DY-1-5 plastic pyrolysis plant of Doing Group
DY-1-5 plastic pyrolysis plant
Place of Origin Henan, China (Mainland)Brand Name DOING
Model Number DY-1-5
type plastic pyrolysis plant
land require 200 sqm
weight 25 tons
length 5500mm
colour according to customersrequest
modal 5 tons
diameter 2200mm
one batch time 16 hours
welder aoto-welding
Price: FOB USD 35000.00~70000.00 / Set
http://www.doinggroup.com/index.php?u=show-69.htmlhttp://www.doinggroup.com/index.php?u=show-69.htmlhttp://www.doinggroup.com/index.php?u=show-69.html -
8/13/2019 DY-1-5 Plastic Pyrolysis Plant of Doing Group
2/3
Henan DOING Mechanical Equipment Co.,ltd
Building 18, Area A, Yingxie Garden, Yingxie Road, Jinshui District, Zhengzhou, Henan Province, China
TEL: +86-371-56771821 +86-371-56771823 FAX: +86-371-86129922
E-mail: [email protected] Website: http://www.doinggroup.com/ 2
Minimum Order Quantity: 1 Set/Sets
Port: Qingdao/Tianjin
Packaging Details: according to customersrequest
Delivery Time: 20 days after deposit
Payment Terms: T/T, Western Union
Supply Ability: 10 Set/Sets per Month
1. Overview of DY-1-5 plastic pyrolysis plantDY-1-5 plastic pyrolysis plant is composed by 13 parts, which are reactor, trans
mission device, catalytic chamber, cooling tube, heavy oil tank, oil-water separa
tor, condenser, light oil tank, safety device, vacuum system, dedusting system, dr
aft fan, chimney.
The two keys of DY-1-5 plastic pyrolysis plant are reactor and cooling system.
Reactor directly decides the machinessafety and service life. It is made by wel
ded steel plate. So the quality of welding will have a direct impact on safety and servi
ce life. Therefore, we use automatic welding machine, X rays detection and heating tr
eatment which will not only guarantee the quality of welding but also greatly improv
e working efficiency.
For cooling systems, there are two steps. Cooling pipe is the first step. The second is c
ondenser. We have three condensers. And there are 57 pipes in one condenser. Diamet
er is 48mm for one small pipe. The heat exchanging area is about 13square meters fo
r one condenser. So the total cooling area is about 40 square meters, which will guara
ntee you a high oil yield.
2.Main features of DY-1-5 plastic pyrolysis plant:
Safety:
A With an auto welding machine for the reactor, it can not only greatly improv
e working efficiency but also guarantee the quality of welding seam, thus avoid explosion caused by gas leak.
-
8/13/2019 DY-1-5 Plastic Pyrolysis Plant of Doing Group
3/3
Henan DOING Mechanical Equipment Co.,ltd
Building 18, Area A, Yingxie Garden, Yingxie Road, Jinshui District, Zhengzhou, Henan Province, China
TEL: +86-371-56771821 +86-371-56771823 FAX: +86-371-86129922
E-mail: [email protected] Website: http://www.doinggroup.com/ 3
B Professional heating treatment and x-ray detection chamber are especially fo
r welding.
C Vacuum system will prevent oil gas from going back to reactor and causing ac
cident.
D. Professional thermometer, pressure gauge and safety valve.
E It is dangerous to burn exhaust gas (C1 to C4) without any safety measures. I
n our process, it is transferred first through the safety device and a safety burnin
g air muzzle. Before burning, we should ensure the safety of production.
Environment friendly:
A Well water dedusting system can avoid black smoke.
B The exhaust gas will be recycled for heating reactor, no gas pollution.
C Every junction of the reactor is in good sealing situation with professional seal
ing material.
Long service life:
A Material: Q245R special steel plate, thickness 14mm.
B Welding: Automatic welding machine with heating treatment and x-ray detecti
on will prolong the service life of reactor to the max.
C The service life of the reactor will be 8 -10 years
Energy saving:
A. Well sealing for heating system, no gas leak and saving fuel.
B The exhaust gas will be recycled for reactor heating.