements Aug-2018TBD Additional Branch Limit for Relays Aug-2018

NPRR817 Create a Panhandle Hub Sep-2018NPRR821 Elimination of the CRR Deration Process Oct-2018NPRR865 Publish RTM Shift Factors for Hubs Load Zones and DC Ties Oct-2018

SCR793SSR Related Telemetry for Transmission Service Provider (TSP) Operators

Oct-2018

ECAP ECAP - ECMS Implementation Phase 2 Oct-2018TBD Job Scheduler Update in CSI Framework Oct-2018TBD Parameter Estimation Oct-2018

53

  • Slide Number 1
  • Slide Number 2
  • Summary ndash July 2018
  • Daily Peak Demand Hourly Average Actual vs Forecast Wind Day-Ahead COPs amp On-Line Capacity at Peak ndash July 2018
  • Actual Wind Output plus Curtailments vs Wind Day-Ahead COPs for All Hours ndash July 2018
  • ERCOTrsquos CPS1 Monthly Performance ndash July 2018
  • Monthly Peak Actual Demand ndash July 2018
  • Monthly Minimum Actual 15-Minute Demand ndash July 2018
  • Day-Ahead Load Forecast Performance ndash July 2018
  • Reliability Unit Commitment (RUC) Capacity by Weather Zone ndash July 2018
  • Generic Transmission Constraints (GTCs) ndash July 2018
  • Advisories and Watches ndash July 2018 Corrected
  • Lake Levels Update ndash August 1 2018
  • Planning Summary ndash July 2018
  • Mapping of Counties to ERCOT Zones ndash July 2018
  • Cumulative MW Capacity of Interconnection Requests by Zone ndashJuly 2018
  • Cumulative MW Capacity of Interconnection Requests by Zone ndashJuly 2018
  • Cumulative MW Capacity of Interconnection Requests by Zone ndashJuly 2018
  • Wind Generation ndash July 2018
  • Solar Generation ndash July 2018
  • Generation Interconnection Activity by Fuel ndash July 2018
  • Generation Interconnection Activity by Project Phase ndash July 2018
  • Slide Number 23
  • Day-Ahead Schedule (Hourly Average) ndash July 2018
  • Percentage of Real-Time Load Hedged in the DAM (Counter-Party Level) ndash July 2018
  • DAM and RTM Price Convergence ndash July 2018
  • Day-Ahead Electricity and Ancillary Service Prices (Hourly Average) ndash July 2018
  • Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash July 2018
  • Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash July 2018
  • DRUC Monthly Summary (Hourly Average) ndash July 2018
  • HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash July 2018
  • NonndashSpinning Reserve Service Deployment ndash July 2018
  • CRR Price Convergence ndash July 2018
  • Daily Average System Lambda and ORDC Price Adders ndash July 2018
  • ERS Procurement for June 2018 ndash September 2018
  • Reliability Services ndash July 2018
  • Ancillary and Other Services ndash July 2018
  • Real-Time Ancillary Service Imbalance (ORDC) ndash July 2018
  • Energy Settlement ndash July 2018
  • Congestion Revenue Rights (CRR) ndash July 2018
  • CRR Balancing Account Fund ndash July 2018
  • Revenue Neutrality ndash July 2018
  • Net Allocation to Load ndash July 2018
  • Advanced Meter Settlement Impacts ndash July 2018
  • ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndash July 2018
  • Retail Transaction Volumes ndash Summary ndash July 2018
  • Retail Transaction Volumes ndash Summary ndash July 2018
  • Slide Number 48
  • ERCOT Portfolio Stoplight Report ndash July 2018
  • ERCOT Portfolio Stoplight Report ndash July 2018
  • ERCOT Portfolio Stoplight Report ndash July 2018
  • ERCOT Portfolio Stoplight Report ndash July 2018
  • ERCOT Portfolio Stoplight Report ndash July 2018
Page 48: ERCOT Monthly Operational Overvie · ERCOT Monthly Operational Overview (July 2018) Revised 08.22.18. ERCOT Public. August 15, 2018

Projects Report

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018

20000000$ 2018 Portfolio

Spending Estimate

Projects In FlightOn Hold (Count = 100) 24905011$

Projects Not Yet Started (Count = 10) 1320628$

Projects Completed (Count = 43) 795250$

(7020889)$

TOTAL 20000000$

Project Number Projects in Initiation Phase (Count = 4)

TBD IT Asset RecoveryNPRR842 Study Area Load Information

209-03 Study Network (STNET) Integration288-01 EDI Map and Translator Replacement

Impact Metric TolerancesUnfavorable variances are represented as negative numbers within the report - Green = No more than 49 unfavorable variance - Yellow = Unfavorable variance between 49 and 99 - Red = Unfavorable variance more than 99

Spending Reductions Required to Maintain Capital Budget

2018 Project Funding

Footnotes1 - One or more phases took longer than expected resulting in additional time required

2 - One or more phases required more labor than expected resulting in additional funding andor time required

3 - Project placed on holdNA - Metric not calculated because - it is reported at the parent project level or - it is an administrative project

Project Number Projects in Planning Phase (Count = 8) Phase Start Baseline

Phase FinishApproved

Phase FinishScheduled

Go-Live DateScheduled

Phase Finish

134-02 Privileged Account Management (PAM) Phase 2 882018 12192018 12192018 TBD 12192018 0 10

183-01 CMM-FT GUI Integration 12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs

242-01 Portfolio Reporting Assessment 1182017 12192018 12192018 TBD 12192018 0 21260-01 Information Governance Assessment 10182017 5302018 9192018 TBD 9192018 0 5286-01 Java Platform Assessment 6202018 11212018 11212018 TBD 11212018 0 6287-01 Security Constrained Unit Commitment (SCUC) 882018 2272019 2272019 TBD 2272019 0 -1

NPRR484Revisions to Congestion Revenue Rights Credit Calculations and Payments - Phase 1b 2

12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs

NPRR702Flexible Accounts Payment of Invoices and Disposition of Interest on Cash Collateral

12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs

Schedule Health Budget Health

49

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018Project Number Projects in Execution Phase (Count = 42) Phase Start Baseline Go-

Live DateApproved Go-

Live DateScheduled

Go-Live DateScheduled

Phase Finish

170-01 Enterprise Content Alignment Program 8262015 11152017 8312018 8312018 8312018 0 0170-06 ECAP - ECMS Implementation Phase 1 4252018 11302018 11302018 11302018 11302018 0 3173-02 ERCOT Flight Certification Website 11152017 2282019 2282019 2282019 5312019 0 2181-01 CRR Framework Upgrade 10262016 1022017 11192018 11192018 2272019 0 2

183-01 CMM Tech Refresh 3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

193-01 PMU Tool Evaluation and Implementation 12132017 892018 2152019 2152019 3202019 0 0196-01 GINR Project Status Application Replacement 12212016 9142017 2282019 2282019 3312019 0 1198-02 Reactive Power Coordination PoC 962017 6162018 8152018 8152018 8152018 0 54209-02 Weather Imaging and Line Observation (WILO) 5302018 212019 212019 212019 2272019 0 2210-01 REC Technology Refresh 8302017 3182018 12132018 12132018 1162019 0 3228-01 Enterprise Database Upgrade 882018 1292020 1292020 1292020 1292020 0 17229-01 IT Change and Configuration Management Phase 2 822017 6192018 12132018 12132018 3252019 0 2 -9238-01 Application Authentication Tech Refresh 962017 3192018 12132018 12132018 1302019 0 3239-01 Identity and Access Management 592018 3132019 3132019 3132019 3132019 0 2241-01 AREA - Generation 10112017 3302018 892018 892018 952018 0 -4244-01 Corporate Wireless 11292017 3282018 1252018 1252018 192019 0 9245-01 2017 EPS Metering Enhancements 6272018 892019 892019 892019 9252019 0 1246-01 iTest Data Refresh 12132017 1192018 11152018 11152018 122019 0 25249-01 Secondary Wind Forecasting Service 8302017 2282018 892018 892018 952018 0 0253-01 CIP Recovery Plan Project - Planning Phase 1 1312018 8292018 8292018 8292018 8292018 0 -2

257-01Security Constrained Optimal Powerflow in Study Network Analysis

1262017 10252018 10252018 10252018 1282018 0 19

261-01 Generic Transmission Constraint Calculation 372018 12132018 12132018 12132018 1232019 0 0263-01 Market Simulator 4112018 12132018 12132018 12132018 1302019 0 7265-01 Real-Time Assessment Continuity 1312018 12132018 12132018 12132018 1302019 0 0279-01 Cyber Security Project 24 6272018 10262018 10262018 10262018 11282018 0 0280-01 Quest Software Portfolio Transition 442018 6272018 9262018 9262018 9262018 0 13282-01 Synchronous Condenser Outage Modeling 662018 10252018 10252018 10252018 1252018 0 1Various 2015 CMM NPRRs 2 -18

NPRR519Exemption of ERS-Only QSEs from Collateral and Capitalization Requirements

3152017 5192018 12112018 12112018 12312018 0 See 2015 CMM NPRRs

NPRR620Collateral Requirements for Counter-Parties with No Load or Generation

3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

NPRR660 Remove CRR State Change Adder 3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

Budget HealthSchedule Health

50

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018Project Number Projects in Execution Phase (Count = 42) Phase Start Baseline Go-

Live DateApproved Go-

Live DateScheduled

Go-Live DateScheduled

Phase Finish

NPRR741 Clarifications to TPE and EAL Credit Exposure Calculations 3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

NPRR749 Option Cost for Outstanding CRRs 882018 12132018 12132018 12132018 TBD 0 NA See 2015 CMM NPRRs

NPRR755 Data Agent-Only QSE Registration 3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

NPRR819Modification of Non-Price Error Resettlement Thresholds and Resettlement Clean-Ups

592018 892018 892018 892018 952018 0 36

NPRR833 Modify PTP Obligation Bid Clearing Change 882018 12132018 12132018 12132018 TBD 0 1

NPRR843Short-Term System Adequacy and AS Offer Disclosure Reports Additions

7182018 10252018 10252018 10252018 11282018 0 0

NPRR864 RUC Modifications to Consider Market-Based Solutions 6202018 10252018 10252018 10252018 11282018 0 4SCR777 Bilateral CRR Interface Enhancement 10262016 1022017 11192018 11192018 2272019 0 NA See 181-01

SCR781 RARF Replacement 12202017 4252018 12192018 12192018 12192018 0 3SCR791 Correction of 60-day SCED GRD Disclosure Report 522018 892018 892018 892018 952018 0 39SCR795 Addition of Intra-Hour Wind Forecast to GTBD Calculation 882018 10252018 10252018 10252018 11142018 0 0

Project Number Expedited Projects in Execution (Count = 34)

Project Number Projects in Stabilization (Count = 10) Execution

Phase StartBaseline Go-Live Target

Approved Go-Live Target

ActualGo-Live Date

Scheduled Execution Phase

Finish

NPRR648 Remove References to Flowgate Rights 3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR683 Revision to Available Credit Limit Calculation 3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR743 Revision to MCE to Have a Floor For Load Exposure 3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR760 Calculation of Exposure Variables For Days With No Activity 3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR776 Voltage Set Point Communication 9202017 3192018 452018 452018 952018 0 1

NPRR800Revisions to Credit Exposure Calculations to Use Electricity Futures Market Prices

3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR815Revise the Limitation of Load Resources Providing Responsive Reserve (RRS) Service

3212018 5312018 5312018 5312018 8292018 0 2

209-01 Multi Station Breaker to Breaker One Lines 282017 392018 532018 532018 8222018 0 -1259-01 DC SCADA and Metering Upgrade 10252017 1172018 7252018 7252018 8292018 0 22266-01 Remote Email Access Enhancement 12132017 372018 662018 6192018 9262018 2 -7 2 -9

Schedule Health Budget Health

Budget HealthSchedule Health

51

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018

Project Number Projects On Hold (Count = 2) Forecast

Start DateBaseline

Phase FinishApproved Go-

Live TargetScheduled

Go-Live DateScheduled

Phase Finish

SCR789 Update NMMS Topology Processor to PSSE 34 Capability 0

269-01Document Repository Redesign and Governance Implementation - Phase 1

0

Project Number Projects Completed (Count = 20)

Baseline Execution

Phase Start

Baseline Go-Live Target

Approved Go-Live Target

Actual Go-Live Date

Actual Execution Phase Finish

185-01 Records Management and eDiscovery 12152016 5242017 8292017 8222017 12132017 2 0224-01 TelAlert Replacement 452017 6272017 842017 842017 592018 0 5230-01 SAS Technical Architecture Redesign 312017 12132017 12132017 12132017 6272018 0 2234-01 Reporting Solution Resiliency (RSR) 452017 8232017 11272017 11272017 1102018 0 8240-01 EDI Translator and Mapping Replacement Assessment 4192017 9272017 2282018 TBD 372018 -2 20254-01 Retail Windows Upgrade 10112017 12182017 12182017 1222018 272018 1 -51 65255-01 Settlements Architecture Enhancements 10252017 1112018 1112018 1192018 2142018 1 -10 53258-01 WD Kainos SMART Automation Testing Tool 4112018 642018 642018 662018 7182018 -3 33271-01 Issue Tracking and Resolution Tool Assessment 12132017 4252018 4252018 TBD 522018 1 -5 -1272-01 Operator Training Simulator Black Start GE Effort 1262017 4252018 4252018 4272018 5162018 -1 19274-01 Average Mid-Term Load Forecast 372018 5312018 5312018 5312018 6272018 0 50

NPRR768Revisions to Real-Time On-Line Reliability Deployment Price Adder Categories

372018 5312018 5312018 5312018 6272018 0 16

NPRR778 Modifications to Date Change and Cancellation Evaluation Window 7192017 10292017 12112017 12112017 1312018 0 23

NPRR782Settlement of Infeasible Ancillary Services Due to Transmission Constraints

5242017 8312017 1122017 1122017 1102018 0 20

NPRR808 Three Year CRR Auction 8232017 9182017 9182017 912017 1312018 65 68

NPRR810Applicability of RMR Incentive Factor on Reservation and Transportation Costs Associated with Firm Fuel Supplies

7172017 11122017 3312018 3312018 3312018 0 NA See 233-00

NPRR830 Revision of 4-Coincident Peak Methodology 12132017 262018 262018 262018 372018 0 85

NPRR831 Inclusion of Private Use Networks in Load Zone Price Calculations 822017 1122017 1122017 1122017 2212018 0 33

OBDRR002 ORDC OBD Revisions for PUCT Project 47199 372018 5312018 5312018 5312018 6272018 0 See NPRR768

SCR792 Enhance Communications of BAAL Exceedances 2142018 452018 452018 452018 4252018 0 69

Project Number Expedited Projects Completed (Count = 23)

Budget HealthSchedule Health

Budget HealthSchedule Health

52

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018

Project Number 2018 Projects Not Yet Started (Count = 10) Forecast

Start Date

NPRR858 Provide Complete Current Operating Plan (COP) Data Aug-2018TBD 2018 OS Enhancements Aug-2018TBD Additional Branch Limit for Relays Aug-2018

NPRR817 Create a Panhandle Hub Sep-2018NPRR821 Elimination of the CRR Deration Process Oct-2018NPRR865 Publish RTM Shift Factors for Hubs Load Zones and DC Ties Oct-2018

SCR793SSR Related Telemetry for Transmission Service Provider (TSP) Operators

Oct-2018

ECAP ECAP - ECMS Implementation Phase 2 Oct-2018TBD Job Scheduler Update in CSI Framework Oct-2018TBD Parameter Estimation Oct-2018

53

  • Slide Number 1
  • Slide Number 2
  • Summary ndash July 2018
  • Daily Peak Demand Hourly Average Actual vs Forecast Wind Day-Ahead COPs amp On-Line Capacity at Peak ndash July 2018
  • Actual Wind Output plus Curtailments vs Wind Day-Ahead COPs for All Hours ndash July 2018
  • ERCOTrsquos CPS1 Monthly Performance ndash July 2018
  • Monthly Peak Actual Demand ndash July 2018
  • Monthly Minimum Actual 15-Minute Demand ndash July 2018
  • Day-Ahead Load Forecast Performance ndash July 2018
  • Reliability Unit Commitment (RUC) Capacity by Weather Zone ndash July 2018
  • Generic Transmission Constraints (GTCs) ndash July 2018
  • Advisories and Watches ndash July 2018 Corrected
  • Lake Levels Update ndash August 1 2018
  • Planning Summary ndash July 2018
  • Mapping of Counties to ERCOT Zones ndash July 2018
  • Cumulative MW Capacity of Interconnection Requests by Zone ndashJuly 2018
  • Cumulative MW Capacity of Interconnection Requests by Zone ndashJuly 2018
  • Cumulative MW Capacity of Interconnection Requests by Zone ndashJuly 2018
  • Wind Generation ndash July 2018
  • Solar Generation ndash July 2018
  • Generation Interconnection Activity by Fuel ndash July 2018
  • Generation Interconnection Activity by Project Phase ndash July 2018
  • Slide Number 23
  • Day-Ahead Schedule (Hourly Average) ndash July 2018
  • Percentage of Real-Time Load Hedged in the DAM (Counter-Party Level) ndash July 2018
  • DAM and RTM Price Convergence ndash July 2018
  • Day-Ahead Electricity and Ancillary Service Prices (Hourly Average) ndash July 2018
  • Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash July 2018
  • Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash July 2018
  • DRUC Monthly Summary (Hourly Average) ndash July 2018
  • HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash July 2018
  • NonndashSpinning Reserve Service Deployment ndash July 2018
  • CRR Price Convergence ndash July 2018
  • Daily Average System Lambda and ORDC Price Adders ndash July 2018
  • ERS Procurement for June 2018 ndash September 2018
  • Reliability Services ndash July 2018
  • Ancillary and Other Services ndash July 2018
  • Real-Time Ancillary Service Imbalance (ORDC) ndash July 2018
  • Energy Settlement ndash July 2018
  • Congestion Revenue Rights (CRR) ndash July 2018
  • CRR Balancing Account Fund ndash July 2018
  • Revenue Neutrality ndash July 2018
  • Net Allocation to Load ndash July 2018
  • Advanced Meter Settlement Impacts ndash July 2018
  • ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndash July 2018
  • Retail Transaction Volumes ndash Summary ndash July 2018
  • Retail Transaction Volumes ndash Summary ndash July 2018
  • Slide Number 48
  • ERCOT Portfolio Stoplight Report ndash July 2018
  • ERCOT Portfolio Stoplight Report ndash July 2018
  • ERCOT Portfolio Stoplight Report ndash July 2018
  • ERCOT Portfolio Stoplight Report ndash July 2018
  • ERCOT Portfolio Stoplight Report ndash July 2018
Page 49: ERCOT Monthly Operational Overvie · ERCOT Monthly Operational Overview (July 2018) Revised 08.22.18. ERCOT Public. August 15, 2018

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018

20000000$ 2018 Portfolio

Spending Estimate

Projects In FlightOn Hold (Count = 100) 24905011$

Projects Not Yet Started (Count = 10) 1320628$

Projects Completed (Count = 43) 795250$

(7020889)$

TOTAL 20000000$

Project Number Projects in Initiation Phase (Count = 4)

TBD IT Asset RecoveryNPRR842 Study Area Load Information

209-03 Study Network (STNET) Integration288-01 EDI Map and Translator Replacement

Impact Metric TolerancesUnfavorable variances are represented as negative numbers within the report - Green = No more than 49 unfavorable variance - Yellow = Unfavorable variance between 49 and 99 - Red = Unfavorable variance more than 99

Spending Reductions Required to Maintain Capital Budget

2018 Project Funding

Footnotes1 - One or more phases took longer than expected resulting in additional time required

2 - One or more phases required more labor than expected resulting in additional funding andor time required

3 - Project placed on holdNA - Metric not calculated because - it is reported at the parent project level or - it is an administrative project

Project Number Projects in Planning Phase (Count = 8) Phase Start Baseline

Phase FinishApproved

Phase FinishScheduled

Go-Live DateScheduled

Phase Finish

134-02 Privileged Account Management (PAM) Phase 2 882018 12192018 12192018 TBD 12192018 0 10

183-01 CMM-FT GUI Integration 12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs

242-01 Portfolio Reporting Assessment 1182017 12192018 12192018 TBD 12192018 0 21260-01 Information Governance Assessment 10182017 5302018 9192018 TBD 9192018 0 5286-01 Java Platform Assessment 6202018 11212018 11212018 TBD 11212018 0 6287-01 Security Constrained Unit Commitment (SCUC) 882018 2272019 2272019 TBD 2272019 0 -1

NPRR484Revisions to Congestion Revenue Rights Credit Calculations and Payments - Phase 1b 2

12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs

NPRR702Flexible Accounts Payment of Invoices and Disposition of Interest on Cash Collateral

12162015 8172016 TBD TBD TBD 0 NA See 2015 CMM NPRRs

Schedule Health Budget Health

49

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018Project Number Projects in Execution Phase (Count = 42) Phase Start Baseline Go-

Live DateApproved Go-

Live DateScheduled

Go-Live DateScheduled

Phase Finish

170-01 Enterprise Content Alignment Program 8262015 11152017 8312018 8312018 8312018 0 0170-06 ECAP - ECMS Implementation Phase 1 4252018 11302018 11302018 11302018 11302018 0 3173-02 ERCOT Flight Certification Website 11152017 2282019 2282019 2282019 5312019 0 2181-01 CRR Framework Upgrade 10262016 1022017 11192018 11192018 2272019 0 2

183-01 CMM Tech Refresh 3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

193-01 PMU Tool Evaluation and Implementation 12132017 892018 2152019 2152019 3202019 0 0196-01 GINR Project Status Application Replacement 12212016 9142017 2282019 2282019 3312019 0 1198-02 Reactive Power Coordination PoC 962017 6162018 8152018 8152018 8152018 0 54209-02 Weather Imaging and Line Observation (WILO) 5302018 212019 212019 212019 2272019 0 2210-01 REC Technology Refresh 8302017 3182018 12132018 12132018 1162019 0 3228-01 Enterprise Database Upgrade 882018 1292020 1292020 1292020 1292020 0 17229-01 IT Change and Configuration Management Phase 2 822017 6192018 12132018 12132018 3252019 0 2 -9238-01 Application Authentication Tech Refresh 962017 3192018 12132018 12132018 1302019 0 3239-01 Identity and Access Management 592018 3132019 3132019 3132019 3132019 0 2241-01 AREA - Generation 10112017 3302018 892018 892018 952018 0 -4244-01 Corporate Wireless 11292017 3282018 1252018 1252018 192019 0 9245-01 2017 EPS Metering Enhancements 6272018 892019 892019 892019 9252019 0 1246-01 iTest Data Refresh 12132017 1192018 11152018 11152018 122019 0 25249-01 Secondary Wind Forecasting Service 8302017 2282018 892018 892018 952018 0 0253-01 CIP Recovery Plan Project - Planning Phase 1 1312018 8292018 8292018 8292018 8292018 0 -2

257-01Security Constrained Optimal Powerflow in Study Network Analysis

1262017 10252018 10252018 10252018 1282018 0 19

261-01 Generic Transmission Constraint Calculation 372018 12132018 12132018 12132018 1232019 0 0263-01 Market Simulator 4112018 12132018 12132018 12132018 1302019 0 7265-01 Real-Time Assessment Continuity 1312018 12132018 12132018 12132018 1302019 0 0279-01 Cyber Security Project 24 6272018 10262018 10262018 10262018 11282018 0 0280-01 Quest Software Portfolio Transition 442018 6272018 9262018 9262018 9262018 0 13282-01 Synchronous Condenser Outage Modeling 662018 10252018 10252018 10252018 1252018 0 1Various 2015 CMM NPRRs 2 -18

NPRR519Exemption of ERS-Only QSEs from Collateral and Capitalization Requirements

3152017 5192018 12112018 12112018 12312018 0 See 2015 CMM NPRRs

NPRR620Collateral Requirements for Counter-Parties with No Load or Generation

3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

NPRR660 Remove CRR State Change Adder 3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

Budget HealthSchedule Health

50

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018Project Number Projects in Execution Phase (Count = 42) Phase Start Baseline Go-

Live DateApproved Go-

Live DateScheduled

Go-Live DateScheduled

Phase Finish

NPRR741 Clarifications to TPE and EAL Credit Exposure Calculations 3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

NPRR749 Option Cost for Outstanding CRRs 882018 12132018 12132018 12132018 TBD 0 NA See 2015 CMM NPRRs

NPRR755 Data Agent-Only QSE Registration 3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

NPRR819Modification of Non-Price Error Resettlement Thresholds and Resettlement Clean-Ups

592018 892018 892018 892018 952018 0 36

NPRR833 Modify PTP Obligation Bid Clearing Change 882018 12132018 12132018 12132018 TBD 0 1

NPRR843Short-Term System Adequacy and AS Offer Disclosure Reports Additions

7182018 10252018 10252018 10252018 11282018 0 0

NPRR864 RUC Modifications to Consider Market-Based Solutions 6202018 10252018 10252018 10252018 11282018 0 4SCR777 Bilateral CRR Interface Enhancement 10262016 1022017 11192018 11192018 2272019 0 NA See 181-01

SCR781 RARF Replacement 12202017 4252018 12192018 12192018 12192018 0 3SCR791 Correction of 60-day SCED GRD Disclosure Report 522018 892018 892018 892018 952018 0 39SCR795 Addition of Intra-Hour Wind Forecast to GTBD Calculation 882018 10252018 10252018 10252018 11142018 0 0

Project Number Expedited Projects in Execution (Count = 34)

Project Number Projects in Stabilization (Count = 10) Execution

Phase StartBaseline Go-Live Target

Approved Go-Live Target

ActualGo-Live Date

Scheduled Execution Phase

Finish

NPRR648 Remove References to Flowgate Rights 3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR683 Revision to Available Credit Limit Calculation 3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR743 Revision to MCE to Have a Floor For Load Exposure 3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR760 Calculation of Exposure Variables For Days With No Activity 3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR776 Voltage Set Point Communication 9202017 3192018 452018 452018 952018 0 1

NPRR800Revisions to Credit Exposure Calculations to Use Electricity Futures Market Prices

3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR815Revise the Limitation of Load Resources Providing Responsive Reserve (RRS) Service

3212018 5312018 5312018 5312018 8292018 0 2

209-01 Multi Station Breaker to Breaker One Lines 282017 392018 532018 532018 8222018 0 -1259-01 DC SCADA and Metering Upgrade 10252017 1172018 7252018 7252018 8292018 0 22266-01 Remote Email Access Enhancement 12132017 372018 662018 6192018 9262018 2 -7 2 -9

Schedule Health Budget Health

Budget HealthSchedule Health

51

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018

Project Number Projects On Hold (Count = 2) Forecast

Start DateBaseline

Phase FinishApproved Go-

Live TargetScheduled

Go-Live DateScheduled

Phase Finish

SCR789 Update NMMS Topology Processor to PSSE 34 Capability 0

269-01Document Repository Redesign and Governance Implementation - Phase 1

0

Project Number Projects Completed (Count = 20)

Baseline Execution

Phase Start

Baseline Go-Live Target

Approved Go-Live Target

Actual Go-Live Date

Actual Execution Phase Finish

185-01 Records Management and eDiscovery 12152016 5242017 8292017 8222017 12132017 2 0224-01 TelAlert Replacement 452017 6272017 842017 842017 592018 0 5230-01 SAS Technical Architecture Redesign 312017 12132017 12132017 12132017 6272018 0 2234-01 Reporting Solution Resiliency (RSR) 452017 8232017 11272017 11272017 1102018 0 8240-01 EDI Translator and Mapping Replacement Assessment 4192017 9272017 2282018 TBD 372018 -2 20254-01 Retail Windows Upgrade 10112017 12182017 12182017 1222018 272018 1 -51 65255-01 Settlements Architecture Enhancements 10252017 1112018 1112018 1192018 2142018 1 -10 53258-01 WD Kainos SMART Automation Testing Tool 4112018 642018 642018 662018 7182018 -3 33271-01 Issue Tracking and Resolution Tool Assessment 12132017 4252018 4252018 TBD 522018 1 -5 -1272-01 Operator Training Simulator Black Start GE Effort 1262017 4252018 4252018 4272018 5162018 -1 19274-01 Average Mid-Term Load Forecast 372018 5312018 5312018 5312018 6272018 0 50

NPRR768Revisions to Real-Time On-Line Reliability Deployment Price Adder Categories

372018 5312018 5312018 5312018 6272018 0 16

NPRR778 Modifications to Date Change and Cancellation Evaluation Window 7192017 10292017 12112017 12112017 1312018 0 23

NPRR782Settlement of Infeasible Ancillary Services Due to Transmission Constraints

5242017 8312017 1122017 1122017 1102018 0 20

NPRR808 Three Year CRR Auction 8232017 9182017 9182017 912017 1312018 65 68

NPRR810Applicability of RMR Incentive Factor on Reservation and Transportation Costs Associated with Firm Fuel Supplies

7172017 11122017 3312018 3312018 3312018 0 NA See 233-00

NPRR830 Revision of 4-Coincident Peak Methodology 12132017 262018 262018 262018 372018 0 85

NPRR831 Inclusion of Private Use Networks in Load Zone Price Calculations 822017 1122017 1122017 1122017 2212018 0 33

OBDRR002 ORDC OBD Revisions for PUCT Project 47199 372018 5312018 5312018 5312018 6272018 0 See NPRR768

SCR792 Enhance Communications of BAAL Exceedances 2142018 452018 452018 452018 4252018 0 69

Project Number Expedited Projects Completed (Count = 23)

Budget HealthSchedule Health

Budget HealthSchedule Health

52

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018

Project Number 2018 Projects Not Yet Started (Count = 10) Forecast

Start Date

NPRR858 Provide Complete Current Operating Plan (COP) Data Aug-2018TBD 2018 OS Enhancements Aug-2018TBD Additional Branch Limit for Relays Aug-2018

NPRR817 Create a Panhandle Hub Sep-2018NPRR821 Elimination of the CRR Deration Process Oct-2018NPRR865 Publish RTM Shift Factors for Hubs Load Zones and DC Ties Oct-2018

SCR793SSR Related Telemetry for Transmission Service Provider (TSP) Operators

Oct-2018

ECAP ECAP - ECMS Implementation Phase 2 Oct-2018TBD Job Scheduler Update in CSI Framework Oct-2018TBD Parameter Estimation Oct-2018

53

  • Slide Number 1
  • Slide Number 2
  • Summary ndash July 2018
  • Daily Peak Demand Hourly Average Actual vs Forecast Wind Day-Ahead COPs amp On-Line Capacity at Peak ndash July 2018
  • Actual Wind Output plus Curtailments vs Wind Day-Ahead COPs for All Hours ndash July 2018
  • ERCOTrsquos CPS1 Monthly Performance ndash July 2018
  • Monthly Peak Actual Demand ndash July 2018
  • Monthly Minimum Actual 15-Minute Demand ndash July 2018
  • Day-Ahead Load Forecast Performance ndash July 2018
  • Reliability Unit Commitment (RUC) Capacity by Weather Zone ndash July 2018
  • Generic Transmission Constraints (GTCs) ndash July 2018
  • Advisories and Watches ndash July 2018 Corrected
  • Lake Levels Update ndash August 1 2018
  • Planning Summary ndash July 2018
  • Mapping of Counties to ERCOT Zones ndash July 2018
  • Cumulative MW Capacity of Interconnection Requests by Zone ndashJuly 2018
  • Cumulative MW Capacity of Interconnection Requests by Zone ndashJuly 2018
  • Cumulative MW Capacity of Interconnection Requests by Zone ndashJuly 2018
  • Wind Generation ndash July 2018
  • Solar Generation ndash July 2018
  • Generation Interconnection Activity by Fuel ndash July 2018
  • Generation Interconnection Activity by Project Phase ndash July 2018
  • Slide Number 23
  • Day-Ahead Schedule (Hourly Average) ndash July 2018
  • Percentage of Real-Time Load Hedged in the DAM (Counter-Party Level) ndash July 2018
  • DAM and RTM Price Convergence ndash July 2018
  • Day-Ahead Electricity and Ancillary Service Prices (Hourly Average) ndash July 2018
  • Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash July 2018
  • Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash July 2018
  • DRUC Monthly Summary (Hourly Average) ndash July 2018
  • HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash July 2018
  • NonndashSpinning Reserve Service Deployment ndash July 2018
  • CRR Price Convergence ndash July 2018
  • Daily Average System Lambda and ORDC Price Adders ndash July 2018
  • ERS Procurement for June 2018 ndash September 2018
  • Reliability Services ndash July 2018
  • Ancillary and Other Services ndash July 2018
  • Real-Time Ancillary Service Imbalance (ORDC) ndash July 2018
  • Energy Settlement ndash July 2018
  • Congestion Revenue Rights (CRR) ndash July 2018
  • CRR Balancing Account Fund ndash July 2018
  • Revenue Neutrality ndash July 2018
  • Net Allocation to Load ndash July 2018
  • Advanced Meter Settlement Impacts ndash July 2018
  • ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndash July 2018
  • Retail Transaction Volumes ndash Summary ndash July 2018
  • Retail Transaction Volumes ndash Summary ndash July 2018
  • Slide Number 48
  • ERCOT Portfolio Stoplight Report ndash July 2018
  • ERCOT Portfolio Stoplight Report ndash July 2018
  • ERCOT Portfolio Stoplight Report ndash July 2018
  • ERCOT Portfolio Stoplight Report ndash July 2018
  • ERCOT Portfolio Stoplight Report ndash July 2018
Page 50: ERCOT Monthly Operational Overvie · ERCOT Monthly Operational Overview (July 2018) Revised 08.22.18. ERCOT Public. August 15, 2018

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018Project Number Projects in Execution Phase (Count = 42) Phase Start Baseline Go-

Live DateApproved Go-

Live DateScheduled

Go-Live DateScheduled

Phase Finish

170-01 Enterprise Content Alignment Program 8262015 11152017 8312018 8312018 8312018 0 0170-06 ECAP - ECMS Implementation Phase 1 4252018 11302018 11302018 11302018 11302018 0 3173-02 ERCOT Flight Certification Website 11152017 2282019 2282019 2282019 5312019 0 2181-01 CRR Framework Upgrade 10262016 1022017 11192018 11192018 2272019 0 2

183-01 CMM Tech Refresh 3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

193-01 PMU Tool Evaluation and Implementation 12132017 892018 2152019 2152019 3202019 0 0196-01 GINR Project Status Application Replacement 12212016 9142017 2282019 2282019 3312019 0 1198-02 Reactive Power Coordination PoC 962017 6162018 8152018 8152018 8152018 0 54209-02 Weather Imaging and Line Observation (WILO) 5302018 212019 212019 212019 2272019 0 2210-01 REC Technology Refresh 8302017 3182018 12132018 12132018 1162019 0 3228-01 Enterprise Database Upgrade 882018 1292020 1292020 1292020 1292020 0 17229-01 IT Change and Configuration Management Phase 2 822017 6192018 12132018 12132018 3252019 0 2 -9238-01 Application Authentication Tech Refresh 962017 3192018 12132018 12132018 1302019 0 3239-01 Identity and Access Management 592018 3132019 3132019 3132019 3132019 0 2241-01 AREA - Generation 10112017 3302018 892018 892018 952018 0 -4244-01 Corporate Wireless 11292017 3282018 1252018 1252018 192019 0 9245-01 2017 EPS Metering Enhancements 6272018 892019 892019 892019 9252019 0 1246-01 iTest Data Refresh 12132017 1192018 11152018 11152018 122019 0 25249-01 Secondary Wind Forecasting Service 8302017 2282018 892018 892018 952018 0 0253-01 CIP Recovery Plan Project - Planning Phase 1 1312018 8292018 8292018 8292018 8292018 0 -2

257-01Security Constrained Optimal Powerflow in Study Network Analysis

1262017 10252018 10252018 10252018 1282018 0 19

261-01 Generic Transmission Constraint Calculation 372018 12132018 12132018 12132018 1232019 0 0263-01 Market Simulator 4112018 12132018 12132018 12132018 1302019 0 7265-01 Real-Time Assessment Continuity 1312018 12132018 12132018 12132018 1302019 0 0279-01 Cyber Security Project 24 6272018 10262018 10262018 10262018 11282018 0 0280-01 Quest Software Portfolio Transition 442018 6272018 9262018 9262018 9262018 0 13282-01 Synchronous Condenser Outage Modeling 662018 10252018 10252018 10252018 1252018 0 1Various 2015 CMM NPRRs 2 -18

NPRR519Exemption of ERS-Only QSEs from Collateral and Capitalization Requirements

3152017 5192018 12112018 12112018 12312018 0 See 2015 CMM NPRRs

NPRR620Collateral Requirements for Counter-Parties with No Load or Generation

3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

NPRR660 Remove CRR State Change Adder 3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

Budget HealthSchedule Health

50

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018Project Number Projects in Execution Phase (Count = 42) Phase Start Baseline Go-

Live DateApproved Go-

Live DateScheduled

Go-Live DateScheduled

Phase Finish

NPRR741 Clarifications to TPE and EAL Credit Exposure Calculations 3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

NPRR749 Option Cost for Outstanding CRRs 882018 12132018 12132018 12132018 TBD 0 NA See 2015 CMM NPRRs

NPRR755 Data Agent-Only QSE Registration 3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

NPRR819Modification of Non-Price Error Resettlement Thresholds and Resettlement Clean-Ups

592018 892018 892018 892018 952018 0 36

NPRR833 Modify PTP Obligation Bid Clearing Change 882018 12132018 12132018 12132018 TBD 0 1

NPRR843Short-Term System Adequacy and AS Offer Disclosure Reports Additions

7182018 10252018 10252018 10252018 11282018 0 0

NPRR864 RUC Modifications to Consider Market-Based Solutions 6202018 10252018 10252018 10252018 11282018 0 4SCR777 Bilateral CRR Interface Enhancement 10262016 1022017 11192018 11192018 2272019 0 NA See 181-01

SCR781 RARF Replacement 12202017 4252018 12192018 12192018 12192018 0 3SCR791 Correction of 60-day SCED GRD Disclosure Report 522018 892018 892018 892018 952018 0 39SCR795 Addition of Intra-Hour Wind Forecast to GTBD Calculation 882018 10252018 10252018 10252018 11142018 0 0

Project Number Expedited Projects in Execution (Count = 34)

Project Number Projects in Stabilization (Count = 10) Execution

Phase StartBaseline Go-Live Target

Approved Go-Live Target

ActualGo-Live Date

Scheduled Execution Phase

Finish

NPRR648 Remove References to Flowgate Rights 3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR683 Revision to Available Credit Limit Calculation 3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR743 Revision to MCE to Have a Floor For Load Exposure 3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR760 Calculation of Exposure Variables For Days With No Activity 3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR776 Voltage Set Point Communication 9202017 3192018 452018 452018 952018 0 1

NPRR800Revisions to Credit Exposure Calculations to Use Electricity Futures Market Prices

3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR815Revise the Limitation of Load Resources Providing Responsive Reserve (RRS) Service

3212018 5312018 5312018 5312018 8292018 0 2

209-01 Multi Station Breaker to Breaker One Lines 282017 392018 532018 532018 8222018 0 -1259-01 DC SCADA and Metering Upgrade 10252017 1172018 7252018 7252018 8292018 0 22266-01 Remote Email Access Enhancement 12132017 372018 662018 6192018 9262018 2 -7 2 -9

Schedule Health Budget Health

Budget HealthSchedule Health

51

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018

Project Number Projects On Hold (Count = 2) Forecast

Start DateBaseline

Phase FinishApproved Go-

Live TargetScheduled

Go-Live DateScheduled

Phase Finish

SCR789 Update NMMS Topology Processor to PSSE 34 Capability 0

269-01Document Repository Redesign and Governance Implementation - Phase 1

0

Project Number Projects Completed (Count = 20)

Baseline Execution

Phase Start

Baseline Go-Live Target

Approved Go-Live Target

Actual Go-Live Date

Actual Execution Phase Finish

185-01 Records Management and eDiscovery 12152016 5242017 8292017 8222017 12132017 2 0224-01 TelAlert Replacement 452017 6272017 842017 842017 592018 0 5230-01 SAS Technical Architecture Redesign 312017 12132017 12132017 12132017 6272018 0 2234-01 Reporting Solution Resiliency (RSR) 452017 8232017 11272017 11272017 1102018 0 8240-01 EDI Translator and Mapping Replacement Assessment 4192017 9272017 2282018 TBD 372018 -2 20254-01 Retail Windows Upgrade 10112017 12182017 12182017 1222018 272018 1 -51 65255-01 Settlements Architecture Enhancements 10252017 1112018 1112018 1192018 2142018 1 -10 53258-01 WD Kainos SMART Automation Testing Tool 4112018 642018 642018 662018 7182018 -3 33271-01 Issue Tracking and Resolution Tool Assessment 12132017 4252018 4252018 TBD 522018 1 -5 -1272-01 Operator Training Simulator Black Start GE Effort 1262017 4252018 4252018 4272018 5162018 -1 19274-01 Average Mid-Term Load Forecast 372018 5312018 5312018 5312018 6272018 0 50

NPRR768Revisions to Real-Time On-Line Reliability Deployment Price Adder Categories

372018 5312018 5312018 5312018 6272018 0 16

NPRR778 Modifications to Date Change and Cancellation Evaluation Window 7192017 10292017 12112017 12112017 1312018 0 23

NPRR782Settlement of Infeasible Ancillary Services Due to Transmission Constraints

5242017 8312017 1122017 1122017 1102018 0 20

NPRR808 Three Year CRR Auction 8232017 9182017 9182017 912017 1312018 65 68

NPRR810Applicability of RMR Incentive Factor on Reservation and Transportation Costs Associated with Firm Fuel Supplies

7172017 11122017 3312018 3312018 3312018 0 NA See 233-00

NPRR830 Revision of 4-Coincident Peak Methodology 12132017 262018 262018 262018 372018 0 85

NPRR831 Inclusion of Private Use Networks in Load Zone Price Calculations 822017 1122017 1122017 1122017 2212018 0 33

OBDRR002 ORDC OBD Revisions for PUCT Project 47199 372018 5312018 5312018 5312018 6272018 0 See NPRR768

SCR792 Enhance Communications of BAAL Exceedances 2142018 452018 452018 452018 4252018 0 69

Project Number Expedited Projects Completed (Count = 23)

Budget HealthSchedule Health

Budget HealthSchedule Health

52

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018

Project Number 2018 Projects Not Yet Started (Count = 10) Forecast

Start Date

NPRR858 Provide Complete Current Operating Plan (COP) Data Aug-2018TBD 2018 OS Enhancements Aug-2018TBD Additional Branch Limit for Relays Aug-2018

NPRR817 Create a Panhandle Hub Sep-2018NPRR821 Elimination of the CRR Deration Process Oct-2018NPRR865 Publish RTM Shift Factors for Hubs Load Zones and DC Ties Oct-2018

SCR793SSR Related Telemetry for Transmission Service Provider (TSP) Operators

Oct-2018

ECAP ECAP - ECMS Implementation Phase 2 Oct-2018TBD Job Scheduler Update in CSI Framework Oct-2018TBD Parameter Estimation Oct-2018

53

  • Slide Number 1
  • Slide Number 2
  • Summary ndash July 2018
  • Daily Peak Demand Hourly Average Actual vs Forecast Wind Day-Ahead COPs amp On-Line Capacity at Peak ndash July 2018
  • Actual Wind Output plus Curtailments vs Wind Day-Ahead COPs for All Hours ndash July 2018
  • ERCOTrsquos CPS1 Monthly Performance ndash July 2018
  • Monthly Peak Actual Demand ndash July 2018
  • Monthly Minimum Actual 15-Minute Demand ndash July 2018
  • Day-Ahead Load Forecast Performance ndash July 2018
  • Reliability Unit Commitment (RUC) Capacity by Weather Zone ndash July 2018
  • Generic Transmission Constraints (GTCs) ndash July 2018
  • Advisories and Watches ndash July 2018 Corrected
  • Lake Levels Update ndash August 1 2018
  • Planning Summary ndash July 2018
  • Mapping of Counties to ERCOT Zones ndash July 2018
  • Cumulative MW Capacity of Interconnection Requests by Zone ndashJuly 2018
  • Cumulative MW Capacity of Interconnection Requests by Zone ndashJuly 2018
  • Cumulative MW Capacity of Interconnection Requests by Zone ndashJuly 2018
  • Wind Generation ndash July 2018
  • Solar Generation ndash July 2018
  • Generation Interconnection Activity by Fuel ndash July 2018
  • Generation Interconnection Activity by Project Phase ndash July 2018
  • Slide Number 23
  • Day-Ahead Schedule (Hourly Average) ndash July 2018
  • Percentage of Real-Time Load Hedged in the DAM (Counter-Party Level) ndash July 2018
  • DAM and RTM Price Convergence ndash July 2018
  • Day-Ahead Electricity and Ancillary Service Prices (Hourly Average) ndash July 2018
  • Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash July 2018
  • Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash July 2018
  • DRUC Monthly Summary (Hourly Average) ndash July 2018
  • HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash July 2018
  • NonndashSpinning Reserve Service Deployment ndash July 2018
  • CRR Price Convergence ndash July 2018
  • Daily Average System Lambda and ORDC Price Adders ndash July 2018
  • ERS Procurement for June 2018 ndash September 2018
  • Reliability Services ndash July 2018
  • Ancillary and Other Services ndash July 2018
  • Real-Time Ancillary Service Imbalance (ORDC) ndash July 2018
  • Energy Settlement ndash July 2018
  • Congestion Revenue Rights (CRR) ndash July 2018
  • CRR Balancing Account Fund ndash July 2018
  • Revenue Neutrality ndash July 2018
  • Net Allocation to Load ndash July 2018
  • Advanced Meter Settlement Impacts ndash July 2018
  • ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndash July 2018
  • Retail Transaction Volumes ndash Summary ndash July 2018
  • Retail Transaction Volumes ndash Summary ndash July 2018
  • Slide Number 48
  • ERCOT Portfolio Stoplight Report ndash July 2018
  • ERCOT Portfolio Stoplight Report ndash July 2018
  • ERCOT Portfolio Stoplight Report ndash July 2018
  • ERCOT Portfolio Stoplight Report ndash July 2018
  • ERCOT Portfolio Stoplight Report ndash July 2018
Page 51: ERCOT Monthly Operational Overvie · ERCOT Monthly Operational Overview (July 2018) Revised 08.22.18. ERCOT Public. August 15, 2018

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018Project Number Projects in Execution Phase (Count = 42) Phase Start Baseline Go-

Live DateApproved Go-

Live DateScheduled

Go-Live DateScheduled

Phase Finish

NPRR741 Clarifications to TPE and EAL Credit Exposure Calculations 3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

NPRR749 Option Cost for Outstanding CRRs 882018 12132018 12132018 12132018 TBD 0 NA See 2015 CMM NPRRs

NPRR755 Data Agent-Only QSE Registration 3152017 5192018 12112018 12112018 12312018 0 NA See 2015 CMM NPRRs

NPRR819Modification of Non-Price Error Resettlement Thresholds and Resettlement Clean-Ups

592018 892018 892018 892018 952018 0 36

NPRR833 Modify PTP Obligation Bid Clearing Change 882018 12132018 12132018 12132018 TBD 0 1

NPRR843Short-Term System Adequacy and AS Offer Disclosure Reports Additions

7182018 10252018 10252018 10252018 11282018 0 0

NPRR864 RUC Modifications to Consider Market-Based Solutions 6202018 10252018 10252018 10252018 11282018 0 4SCR777 Bilateral CRR Interface Enhancement 10262016 1022017 11192018 11192018 2272019 0 NA See 181-01

SCR781 RARF Replacement 12202017 4252018 12192018 12192018 12192018 0 3SCR791 Correction of 60-day SCED GRD Disclosure Report 522018 892018 892018 892018 952018 0 39SCR795 Addition of Intra-Hour Wind Forecast to GTBD Calculation 882018 10252018 10252018 10252018 11142018 0 0

Project Number Expedited Projects in Execution (Count = 34)

Project Number Projects in Stabilization (Count = 10) Execution

Phase StartBaseline Go-Live Target

Approved Go-Live Target

ActualGo-Live Date

Scheduled Execution Phase

Finish

NPRR648 Remove References to Flowgate Rights 3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR683 Revision to Available Credit Limit Calculation 3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR743 Revision to MCE to Have a Floor For Load Exposure 3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR760 Calculation of Exposure Variables For Days With No Activity 3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR776 Voltage Set Point Communication 9202017 3192018 452018 452018 952018 0 1

NPRR800Revisions to Credit Exposure Calculations to Use Electricity Futures Market Prices

3152017 5192018 5192018 262018 12312018 23 NA See 2015 CMM NPRRs

NPRR815Revise the Limitation of Load Resources Providing Responsive Reserve (RRS) Service

3212018 5312018 5312018 5312018 8292018 0 2

209-01 Multi Station Breaker to Breaker One Lines 282017 392018 532018 532018 8222018 0 -1259-01 DC SCADA and Metering Upgrade 10252017 1172018 7252018 7252018 8292018 0 22266-01 Remote Email Access Enhancement 12132017 372018 662018 6192018 9262018 2 -7 2 -9

Schedule Health Budget Health

Budget HealthSchedule Health

51

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018

Project Number Projects On Hold (Count = 2) Forecast

Start DateBaseline

Phase FinishApproved Go-

Live TargetScheduled

Go-Live DateScheduled

Phase Finish

SCR789 Update NMMS Topology Processor to PSSE 34 Capability 0

269-01Document Repository Redesign and Governance Implementation - Phase 1

0

Project Number Projects Completed (Count = 20)

Baseline Execution

Phase Start

Baseline Go-Live Target

Approved Go-Live Target

Actual Go-Live Date

Actual Execution Phase Finish

185-01 Records Management and eDiscovery 12152016 5242017 8292017 8222017 12132017 2 0224-01 TelAlert Replacement 452017 6272017 842017 842017 592018 0 5230-01 SAS Technical Architecture Redesign 312017 12132017 12132017 12132017 6272018 0 2234-01 Reporting Solution Resiliency (RSR) 452017 8232017 11272017 11272017 1102018 0 8240-01 EDI Translator and Mapping Replacement Assessment 4192017 9272017 2282018 TBD 372018 -2 20254-01 Retail Windows Upgrade 10112017 12182017 12182017 1222018 272018 1 -51 65255-01 Settlements Architecture Enhancements 10252017 1112018 1112018 1192018 2142018 1 -10 53258-01 WD Kainos SMART Automation Testing Tool 4112018 642018 642018 662018 7182018 -3 33271-01 Issue Tracking and Resolution Tool Assessment 12132017 4252018 4252018 TBD 522018 1 -5 -1272-01 Operator Training Simulator Black Start GE Effort 1262017 4252018 4252018 4272018 5162018 -1 19274-01 Average Mid-Term Load Forecast 372018 5312018 5312018 5312018 6272018 0 50

NPRR768Revisions to Real-Time On-Line Reliability Deployment Price Adder Categories

372018 5312018 5312018 5312018 6272018 0 16

NPRR778 Modifications to Date Change and Cancellation Evaluation Window 7192017 10292017 12112017 12112017 1312018 0 23

NPRR782Settlement of Infeasible Ancillary Services Due to Transmission Constraints

5242017 8312017 1122017 1122017 1102018 0 20

NPRR808 Three Year CRR Auction 8232017 9182017 9182017 912017 1312018 65 68

NPRR810Applicability of RMR Incentive Factor on Reservation and Transportation Costs Associated with Firm Fuel Supplies

7172017 11122017 3312018 3312018 3312018 0 NA See 233-00

NPRR830 Revision of 4-Coincident Peak Methodology 12132017 262018 262018 262018 372018 0 85

NPRR831 Inclusion of Private Use Networks in Load Zone Price Calculations 822017 1122017 1122017 1122017 2212018 0 33

OBDRR002 ORDC OBD Revisions for PUCT Project 47199 372018 5312018 5312018 5312018 6272018 0 See NPRR768

SCR792 Enhance Communications of BAAL Exceedances 2142018 452018 452018 452018 4252018 0 69

Project Number Expedited Projects Completed (Count = 23)

Budget HealthSchedule Health

Budget HealthSchedule Health

52

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018

Project Number 2018 Projects Not Yet Started (Count = 10) Forecast

Start Date

NPRR858 Provide Complete Current Operating Plan (COP) Data Aug-2018TBD 2018 OS Enhancements Aug-2018TBD Additional Branch Limit for Relays Aug-2018

NPRR817 Create a Panhandle Hub Sep-2018NPRR821 Elimination of the CRR Deration Process Oct-2018NPRR865 Publish RTM Shift Factors for Hubs Load Zones and DC Ties Oct-2018

SCR793SSR Related Telemetry for Transmission Service Provider (TSP) Operators

Oct-2018

ECAP ECAP - ECMS Implementation Phase 2 Oct-2018TBD Job Scheduler Update in CSI Framework Oct-2018TBD Parameter Estimation Oct-2018

53

  • Slide Number 1
  • Slide Number 2
  • Summary ndash July 2018
  • Daily Peak Demand Hourly Average Actual vs Forecast Wind Day-Ahead COPs amp On-Line Capacity at Peak ndash July 2018
  • Actual Wind Output plus Curtailments vs Wind Day-Ahead COPs for All Hours ndash July 2018
  • ERCOTrsquos CPS1 Monthly Performance ndash July 2018
  • Monthly Peak Actual Demand ndash July 2018
  • Monthly Minimum Actual 15-Minute Demand ndash July 2018
  • Day-Ahead Load Forecast Performance ndash July 2018
  • Reliability Unit Commitment (RUC) Capacity by Weather Zone ndash July 2018
  • Generic Transmission Constraints (GTCs) ndash July 2018
  • Advisories and Watches ndash July 2018 Corrected
  • Lake Levels Update ndash August 1 2018
  • Planning Summary ndash July 2018
  • Mapping of Counties to ERCOT Zones ndash July 2018
  • Cumulative MW Capacity of Interconnection Requests by Zone ndashJuly 2018
  • Cumulative MW Capacity of Interconnection Requests by Zone ndashJuly 2018
  • Cumulative MW Capacity of Interconnection Requests by Zone ndashJuly 2018
  • Wind Generation ndash July 2018
  • Solar Generation ndash July 2018
  • Generation Interconnection Activity by Fuel ndash July 2018
  • Generation Interconnection Activity by Project Phase ndash July 2018
  • Slide Number 23
  • Day-Ahead Schedule (Hourly Average) ndash July 2018
  • Percentage of Real-Time Load Hedged in the DAM (Counter-Party Level) ndash July 2018
  • DAM and RTM Price Convergence ndash July 2018
  • Day-Ahead Electricity and Ancillary Service Prices (Hourly Average) ndash July 2018
  • Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash July 2018
  • Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash July 2018
  • DRUC Monthly Summary (Hourly Average) ndash July 2018
  • HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash July 2018
  • NonndashSpinning Reserve Service Deployment ndash July 2018
  • CRR Price Convergence ndash July 2018
  • Daily Average System Lambda and ORDC Price Adders ndash July 2018
  • ERS Procurement for June 2018 ndash September 2018
  • Reliability Services ndash July 2018
  • Ancillary and Other Services ndash July 2018
  • Real-Time Ancillary Service Imbalance (ORDC) ndash July 2018
  • Energy Settlement ndash July 2018
  • Congestion Revenue Rights (CRR) ndash July 2018
  • CRR Balancing Account Fund ndash July 2018
  • Revenue Neutrality ndash July 2018
  • Net Allocation to Load ndash July 2018
  • Advanced Meter Settlement Impacts ndash July 2018
  • ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndash July 2018
  • Retail Transaction Volumes ndash Summary ndash July 2018
  • Retail Transaction Volumes ndash Summary ndash July 2018
  • Slide Number 48
  • ERCOT Portfolio Stoplight Report ndash July 2018
  • ERCOT Portfolio Stoplight Report ndash July 2018
  • ERCOT Portfolio Stoplight Report ndash July 2018
  • ERCOT Portfolio Stoplight Report ndash July 2018
  • ERCOT Portfolio Stoplight Report ndash July 2018
Page 52: ERCOT Monthly Operational Overvie · ERCOT Monthly Operational Overview (July 2018) Revised 08.22.18. ERCOT Public. August 15, 2018

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018

Project Number Projects On Hold (Count = 2) Forecast

Start DateBaseline

Phase FinishApproved Go-

Live TargetScheduled

Go-Live DateScheduled

Phase Finish

SCR789 Update NMMS Topology Processor to PSSE 34 Capability 0

269-01Document Repository Redesign and Governance Implementation - Phase 1

0

Project Number Projects Completed (Count = 20)

Baseline Execution

Phase Start

Baseline Go-Live Target

Approved Go-Live Target

Actual Go-Live Date

Actual Execution Phase Finish

185-01 Records Management and eDiscovery 12152016 5242017 8292017 8222017 12132017 2 0224-01 TelAlert Replacement 452017 6272017 842017 842017 592018 0 5230-01 SAS Technical Architecture Redesign 312017 12132017 12132017 12132017 6272018 0 2234-01 Reporting Solution Resiliency (RSR) 452017 8232017 11272017 11272017 1102018 0 8240-01 EDI Translator and Mapping Replacement Assessment 4192017 9272017 2282018 TBD 372018 -2 20254-01 Retail Windows Upgrade 10112017 12182017 12182017 1222018 272018 1 -51 65255-01 Settlements Architecture Enhancements 10252017 1112018 1112018 1192018 2142018 1 -10 53258-01 WD Kainos SMART Automation Testing Tool 4112018 642018 642018 662018 7182018 -3 33271-01 Issue Tracking and Resolution Tool Assessment 12132017 4252018 4252018 TBD 522018 1 -5 -1272-01 Operator Training Simulator Black Start GE Effort 1262017 4252018 4252018 4272018 5162018 -1 19274-01 Average Mid-Term Load Forecast 372018 5312018 5312018 5312018 6272018 0 50

NPRR768Revisions to Real-Time On-Line Reliability Deployment Price Adder Categories

372018 5312018 5312018 5312018 6272018 0 16

NPRR778 Modifications to Date Change and Cancellation Evaluation Window 7192017 10292017 12112017 12112017 1312018 0 23

NPRR782Settlement of Infeasible Ancillary Services Due to Transmission Constraints

5242017 8312017 1122017 1122017 1102018 0 20

NPRR808 Three Year CRR Auction 8232017 9182017 9182017 912017 1312018 65 68

NPRR810Applicability of RMR Incentive Factor on Reservation and Transportation Costs Associated with Firm Fuel Supplies

7172017 11122017 3312018 3312018 3312018 0 NA See 233-00

NPRR830 Revision of 4-Coincident Peak Methodology 12132017 262018 262018 262018 372018 0 85

NPRR831 Inclusion of Private Use Networks in Load Zone Price Calculations 822017 1122017 1122017 1122017 2212018 0 33

OBDRR002 ORDC OBD Revisions for PUCT Project 47199 372018 5312018 5312018 5312018 6272018 0 See NPRR768

SCR792 Enhance Communications of BAAL Exceedances 2142018 452018 452018 452018 4252018 0 69

Project Number Expedited Projects Completed (Count = 23)

Budget HealthSchedule Health

Budget HealthSchedule Health

52

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018

Project Number 2018 Projects Not Yet Started (Count = 10) Forecast

Start Date

NPRR858 Provide Complete Current Operating Plan (COP) Data Aug-2018TBD 2018 OS Enhancements Aug-2018TBD Additional Branch Limit for Relays Aug-2018

NPRR817 Create a Panhandle Hub Sep-2018NPRR821 Elimination of the CRR Deration Process Oct-2018NPRR865 Publish RTM Shift Factors for Hubs Load Zones and DC Ties Oct-2018

SCR793SSR Related Telemetry for Transmission Service Provider (TSP) Operators

Oct-2018

ECAP ECAP - ECMS Implementation Phase 2 Oct-2018TBD Job Scheduler Update in CSI Framework Oct-2018TBD Parameter Estimation Oct-2018

53

  • Slide Number 1
  • Slide Number 2
  • Summary ndash July 2018
  • Daily Peak Demand Hourly Average Actual vs Forecast Wind Day-Ahead COPs amp On-Line Capacity at Peak ndash July 2018
  • Actual Wind Output plus Curtailments vs Wind Day-Ahead COPs for All Hours ndash July 2018
  • ERCOTrsquos CPS1 Monthly Performance ndash July 2018
  • Monthly Peak Actual Demand ndash July 2018
  • Monthly Minimum Actual 15-Minute Demand ndash July 2018
  • Day-Ahead Load Forecast Performance ndash July 2018
  • Reliability Unit Commitment (RUC) Capacity by Weather Zone ndash July 2018
  • Generic Transmission Constraints (GTCs) ndash July 2018
  • Advisories and Watches ndash July 2018 Corrected
  • Lake Levels Update ndash August 1 2018
  • Planning Summary ndash July 2018
  • Mapping of Counties to ERCOT Zones ndash July 2018
  • Cumulative MW Capacity of Interconnection Requests by Zone ndashJuly 2018
  • Cumulative MW Capacity of Interconnection Requests by Zone ndashJuly 2018
  • Cumulative MW Capacity of Interconnection Requests by Zone ndashJuly 2018
  • Wind Generation ndash July 2018
  • Solar Generation ndash July 2018
  • Generation Interconnection Activity by Fuel ndash July 2018
  • Generation Interconnection Activity by Project Phase ndash July 2018
  • Slide Number 23
  • Day-Ahead Schedule (Hourly Average) ndash July 2018
  • Percentage of Real-Time Load Hedged in the DAM (Counter-Party Level) ndash July 2018
  • DAM and RTM Price Convergence ndash July 2018
  • Day-Ahead Electricity and Ancillary Service Prices (Hourly Average) ndash July 2018
  • Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash July 2018
  • Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash July 2018
  • DRUC Monthly Summary (Hourly Average) ndash July 2018
  • HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash July 2018
  • NonndashSpinning Reserve Service Deployment ndash July 2018
  • CRR Price Convergence ndash July 2018
  • Daily Average System Lambda and ORDC Price Adders ndash July 2018
  • ERS Procurement for June 2018 ndash September 2018
  • Reliability Services ndash July 2018
  • Ancillary and Other Services ndash July 2018
  • Real-Time Ancillary Service Imbalance (ORDC) ndash July 2018
  • Energy Settlement ndash July 2018
  • Congestion Revenue Rights (CRR) ndash July 2018
  • CRR Balancing Account Fund ndash July 2018
  • Revenue Neutrality ndash July 2018
  • Net Allocation to Load ndash July 2018
  • Advanced Meter Settlement Impacts ndash July 2018
  • ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndash July 2018
  • Retail Transaction Volumes ndash Summary ndash July 2018
  • Retail Transaction Volumes ndash Summary ndash July 2018
  • Slide Number 48
  • ERCOT Portfolio Stoplight Report ndash July 2018
  • ERCOT Portfolio Stoplight Report ndash July 2018
  • ERCOT Portfolio Stoplight Report ndash July 2018
  • ERCOT Portfolio Stoplight Report ndash July 2018
  • ERCOT Portfolio Stoplight Report ndash July 2018
Page 53: ERCOT Monthly Operational Overvie · ERCOT Monthly Operational Overview (July 2018) Revised 08.22.18. ERCOT Public. August 15, 2018

PUBLIC

ERCOT Portfolio Stoplight Report ndash July 2018

Project Number 2018 Projects Not Yet Started (Count = 10) Forecast

Start Date

NPRR858 Provide Complete Current Operating Plan (COP) Data Aug-2018TBD 2018 OS Enhancements Aug-2018TBD Additional Branch Limit for Relays Aug-2018

NPRR817 Create a Panhandle Hub Sep-2018NPRR821 Elimination of the CRR Deration Process Oct-2018NPRR865 Publish RTM Shift Factors for Hubs Load Zones and DC Ties Oct-2018

SCR793SSR Related Telemetry for Transmission Service Provider (TSP) Operators

Oct-2018

ECAP ECAP - ECMS Implementation Phase 2 Oct-2018TBD Job Scheduler Update in CSI Framework Oct-2018TBD Parameter Estimation Oct-2018

53

  • Slide Number 1
  • Slide Number 2
  • Summary ndash July 2018
  • Daily Peak Demand Hourly Average Actual vs Forecast Wind Day-Ahead COPs amp On-Line Capacity at Peak ndash July 2018
  • Actual Wind Output plus Curtailments vs Wind Day-Ahead COPs for All Hours ndash July 2018
  • ERCOTrsquos CPS1 Monthly Performance ndash July 2018
  • Monthly Peak Actual Demand ndash July 2018
  • Monthly Minimum Actual 15-Minute Demand ndash July 2018
  • Day-Ahead Load Forecast Performance ndash July 2018
  • Reliability Unit Commitment (RUC) Capacity by Weather Zone ndash July 2018
  • Generic Transmission Constraints (GTCs) ndash July 2018
  • Advisories and Watches ndash July 2018 Corrected
  • Lake Levels Update ndash August 1 2018
  • Planning Summary ndash July 2018
  • Mapping of Counties to ERCOT Zones ndash July 2018
  • Cumulative MW Capacity of Interconnection Requests by Zone ndashJuly 2018
  • Cumulative MW Capacity of Interconnection Requests by Zone ndashJuly 2018
  • Cumulative MW Capacity of Interconnection Requests by Zone ndashJuly 2018
  • Wind Generation ndash July 2018
  • Solar Generation ndash July 2018
  • Generation Interconnection Activity by Fuel ndash July 2018
  • Generation Interconnection Activity by Project Phase ndash July 2018
  • Slide Number 23
  • Day-Ahead Schedule (Hourly Average) ndash July 2018
  • Percentage of Real-Time Load Hedged in the DAM (Counter-Party Level) ndash July 2018
  • DAM and RTM Price Convergence ndash July 2018
  • Day-Ahead Electricity and Ancillary Service Prices (Hourly Average) ndash July 2018
  • Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash July 2018
  • Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash July 2018
  • DRUC Monthly Summary (Hourly Average) ndash July 2018
  • HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash July 2018
  • NonndashSpinning Reserve Service Deployment ndash July 2018
  • CRR Price Convergence ndash July 2018
  • Daily Average System Lambda and ORDC Price Adders ndash July 2018
  • ERS Procurement for June 2018 ndash September 2018
  • Reliability Services ndash July 2018
  • Ancillary and Other Services ndash July 2018
  • Real-Time Ancillary Service Imbalance (ORDC) ndash July 2018
  • Energy Settlement ndash July 2018
  • Congestion Revenue Rights (CRR) ndash July 2018
  • CRR Balancing Account Fund ndash July 2018
  • Revenue Neutrality ndash July 2018
  • Net Allocation to Load ndash July 2018
  • Advanced Meter Settlement Impacts ndash July 2018
  • ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndash July 2018
  • Retail Transaction Volumes ndash Summary ndash July 2018
  • Retail Transaction Volumes ndash Summary ndash July 2018
  • Slide Number 48
  • ERCOT Portfolio Stoplight Report ndash July 2018
  • ERCOT Portfolio Stoplight Report ndash July 2018
  • ERCOT Portfolio Stoplight Report ndash July 2018
  • ERCOT Portfolio Stoplight Report ndash July 2018
  • ERCOT Portfolio Stoplight Report ndash July 2018